Pipeline Systems PIP PLSC0019 Specification for Pressure Testing HDPE Plastic Pipeline Systems

Size: px
Start display at page:

Download "Pipeline Systems PIP PLSC0019 Specification for Pressure Testing HDPE Plastic Pipeline Systems"

Transcription

1 November 2017 Pipeline Systems PIP PLSC0019 Specification for Pressure Testing HDPE Plastic Pipeline Systems

2 PURPOSE AND USE OF PROCESS INDUSTRY PRACTICES In an effort to minimize the cost of process industry facilities, this Practice has been prepared from the technical requirements in the existing standards of major industrial users, contractors, or standards organizations. By harmonizing these technical requirements into a single set of Practices, administrative, application, and engineering costs to both the purchaser and the manufacturer should be reduced. While this Practice is expected to incorporate the majority of requirements of most users, individual applications may involve requirements that will be appended to and take precedence over this Practice. Determinations concerning fitness for purpose and particular matters or application of the Practice to particular project or engineering situations should not be made solely on information contained in these materials. The use of trade names from time to time should not be viewed as an expression of preference but rather recognized as normal usage in the trade. Other brands having the same specifications are equally correct and may be substituted for those named. All Practices or guidelines are intended to be consistent with applicable laws and regulations including OSHA requirements. To the extent these Practices or guidelines should conflict with OSHA or other applicable laws or regulations, such laws or regulations must be followed. Consult an appropriate professional before applying or acting on any material contained in or suggested by the Practice. This Practice is subject to revision at any time. Process Industry Practices (PIP), Construction Industry Institute, The University of Texas at Austin, 3925 West Braker Lane (R4500), Austin, Texas PIP Member Companies and Subscribers may copy this Practice for their internal use. Changes or modifications of any kind are not permitted within any PIP Practice without the express written authorization of PIP. Authorized Users may attach addenda or overlays to clearly indicate modifications or exceptions to specific sections of PIP Practices. Authorized Users may provide their clients, suppliers and contractors with copies of the Practice solely for Authorized Users purposes. These purposes include but are not limited to the procurement process (e.g., as attachments to requests for quotation/ purchase orders or requests for proposals/contracts) and preparation and issue of design engineering deliverables for use on a specific project by Authorized User s client. PIP s copyright notices must be clearly indicated and unequivocally incorporated in documents where an Authorized User desires to provide any third party with copies of the Practice. PUBLISHING HISTORY November 2017 Issued Not printed with State funds

3 November 2017 Pipeline Systems Table of Contents PIP PLSC0019 Specification for Pressure Testing HDPE Plastic Pipeline Systems 1. Scope References... 2 Industry Codes and Standards Definitions Requirements Safety Test Pressure and Duration Testing Medium Test Segment Isolation Pre-test Notifications and Permits Recording Instruments Conducting the Pressure Test Documentation Process Industry Practices Page 1 of 13

4 1. Scope This standard provides minimum requirements for performing pressure tests using a liquid medium on non-reinforced HDPE plastic pipe intended for all service types (e.g., hydrocarbon, produced water). 2. References Applicable parts of the following industry codes and standards shall be considered an integral part of this Practice. The edition in effect on the date of contract award shall be used, except as otherwise noted. Short titles are used herein where appropriate. Code section references below are specific to the code editions in effect at the issuance of this Practice. Industry Codes and Standards 3. Definitions American Society of Mechanical Engineers (ASME) ASME B Pipe Flanges and Flanged Fittings: NPS 1/2 through NPS 24 Metric/Inch Standard American Petroleum Institute (API) API Standard Welding of Pipelines and Related Facilities owner: The party who owns the facility or pipeline wherein the piping will be used purchaser: The party who awards the contract to the supplier. The purchaser may be the owner or the owner's authorized agent. supplier: The party responsible for providing the testing services 4. Requirements 4.1 Safety Testing shall be performed in accordance with owner and local regulatory requirements The test area shall be clearly identified by using safety barriers and posted signs Only personnel involved with the pressure test (e.g., inspecting the equipment, taking the necessary readings) shall be permitted within the test area All personnel and equipment not actively involved in the test shall maintain a minimum distance of 15.2 m (50 feet) from any pressurized pipe or fitting Owner shall notify people who live or work within 30.4 m (100 feet) of a pipeline segment to be tested about the testing activities before pressurization of the pipe is started. Process Industry Practices Page 2 of 13

5 4.1.6 If the distances specified in Sections and are not possible, owner shall ensure that people and equipment not actively involved in the test are maintained as far away from the test area as possible If testing is to be performed in high traffic areas, consideration should be given to providing additional signage and/or providing public notice of the testing activities Before the start of testing, a Job Safety Analysis shall be conducted for all personnel within the vicinity of the test Except if used for instrumentation lines, hoses sized 25 mm (1 inch) and greater and pressurized to greater than 0.68barg (10 psig) shall be staked at a minimum of every 7.6 m (25 feet) Mechanical connections (e.g., hose connections, instrument lines, hammer unions) shall be protected with whip checks or equivalent All components (e.g., piping, hoses, fittings) shall be inspected for proper pressure rating All mechanical connections shall be exposed for leak examination For underground connections, joints, and seals exposed for observation during the test, sufficient backfill material shall be placed between the joints and over the pipe to prevent movement because of thrust forces. Comment: Large amounts of exposed piping can result in large temperature related pressure changes, making a stable test difficult to achieve Personnel responsible for the tests shall have relevant and adequate training and experience in pipeline hydrostatic and/or pneumatic testing For preventing over pressurization, a Pressure Relief Device (PRD) shall be installed with the set point equal to the maximum allowable test pressure plus 1.4 barg (20 psig). The PRD shall be tested before conducting the pressure test Direct heating of any pipe contained within the test section shall not be permitted during the test If a leak is discovered, the test section shall be depressurized before repairing the leak Because leakage at a butt fusion joint can indicate imminent catastrophic rupture, if butt fusion leakage is discovered, the test section shall be depressurized immediately Appropriate environmental, health, and safety (EHS) protocols shall be specified and followed including but not limited to the following: a. Energy isolation (i.e., Lock Out Tag Out) b. Hazard Assessment & Personal Protective Equipment (PPE) c. Hot work d. Excavation and trenching e. Pre-Job Planning Process Industry Practices Page 3 of 13

6 4.2 Test Pressure and Duration Pressure tests shall be held for 1 hour after the 4 hour expansion phase (see Section ) The piping material temperature shall not be higher than the greater of: a. 38 C (100 F) b. the material s long term hydrostatic design basis temperature For DOT regulated, non-reinforced plastic pipelines, the maximum test pressure shall not be greater than 14.8 barg (215 psig) Owner shall determine and furnish the following pressure test parameters: a. Maximum Piping Material Temperature b. Maximum test pressure c. Minimum test pressure d. Duration of test d. Location of test equipment f. High point, low point, and measurement elevations The pressure test parameters shall be recorded in the Pressure Test Record The effect of elevation on test pressures shall be considered for tests where elevation change is greater than 30.5 m (100 feet) Testing pressures shall be in accordance with piping materials manufacturers limitations. 4.3 Testing Medium Unless otherwise specified in the contract documents, municipal water shall be used as the testing medium If municipal water is not available or if another type of water is specified in the contract documents, the water used for the pressure test shall be tested and shall be in accordance with the following requirements: a. Total Suspended Solids: Less than or equal to 100 ppm b. Total Dissolved Solids (TDS): Less than or equal to 2,000 ppm c. ph: Between 6 and If ambient temperatures are expected to be less than 4.4 C (40 F) during the test period, methanol or another freezing inhibitor shall be considered If use of any chemicals is expected, owner shall furnish a plan for water disposal. 4.4 Test Segment Isolation Test termination points shall be isolated from adjacent pipeline facilities. Process Industry Practices Page 4 of 13

7 4.4.2 Unless otherwise instructed by the valve manufacturer, valves which are in-line for the test shall be maintained in half-open position during the test ASME code pressure vessels shall be isolated from the test An owner representative shall supervise the isolation operation and ensure the isolation has been conducted properly. 4.5 Pre-test Notifications and Permits All required state and federal notifications shall be made and permits shall be obtained before any testing starts A local owner s representative shall be consulted to determine if additional permits are required for pressure testing or water disposal. 4.6 Recording Instruments General Unless otherwise agreed by purchaser, a traditional dead weight tester (DWT) shall be used for recording the test information If a digital gauge is to be used, the gauge shall be as accurate as a traditional DWT over the entire test pressure range Field adjustments to the chart recorders shall not be permitted If the chart recorder readings differ from the DWT readings, the difference shall be noted in the pressure test documentation Pen charts that record pressure and pipe and fluid temperature shall be used for each pressure test and for pre-testing any pipe or assembly including bore pipe Ambient temperature shall be recorded with a pen chart or other recording device Pressure and temperature recording equipment shall be provided in accordance with Table 1. Table 1 - Pressure and temperature recording equipment Deadweight (Hydraulic or Electronic) Pressure Recorder Ambient Temperature Recorder Pipe Temperature Recorder Combination Pressure and Ambient Temperature Recorder NIST-certified Pressure Gauge (Backup) Required X X X X X Optional X Recorder Manifolds Recorders that connect to the pipe segment being tested shall have a piped manifold. Process Industry Practices Page 5 of 13

8 A recorder manifold shall have additional connections for the DWT and a backup manual pressure gauge A recorder manifold shall be capable of isolating all of the instruments from the pipe segment being tested Calibration Certifications Calibration certificates shall be provided for the DWT or equivalent recording device and pen chart recorders All instrument certifications shall be valid for 12 months before recertification is required Copies of all calibration certifications for pressure and temperature recording equipment shall be provided before testing begins All recording equipment shall have certification dates not greater than 6 months before the testing date Deadweight Testers Owner approved DWT may be electronic or hydraulic DWT shall be capable of measuring pressures in maximum increments of 0.1 barg (1 psi) DWT shall have the following components: a. National Institute of Standards and Technology (NIST) traceable Hydraulic Deadweight Tester b. Pressure Recorder with NIST traceable certification Pressure Recorders Pressure recorders shall be capable of recording up to a 24-hour range Pen chart recorders shall be in accordance with the following: a. 200 mm (8 inch) minimum diameter chart size. Larger charts are preferred. b. The recorder shall permit the minimum and maximum test pressures to be between 35 to 65% of the range of scale Pressure recorders shall be in accordance with the following: a. Range of scale appropriate to test pressure b. Capable of recording units of pressure as specified by the owner. c. Maximum logging interval: 30 seconds Pipe Temperature Recorders Temperature recorders shall be capable of recording up to a 24 hour range Pen chart recorders shall be in accordance with the following: Process Industry Practices Page 6 of 13

9 a. 200 mm (8 inch) minimum diameter chart size. Larger charts are preferred. b. Range of scale: 0 to 70 C (150 F) Temperature recorders shall be in accordance with the following: a. Range of scale: 0 to 100 C (200 F) b. Capable of recording units of temperature as specified by the owner. c. Maximum logging interval: 30 seconds The sensor of a pipe temperature recording device shall be installed in contact with the pipeline and located in accordance with the following: a. At a point that has protection from the sun. b. At a distance far enough from the test medium injection point so that the effect of the exposed piping on temperature is minimized. c. Backfill around the sensor shall be tamped Ambient Air Temperature Recorder Temperature recorders shall be capable of recording up to a 24-hour range Pen chart recorders shall be in accordance with the following: a. 200 mm (8 inch) minimum diameter chart size. Larger charts are preferred. b. Range of scale: 0 to 70 C or 0 to 150 F Temperature recorders shall be in accordance with the following: a. Range of scale: 0 to 100 C or 0 to 200 F b. Capable of recording units of temperature as specified by the owner. c. Maximum logging interval: 30 seconds Combination Pressure and Ambient Temperature Recorder A dual pen chart recorder may be used to record pressure and ambient temperature Each recorded line shall be clearly labeled on the chart The recording pen shall apply enough pressure to draw a heavy, consistent line on the chart In addition to a DWT (hydraulic or electronic), a back-up NIST-certified pressure gauge shall be used to ensure test pressure accuracy Recorders that connect to the pipe segment being tested shall be common on the same manifold. Process Industry Practices Page 7 of 13

10 The manifold shall have additional connections for the DWT and the backup NIST-certified pressure gauge The manifold shall be capable of being isolated from the test segment Recommendations for Charts and Chart Recorders Selection Large charts are preferred Separate charts for recording the temperature and pressure are preferable Dual or combined chart recorders are permissible If a dual pen chart recorder is used, each recorded line shall be clearly labeled on the chart The chart s scale should allow easy, identifiable reading of the recording The chart time range should be an appropriate length, typically 24 hours The recording pen should apply enough pressure to draw a heavy, consistent line on the chart. 4.7 Conducting the Pressure Test Pre-Test Preparation Before testing, completion of the following activities shall be verified for both the system to be tested and the test equipment: a. All mechanical joints are completely assembled with all necessary seals, fasteners, and gaskets properly installed b. All flange bolts are torqued in accordance with owner s specifications c. All valve body bleed vents are closed and tightened d. All non-destructive testing (NDT) has been performed in accordance with the contract documents Temporary welded assemblies including test heads used for test activities shall be examined by 100% radiographic inspection and approved in accordance with API Standard 1104 before conducting the hydrostatic test All test heads (i.e., a short section of pipe with an end cap and valves welded to the end of a section and used in the filling of pipe and controlling pressure during testing operations) shall be pre-tested a minimum of one hour to a minimum of 125% of the maximum test pressure Documentation of pressure testing and NDT shall be retained and included in the final documentation listed in Section Except as permitted by Section , all test termination points shall be isolated from the adjacent pipeline facilities and pressure vessels by blind flanges with appropriate blind flange ratings to meet or exceed the Process Industry Practices Page 8 of 13

11 pressures expected during testing, and manufactured in accordance with ASME B Skillet or spectacle blinds per ASME B16.48 which are stamped with the appropriate pressure rating or for which the material certifications are available may be used to isolate test termination points Flushing, pigging, or other means of cleaning the system to remove dirt and debris that may damage valves and regulators shall be performed before testing. Comment: Cleaning by pigging involves forcing a resilient plastic plug (i.e., soft pig) through the pipeline. Pigging should be performed using a launcher and receiver. Soft pigs are required with polyethylene pipe. Scraping finger type or bucket type pigs can severely damage the pipeline and should not be used Unless otherwise instructed by the valve manufacturer, all installed valves in the test section shall be tested in the half-open position so that the valve seats and gate segments are not required to withstand the test pressure Check valves shall be secured in the full open position or the flappers removed Valves that are only connected on one side shall have blinds or hex plugs for flanged and threaded ends, respectively Instruments and sensing lines shall be disconnected and the root valve shall be in the open position and plugged Initial Filling of Test Segment The filling or pressurization shall be performed in a controlled and steady manner and in the presence of a purchaser representative The pipe segment shall be filled with the test liquid in a manner that will ensure no air or product remains in the pipe to be tested A displacement pig shall be launched by pumping water behind the displacement pig and holding a pre-packed column of air or nitrogen in front of the pig Fill rates shall not be greater than 1.5 meters per second (5 feet per second) pig velocity If the line cannot be properly displaced of air during the filling operation, vent valves shall be installed at the high elevation points where air is likely to accumulate After the line has been filled, a minimum of 4 hours shall be permitted for the test water temperature to stabilize before strength testing. Permitting the test water to stabilize overnight is preferred Stabilization shall be complete before the strength test portion of the hydrotest. Process Industry Practices Page 9 of 13

12 4.7.3 Expansion Phase To permit gradual, acceptable expansion of the pipe during the expansion phase, the pressure shall be gradually increased by approximately 0.68 barg/min (10 psig/min) or less, until the minimum test pressure is reached Once the minimum test pressure is reached, the pipe shall be shut in and permitted to expand for one hour Additional medium shall be added once every hour for four hours to maintain test pressure During the expansion phase, continuous surveillance shall be maintained for leaks in test equipment, connections, flanges, etc When making repairs to equipment or pipe segments or tightening bolts, the pressure shall be bled down to 0 barg (0 psig) and re-pressurized after the repairs are made When the maximum test pressure is reached, the following readings shall be placed in the Pressure Test Log at a minimum of 15 minute intervals: a. Time b. Pressure (Hydraulic or Electronic Deadweight) c. Temperature (Ambient and Pipe) d. Remarks (e.g., Volume of make-up test liquid additions to maintain pressure, Pressure bleed-off, irregularities in the pen chart recordings, weather changes, etc.) Strength Test Phase After the initial expansion, the minimum test pressure shall be held for an additional hour When the target strength test pressure is reached, the duration begins and the individual responsible for conducting the test shall record the following readings at 15 minute intervals: a. Time b. Pressure (dead weight tester or equivalent) c. Temperature (ambient and pipe/test medium) d. Remarks (weather changes) e. Volume of water added or withdrawn The combined time between initial pressurization before expansion and final depressurization shall not be greater than 8 hours If the test is not completed within 8 hours, the test section shall be depressurized and permitted to relax for a minimum of 8 hours before pressurizing the test section again. Process Industry Practices Page 10 of 13

13 4.7.5 Termination of Test and Depressurization of Piping Before depressurization, purchaser shall review the data and information from the test to determine if the test was successful Unless the test period becomes greater than specified in Section , the test pressure shall be maintained above the minimum test pressure until the test is approved by the purchaser After the test has been completed, the pressure in the pipeline shall be gradually decreased at a rate not greater than 1.7 barg/min (25 psig/min) until the pressure reaches 3.4 barg (50 psig) Pass/Fail Criteria A test shall be considered passing if no visual leakage is observed, and pressure during the 1 hour strength test phase remains steady within 5% of the target test pressure If the pressure drop is greater than the allowable 5% of the target test pressure during the 1 hour strength test phase, an additional attempt may be made by re-pressurizing to the target test pressure and conducting another one (1) hour strength test phase as long as the maximum test duration specified in Section is not exceeded If the test does not meet the passing requirements within the maximum pressure test period, or if leak repairs are required, the test section shall be depressurized and remain so for 8 hours until a re-test can be attempted Dewatering 4.8 Documentation Following successful completion of the pressure test, the hydrostatic test water from the pipeline segment shall be displaced De-watering shall be performed by propelling displacement pigs through the pipeline system with air, nitrogen, or natural gas If natural gas is used to propel the displacement pig, a pre-start-up safety review shall be completed The pipeline system shall be dried in accordance with owner s requirements for the intended pipeline or facility use and product specification Displaced water shall be disposed of or directed into temporary storage for treatment in accordance with requirements furnished by the owner s representative Pressure Test Documentation The following documentation is required: a. An explanation of all pressure discontinuities, including test failures appearing on the pressure recording charts. b. The temperature and pressure recording charts from the test. The temperature and pressure recording charts shall be signed by the Process Industry Practices Page 11 of 13

14 supplier and a purchaser representative. The signatures on the charts shall verify that the charts were produced by the recorder during the pressure test. c. Documentation of any volume additions or withdrawals. d. Sufficient description to designate which pipelines were tested and the extent of pipeline (e.g., stationing, chainage etc.) included in the test sections. e. A map and/or sketch showing the locations of the test points, temperature bulb, and pressure pump See Figure 1 for a sample of documentation form DWT Data shall be provided in accordance with the following: a. A list of the pressure readings taken with the DWT showing comparable pressure recorder readings at the time of the test shall be included in the final report. b. The DWT readings shall be the pressure readings provided in the final report and used for all calculations and certifications. c. The pressure recording charts are only to document pressure continuity and shall not be provided as the official test pressure readings For pipelines with elevation differences of greater than 30.5 m (100 feet) from the highest to the lowest test points, a profile shall be included in the final report showing the elevation along the test section and at the test site Additionally, the final report shall contain but not be limited to, the following elements for each test section: a. Biocide treatment reports b. Pressure recording charts c, Deadweight (hydraulic and electronic) reading logs d. Pipe temperature recording charts or combination pressure/temperature recording charts. e. Ambient air temperature recording charts f. Calibration certificates of each piece of testing equipment utilized g. Reports covering the disposition of all test failures/leaks h. Alignment drawings showing pressure test boundaries i. Documentation of a Completed Pre-Task Safety Meeting. j. Photos of test equipment configuration and manifolds All other relevant field data taken during the test shall also be included in the final report The final report shall be forwarded to the owner within 24 hours of completion of a successful pressure test. Process Industry Practices Page 12 of 13

15 Figure 1: Sample Pressure Test Documentation Form Process Industry Practices Page 13 of 13

PIP PNE00012 Piping Examination and Leak Test Guide

PIP PNE00012 Piping Examination and Leak Test Guide October 2017 Piping PIP PNE00012 Piping Examination and Leak Test Guide PURPOSE AND USE OF PROCESS INDUSTRY PRACTICES In an effort to minimize the cost of process industry facilities, this Practice has

More information

HYDROSTATIC LEAK TEST PROCEDURE

HYDROSTATIC LEAK TEST PROCEDURE This information is proprietary and shall not be disclosed outside your organization, nor shall it be duplicated, used or disclosed for purposes other than as permitted under the agreement with Kinetics

More information

SECTION PRESSURE TESTING OF PIPING

SECTION PRESSURE TESTING OF PIPING SECTION 15044 PRESSURE TESTING OF PIPING PART 1 - GENERAL 1.01 DESCRIPTION A. Scope of Work: This section specifies the leakage and pressure testing of piping. B. Testing Records: PART 2 - PRODUCTS 2.01

More information

Safety. April 2018 Supersedes all previous publications 2018 Chevron Phillips Chemical Company LP

Safety. April 2018 Supersedes all previous publications 2018 Chevron Phillips Chemical Company LP Technical Note 802 Leak Testing of Polyethylene Pipe For Municipal and Industrial Applications Part 1 Pre-Test Considerations Leak testing may be used to find leaks in a newly constructed or newly modified

More information

PIP PNSMV004 Carbon Steel Globe Valve Descriptions

PIP PNSMV004 Carbon Steel Globe Valve Descriptions February 2015 Piping PIP PNSMV004 Carbon Steel Globe Valve Descriptions PURPOSE AND USE OF PROCESS INDUSTRY PRACTICES In an effort to minimize the cost of process industry facilities, this Practice has

More information

Process Industry Practices Pipeline Systems

Process Industry Practices Pipeline Systems September 2013 Process Industry Practices Pipeline Systems PIP PLX03CS5S01 Pipeline Systems, ASME B31.8 Material Specification Inside Production, Well Site Facility, Class 300, Carbon Steel, 0.03125" (1/32

More information

Pipeline Systems PIP PLSMV004 Carbon Steel Globe Valve Descriptions

Pipeline Systems PIP PLSMV004 Carbon Steel Globe Valve Descriptions November 2017 Pipeline Systems PIP PLSMV004 Carbon Steel Globe Valve Descriptions PURPOSE AND USE OF PROCESS INDUSTRY PRACTICES In an effort to minimize the cost of process industry facilities, this Practice

More information

PIP PN03SA0S03 Piping Material Specification 3SA0S03 Class 300, 304/304L Stainless Steel, Socket Weld, C.A.-None, Low Temperature Process

PIP PN03SA0S03 Piping Material Specification 3SA0S03 Class 300, 304/304L Stainless Steel, Socket Weld, C.A.-None, Low Temperature Process February 2018 Piping PIP PN03SA0S03 Piping Material Specification 3SA0S03 Class 300, 304/304L Stainless Steel, Socket Weld, C.A.-None, Low Temperature Process PURPOSE AND USE OF PROCESS INDUSTRY PRACTICES

More information

PIP PN03SV0S01 Piping Material Specification 3SV0S01 Class 300, Alloy 254 SMO (UNS S31254), Socket Weld, C.A. Process (PTFE Packing/Gaskets)

PIP PN03SV0S01 Piping Material Specification 3SV0S01 Class 300, Alloy 254 SMO (UNS S31254), Socket Weld, C.A. Process (PTFE Packing/Gaskets) May 2016 Piping PIP PN03SV0S01 Piping Material Specification 3SV0S01 Class 300, Alloy 254 SMO (UNS S31254), Socket Weld, 0.000 C.A. Process (PTFE Packing/Gaskets) PURPOSE AND USE OF PROCESS INDUSTRY PRACTICES

More information

Perform Pressure & Leak Test, Tubing & Piping. Module 12306

Perform Pressure & Leak Test, Tubing & Piping. Module 12306 Perform Pressure & Leak Test, Tubing & Piping Module 12306 Instrumentation Trainee Task Module 12306 PERFORM PRESSURE AND LEAK TEST, TUBING AND PIPING Objectives Upon completion of this module, the trainee

More information

CLASS D - SENSITIVE LEAK TEST GAS AND BUBBLE METHOD. 1.1 To provide definitive requirements for PNEUMATIC pressure testing of piping systems.

CLASS D - SENSITIVE LEAK TEST GAS AND BUBBLE METHOD. 1.1 To provide definitive requirements for PNEUMATIC pressure testing of piping systems. Page 1 of 7 CLASS D - SENSITIVE LEAK TEST GAS AND BUBBLE METHOD 1. SCOPE 1.1 To provide definitive requirements for PNEUMATIC pressure testing of piping systems. 1.2 The piping system as used herein is

More information

Standard Pneumatic Test Procedure Requirements for Piping Systems

Standard Pneumatic Test Procedure Requirements for Piping Systems the pressure equipment safety authority Standard Pneumatic Test Procedure Requirements for Piping Systems AB-522 Edition 2, Rev. 1 Issued 2016-10-24 Table of Contents FOREWORD... 1 1.0 INTRODUCTION...

More information

PIP PN03SA0S01 Piping Material Specification 3SA0S01 Class 300, 304/304L Stainless Steel, Socket Weld, C.A., Process

PIP PN03SA0S01 Piping Material Specification 3SA0S01 Class 300, 304/304L Stainless Steel, Socket Weld, C.A., Process May 2016 Piping PIP PN03SA0S01 Piping Material Specification 3SA0S01 Class 300, 304/304L Stainless Steel, Socket Weld, 0.000 C.A., Process PURPOSE AND USE OF PROCESS INDUSTRY PRACTICES In an effort to

More information

PIP PNSMV037 Bronze and Iron Butterfly Valve Descriptions

PIP PNSMV037 Bronze and Iron Butterfly Valve Descriptions October 2017 Piping PIP PNSMV037 Bronze and Iron Butterfly Valve Descriptions PURPOSE AND USE OF PROCESS INDUSTRY PRACTICES In an effort to minimize the cost of process industry facilities, this Practice

More information

CLASS DH - PNEUMATIC TESTING - GREATER THAN 1 BAR (15 PSIG)

CLASS DH - PNEUMATIC TESTING - GREATER THAN 1 BAR (15 PSIG) Page 1 of 10 CLASS DH - PNEUMATIC TESTING - GREATER THAN 1 BAR (15 PSIG) 1. SCOPE 1.1 To provide definitive requirements for HIGH PRESSURE PNEUMATIC testing of piping systems according to ASME B31.3. This

More information

Hygienic Process Sample PIP PHCM0004 Hygienic Valve Commodity Codes Designator System

Hygienic Process Sample PIP PHCM0004 Hygienic Valve Commodity Codes Designator System Hygienic Process Sample PIP PHCM0004 Hygienic Valve Commodity Codes Designator System PURPOSE AND USE OF PROCESS INDUSTRY PRACTICES In an effort to minimize the cost of process industry facilities, this

More information

Subpart E. Pressure Testing

Subpart E. Pressure Testing Subpart E Pressure Testing 195.300 Scope This subpart prescribes minimum requirements for pressure testing of steel pipelines. However, this subpart does not apply to movement of pipe covered by 195.424.

More information

Hydrostatic Pressure Testing

Hydrostatic Pressure Testing General An experienced or qualified person will be put in charge of hydro and should meet with the supervisor in charge of the job prior to test. Customer expectations should be clarified prior to beginning

More information

BUTTERFLY VALVES Series 800

BUTTERFLY VALVES Series 800 BUTTERFLY VALVES Series 800 WARNING Before proceeding read ALL instructions and become familiar with the equipment and associated drawings. Follow ALL applicable safety regulations and codes for pressurized

More information

ACCREDITATION OF ON-LINE LEAK SEAL ORGANIZATIONS

ACCREDITATION OF ON-LINE LEAK SEAL ORGANIZATIONS ACCREDITATION OF ON-LINE LEAK SEAL ORGANIZATIONS TSSA GUIDE FOR SURVEY TEAMS The Technical Standards and Safety Authority Boilers and Pressure Vessels Safety Division 3300 Bloor Street West 14th Floor,

More information

The purpose of this task is to prevent damage from occurring to the pipe or it s coating when backfilling an exposed pipeline.

The purpose of this task is to prevent damage from occurring to the pipe or it s coating when backfilling an exposed pipeline. OQ Task Name Task 39.0 Backfill 1.0 Task Description This task applies to the process and material to backfill or cover a buried pipeline which has been excavated or otherwise exposed, Backfilling shall

More information

San Antonio Water System Standard Specifications for Construction ITEM NO. 841 HYDROSTATIC TESTING OPERATIONS

San Antonio Water System Standard Specifications for Construction ITEM NO. 841 HYDROSTATIC TESTING OPERATIONS ITEM NO. 841 HYDROSTATIC TESTING OPERATIONS 841.1 DESCRIPTION: This item shall consist of hydrostatic testing operations, of water mains in accordance with these specifications. 841.2 MATERIALS: The materials

More information

Spilt body Flange ball valve. TC-205MFF-PN1640 User Manual English Version. Document No: TC-205MFF-PN1640.Ur-manual. Date: 2007/04/2617. Version: 1.

Spilt body Flange ball valve. TC-205MFF-PN1640 User Manual English Version. Document No: TC-205MFF-PN1640.Ur-manual. Date: 2007/04/2617. Version: 1. Spilt body Flange ball valve TC-205MFF-PN1640 Series PED Category I,II TC-205MFF-PN1640 User Manual English Version Use for company in Europe who will place the product on the market, please amend which

More information

Date of Issue: July 2016 Affected Publication: API Specification 16C, Choke and Kill Equipment, Second Edition, March 2015 ADDENDUM 1

Date of Issue: July 2016 Affected Publication: API Specification 16C, Choke and Kill Equipment, Second Edition, March 2015 ADDENDUM 1 Date of Issue: July 2016 Affected Publication: API Specification 16C, Choke and Kill Equipment, Second Edition, March 2015 ADDENDUM 1 Page 16, Section 4.6, delete the entire section and renumber all subsequent

More information

COSASCO 6000 PSI SINGLE ISOLATION SERVICE VALVE (FR) MAINTENANCE

COSASCO 6000 PSI SINGLE ISOLATION SERVICE VALVE (FR) MAINTENANCE COSASCO 6000 PSI SINGLE ISOLATION SERVICE VALVE (FR) MAINTENANCE 11841 Smith Avenue Santa Fe Springs, CA 90670 Tel: (562) 949-0123 (800) 635-6898 Fax: (562) 949-3065 www.cosasco.com Page: 2 of 26 Revision

More information

IAPMO GUIDE CRITERIA FOR BALL VALVES IAPMO IGC PURPOSE

IAPMO GUIDE CRITERIA FOR BALL VALVES IAPMO IGC PURPOSE INTERNATIONAL ASSOCIATION OF PLUMBING AND MECHANICAL OFFICIALS IAPMO GUIDE CRITERIA FOR BALL VALVES IAPMO IGC 157-20067 1 PURPOSE 1.1 The purpose of this standard is to establish an acceptable standard

More information

COSASCO 3600 PSI SINGLE ISOLATION SERVICE VALVE (FR) MAINTENANCE

COSASCO 3600 PSI SINGLE ISOLATION SERVICE VALVE (FR) MAINTENANCE COSASCO 3600 PSI SINGLE ISOLATION SERVICE VALVE (FR) MAINTENANCE Rohrback Cosasco Systems, Inc. 11841 E. Smith Avenue Santa Fe Springs, CA 90670 Tel: (562) 949-0123 (800) 635-6898 Fax: (562) 949-3065 www.cosasco.com

More information

STANDARD SPECIFICATION FOR SPLIT TEES (HOT TAP MATERIAL)

STANDARD SPECIFICATION FOR SPLIT TEES (HOT TAP MATERIAL) STANDARD SPECIFICATION FOR SPLIT TEES (HOT TAP MATERIAL) TEE (HOT TAPPING MATERIAL) S-04-02-040 Page 1 of 7 1.0 SCOPE This specification covers the basic requirements for the design, manufacture and supply

More information

OCTOBER 2017 ISSUE Page 1 of 7

OCTOBER 2017 ISSUE Page 1 of 7 Field testing is performed on fully assembled pipelines for the purpose of determining pipeline acceptability. Following visual acceptance of joints and pipeline components, pressure pipelines in their

More information

Un-Pressurized Orefice Fittings FIO EZ. Parts List and Operation Instructions TECHNICAL MANUAL. Dn 2-6 Class Lbs

Un-Pressurized Orefice Fittings FIO EZ. Parts List and Operation Instructions TECHNICAL MANUAL. Dn 2-6 Class Lbs Un-Pressurized Orefice Fittings FIO EZ Parts List and Operation Instructions TECHNICAL MANUAL Dn 2-6 Class 150-600 Lbs US US 2 FIO EZ - MT 108-US - 05-2016 FIO EZ Important Instructions US Pietro Fiorentini

More information

New Hampshire Public Utilities Commission CFR 49 Part 192 Regulations. MINIMUM Pipeline Safety Regulations

New Hampshire Public Utilities Commission CFR 49 Part 192 Regulations. MINIMUM Pipeline Safety Regulations New Hampshire Public Utilities Commission CFR 49 Part 192 Regulations MINIMUM Pipeline Safety Regulations Application for Jurisdictional LPG Operators 1 Pipeline Safety Regulations 49 CFR Part 192 (NOTE:

More information

Piped Air SCBA Refilling System Standard

Piped Air SCBA Refilling System Standard WALT WHITE Fire Chief 5770 Freeport Blvd., Suite 200 Sacramento, CA 95822-3516 Ph: (916) 808-1300 Fax: (916) 808-1629 www.sacfire.org Piped Air SCBA Refilling System Standard SCOPE: This specification

More information

299H Series. Introduction. P.E.D. Categories. Specifications. Installation. Warning. Installation Guide English September 2012

299H Series. Introduction. P.E.D. Categories. Specifications. Installation. Warning. Installation Guide English September 2012 Installation Guide English September 2012 299H Series Introduction This Installation Guide provides instructions for installation, startup, and adjustment of 299H Series regulators. To receive a copy of

More information

Flange Bolt Torquing. for Resistoflex Plastic-Lined Piping Products. Torquing. Retorquing. Hydrotesting. Annual retorquing

Flange Bolt Torquing. for Resistoflex Plastic-Lined Piping Products. Torquing. Retorquing. Hydrotesting. Annual retorquing Flange Bolt Torquing for Resistoflex Plastic-Lined Piping Products Torquing When assembling flange connections, always use a full complement of clean, new high strength A193-B7 bolting. If using stainless

More information

Type Testing of Rising Stem Valves Equipped with Graphite Packing for Fugitive Emissions

Type Testing of Rising Stem Valves Equipped with Graphite Packing for Fugitive Emissions Type Testing of Rising Stem Valves Equipped with Graphite Packing for Fugitive Emissions 1 Scope This standard specifies the requirements and acceptance criteria (100 ppmv) for fugitive emission type testing

More information

Fluid Sealing Association

Fluid Sealing Association Fluid Sealing Association STANDARD FSA-PSJ-701-06 PIPING SYSTEMS NON-METALLIC EXPANSION JOINT HYDROTESTING AND VACUUM TESTING 994 Old Eagle School Road, Suite 1019 Wayne, Pennsylvania 19087-1866 Phone:

More information

Fisher DVI Desuperheater Venturi Inline

Fisher DVI Desuperheater Venturi Inline Instruction Manual DVI Desuperheater Fisher DVI Desuperheater Venturi Inline Contents Introduction... 1 Scope of Manual... 1 Description... 1 Principle of Operation... 2 Installation... 3 Operating Instructions...

More information

API MPMS Chapter 17.6 Guidelines for Determining the Fullness of Pipelines between Vessels and Shore Tanks

API MPMS Chapter 17.6 Guidelines for Determining the Fullness of Pipelines between Vessels and Shore Tanks API MPMS Chapter 17.6 Guidelines for Determining the Fullness of Pipelines between Vessels and Shore Tanks 1. Scope This document describes procedures for determining or confirming the fill condition of

More information

2.0 Dates and Times Tests to be carried out starting Monday 28 Nov for completion Friday 2 Dec.

2.0 Dates and Times Tests to be carried out starting Monday 28 Nov for completion Friday 2 Dec. MS No: :. A 1.0 Scope of Work Preparation notes: delete column before issuing. 1.1 General Description of Works, Location & Boundaries Strength and tightness testing of Glycol System between plant room

More information

REFER TO AQUATHERM TECHNICAL BULLETIN A-AQTTB FOR ADDITIONAL INFORMATION AND SAFETY PRECAUTIONS

REFER TO AQUATHERM TECHNICAL BULLETIN A-AQTTB FOR ADDITIONAL INFORMATION AND SAFETY PRECAUTIONS Aquatherm Standard Pressure Testing Procedure Aquatherm offers an extensive warranty to protect against damages caused by failure from manufacturer s defect. Aquatherm requires that all installations be

More information

TECHNICAL DATA. than the water inlet pressure to the concentrate

TECHNICAL DATA. than the water inlet pressure to the concentrate Foam102a 1. DESCRIPTION The Viking Low Flow Foam/Water proportioning system, is a UL Listed and FM Approved system, for use with 3M foam concentrates. This system consists of a standard wet pipe sprinkler

More information

TBV OPERATION AND MAINTENANCE MANUAL SERIES 2800: FLANGED BALL VALVE. For technical questions, please contact the following:

TBV OPERATION AND MAINTENANCE MANUAL SERIES 2800: FLANGED BALL VALVE. For technical questions, please contact the following: TBV OPERATION AND MAINTENANCE MANUAL SERIES 2800: FLANGED BALL VALVE For technical questions, please contact the following: Engineering Department 1537 Grafton Road Millbury, MA 01527 Phone: (508) 887-9400

More information

P5513. Users Manual. Pneumatic Comparison Test Pump. Test Equipment Depot Washington Street Melrose, MA TestEquipmentDepot.

P5513. Users Manual. Pneumatic Comparison Test Pump. Test Equipment Depot Washington Street Melrose, MA TestEquipmentDepot. Test Equipment Depot - 800.517.8431-99 Washington Street Melrose, MA 02176 TestEquipmentDepot.com P5513 Pneumatic Comparison Test Pump Users Manual PN 3963372 November 2010 2010 Fluke Corporation. All

More information

3-PIECE BALL VALVE, 3600 PSI/ PN 248, WITH ISO DIRECT MOUNTING PAD 306M SERIES/ PED Category II

3-PIECE BALL VALVE, 3600 PSI/ PN 248, WITH ISO DIRECT MOUNTING PAD 306M SERIES/ PED Category II 3-PIECE BALL VALVE, 3600 PSI/ PN 248, WITH ISO DIRECT MOUNTING PAD 306M SERIES/ PED Category II 306M User Manual English Version Use for company in Europe who will place the product on the market, please

More information

TECHNICAL DATA. Low-Flow Foam Preaction System with Hydraulically Actuated Concentrate Control Valve.

TECHNICAL DATA. Low-Flow Foam Preaction System with Hydraulically Actuated Concentrate Control Valve. Foam 302 a 1. DESCRIPTION (Refer to Figure 1 on page 302 e.) The Viking Low-Flow Foam/Water Proportioning System is a UL Listed and FM Approved system, for use with 3M and Viking brand foam concentrate.

More information

SERVICE MANUAL MODEL BA050BMST BREATHING AIR PANEL

SERVICE MANUAL MODEL BA050BMST BREATHING AIR PANEL www.modsafe.com SERVICE MANUAL MODEL BA050BMST BREATHING AIR PANEL WARNING: Do not attempt to operate this equipment without first reading and understanding the service manual enclosed with this device.

More information

Model PIV UL/FM Post Indicator Valve. Maintenance and Operation Manual UL/FM Post Indicator Valve Configuration AWWA C515

Model PIV UL/FM Post Indicator Valve. Maintenance and Operation Manual UL/FM Post Indicator Valve Configuration AWWA C515 Model 2010 -PIV UL/FM Post Indicator Valve Maintenance and Operation Manual UL/FM Post Indicator Valve Configuration AWWA C515 2 LAYOUT AND SITING At the design stage, it should be considered where valves

More information

Smart Water Application Technologies (SWAT) TM

Smart Water Application Technologies (SWAT) TM Smart Water Application Technologies (SWAT) TM Equipment Functionality Test Protocol Version 2.3 June 2014 SWAT Committee 8280 Willow Oaks Corporate Drive Suite 400 Fairfax, VA 22031 www.irrigation.org

More information

TABLE OF CONTENTS PART 2 - CONFINED SPACES

TABLE OF CONTENTS PART 2 - CONFINED SPACES May 11, 2006 TABLE OF CONTENTS PART 2 - CONFINED SPACES Page DEFINITIONS... 2-1 GENERAL... 2-2 RESPONSIBILITIES... 2-2 HAZARD ASSESSMENT AND WORK PROCEDURES... 2-3 IDENTIFICATION AND ENTRY PERMITS... 2-3

More information

WKM Model 320F Floating Ball Valve

WKM Model 320F Floating Ball Valve Date: 4 WKM Model 320F Floating Ball Valve Installation, Operation, and Maintenance Manual 1 Date: 4 All the information contained in this manual is the exclusive property of Cameron. Any reproduction

More information

Annex G (normative) Requirements for Nondestructive Examination

Annex G (normative) Requirements for Nondestructive Examination Purchase API Spec online at http://www.techstreet.com/api Annex G (normative) G.1 General Requirements for Nondestructive Examination This annex specifies the requirements for NDE that shall be performed

More information

Leak testing of Valves. Standards for acceptable Rates of Valve Leakage

Leak testing of Valves. Standards for acceptable Rates of Valve Leakage Leak testing of Valves Standards for acceptable Rates of Valve Leakage American Petroleum Institute (API) The API standard 598: Valve Inspection and Testing, covers the testing and inspection requirements

More information

BT6HC Hygienic Sanitary Balanced Pressure Steam Trap for High Capacity and CIP/SIP Applications

BT6HC Hygienic Sanitary Balanced Pressure Steam Trap for High Capacity and CIP/SIP Applications 1800350/6 IM-P180-12 ST Issue 6 BT6HC Hygienic Sanitary Balanced Pressure Steam Trap for High Capacity and CIP/SIP Applications Installation and Maintenance Instructions 1. Safety information 2. General

More information

1800C and 1800C-HC Series Service Regulators

1800C and 1800C-HC Series Service Regulators 1800C and 1800C-HC Series Service Regulators Installation Instructions www.elster-americanmeter.com General Information: The 1800C and 1800C-HC Regulators are available as Full Capacity Internal Relief

More information

EASTERN ENERGY SERVICES PTE LTD. 60 Kaki Bukit Place #02-19 Eunos Tech Park Singapore, SG Singapore Telephone: Fax:

EASTERN ENERGY SERVICES PTE LTD. 60 Kaki Bukit Place #02-19 Eunos Tech Park Singapore, SG Singapore Telephone: Fax: 2 Table Of Contents 1. Introduction 3 2. About this Manual 3 3. Contacting YZ Systems 3 4. Vessel Components 4 5. Specifications 5 6. Application 6 7. Theory of Operation 7 8. DuraSite Installation & Use

More information

1200B2 Series Service Regulators. Instruction Manual

1200B2 Series Service Regulators. Instruction Manual 00B Series Service Regulators Instruction Manual 00B Series Service Regulators 0 Elster American Meter 00B Series Service Regulators General Information The 00B Series Service Regulators are available

More information

PROCEDURES FOR REPAIRS TO ASME NV STAMPED PRESSURE RELIEF DEVICES OF NUCLEAR SAFETY RELATED PRESSURE RELIEF VALVES

PROCEDURES FOR REPAIRS TO ASME NV STAMPED PRESSURE RELIEF DEVICES OF NUCLEAR SAFETY RELATED PRESSURE RELIEF VALVES NB16 0603 NR Task Group 1 9 16 1. One update by NR task group page 3: 7/17/19 2. Two updates to S6.1 and S6.3 on page 1: 7/19/17 SUPPLEMENT 6 PROCEDURES FOR REPAIRS TO ASME NV STAMPED PRESSURE RELIEF DEVICES

More information

Precision Liquid Settlement Array Manual

Precision Liquid Settlement Array Manual Precision Liquid Settlement Array Manual All efforts have been made to ensure the accuracy and completeness of the information contained in this document. RST Instruments Ltd reserves the right to change

More information

Preparation and Installation of the Sanitary BDI-FLX Sensor and Connection to the BDI-FLX Interface Cable

Preparation and Installation of the Sanitary BDI-FLX Sensor and Connection to the BDI-FLX Interface Cable GEP-6075 Rev. B 101574 Ref. I.D.: 16973 Preparation and Installation of the Sanitary BDI-FLX Sensor and Connection to the BDI-FLX Interface Cable WARNING USER SHOULD READ AND THOROUGHLY UNDERSTAND THESE

More information

LARGE DRY CHEMICAL, TWIN-AGENT, AFFF, HALON 1211, AND AQUASONIC (NITROGEN-OPERATED SYSTEMS) Pressure Regulator Test Manual

LARGE DRY CHEMICAL, TWIN-AGENT, AFFF, HALON 1211, AND AQUASONIC (NITROGEN-OPERATED SYSTEMS) Pressure Regulator Test Manual LARGE DRY CHEMICAL, TWIN-AGENT, AFFF, HALON 1211, AND AQUASONIC (NITROGEN-OPERATED SYSTEMS) Pressure Regulator Test Manual 002694 IntroductIon 8-1-11 Page 1 ForEWord This manual is intended for use with

More information

ANDERSON GREENWOOD SERIES 9000 POSRV INSTALLATION AND MAINTENANCE INSTRUCTIONS

ANDERSON GREENWOOD SERIES 9000 POSRV INSTALLATION AND MAINTENANCE INSTRUCTIONS Procedure-assembly-functional test and performance requirements 1 SCOPE 1.1 This document establishes the general procedure for assembly, functional testing and normal performance requirements of low Series

More information

Lockout / Tag out Program

Lockout / Tag out Program Lockout / Tag out Program Presented by DOSHTI www.doshti.com You will learn Purpose of Lockout- Tag out Requirements for LOTO Types of Hazardous Energy Procedures for LOTO The OSHA Standard for the Control

More information

Bermad Pressure Reducing. Model: 42T

Bermad Pressure Reducing. Model: 42T Bermad Pressure Reducing Pilot Operated Pressure Control Valve Model: 42T Installation Operation Maintenance Manual (IOM) REV. 27.7.17 Page 1 of 12 Safety First BERMAD believes that the safety of personnel

More information

Type ACE97. Introduction. Installation. P.E.D. Categories. Specifications. Overpressure Protection. Installation Guide English May 2002

Type ACE97. Introduction. Installation. P.E.D. Categories. Specifications. Overpressure Protection. Installation Guide English May 2002 Installation Guide English May 2002 Type ACE97 Introduction This installation guide provides instructions for installation, startup, and adjustment. To receive a copy of the instruction manual, contact

More information

Changes Between API STD 520 Part II 6th Ed and 5th Ed Cataloged

Changes Between API STD 520 Part II 6th Ed and 5th Ed Cataloged Changes Between API STD 520 Part II 6th Ed and 5th Ed Cataloged Dustin Smith Smith & Burgess LLC 7600 W Tidwell, Houston, TX Dustin.Smith@smithburgess.com John Burgess Jessye Palladino Smith & Burgess

More information

Telefon (+45) Telefax (+45)

Telefon (+45) Telefax (+45) Uni-Valve A /S VENTILER & INSTRUMENTER Telefon (+45) 43 43 82 00 Telefax (+45) 43 43 74 75 mail@uni-valve.com www.uni-valve.com UNI-S83 / S84 3/4-way ball valve Installation and Operating manual 3/4-WAY

More information

PV4 and PV6 Piston Valves

PV4 and PV6 Piston Valves 1181250/1 IM-P118-05 ST Issue 1 PV4 and PV6 Piston Valves Installation and Maintenance Instructions 1. Safety information 2. General product information 3. Installation 4. Commissioning 5. Operation 6.

More information

Installation, Operating and Maintenance Instructions. V914 Cast Iron Flanged Swing Check Valve V914

Installation, Operating and Maintenance Instructions. V914 Cast Iron Flanged Swing Check Valve V914 Installation, Operating and Maintenance Instructions V914 Cast Iron Flanged Swing Check Valve V914 THE PRESSURE EQUIPMENT DIRECTIVE 97/23/EC and CE MARKING The Pressure Equipment Regulations 1999 (SI 1999/2001)

More information

Valve Inspection & Testing

Valve Inspection & Testing Inspection & Testing in accordance with API 598 Valve Inspection & Testing Shell Test (Body Hydro Test): - Each valve shall be tested in accordance with ASME B 16.34 for ASME valves. Shell test pressure

More information

Installation restrictions for length of sections should also be noted.

Installation restrictions for length of sections should also be noted. Since 1966 CHART (formerly MVE) has specialized in the design and fabrication of custom cryogenic piping for liquid nitrogen, oxygen, argon, helium, and hydrogen in pipe sizes ranging from 1/4" through

More information

1 Scope... 2 Functions of cementing float equipment... 3 Definitions... 4 Calibration... 5 Test Categories... 6 General...

1 Scope... 2 Functions of cementing float equipment... 3 Definitions... 4 Calibration... 5 Test Categories... 6 General... American Petroleum Institute Contents Page 1 Scope... 2 Functions of cementing float equipment... 3 Definitions... 4 Calibration... 5 Test Categories... 6 General... 7 Apparatus and Materials... 8 High-temperature/high-pressure

More information

Part 192 Subparts J & K. Testing & Uprating

Part 192 Subparts J & K. Testing & Uprating Part 192 Subparts J & K Testing & Uprating MAOP, Testing, & Uprating Are All Linked MAOP = Maximum Pressure Allowed By Regulations (192.619 et seq.) MAOP Determined By Operator for Each Pipeline or Segment

More information

RS(H)10,15 USER MANUAL. Read the complete manual before installing and using the regulator.

RS(H)10,15 USER MANUAL. Read the complete manual before installing and using the regulator. RS(H)10,15 USER MANUAL Read the complete manual before installing and using the regulator. WARNING INCORRECT OR IMPROPER USE OF THIS PRODUCT CAN CAUSE SERIOUS PERSONAL INJURY AND PROPERTY DAMAGE. Due to

More information

Energy Control. Suite 2A, 55 Frid Street Hamilton, ON L8P 4M3 office: cell:

Energy Control. Suite 2A, 55 Frid Street Hamilton, ON L8P 4M3 office: cell: Energy Control Suite 2A, 55 Frid Street Hamilton, ON L8P 4M3 office: 905.577.0303 cell: 905.977.0210 consultant@staffaid.ca www.staffaid.com Safety, Energy Control, Power Lockout & Function Test Procedures

More information

CONTROL VALVE SEAT LEAKAGE

CONTROL VALVE SEAT LEAKAGE ANSIIFCI 70-2-2006 AMERICAN NATIONAL STANDARD CONTROL VALVE SEAT LEAKAGE \D o N I N I o ~ H U ~ H [/) ~ Fluid Controls Institute, Inc. Spo~sor: Fluid Controls institute, inc. 1300 Sumner Ave Cleveland,

More information

SECTION 25 TESTING AND DISINFECTING WATER MAINS General

SECTION 25 TESTING AND DISINFECTING WATER MAINS General SECTION 25 TESTING AND DISINFECTING WATER MAINS 25-1.01 Scope 25-1 General This section describes the requirements for pressure and leak testing, and disinfecting of water mains and appurtenances, including

More information

Temporary Connections to Process. Supersedes: 10/31/09 (Rev.02) Preparer: Owner: Approver: EHS Team Member EHS Team Member EHS Manager

Temporary Connections to Process. Supersedes: 10/31/09 (Rev.02) Preparer: Owner: Approver: EHS Team Member EHS Team Member EHS Manager Procedure No.: PA-020-0048 Page: 1 of 6 Preparer: Owner: Approver: EHS Team Member EHS Team Member EHS Manager Document Revision Change Table Revision Number Revision Description Revised By Revision Date

More information

1 Exam Prep NFPA 99 Health Care Facilities Questions and Answers (Plumbing Contractor)

1 Exam Prep NFPA 99 Health Care Facilities Questions and Answers (Plumbing Contractor) 1 Exam Prep NFPA 99 Health Care Facilities Questions and Answers (Plumbing Contractor) 1. According to NFPA 99, SCFM is an acronym for. a) Surface Conditions at Fahrenheit Mercury b) Standard Conditions

More information

WHEATLEY Series 500 Swing Check Valve

WHEATLEY Series 500 Swing Check Valve Document Number: TC003001-13 Revision: 02 WHEATLEY Series 500 Swing Check Valve Installation, Operation, and Maintenance Manual TABLE OF CONTENTS BILL OF MATERIALS...3 SCOPE...5 INSTALLATION AND OPERATION

More information

SECTION DOMESTIC WATER PIPING

SECTION DOMESTIC WATER PIPING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions Specification Sections, apply to this Section. B. Related Sections

More information

Wet pipe low flow foam/water system

Wet pipe low flow foam/water system December 6, 2010 Foam 14a 1. The Viking Low Flow Foam/Water proportioning system, is a UL Listed and FM Approved system, for use with Viking supplied foam concentrates. This system consists of a standard

More information

MUELLER. Xp, & Lineseal 350 Butterfly Valves

MUELLER. Xp, & Lineseal 350 Butterfly Valves Installation/Operating Manual MUELLER Lineseal Iii, Lineseal Xpii, Lineseal Xp, & Lineseal 350 Butterfly Valves! WARNING: 1. Read and follow instructions carefully. Proper training and periodic review

More information

HEALTH AND SAFETY PROGRAM 201 HOT TAP PERMIT/FILLET WELD REPAIRS

HEALTH AND SAFETY PROGRAM 201 HOT TAP PERMIT/FILLET WELD REPAIRS Page 1 of 15 1.0 PURPOSE 1.1. Axiall, Plaquemine Complex, has developed this Hot Tap Permit Program to eliminate potential accidents, injuries, and to enhance employee protection. 1.2. To provide for the

More information

Pressure Equipment Directive PED 2014/68/EU Commission's Working Group "Pressure"

Pressure Equipment Directive PED 2014/68/EU Commission's Working Group Pressure F. INTERPRETATION OF THE ESSENTIAL SAFETY REQUIREMENTS ON MANUFACTURING Guideline F-01 Guideline related to: Annex 1 Section 3.1.2 According to section 3.1.2 (permanent joining) of Annex I, the third party

More information

Installation Operation Maintenance

Installation Operation Maintenance 682 Seal Cooler New generation seal cooler to meet and exceed the seal cooler requirements stated in the 4th Edition of API Standard 682 Installation Operation Maintenance Experience In Motion Description

More information

Control of Hazardous Energy Lockout / Tagout Program

Control of Hazardous Energy Lockout / Tagout Program Control of Hazardous Energy Lockout / Tagout Program August 2016 Table of Contents Purpose... 1 Scope and Application... 1 Responsibilities... 1 Environmental Health and Safety Personnel (EH&S)... 1 Directors

More information

Manual Actuated Boiler Blowdown Valves

Manual Actuated Boiler Blowdown Valves Manual Actuated Boiler Blowdown Valves Installation and Maintenance Instructions 1. Safety information 2. General product information 3. Installation 4. Operation 5. Maintenance 6. Spare parts p.1 1. Safety

More information

BS Series Basket Strainer

BS Series Basket Strainer BS Series Basket Strainer Operating, Installation, & Maintenance Manual Corrosion Resistant Fluid and Air Handling Systems. Dated 04-26-12 PRESSURE DROP SIMTECH strainers are engineered to offer the lowest

More information

Disposal/Injection Well Pressure Test Report (H-5)

Disposal/Injection Well Pressure Test Report (H-5) RAILROAD COMMISSION OF TEXAS Disposal/Injection Well Pressure Test Report (H-5) Lauryn McFarland Engineering Technician Summary When Mechanical Integrity Test (MIT) is required How to file MIT How to perform

More information

MST21 Stainless Steel Balanced Pressure Thermostatic Steam Trap

MST21 Stainless Steel Balanced Pressure Thermostatic Steam Trap 1250650/6 IM-P125-07 ST Issue 6 MST21 Stainless Steel Balanced Pressure Thermostatic Steam Trap Installation and Maintenance Instructions 1. Safety information 2. General product information 3. Installation

More information

Exhibit 4. Determination of Static Pressure Performance of the Healy Clean Air Separator (Executive Orders VR-201-N and VR-202-N)

Exhibit 4. Determination of Static Pressure Performance of the Healy Clean Air Separator (Executive Orders VR-201-N and VR-202-N) 1 APPLICABILITY Exhibit 4 Determination of Static Pressure Performance of the Healy Clean Air Separator (Executive Orders VR-201-N and VR-202-N) Definitions common to all certification and test procedures

More information

Guidelines for Pressure Boundary Bolted Flange Joint Assembly

Guidelines for Pressure Boundary Bolted Flange Joint Assembly ASME PCC-1 2010 (Revision of ASME PCC-1 2000) Guidelines for Pressure Boundary Bolted Flange Joint Assembly A N A M E R I C A N N A T I O N A L S T A N D A R D ASME PCC-1 2010 (Revision of ASME PCC-1 2000)

More information

RHPS Series RD(H)F40 User Manual. Read the complete manual before installing and using the regulator.

RHPS Series RD(H)F40 User Manual. Read the complete manual before installing and using the regulator. RHPS Series RD(H)F40 User Manual Read the complete manual before installing and using the regulator. 2 WARNING Before removing a regulator from the system for service, you must depressurize system purge

More information

ACCUMULATOR OPERATING & MAINTENANCE INSTRUCTIONS

ACCUMULATOR OPERATING & MAINTENANCE INSTRUCTIONS ACCUMULATOR OPERATING & MAINTENANCE INSTRUCTIONS READ ALL INSTRUCTIONS PRIOR TO INSTALLATION AND OPERATION TO AVOID POSSIBLE INJURY Warning: Always consider any accumulator to contain pressure until proven

More information

MUELLER. Mega-Lite Drilling Machine. Reliable Connections. table of contents PAGE. Equipment 2. Operating Instructions 3-4. Parts Information 5

MUELLER. Mega-Lite Drilling Machine. Reliable Connections. table of contents PAGE. Equipment 2. Operating Instructions 3-4. Parts Information 5 operating Instructions manual MUELLER Mega-Lite Drilling Machine table of contents PAGE Equipment 2 Operating Instructions 3-4 Parts Information 5 Travel Charts 6-11! WARNING: 1. Read and follow instructions

More information

SERVICE MANUAL MODEL BA100BMST 100 SCFM PORTABLE AIR PANEL

SERVICE MANUAL MODEL BA100BMST 100 SCFM PORTABLE AIR PANEL Product Manual MST Portable Air Filtration System SERVICE MANUAL MODEL BA100BMST 100 SCFM PORTABLE AIR PANEL WARNING: Do not attempt to operate this equipment without first reading and understanding the

More information

Installation Operation Maintenance. Bermad Level Control Valve with Modulating Horizontal Float Pilot valve One Way Flow IOM.

Installation Operation Maintenance. Bermad Level Control Valve with Modulating Horizontal Float Pilot valve One Way Flow IOM. Bermad Level Control Valve with Modulating Horizontal Float Pilot valve One Way Flow Model: FP 450-80 Installation Operation Maintenance PAGE 1 OF 5 1. Safety First BERMAD believes that the safety of personnel

More information

CLEANING, INSPECTION, AND TESTING OF SEWERS

CLEANING, INSPECTION, AND TESTING OF SEWERS CLEANING, INSPECTION, AND TESTING OF SEWERS PART 1 - GENERAL 1.01 SECTION INCLUDES A. Cleaning, Inspecting, and Testing Sanitary Sewers B. Cleaning, Inspecting, and Testing Storm Sewers C. Cleaning and

More information

Pipeline Pigging and Hydrostatic Test

Pipeline Pigging and Hydrostatic Test Project Engineering Standard Solutions, Standards and Software www.klmtechgroup.com Page 1 of 20 Rev: 01 KLM #03-12 Block Aronia, Jalan Sri Perkasa 2 Taman Tampoi Utama 81200 Johor Bahru Malaysia. KLM

More information

SAPAG. Safety valves, type 5700 Storage, Use, Operation and Maintenance Instructions. IMPORTANT NOTICE

SAPAG. Safety valves, type 5700 Storage, Use, Operation and Maintenance Instructions.  IMPORTANT NOTICE SAPAG IMPORTANT NOTICE Contents Important notice 1 0 Valve identification 2 1 Storage 2 2 Installation 2 3 Operation 2 4 Maintenance 3 4.1 Dismantling 3 4.2 Inspection 3 4.3 Repair 3 4.4 Assembly 4 4.5

More information