1 Niko Deepwater Weatherford MPD DODI Ocean Monarch Nelson Emery Niko Indonesia Drilling Superintendent 26 Feb SPE Thailand 1

2 Outline Drivers for MPD: 1. Safety of personnel in remote operations 2. Twelve (12) of sixteen (16) wells Carbonate projects 3. Safely handle gas in riser compared to diverter safer for personnel - protect environment from diverting 4. Ability for < 8.5 ppg SBM to drill clays in Carbonate 5. Utilize MPD seal to mimic GOM SSBOP closures during drilling of balloon formations 6. Use ECD to drill / ppg over ECD for connections to efficiently drill well sections less circulate times 2

3 Superintendents Network Teleconference May 21, 2003 (HOU) Participants: G. Anthony, M. Bunyak, S. Furry, M. Brown, B. Carlson, A. Djamil, N. Emery, G. Olivera, E. Harness, J. Orndorff, L. Phelps and E. Dore Deepwater Gulf of Mexico Eddie Dore Since our last teleconference call, the Discoverer Spirit Drillship has completed drilling the Bohr #1 well, Mississippi Canyon Block 637, in 4066 of water. The well was drilled to 26,900 in 122 days, which were 38 days over AFE days and approximately $22 million over budget. There were many Unocal Deepwater records set on this well, such as 10 casing string (including two expandable strings that both leaked) to get to TD, losing approximately 60,000 bbls of SBM, over 250 closures on the annular preventer during drilling making connections on the stack due to ballooning plus well control incidents, etc. We were not proud of any of these records but as you can see in below attachment, we still out performed most of the competition. The Shell s Deep Mensa well took a total of 350 days. 3

4 Proposed Pananda 1 (19, 685 TD / 7,430 WD) Diamond Ocean Monarch Pananda - 1 PROPOSED Rig elevation - 86' Water depth - 7,430' 7,815' - 30" X 1.00" X 1.50" 26" riserless section - SW / sweeps 9.8 ppg LOT 10,450' - 20" 169 # X-56 Leopard 17 1/2" section ppg SBM 11.4 ppg LOT 12,600' /8" 88.2 # P-110 VAM TVD 12 1/4" X 13 1/2" section ppg SBM 12.9 ppg LOT 15,000' /4" 60 # P-110 VAM FJL 10 5/8" X 11 5/8" section ppg SBM 14.1 ppg LOT 17,500' - 9 5/8"" 53.5 # P-110 AB-HDL 7", 29 ppf, P-110, Vam Top 8 1/2" section ppg SBM 19,685' - TD (+ 350 F) 4

5 10 5/8 X 11 5/8 16,766 w/ 12.3 ppg ppg ECD ppg ESD w/ SBP-- Continue to drill 10 5/8 X 11 5/8 w/ 12.3 ppg 850 GPM from ft to ft in MPD mode while monitoring flow in and flow out, pressure and trip tank. Flow thru AFT & FWD lines and bypass choke. Flow thru gut line via Coriolis. ECD = ppg. GPM PSI RPM = 140 WOB TRQ ECD BGD CG (16,587 ) Niko SBM Mud Properties: O/W 83/17 HPHT 2.0 /3.0 Alk Lime WPS K - Record section water intrusion 5

6 10 5/8 X 11 5/8 17,200 w/ 12.3 ppg ppg ECD ppg ESD w/ SBP--- Continue to drill 10 5/8 X 11 5/8 w/ 12.3 ppg 850 GPM from ft to ft in MPD mode flow thru AFT & FWD lines thru gutline and bypass choke to Coriolis = ppg ECD. Hold 320 psi on connection (12.7 ppg EMW). GPM PSI RPM WOB TRQ ECD BGD CG (17,170 ) **Reduced pump rate observing ECD on PWD and increased MW from 12.3 to 12.7 ppg w/ 16.0 ppg pill on bottom for 9 5/8 liner run and set 6

7 Fingerprint - 9 5/8 17,208 w/ 13.2 ppg Pak Nelson, Attached is MPD pressure 13.2ppg for 8-1/2 section with various flow rate. Attached document is for 700gpm + 160gpm on the boost. And below is all rate and pressure we get during test for your reference Returns coming up forward flow line through gutline to Coriolis and returning to header box. 500GPM + 160GPM on the boost - SBP 36psi. RCD pressure 117psi. 550GPM + 160GPM on the boost - SBP 39psi RCD pressure 133psi 600GPM + 160GPM on the boost - SBP 39psi RCD pressure 145 psi 700GPM + 160GPM on the boost - SBP 46psi RCD pressure 166 psi Returns coming up forward flow line through both chokes to Coriolis returning to header box. 500GPM + 160GPM on the boost - SBP 46psi RCD pressure 129psi 550GPM + 160GPM on the boost - SBP 52psi RCD pressure 145psi 600GPM + 160GPM on the boost - SBP 55psi RCD pressure 155psi 700GPM + 160GPM on the boost - SBP 66psi RCD pressure 166psi Returns coming up both flow lines through gutline to Coriolis meter returning to header box. 700GPM + 160GPM on the boost - SBP 53psi RCD pressure 154psi Returns coming up both flow lines through chokes A and B through Coriolis meter returning to header box. 500GPM + 160GPM on the boost - SBP 48psi RCD pressure 110psi 550GPM + 160GPM on the boost - SBP 50psi RCD pressure 116psi 600GPM + 160GPM on the boost - SBP 52psi RCD pressure 127psi 700GPM + 160GPM on the boost - SBP 67psi RCD pressure 130psi Returns coming up both flow lines, one choke and through Coriolis meter and return back to header box. 500GPM + 160GPM on the boost - SBP 74psi RCD pressure 137psi 550GPM + 160GPM on the boost - SBP 84psi RCD pressure 145psi 600GPM + 160GPM on the boost - SBP 92psi RCD pressure 155psi 700GPM + 160GPM on the boost - SBP 110psi RCD pressure 184psi Thanks Ali 7

8 8 ½ X 9 7/8 18,664 w/ 13.2 ppg ppg ECD ppg ESD w/ SBP-- Continue to drill 8 1/2 X 9 7/8 hole w/ 13.2 ppg 600 GPM from ft to ft in MPD mode flow thru AFT & FWD lines thru gutline and bypass choke to Coriolis = 13.9 ppg ECD. Hold 670 psi on connection (+13.9 ppg EMW). GPM PSI RPM WOB TRQ ECD BGD - 40 CG (18,571 ) **Reduced pump rate observing ECD on PWD and increased MW from 13.2 to 13.8 ppg w/ 16.0 ppg pill on bottom for 7 liner run and set 8

9 6 1/8 19,685 w/ 14.1 ppg ppg ECD ppg ESD w/ SBP-- Continue to drill 6 1/8 hole w/ 14.1 ppg 270 GPM from to ft in MPD mode flow thru AFT & FWD lines thru gutline and bypass choke to Coriolis = 14.7 ppg ECD. Hold 685 psi on connection (+14.8 ppg EMW). GPM PSI RPM WOB TRQ ECD BGD - 15 CG - 48 (19,646 ) **Reduced pump rate observing ECD on PWD and increased MW from 14.1 to 14.4 ppg w/ plan to stage to 14.6 ppg for log trip. Mud loss start = spot pill 2 3 bbl hour losses; took 11 MDT sample with ESD of ppg 9

10 MW / ECD / ESD / LOT / SBP 1.5 ESD and ECD in the 6 1/8 section After the good LOT result (14.91 ppg), MW was increased to 13.9 ppg and back pressure maintained at 685 psi; (value close to agreed allowable pressure 750 psi); Hence MW was increased to 14.1 ppg and back pressure reduced to 525 psi. Max ESD ppg (18824 ), max ECD ppg (19485 ). The last ESD (19646 ) is lower than the previous one despite increased SBP. Possibly due to momentary drop of SBP (see figure next page) or downhole cause. Note that in this section ESD has always been higher than the ECD, by choice of avoiding pipe connection gas that may have interfere with potential formation gas from reservoir. ESD was very close from surface leak-off pressure, but no losses have been observed while drilling. 10

11 Fingerprint results minimum backpressure on well DEPTH - CSG/LIN. - MW - GPM Flow line+ Coriolis Flow line Choke + Coirolis 10, psi (cold SBM) 75 psi psi 132 psi 12, / psi psi 15, ¾ psi 150 psi psi 175 psi 17, / psi 154 psi 18, psi 110 psi 11

12 MPD Pressure Control effect on ROP DRILLING RATES WITH / WITHOUT BEARING/SEAL IN MPD WITHOUT BEARING / SEAL IN MPD - MUD DENSITY EQUAL TO PORE PRESSURE FROM TO FOOTAGE HOURS FT / HOUR 15,088 15, ,208 15, ,422 15, ,725 16, ,363 16, ,587 16, ,678' in 35 hours drilling = 47.9' ft/hr May 1600 hours to May 0400 hours = 1,678' in 36 hours = 46.1 ' ft / hr ( Circulate 6 hours to clean up gas ) WITH BEARING/SEAL IN MPD HOLD BACK PRESSURE TO EQUAL PORE PRESSURE 16,766 16, ,945 16, ,990 17, ,034 17, ' in 15 hours drilling = 29.7' ft/hr May 1000 hours to May 0800 hours = 446' in 22 hours = 20.2' ft/hr ( Circulate 11.5 hours to raise mud weight and clean up gas ) 12

13 Kick at 15078ft during drilling 12¼ x13½ phase During drilling 12¼ x13½ hole at 14970ft with 10.5ppg mud, the background gas was showing increase from 90u to 160u. Made a pipe connection at 14989ft and drill ahead to 15030ft. Performed SIT for 5 minutes, drill ahead to 15078ft and performed circulation. After 85minutes of circulation, the ECD and SPP were tend to decrease, followed by the increase in Flow return and 12bbls gain in active pit when the gas increase to maximum 2826 unit. This gas was a connection gas from 14989ft. Gas cut mud 1.0ppg was observed at gas peak. (please refer to plot#1&2). Continued to circulate and decided to increase the MW from 10.5ppg to 10.8ppg by adding barite into the active pit. During circulation, observed a trend of decreasing in ECD and SPP. Performed Flow Check (F/C), trip tank gain 3bbls/3min. Shut in the well and monitor the pressure: SICP=180psi and SIDP=150psi after 15minutes. Pumped 10.80ppg mud to kill the well with Wait & Weight Method. The gas during pumping through choke was high and steady at 2100unit, as per calculation this gas was coming from below the BOP. Concurrently, displacing the riser with 10.8ppg mud, and observed the SIT gas was 2455u, F/C was 3342unit came from the riser; the background gas was steady at 1500unit after 10.8ppg mud around. Shut in the well, SICP=SIDP=0. Open the BOP, and continue circulate with 10.8ppg mud. The maximum bottoms up gas was 2769u with background steady at 700unit. Performed SIT with 10.8ppg mud, and circulate increase MW to 11.0ppg. The SIT gas was 503u, BG 463u, 40unit ABG. The background gas was then decrease to 250unit after 11.0ppg mud around. Spot 1000ft of 15ppg LCM (from 15078ft to 14078ft) and pump out of hole to casing shoe, pump another 40bbls of 12ppg LCM at shoe before pulled out of hole to surface. 13

14 15,078 - Increase flow from 14,989 Pump rate 26 BPM / MW 10.5 ppg / ECD 10.9 ppg Annulus to riser=856 bbls(33 min) Riser annulus = 2418 bbls (93 min) 14,989 PC 2826 units / cut to 10.3 ppg / start 10.8 ppg in / 20 min SI 14

15 Incr MW ppg - kill well thru 4-5 bpm Flush riser CBU incr MW to 11.0ppg - total 22 hours Pump out - spot 1, ppg pill to run 11 ¾ liner 15

16 RCD Bearing/Packer installed drilling 8 ½ X 9 7/8 hole 17,941 w/ 13.2 ppg increased SBP 13 hours Drill to 18,664 w/ 13.2 ppg ppg EMW w/ SBP csg pt. 16

17 Installation / Utilization Cost: Niko-Diamond-Weatherford MPD Diamond Ocean Monarch for Pananda

18 MPD Utilization Cost drilling Pananda # 1 TIME / COST DUE TO MPD UTILIZATION NIKO PANANDA # 1 ( Hourly spread cost = $ 48,000 ) DATE HOURS 22-Apr 20 PU WFD MPD to riser 23-Apr 24 RU Coflex - PRV valve repair -latch 24-Apr 17.5 MU -RCD to diverter - test riser 25-Apr 4 Install bearing/seal in RCD 26-Apr 7.5 Singature / fingerprint flow test 3-May 3 Set seal - fingerprint test on 13 5/8" 10-May 3.5 Set seal - fingerprint test on 11 3/4" 11-May gpm w/ 12.3 ppg 13-May 1 Retrieve RCD bearing/seal for 9 5/8" 17-May 1 Set bearing/seal 18-May 2 Fingerprint for 8 1/2" X 9 7/8" hole 24-May 1 Retrieve RCD bearing/seal for 7" 25-May 2.5 RU/RD Eline adapter to log 29-May 1.5 Change RCD bearing/seal for 6 1/8" 30-May 1 Install bearing/seal in RCD 31-May 4.5 Fingerprint for 6 1/8" w/ 13.6 ppg 4-Jun 2.5 Retrieve RCD bearing/seal 11-Jun 17 Unlock from diverter - RD MPD 12-Jun 3.5 Lay out RCD/DSIT - triple barrel TOTAL HOURS 121 TOTAL COST $ 5, 808,

19 Actual Operations Continuous RCD/Bearing Assembly utilization installed new RCD/Bearing Assembly per hole section Higher bottom hole pressure during connection vs during drilling (ECD), to prevent influx if human error occurred during connection Drilled under pore pressure utilizing MPD for two (2) bottom sections of well Drill to section TD with effective section PP EMW Utilize ECD ( +/- 0.6 ppg ) + MPD SBP on connection with plan to raise MW to PP on final trip to log / run liner Risk of wear on SSBOP annular as per GOM eliminated 19

20 RCD / Bearing Assembly Utilization Model 7875 BTR RCD 5% 33% 62% Number of Hours Nothing was installed = 725 (62%) Number of Hours Bearing Assembly was installed = 385 (33%) Number of Hours Logging Adapter was installed = 66 (5%) Total Hours = 1176 Note: Model 7875 BTR RCD was installed with the riser and remove with the riser. Above timing includes section drilled without MPD but RCD was already installed. 20

21 21

22 Niko Diamond Weatherford MPD Conclusion Drilling to target depth of 19,685 would not have been possible with planned casing program without MPD Drilling with MW less than PP is most efficient use of MPD on higher density wells. Higher SBM on connection than ECD also only allows flow while drilling. Initial installation and cost of $ 7.255MM allowed well to be drilled +/- $ 18MM under AFE and kept complete control during any gas intrusion events Time and cost due to initial use of $ 5.8MM should be down +/- 20% after three (3) wells to $ 4.6MM est. TEAM BUILDING BEFORE WELL = SUCCESS 22

August 21, Deepwater MPD / PMCD

August 21, Deepwater MPD / PMCD August 21, 2011 Deepwater MPD / PMCD Managed Pressure Drilling (MPD) Pressure held on top of riser while drilling. Drill in overbalance condition Pressurized Mud Cap Drilling (PMCD) Pressure of mud column

More information

SUBSEA KILL SHEET EXERCISE No. 5

SUBSEA KILL SHEET EXERCISE No. 5 Subsea Kill Sheet Exercise No. 5 SUBSEA KILL SHEET EXERCISE No. 5 Name: Date: Complete the Subsea vertical kill sheet provided on pages 2 and 3. Then answer questions 1 to 12. Please round calculations

More information

Offshore Managed Pressure Drilling Experiences in Asia Pacific. SPE paper

Offshore Managed Pressure Drilling Experiences in Asia Pacific. SPE paper Offshore Managed Pressure Drilling Experiences in Asia Pacific SPE paper 119875 Authors: Steve Nas, Shaun Toralde, Chad Wuest, SPE, Weatherford Solutions Sdn Bhd, SPE, Weatherford Indonesia SPE, Weatherford

More information

Dilution-Based Dual Gradient Well Control. Presented at the 2011 IADC Dual Gradient Workshop, 5 May 2011 by Paul Boudreau, Dual Gradient Systems LLC

Dilution-Based Dual Gradient Well Control. Presented at the 2011 IADC Dual Gradient Workshop, 5 May 2011 by Paul Boudreau, Dual Gradient Systems LLC Dilution-Based Dual Gradient Well Control Presented at the 2011 IADC Dual Gradient Workshop, 5 May 2011 by Paul Boudreau, Dual Gradient Systems LLC In this very short presentation, we will Review Dilution-based

More information

W I L D W E L L C O N T R O L CIRCULATION & WELL CONTROL

W I L D W E L L C O N T R O L CIRCULATION & WELL CONTROL CIRCULATION & WELL CONTROL Learning Objectives You will learn: The importance of pump rates and pressures during well control operations Pressure relationships Basic calculations necessary in well control

More information

Extended leak off testing

Extended leak off testing Extended leak off testing Rev: 1.0 03/01/01 Purpose To ensure minimal operational time and risk exposure to personnel, process, production and equipment. The following extended leak off test procedures

More information

Study Guide IADC WellSharp Driller and Supervisor

Study Guide IADC WellSharp Driller and Supervisor Times to Flow Check: Before pulling out of the hole Before pulling BHA into the BOP When bit is pulled into the casing Increase in cuttings at shakers with same ROP On connections Upon abnormal trip tank

More information

BP SIT Testing Franks Facility Lafayette

BP SIT Testing Franks Facility Lafayette BP SIT Testing Franks Facility Lafayette General Information Status: Franks test well Lafayette La. Rig: Franks Test Rig Casing: 13 3/8, 0 to 4,600 Workstring: 4 ½ IF Brine: Fresh Water Directional: Straight

More information

MPD Technique in Haynesville Shale Delivers Significant Value in Over Pressured Zones, A Case Study on Four Wells.

MPD Technique in Haynesville Shale Delivers Significant Value in Over Pressured Zones, A Case Study on Four Wells. AADE-11-NTCE-55 MPD Technique in Haynesville Shale Delivers Significant Value in Over Pressured Zones, A Case Study on Four Wells. Serkan Cenberlitas, Jim Crenshaw, and Ferhat Gumus, Weatherford International;

More information

DAY ONE. 2. Referring to the last question, what mud weight would be required to BALANCE normal formation pressure?

DAY ONE. 2. Referring to the last question, what mud weight would be required to BALANCE normal formation pressure? DAY ONE 1. Normal formation pressure gradient is generally assumed to be: A..496 psi/ft B..564 psi/ft C..376 psi/ft D..465 psi/ft 2. Referring to the last question, what mud weight would be required to

More information

1. The well has been shut in on a kick and the kill operation has not started.

1. The well has been shut in on a kick and the kill operation has not started. Well Control Methods Day 2 1. The well has been shut in on a kick and the kill operation has not started. Shut in drill pipe pressure Shut in casing pressure 500 psi 700 psi After stabilization, both pressures

More information

Deepwater Horizon Incident Internal Investigation

Deepwater Horizon Incident Internal Investigation Not all Information has been verified or corroborated. Subject to review based on additional information or analysis. Deepwater Horizon Incident Internal Investigation 1 Areas of Discussion Investigation

More information

DRILLING MANAGED PRESSURE REGIONAL OUTLOOK: EAST AFRICA REDUCED EMISSION COMPLETIONS SHALE TECHNOLOGY REVIEW

DRILLING MANAGED PRESSURE REGIONAL OUTLOOK: EAST AFRICA REDUCED EMISSION COMPLETIONS SHALE TECHNOLOGY REVIEW MARCH 2014 / DEFINING TECHNOLOGY FOR EXPLORATION, DRILLING AND PRODUCTION / WorldOil.com MANAGED PRESSURE DRILLING How automated MPD enables drilling of an impossible well in Mexico REGIONAL OUTLOOK: EAST

More information

ECD Reduction Tool. R. K. Bansal, Brian Grayson, Jim Stanley Control Pressure Drilling & Testing

ECD Reduction Tool. R. K. Bansal, Brian Grayson, Jim Stanley Control Pressure Drilling & Testing ECD Reduction Tool R. K. Bansal, Brian Grayson, Jim Stanley Control Pressure Drilling & Testing Drilling Engineering Association, Fourth Quarter Meeting November 20, 2008 1 Presentation outline Description

More information

DRILLSCENE PROACTIVE DRILLING DECISIONS

DRILLSCENE PROACTIVE DRILLING DECISIONS DRILLSCENE PROACTIVE DRILLING DECISIONS RISE TO THE CHALLENGE OF REAL-TIME DRILLING CONTROL Today s oil and gas drilling operations present significant technical challenges in remote locations and increasingly

More information

SPE/IADC Abstract

SPE/IADC Abstract SPE/IADC 125311 Pressurized Mud Cap Drilling Drastically Reduces Non-Productive Time in Soka Field, South Sumatera Michael Runtuwene, Sanny Suprihono, and Dany Rizka, SPE, Medco E&P Indonesia, Andi Eka

More information

WILD WELL CONTROL WARNING SIGNS OF KICKS

WILD WELL CONTROL WARNING SIGNS OF KICKS WARNING SIGNS OF KICKS Warning Signs of Kicks Learning Objectives You will learn the warning signs that indicate the well may be kicking: Warning signs of kicks False kick indicators You will also learn

More information

BANDAR PANJI-1 WELL CONTROL INCIDENT REPORT

BANDAR PANJI-1 WELL CONTROL INCIDENT REPORT BANDAR PANJI-1 WELL CONTROL INCIDENT REPORT EXECUTIVE SUMMARY I was requested by management to review the Banjar Panji-1 drilling operations from the conception of the Integrated Drilling Management approach

More information

Worked Questions and Answers

Worked Questions and Answers Worked Questions and Answers A Learning Document for prospective Candidates For the Rotary Drilling Well Control Test Programme Copyright, IWCF June 2000 Revision No.1, November 2000 IWCF 2000 page 1 of

More information

DUO-SQUEEZE H LCM Mixing Tables and Operating Procedures

DUO-SQUEEZE H LCM Mixing Tables and Operating Procedures BAROID DUO-SQUEEZE H LCM Mixing Tables and Operating Procedures Prepared for: Prepared by: Submitted by: Submittal Date: All Customers Sharath Savari, Donald L. Whitfill Halliburton January 2014 1 Copyright

More information

Practice Exam IADC WellSharp Driller and Supervisor

Practice Exam IADC WellSharp Driller and Supervisor Workover & Completion Day 4 1. In a workover operation of a shut in well a Lubricator is being used together with a Wireline BOP / Wireline Valve. Which Barrier is classified as the Primary Barrier? A.

More information

Understanding pressure and pressure

Understanding pressure and pressure CHAPTER 1 1-1 PRESSURE BASICS Remember to think downhole. The concepts provided in this section cover the foundations for good well control. Understanding pressure and pressure relationships is important

More information

R.K. Bansal, Weatherford; P.A. Bern, BP Exploration; Rick Todd, Weatherford; R.V. Baker, BP America; Tom Bailey, Weatherford

R.K. Bansal, Weatherford; P.A. Bern, BP Exploration; Rick Todd, Weatherford; R.V. Baker, BP America; Tom Bailey, Weatherford AADE-07-NTCE-69 A Downhole Tool for Reducing ECD R.K. Bansal, Weatherford; P.A. Bern, BP Exploration; Rick Todd, Weatherford; R.V. Baker, BP America; Tom Bailey, Weatherford Copyright 2007, AADE This paper

More information

Solid Expandable Tubular Technology: The Value of Planned Installation vs. Contingency

Solid Expandable Tubular Technology: The Value of Planned Installation vs. Contingency Solid Expandable Tubular Technology: The Value of Planned Installation vs. Contingency Chris Carstens Unocal Corporation 14141 Southwest Freeway Sugar Land, Texas 77478 Mike Breaux Unocal Corporation 14141

More information

Drilling Morning Report

Drilling Morning Report REPORT DATE 5/0/200 Report # AFE # Casing OD(in) WT(lbs/ft) Grade Btm MD(ft) Btm TVD(ft) DCRB04 TVD: 32 MD: 32 Progress: 32 Planned TD:,500 Current Hole Size: Days From Spud: Spud Date: 5//0 Days on Well:

More information

Chapter 4 Key Findings. 4 Key Findings

Chapter 4 Key Findings. 4 Key Findings Chapter 4 Key Findings 211 4 Key Findings 212 Chapter 4 Key Findings This summarizes the key findings of the investigation team based on its extensive review of available information concerning the Macondo

More information

AADE 2009NTCE-04-04: PRACTICAL ASPECTS AND VALUE OF AUTOMATED MPD IN HPHT WELLS

AADE 2009NTCE-04-04: PRACTICAL ASPECTS AND VALUE OF AUTOMATED MPD IN HPHT WELLS sudden appearance of permeable sequences abnormally pressured to higher than anticipated levels in an already narrow margin. 2009 NATIONAL TECHNICAL CONFERENCE & EXHIBITION, NEW ORLEANS, LOUISIANA AADE

More information

Why Do Not Disturb Is a Safety Message for Well Integrity

Why Do Not Disturb Is a Safety Message for Well Integrity Why Do Not Disturb Is a Safety Message for Well Integrity Presented at the Practical Well Integrity Conference 9-10 December, 2014 in Houston By Ron Sweatman, Principal Advisor, Reservoir Development Services,

More information

A New and Simplified Method for Determination of Conductor Surface Casing Setting Depths in Shallow Marine Sediments (SMS)

A New and Simplified Method for Determination of Conductor Surface Casing Setting Depths in Shallow Marine Sediments (SMS) AADE-07-NTCE-41 A New and Simplified Method for Determination of Conductor Surface Casing Setting Depths in Shallow Marine Sediments (SMS) Paknejad, A., Texas A&M University; Schubert, J., Texas A&M University

More information

Hard or Soft Shut-in : Which is the Best Approach?

Hard or Soft Shut-in : Which is the Best Approach? HARD - SOFT shut-in? Hard or Soft Shut-in : Which is the Best Approach? March '93 INTRODUCTION There is now reasonable acceptance through-out the industry for the use of a hard shut-in procedure following

More information

NOT TO COPY -- NO DISSEMINATE WITHOUT WRITTEN AGREEMENT. Presentation JB AG JCN JR 1

NOT TO COPY -- NO DISSEMINATE WITHOUT WRITTEN AGREEMENT. Presentation JB AG JCN JR 1 Presentation JB AG JCN JR 1 Kicks & blowouts A kick is an unexpected influx into a well of a formation fluid. Should this influx be uncontrolled... -- during its way from the bottom of the hole up in the

More information

University 31E 4. Ward County, TX. Rig: Union Drlg Rig 229. AFE: $1,393, DHC: $761, WI: Notes: Workover:

University 31E 4. Ward County, TX. Rig: Union Drlg Rig 229. AFE: $1,393, DHC: $761, WI: Notes: Workover: Zone: War-Wink Cherry Canyon TD: 7250' Rig: Union Drlg Rig 229 Status: WOC Spud Date: 1/26/2013 RR Date: 2/12/2013 First Sales: AFE: $1,393,293.00 DHC: $761,963.00 WI: Notes: Date Activity 11/14/2012 11/14/12

More information

Blowout during Workover Operation A case study Narration by: Tarsem Singh & Arvind Jain, OISD

Blowout during Workover Operation A case study Narration by: Tarsem Singh & Arvind Jain, OISD 1. Introduction An incident of gas leakage from a well took place during workover operations. Subsequently, the gas caught fire on the fourth day in which twelve persons were injured. Two contract workers,

More information

PHE KE30-A8 WORKOVER PROGRAM

PHE KE30-A8 WORKOVER PROGRAM PHE WMO KE30-A8 WORKOVER PROGRAM PHE KE30-A8 WORKOVER PROGRAM Prepared by: Ross Webber. Hendra Wahyudi. Chandra Maulana. George Lattimore Adi Benanjaya Achmad Soendaroe. Tri Wiyono DRILLING ENGINEER SR.

More information

W I L D W E L L C O N T R O L PRESSURE BASICS AND CONCEPTS

W I L D W E L L C O N T R O L PRESSURE BASICS AND CONCEPTS PRESSURE BASICS AND CONCEPTS Pressure Basics and Concepts Learning Objectives You will be familiarized with the following basic pressure concepts: Defining pressure Hydrostatic pressure Pressure gradient

More information

Evaluation of deepwater kicks and future countermeasures

Evaluation of deepwater kicks and future countermeasures WELLS AND WELL INTERVENTION Evaluation of deepwater kicks and future countermeasures Paal Skalle, Per Holand 2 and Sigbjørn Sangesland Norwegian University of Science and Technology and 2 SINTEF/ExproSoft

More information

Subsea Safety Systems

Subsea Safety Systems Subsea Safety Systems The ELSA-HP has been developed to service the high pressure horizontal tree completion and intervention market. With systems designed and qualified up to 15,000 psi, 250 degf and

More information

RPSEA UDW Forum June 22 & 23, Secure Energy for America

RPSEA UDW Forum June 22 & 23, Secure Energy for America RPSEA UDW Forum June 22 & 23, 2010 Secure Energy for America PROJECT TEAM RPSEA Operator Advisory Committee Anadarko Chevron Shell ConocoPhillips Subcontractors IntecSea NOV CTES General Marine Contractors

More information

MOCS. Multiple Opening Circulation Sub. Fluid Bypass Valve

MOCS. Multiple Opening Circulation Sub. Fluid Bypass Valve MOCS Multiple Opening Circulation Sub Fluid Bypass Valve 1 Applications BHA Protection o o Pumping LCM Spotting Acid Work-over and completions o o o Well bore cleanout Fluid displacements Bottoms-up circulation

More information

INTERPRETATION NOTE ISSUED UNDER THE PETROLEUM DRILLING REGULATIONS (CNR 1150/96)

INTERPRETATION NOTE ISSUED UNDER THE PETROLEUM DRILLING REGULATIONS (CNR 1150/96) BOP CLASSIFICATION SYSTEM FOR ONSHORE NEWFOUNDLAND AND LABRADOR INTERPRETATION NOTE ISSUED UNDER THE PETROLEUM DRILLING REGULATIONS (CNR 1150/96) PREPARED BY THE PETROLEUM RESOURCE DEVELOPMENT DIVISION

More information

Air and Gas Drilling

Air and Gas Drilling Air and Gas Drilling Air and Gas Drilling It is a technique in which the more common drilling fluids, (water or mud) are replaced by highly compressible Air or Natural gas. But Compressibility makes pressure

More information

Wellwork Chronological Regulatory Report

Wellwork Chronological Regulatory Report Well Name: UNIVERSITY 49 #0808H Field: Lin (Wolfcamp) S/T/R: / / County, State: Location Desc: Operator: Enduring Resources, LLC Project Type: Completion District: Southern Project AFE: DV02151 AFE's Associated:

More information

Rig Math. Page 1.

Rig Math. Page 1. Page 1 The Calculator and Main Keyboard Display Numerical 10-key pad used for entering numerical values Trigonometric Functions These keys will be used where wellbore angle is an issue These are the keys

More information

AADE-16-FTCE-55. Copyright 2016, AADE

AADE-16-FTCE-55. Copyright 2016, AADE AADE-16-FTCE-55 Integrated solution for drilling a sidetrack high-pressure production well M. Trebilcock, J. Castellanos and E. Narváez, QMax Solutions Inc.; C. I. Arocha and M. P. Diaz, Petronorte Copyright

More information

BLOCK: CB-ONN-2010/8 GUJRAT-INDIA

BLOCK: CB-ONN-2010/8 GUJRAT-INDIA Well Control Manual Bharat PetroResources Limited BLOCK: CB-ONN-2010/8 GUJRAT-INDIA Prepared By: EnQuest PetroSloutions Pvt. Ltd. Contents 1.0.0 Definitions 2.0.0. Causes of Kicks 3.0.0. Kick indications

More information

Kicks Controlling Techniques Efficiency in Term of Time

Kicks Controlling Techniques Efficiency in Term of Time Engineering, 2017, 9, 482-492 http://www.scirp.org/journal/eng ISSN Online: 1947-394X ISSN Print: 1947-3931 Kicks Controlling Techniques Efficiency in Term of Time Ali K. Darwesh, Thorkild Maack Rasmussen,

More information

Blowout Engineers personnel have worked in over 40 countries and have a wide range of experience in addition to blowout control operations.

Blowout Engineers personnel have worked in over 40 countries and have a wide range of experience in addition to blowout control operations. 1.888.505.6346 1 Blowout Engineers provides operators the full complement of well control engineering and services. Blowout Control Well Control Project Management Relief Well Design and Execution Underground

More information

2-7/8 TRIPLE PORTED PBL BYPASS SYSTEM

2-7/8 TRIPLE PORTED PBL BYPASS SYSTEM RECEIVING PBL AT RIG SITE TITLE: Operating Instructions for 2-7/8 Triple Port PBL 1-10-201 2-7/8 TRIPLE PORTED PBL BYPASS SYSTEM OPERATING INSTRUCTIONS 1. On receipt of PBL Bypass Tools at Rig site, the

More information

Casing Design. Casing Design. By Dr. Khaled El-shreef

Casing Design. Casing Design. By Dr. Khaled El-shreef Casing Design By Dr. Khaled El-shreef 1 Casing Design CONTENTS Function of Casing Casing Types & Tools Strength Properties Casing Specification Casing Design 2 1 RUNNING AND CEMENTING CASING Reasons for

More information

Safety and Risk Analysis of Deepwater Drilling using Managed Pressure Drilling Technology

Safety and Risk Analysis of Deepwater Drilling using Managed Pressure Drilling Technology Safety and Risk Analysis of Deepwater Drilling using Managed Pressure Drilling Technology Jyoti Bhandari 1, Faisal Khan* 1, and Vikram Garaniya 1 1.Offshore Safety and Risk Management Group, Australian

More information

VOLUMETRIC METHODS and STRIPPING OPERATIONS

VOLUMETRIC METHODS and STRIPPING OPERATIONS VOLUMETRIC METHODS and STRIPPING OPERATIONS WELL CONTROL SCHOOL Muscat, Oman Training Center VOLUMETRIC METHODS and STRIPPING OPERATIONS The material contained here, is based on the best sources available

More information

OPTIMUM SELECTION OF WELL CONTROL METHODS

OPTIMUM SELECTION OF WELL CONTROL METHODS OPTIMUM SELECTION OF WELL CONTROL METHODS Md AHAMMAD SHARIF Assistant professor, Department of Petroleum Engineering, GIET College of Engineering, Rajahmundry. Dr. S. SRIGOWRI REDDY Professor, GIET College

More information

Well Control Drill Guide Example Only. Drill Guide is the list of drills, questions and attributes that are in DrillPad.

Well Control Drill Guide Example Only. Drill Guide is the list of drills, questions and attributes that are in DrillPad. Well Control Drill Guide Example Only Drill Guide is the list of drills, questions and attributes that are in DrillPad. This Well Control Drill Guide will be used in conjunction with the rig-specific well

More information

W I L D W E L L C O N T R O L AIR DRILLING

W I L D W E L L C O N T R O L AIR DRILLING AIR DRILLING Air Drilling Learning Objectives You will learn the basics of: Air drilling equipment Types of air drilling Differences between mud and air drilling You will learn how to apply well control

More information

AMERICAN ENERGY - PERMIAN BASIN, LLC UL Daily Drilling Partner Summary

AMERICAN ENERGY - PERMIAN BASIN, LLC UL Daily Drilling Partner Summary AEPB WELL NO. Report End Date: Report Number: 1 Rig: INTEGRITY, 3 Projected Days (days): 0 Drilling Days: : 70 : 0 Planned VS (ft): Current VS (ft): 42383383570000 MIRU MIRU INTEGRITY 3. 70 Longitude Orig

More information

Faculty of Science and Technology. Master Thesis. Writer: Audun Tufte Veisene (Writer s signatures)

Faculty of Science and Technology. Master Thesis. Writer: Audun Tufte Veisene (Writer s signatures) Faculty of Science and Technology Master Thesis Study program/ Specialization: Petroleum Engineering/ Drilling Technology Spring semester, 2014 Open Writer: Audun Tufte Veisene (Writer s signatures) Faculty

More information

Managed Pressure Drilling Automation Techniques for Horizontal Applications

Managed Pressure Drilling Automation Techniques for Horizontal Applications AADE-13-FTCE-11 Managed Pressure Drilling Automation Techniques for Horizontal Applications C.J. Bernard, Randy Lovorn, Derrick Lewis, Emad Bakri and Saad Saeed, Halliburton Copyright 2013, AADE This paper

More information

Low Pressure AutoChoke Console Precise wellbore pressure control for your underbalanced and managed-pressure drilling operations

Low Pressure AutoChoke Console Precise wellbore pressure control for your underbalanced and managed-pressure drilling operations Low Pressure AutoChoke Console Precise wellbore pressure control for your underbalanced and managed-pressure drilling operations High resolution pressure control at your fingertips, during your UBD and

More information

BaraBlend -665 LCM Standard Field Application Procedure

BaraBlend -665 LCM Standard Field Application Procedure BAROID BaraBlend -665 LCM Standard Field Application Procedure Prepared for: Prepared by: Submitted by: Submittal Date: All Customers Sharath Savari, Donald L. Whitfill Halliburton Apr 2016 1 Copyright

More information

EP WELLS DAILY OPERATIONS REPORT Report 19 05/26/2016

EP WELLS DAILY OPERATIONS REPORT Report 19 05/26/2016 Report 19 5/26/216 Company Type WBS No/API No PERMIAN Exploration 324861 / 423132849. Event Summary Event Type Drilling only Event Start Date 4/24/216 Days on Location 18.67 Objective Drill - Wolfcamp

More information

The SPE Foundation through member donations and a contribution from Offshore Europe

The SPE Foundation through member donations and a contribution from Offshore Europe Primary funding is provided by The SPE Foundation through member donations and a contribution from Offshore Europe The Society is grateful to those companies that allow their professionals to serve as

More information

IWCF Equipment Sample Questions (Combination of Surface and Subsea Stack)

IWCF Equipment Sample Questions (Combination of Surface and Subsea Stack) IWCF Equipment Sample Questions (Combination of Surface and Subsea Stack) 1. Given the volumes below, how much hydraulic fluid will be required to carry out the following operations (no safety margin)?

More information

Terrace Petroleum Corporation Cunning Wolf UL No. 602H, 1980 FNL and 467 FWL Section 6, Block 23, ULS Pecos County, Texas

Terrace Petroleum Corporation Cunning Wolf UL No. 602H, 1980 FNL and 467 FWL Section 6, Block 23, ULS Pecos County, Texas Terrace Petroleum Corporation Cunning Wolf UL No. 602H, 1980 FNL and 467 FWL Section 6, Block 23, ULS Pecos County, Texas 3-29-13 DAY 1 Previously built location, roads, built and lined reserve pits. Move

More information

Eliminating Fatal Risks. Dale Bradford Drilling Superintendent

Eliminating Fatal Risks. Dale Bradford Drilling Superintendent Eliminating Fatal Risks Dale Bradford Drilling Superintendent Setting the Stage: The BHPB Fatal Risks BHPB Fatal Risks identified following a review of past fatalities and significant incidents within

More information

REVISION INDEX DESCRIPTION AND/OR PAGES MODIFIED

REVISION INDEX DESCRIPTION AND/OR PAGES MODIFIED : PROGRAM: AREA: DDP&T-POCOS DRILLING AND RIG SYSTEMS PAGE: 1 of 28 REVISION INDEX DESCRIPTION AND/OR PAGES MODIFIED First edition that incorporates and replaces the following documents: ET-2.-114-61-

More information

Commentary on the book by Andrew Hopkins. By Graham Dalzell

Commentary on the book by Andrew Hopkins. By Graham Dalzell Commentary on the book by Andrew Hopkins By Graham Dalzell How we drill oil wells The disaster itself how it happened; (anonymised)- oil, well and drilling companies Andrew s conclusions on the Human,

More information

ENDEAVOR ENERGY RESOURCES

ENDEAVOR ENERGY RESOURCES ENDEAVOR ENERGY RESOURCES Lease WELL NO FIELD PBTD PERFORATIONS FOREMAN TOOLPUSHER API NUMBER DATE University 5-20-21 #1H 14,223' Tony Cody 07/02/13 OART WEATHER FLUID SUMMARY W/O UNIT DATA W/L UNIT DATA

More information

OCEAN DRILLING PROGRAM

OCEAN DRILLING PROGRAM BIH OCEAN DRILLING PROGRAM www.oceandrilling.org Scientifi c Application Packers A packer is an inflatable rubber element that inflates to seal the annular space between the drill string and the borehole

More information

International Well Control Forum. IWCF Drilling Well Control Syllabus Level 3 and 4 March 2017 Version 7.0

International Well Control Forum. IWCF Drilling Well Control Syllabus Level 3 and 4 March 2017 Version 7.0 International Well Control Forum IWCF Drilling Well Control Syllabus and 4 March 2017 Version 7.0 IWCF Drilling Well Control Syllabus and 4 Contents Guidance Notes... 5 1.1. Introduction... 5 1.2. Who

More information

HPHT Annular Casing Packer. Obex Annular Casing Packer

HPHT Annular Casing Packer. Obex Annular Casing Packer HPHT Annular Casing Packer Obex Annular Casing Packer Industry Challenge Casing packer to support second stage cement Reduce hydrostatic pressure on formation Get cement to surface Annular gas migration

More information

AADE 01-NC-HO-08. Copyright 2001 AADE National Drilling Technical Conference

AADE 01-NC-HO-08. Copyright 2001 AADE National Drilling Technical Conference AADE 01-NC-HO-08 Planning and Field Validation of Annular Pressure Predictions Gregory Mullen, Chakravarthy Singamsetty, William Dye, Baker Hughes, INTEQ Drilling Fluids, Danny Ledet, Andrew Rawicki, Todd

More information

MASTER S THESIS. A Discussion of Well Control Methods. Faculty of Science and Technology. Study program/ Specialization: Spring semester, 2013

MASTER S THESIS. A Discussion of Well Control Methods. Faculty of Science and Technology. Study program/ Specialization: Spring semester, 2013 Faculty of Science and Technology MASTER S THESIS Study program/ Specialization: Petroleum Engineering Spring semester, 2013 Open Writer: Øystein Røssland (Writer s signature) Faculty supervisor: Professor

More information

IWCF Equipment Sample Questions (Surface Stack)

IWCF Equipment Sample Questions (Surface Stack) IWCF Equipment Sample Questions (Surface Stack) 1. During a well control operation 4000 psi was shut in below the middle pipe rams. Ram type BOP data: Model: Cameron U type Rated Working Pressure: 15000

More information

Simulation study evaluating alternative initial responses to formation fluid influx during managed pressure drilling

Simulation study evaluating alternative initial responses to formation fluid influx during managed pressure drilling Louisiana State University LSU Digital Commons LSU Master's Theses Graduate School 2007 Simulation study evaluating alternative initial responses to formation fluid influx during managed pressure drilling

More information

RISER GAS MIGRATION IN EC-DRILL OPERATIONS. A Thesis OMER KALDIRIM

RISER GAS MIGRATION IN EC-DRILL OPERATIONS. A Thesis OMER KALDIRIM RISER GAS MIGRATION IN EC-DRILL OPERATIONS A Thesis by OMER KALDIRIM Submitted to the Office of Graduate and Professional Studies of Texas A&M University in partial fulfillment of the requirements for

More information

Hydraulic Optimization Worksheet for MS Excel All Versions subsequent to 5.0

Hydraulic Optimization Worksheet for MS Excel All Versions subsequent to 5.0 Hydraulic Optimization Worksheet for MS Excel All Versions subsequent to 5.0 1. Introduction. 2. Data Input. Header. Bit Information. Mud Information. Casing Program. P.D.M./Turbine. Drill String Design.

More information

Development of a Subsurface Mudline Packer to Reduce Risk of Flow after Cementing and Sustained Casing Pressure, While Providing a Platform for P&A.

Development of a Subsurface Mudline Packer to Reduce Risk of Flow after Cementing and Sustained Casing Pressure, While Providing a Platform for P&A. Development of a Subsurface Mudline Packer to Reduce Risk of Flow after Cementing and Sustained Casing Pressure, While Providing a Platform for P&A. Sean Yakeley, Ed Wood and Yang Xu (Baker Hughes Inc)

More information

New generation of solid expandable liners help give operators a jump on trouble zones

New generation of solid expandable liners help give operators a jump on trouble zones New generation of solid expandable liners help give operators a jump on trouble zones By Pat York, Weatherford SINCE SOLID EXPANDABLE technology has gained credibility as an effective contingency option,

More information

and and Norton J. Lapeyrouse CONTENTS

and and Norton J. Lapeyrouse CONTENTS and and Norton J. Lapeyrouse CONTENTS Chapter 1 Basic Formulas P. 3 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. 14. 15. 16. 17. 18. 19. Pressure Gradient Hydrostatic Pressure Converting Pressure into Mud

More information

D & V Oil Co. LP. Daily Completion Report - University CN A #6 API # /23/2016. Perfs ' ' Activity :

D & V Oil Co. LP. Daily Completion Report - University CN A #6 API # /23/2016. Perfs ' ' Activity : Daily Completion Report - University CN A #6 API # 42-105-42334 12/23/2016 Activity at Report Time: Perfs - 2512' - 2632' Depth at Report Time Put Well on Production 2655' - PBTD Activity : Arrive Location.

More information

CHE Well Testing Package/Service:

CHE Well Testing Package/Service: CHE Well Testing Package/Service: CHE delivers well testing package And services, trailer mounted well testing package and offshore/onshore well testing services with over 10 years experience. Our testing

More information

SPE/IADC Abstract. Introduction

SPE/IADC Abstract. Introduction SPE/IADC 156888 Demonstrating the Value of Integrating FPWD Measurements With Managed Pressure Drilling To Safely Drill Narrow Mud Weight Windows in HP/HT Environment L. Umar, I. Azian, N. Azree, A.R.M.

More information

Best Practices - Coiled Tubing Deployed Ball Drop Type Perforating Firing Systems

Best Practices - Coiled Tubing Deployed Ball Drop Type Perforating Firing Systems Best Practices - Coiled Tubing Deployed Ball Drop Type Perforating Firing Systems As a result of a recent job incident utilizing a Ball Drop Type firing system deployed on coiled tubing, the following

More information

Using True Real-Time Data Interpretation to Facilitate Deepwater Drilling Mario Zamora and Sanjit Roy, M-I L.L.C.

Using True Real-Time Data Interpretation to Facilitate Deepwater Drilling Mario Zamora and Sanjit Roy, M-I L.L.C. AADE 1-NC-HO-9 Using True Real-Time Data Interpretation to Facilitate Deepwater Drilling Mario Zamora and Sanjit Roy, M-I L.L.C. Copyright 21 AADE National Drilling Technical Conference This paper was

More information

SPE Forum: Source Control for Wells in Shallow Water. Lars Herbst, Gulf of Mexico Regional Director

SPE Forum: Source Control for Wells in Shallow Water. Lars Herbst, Gulf of Mexico Regional Director SPE Forum: Source Control for Wells in Shallow Water Lars Herbst, Gulf of Mexico Regional Director Agenda Introduction and Background Historical Well Control Events Scope of Discussion Scenario Driven

More information

W I L D W E L L C O N T R O L FLUIDS

W I L D W E L L C O N T R O L FLUIDS FLUIDS Fluids Learning Objectives You will learn about different fluids that can be used in well control. You will become familiar with the characteristics and limitations of fluids. You will learn general

More information

BENEDUM (DEVONIAN, GAS) API # UPTON COUNTY, TX DRILLING PERMIT # DAILY REPORTS

BENEDUM (DEVONIAN, GAS) API # UPTON COUNTY, TX DRILLING PERMIT # DAILY REPORTS 11/17/2011 11/18/2011 11/19/2011 AFE dated 11/18/2011 - pull tbg out of hole and make a mill run. Run packer on tbg and attempt to reestablish production from Devonian Formation. MIRU Great Basin Pulling

More information

EVALUATION OF LIQUID LIFT APPROACH TO DUAL GRADIENT DRILLING

EVALUATION OF LIQUID LIFT APPROACH TO DUAL GRADIENT DRILLING EVALUATION OF LIQUID LIFT APPROACH TO DUAL GRADIENT DRILLING A Thesis by UGOCHUKWU NNAMDI OKAFOR Submitted to the Office of Graduate Studies of Texas A&M University in partial fulfillment of the requirements

More information

6-3/4 DUAL PORTED PBL BYPASS SYSTEM (Applicable to sizes 6-1/4 & 6-1/2 also)

6-3/4 DUAL PORTED PBL BYPASS SYSTEM (Applicable to sizes 6-1/4 & 6-1/2 also) RECEIVING PBL AT RIG SITE TITLE: Operating Instructions for -3/4 PBL -3/4 DUAL PORTED PBL BYPASS SYSTEM (Applicable to sizes -1/4 & -1/2 also) OPERATING INSTRUCTIONS 1. On receipt of PBL Bypass Tools at

More information

Wellwork Chronological Regulatory Report

Wellwork Chronological Regulatory Report Well Name: UNIVERSITY 09A #1003H Field: Lin (Wolfcamp) S/T/R: / / County, State: Location Desc: Operator: Enduring Resources, LLC Project Type: Completion District: Southern - ERPBU Project AFE: DV02251

More information

A simulation-based evaluation of alternative initial responses to gas kicks during managed pressure drilling operations

A simulation-based evaluation of alternative initial responses to gas kicks during managed pressure drilling operations Louisiana State University LSU Digital Commons LSU Master's Theses Graduate School 2009 A simulation-based evaluation of alternative initial responses to gas kicks during managed pressure drilling operations

More information

WellCAP IADC WELL CONTROL ACCREDITATION PROGRAM

WellCAP IADC WELL CONTROL ACCREDITATION PROGRAM WellCAP IADC WELL CONTROL ACCREDITATION PROGRAM DRILLING OPERATIONS CORE CURRICULUM AND RELATED JOB SKILLS FORM WCT-02DS SUPERVISORY LEVEL The purpose of the core curriculum is to identify a body of knowledge

More information

The Diagnosis of Well Control Complications during Managed Pressure Drilling

The Diagnosis of Well Control Complications during Managed Pressure Drilling Louisiana State University LSU Digital Commons LSU Master's Theses Graduate School 213 The Diagnosis of Well Control Complications during Managed Pressure Drilling Brian Piccolo Louisiana State University

More information

The Developing Design of the Blowout Preventer in Deep Water

The Developing Design of the Blowout Preventer in Deep Water The Developing Design of the Blowout Preventer in Deep Water IADC World Drilling 2011 Conference & Exhibition 15-16 June 2011, Bella Centre, Copenhagen Eric Brown Project Manager National Oilwell Varco

More information

BaraShield -664 LCM Standard Field Application Procedure

BaraShield -664 LCM Standard Field Application Procedure BaraShield -664 LCM Standard Field Application Procedure Prepared for: Prepared by: Submitted by: Submittal Date: All Customers Sharath Savari, Donald L. Whitfill Halliburton March 2016 1 Copyright 2011

More information

Valve Replacement: Using Non-Intrusive Isolation Technology to Minimize Production Downtime

Valve Replacement: Using Non-Intrusive Isolation Technology to Minimize Production Downtime CASE STUDY CS15-02 >> Valve Replacement: Using Non-Intrusive Isolation Technology to Minimize Production Downtime What s Inside:» Explore Double Block & Monitor» Increase Operational Safety» Achieve Double

More information

UPM A Virtual Wellbore Modelling System to Prevent and Enhance the Detection of Well Control Events in Deepwater Drilling

UPM A Virtual Wellbore Modelling System to Prevent and Enhance the Detection of Well Control Events in Deepwater Drilling UPM 16080 A Virtual Wellbore Modelling System to Prevent and Enhance the Detection of Well Control Events in Deepwater Drilling Brian Piccolo, Austin Johnson, Scott Petrie, Henry Pinkstone, Christian Leuchtenberg

More information

Well Control for Drilling Operations Personnel Core Curriculum and Related Learning Objectives

Well Control for Drilling Operations Personnel Core Curriculum and Related Learning Objectives Well Control for Drilling Operations Personnel Core Curriculum and Related Learning Objectives Form WSP-02-DO-D Second Edition, Revision 1 19 June 2015 ADC 2015 COPYRGHT PROTECTED DOCUENT All rights reserved.

More information

RIH intermediate section casing in Bazian-1 exploration oil well

RIH intermediate section casing in Bazian-1 exploration oil well Energy and Sustainability V 559 RIH intermediate section casing in Bazian-1 exploration oil well A. K. Darwesh Petroleum Engineering Department, Engineering Faculty, Koya University, Kurdistan Abstract

More information

APPENDIX A1 - Drilling and completion work programme

APPENDIX A1 - Drilling and completion work programme APPENDIX A1 - Drilling and completion work programme Information about the well and drilling To the extent possible, the international system of units (SI) should be adhered to, and the drilling programme

More information