Appendix: Simplified Instructions for Operating the HP 5890 GC/FID and Air Sampling Systems

Size: px
Start display at page:

Download "Appendix: Simplified Instructions for Operating the HP 5890 GC/FID and Air Sampling Systems"

Transcription

1 Appendix: Simplified Instructions for Operating the HP 5890 GC/FID and Air Sampling Systems The bucket brigade air sampler. For the square Tedlar bags with the push/pull valves: Put the valve of a tedlar bag through the hole in the lid of the bucket. The big part of the valve should fit snugly in the hole. Be careful to only handle the hard plastic part of the valve, since it s really easy to break the valve loose from the bag, ruining it. {They cost $50 each.} For the rectangular Tedlar bags with the twist valves: Put the tedlar bag in the bucket and attach the tubing to the valve stem and open the valve. Be careful to only handle the hard plastic part of the valve, since it s really easy to break the valve loose from the bag, ruining it. {They cost $50 each.} Put the lid on the bucket, being careful not to smash the tedlar bag in the lid. You will need to pound a bit on the lid to get it well seated all the way around. Connect the flexible tubing from the hand-held vacuum to the copper tube at the bottom of the bucket. When you re ready to grab a sample, open the valve on the tedlar bag (if it is the push/pull design) by pushing it in about a cm. {It should go in very easily, be careful not to push the valve back through the lid of the bucket. (You might want to try this before you put the lid on the bucket to see how it works.)} Turn on the hand-held vacuum. {The vacuum pulls air out of the bucket making the Tedlar bag inflate (similar to the way your lungs work) without letting the air come in contact with anything but the valve and the bag, both of which are made of clean, non-reactive Teflon.} Either wait for a suitable amount of time (after the first bag, you ll have a feeling for this) and then switch off the vacuum, or listen for the bag to stop crinkling which it does while it s filling. {Be careful about running the vacuum too long, we re not sure how long the batteries will last - but you need the bags to be full.}

2 Close the push/pull valve on the sampling bag by pulling out on it. Take the lid off the bucket, close the valve if you are using the twist type valve and remove the Tedlar bag from the bucket, again being careful to hold onto the hard part of the valve. If the bag didn t fill completely, you can put the lid back on and try some more vacuum. Otherwise, retain the bag for analysis and get the next one ready for sampling. Rinsing the bags After all samples have been tested Pull all of the air out of the bag using the house vacuum (yellow tap) and then fill the bag with the house air (orange tap) and re-empty the bag with the vacuum. Do the fill and empty cycle at least twice. {It is highly recommended that you do this before collecting any samples to ensure that the bags have been cleaned since the group before you might not have done this. Also, you can do more cycles if you are concerned that there may be carryover between air samples. Leave the bags empty with the valves closed for the next lab.} The water displacement method for measuring the volume of air in the bags (low tech, but reasonably accurate) Put the valve through the hole in the square piece of plexiglass with the valve facing up. Put the lid (with bag attached) on top of the volume sampling apparatus, with the bag pointed down (towards the water). Turn on the water and let run until the Plexiglas cylinder is full. (Make sure that the lid and bag are pushing firmly against the water in order to ensure that you are only measuring the bag s volume and not any extra air in the container. Remove the lid and bag from the volume sampler and measure the depth of the airspace above the water. Now calculate the volume of the bag. The GC/FID system including computer data system and printer

3 {Running this experiment is kind of involved, so if there s anything that isn t completely clear to you, please ask the TA. They ll light the FID for you and hang around the first couple of times you do an injection, just to make sure everything goes ok.} Lighting the FID (the TA may have done this already, if you aren t sure, ask) Make sure that the nitrogen gas is on and flowing (outlet pressure should be around 25 PSI and black outlet valve should be open.) Make sure that the computer and monitor are on if the screen is blank or shows a screensaver, just wiggle the mouse. If the computer is off, switch it and the monitor on; when it boots up, it will give an error message that you get around by pressing F1. It should start up the rest of the way by itself. The screen in the upper left hand of the display shows a set of lines, one black and the other green and a few controls: attenuation, time, and zero (button). Make sure that the attenuation is set at 0 (zero) and press the zero button. The black line should move on top of the green line. On the front panel of the GC, press the Detector A button the display should say Det A , meaning that the detector is set for 200 and that it s at 200 degrees C. Open the main tank valve and the black outlet valve on the hydrogen and compressed air cylinders. If you haven t worked with compressed gases before, have the TA help you, since this can be dangerous if done wrong. The outlet pressures for hydrogen should be 15 psig and for air should be 40 psig. Turn the black knob in the upper left hand panel of the GC (labeled air) all the way counter-clockwise (open) and then do the same with the hydrogen, which is right below the air, and finally open the open the aux gas (nitrogen) valve. (These are all on/off type valves, so you don t have to worry about setting them.) Let the gases run for a minute or so, and open the cover on the right side of the top of the GC. The little metal chimney is the FID. Press the light FID button - usually the gas will suck down in and you ll hear a gentle pop when the gas lights. You should also see a big jump in the signal (black line) trace on the computer monitor, about 10 seconds after you light the FID. What we re looking

4 for here is a big peak followed by a signal that is bigger than the zero level, which then usually drifts down slowly with time. If you don t see this, the signal will probably spike up and drop right back down to zero. Then you have to wait a few seconds and try again. Sometimes it works on the first try, but there have been times when I ve had to try up to twenty times. (If the FID ignition button isn t working, then you can also light the FID by using the fireplace lighter) Hopefully you won t need to fuss with this too much to get things going. Once it is on, we leave it on for the whole day. It needs to stabilize for around ten minutes before you run the first chromatogram of the day. If it blows out at some point during the experiment, you can just relight it again while the chromatogram is running (if you figure out that it has gone out.) Since the toluene comes out late in the chromatogram, you can usually get this done in time to avoid losing that run. At the end of the day, turn off the three valves on the GC (hydrogen then air then aux gas) and the tank and outlet valves on the hydrogen and compressed air bottles. DO NOT turn off the nitrogen cylinder as this will destroy the GC column {~500 dollars to replace. We usually leave the GC and computer running all the time during the week.} Running a Chromatogram (there are more detailed instructions in the experimental webnotes for this lab) Put the bag on the inlet tubing, open the valve on the bag, make sure the injection valve is in the LOAD position, and turn on (or leave on) the air pump. If you are doing a cryogenic preconcentration run, put the cup of cryogen around the metal sampling loop for a predetermined length of time (usually 5 minutes.) Without cryogenic preconcentration - When you are ready to inject a sample onto the GC, move the metal hook in lower left front panel of the GC from LOAD (horizontal) to INJECT (vertical - clockwise 90 degrees, from stop to stop - you ll

5 feel what I mean) and then quickly reach up and push the START button on the GC. With cryogenic preconcentration Remove the cup of cryogen, switch the valve from LOAD to INJECT, put the cup of water on the metal loop, and then push the START button on the GC. The GC sends the start signal to the computer which will initiate the temperature program. The display on the upper right of the computer should change color from Green to Blue and the status should change from Ready to Running. The running signal display in the upper left corner on the monitor should show a red vertical line, indicating the start of the chromatogram. You can watch peaks come out of the GC on this display, and you can adjust the attenuation control to keep things on screen (this doesn t change anything about the actual signal collection.) About 1.7 minutes into the chromatogram, you ll see a small peak which is the air that you injected coming out through the detector. After about 1 minute, switch the sampling valve on the GC back to LOAD (from INJECT.) {This isn t really time critical, but it s necessary to do it before you start the next sample. And if you leave the pump on all the time, the loop will be cleaned while it s in the LOAD position. Finally you sometimes see a little air peak from leakage that occurs when the valve is switched from one position to the other, and its helpful if that peak is always in the same place.} When the chromatogram is finished (18.75 minutes) the status display will turn to Red (and say Not Ready ) while the oven cools back down to 125 and stabilizes. {You will also see the chromatogram flash up on the screen and then disappear. To go back and look at the chromatogram, you can choose (on the computer) DataAnalysis MainScreen and to get back to the normal display Files Return to Top.}

6 After about 5 minutes the display will turn Green and say Ready again to indicate that you can initiate another run. {If you re doing a preconcentration run, the trapping step takes over 5 minutes, so you don t have to wait to start that part.} VERY IMPORTANT the thing that we can print out, that contains all the data you really need, is the Report Screen that is in a window on top of the normal display (and usually pushed way down to the bottom of the screen.) You have to print this BEFORE the next chromatogram finishes, or it will be overwritten by the next set of data. The report should print automatically, but if you need to print a report, select (on the Report menu) Tabulate Print. Usually you ll want to note (circle, underline, etc.) which of the peaks in the chromatogram is the toluene and xylene sometimes the chromatogram display (DataAnalysis MainScreen) can help you figure out which is which. It can be hard to figure out later. For TA s: Preparation of m-xylene standard Clean and half-fill a tedlar bag with house air. Add 2.5 μl neat m-xylene through the septum port. Fill the bag the rest of the way (be careful to not overfill and pop the bag) with house air and mix thoroughly. Measure the bag volume and provide it to the students so they can calculate the stock m-xylene concentration. Revised DBA

Air Quality 2b - PFGC/FID Analysis of Benzene and Toluene in Automobile Emissions

Air Quality 2b - PFGC/FID Analysis of Benzene and Toluene in Automobile Emissions Air Quality 2b - PFGC/FID Analysis of Benzene and Toluene in Automobile Emissions Introduction: There is a bit of explanation of the health effects of benzene in the Introduction section of the first part

More information

5890II GC Standard Operating Procedure 9/2/2005

5890II GC Standard Operating Procedure 9/2/2005 5890II GC Standard Operating Procedure 9/2/2005 This procedure is for the analysis of natural gas using the HP 5890II GC with the Restek ShinCarbon column. Detector Type: TCD Column Type: Restek Micropacked,

More information

Chromat Calibration Updated October 27th, 2017

Chromat Calibration Updated October 27th, 2017 Chromat Calibration Updated October 27th, 2017 Calibrating the Chromatograph Performing the Chromat Calibration is highly recommended when starting a new well. The MLogger already has a default calibration

More information

Cover Page for Lab Report Group Portion. Head Losses in Pipes

Cover Page for Lab Report Group Portion. Head Losses in Pipes Cover Page for Lab Report Group Portion Head Losses in Pipes Prepared by Professor J. M. Cimbala, Penn State University Latest revision: 02 February 2012 Name 1: Name 2: Name 3: [Name 4: ] Date: Section

More information

Varian 3300 Gas Chromatograph Abbreviated Operating Instructions

Varian 3300 Gas Chromatograph Abbreviated Operating Instructions Varian 3300 Gas Chromatograph Abbreviated Operating Instructions 1. Introduction and Startup 2 2. Basic Configurations for the GC 3 3. Sample Preparation 3 4. Building a Method 3 5. Split/Splitless Injection

More information

Calibration of a GC955

Calibration of a GC955 Calibration of a GC955 1 Contents of the power point instructions Standard calibration Automatic validation methods and calibration of multi component mixes Autolinearisation: test of the linearity of

More information

Air Ball! Evaluation copy

Air Ball! Evaluation copy Air Ball! Computer 24 Do you ever wonder how the National Basketball Association (NBA) decides how much air should be in the basketballs used during a game? The NBA measures the pressure inside the ball

More information

NITROGEN INFLATION SYSTEM NG-4, NG-6, NG-12, NG-18

NITROGEN INFLATION SYSTEM NG-4, NG-6, NG-12, NG-18 NITROGEN OPERATING INSTRUCTIONS NITROGEN INFLATION SYSTEM NG-4, NG-6, NG-12, NG-18 READ INSTRUCTIONS THOROUGHLY BEFORE OPERATING 3451 S. 40th Street Phoenix, AZ 85040 602.437.5020 800.223.4540 www.tsissg.com

More information

Title: Xactix XeF2 Etcher Semiconductor & Microsystems Fabrication Laboratory Revision: A Rev Date: 03/23/2016

Title: Xactix XeF2 Etcher Semiconductor & Microsystems Fabrication Laboratory Revision: A Rev Date: 03/23/2016 Approved by: Process Engineer / / / / Equipment Engineer 1 SCOPE The purpose of this document is to detail the use of the Xactix XeF2 Etcher. All users are expected to have read and understood this document.

More information

AKTA pure 25 New Owner s Intro

AKTA pure 25 New Owner s Intro AKTA pure 25 New Owner s Intro The exercise below will give a quick demonstration of how easy and intuitive the AKTA pure 25 will be for you in demonstrating downstream processing to your students. Steps

More information

Using the Akta Prime plus October 22, 2012

Using the Akta Prime plus October 22, 2012 Some starting precautions: 1. Vacuum filter all buffers. Removes any large particles/debris that may clog your column De-gases the buffers 2. Clarify lysates first by centrifugation and then filtration

More information

Trion PECVD SOP IMPORTANT: NO PLASTIC, TAPE, RESISTS, OR THERMAL PASTE ARE ALLOWED IN THE CHAMBER

Trion PECVD SOP IMPORTANT: NO PLASTIC, TAPE, RESISTS, OR THERMAL PASTE ARE ALLOWED IN THE CHAMBER Trion PECVD SOP IMPORTANT: NO PLASTIC, TAPE, RESISTS, OR THERMAL PASTE ARE ALLOWED IN THE CHAMBER CAUTION: THE CHAMBER PLATE GETS EXTREMELY HOT Start Up Procedure 1) Open bottle and regulator for Helium,

More information

Equipment Operating Procedure Glove Box

Equipment Operating Procedure Glove Box Equipment Operating Procedure Glove Box Page 1 0.0 Changing the Compressed Gas Cylinder 1. Complete Compressed Gas Cylinder training from EHS website before manually exchanging gas cylinders. In order

More information

UNITY 2 TM. Air Server Series 2 Operators Manual. Version 1.0. February 2008

UNITY 2 TM. Air Server Series 2 Operators Manual. Version 1.0. February 2008 UNITY 2 TM Air Server Series 2 Operators Manual Version 1.0 February 2008 1. Introduction to the Air Server Accessory for UNITY 2...2 1.1. Summary of Operation...2 2. Developing a UNITY 2-Air Server method

More information

FROG-4000 TM Chemical Analysis System

FROG-4000 TM Chemical Analysis System FROG-4000 TM Chemical Analysis System User s Manual Defiant Technologies, Inc. 2014 Vol.4 This page is intentionally left blank. FROG-4000 TM Chemical Analysis System User s Manual Defiant Technologies,

More information

System Overview. TCD Detector temperature setpoint Regulator

System Overview. TCD Detector temperature setpoint Regulator System Overview POPULAR CONFIGURATION GCs Your educational TCD GC is configured on the compact 310 chassis. It is equipped with a TCD Detector, a temperature programmable Column Oven, a 3 Silica Gel packed

More information

Air Ball! LabQuest Vernier Gas Pressure Sensor Vernier Motion Detector basketball stopper with needle, stopper stem and tubing attached meter stick

Air Ball! LabQuest Vernier Gas Pressure Sensor Vernier Motion Detector basketball stopper with needle, stopper stem and tubing attached meter stick Air Ball! LabQuest 24 Do you ever wonder how the National Basketball Association (NBA) decides how much air should be in the basketballs used during a game? The NBA measures the pressure inside the ball

More information

Ammonia Treatment Instructions Page 1 of 5

Ammonia Treatment Instructions Page 1 of 5 Page 1 of 5 Original version by Douglas Call Updated January 21, 2009 by David Jones Department: Chemical Engineering Location: Fenske 102 (access thru room 103) Contact: BP Matthew Holbrook 161 Fenske

More information

Determination of Zn using Atomic Absorption with Multiple Standard Additions

Determination of Zn using Atomic Absorption with Multiple Standard Additions 1. Purpose Determination of Zn using Atomic Absorption with Multiple Standard Additions This procedure will determine the concentration of zinc at the parts-per-million level using flame atomic absorption

More information

FROG-4000 TM Chemical Analysis System

FROG-4000 TM Chemical Analysis System FROG-4000 TM Chemical Analysis System User s Manual Defiant Technologies, Inc. 2015 Vol.5 This page is intentionally left blank. FROG-4000 TM Chemical Analysis System User s Manual Defiant Technologies,

More information

Automated Determination of Dissolved Gases in Water Anne Jurek. Abstract: Discussion:

Automated Determination of Dissolved Gases in Water Anne Jurek. Abstract: Discussion: Automated Determination of Dissolved Gases in Water Anne Jurek Abstract: The RSK-175 standard operating procedure was developed in order to determine the amount of dissolved gas in water. Due to the expansion

More information

Glove Box Installation Manual

Glove Box Installation Manual Glove Box Installation Manual 1998 by M. Braun Company File: GB-UNI-INS.DOC! Edition 08-00 by M. Boutin! Subject to be changed without notice Glovebox Installation Your Glove box has been fully assembled,

More information

SRI Model H2-40 Hydrogen Generator Operation and Maintenance Nov 2006

SRI Model H2-40 Hydrogen Generator Operation and Maintenance Nov 2006 Nov 2006 Place the H2-40 on a benchtop surface which will not be damaged by water in the event of a leak. Fill a bottle with clean water. Tapwater is OK in most large cities, but bottled drinking water

More information

Manual for continuous distillation

Manual for continuous distillation Manual for continuous distillation 1. Week 1: Objectives: Run the column at total reflux. When steady state is reached, take the sample from the top and bottom of the column in order to determine the overall

More information

Experiment GC : Analysis of BTEX by GC-FID

Experiment GC : Analysis of BTEX by GC-FID 46 Experiment GC : Analysis of BTEX by GC-FID Learning Goals: Familiarity with gas chromatography Gain experience in temperature programming and method development Correctly use an internal standard, and

More information

1. Study the performance of a binary distillation column operated in batch mode.

1. Study the performance of a binary distillation column operated in batch mode. Goals for batch distillation using the East distillation column: 1. Study the performance of a binary distillation column operated in batch mode. 2. Determine the overall and local efficiency of the column

More information

Pegas 4000 MF Gas Mixer InstructionManual Columbus Instruments

Pegas 4000 MF Gas Mixer InstructionManual Columbus Instruments Pegas 4000 MF Gas Mixer InstructionManual Contents I Table of Contents Foreword Part I Introduction 1 2 1 System overview... 2 2 Specifications... 3 Part II Installation 4 1 Rear panel connections...

More information

Quantitative Analysis of Hydrocarbons by Gas Chromatography

Quantitative Analysis of Hydrocarbons by Gas Chromatography Quantitative Analysis of Hydrocarbons by Gas Chromatography Introduction Gas-liquid chromatography (GLC) accomplishes a separation by partitioning solutes between a mobile gas phase and a stationary liquid

More information

Warnings: Notes: Revised: October 5, 2015

Warnings: Notes: Revised: October 5, 2015 Karl Suss MA6 Mask Aligner Standard Operating Procedure Faculty Supervisor: Prof. Robert White, Mechanical Engineering (x72210) Safety Office: Peter Nowak x73246 (Just dial this directly on any campus

More information

BASIC RULES OF USAGE, OLIS DSM-20 CD Management The instrument is currently managed by the Analytical Biophysics Core Facility.

BASIC RULES OF USAGE, OLIS DSM-20 CD Management The instrument is currently managed by the Analytical Biophysics Core Facility. Olis DSM-20 instructrions and rules p. 1 BASIC RULES OF USAGE, OLIS DSM-20 CD Management The instrument is currently managed by the Analytical Biophysics Core Facility. Signup On a first-come, first-served

More information

Cover Page for Lab Report Group Portion. Pump Performance

Cover Page for Lab Report Group Portion. Pump Performance Cover Page for Lab Report Group Portion Pump Performance Prepared by Professor J. M. Cimbala, Penn State University Latest revision: 02 March 2012 Name 1: Name 2: Name 3: [Name 4: ] Date: Section number:

More information

FROG-5000TM Chemical Analysis System User s Manual

FROG-5000TM Chemical Analysis System User s Manual FROG-5000TM Chemical Analysis System User s Manual Defiant Technologies, Inc. 2018 Rev.3 How to assemble a ferrule. This problem has arisen so often and caused so many problems, that we have added it as

More information

256 Pneumatic Pressure Indicator

256 Pneumatic Pressure Indicator 256 Pneumatic Pressure Indicator 51425699 Copyright 2002 Slope Indicator Company. All Rights Reserved. This equipment should be installed, maintained, and operated by technically qualified personnel. Any

More information

Douglas Call 4/11/2008 1/5. Ammonia Treatment

Douglas Call 4/11/2008 1/5. Ammonia Treatment Douglas Call 4/11/2008 1/5 Ammonia Treatment Department: Chemical Engineering Location: Fenske 102 Contact: Zachary Pace Smith BillyPaul Matthew Holbrook zps5000@psu.edu 166 Fenske bmh200@psu.edu 5-9734

More information

Boyle s Law: Pressure-Volume Relationship in Gases

Boyle s Law: Pressure-Volume Relationship in Gases Boyle s Law: Pressure-Volume Relationship in Gases The primary objective of this experiment is to determine the relationship between the pressure and volume of a confined gas. The gas we will use is air,

More information

Instructions for Assembly, Installation, and Operation of the Gas Addition Kit Accessory with the CEM Discover Systems

Instructions for Assembly, Installation, and Operation of the Gas Addition Kit Accessory with the CEM Discover Systems Corporation Issued: 5/09 P/N: 600104 Rev. 2 Instructions for Assembly, Installation, and Operation of the Gas Addition Kit Accessory with the CEM Discover Systems The Gas Addition Accessory permits the

More information

Rejuvenation Instructions

Rejuvenation Instructions Rejuvenation Instructions #401 Air Systems UPR This NRI covers the following: Understanding the applications and operation of flow meters. Understand the application and operation of test pressure gauges.

More information

How Do I Install My Garden Master Bucket Garden?

How Do I Install My Garden Master Bucket Garden? How Do I Install My Garden Master Bucket Garden? 1. On the arrival of your Bucket Garden open the bucket and remove the 4 screws from the outside of the bucket rim and pull the 2 buckets apart. Check the

More information

ARC Unofficial Manual to the Solvent Dispensing System. Designed by J. C. Meyer

ARC Unofficial Manual to the Solvent Dispensing System. Designed by J. C. Meyer RC Unofficial Manual to the Solvent Dispensing System Designed by J. C. Meyer 1 Table of Contents: I. Introduction...3 II. rgon Supply...3 Tanks Regulators Over Pressurization III. Solvent Kegs...4 Solvent

More information

DETERMINATION OF TETRAHYDROTHIOPHENE IN AMBIENT AIR BY GAS CHROMATOGRAPHY WITH A PFPD DETECTOR COUPLED TO A PRECONCENTRATION TECHNOLOGY

DETERMINATION OF TETRAHYDROTHIOPHENE IN AMBIENT AIR BY GAS CHROMATOGRAPHY WITH A PFPD DETECTOR COUPLED TO A PRECONCENTRATION TECHNOLOGY DETERMINATION OF TETRAHYDROTHIOPHENE IN AMBIENT AIR BY GAS CHROMATOGRAPHY WITH A PFPD DETECTOR COUPLED TO A PRECONCENTRATION TECHNOLOGY Nengbing Xu, Hongmei Ying and Libo Zhu Ningbo Environmental Monitoring

More information

General Specifications: Forensic. Petrochemical Environmental. Lab Quality Analyses in the Field, It Goes with you Anywhere!

General Specifications: Forensic. Petrochemical Environmental. Lab Quality Analyses in the Field, It Goes with you Anywhere! The portable Gas Chromatograph is now more versatile than ever. DPS Instruments is pleased to present the newest Portable Companion 2 Gas Chromatograph with room for 2 Detectors. The Companion 2 GC was

More information

SOP: Buck Scientific BLC-20P HPLC Operation

SOP: Buck Scientific BLC-20P HPLC Operation Page 1 of 11 Approvals Preparer: John Buford Reviewer: Tim Kull Reviewer: Dr. Margaret Bryans Date: 16OCT13 Date: 30OCT13 Date: 31OCT13 1. Purpose 1.1. Basic operation of the Buck Scientific BLC-20P isocratic

More information

ASTM 3612/TOGA/Dissolved Gas GC Revised October 2013

ASTM 3612/TOGA/Dissolved Gas GC Revised October 2013 The SRI ASTM 3612/TOGA/ Dissolved Gas GC configuration ( TOGA GC ) permits measurement of gasses dissolved in water, oil or other liquids, and is based on the requirements of ASTM method 3612, option C,

More information

Detector Carrier Gas Comments Detector anode purge or reference gas. Electron Capture Nitrogen Maximum sensitivity Nitrogen Argon/Methane

Detector Carrier Gas Comments Detector anode purge or reference gas. Electron Capture Nitrogen Maximum sensitivity Nitrogen Argon/Methane Gas requirements Gases for packed columns The carrier gas you use depends upon the type of detector and the performance requirements. Table 520-1 lists gas recommendations for packed column use. In general,

More information

FOR INSTALLING CO 2 BLENDER KIT (P/N IN BEER SYSTEM

FOR INSTALLING CO 2 BLENDER KIT (P/N IN BEER SYSTEM IMI CORNELIUS INC One Cornelius Place Anoka, MN 55303-623 Telephone (800) 238-3600 Facsimile (612) 22-326 INSTALLATION INSTRUCTIONS FOR INSTALLING CO 2 BLENDER KIT (P/N 111612000 IN BEER SYSTEM SECONDARY

More information

I have to say that I had no idea about compressors. That means it s easy for everybody.

I have to say that I had no idea about compressors. That means it s easy for everybody. D I S C L A I M E R O F L I A B I L I T Y A N D W A R R A N T Y This publication describes the author s opinions regarding the subject matter herein. The author and publisher are not rendering advice or

More information

EXPERIMENT XI. Careful!! Improper handling of the vacuum line may result in the release of SO 2 which is an irritating and suffocating gas.

EXPERIMENT XI. Careful!! Improper handling of the vacuum line may result in the release of SO 2 which is an irritating and suffocating gas. Chem 366-3 Page XI - 1 EXPERIMENT XI INFRARED SPECTRUM OF SO2 (S&G, 5th ed. Expt 36, 6th ed. Expt. 35) 1. Pre-Lab preparation. The description of this experiment has disappeared from the more recent editions

More information

WIDDER TOOLS. HPICAL Calibration Station 1 (203)

WIDDER TOOLS. HPICAL Calibration Station  1 (203) WIDDER TOOLS HPICAL-15000 Calibration Station WWW.WIDDERTOOLS.COM 1 1. TEST SET-UP a. Be sure air and water supply lines are installed per basic set-up & installation instructions supplied with calibration

More information

Multiple Gas#5 GC configuration Jan 2016

Multiple Gas#5 GC configuration Jan 2016 History: Unfortunately there is no single column that can separate: Hydrogen Oxygen Nitrogen Methane CO CO2 Ethane Water Propane Butane Pentane Over the years SRI Instruments has devised several solutions

More information

Nanofabrication Facility: PECVD SOP Rev. 00, April 24

Nanofabrication Facility: PECVD SOP Rev. 00, April 24 Author: Charlie Yao & Mario Beaudoin Email: charlieyao@gmail.com; Beaudoin@physics.ubc.ca Phone: 604-822-1853(MB). Purpose This document outlines the standard operation for the Trion Plasma Enhanced Chemical

More information

User s Booklet for the Wyatt minidawn Light Scattering Instrumentation

User s Booklet for the Wyatt minidawn Light Scattering Instrumentation User s Booklet for the Wyatt minidawn Light Scattering Instrumentation The Wyatt minidawn Light Scattering instrument is able to measure the weight average molecular weight of a synthetic polymer or a

More information

Parallel Reactor Standard Operating Procedure THIS SOP IS NOT MEANT TO REPLACE HANDS-ON TRAINING FROM QUALIFIED PERSONNEL!

Parallel Reactor Standard Operating Procedure THIS SOP IS NOT MEANT TO REPLACE HANDS-ON TRAINING FROM QUALIFIED PERSONNEL! Parallel Reactor Standard Operating Procedure THIS SOP IS NOT MEANT TO REPLACE HANDS-ON TRAINING FROM QUALIFIED PERSONNEL! This SOP describes the basic procedure for using the HEL Cat-24 parallel reactor,

More information

with O 2 Controller Instruction Manual

with O 2 Controller Instruction Manual 14500 Coy Drive, Grass Lake, Michigan 49240 734-475-2200 E-mail: sales@coylab.com www.coylab.com Hypoxic Cabinets (In-Vivo / In-Vitro) with O 2 Controller Instruction Manual Index Page Warranty 2 Warnings

More information

Emulsiflex C3 Homogenizer Protocol

Emulsiflex C3 Homogenizer Protocol Emulsiflex C3 Homogenizer Protocol Contact Annette Erbse, ex. 2-0528, erbse@colorado.edu, Office C316 Nicole Kethley, Nicole.kethley@colorado.edu, Office C316 or C370 Please contact Annette Erbse or Nicole

More information

This GC has two columns (I think new columns can be ordered from Restek)

This GC has two columns (I think new columns can be ordered from Restek) SRI 8610C GC Ann s Notes 11-17-2014 Introduction This is the GC as it came from the manufacturer This GC has two columns (I think new columns can be ordered from Restek) 1. Hayesep D: Column 1 a. Separating

More information

Installation of Your SprayMaster System

Installation of Your SprayMaster System Installation of Your SprayMaster System 1. At the installation site, remove all equipment from the corrugated box and the polyethylene drum and replace the drum lid. Check the picture to identify each

More information

Using the UltraRAE. Firmware 2.35

Using the UltraRAE. Firmware 2.35 Using the UltraRAE Firmware 2.35 Training Agenda UltraRAE features Setting up the UltraRAE Turning on the UltraRAE Idle Operation RAE-Sep Tubes Prepping for a measurement Taking a measurement Alarm modes

More information

DURRIDGE STAINLESS STEEL SOIL GAS PROBE

DURRIDGE STAINLESS STEEL SOIL GAS PROBE DURRIDGE STAINLESS STEEL SOIL GAS PROBE CONTENTS 1. Introduction... 3 2. Placement... 3 3. Connection... 4 4 Measurement... 4 4.1 GRAB Protocol... 5 4.2 Continuous Monitoring... 6 4.3 Thoron Protocol...

More information

Ghost Peaks: How to Fix a Haunting Problem. Jacob A. Rebholz Teledyne Tekmar VOC Product Line Manager

Ghost Peaks: How to Fix a Haunting Problem. Jacob A. Rebholz Teledyne Tekmar VOC Product Line Manager Ghost Peaks: How to Fix a Haunting Problem Jacob A. Rebholz Teledyne Tekmar VOC Product Line Manager Outline of Topics What is a ghost peak? How to identify ghost peaks and their source How to correct

More information

Cover Page for Lab Report Group Portion. Flow Visualization in a Water Channel

Cover Page for Lab Report Group Portion. Flow Visualization in a Water Channel Cover Page for Lab Report Group Portion Flow Visualization in a Water Channel Prepared by Professor J. M. Cimbala, Penn State University Latest revision: 08 September 2017 Name 1: Name 2: Name 3: [Name

More information

Experiment 11: The Ideal Gas Law

Experiment 11: The Ideal Gas Law Experiment 11: The Ideal Gas Law The behavior of an ideal gas is described by its equation of state, PV = nrt. You will look at two special cases of this. Part 1: Determination of Absolute Zero. You will

More information

Automated Determination of Dissolved Gases in Water Anne Jurek

Automated Determination of Dissolved Gases in Water Anne Jurek Automated Determination of Dissolved Gases in Water Anne Jurek Abstract: Tapping the natural gas reservoirs throughout the United States has long been a viable solution for energy independence; however

More information

Troubleshooting. Select the Table of Contents here Rheodyne All rights reserved

Troubleshooting. Select the Table of Contents here Rheodyne All rights reserved nmlkji Literature nmlkj Site Troubleshooting This section contains our complete Troubleshooting Guide. It presents detailed discussions of the most common problems encountered when using sample injection

More information

Experiment 18 Properties of Gases

Experiment 18 Properties of Gases Experiment 18 Properties of Gases E18-1 E18-2 The Task In this experiment you will investigate some of the properties of gases, i.e. how gases flow, their phase changes and chemical reactivity. Skills

More information

Build Your Own Flamethrower Step-by-step Manual

Build Your Own Flamethrower Step-by-step Manual Build Your Own Flamethrower Step-by-step Manual Table of Contents: Parts List.. page 1 Operation...page 6 Diagrams. pages 7-9 Parts list: Required: Air tank (large) Pressure washer gun with high-pressure

More information

Endo-Flush Order # ZUTR30004 OPERATION MANUAL. Zutron Medical, LLC W 98 th St #40-27 Lenexa, KS Phone Fax

Endo-Flush Order # ZUTR30004 OPERATION MANUAL. Zutron Medical, LLC W 98 th St #40-27 Lenexa, KS Phone Fax OPERATION MANUAL Zutron Medical, LLC 17501 W 98 th St #40-27 Lenexa, KS 66219 Phone 877-343-5873 Fax 913-967-5944 ZUT-Lab-004-30004 REV. 03312017 Table of Contents 2 Introduction 1. Intended Use 2. Labels,

More information

Instruction Manual Dräger MSI P7 and MSI P7 plus

Instruction Manual Dräger MSI P7 and MSI P7 plus Dräger MSI GmbH Rohrstraße 32 58093 Hagen Tel.: +49-2331 / 9584-0 Fax: +49-2331 / 9584-29 e-mail: info@draeger-msi.de D 923; Edition 2011-01-01 Content 1. General Hints Page 4 2. The Instrument 2.1 Front

More information

Declining Weight Blending System Quick Start Manual E Main St Marshall, IL Phone: Fax: Website:

Declining Weight Blending System Quick Start Manual E Main St Marshall, IL Phone: Fax: Website: Declining Weight Blending System Quick Start Manual 12285 E Main St Marshall, IL 62441 Phone: 217-826-6352 Fax: 217-826-8551 Website: www.yargus.com P a g e 2 MAIN SCREEN The MAIN SCREEN on the cover page

More information

Lab 1: Pressure and surface tension. Bubblers, gravity and the mighty paper clip.

Lab 1: Pressure and surface tension. Bubblers, gravity and the mighty paper clip. Lab 1: Pressure and surface tension. Bubblers, gravity and the mighty paper clip. CEE 3310 - Summer 2012 SAFETY The major safety hazard in this laboratory is a shock hazard. Given that you will be working

More information

LAMINAR FLAME SPEED ANALYSIS USING PIV (PARTICLE IMAGE VELOCIMETRY)

LAMINAR FLAME SPEED ANALYSIS USING PIV (PARTICLE IMAGE VELOCIMETRY) LAMINAR FLAME SPEED ANALYSIS USING PIV (PARTICLE IMAGE VELOCIMETRY) OPERATIONAL PROCEDURES Venue: Project Room, Hopkinson Lab, CUED Experimental date: 25 March 2008 Prepared by: Cheng Tung Chong (ctc31@camacuk)

More information

R I T. Title: STS ASE Semiconductor & Microsystems Fabrication Laboratory Revision: Original Rev Date: 01/21/ SCOPE 2 REFERENCE DOCUMENTS

R I T. Title: STS ASE Semiconductor & Microsystems Fabrication Laboratory Revision: Original Rev Date: 01/21/ SCOPE 2 REFERENCE DOCUMENTS Approved by: Process Engineer / / / / Equipment Engineer 1 SCOPE The purpose of this document is to detail the use of the STS ASE. All users are expected to have read and understood this document. It is

More information

Automated Determination of Dissolved Gases in Water By Headspace Calibration of Mixed Gases Anne Jurek

Automated Determination of Dissolved Gases in Water By Headspace Calibration of Mixed Gases Anne Jurek Automated Determination of Dissolved Gases in Water By Headspace Calibration of Mixed Gases Anne Jurek Abstract: Due to the expansion of natural gas drilling through horizontal fracturing, there has been

More information

HPICAL Operation & Data Logging Procedures. Click spacebar to advance through slides 1

HPICAL Operation & Data Logging Procedures. Click spacebar to advance through slides 1 HPICAL-15000 Operation & Data Logging Procedures Click spacebar to advance through slides 1 WARNING Always wear proper safety equipment when using high pressure equipment. Do not exceed 125 psi air pressure.

More information

SOP for use of the SX19 Stopped-Flow Instrument

SOP for use of the SX19 Stopped-Flow Instrument SOP for use of the SX19 Stopped-Flow Instrument The main components of the stopped flow system are: Always book the system before use. Starting up and preparing the SX19 for use: 1. Turn on the compressed

More information

AUTOMATIC TIRE INFLATOR # MW-60, MW-60-4WAY & MW-64HP

AUTOMATIC TIRE INFLATOR # MW-60, MW-60-4WAY & MW-64HP USER MANUEL AUTOMATIC TIRE INFLATOR # MW-60, MW-60-4WAY & MW-64HP TIRE EQUIPMENT MANUFACTURER 1.866.409.RACK WWW.MARTINSINDUSTRIES.COM info@martinsindustries.com PARTS Verify that the following components

More information

RK-IR Sample Draw Aspirator Adapter Operator s Manual

RK-IR Sample Draw Aspirator Adapter Operator s Manual 30-0951RK-IR Sample Draw Aspirator Adapter Operator s Manual Part Number: 71-0018RK Revision: A Released: 6/2/10 www.rkiinstruments.com Product Warranty RKI Instruments, Inc. warrants gas alarm equipment

More information

TQC Bresle Chloride test 2008

TQC Bresle Chloride test 2008 TQC Bresle Chloride test 2008 SP7310 MANUAL See also : ISO8502-6 ISO8502-9 1 DETERMINATION OF SOLUBLE CONTAMINANTS ON SURFACES IN CONFORMITY WITH ISO 1.1 PREPARATION With this system very low concentrations

More information

Arizona State University Center for Solid State Electronics Research Issue: E Title: Heat Pulse 610 Operating Procedure Page 1 of 7

Arizona State University Center for Solid State Electronics Research Issue: E Title: Heat Pulse 610 Operating Procedure Page 1 of 7 Title: Heat Pulse 610 Operating Procedure Page 1 of 7 Table of Contents 1.0 Purpose/Scope... 2 2.0 Reference Documents... 2 2.1 Heat Pulse Operations Manual... 2 2.2 Solaris software Operations Manual...

More information

Unifilm Technology PVD-300 Sputter Deposition Operation Instructions

Unifilm Technology PVD-300 Sputter Deposition Operation Instructions Unifilm Technology PVD-300 Sputter Deposition Operation Instructions Contributors: Devin Brown, Kevin Klein, Ben King, Eric Woods Anything that is BOLD UNDERLINED ITALICS means that you should press that

More information

MJB4 Mask Aligner Operating Procedure. Effective Date: 07/12/2012 Author(s): Jiong Hua Phone:

MJB4 Mask Aligner Operating Procedure. Effective Date: 07/12/2012 Author(s): Jiong Hua Phone: MJB4 Mask Aligner Operating Procedure Effective Date: 07/12/2012 Author(s): Jiong Hua Phone: 402-472-3773 Email: jhua2@unl.edu 1 1 Introduction 1.1 Key Words Karl Suss MJB4 Mask Aligner, Optical Lithography,

More information

TANK MANAGER FOR TWO TANKS OPERATING MANUAL. 10/31/11 C-More T6C L color touch panel

TANK MANAGER FOR TWO TANKS OPERATING MANUAL. 10/31/11 C-More T6C L color touch panel TANK MANAGER FOR TWO TANKS OPERATING MANUAL 10/31/11 C-More T6C L color touch panel 1 TABLE OF CONTENTS GENERAL...3 INSTALLATION...4 STONE TEST PROCEDURE...7 OPERATIONAL SUMMARY...7 AUTO CARBONATION...10

More information

6890 GC Not Ready Messages (A16010)

6890 GC Not Ready Messages (A16010) 6890 GC Not Ready Messages (A16010) This document is believed to be accurate and up-to-date. However, Agilent Technologies, Inc. cannot assume responsibility for the use of this material. The information

More information

Baby Booster Manual. KISS Rebreather, LLC. MSL Jetsam/ Baby Booster Manual R.2

Baby Booster Manual. KISS Rebreather, LLC. MSL Jetsam/ Baby Booster Manual R.2 Baby Booster Manual KISS Rebreather, LLC. MSL 72.126 Jetsam/ Baby Booster Manual R.2 2 MSL 72.126 Jetsam/ Baby Booster Manual R.2 Photo by Curt Bowen, ADM. 3 MSL 72.126 Jetsam/ Baby Booster Manual R.2

More information

PRE CUT CAR WINDOW TINTING INSTALLATION GUIDE

PRE CUT CAR WINDOW TINTING INSTALLATION GUIDE PRE CUT CAR WINDOW TINTING INSTALLATION GUIDE EXPERT APPROVED! FOR PRE-CUT CAR WINDOW TINT KITS THOUROUGH STEP BY STEP GUIDE CO-CREATED WITH ONE OF OUR EXPERTS INSIDER TIPS DETAILED COLOUR PHOTO REFERENCES

More information

ELE INTERNATIONAL COMPRESSION TESTER Standard Operating Procedure

ELE INTERNATIONAL COMPRESSION TESTER Standard Operating Procedure Andrew Sutherland Supervisor of Laboratory/Workshop Mechanical & Electrical Type of hazards (mechanical, electrical, chemical, biological or radiation) ELE Compression Tester Name and Function of Lab/Project

More information

Mass Spec will not Autotune

Mass Spec will not Autotune Mass Spec will not Autotune Applies to 5973A/N MSD What could be the problem? There could be several things that would cause your Mass Spec not to Autotune. The most common, easily corrected Autotune problems

More information

JETFIRST 150 RTA SYSTEM OPERATING MANUAL Version: 2 Feb 2012

JETFIRST 150 RTA SYSTEM OPERATING MANUAL Version: 2 Feb 2012 JETFIRST 150 RTA SYSTEM OPERATING MANUAL Version: 2 Feb 2012 UNIVERSITY OF TEXAS AT ARLINGTON Nanofabrication Research and Teaching Facility TABLE OF CONTENTS 1. Introduction....2 1.1 Scope of Work.....2

More information

OPERATION MANUAL RTI RHS650 RTI TECHNOLOGIES, INC East Market Street York, PA Manual P/N

OPERATION MANUAL RTI RHS650 RTI TECHNOLOGIES, INC East Market Street York, PA Manual P/N OPERATION MANUAL RTI RHS650 RTI TECHNOLOGIES, INC. 4075 East Market Street York, PA 17402 Manual P/N 035-80589-02 Table of Contents Components... 2 Test... 4 Recovery/Recycling... 5 Evacuation... 7 Charging...

More information

Operation of the Perkin Elmer TGA-GC/MS

Operation of the Perkin Elmer TGA-GC/MS Operation of the Perkin Elmer TGA-GC/MS Summary of the TGA-GC/MS: The TGA-GC/MS allows a user to decompose a sample by heating, measure its loss of mass, and simultaneously analyze the chemical composition

More information

S/Y MORSKI ZEKAN TECHNICAL INFORMATION

S/Y MORSKI ZEKAN TECHNICAL INFORMATION S/Y MORSKI ZEKAN TECHNICAL INFORMATION Cabins: 3 Toilets: 1 Max. Persons: 8 (6+2) LOA: 11,35 m Beam: 3,80 m Draft: 1,95 m Engine: Volvo 28HP Water tanks: 360 L Fuel tank: 150 L Anchor windlass Speed and

More information

490 Micro GC Site Preparation Checklist

490 Micro GC Site Preparation Checklist Thank you for purchasing an Agilent instrument. To get you started and to assure a successful and timely installation, please refer to this specification or set of requirements. Correct site preparation

More information

INSTRUCTIONS FOR MODELS SG3897 AND SG3898 CROSS PURGE ASSEMBLIES

INSTRUCTIONS FOR MODELS SG3897 AND SG3898 CROSS PURGE ASSEMBLIES INSTRUCTIONS FOR MODELS SG3897 AND SG3898 CROSS PURGE ASSEMBLIES THIS BOOKLET CONTAINS PROPRIETARY INFORMATION OF ADVANCED SPECIALTY GAS EQUIPMENT CORP. AND IS PROVIDED TO THE PURCHASER SOLELY FOR USE

More information

USER MANUAL OPERATION AND THE USE OF A CAR WITH. Diego G3 / NEVO SEQUENTIAL GAS INJECTION SYSTEM

USER MANUAL OPERATION AND THE USE OF A CAR WITH. Diego G3 / NEVO SEQUENTIAL GAS INJECTION SYSTEM USER MANUAL OPERATION AND THE USE OF A CAR WITH Diego G3 / NEVO SEQUENTIAL GAS INJECTION SYSTEM Page 2 / 8 Table of csontents 1. STARTING THE ENGINE... 3 2. CONTROL PANEL... 3 2.1 Indication of the current

More information

no peaks missing peaks too small peaks increasing retention decreasing retention

no peaks missing peaks too small peaks increasing retention decreasing retention GC Troubleshooting We can help you. 1. Observation: no peaks no peaks missing peaks too small peaks increasing retention decreasing retention declining baseline rising baseline bleeding plateaus interfering

More information

UNIVERSITY OF ROCHESTER ENVIRONMENTAL HEALTH & SAFETY

UNIVERSITY OF ROCHESTER ENVIRONMENTAL HEALTH & SAFETY Revision No.: 1 Page 1 of 6 I. PURPOSE This policy/procedure establishes the proper steps for set up, and operation of the BullEx I.T.S Xtreme training system. II. PERSONNEL AFFECTED Fire Safety staff

More information

Read this first. Zetasizer nano series Self installation and Quick start guide MRK825-02

Read this first. Zetasizer nano series Self installation and Quick start guide MRK825-02 ! Read this first Zetasizer nano series Self installation and Quick start guide I N S T R U M E N T S MRK825-02 Zetasizer Nano series Self installation and Quick start guide MAN0383 Issue 1.1 July 2007

More information

AKTA ION EXCHANGE CHROMATOGRAPHY SOP Date: 2/02/05 Author: A DeGiovanni Edited by: C. Huang Reviewed by:

AKTA ION EXCHANGE CHROMATOGRAPHY SOP Date: 2/02/05 Author: A DeGiovanni Edited by: C. Huang Reviewed by: 1 AKTA ION EXCHANGE CHROMATOGRAPHY SOP Date: 2/02/05 Author: A DeGiovanni Edited by: C. Huang Reviewed by: Materials/Reagents/Equipment Vendor 1. 0.2 um filtered Water + 0.05% sodium azide 2. 0.2 um filtered

More information

Medical Instruments in the Developing World

Medical Instruments in the Developing World 2.2 Ventilators 2.2.1 Clinical Use and Principles of Operation Many patients in an intensive care and the operating room require the mechanical ventilation of their lungs. All thoracic surgery patients,

More information

CSA Sample Draw Aspirator Adapter Operator s Manual

CSA Sample Draw Aspirator Adapter Operator s Manual 30-0951-CSA Sample Draw Aspirator Adapter Operator s Manual Part Number: 71-0367 Revision: 0 Released: 4/30/15 www.rkiinstruments.com WARNING Read and understand this instruction manual before operating

More information

then the work done is, if the force and the displacement are in opposite directions, then the work done is.

then the work done is, if the force and the displacement are in opposite directions, then the work done is. 1. What is the formula for work? W= x 2. What are the 8 forms of energy? 3. Write the formula for the following: Kinetic Energy Potential Energy 4. If the force and the displacement are in the same direction,

More information