JOB SAFETY ANALYSIS. How to use the Risk Assessment Charts. Likelihood A (Almost Certain) B (Likely) C (Possible)

Size: px
Start display at page:

Download "JOB SAFETY ANALYSIS. How to use the Risk Assessment Charts. Likelihood A (Almost Certain) B (Likely) C (Possible)"

Transcription

1 Page 1 of 6 How to use the Assessment Charts 1. Determine the Likelihood on the Qualitative Assessment Process Chart (pick a letter applicable to the task). 2. Determine the Consequence on the Qualitative Assessment Process Chart (pick a number applicable to the task). 3. Take Likelihood score and the Consequence score to the Analysis Matrix and line up both letter and number scores by using the matrix to determine the Rating. 4. Write the scores in the Rating (eg. Likelihood = C - Possible, Consequence = 3 - Moderate, Rating = High). 5. Determine whether a JSA is required. If the is rated above Low then a JSA must be completed. A B C D E Freo Group Limited Qualitative Assessment Process Step 1 Determine the Likelihood Almost Certain Expected to happen Likely May easily happen Possible May happen Unlikely May happen sometime Rare May happen in extreme circumstances Step 2 Determine the Consequence Low No injuries or low financial cost Minor First aid treatment or medium financial loss Moderate Medical treatment required or high financial cost Major Lost time injury or major financial loss Critical Death or extreme financial loss Likelihood A (Almost Certain) B (Likely) C (Possible) D (Unlikely) E (Rare) 1 (Low) Legend: Low Moderate High Extreme Freo Group Limited Analysis Matrix Step 3 - Calculate the 2 (Minor) Consequences 3 (Moderate) 4 (Major) 5 (Critical) A JSA MUST be undertaken for any risk greater than a 'Low' rating 1

2 Page 2 of 6 JSA Task Description: Job Location: Date: JSA #: Revision: Plant, Equipment and Tools Work Group List: Permits, Isolations, Barricades, Signs JSA Participants: # of: Classification: 1 Sign: Supervisor 2 Sign: Crane Operator 3 Sign: Rigger 4 Sign: Dogman 5 Sign: Transport 6 Sign: Other 7 Sign: SUPERVISOR APPROVAL Name: Company: Date: Sign: Personal Protective Equipment (PPE) required (Check box of required PPE): Protective clothing Hi vis clothing Hard hat Safety boots Gloves Safety glasses Mono goggles Face shield Welding mask Harness Hearing protection Dust mask Half face mask Respirator Breathing apparatus Hair protection 2

3 Page 3 of 6 Step No. Job Step What is performed at this step? Potential Hazards & Consequences 1 Appropriate personnel for the task Incompetent Personnel Unfamiliar work areas Inherent Control Measure 1. Operator to have appropriate licences and verified competent. 2. All personnel to be site inducted Residual 2 Mobilise equipment to work area Equipment not inspected for site Traffic and machinery 1. All equipment inspected/approved for site 2. Obey road/ site rules & signage 3 Unload equipment and tools Manual handling Slips, Trips and Falls Sprains and Strains 1. Correct lifting techniques, assistance from others, 2. Correct PPE 3. Housekeeping 4 Site possession Interference by others, Unauthorised personnel in work area 1. Install hard barricading 2. Correct Flagging 3. Information Tags 5 Concrete placing Manual handling Slips, Trips and Falls Sprains and Strains Cuts scratches Electric shock Noise Concrete spatter/ burn Collision/ struck by concrete truck 1. Correct lifting techniques, assistance from others, 2. Correct and appropriate PPE (Check MSDS) 3. Housekeeping 4. Generator to have RCD and current tag. 5. All power tools and leads to be tagged. 6. Use of lead stands to keep leads above ground. 7.MSDS available at all times 8. Spotter for concrete truck at all times 9. Barrier Cream, 3

4 Page 4 of 6 Step Inherent Job Step Potential Hazards & Consequences No. What is performed at this step? 6 Control Measure Residual

5 Page 5 of 6 Date Step Description of the Change Including New Hazards and Controls JSA Management of Change Change Made By Change Approved By Team Review By New Rating 5

6 Page 6 of 6 JSA Worksheet Daily Review - All personnel must read, understand and sign the JSA Date Name Signature Date Name Signature 6

WORK METHOD STATEMENT STRUCTURAL STEEL

WORK METHOD STATEMENT STRUCTURAL STEEL ORGANISATION DETAILS Organisation Name: Gedoun Constructions Pty Ltd Contact Name: Joe Gedoun ACN/ABN: 52 284 873 581 Contact Position: Director Address: PO Box 1138, Townsville QLD 4810 Contact Phone

More information

Specific Safety Legislation/Codes of Practice/Australian Standards applicable to this JSA (Tick those applicable).

Specific Safety Legislation/Codes of Practice/Australian Standards applicable to this JSA (Tick those applicable). OCCUPATIONAL HEALTH & SAFETY MANUAL Section OHS-005, Job Safety Analysis SCORESBY, VIC 3179 GEELONG, VIC 3218 MALAGA, WA 6090 DUDLEY PARK, SA 5008 MANSFIELD, QLD 4122 NORTH ROCKS, NSW, 2641 ACT 2609 LAVINGTON,

More information

Safe Work Method Statement LRB TREE SERVICES 6 Behland St, Kearneys Spring QLD, 4350 ABN

Safe Work Method Statement LRB TREE SERVICES 6 Behland St, Kearneys Spring QLD, 4350 ABN JOB NO: PROJECT: DATE: 1/1/2018 SWMS NO: SWMS 001.1 PREPARED BY: LUKE BLINCO REVISED BY: ACTIVITY: TREE REMOVAL & PRUNING SIGNED BY: REVISION DATE: MINIMUM PERSONAL PROTECTIVE EQUIPMENT (PPE) REQUIREMENTS

More information

How severely could the risk hurt someone? Low/Insignificant First aid

How severely could the risk hurt someone? Low/Insignificant First aid Safe Work Method Statement No: WMS-0 Task: Line Marking This WMS is submitted to: Project name and site address: Contact: Preparation of WMS by: Robert Raams Company: Enwon (Australia) Pty Ltd Authorised

More information

SH&E Work Method Statement Concrete Cutting & Drilling Fast Cut Qld Pty Ltd, 91 Basalt, GEEBUNG PH M ABN

SH&E Work Method Statement Concrete Cutting & Drilling Fast Cut Qld Pty Ltd, 91 Basalt, GEEBUNG PH M ABN SH&E Work Method Statement Concrete Cutting & Drilling Fast Cut Qld Pty Ltd, 91 Basalt, GEEBUNG PH 07 3265 6537 M 0411 756 719 ABN 45 081 359 613 OHS-FRM-100 Rev 11 (07/18) Page 1 SH&EWMS No.: F-C-QLD-30

More information

SH&EWMS No.: F-C-QLD-10 Revision Date: July 2018 Revision Due: July 2019

SH&EWMS No.: F-C-QLD-10 Revision Date: July 2018 Revision Due: July 2019 OHS-FRM-103 Rev11 (07/18) SH&E Work Method Statement Concrete Cutting & Drilling Fast Cut Qld Pty Ltd, 91 Basalt, GEEBUNG ABN 45 081 359 613 Phone: 07 3889 8827 Mobile: 0411 756 719 Page 1 SH&EWMS No.:

More information

How severely could the risk hurt someone?

How severely could the risk hurt someone? Safe Work Method Statement No: WMS-08 Task: Install Drainage This WMS is submitted to: Project name and site address: Contact: Preparation of WMS by: Robert Raams Company: Enwon (Australia) Pty Ltd Authorised

More information

WHS OHS HAZARD REGISTER (SITE AND OFFICE OPERATIONS)

WHS OHS HAZARD REGISTER (SITE AND OFFICE OPERATIONS) WHS 017 - WHS 017 Hazard Register - Version 5.0 April 20 Doc No: WHS 017 Effective Date: 04/04/20 1 WORKING WITH EARTHMOVING PLANT/ TRUCKS/SITE VEHICLES COLLISIONS OTHER PLANT EQUIPMENT SITE VEHICLES PERSONNELL

More information

SAFE WORK METHOD STATEMENT Part 1

SAFE WORK METHOD STATEMENT Part 1 SAFE WORK METHOD STATEMENT Part 1 Company Details: Aztech Integrated Systems Pty Ltd ABN: 50 142 740 172 Director : Aaron Caruana +61 418 178 719 7/227A Brisbane Road, Labrador, QLD, 4215. Project Details:

More information

How severely could the risk hurt someone? Low/Insignificant First aid

How severely could the risk hurt someone? Low/Insignificant First aid Safe Work Method Statement No: WMS-02 Task: Concreting, Formwork and Steel Fixing This WMS is submitted to: Project name and site address: Contact: Preparation of WMS by: Robert Raams Company: Enwon (Australia)

More information

WORK METHOD STATEMENT CARPET LAYING

WORK METHOD STATEMENT CARPET LAYING ORGANISATION DETAILS Organisation Name: Gedoun Constructions Pty Ltd Contact Name: Joe Gedoun ACN/ABN: 52 284 873 581 Contact Position: Director Address: PO Box 1138, Townsville QLD 4810 Contact Phone

More information

FLYING OBJECTS MANUAL HANDLING EXCESSIVE NOISE

FLYING OBJECTS MANUAL HANDLING EXCESSIVE NOISE JOB NO: PROJECT: DATE: SWMS NO: SWMS 002 PREPARED BY: Ian Hartley REVISED BY: Nick Bragg & Cameron McNeil ACTIVITY: STUMP REMOVAL SUPERVISED BY: REVISION DATE: April 2016 MINIMUM PERSONAL PROTECTIVE EQUIPMENT

More information

WHS F029 Job Safety Analysis (JSA) and volume less than 10m2

WHS F029 Job Safety Analysis (JSA) and volume less than 10m2 Handling Archaeological Asbestos Fragments Non-friable Title and volume less than 10m2 School/Business Unit Humanities Location (building/lab/ workshop if applicable) JSA Development 9 June 2017 JSA Development

More information

Pre-control risk estimate. Likelihood Risk

Pre-control risk estimate. Likelihood Risk Activity Consequence s mitigation measures Site Access & Egress Slips, trips & falls al injury by falling. Sprains & broken bones. Site operatives 3 4 12 Ensure access to site is kept clear of plant &

More information

SAFE WORK METHOD STATEMENT SWMS No Version

SAFE WORK METHOD STATEMENT SWMS No Version SAFE WORK METHOD STATEMENT SWMS No Version Company Name: Hunter Readymixed Concrete Pty Ltd 00 004 Location: Thornton Cessnock Tea Gardens Gateshead ABN: 6 076 08 695 SWMS Developed By: Duane Harrison

More information

WH&S Act 2011 & Regulations 2011, Environmental Protection Act and Regulations

WH&S Act 2011 & Regulations 2011, Environmental Protection Act and Regulations Workplace Address: Page 1 of PART 1: TASK DETAILS Client: JOB/TASK: Using Water blaster PART 2: RESOURCES Relevant Legislation/Codes Practice: Training Required: Equipment Used: Materials Used: Substances

More information

Wheeler Cranes 6 McIntyre Rd Tomago NSW 2324

Wheeler Cranes 6 McIntyre Rd Tomago NSW 2324 Wheeler Cranes 6 McIntyre Rd Tomago NSW 2324 ABN: 34 088 229 190 This SWMS has been developed and authorised by: Name Albie Wheeler Position Managing Director Date 1/7/12 Signature Phone 0249649991 Mobile

More information

SWMS No 012 Samark North Qld Pty Ltd ABN : Electrical Contractors License C37121 Page 2 of 6

SWMS No 012 Samark North Qld Pty Ltd ABN : Electrical Contractors License C37121 Page 2 of 6 Samark North Qld Pty Ltd SWMS SWMS No 0 Samark North Qld Pty Ltd ABN : 99 08 98 87 Electrical Contractors License C37 Page of 6 Safe Work Method Statement Title: SWMS:0 INSTALLING LIGHT POLES Work Method

More information

SAFE WORK METHOD STATEMENT Part B

SAFE WORK METHOD STATEMENT Part B SAFE WORK METHOD STATEMENT Part B SWMS No.: 01 WORK ACTIVITY DESCRIPTION: Door Installation All FORESEEABLE OHS & ENVIRONMENTAL HAZARDS & RISKS ASSOSSIATED WITH THE WORKS MUST BE ASSESSED & ALLOCATED CONTROLS

More information

TASK DAY RISK ASSESSMENT FORM

TASK DAY RISK ASSESSMENT FORM TASK DAY RISK ASSESSMENT FORM Assessment date Location and Activity details: Site Address Step One - Identify the activity and hazards Consider the activity or work area and identify if any of the hazards

More information

WORK METHOD STATEMENT ALUMINIUM WINDOWS AND DOORS

WORK METHOD STATEMENT ALUMINIUM WINDOWS AND DOORS ORGANISATION DETAILS Organisation Name: Gedoun Constructions Pty Ltd Contact Name: Joe Gedoun ACN/ABN: 52 284 873 581 Contact Position: Director Address: PO Box 1138, Townsville QLD 4810 Contact Phone

More information

SH&EWMS No.: F-C-QLD-14 Revision Date: July 2018 Revision Due: July 2019

SH&EWMS No.: F-C-QLD-14 Revision Date: July 2018 Revision Due: July 2019 SH&E Work Method Statement Concrete Cutting & Drilling Fast Cut Qld Pty Ltd, 91 Basalt, GEEBUNG ABN 45 081 359 613 Phone: 07 3265 6537 Mobile: 0411 756 719 OHS-FRM-100 Rev 11 (07/19) Page 1 SH&EWMS No.:

More information

University College Dublin Machinery/Equipment Risk Assessment Template

University College Dublin Machinery/Equipment Risk Assessment Template 1. General Information Name of Person(s) carrying out assessment and their position Principal Investigator / Supervisor / Head of School or Unit (Person responsible for ensuring safety) Date of assessment

More information

Safe Work Method Statement (SWMS) Worksheet

Safe Work Method Statement (SWMS) Worksheet WORKPLACE / PROJECT NAME: AMS REF NO / TITLE: COMPANY NAME: NETWORK DIRECTIONAL DRILLING (GEELONG) P/L (if applicable) SWMS NO: (if applicable) WORK ACTIVITY / JOB / TASK OR PROCESS DESCRIPTION DATE SWMS

More information

SH&EWMS No: F-C-QLD-23 Revision Date: July 2018 Revision Due: July Brief Description of Work Activity: Use Petrol Hand Saw / Ring Saw

SH&EWMS No: F-C-QLD-23 Revision Date: July 2018 Revision Due: July Brief Description of Work Activity: Use Petrol Hand Saw / Ring Saw SH&E Work Method Statement Concrete Cutting & Drilling Fast Cut Qld Pty Ltd, 91 Basalt St, GEEBUNG 4034 ABN 45 081 359 613 Phone: 07 3265 6537 Mobile: 0411 756 719 OHS-FRM-100 Rev 11 (07/18) Page 1 SH&EWMS

More information

SH&E Work Method Statement Concrete Cutting & Drilling Fast Cut Qld Pty Ltd, 91 Basalt St, GEEBUNG QLD 4031 ph ABN:

SH&E Work Method Statement Concrete Cutting & Drilling Fast Cut Qld Pty Ltd, 91 Basalt St, GEEBUNG QLD 4031 ph ABN: SH&E Work Method Statement Concrete Cutting & Drilling Fast Cut Qld Pty Ltd, 91 Basalt St, GEEBUNG QLD 4031 ph 07 3265 6537 ABN: 45 081 359 613 OHS-FRM-100 Rev 11 (07/18) Page 1 SH&EWMS No.: F-C-QLD-05

More information

Safe Work Method Statement

Safe Work Method Statement Title Skid Steer Operation (Bobcat) SWMS No. 14 Authorized and email Signed by the (Managing Director / CEO / Partner / Proprietor) on Date 01/08 /2016 Safe Work Procedure for the Work:- Yes No Employees

More information

How severely could the risk hurt someone? Low/Insignificant First aid

How severely could the risk hurt someone? Low/Insignificant First aid Safe Work Method Statement No: WMS-0 Task: Operate Diesel Road Saw This WMS is submitted to: Project name and site address: Contact: Preparation of WMS by: Robert Raams Company: Enwon (Australia) Pty Ltd

More information

Work Activity (e.g. Road Work): Work Location:.

Work Activity (e.g. Road Work): Work Location:. Working with Cranes Work Activity (e.g. Road Work): Work Location:. GENERAL INFORMATION Hinchinbrook Shire Council Lannercost Street Ingham Qld, 4850 ABN 46 291 971 168 Ph: 47764610 All personnel conducting

More information

SH&E Work Method Statement Concrete Cutting & Drilling Fast Cut Qld Pty Ltd, 91 Basalt St, GEEBUNG QLD 4031 ph ABN:

SH&E Work Method Statement Concrete Cutting & Drilling Fast Cut Qld Pty Ltd, 91 Basalt St, GEEBUNG QLD 4031 ph ABN: SH&E Work Method Statement Concrete Cutting & Drilling Fast Cut Qld Pty Ltd, 91 Basalt St, GEEBUNG QLD 4031 ph 07 3265 6537 ABN: 45 081 359 613 OHS-FRM-100 Rev 6 (07/14) Page 1 SH&EWMS No.: F-C-QLD-01

More information

THE CONTROLLED COPY OF THIS DOCUMENT IS ON THE COMPUTER NETWORK PRINTED COPIES ARE ONLY CURRENT FOR THE DATE AT THE BOTTOM OF THE PAGE.

THE CONTROLLED COPY OF THIS DOCUMENT IS ON THE COMPUTER NETWORK PRINTED COPIES ARE ONLY CURRENT FOR THE DATE AT THE BOTTOM OF THE PAGE. TE CONTROLLED COPY OF TIS DOCUMENT IS ON TE COMPUTER NETWORK PRINTED COPIES ARE ONLY CURRENT FOR TE DATE AT TE BOTTOM OF TE PAGE. Title Using Angle Grinders SWMS No. 8 Authorized and email Signed by the

More information

SAFE WORK METHOD STATEMENT WORKING IN CONFINED SPACE HSE NET NAT SWMS APAND00030

SAFE WORK METHOD STATEMENT WORKING IN CONFINED SPACE HSE NET NAT SWMS APAND00030 SAFE WORK METHOD STATEMENT WORKING IN CONFINED SPACE HSE NET NAT SWMS APAND00030 HIGH RISK APT AM Holdings Pty. Ltd. [ABN] 95124754383 Principal Contractor (PC) APA Group Level 19, HSBC Building 580 George

More information

WORK METHOD STATEMENT TERMITE PROTECTION

WORK METHOD STATEMENT TERMITE PROTECTION ORGANISATION DETAILS Organisation Name: Gedoun Constructions Pty Ltd Contact Name: Joe Gedoun ACN/ABN: 52 284 873 581 Contact Position: Director Address: PO Box 1138, Townsville QLD 4810 Contact Phone

More information

Temporary load-bearing support for structural alterations or repairs

Temporary load-bearing support for structural alterations or repairs CRITICAL NOTE This document only becomes a Safe Work Method Statement where the High Risk Construction Work section of this document is completed Company: ABN: Contact Person: Ph: Project/Site: Principal

More information

Work Health & Safety Event Safety Checklist Small Event

Work Health & Safety Event Safety Checklist Small Event Note: This checklist relates to the Bedford Park site and contains information specific to that site. Other sites can use the checklist but may need to adapt the information. This documentation must be

More information

SAFE WORK METHOD STATEMENT Part 1 CONCRETE SAWING

SAFE WORK METHOD STATEMENT Part 1 CONCRETE SAWING SAFE WORK METHOD STATEMENT Part 1 CONCRETE SAWING Personal Protective Equipment Foot Hearing High Visibility Head Eye Face Hand Protective Clothing Breathing Normal Requirements: Safety footwear, hearing

More information

WORK METHOD STATEMENT RENDERING

WORK METHOD STATEMENT RENDERING ORGANISATION DETAILS Organisation Name: Gedoun Constructions Pty Ltd Contact Name: Joe Gedoun ACN/ABN: 52 284 873 581 Contact Position: Director Address: PO Box 1138, Townsville QLD 4810 Contact Phone

More information

Safe Work Method Statement

Safe Work Method Statement Company Name: Safe Work Method Statement Site Address: Other Details: Contractor: Activity/Trade: Electrician Date: TASKS List the tasks required to perform the activity in sequence carried out. Entry

More information

Job Safety and Environmental Analysis (JSEA)/Safe Work Method Statement (SWMS)

Job Safety and Environmental Analysis (JSEA)/Safe Work Method Statement (SWMS) Job Safety and Environmental Analysis (JSEA)/Safe Work Method Statement (SWMS) Part 1: Project and Task Identification Process: Initiators of JSEAs are responsible for consulting the Project Supervisor,

More information

SAFE WORK METHOD STATEMENT

SAFE WORK METHOD STATEMENT SAFE WORK METHOD STATEMENT WATER PUMP - PETROL Prepared for Client: Rural Construction & Maintenance Pty Ltd Project No: 1 Site: 660 Great Ocean Road, Bellbrae Date Prepared: 29/07/2015 1. RESPONSIBILITIES

More information

Hazards Requiring Attention: AS AT Friday, 29 January Next Review Saturday, 28 January Total Hazards Recorded 39. Critical Risk Hazards 0

Hazards Requiring Attention: AS AT Friday, 29 January Next Review Saturday, 28 January Total Hazards Recorded 39. Critical Risk Hazards 0 EF26 Risk Assessment CAT Excavator Hazards Requiring Attention: AS AT Friday, 29 January 2016 0 Next Review Saturday, 28 January 2017 Total Hazards Recorded 39 Critical Risk Hazards 0 High Risk Hazards

More information

Wheeler Cranes 6 McIntyre Rd Tomago NSW 2324

Wheeler Cranes 6 McIntyre Rd Tomago NSW 2324 Wheeler Cranes 6 McIntyre Rd Tomago NSW 2324 ABN: 34 088 229 190 This SWMS has been developed and authorised by: Name Steve Smallman Position Safety & Systems Manager Date 21/6/13 Phone 0249649991 Signature

More information

SAFE WORK METHOD STATEMENT

SAFE WORK METHOD STATEMENT SAFE WORK METHOD STATEMENT AUGER / POST HOLE DIGGER Prepared for Client: Rural Construction & Maintenance Pty Ltd Project No: 1 Site: 660 Great Ocean Road, Bellbrae Date Prepared: 29/07/2015 1. RESPONSIBILITIES

More information

WINDMILL (pre-start) HAZARD INSPECTION CHECKLIST

WINDMILL (pre-start) HAZARD INSPECTION CHECKLIST Windmill Hazard Inspection Checklist WINDMILL (pre-start) HAZARD INSPECTION CHECKLIST Authorised by: LOCATION OF INSPECTION...... Inspected By (1)........... (2)..... PRINT PRINT Signature (1):. (2)....

More information

Appendix 4C - Sample SWMS Trenching

Appendix 4C - Sample SWMS Trenching Appendix 4C - Sample SWMS Trenching SAFE WORK METHOD STATEMENT SWMS Reference : Insert document number : Version A Date : Workplace / Project : Company Address: Work Activity / Job / Task or Process :

More information

Safe Work Method Statement

Safe Work Method Statement TE CONTROLLED COPY OF TIS DOCUMENT IS ON TE COMPUTER NETWORK PRINTED COPIES ARE ONLY CURRENT FOR TE DATE AT TE BOTTOM OF TE PAGE. Title Dogging of Crane General Loading and Unloading SWMS No. 20 Authorized

More information

Contractor OHS Induction. AOHS-05-GUI September 2016

Contractor OHS Induction. AOHS-05-GUI September 2016 Contractor OHS Induction AOHS-05-GUI-002 8 September 2016 1 About AQWEST AQWEST is a Government Trading Enterprise responsible for supplying drinking water to Bunbury. Formed in 1906 as the Bunbury Water

More information

SAFE WORK METHOD STATEMENT

SAFE WORK METHOD STATEMENT SAFE WORK METHOD STATEMENT EXCAVATION OR TRENCHING Prepared for Client: Rural Construction & Maintenance Pty Ltd Project No: 1 Site: 660 Great Ocean Road, Bellbrae Date Prepared: 29/07/2015 1. RESPONSIBILITIES

More information

JOB SAFETY ENVIRONMENT ANALYSIS (JSEA) Working With In Situ Testing Rigs

JOB SAFETY ENVIRONMENT ANALYSIS (JSEA) Working With In Situ Testing Rigs Personnel Involved Manager Project Operators Assistant Notes re Operator/Off-Sider Training Allan McConnell In situ testing is a niche business with very few rigs in Australia. There are no specific training

More information

WORK METHOD STATEMENT ELECTRICAL

WORK METHOD STATEMENT ELECTRICAL ORGANISATION DETAILS Organisation Name: Gedoun Constructions Pty Ltd Contact Name: Joe Gedoun ACN/ABN: 52 284 873 581 Contact Position: Director Address: PO Box 1138, Townsville QLD 4810 Contact Phone

More information

Job Hazard Analysis Form (JHA)

Job Hazard Analysis Form (JHA) Job Hazard Analysis Form (JHA) This form can be used by all Sanford Underground Research Facility (SURF) employees as well as contractors, subcontractors, and science collaborators. This is a dynamic document

More information

Exercise IARD. Risk Assessment & Management Plan

Exercise IARD. Risk Assessment & Management Plan Risk Assessment & Management Plan Approved by Exercise Director: Senior Sergeant A Bennett Date:../ /.. Prepared by SRCTU Version 1 1 Contents 1. Introduction... 3 1.1. Phase 1:... 3 1.2. Phase 2:... 3

More information

SAFE WORK METHOD STATEMENT CARPENTER

SAFE WORK METHOD STATEMENT CARPENTER HOST EMPLOYER DECLARATION I declare the worker/s named on this work authority have been provided with a site specific safety induction that complies with the requirements of the Workplace Health & Safety

More information

Potential risk of injury to staff

Potential risk of injury to staff Register Fire, Earthquake - other Emergencies Manual Handling and Repetitive Work Repetitive, Forceful Work Poor Housekeeping Not Wearing PPE (Personal Protective Equipment) Potential risk of injury to

More information

Job Hazard Analysis and Mitigation page 1 of 8. February 7, 2008 Rev. 6. Task or Employee: AEG Field Core Functions (Rev. 6) Routine Non-routine

Job Hazard Analysis and Mitigation page 1 of 8. February 7, 2008 Rev. 6. Task or Employee: AEG Field Core Functions (Rev. 6) Routine Non-routine Job Hazard Analysis and Mitigation page 1 of 8 Task or Employee: AEG Field Core Functions () Routine Non-routine Retention: Completed Routine JHAMs are retained by the employee and supervisor. Non-routine

More information

Safe Work Method Statement

Safe Work Method Statement TE CONTROLLED COPY OF TIS DOCUMENT IS ON TE COMPUTER NETWORK PRINTED COPIES ARE ONLY CURRENT FOR TE DATE AT TE BOTTOM OF TE PAGE. Title Working at eight SWMS No. 16 Authorized and email Signed by the (Managing

More information

Hazards Requiring Attention: AS AT Friday, 1 April Next Review Saturday, 1 April Total Hazards Recorded 43. Critical Risk Hazards 0

Hazards Requiring Attention: AS AT Friday, 1 April Next Review Saturday, 1 April Total Hazards Recorded 43. Critical Risk Hazards 0 EF26 Risk Assessment Kubota U35-4 s Requiring Attention: AS AT Friday, 1 April 2016 0 Next Review Saturday, 1 April 2017 Total s Recorded 43 Critical Risk s 0 High Risk s 0 Moderate Risk s 10 Low Risk

More information

PLANT HAZARD AND RISK ASSESSMENT WORKSHEET (PHA)

PLANT HAZARD AND RISK ASSESSMENT WORKSHEET (PHA) Matrix Assessment Date: 15.2.2011 Consequences Likelihood or Probability Plant Type: CRANE Plant Make: TADANO Plant Model: TL250E Fleet: 281 Plant Serial No. 335347 Assessment Facilitated by: A WHEELER

More information

Important Safety Information Enclosed

Important Safety Information Enclosed Important Safety Information Enclosed ShedBoss Safety Pack NOTE: ENSURE YOUR CONSTRUCTION CREW RECEIVES THIS PACK TO COMPLY WITH SAFE WORK AUSTRALIA CODE OF PRACTICE www.shedboss.com.au Important Safety

More information

QUEENSLAND UNIVERSITY OF TECHNOLOGY

QUEENSLAND UNIVERSITY OF TECHNOLOGY QUEENSLAND UNIVERSITY OF TECHNOLOGY SITE SPECIFIC SAFETY MANAGEMENT PLAN FOR SAMFORD HOUSE SAMFORD ECOLOGICAL RESEARCH FACILITY SAMFORD VALLEY 2007 Dylan Randall SN: 06305466 dylan.randall@student.qut.edu.au

More information

RIIWMG203D Drain and Dewater Civil Construction Site Learner Guide

RIIWMG203D Drain and Dewater Civil Construction Site Learner Guide RIIWMG203D Drain and Dewater Civil Construction Site Table of Contents 1.1 Introduction... 3 1.1.1 Drainage and Dewatering... 3 1.2 Site Policies and Procedures... 5 1.3 Work Instructions... 6 1.3.1 Reading

More information

Proper use of the JOB SAFETY ANALYSIS (JSA) FORM

Proper use of the JOB SAFETY ANALYSIS (JSA) FORM Safety Review & Tool Box Talk Company: Supervisor: Topic: Proper use of the JOB SAFETY ANALYSIS (JSA) FORM Participants Please Fill in this form and fax to (905) 847-1275 or scan and e-mail to tessa@camacc.com

More information

SAFE WORK METHOD STATEMENT

SAFE WORK METHOD STATEMENT SWMS No. 09 SEED COECTION Barung andcare Assoc Inc 38A Coral St, Maleny Qld, 4552 Tel: 07 5494 3151 Email: info@barunglandcare.org.au ABN: 48 562 796 065 VERSION CONTRO Original version Date of this version

More information

Safety Guidelines for Live Entertainment and Events I Part 2. Hazard Identification and Risk Management 1

Safety Guidelines for Live Entertainment and Events I Part 2. Hazard Identification and Risk Management 1 Safety Guidelines for Live Entertainment and Events Part 2. Hazard Identification and Risk Management Contents Disclaimer... 1 1. Principles of Risk Management... 2 2. The Risk Management Process... 2

More information

Occupational Health Safety and Welfare. Our Policy

Occupational Health Safety and Welfare. Our Policy Occupational Health Safety and Welfare Our Policy OCUPATIONAL HEALTH AND SAFETY POLICY Management of QI Electrical Services is committed to ensuring, as far as responsibly practicable, that all employees

More information

SAFETY MANAGEMENT SYSTEM

SAFETY MANAGEMENT SYSTEM Equipment Location: Hazard Hired From All Master Hire Stores Entanglement Can anyone s hair, clothing, gloves, necktie, jewellery, cleaning brushes, rags or other materials become entangled with moving

More information

What is an induction? Contribute to OH&S Processes

What is an induction? Contribute to OH&S Processes What is an induction? Session 2 Contribute to OH&S Processes Types of Induction New Employee Induction Site Inductions Equipment Inductions Activity 2.1 Induction Description What is a Hazard? Session

More information

SAFETY MANAGEMENT SYSTEM

SAFETY MANAGEMENT SYSTEM Equipment Location: Hazard Hired From All Master Hire Stores Entanglement Can anyone s hair, clothing, gloves, necktie, jewellery, cleaning brushes, rags or other materials become entangled with moving

More information

Potential hazards People at risk and how? Actions already in place Further action required Action by

Potential hazards People at risk and how? Actions already in place Further action required Action by Risk Assessment Flat Roof Repair Prepared by Oracle Managed Services For: BAM FM On: 24/02/2017 Review date: N/A Potential hazards People at risk and how? Actions already in place Further action required

More information

SAFETY MANAGEMENT SYSTEM

SAFETY MANAGEMENT SYSTEM Equipment Location: Hazard Entanglement Hired From All Master Hire Stores Can anyone s hair, clothing, gloves, necktie, jewellery, cleaning brushes, rags or other materials become entangled with moving

More information

SAFETY MANAGEMENT SYSTEM

SAFETY MANAGEMENT SYSTEM Equipment Location: Hazard Hired From All Master Hire Stores Entanglement Can anyone s hair, clothing, gloves, necktie, jewellery, cleaning brushes, rags or other materials become entangled with moving

More information

SAFE WORK METHOD STATEMENT Part 1 EXCAVATOR AUGER ATTACHMENT

SAFE WORK METHOD STATEMENT Part 1 EXCAVATOR AUGER ATTACHMENT SAFE WORK METHOD STATEMENT Part 1 EXCAVATOR AUGER ATTACHMENT Personal Protective Equipment Foot Hearing High Visibility Head Eye Day Operations Normal Requirements: Safety footwear, hearing protection,

More information

SAFE WORK METHOD STATEMENT Part 1. Company Details. Company Name: Contact Name, Position and Phone number: Address: Project details.

SAFE WORK METHOD STATEMENT Part 1. Company Details. Company Name: Contact Name, Position and Phone number: Address: Project details. SAFE WORK METHOD STATEMENT Part 1 Company Details Company Name: ABN: Contact Name, Position and Phone number: Address: Project details Project: Area: Job Address: Job Description: Activity: Installation

More information

Risk Assessment Underwritten For:

Risk Assessment Underwritten For: Competition Organising Partner: CITB /SkillBuild Competition Skills: Bricklaying SKILLBUILD Risk Assessment Venue: Regional Competitions Event Dates: 0 April 9 June 017 Written by PM: Donna Havers Risk

More information

SAFETY MANAGEMENT SYSTEM

SAFETY MANAGEMENT SYSTEM Equipment Location: Hazard Hired From All Master Hire Stores Entanglement Can anyone s hair, clothing, gloves, necktie, jewellery, cleaning brushes, rags or other materials become entangled with moving

More information

EVENT SAFETY RISK ASSESSMENT - (SMALL TO MEDIUM SIZED COMMUNITY EVENTS) 1

EVENT SAFETY RISK ASSESSMENT - (SMALL TO MEDIUM SIZED COMMUNITY EVENTS) 1 EVENT SAFETY RISK ASSESSMENT (SMALL TO MEDIUM SIZED COMMUNITY EVENTS) EVENT SAFETY MANAGEMENT INFORMATION SHEET September 2010 #3 RISK ASSESSMENT IT S A MUST The success of your event is measured in many

More information

The Sample Company Pty Ltd

The Sample Company Pty Ltd Job Safety and Environmental Analysis (JSEA) / Safe Work Method Statement (SWMS) Part 1: Project and Task Identification Process Initiators of SWMSs are responsible for consulting the Project Supervisor,

More information

SAFE WORK METHOD STATEMENT

SAFE WORK METHOD STATEMENT SAFE WORK METHOD STATEMENT LOADING AND UNLOADING VEHICLES Prepared for Client: Rural Construction & Maintenance Pty Ltd Project No: 1 Site: 660 Great Ocean Road, Bellbrae Date Prepared: 29/07/2015 1. RESPONSIBILITIES

More information

HAZARD IDENTIFICATION & RISK ASSESSMENT

HAZARD IDENTIFICATION & RISK ASSESSMENT Clearheart Construction Co., Inc. Hazard Identification & Risk Assessment HAZARD IDENTIFICATION & RISK ASSESSMENT If all employees and subcontractors followed established OSHA compliant procedures to accomplish

More information

Document: APA HSE GP Tx Version: 0.01 Date: 04/03/2013 Review by: 26/03/2014 Page 1 of 11 pages

Document: APA HSE GP Tx Version: 0.01 Date: 04/03/2013 Review by: 26/03/2014 Page 1 of 11 pages SAFE WORK METHOD STATEMENT WORKSHOP FABRICATION HSE NET NAT SWMS APAND00033 APT AM Holdings Pty. Ltd. [ABN] 95124754383 APA Group Principal Contractor (PC) Level 19, HSBC Building Subcontractor 580 George

More information

SWMS No 001 Samark North Qld Pty Ltd ABN : Electrical Contractors License C37121 Page 2 of 5

SWMS No 001 Samark North Qld Pty Ltd ABN : Electrical Contractors License C37121 Page 2 of 5 Samark North Qld Pty Ltd SWMS Manual SWMS No 00 Samark North Qld Pty Ltd ABN : 99 082 98 87 Electrical Contractors License C372 Page 2 of Safe Work Method Statement Title: SWMS:00 USING PORTABLE LADDERS

More information

Procedure: Work health and safety hazard management

Procedure: Work health and safety hazard management Procedure: Work health and safety hazard management Purpose This procedure describes how the Australian National University (ANU) manages Work Health Safety hazards for the health, safety, rehabilitation

More information

Safe Work Method Statement (SWMS)

Safe Work Method Statement (SWMS) Safe Work Method Statement (SWMS) Organisation Details : Organisation Name Northern Plumbing Contact ABN 17 15 41 4 Position Director Address 47 Thomas Street Edgeworth 85 Phone Number 0411 10 4 Project

More information

Activity Hazard Analysis (AHA) EM A.13 FIGURE 1-2 CONTRACTOR REQUIRED AHA TRAINING

Activity Hazard Analysis (AHA) EM A.13 FIGURE 1-2 CONTRACTOR REQUIRED AHA TRAINING Activity Hazard Analysis (AHA) EM 385 2008 01.A.13 FIGURE 1-2 CONTRACTOR REQUIRED AHA TRAINING Activity Hazard Analysis (AHA) AHAs: Risk Assessment Tool Defines the Activity or Work to be Performed Identifies

More information

FIELDWORK RISK ASSESSMENT FORM

FIELDWORK RISK ASSESSMENT FORM FIELDWORK RISK ASSESSMENT FORM SECTION 1: GENERAL DETAILS AND APPROVAL FIELDWORK DETAILS Fieldwork type: Undergraduate Postgraduate Research Other: Fieldwork description: Subject name (if applicable):

More information

Risk Assessment Form (Qualitative)

Risk Assessment Form (Qualitative) Assessment Form (Qualitative) Project / ocation:..d.a.s WATERS Contract No: RA & Issue No: 008 Prepared by:.r.smit Date: 10/10/16 Signature: ACTIVITY DESCRIPTION: Person (s) at risk: General Ground works

More information

Risk Assessment Form

Risk Assessment Form Assessment Form Oil Salvage Limited Assessment Record Activity: Loading of tankers (Collection and Deliveries) Ref Number: RA03 Having assessed the and risks, I believe that if the control measures identified

More information

University of Vermont Department of Physical Plant Personal Protective Equipment Program

University of Vermont Department of Physical Plant Personal Protective Equipment Program University of Vermont Department of Physical Plant Personal Protective Equipment Program REVISED AND DISTRIBUTED BY: THE UNIVERSITY OF VERMONT DEPARTMENT OF PHYSICAL PLANT TRAINING AND COMPLIANCE OFFICE

More information

Potable Water Truck Safe Work Procedure PTES_HSE_SWP_041. Name Date Signature. Author Geoff Selfe 25/01/2016. Reviewed Solomon Site 25/01/

Potable Water Truck Safe Work Procedure PTES_HSE_SWP_041. Name Date Signature. Author Geoff Selfe 25/01/2016. Reviewed Solomon Site 25/01/ Potable Water Truck Safe Work Procedure PTES_HSE_SWP_041 Name Date Signature Author Geoff Selfe 25/01/2016 Reviewed Solomon Site 25/01/2016 ----- Approved Michael Garkaklis 25/01/2016 Key Safety Acts Complete

More information

Accident/Incident Reporting and Investigation Procedures

Accident/Incident Reporting and Investigation Procedures Accident/Incident Reporting and Investigation Procedures Policy reference Workplace Health and Safety Policy Procedure reference Workplace Health and Safety Risk Assessment Procedures Procedure It is imperative

More information

HAZARD IDENTIFICATION AND RISK ANALYSIS RECORD

HAZARD IDENTIFICATION AND RISK ANALYSIS RECORD HAZARD IDENTIFICATION AND RISK ANALYSIS RECORD Location: Company Wide Date of Assessment: 04 April 2017 Revision No.: 0 Description of planned work or activity: HIRA Register Attendees: see attached tool-box

More information

Management of risk. Definition of terms. Managing risks. Risk

Management of risk. Definition of terms. Managing risks. Risk Definition of terms Risk Management of risk Risk is the possibility that harm (death, injury or illness) might occur when exposed to a hazard. A hazard is anything with the potential to cause injury or

More information

SFG-SWMS-SHOPFITTING

SFG-SWMS-SHOPFITTING SFG-SWMS-SHOPFITTING PROJECT NAME: 266 Woori Yallock Road Cockatoo VIC 371 ACN: 620 127 915 Email: admin@superbfitoutgroup.com Mobile: 0452 5UPERB (57 372) PH: (03) 59 6 3 93 RISK ASSESSMENT & SAFE WORK

More information

SH&EWMS No.: FC-QLD-017 Revision Date: July 2017 Revision Due: July 2018

SH&EWMS No.: FC-QLD-017 Revision Date: July 2017 Revision Due: July 2018 SH&E Work Method Statement Concrete Cutting & Drilling Fast Cut Qld Pty Ltd, 91 Basalt St, GEEBUNG 4034 ABN 45 081 359 613 Phone: 07 3265 6537 Mobile: 0411 756 719 OHS-FRM-100 Rev 10 (07/17) Page 1 SH&EWMS

More information

SAFE WORK METHOD STATEMENT (SWMS) All Trades Abseiling ABN: Ph:

SAFE WORK METHOD STATEMENT (SWMS) All Trades Abseiling ABN: Ph: PCBU: ALL TRADES ABSEILING ABN: 42 137 576 035 PO Box 774 NEWPORT NSW 2106 LIC: 123517C P: 0412 227 578 Principal Contractor (PC): Date SWMS provided to PC: Work activity: Workplace location: High risk

More information

EHS Workplace Inspection Checklist (Ref. SOP QMS-080; EHS-010)

EHS Workplace Inspection Checklist (Ref. SOP QMS-080; EHS-010) (Ref. SOP QMS-080; EHS-010) Form-445 Inspected by: Date of inspection Date of Report Report # Pages Area Manager: Area Inspected: General This EHS Workplace Inspection was conducted by: Scope of the Inspection:

More information

SWMS documented by: Feb Bo Ceprnja Date Feb Feb Feb 2018

SWMS documented by: Feb Bo Ceprnja Date Feb Feb Feb 2018 Contractor Company Details: BUILDSAFE SAFE WORK METHOD STATEMENT 0002 (Void Platform Stairs) Part 1 (To be used in conjunction with SWMS 0001 General Site Activities & SWMS 0002 Void Platform) Additional

More information

Company Name: Address: ABN: Company Contact: Position: Phone No.: Date SWMS provided to Principal Contractor: Principal Contractor Signature: Date:

Company Name: Address: ABN: Company Contact: Position: Phone No.: Date SWMS provided to Principal Contractor: Principal Contractor Signature: Date: Page 1 of 15 ACTIVITY: Heights - Working at SWMS No.: SAFE WORK METHOD STATEMENT (SWMS) - Part 1 Company Name: Address: ABN: Company Contact: Position: Phone No.: Project Details Project: Job Address:

More information

SCHNEIDER AUTOMATIC CIRCUIT RECLOSER JOB SAFETY ANALYSIS

SCHNEIDER AUTOMATIC CIRCUIT RECLOSER JOB SAFETY ANALYSIS Title: Schneider Automatic Circuit Recloser Job Safety Analysis Purpose and Scope: This document describes the tests to be carried out before accepting a new or repaired N and W series Schneider Automatic

More information

HAZARD MANAGEMENT PROCEDURE

HAZARD MANAGEMENT PROCEDURE TABLE OF CONTENTS 1. OBJECTIVE... 2 2. SCOPE... 2 3. DEFINITIONS... 2 4. RESPONSIBILITIES... 2 5. HAZARD IDENTIFICATION... 3 5.1 HAZARD AND RISK IDENTIFICATION TOOLS AND METHODS... 3 5.1.1 Take 5 Risk