1 1. INTRODUCTION MANUAL MINE CLEARANCE 1.1 Humanitarian demining techniques used during each project may differ according to equipment, the terrain, type of mines / UXO, etc. All procedures used in clearance operations are to be fully explained in step-by-step detail in the mine action organisations SOP. The following are established humanitarian demining clearance procedures and although, certain techniques may vary between mine action organisations, these shall be recognised as the minimum standard required by the UNMAO in Sudan. 2. STANDARDS, METHODOLOGY & ACTIONS ON 2.1 The following are established humanitarian demining clearance procedures and although, certain techniques may vary between mine action organisations, these shall be recognised as the minimum standard required by the UNMAO in Sudan. a. Clearance Depth: The minimum depth when searching for mines is 13 cm (130 mm), measured from the surface of the ground to the top of the mine. Any reduction must be authorised by the UNMAO. The depth shall be increased when required. b. Clearance Lane: A manual mine clearance deminer is responsible for clearing a one metre wide lane using one or a combination of the following recognised methods: (1) Hand-held metal detector. (2) Prodding. (3) Excavation. c. Visual Search: Prior to conducting a manual search, a visual search of the unclear area shall be conducted. As a minimum, the area where the manual search is to be performed shall be visually searched. The following should be considered when conducting the visual search: (1) Tripwires, cords. (2) Protruding fuses, mines, UXO, booby-traps. (3) Disturbance to the ground. (4) Depressions, holes, mounds. (5) Suspicious objects (inconsistent to the surroundings). (6) Other mine / UXO indicators (packaging, components, animal remains). Page 1 of 9

2 d. Detection of Tripwires: If the vegetation permits, a tripwire feeler may be used to locate tripwires. This should be made from light-gauge wire and fabricated in such a way to allow the detection of both slack and taut wires. Starting from a crouched/ kneeling or prone position, the tripwire feeler is moved along the ground, forward of the base stick and raised slowly upwards until clear of the vegetation or head height when standing. This is completed a minimum of three times, over the full width of the clearance lane and overlap. In order to deploy the trip wire feeler safely, the operator should be able to see the end of the feeler at all times. If the vegetation does not allow the use of a tripwire feeler, the search is completed using the eyes and hands. After a thorough visual check of the area, search the area by slowly moving the hands forward, gently parting any thick vegetation that may obscure tripwires. The deminer shall not pull vegetation and avoid touching any trip wires. e. Clearance of Vegetation: The clearance of vegetation is to be done in a safe, controlled method, avoiding any disturbance of vegetation outside the width of the lane plus overlap. If necessary, one hand shall be used to hold the tree, branch, or clump of vegetation, while the other uses the cutting tool. All vegetation is to be cut to as close to the ground as is safely possible and placed in a cleared area, ensuring that it does not become an obstacle. When cutting vegetation, the operator shall ensure that a visual inspection is made and that the tool does not make contact with the ground. Caution shall be taken when cutting vegetation to avoid heavy vegetation from falling into the unclear area. f. Use of Metal Detector: Prior to its use, the metal detector shall be checked to ensure that it is functioning correctly. The detector shall be used to check the one metre wide lane and, as a safety margin, a minimum 10 cm and maximum of 50 cm overlap to the sides of the lane. The metal detector search shall be conducted to a maximum distance of 50 cm forward of the base stick, ensuring that the area is checked at least twice. The detector search process shall incorporate an overlap, ensuring that the distance moved forward is at least ten centimetres less than the distance searched with the detector, therefore, providing a minimum of ten centimetres safety margin. The sensitivity of the metal detector is to be checked regularly in accordance with the manufacturer guidelines and organisation SOP to ensure that it is capable of searching the ground to the required depth. Details for the calibration of the detector shall be included in the Organisation SOP s. Page 2 of 9

3 Min 10cm Limit of travel of metal detector Overlap Position of Base Stick after search Max 40cm Cleared Max 50 cm 1m Uncleared Area Progression of lane 10-50cm Overlap Figure 4.1 Use of the Metal Detector g. Detector Signal, Isolation & Marking: Prior to investigating the detector signal, the precise location of the signal shall be identified and marked. Nothing shall be placed on the area of the detector signal. A signal marker shall be placed before the closest point of the signal or isolation markers maybe used to mark the extremities of the signal. No attempt should be made to mark the rear of the signal from this position. If it is deemed necessary, then, it should be approached from a cleared area from another side. Extreme caution shall be taken when using these markers to ensure that they are carefully positioned outside the site of the signal. Page 3 of 9

4 Limit of travel of metal detector Detector Signal Signal Marker Isolation Markers Maximum 50 cm 1m Uncleared Area Progression of lane Figure 4.2 Detector Signal Marking h. Prodding & Excavation: Once the precise location of the signal has been identified using the metal detector, the source of the signal shall be investigated to identify it. This shall be done by prodding and/or excavating (1) Prodding shall commence a minimum of ten centimetres back from the nearest point of the signal and to the required width, which, is dependent on the size of the signal. All prodding is to be at an angle </> than thirty degrees and at maximum intervals of two point five centimetres. The prodder is to be used with an even motion, avoiding any excessive force or stabbing. The depth prodded shall be dependent on the ground conditions, search depth and tool design. If it is not possible to conduct prodding from the surface of the ground to the required search depth, then a certain amount of excavation shall be conducted in order to achieve the required prodding depth. Alternatively, the prodding procedure may be replaced with excavation (sapping) only. In hard ground, resulting from extremely dry conditions, water could be used to soften the ground before prodding commences. (2) Excavation (Sapping) is used to reveal the identity/source of the signal. A hole is dug a minimum of ten centimetres back from the nearest point of the signal to a minimum depth of fifteen centimetres. The trowel (or similar tool) is used to slowly remove the soil towards the location of the source of the signal. Any excessive pressure and Page 4 of 9

5 abrupt movements with the trowel shall be avoided. The prodder may also be used in conjunction with the excavation process. If an object is not located after using the prodder and excavation to the required depth, the Supervisor will decide whether further investigation is required. i. Action on Locating Metal The metal shall be carefully removed from the ground and placed it in the metal contamination pit. The area where the metal was removed from shall be checked visually and with the metal detector for additional signals, prior to moving forward. j. Action on Locating Mines/UXO The deminer shall stop mine clearance activities, place a mine marker a minimum ten centimetres before the mine/uxo and notify the supervisor through the chain of command. The supervisor is responsible for ensuring all actions relating to the removal or destruction of the mine/uxo in situ are carried out correctly and by a qualified EOD operator. The lane may be cordoned and mine clearance activities started in a new lane. No personnel shall be allowed past a located mine/uxo in a one metre wide clearance lane. In circumstances where the mine/uxo is not destroyed or removed immediately, the deminer shall be moved to an alternative lane or clearance shall be conducted to safely bypass the mine/uxo. No mine clearance should be conducted within fifty metres of a located mine/uxo. Min 10 cm Mine Marker Figure 4.3 Marking of Located Mine / UXO k. Disposal of Mines/UXO Where possible all mines/uxo should be destroyed in situ. If this is not possible, or proves to be impractical, the mines/uxo shall be manually neutralised/ disarmed and moved to a secure location. All mines shall be pulled prior to neutralising/disarming if it is suspected that they are booby-trapped. The planned destruction of located mines should be carried out during or after each working day unless a specific safety hazard (or lack/limited amount of explosives) prevents this. Only qualified EOD personnel shall conduct demolitions or render safe procedures. Page 5 of 9

6 Where mines/uxo are not destroyed on the day that they are found, they are to be accurately reported in the organisations daily clearance log and destroyed as soon as possible. If they are not destroyed by the end of the working week, the organisation is to ensure they are included on the weekly progress report for the task submitted to the UNRMAO and an explanation given. l. Action on Locating a Tripwire The deminer shall stop mine clearance activity and place 3 x small red stones a minimum of ten centimetres before and in the direction of the trip wire (see Figure 4.4) and then notify the supervisor. The supervisor is responsible for ensuring that both ends of the tripwire are located and appropriate action is taken depending on what is found at each end. It is stressed that the method employed in tracing the tripwire should at all times ensure that deminers tasked do not become isolated. Conditions should always allow for swift, safe and effective Casevac to be conducted should an accident occur. Whilst tracing a tripwire there shall be no other activities within fifty metres. 10cm Figure 4.3 Marking of tripwire Page 6 of 9

7 m. Pulling Procedure When it is necessary to remotely pull a mine/uxo or other item, the supervisor is responsible for the pulling procedure. All personnel not involved in the pulling operation are to be withdrawn to a safe area and sentries posted. A pulling cable (made of non-stretchable material) shall be unrolled and laid along the clear ground between the pulling point and the location of the item. A sandbag fulcrum should be placed at a safe distance before the item to afford some blast/fragmentation protection, act as a barrier, and provide a greater angle to dislodge the item from its position. Before attaching the cable to the item, a check of the cable and the area of the pull shall be conducted to ensure that there are no kinks, breaks or obstacles which may impede the pulling procedure. EOD evacuation and safety distance calculations should be used to determine how far the pulling point is located from the item to be pulled. This distance shall only be reduced to a minimum of 50 metres when: (1) There is adequate protection from blast and fragmentation in relation to the item to be pulled and the threat from secondary devices. (2) The person conducting the pull is wearing full PPE (helmet/visor and body armour) and is close the ground, ensuring that the PPE is affording the maximum protection possible. This shall only be conducted as a last resort and when there is no alternative protection from blast and fragmentation. (3) The following shall be considered when conducting the pulling drill: (a) The type of ordnance (eg, mine, mortar, grenade, projectile, rocket, sub-munition). (b) The function of the ordnance (eg, blast, fragmentation). (c) The condition of the ordnance (eg, fused/unfused, unfired/safe, blind). (d) The explosive quantity of the ordnance. (e) Booby-traps / secondary devices. (f) Proximity of personnel, animals, equipment and buildings. Once all personnel have retired to the safe area, a hook/clip is attached or the cable is tied to the item. The item is pulled in a slow, continuous movement, avoiding any sharp, jerking action. A minimum wait-time of 60 seconds is to be allowed before approaching the item. The type of UXO or mine being pulled shall dictate requirements for extended wait times. If signs of smoke are seen from the area where the item is located, a wait-time of at least 30 minutes shall be enforced, commencing from the last signs of smoke. After the wait-time has elapsed, the sentries shall remain in position while the pulled item is checked. This is a one-man risk and shall be conducted by an EOD qualified person. Once the item is identified and made safe, the original position of the item is then checked as per normal manual mine clearance procedures for any sign of mines, UXO or boobytrap devices. Page 7 of 9

8 Page 8 of 9 Chapter 4 n. High Metallic Areas In areas where the metallic content of the soil is high, the metal detector may be ineffective. The detector procedure shall be replaced with a complete prodding and/or excavating procedure to ensure that all mines/uxo are located to the required depth. The minimum depth to be excavated is 15 centimetres and the complete width of the one metre wide lane shall be investigated to this depth. The detector should be used to regularly check the soil contamination level and confirm whether the complete prodding and excavation process can be replaced with the detector procedure. Alternatively, mark the boundary of the high metallic area for clearance by MDD or mechanical means. The size of the area, type of terrain and the availability of alternative clearance assets will determine the most efficient method of clearance to use. o. Mountainous and Rocky Terrain In areas where the ground is mountainous and rocky, there may be a requirement to remove rocks (E.g., physical hazard, suspicion that a mine/uxo is beneath the rocks, ghost signal ). Therefore, the Supervisor shall make a decision on the best clearance method(s) (E.g., lifting, detector search, prodding and/or excavation, pulling drill). When removing rocks by hand, caution shall be made so as to avoid disturbing the ground and the rocks should be lifted vertically. p. Clearance of Obstacles During the clearance of minefields, obstacles should be identified and special clearance drills adopted as required. (E.g., sapping, pulling, EOD).Those obstacles that cannot be cleared immediately are to be marked and if necessary fenced for future clearance operations. The supervisor on site must give consideration to the approach and clearance method used for each type of obstacle encountered. q. Burning of Vegetation in Unclear Areas Burning of unclear areas may be conducted in order to remove vegetation to facilitate mine clearance operations. Prior to commencing burning, the organisation concerned shall liaise with the UNMAO and local authorities. Caution must be exercised by the organisation and the burning must be controlled in order to prevent the undesired burning of other areas and cause an unacceptable risk to the local population. The results from burning must be considered, such as, the altered state and instability of mines and UXO. Any demining organisation conduct burning of unclear areas is to ensure that the following precautions are adhered to: (1) Inform the UNMAO and local authorities. (2) If possible, inform the local emergency fire services. (3) If necessary, construct a firebreak to prevent the fire from spreading. (4) Ensure that adequate precautions are taken to extinguish any small fires in cleared areas. (eg, fire extinguishers, sand). (5) Calculate the blast / fragmentation safety distance depending on the threat (eg, mines/uxo) and post sentries accordingly. (6) Inform the UNMAO and relevant authorities on completion of burning. (7) Allow a 24 hour soak time, from the last signs of smoke before conducting demining operations in the burned area.

9 r. Working Hours A manual mine clearance deminer shall not work for longer than sixty (60) minutes before taking a break of at least ten (10) minutes. The working time may vary between organisations and specific situations (eg, climate), however, the aforementioned times shall be adhered to. A normal working day for a manual mine clearance deminer shall not exceed 6 hours actual mine clearance work a day. In excessive climatic conditions, the working hours may be reduced or the daily routine changed. A safe and sensible approach shall be made by the demining organisation supervisor in order to achieve the best possible mine clearance results without compromising the safety of demining personnel. Page 9 of 9

Using a metal-detector to locate explosive hazards

Using a metal-detector to locate explosive hazards Using a metal-detector to locate explosive hazards There must always be absolute confidence in the metal-detector s ability to locate the target device at the required depth before metal-detector Clearance

More information

DDAS Accident Report

DDAS Accident Report DDAS Accident Report Accident details Report date: 28/09/2013 Accident number: 798 Accident time: 05:40 Accident Date: 17/08/2011 Where it occurred: Near Dusti, Kumsangir, Tajikistan Primary cause: Inadequate

More information

Countermine Operations

Countermine Operations Appendix H Countermine Operations Military operations are often conducted in areas where warring factions have left unrecorded mines and minefields scattered across the landscape. In these environments,

More information

CHAPTER 10: DESTROYING MINES AND ERW

CHAPTER 10: DESTROYING MINES AND ERW GENERIC SOPs CHAPTER 10: DESTROYING MINES AND ERW Date: The procedures for neutralising and rendering safe mines described in this Chapter should not be adopted without thoroughly checking them to confirm

More information

DDAS Accident Report. Accident details. Map details. Accident Notes. Report date: 19/05/2006 Accident number: 314

DDAS Accident Report. Accident details. Map details. Accident Notes. Report date: 19/05/2006 Accident number: 314 DDAS Accident Report Accident details Report date: 19/05/2006 Accident number: 314 Accident time: 13:00 Accident Date: 07/06/2000 Where it occurred: Power lines North of Rio Ligonha, Nampula Province Primary

More information

UXO Safety Training Agenda. UXO Safety

UXO Safety Training Agenda. UXO Safety Appendix E UXO Safety Training Agenda Identify UXO Hazard By Type and Subgroup Determine the Hazards Marking a UXO Evacuation for a UXO UXO Safety NEVER approach a suspected UXO DO NOT use a radio within

More information

BOSNIA AND HERZEGOVINA MINE ACTION CENTRE S T A N D A R D FOR MINE CLEARANCE AND EOD OPERATIONS IN BOSNIA AND HERZEGOVINA

BOSNIA AND HERZEGOVINA MINE ACTION CENTRE S T A N D A R D FOR MINE CLEARANCE AND EOD OPERATIONS IN BOSNIA AND HERZEGOVINA Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized BOSNIA AND HERZEGOVINA MINE ACTION CENTRE S T A N D A R D FOR MINE CLEARANCE AND EOD

More information

Government of Azerbaijan

Government of Azerbaijan 28. GLOSSARY and ACRONYMS A AAM Access Lane Access Route Accident AD AHD Ammunition Anti handling device Anti Personnel mine (AP) Anti Personnel minefield Anti tank mine (AT) Anti tank minefield AP APERS

More information

DDAS Accident Report

DDAS Accident Report DDAS Accident Report Accident details Report date: 13/06/2008 Accident number: 577 Accident time: 10:48 Accident Date: 22/08/2005 Where it occurred: SS 19, Nimule to Juba Road, Lokichokkio Primary cause:

More information

Safe distances when using explosives

Safe distances when using explosives Guidance note Safe distances when using explosives Information for employers and contractors about safe distances for general explosive blasting operations at sites other than mines and quarries, and setting

More information

Contractor handbook. Purpose

Contractor handbook. Purpose Page no: 1 / 6 Contractor handbook Purpose Mitie aims to ensure that the highest levels of performance are achieved by all persons working for us or on our behalf. We require the same level of performance

More information

APPENDIX E TARGET ANALYSIS AND MUNITIONS EFFECTS

APPENDIX E TARGET ANALYSIS AND MUNITIONS EFFECTS APPENDIX E TARGET ANALYSIS AND MUNITIONS EFFECTS This appendix implements QSTAG 224. E-1. OBSERVER RESPONSIBILITIES As the eyes of the artillery and mortars, the observer has two major responsibilities

More information

Land Release. and Cluster Munitions

Land Release. and Cluster Munitions Land Release and Cluster Munitions The Geneva International Centre for Humanitarian Demining (GICHD) works for the elimination of antipersonnel mines, cluster munitions and explosive remnants of war. The

More information

Specialist IED search teams

Specialist IED search teams DRAFT Standard Operating Procedures for Specialist IED search teams in Humanitarian Mine Action (HMA) The need to search to search for, recognise, and disrupt/destroy IEDs with minimum injury is the HMA

More information

Electrical Safety. Hazard Awareness

Electrical Safety. Hazard Awareness Electrical Safety Hazard Awareness What does Hazard mean? Hazard means: any potential or actual threat to the wellbeing of people, machinery or environment Electrical hazard safety means: taking precautions

More information

MINIBIKE MOTOCROSS CIRCUIT SAFETY GUIDELINES

MINIBIKE MOTOCROSS CIRCUIT SAFETY GUIDELINES MINIBIKE MOTOCROSS CIRCUIT SAFETY GUIDELINES Issue #4 JANUATY 2015 1. The Minibike Circuit Guidelines will be used to conduct course inspections prior to the issue of a Course Certificate 2. A Course Certificate

More information

MOTOCROSS CIRCUIT SAFETY GUIDELINES

MOTOCROSS CIRCUIT SAFETY GUIDELINES MOTOCROSS CIRCUIT SAFETY GUIDELINES Issue #3 OCTOBER 2012 1. The MCFederation Motocross Circuit Guidelines will be used to conduct course inspections prior to the issue of a Course Certificate and are

More information

Exploding Flame Devices GENERAL INFORMATION. Components FM 3-11/MCRP CHAPTER 4

Exploding Flame Devices GENERAL INFORMATION. Components FM 3-11/MCRP CHAPTER 4 CHAPTER 4 Exploding Flame Devices Historically, exploding flame devices have been employed with great success in combat. In the Korean Conflict, the 8th Cavalry Regiment, 1st Cavalry Division, inflicted

More information

Monitoring excavation in the highway

Monitoring excavation in the highway This unit covers the requirements that you must meet when monitoring excavation work in the highway. You must ensure that you act in accordance with all current specifications and procedures and that you

More information

PF30 Inspection & Maintenance Manual

PF30 Inspection & Maintenance Manual PF30 Inspection & Maintenance Manual Version 1.4 (September 2011) 1 Contents 1. Warning!!!!!!!!!! 3 2. Terminology! Figure 1: POWERFAN PF30 and Drope!!!! 4! Figure 2: POWERFAN PF30 with belt guard retracted!!

More information

Vieques Munitions Response: Current Issues

Vieques Munitions Response: Current Issues Vieques Munitions Response: Current Issues NAOC General Membership Meeting December 7, 2016 Agenda Project Overview Surface Clearance Subsurface Clearance Remote Controlled Equipment Underwater MEC Open

More information

RECOGNIZE UXO C H A P T E R 2

RECOGNIZE UXO C H A P T E R 2 C H A P T E R 2 RECOGNIZE UXO Being able to recognize a UXO is the first and most important step in reacting to a UXO hazard. There is a multitude of ordnance used throughout the world, and it comes in

More information

Estimating the Clearance Depth Required in UXO Contaminated Areas NSGG

Estimating the Clearance Depth Required in UXO Contaminated Areas NSGG Estimating the Clearance Depth Required in UXO Contaminated Areas NSGG - 2013 Michael Laneville Principal Geophysicist MMG LXML Sepon UXO Department Factors Affecting Clearance Depth 1. End land use requirements

More information

HOW TO DIG A TEST PIT

HOW TO DIG A TEST PIT HOW TO DIG A TEST PIT An archaeological test pit is a small 1m by 1m trench dug in a series of layers, or spits, to a depth of approximately 1m. The archaeological materials collected from these layers

More information

Status Date Prepared Reviewed Endorsed Approved

Status Date Prepared Reviewed Endorsed Approved Discipline Engineering Standard NSW Category Signalling Title Rerailing Precautions to be Taken Reference Number SMP 26 (RIC Standard: SC 00 52 00 26 SI) Document Control Status Date Prepared Reviewed

More information

Safe Use of Explosives in Construction. Safe to Blast. Information Sheet

Safe Use of Explosives in Construction. Safe to Blast. Information Sheet Safe Use of Explosives in Construction Safe to Blast Information Sheet This guide has been developed to provide general information to site management on issues dealing with safe use of explosives on construction

More information

Fire Safety Hot Work Permit Policy/ Procedures

Fire Safety Hot Work Permit Policy/ Procedures Fire Safety Hot Work Permit Policy/ Procedures INTRODUCTION Serious fires frequently occur during maintenance and construction operations, where work is proceeding on either machinery, plant or the fabric

More information

Rescue Technician: Rope Rescue I

Rescue Technician: Rope Rescue I Rescue Technician: Rope Rescue I Skill Sheet Package Based on NFPA 1006: Standard for Technical Rescue Professional Qualifications, 2013 Edition. Alabama Fire College August 2016 REVISED 02/10/2017 Alabama

More information

DDAS Accident Report. Accident details. Map details. Accident Notes. Report date: 15/03/2004 Accident number: 323

DDAS Accident Report. Accident details. Map details. Accident Notes. Report date: 15/03/2004 Accident number: 323 DDAS Accident Report Accident details Report date: 15/03/2004 Accident number: 323 Accident time: 12:50 Accident Date: 30/05/2001 Where it occurred: Rasa Koshare minefield No.358 Primary cause: Field control

More information

ROBOTICS AND AUTONOMOUS SYSTEMS in EXPLOSIVE ORDNANCE DISPOSAL

ROBOTICS AND AUTONOMOUS SYSTEMS in EXPLOSIVE ORDNANCE DISPOSAL ROBOTICS AND AUTONOMOUS SYSTEMS in EXPLOSIVE ORDNANCE DISPOSAL LCdr John Keenan Joint Counter Explosive Threat Task Force Defeat the Device (DTD-2) John.keenan@forces.gc.ca DEFINING THE PROBLEM THE MISSION

More information

2.0 Management Systems and Documentation

2.0 Management Systems and Documentation SHE Rules BOW142.3 1.0 Introduction This document details the safety, health and environment rules that apply to anyone accessing Arqiva sites and describes the standards of performance expected. This

More information

Underground Mine Signs Guideline Underground Fires Major Hazard Standard

Underground Mine Signs Guideline Underground Fires Major Hazard Standard WMC Environment, Health & Safety Management System Guideline Underground Fires Major Hazard Standard MHS-02 DocsOpen Ref: 57228, 01/03/2001 Uncontrolled copy check web for latest revision Revision Reviewed

More information

Specialist IED search teams

Specialist IED search teams DRAFT version 3: 2017 Standard Operating Procedures for Specialist IED search teams in Humanitarian Mine Action (HMA) The need to search for, recognise, and disrupt/destroy IEDs with minimum consequences

More information

Annex B: Range Specification Requirements

Annex B: Range Specification Requirements Annex B: Range Specification Requirements The following Range Specification Requirements are issued and relate to the requirements for the approval of firearm ranges and galleries to be operated in Tasmania:

More information

LEVEL 2 CERTIFICATE OF COMPETENCE IN CHAINSAW AND RELATED OPERATIONS ASSESSMENT SCHEDULE

LEVEL 2 CERTIFICATE OF COMPETENCE IN CHAINSAW AND RELATED OPERATIONS ASSESSMENT SCHEDULE Registered Charity No. 1096429 STONELEIGH PARK, WARWICKSHIRE CV8 2LG Tel: 024 7685 7300 Fax: 024 7669 6128 Email: information@nptc.org.uk LEVEL 2 CERTIFICATE OF COMPETENCE IN CHAINSAW AND RELATED OPERATIONS

More information

Contractor Control Procedures. Contractor Control Procedures. Working Together. November Borders College 24/11/2014.

Contractor Control Procedures. Contractor Control Procedures. Working Together. November Borders College 24/11/2014. Working Together Contractor Control Procedures November 2014 Borders College 24/11/2014 1 Working Together 1. Introduction This procedure aims to control the health and safety of contractors working on

More information

Bogo Operations Pollution Incident Response Management Plan

Bogo Operations Pollution Incident Response Management Plan Bogo Operations Pollution Incident Response Management Plan Rhyolite Hard Rock Aggregate Quarry 134 Paynes Road BOOKHAM NSW 2582 PO Box 426 COWRA NSW 2794 p: 02 6227 7260 p: 02 6345 4253 e: info@bogoquarry.com.au

More information

Unexploded Ordnance Guide for the Marine Antiquities Scheme (MAS)

Unexploded Ordnance Guide for the Marine Antiquities Scheme (MAS) 6 Alpha Associates Limited Quatro House, Frimley Road Camberley, Surrey GU16 7ER Tel: +44(0) 203 371 3900 Web: www.6alpha.com Unexploded Ordnance Guide for the Marine Antiquities Scheme (MAS) 1 Introduction

More information

Temporary Vehicle Restraint System Policy

Temporary Vehicle Restraint System Policy Temporary Vehicle Restraint System Policy Prepared By; J Wilkinson H&S Manager, Civils Prepared for: Installation of TVRS on all triio highways projects including JV s. Page 1 of 8 Contents 1.0 Introduction

More information

SITE INSPECTION PROCEDURE FORM

SITE INSPECTION PROCEDURE FORM SITE INSPECTION PROCEDURE FORM The Oil and Gas Commission, as regulators of British Columbia s oil and gas industry focuses on effectively regulating and managing the Provinces oil and gas sector. The

More information

BIKETRIAL FEDERATION FULL RULES 2017

BIKETRIAL FEDERATION FULL RULES 2017 BIKETRIAL FEDERATION FULL RULES 2017 The rules within this document are for British National events (Cup & Championship). They should be used as a guideline for Club rules, but clubs may change anything

More information

Appendix 4C - Sample SWMS Trenching

Appendix 4C - Sample SWMS Trenching Appendix 4C - Sample SWMS Trenching SAFE WORK METHOD STATEMENT SWMS Reference : Insert document number : Version A Date : Workplace / Project : Company Address: Work Activity / Job / Task or Process :

More information

Improvised Explosive Devices:

Improvised Explosive Devices: Organization of American States Department of Public Security Improvised Explosive Devices: Perspectives on the Threat and Responses in the Americas Carl E. Case Coordinator Mine Action and Control of

More information

Committee Input No. 35-NFPA [ Chapter 1 ] Submitter Information Verification. Committee Statement

Committee Input No. 35-NFPA [ Chapter 1 ] Submitter Information Verification. Committee Statement Committee Input No. 35-NFPA 1670-2015 [ Chapter 1 ] Chapter 1 Administration 1.1 Scope. 1.1.1* This standard shall identify and establish levels of functional capability for conducting operations at technical

More information

HEALTH AND SAFETY METHOD STATEMENT AIR CONDITIONING/REFRIGERATION MAINTENANCE/SERVICE. 2. Clean filters and screens when necessary

HEALTH AND SAFETY METHOD STATEMENT AIR CONDITIONING/REFRIGERATION MAINTENANCE/SERVICE. 2. Clean filters and screens when necessary HEALTH AND SAFETY METHOD STATEMENT AIR CONDITIONING/REFRIGERATION MAINTENANCE/SERVICE Air Conditioning Indoor/Outdoor Unit as applicable 1. Check Pressures 2. Clean filters and screens when necessary 3.

More information

Work Activity (e.g. Road Work): Work Location:.

Work Activity (e.g. Road Work): Work Location:. Working with Cranes Work Activity (e.g. Road Work): Work Location:. GENERAL INFORMATION Hinchinbrook Shire Council Lannercost Street Ingham Qld, 4850 ABN 46 291 971 168 Ph: 47764610 All personnel conducting

More information

Vacuum Excavation in the vicinity of the Wellington Electricity Network

Vacuum Excavation in the vicinity of the Wellington Electricity Network Vacuum Excavation in the vicinity of the Network. Document no: ENG-116 Document Rev: 1 Issue Status: Final Issue Date: 14/05/2015 Page 1 of 9 Contents 1. PURPOSE... 3 2. POLICY... 3 3. SCOPE... 3 4. REFERENCES...

More information

Excavations and Trenches

Excavations and Trenches Purpose Excavation and trenching are among the most hazardous work activities undertaken by the TNRD. This document outlines general requirements and specific safe work procedures to ensure the health

More information

GAS PIPELINE SAFETY GUIDE.

GAS PIPELINE SAFETY GUIDE. GAS PIPELINE SAFETY GUIDE. Date of issue 27/02/2017 Date of next review 27/02/2018 Page 1 Vector Limited 2017 Gas Pipeline Safety Guide February 2017 CONTENTS CONTENTS...2 WORKING SAFELY... 3 Your Legal

More information

FIRE FIGHTER II - SKILLS PERFORMANCE SHEET

FIRE FIGHTER II - SKILLS PERFORMANCE SHEET Fire Fighter II Skill Stations: NFPA 1001 2013 Edition Station A Fire Ground Communications & Operations / Interior Attack Coordination MANDATORY STATION Station B Sprinkler Drain/Pressures RANDOM STATION

More information

Chapter Twelve: Clout Archery

Chapter Twelve: Clout Archery Chapter Twelve: Clout Archery 12.1 Clout Archery Rounds A Clout Archery Round comprises six (6) ends of six (6) arrows (36 arrows). A Double Round consists of two separate rounds with the scores added

More information

Exhibit 2 Preliminary Conceptual Site Model

Exhibit 2 Preliminary Conceptual Site Model MEC/MD Land Use and MRS 1 GA S CHAMBERS 23.8 Training using CS smoke pots/grenades. Assume disposal of canisters in pits or tossed away from the gas chamber (gas chamber #1) in the same general area. Training

More information

Table of Contents Documentation for PIT TROLLEY A4

Table of Contents Documentation for PIT TROLLEY A4 Table of Contents Documentation for PIT TROLLEY A4 Declaration of conformity 1 Safety instructions and routines to check for safety 2 Description of features and technical data 3 Assembly instructions

More information

Examiner s Report March 2013

Examiner s Report March 2013 Examiner s Report March 2013 Level 3 Diploma Paper 5: Fire Service Operations UK Specific. Introduction Candidates were required to answer six questions from a choice of ten questions. The most popular

More information

Safe Work Practices / Procedures / Instruction CONFINED SPACE

Safe Work Practices / Procedures / Instruction CONFINED SPACE CONFINED SPACE Entry into and work in a confined space poses health and safety problems which may include: Presence or possible build up of a hazardous atmosphere Unexpected movement of equipment or materials

More information

PART 1 DEMINING Edition 1, Version 3 Date 1 st October 2015

PART 1 DEMINING Edition 1, Version 3 Date 1 st October 2015 NATIONAL TECHNICAL STANDARDS AND GUIDELINES SOUTH SUDAN PART 1 DEMINING Edition 1, Version 3 Date 1 st October 2015 Authorised by: Jurkuch Barach Jurkuch Chairperson, Republic of South Sudan National Mine

More information

LEADER SEARCH RADAR LIFE LOCATOR

LEADER SEARCH RADAR LIFE LOCATOR INTRODUCTION OF: Ultra Wide Band Victims detector & Locator V30.09.13.00 Product Concept i. The is designed to be simplistic in use whilst producing reliable and accurate information in the search for

More information

OBSTACLES, MINES, AND DEMOLITIONS

OBSTACLES, MINES, AND DEMOLITIONS APPENDIX C OBSTACLES, MINES, AND DEMOLITIONS Obstacles and mines are used extensively in combat in built-up areas to allow the defender to canalize the enemy, - -impede - his movement, and disrupt his

More information

Participate in a rescue operation

Participate in a rescue operation PUASAR001B Unit Descriptor Employability Skills Prerequisite Unit(s) Corequisite Unit(s) Application of the Unit Unit Sector Participate in a rescue operation This unit covers the competency to participate

More information

CONTRACTOR SAFETY INDUCTION HANDBOOK

CONTRACTOR SAFETY INDUCTION HANDBOOK CONTRACTOR SAFETY INDUCTION HANDBOOK As a valued contractor for Total Group we would ask that you read and carefully consider the details included in this document. Total Group carry out work for a number

More information

RANGE STANDING ORDERS

RANGE STANDING ORDERS Warkworth Pistol Club Inc. RANGE STANDING ORDERS WARKWORTH PISTOL CLUB RIVER ROAD RANGE COMPLEX Range Standing Orders are written to ensure all Club Members and users are aware of the conditions that apply

More information

ARTIFICIAL GRASS PITCH INTRODUCTORY GUIDE

ARTIFICIAL GRASS PITCH INTRODUCTORY GUIDE ARTIFICIAL GRASS PITCH INTRODUCTORY GUIDE Rugby Football Union 1 INTRODUCTION The last 15 years has seen major innovations in the development of artificial turf surfaces for sport. Most significant for

More information

IMPROVISED EXPLOSIVE DEVICES

IMPROVISED EXPLOSIVE DEVICES Meetings of Experts on Amended Protocol II IMPROVISED EXPLOSIVE DEVICES Geneva, 23 24 April 2012 AGENDA Improvised Explosive Devices in Colombia Types of IEDs New technologies new challenges Counter IED

More information

FM CHAPTER 3. Movement GENERAL

FM CHAPTER 3. Movement GENERAL CHAPTER 3 Movement GENERAL Normally, you will spend more time moving than fighting. You must use proper movement techniques to avoid contact with the enemy when you are not prepared for contact. The fundamentals

More information

February 2011 Australasian Road Rescue Organisation Command Guideline

February 2011 Australasian Road Rescue Organisation Command Guideline INITIAL TEAM APPROACH PLANNING & COMMUNICATION Command Guidlenes RISK ASSESS HAZARDS IDENTIFIED FULL INNER AND OUTER SURVEY & INFO GATHERED INITIAL PRIORITIES GIVEN TO TEAMS ESTABLISH DEGREE OF ENTRAPMENT

More information

TEST AND EVALUATION Polarisation, Göran Forsell, FOI

TEST AND EVALUATION Polarisation, Göran Forsell, FOI SWEDISH ARMED FORCES Date: --8 SWEDISH EOD AND DEMINING CENTRE Referencenumber: 5: 55 Anders Tengbom and Magnus Karlsson TEST AND EVALUATION Polarisation, Göran Forsell, FOI Oktober Send list Ert tjänsteställe,

More information

EUSMUNC06 (SQA Unit Code - FG2W 04) Locate and avoid supply apparatus for Utilities Network Construction

EUSMUNC06 (SQA Unit Code - FG2W 04) Locate and avoid supply apparatus for Utilities Network Construction Locate and avoid supply apparatus for Utilities Network Construction Overview This national occupational standard defines the competence involved in locating and avoiding supply apparatus by using appropriate

More information

GUIDELINES FOR THE SAFE USE, STORAGE, AND DISPOSAL OF EXPLOSIVES IN SURFACE MINES AND QUARRIES

GUIDELINES FOR THE SAFE USE, STORAGE, AND DISPOSAL OF EXPLOSIVES IN SURFACE MINES AND QUARRIES MinEx Health & Safety Council GUIDELINES FOR THE SAFE USE, STORAGE, AND DISPOSAL OF EXPLOSIVES IN SURFACE MINES AND QUARRIES Updated March 2008 NOTE: These guidelines have been superseded by the Health

More information

HUMANITARIAN MINE ACTION GLOBAL Standing Operating Procedures SOPs

HUMANITARIAN MINE ACTION GLOBAL Standing Operating Procedures SOPs HUMANITARIAN MINE ACTION GLOBAL Standing Operating Procedures SOPs Release date: 2019 Parts, or all, of this document may be copied and used subject to the terms below. NO PART OF THESE SOPS MAY BE REPRODUCED

More information

NORTH WALES POLICE and NORTH WALES MOUNTAIN RESCUE ASSOCIATION

NORTH WALES POLICE and NORTH WALES MOUNTAIN RESCUE ASSOCIATION NORTH WALES POLICE and NORTH WALES MOUNTAIN RESCUE ASSOCIATION Protocol concerning Fatalities and Difficult to Reach Crime Scenes. INTRODUCTION The geographical nature of North Wales and its prominence

More information

ELECTRICAL (COMPREHENSIVE) SAFETY PROGRAM REGULATORY STANDARD: OSHA - 29 CFR CFR , ,

ELECTRICAL (COMPREHENSIVE) SAFETY PROGRAM REGULATORY STANDARD: OSHA - 29 CFR CFR , , ELECTRICAL (COMPREHENSIVE) SAFETY PROGRAM REGULATORY STANDARD: OSHA - 29 CFR 1910.331 335-29 CFR 1926.302, 1926.416, 1926.417 BASIS: The National Safety Council estimates that there are at least 300 deaths

More information

Geotechnics, Face and Stockpile Operations

Geotechnics, Face and Stockpile Operations Quarries National Joint Advisory Committee (QNJAC) Geotechnics, Face and Stockpile Operations Information Sheet 4 October 2012 Duties of the Operator This information sheet has been developed by the Quarries

More information

Safety at Work. Rules for Staying Alive

Safety at Work. Rules for Staying Alive Safety at Work Rules for Staying Alive Safety at Work Rules for Staying Alive Introduction The purpose of Dana Gas Rules For Staying Alive is to address the key causes of deaths in our industry. These

More information

Fire Apparatus Operator Aircraft Rescue and Fire Fighting

Fire Apparatus Operator Aircraft Rescue and Fire Fighting Fire Apparatus Operator Aircraft Rescue and Fire Fighting Skill Sheet Package Based on NFPA 1002: Standard on Fire Apparatus Driver/ Operator Professional Qualifications, 2014 Edition. Alabama Fire College

More information

Rockhampton Office Brisbane Office Tarong Site. Barron Gorge Hydro PS Kareeya Hydro PS Mica Creek PS

Rockhampton Office Brisbane Office Tarong Site. Barron Gorge Hydro PS Kareeya Hydro PS Mica Creek PS Business Procedure Hot Work Document Number OHS-PROC-128 This document applies to the following sites: All Sites Rockhampton Office Brisbane Office Tarong Site Barron Gorge Hydro PS Kareeya Hydro PS Mica

More information

GUIDELINES FOR USE GUARD

GUIDELINES FOR USE GUARD GUIDELINES FOR USE GUARD G Guard Range of Load Arrestors Retractable Fall Arrest Safety Line for Protection of Machinery & Sensitive Loads GLOBESTOCK MILE OAK INDUST. ESTATE, MAESBURY ROAD, OSWESTRY, SHROPSHIRE

More information

APLC/MSP.16/2017/WP.14

APLC/MSP.16/2017/WP.14 Meeting of the States Parties to the Convention on the Prohibition of the Use, Stockpiling, Production and Transfer of Anti-Personnel Mines and on Their Destruction APLC/MSP.16/2017/WP.14 23 October 2017

More information

TC65M/15M TEMPERATURE CALIBRATOR USER S MANUAL

TC65M/15M TEMPERATURE CALIBRATOR USER S MANUAL TC65M/15M TEMPERATURE CALIBRATOR USER S MANUAL Thank you for purchasing a Scan-Sense temperature calibrator. The products are manufactured by Scan-Sense AS in accordance with our high quality standards

More information

Temporary load-bearing support for structural alterations or repairs

Temporary load-bearing support for structural alterations or repairs CRITICAL NOTE This document only becomes a Safe Work Method Statement where the High Risk Construction Work section of this document is completed Company: ABN: Contact Person: Ph: Project/Site: Principal

More information

Instructions for the Use of the Excel Spreadsheet. There are Three tabs at the bottom of this worksheet. Instructions tab is the one you are reading

Instructions for the Use of the Excel Spreadsheet. There are Three tabs at the bottom of this worksheet. Instructions tab is the one you are reading Instructions for the Use of the Excel Spreadsheet There are Three tabs at the bottom of this worksheet Instructions tab is the one you are reading H&S Plan Tab The Plan Tab is the front cover pages of

More information

Environmental Services Buller District Council 4-6 Brougham Street PO Box 21, Westport 7866 Telephone

Environmental Services Buller District Council 4-6 Brougham Street PO Box 21, Westport 7866 Telephone Environmental Services Buller District Council 4-6 Brougham Street PO Box 21, Westport 7866 Telephone 788 9111 Reefton Service Centre 66 Broadway PO Box 75, Reefton Telephone 732 8821 Email info@bdc.govt.nz

More information

Risk assessment. Assessment details. Task. Introduction. Please complete the form as fully and accurately as you can. Assessors job title

Risk assessment. Assessment details. Task. Introduction. Please complete the form as fully and accurately as you can. Assessors job title Risk assessment Introduction Please complete the form as fully and accurately as you can. Assessment details Name of organisation Assessor's name Assessors job title Any Company John Smith Manager Date

More information

POOL FENCING A Guide to the Fencing of Swimming Pools Act 1987

POOL FENCING A Guide to the Fencing of Swimming Pools Act 1987 POOL FENCING A Guide to the Fencing of Swimming Pools Act 1987 Enforcement Team Inspections and Enforcement Unit Christchurch City Council 163-173 Tuam Street PO Box 237, Christchurch Telephone 941-8999

More information

This Procedure details the procedures to be followed in order to achieve Safety from the System when:

This Procedure details the procedures to be followed in order to achieve Safety from the System when: 1 SCOPE This Procedure details the procedures to be followed in order to achieve Safety from the System when: using Insulated Tools within the Vicinity Zone or the Live Zone, when carrying out Tree Work

More information

MISSOURI UNIVERSITY OF SCIENCE & TECHNOLOGY Procedure: 3.6

MISSOURI UNIVERSITY OF SCIENCE & TECHNOLOGY Procedure: 3.6 Procedure This electrical safety procedure structures safety procedures to meet the requirements of the NFPA-70E Standard. The program is designed for qualified employees who occasionally must perform

More information

RANGE STANDING ORDERS November 2012 November 2017

RANGE STANDING ORDERS November 2012 November 2017 RANGE STANDING ORDERS November 2012 November 2017 Hutt valley New Zealand Deerstalkers Association Range (Kaitoke) Range Standing Orders are written to ensure all Club Members and users are aware of the

More information

Confined Space Program

Confined Space Program Insert City Name Page 1 of 6 Purpose Regularly, confined spaces must be entered for inspection, cleaning or repair. Such spaces can present unusual hazards such as lack of sufficient oxygen, special mechanical

More information

Cobra Cold Cut System

Cobra Cold Cut System Cobra Cold Cut System D38 A Summary: This standard operating procedure concerns the use of the Cobra cold cut system within Avon Fire & Rescue. This piece of equipment will assist firefighters to attack

More information

INADVERTENT RETURN PLAN FOR HORIZONTAL DIRECTIONAL DRILLING (HDD)

INADVERTENT RETURN PLAN FOR HORIZONTAL DIRECTIONAL DRILLING (HDD) INADVERTENT RETURN PLAN FOR HORIZONTAL DIRECTIONAL DRILLING (HDD) FACILITY OPERATOR: NextEra Energy Resources, LLC 700 Universe Boulevard Juno Beach, FL 33408 For Horizontal Directional Drilling Contents

More information

Company Policy Health & safety for work performed at Customer premises

Company Policy Health & safety for work performed at Customer premises Policy Statement Absolute Calibration Limited is concerned for the welfare of all staff employed by the Company and all personnel who may be affected by its actions during the performance of services at

More information

Chapter 4 Cyclo-cross

Chapter 4 Cyclo-cross Chapter 4 Cyclo-cross 110 4. Cyclo-cross Racing 4A. Course and obstacles 4A1. The course shall be held over varying terrain including roads, country or forest paths, and open terrain alternating in such

More information

c. Throwers must consider the flight of the grenade to make sure no obstacle will alter the flight of the grenade or cause it to bounce back toward th

c. Throwers must consider the flight of the grenade to make sure no obstacle will alter the flight of the grenade or cause it to bounce back toward th APPENDIX C HAND GRENADE SAFETY CONSIDERATIONS This appendix lists precautions and other considerations to be followed by hand grenade users. It should be used with Appendix B, Live Hand Grenade Range Operations

More information

Emergency Vehicle Driver

Emergency Vehicle Driver Emergency Vehicle Driver Skill Sheet Package Based on NFPA 1002: Standard on Fire Apparatus Driver/Operator Professional Qualifications, 2014 Edition. Alabama Fire College February 2016 0 /09/2017 Alabama

More information

RIIWMG203D Drain and Dewater Civil Construction Site Learner Guide

RIIWMG203D Drain and Dewater Civil Construction Site Learner Guide RIIWMG203D Drain and Dewater Civil Construction Site Table of Contents 1.1 Introduction... 3 1.1.1 Drainage and Dewatering... 3 1.2 Site Policies and Procedures... 5 1.3 Work Instructions... 6 1.3.1 Reading

More information

Risk Assessment June Skirmish Paintball Games Exeter

Risk Assessment June Skirmish Paintball Games Exeter Ve hicl Physical Electricity Environment Machiner y Risk Assessment June 2012. Skirmish Paintball Games Exeter Location Skirmish Paintball Exeter Carried out by: Martin Collins Date 10 th June 2012 Authorised

More information

FV Flash Vessel Installation and Maintenance Instructions

FV Flash Vessel Installation and Maintenance Instructions 4041050/5 IM-P404-10 EMM Issue 5 FV Flash Vessel Installation and Maintenance Instructions 1. Safety information 2. Specific product safety information 3. Product information 4. Installation 5. Commissioning

More information

M S I C R A N E S C A L E

M S I C R A N E S C A L E 2 M E A S U R E M E N T S Y S T E M S I N T E R N A T I O N A L Table of Contents Forward...3 Safe Operating Guidelines...4 Operating Suggestions...4 Handling Hoist Motion...4 Safe Loading and Rigging

More information

Surface exploration drilling

Surface exploration drilling Checklist Surface exploration drilling This checklist is intended to assist employers to identify common hazards and manage risks associated with surface exploration drilling. June 2017 Background In surface

More information

UXO Below: Mitigating Marine UXO Risk

UXO Below: Mitigating Marine UXO Risk RPS Energy Ltd Explosives Engineering Services UXO Below: Mitigating Marine UXO Risk Presented by Victoria Phillips 1 Aim To deliver an overview of Unexploded Ordnance (UXO) in the marine environment,

More information

RANGE STANDING ORDERS

RANGE STANDING ORDERS Hutt Valley New Zealand Deerstalkers Association Block XV, Akatarawa, Kaitoke Rimutaka incline, Incline Road, State Highway 2 RANGE STANDING ORDERS Range Name: Hutt Valley New Zealand Deerstalkers Association

More information