1 RAIMONDI Index Introduction 1 1. Verification upon receipt and storage before installation 1 2. Handling 1 3. Installation 2 4. Scheduled maintenance 2 5. Possible damage and relevant solutions 3 6. Disassembly instructions 4 7. Assembly instructions 4 8. Spare parts list 5 9. Enclosures 6 Introduction This manual provides guidelines to be observed for the following operations: storage installation into the pipeline maintenance preservation The manual is intended for the following personnel/staff: plant warehouse staff installers maintenance engineers This symbol means and indicates all matters relating to safety. Please read the warning notices carefully and follow the instructions. These serve to guarantee your safety and to prevent damage to people and property. In addition to the instructions in this manual, specific plant safety regulations must always be followed. It is recommended that this manual is read carefully and entirely, before starting any maintenance, in order to optimize intervention timing, and to ensure that suggested spare parts and gaskets are available in the event of valve assembly. For installation and maintenance operations no specific equipment or tools are required, other than those usually available in the plant. Fig. 1 - Valve lifting and handling Emerson is always at the Customer s disposal for any further technical information. 1. Verification upon receipt and storage before installation When the materials arrive, it is recommended to: Check the integrity of the case. Open the case and verify that there is no damage due to transportation. Do not open the barrier bag (if present). Verify that the contents are those stated on the packing list. Store the valves (unless damaged) in their original packaging. Please observe the following: 1. Store the valves in a closed, clean and dry storage room. 2. Do not place packages directly on the ground. 3. Check the packages every two months. 4. Substitute the silica gel every six months. This is not applicable in the case of barrier bag packages. 2. Handling During handling operations, valves must be lifted and handled as indicated in fig. 1 by using lifting equipment (fasteners, hooks, etc.) that must be sized and selected on the basis of valve weight (indicated in the drawings). If there are any eyebolts in the valve body, these can be used to lift the valve. Do not use any lifting points located on the actuator to lift the valve. These lifting points are to lift the actuator only. Lifting and handling must be done only by qualified personnel. Do not use any lifting straps that are either damaged or of inadequate/unknown size. Emerson reserves the right to change the contents without notice RAIIC-0052-EN-1310
2 3. Installation For correct operation, the valves must be installed in horizontal pipes with the stem in vertical position. If installed in vertical lines or in horizontal lines with the stem not vertical, maintenance is much more difficult. Any installation position other than those indicated may cause incorrect operation and/or rapid deterioration. The following operations must be performed only immediately before the installation: 1. Remove the protection caps of the end faces. 2. Check the upstream and downstream pipeline sections. Make sure that there are no solid particles or any other kind of dirt or debris inside. If necessary, clean carefully by using an air line. 3. Pay attention to the flow direction. Before starting the installation of the valve, please verify that: the valve class is suitable for the required operating pressure, and the materials of construction are suitable for the intended service (type of process fluid). Fig. 2 - Possible installation positions Verify that the flow direction of the line corresponds to the flow direction indicated by the arrow on the valve body. General notes In order to avoid damage during welding and post welding heat treatment, we suggest to disassemble the internal part following the instructions given in section 6 of this manual. In case that one end of the valve is not connected to the line for a period of time longer than half a day, the open end must be properly closed and sealed in order to prevent entry of dirt or debris. Check that there is sufficient space to easily disassemble the valve. Position the valve and verify its alignment with the pipe. Proceed with welding in accordance with the procedure indicated by the engineering company that designed the plant. During site welding of the valve to the pipe, the valve and adjacent piping must be supported so that the pipeline stresses are not transmitted to the valve body. Usually, the first weld layer will be made with TIG, while following weld layers will be made with the appropriate electrode for the valve body material. Welding and stress relieving procedures should conform to the applicable code or standard. Position the valve and verify its alignment with the pipe. Proceed with the welding operation in Protect eyes with appropriate welding masks or goggles during all welding operations. 4. Scheduled maintenance 4.1 Routine inspection Normal check Verify once a month that there is no leakage from packing or in the body/bonnet area. a. In case of leakage from the packing, tighten the appropriate gland nuts and bolts according to the procedures described in the assembly section. b. In case of leakage from the body/bonnet gasket, tighten the bonnet support bolts as stated in the re-assembly procedure. Otherwise de-pressurize the line as soon as possible in order to prevent erosion. Verify bearings greasing and stem thread every two or three months, depending on operating frequency. For actuated valves, refer also to the actuator manual in addition to the above. Preventive Verify the tightness of gland bolts every three months. Grease the stem and bearings every six months for motorized valves and every eight months for hand-operated valves. Check the travel of the gland follower every twelve months. Install a new packing when the end of the travel is approaching. Disassemble critical and/or actuated valves every four years. Verify the sealing surfaces and lap them if necessary. Substitute the bonnet gasket and the packing. Grease the stem. For the actuator, proceed as indicated in its maintenance manual. Emerson reserves the right to change the contents without notice page 2
3 5. Troubleshooting guide Below is a list with the most common problems. 5.1 Leakage from the packing When there is humidity or droplets near the packing area, the stem or the gland, and these cannot be corrected by tightening the gland bolts, you may want continuing the work of the line until the first stop of the plant. In this case, the stem can be set in backseat position, verifying the following: Packing may have hardened. In this case, it must be replaced. The gland is at the end of its travel. This means that the packing cannot be compressed. Packing must be replaced. Scratches, scorings or other marks may be found in the stem. It may also have got bound. In these cases, the stem must be replaced. The gland may be jammed on the stem because of a non-uniform tightness of the gland bolts. Release the gland bolts. Move the gland and set it again; then tighten the bolts progressively. 5.2 Leakage from body/bonnet joint Leakage under operation from the pressure seal joint requires immediate action, since it may cause major damage to the valve rapidly. Typical causes for leakage are: Previous incorrect reassembly of the valve. Re-using pressure seal gasket. A defect inside the valve body. 5.3 Leakage between seat and disc In case of leakage between seat and disc, we recommend to perform closing and opening operations with a pressure differential. If leakage persists, check that: No foreign material is locked between seat and disc, scoring the sealing surfaces. No foreign material is deposited between the seats, thus preventing the disc from closing. Incomplete previous closing allowed the fluid to impact onto the seal surfaces, eroding these. The valve has been used for line flushing, and therefore seats have been damaged by foreign material. For all the above cases it is absolutely necessary to disassemble the valve as soon as possible and proceed with an inspection of the internal parts in order to reduce further damage. 5.4 Jamming of valve along the stroke If a higher torque is required at some points along the stroke when opening/closing the valve, proceed as follows: Examine the stem and make sure that there is no picking-up in either the smooth or the threaded parts. Disassemble the valve, as a seizure may be starting to form between body guides and disc. 5.5 Problems relevant to motor operators For these problems, refer to the actuator instruction manual. Emerson reserves the right to change the contents without notice page 3
4 6. Disassembly Instructions Below are the procedures to follow to disassemble valves. Before starting any operation, it is important to: identify the problem clean the area around the valve that is to be disassembled arrange for a box and/or a pallet for all components arrange for a polyethylene sheet to protect all components and to avoid that any particles inadvertently enter the body. 1. Fully close valve. 2. Loosen and remove the nuts (26.1), remove the position indicator 3. Loosen and remove the nuts (9). 4. Using suitable lifting equipment, lift the handwheel/yoke assembly. 5. Loosen and remove the gland nuts (17), gland flange (16) and gland (15). 6. Remove safety ring (4). 7. Knock down the bonnet (2) with a soft-faced hammer to relieve the load on the segment ring (5), by pushing them outside through the four radial holes in the body. 8. Reassemble the safety ring and nuts (4). 9. Tighten the nuts (11) of the bonnet bolts (10) evenly, until the bonnet is lifted. Remove the ring (6) and the pressure seal gasket (7). 10. After the gasket has been removed, proceed by removing the bonnet (2) assembly with stem (20) and disc(28). Before starting disassembly it is very important to verify for your safety that: the line is not pressurized the line is at ambient temperature the line is drained all electrical supplies have been switched off and disconnected prior to dismantling the valve. Refer to figs. 3 and 4 7. Assembly Instructions Before starting assembly it is recommended to verify the following points: Remove any dirt or particles with a wire brush or abrasive cloth; remove any oil or grease with a suitable solvent, to avoid damage cause by foreign particles in particular on the sealing area. Never re-use the old gaskets, even though they seem to be in good shape. Verify that there are no scratches on the body sealing area. 1. Place the disc (28) on a clean flat surface, then fit the stem (20) into the disc. 2. Fit the disc nut (30) over the stem (20), screw into the disc (28) and then tighten. Ensure that the stem is free to move. Then tack weld the disc nut to the disc. 3. Fit the bonnet assembly with stem (20) and disc (28) into body (1). 4. Place a new pressure seal gasket on the bonnet. 5. Assemble the ring (6) and the segment rings (5). 6. Insert the safety ring (4) and tighten the nuts (10) to the torque values stated in table Fit the ground ring (13), a new gland packing (14), gland (15), gland flange (16) and gland nuts (17), and tighten these evenly. DO NOT over-tighten as this will cause high friction loads on the stem. 8. Using suitable lifting equipment, carefully lower the handwheel/yoke assembly onto the valve, taking care not to damage the yoke studs (8). Secure the assembly by cross-tightening the yoke nuts (9). 10. Fit the position indicator (25) 11. After the valve has been pressurized, verify that the nuts (9) are tightened by following the tightening torque values indicated in table 2. Emerson reserves the right to change the contents without notice page 4
5 8. Spare parts list Emerson guarantees the supply of any spare part for a period of at least ten years from the manufacturing date (month/year) indicated on the tag plate. The main objective in formulating a service parts inventory policy is the capability to provide prompt valve service, thus preventing extension of maintenance down time. To accomplish this, it is necessary to have the proper service parts immediately available for the optimum number of valves. This can be achieved at a minimum cost by defining the inventory on a frequency of need basis. To assist in reaching this objective, the field service and repair organization of Raimondi recommends following these guidelines in order to establish inventory levels: 1. Identify the total number of valves in service by size, type number, pressure/temperature class, tag number. 2. Identify the frequency of replacement tendency of specific parts: Class I Parts most frequently replaced. Class II Parts less frequently replaced, but critical in the event of an emergency requirement. Class III Parts seldom replaced Class IV Hardware (e.g. nuts, bolts, pins, cap components etc.) Class V Parts practically never requiring replacement 3. Operational reliability is defined as a probable percentage (%) of total, uninterrupted operational time that can be expected by stocking predetermined valve component classifications. Determine the operational reliability which is compatible with a specific company s operational objectives and service parts inventory investment policy. Then relate operational reliability to part classifications, which will satisfy that need. Guidelines are as follows: Parts classification Operational reliability Class I 70% Class I and II 85% Class I, II and III 95% Class I, II, III and IV 99% 4. Consult recommended spare parts list by valve type to determine quantity of parts valves to be covered by the inventory plan. 5. Select parts and specify quantities. Classification of spare parts Classification Item No. Description CLASS I 7 Pressure seal Parts most frequently replaced 14 Gasket CLASS II 20 Stem Parts less frequently replaced but 15 Gland critical in case of an emergency 28 Disc 30 Disc nut 33 Socket head screw CLASS III 25 Position indicator Parts seldom replaced 16 Gland flange CLASS IV 8 Body/yoke stud Hardware (e.g. nuts, studs, pins, etc.) 9 Body/yoke nut 10 Body/bonnet stud 11 Body/bonnet stud 18 Gland stud 17 Gland nut CLASS V Parts practically never requiring replacement Balance Emerson reserves the right to change the contents without notice page 5
6 9. Appendices The reference drawings are those relating to the supply only. The drawings published in this manual are typical drawings only and may not represent the valves supplied. Fig. 3 - Typical valve 51A 51B A By-pass Outlet Inlet Table 1 - Parts list Pos. Part name Material Pos. Part name Material Pos. Part name Material 1 Body A Body seat surface A 182 F6A 2 Bonnet A Yoke A St 35 4 Safety ring A Segment ring A Ring A Body/bonnet gasket Pure graphite 8 Body/bonnet bolts A 193 B7 9 Body/bonnet nuts A 194 2H 10 Nuts A 194 2H 11 Bolts A 193 B7 13 Ground ring A 182 F6A 14 Packing Pure graphite 15 Gland A 182 F6A 16 Gland flange A Gland nuts A 194 2H 18 Gland bolts A 193 B7 19 Gland gasket Graphite 20 Stem X35CrMo17 21 Yoke nut B 148 Gr. B 22 Bearings C. steel 23 Flange A Socket head screw Class Position indicator A Security pin Class Nut Class Lubricator C. steel 28 Disc A Disc surface A 182 F6A 30 Disc nut A 182 F6A 31 Cylinder A 182 F6A 32 O-ring Viton A-75 Sh.A 33 Socket head screw Stainless steel 35 Key AISI Stem key AISI Actuator 51 Stub PFE Nuts Extension Extension key AISI 4140 Emerson reserves the right to change the contents without notice page 6
7 Table 2 - Tightening torque values for bolts/screws Body/yoke - Bolts/screws: A 193 B7 Bonnet - Bolts/screws: A 193 B7 Ø Bolts/screws Torque values Ø Bolts/screws Torque values Kgm (Nm) Kgm (Nm) M12 5 (50) M12 1 (9) M16 10 (100) M16 2 (18) M20 17 (170) M20 3 (30) M22 29 (280) M22 5 (48) M24 43 (420) M24 7,5 (73) M30 61 (600) M30 11 (105) M33 86 (850) M33 15 (150) M (1100) M36 21 (205) Stem Gland bolts: A 193 B7 Diam. M16 M18 M20 M22 M24 M27 M30 M33 25,4 1,90 2,10 2,40 2,60 2,80 3,20 3,60 3,90 31,8 3,00 3,30 3,70 4,00 4,40 5,00 5,60 6,10 34,9 3,30 3,60 4,00 4,40 4,80 5,40 6,00 6,60 44,5 4,90 5,50 6,10 6,60 7,30 8,20 9,10 10,00 50,8 6,60 7,40 8,20 8,80 9,70 11,00 12,20 13,40 57,2 8,60 9,60 10,60 11,40 12,60 14,20 15,80 17,30 63,5 9,40 10,40 11,50 12,50 13,70 15,50 17,30 18,80 69,8 10,10 11,30 12,50 13,50 14,90 16,80 18,70 20,40 76,2 12,70 14,10 15,60 16,80 18,50 21,00 23,30 25,40 82,5 13,90 15,50 17,10 18,50 20,40 23,00 25,60 28,00 95,3 15,30 17,00 18,80 20,30 22,40 25,30 28,10 30,70 Select the constant in relation to stem diameter and packing bolt size In order to obtain the packing bolt torque in Nm multiply the selected constant for pressure in MPa Example Valve under pressure of 24 MPa with steam diameter equal to 44,5 mm and packing bolt size equal to M16 a. Constant is equal to 4,9 b. Packing bolts torque is equal to 4,9 x 24 = 117,6 Nm Table 3 Suggested greases Manufacturers Suggested Greases for bearings Agip GRMUEP2 API PGX2 BP Grease LTX 2 Esso Beacon 2 Fina Finagrease HP Finagrease EPL2 Mobil Mobilux EP2 Q8 Q8 Rembrandt EP2 Shell Alvania R2 Supergrease A Texaco Multifak EP2 Grease L2 Total Multis EP2 Multis 2 Viscol Signal Rolsfer 2 Apply Molykote to the stem threads. All other bolts and nuts are assembled with usual lubricant or Molykote. Emerson reserves the right to change the contents without notice page 7
Sempell High Pressure Forged Check Valves Forged steel, swing check and tilting disc configuration
Installation and Maintenance Instructions Handling requirements A - Packed valves Pallets: Lifting and handling of the packed valves in pallets will be carried out by a fork lift truck, by means of the
More informationKTM OM-2 SPLIT BODY FLOATING BALL VALVES INSTALLATION AND MAINTENANCE INSTRUCTIONS
Before installation these instructions must be fully read and understood SECTION 1 - STORAGE 1.1 Preparation and preservation for storage All valves should be properly packed in order to protect the parts
More informationInstallation & Operation Manual Proven Quality since 1892
Content 1. ERIKS operating companies 2. Product description 3. Requirements for maintenance staff 4. Transport and storage 5. Function 6. Application 7. Installation 8. Maintenance 9. Service and repair
More informationEngineering Data Sheet
Page 1 of 6 CE MARKING AND THE PRESSURE EQUIPMENT DIRECTIVE 97/23/EC Valves must be installed into a well designed system and it is recommended that the system be inspected in accordance with the appropriate
More informationINSTALLATION, OPERATION & MAINTENANCE MANUAL
INSTALLATION, OPERATION & MAINTENANCE MANUAL AWWA C500 SOLID WEDGE GATE VALVE 2 72 NRS and OS&Y Series 100 and Series 105 TABLE OF CONTENTS SECTION PAGE # Equipment List 2 General 3 Receipt and Inspection
More informationBray/ VAAS O-Ported Series Knife Gate Valve 770/780 Series Operation and Maintenance Manual
Bray/ VAAS Knife Gate Valve 770/780 Series Operations and Maintenance Manual Table of Contents Definition of Terms 1 Safety Instructions 1 Introduction 2 Unpacking 2 Storage 2 Installation 2 Commissioning
More informationVALVES & MEASUREMENT
VALVES & MEASUREMENT TBV OPERATION AND MAINTENANCE MANUAL SERIES 1100: THREE PIECE BALL VALVE For technical questions, please contact the following: Engineering Department 1537 Grafton Road Millbury, MA
More informationINSTRUCTION MANUAL. Anchor Darling 800 Globe Valves. Installation Operation Maintenance. Sizes 1/2 through 2 FCD ADENIM
INSTRUCTION MANUAL Anchor Darling 800 Globe Valves Sizes 1/2 through 2 Installation Operation Maintenance FCD ADENIM0008-00 Revision Record Revision Section Description Date - All Original Issue 04/02/2004
More informationInstallation, Operation and Maintenance Manual for Back Pressure Regulator
Installation, Operation and Maintenance Manual for Back Pressure Regulator Model 8860 2009 Groth Corporation IOM-8860 Rev. B 12541 Ref. ID: 95565 Page 2 of 13 Table of Contents I. INTRODUCTION 3 II. DESIGN
More informationWHEATLEY WHEATLEY SERIES 500 SWING CHECK VALVE. Installation, Operation and Maintenance Manual
WHEATLEY SERIES 500 SWING CHECK VALVE STANDARD INTEGRAL SEAT & OPTIONAL REMOVABLE SEAT 2" FP - 6" FP 150# - 1500# 8" FP - 12" FP 150# - 900# API 6D and B16.34 2" FP - 4" FP 5000# DRILLING PRODUCTION VALVE
More informationOperating instruction
Operating instruction MV, XV, HG, HP, RKO, D2G, TV, BV, WB & SLV 1 Introduction 2 2 Stafsjö s knife gate valves 2 3 Technical information 2 3.1 Pressure test 2 3.2 Labelling 2 4 Storage 3 5 Transportation
More informationINSTALLATION, MAINTENANCE & OPERATING INSTRUCTIONS 2-4 REDUCED PORT/ FULL PORT (5700/6700) ANSI CLASS 150/300/600/900/1500/2500 TRUNNION BALL VALVES
PBV-USA,Inc. 12735 Dairy Ashford. Stafford, Texas USA 77477 281-340-5400; 800-256-6193 FAX: 281-340-5499 INDUSTRIAL BALL VALVES IM0 69 April 2001 Rev 9 INSTALLATION, MAINTENANCE & OPERATING INSTRUCTIONS
More informationKENNEDY VALVE OPERATION & MAINTENANCE MANUAL
2 54 ROTATING DISC GATE VALVE OPERATION & MAINTENANCE MANUAL Rel. 5/27/16 1 TABLE OF CONTENTS 3 General 3 Receipt & Inspection 4 Gate Valve Storage & Handling 5 6 Installation 7 Operation 8 Field Testing
More informationTBV OPERATION AND MAINTENANCE MANUAL SERIES 2800: FLANGED BALL VALVE. For technical questions, please contact the following:
TBV OPERATION AND MAINTENANCE MANUAL SERIES 2800: FLANGED BALL VALVE For technical questions, please contact the following: Engineering Department 1537 Grafton Road Millbury, MA 01527 Phone: (508) 887-9400
More informationMODEL 200 KNIFE GATE VALVES INSTALLATION & MAINTENANCE MANUAL
MODEL 200 KNIFE GATE VALVES INSTALLATION & MAINTENANCE MANUAL Index 1. List of components / General arrangement 2. Description 3. Handling 4. Installation 5. Actuators / Operation 6. Maintenance a. Changing
More informationROTATING DISK VALVES INSTALLATION AND MAINTENANCE 1. SCOPE 3 2. INFORMATION ON USAGE 3 3. VALVE TYPES 3 4. OPERATORS 5 5. VALVE CONSTRUCTION 6
Sub Section INDEX Page Number 1. SCOPE 3 2. INFORMATION ON USAGE 3 3. VALVE TYPES 3 4. OPERATORS 5 5. VALVE CONSTRUCTION 6 6. INSTALLATION AND OPERATION 6 7. MAINTENANCE 8 8. REPAIR 9 9. ASSEMBLY 10 10.
More informationPC3_ and PC4_ Pipeline Connectors
1283050/4 IM-P128-06 ST Issue 4 PC3_ and PC4_ Pipeline Connectors Installation and Maintenance Instructions 1. Safety information 2. Description PC30 shown 3. Installation 4. Welding of pipeline connector
More informationDelVal Flow Controls Private limited
DelVal Flow Controls Private limited (A DIVISION OF DelTech CONTROLS LLC, USA) DelVal Series 50/5, 5A/5B Butterfly Valves INSTALLATION, OPERATION AND MAINTENANCE MANUAL ENGINEERING DATA SHEET E.D.S. NO
More informationCARTRIDGE FILTERS TECHNICAL MANUAL MT 080. Installation, commissioning and maintenance instructions. 08/02 Edition
CARTRIDGE FILTERS TECHNICAL MANUAL MT 080 Installation, commissioning and maintenance instructions 08/02 Edition 1 2 CONTENTS 1.0 PAGE INTRODUCTION 1.1 MAIN FEATURES 1.2 OPERATION 1.3 CLOSING OF HEAD WITH
More informationINSTALLATION, OPERATION AND MAINTENANCE GUIDE
INSTALLATION, OPERATION AND Placement in Pipeline System When installing Process Development & Control s ElastoTITE Elastomer-Hinged Check Valves in a pipeline, a minimum of five pipe diameters should
More informationTelefon (+45) Telefax (+45)
Uni-Valve A /S VENTILER & INSTRUMENTER Telefon (+45) 43 43 82 00 Telefax (+45) 43 43 74 75 mail@uni-valve.com www.uni-valve.com UNI-S83 / S84 3/4-way ball valve Installation and Operating manual 3/4-WAY
More informationVALVE GLOBE CAM TS OF 11 DOC NO REV. NO DATE PAGE NO. maximum life. DESIGN CONDITION 1g of force in. property damage.
CAM TS 31 1 OF 11 1.0 GENERAL It is recommended that this entire document shall be read prior to proceeding with the installation or repair. Only correct installation, maintenance and operation will ensure
More informationModel PIV UL/FM Post Indicator Valve. Maintenance and Operation Manual UL/FM Post Indicator Valve Configuration AWWA C515
Model 2010 -PIV UL/FM Post Indicator Valve Maintenance and Operation Manual UL/FM Post Indicator Valve Configuration AWWA C515 2 LAYOUT AND SITING At the design stage, it should be considered where valves
More informationManual Actuated Boiler Blowdown Valves
Manual Actuated Boiler Blowdown Valves Installation and Maintenance Instructions 1. Safety information 2. General product information 3. Installation 4. Operation 5. Maintenance 6. Spare parts p.1 1. Safety
More informationApollo Standard Port, Full Port & One Piece Flanged Ball Valves Installation, Operation, & Maintenance Manual
I854000.D Apollo Standard Port, Full Port & One Piece Flanged Ball Valves Installation, Operation, & Maintenance Manual Introduction This manual presents guidelines for the Installation, Operation and
More informationWafer Check Valve. Contents. User s Manual. (1) Be sure to read the following description of our product warranty 1
Serial No. H-V066-E-3 Wafer Check Valve User s Manual Contents (1) Be sure to read the following description of our product warranty 1 (2) General operating instructions 2 (3) General instructions for
More informationRS(H)10,15 USER MANUAL. Read the complete manual before installing and using the regulator.
RS(H)10,15 USER MANUAL Read the complete manual before installing and using the regulator. WARNING INCORRECT OR IMPROPER USE OF THIS PRODUCT CAN CAUSE SERIOUS PERSONAL INJURY AND PROPERTY DAMAGE. Due to
More informationWHEATLEY Series 500 Swing Check Valve
Document Number: TC003001-13 Revision: 02 WHEATLEY Series 500 Swing Check Valve Installation, Operation, and Maintenance Manual TABLE OF CONTENTS BILL OF MATERIALS...3 SCOPE...5 INSTALLATION AND OPERATION
More informationBUTTERFLY VALVES Series 800
BUTTERFLY VALVES Series 800 WARNING Before proceeding read ALL instructions and become familiar with the equipment and associated drawings. Follow ALL applicable safety regulations and codes for pressurized
More informationSAPAG. Safety valves, type 5700 Storage, Use, Operation and Maintenance Instructions. IMPORTANT NOTICE
SAPAG IMPORTANT NOTICE Contents Important notice 1 0 Valve identification 2 1 Storage 2 2 Installation 2 3 Operation 2 4 Maintenance 3 4.1 Dismantling 3 4.2 Inspection 3 4.3 Repair 3 4.4 Assembly 4 4.5
More informationFLANGED MULTI-PORT BALL VALVES
INTRODUCTION This instruction manual includes installation, operation and maintenance information for flanged multi-port ball valves. This manual addresses lever operated ball valves only. Please refer
More informationEaton Filtration, LLC
Eaton Filtration, LLC 900 Fairmount Avenue, Elizabeth, NJ 07207 Phone: 908-787-1000 Fax: 908-351-7893 E-Mail: filtration@eaton.com Web: www.filtration.eaton.com Installation, Operation & Service Manual
More information3-PIECE BALL VALVE, 3600 PSI/ PN 248, WITH ISO DIRECT MOUNTING PAD 306M SERIES/ PED Category II
3-PIECE BALL VALVE, 3600 PSI/ PN 248, WITH ISO DIRECT MOUNTING PAD 306M SERIES/ PED Category II 306M User Manual English Version Use for company in Europe who will place the product on the market, please
More informationM45 ISO Ball Valve DN25 to 150 Installation and Maintenance Instructions
BAC 13310 IM-P133-42 ST Issue 2 M45 ISO Ball Valve DN25 to 150 Installation and Maintenance Instructions 1. General safety information 2. General product information 3. Installation 4. Commissioning 5.
More informationEaton Filtration, LLC
Eaton Filtration, LLC 900 Fairmount Avenue, Elizabeth, NJ 07207 Phone: 908-787-1000 Fax: 908-351-7893 E-Mail: filtration@eaton.com Web: www.filtration.eaton.com Installation, Operation & Service Manual
More informationMounting and Operating Instructions EB 3007 EN. Self-operated Pressure Regulators. Differential Pressure Regulators (opening) Type Type 42-25
Self-operated Pressure Regulators Differential Pressure Regulators (opening) Type 42-20 Type 42-25 Type 42-20 Differential Pressure Regulator Type 42-25 Differential Pressure Regulator Mounting and Operating
More information1.0 - OPENING AND CLOSING THE DOOR
The purpose of this manual is to provide the user with instructions on how to safely open and close, how to conduct routine maintenance, and how to install the PEI TWINLOCK Closure on a pressure vessel.
More informationBSA6T and BSA64T Stainless Steel Bellows Sealed Stop Valves Installation and Maintenance Instructions
1843950/3 IM-P184-03 ST Issue 3 BSA6T and BSA64T Stainless Steel Bellows Sealed Stop Valves Installation and Maintenance Instructions 1. General safety information 2. General product information 3. Installation
More informationDifferential Pressure Regulator Type Type 45-6 (0.1 to 1 bar, DN 15) Mounting and Operating Instructions EB 3226 EN
Differential Pressure Regulator Type 45-6 Type 45-6 (0.1 to 1 bar, DN 15) Mounting and Operating Instructions EB 3226 EN Edition March 2008 Contents Contents Page 1 Design and principle of operation...................
More informationFLANGED TWO-PIECE BALL VALVES
INTRODUCTION This instruction manual includes installation, operation, and maintenance information for FNW flanged split-body ball valves. This manual addresses lever operated ball valves only. Please
More informationKTM V-PORT CONTROL BALL VALVES INSTALLATION AND OPERATION MANUAL
Please read through this manual completely before operating the valves SECTION 2 - SPECIFICATIONS The safety of the valves and conformity with your equipment should be checked by the design engineer or
More informationFLANGED TWO-PIECE BALL VALVES
INTRODUCTION This instruction manual includes installation, operation, and maintenance information for FNW flanged split-body ball valves. This manual addresses lever operated ball valves only. Please
More informationSpilt body Flange ball valve. TC-205MFF-PN1640 User Manual English Version. Document No: TC-205MFF-PN1640.Ur-manual. Date: 2007/04/2617. Version: 1.
Spilt body Flange ball valve TC-205MFF-PN1640 Series PED Category I,II TC-205MFF-PN1640 User Manual English Version Use for company in Europe who will place the product on the market, please amend which
More informationINSTALLATION, OPERATION AND MAINTENANCE INSTRUCTIONS TYPE BV2-LD
INSTALLATION, OPERATION AND MAINTENANCE INSTRUCTIONS TYPE BV2-LD 1. Storage & Protection 1.1. Storage The valves stay in the open position during the transportation. For incoming QC must check: a. Packing
More informationFisher and Whisper Disk Diffusers
Instruction Manual Inline and Vent Diffusers Fisher 6010 -- 6015 and Whisper Disk Diffusers Contents Introduction... 2 Scope of Manual... 2 Description... 2 Principle of Operation... 3 Piping Considerations...
More informationINSTRUCTIONS AND MAINTENANCE MANUAL SERIES: FK
INSTRUCTIONS AND MAINTENANCE MANUAL 04/09/2014 SERIES: FK cmo@cmo.es http://www.cmo.es Page 1 ASSEMBLY THE FK VALVE COMPLIES WITH THE FOLLOWING: Machinery Directive: DIR 2006/42/EC (MACHINERY) Pressure
More informationAssembly Drawing: W-311B-A01, or as applicable Parts List: W-311B-A01-1, or as applicable Special Tools: , , &
REDQ Regulators Model 411B Barstock Design Powreactor Dome Regulator OPERATION AND MAINTENANCE Contents Scope..............................1 Installation..........................1 General Description....................1
More informationPure-Flo Handwheel Operated Valves (903, 913, 963) Instruction Manual
PFMM-08 Pure-Flo Handwheel Operated Valves (903, 913, 963) Instruction Manual This manual provides installation, operation and maintenance instructions for Pure-Flo Diaphragm Valves (with 903, 913, 963
More informationTITAN FLOW CONTROL, INC.
PREFACE: This manual contains information concerning the installation, operation, and maintenance of Titan Flow Control (Titan FCI) Simplex Basket Strainers. To ensure efficient and safe operation of Titan
More informationPRS(TC)4,8 USER MANUAL. Read the complete manual before installing and using the regulator.
PRS(TC)4,8 USER MANUAL Read the complete manual before installing and using the regulator. WARNING INCORRECT OR IMPROPER USE OF THIS PRODUCT CAN CAUSE SERIOUS PERSONAL INJURY AND PROPERTY DAMAGE. Due to
More informationINSTRUCTIONS AND MAINTENANCE MANUAL SERIES: RT
INSTRUCTIONS AND MAINTENANCE MANUAL 05/11/2015 SERIES: RT cmo @cmo.es http://www.cmo.es page 1 ASSEMBLY THE RT VALVE COMPLIES WITH THE FOLLOWING: Machinery Directive: DIR 2006/42/EC (MACHINERY) Pressure
More informationSALCO PRODUCTS, INC. PRESSURE RELIEF VALVE STORAGE, INSTALLATION, OPERATING, MAINTENANCE/TESTING, AND INSPECTION INSTRUCTIONS
STORAGE INSTRUCTIONS Until it is time to install a new or reconditioned valve on the car, the valve must be kept in its original packaging in order to protect it from dirt and damage. INSTALLATION INSTRUCTIONS
More informationAPCO ARV CLEAN WATER AIR RELEASE VALVES. Model 50A
APCO ARV CLEAN WATER AIR RELEASE VALVES Model 50A Instruction D12013 February 2017 Instructions These instructions provide installation, operation and maintenance information for APCO ARV Clean Water Air
More informationINSTALLATION, OPERATION and MAINTENANCE MANUAL
INSTALLATION, OPERATION and MAINTENANCE MANUAL TRUNNION MOUNTED BALL VALVE NEXTECH I ValvTechnologies, Inc. 5904 Bingle Road Houston, Texas 77092 U.S.A. Email: sales@valv.com www.valv.com 705_Nextech IOM
More informationA3S Bellows Sealed Stop Valve Installation and Maintenance Instructions
1326050/3 IM-P132-11 ST Issue 3 A3S Bellows Sealed Stop Valve Installation and Maintenance Instructions 1 General safety information 2 General product information 3 Installation 4 Commissioning 5 Operation
More informationKECKLEY. Installation, Operation, and Maintenance Manual. Style KGV - Knife Gate Valve
KECKLEY Installation, Operation, and Maintenance Manual Style KGV - Knife Gate Valve Table of Contents Introduction and Safety... 3 Safety message levels... 3 User health and safety... 3-4 Transportation
More informationCrosby style JCE Safety Valve Installation, Maintenance and Adjustment Instructions CROSBY
CROSBY Table of contents 1. Installation 1 1.1. Drainage 1 1.2. Discharge pipework 1 1.3. Preparation for installation 1 2. Pressure adjustment 1 3. Maintenance 1 4. Dismantling 1 4.1. All valve types
More informationSV5 Safety Valve Installation and Maintenance Instructions
3120036/3 IM-S13-12 CH Issue 3 SV5 Safety Valve Installation and Maintenance Instructions 1. General specification 2. Supply 3. Before fitting the valve 4. Installation 5. Damage prevention 6. Commissioning
More informationMANUALLY OPERATED VALVE VLM SYNCROFLUX TECHNICAL MANUAL MT042/E
MANUALLY OPERATED VALVE VLM SYNCROFLUX TECHNICAL MANUAL MT042/E INSTALLATION, COMMISSIONING AND MAINTENANCE INSTRUCTIONS CONTENTS 1.0 INTRODUCTION 1.1 MAIN CHARACTERISTICS 1.2 VALVE CONTROL 2.0 INSTALLATION
More informationNeedle valve. Contents. User s Manual. (1) Be sure to read the following warranty clauses of our product 1. (2) General operating instructions 2
Serial No. H-V024-E-7 Needle valve User s Manual Contents (1) Be sure to read the following warranty clauses of our product 1 (2) General operating instructions 2 (3) General instructions for transportation,
More informationINSTRUCTIONS AND MAINTENANCE MANUAL SERIES: K
INSTRUCTIONS AND MAINTENANCE MANUAL 05/09/2014 SERIES: K cmo@cmo.es http://www.cmo.es Page 1 ASSEMBLY DESCRIPTION Machinery Directive: DIR 2006/42/EC (MACHINERY) Pressure Equipment Directive: DIR 97/23/EC
More informationKENNEDY VALVE RESILIENT WEDGE GATE VALVE MAINTENANCE MANUAL
KENNEDY VALVE Division of McWane, Inc. 1021 East Water Street P.O. Box 931 Elmira, New York 14902-0931 Telephone (607) 734-2211 Fax (607) 734-1003 KENNEDY VALVE RESILIENT WEDGE GATE VALVE MAINTENANCE MANUAL
More informationInstallation, Operating and Maintenance Instructions. V914 Cast Iron Flanged Swing Check Valve V914
Installation, Operating and Maintenance Instructions V914 Cast Iron Flanged Swing Check Valve V914 THE PRESSURE EQUIPMENT DIRECTIVE 97/23/EC and CE MARKING The Pressure Equipment Regulations 1999 (SI 1999/2001)
More informationInstallation Troubleshooting Maintenance Instructions Installation / Start-up
Model ZW207 Installation Troubleshooting Maintenance Instructions Installation / Start-up NOTE: Flushing of all pipe lines is to be performed to remove all debris prior to installing valve. 1. For making
More informationInstallation Instructions For Flat Seated Bolted Type RAH Series Disk Holders
Installation Instructions For Flat Seated Bolted Type RAH Series Disk Holders RA Series Rupture Disks 1. WARNING a) Read the complete instructions before attempting to install the rupture disk and holder
More informationAtmospheric relief valve type 1100 Installation and maintenance instructions
SAPAG 1. Description Sapag atmospheric relief valves type 1100 have been selected for installation because of their performance features, reliability and ease of maintenance. They are designed to protect
More informationBCV31 DN20 - Blowdown Control Valve
4034650/8 IM-P403-37 AB Issue 8 BCV31 DN20 - Blowdown Control Valve Installation and Maintenance Instructions 1. Safety information 2. Application 3. Technical data 4. Operation 5. Installation 6. Flow
More informationUSER INSTRUCTIONS. NAF Duball DL Ball Valves. Installation Operation Maintenance. Experience In Motion. flowserve.com
USER INSTRUCTIONS NAF Duball DL Ball Valves FCD NFENIM4167-01-A4 01/17 Installation Operation Maintenance 1 Experience In Motion Contents SAFETY 3 1 General 3 2 Lifting 4 3 Receiving Inspection 4 4 Installation
More informationKTM METALTITE BALL VALVES - FLOATING TYPE INSTALLATION AND OPERATION MANUAL
The content of this manual is effective as of April 2015. KTM reserves the right to discontinue the manufacture of, change or modify design and/ or construction of any KTM product during the manufacturing
More informationINSTALLATION & MAINTENANCE INSTRUCTION
ARCHON Industries, Inc Liquid Level Gauges Models: BT-LLG ND-LLG INSTALLATION & MAINTENANCE INSTRUCTION Instruction No.: 1014.2 Revision Issued: 3/01/03 Approved: Engineering Manager Warning ONLY QUALIFIED
More informationConstant Pressure Crude Oil Container Model CPCCP
Installation, Operations, and Maintenance Manual Constant Pressure Crude Oil Container Model CPCCP The information in this manual has been carefully checked for accuracy and is intended to be used as a
More informationTHE BP-301 SERIES. Operating and Service Manual. Series includes all variants of BP-301 (LF 0.1Cv / MF 0.5Cv)
THE BP-301 SERIES Operating and Service Manual Series includes all variants of BP-301 (LF 0.1Cv / MF 0.5Cv) Issue B October 2015 1 TABLE OF CONTENTS 1. Description... 3 2. Installation... 3 3. Operation...
More informationLRS(H)4 USER MANUAL. Read the complete manual before installing and using the regulator.
LRS(H)4 USER MANUAL Read the complete manual before installing and using the regulator. WARNING INCORRECT OR IMPROPER USE OF THIS PRODUCT CAN CAUSE SERIOUS PERSONAL INJURY AND PROPERTY DAMAGE. Due to the
More informationTHE HF-300 SERIES. Operating and Service Manual. Series includes all variants of HF-300/301
THE HF-300 SERIES Operating and Service Manual Series includes all variants of HF-300/301 Issue A July 2015 1 TABLE OF CONTENTS 1. Description... 3 2. Installation... 3 3. Operation... 4 3.1. Spring Loaded...
More informationSerie 06-M6. Swing wafer check valve. made in. Application fields. Check valves E U R O P E WATER CONDITIONING INDUSTRY
Swing wafer check valve BRANDONI made in E U R O P E Application fields WATER CONDITIONING INDUSTRY HEATING 38 www.brandoni.it The valves in series 06 are swing wafer check valves, manufactured in accordance
More informationKBV21i and KBV40i Key Operated Boiler Blowdown Valves Installation and Maintenance Instructions
4059051/3 IM-P405-48 EMM Issue 3 KBV21i and KBV40i Key Operated Boiler Blowdown Valves Installation and Maintenance Instructions 1. Safety information 2. General product information 3. Installation 4.
More informationInstallation Operation Maintenance. Bermad Level Control Valve with Modulating Horizontal Float Pilot valve One Way Flow IOM.
Bermad Level Control Valve with Modulating Horizontal Float Pilot valve One Way Flow Model: FP 450-80 Installation Operation Maintenance PAGE 1 OF 5 1. Safety First BERMAD believes that the safety of personnel
More informationPure-Flo Handwheel Operated Valves (970) Instruction Manual
PFMM-RHWO-08 Rev 1 Pure-Flo Handwheel Operated Valves (970) Instruction Manual This manual provides installation, operation and maintenance instructions for manually operated Pure-Flo diaphragm valves.
More informationDIRECT DRIVE DIXIE DOUBLE SEAMER Model 25D
OPERATOR'S MANUAL DIRECT DRIVE DIXIE DOUBLE SEAMER Model 25D LUBRICATE DAILY: A. Gears inside gear housing at chuck shaft (1) Oil B. Seam rolls and cam rolls (4) - Oil C. Seam roll levers through gear
More informationPneumatic switch module 3/2-way valve (On/Off) Types P Types FP Function tested for use of the float in Ex-zone 0
Operating Manual LTIA3E Pneumatic switch module 3/2-way valve (On/Off) Types P Types FP Function tested for use of the float in Ex-zone 0 Contents 1. Safety Instructions 2. Conformity to standards 3. Technical
More informationTD45 Thermodynamic Steam Trap Installation and Maintenance Instructions
0685255/1 IM-P068-47 ST Issue 1 TD45 Thermodynamic Steam Trap Installation and Maintenance Instructions 1 General safety information 2 General product information 3 Installation 4 Commissioning 5 Operation
More informationDeclaration of Conformity as per Directive 97/23/EC
Declaration of Conformity as per Directive 97/23/EC The manufacturer declares that:, 47906 Kempen, Germany Multi-way diverting valves Series 29a and Series 29b, with packing with lever 1. The valves are
More informationOPERATING AND MAINTENANCE MANUAL ALFA SPLIT BODY TRUNNION MOUNTED BALL VALVES Model ALFA T2 (Valid for S.B. valves both for D.B.B.
Doc. Nr. MMT2 Rev.9 EN Sheet 1 of 14 ALFA Model ALFA T2 (Valid for S.B. valves both for D.B.B. valves) INDEX PAGE 0. Technical Data 2 1. Transportation, handling and storage 3 2. Installation instructions
More informationThreaded Closures Installation, Operation & Maintenance
Howard Street Bulletin TT Louisville, KY 0 USA Revised Jan 0 Phone 0--0 Fax 0--00 Threaded Closures Installation, Operation & Maintenance Caution: Operating a closure can be a hazardous activity and certain
More information1. Preface Important Safety Notes Brief Product Information Product Working Principle Installation Guidelines...
Table of Contents 1. Preface...1 2. Important Safety Notes...1 3. Brief Product Information...3 4. Product Working Principle...5 5. Installation Guidelines...6 6. Startup and Commissioning...8 7. Maintenance
More informationControl Valves ZK 610 ZK 613
Control Valves ZK 610 ZK 613 Original Installation Instructions 819043-02 Contents Foreword... 3 Availability... 3 Formatting features in the document... 3 Safety... 4 Use for the intended purpose... 4
More informationControl Valve ZK 29. Original Installation Instructions
Control Valve ZK 29 Original Installation Instructions 810685-05 Contents Foreword... 3 Availability... 3 Formatting features in the document... 3 Shown and described types of equipment... 3 Safety...
More informationTHE MF-400 SERIES. Operating and Service Manual. Series includes all variants of MF-400/401
THE MF-400 SERIES Operating and Service Manual Series includes all variants of MF-400/401 Issue A October 2013 1 TABLE OF CONTENTS 1. Description... 3 2. Installation... 3 3. Operation... 4 4. Special
More informationUSM21 Sealed Bimetallic Steam Trap for use with Pipeline Connectors Installation and Maintenance Instructions
6250250/1 IM-P625-03 ST Issue 1 USM21 Sealed Bimetallic Steam Trap for use with Pipeline Connectors Installation and Maintenance Instructions 1. General safety information 2. General product information
More informationKBV21i and KBV40i Air Actuated Boiler Blowdown Valves
4059051/1 IM-P405-48 AB Issue 1 KBV21i and KBV40i Air Actuated Boiler Blowdown Valves Installation and Maintenance Instructions 1. Safety information 2. General product information 3. Installation 4. Commissioning
More informationPressure Reducing Valve DMV 750 set range: bar
Pressure Reducing Valve DMV 750 set range:.0-6.0 bar Advantage pressure setting possible at any time, also during operation hermetically sealed by valve diaphragm high level of operating safety and long
More informationUn-Pressurized Orefice Fittings FIO EZ. Parts List and Operation Instructions TECHNICAL MANUAL. Dn 2-6 Class Lbs
Un-Pressurized Orefice Fittings FIO EZ Parts List and Operation Instructions TECHNICAL MANUAL Dn 2-6 Class 150-600 Lbs US US 2 FIO EZ - MT 108-US - 05-2016 FIO EZ Important Instructions US Pietro Fiorentini
More informationMSC-P and MSC-N Manifolds for Steam Distribution and Condensate Collection
1170850/1 IM-P117-36 ST Issue 1 MSC-P and MSC-N Manifolds for Steam Distribution and Condensate Collection Installation and Maintenance Instructions 1. Safety information 2. General product information
More informationInstallation, Operation, and Maintenance Manual
Industrial Process Installation, Operation, and Maintenance Manual CF37 Conventional Knife Gate Valve Table of Contents Table of Contents Introduction and Safety...2 Safety message levels...2 User health
More informationGREIG FILTERS, INC. OPERATION MANUAL
GREIG FILTERS, INC. OPERATION MANUAL MODEL DCFH 3P 15/3 100 S4 DOE/222 DUAL CARTRIDGE FILTER HOUSING TABLE OF CONTENTS I. INTRODUCTION II. CARTRIDGE FILTER HOUSING UNIT A. OPERATION B. INSTALLATION C.
More informationInstruction Manual. Alfa Laval SB Membrane Sample Valve ESE02963-EN Original manual
Instruction Manual Alfa Laval SB Membrane Sample Valve ESE02963-EN2 2016-02 Original manual Table of contents The information herein is correct at the time of issue but may be subject to change without
More informationWW-720. Pressure Reducing Control Valve
WW-720 Pressure Reducing Control Valve (Size Ranges: 2-4 and 6-14 ) Installation Operation & Maintenance Page 1 of 6 1. DESCRIPTION The Model 720 Pressure Reducing is an automatic control valve (powered
More informationInstallation, Operation, and Maintenance Manual. Welker Constant Pressure Cylinder With Welker Magnetic Indicator (With Gravity Mixer) Model CP2GM-HP
Installation, Operation, and Maintenance Manual Welker Constant Pressure Cylinder With Welker Magnetic Indicator (With Gravity Mixer) Model The information in this manual has been carefully checked for
More informationINSTALLATION COMMISSIONING, OPERATION & MAINTENANCE MANUAL
WedgeRock RW Series Worm Gear Actuators INSTALLATION COMMISSIONING, OPERATION & MAINTENANCE MANUAL Revision 01 Date 4/3/17 Page 1 Table of Contents 1.0 INTRODUCTION... 4 1.1 PURPOSE... 4 1.2 AUDIENCE...
More informationRHPS Series RD(H)F40 User Manual. Read the complete manual before installing and using the regulator.
RHPS Series RD(H)F40 User Manual Read the complete manual before installing and using the regulator. 2 WARNING Before removing a regulator from the system for service, you must depressurize system purge
More information