Risk-Based Condition Assessment and Maintenance Engineering for Aging Aircraft Structure Components
|
|
- William Shepherd
- 5 years ago
- Views:
Transcription
1 Risk-Based Condition Assessment and Maintenance Engineering for Aging Aircraft Structure Components Dr. Dan M. Ghiocel* and Dr. Letian Wang Ghiocel Predictive Technologies Inc. 6 South Main St., 2 nd Floor, Pittsford NY, 14534, USA * dan.ghiocel@ghiocel-tech.com Abstract The paper illustrates how probabilistic physics-based models can be used for risk-based condition assessment and life prediction of aircraft components including the uncertainties in maintenance activities. Although this paper focuses on aircraft components under corrosion-fatigue damage, the proposed approach can be extended elsewhere to any machinery under progressive damage. Probabilistic modeling includes all significant uncertainties that affect aircraft component reliability, such as flight conditions, operational loading and environmental severity, manufacturing deviations, material properties and maintenance inspection activities. Maintenance uncertainties include those related to the NDI techniques and operator s skills. Reliability analyses were performed using the ProCORFA software that is currently being developed by GP Technologies for the US Air Force. 1.0 Introduction A continuing challenge in the aviation industry is how to safely keep aircraft in service longer with limited maintenance budgets. Probabilistic methods provide tools to better assess the impact of uncertainties on component life and risk of failure. Probabilistic tools applied to risk-based condition assessment and life prediction help managers to make better risk-informed decisions regarding aircraft fleet operation and airworthiness. In addition to assessing aircraft reliability, probabilistic methods also provide information for performing an analysis of the cost of continuing operation based on risks and their financial consequence. Corrosion and fatigue, separately or in combination, are serious threats to the continued safe operation of aircraft. As a result, the US Air Force, the US Navy, the FAA and the JAA have guidelines on how aircraft should be designed and maintained to minimize the risk of failure from fatigue damage. Aircraft structure joints are the most fatigue and corrosion susceptible areas on an aircraft. Loads are transferred from one structural detail to another through fasteners with the attendant stress-concentrating holes making this a prime location for fatigue cracks to form. The tight fit of details and fasteners can trap moisture in the joint. Relative movement between the structural details and the fasteners, as well as the stress concentrations, can cause corrosion protection systems (anodize, primer and topcoat) to crack and wear allowing moisture to reach the aluminum parts and start the corrosion process. This paper presents an illustrative reliability analysis of an aircraft structure joint under corrosion-fatigue progressive damage. The computational reliability analyses were performed using the ProCORFA software developed by GP Technologies in collaboration with STI Technologies for USAF. 2.0 Aircraft Structure Lapjoint Example The investigated example aircraft structure joint is a longitudinal skin joint on the pressurized fuselage of a transport aircraft (Figure 1). The loading of longitudinal skin joints, particularly those on or near the horizontal neutral axis of the fuselage, is simply the pressurization of the fuselage, which is approximately constant amplitude with a stress ratio (ratio between minimum over maximum stress) of zero. For illustration purposes, we assume that there is only a single pressurization stress cycle per flight.
2 To keep the discussion simple, the illustrative examples presented in this section include only the effect of pitting corrosion of corrosion-fatigue life. The effects of other corrosion types, including intergranular corrosion in early stages, or general thickness loss and pillowing in later stages are not considered. No cladding was assumed. Also, the multiple site damage (MSD) or widespread fatigue damage (WFD) that usually produces the ultimate lapjoint system failures are not included. Only the local failure in critical locations is considered. However, both MSD and WFD are real threats to aircraft structural integrity and therefore they must be considered when evaluating the risk of failure for an actual aircraft structure. The major loading in the lapjoint comes from the pressurization in the aircraft. The input random variables included in the ProCORFA reliability analysis are shown in Table 1. Random Parameter Mean Standard Deviation Probability Distribution Uniform Pressure Inside Aircraft, p 59.3 Pa 2.97 Pa Normal Single Flight Duration, d 2.8 hours 0.50 hours Lognormal Surface Particle Size, a microns 6.02 microns Weibull Strain Life Curve Exponent, b and c , , Normal, Normal Strain Life Curve Parameters, σ f and ε f 1044MPa MPa Normal Normal Stress Intensity Range Threshold, K th 3.00 MPa m 0.15 MPa m Normal Toughness, K c 97.7 MPa m 2.93 MPa m Normal Pit Growth Parameter, I PO, in Wei Model Variation due to the Environmental Conditions at Different Airport Locations C/s C/s Truncated Exponential, from 0.1 and 100 C/s Figure 2 illustrates the stochastic history of pressure loading and environmental conditions of the aircraft. The elementary constituent of the stochastic history of the lapjoint is the block that includes a single flight and a single stay on ground. It was assumed that the random pressure load is described by a single cycle for each flight. The environmental severity condition that drives corrosion was considered to randomly vary with the airport location. However, for the same location it was assumed that the environmental condition is a time-invariant quantity. The surface particles were assumed to be the initiators of the pits and microcracks. The environmental severity condition characterized by the pit growth rate was modeled by a highly skewed probability distribution. A truncated exponential distribution was used to fit the trend of the measured corrosion rate data at different airport locations. These large differences in values indicate that the crevice pits can grow up to ten times faster in some airport locations than in others. Four flight scenarios were investigated for reliability analysis of the aircraft lapjoint [1]. The four scenarios were obtained by combining to two aircraft operating scenarios, namely (i) one flight /day and (ii) three flights/day with two flying scenarios, namely (i) each aircraft flies from an airport location to the same airport location - without random rotation of the airport location - and (ii) each aircraft flies randomly from an airport location to any other airport location - with random rotation of the airport location. In the last flying scenario it was assumed that all airport locations are equally probable and each individual aircraft can visit all airport locations. This is the ideal situation for reducing corrosion effect scatter assuming a uniform distribution of the aircraft fleet across the airport location set. To compute the probabilistic corrosion-fatigue life of the lapjoint both the crack initiation and the crack propagation stages were included. The stochastic strain-life curve and the stochastic Forman crack propagation models were developed from the deterministic models based on the assumption that their parameters are random
3 quantities as shown in Table 1. To include the effect of pitting corrosion on the lapjoint fatigue life a simultaneous corrosion-fatigue (SCF) model was employed [1]. Figure 3 shows the simulated pit depth growth curves for all airport locations assuming no rotation of airport locations. These pit curves were computed using Wei pitting model [2]. The pit growth curves shown in the figures stop at the failure times. Figure 3 includes both the one-flight/day scenario and and the three-flights/day scenario, respectively. Figure 4 shows the pit growth curves for the same two scenarios with a random rotation of aircraft location. It was assumed that each aircraft has an equal probability to fly to any airport location. This means there is a high probability that each airport will be visited about the same number of times by each aircraft. Therefore, for the scenario with the airport rotation, the scatter of the pit growth drops significantly converging in the limit to the (deterministic) mean pit growth for an infinite number of flights per aircraft. The simulated crack length curves are plotted in Figures 5 and 6 for the four investigated scenarios. The computed histograms (with different incremental steps) of predicted corrosion-fatigue life of the four cases are shown in Figure 7. It should be noted that the mean corrosion-fatigue life is about double for the one-flight/day scenario versus three-flights/day scenario. Figure 8 illustrates the probability density of the time until a 5.0 mm crack length is reached for the one-flight/day scenario, without airport rotation and with airport rotation, respectively. The computed probability densities (PDF) are compared with analytical densities, namely the lognormal and normal probability densities. It should be noted that for the without rotation case, the computed skewed density is far from the lognormal density, while for the with rotation case, the computed density is very close to normal density. For the former case, without rotation, the heavy right tail of the PDF shape is due to the fact that many airport locations have milder environmental severity conditions. For the latter case, the scatter of corrosion effects is reduced and the probability density converges to the normal distribution in accordance with the central limit theorem. To consider the effect of maintenance, the uncertainties associated with the probability of crack detection for different standard NDE inspections were included using the appropriate POD curves. The Eddy Current NDE technique with different operator skill classes was considered. The Eddy Current POD curve was assumed to correspond to a lognormal distribution with a logarithmic mean and logarithmic standard deviation of (i) and 0.98 for the best operator, (ii) 3.75 and 0.70 for the average operator and (iii) for 2.73 and 0.45 for the worst operator. No crack sizing error was included in addition to operator s skill variation. At each inspection time, the statistical crack population was filtered through the POD curve. Based on the computed probabilities of acceptance or rejection, each crack was randomly accepted or removed by replacing the cracked component. The repair effects were not considered for this illustrative example. Figures 9 and 10 indicate the inspection schedule required over 20,000 days (about 60 years) for maintaining the corrosion-fatigue damage risk under a reliability target defined by a upper bound failure probability of 2x10-7. Figure 9 shows the results computed for the one-flight/day scenario without airport rotation. Figure 9 compares results for different NDE operator s skills (best operator versus worst operator) and for different failure limit criteria (crack limit of 1.0 in versus crack limit of 0.40 in). It should be noted that the minimum inspection interval drops from 2,300 days (6,450 FH) to 1,300 days (3,640 FH) due to the NDE operator s skill, and from 2,300 days (6,540 FH) to 900 days (2,520 FH) due to the crack limit criterion considered. Figure 10 compares the required inspection schedules for the two cases, without and with airport rotation, including both the one-flight/day scenario and three-flights/day scenario, assuming the same reliability target, an average operator s skill and a 1.0 in crack limit failure criterion. Without the airport rotation, the required inspection intervals in real time are about two-three times longer for the one-flight/day scenario than for the three-flights/day scenario. However, if the inspection intervals are measured in effective FH instead of days, this observation is not true. The minimum inspection intervals are 1,600 days (4,480 FH) for the one-flight/day scenario and 600 days (5,040 FH) for the three-flights/day
4 scenario. The increase of the inspection intervals expressed in flight hours from the one-flight/day scenario to three-flights/day scenario indicates that the effects of corrosion are more severe for oneflight/day when the time spent by an aircraft on ground is longer. With the airport rotation, the minimum inspection intervals are much longer than those computed without airport location rotation. The minimum inspection intervals are 11,200 days (31,360 FH) for the one-flight/day scenario and 4,600 days (38,640 FH) for the three-flights/day scenario. This large benefit effect of the random rotation of airport locations is mainly a result of the large reduction is the statistical scatter of corrosion effects as a result of the central limit theorem. The exclusive use of instantaneous failure probabilities to characterize aircraft reliability is insufficient for setting the risk-based maintenance strategy. This is because from a risk-based maintenance point of view, one is interested in the aircraft reliability over a period of time, not only at the critical instantaneous times. To illustrate the point, we can review the results in Figure 10. For the inspection schedule shown, the maximum risk is almost constant with a value of 1.2x10-7. The maximum risk is bounded to 1.2x10-7 independent of the aircraft operating scenarios, without or with airport location rotation. However, the number of inspections is different, so that number of times when the maximum failure risk is reached is different for the two operating scenarios. Thus, if the average hazard failure rates over a long period are computed they are very different. For the results in Figure 10, if the average hazard failure rates are computed over the 20,000 days (about 60 years) period, these are 1.04x10-10 event/day and 7.97x10-12 for the case without airport rotation and the case with rotation, respectively. 3.0 Concluding Remarks Computational risk-based maintenance using physics-based stochastic damage models, carefully calibrated with the appropriate empirical data, provides a quantitative process for simultaneously maximizing aircraft availability and reducing maintenance costs while maintaining safety and airworthiness. The physics-based stochastic modeling tools and computational reliability methods are sufficiently mature to approach the problem of aircraft fleet maintenance from a risk-based perspective. 4.0 References 1. Ghiocel, D.M. and Tuegel, E.J. Reliability Assessment of Aircraft Structure Joints Under Corrosion-Fatigue Damage, Chapter in CRC Engineering Design Reliability Handbook, Eds. E. Nikolaidis, D.M. Ghiocel and S. Singhal, CRC Press, to appear in July Ghiocel, D.M., Risk-Based Condition Assessment and Maintenance Engineering, The 2nd MIT Conference on Fluid and Solid Mechanics, Boston, MA, June 11-14, Ghiocel, D.M. Probabilistic Modeling Techniques for Optimal-Cost Risk-Based Condition-Based Maintenance Strategy", the 56 th Machine Failure Prevention Technology Meeting, Virginia Beach, VA, April 15-17, Ghiocel, D.M. and Altmann, J. Conceptual and Tool Advances in Machinery Preventive Diagnostics", the 56 th Machine Failure Prevention Technology Meeting, Virginia Beach, VA, April 15-17, Wei, R.P., Corrosion and Corrosion Fatigue of Airframe Materials, FAA report DOT/FAA/AR- 00/22, 2000
5 A Material: 2024-T3 Clad Max. σ = MPa Thru stress ratio = Bearing stress ratio = 1.79 Skin Panel 20R (t = 1.60 mm) A Looking at RH Side Up Fwd Stringer 20R Rivet diameter = 4.85 mm Rivet spacing = 25.4 mm Figure 1. Details of Aircraft Structure Lap Joint Skin Panel 24R Section A-A (Rotated 90 o CCW) Figure 2. Stochastic History of Loading and Environmental Conditions
6 Figure 3. Simulated Pit Growth Curves for Without Airport Rotation Figure 4. Simulated Pit Growth Curves With Airport Rotation Figure 5. Simulated Crack Size Curves Without Airport Rotation
7 Figure 6. Simulated Crack Size Curves With Airport Rotation Figure 7. Corrosion-Fatigue Statistical Histograms for the Four Scenarios Figure 8. PDF of Corrosion-Fatigue Life for One-Flight/Day Without and With Airport Rotation
8 Figure 9. Risk-based Inspection Times for One-Flight/Day, Without Rotation and Given Target Risk of 2x10-7 : a) Effect of the Operator s Skill and b) Effect of Crack Limit Criterion. Figure 10. Risk-based Inspection Times Without & With Rotation for A Given Target Risk; a) One Flight/Day and b) Three Flights/Day
Presented to the Israel Annual Conference on Aerospace Sciences, 2009 RISK-ANALYSIS A SUPPLEMENT TO DAMAGE-TOLERANCE ANALYSIS
RISK-ANALYSIS A SUPPLEMENT TO DAMAGE-TOLERANCE ANALYSIS Abraham Brot Engineering Division Israel Aerospace Industries Ben-Gurion Airport, Israel abrot@iai.co.il ABSTRACT Risk-analysis, based on probabilistic
More informationASSESSING THE RELIABILITY OF FAIL-SAFE STRUCTURES INTRODUCTION
ASSESSING THE RELIABILITY OF FAIL-SAFE STRUCTURES Abraham Brot * Abstract: A computer simulation method is described, that can be used to assess the reliability of a dual-path fail-safe design. The method
More informationPC-21 A Damage Tolerant Aircraft. Paper presented at the ICAF 2009 Symposium by Lukas Schmid
PC-21 A Damage Tolerant Aircraft Paper presented at the ICAF 2009 Symposium by Lukas Schmid PC-21 A Damage Tolerant Aircraft 12.05.2009 2 Acknowledgment Markus Gottier, Gottier Engineering Dave Boorman,
More informationCOMPUTATION of life expectancy of structural components is
JOURNAL OF AIRCRAFT Vol. 45, No. 1, January February 2008 Efficient Reliability-Based Design and Inspection of Stiffened Panels Against Fatigue Amit A. Kale, Raphael T. Haftka, and Bhavani V. Sankar University
More information5.1 Introduction. Learning Objectives
Learning Objectives 5.1 Introduction Statistical Process Control (SPC): SPC is a powerful collection of problem-solving tools useful in achieving process stability and improving capability through the
More informationJustification of Risk Reduction through In-Service Inspection / REDUCE
NUGENIA+ WP6.12 Justification of Risk Reduction through In-Service Inspection / REDUCE Jens Gunnars Inspecta Technology AB jens.gunnars@inspecta.com WP6.12 Task Leader NUGENIA+ Final Seminar, Helsinki
More informationFailure Data Analysis for Aircraft Maintenance Planning
Failure Data Analysis for Aircraft Maintenance Planning M. Tozan, A. Z. Al-Garni, A. M. Al-Garni, and A. Jamal Aerospace Engineering Department King Fahd University of Petroleum and Minerals Abstract This
More informationUSING A PROBABILITY APPROACH TO RANK IN-LINE INSPECTION ANOMALIES FOR EXCAVATION AND FOR SETTING REINSPECTION INTERVALS
USING A PROBABILITY APPROACH TO RANK IN-LINE INSPECTION ANOMALIES FOR EXCAVATION AND FOR SETTING REINSPECTION INTERVALS by Dennis C. Johnston and Carolyn E. Kolovich Kiefner & Associates, Inc. P.O. Box
More informationDetermination of the Design Load for Structural Safety Assessment against Gas Explosion in Offshore Topside
Determination of the Design Load for Structural Safety Assessment against Gas Explosion in Offshore Topside Migyeong Kim a, Gyusung Kim a, *, Jongjin Jung a and Wooseung Sim a a Advanced Technology Institute,
More informationFig. 1. Test in pool.
1 Lecture #13(14A). Experimental estimation of service life Plan: 1. Methods of fatigue tests 2. Program composition of tests 3. Estimation of the directive stresses 1. Methods of fatigue tests The fullest
More informationThe risk assessment of ships manoeuvring on the waterways based on generalised simulation data
Safety and Security Engineering II 411 The risk assessment of ships manoeuvring on the waterways based on generalised simulation data L. Gucma Maritime University of Szczecin, Poland Abstract This paper
More informationQueue analysis for the toll station of the Öresund fixed link. Pontus Matstoms *
Queue analysis for the toll station of the Öresund fixed link Pontus Matstoms * Abstract A new simulation model for queue and capacity analysis of a toll station is presented. The model and its software
More information(DD/MMM/YYYY): 10/01/2013 IP
Title: Submitter: CPCP for Safe Life Items EASA, MRB Section Applies To: Vol 1: Vol 2: Both: X Issue: Problem: A Corrosion Prevention and Control Programme (CPCP) is required for all primary aircraft structure
More informationEnbridge Pipelines Inc. PIPELINE INTEGRITY AXIAL CRACK THREAT ASSESSMENT
Enbridge Pipelines Inc. Line 9B Reversal and Line 9 Capacity Expansion Project Appendix A to Updated Pipeline Engineering Assessment PIPELINE INTEGRITY AXIAL CRACK THREAT ASSESSMENT Table of Contents 1.
More informationAnalysis of Operating Loads on an Aircraft s Vertical Stabilizer on the Basis of Recorded Data
A publication of CHEMICAL ENGINEERING TRANSACTIONS VOL. 33, 2013 Guest Editors: Enrico Zio, Piero Baraldi Copyright 2013, AIDIC Servizi S.r.l., ISBN 978-88-95608-24-2; ISSN 1974-9791 The Italian Association
More informationABS TECHNICAL PAPERS 2005
OTC 17535 Structural Reliability Applications in Risk-Based Inspection Plans and Their Sensitivities to Different Environmental Conditions A. P. Ku and R. E. Spong, Energo Engineering; C. Serratella, ABS
More informationNKS PODRIS project. Importance of inspection reliability assumptions on piping failure probability estimates
NKS PODRIS project Importance of inspection reliability assumptions on piping failure probability estimates Kaisa Simola, Otso Cronvall & Ilkka Männistö (VTT) Jens Gunnars, Peter Dillström & Lars Averlind
More informationE. Agu, M. Kasperski Ruhr-University Bochum Department of Civil and Environmental Engineering Sciences
EACWE 5 Florence, Italy 19 th 23 rd July 29 Flying Sphere image Museo Ideale L. Da Vinci Chasing gust fronts - wind measurements at the airport Munich, Germany E. Agu, M. Kasperski Ruhr-University Bochum
More informationOffshore platforms survivability to underwater explosions: part I
Computational Ballistics III 123 Offshore platforms survivability to underwater explosions: part I A. A. Motta 1, E. A. P. Silva 2, N. F. F. Ebecken 2 & T. A. Netto 2 1 Brazilian Navy Research Institute,
More informationEnergy Output. Outline. Characterizing Wind Variability. Characterizing Wind Variability 3/7/2015. for Wind Power Management
Energy Output for Wind Power Management Spring 215 Variability in wind Distribution plotting Mean power of the wind Betz' law Power density Power curves The power coefficient Calculator guide The power
More informationChapter 20. Planning Accelerated Life Tests. William Q. Meeker and Luis A. Escobar Iowa State University and Louisiana State University
Chapter 20 Planning Accelerated Life Tests William Q. Meeker and Luis A. Escobar Iowa State University and Louisiana State University Copyright 1998-2008 W. Q. Meeker and L. A. Escobar. Based on the authors
More informationStress Analysis of The West -East gas pipeline with Defects Under Thermal Load
Stress Analysis of The West -East gas pipeline with Defects Under Thermal Load Abstract Xu Lei School of Petroleum Engineering, Yangtze University, Wuhan 430000, China 13071247220@163.com Natural gas is
More informationResidual Stresses in Railway Axles
Residual Stresses in Railway Axles ŘEHA BOHUSLAV 1,a,*, VÁCLAVÍK JAROSLAV 2,b NÁVRAT TOMÁŠ 3,c and DAVID HALABUK 3,d 1 GHH-BONATRANS GROUP a.s., Revoluční 1234, 735 94 Bohumín, Czech Republic 2 Výzkumný
More informationFATIGUE, FAIL-SAFE, AND DAMAGE TOLERANCE EVALUATION OF METALLIC STRUCTURE FOR NORMAL, UTILITY, ACROBATIC, AND COMMUTER CATEGORY AIRPLANES
AC 23-13A FATIGUE, FAIL-SAFE, AND DAMAGE TOLERANCE EVALUATION OF METALLIC STRUCTURE FOR NORMAL, UTILITY, ACROBATIC, AND COMMUTER CATEGORY AIRPLANES September 29, 2005 For sale by the Superintendent of
More informationLife Extension of Mobile Offshore Units
Life Extension of Mobile Offshore Units Operation of classified aging units Sigmund Røine DNV Mobile Offshore Units in Operation Presentation content MOU integrity during operation Survey Principles for
More informationPOWER Quantifying Correction Curve Uncertainty Through Empirical Methods
Proceedings of the ASME 2014 Power Conference POWER2014 July 28-31, 2014, Baltimore, Maryland, USA POWER2014-32187 Quantifying Correction Curve Uncertainty Through Empirical Methods ABSTRACT Christopher
More informationSELECTED ASPECTS RELATED TO THE APPLIED LOADS CONTROL DURING FATIGUE TESTS OF A METALLIC AIRFRAME
Fatigue of Aircraft Structures Vol. 1 (2014) 102-106 10.1515/fas-2014-0010 SELECTED ASPECTS RELATED TO THE APPLIED LOADS CONTROL DURING FATIGUE TESTS OF A METALLIC AIRFRAME Józef Brzęczek Jerzy Chodur
More informationGravity Probe-B System Reliability Plan
Gravity Probe-B System Reliability Plan Document #P0146 Samuel P. Pullen N. Jeremy Kasdin Gaylord Green Ben Taller Hansen Experimental Physics Labs: Gravity Probe-B Stanford University January 23, 1998
More informationDamage Tolerance Inspection Methodology for Slow Crack Growth Metallic Structure
Structures Bulletin ASC/EN Bldg 28, 2145 Monahan Way WPAFB, OH 45433-7101 Phone 937-656-9956 Number: EN-SB-12-003 Date: 19 July 2012 Subject: Damage Tolerance Inspection Methodology for Slow Crack Growth
More informationEffects of directionality on wind load and response predictions
Effects of directionality on wind load and response predictions Seifu A. Bekele 1), John D. Holmes 2) 1) Global Wind Technology Services, 205B, 434 St Kilda Road, Melbourne, Victoria 3004, Australia, seifu@gwts.com.au
More informationSWG-11-JM-10. F Limit Reference Points about Preventing Recruitment Overfishing and its Uncertainty
11th Meeting of the Science Working Group Lima, Peru, 1-19 October 01 F Limit Reference Points about Preventing Recruitment Overfishing and its Uncertainty One of the purposes of reference points (RPs)
More informationMAE 322 Machine Design Lecture 5 Fatigue - 2. Dr. Hodge Jenkins Mercer University
MAE 322 Machine Design Lecture 5 Fatigue - 2 Dr. Hodge Jenkins Mercer University Returning to Stress-Life Fatigue Modeling Fatigue Stress-Life: S f -N Diagram for steels Stress levels below S e (Endurance
More informationReliability Analysis of the LabTecta Bearing Protector
Reliability Analysis of the LabTecta Bearing Protector This article examines the statistical life expectancy of the LabTecta bearing protector, supplied by AESSEAL. The LabTecta is an IEEE 841-2001 and
More informationLOW PRESSURE EFFUSION OF GASES revised by Igor Bolotin 03/05/12
LOW PRESSURE EFFUSION OF GASES revised by Igor Bolotin 03/05/ This experiment will introduce you to the kinetic properties of low-pressure gases. You will make observations on the rates with which selected
More informationAssessment of correlations between NDE parameters and tube structural integrity for PWSCC at U-bends
Assessment of correlations between NDE parameters and tube structural integrity for PWSCC at U-bends S. Bakhtiari, T. W. Elmer, Z. Zeng and S. Majumdar Nuclear Engineering Division Argonne National Laboratory
More informationSENSITIVITY OF RISK REDUCTION TO PROBABILITY OF DETECTION CURVES (POD) LEVEL AND DETAIL
Institute for Energy SENSITIVITY OF RISK REDUCTION TO PROBABILITY OF DETECTION CURVES (POD) LEVEL AND DETAIL Authors: Luca Gandossi, Kaisa Simola DG JRC Institute for Energy 27 EUR 292 EN Mission of the
More informationControl Strategies for operation of pitch regulated turbines above cut-out wind speeds
Control Strategies for operation of pitch regulated turbines above cut-out wind speeds Helen Markou 1 Denmark and Torben J. Larsen, Risø-DTU, P.O.box 49, DK-4000 Roskilde, Abstract The importance of continuing
More informationHow Many Iterations Are Enough?
T ECOLOTE R ESEARCH, I NC. Bridging Engineering and Economics Since 1973 How Many Are Enough? Alfred Smith 2008 Joint SCEA/ISPA Annual Conference and Training Workshop Pacific Palms Conference Resort,
More informationESTIMATION OF THE DESIGN WIND SPEED BASED ON
The Seventh Asia-Pacific Conference on Wind Engineering, November 8-12, 2009, Taipei, Taiwan ESTIMATION OF THE DESIGN WIND SPEED BASED ON UNCERTAIN PARAMETERS OF THE WIND CLIMATE Michael Kasperski 1 1
More informationChapter 12 Practice Test
Chapter 12 Practice Test 1. Which of the following is not one of the conditions that must be satisfied in order to perform inference about the slope of a least-squares regression line? (a) For each value
More informationINF.41/Add.1/Rev.1. Economic Commission for Europe Inland Transport Committee
Economic Commission for Europe Inland Transport Committee Working Party on the Transport of Dangerous Goods INF.41/Add.1/Rev.1 Joint Meeting of the RID Committee of Experts and the Working Party on the
More informationAutodesk Moldflow Communicator Process settings
Autodesk Moldflow Communicator 212 Process settings Revision 1, 3 March 211. Contents Chapter 1 Process settings....................................... 1 Profiles.................................................
More informationThe Application Of Computer Modeling To Improve The Integrity Of Ballast Tanks
Paper No. 4255 The Application Of Computer Modeling To Improve The Integrity Of Ballast Tanks Robert Adey, Guy Bishop, John Baynham, CM BEASY Ltd Ashurst Lodge Southampton, SO40 7AA, UK ABSTRACT Generally
More informationControlling Cabin and Envelope Air Flows & Pressure Differentials
Controlling Cabin and Envelope Air Flows & Pressure Differentials To control envelope moisture and related problems Douglas S. Walkinshaw and Keith F. Preston ECHO Air Inc www.indoorair.ca 1 This paper
More informationTokyo: Simulating Hyperpath-Based Vehicle Navigations and its Impact on Travel Time Reliability
CHAPTER 92 Tokyo: Simulating Hyperpath-Based Vehicle Navigations and its Impact on Travel Time Reliability Daisuke Fukuda, Jiangshan Ma, Kaoru Yamada and Norihito Shinkai 92.1 Introduction Most standard
More informationPGA Tour Scores as a Gaussian Random Variable
PGA Tour Scores as a Gaussian Random Variable Robert D. Grober Departments of Applied Physics and Physics Yale University, New Haven, CT 06520 Abstract In this paper it is demonstrated that the scoring
More informationLOW PRESSURE EFFUSION OF GASES adapted by Luke Hanley and Mike Trenary
ADH 1/7/014 LOW PRESSURE EFFUSION OF GASES adapted by Luke Hanley and Mike Trenary This experiment will introduce you to the kinetic properties of low-pressure gases. You will make observations on the
More informationQuantitative Risk of Linear Infrastructure on Permafrost Heather Brooks, PE. Arquluk Committee Meeting November 2015
Slide 1 Quantitative Risk of Linear Infrastructure on Permafrost Heather Brooks, PE Arquluk Committee Meeting November 2015 Welcome to the meeting of the committee for Arquluk s Quantitative Risk of Linear
More informationSUBPART C - STRUCTURE
SUBPART C - STRUCTURE GENERAL CS 23.301 Loads (a) Strength requirements are specified in terms of limit loads (the maximum loads to be expected in service) and ultimate loads (limit loads multiplied by
More informationCalculation of Trail Usage from Counter Data
1. Introduction 1 Calculation of Trail Usage from Counter Data 1/17/17 Stephen Martin, Ph.D. Automatic counters are used on trails to measure how many people are using the trail. A fundamental question
More informationEngineering Practice on Ice Propeller Strength Assessment Based on IACS Polar Ice Rule URI3
10th International Symposium on Practical Design of Ships and Other Floating Structures Houston, Texas, United States of America 2007 American Bureau of Shipping Engineering Practice on Ice Propeller Strength
More informationHydraulic and Economic Analysis of Real Time Control
Hydraulic and Economic Analysis of Real Time Control Tom Walski 1, Enrico Creaco 2 1 Bentley Systems, Incorporated, 3 Brian s Place, Nanticoke, PA, USA 2 Dipartimento di Ingegneria Civile ed Architettura,
More informationintended velocity ( u k arm movements
Fig. A Complete Brain-Machine Interface B Human Subjects Closed-Loop Simulator ensemble action potentials (n k ) ensemble action potentials (n k ) primary motor cortex simulated primary motor cortex neuroprosthetic
More informationEvaluation of NEA haddock Harvest Control Rules
Evaluation of NEA haddock Harvest Control Rules Alexey Russkikh, Anatolii Chetyrkin, Yuri Kovalev, Bjarte Bogstad, and Gjert Dingsør Background Northeast arctic haddock has been managed by harvest control
More informationVibration-Free Joule-Thomson Cryocoolers for Distributed Microcooling
Vibration-Free Joule-Thomson Cryocoolers for Distributed Microcooling W. Chen, M. Zagarola Creare Inc. Hanover, NH, USA ABSTRACT This paper reports on an innovative concept for a space-borne Joule-Thomson
More informationLab 1. Adiabatic and reversible compression of a gas
Lab 1. Adiabatic and reversible compression of a gas Introduction The initial and final states of an adiabatic and reversible volume change of an ideal gas can be determined by the First Law of Thermodynamics
More informationUKOPA Dent Management Strategy
UKOPA Dent Management Strategy 1 Background Pipelines are thin shell structures which are susceptible to geometric distortions and dents during handling, construction, and operation. These dents and distortions,
More informationDesign and Optimization of Weld Neck Flange for Pressure Vessel
V th International Symposium on Fusion of Science & Technology, New Delhi, India, January 18-22, 2016 ID: 2016-ISFT-430 Design and Optimization of Weld Neck Flange for Pressure Vessel Vinod Kumar 1, Vivek
More informationCalibration and Validation of the Shell Fatigue Model Using AC10 and AC14 Dense Graded Hot Mix Asphalt Fatigue Laboratory Data
Article Calibration and Validation of the Shell Fatigue Model Using AC10 and AC14 Dense Graded Hot Mix Asphalt Fatigue Laboratory Data Mofreh Saleh University of Canterbury, Private Bag 4800, Christchurch,
More informationEvaluation of Friction Stir Weld Process and Properties for Aircraft Application
Evaluation of Friction Stir Weld Process and Properties for Aircraft Application Christian Widener Evaluation of Friction Stir Weld Process and Properties for Aircraft Application Motivation and Key Issues
More informationComparing the calculated coefficients of performance of a class of wind turbines that produce power between 330 kw and 7,500 kw
World Transactions on Engineering and Technology Education Vol.11, No.1, 2013 2013 WIETE Comparing the calculated coefficients of performance of a class of wind turbines that produce power between 330
More informationCharacterizers for control loops
Characterizers for control loops By: F. G. Shinskey (May 1999) Introduction Commercial controllers such as the PID series (proportional, integral, derivative, and their combinations) are linear devices
More informationAnalysis of fatigue failure in D-shaped karabiners
Analysis of fatigue failure in D-shaped karabiners K.B. Blair, D.R. Custer, J.M. Graham, and M.H. Okal Center for Sports Innovation, Massachusetts Institute of Technology, USA Abstract In order to determine
More informationCertification Memorandum. Parts Detached from Aeroplanes
Certification Memorandum Parts Detached from Aeroplanes EASA Proposed CM No.: CM 21.A-A-001 Issue 01 issued 20 April 2018 Regulatory requirement(s): 21.A.3B (b), AMC&GM 21.A.3B (b) EASA Certification Memoranda
More informationRULES PUBLICATION NO. 52/P UNDERWATER INSPECTION OF MOBILE OFFSHORE DRILLING UNITS IN LIEU OF DRYDOCKING
RULES PUBLICATION NO. 52/P UNDERWATER INSPECTION OF MOBILE OFFSHORE DRILLING UNITS IN LIEU OF DRYDOCKING 2001 Publications P (Additional Rule Requirements) issued by Polski Rejestr Statków complete or
More informationThe Use of ILI In Dent Assessments
The Use of ILI In Dent Assessments Prepared for: 2014 CRUG Conference Date: 11 September 2014 Prepared by: Rhett Dotson, PE Contributions from Dr. Chris Alexander and Markus Ginten Contents Current Dent
More informationSelecting Maintenance Tactics Section 4
ARE 24 Facilities Maintenance Management Prepared By: KAMAL A. BOGES # 2321 November 2 nd, 2003 Selecting Maintenance Tactics Section 4 Uptime Strategies for Excellence in Maintenance Management By: John
More informationTechnical Standards and Legislation: Risk Based Inspection. Presenter: Pierre Swart
Technical Standards and Legislation: Risk Based Inspection Presenter: Pierre Swart Agenda Change in Legislation. Where RBI fits in. Application to implement RBI. RBI concepts. Elements of an RBI analysis.
More informationProf. B V S Viswanadham, Department of Civil Engineering, IIT Bombay
43 Module 3: Lecture - 5 on Compressibility and Consolidation Contents Stresses in soil from surface loads; Terzaghi s 1-D consolidation theory; Application in different boundary conditions; Ramp loading;
More informationSection I: Multiple Choice Select the best answer for each problem.
Inference for Linear Regression Review Section I: Multiple Choice Select the best answer for each problem. 1. Which of the following is NOT one of the conditions that must be satisfied in order to perform
More informationTightening Evaluation of New 400A Size Metal Gasket
Proceedings of the 8th International Conference on Innovation & Management 307 Tightening Evaluation of New 400A Size Metal Gasket Moch. Agus Choiron 1, Shigeyuki Haruyama 2, Ken Kaminishi 3 1 Doctoral
More informationCoke drum Monitoring & Inspection for Fatigue Life and Safety Improvement
Coke drum Monitoring & Inspection for Fatigue Life and Safety Improvement Amish B. Jani Asstt Vice President (Corrosion & Inspection), 2012 Coking.com, Ft. McMurray, Canada Presentation Tej Chadda Chief
More informationStress and deformation of offshore piles under structural and wave loading
Stress and deformation of offshore piles under structural and wave loading Author Eicher, Jackie, Guan, Hong, Jeng, Dong-Sheng Published 2003 Journal Title Ocean Engineering DOI https://doi.org/10.1016/s0029-8018(02)00031-8
More informationDetermining Occurrence in FMEA Using Hazard Function
Determining Occurrence in FMEA Using Hazard Function Hazem J. Smadi Abstract FMEA has been used for several years and proved its efficiency for system s risk analysis due to failures. Risk priority number
More informationEFFICIENCY OF TRIPLE LEFT-TURN LANES AT SIGNALIZED INTERSECTIONS
EFFICIENCY OF TRIPLE LEFT-TURN LANES AT SIGNALIZED INTERSECTIONS Khaled Shaaban, Ph.D., P.E., PTOE (a) (a) Assistant Professor, Department of Civil Engineering, Qatar University (a) kshaaban@qu.edu.qa
More informationTHE SAFE ZONE FOR PAIRED CLOSELY SPACED PARALLEL APPROACHES: IMPLICATIONS FOR PROCEDURES AND AUTOMATION
THE SAFE ZONE FOR PAIRED CLOSELY SPACED PARALLEL APPROACHES: IMPLICATIONS FOR PROCEDURES AND AUTOMATION Steven Landry and Amy R. Pritchett Georgia Institute of Technology Abstract Changes to air traffic
More informationSubject: Structural Certification Criteria Date: 10/11/18 Policy No: PS-AIR for Antennas, Radomes, and Other External Modifications
Policy Statement Subject: Structural Certification Criteria Date: 10/11/18 Policy No: PS-AIR-25-17 for Antennas, Radomes, and Other External Modifications Initiated By: AIR-675 Summary This policy statement
More informationA quantitative software testing method for hardware and software integrated systems in safety critical applications
A quantitative software testing method for hardware and software integrated systems in safety critical applications Hai ang a, Lixuan Lu* a a University of Ontario Institute of echnology, Oshawa, ON, Canada
More informationFitness for Service Assessment of Ageing Pressure Vessel Experiencing External Corrosion: A Case Study
The International Journal Of Engineering And Science (IJES) Volume 6 Issue 2 Pages PP 12-16 2017 ISSN (e): 2319 1813 ISSN (p): 2319 1805 Fitness for Service Assessment of Ageing Pressure Vessel Experiencing
More informationSPE The paper gives a brief description and the experience gained with WRIPS applied to water injection wells. The main
SPE 102831 Online Water-Injection Optimization and Prevention of Reservoir Damage Bjørn Øyvind Bringedal, Svein Arne Morud, Nicolas Alexander Hall, ABB; Gary Huseman, Shell Copyright 2006, Society of Petroleum
More informationRunning head: DATA ANALYSIS AND INTERPRETATION 1
Running head: DATA ANALYSIS AND INTERPRETATION 1 Data Analysis and Interpretation Final Project Vernon Tilly Jr. University of Central Oklahoma DATA ANALYSIS AND INTERPRETATION 2 Owners of the various
More informationAPPLICATION OF ACOUSTIC EMISSION DETECTION TECHNOLOGY ON MULTILAYER BINDING HIGH PRESSURE VESSEL
17th World Conference on Nondestructive Testing, 25-28 Oct 2008, Shanghai, China APPLICATION OF ACOUSTIC EMISSION DETECTION TECHNOLOGY ON MULTILAYER BINDING HIGH PRESSURE VESSEL GUANG DAI, WEI LI, ZHIJUN
More informationReducing risk and cost through an optimised inspection approach. February 2017
Reducing risk and cost through an optimised inspection approach February 2017 Structural fatigue Maari platform 1.4m long crack found in a horizontal bracing in November 2016. Platform was shut down for
More informationPhase B: Parameter Level Design
Phase B: Parameter Level Design 1 FMEA A chart describing the ways in which the product may fail, the impact, and what has been done to alleviate any problems. Measure of the inability to achieve overall
More informationA review of best practices for Selection, Installation, Operation and Maintenance of Gas meters for Flare Applications used for Managing facility
A review of best practices for Selection, Installation, Operation and Maintenance of Gas meters for Flare Applications used for Managing facility mass balance and compliance 1. What, When and Why? 2. Flare
More informationINTERNAL AXIAL CORROSION IN OFFSHORE PIPELINES: INSPECTION AND ASSESSMENT. By: Dr. Christoph Jäger, Abdullahi Atto, NDT Global, Germany
INTERNAL AXIAL CORROSION IN OFFSHORE PIPELINES: INSPECTION AND ASSESSMENT By: Dr. Christoph Jäger, Abdullahi Atto, NDT Global, Germany Abstract Internal long axial corrosion is the most common corrosion
More informationRoundabouts along Rural Arterials in South Africa
Krogscheepers & Watters 0 0 Word count: 00 text + figures = 0 equivalent words including Title and Abstract. Roundabouts along Rural Arterials in South Africa Prepared for: rd Annual Meeting of Transportation
More informationQuang C. Huynh SEDAR46-RW-01
Estimating total mortality rates and calculating overfishing limits from length observations for six U.S. Caribbean stocks Quang C. Huynh SEDAR46-RW-01 14 January 2016 This information is distributed solely
More informationHIGH FLOW PROTECTION FOR VARIABLE SPEED PUMPS
Proceedings of the First Middle East Turbomachinery Symposium February 13-16, 2011, Doha, Qatar HIGH FLOW PROTECTION FOR VARIABLE SPEED PUMPS Amer A. Al-Dhafiri Rotating Equipment Engineer Nabeel M. Al-Odan
More informationCombination Analysis Tutorial
Combination Analysis Tutorial 3-1 Combination Analysis Tutorial It is inherent in the Swedge analysis (when the Block Shape = Wedge), that tetrahedral wedges can only be formed by the intersection of 2
More informationScienceDirect. Rebounding strategies in basketball
Available online at www.sciencedirect.com ScienceDirect Procedia Engineering 72 ( 2014 ) 823 828 The 2014 conference of the International Sports Engineering Association Rebounding strategies in basketball
More informationMODELING RADIOACTIVE DECAY WITH FLUID DYNAMICS
DEVIL PHYSICS BADDEST CLASS ON CAMPUS MODELING RADIOACTIVE DECAY WITH FLUID DYNAMICS Note: Due to material and space constraints, you will work in teams of three to collect data Each individual will be
More informationQuantifying the Bullwhip Effect of Multi-echelon System with Stochastic Dependent Lead Time
Quantifying the Bullwhip Effect of Multi-echelon System with Stochastic Dependent Lead Time Ngoc Anh Dung Do 1, Peter Nielsen 1, Zbigniew Michna 2, and Izabela Ewa Nielsen 1 1 Aalborg University, Department
More informationThe Role of Olive Trees Distribution and Fruit Bearing in Olive Fruit Fly Infestation
The Role of Olive Trees Distribution and Fruit Bearing in Olive Fruit Fly Infestation Romanos Kalamatianos 1, Markos Avlonitis 2 1 Department of Informatics, Ionian University, Greece, e-mail: c14kala@ionio.gr
More informationPaper 2.2. Operation of Ultrasonic Flow Meters at Conditions Different Than Their Calibration
Paper 2.2 Operation of Ultrasonic Flow Meters at Conditions Different Than Their Calibration Mr William Freund, Daniel Measurement and Control Mr Klaus Zanker, Daniel Measurement and Control Mr Dale Goodson,
More informationAn Investigation of Small-Crack Effects in Various Aircraft Engine Rotor Materials
An Investigation of Small-Crack Effects in Various Aircraft Engine Rotor Materials Propulsion Safety and Affordable Readiness (P-SAR) Conference Jacksonville, Florida March 20-22, 2012 Craig McClung Vikram
More informationStress evaluation of a bicycle crank arm connection using BEM
Stress evaluation of a bicycle crank arm connection using BEM C. J. Hoff, R. E. Dippery & 3. Knapp Department of Mechanical Engineering Kettering University, USA Abstract An interesting problem encountered
More informationA FINITE ELEMENT PROCEDURE TO MODEL THE EFFECT OF HYDROSTATIC TESTING ON SUBSEQUENT FATIGUE CRACK GROWTH
Proceedings of the International Pipeline Conference & Exposition IPC216 September 26-3, 216, Calgary, Alberta, Canada IPC216-64563 A FINITE ELEMENT PROCEDURE TO MODEL THE EFFECT OF HYDROSTATIC TESTING
More informationInternational Journal of Petroleum and Geoscience Engineering Volume 03, Issue 02, Pages , 2015
International Journal of Petroleum and Geoscience Engineering Volume 03, Issue 02, Pages 116- ISSN: 2289-4713 Improving Reservoir Recovery Factor Using Enhanced Electrical Submersible Pump Design; a Case
More informationHelicopter Safety Recommendation Summary for Small Operators
Helicopter Safety Recommendation Summary for Small Operators Prepared by the International Helicopter Safety Team September 2009 Introduction This document is intended to provide a summary of the initial
More information