1 2.7 Safety Requirements When Working from an EWP Purpose The purpose of this instruction is to inform all Horizon Power workers of the safety requirements when working from a EWP. Scope The scope of this instruction includes safety information and work procedures for all Horizon Power workers who undertake the use of EWPs on Horizon Powers network. Safety Before the commencement of work, a risk assessment must be carried out using the Risk Analysis Procedure (OSH ), to identify and document the hazards and risks associated with the task and ensure appropriate control measures are implemented. It is important that, appropriate control measures must be identified, documented and implemented to lessen or control the identified hazards. Instruction EWP Operators, Occupants and Safety Observers EWP operators and safety observers must possess a current High Risk Work licence EWP operators and safety observers must be trained in the emergency retrieval systems relevant to the EWP being used The safety observer must be competent in the recognition hazards relevant to the use of EWPs and the work task being performed (see Field Instruction 2.27 Safety Observer Role) EWPs must be fitted with an Emergency Decent Device (EDD), with the exception of scissor lifts and self-propelled boom lifts The EWP basket operator must be trained and competent in EDD rescue EWP ground-based operator must be competent in the operation of the EWP and qualified to perform the role of safety observer if a separate observer is not present EWP basket users must wear an approved full body fall protection harness and lanyard, tagged and inspected before use EWP Checks Perform the logbook pre-start EWP operations checks and complete the operator High Risk logbook (yellow book) prior to each operation. If during pre-start checks there is an operational issue, rectify issue or tag EWP with Out of Service Tag The EWP must have an insulation rating equal to, or greater than, the voltage of any energised apparatus within the maximum reach of the boom and basket CS # Safety Requirements When Working from an EWP Page 1 of 6

2 CAUTION A minimum 132kV insulated EWP must be used for 220kV transmission lines and associated works. Refer to the un-insulated clearances in Table 1 in Field Instruction 2.17 Safe Approach Distances. For un-insulated Vegetation Works, refer to Field Instruction 10.6 Vegetation Management Work Insulated EWP s must be electrically tested every six months with a three-week grace period if required After each 6 monthly electrical test, a compliance sticker must be placed in the cab of the EWP in a prominent position, usually on the windscreen An insulated EWP that does not display a current electrical test sticker or carry an electrical test certificate must be classified as non-insulating and must not be used on the network Check EWP compliance plate to ensure the EWP boom assembly is within 10 year major inspection date Only operate an EWP when the wind velocity is less than 45 km/h or as stated on manufactures compliance plate, or 40 km/h when using HV lifting device for Live HV Work Attach the fall protection harness to the EWP basket anchor point before operating the boom Check EDD release pin and EDD device is in good working order before ascending Operating an EWP When operating a EWP, stay inside the basket and have at least one foot on the basket floor at all times. When transferring between a EWP basket and a tower structure or an approved working platform, always remain attached while transferring from EWP to structure, during the transfer process, all work is to stop until transfer is completed. Operating procedures to follow: Outriggers must be fully deployed and ensure EWP is level Outrigger foot pads must be used on all ground surfaces Use wheel chocks on inclined or declined ground surfaces Ensure EWP basket boom restraints have been removed Tool boxes, bags, EWP remote controls and equipment must not hang or be placed outside of the EWP basket Do not exceed the EWP basket safe working load, this includes tools, equipment and lifting conductors Remain attached at all times when working aloft and travelling in EWP basket Flashing beacons turned on and traffic management used if required CS # Safety Requirements When Working from an EWP Page 2 of 6

3 Earthing EWP Where there is a risk of a EWP encroaching within the High Voltage Safe Approach Distance (SAD) either directly or through another conducting medium, the EWP must be earthed as per Field Instruction 2.13 Vehicle and Plant earthing Requirements. Vehicle earthing leads must meet minimum vehicle earthing requirements and be approved by Horizon Power; they must be able to withstand the rated short circuit fault current of the relevant High Voltage electrical apparatus. EWPs must be earthed when: Working on or near Live High Voltage conductors / apparatus Working on or near de-energised High Voltage conductors / apparatus When working in a substation When confirming High Voltage conductors de-energised and applying portable High Voltage earths When more than one EWP is involved: when EWPs are within a distance of two (2) metres of each other, they should be connected (bonded) to a common earthing point when EWPs are separated by more than two (2) metres, each mobile plant should have its own direct earth connection applied Working Near Energised Apparatus Everyone involved in EWP operations near energised apparatus must maintain a Ground Approach Distance (GAD) around the base of the EWP, this includes stabilisers and outriggers, (see Table 1 and Fig 1 below). If this is not possible, insulated gloves and outers rated to the highest voltage within the boom reach on the structure must be used. For High Voltages above 33kV insulated gloves and outers must not be used and the GAD must be maintained at all times. The safety observer and other team members must ensure that worksite visitors and the public do not encroach the GAD at any time. Voltage of conductor Table 1: Ground approach distances (mm) Insulated Gloves and Outers to Enter GAD if Required Low voltage 1,000 Yes High Voltage 1 kv up to 33 kv 1, kv 1,500 No 132 kv 1,800 No Yes Over 132 kv 3,000 No CS # Safety Requirements When Working from an EWP Page 3 of 6

4 Fig 1: Ground Approach Distance example CAUTION Where inadvertent electrical contact may occur, a barrier must be placed around the EWP and the vehicle earth stake must be barried off to a minimum radius if one meter to avoid touch potential. Un-insulated EWP s in a Zone or Terminal Substation There are different rules for un-insulted EWPs compared to insulated EWPs especially when working around live apparatus in a substation. Un-insulated EWPs are not permitted to work on any live apparatus. Operating procedures to follow: Clearly define the worksite with barriers, flags, ropes and signs All assets within the worksite must be de-energised, isolated and earthed Safe approach distances (SADs) must apply between the worksite boundary and any live conductors to ensure the safety of personnel at all locations within the defined worksite Observe the SAD of live or de-energised adjacent apparatus Un-insulated EWPs working within substation sites must have the chassis connected to a known earth point using the approved earthing leads either bolted or clamped Where practicable the un-insulated EWP basket must also be earthed to the apparatus being worked on unless the apparatus is being tested, removed or replaced Un-insulated EWPs are not permitted to enter the SAD Un-insulated EWPs can only be used on equipment that is earthed Equipment under construction that is at risk of induced voltages must also be made safe by applying earths to ensure no voltage potential rise is possible CS # Safety Requirements When Working from an EWP Page 4 of 6

5 Traveling in EWP Baskets A risk assessment must be completed to identify all foreseeable hazards and to ensure that risk controls are implemented Comply with the conditions of Department of Transport Exemption 46V14CCHZ3 EWP booms must be kept in the stowed position when traveling The EWP must not exceed six km/h or the posted road speed limit whichever is lower When travelling in the EWP basket you must wear an approved full body safety harness and lanyard attached at all times Carry a copy of Department of Transport Exemption 46V14CCHZ3 within the vehicle and produced on demand if required Escorting a Person in a EWP An escorted person is defined as someone who is authorised to ascend in a EWP basket but is prohibited from performing any operational work. They may only observe, take photographs or make a movie on behalf of Horizon Power A trained and authorised EWP basket operator must accompany the escorted person Escorted person must not operate any EWP controls The EWP basket operator must provide the escorted person with an induction that includes the operation of the EWP and the correct use of the fall arrest harness The EWP basket and boom must not encroach the SAD Cleaning and Maintenance of EWP Wash and clean the inside and outside of insulated EWP boom sections every six weeks or more regularly if used in harsh conditions Use recommended methods and substances to polish the fibreglass After cleaning, rinse well with water to remove any residue Ensure the insulated EWP boom sections are completely dry before using for work on live equipment Report cracks or damage found in the fibreglass section of an EWP boom to the formal leader, tag out EWP with an Out of Service tag, and do not use the EWP until repaired In an Emergency When a EWP has mechanical failure and cannot be lowered, and the personnel are safe, remain in the bucket until a second EWP arrives to effect a rescue The EDD device must only be used in time-critical or life threatening situations or if there is no second EWP for rescue Never tamper with the dead man basket control to bypass its manual function CS # Safety Requirements When Working from an EWP Page 5 of 6

6 References Occupational Safety & Heath Act 1984 Occupational Safety & Health Regulations 1996 SHMS OSH Job Risk Analysis (JRA) Procedure SHMS OSH Personal Protective Equipment SHMS OSH Mobile Plant and Equipment SHMS OSH Elevating Work Platform Procedure Electrical Safety Standards Field Instruction 2.6 Worksite Clothing / Personal Protective Equipment Requirements Field Instruction 2.13 Vehicle and Plant Earthing Requirements Field Instruction 2.17 Safe Approach Distances Field Instruction 2.23 Job Hazard and Risk management (JRA) Field Instruction 2.27 Safety Observer Role Field Instruction 4.1 Substation Entry Requirements Field Instruction 4.3 Substation Clearances Field Instruction 10.6 Vegetation Management Work AS Cranes, hoists and winches Safe use Part 10: Mobile elevating work platforms CS # Safety Requirements When Working from an EWP Page 6 of 6

Field Instruction. This instruction outlines the minimum requirements for all Horizon Power workers who undertake Vegetation Management Work.

Field Instruction. This instruction outlines the minimum requirements for all Horizon Power workers who undertake Vegetation Management Work. 10.6 Management Work Purpose This instruction outlines the minimum requirements for all Horizon Power workers who undertake Management Work. Scope The scope of this instruction is to inform all Horizon

More information

Field Instruction. Stringing new bare conductors above or below live bare overhead conductors

Field Instruction. Stringing new bare conductors above or below live bare overhead conductors 5.10 Stringing, Tensioning and Sagging Conductors/Cables Purpose The purpose of this instruction is for all Horizon Power workers who undertake the stringing and tensioning of bare overhead conductors

More information

Quiz. telescoping. designed to. established. 1 Pag. EWP Pre Reading

Quiz. telescoping. designed to. established. 1 Pag. EWP Pre Reading EWP Pre Reading and Quiz Due to the intensivee nature of our EWP course, it is mandatory that you study this manual thoroughly before attending your course. Doing so will ensure you have the best possible

More information

Due to. manual. in one day. telescoping. designed to. established. 1 Pag. g v2.0

Due to. manual. in one day. telescoping. designed to. established. 1 Pag. g v2.0 EWP Pre Reading Manual v2.0 Due to the intensive nature of our one day EWP course, it is mandatory that you study this manual thoroughly before attending your course. Doing so will ensure you have the

More information

SWMS No 007 Samark North Qld Pty Ltd ABN : Electrical Contractors License C37121 Page 2 of 6

SWMS No 007 Samark North Qld Pty Ltd ABN : Electrical Contractors License C37121 Page 2 of 6 Samark North Qld Pty Ltd SWMS Manual SWMS No 007 Samark North Qld Pty Ltd ABN : 99 082 958 487 Electrical Contractors License C37121 Page 2 of 6 Safe Work Method Statement Title: SWMS:007 WORKING ON ENERGISED

More information

Cranes and Hoists. Elevating Work Platforms ASSESSMENT

Cranes and Hoists. Elevating Work Platforms ASSESSMENT Cranes and Hoists Elevating Work Platforms ASSESSMENT Part 1 Part 2 Performance Oral/Written June 1995 Contents Page Assessor guidelines general guidelines for Schedule B i Part one Performance Assessment

More information

Field Instruction. Protect Horizon Power employees and contractors from a potential hazard.

Field Instruction. Protect Horizon Power employees and contractors from a potential hazard. 2.15 Temporary Safety Barriers and/or Warning Signs Purpose This instruction sets out the minimum requirements for the installation and erection of temporary safety barriers and/or warning signs to: Protect

More information

These Electricity Safety Rules and associated National Safety Instructions are written to safeguard personnel working for or on behalf of National

These Electricity Safety Rules and associated National Safety Instructions are written to safeguard personnel working for or on behalf of National These Electricity Safety Rules and associated National Safety Instructions are written to safeguard personnel working for or on behalf of National Grid, on or near to its electricity apparatus. National

More information

Safe Work Method Statement

Safe Work Method Statement TE CONTROLLED COPY OF TIS DOCUMENT IS ON TE COMPUTER NETWORK PRINTED COPIES ARE ONLY CURRENT FOR TE DATE AT TE BOTTOM OF TE PAGE. Title Working at eight SWMS No. 16 Authorized and email Signed by the (Managing

More information

PSSI 6 Demarcation of Work Areas in Substations

PSSI 6 Demarcation of Work Areas in Substations 1. SCOPE This Safety Instruction applies the principles established by the ScottishPower Safety Rules (Electrical and Mechanical), setting down the requirements in those situations where it is necessary

More information

List all key terms and acronyms used in the procedure, and their definitions.

List all key terms and acronyms used in the procedure, and their definitions. Purpose The purpose of this procedure is to provide guidelines for electrical safety in general within Seqwater in compliance with the Electrical Safety Act 2002, Industry Codes of Practice, Regulations,

More information

SWMS No 012 Samark North Qld Pty Ltd ABN : Electrical Contractors License C37121 Page 2 of 6

SWMS No 012 Samark North Qld Pty Ltd ABN : Electrical Contractors License C37121 Page 2 of 6 Samark North Qld Pty Ltd SWMS SWMS No 0 Samark North Qld Pty Ltd ABN : 99 08 98 87 Electrical Contractors License C37 Page of 6 Safe Work Method Statement Title: SWMS:0 INSTALLING LIGHT POLES Work Method

More information

FATAL AND SEVERE RISK PROGRAM

FATAL AND SEVERE RISK PROGRAM FATAL AND SEVERE RISK PROGRAM LEADER SESSION FALL FROM HEIGHTS Only do the task if it can be done safely FALL FROM HEIGHTS OUR COMMITMENT LIFE SAVING BEHAVIOUR: I WILL ALWAYS USE ADEQUATE PROTECTION WHERE

More information

Critical Risk Control Protocol

Critical Risk Control Protocol Critical Risk Control Protocol Contents Foreword 3 Introduction 4 Critical Controls 4 Exemption Process 4 UGL s Critical Risks 5 Working at Height 6 Operation of Mobile Plant 7 Working in Confined Spaces

More information

ELECTRICAL (COMPREHENSIVE) SAFETY PROGRAM REGULATORY STANDARD: OSHA - 29 CFR CFR , ,

ELECTRICAL (COMPREHENSIVE) SAFETY PROGRAM REGULATORY STANDARD: OSHA - 29 CFR CFR , , ELECTRICAL (COMPREHENSIVE) SAFETY PROGRAM REGULATORY STANDARD: OSHA - 29 CFR 1910.331 335-29 CFR 1926.302, 1926.416, 1926.417 BASIS: The National Safety Council estimates that there are at least 300 deaths

More information

TLILIC2005A Licence to operate a boomtype elevating work platform (boom length 11 meters or more)

TLILIC2005A Licence to operate a boomtype elevating work platform (boom length 11 meters or more) TLILIC2005A Licence to operate a boomtype elevating work platform (boom length 11 meters or more) Release: 1 TLILIC2005A Licence to operate a boom-type elevating work platform (boom length 11 meters or

More information

ACCREDITED SAFETY TRAINING FOR EQUIPMENT OPERATORS

ACCREDITED SAFETY TRAINING FOR EQUIPMENT OPERATORS JOB HAZARD ANALYSIS ELEVATING WORK PLATFORM Note: This is just a guideline. A Assessment must be designed for each specific EWP and each specific work area and task. A JHA is a never ending document. There

More information

Control of Energy - Isolation Process

Control of Energy - Isolation Process Issue Date: 24/03/17 Last Reviewed: 24/03/17 Next Review Date: 24/03/18 Authorised By: Mike Muir Safe Operating Procedure Control of Energy - Isolation Process Purpose: This SOP is based on a Generic 12-step

More information

1 AIM 2 4 REASONS FOR INCLUSION 3 6 PLANT AND EQUIPMENT REQUIREMENTS 4 7 SYSTEM AND PROCEDURAL REQUIREMENTS 4 8 PEOPLE REQUIREMENTS 6

1 AIM 2 4 REASONS FOR INCLUSION 3 6 PLANT AND EQUIPMENT REQUIREMENTS 4 7 SYSTEM AND PROCEDURAL REQUIREMENTS 4 8 PEOPLE REQUIREMENTS 6 CONTENTS PAGE 1 AIM 2 2 APPLICATION 2 3 DEFINITIONS 2 4 REASONS FOR INCLUSION 3 5 REQUIREMENTS 3 6 PLANT AND EQUIPMENT REQUIREMENTS 4 7 SYSTEM AND PROCEDURAL REQUIREMENTS 4 8 PEOPLE REQUIREMENTS 6 APPENDIX

More information

SAFE WORK PROCEDURE. Location of Equipment Written By: Approved By: Date Created Last Revision

SAFE WORK PROCEDURE. Location of Equipment Written By: Approved By: Date Created Last Revision Page 1 of 5 Location of Equipment Written By: Approved By: Date Created Last Revision School: Facilities & Operations Brent Vandenbosch Gordon Howe October 14, 2009 new Room: n/a Barry Hamilton HAZARDS

More information

Instructions for assembly and use ZAP telescopic platform ladder Z600

Instructions for assembly and use ZAP telescopic platform ladder Z600 en Instructions for assembly and use ZAP telescopic platform ladder Z600 291361 English Instructions for assembly and use ZAP telescopic platform ladder Contents 1. Information on this manual... 2 1.1

More information

Elevating Work Platforms. WP Class Assessment Information

Elevating Work Platforms. WP Class Assessment Information Elevating Work Platforms Vic Access 4/123 Chesterville Rd Highett 3190 Ph: 9555 116 Phone 0419 153 143 Tim Hille WP Class Assessment Information * Note: 31 Questions are chosen out of 49 All answers are

More information

Fall Protection and Elevated Work

Fall Protection and Elevated Work Program No: SP-010 Page 1 1.0 PURPOSE AND INTRODUCTION Fall Protection and Elevated Work To establish fall protection safety procedures for Pitt County Schools employees engaged in any of the following

More information

UK Contractors Group Mobile Elevating Work Platforms Good Practice Toolkit June June 2015 Page 1 of 16

UK Contractors Group Mobile Elevating Work Platforms Good Practice Toolkit June June 2015 Page 1 of 16 UK Contractors Group Mobile Elevating Work Platforms Good Practice Toolkit www.ukcg.org Page 1 of 16 Contents Foreword Reference Material Initial Considerations Planning and Preparation for MEWP Activities

More information

Floor Mount Socket. T: +44 (0) F: +44 (0)

Floor Mount Socket. T: +44 (0) F: +44 (0) G-Davit : Floor Mount Socket USER INSTRUCTION MANUAL A davit socket for installation bolted to a high strength flooring material. Suitable for both fall arrest use and lifting. EN795 Class B, PPE Anchor

More information

Work Activity (e.g. Road Work): Work Location:.

Work Activity (e.g. Road Work): Work Location:. Working with Cranes Work Activity (e.g. Road Work): Work Location:. GENERAL INFORMATION Hinchinbrook Shire Council Lannercost Street Ingham Qld, 4850 ABN 46 291 971 168 Ph: 47764610 All personnel conducting

More information

LADDERS FIXED AND PORTABLE

LADDERS FIXED AND PORTABLE CONTRACTOR WHS HAZARD STANDARD LADDERS FIXED AND PORTABLE EXTERNAL USE ONLY Principles in the Optus Contractor WHS management process CONTRACTOR MANAGEMENT STAGES PRINCIPLES THIS STANDARD REQUISITION Requisition

More information

The purpose of this training is to give field technicians awareness training and guidelines on potential hazards they may encounter in the field.

The purpose of this training is to give field technicians awareness training and guidelines on potential hazards they may encounter in the field. Purpose The purpose of this training is to give field technicians awareness training and guidelines on potential hazards they may encounter in the field. Fall Protection and Prevention JELD-WEN Field Employees

More information

Health & Safety Policy and Procedures Manual SECTION 6 ELECTRICAL SAFETY / CONTROL OF HAZARDOUS ENERGY

Health & Safety Policy and Procedures Manual SECTION 6 ELECTRICAL SAFETY / CONTROL OF HAZARDOUS ENERGY SECTION 6 ELECTRICAL SAFETY / CONTROL OF HAZARDOUS ENERGY 1. CONTROL OF HAZARDOUS ENERGY POLICY AND PROCEDURES A. OSHA References: 29 CFR 1910.147, 29 CFR 1910.332, 29 CFR 1910.333, 29 CFR 1926.417 B.

More information

Safe Work Method Statement

Safe Work Method Statement TE CONTROLLED COPY OF TIS DOCUMENT IS ON TE COMPUTER NETWORK PRINTED COPIES ARE ONLY CURRENT FOR TE DATE AT TE BOTTOM OF TE PAGE. Title Use of a Mobile Elevated Work Platform (MEWP) Boom SWMS No. 19 Authorized

More information

Western Power Safe Work Method Statement Task details

Western Power Safe Work Method Statement Task details Western Power Safe Work Method Statement Task details Description Install and Maintain V Overhead Equipment and Associated ardware (de-energised) DM 10716988 Approved by Manager, Work Practices Review

More information

PRO Lifting Operations

PRO Lifting Operations MS&L Procedure PRO-4.5-0001-1-06 Lifting Operations Document Owner: Bill Kruesi HSSE Manager - Asset Mgmt. Owen Quake ANZ Engineering Authority Approved By: Bill Kruesi HSSE Manager - Asset Mgmt. Control

More information

Job Safety and Environmental Analysis (JSEA)/Safe Work Method Statement (SWMS)

Job Safety and Environmental Analysis (JSEA)/Safe Work Method Statement (SWMS) Job Safety and Environmental Analysis (JSEA)/Safe Work Method Statement (SWMS) Part 1: Project and Task Identification Process: Initiators of JSEAs are responsible for consulting the Project Supervisor,

More information

Permit-To-Work Guidance and Templates

Permit-To-Work Guidance and Templates Managing Contractors Policy - Appendix E Permit-To-Work Guidance and Templates This document has been constructed to provide guidance in how to use a permit to work correctly. The first part explains the

More information

Contractor handbook. Purpose

Contractor handbook. Purpose Page no: 1 / 6 Contractor handbook Purpose Mitie aims to ensure that the highest levels of performance are achieved by all persons working for us or on our behalf. We require the same level of performance

More information

Vacuum Excavation in the vicinity of the Wellington Electricity Network

Vacuum Excavation in the vicinity of the Wellington Electricity Network Vacuum Excavation in the vicinity of the Network. Document no: ENG-116 Document Rev: 1 Issue Status: Final Issue Date: 14/05/2015 Page 1 of 9 Contents 1. PURPOSE... 3 2. POLICY... 3 3. SCOPE... 3 4. REFERENCES...

More information

LEVEL 2 CERTIFICATE OF COMPETENCE IN THE SAFE USE AND OPERATION OF MOBILE ELEVATED WORK PLATFORMS

LEVEL 2 CERTIFICATE OF COMPETENCE IN THE SAFE USE AND OPERATION OF MOBILE ELEVATED WORK PLATFORMS NPTC Registered Charity No. 1096429 NATIONAL AGRICULTURAL CENTRE STONELEIGH PARK, WARWICKSHIRE CV8 2LG Tel: 024 7669 6553 Fax: 024 7669 6128 Email: information@nptc.org.uk LEVEL 2 CERTIFICATE OF COMPETENCE

More information

DM# High Voltage Live Work Procedures Distribution Insulated Stick

DM# High Voltage Live Work Procedures Distribution Insulated Stick DM# High Voltage Live Work Procedures Distribution Insulated Stick 2014, Electricity Networks Corporation t/a Western Power. Permission is granted to view, copy, print and use documents providing the information

More information

Aerial Lift Safety Program

Aerial Lift Safety Program Aerial Lift Safety Program Revision Date: 6-19-2017 TABLE OF CONTENTS Aerial Lift Safety Program 1.0 Overview... 3 2.0 Policy......3 3.0 Requirements. 3 4.0 Purpose..... 4 5.0 Scope.........4 6.0 Responsibilities........7

More information

Harbour Town Gold Coast Site Induction

Harbour Town Gold Coast Site Induction Harbour Town Gold Coast Site Induction At Harbour Town Gold Coast we believe that safety is integral to the way we do business. We are committed to operating a safe environment for all where we are incident

More information

Safe Work Method Statement

Safe Work Method Statement TE CONTROLLED COPY OF TIS DOCUMENT IS ON TE COMPUTER NETWORK PRINTED COPIES ARE ONLY CURRENT FOR TE DATE AT TE BOTTOM OF TE PAGE. Title Dogging of Crane General Loading and Unloading SWMS No. 20 Authorized

More information

: Electric Power Generation, Transmission, and Distribution. Region IV - OSHA

: Electric Power Generation, Transmission, and Distribution. Region IV - OSHA 1910.269: Electric Power Generation, Transmission, and Distribution Region IV - OSHA Scope This standard covers the operation and maintenance of electric power generation, control, transformation transmission,

More information

FALL PROTECTION (SAF-SPI-06)

FALL PROTECTION (SAF-SPI-06) 1. PURPOSE To describe the Ontario Operations standard methods for preventing serious injury resulting from fall from heights and to provide a Standard for Fall Protection to safeguard employees who work

More information

WORK METHOD STATEMENT ELECTRICAL

WORK METHOD STATEMENT ELECTRICAL ORGANISATION DETAILS Organisation Name: Gedoun Constructions Pty Ltd Contact Name: Joe Gedoun ACN/ABN: 52 284 873 581 Contact Position: Director Address: PO Box 1138, Townsville QLD 4810 Contact Phone

More information

Minimum Rules for carrying out High Voltage Live Work

Minimum Rules for carrying out High Voltage Live Work Minimum Rules for carrying out High Voltage Live Work In the Victorian Electricity Supply Industry (VESI) June 2015 This document has been developed by the VESI HV Live Work Committee DATE VERSION AMENDMENT

More information

Electrical safety code of practice Working near overhead and underground electric lines

Electrical safety code of practice Working near overhead and underground electric lines Electrical safety code of practice 2010 Working near overhead and The Queensland Electrical safety code of practice 2010 Working near exposed live parts was made on 18 December 2009 and commenced on 1

More information

Safety at Work. Rules for Staying Alive

Safety at Work. Rules for Staying Alive Safety at Work Rules for Staying Alive Safety at Work Rules for Staying Alive Introduction The purpose of Dana Gas Rules For Staying Alive is to address the key causes of deaths in our industry. These

More information

Safe Work Procedure for installation of external cladding

Safe Work Procedure for installation of external cladding Safe Work Procedure for installation of external cladding This procedure has been formulated to cover safe systems of work for the installation of external cladding. This instruction will be used to reduce

More information

Western Power Safe Work Method Statement Task details

Western Power Safe Work Method Statement Task details Western Power Safe Work ethod Statement Task details Description Substation aintenance D 10721527 Approved by anager, Work Practices Review team SWS Development Approval date October 2015 Qualifications/icences

More information

DOCUMENT CONTROL. Name: Mark Van Vuuren Position: Field Practices Coordinator Date: June 2014

DOCUMENT CONTROL. Name: Mark Van Vuuren Position: Field Practices Coordinator Date: June 2014 DOCUMENT CONTROL Document Owner (May also be the Process Owner) Approved By * Authorisation ** Process Owner is hereby vested with authority and responsibility to manage the process end to end. Name: Mark

More information

Who Wants To Be a MEWP Millionaire?

Who Wants To Be a MEWP Millionaire? Who Wants To Be a MEWP Millionaire? The employer has a responsibility to provide: A Modifications to equipment B Exemption in respect to training if required C Information, instruction, training and supervision

More information

GOLDEN SAFETY RULES AFT DR

GOLDEN SAFETY RULES AFT DR GOLDEN SAFETY RULES The Golden Safety Rules exist to keep you safe Your safety and the safety of your workmates is paramount. The Golden Safety Rules exist, above all else, to keep you safe. Since we adopted

More information

??????? is committed to providing a safe work environment for its employees and preventing occupational injuries due to falls.

??????? is committed to providing a safe work environment for its employees and preventing occupational injuries due to falls. Intent??????? is committed to providing a safe work environment for its employees and preventing occupational injuries due to falls. Fall Protection is an integral part of our commitment to a safe work

More information

Policy Redesign Project. Plant Safety Policy. Table of Contents

Policy Redesign Project. Plant Safety Policy. Table of Contents Policy Redesign Project All policies and procedures are being reviewed as part of this project. This document is pending review, but remains in effect until the review is carried out. Plant Safety Policy

More information

WINDMILL (pre-start) HAZARD INSPECTION CHECKLIST

WINDMILL (pre-start) HAZARD INSPECTION CHECKLIST Windmill Hazard Inspection Checklist WINDMILL (pre-start) HAZARD INSPECTION CHECKLIST Authorised by: LOCATION OF INSPECTION...... Inspected By (1)........... (2)..... PRINT PRINT Signature (1):. (2)....

More information

OSHA s new walking working surfaces standards

OSHA s new walking working surfaces standards OSHA s new walking working surfaces standards changes and new requirements Inspection of walking working surfaces 1910.22(d) Regularly and as needed and correct, repair, or guard against hazardous conditions;

More information

This subject outlines procedures to prevent accidents or injuries to you and others from inappropriate selection and use of fall protection equipment.

This subject outlines procedures to prevent accidents or injuries to you and others from inappropriate selection and use of fall protection equipment. Page 1 of 7 REFERENCES Personal Protective Equipment Standards 1.31 PURPOSE This subject outlines procedures to prevent accidents or injuries to you and others from inappropriate selection and use of fall

More information

Isolation Lockout and Tagging

Isolation Lockout and Tagging PURPOSE To define the minimum system requirements for isolation of plant and equipment from hazardous substances, mechanical, electrical or other energy sources to protect all workers from personal injury

More information

Safe Working at Heights Theory Assessment

Safe Working at Heights Theory Assessment Safe Working at Heights Theory Assessment Version 4.00 Safe Working at Heights Theory Assessment This Theory Assessment will form part of the formal assessment for the following unit/s of competency: RIIWHS204D

More information

Pannier Corporation Health and Safety Handbook Marking System Group Aerial Lifts Original Date: Section: Revision date: Page: 12/5/ of 11

Pannier Corporation Health and Safety Handbook Marking System Group Aerial Lifts Original Date: Section: Revision date: Page: 12/5/ of 11 12/5/2013 37 1 of 11 1.0 Overview Aerial lifts are commonly used in construction, inspection, athletic events and repair services to lift Pannier employees to an elevated work position. Proper operation

More information

ISOLATION ISSUE 2 1 AIM 2 4 REASONS FOR INCLUSION 3 6 PLANT AND EQUIPMENT REQUIREMENTS 3 7 SYSTEM & PROCEDURAL REQUIREMENTS 4 8 PEOPLE REQUIREMENTS 6

ISOLATION ISSUE 2 1 AIM 2 4 REASONS FOR INCLUSION 3 6 PLANT AND EQUIPMENT REQUIREMENTS 3 7 SYSTEM & PROCEDURAL REQUIREMENTS 4 8 PEOPLE REQUIREMENTS 6 CONTENTS PAGE 1 AIM 2 2 APPLICATION 2 3 DEFINITIONS 2 4 REASONS FOR INCLUSION 3 5 REQUIREMENTS 3 6 PLANT AND EQUIPMENT REQUIREMENTS 3 7 SYSTEM & PROCEDURAL REQUIREMENTS 4 8 PEOPLE REQUIREMENTS 6 APPENDIX

More information

Fall Protection / Open Holes & Guardrail

Fall Protection / Open Holes & Guardrail Fall Protection / Open Holes & Guardrail 1. Leading Edges Policy Statement It is GW Communications policy that any worker exposed to a fall 6 or greater, shall be protected from coming into contact with

More information

Our commitment to safety

Our commitment to safety 2 Our commitment to safety At South East Water, we have an absolute commitment to achieving and maintaining a safe and healthy workplace for our people, including our contractors and stakeholders which

More information

SYDNEY TRAMWAY MUSEUM WORKING ON ELEVATED PLATFORMS PROCEDURE

SYDNEY TRAMWAY MUSEUM WORKING ON ELEVATED PLATFORMS PROCEDURE WORKING ON ELEVATED PLATFORMS PROCEDURE DECEMBER 2008JANUARY 2014 1. Document Details: SYDNEY TRAMWAY MUSEUM Document Control Record Name: Working On Elevated Platforms Procedure Number STM 6161 Version

More information

You must NOT touch any equipment unless you are authorised to work on or with that equipment and you have followed correct safety procedures.

You must NOT touch any equipment unless you are authorised to work on or with that equipment and you have followed correct safety procedures. SYDNEY TOWN HALL 1 HIRER & CONTRACTOR SAFETY FACT SHEET Issue 2 September 2013 www.sydneytownhall.com.au City of Sydney - Venue Management will provide and maintain a safe working environment for the health,

More information

2-1- Shipping Receiving Lifting Location on Site Installation Stages 6

2-1- Shipping Receiving Lifting Location on Site Installation Stages 6 NEUTRAL GROUNDING RESISTORS INSTALLATION, OPERATION & MAINTENANCE MANUAL Contents 1- SAFETY INSTRUCTIONS... 3 1-1- Compliance with Instructions in this Manual. 3 1-2- Guidance Notes Installation.... 3

More information

7 Hazard assessment 8 Worker participation 9 Hazard elimination and control

7 Hazard assessment 8 Worker participation 9 Hazard elimination and control This document is a guideline only. Employers have a responsibility of assessing all applicable occupational health and safety legislation, for the tasks they are performing. Businesses in this industry

More information

Energy Networks Management Safety Procedures DEFINITIONS

Energy Networks Management Safety Procedures DEFINITIONS 1. SCOPE Throughout the Energy Networks Management Safety Procedures (MSP s), terms printed in bold type are as defined in the ScottishPower Safety Rules (Electrical and Mechanical) 4 th Edition. Most

More information

Safety Essentials. Mandatory rules for our high risk activities

Safety Essentials. Mandatory rules for our high risk activities Mandatory rules for our high risk activities Remember... Only undertake activities for which you are trained, competent and authorised to do Before you start a job take a step back, think about all the

More information

LEVEL 2 CERTIFICATE OF COMPETENCE IN CHAINSAW AND RELATED OPERATIONS ASSESSMENT SCHEDULE

LEVEL 2 CERTIFICATE OF COMPETENCE IN CHAINSAW AND RELATED OPERATIONS ASSESSMENT SCHEDULE Registered Charity No. 1096429 STONELEIGH PARK, WARWICKSHIRE CV8 2LG Tel: 024 7685 7300 Fax: 024 7669 6128 Email: information@nptc.org.uk LEVEL 2 CERTIFICATE OF COMPETENCE IN CHAINSAW AND RELATED OPERATIONS

More information

KG Training and Assessing. IMPORTANT! You must read this first!

KG Training and Assessing. IMPORTANT! You must read this first! ABN: 421 334 328 63 Location: Unit 1/8 Day Road, Rockingham WA 6168 Postal Address: PO Box 2111Rockingham DC WA 6967 Phone: 08 9592 2535 Office Email: admin@kgtraining.com.au Web: www.kgtraining.wa.edu.au

More information

At the end of this presentation you should know the difference between fall prevention, fall restraint, and fall arrest.

At the end of this presentation you should know the difference between fall prevention, fall restraint, and fall arrest. 0 At the end of this presentation you should know the difference between fall prevention, fall restraint, and fall arrest. We will review the hazards associated with fall protection and how to mitigate

More information

Safe Work Method Statement

Safe Work Method Statement Title Skid Steer Operation (Bobcat) SWMS No. 14 Authorized and email Signed by the (Managing Director / CEO / Partner / Proprietor) on Date 01/08 /2016 Safe Work Procedure for the Work:- Yes No Employees

More information

SAFETY HARNESSES IN MOBILE ELEVATING WORK PLATFORMS

SAFETY HARNESSES IN MOBILE ELEVATING WORK PLATFORMS SAFETY HARNESSES IN MOBILE ELEVATING WORK PLATFORMS BOOM TYPE PLATFORMS It is strongly recommend that a full body harness with an adjustable lanyard (used to provide work restraint and adjusted to be as

More information

Isolation Standard - Tags

Isolation Standard - Tags Isolation Standard - Tags 1. Purpose To provide Nyrstar Hobart with a procedure designed to ensure anyone working on plant and equipment is kept free from injury or incidents resulting from uncontrolled

More information

SAFETY QUALITY TECHNOLOGY. Guidance on Safe Isolation Procedures

SAFETY QUALITY TECHNOLOGY. Guidance on Safe Isolation Procedures SAFETY QUALITY TECHNOLOGY Guidance on Safe Isolation Procedures Introduction Every year, people working on construction sites suffer electric shock and burn injuries some of which, tragically, are fatal.

More information

Specialists Window Cleaning Induction

Specialists Window Cleaning Induction Specialists Window Cleaning Induction Mobile Tower Scaffolds Mobile tower scaffolds are used on flat firm, stable ground to access higher levels. They have toe boards, mid rails & guard rails to prevent

More information

Handbook 16. Issue 4. AC electrified lines. GERT8000-HB16 Rule Book. September 2018 Comes into force 01 December 2018

Handbook 16. Issue 4. AC electrified lines. GERT8000-HB16 Rule Book. September 2018 Comes into force 01 December 2018 GERT8000-HB16 Rule Book AC electrified lines Handbook 16 Issue 4 September 2018 Comes into force 01 December 2018 This handbook is for those personnel who need to go on the operational railway in an AC

More information

User Instructions 1790 Rail Anchor

User Instructions 1790 Rail Anchor User Instructions 1790 Rail Anchor This document is intended to meet the Manufacturer s Instruction requirements as stated by ANSI Z359.1, and should be used as part of an employee training program as

More information

2.2. Anchorage Point A secure point of attachment for Lifelines, lanyards or deceleration devices.

2.2. Anchorage Point A secure point of attachment for Lifelines, lanyards or deceleration devices. Title: Elevated Walking/Working Surfaces (Fall Protection) Site Function: Safety Procedure No.: MC032.122 Page: 1 of 16 McIntosh Site Reviewed: 02/2013 Effective: 03/2013 Supersedes: 08/2012 Preparer:

More information

Progressive Safety Services LLC

Progressive Safety Services LLC 1910.23 Guarding Floor and Wall Openings and Holes 1910.66 Powered Platforms, Manlifts and Vehicle Mounted Work Platforms. 1926.500 Fall Protection 1926.501 Duty to Have Fall Protection 1926.502 Fall Protection

More information

Field Instruction. 2.6 Worksite Clothing - Personal Protective Equipment (PPE) Requirements

Field Instruction. 2.6 Worksite Clothing - Personal Protective Equipment (PPE) Requirements 2.6 Wksite Clothing - Personal Protective Equipment (PPE) Requirements Purpose This Field Instruction describes the selection use maintenance of approved Personal Protective Equipment (PPE) f all Hizon

More information

FALL PREVENTION PROCEDURE

FALL PREVENTION PROCEDURE TABLE OF CONTENTS 1. OBJECTIVE... 3 2. SCOPE... 3 3. DEFINITIONS... 3 4. RESPONSIBILITIES... 4 5. HAZARD AND RISK ASSESSMENT... 4 5.1 WORKING AT HEIGHT PERMIT... 4 5.1.1 Permit Currency... 5 5.1.2 Working

More information

Western Power Safe Work Procedures Task details

Western Power Safe Work Procedures Task details Western Power Safe Work Procedures Task details Description ive ine Safe Work Procedures for use with the SWS, ive ine Work (D# 10696821) D 10708984 Approved by Work Practices anager Review team SWS Development

More information

Safe Work Method Statement Transmission Field Protection Services

Safe Work Method Statement Transmission Field Protection Services Purpose Permits Authorisations Training Equipment Electrical Access Permit (EAP) or Sanction to Test (STT) Electrical worker s licence, Network Authority Card (NAC), Recipient in charge (RIC), Tester in

More information

Original Date of Issue: 04/09

Original Date of Issue: 04/09 POLICIES AND PROCEDURES DEPARTMENT: Environmental Health and Safety SUBJECT: Electrical Safety Program Original Date of Issue: 04/09 Reviewed 12/2011 Revised 12/2011 BACKGROUND ELECTRIC SHOCK It is well

More information

PLANT/EQUIPMENT/ASSET HAZARD REPORT

PLANT/EQUIPMENT/ASSET HAZARD REPORT Asset Description: EL-09100-060 : Gantry hoist system Sale Type For what use is this asset being sold? Re-Use Spare Parts Scrap Note 1: Assets are sold only for the use indicated. Any other use is at the

More information

Contractor OHS Induction. AOHS-05-GUI September 2016

Contractor OHS Induction. AOHS-05-GUI September 2016 Contractor OHS Induction AOHS-05-GUI-002 8 September 2016 1 About AQWEST AQWEST is a Government Trading Enterprise responsible for supplying drinking water to Bunbury. Formed in 1906 as the Bunbury Water

More information

Field / Workshop Personal Protective Equipment

Field / Workshop Personal Protective Equipment 1. PURPOSE AND SCOPE The purpose of this document is to specify Ergon Energy s minimum Personal Protective Equipment (PPE) requirements for field worksites and workshops. These requirements apply to: Work

More information

Reviewed: New Effective: 5/18/12 Supersedes: New Preparer: Owner: Approver: Team Member, Occupational Safety Industrial Hygiene

Reviewed: New Effective: 5/18/12 Supersedes: New Preparer: Owner: Approver: Team Member, Occupational Safety Industrial Hygiene Procedure No.: BC032.027 Page: 1 of 15 Preparer: Owner: Approver: Team Member, Occupational Safety Industrial Hygiene Manager, Occupational Safety Industrial Hygiene Vice President, Ecology & Safety (Signature

More information

Status Date Prepared Reviewed Endorsed Approved

Status Date Prepared Reviewed Endorsed Approved Discipline Engineering Standard NSW Category Signalling Title Rerailing Precautions to be Taken Reference Number SMP 26 (RIC Standard: SC 00 52 00 26 SI) Document Control Status Date Prepared Reviewed

More information

FALL PROTECTION PROGRAM (OHS-0010)

FALL PROTECTION PROGRAM (OHS-0010) () For Issued: December 17, 2007 Revised: 1 st Issue PAGE 1 OF 17 Table of Contents 1.0 Purpose...2 2.0 Document Control...2 2.1 Approvals...2 2.2 Responsibility...2 3.0 Definitions...3 4.0 Objective...7

More information

Lock Out - Tag Out Safety Program

Lock Out - Tag Out Safety Program Lock Out - Tag Out Safety Program Daniel Schmid 4-22-15 Pam Schmid 4-22-15 Dan Schmid Pam Schmid Safety Director Quality Director Table of Contents DOCUMENT REVISION TABLE... 3 PURPOSE... 4 RESPONSIBILITY...

More information

Working at Heights PROCEDURE

Working at Heights PROCEDURE Working at Heights PROCEDURE Contents 1.0 Purpose 2.0 Objective 3.0 Scope and limitation 4.0 References and sources of information 5.0 Responsibilities 5.1 University Managers 5.2 University Staff Overseeing

More information

TLILIC2001 Licence to Operate a Forklift Truck

TLILIC2001 Licence to Operate a Forklift Truck Learner Name: Learner ID: Learner Contact Number: Learner Email Address: Date Training Commenced: This Book Contains: Course Information. Review Questions. The following review questions are to be completed

More information

Vehicle-mounted elevating and rotating work platforms.

Vehicle-mounted elevating and rotating work platforms. Regulations (Standards - 29 CFR) Vehicle-mounted elevating and rotating work platforms. - 1910.67 Regulations (Standards - 29 CFR) - Table of Contents Part Number: 1910 Part Title: Occupational Safety

More information

Safe Work Method Statement Transmission Field Protection Services

Safe Work Method Statement Transmission Field Protection Services Safe Work Method Statement Transmission Field Protection Services Purpose Permits Authorisations Training Equipment Fault finding on live V changeover/distribution boards N/A Electrical worker s licence,

More information

Applications and Considerations Section 11

Applications and Considerations Section 11 11 Applications and Considerations Section 11 www.hubbellpowersystems.com E-mail: hpsliterature@hps.hubbell.com Phone: 573-682-5521 Fax: 573-682-8714 210 North Allen Centralia, MO 65240, USA Copyright

More information

Instructions for Dual Retractable Web lanyards Type 1. Instructions for E6 Energy Absorbing Y, Bypass Lanyards. For Worker Mass Range of 90 to 175 kg

Instructions for Dual Retractable Web lanyards Type 1. Instructions for E6 Energy Absorbing Y, Bypass Lanyards. For Worker Mass Range of 90 to 175 kg P.O. Box 3026 Sherwood Park Alberta T8H 2T1 Phone: (780) 464-7139 Fax: (780) 464-7652 e-mail: inquiries@ safetydirect.ca Web site: www.safetydirect.ca Instructions for Dual Retractable Web lanyards Type

More information

Building 43 Roof Safety Assessment

Building 43 Roof Safety Assessment Roof Safety Survey GENERAL INFORMATION CAMPUS: Wollongong Campus BUILDING: Building 43 Building 43 Roof Safety Assessment DESCRIPTION: RISK ASSESSMENT # : ROOF ACCESS: SIGNAGE: COMPLIANCE PLATES: SAFE

More information