1 Work Health Safety Record Management Guidelines October, 2014 Contents 1 Executive Summary More information University Records Management WHS Legislative Requirements Other Acts WHS Standards Responsibilities Glossary Versioning Appendix 1: Work Health and Safety Document and Record Retention... 5 Responsible Officer Executive Director Human Resources Approved by Executive Director Human Resources Approved and commenced October, 2014 Review by October, 2017 Relevant Policy or Procedure the Records Management Policy and Guidelines Guideline supports Responsible Organisational Unit Work Health and Safety Human Resources Work Health Safety Record Management Guidelines (October, 2014) Page 1

2 1 Executive Summary These guidelines have been developed to support the effective management, identification, maintenance and disposition of Work Health and Safety (WHS) s at the University of Tasmania, including the results of audits and reviews. 2 More information For further information, contact the Work Health and Safety Unit health.safety@utas.edu.au 3 University Records Management s WHS s are managed in accordance with: Records Management Policy; and Records Management Guidelines. Their purpose is to ensure that all University s are appropriately created, managed, maintained and disposed of in accordance with legislative requirements, policy, and recognised standards of best practice, For further information, contact the Records Management Unit (RMU): RMU.Staff@utas.edu.au 4 WHS Legislative Requirements Statutory requirements for work health and safety keeping are set down in the: Work Health and Safety Act 2012; and Work Health and Safety Regulations A summary of the keeping requirements contained in the Act and Regulations, including retention times is provided in Appendix 1: Work Health and Safety Document and Record Retention. Penalties apply for failure to comply with these requirements. 5 Other Acts The following Acts also govern what information must be kept, how that information must be managed and when and how the information may be disposed of: Archives Act 1983 and Archives Regulations 2004 University of Tasmania Act 1992 Personal Information Protection Act 2004 Right to Information Act 2009 The Archives Act 1983 and the Archives Regulations 2004, provide the legislative background and provisions for dealings with State Records. Work Health Safety Record Management Guidelines (October, 2014) Page 2

3 The Tasmanian Archive and Heritage Office (TAHO) sets guidelines for the creation, maintenance, use and disposal of these s. s WHS s are to be managed in accordance with: Tasmanian Archive & Heritage Office Records Retention & Disposal Schedule For Functional s of the University of Tasmania - Disposal Authorisation No. 2398, 4 May Work Health and Safety Archives Office of Tasmania Disposal Schedule For Common Administrative Functions - Disposal Authorisation No. 2157, Compensation Equipment & Stores Occupational Health and Safety Personnel Property Management Further advice and support on retention and disposal schedules for work health and safety s is available from LINC Tasmania at 6 Application of Legislative Requirements Where more than one legislative requirement applies to a, the University will apply whichever retention period is the greater. 7 WHS Standards WHS s are maintained in conformance with the requirements of Australian Standard AS/NZS 4801 Occupational Health and Safety Management Systems. Records must: be legible, identifiable and traceable to the activity or service involved; be stored electronically (TRIM) and maintained to ensure they are readily retrievable and protected against damage, deterioration or loss; and have their retention times established and ed. 8 Responsibilities Records Management Unit (RMU) The RMU is responsible for the application of sound s management practices across the University, including implementation of the Records Management Policy and Guidelines. Work Health Safety Record Management Guidelines (October, 2014) Page 3

4 Work Health and Safety (WHS) Unit Organisational Units (OUs) The WHS Unit is responsible for supporting the effective management, identification, maintenance and disposition of Work Health and Safety (WHS) s in accordance with legislative requirements and applicable standards. OUs are responsible for ensuring WHS related documents are managed, identified, maintained and disposed of in accordance with the University s Records Management Policy and Guidelines. 9 Glossary Term/Acronym Organisational Unit Records Management TRIM Tasmanian Archive and Heritage Office Definition College, Faculty, School, Centre, University Institute, other University Entity, Division, Section or University Business Enterprise. The field of management responsible for the efficient and systematic control of the creation, receipt, maintenance, use and disposition of s, including processes for capturing and maintaining evidence of and information about business activities and transactions in the form of s s Electronic Document and Records Management System (EDRMS). Regulates the preservation and eventual destruction or retention of s in Tasmania 10 Versioning Current Version Version 1 Work Health Safety Record Management (current document); Approved October, Amended in December 2016 to incorporate Colleges. Work Health Safety Record Management Guidelines (October, 2014) Page 4

5 11 Appendix 1: Work Health and Safety Document and Record Retention Work Health and Safety Act 2012 S.4 Definitions document includes ; employee, in relation to an employee, has the same meaning as it has in the Privacy Act 1988 of the Commonwealth; Section Action by Document Notifiable incidents S.38 Duty to notify of notifiable incidents A of each notifiable incident At least 5 years from the day that notice of the incident is given to the regulator under this section. 1) DA2157/ Work Health and Safety Regulations 2012 Section Action by Document Airborne contaminants S.50 Monitoring airborne contaminant levels The results of air monitoring carried out are ed 30 years after the date the is made DA2157/ Confined Spaces S.76 Information, training and instruction for workers A of all training provided to a worker under 2 years DA2398/ Work Health Safety Record Management Guidelines (October, 2014) Page 5

6 Section Action by Document the confined spaces regulation S.77 Confined space entry permit and risk assessment must be kept the work to which the confined space assessment or permit relates Electrical work on energised electrical equipment S.162 Record keeping confined space risk assessment and confined space entry permit The copy of the confined space assessment or permit (as applicable) energised electrical equipment risk assessment energised electrical equipment safe work At least 28 days after the work to which the confined space risk assessment it relates is completed Until the work to which the confined space entry permit relates is completed At least 2 years after the incident occurs At least 28 days after the work to which it relates is completed; and Until the work to which it relates is completed Work Health Safety Record Management Guidelines DA2157/ ) DA2157/ DA2157/ DA2157/ Work Health Safety Record Management Guidelines (October, 2014) Page 6

7 Section Action by Document method statement the work to which the energised electrical equipment assessment or statement relates, Diving Work S.182 Diving work keeping the work to which the assessment or dive plan relates Control measures for certain plant S.226 Plant with presence-sensing safeguarding system s Where the University has management or control of plant with a presencesensing safeguarding system at a The energised electrical equipment assessment or statement (as applicable) diving risk assessment dive plan The assessment or dive plan (as applicable) A of safety integrity tests, inspections, maintenance, commissioning, decommissioni At least 2 years after the incident occurs At least 28 days after the work to which it relates is completed and until the dive work to which it relates is completed At least 2 years after the incident occurs 5 years or the life of the plant or until the University relinquishes control of the plant if the plant is registered plant or has been altered Work Health Safety Record Management Guidelines DA2157/ DA2157/ DA2157/ DA2157/ DA2157/ Destroy 7 years after the plant has been scrapped OR transfer to new owner when ownership of the plant is transferred. Work Health Safety Record Management Guidelines (October, 2014) Page 7

8 Section Action by Document workplace the ng, University must dismantling keep and alterations of the plant High risk construction work safe work method statements S.303 S High risk construction work safe work method statement must be kept the high risk construction work to which the safe work method statement relates Excavation work S. 304 Excavation work underground essential services information the excavation work to which the information relates Where the University has control or management of the workplace, the University high risk construction work safe work method statement The statement The underground essential services information is available for inspection The underground essential services information Until the high risk construction work to which it relates is completed At least 2 years after the incident occurs. Until the excavation work is completed At least 2 years after the incident occurs DA2157/ DA2157/ DA2157/ DA2157/ Work Health Safety Record Management Guidelines (October, 2014) Page 8

9 Section Action by Document Additional Duties of Principal Contractor S.313 Copy of WHS management plan must be kept the construction project to which the statement relates, Where the University is the principal contractor for a construction project the University must ensure that Prohibited and restricted carcinogens S.340 Supply of prohibited and restricted carcinogens A supplier prohibited and restricted carcinogens Hazardous chemicals - Health monitoring S.378 Health monitoring s that WHS management plan for the project is kept The WHS management plan A of the name of the person supplied and the name and quantity of the substance supplied. Health monitoring reports in relation to a worker Until the project to which management plan for the project relates is completed. At least 2 years after the incident occurs. 5 years after the substance was last supplied to the person At least 30 years after the is made DA2157/ Destroy 7 years after plan is superseded DA2157/ DA2157/ DA2157/ Destroy when the employee reaches 75 years of age or 7 years after separation, whichever is the later. Work Health Safety Record Management Guidelines (October, 2014) Page 9

10 Section Action by Document carrying out work for the University are kept as a confidential and identified as a in relation to the worker. Hazardous Chemicals - Prohibition, authorisation and restricted use S.388 Records to be kept Where the University is authorised to use, handle or store a prohibited carcinogen or restricted carcinogen at the workplace the University Lead - Health monitoring A of the full name, date of birth and address of each worker likely to be exposed to the prohibited carcinogen or restricted carcinogen during the period of authorisation; and A copy of each authorisation given to the person including any conditions imposed on the authorisation Work Health Safety Record Management Guidelines 30 years after the authorisation ends DA2157/ Destroy 30 years after action completed Work Health Safety Record Management Guidelines (October, 2014) Page 10

11 Section Action by Document that S.418 Health monitoring s Asbestos - Health monitoring S.444 Health monitoring s Asbestos - Training S.445 Duty to train workers about asbestos that that Health monitoring reports in relation to a worker carrying out work for the University are kept as a confidential and identified as a in relation to the worker Health monitoring reports in relation to a worker carrying out work for the University are kept as a confidential and identified as a in relation to the worker A is kept of the training undertaken by At least 30 years after the is made. At least 40 years after the is made. 5 years after the day the worker ceases working for the University. DA2157/ Destroy when the employee reaches 75 years of age or 7 years after separation, whichever is the later. DA2157/ Destroy when the employee reaches 75 years of age or 7 years after separation, whichever is the later. DA2398/ Work Health Safety Record Management Guidelines (October, 2014) Page 11

12 Section Action by Document the worker while the worker is carrying out the work Asbestos Removal Work S.461 Licensed asbestos removalist training s S.465 Asbestos removal control plan to be kept and available the asbestos removal work to which the asbestos removal control plan relates, A licensed asbestos removalist must keep A licensed asbestos removalist must ensure that The licensed asbestos removalist must keep A of the training undertaken by a worker carrying out licensed asbestos removal work asbestos removal control plan The asbestos removal control plan While the worker is carrying out licensed asbestos removal work and For 5 years after the day the worker stopped carrying out licensed asbestos removal work for the removalist. Until the asbestos removal work to which it relates is completed At least 2 years after the incident occurs. DA2398/ DA2157/ Destroy 7 years after the demolition of the building Accidents/incidents that result in serious injury or death DA2157/ ) Accidents/incidents that do not result in serious injury or death Destroy 7 years after the action completed provided the person Work Health Safety Record Management Guidelines (October, 2014) Page 12

WHS record keeping requirements

WHS record keeping requirements WHS record keeping requirements The table below provides details of the record keeping requirements in the Model Work Health and Safety Regulation, covering the following areas: Air-borne contaminant levels

More information

WHS record keeping - general (Local areas responsible for keeping these records)

WHS record keeping - general (Local areas responsible for keeping these records) WHS record keeping - general (Local areas responsible for keeping these records) Records Examples Retention period Records relating to risk assessment and management of hazards (except particular requirements

More information

Chief Operating Officer Approved by. Responsible Officer. Vice-Chancellor Approved and commenced 25 September, 2017 Review by September, 2020

Chief Operating Officer Approved by. Responsible Officer. Vice-Chancellor Approved and commenced 25 September, 2017 Review by September, 2020 Work Health and Safety Policy Responsible Officer Chief Operating Officer Approved by Vice-Chancellor Approved and commenced 25 September, 2017 Review by September, 2020 Relevant Legislation, University

More information

Boating Activity Minimum Standard. January 2015

Boating Activity Minimum Standard. January 2015 Boating Activity Minimum Standard January 2015 Contents 1 Executive Summary... 2 2 More Information... 2 3 Using this Standard... 2 4 Minimum Standard requirements... 2 4.1 Legislation... 2 4.1.1 Requirements

More information

CONTRACTOR WHS HAZARD STANDARD HAZARDOUS CHEMICALS EXTERNAL USE ONLY

CONTRACTOR WHS HAZARD STANDARD HAZARDOUS CHEMICALS EXTERNAL USE ONLY CONTRACTOR WHS HAZARD STANDARD HAZARDOUS CHEMICALS EXTERNAL USE ONLY Principles in the Optus Contractor WHS management process CONTRACTOR MANAGEMENT STAGES PRINCIPLES THIS STANDARD REQUISITION Requisition

More information

Project & Task Work Health and Safety Risk Management Procedure

Project & Task Work Health and Safety Risk Management Procedure Project & Task Work Health and Safety Risk Management Procedure Related Policy Work Health and Safety Policy Responsible Officer Executive Director Human Resources Approved by Executive Director Human

More information

Plant Isolation Lock out/tag out Procedure

Plant Isolation Lock out/tag out Procedure Plant Isolation Lock out/tag out Procedure Related Policy Responsible Officer Approved by Work Health and Safety Policy Approved and commenced November, 2014 Review by November, 2017 Responsible Organisational

More information

WHS PROCEDURE P Confined Spaces. Approved by: Ruth Hampton Review Date: 6 th December 2015

WHS PROCEDURE P Confined Spaces. Approved by: Ruth Hampton Review Date: 6 th December 2015 5 WHS PROCEDURE P21-01 Page 1 of 7 Issue: 2 1. Intent The Salvation Army Australia Eastern Territory (TSA-AUE) is committed to the provision of a safe, healthy and injury free environment for all persons

More information

Section J. How to develop safety elements for project safety management system. How to develop safety elements for project SMS

Section J. How to develop safety elements for project safety management system. How to develop safety elements for project SMS Section J How to develop safety elements for project safety management system 1. Once the project management has developed or adopted a safety policy, it needs to develop safety elements to meet the objectives

More information

Health & Safety Policy & Plan. Rightway Roofing.

Health & Safety Policy & Plan. Rightway Roofing. Health & Safety Policy & Plan. Rightway Roofing. Valid: 02/2012-02/2013 Contents ( 1 ) Policy Statement. ( 2 ) Hazard Identification. ( 3 ) Hazard Management. ( 4 ) Induction & Training. ( 5 ) Monitoring

More information

Manual Tasks Minimum Standard. October, 2014

Manual Tasks Minimum Standard. October, 2014 Manual Tasks Minimum Standard Manual Tasks Minimum Standard October, 2014 Contents 1 Executive Summary... 2 2 More Information... 2 3 Using this Standard... 2 4 Managing Risk... 2 4.1 Consultation... 2

More information

Health, Safety and Environment Management System. HSE-PRO-008 HSE Responsibilities Procedure

Health, Safety and Environment Management System. HSE-PRO-008 HSE Responsibilities Procedure Health, Safety and Environment Management System HSE-PRO-008 HSE Responsibilities Procedure 1 Table of Contents 1 Intent... 3 2 Scope... 3 3 Definitions... 3 4 Duty, Obligations and Responsibilities...

More information

Safe work method statements

Safe work method statements Information about Safe work method statements How to prepare and use a safe work method statement (SWMS) for high risk construction work (HRCW) and who needs to prepare one. October 2018 Key concepts Hazard

More information

BSBWHS404A Contribute to WHS hazard identification, risk assessment and risk control Learning Guide

BSBWHS404A Contribute to WHS hazard identification, risk assessment and risk control Learning Guide BSBWHS404A Contribute to WHS hazard identification, risk assessment and risk control BSB41412 Certificate IV in Work Health and Safety BSB41412-Learning-Guide-Sample-V2 BSB41412-Learning-Guide-Sample-V2

More information

Harmonisation of Work Health and Safety Legislation

Harmonisation of Work Health and Safety Legislation NATIONAL RESEARCH CENTRE FOR OHS REGULATION Work health and safety Briefing Work Health and Safety Harmonisation of Work Health and Safety Legislation Acts and regulations giving effect to the Australian

More information

Policy Redesign Project. Plant Safety Policy. Table of Contents

Policy Redesign Project. Plant Safety Policy. Table of Contents Policy Redesign Project All policies and procedures are being reviewed as part of this project. This document is pending review, but remains in effect until the review is carried out. Plant Safety Policy

More information

Removal of Lead-Based Paint

Removal of Lead-Based Paint Safety Management System SP24-61 Process Authority: HS Manager Removal of Lead-Based Paint Approval: Chief Operating Officer Version Date:30/03/2015 Revision: B 1 Purpose To define the requirements for

More information

List all key terms and acronyms used in the procedure, and their definitions.

List all key terms and acronyms used in the procedure, and their definitions. Purpose The purpose of this procedure is to provide guidelines for electrical safety in general within Seqwater in compliance with the Electrical Safety Act 2002, Industry Codes of Practice, Regulations,

More information

Hazard & Risk Management

Hazard & Risk Management Hazard & Risk Management Introduction The Church recognises WHS hazards and risks must be appropriate managed to ensure, so far as reasonably practicable, the health and safety of all workers at Church

More information

Procedure: Work health and safety hazard management

Procedure: Work health and safety hazard management Procedure: Work health and safety hazard management Purpose This procedure describes how the Australian National University (ANU) manages Work Health Safety hazards for the health, safety, rehabilitation

More information

(2) but does not include a shaft, trench or tunnel that is a mine or is part of the workings of a mine.

(2) but does not include a shaft, trench or tunnel that is a mine or is part of the workings of a mine. Health and Safety Procedure - Confined Spaces Section 1 - Background and Purpose (1) Confined spaces are, for the purposes of this procedure, defined as the following which is the definition under the

More information

Work Activity (e.g. Road Work): Work Location:.

Work Activity (e.g. Road Work): Work Location:. Working with Cranes Work Activity (e.g. Road Work): Work Location:. GENERAL INFORMATION Hinchinbrook Shire Council Lannercost Street Ingham Qld, 4850 ABN 46 291 971 168 Ph: 47764610 All personnel conducting

More information

Newtown Neighbourhood Centre

Newtown Neighbourhood Centre Policy Name Policy Number 1.10.1.1 Relevant procedures Work Health and Safety All procedures relating to the health, safety and well being of individuals in the workplace are relevant to this policy. Author

More information

SOP. Working in Confined Spaces

SOP. Working in Confined Spaces Purpose This procedure outlines the requirements for the management of entry into confined spaces in all work areas with the intention of minimising risks to health and safety from any potential hazards

More information

CONTRACTOR WHS HAZARD STANDARD CONFINED SPACE EXTERNAL USE ONLY

CONTRACTOR WHS HAZARD STANDARD CONFINED SPACE EXTERNAL USE ONLY CONTRACTOR WHS HAZARD STANDARD CONFINED SPACE EXTERNAL USE ONLY Principles in the Optus Contractor WHS management process CONTRACTOR MANAGEMENT STAGES PRINCIPLES THIS STANDARD REQUISITION Requisition WHS

More information

ASTC210 (SQA Unit Code - F4PS 04) Clean confined spaces

ASTC210 (SQA Unit Code - F4PS 04) Clean confined spaces Overview This unit is about maintaining levels of cleanliness in confined spaces. When working in confined spaces it is important to be vigilant against possible hazards and risks that may arise during

More information

Work Health and Safety Risk Management Procedures

Work Health and Safety Risk Management Procedures Work Health and Safety Risk Management Procedures Table of Contents 1. Governing Policy 2. Purpose 3. Scope 4. Definitions 5. Responsibilities 6. Risk Management Process 6.1. Process summary 6.2. Hazard

More information

Instructions for the Use of the Excel Spreadsheet. There are Three tabs at the bottom of this worksheet. Instructions tab is the one you are reading

Instructions for the Use of the Excel Spreadsheet. There are Three tabs at the bottom of this worksheet. Instructions tab is the one you are reading Instructions for the Use of the Excel Spreadsheet There are Three tabs at the bottom of this worksheet Instructions tab is the one you are reading H&S Plan Tab The Plan Tab is the front cover pages of

More information

Corporate Standard Hazardous Substance Management HB#625157

Corporate Standard Hazardous Substance Management HB#625157 Contents Contents... 1 Functional Flowchart... 1 Objective... 1 Scope... 1 Definitions... 2 Responsibilities... 3 OH&S Systems Manager... 3 Station / Site Manager... 3 Workers... 3 Hazards... 3 Risk Assessment...

More information

Procedure: Pressure equipment safety

Procedure: Pressure equipment safety Procedure: Pressure equipment safety Purpose The purpose of this procedure is to define the method for safe operation and inspection of pressure equipment and the collection and recording of associated

More information

Safety Guidelines for Live Entertainment and Events I Part 2. Hazard Identification and Risk Management 1

Safety Guidelines for Live Entertainment and Events I Part 2. Hazard Identification and Risk Management 1 Safety Guidelines for Live Entertainment and Events Part 2. Hazard Identification and Risk Management Contents Disclaimer... 1 1. Principles of Risk Management... 2 2. The Risk Management Process... 2

More information

Safety Management Manual

Safety Management Manual Commercial Services & Development Safety Management Manual Version 4.3, April 2016 Please note that the referenced policies or procedures under each section may be under review. Contents 1. Work health

More information

HAZARDOUS SUBSTANCE AND DANGEROUS GOODS

HAZARDOUS SUBSTANCE AND DANGEROUS GOODS The Barro Group is committed to continuously improving the management and standards of Occupational Health and Safety. This commitment extends to minimising exposure of employees, contractors, visitors

More information

Contractor OHS Induction. AOHS-05-GUI September 2016

Contractor OHS Induction. AOHS-05-GUI September 2016 Contractor OHS Induction AOHS-05-GUI-002 8 September 2016 1 About AQWEST AQWEST is a Government Trading Enterprise responsible for supplying drinking water to Bunbury. Formed in 1906 as the Bunbury Water

More information

To comply with the OHS Act, the responsible manager must carry out and document the following:

To comply with the OHS Act, the responsible manager must carry out and document the following: Owner: Manager Health, Wellbeing and Safety Last Update: 10 January 2018 Contents 1. Purpose... 1 2. Minimum Compliance Requirements... 1 3. Definitions... 2 4. Legislative requirements under the OHS Act

More information

LOCK-OUT / TAG-OUT SYSTEM & PROCEDURE

LOCK-OUT / TAG-OUT SYSTEM & PROCEDURE Date Adopted 8/04/2008 Due for Review 8/4/2009 Business Unit HR & Safety Current Policy Date 8/4/2008 LOCK-OUT / TAG-OUT SYSTEM & PROCEDURE 1.0 PURPOSE 2.0 SCOPE To prevent injuries to persons or damage

More information

MINE SAFETY TARGETED ASSESSMENT PROGRAM. Ground or strata failure NSW metalliferous mines. April

MINE SAFETY TARGETED ASSESSMENT PROGRAM. Ground or strata failure NSW metalliferous mines. April MINE SAFETY TARGETED ASSESSMENT PROGRAM Ground or strata failure NSW metalliferous mines April 2017 www.resourcesandenergy.nsw.gov.au Document control Publication title: Ground or strata failure NSW metalliferous

More information

Procedure: Safety signage

Procedure: Safety signage Procedure: Safety signage Purpose To describe how the University establishes, implements and maintains safety signage throughout the workplace. This procedure ensures that legal and other obligations of

More information

CONTRACTOR SAFETY INDUCTION HANDBOOK

CONTRACTOR SAFETY INDUCTION HANDBOOK CONTRACTOR SAFETY INDUCTION HANDBOOK As a valued contractor for Total Group we would ask that you read and carefully consider the details included in this document. Total Group carry out work for a number

More information

Contractor handbook. Purpose

Contractor handbook. Purpose Page no: 1 / 6 Contractor handbook Purpose Mitie aims to ensure that the highest levels of performance are achieved by all persons working for us or on our behalf. We require the same level of performance

More information

Safe Use of Explosives in Construction. Safe to Blast. Information Sheet

Safe Use of Explosives in Construction. Safe to Blast. Information Sheet Safe Use of Explosives in Construction Safe to Blast Information Sheet This guide has been developed to provide general information to site management on issues dealing with safe use of explosives on construction

More information

Competency type. positions. All workers (including contractors), higher degree students and volunteers

Competency type. positions. All workers (including contractors), higher degree students and volunteers Appendix A Training Required for Work Health & Safety Training WHS general and/or site/work specific induction of the emergency procedures and assembly areas Local first aid provisions. of hazards and

More information

Iron Ore Company of Canada Health, Safety & Environment

Iron Ore Company of Canada Health, Safety & Environment Hazardous Materials 1 PURPOSE The entry of all substances onto site is controlled, Banned substances are not admitted, Potential health effects and hazards are identified and controlled, All products are

More information

GENERAL WORK HEALTH & SAFETY CHECKLIST INTENDED USE. St Euphemia College - General Work Health and Safety Checklist

GENERAL WORK HEALTH & SAFETY CHECKLIST INTENDED USE. St Euphemia College - General Work Health and Safety Checklist GENERAL WORK HEALTH & SAFETY CHECKLIST INTENDED USE This document is a summary checklist intended for employees as well as the School executive, and sets out the measures that a PCBU should put in place

More information

SAFE WORK METHOD STATEMENT Part 1

SAFE WORK METHOD STATEMENT Part 1 SAFE WORK METHOD STATEMENT Part 1 Company Details: Aztech Integrated Systems Pty Ltd ABN: 50 142 740 172 Director : Aaron Caruana +61 418 178 719 7/227A Brisbane Road, Labrador, QLD, 4215. Project Details:

More information

LADDERS FIXED AND PORTABLE

LADDERS FIXED AND PORTABLE CONTRACTOR WHS HAZARD STANDARD LADDERS FIXED AND PORTABLE EXTERNAL USE ONLY Principles in the Optus Contractor WHS management process CONTRACTOR MANAGEMENT STAGES PRINCIPLES THIS STANDARD REQUISITION Requisition

More information

Safe management of industrial steam and hot water boilers A guide for owners, managers and supervisors of boilers, boiler houses and boiler plant

Safe management of industrial steam and hot water boilers A guide for owners, managers and supervisors of boilers, boiler houses and boiler plant Health and Safety Executive Safe management of industrial steam and hot water boilers A guide for owners, managers and supervisors of boilers, boiler houses and boiler plant Background Accidents involving

More information

POLICY FOR THE CONTROL OF SUBSTANCES HAZARDOUS TO HEALTH (COSHH)

POLICY FOR THE CONTROL OF SUBSTANCES HAZARDOUS TO HEALTH (COSHH) POLICY FOR THE CONTROL OF SUBSTANCES HAZARDOUS TO HEALTH (COSHH) INTRODUCTION & LEGISLATION Using chemicals or other hazardous substances at work can put people s health at risk. The law requires employers

More information

Hazardous Materials Management Guidelines

Hazardous Materials Management Guidelines Environmental, Health and Safety Guidelines Hazardous Materials Management Guidelines Applicability These guidelines apply to facilities and activities involving the transportation, production, handling,

More information

Geotechnics, Face and Stockpile Operations

Geotechnics, Face and Stockpile Operations Quarries National Joint Advisory Committee (QNJAC) Geotechnics, Face and Stockpile Operations Information Sheet 4 October 2012 Duties of the Operator This information sheet has been developed by the Quarries

More information

Temporary load-bearing support for structural alterations or repairs

Temporary load-bearing support for structural alterations or repairs CRITICAL NOTE This document only becomes a Safe Work Method Statement where the High Risk Construction Work section of this document is completed Company: ABN: Contact Person: Ph: Project/Site: Principal

More information

HAZARDOUS SUBSTANCES / DANGEROUS GOODS

HAZARDOUS SUBSTANCES / DANGEROUS GOODS HAZARDOUS SUBSTANCES / DANGEROUS GOODS Golden Brown is committed to continuously improving the management and standards of Occupational health and Safety. This commitment extends to minimising exposure

More information

RISK ASSESSMENT A UNIVERSITY GUIDE TO PRACTICAL RISK ASSESSMENT UNDER THE MANAGEMENT OF HEALTH AND SAFETY AT WORK REGULATIONS 1992

RISK ASSESSMENT A UNIVERSITY GUIDE TO PRACTICAL RISK ASSESSMENT UNDER THE MANAGEMENT OF HEALTH AND SAFETY AT WORK REGULATIONS 1992 RISK ASSESSMENT A UNIVERSITY GUIDE TO PRACTICAL RISK ASSESSMENT UNDER THE MANAGEMENT OF HEALTH AND SAFETY AT WORK REGULATIONS 1992 PERSONNEL DIVISION REVIEWED AUTUMN 1999 CONTENTS Page 1 INTRODUCTION 1

More information

Construction & Building Industry Safety Guideline. Electrical Isolations

Construction & Building Industry Safety Guideline. Electrical Isolations Construction & Building Industry Safety Guideline Electrical Isolations Disclaimer This Guideline contains information regarding work health and safety. It includes some of your obligations under the work

More information

Hazard Communication Program

Hazard Communication Program The University of Memphis Hazard Communication Program November 2016 Table of Contents University of Memphis Hazard Communication Program Contents Purpose... 1 Scope and Application... 1 Responsibilities...

More information

ISOLATION ISSUE 2 1 AIM 2 4 REASONS FOR INCLUSION 3 6 PLANT AND EQUIPMENT REQUIREMENTS 3 7 SYSTEM & PROCEDURAL REQUIREMENTS 4 8 PEOPLE REQUIREMENTS 6

ISOLATION ISSUE 2 1 AIM 2 4 REASONS FOR INCLUSION 3 6 PLANT AND EQUIPMENT REQUIREMENTS 3 7 SYSTEM & PROCEDURAL REQUIREMENTS 4 8 PEOPLE REQUIREMENTS 6 CONTENTS PAGE 1 AIM 2 2 APPLICATION 2 3 DEFINITIONS 2 4 REASONS FOR INCLUSION 3 5 REQUIREMENTS 3 6 PLANT AND EQUIPMENT REQUIREMENTS 3 7 SYSTEM & PROCEDURAL REQUIREMENTS 4 8 PEOPLE REQUIREMENTS 6 APPENDIX

More information

TOXIC GAS DETECTORS IN THE WORKPLACE UK REGULATIONS AND STANDARDS

TOXIC GAS DETECTORS IN THE WORKPLACE UK REGULATIONS AND STANDARDS SUMMARY TOXIC GAS DETECTORS IN THE WORKPLACE UK REGULATIONS AND STANDARDS In recent articles supplied by the Council of Gas Detection and Environmental Monitoring (CoGDEM) for inclusion in International

More information

Contractor / Exhibitor Handbook

Contractor / Exhibitor Handbook Contractor / Exhibitor Handbook Health and Safety This booklet outlines the basic rules that must be followed by contractors and other visitors working on Live Promotions Events sites. The contractors

More information

HAZARD MANAGEMENT PROCEDURE

HAZARD MANAGEMENT PROCEDURE TABLE OF CONTENTS 1. OBJECTIVE... 2 2. SCOPE... 2 3. DEFINITIONS... 2 4. RESPONSIBILITIES... 2 5. HAZARD IDENTIFICATION... 3 5.1 HAZARD AND RISK IDENTIFICATION TOOLS AND METHODS... 3 5.1.1 Take 5 Risk

More information

WORK HEALTH SAFETY MANAGEMENT SYSTEM First Aid Policy & Procedure WHS2200

WORK HEALTH SAFETY MANAGEMENT SYSTEM First Aid Policy & Procedure WHS2200 Issued by: WHS Effective Date: 1 Oct 13 Rev: A Page 1 of 7 1. Purpose Hockey NSW is committed to preventing work -elated injuries and illness from occurring, however, if an accident or injury occurs, Hockey

More information

Release: 1. UEPOPL002A Licence to operate a reciprocating steam engine

Release: 1. UEPOPL002A Licence to operate a reciprocating steam engine Release: 1 UEPOPL002A Licence to operate a reciprocating steam engine UEPOPL002A Licence to operate a reciprocating steam engine Modification History Not applicable. Unit Descriptor Unit Descriptor 1)

More information

ontario regulation 629/05 made under the occupational health and safety act

ontario regulation 629/05 made under the occupational health and safety act ontario regulation 629/05 made under the occupational health and safety act Made: December 7, 2005 Filed: December 8, 2005 Published on e-laws: December 9, 2005 Printed in The Ontario Gazette: December

More information

How severely could the risk hurt someone? Low/Insignificant First aid

How severely could the risk hurt someone? Low/Insignificant First aid Safe Work Method Statement No: WMS-0 Task: Line Marking This WMS is submitted to: Project name and site address: Contact: Preparation of WMS by: Robert Raams Company: Enwon (Australia) Pty Ltd Authorised

More information

Health and Safety Inspection Procedure

Health and Safety Inspection Procedure Template v4 WILTSHIRE POLICE FORCE PROCEDURE Health and Safety Inspection Procedure Effective from: 25.03.2012 Last Review Date: 10.05.2015 Version: 2.0 Next Review Date: 10.05.2018 TABLE OF CONTENTS PROCEDURE

More information

ONTARIO REGULATION 632/05 CONFINED SPACES

ONTARIO REGULATION 632/05 CONFINED SPACES Français Occupational Health and Safety Act ONTARIO REGULATION 632/05 CONFINED SPACES Consolidation Period: From December 16, 2009 to the e-laws currency date. Last amendment: O. Reg. 492/09. This is the

More information

Contractor Code of Conduct

Contractor Code of Conduct Application This procedure and associated documents are based on Health, Safety and Environmental best practice. Additional guidelines may be required within countries where local and / or in-country regulations

More information

SH&E Work Method Statement Concrete Cutting & Drilling Fast Cut Qld Pty Ltd, 91 Basalt, GEEBUNG PH M ABN

SH&E Work Method Statement Concrete Cutting & Drilling Fast Cut Qld Pty Ltd, 91 Basalt, GEEBUNG PH M ABN SH&E Work Method Statement Concrete Cutting & Drilling Fast Cut Qld Pty Ltd, 91 Basalt, GEEBUNG PH 07 3265 6537 M 0411 756 719 ABN 45 081 359 613 OHS-FRM-100 Rev 11 (07/18) Page 1 SH&EWMS No.: F-C-QLD-30

More information

Our commitment to safety

Our commitment to safety 2 Our commitment to safety At South East Water, we have an absolute commitment to achieving and maintaining a safe and healthy workplace for our people, including our contractors and stakeholders which

More information

3. PURPOSE: To establish the minimum safety content of swimming pool Operations Manuals.

3. PURPOSE: To establish the minimum safety content of swimming pool Operations Manuals. GO.. TITLE: OPERATIONS MANUALS 2. DATE ISSUED: July 996 ISSUE: 2 3. PURPOSE: To establish the minimum safety content of swimming pool Operations Manuals. 4. (a) An Operations Manual should be prepared

More information

How severely could the risk hurt someone? Low/Insignificant First aid

How severely could the risk hurt someone? Low/Insignificant First aid Safe Work Method Statement No: WMS-02 Task: Concreting, Formwork and Steel Fixing This WMS is submitted to: Project name and site address: Contact: Preparation of WMS by: Robert Raams Company: Enwon (Australia)

More information

SAFE WORK METHOD STATEMENT CARPENTER

SAFE WORK METHOD STATEMENT CARPENTER HOST EMPLOYER DECLARATION I declare the worker/s named on this work authority have been provided with a site specific safety induction that complies with the requirements of the Workplace Health & Safety

More information

DRIVER FATIGUE MANAGEMENT PLAN

DRIVER FATIGUE MANAGEMENT PLAN DRIVER FATIGUE MANAGEMENT PLAN Basic principles to include in a driver fatigue management plan A number of basic principles apply when developing a Driver Fatigue Management Plan. The following are detailed

More information

Working Alone. Latest revised date: October 26, 2011 Page 1 of 7 Prepared by: Department of Health & Safety S-014

Working Alone. Latest revised date: October 26, 2011 Page 1 of 7 Prepared by: Department of Health & Safety S-014 Working Alone Latest revised date: October 26, 2011 Page 1 of 7 1.0 Introduction Memorial will establish specific practices and procedures to minimize the risks of injury or violence to staff, faculty,

More information

POLICY ON THE PROVISION & USE OF PERSONAL PROTECTIVE EQUIPMENT

POLICY ON THE PROVISION & USE OF PERSONAL PROTECTIVE EQUIPMENT POLICY ON THE PROVISION & USE OF PERSONAL PROTECTIVE EQUIPMENT June 2013 Lead Manager John Green, Health & Safety Service Manager Responsible Director Director of Human Resources Approved By Health and

More information

NZQA unit standard version 3 Page 1 of 8. Manage the mine ventilation system at an extractive site

NZQA unit standard version 3 Page 1 of 8. Manage the mine ventilation system at an extractive site Page 1 of 8 Title Manage the mine ventilation system at an extractive site Level 7 Credits 30 Purpose This unit standard covers the development and management of the operation and maintenance of a mine

More information

Occupational Health and Safety Act

Occupational Health and Safety Act Page 1 of 16 Français Occupational Health and Safety Act ONTARIO REGULATION 632/05 CONFINED SPACES Consolidation Period: From March 29, 2011 to the e-laws currency date. Last amendment: O. Reg. 95/11.

More information

This procedure must be read in conjunction with WHS-PRO-020: Emergency Procedures

This procedure must be read in conjunction with WHS-PRO-020: Emergency Procedures 1. Purpose Document No: WHS-PRO-021 Approval Date: 8/04/17 EMERGENCY WARDENS Approved By: G. Mowbray Review Date: 8/04/19 Responsible Officer: Expiry Date: N/A Employment Relations Advisor Issue No: 8/04/17

More information

Builders Guide to MANAGING SAFETY on Work Sites

Builders Guide to MANAGING SAFETY on Work Sites Builders Guide to MANAGING SAFETY on Work Sites Links to web sites in your State with harmonised WHS laws: South Australia New South Wales Queensland Northern Territory ACT Tasmania Commonwealth www.safework.sa.gov.au

More information

SAFETY AND HEALTH INDUSTRIAL HYGIENE Hazard Communication Program Effective Date: 08/07/14 Standard: 10.1 Document Number: KUSHIH0008 Rev: 01

SAFETY AND HEALTH INDUSTRIAL HYGIENE Hazard Communication Program Effective Date: 08/07/14 Standard: 10.1 Document Number: KUSHIH0008 Rev: 01 Introduction: This Hazard Communication (HazCom) Program manual was designed to meet the requirements of OSHA 29 CFR 1910.1200, MSHA 30 CFR Part 47, and all Rio Tinto Kennecott Copper (RTKC) standards.

More information

Lifting Operations and Lifting Equipment Regulations (LOLER) Policy. Version No. 2. Review: May 2019

Lifting Operations and Lifting Equipment Regulations (LOLER) Policy. Version No. 2. Review: May 2019 Livewell Southwest Lifting Operations and Lifting Equipment Regulations (LOLER) Policy Version No. 2 Review: May 2019 Notice to staff using a paper copy of this guidance The policies and procedures page

More information

IGO GROUP SAFETY STANDARD 30 - WORKPLACE VENTILATION INDEPENDENCE GROUP NL

IGO GROUP SAFETY STANDARD 30 - WORKPLACE VENTILATION INDEPENDENCE GROUP NL IGO GROUP SAFETY STANDARD 30 - WORKPLACE VENTILATION INDEPENDENCE GROUP NL CONTENTS 1. INTENT... 3 2. APPLICATION... 3 3. UNDERGROUND VENTILATION... 3 3.2 Underground Ventilation Officer... 3 3.3 Risk

More information

Asbestos Management Plan

Asbestos Management Plan Asbestos Management Plan Ratified by the Finance and Buildings Committee: July 2018 ASBESTOS MANAGEMENT PLAN CONTENTS Policy Statement 4 Introduction 5 Purpose 5 Scope 5 Definitions 6 Abbreviations 6

More information

CONTROL OF SUBSTANCES HAZARDOUS TO HEALTH PROCEDURE

CONTROL OF SUBSTANCES HAZARDOUS TO HEALTH PROCEDURE CONTROL OF SUBSTANCES HAZARDOUS TO HEALTH PROCEDURE 1. INTRODUCTION The University uses substances hazardous to health in many of its operations, and accepts that it has a duty of care to reduce exposure

More information

How severely could the risk hurt someone?

How severely could the risk hurt someone? Safe Work Method Statement No: WMS-08 Task: Install Drainage This WMS is submitted to: Project name and site address: Contact: Preparation of WMS by: Robert Raams Company: Enwon (Australia) Pty Ltd Authorised

More information

Guidance: HSW Risk Assessment Methodology HSW-PR09-WI01. Objective. Implementation

Guidance: HSW Risk Assessment Methodology HSW-PR09-WI01. Objective. Implementation 1.0 Objective This Work Instruction is designed to assist in the assessment of health and safety and wellbeing (HSW) risk and suggested controls associated with hazards identified while working throughout

More information

Hazardous substance risk management

Hazardous substance risk management November 2017 H E A LT H & S A F E T Y AT WO R K HSWA AC T QUICK GUIDE Hazardous substance risk management KEY FACTS You must proactively manage the risks that come from having hazardous substances in

More information

COSAO26 Identify workplace health and safety hazards and control risks in asbestos surveying and analysis

COSAO26 Identify workplace health and safety hazards and control risks in asbestos surveying and analysis Identify workplace health and safety hazards and control risks in Overview This unit is about identifying hazards and assessing risks. You will also need to verify and implement methods and procedures

More information

Health &Safety Policy HS803

Health &Safety Policy HS803 Health &Safety Policy HS803 HSP 1.1 page 1 of 1 Introduction Issue: 03 Date: Jul 18 The purpose of this Health and Safety Policy is to define the health and safety management system of Bayanix (herein

More information

Hazard Management Making your workplace safer

Hazard Management Making your workplace safer Hazard Management Making your workplace safer A Guide to Hazard Identification, Risk Assessment, Control and Reviewing 1 What is a hazard? A hazard is something which has the potential to harm the health,

More information

APPROVED CODE OF PRACTICE FOR THE SAFE CONDUCT OF TRACK AND FIELD TRAINING

APPROVED CODE OF PRACTICE FOR THE SAFE CONDUCT OF TRACK AND FIELD TRAINING APPROVED CODE OF PRACTICE FOR THE SAFE CONDUCT OF TRACK AND FIELD TRAINING Revised August 2017 CONTENTS PAGE 2017 Updated Code of Practice 3 UKA Health & Safety Policy 4 Definitions 5 Hazard identification

More information

CSTMC Asbestos Management Policy and Procedures

CSTMC Asbestos Management Policy and Procedures ASBESTOS MANAGEMENT PLAN FOR COLLECTIONS at the CANADA SCIENCE AND TECHNOLOGY MUSEUM CORPORATION October 2010 1. FOREWORD 1.1. This document specifies the Canada Science and Technology Museum Corporation

More information

Mining and Quarrying Safety and Health Regulation 2001

Mining and Quarrying Safety and Health Regulation 2001 Queensland Mining and Quarrying Safety and Health Act 1999 Mining and Quarrying Safety and Health Regulation 2001 Reprinted as in force on 1 July 2010 Reprint No. 3B This reprint is prepared by the Office

More information

HAZARDOUS WASTE OPERATIONS AND EMERGENCY RESPONSE

HAZARDOUS WASTE OPERATIONS AND EMERGENCY RESPONSE Page 1 of 10 HAZARDOUS WASTE OPERATIONS AND EMERGENCY RESPONSE 1.0 SCOPE This Performance Assessment Guide for Hazardous Waste Operations and Emergency Response (HAZWOPER) will be used to carry out the

More information

Procedure: Work health and safety reporting

Procedure: Work health and safety reporting Procedure: Work health and safety reporting Purpose This procedure describes how the Australian National (ANU) identifies and defines the Work Health and Safety reporting needs to comply with the work

More information

Health, Safety and Welfare Policy

Health, Safety and Welfare Policy Health, Safety and Welfare Policy This Policy is prepared in accordance with section 2(3) the Health and Safety at work etc. Act 1974, with the intention of promoting a safe working environment that will,

More information

HEAT, COLD, SOLAR ULTRAVIOLET & INCLEMENT WEATHER

HEAT, COLD, SOLAR ULTRAVIOLET & INCLEMENT WEATHER CONTRACTOR WHS HAZARD STANDARD HEAT, COLD, SOLAR ULTRAVIOLET & INCLEMENT WEATHER EXTERNAL USE ONLY Principles in the Optus Contractor WHS management process CONTRACTOR MANAGEMENT STAGES PRINCIPLES THIS

More information

in Australian Workplaces

in Australian Workplaces Copyright 2011 - OnGuard Safety Training Pty Ltd 1 of 7 in Australian Workplaces Introduction Part 2 Part 3 Part 4 Part 5 SafeWork SA Introduction Hazard identification is the process used to identify

More information

SUBJECT: LIFTING OPERATIONS AND LIFTING EQUIPMENT (LOLER)

SUBJECT: LIFTING OPERATIONS AND LIFTING EQUIPMENT (LOLER) SUBJECT: LIFTING OPERATIONS AND LIFTING EQUIPMENT (LOLER) 1.0 INTRODUCTION The purpose of this procedure is to give direction on the responsibilities and requirements related to UK legislation covering

More information

PLANT/EQUIPMENT/ASSET HAZARD REPORT

PLANT/EQUIPMENT/ASSET HAZARD REPORT Asset Description: EL-08001-011 : Harrison 550 CNC Lathe Large Sale Type For what use is this asset being sold? Re-Use þ Spare Parts Scrap Note 1: Assets are sold only for the use indicated. Any other

More information

WHS PROCEDURE P Plant Isolation. Approved by: Ruth Hampton Review Date: 6 th December 2015

WHS PROCEDURE P Plant Isolation. Approved by: Ruth Hampton Review Date: 6 th December 2015 5 WHS PROCEDURE P29-02 Page 1 of 7 Issue: 2 1. Intent The Salvation Army Australia Eastern Territory (TSA-AUE) is committed to the provision of a safe, healthy and injury free environment within the mission

More information