EFFECT OF GAS-OIL-RATIO ON OIL PRODUCTION MASTER OF SCIENCE

Size: px
Start display at page:

Download "EFFECT OF GAS-OIL-RATIO ON OIL PRODUCTION MASTER OF SCIENCE"

Transcription

1 EFFECT OF GAS-OIL-RATIO ON OIL PRODUCTION A THESIS Presented to the Faculty of the African University of Science and Technology in Partial Fulfilment of the Requirements for the Degree of MASTER OF SCIENCE By PARKER, Ebenezer Sekyi Abuja, Nigeria November, 2010

2 ABSTRACT Maximum production from an oil well can be achieved through proper selection of tubing size. The selection of optimum tubing size must be evaluated when completing a well in any type of reservoir especially solution gas drive reservoir since there is likelihood of producing more gas as the reservoir pressure declines. The most widely used methods such as Tarner, Muskat and Tracy methods for predicting the performance of a solution gas drive reservoir were discussed and used to estimate the behaviour of producing GOR. A comparison was made between the results from each method. System analysis approach was adopted for this study. The future IPR curves were determined by a combination of Vogel and Fetkovich correlation. Beggs and Brill multiphase spreadsheet was used to produce the TPR curves by estimating flowing bottomhole pressure for several tubing size using the predicted GOR produced and a range of flowrates. The effect of water production was also considered in this study. The results showed that for IPR5 as GOR increased from 1052 to 1453 scf/stb, oil production rate for 2 7/8-in increased by 17.6% and 3.3% for a further increase in GOR at 2610 scf/stb. At a GOR of 2610 scf/stb oil production decreased by 3.17% at water-cut of 5% and 9.5% at water-cut of 25%. All things being equal, the percentage reduction in production reduces as GOR increases from 2610 to 5635 scf/stb for all the tubing sizes used. i

3 ACKNOWLEDGEMENT I thank the Almighty God for giving me the strength and ability to complete my master programme successfully. I would also like to thank the members of my graduate committee for their earnest contribution, support and time. I would like to acknowledge the advice, supervision, guidance and financial support of Professor Dulu Appah throughout my entire work. I thank the African University of Science and Technology for providing and making available the necessary facilities which facilitated my research with much less stress. Finally, I would like to thank my parents, Mr and Mrs Parker and my siblings, Adelaide, Benjamin and Nancy for their unceasing prayers and encouragement. ii

4 TABLE OF CONTENTS Content Page ABSTRACT... i ACKNOWLEDGEMENT... ii TABLE OF CONTENTS... iii LIST OF FIGURES... v LIST OF TABLES... vi CHAPTER INTRODUCTION Vertical Lift Problems relating to tubing Pressure Drop across Production System Inflow Performance Relationship Single Phase Inflow Performance Two Phase Inflow Performance Relationship Construction of IPR using Test Points Future inflow performance relationship for an oil well Tubing Performance Relationship Behaviour of Produced GOR Statement of Problem Objectives Methodology CHAPTER LITERATURE REVIEW Overview of System Analysis Approach Applications of System Analysis Approach iii

5 2.3 Optimization Approach CHAPTER METHODOLOGY Prediction of produced GOR Tarner s method Tracy s Method Muskat Method Future inflow performance relationship (IPR) for an oil well Construction of TPR curves CHAPTER RESULTS AND DISCUSSION Results Discussion Behaviour of Tubing curves at LGOR Behaviour of Tubing curves at HGOR Production profile of the various tubing sizes Effect of water cut in HGOR condition CHAPTER CONCLUSION AND RECOMMENDATION CONCLUSION RECOMMENDATION APPENDIX A APPENDIX B NOMENCLATURE REFERENCES iv

6 LIST OF FIGURES Page Figure 1.1 Pressure Losses in a Simple Production System Figure 2.1 Node flow rate and pressure Figure 4.1 Variation of GOR with Pressure using Tracy, Tarner and Muskat Methods Figure 4.2 GLR vrs GOR at varying water cut ratios. (Tracy s method) Figure 4.3 GLR vrs GOR at varying water cut ratios. (Tarner s Method) Figure 4.4 GLR vrs GOR at varying water cut ratios. (Muskat s Method) Figure 4.5 Variation of GOR with reservoir pressure Figure 4.6 Future Inflow Performance Relationships Curves Figure 4.7 Effect of tubing size on production rate at a constant GOR (840 scf/stb) Figure 4.8 Effect of tubing size on production rate at a constant GOR (1052 scf/stb) Figure 4.9 Effect of tubing size on production rate at a constant GOR (1453 scf/stb) Figure 4.10 Effect of tubing size on production rate at a constant GOR (2610 scf/stb) Figure 4.11 Effect of tubing size on production rate at a constant GOR (3444 scf/stb) Figure 4.12 Effect of tubing size on production rate at a constant GOR (5653 scf/stb) Figure 4.13 Production profile for 2 3/8-in tubing size Figure 4.14 Production profile for 2 7/8-in tubing size Figure 4.15 Production profile for 3 1/2-in tubing size Figure 4.16 Production profile for 4-in tubing size Figure 4.17 Effect of water cut on flowrate at a GOR of 2610 scf/stb Figure 4.18 Effect of water cut on flowrate at a GOR of 3444 scf/stb Figure 4.19 Effect of water cut on flowrate at a GOR of 5635 scf/stb Figure A.1 Log-log graph of K ro vrs S g Figure A.2 Log-Log graph of K rg vrs S g Figure B.2 Variation of pressure and instantaneous GOR calculated by Tarner smethod Figure B.4 Variation of pressure and instantaneous GOR calculated by Muskat method v

7 LIST OF TABLES Page Table 4.2a Available PVT Data for predicting oil reservoir performance Table 4.2b Data generated from PVT data in table 4.2a Table 4.2c Continuation of Data generated from PVT data in table 4.2b Table 4.3a Operating point for various tubing diameters at a GOR of 840 scf/stb Table 4.3b Operating point for various tubing diameters at a GOR of 1052 scf/stb Table 4.3c Operating point for various tubing diameters at a GOR of 1453 scf/stb Table 4.3d Operating point for various tubing diameters at a GOR of 2610 scf/stb Table 4.3f Operating point for various tubing diameters at a GOR of 5635 scf/stb Table 4.4a Variation in production rate and pressure with GOR range of scf/stb Table 4.4b Variation in production rate and Pressure with GOR range of scf/stb Table 4.4c Variation in production rate and Pressure with GOR range of scf/stb Table 4.4d Variation in production rate and pressure with GOR range of scf/stb Table B.1 Data generated from PVT data in table 4.2a using Tarner method Table B.3a Data generated from PVT data in table 4.2a using Muskat method Table B.3b Continuation of data generated from PVT data in table B.3a vi

8 CHAPTER 1 INTRODUCTION Production optimization identifies the opportunities to increase production and reduce operating costs. The overall goal is to achieve the optimum profitability from the well. To achieve and maintain this, it is essential to evaluate and monitor different sections of the production system including, the wellbore sandface, reservoir, produced fluids, production equipment on surface and downhole. Several methods are being used for production optimization. The most common and widely used method is the system analysis approach commonly known as nodal analysis. Optimization of the wellbore is considered mainly during well completion stages. Tubing joints vary in length from 18 to 35 feet although the average tubing joint is approximately 30 feet. Tubing is available in a range of outer diameter sizes. The most common sizes are 2 3/8-in, 2 7/8-in, 3 1/2-in and 4 1/2-in. The API defines tubing as pipe from 1-in to 4 1/2-in OD. Larger diameter tubulars (4 1/2-in to 20-in) are being termed casing. (Schlumberger, 2001) The flow rate per well is the key parameter. It governs the number of wells that need to be drilled to achieve the optimum economic output of the field. The first parameter that needs to be considered in the tubing string selection is the nominal tubing diameter. The grades of steel and nominal weight are chosen based on the stress the tubing will have to withstand during production. Thirdly, depending on the how corrosive the existing and future effluents, the type of connection and the metallurgy are selected. In fact the different stages mentioned above overlap and sometimes make the choice of tubing a difficult job. In the determination of the nominal pipe diameter, the nominal diameter through the weight governs the inside through diameter of the pipe. The flows that can pass through it depend on the acceptable pressure losses but are also limited by two parameters: the maximum flow rate corresponding to the erosion velocity and the minimum flow rate necessary to achieve lifting of water or condensate. Tubings with diameter less than 2 7/8-in are mostly reserved for operations on well using concentric pipe and are termed macronic string. Note also that the space required by couplings of the tubing limits the nominal tubing diameter that can be run into the production casing. (Perrin, et al., 1999) 1

9 1.1 Vertical Lift Problems relating to tubing In lieu of the usefulness of tubing strings in oil and gas production, it can have some limitations. Tubing wear occurs most often in pumping wells. It depends little upon whether the hole is vertical or slanting, but it is much worse in dog-legged holes regardless of the deviation. It may either be external or internal. If external, it is usually the couplings which are affected and the cause is the rubbing against the inside of the casing in phase with the reversing strokes of the sucker rods. If the wear is internal, it is caused by the sucker rods. There can be leakage from the inside to the outside or vice versa. This can be attributed to the API thread shape used (the V- shaped or round thread shape.) The tubing string can be flattened from wall to wall by either having a higher hydrostatic pressure or as a result of diastrophic shifting of formation caused by an earthquake. Since some 90 percent of all oil-well tubing is upset design, practically all failures are in the body of the pipe. However, any tension failures are rare because tubing is almost always run inside of casing and except for occasional trouble of unseating packers; it seldom becomes stuck and therefore needs not be pulled on. As with upset casing, upset tubing will stretch before failing. The tubing will burst when the pressure inside the tubing string is higher than the pressure in that annulus. This tubing trouble is commonly seen in high pressure wells and can be exceeding serious. (Hexter, 1955) 2

10 1.2 Pressure Drop across Production System P wh 4 Gas Sales Line P sep STOCK TANK ΔP T P wf 2 P wfs 1 Figure 1.1 Pressure Losses in a Simple Production System. 3

11 Integrating the production system component helps to design a well completion or predict the production ratio properly. Since the tubing section in Figure 1.1 contributes to about 80% of the total pressure drop in the production system, much research should be carried out in that area in order to reduce the pressure drop. The pressure drops in the tubing section are mainly frictional pressure drop and hydrostatic pressure drop. The last pressure drop which is due to acceleration is usually neglected because it is negligible. The general pressure gradient equation for a vertical well is: (1.1) Equation (1.1) can be written as the composite of the three component as (1.2) Many correlations have been developed in the last 30 and 40 years for predicting two-phase flowing pressure gradient in producing wells. Due to the limitations and the availability of some for these correlations, Beggs and Brill was used for prediction in this study. (Beggs, 2003) The optimization process requires the knowledge of inflow performance relationship, the tubing performance relationship and the behaviour of the produced gas-oil-ratio. 1.3 Inflow Performance Relationship The inflow performance relationship of a well is a relationship between its producing bottomhole pressure and it corresponding production rates under a given reservoir condition. The preparations of inflow performance relationship curves for oil and gas wells are extremely important in production system analysis. Unless some idea of the productive capacity of a well can be established the design and optimization of the piping system of the well becomes difficult. 4

12 1.3.1 Single Phase Inflow Performance In a single phase liquid flow, the pressure is above the bubble point pressure. The inflow performance relationship is usually depicted by a straight line. The IPR equation for this phase is given as: (Clegg, 2007) (1.3) Two Phase Inflow Performance Relationship Solution gas escapes from the oil and becomes free gas when the reservoir pressure falls below the bubble point pressure. During this state of pressure decline, oil and gas (two phase flow) exists in the whole reservoir. The presence of free gas leads to reduced relative permeability and increased oil viscosity. The synergies of these two effects result in lower oil production rates. This makes the IPR curve deviate from linear trend below the bubble point pressure. The two main widely used empirical correlations for modeling IPR of two phase reservoir are; Vogel (1968) equation. (1.4) The can be theoretically estimated based on the reservoir pressure and productivity index above the bubble point pressure. (BOYUN, et al., 2007) The pseudo-steady state flow follows that (1.5) Fetkovich equation is written as (1.6) 5

13 Where n is an empirical constant related to Construction of IPR using Test Points Due the unavailability of reservoir parameters for the determining productivity index in the IPR model, test points are frequently used for constructing IPR curves. Constructing IPR curves using test points involves back calculation of the constant in the IPR model for single phase (under-saturated oil) reservoir. The model constant can be determined by using equation (1.3) Where is the tested production rate at tested flowing bottomhole pressure For a partial two-phase reservoir, the model constant in the generalized Vogel equation (equation 1.4) must be determined on the range of tested flowing bottomhole pressure. If the range of tested flowing bottomhole pressure is greater than bubble point pressure, the model constant should be determined by equation (1.3). (Boyun, 2007) If the tested flowing bottomhole pressure is less than bubble point pressure, the model constant J* should be determined using (1.7) 6

14 1.3.4 Future inflow performance relationship for an oil well For saturated conditions many approximate methods to simulate the effects of depletion on productivity index for saturated conditions. Usually those methods provide an equation relating changes in the productivity index J* as a function of reservoir average pressure. In essence the methods for future reservoir prediction express changes in J* as a function of changes in average reservoir pressure. In this study a combination of Fetkovich and Vogel equations were used to predict the future IPRs. (Prado, 2009) Fetkovich expressed changes in productivity index as a function of changes in average reservoir pressure as; (1.8) Fetkovich also expressed Absolute Open Flow (AOF) as a function of the average reservoir pressure. (1.9) For under-saturated conditions, when the bottom hole flowing pressure is higher than the bubble point pressure, the flow of fluids in the reservoir is single phase and the linear IPR is valid. (Prado, 2009) When the bottom hole flowing pressure is below the bubble point pressure, a modified parabolic equation is used for the IPR. (1.10) (1.11) 7

15 (1.12) Productivity index for the saturated part of the IPR is defined as: (1.13) (1.14) (1.15) 1.4 Tubing Performance Relationship A tubing performance may be defined as the behaviour of a well in giving up the reservoir fluids to the surface. The performance is commonly showed as a plot of flowrate versus bottomhole flowing pressure. This plot is called the tubing performance relationship (TPR). For a specified wellhead pressure, the TPR curves vary with diameter of the tubing. Also, for a given tubing size, the curves vary with wellhead pressure. For single-phase liquid flow, pressure loss in tubing can be determined using a simple fluid flow equation for vertical pipe, or using some graphical pressure loss correlations where available with GLR = 0. Tubing performance curves are used to determine the producing capacity of a well. By plotting IPR and TPR on the same graph paper, a stabilized maximum production rate of the well can be estimated. (Lyon, 2010) 1.5 Behaviour of Produced GOR Increasing GOR lightens the mixture density and thereby reduces the pressure loss due to hydrostatic forces. Larger gas quantities usually result in larger pressure losses due to friction. 8

16 The GOR is considered critical when the producing GOR is equal to or greater than three times the solution GOR (R si ), that is (GOR 3R si ) for producing oil well that is not on gas lift. (Slider, 1983) The relationship between GLR and GOR can be expressed as (1.16) The produced GOR is constant above the saturation pressure. However, once the gas saturation has reached a point that the free gas in the reservoir begins to flow, the behaviour of the gas-oil - ratio becomes more complicated. The produced gas-oil-ratio, R at any particular time is the ratio of the standard cubic feet of gas being produced at any time to stock-tank barrels of oil being produced at that same instant. (Slider, 1983) (1.17) The term can be expanded using the radial flow equation as: (1.18) Writing and in terms of the above equation applied at the wellbore with the rates corrected from reservoir volumes to scf and stb, respectively, yields an expression for reservoir flowing GOR and the produced GOR: (1.19) 9

17 (1.20) (1.21) The ratio of the effective permeabilities in the above equation is the same as the ratio of the relative permeabilities which is a function of the liquid saturation. In order to determine the relative permeability ratio and the produced gas oil ratio, it is necessary to evaluate the oil saturation corresponding to any cumulative oil production. (Slider, 1983) The oil saturation is the remaining reservoir barrels of oil in the reservoir,, divided by the reservoir pore volume in barrels. The pore volume can be determined from the initial oil saturation, and the original reservoir barrels of oil in the reservoir,. Thus the material balance expression for the oil saturation is written as: (1.22) 1.6 Statement of Problem The proper selection, design, and installation of tubing string are critical parts of any well completion. Tubing strings must be sized correctly to enable the fluids to flow efficiently or to permit installation of effective artificial lift equipment. The optimum tubing size is selected to obtain the desired production rates at the lowest capital and operating costs. This usually means at the maximum initial flow rate and maintaining it as long as possible. Whatever the case, the selection process inevitably involves analysis of the gross fluid deliverability and flow stability under changing reservoir conditions to confirm that the production forecast can be met. A tubing string that is too small causes large friction losses and limits production. It also may severely restrict the type and size of artificial lift equipment. A tubing string that is too large may 10

18 cause heading and unstable flow, which results in loading up of the well and can complicate workover operations. As previously mentioned, the changing conditions over the life of the well must be considered when selecting tubing size. These changes are normally declining reservoir pressure, increasing water cut and Gas Oil Ratio which will reduce flow rates. Water production is rarely observed in the early and mid-stages of production. However GOR production is likely to occur during the early stage as well as throughout the life of the well. High Gas Oil Ratio (HGOR) is a situation where the produced GOR is equal to or three times higher than the initial GOR. When this occurs it will lead to unstable flow and thus hinder production forecast. This trend is downwards towards cessation of flow and, obviously the tubing selected for the start of production will not be the optimum size after some period of time. 1.7 Objectives 1. To examine the effect of Low and High GOR on tubing performance. 2. To identify the critical points beyond which production begins to decline. 3. To observe the effect of water production at HGOR condition on production rate. 1.8 Methodology 1. Generation of GOR profile with respect to decreasing reservoir pressure. 2. Sensitivity Analysis (based on the GOR profile). 3. Determination of critical point of GOR. 4. Analysis of the effect of water production at HGOR condition on oil flowrate. 11

19 2.1 Overview of System Analysis Approach CHAPTER 2 LITERATURE REVIEW Systems analysis, which has been applied to many types of systems of interacting components, consists of selecting a point or node within the producing system (well and surface facilities). Equations for the relationship between flow rate and pressure drop are then developed for the well components both upstream of the node (inflow) and downstream (outflow). The flow rate and pressure at the node can be calculated since flow into the node equals flow out of the node and only one pressure can exist at the node. Furthermore, at any time, the pressures at the end points of the system (separator and reservoir pressure) are both fixed. Thus: P R - (Pressure loss upstream components) = P node (2.1) P sep + (Pressure loss downstream components) = P node (2.2) Figure 2.1 Node flow rate and pressure 12

20 Typical results of such an analysis are shown in Figure 2.1 where the pressure-rate relationship has been plotted for both the inflow (Equation 2.1) and outflow (Equation 2.2) at the node. The intersection of these two lines is the (normally unique) operating point. This defines the pressure and rate at the node. This approach forms the basis of all hand and computerized flow calculation procedures. It is frequently referred to as Nodal analysis. 2.2 Applications of System Analysis Approach The use of systems analysis to design a hydrocarbon production system was first suggested by Gilbert (1954). Gilbert performed a sensitivity analysis to determine an approximate solution for natural flow and gas-lift problems for 1.9-in, 2 3/8-in, in and 3 1/2-in API tubing sizes and crude oils with API gravity ranging from 25 to 40 API. He also explains the hydraulics of natural flow as well as summarizing the methods for estimating individual well capabilities using the same set of API tubing sizes. The author has prepared a very useful tool for the solution of problems relative to flow of oil, gas, and water in a tubing string. Brown and Lea run a production optimization using a computerized well model. This computerized well model has contributed to improving completion techniques, for better efficiency and higher production with many wells. The optimization was carried out for gravel packed well as well as perforated wells. Tubings were evaluated for a well to gravel packed. The IPR curve was prepared using Darcy s law including the additional turbulence pressure drops. The Gulf Coast well was considered for this experiment. Tubing sizes of 2 7/8-in 3 1/2-in and 4 1/2-in are evaluated at the wellhead pressure of 1200 psi needed to flow gas into the sales lines. From the analysis 4 ½-in tubing is selected. For the perforated well a sample oil well with low GOR, a low bubblepoint pressure, and assumed single-phase liquid flow across the completion was analyzed. The reason for this selection is that current technology has offered solutions only for single-phase flow across such completions. When two-phase flow occurs across a gravel-packed or a standard perforated well, relative permeability effects must be considered. The IPR curve was prepared with Darcy s law, 13

21 assuming no pressure drop across the completion. Tubing performance curve was plotted for 2 3/8-in, 2 7/8-in and 3 1/2-in- -in tubing. Assuming 3 1/2-in-in tubing is selected, transfer it pressure drop curve. Using the appropriated equations from Mcleod and as discussed by Brown et al., the pressure drops across the available completions were determined. A final plot is constructed to show the importance of perforating underbalanced. Rafiqul Awal et al develop a new nodal analysis technique which helps improve well completion of matured oil field. They proposed the use of a simple, tapered tubing string completion (using larger internal diameter ID tubing pipes in the upper sections) that can be customized for specific reservoirs. They employed nodal analysis technique to develop an equivalent tubing diameter (ETD) concept. The ETD allow for comparing the well performance for single ID tubing. The procedure also seeks an optimum length for the larger tubing ID in the upper section. This method had limitations as it was suitable for wells with moderate to high open flow potential. It is suited for low GOR wells with high future water-cut. The technique was to reduce or eliminate the high capital cost of investing into waterflooding or any other Enhanced oil recovery method. The experiment was carried out by firstly using a mono tubing completion using five tubing ID sizes: in, in, in, in and in. The well performance graphs produced showed that for water-cut ranging from 50% to 60%, the stabilized gross liquid rate increase with tubing size until in. The reserve at in indicating the optimum tubing diameter lies between the in and in Next, we show the nodal analysis results for the Duplex Tapered Internal Diameter Tubing Completion TIDC realizations. The TIDC realizations shown were very simple, i.e., the depth intervals for various tubing sizes in a TIDC completion are equal. The result showed that the Duplex TIDC gives significantly higher gross liquid rates at all three water-cut values. The optimization process was carried out by choosing several values for length of the upper tubing section, and comparing the stabilized flow rates. It reveals the optimum length of the upper section (larger ID, in.) to be 3,600-ft, which much shorter than the smaller ID (3.476-in.), lower section: (9,990 3,600) ft = 6,390-ft. In the foregoing duplex TIDC optimized solution, the economic gains are significant, given the high oil price. The duplex TIDC gives increased gross fluid rates as follows: 14

22 10 to 15% compared to the in. mono tubing completion, and 10 to 30% compared to the in. mono tubing completion, over the water-cut range of 50 to 70% 2.3 Optimization Approach This work looks closely at the application of nodal analysis to oil wells with high GOR. Analysis of the behaviour of GOR produced on production rate is coupled with variation of water-cut at HGOR conditions. 15

23 CHAPTER 3 METHODOLOGY 3.1 Prediction of produced GOR Planning the development of a reservoir with respect to sizing equipment and planning for artificial lift as well as evaluating the project form an economics point of view, requires the ability to predict reservoir performance in the future. The reservoir PVT data must be available in order to predict the primary recovery performance of a depletion-drive reservoir in terms of Np and Gp. These data are: initial oil-in-place, hydrocarbon PVT, initial fluid saturation, and relative permeability. All the methods used to predict the future performance of a reservoir are based on combining the appropriate material balance equation (MBE), with instantaneous GOR using a proper saturation equation. However the prediction is narrowed only to the instantaneous GOR. The calculations are repeated at a series of assumed reservoir pressure drops. There are several techniques that were specifically developed to predict the performance of the solution gas drive reservoir. These methods include Tarner s method, Tracy s method and Muskat method, Tarner s method Tarner (1944) pointed out that the N p1 and G p1 are set equal to zero at the initial reservoir pressure that is at bubble point pressure. He computed based on the assumed using equation (3.1) (3.1) For each of N pn assumed, a corresponding S o was determined using equation (2.7). From the S o determined, calculate S g using equation (3.2) and using the field data S g versus k g /k o in appendix A determine k g /k o (3.2) 16

24 Calculate the instantaneous Gas Oil ration (R n ) using equation (2.6) Checking the validity of the assumed Np necessitates the need to calculate the Gp again using equation. (3.3). if the new calculated G p agrees with the previous G p then the assumed N p is correct. This sequence is repeated for the subsequent pressures. (3.3) If there are difficulties in the guessing of the cumulative oil production equation (3.4) can be used. (3.4) Tracy s Method Tracy (1955) suggests that the general material balance equation can be rearranged and expressed in terms of two functions of PVT variables for depletion drive reservoir without water influx. Following equation is based on an initial oil in place of 1 STB (3.5) Where (3.6) (3.7) The following Procedure was adopted for the prediction 1. Select an average reservoir pressure 2. Calculate values of the PVT functions 3. Estimate the GOR at assumed reservoir pressure from PVT data 17

25 4. Calculate the average instantaneous GOR using equation (3.8) (3.8) 5. Calculate the incremental oil production from equation 3.9 (3.9) 6. Calculate the cumulative oil production using equation (3.10) (3.10) 7. Calculate the oil and gas saturation at selected average reservoir pressure 8. Obtain relative permeability ratio K rg /k ro at S g 9. Calculate the Instantaneous GOR from equation (2.6) 10. Compare the estimated GOR in step (3) with the calculated GOR in step (10). If the values are within acceptable tolerance proceed to next step. If not within the tolerance set the estimated GOR equal to the calculated GOR and repeat the calculation from step (2). 11. Calculate the cumulative gas production (3.11) 12. Since results of the calculations are based on 1 STB of oil initially in place, a final check on the accuracy of the prediction should be made on the MBE and repeat the calculation from step 1 = 1±Tolerance (3.12) 18

26 3.1.3 Muskat Method Muskat (1946) expressed the material balance equation for a depletion-drive reservoir in following differential form: (3.13) Craft, Hawkins, and Terry (1991) suggested the calculations can be greatly facilitated by computing and preparing in advance in graphical form the following pressure dependent groups: (3.14) (3.15) (3.16) Introducing the above pressure dependent terms into Equation (3.14) gives (3.17) 19

27 Craft et al, 1991 proposed the following procedure for solving Muskat s equation for a given pressure drop. The following procedure was adopted 1. Prepare a plot of k rg /k ro versus gas saturation 2. Plot R s, B g and (1/B g ) versus pressure and determine the slope of each plot at selected pressures, that is db o /dp, dr s /dp and d(1/b g )/dp 3. Calculate the pressure dependent terms X(p), Y(p) and Z(p) that correspond to the selected pressures in step Plot the pressure dependent terms as a function of pressure. 5. Graphically determine the values of X(p), Y(p) and Z(p) that corresponds to the pressure p. 6. Solve equation (3.17) for (dso/dp) by using the oil saturation S o * at the beginning of the pressure drop interval p* 7. Determine the oil saturations So at the average reservoir pressure using equation (3.18) (3.18) 8. Using the So from Step 7 and the pressure p, recalculate (ds o /dp) from equation Calculate the average value for (ds o /dp) from the two values obtained in step 6 and 8 or; (3.19) 10. Using solve for oil saturation S o from (3.20) This value of S o becomes for the next pressure drop interval. 20

28 11. Calculate gas saturation Sg by (3.21) 12. From equation (2.7), solve for the cumulative oil production (3.22) 13. Calculate the cumulative gas production G p using equation (3.22) and repeat steps 5 through 13 for all pressure drops. (3.23) These prediction methods were compared and series of graphs were constructed to select the best method. A plot of GLR versus GOR was constructed using various water cut ratios (15%, 20 % and 25%). 3.2 Future inflow performance relationship (IPR) for an oil well Several correlations have been developed for predicting future inflow performance relationships curves (IPRs). In this study a combination of Fetkovich and Vogel Equation was used to predict the future IPRs. The following steps were used to construct the IPRs. 1. Using Beggs and Brill (1978 ), estimate the bubble point pressure, P b for the current GLR 21

29 2. Calculate and it corresponding using the equations (3.24) and (3.25) respectively at the average reservoir pressure. (3.24) (3.25) The q b below the bubble point pressure and at the bubble point pressure is zero. Above the bubble point pressure, is determined by using equation (3.24). Below the bubble point pressure the is based on previous and pressure and determined by using equation (3.25) 3. Calculate for the average reservoir pressure (3.26) 4. Calculate for the productivity index J* and for the bubble point pressure P b (3.27) 5. Generate a pressure profile below the bubble point pressure and calculate the corresponding and J* using Fetkovich correlations. 6. Plug in the first average reservoir pressure and it corresponding in the IPR program.xls to generate the IPR. 7. Repeat steps 6 and 7 for all the generated in 5 to generate their IPR s. 22

30 3.3 Construction of TPR curves Using the Beggs and brill spreadsheet, the generated flowrates and it corresponding pressures were used to construct the outflow performance relationship (OPR) or TPR curve. To achieve that, a range of tubing sizes (2 3/8-in, 2 7/8-in, 3 1/2-in and 4 -in) were selected. The tubing diameter, estimated GOR, depth of the well, wellhead pressure, reservoir pressure and fluid properties were kept constant while changing the oil flowrate. The watercut was assumed to be zero in the first instance and later varied with equal interval. For each flowrate used a pressure is recorded at the node. This method was used to construct TPR curves for all the tubing string sizes considered in this study. 23

31 CHAPTER 4 RESULTS AND DISCUSSION In this chapter the nodal analysis described in chapter two is applied for various instantaneous GORs and water cuts. The results obtained from the sensitivity analysis are presented in this chapter. 4.1 Results Tables 4.4a to 4.4e show the variation in oil production rate as well as pressure for a particular range of GOR. The red coloured numbers in Tables 4.3a to 4.3f signify an increase in either the production rate or bottomhole flowing pressure. The blue coloured numbers in Tables 4.3a to 4.3f signify a decrease in either the production rate or bottomhole flowing pressure. Tables 4.3a to 4.3f show the operating points of the various tubing sizes at specific reservoir pressure and GOR. 24

32 GOR (SCF/STB A comparison of GOR estimated by the three predictive methods as described in chapter 3 is presented in Figure Tracey Tarner Muskat Pressure, Psi Figure 4.1 Variation of GOR with Pressure using Tracy, Tarner and Muskat Methods. 25

33 GLR (SCF/STB) GLR (SCF/STB) Tracy wc (15%) wc (20%) 4000 wc (25%) Tracy 15% 20% GOR (SCF/STB) 25 Figure 4.2 GLR vrs GOR at varying water cut ratios. (Tracy s method) Tarner wc (15%) wc (20%) 4000 wc (25%) Tarner 15% 20% GOR (SCF/STB) Figure 4.3 GLR vrs GOR at varying water cut ratios. (Tarner s Method) 26

34 GLR (SCF/STB) Muskat wc (15%) wc (20%) wc (25%) Muskat 15% 20% 25% GOR (SCF/STB) Figure 4.4 GLR vrs GOR at varying water cut ratios. (Muskat s Method) Table 4.1 Estimated GLR at varying water cut with all the prediction methods Tracy Tarner Muskat Calculated Difference wc (%) GOR (scf/stb) GLR (scf/stb) 25% % % % % % From Table 4.1 all the prediction methods yielded approximately the same GLR at a specific GOR and water cut. The results presuppose that either of the methods can be used to predict the instantaneous gas oil ratio for the oil well with much accuracy. Tracy method was selected due to the fact, the error margin between the estimated and calculated GOR was very small and a zero 27

35 tolerance was observed for each pressure drop. The only exception is that Muskat method predicted a much higher GOR of 6304 scf/stb as opposed to the 5800 and 5635 scf/stb of Tarner and Tracy methods respectively. Following Tracy s steps in Chapter three for prediction of produced GOR, the GOR was estimated. Table 4.2b shows the generated data based on input PVT data in Table 4.2a. A plot of the produced or instantaneous GOR versus pressure is also showed in Figure 4.3 The following data applies to a solution gas drive reservoir Initial oil in place is 3.7 MMSTB Connate Water Saturation is 35% Oil Saturation is 0.65 Bubble Point Pressure is 2500 psi Abandonment Pressure is 700 psi Table 4.2a Available PVT Data for predicting oil reservoir performance P B o B g R s U o /U g psi bbl/stb bbl/scf scf/bbl

36 Table 4.2b Data generated from PVT data in table 4.2a P Psi Фo Фg Rav ΔNp Np ΔGp

37 Table 4.2c Continuation of Data generated from PVT data in table 4.2b Gp So Sg kro krg krg/kro GOR (Scf/stb) 840 Tolerance E

38 GOR SCF/STB The produced GOR using Tracy s method in Table 4.2c is plotted against it respective bottomhole pressure pressure in Figure Pressure Psi Figure 4.5 Variation of GOR with reservoir pressure The data generated for Muskat and Tarner methods using the same data in Table 4.1a are presented in appendix B. Plots of GOR versus pressure for both methods are also presented in appendix B. 31

39 Preesure, psi The Inflow performance relationship curves in Figure 4.4 were produced by following the procedure in section Production rate, stb/day IPR 1 IPR 2 IPR 3 IPR 4 IPR 5 IPR 6 IPR 7 IPR 8 IPR 9 IPR 10 IPR 11 Figure 4.6 Future Inflow Performance Relationships Curves 32

40 Bottomhole Flowing Pressure psi Figure 4.7 to 4.12 shows plots of IPR and TPR for various tubing sizes at specific GOR at a water cut of zero. GOR of 840 scf/stb " 2.875" 3.5" 4" IPR 1 IPR 2 IPR 3 IPR 4 IPR 5 IPR 6 IPR IPR Flowrate, stb/day IPR 9 IPR 10 IPR 11 Figure 4.7 Effect of tubing size on production rate at a constant GOR (840 scf/stb) Table 4.3a Operating point for various tubing diameters at a GOR of 840 scf/stb IPR/OD 2 3/8-in 2 7/8-in 3 1/2-in 4-in Q P Q P Q P Q P

41 Bottomhole Flowing Pressure,psi GOR at 1052 scf/stb " IPR 1 IPR " 3.5" 4" IPR 3 IPR 4 IPR 5 IPR 6 IPR IPR Flowrate,stb/day IPR 9 IPR 10 IPR 11 Figure 4.8 Effect of tubing size on production rate at a constant GOR (1052 scf/stb) Table 4.3b Operating point for various tubing diameters at a GOR of 1052 scf/stb IPR/OD 2 3/8-in 2 7/8-in 3 1/2-in 4-in Q P Q P Q P Q P

42 Bottomhole Flowing Pressure,psi GOR at 1453 scf/stb " IPR " IPR 2 IPR 3 IPR " IPR 5 IPR " IPR 7 IPR 8 IPR 9 0 IPR IPR 11 Flowrate,stb/day Figure 4.9 Effect of tubing size on production rate at a constant GOR (1453 scf/stb) Table 4.3c Operating point for various tubing diameters at a GOR of 1453 scf/stb IPR/OD 2 3/8-in 2 7/8-in 3 1/2-in 4-in Q P Q P Q P Q P

43 Bottomhole Flowing Pressure,psi GOR at 2610 scf/stb " 2.875" IPR 1 IPR 2 IPR " 4" IPR 4 IPR 5 IPR 6 IPR 7 IPR 8 0 IPR IPR 10 Flowrate, stb/day IPR 11 Figure 4.10 Effect of tubing size on production rate at a constant GOR (2610 scf/stb) Table 4.3d Operating point for various tubing diameters at a GOR of 2610 scf/stb IPR/OD 2 3/8-in 2 7/8-in 3 1/2-in 4-in Q P Q P Q P Q P

44 Bottomhole Flowing Pressure,psi GOR at 3444 scf/stb " 2.875" 3.5" 4" IPR 1 IPR 2 IPR 3 IPR 4 IPR 5 IPR 6 IPR Flowrate, stb/day IPR 8 IPR 9 IPR 10 IPR 11 Figure 4.11 Effect of tubing size on production rate at a constant GOR (3444 scf/stb) Table 4.3e Operating point for various tubing diameters at a GOR of 3444 scf/stb IPR/OD 2 3/8-in 2 7/8-in 3 1/2-in 4-in Q P Q P Q P Q P

45 Bottomhole Flowing Pressure,psi GOR at 2610 scf/stb " 2.875" IPR 1 IPR 2 IPR " 4" IPR 4 IPR 5 IPR 6 IPR 7 IPR 8 0 IPR IPR 10 Flowrate, stb/day IPR 11 Figure 4.12 Effect of tubing size on production rate at a constant GOR (5653 scf/stb) Table 4.3f Operating point for various tubing diameters at a GOR of 5635 scf/stb IPR/OD 2 3/8-in 2 7/8-in 3 1/2-in 4-in Q P Q P Q P Q P

46 Table 4.4a Variation in production rate and pressure with GOR range of scf/stb Production Increase % ( scf/stb) Pressure reduction psi OID/IPR ID/IPR / N/A 2 3/ N/A 2 7/ N/A 2 7/ N/A 3 1/ N/A 3 1/ N/A N/A N/A Table 4.4b Variation in production rate and Pressure with GOR range of scf/stb Production Increase % ( scf/stb) Pressure reduction psi OD/IPR ID/IPR / / / / / / N/A N/A Table 4.4c Variation in production rate and Pressure with GOR range of scf/stb Production decrease % ( scf/stb) Pressure increase psi ID/IPR ID/IPR / / / / / / N/A N/A Table 4.4d Variation in production rate and pressure with GOR range of scf/stb Production decrease % ( scf/stb) Pressure increase psi ID/IPR ID/IPR / N/A 2 3/ N/A 2 7/ / / /

47 Flowrate, stb/day Table 4.4e Variation in production rate and Pressure with GOR range of scf/stb Production decrease % ( scf/stb) Pressure increase psi ID/IPR ID/IPR / N/A 2 3/ N/A 2 7/ / / / /8" TUBING SIZE IPR1 IPR2 IPR GOR, scf/stb Figure 4.13 Production profile for 2 3/8-in tubing size 40

48 Flowrate, stb/day Flowrate, stb/day /8" TUBING SIZE GOR, scf/stb IPR1 IPR2 IPR5 Figure 4.14 Production profile for 2 7/8-in tubing size /2" TUBING SIZE IPR2 IPR5 IPR GOR, scf/stb Figure 4.15 Production profile for 3 1/2-in tubing size 41

49 Flowrate stb/day Flowrate, stb/day " TUBING SIZE IPR1 IPR2 IPR5 IPR GOR, scf/stb Figure 4.16 Production profile for 4-in tubing size scf/stb and IPR wc = 0 wc = 20% wc = 5% wc = 25% Tubing diameter, in Figure 4.17 Effect of water cut on flowrate at a GOR of 2610 scf/stb 42

50 Flowrate, stb/day Flowrate, stb/day scf/stb and IPR wc = 0 wc = 5% wc = 20% wc = 25% Tubing diameter, in Figure 4.18 Effect of water cut on flowrate at a GOR of 3444 scf/stb scf/stb and IPR Tubing diameter, in wc = 0 wc = 5% wc = 20% wc = 25% Figure 4.19 Effect of water cut on flowrate at a GOR of 5635 scf/stb 43

51 4.2 Discussion The two major components of production optimization (cost and reduction in pressure losses) can be positively influenced by acting on the analysis and recommendation of this study. In the analysis of the behaviour of the produced GOR on tubing performance, equal numbers of Low and High GOR values were selected Behaviour of Tubing curves at LGOR From Figure 4.5, tubing performance curves for (2 3/8-in, 2 7/8-in, and 3 1/2-in) tubing sizes intersect IPR1 and IPR4 curves making tubing selection feasible. The 4-in tubing performance curve intersect IPR1 to IPR3 curves. Moving closer to IPR5, the TPR curves for (2 3/8-in, 2 7/8- in, and 3.1/2-in) tubing sizes converge. The bigger tubing size (4-in) cannot be used to produce the well at lower IPR curves (IPR4 and IPR5). Considering the IPR1 curve, the 4-in tubing size can produce as high as 2100 stb/day at a bottomhole pressure of 1375 psi whereas the 2 3/8-in produces 1310 stb/day at a much higher bottomhole pressure of 2090psi. The bottomhole pressure tends to decrease with increasing tubing diameter. As GOR increases from 840 scf/stb to 1052 scf/stb in Figure 4.6, a shift in the tubing curves to the right is observed associated with an increase in oil production. From table 4.4a it can be seen that for all the tubing sizes used the more bottomhole pressure reduces the greater the percent increase in oil production rate. Considering the IPR1 curve, 2 7/8-in tubing size experienced the highest pressure drop associated with the highest percent increment in production. The same trend was observed when the GOR increased from 1052 to 1453 scf/stb. The only exception was 1.5% reduction in production rate at for 2.3/8-in tubing size when it intersect the IPR1 curve. Considering IPR2 and for the same range of GOR, 4-in has the highest production rate increase followed by 3 1/2-in with a corresponding pressure drop of 80psi and 130psi respectively. There was no pressure drop using 2 7/8-in yet there was a potential gain in production. 44

52 From table 4.4a to 4.4b, it was observed that as GOR increases, bottomhole pressure decreases associated with an increase in oil production rate. This phenomenon is mainly valid for low GOR cases Behaviour of Tubing curves at HGOR From Figure 4.8, a slight shift of the tubing curves to the left side is observed. This is associated with decrease oil production. At a GOR of 2610 scf/stb, production can be feasible and extended to the IPR5 curve. Moving from the region of LGOR to HGOR a decrease in production rate is observed due to the increase in bottomhole pressure. For a GOR range of 1453 to 2610 scf/stb and IPR5 curve, there is a percent decrease in production using 2 3/8-in, 2 7/8-in and 3 1/2-in tubing sizes. As the GOR increases further, the more the rise in bottomhole pressure causing much more decrease in production. For a GOR ranges of 2610 to 3444 scf/stb and 3444 to 5635 scf/stb, the 4-in tubing size can be still be used to produce a substantial quantity of the oil at lower reservoir pressures. From table 4.4d to 4.4e, it is observed that as GOR increases, bottomhole pressure increases with an associated decrease in oil production rate. This phenomenon is mainly valid for HGOR cases Production profile of the various tubing sizes The analysis of the two cases of GOR condition shows that there is a point for each tubing size where production rate begins to decline. Considering IPR1 and IPR 2 in Figure 4.13 there is a sharp gradual increase in production rate. The production rate tends to decrease when the GOR increases beyond 1500 scf/stb. The production rate beyond the critical point for IPR5 seems to be fairly constant. From Figure 4.14, the same trend in Figure 4.13 was observed for 2 7/8 tubing size. From Figures 4.15 and 4.16 the critical point for 3 1/2 and 4 tubing sizes varies for different IPR curves and the critical point is also not distinct. Production using 4 tubing size with the Lower IPR curves (IPR5 and IPR6) will be only possible beyond a GOR of 2600 scf/stb. 45

PRODUCTION I (PP 414) ANALYSIS OF MAXIMUM STABLE RATE AND CHOKES RESOLVE OF OIL WELLS JOSE RODRIGUEZ CRUZADO JOHAN CHAVEZ BERNAL

PRODUCTION I (PP 414) ANALYSIS OF MAXIMUM STABLE RATE AND CHOKES RESOLVE OF OIL WELLS JOSE RODRIGUEZ CRUZADO JOHAN CHAVEZ BERNAL PRODUCTION I (PP 414) SUBJECT: ANALYSIS OF MAXIMUM STABLE RATE AND CHOKES RESOLVE OF OIL WELLS BY: JOSE RODRIGUEZ CRUZADO JOHAN CHAVEZ BERNAL PROFESSOR MSc. LUIS ANTONIO DEL CASTILLO DE RODRIGUEZ LIMA,

More information

Section 2 Multiphase Flow, Flowing Well Performance

Section 2 Multiphase Flow, Flowing Well Performance Section 2 Multiphase Flow, Flowing Well Performance Multiphase Vertical Flow When producing an oil or gas well, the flow of the fluids up the tubing will be in most cases be 2 phase, liquid and gas. The

More information

International Journal of Petroleum and Geoscience Engineering Volume 03, Issue 02, Pages , 2015

International Journal of Petroleum and Geoscience Engineering Volume 03, Issue 02, Pages , 2015 International Journal of Petroleum and Geoscience Engineering Volume 03, Issue 02, Pages 116- ISSN: 2289-4713 Improving Reservoir Recovery Factor Using Enhanced Electrical Submersible Pump Design; a Case

More information

CASE STUDY OF NATURAL FLOW AND ARTIFICIAL LIFT FOR A SOLUTION GAS DRIVE RESERVOIR PROJECT. Presented to the Graduate Faculty.

CASE STUDY OF NATURAL FLOW AND ARTIFICIAL LIFT FOR A SOLUTION GAS DRIVE RESERVOIR PROJECT. Presented to the Graduate Faculty. CASE STUDY OF NATURAL FLOW AND ARTIFICIAL LIFT FOR A SOLUTION GAS DRIVE RESERVOIR A PROJECT Presented to the Graduate Faculty of the African University of Science and Technology in Partial Fulfilment of

More information

COMPARATIVE EVALUATION OF ARTIFICIAL LIFT METHODS ON A NIGER DELTA FIELD

COMPARATIVE EVALUATION OF ARTIFICIAL LIFT METHODS ON A NIGER DELTA FIELD COMPARATIVE EVALUATION OF ARTIFICIAL LIFT METHODS ON A NIGER DELTA FIELD Okologume Chinedu Wilfred 1, Ofesi Samuel F. 2 1, 2 Department of Petroleum and Natural Gas Engineering, Federal University of Petroleum

More information

Novel empirical correlations for estimation of bubble point pressure, saturated viscosity and gas solubility of crude oils

Novel empirical correlations for estimation of bubble point pressure, saturated viscosity and gas solubility of crude oils 86 Pet.Sci.(29)6:86-9 DOI 1.17/s12182-9-16-x Novel empirical correlations for estimation of bubble point pressure, saturated viscosity and gas solubility of crude oils Ehsan Khamehchi 1, Fariborz Rashidi

More information

W I L D W E L L C O N T R O L PRESSURE BASICS AND CONCEPTS

W I L D W E L L C O N T R O L PRESSURE BASICS AND CONCEPTS PRESSURE BASICS AND CONCEPTS Pressure Basics and Concepts Learning Objectives You will be familiarized with the following basic pressure concepts: Defining pressure Hydrostatic pressure Pressure gradient

More information

Production Optimization Using Bean Size Selection for Niger Delta Oil Wells

Production Optimization Using Bean Size Selection for Niger Delta Oil Wells Production Optimization Using Bean Size Selection for Niger Delta Oil Wells Idongesit Effiong Essen 1, Dulu Appah 2, Mfon Godwill Udoaka 3 1,3 Department of Petroleum Engineering, University of Uyo, Uyo,

More information

SURFACE CASING SELECTION FOR COLLAPSE, BURST AND AXIAL DESIGN FACTOR LOADS EXERCISE

SURFACE CASING SELECTION FOR COLLAPSE, BURST AND AXIAL DESIGN FACTOR LOADS EXERCISE SURFACE CASING SELECTION FOR COLLAPSE, BURST AND AXIAL DESIGN FACTOR LOADS EXERCISE Instructions Use the example well data from this document or the powerpoint notes handout to complete the following graphs.

More information

Drilling Efficiency Utilizing Coriolis Flow Technology

Drilling Efficiency Utilizing Coriolis Flow Technology Session 12: Drilling Efficiency Utilizing Coriolis Flow Technology Clement Cabanayan Emerson Process Management Abstract Continuous, accurate and reliable measurement of drilling fluid volumes and densities

More information

Using the Artificial Gas Lift to Increase the Productivity of Noor Oil Field / Mishrif Formation

Using the Artificial Gas Lift to Increase the Productivity of Noor Oil Field / Mishrif Formation Iraqi Journal of Chemical and Petroleum Engineering Iraqi Journal of Chemical and Petroleum Engineering Vol.16 No.2 (June 2015) 39-44 ISSN: 1997-4884 University of Baghdad College of Engineering Using

More information

Gerald D. Anderson. Education Technical Specialist

Gerald D. Anderson. Education Technical Specialist Gerald D. Anderson Education Technical Specialist The factors which influence selection of equipment for a liquid level control loop interact significantly. Analyses of these factors and their interactions

More information

Electrical Submersible Pump Analysis and Design

Electrical Submersible Pump Analysis and Design Electrical Submersible Pump Analysis and Design May 30, 2001 Abstract Case Services software provides production optimization for a variety of different methods of artificial lift. This paper discusses

More information

A Successful Experience in Optimization of a Production Well in a Southern Iranian Oil Field

A Successful Experience in Optimization of a Production Well in a Southern Iranian Oil Field Iranian Journal of Chemical Engineering Vol. 6, No. 2 (Spring), 2009, IAChE A Successful Experience in Optimization of a Production Well in a Southern Iranian Oil Field S. R. Shadizadeh, M. Zoveidavianpoor

More information

Well Performance and Nodal TM Analysis Fundamentals COPYRIGHT. Skill Module Overview

Well Performance and Nodal TM Analysis Fundamentals COPYRIGHT. Skill Module Overview Introduction Well Performance and Nodal TM Analysis Fundamentals Skill Module Overview This fundamental level PetroAcademy module addresses well performance and how an oil or gas or even an injection well

More information

An approach to account ESP head degradation in gassy well for ESP frequency optimization

An approach to account ESP head degradation in gassy well for ESP frequency optimization SPE-171338-MS An approach to account ESP head degradation in gassy well for ESP frequency optimization V.A. Krasnov, Rosneft; K.V. Litvinenko, BashNIPIneft; R.A. Khabibullin, RSU of oil and gas Copyright

More information

Chapter 8: Reservoir Mechanics

Chapter 8: Reservoir Mechanics PTRT 1472: Petroleum Data Management II Chapter 8: Reservoir Mechanics - Reservoir drives Types of Natural Gas Reservoir Fluids Natural gas is petroleum in a gaseous state, so it is always accompanied

More information

Demystifying ESPs: A technique to make your ESP talk to you.

Demystifying ESPs: A technique to make your ESP talk to you. 6 th European Electric Submersible Pump Round Table Aberdeen Section Demystifying ESPs: A technique to make your ESP talk to you. A.J. (Sandy) Williams (Phoenix Petroleum Services) Abstract Using a diagnostic

More information

SPE Copyright 2012, Society of Petroleum Engineers

SPE Copyright 2012, Society of Petroleum Engineers SPE 159645 Successful Application of Venturi Orifice Gas Lift Valve in Kaji-Semoga Field, South Sumatra: A Case Study Nova Arthur Rilian, SPE, Adam Fatchur Rohman, SPE, Kamal Hamzah, SPE, Yoseph Itok Arseto,

More information

Design Tapered Electric Submersible Pumps For Gassy Wells Desheng Zhou, SPE, Rajesh Sachdeva, SPE, IHS INC.

Design Tapered Electric Submersible Pumps For Gassy Wells Desheng Zhou, SPE, Rajesh Sachdeva, SPE, IHS INC. SPE 113661 Design Tapered Electric Submersible Pumps For Gassy Wells Desheng Zhou, SPE, Rajesh Sachdeva, SPE, IS INC. Copyright 8, Society of Petroleum Engineers This paper was prepared for presentation

More information

W I L D W E L L C O N T R O L FLUIDS

W I L D W E L L C O N T R O L FLUIDS FLUIDS Fluids Learning Objectives You will learn about different fluids that can be used in well control. You will become familiar with the characteristics and limitations of fluids. You will learn general

More information

4 RESERVOIR ENGINEERING

4 RESERVOIR ENGINEERING 4 RESERVOIR ENGINEERING This chapter summarizes the reservoir engineering data and analysis used in the development of the Depletion Plan for the White Rose Field. The data were derived from seismic and

More information

Reservoir Engineering 3 (Flow through Porous Media and Applied Reservoir Engineering)

Reservoir Engineering 3 (Flow through Porous Media and Applied Reservoir Engineering) Sudan University of Science and Technology College of Petroleum Engineering and Technology Reservoir Engineering 3 (Flow through Porous Media and Applied Reservoir Engineering) Dr. Tagwa Ahmed Musa Last

More information

GEOTHERMAL WELL COMPLETION TESTS

GEOTHERMAL WELL COMPLETION TESTS GEOTHERMAL WELL COMPLETION TESTS Hagen Hole Geothermal Consultants NZ Ltd., Birkenhead, Auckland, New Zealand. ABSTRACT This paper reviews the measurements that are typically made in a well immediately

More information

SPE Copyright 2001, Society of Petroleum Engineers Inc.

SPE Copyright 2001, Society of Petroleum Engineers Inc. SPE 67232 Sampling Volatile Oil Wells Ahmed H. El-Banbi, SPE, Cairo University/Schlumberger Holditch-Reservoir Technologies, and William D. McCain, Jr., SPE, Texas A&M University Copyright 2001, Society

More information

Gas Gathering System Modeling The Pipeline Pressure Loss Match

Gas Gathering System Modeling The Pipeline Pressure Loss Match PETROLEUM SOCIETY CANADIAN INSTITUTE OF MINING, METALLURGY & PETROLEUM PAPER 2005-230 Gas Gathering System Modeling The Pipeline Pressure Loss Match R.G. MCNEIL, P.ENG. Fekete Associates Inc. D.R. LILLICO,

More information

1. INTRODUCTION. International Journal of Students Research in Technology & Management Vol 1 (05), September 2013, ISSN , pg

1. INTRODUCTION. International Journal of Students Research in Technology & Management Vol 1 (05), September 2013, ISSN , pg DESIGN OF A GAS LIFT SYSTEM TO INCREASE OIL PRODUCTION FOR OFFSHORE WELLS WITH HIGH WATER CUT Saurabh Kumar B.Tech (Petroleum Engineering) Indian School of Mines University, Dhanbad saurabhsuman1702@gmail

More information

Gas Lift Workshop Doha Qatar 4-88 February Gas Lift Optimisation of Long Horizontal Wells. by Juan Carlos Mantecon

Gas Lift Workshop Doha Qatar 4-88 February Gas Lift Optimisation of Long Horizontal Wells. by Juan Carlos Mantecon Gas Lift Workshop Doha Qatar 4-88 February 2007 Gas Lift Optimisation of Long Horizontal Wells by Juan Carlos Mantecon 1 Long Horizontal Wells The flow behavior of long horizontal wells is similar to pipelines

More information

Artificial Lift: Making Your Electrical Submersible Pumps Talk To You

Artificial Lift: Making Your Electrical Submersible Pumps Talk To You Report by: Distributed by: Artificial Lift: Making Your Electrical Submersible Pumps Talk To You Author Sandy Williams, Director, Artificial Lift Performance Ltd Disclaimer: Whilst every effort has been

More information

2003 WJTA American Waterjet Conference August 17-19, 2003 Houston, Texas Paper PIPE THREADS-WHAT IS THE LIMIT?

2003 WJTA American Waterjet Conference August 17-19, 2003 Houston, Texas Paper PIPE THREADS-WHAT IS THE LIMIT? 23 WJTA American Waterjet Conference August 17-19, 23 Houston, Texas Paper PIPE THREADS-WHAT IS THE LIMIT? D. Wright, J. Wolgamott, G. Zink StoneAge, Inc. Durango, Colorado, U.S.A. ABSTRACT At present

More information

Innovating Gas-Lift for Life of Well Artificial Lift Solution. The Unconventional Solution!

Innovating Gas-Lift for Life of Well Artificial Lift Solution. The Unconventional Solution! Innovating Gas-Lift for Life of Well Artificial Lift Solution The Unconventional Solution! Glenn Wilde Optimum Production Technologies Inc. Revive Energy Corp. Unconventional Oil & Gas Resources Unconventional

More information

Contact Information. Progressive Optimization Service. We Provide: Street Bay #2. Grande Prairie, AB T8V - 4Z2

Contact Information. Progressive Optimization Service. We Provide: Street Bay #2. Grande Prairie, AB T8V - 4Z2 Progressive Optimization Services (P.O.S.) is an Oil and Gas Optimization Service company based out of Grande Prairie, Alberta with offices in Edson, Alberta and Ft St John British Columbia our operations

More information

PRODUCTION AND OPERATIONAL ISSUES

PRODUCTION AND OPERATIONAL ISSUES PRODUCTION AND OPERATIONAL ISSUES Dr. Ebrahim Fathi Petroleum and Natural Gas Engineering Department West Virginia University Audience and Date March 2, 2016 Summary Production and Operational Issues Shale

More information

CONTROL VALVE WHAT YOU NEED TO LEARN?

CONTROL VALVE WHAT YOU NEED TO LEARN? CONTROL VALVE WHAT YOU NEED TO LEARN? i) The control valve characteristics refers to the relationship between the volumetric flowrate F (Y-axis) through the valve AND the valve travel or opening position

More information

RESERVOIR DRIVE MECHANISMS

RESERVOIR DRIVE MECHANISMS RESERVOIR DRIVE MECHANISMS There are several ways in which oil can be naturally displaced and produced from a reservoir, and these may be termed mechanisms or "drives". Where one mechanism is dominant,

More information

WORKING WITH OIL WELLS PRODUCING GAS BELOW THE BUBBLE POINT IN TIGHT ROCK

WORKING WITH OIL WELLS PRODUCING GAS BELOW THE BUBBLE POINT IN TIGHT ROCK WORKING WITH OIL WELLS PRODUCING GAS BELOW THE BUBBLE POINT IN TIGHT ROCK In Daedalus, you must remember that the Base math engines are only suitable for gas or still oil situations. If you are modeling

More information

Critical Velocity/ Nodal Stability Gas Well Predictions

Critical Velocity/ Nodal Stability Gas Well Predictions Originally Presented at: Gas Well De-Liquification Workshop Adams Mark Hotel, Denver, Colorado March 5-7, 2007 European Conference Gas Well Deliquification 25-2626 September 2007 Critical Velocity/ Nodal

More information

GAS CONDENSATE RESERVOIRS. Dr. Helmy Sayyouh Petroleum Engineering Cairo University

GAS CONDENSATE RESERVOIRS. Dr. Helmy Sayyouh Petroleum Engineering Cairo University GAS CONDENSATE RESERVOIRS Dr. Helmy Sayyouh Petroleum Engineering Cairo University Introduction and Definitions Gas condensate production may be thought of as a type intermediate between oil and gas. The

More information

A COMPARATIVE ANALYSIS OF CONTINUOUS GAS LIFT VALVE POSITIONING METHODS AND ITS APPLICATION WITH MS EXCEL & VBA

A COMPARATIVE ANALYSIS OF CONTINUOUS GAS LIFT VALVE POSITIONING METHODS AND ITS APPLICATION WITH MS EXCEL & VBA A COMPARATIVE ANALYSIS OF CONTINUOUS GAS LIFT VALVE POSITIONING METHODS AND ITS APPLICATION WITH MS EXCEL & VBA Darsana Dutta, Palash Lochan Bordoloi, Pranjit Mahanta, Rajnib Borah, Sarmistha Roy Choudhury,

More information

International Journal of Petroleum and Geoscience Engineering Volume 03, Issue 01, Pages 56-60, 2015

International Journal of Petroleum and Geoscience Engineering Volume 03, Issue 01, Pages 56-60, 2015 International Journal of Petroleum and Geoscience Engineering Volume 03, Issue 01, Pages ISSN: 2289-4713 Investigation of Under-Saturated Oil Viscosity Correlations under Reservoir Condition; A Case Study

More information

Casing Design. Casing Design. By Dr. Khaled El-shreef

Casing Design. Casing Design. By Dr. Khaled El-shreef Casing Design By Dr. Khaled El-shreef 1 Casing Design CONTENTS Function of Casing Casing Types & Tools Strength Properties Casing Specification Casing Design 2 1 RUNNING AND CEMENTING CASING Reasons for

More information

WILD WELL CONTROL WARNING SIGNS OF KICKS

WILD WELL CONTROL WARNING SIGNS OF KICKS WARNING SIGNS OF KICKS Warning Signs of Kicks Learning Objectives You will learn the warning signs that indicate the well may be kicking: Warning signs of kicks False kick indicators You will also learn

More information

Well Control Modeling Software Comparisons with Single Bubble Techniques in a Vertical Well

Well Control Modeling Software Comparisons with Single Bubble Techniques in a Vertical Well Well Control Modeling Software Comparisons with Single Bubble Techniques in a Vertical Well Jace R. Larrison, P.E. Blowout Engineers, LLC Recent advances in well control modeling simulators have incorporated

More information

Permeability. Darcy's Law

Permeability. Darcy's Law Permeability Permeability is a property of the porous medium that measures the capacity and ability of the formation to transmit fluids. The rock permeability, k, is a very important rock property because

More information

EDUCTOR. principle of operation

EDUCTOR. principle of operation EDUCTOR principle of operation condensate and mixing eductor s are designed to mix two liquids intimately in various proportions in operations where the pressure liquid is the greater proportion of the

More information

1. UPDATE 12/12/2014: What wells are regulated under the MIA Program? Must they be drilled, stimulated, and completed? Must they be in production?

1. UPDATE 12/12/2014: What wells are regulated under the MIA Program? Must they be drilled, stimulated, and completed? Must they be in production? PLEASE NOTE THAT ALL USES OF THE WORD OPERATOR IN THIS DOCUMENT REFER TO THE ACT 13 DEFINITION OF WELL OPERATOR AND THUS, REFERENCE THE PERMIT HOLDER (PERMITEE) FOR THE WELL. ANY ENFORCEMENT ACTIONS UNDER

More information

Artificial Lift Basics Pre Reading

Artificial Lift Basics Pre Reading Artificial Lift Basics Pre Reading (Last Updated 7 January 2016) NOTICE AND DISCLAIMER The information contained herein and/or these workshop/seminar proceedings (WORK) was prepared by or contributed to

More information

3 1 PRESSURE. This is illustrated in Fig. 3 3.

3 1 PRESSURE. This is illustrated in Fig. 3 3. P = 3 psi 66 FLUID MECHANICS 150 pounds A feet = 50 in P = 6 psi P = s W 150 lbf n = = 50 in = 3 psi A feet FIGURE 3 1 The normal stress (or pressure ) on the feet of a chubby person is much greater than

More information

APPENDIX A1 - Drilling and completion work programme

APPENDIX A1 - Drilling and completion work programme APPENDIX A1 - Drilling and completion work programme Information about the well and drilling To the extent possible, the international system of units (SI) should be adhered to, and the drilling programme

More information

Coiled Tubing string Fatigue Management in High Pressure Milling Operation- Case Study

Coiled Tubing string Fatigue Management in High Pressure Milling Operation- Case Study Coiled Tubing string Fatigue Management in High Pressure Milling Operation- Case Study Abstract: Paper Presenter: Ebrahim Rabbani 1 e.rabbani@mehranservices.com Ebrahim Rabbani, Danial Davoodi 2, Fatemeh

More information

Reservoir Performance of Fluid Systems with Widely Varying Composition (GOR)

Reservoir Performance of Fluid Systems with Widely Varying Composition (GOR) Reservoir Performance of Fluid Systems with Widely Varying Composition (GOR) A Simulation Approach M. Sc. Thesis Singh Kameshwar December 1997 Declaration I hereby declare that this Master of Science thesis

More information

PC-PUMP Points to Consider

PC-PUMP Points to Consider PC-PUMP Points to Consider March 2007 This document contains a list of details regarding the use of C-FER s PC-PUMP software that all users should be aware of. These are based on questions asked and problems

More information

The Use of a Process Simulator to Model Aeration Control Valve Position and System Pressure

The Use of a Process Simulator to Model Aeration Control Valve Position and System Pressure The Use of a Process Simulator to Model Aeration Control Valve Position and System Pressure Matthew Gray 1 * and Steve Kestel 1 1 BioChem Technology, King of Prussia, PA *Email: mgray@biochemtech.com ABSTRACT

More information

DISTILLATION POINTS TO REMEMBER

DISTILLATION POINTS TO REMEMBER DISTILLATION POINTS TO REMEMBER 1. Distillation columns carry out physical separation of liquid chemical components from a mixture by a. A combination of transfer of heat energy (to vaporize lighter components)

More information

Optimization of Separator Train in Oil Industry

Optimization of Separator Train in Oil Industry Optimization of Separator Train in Oil Industry Pawan jain a M.E. Petroleum Engineering, Maharashtra Institute of Technology, Pune-411038 ---------------------------------------------------------------------***---------------------------------------------------------------------

More information

Perforating Center of Excellence TESTING SERVICES OVERVIEW

Perforating Center of Excellence TESTING SERVICES OVERVIEW Perforating Center of Excellence TESTING SERVICES OVERVIEW Jet Research Center (JRC) is the leader in energetic research and testing for the oil and gas industry. Since introducing jet perforators for

More information

The Discussion of this exercise covers the following points:

The Discussion of this exercise covers the following points: Exercise 3-2 Orifice Plates EXERCISE OBJECTIVE In this exercise, you will study how differential pressure flowmeters operate. You will describe the relationship between the flow rate and the pressure drop

More information

Micro Motion Pressure Drop Testing

Micro Motion Pressure Drop Testing 12/2018 Micro Motion Pressure Drop Testing www.emerson.com/micromotion Introduction Micro Motion has traditionally taken a very conservative approach to pressure drop, with single pressure measurements

More information

3. GRADUALLY-VARIED FLOW (GVF) AUTUMN 2018

3. GRADUALLY-VARIED FLOW (GVF) AUTUMN 2018 3. GRADUALLY-VARIED FLOW (GVF) AUTUMN 2018 3.1 Normal Flow vs Gradually-Varied Flow V 2 /2g EGL (energy grade line) Friction slope S f h Geometric slope S 0 In flow the downslope component of weight balances

More information

Restoring Fluid Flow in Tubing Strings

Restoring Fluid Flow in Tubing Strings Restoring Fluid Flow in Tubing Strings Andrew Roth, Product Manager Fike Corporation Fike Hydraulic Tubing Drains (HTD) for use with deep hole drilling tools, downhole devices and other oil and off shore

More information

Understanding pressure and pressure

Understanding pressure and pressure CHAPTER 1 1-1 PRESSURE BASICS Remember to think downhole. The concepts provided in this section cover the foundations for good well control. Understanding pressure and pressure relationships is important

More information

Flow Scanner. Production logging in multiphase horizontal wells

Flow Scanner. Production logging in multiphase horizontal wells Flow Scanner Production logging in multiphase horizontal wells Applications Multiphase flow profiling in nonvertical wells Identification of fluid and gas entries in multiphase well or liquid in gas wells

More information

Simulation of Wind Variation for the WPI Kite-Powered Water Pump

Simulation of Wind Variation for the WPI Kite-Powered Water Pump DJO-1401 Simulation of Wind Variation for the WPI Kite-Powered Water Pump A Major Qualifying Project Report Submitted to the Faculty of the WORCESTER POLYTECHNIC INSTITUTE in Partial Fulfillment of the

More information

Pump Fillage Problem Overview. Jim McCoy. 9 th Annual Sucker Rod Pumping Workshop. Renaissance Hotel Oklahoma City, Oklahoma September 17-20, 2013

Pump Fillage Problem Overview. Jim McCoy. 9 th Annual Sucker Rod Pumping Workshop. Renaissance Hotel Oklahoma City, Oklahoma September 17-20, 2013 9 th Annual Sucker Rod Pumping Workshop Renaissance Hotel Oklahoma City, Oklahoma September 17-20, 2013 Pump Fillage Problem Overview Jim McCoy Lynn Rowlan Tony Podio Ken Skinner Echometer Company Jim@echometer.com

More information

1 PIPESYS Application

1 PIPESYS Application PIPESYS Application 1-1 1 PIPESYS Application 1.1 Gas Condensate Gathering System In this PIPESYS Application, the performance of a small gascondensate gathering system is modelled. Figure 1.1 shows the

More information

Ermenek Dam and HEPP: Spillway Test & 3D Numeric-Hydraulic Analysis of Jet Collision

Ermenek Dam and HEPP: Spillway Test & 3D Numeric-Hydraulic Analysis of Jet Collision Ermenek Dam and HEPP: Spillway Test & 3D Numeric-Hydraulic Analysis of Jet Collision J.Linortner & R.Faber Pöyry Energy GmbH, Turkey-Austria E.Üzücek & T.Dinçergök General Directorate of State Hydraulic

More information

Using Gas Lift to Unload Horizontal Gas Wells

Using Gas Lift to Unload Horizontal Gas Wells Gas Well Deliquification Workshop Sheraton Hotel, Denver, Colorado February 27 March 2, 211 Using Gas Lift to Unload Horizontal Gas Wells Rob Sutton Marathon Oil Company Conventional Gas Lift Application

More information

Journal of Applied Fluid Transients, Vol 1-1, April 2014 (3-1)

Journal of Applied Fluid Transients, Vol 1-1, April 2014 (3-1) Modeling and Field Verification Study of Air Slam Conditions on kalanit Pipeline System By Yiftach Brunner & Sathish Kumar ir valves are integral part of long water transmission mains and are essential

More information

Analysis of Shear Lag in Steel Angle Connectors

Analysis of Shear Lag in Steel Angle Connectors University of New Hampshire University of New Hampshire Scholars' Repository Honors Theses and Capstones Student Scholarship Spring 2013 Analysis of Shear Lag in Steel Angle Connectors Benjamin Sawyer

More information

Evaluation of Three Different Bubble Point Pressure Correlations on Some Libyan Crude Oils

Evaluation of Three Different Bubble Point Pressure Correlations on Some Libyan Crude Oils Evaluation of Three Different Bubble Point Pressure Correlations on Some Libyan Crude Oils Dr. Mustafa O. Sharrad, Dr.Hosam H. M. Almahrog Dr. Emhemed A. Aboraema Dept. of Chemical and Petroleum Engineering,

More information

Testing Services Overview

Testing Services Overview 2 Jet Research Center JRC Jet Research Center Perforating Center of Excellence Testing Services Overview API RP19B Testing Advanced Testing Operational Testing API RP19B Testing The American Petroleum

More information

Blowout during Workover Operation A case study Narration by: Tarsem Singh & Arvind Jain, OISD

Blowout during Workover Operation A case study Narration by: Tarsem Singh & Arvind Jain, OISD 1. Introduction An incident of gas leakage from a well took place during workover operations. Subsequently, the gas caught fire on the fourth day in which twelve persons were injured. Two contract workers,

More information

PETROLEUM TECHNOLOGY SKILL TEST

PETROLEUM TECHNOLOGY SKILL TEST PETROLEUM TECHNOLOGY SKILL TEST 1 w w w. p m t u t o r. o r g The JOBFinder Manual This 900-page book is designed for fresh and experienced graduates seeking opportunity in companies like Mobil, Shell,

More information

Gas viscosity ( ) Carr-Kobayashi-Burrows Correlation Method Lee-Gonzalez-Eakin Method. Carr-Kobayashi-Burrows Correlation Method

Gas viscosity ( ) Carr-Kobayashi-Burrows Correlation Method Lee-Gonzalez-Eakin Method. Carr-Kobayashi-Burrows Correlation Method Gas viscosity The viscosity of a fluid is a measure of the internal fluid friction (resistance) to flow. If the friction between layers of the fluid is small, i.e., low viscosity, an applied shearing force

More information

OIL SUPPLY SYSTEMS ABOVE 45kW OUTPUT 4.1 Oil Supply

OIL SUPPLY SYSTEMS ABOVE 45kW OUTPUT 4.1 Oil Supply OIL SUPPLY SYSTEMS ABOVE 45kW OUTPUT 4.1 Oil Supply 4.1.1 General The primary function of a system for handling fuel oil is to transfer oil from the storage tank to the oil burner at specified conditions

More information

Environmental Science: An Indian Journal

Environmental Science: An Indian Journal Environmental Science: An Indian Journal Research Vol 14 Iss 1 Flow Pattern and Liquid Holdup Prediction in Multiphase Flow by Machine Learning Approach Chandrasekaran S *, Kumar S Petroleum Engineering

More information

Gas Well Deliquification Workshop. Sheraton Hotel, Denver, Colorado February 29 March 2, 2016

Gas Well Deliquification Workshop. Sheraton Hotel, Denver, Colorado February 29 March 2, 2016 Gas Well Deliquification Workshop Sheraton Hotel, February 29 March 2, 2016 Enriched Inflow Performance Relationship (EIPR) Curves for Simultaneous Selection of Target Rate & Pump Setting Depth While Visualizing

More information

Characterizers for control loops

Characterizers for control loops Characterizers for control loops By: F. G. Shinskey (May 1999) Introduction Commercial controllers such as the PID series (proportional, integral, derivative, and their combinations) are linear devices

More information

New Viscosity Correlation for Different Iraqi Oil Fields

New Viscosity Correlation for Different Iraqi Oil Fields Iraqi Journal of Chemical and Petroleum Engineering Iraqi Journal of Chemical and Petroleum Engineering Vol.15 No.3 (September 2014) 71-76 ISSN: 1997-4884 University of Baghdad College of Engineering New

More information

TUTORIAL. NPSHA for those who hate that stuffy word. by Jacques Chaurette p. eng. copyright 2006

TUTORIAL. NPSHA for those who hate that stuffy word. by Jacques Chaurette p. eng.  copyright 2006 TUTORIAL NPSHA for those who hate that stuffy word by Jacques Chaurette p. eng. www.lightmypump.com copyright 2006 page.2 NPSHA for those who hate that stuffy word This article follows the same approach

More information

USING A PROBABILITY APPROACH TO RANK IN-LINE INSPECTION ANOMALIES FOR EXCAVATION AND FOR SETTING REINSPECTION INTERVALS

USING A PROBABILITY APPROACH TO RANK IN-LINE INSPECTION ANOMALIES FOR EXCAVATION AND FOR SETTING REINSPECTION INTERVALS USING A PROBABILITY APPROACH TO RANK IN-LINE INSPECTION ANOMALIES FOR EXCAVATION AND FOR SETTING REINSPECTION INTERVALS by Dennis C. Johnston and Carolyn E. Kolovich Kiefner & Associates, Inc. P.O. Box

More information

Application Worksheet

Application Worksheet Application Worksheet All dimensions are nominal. Dimensions in [ ] are in millimeters. Service Conditions Medium Through Valve: Required C v : Temperature Maximum: Minimum: Normal: Flow Maximum: Minimum:

More information

COPYRIGHT. Production Logging Flowmeter Survey Solution Guide

COPYRIGHT. Production Logging Flowmeter Survey Solution Guide Production Logging Flowmeter Survey Solution Guide Applying Slippage & Liquid Holdup equations, solve for Q oil and Q water at 6130 ft and 6216 ft @ 6130 ft, the % ratio of flow is about 100 %, or 9190

More information

CHAPTER 5: VACUUM TEST WITH VERTICAL DRAINS

CHAPTER 5: VACUUM TEST WITH VERTICAL DRAINS CHAPTER 5: VACUUM TEST WITH VERTICAL DRAINS 5.1 Introduction Using surcharging as the sole soil consolidation mean can take a long time to reach the desired soil settlement. Soil consolidation using prefabricated

More information

Pigging as a Flow Assurance Solution Avoiding Slug Catcher Overflow

Pigging as a Flow Assurance Solution Avoiding Slug Catcher Overflow Pigging as a Flow Assurance Solution Avoiding Slug Catcher Overflow Aidan O'Donoghue, Pipeline Research Limited, Glasgow, UK This paper sets out to provide an initial method of assessing the bypass requirements

More information

Validation Study of Gas Solubility Correlations at bubble point pressure for Some Libyan Crude Oils Using Three chosen Correlations

Validation Study of Gas Solubility Correlations at bubble point pressure for Some Libyan Crude Oils Using Three chosen Correlations Validation Study of Gas Solubility Correlations at bubble point pressure for Some Libyan Crude Oils Using Three chosen Correlations Dr. Mustafa O. Sharrad Dept. of Chemical and Petroleum Engineering, Faculty

More information

Multi-Stage Plunger Lift: Case Histories

Multi-Stage Plunger Lift: Case Histories Gas Well De-Liquification Workshop February 28 - March 2, 2005 Multi-Stage Plunger Lift: Case Histories Rick Hughes, Production Superintendent S. OK District Ted Davis, Production Foreman S. OK District

More information

A New and Simplified Method for Determination of Conductor Surface Casing Setting Depths in Shallow Marine Sediments (SMS)

A New and Simplified Method for Determination of Conductor Surface Casing Setting Depths in Shallow Marine Sediments (SMS) AADE-07-NTCE-41 A New and Simplified Method for Determination of Conductor Surface Casing Setting Depths in Shallow Marine Sediments (SMS) Paknejad, A., Texas A&M University; Schubert, J., Texas A&M University

More information

From the Reservoir Limit to Pipeline Flow: How Hydrocarbon Reserves are Produced. 11/10/

From the Reservoir Limit to Pipeline Flow: How Hydrocarbon Reserves are Produced. 11/10/ From the Reservoir Limit to Pipeline Flow: How Hydrocarbon Reserves are Produced 11/10/2011 www.gekengineering.com 1 Rock Occurance and Production Although carbonates are a smaller volume of rock present,

More information

New power in production logging

New power in production logging New power in production logging Locating the zones where fluids enter the wellbore in a producing or injecting well is an important aspect of production logging. It is relatively straightforward to establish

More information

POWER Quantifying Correction Curve Uncertainty Through Empirical Methods

POWER Quantifying Correction Curve Uncertainty Through Empirical Methods Proceedings of the ASME 2014 Power Conference POWER2014 July 28-31, 2014, Baltimore, Maryland, USA POWER2014-32187 Quantifying Correction Curve Uncertainty Through Empirical Methods ABSTRACT Christopher

More information

Autodesk Moldflow Communicator Process settings

Autodesk Moldflow Communicator Process settings Autodesk Moldflow Communicator 212 Process settings Revision 1, 3 March 211. Contents Chapter 1 Process settings....................................... 1 Profiles.................................................

More information

16. Studio ScaleChem Calculations

16. Studio ScaleChem Calculations 16. Studio ScaleChem Calculations Calculations Overview Calculations: Adding a new brine sample Studio ScaleChem can be used to calculate scaling at one or more user specified temperatures and pressures.

More information

ANALYZING PRESSURE AND TEMPERATURE DATA FROM SMART PLUNGERS TO OPTIMIZE LIFT CYCLES. A Thesis GOPI KRISHNA CHAVA

ANALYZING PRESSURE AND TEMPERATURE DATA FROM SMART PLUNGERS TO OPTIMIZE LIFT CYCLES. A Thesis GOPI KRISHNA CHAVA ANALYZING PRESSURE AND TEMPERATURE DATA FROM SMART PLUNGERS TO OPTIMIZE LIFT CYCLES A Thesis by GOPI KRISHNA CHAVA Submitted to the Office of Graduate Studies of Texas A&M University in partial fulfillment

More information

FREQUENTLY ASKED QUESTIONS

FREQUENTLY ASKED QUESTIONS What are some applications in which you ve successfully used this product? New Completions - Stage by Stage Diversion Between Frac plugs for Intra-Stage Diversion Replace Frac Plugs with Perf PODs - Full

More information

HydroPull. Extended-Reach Tool. Applications

HydroPull. Extended-Reach Tool. Applications Extended-Reach Tool HydroPull This tool incorporates a cycling valve that momentarily interrupts the flow to create water-hammer pressure pulses inside coiled or jointed tubing used in horizontal well

More information

Sarah N. S. All-Said Noor * ; Dr. Mohammed S. Al-Jawad ** ; Dr. Abdul Aali Al- Dabaj ***

Sarah N. S. All-Said Noor * ; Dr. Mohammed S. Al-Jawad ** ; Dr. Abdul Aali Al- Dabaj *** Sarah N. S. All-Said Noor * ; Dr. Mohammed S. Al-Jawad ** ; Dr. Abdul Aali Al- Dabaj *** * Exploration petroleum company, ** University of Technology, ***Ministry of Oil The behavior of pressure derivative

More information

OCEAN DRILLING PROGRAM

OCEAN DRILLING PROGRAM BIH OCEAN DRILLING PROGRAM www.oceandrilling.org Scientifi c Application Packers A packer is an inflatable rubber element that inflates to seal the annular space between the drill string and the borehole

More information

Worked Questions and Answers

Worked Questions and Answers Worked Questions and Answers A Learning Document for prospective Candidates For the Rotary Drilling Well Control Test Programme Copyright, IWCF June 2000 Revision No.1, November 2000 IWCF 2000 page 1 of

More information

Broadly speaking, there are four different types of structures, each with its own particular function:

Broadly speaking, there are four different types of structures, each with its own particular function: 3 The selection of structures 3.1 Introduction In selecting a suitable structure to measure or regulate the flow rate in open channels, all demands that will be made upon the structure should be listed.

More information