Hyquest Solutions Pty Ltd
|
|
- Alice Hood
- 5 years ago
- Views:
Transcription
1 INSTRUCTION MANUAL BUBBLERS MODELS HS23SL / HS23DL / HS23DO QUALITY SYSTEM ISO: 9001 CERTIFIED HYQUEST SOLUTIONS PTY LTD PO BOX 332, LIVERPOOL B.C NSW 1871, AUSTRALIA Phone:(Int.) Fax: :(Int.) Phone:(Nat.) (02) Fax: :(Nat.) (02) sales@hyquestsolutions.com.au Web: HS23 Copyright Page 1 Issue 2: 24/11/15
2 Contents Contents... 2 I. GENERAL... 3 II. UNPACKING YOUR HS23 BUBBLE UNIT... 3 III. SPECIFICATION... 4 IV. INSTALLATION & OPERATION OF MODEL HS V. ADJUSTMENT OF BUBBLE RATE USING INSTRUMENT LINE... 7 VI ADJUSTMENT OF BUBBLE RATE USING RIVER LINE... 9 VII Part List Appendix IX INSTALLATION OF POLYTHENE TUBING AND ORIFICE FITTINGS X STANDARD ORIFICE XI GAS CHAMBER ORIFICE XII TYPICAL INSTALLATION HS23 Copyright Page 2 Issue 2: 24/11/15
3 I. GENERAL The HS23 bubble unit utilises the proven gas purge method to sense water level by bubbling gas through a small diameter tube and out from an open orifice end into the water body. Changes in water level in the water body result in a change in the pressure of gas inside the tube. A pressure transducer, connected to the HS23 then converts pressure changes in the tube to a reading of water level (in metres or feet). The HS23 provides a constant differential pressure (3 5 psi) above the pressure head at the end of the river line. The HS23 is a design which incorporates a regulator valve for setting the bubble rate. The unit is precalibrated at the factory (refer to section VII). This new design eliminates the need of a sight glass and oil reservoir for the setting of the bubble rate. It also eliminates costly and often ineffective maintenance of the bubble unit due to oil inadvertently getting into the system which is the most common cause of failure with sight glass devices. The HS23 is a low maintenance unit with minimum components ensuring increased reliability. The high quality of the construction materials ensures long life in the harshest of environments. II. UNPACKING YOUR HS23 BUBBLE UNIT This package should contain: Dry Bubble Unit Allen Key (1/32ʺ) Please verify you have received these items and that the type of dry bubble unit is as ordered. To prepare the dry bubble unit for installation: read manual carefully, it can be downloaded from our website lift the unit from the carton and place on secure surface remove polythene bag undo the two mounting bolts and remove from transport board Attach Dry Bubble unit to wall or edge of self using the two holes on the mounting plate. (It is preferable to set up the bubble unit in the vertical position) Your dry bubble unit is now ready for installation (refer to section V, page 7). HS23 Copyright Page 3 Issue 2: 24/11/15
4 III. SPECIFICATION Model Configurations: 1. Single Line Gas Purging System HS23SL: a. Inlet to suit tubing diameters 1/4" standard 3/16" alternative 3/8" alternative b. Outlet to suit tubing diameters 3/8" standard 3/16" alternative 1/4" alternative c. Gas supply dry nitrogen or dry air d. Packing details: Dimensions: Weight: 220mm x 220mm x 150mm 3.5 kg 2. Dual Orifice Gas Purging System HS23DO: a. Inlet to suit tubing diameters 1/4" standard 3/16" alternative 3/8" alternative b. Outlet to suit tubing diameters 3/8" standard 3/16" alternative 1/4" alternative c. Gas supply dry nitrogen or dry air d. Packing details: Dimensions: Weight: 220mm x 220mmx150mm 4.5 kg Compatible Pressure Transducers: Models WL3100, WL3100A and WL2100D HS23 Copyright Page 4 Issue 2: 24/11/15
5 IV. INSTALLATION & OPERATION OF MODEL HS23 Set gas bottle in a convenient position and fix to a wall or shelf with a bracket or chain to prevent bottle from falling over. Before fitting the gas regulator, turn on bottle to clear dust away from the outlet (also check that bottle contains gas). Fit regulator in accordance with manufacturer's instructions. Fix bubble unit in a secure vertical position to wall or edge of shelf. Install tubing as required by site conditions. Figure 1 and Figure 2 show recommended tubing arrangements for single, dual line and dual orifice systems respectively. The inlet and outlet ports are 1/4 NPT female threads and on standard units are fitted with compression fittings for use with 3/8" OD x 1/8" ID polythene tubing for outlets and 1/4" OD nylon tubing for gas inlet. An adaptor fitting can be provided to accommodate a variety of sensors and alternative tube fittings are also available on request. Refer to appendix for suggested site arrangements. Prior to opening the gas supply valve, ensure that black valve(a) to instrument and the red purge valve (C) is shut, and that black valve (B) or (E) to the river are open. In addition, ensure that the gas supply regulator is set at 500 KPa (72 psi). This supply pressure is adequate for a change of river height of 25 Metres (80 Feet). The supply pressure to the bubble unit regulator should not exceed 1,050 kpa (150 psi) under any circumstances. Open the gas supply pressure and then open the red purge valve (C) to purge the river line for approximately 10 minutes, check orifice and ensure that gas is bubbling from the orifice After purging the river line shut the red purge valve (C) and allows the bubble rate to settle for five minutes before proceeding. The HS23 is factory set to 100 ± 10% bubbles per minutes (this rate represents approximately 27 bubbles per minutes at the river line). (Refer to fig.4a) for bubble rate selection chart. For details of bubble rate adjustments (refer to section VII). Slowly open valve (A) to instrument instrument should now respond to pressure in system and soon record the true head over the orifice. Leak test all joints. Adjust the pressure sensing device to correspond to the head indicated by the reference gauge. HS23 Copyright Page 5 Issue 2: 24/11/15
6 HS23SL Single Line Figure 1 HS23DO Dual Orifice Figure 2 HS23 Copyright Page 6 Issue 2: 24/11/15
7 V. ADJUSTMENT OF BUBBLE RATE USING INSTRUMENT LINE Note: This option is only available if customer orders the optional kit for testing bubble rate using instrument line. 12 Minimum Bubble Rate as shown in table below Change in level Metres/Hr 8 4 HS23 with GCO1P/SS HS23 with BU07 HS22 with Glass Site Graph showing relationship between follow rate and bubble rate for a selected length of tube. Please note the bubble rate changes depending on the orifice that has been used. Figure 3 HS23 Copyright Page 7 Issue 2: 24/11/15
8 1. Shut river line valves (B) and (E) and ensure that the purge valve is closed. 2. Shut instrument line valves (A) 3. Place Bubble Test Orifice in a container of water 4. Connect Test Orifice Line 5. Slowly open Instrument Line 6. Note: Bubble rate may not appear immediately at test orifice. Allow sufficient time for differential regulator and HS23 to stabilise pressure in test line. This may take up to 10 minutes. Once bubble rate has stabilised check bubble and if adjustment is required, refer to the chart below. 7. After checking bubble rate turn of instrument line and disconnect test orifice line 8. Reopen instrument and river line The chart below has been prepared to show the relationship between the bubble rate at the test orifice and the equivalent rates that would be observed on a sight glass bubble unit. Once the desired bubble rate has been achieved tighten the grubscrew to lock the metering valve. Bubble rate when a Gas Chamber Orifice Model (GCO1 P) in use Bubble rate when a standard orifice model BU07 in use Bubble rate when a HS22 bubble unit with sight glass is in use Note: Bubble rates detailed above are only an approximate guide for the purpose of conserving gas and have no influence on the performance of the transducer. Example: To adjust the HS23 to the equivalent of 120 bubbles per minute, the metering valve should be rotated anticlockwise until 35 bubbles per minute are emerging from the test orifice of the bubble unit. HS23 Copyright Page 8 Issue 2: 24/11/15
9 VI ADJUSTMENT OF BUBBLE RATE USING RIVER LINE 12 Minimum Bubble Rate as shown in table below Change in level Metres/Hr 8 4 HS23 with GCO1P HS23 with BU07 HS22 with Glass Site Graph showing relationship between follow rate and bubble rate for selected length of tube. Please note the bubble rate changes depending on the orifice that has been used. Figure 4 HS23 Copyright Page 9 Issue 2: 24/11/15
10 The HS23 Bubble Unit has been factory set to the equivalent rate of 100 bubbles per minute. To check and adjust the bubble rate the following method should be employed: 1. Shut the instrument line valve (A), river line valves (B) and (E) and ensure that the purge valve is closed. 2. Disconnect the river line tubing from the bubble unit. 3. Connect a one metre length of tube to the river line fitting of the bubble unit. 4. Submerge the other end of the tube to a depth of 100mm in a container of clean water. (This end of the tube should be secured at this depth, preferably in a horizontal position). The end of the tube should not be in contact with the sides or bottom of the water container. 5. The water container should be placed on a steady surface to prevent movement of the water. Ensure that the level of the water is below the level of the HS23 bubble unit, to avoid the ingress of water. 6. Ensure that the gas supply valve is open and the gas supply regulator is set at 500KPa. 7. Open the river line valve (B) or (E). (Gas should be bubbling from the orifice) 8. Allow the rate to settle for five minutes before timing the bubble rate. 9. With the aid of a stop watch, count the number of bubbles emerging from the orifice in a one minute period. The factory set rate is 27 +/ 10% bubbles per minute. 10. For recommended bubble rates (refer to figure 4). 11. To adjust the rate, release the grubscrew in the metering valve knob. (a 1/32" Allen key will be required.) The valve is now free to rotate. 12. Rotate the valve knob to adjust the rate of bubbles emerging from the tube orifice. Clockwise to reduce and anticlockwise to increase to the desired rate. Repeat step 8 and 9 until desired bubble rate is obtained. 13. Tighten the grubscrew in the metering valve knob. (a 1/32" Allen key will be required.) The valve is now shut. 14. Shut the instrument line valve (A), river line valves (B) and (E) and ensure that the purge valve is closed. 15. Disconnect the one metre length tube from the river line fitting of the bubble unit. 16. Reconnect the river line tubing to the bubble unit 17. To continue installation (refer to section V) HS23 Copyright Page 10 Issue 2: 24/11/15
11 The chart below has been prepared to show the relationship between the bubble rate at the test orifice and the equivalent rates that would be observed on a sight glass bubble unit. Bubble rate when a Gas Chamber Orfice Model (GCO1 P) in use Bubble rate when a standard orifice model BU07 or test orifice in use Bubble rate when a HS22 bubble unit with sight glass is in use Once the desired bubble rate has been achieved tighten the grubscrew to lock the metering valve. Note: Bubble rates detailed above are only an approximate guide for the purpose of conserving gas and have no influence on the performance of the transducer. Example: To adjust the HS23 to the equivalent of 120 bubbles per minute, the metering valve should be rotated anticlockwise until 35 bubbles per minute are emerging from the test orifice of the bubble unit. HS23 Copyright Page 11 Issue 2: 24/11/15
12 VII Part List Part No. BU02-04 Diaphragm Spring Part No. BU02-02 Bonnet Part No. SC Nut Aluminium-1/4 Part No. SC Nylon Ferrule-1/4 Part No. SC Metering Valve Part No. SC Screw Part No. BU04 Assembly Diaphragm Part No. HS Valve Stem Part No. SC O ring Part No. HS Retainer Nut Part No. SC Nut Brass ¼ Part No. SC Nylon Ferrule Set ¼ Part No. SC O ring Part No. SC Adaptor Tube Part No. HS Locking Screw Part No. HS Unit Body Part No. SC ¼ Tube Part No. HS ¼ Tube insert C Part No. SC Stop Valve Part No. SC ¼ Tube Part No. HS ¼ Tube insert Part No. SC Red Knob Part No. HS Manifold Part No. SC Nut Brass ¼ Part No. HSF02-01 Connector M x¼ Tube A B Part No. HSF02-01 Connector M x¼ Tube Part No. SC Nylon Ferrule Set ¼ Part No. HSF02-04 Connector F x 1/4 Tube Part No. HSF02-02 Connector F x 3/8 Tube Part No. SC Stop Valve Part No. SC Black Knob Part No. SC Nut Brass 3/8 Part No. SC Nylon Ferrule Set 3/8 Single Line Bubble Unit Model HS23SL HS23 Copyright Page 12 Issue 2: 24/11/15
13 Please Note: for the rest of the parts. Please refer to HS23-SL Part No. HSF02-01 Connector M x¼ Tube Part No. BU01-08 Cross Piece F x F x F x F C B Part No. HSF02-02 Connector F x 3/8 Tube E A Part No. HSF02-04 Connector F x 1/4 Tube Part No. SC Nut Brass 3/8 Part No. SC Nylon Ferrule Set 3/8 Part No. SC Brass Plug Part No. SC Nut Brass ¼ Part No. SC Nylon Ferrule Set ¼ Dual Orifice Bubble Unit Model HS23DO HS23 Copyright Page 13 Issue 2: 24/11/15
14 Please Note: for the rest of the parts. Please refer to HS23-SL Please Note: This product is no longer available; it has been superseded by the GCO1 P Part No. HSF02-01 Connector M x¼ Tube Part No. BU01-08 Cross Piece F x F x F x F C A D Part No. SC Nut Brass ¼ Part No. SC Nylon Ferrule Set ¼ Part No. HSF02-04 Connector F x 1/4 Tube Part No. SC Connector M x3/8 Tube Part No. SC Brass Plug Part No. SC Nut Brass 3/8 Part No. SC Nylon Ferrule Set 3/8 Dual Line Bubble Unit Model HS23DL HS23 Copyright Page 14 Issue 2: 24/11/15 B Part No. HSF02-02 Connector F x 3/8 Tube Part No. SC Nut Brass 3/8 Part No. SC Nylon Ferrule Set 3/8
15 Appendix HS23 Copyright Page 15 Issue 2: 24/11/15
16 VIII INSTALLATION OF POLYTHENE TUBING AND ORIFICE FITTINGS A. General The polythene tubing is provided in either ¼ (6mm) or 3/8 (10mm) OD sizes. It is an extremely durable material that has been used successfully in this application world wide for many years. The tubing is flexible, easy to handle and can be cut with a knife. The orifice fitting is comprised of a moulded polythene threaded cap, an orifice outlet and a tube fitting. The moulded cap will screw onto a standard 50 nominal bore galvanised pipe. B. Orifice Fittings The site and reference level for the orifice fittings should be resolved before installation proceeds. The length of tubing from the HS23 to the orifice should not exceed 150 metres. A suggested method for installation of the orifice fitting is shown below. The site of the orifice should be positioned in quiet water out of the mainstream to provide protection. The area should be free of silting and aquatic growth. The mounting for the orifice fitting should consist of a section of 50 nominal bore galvanised pipe threaded at one end and secured at the appropriate reference level. The securing of the orifice mounting should be such that it can withstand the forces applied by the flowing stream and associated floating debris. C. Preparation of Orifice Tubing Do not open the carton or remove the strapping. To prepare the roll of tubing for use, cut a 300 mm diameter hole in the centre of the cardboard carton, retrieve the end of the tubing from the middle of the coil, then cut the strapping retaining the coil. This method will reduce the possibility of tangling the tubing. Prevent the ingress of dirt etc. from entering the tubing, by taping up the ends. At no time should the open end of the tubing be permitted to contact the soil. D. Orifice Tubing It is recommended that a trench be dug (minimum 600 deep) between the equipment shelter and the proposed positions of the orifice The trenches should not have any low points in their length; they should have a continuous fall to the river. HS23 Copyright Page 16 Issue 2: 24/11/15
17 Pull the free end of the coiled tubing to the orifice position laying the tubing in the trench as you go. Refer to diagrams below Remove the protective tape from the end of the tubing, and push the tubing through the 50 nominal bore pipe mounting. Insert the tubing into the tube fitting on the rear of the orifice fitting, ensuring that both ferrules are in place. Tighten the fitting nut. (Refer to the following diagram for tightening procedure). Place the orifice fitting onto the mounting pipe and tighten. Cut the tube at the coil end (tape both ends), ensuring that there is sufficient length to make the joint at the HS23 within the shelter. Check the lay of the tubing in the trench to ensure that it is free of coils and kinks. Under no circumstances should the tube form hollows where moisture can be trapped within the tube. Lay the tubing into position in the equipment shelter as required. Remove the protective tape from the end of river line tube. Insert the end of the tube into the appropriate river line fitting on the HS23 and tighten both fittings. (Refer to diagram for tightening procedure). Open the valve to the orifice. HS23 Copyright Page 17 Issue 2: 24/11/15
18 IX STANDARD ORIFICE HS23 Copyright Page 18 Issue 2: 24/11/15
19 X GAS CHAMBER ORIFICE The HyQuest Solutions Gas Chamber Orifice (GCO1P/SS) is designed to replace the standard orifice in a gas purge water level measurement system The GCO1P/SS permits the use of extremely low bubble rates with increased sensitivity and near total reduction of lag between actual level rise and orifice pressure. It can also operate satisfactorily when buried under up to 1m of silt. Bubble rates as low as 10 bubbles per minute can be used, thereby reducing gas consumption and prolonging the life of the gas bottle, or reducing the duty cycle operation of the compressor pump on our HS 55/45/40 bubbler water level measurement systems. The main GC01P/SS chamber is constructed entirely of polyethylene with a copper coated brass screen to deter aquatic growth, and is supplied fitted with a 2" flexible coupling to suit a standard 2 threaded pipe and to allow easy installation as the coupling allows up to 30 degrees of adjustment from horizontal. The GCO1P/SS has an in built 1/4 inch NPT hex brass coupling and is supplied with 1/4 inch NPT male to 3/8. The bottom of the chamber includes a revolving copper coated brass screen for cleaning purposes The unit is designed to be fitted to existing installations preferably during low water condition. Refer reverse side for results of comparative tests and installation details. Float Operated Encoder (Level in mm) Standard Orifice 100 Bubbles/Min Gas Chamber Orifice 10 Bubbles/Min Reading Lag Reading Lag HS23 Copyright Page 19 Issue 2: 24/11/15
20 Step 1: Secure Socket/Locknut to the 2 BSP pipe 2 BSP THREADED PIPE Step 2: Undo the nut and ferrules; feed the tube nut and the two ferrules onto the river line as shown in figure below Step 3: Tighten the tube nut to the GCO1P/SS fitting as shown in figure below HS23 Copyright Page 20 Issue 2: 24/11/15
21 Step 4: Place the GCO1P/SS assembly onto the mounting pipe, adjust coupling so the GCO1P/SS is horizontal to the water, and tighten the flexible coupling with GCO1 in position. 30 O Note: Ensure that the GCO1P/SS is horizontally level as shown. Flexible coupling allows adjustment up to 30 Parts & Dimensions HS23 Copyright Page 21 Issue 2: 24/11/15
22 XI TYPICAL INSTALLATION HS23 Copyright Page 22 Issue 2: 24/11/15
Hydrological Services Pty Ltd 2012
INSTRUCTION MANUAL DRY BUBBLE UNIT MODEL HS23SL/HS23DO HYDROLOGICAL SERVICES PTY LTD PO BOX 332, LIVERPOOL B.C NSW 1871, AUSTRALIA Phone: (Int.) 612 9601 2022 Fax:(Int.) 612 9602 6971 Phone: (Nat.) (02)
More informationHyQuest Solutions Pty. Ltd.
INSTRUCTION MANUAL L GAS PURGE COMPRESSOR MODEL HS55V / HS55VDO/HS55VB Gas Purge Compressor- Model HS-55/DO/D DB HS-55 100-1 Issue 2: 30/5/2014 CONTENTS Contents HS 55 & HS 55DO & HS 55DB GAS PURGE COMPRESSOR...
More informationHYQUEST SOLUTIONS PTY LTD INSTRUCTION MANUAL TIPPING BUCKET RAIN GAUGE MODEL TB6
INSTRUCTION MANUAL TIPPING BUCKET RAIN GAUGE MODEL TB6 QUALITY SYSTEM ISO:9001 CERTIFIED HYQUEST SOLUTIONS PTY LTD PO BOX 332, LIVERPOOL B.C NSW 1871, AUSTRALIA Phone:(Int.) 612 9601 2022 Fax: :(Int.)
More informationInstallation and Operation Manual. Advanced Bubbler System
Installation and Operation Manual Advanced Bubbler System Models: HS40 Compact (HS40AFC) HS40/2100 Compact (HS40AFC/2100) HS40/3100 Compact (HS40AFC/3100) HS40/3100A Compact (HS40AFC/3100A) plus /DO and
More informationINSTRUCTION MANUAL TIPPING BUCKET RAIN GAUGE. MODEL TB3/0.1mm
INSTRUCTION MANUAL TIPPING BUCKET RAIN GAUGE MODEL TB3/0.1mm QUALITY SYSTEM ISO 9001 2008 CERTIFIED HYQUEST SOLUTIONS PTY LTD PO BOX 332, LIVERPOOL B.C NSW 1871, AUSTRALIA Phone:(Int.) 612 9601 2022 Fax:
More informationHS Bubbler Technology. HyQuest Solutions New Zealand User Group August 2017
HS Bubbler Technology HyQuest Solutions New Zealand User Group August 2017 Origins of Gas Purge Technology 1940 s - Developed By Dutch Engineer Late 1940 s 1954 - Adopted by State of Illinois Water Group
More informationINSTRUCTION MANUAL TIPPING BUCKET RAINGAUGE MODEL TB3
INSTRUCTION MANUAL TIPPING BUCKET RAINGAUGE MODEL TB3 QUALITY SYSTEM ISO:9001 CERTIFIED HYQUEST SOLUTIONS PTY LTD PO BOX 332, LIVERPOOL B.C NSW 1871, AUSTRALIA Phone:(Int.) 612 9601 2022 Fax: :(Int.) 612
More informationINSTRUCTION MANUAL TIPPING BUCKET RAINGAUGE MODEL TB305-1MM
HYDROLOGICAL SEVICES PTY LTD INSTRUCTION MANUAL TIPPING BUCKET RAINGAUGE MODEL TB305-1MM QUALITY SYSTEM ISO 9001 2008 CERTIFIED HYDROLOGICAL SERVICES PTY LTD PO BOX 332, LIVERPOOL B.C NSW 1871, AUSTRALIA
More informationHalsey Taylor Owners Manual STOP!
Halsey Taylor Owners Manual 4710 Freeze Resistant Floor Mounted Steel Fountain STOP! PLEASE READ THE FOLLOWING INFORMATION. ITALLATION ITRUCTIO FOR THE 4710FR FTN. WITH 97243C SINGLE VALVE CONTROL ASSEMBLY
More informationHalsey Taylor Owners Manual 4410 Freeze Resistant Tubular Fountain STOP!
Halsey Taylor Owners Manual 4410 Freeze Resistant Tubular Fountain STOP! PLEASE READ THE FOLLOWING INFORMATION. ITALLATION ITRUCTIO FOR THE 4410FR FTN. WITH 97243C SINGLE VALVE CONTROL ASSEMBLY ARE LOCATED
More informationTHE MF-400 SERIES. Operating and Service Manual. Series includes all variants of MF-400/401
THE MF-400 SERIES Operating and Service Manual Series includes all variants of MF-400/401 Issue A October 2013 1 TABLE OF CONTENTS 1. Description... 3 2. Installation... 3 3. Operation... 4 4. Special
More informationTHE HF-300 SERIES. Operating and Service Manual. Series includes all variants of HF-300/301
THE HF-300 SERIES Operating and Service Manual Series includes all variants of HF-300/301 Issue A July 2015 1 TABLE OF CONTENTS 1. Description... 3 2. Installation... 3 3. Operation... 4 3.1. Spring Loaded...
More informationWelker Sampler. Model GSS-1. Installation, Operation, and Maintenance Manual
Installation, Operation, and Maintenance Manual Welker Sampler Model GSS-1 The information in this manual has been carefully checked for accuracy and is intended to be used as a guide to operations. Correct
More informationWater Weir Flow Controller. Introduction. Safety Precautions. Mounting the Hardware
57007-88 Introduction Safety Precautions This instruction sheet describes how to set up and use the Hach (Figure 1). A water weir is a device that raises or diverts water to regulate the flow. Hach s water
More informationFOR INSTALLING CO 2 BLENDER KIT (P/N IN BEER SYSTEM
IMI CORNELIUS INC One Cornelius Place Anoka, MN 55303-623 Telephone (800) 238-3600 Facsimile (612) 22-326 INSTALLATION INSTRUCTIONS FOR INSTALLING CO 2 BLENDER KIT (P/N 111612000 IN BEER SYSTEM SECONDARY
More informationHYQUEST SOLUTIONS PTY LTD INSTRUCTION MANUAL TIPPING BUCKET RAINGAUGE MODEL TB6
INSTRUTION MANUAL TIPPING BUKET RAINGAUGE MODEL TB6 QUALITY SYSTEM ISO:9001 ERTIFIED HYQUEST SOLUTIONS PTY LTD PO BOX 332, LIVERPOOL B. NSW 1871, AUSTRALIA Phone:(Int.) 612 9601 2022 Fax: :(Int.) 612 9602
More informationInstruction Manual Updated 7/26/2011 Ver. 2.2
4-Unit Model MB HTHP Filter Press #171-50-4: 115-Volt #171-51-4: 230-Volt Instruction Manual Updated 7/26/2011 Ver. 2.2 OFI Testing Equipment, Inc. 11302 Steeplecrest Dr. Houston, Texas 77065 U.S.A. Tele:
More informationV48 Series 3-Way Pressure-Actuated Water-Regulating Valves With Union Fittings
Installation Instructions V48 Issue Date 08/30/01 V48 Series 3-Way Pressure-Actuated Water-Regulating Valves With Union Fittings Application IMPORTANT: The V48 Series 3-Way Pressure-Actuated Water-Regulating
More informationV46 Series 2-Way Pressure-Actuated Water-Regulating Valves With Union Fittings
Installation Instructions V46 Issue Date 11//1 V46 Series -Way Pressure-Actuated Water-Regulating Valves With Union Fittings Application IMPORTANT: The V46 Series -Way Pressure-Actuated Water-Regulating
More informationVERTICAL BLADDER TANK
Balanced Pressure Proportioning System Reliable Foam System Requiring Only Water Power Perfect For Tight Spaces UL Listed, ASME, National Board Registered Bladder-UL162 Approved, High Tensile Pressure
More informationTHE BP-690 SERIES. Operating and Service Manual. Series includes all variants of BP-LF/MF-690/691
THE BP-690 SERIES Operating and Service Manual Series includes all variants of BP-LF/MF-690/691 Issue B April 2015 1 TABLE OF CONTENTS 1. Description... 3 2. Installation... 3 3. Operation... 4 4. Special
More informationAssembly Drawing: W-311B-A01, or as applicable Parts List: W-311B-A01-1, or as applicable Special Tools: , , &
REDQ Regulators Model 411B Barstock Design Powreactor Dome Regulator OPERATION AND MAINTENANCE Contents Scope..............................1 Installation..........................1 General Description....................1
More informationHORIZONTAL BLADDER TANK
Balanced Pressure Proportioning System Reliable Foam System Requiring Only Water Power Perfect For Low Ceilings UL Listed, ASME, National Board Registered Bladder-UL162 Approved, High Tensile Pressure
More informationHYQUEST SOLUTIONS PTY LTD INSTRUCTION MANUAL TIPPING BUCKET RAIN GAUGE MODEL TB4
INSTRUTION MANUAL TIPPING BUKET RAIN GAUGE MODEL TB4 QUALITY SYSTEM ISO:9001 ERTIFIED HYQUEST SOLUTIONS PTY LTD PO BOX 332, LIVERPOOL B. NSW 1871, AUSTRALIA Phone:(Int.) 612 9601 2022 Fax: :(Int.) 612
More informationV43 Pressure Actuated Water Regulating Valve
FANs 125, 121 Product/Technical Bulletin V43 Issue Date 0996 V43 Pressure Actuated Water Regulating Valve The V43 Pressure Actuated Water Regulating Valves are designed to regulate water flow for water-cooled
More informationRD(H)20/25 Pressure-Reducing Regulator User Manual
RD(H)20/25 Pressure-Reducing Regulator User Manual Read the complete manual before installing and using the regulator. 2 Safe Product Selection When selecting a product, the total system design must be
More information1200B2 Series Service Regulators. Instruction Manual
00B Series Service Regulators Instruction Manual 00B Series Service Regulators 0 Elster American Meter 00B Series Service Regulators General Information The 00B Series Service Regulators are available
More information1800C and 1800C-HC Series Service Regulators
1800C and 1800C-HC Series Service Regulators Installation Instructions www.elster-americanmeter.com General Information: The 1800C and 1800C-HC Regulators are available as Full Capacity Internal Relief
More informationDual Solenoid Gas Valve Installation
Installation IMPORTANT: These instructions are intended as a guide for qualified personnel installing or servicing FLYNN Gas Products. Carefully follow all instructions in this bulletin and all instructions
More informationSystem Pressure Manager Standard & System Pressure Manager Plus
System Pressure Manager Standard & System Pressure Manager Plus Installation, Commissioning & Servicing Instructions Note: THESE INSTRUCTIONS MUST BE READ AND UNDERSTOOD BEFORE INSTALLING, COMMISSIONING,
More informationTECHNICAL DATA. Trimpac 251a. Spetember 16, 2013
Spetember 16, 2013 Trimpac 251a 1. DEsCrIpTION DESCRIPTION TRIMPAC Model B-6 and B-6B is a factory assembled trim package for a double interlocked preaction system with an electric/pneu-lectric release
More informationINSTALLATION INSTRUCTIONS MANUAL ON/OFF SAFETY VALVE/PILOT KIT MODEL GA9050A-1 (F0235)
P/N 126905-01 Rev. B 11/2016 INSTALLATION INSTRUCTIONS MANUAL ON/OFF SAFETY VALVE/PILOT KIT MODEL GA9050A-1 (F0235) For All Single, Dual and Triple Burner Natural and Propane/LP Gas Logs P126905-01 For
More informationInstallation, Operation and Maintenance Manual for Back Pressure Regulator
Installation, Operation and Maintenance Manual for Back Pressure Regulator Model 8860 2009 Groth Corporation IOM-8860 Rev. B 12541 Ref. ID: 95565 Page 2 of 13 Table of Contents I. INTRODUCTION 3 II. DESIGN
More informationPipe threads for tubes and fittings where pressure-tight joints are not made on the threads. (requires PTFE sealing tape or liquid sealant).
Fittings for CO 2 Pipe Threads Pipe thread references quoted in this catalogue conform with the requirements specified in the latest issue and amendments of the following ISO Standards: ISO 7-1 (BS21)
More informationTECHNICAL DATA. Trimpac 244a. September 16, 2013
September 16, 2013 Trimpac 244a 1. DEsCrIpTION DESCRIPTION TRIMPAC Model B-1 and B-1B is a factory-assembled trim package with an electric release module in a metal enclosure. The standard trim normally
More informationComponents for air preparation and pressure adjustment. OUT port position ( ) connected Rear side. of IN port. Air tank. directly.
Components preparation and pressure adjustment ABP Overview ABP is a component that enables boosting by s only up to twice primary pressure (.0MPa max.) in combination with using air tank but not using
More informationInstallation, Operation, and Maintenance Manual
Installation, Operation, and Maintenance Manual Welker The information in this manual has been carefully checked for accuracy and is intended to be used as a guide for the installation, operation, and
More informationINSTALLATION INSTRUCTIONS. CVS 67CFR Pressure Reducing Instrument Supply Regulator INTRODUCTION
INSTALLATION INSTRUCTIONS CVS 67CFR Pressure Reducing Instrument Supply Regulator INTRODUCTION The CVS Controls 67CFR Filter regulator is a pressure reducing supply regulator typically used for pneumatic
More informationSIMPLAIR PIPING TOOL. JXT Company
SIMPLAIR PIPING INGERSOLL-RAND SIMPLAIR PIPING With push-in fittings and lightweight anodized aluminum pipe, a SimplAir system provides ideal connection throughout your entire air distribution system.
More informationRegulator from 1800 B series
Regulator from 1800 B series Regulator from 1800 B series Measuring of industrial gases frequently requests a precise pressure regulation for the purpose of dosage and proccesing. UNIS FAGAS has two kinds
More informationACCESSORY KIT INSTALLATION INSTRUCTIONS
ACCESSORY KIT INSTALLATION INSTRUCTIONS 1NP0680 - PROPANE CONVERSION FOR USE WITH MODELS: PM8, PC8, PM9, PC9, FL9M, FL9C, FC9M, FC9C This conversion kit is to be installed by a qualified service agency
More informationRHPS Series RD(H)F40 User Manual. Read the complete manual before installing and using the regulator.
RHPS Series RD(H)F40 User Manual Read the complete manual before installing and using the regulator. 2 WARNING Before removing a regulator from the system for service, you must depressurize system purge
More informationDiscontinued. Powers Controls. Technical Instructions Document No P25 RV Rev. 1, May, RV 201 Pressure Reducing Valves.
Powers Controls RV 201 Pressure Reducing Valves Description Features Product Numbers Dual Pressure PRV Technical Instructions Document No. 155-049P25 RV 201-1 Single Pressure PRV The RV 201 Pressure Reducing
More informationOPERATION MANUAL NTF-15
OPERATION MANUAL NTF-15 Nitrogen Tire Filling Valve Stem Caps (Qty=200) Order P/N 436075 RTI Technologies, Inc 10 Innovation Drive York, PA 17402 800-468-2321 www.rtitech.com 035-81235-00 (Rev B) TABLE
More informationPRO-50 Instrument Supply Regulator
Features CRN Approved The PRO-50 Regulator has been granted a Canadian Registration Number. Sour Service Capability Available in NACE configurations that comply with NACE MR0175/MR0103. Environmental limits
More informationPressure Dump Valve Service Kit for Series 2300 Units
Instruction Sheet Pressure Dump Valve Service Kit for Series 00 Units. Overview The Nordson pressure dump valve is used to relieve hydraulic pressure instantly in Series 00 applicator tanks when the unit
More informationTECHNICAL DATA. TRIMPAC Model B-5 & B-5B
September 16, 2013 Trimpac 250a 1. DESCRIPTION DEsCRIPTIoN is a factory assembled trim package for a ed an electric/pneumatic release module in a metal enclosure. The standard trim normally required on
More informationMUELLER A A Non-Adjustable. Vertical Indicator Posts. Reliable Connections. General Information 2. Technical Data 3.
Installation Instructions manual MUELLER table of contents PAGE A-20808 General Information 2 Technical Data 3 Dimensions 4 A-20809 Non-Adjustable Installation 5-6 Parts 7 Maintenance 8 Vertical Indicator
More informationOperating Procedure TITON SUBSEA BOLT TENSIONER
Operating Procedure TITON SUBSEA BOLT TENSIONER B & A Hydraulics Ltd Block 1, Units 1 & 2 Souter Head Industrial Centre Souter Head Road Altens Aberdeen Phone: 01224 898955 Fax: 01224 898787 E-Mail: TITON@bahyd.co.uk
More informationPremium Series. Economical Price & Reliable Performance. High Quality. Rust-Resistant. Long Life. Tamper-Resistant locking Screw.
Premium Series High Quality Forged Brass Body Rust-Resistant Nickel Plated Finish Long Life Corrosion Resistant Valve Seat Economical Price & Reliable Performance Tamper-Resistant locking Screw Reduces
More informationYour safety and the safety of others are very important.
NATURAL GAS TO PROPANE CONVERSION KIT ALPKT57- INSTALLATION INSTRUCTIONS PROPANE CONVERSION KIT SAFETY... INSTALLATION REQUIREMENTS... Tools and Parts... LP Gas Requirements... Table of Contents INSTALLATION
More informationTechcon Systems TS1254 Pressure Pot
Techcon Systems TS1254 Pressure Pot User Guide Copyright OK International, Inc. TABLE OF CONTENT 1. SAFETY. 3 1.1 Intended Use 3 1.2 Safety Precaution 3 2. FEATURES. 5 3. SPECIFICATIONS 4 4. INSTALLATION
More information36C/36D HSI, DSI Proven Pilot Gas Valves INSTALLATION INSTRUCTIONS
36C/36D HSI, DSI Proven Pilot Gas Valves INSTALLATION INSTRUCTIONS Operator: Save these instructions for future use! FAILURE TO READ AND FOLLOW ALL INSTRUCTIONS CAREFULLY BEFORE INSTALLING OR OPERATING
More informationCombination Air Valve
Combination Air Valve For Sewage and Wastewater Model C50 Installation, Operation and Maintenance Manual (IOM) Table of Contents General... Page 2 Safety... Page 2 Operational Data... Page 3 Materials
More informationInstallation, Operation, and Maintenance Manual
Installation, Operation, and Maintenance Manual Welker Instrument Supply Pressure System Model WIC The information in this manual has been carefully checked for accuracy and is intended to be used as a
More informationSUMMITTM 400 & 600. Natural Gas Barbecues. Step-By-Step Guide
SUMMITTM 400 & 600 Natural Gas Barbecues Step-By-Step Guide W E B E R W E B E R W E B E R W E B E R Summit 400 NG Summit 600 NG CANADIAN GAS ASSOCIATION R A P P R O V E D WARNING: Follow all leak check
More informationInstallation of Your SprayMaster System
Installation of Your SprayMaster System 1. At the installation site, remove all equipment from the corrugated box and the polyethylene drum and replace the drum lid. Check the picture to identify each
More informationTechcon Systems TS1258 Pressure Pot
Techcon Systems TS1258 Pressure Pot User Guide TABLE OF CONTENT 1. SAFETY. 3 1.1 Intended Use 3 1.2 Safety Precaution 3 2. CERTIFICATE OF COMFORMANCE 4 3. FEATURES. 5 4. SPECIFICATIONS 5 5. INSTALLATION
More informationINSTRUCTION MANUAL TIPPING BUCKET RAINGUAGE MODEL TB3
HYDROLOGICAL SEVICES INSTRUCTION MANUAL TIPPING BUCKET RAINGUAGE MODEL TB3 QUALITY SYSTEM ISO 9001 2000 CERTIFIED HYDROLOGICAL SERVICES PTY LTD PO BOX 332, LIVERPOOL B.C NSW 1871, AUSTRALIA Phone:(Int.)
More informationMUELLER. A A Adjustable. Vertical Indicator Posts. Reliable Connections. General Information 2. Technical Data 3.
Installation Instructions manual MUELLER table of contents PAGE A-20806 A-20807 Adjustable General Information 2 Technical Data 3 Dimensions 4 Installation 5-6 Parts 7 Maintenance 8 Vertical Indicator
More informationTHE BP-301 SERIES. Operating and Service Manual. Series includes all variants of BP-301 (LF 0.1Cv / MF 0.5Cv)
THE BP-301 SERIES Operating and Service Manual Series includes all variants of BP-301 (LF 0.1Cv / MF 0.5Cv) Issue B October 2015 1 TABLE OF CONTENTS 1. Description... 3 2. Installation... 3 3. Operation...
More informationTECHNICAL DATA MAINTENANCE AIR COMPRESSOR MODEL G-1
Dry 131h 1. DESCRIPTION The Viking Model G-1 Maintenance Air Compressor is an electric motor-driven, aircooled, single-stage, oil-less compressor. The unit is equipped with a check valve and provides a
More informationTHE HF-210 SERIES. Operating and Service Manual. Series includes all variants of HF-210/211. Issue A October 2014 *Section 6.
THE HF-210 SERIES Operating and Service Manual Series includes all variants of HF-210/211 Issue A October 2014 *Section 6.1 in development 1 TABLE OF CONTENTS 1. Description... 3 2. Installation... 3 3.
More informationATD LB PRESSURE BLASTER INSTRUCTION MANUAL
ATD-8402 90LB PRESSURE BLASTER INSTRUCTION MANUAL SAVE THESE INSTRUCTIONS SAFETY INSTRUCTIONS FOR SANDBLASTER 1. Before opening the tank release the air pressure on the sand tank. To do this, turn off
More informationRS(H)10,15 USER MANUAL. Read the complete manual before installing and using the regulator.
RS(H)10,15 USER MANUAL Read the complete manual before installing and using the regulator. WARNING INCORRECT OR IMPROPER USE OF THIS PRODUCT CAN CAUSE SERIOUS PERSONAL INJURY AND PROPERTY DAMAGE. Due to
More informationInstallation Operating Instructions for Simple Duplex Manual Manifolds PX-TSD Series
Introduction Powerex manifolds are cleaned, tested and prepared for the indicated gas service and are built in accordance with the Compressed Gas Association guidelines. The manifold consists of a regulator
More informationMUELLER. A Wall Type. Indicator Post. Reliable Connections. General Information 2. Technical Data/ Dimensions 3. Installation 4-5.
Installation Instructions manual MUELLER table of contents PAGE A-20814 Wall Type General Information 2 Technical Data/ Dimensions Installation 4-5 Maintenance 6 Parts 7 Indicator Post! WARNING: 1. Read
More informationIP2, IP2A and IP2D. Spirax-Monnier International Compressed Air Filter/ Regulators
Page 1 of 6 TI-P510-01 H Issue 5 IP2, IP2 and IP2D ISO 9001 Spirax-Monnier International ompressed ir Filter/ Regulators ert. No. LRQ 0963008 Description The IP range of Spirax-Monnier international compressed
More informationPAGE (Rev. A - 06/17)
Owners Manual Models 4420BF1UDBFR* and 4420BF1LDBFR* Bi-Level Tubular Bottle Filler Fountain with Pet Fountain and Sanitary Freeze Resistant Triple Valve Control Assembly MODEL (LK)4420BF1UDBFR MODEL (LK)4420BF1LDBFR
More informationGILMONT ACCUCAL FLOWMETERS
OPERATING MANUAL GILMONT ACCUCAL FLOWMETERS 28W092 Commercial Ave. Barrington, IL U.S.A. 60010-2392 (847) 381-4888 (847) 381-7053 (Fax) 800-962-7142 www.barnant.com e-mail: barnant@barnant.com A-1299-0766
More informationINSTALLATION INSTRUCTIONS FOR GRT75-PF-RFS PET FOUNTAIN
INSTALLATION INSTRUCTIONS FOR GRT75-PF-RFS PET FOUNTAIN Important: Read all instructions and refer to local codes prior to installation. l Local soil conditions may require more gravel for drainage. l
More informationVACUUM REGULATORS CONTENTS
CAD drawing data catalog is available. ACCESSORIES GENERAL CATALOG AIR TREATMENT, AUXILIARY, VACUUM, AND FLUORORESIN PRODUCTS CONTENTS Small Regulators Features 759 Specifications, Order Codes, Flow Rate
More informationFRAGMENTATION INSTRUCTION & OPERATION HANDBOOK
FRAGMENTATION INSTRUCTION & OPERATION HANDBOOK Doc. Jordair FRAGMENTATION-MANUAL WARNING! HIGH PRESSURE UNITS Under no circumstances should the fill stations be operated with the safety relief valves removed
More informationPrecision and Instrument Regulators 1/4" port size
Section 8 Precision and Instrument Regulators /" port size Contents -8 Precision Air Pressure Regulator /" ports............ale-8-2 R38 Instrument Regulator Aluminum Model /" ports.........ale-8- -8 R38
More informationInstallation Instructions
LP and High Altitude LP Gas Conversion Kit For United States Installations Installation Instructions For Model Series *G6/PGF1 Furnaces, *L1/PGC1 Furnaces, and *R4/PPG1 Gas/Electric Appliances using Honeywell
More informationSERVICE MANUAL SALAMANDER BROILERS RADIANT AND INFRARED 36RB 36IRB VULCAN C36RB C36IRB WOLF
SERVICE MANUAL SALAMANDER BROILERS RADIANT AND INFRARED VULCAN 36RB 36IRB WOLF C36RB C36IRB This Manual is prepared for the use of trained Vulcan Service Technicians and should not be used by those not
More informationO P E R ATING INSTRUCTIONS FOR MODEL SPR-45 Automatic Screen and Stencil Printer
O P E R ATING INSTRUCTIONS FOR MODEL SPR-45 Automatic Screen and Stencil Printer TABLE OF CONTENTS I. SPECIFICATIONS...3. II. SAFETY INSTRUCTIONS...4. III. INSTALLATION...5. IV. SET-UP...6. V. SYSTEM OPERATION...9.
More informationInflatable Packer Single & Double. Single & Double Packer Dimension. Wireline Packer. Water Testing Packer (WTP) Packer
Inflatable Packer Single & Double Single & Double Packer Dimension Wireline Packer Water Testing Packer (WTP) Packer Packer Working Pressure & Depth Chart Packer Water Hand Pump Packer Air Driven Pump
More informationACCESSORY KIT INSTALLATION MANUAL
ACCESSORY KIT INSTALLATION MANUAL LP (PROPANE) CONVERSION KIT 1NP0366 FOR USE WITH MODELS: G8C & GF8 This conversion kit shall be installed by a qualified service agency in accordance with these instructions
More informationChemical Injection Technologies Installation/Service Bulletin
Bulletin 4002 Chemical Injection Technologies Installation/Service Bulletin SUPERIOR Series CL-16/26/56 Automatic Switchover Gas Chlorinator - Installation & Operation IMPORTANT!! READ THESE PRECAUTIONS
More informationP5513. Users Manual. Pneumatic Comparison Test Pump. Test Equipment Depot Washington Street Melrose, MA TestEquipmentDepot.
Test Equipment Depot - 800.517.8431-99 Washington Street Melrose, MA 02176 TestEquipmentDepot.com P5513 Pneumatic Comparison Test Pump Users Manual PN 3963372 November 2010 2010 Fluke Corporation. All
More informationMounting and Operating Instructions EB EN. Type Supply Pressure Regulator. with increased air capacity
Type 4708-45 Supply Pressure Regulator with increased air capacity Translation of original instructions Mounting and Operating Instructions EB 8546-1 EN Edition March 2016 Note on these mounting and operating
More informationOperation Manual. Diaphragm Sensed Gas Pressure Regulators
687 Technology Way Napa, CA 94558 Phone: (707) 259-0102 FAX: (707) 259-0117 www.aptech-online.com Diaphragm Sensed Gas (AP/AZ/AK Models: 20, 100, 500, 1000, 1000T 10PA, 1100, 1200, 12PA, 1300, 1400T, 14PA,
More informationAIR/OVER HYDRAULIC JACK 20 TON
AIR/OVER HYDRAULIC JACK 0 TON 4487 ASSEMBLY AND OPERATING INSTRUCTIONS 349 Mission Oaks Blvd., Camarillo, CA 930 Visit our Web site at http://www.harborfreight.com Copyright 999 by Harbor Freight Tools.
More informationPressure Dump Valve Service Kit for Series 3000 Units
Instruction Sheet Pressure Dump Valve Service Kit for Series 000 Units. Overview The Nordson pressure dump valve is used to relieve hydraulic pressure instantly in Series 00, 400, 500, and 700 applicator
More informationInstallation, Operating, Maintenance and Safety Instructions for. Pressurised water systems for boats
FLOMAX-SYSTEM DOC532/11 Installation, Operating, Maintenance and Safety Instructions for FLOMAX-SYSTEM Pressurised water systems for boats CW343A FloMax System 12 volt d.c. CW344A FloMax System 24 volt
More informationPRS(TC)4,8 USER MANUAL. Read the complete manual before installing and using the regulator.
PRS(TC)4,8 USER MANUAL Read the complete manual before installing and using the regulator. WARNING INCORRECT OR IMPROPER USE OF THIS PRODUCT CAN CAUSE SERIOUS PERSONAL INJURY AND PROPERTY DAMAGE. Due to
More informationABRASIVE REGULATOR II
ABRASIVE REGULATOR II 13096 Abrasive Regulator II TABLE OF CONTENTS Contact Information and Customer & Technical Service... 1 1 Introduction... 1 2 Abrasive Regulator... 1 Description:... 1 2.1 Regulator
More informationproduct manual HM-4140, HM-4150, HM-4160 HM-4160A HM-4150 Humboldt FlexPanels
12.09 product manual HM-4140, HM-4150, HM-4160 HM-4160A HM-4150 Humboldt FlexPanels Introduction: This manual covers the installation and operation of Humboldt FlexPanels for Triaxial and Permeability
More informationNickel-Plated Brass Right Angle Flow Control Valves NPTF/Inch Series GSCU, GMCU, GSVU, GMVU, GSCO, GMCO
Nickel-Plated Brass Right Angle Flow Control Valves NPTF/Inch Series GSCU, GMCU, GSVU, GMVU, GSCO, GMCO Swivel Design : Meter-Out, Meter-In and Needle Orifice Tube Diameter OD: 1/8, 5/2, 1/4, 5/16, /8
More informationInstallation Instructions
Installation Instructions COLONY SOFT 7.0 Centerset Lavatory Faucet 7.0 with Speed Connect Drain Congratulations on purchasing your American Standard faucet with the Speed Connect drain, a features found
More informationInstallation Operation Maintenance. Bermad Level Control Valve with Modulating Horizontal Float Pilot valve One Way Flow IOM.
Bermad Level Control Valve with Modulating Horizontal Float Pilot valve One Way Flow Model: FP 450-80 Installation Operation Maintenance PAGE 1 OF 5 1. Safety First BERMAD believes that the safety of personnel
More informationKJ4000 Operating Instructions & Parts Manual NSN
KJ4000 Operating Instructions & Parts Manual NSN 1025-01-473-7710 Mandus Group Ltd. KJ4000 Operators Manual Date: 3 Jan. 2002 TABLE OF CONTENTS General Safety Instructions...Page 1 Operator Instructions...Page
More informationConstant Pressure Crude Oil Container Model CPCCP
Installation, Operations, and Maintenance Manual Constant Pressure Crude Oil Container Model CPCCP The information in this manual has been carefully checked for accuracy and is intended to be used as a
More informationABRASIVE REGULATOR II
ABRASIVE REGULATOR II 13096 Abrasive Regulator II TABLE OF CONTENTS 1 Introduction... 1 2 Abrasive Regulator... 2 2.1 Regulator Installation... 2 Location... 2 Attaching the Regulator to the Machine...
More informationD05 Pressure Regulating Valves
D05 Pressure Regulating Valves FEATURES PRODUCT DATA Noncorroding unitized cartridge contains all working parts and is easily replaceable. Includes built-in strainer and thermal bypass. Balanced seat construction
More informationBermad Pressure Reducing. Model: 42T
Bermad Pressure Reducing Pilot Operated Pressure Control Valve Model: 42T Installation Operation Maintenance Manual (IOM) REV. 27.7.17 Page 1 of 12 Safety First BERMAD believes that the safety of personnel
More informationBERMAD Waterworks. Level Control Valve with Altitude Pilot. 700 Series. Model X. Features and Benefits. Major Additional Features
Level Control Valve with Altitude Pilot High level reservoirs & water towers Energy cost critical systems Systems with poor water quality Inherent refreshing Level sustaining at reservoir outlet The Level
More informationManual Solvent Purification System. Innovative Technology, Inc.
Innovative Technology, Inc. 2 New Pasture Road, Newburyport, MA 01950-4054 USA Email: Info@gloveboxes.com TEL: +1 978 462 4415 FAX: +1 978 462 3338 Manual Solvent Purification System Copyright Innovative
More informationOPERATION MANUAL NTF-60 Plus
OPERATION MANUAL NTF-60 Plus Nitrogen Tire Filling Valve Stem Caps (Qty=200) Order P/N 436075 RTI Technologies, Inc 10 Innovation Drive York, PA 17402 800-468-2321 www.rtitech.com 035-81264-00 (Rev A)
More information