1 MS No: :. A 1.0 Scope of Work Preparation notes: delete column before issuing. 1.1 General Description of Works, Location & Boundaries Strength and tightness testing of Glycol System between plant room and first cooler valve stations in roof void using Oxygen Free Nitrogen. Example, edit as applicable 1.2 Equipment to be Installed / Removed / Isolated Balance lines to be install around check valves xyz (GS4 24(b)) Relief valves xyz to be removed. Pressure Transmitters xyz to be isolated 2.0 Dates and Times Tests to be carried out starting Monday 28 Nov for completion Friday 2 Dec. Strength tests to be carried out at times when areas can be clear of all personnel. 3.0 Monitoring and Witnessing The competent person in charge of the test must be present during initial pressurising of the system, whilst the system is being raised to and held at strength test pressure and until the system pressure has been reduced in pressure for examination. Edit as applicable Edit (times &) dates Identify specific time if applicable A normal requirement The pressure source must not be left unattended while not isolated from the system. The customer (Mr Everright, tel ) to be notified 15 minutes before system is expected to reach strength test pressure. Test duration is NOT to be extended to await his arrival. The customer (Mr Everright, tel ) to be notified when system reaches Maximum Allowable Pressure. The system is not to be raised to full strength test pressure until the customer is present or has given his consent for the test to proceed. Examples only edit/delete as applicable 4.0 Resources Sections 6 to 12 should be used before completing Sections 4 and Supervision, Labour, Qualifications and Training Engineer - Gary Carpenter Star pressure test trained Oct 05 Page 1 of 9

2 MS No: :. A Second Man Joe Brown Star ST1 Engineer 4.2 Tools and Equipment to be used, Certification and Notes OFN Pack(s) Pressure test manifold from London branch Test hoses Ammonia charging hose tested 09/12/04-6mm st.st. tube and fittings Regulator 230 to 40 bar Safety valve (see SS125 Sect 3.0) 10 bar Calibrated gauge B , calibrated 29/9/05 Torches Soapy bubble solution with containers, paint brushes and/or sprayer. Barrier tape and pressure test warning signs. 4.3 Personal Protective Equipment The following PPE will be worn at all times: Safety Boots, Overalls, Safety Helmet. Flame Retarded High Visibility Vest. The following PPE will be worn at appropriate stages in the operation as detailed in the Relevant Documents in section 11: Gloves, Hearing Protection, Safety Harness, Eye Protection. Note: Regulation 40 bar outlet except for CO 2 Note: Gauge workings within 20% - 80% range Fairly standard requirements Page 2 of 9

3 MS No: :. A 5.0 Detailed Sequence/Method of Working Engineer and second man to initial each section as test proceeds 5.1 test pressures from diagram of connections: Initial Examination (max 10% MAP) 0.8 bar Maximum Allowable Pressure 8.0 bar Strength Test 8.8 bar Tightness Test 8.0 bar 5.2 Prepare System Pressure Test Record SF identifying extent of test and components to be included in or isolated from test. Refer to SS113 for further guidance. 5.3 that all vessels have previously been (hydraulically) strength tested to a pressure higher than the current OFN strength test pressure. 5.4 Inform the customer that a pressure test is to take place and the restrictions which will apply. what witnessing, if any, they require see Survey the system and identify the exclusion area (see 7.1) typically people must be kept outside the building or a minimum of 30 meters from the components under test. (SS 125 Sect 5.4. and GS4 27(b)) 5.6 Identify a safe working area for setting up the test equipment typically behind a brick wall and out of line of site to condensers, pipework or other components under test. 5.7 Establish a safe means of discharging nitrogen to atmosphere (not a confined space) without entering the exclusion area. 5.8 Check system for tightness. 5.9 that applicable valves are open or closed that applicable items are isolated or removed for the test e.g. relief valves (see 1.2) and balance lines are installed around check valves as required (see 1.2) all systems, vessels, etc. connected to section under test are vented to prevent pressure build up should isolation valves pass Set up test equipment in safe area correct regulator is fitted (230 bar or 300bar) correct calibrated gauge (20% to 80% of Eng. Inits. 2 nd Man Inits Preparation notes: delete column before issuing. Edit pressures as applicable. Edit if necessary e.g. refer to appended sketch of exclusion area Refer to sketch if applicable Page 3 of 9

4 MS No: :. A range) is fitted correct safety relief valve is fitted (see 5.1) and is correctly located in accordance with SS Secure any single OFN cylinders in a vertical position and restrain charging line with tie wraps or equivalent correct PPE is being worn (see 4.3) 5.19 Set regulator outlet pressure to not more than 10 bar above initial examination pressure (see 5.1) 5.20 Gradually introduce nitrogen into the system until the initial examination pressure is reached (see 5.1). Isolate the system from the nitrogen supply. NEVER LEAVE THE PRESSURE SOURCE UNATTENDED WHILE OPEN TO THE SYSTEM UNDER TEST Enter exclusion area and carry out a visual /aural inspection of the system for obvious leaks. If necessary use a soapy bubble test to pinpoint leaks If any repairs are required, isolate as applicable and reduce that section of the system to atmospheric pressure before proceeding Repeat steps 5.15 to 5.17 until all obvious leaks have been repaired Cordon off exclusion area, place signs prohibiting access and ensure all personnel have left Set regulator outlet pressure to not more than 5 bar above strength test pressure (see 5.1) 5.26 From the safe area, slowly introduce the nitrogen into the system until the strength test pressure (see 5.1) is reached. NEVER LEAVE THE PRESSURE SOURCE UNATTENDED WHILE OPEN TO THE SYSTEM UNDER TEST. CAUTION: No-one may approach the system during this phase unless the following procedure is followed: a) Isolate the system from the nitrogen supply. b) Working from within the safe area, reduce the system pressure by at least 1 bar or 10%, whichever is the larger. c) The system may now be approached. d) If any leaking flanged joints and screwed fittings require tightened or if any other repair is required, that section of the system must be isolated and reduced to atmospheric pressure before proceeding with the repairs. A safe If known, the location of cordons and signs can be detailed here. Add customer witness note if applicable. Page 4 of 9

5 MS No: :. A means of discharging nitrogen to atmosphere must be used. e) After repairs, slowly re-introduce nitrogen into the vented section. f) From the safe area, proceed with the strength test When the strength test pressure is reached, isolate the system from the nitrogen supply and hold the strength test pressure for 5 minutes Reduce the pressure in the system tightness test pressure (see 5.1) and hold for the duration of the tightness test. At this stage general access restrictions can be lifted, signs removed and the system can be approached Leave the plant to stand under pressure for at least 30 minutes, monitoring the gauge for a fall in pressure which might indicate a leak (the drop test). During the drop test, or later as convenient, test for leaks using soapy bubble solution. REPAIRS a) If any leaking flanged joints and screwed fittings require tightened or if any other repair is required, that section of the system must be isolated and reduced to atmospheric pressure before proceeding with the repairs. A safe means of discharging nitrogen to atmosphere must be used b) After repairs, slowly re-introduce nitrogen into the vented section. c) Bring the system back up to tightness test pressure (see 5.1) with additional nitrogen if required d) If the leak repairs involved cutting or welding of the pressure envelope, repeat the strength test. e) Repeat the drop test f) Repeat the soapy bubble test on the repairs only. Add customer witness note if applicable. Add customer witness note if applicable. Add Helium sniffer if applicable 5.30 Reduce the pressure in the system to atmospheric. Or perhaps a 0.5 bar holding charge 5.31 that there is no trapped pressure in the system e.g. behind check valves Inform customer that the tests are complete Dismantle test equipment and return it to store. Page 5 of 9

6 MS No: :. A 5.34 Replace items removed for pressure test (see 1.2) Complete the System Pressure Test Record (SF.052). Revision Revision Notes* Name (print) Signature Date A First Distribution I confirm that I have read and understood this Method Statement and the associated Risk Assessment(s) and COSHH Safety Data Sheet(s). Should circumstances change which invalidate this Method Statement or prevent the Control Measures being implemented, work shall be suspended until the Method Statement has been reviewed by the author or other suitable, competent, person and, if necessary, revised. MS Name (print) Signature Company Date Method Statement Preparation Checklist and Additional Notes use before completing Sections 4 and 5 above 6.0 Tools and Equipment to be used, Certification and Notes 6.1 Lifting Equipment Plant Room lifting beam to be used for lifting OFN cylinders into plant room. Hoist certificates held in site office 6.2 Access Equipment Mobile scaffold tower and ladders to be used for access to leak test welds and fittings as required. Inspections per general site routine. Example only Example only 6.3 Vehicles and Plant Not applicable Page 6 of 9 Edit if

7 MS No: :. A 6.4 Portable Equipment Certification (see section 4.2 for listing) to be held in site office: Pressure test manifold Test hoses Regulator Safety valve Gauge 7.0 Summary of Control Measures See Relevant Document referenced in section 11 for full details 7.1 Permits/Access restrictions/signs See attached sketch reference Appendix 1 for details of exclusion area. 7.2 Access and Lighting Access to plant room via staircase Temporary lighting available in Plant room Torches available to supplement required certificates available Examples only Examples only 7.3 Storage and Disposal of Materials Nitrogen packs to be stored in caged compound when not in use. Nitrogen to be released to atmosphere after use 7.5 Information/Action by Customer Customer to observe and co-operate with exclusion areas during strength test Edit if caged compound is not available. 8.0 Emergency Arrangement As site procedure detailed at induction 8.1 First Aid First aid kit available in Star site office 8.2 Fire No significant risk. 8.3 Chemical Leaks No significant risk 8.4 Incident Reporting Any incidents or near misses to be reported to Star Site Manager and the Main Contractor/Customer Form SF 807 to be completed for a near miss. Add details of any site first aid facility Modify if not so Modify if not so 9.0 Temporarily Amended Systems Page 7 of 9

8 MS No: :. A 9.1 Plant Isolation and Alterations Not Applicable 9.2 Traffic Routing Not Applicable 10.0 Statutory Records Not Applicable? Or insert details of rerouting of vehicular and personnel traffic 11.0 Relevant Documents 11.1 Risk Assessments RA OFN pressure testing of package unit piping, site pipe work & pre-fabricated pipe and component assemblies copy available in the Star site office Material Safety Data Sheets Oxygen Free Nitrogen copy available in Star site office 11.3 COSHH Assessment COSHH A.016 Oxygen Free Nitrogen & OFN-Helium copy available in Star site office 11.4 Star Standard Specifications and Technical Bulletins Standard Specification No. 125 Pressure Test Procedures copy available in Star site office Standard Specification No. 113 Pressure Test Certification of Systems copy available in Star site office 11.5 Drawings 11.6 Other Not Applicable If library risk assessment is not applicable a site specific one will be required. copy is held on site. copy is held on site. copy held on site. copy is held on site. Insert DoC drawing Nos 12.0 Additional Information 12.1 Add site specific additional Page 8 of 9

9 MS No: :. A 12.2 info Page 9 of 9

HYDROSTATIC LEAK TEST PROCEDURE

HYDROSTATIC LEAK TEST PROCEDURE This information is proprietary and shall not be disclosed outside your organization, nor shall it be duplicated, used or disclosed for purposes other than as permitted under the agreement with Kinetics

More information

Contractor handbook. Purpose

Contractor handbook. Purpose Page no: 1 / 6 Contractor handbook Purpose Mitie aims to ensure that the highest levels of performance are achieved by all persons working for us or on our behalf. We require the same level of performance

More information

SCOPE OF WORK, SAFETY METHOD STATEMENT & RISK ASSESSMENT

SCOPE OF WORK, SAFETY METHOD STATEMENT & RISK ASSESSMENT SCOPE OF WORK, SAFETY METHOD STATEMENT & RISK ASSESSMENT Prepared for:- Date:- Work Scheduled:- SCOPE OF WORK Carry out installation of flow meters / pressure sensors. Installation of flow meter procedure

More information

CLASS DH - PNEUMATIC TESTING - GREATER THAN 1 BAR (15 PSIG)

CLASS DH - PNEUMATIC TESTING - GREATER THAN 1 BAR (15 PSIG) Page 1 of 10 CLASS DH - PNEUMATIC TESTING - GREATER THAN 1 BAR (15 PSIG) 1. SCOPE 1.1 To provide definitive requirements for HIGH PRESSURE PNEUMATIC testing of piping systems according to ASME B31.3. This

More information

MAINTENANCE AND SAFETY OF CNG REFUELLING STATIONS

MAINTENANCE AND SAFETY OF CNG REFUELLING STATIONS ISSN 1172-3416 NZ GCP 2 : 1993 NEW ZEALAND GAS CODE OF PRACTICE for MAINTENANCE AND SAFETY OF CNG REFUELLING STATIONS Issued by the Secretary of Commerce in accordance with the Gas Act 1992 THE GAS ACT

More information

Glasgow City Council EDUCATION SERVICES. Technician Support Service

Glasgow City Council EDUCATION SERVICES. Technician Support Service Glasgow City Council EDUCATION SERVICES Technician Support Service Technician Guidance Sheets TGS/10a Use & Inspection of Gas Cylinders & Associated s Issued by Technician Support Service Date September

More information

Method Statement: Testing Dry Riser System

Method Statement: Testing Dry Riser System Method Statement: Testing Dry Riser System Page 1 of 6 Scope of work Test dry riser system in accordance with BS 5306. Definitions For the purposes of this document, the following definitions apply Rising

More information

PLANNED LIGHTING MAINTENANCE LTD METHOD STATEMENT & RISK ASSESSMENT REPLACEMENT OF LAMPS OR REPAIRS TO HIGH LEVEL LIGHT UNITS

PLANNED LIGHTING MAINTENANCE LTD METHOD STATEMENT & RISK ASSESSMENT REPLACEMENT OF LAMPS OR REPAIRS TO HIGH LEVEL LIGHT UNITS PLANNED LIGHTING MAINTENANCE LTD METHOD STATEMENT & RISK ASSESSMENT REPLACEMENT OF LAMPS OR REPAIRS TO HIGH LEVEL LIGHT UNITS Project: (insert Client) Replacement/ Repair of high level light units/ high

More information

CLASS D - SENSITIVE LEAK TEST GAS AND BUBBLE METHOD. 1.1 To provide definitive requirements for PNEUMATIC pressure testing of piping systems.

CLASS D - SENSITIVE LEAK TEST GAS AND BUBBLE METHOD. 1.1 To provide definitive requirements for PNEUMATIC pressure testing of piping systems. Page 1 of 7 CLASS D - SENSITIVE LEAK TEST GAS AND BUBBLE METHOD 1. SCOPE 1.1 To provide definitive requirements for PNEUMATIC pressure testing of piping systems. 1.2 The piping system as used herein is

More information

Perform Pressure & Leak Test, Tubing & Piping. Module 12306

Perform Pressure & Leak Test, Tubing & Piping. Module 12306 Perform Pressure & Leak Test, Tubing & Piping Module 12306 Instrumentation Trainee Task Module 12306 PERFORM PRESSURE AND LEAK TEST, TUBING AND PIPING Objectives Upon completion of this module, the trainee

More information

Safety. April 2018 Supersedes all previous publications 2018 Chevron Phillips Chemical Company LP

Safety. April 2018 Supersedes all previous publications 2018 Chevron Phillips Chemical Company LP Technical Note 802 Leak Testing of Polyethylene Pipe For Municipal and Industrial Applications Part 1 Pre-Test Considerations Leak testing may be used to find leaks in a newly constructed or newly modified

More information

Standard Pneumatic Test Procedure Requirements for Piping Systems

Standard Pneumatic Test Procedure Requirements for Piping Systems the pressure equipment safety authority Standard Pneumatic Test Procedure Requirements for Piping Systems AB-522 Edition 2, Rev. 1 Issued 2016-10-24 Table of Contents FOREWORD... 1 1.0 INTRODUCTION...

More information

WHS CONTRACTOR INFORMATION PACKAGE

WHS CONTRACTOR INFORMATION PACKAGE WHS CONTRACTOR INFORMATION PACKAGE Introduction This information package provides Informa exhibitors and contractors with important information that will be required to plan and manage work on all stages

More information

Compressed Gases Storage and Handling Safety Policy. Individual Unit Function: Safety Procedure No.: SOP-0103 Page: 1 of 6

Compressed Gases Storage and Handling Safety Policy. Individual Unit Function: Safety Procedure No.: SOP-0103 Page: 1 of 6 Procedure No.: SOP-0103 Page: 1 of 6 MIDGA Reviewed: 07/09/18 Effective: 1/14/98 Supersedes: Original Preparer: Owner: Approver: Safety Safety Safety 1. PURPOSE The purpose of this procedure is to establish

More information

Installation, Operation and Maintenance Instructions Buffer Vessel OM006

Installation, Operation and Maintenance Instructions Buffer Vessel OM006 Installation, Operation and Maintenance Instructions Buffer Vessel OM006 Calorifiers Heat Exchangers Pressurisation Units Sales Tel: 01457 835700 Sales Fax: 01457 832700 E-mail: sales@gmsthermal.co.uk

More information

Warning: NEVER ALTER TEST EQUIPMENT

Warning: NEVER ALTER TEST EQUIPMENT PAGE 1 OF 6 General: Pressure Testing Shop Built Tanks Pressure testing tanks with either positive pressure or vacuum can be a very dangerous exercise. It is important to understand the equipment involved

More information

DRAFT. Operating Procedures for the NPDGamma Liquid Hydrogen Target in TA-53, Building MPF-35

DRAFT. Operating Procedures for the NPDGamma Liquid Hydrogen Target in TA-53, Building MPF-35 Operating Procedures for the NPDGamma Liquid Hydrogen Target V0.03 11/26/05 1 DRAFT Operating Procedures for the NPDGamma Liquid Hydrogen Target in TA-53, Building MPF-35 Version 0.03 November 26, 2005

More information

SAFETY TRAINING LEAFLET 06 CARBON DIOXIDE

SAFETY TRAINING LEAFLET 06 CARBON DIOXIDE SAFETY TRAINING LEAFLET 06 CARBON DIOXIDE Doc 23.06/18 EUROPEAN INDUSTRIAL GASES ASSOCIATION AISBL AVENUE DES ARTS 3-5 B 1210 BRUSSELS Tel: +32 2 217 70 98 Fax: +32 2 219 85 14 E-mail: info@eiga.eu Internet:

More information

Types 749B and R130 Changeover Manifolds

Types 749B and R130 Changeover Manifolds Instruction Manual MCK-1179 Types 749B and R130 June 2012 Types 749B and R130 Changeover Manifolds TYPE HSRL-749B TYPE 64SR/122 TYPE R130/21 TYPE 749B/21 Figure 1. Changeover Manifolds and Regulator Assemblies

More information

Contractor Control Procedures. Contractor Control Procedures. Working Together. November Borders College 24/11/2014.

Contractor Control Procedures. Contractor Control Procedures. Working Together. November Borders College 24/11/2014. Working Together Contractor Control Procedures November 2014 Borders College 24/11/2014 1 Working Together 1. Introduction This procedure aims to control the health and safety of contractors working on

More information

PRESSURE REDUCING STATION INSTALLATION, OPERATIONS & MAINTENANCE MANUAL

PRESSURE REDUCING STATION INSTALLATION, OPERATIONS & MAINTENANCE MANUAL PRESSURE REDUCING STATION INSTALLATION, OPERATIONS & MAINTENANCE MANUAL Company Registered Office: Crown House, Stockport, Cheshire, SK13RB No. 850 0700 67 Registered in England and Wales No. 05058855

More information

Alkylphosphines. Storage and Handling Recommendations

Alkylphosphines. Storage and Handling Recommendations Alkylphosphines Storage and Handling Recommendations 2 The Phosphine Specialties Group has been producing phosphine and phosphine derivatives on a large scale for a number of years and the handling procedures

More information

MSC-P and MSC-N Manifolds for Steam Distribution and Condensate Collection

MSC-P and MSC-N Manifolds for Steam Distribution and Condensate Collection 1170850/1 IM-P117-36 ST Issue 1 MSC-P and MSC-N Manifolds for Steam Distribution and Condensate Collection Installation and Maintenance Instructions 1. Safety information 2. General product information

More information

Confined Space. Program Responsibilities

Confined Space. Program Responsibilities Confined Space CONFINED SPACE ENTRY AND RESCUE The OSHA standard on Permit-Required Confined Spaces (29 CFR 1910.146) requires employers to implement practices and procedures to protect employees from

More information

TECHNICAL DATA. Q = C v P S

TECHNICAL DATA. Q = C v P S Preaction 346a 1. Description The 6 Model G-6000P Electric Release Preaction System Riser Assembly can be used as a Single Interlock Preaction System with Electric Release, or as a Double Interlock Preaction

More information

Additional requirements for all types of entry are described in Section Determining the Applicable Entry Method

Additional requirements for all types of entry are described in Section Determining the Applicable Entry Method ENVIRONMENT, SAFETY & HEALTH DIVISION Chapter 6: Confined Space Entry Procedures Product ID: 155 Revision ID: 1948 Date published: 15 September 2017 Date effective: 15 September 2017 URL: http://www-group.slac.stanford.edu/esh/eshmanual/references/confinedprocedentry.pdf

More information

PC3_ and PC4_ Pipeline Connectors

PC3_ and PC4_ Pipeline Connectors 1283050/4 IM-P128-06 ST Issue 4 PC3_ and PC4_ Pipeline Connectors Installation and Maintenance Instructions 1. Safety information 2. Description PC30 shown 3. Installation 4. Welding of pipeline connector

More information

Installation, Operation and Maintenance Instructions for Mild Steel Buffer Vessel

Installation, Operation and Maintenance Instructions for Mild Steel Buffer Vessel OM006 Installation, Operation and Maintenance Instructions for Mild Steel Buffer Vessel The operating and maintenance instructions contained within this package are for standard mild steel buffer vessels

More information

Essential Standard No. 16. Streetworks - Short duration static works carried out from a vehicle

Essential Standard No. 16. Streetworks - Short duration static works carried out from a vehicle Key Messages Short duration static works must not exceed 60 mins, including setting up and dismantling traffic management. A vehicle or vehicles should be used whenever possible to protect the workforce.

More information

RE: PROPANE SYSTEM & REGULATOR TESTING/INSPECTION PROCEDURE

RE: PROPANE SYSTEM & REGULATOR TESTING/INSPECTION PROCEDURE March 22, 2013 RE: PROPANE SYSTEM & REGULATOR TESTING/INSPECTION PROCEDURE Regulators: Symptom: Pressure Drop Cause: External leaks detected at pigtail hose MPT fitting connection(s) to regulator body

More information

Health and Safety Guidance Note No 37

Health and Safety Guidance Note No 37 Health and Safety Guidance Note No 37 THE SAFE USE AND STORAGE OF GAS CYLINDERS Accidents involving gas cylinders can cause serious injury or even death. The legal term for gas cylinders is transportable

More information

30T A/Manual Hydraulic Shop Press

30T A/Manual Hydraulic Shop Press 30T A/Manual Hydraulic Shop Press Operation Manual 1 1. Important Information 1.1 Safety Information 1.1.1 Hazard Symbols Used in the Manuals This manual includes the hazard symbols defined below when

More information

BP OIL -- TOLEDO REFINERY

BP OIL -- TOLEDO REFINERY Document Type: Procedure BP OIL -- TOLEDO REFINERY Refinery Wide Reference No.: SAF 086 Effective Date: October 3, 2011 Use of Nitrogen (N 2 ) Rev. No.: 7 Owner: Jon Parker Auth. By: D. C. Durnwald (Signature

More information

Operation of Embrey Excavator Shears Safe Work Procedure PTES_HSE_SWP_039. Name Date Signature. Author Jarred Hearle 27/11/2015

Operation of Embrey Excavator Shears Safe Work Procedure PTES_HSE_SWP_039. Name Date Signature. Author Jarred Hearle 27/11/2015 Operation of Embrey Excavator Shears Safe Work Procedure PTES_HSE_SWP_039 Name Date Signature Author Jarred Hearle 27/11/2015 Reviewed FMG Site Team 27/11/2015 ---------- Approved Geoff Selfe 27/11/2015

More information

Contractor Hazard Identification and Control Guide

Contractor Hazard Identification and Control Guide Exposure to Asbestos Containing Materials (ACM) Accidental disturbance or removal of ACM. Asbestos Containing Materials are to be removed outside school hours. No DET employees, students or visitors are

More information

Procedure: Pressure equipment safety

Procedure: Pressure equipment safety Procedure: Pressure equipment safety Purpose The purpose of this procedure is to define the method for safe operation and inspection of pressure equipment and the collection and recording of associated

More information

Auto-Rewind Hose Reels INSTRUCTION MANUAL FOR OXY-LPG MODEL

Auto-Rewind Hose Reels INSTRUCTION MANUAL FOR OXY-LPG MODEL Auto-Rewind Hose Reels INSTRUCTION MANUAL FOR OXY-LPG MODEL Introduction Thank you for purchasing a Retracta Auto Rewind Hose Reel. The Retracta range of hose reels are a breakthrough in industrial quality

More information

Title/Description: Fuel Cell Fill Procedure

Title/Description: Fuel Cell Fill Procedure Fuel Cell Procedure Document No.: Author: Kurt Stiffel Title/Description: Approved by: Revision: 1-00 Effective Date: 1.0 Reference Documents All released OOI documents in Alfresco 3161-20000 Fuel Cell

More information

SAFETY POLICY AND PROCEDURE MANUAL All Euramax Subsidiaries. Number K-3.0 Welding Safety Procedures

SAFETY POLICY AND PROCEDURE MANUAL All Euramax Subsidiaries. Number K-3.0 Welding Safety Procedures Number K-3.0 Issued: 1/2009 Revised: 3/2016 Page 1 of 3 1.0 PURPOSE: To standardize procedures associated with production and maintenance welding and to minimize the potential risk of accident or injury

More information

OXY FUEL SYSTEM SET UP & SHUT DOWN PROCEDURE CHECKLIST ACETYLENE FUEL GAS

OXY FUEL SYSTEM SET UP & SHUT DOWN PROCEDURE CHECKLIST ACETYLENE FUEL GAS OXY FUEL SYSTEM SET UP & SHUT DOWN PROCEDURE CHECKLIST ACETYLENE FUEL GAS Items needed for demonstrations: Fire extinguisher PPE (Personal Protective Equipment): o Lab coats/welding jackets o Leather gloves

More information

Pressure Systems Safety Regulation

Pressure Systems Safety Regulation Pressure Systems Safety Regulation Introduction This document informs Faculty of the key requirements of the UK and Chinese Pressure Systems Safety regulations. The aim of these regulations is to prevent

More information

Working Environment Safety Assessment

Working Environment Safety Assessment For your own safety and/or safety of your workforce, and to improve the efficiency of your business practices, you should be aware of, and be up to date with, the key safety issues and good practices relevant

More information

HS26 Working at Height Policy and Procedure

HS26 Working at Height Policy and Procedure HS26 Working at Height Policy and Procedure HS26: Working at Height Policy and Procedure v2-0.jun 2016 Page 1 of 8 1. Scope This policy applies to all staff, students and visitors to The Shared Learning

More information

D R A F T. Operating Procedures for the NPDGamma Liquid Hydrogen Target at the BL 13. Version 1.00

D R A F T. Operating Procedures for the NPDGamma Liquid Hydrogen Target at the BL 13. Version 1.00 D R A F T Operating Procedures for the NPDGamma Liquid Hydrogen Target at the BL 13 Version 1.00 October 06, 2010 Operating Procedures for the NPDGamma Liquid Hydrogen Target V1.00 6/10/10 2 Table of Content

More information

Anti-flood device Model B-1

Anti-flood device Model B-1 December 4, 2009 Dry Systems 123a 1. DESCRIPTION The Anti-flood Device is required when Viking accelerators are installed on dry systems according to Viking Model E-1 Accelerator Trim Charts. In the SET

More information

USM21 Sealed Bimetallic Steam Trap for use with Pipeline Connectors Installation and Maintenance Instructions

USM21 Sealed Bimetallic Steam Trap for use with Pipeline Connectors Installation and Maintenance Instructions 6250250/1 IM-P625-03 ST Issue 1 USM21 Sealed Bimetallic Steam Trap for use with Pipeline Connectors Installation and Maintenance Instructions 1. General safety information 2. General product information

More information

80 Litre Suction Oil Drainer

80 Litre Suction Oil Drainer 80 Litre Suction Oil Drainer Please dispose of packaging for the product in a responsible manner. It is suitable for recycling. Help to protect the environment, take the packaging to the local amenity

More information

TECHNICAL DATA. Q = C v P S

TECHNICAL DATA. Q = C v P S January 6, 2012 Preaction 348a 1. Description Viking supervised Surefire Preaction Systems utilize the Viking G-6000P Valve. The small profile, lightweight, pilot operated Viking G-6000P Valve comes complete

More information

Harbour Town Gold Coast Site Induction

Harbour Town Gold Coast Site Induction Harbour Town Gold Coast Site Induction At Harbour Town Gold Coast we believe that safety is integral to the way we do business. We are committed to operating a safe environment for all where we are incident

More information

TECHNICAL DATA. Q = C v P S

TECHNICAL DATA. Q = C v P S January 6, 2012 Preaction 333a 1. Description Viking supervised Surefire Preaction Systems Utilize the Viking G-3000P Valve. The small profile, lightweight, pilot-operated Viking G-3000P Valve comes complete

More information

SCA Series Inverted Bucket Steam Traps

SCA Series Inverted Bucket Steam Traps 0770050/5 IM-P077-06 ST Issue 5 SCA Series Inverted Bucket Steam Traps Installation and Maintenance Instructions 1. General safety information 2. General product information 3. Installation 4. Commissioning

More information

TECHNICAL DATA. Q = C v P S

TECHNICAL DATA. Q = C v P S January 6, 2012 Preaction 331a 1. Description Viking supervised Double-Interlocked Electric/Pneumatic Release Preaction Systems utilize the Viking G-3000P Valve. The small profile, lightweight, pilot-operated

More information

ACCREDITATION OF ON-LINE LEAK SEAL ORGANIZATIONS

ACCREDITATION OF ON-LINE LEAK SEAL ORGANIZATIONS ACCREDITATION OF ON-LINE LEAK SEAL ORGANIZATIONS TSSA GUIDE FOR SURVEY TEAMS The Technical Standards and Safety Authority Boilers and Pressure Vessels Safety Division 3300 Bloor Street West 14th Floor,

More information

Installation, Operation and Maintenance Instructions for Pacific PA Non-Storage Heat Exchanger

Installation, Operation and Maintenance Instructions for Pacific PA Non-Storage Heat Exchanger OM008 Installation, Operation and Maintenance Instructions for Pacific PA Non-Storage Heat Exchanger The operating and maintenance instructions contained within this package are for Pacific water/water

More information

GI Series Diaphragm Pressure Gauge Guard

GI Series Diaphragm Pressure Gauge Guard Diaphragm Pressure Gauge Guard INSTRUCTION MANUAL Please read this Instruction Manual Carefully and Thoroughly for the Correct and Optimum use of this Product. Kindly keep this manual in a convenient place

More information

Safe work method statements

Safe work method statements Information about Safe work method statements How to prepare and use a safe work method statement (SWMS) for high risk construction work (HRCW) and who needs to prepare one. October 2018 Key concepts Hazard

More information

Safe Work Instructions For Oxygen Acetylene Equipment

Safe Work Instructions For Oxygen Acetylene Equipment Safe Work Instructions For Oxygen Acetylene Equipment Policy Sponsor: Assistant Vice President Facilities Management Responsible Unit: Trade Services Approval Date: September 2010 Revisions: January 2018

More information

U.S. CONCRETE, INC. SAFETY POLICY and PROCEDURE MANUAL

U.S. CONCRETE, INC. SAFETY POLICY and PROCEDURE MANUAL SAFE -14 Page 1 of 8 U.S. CONCRETE, INC. SAFETY POLICY and PROCEDURE MANUAL FUNCTION Safety TOPIC Hotwork Permit Program OBJECTIVE(S): GENERAL POLICY: To provide a work atmosphere that is conducive to

More information

200L BELT DRIVEN AIR COMPRESSOR

200L BELT DRIVEN AIR COMPRESSOR 200L BELT DRIVEN AIR COMPRESSOR MODEL NO: BOXER 14/200 PART NO: 2245215 OPERATION & MAINTENANCE INSTRUCTIONS ORIGINAL INSTRUCTIONS LS0118 ISS 4 INTRODUCTION Thank you for purchasing this CLARKE 200L Belt

More information

Contractor OHS Induction. AOHS-05-GUI September 2016

Contractor OHS Induction. AOHS-05-GUI September 2016 Contractor OHS Induction AOHS-05-GUI-002 8 September 2016 1 About AQWEST AQWEST is a Government Trading Enterprise responsible for supplying drinking water to Bunbury. Formed in 1906 as the Bunbury Water

More information

LITTLE MAX MODEL 50G 50,000 BTU PROPANE TORCH

LITTLE MAX MODEL 50G 50,000 BTU PROPANE TORCH LITTLE MAX MODEL 50G 50,000 BTU PROPANE TORCH INSTRUCTION MANUAL MODEL 50G PROPANE TORCH ASSEMBLY, TESTING, AND OPERATING INSTRUCTIONS PLEASE READ AND RETAIN THIS INFORMATION FOR FUTURE REFERENCE DO NOT

More information

B S Glass Ltd Safety procedures- outsourced Workplaces

B S Glass Ltd Safety procedures- outsourced Workplaces B S Glass Ltd Jan 17 B S Glass Ltd Safety procedures- outsourced Workplaces Index - - - - - - - - Page No On Site safety - - - - - - - - - - - - - - - - - - - Content 3. 1.00 Health and Safety Mission

More information

ACS.TPCP1A SAFETY ASSESSMENT CRITERIA INITIAL AND RE-ASSESSMENT NON-DOMESTIC NATURAL GAS TESTING AND PURGING

ACS.TPCP1A SAFETY ASSESSMENT CRITERIA INITIAL AND RE-ASSESSMENT NON-DOMESTIC NATURAL GAS TESTING AND PURGING ACS.TPCP1A SAFETY ASSESSMENT CRITERIA INITIAL AND RE-ASSESSMENT NON-DOMESTIC NATURAL GAS TESTING AND PURGING Issue 3.1 ACS.SMB 1 TPCP1A INITIAL & RE-ASSESSMENT Introduction Tests gas safety competencies

More information

Charmborough Bells Risk Assessment and Method Statement

Charmborough Bells Risk Assessment and Method Statement Charmborough Bells Risk Assessment & Method Statement Charmborough Bells Risk Assessment and Method Statement Introduction This risk assessment and method statement has been prepared to outline the procedures

More information

CPX EMERGENCY STANDBY MANIFOLD INSTALLATION, OPERATIONS & MAINTENANCE MANUAL

CPX EMERGENCY STANDBY MANIFOLD INSTALLATION, OPERATIONS & MAINTENANCE MANUAL CPX EMERGENCY STANDBY MANIFOLD INSTALLATION, OPERATIONS & MAINTENANCE MANUAL Company Registered Office: Crown House, Stockport, Cheshire, SK13RB No. 850 0700 67 Registered in England and Wales No. 05058855

More information

User Operation Manual and Safety Instructions

User Operation Manual and Safety Instructions PCP Airgun Charging Station 74 cu.ft. / 98 cu. ft. Carbon Fiber Tank & Accessories User Operation Manual and Safety Instructions BRAND: Air Venturi DESCRIPTION: PCP Airgun Charging System FILL PRESSURE:

More information

TECHNICAL DATA. Q = C v P S

TECHNICAL DATA. Q = C v P S January 6, 2012 Preaction 347a 1. Description Viking supervised Double-Interlocked Electric/Pneumatic Release Preaction Systems utilize the Viking G-6000P Valve. The small profile, lightweight, pilot operated

More information

Doc No: WELDHOT Midland Engineering Co., Inc. Initial Issue Date 12/14/15 Safety Management System

Doc No: WELDHOT Midland Engineering Co., Inc. Initial Issue Date 12/14/15 Safety Management System Revision Preparation: Safety Mgr Authority: President Issuing Dept: Safety Page: Page 1 of 7 PURPOSE To provide guidelines for the safe operation of welding, cutting and hot work of equipment, and to itemize

More information

CLIENT: UNIVERSAL TOOL & PRODUCTION COMPANY Ltd. METHOD STATEMENT Commissioning and Final connections to IHT Skid

CLIENT: UNIVERSAL TOOL & PRODUCTION COMPANY Ltd. METHOD STATEMENT Commissioning and Final connections to IHT Skid CLIENT: UNIVERSAL TOOL & PRODUCTION COMPANY Ltd METHOD STATEMENT Commissioning and Final connections to IHT Skid UNITS 15/16 DAEDALUS HANGERS EAST GOSPORT Development: Title & Company Name Signature Date

More information

API MPMS Chapter 17.6 Guidelines for Determining the Fullness of Pipelines between Vessels and Shore Tanks

API MPMS Chapter 17.6 Guidelines for Determining the Fullness of Pipelines between Vessels and Shore Tanks API MPMS Chapter 17.6 Guidelines for Determining the Fullness of Pipelines between Vessels and Shore Tanks 1. Scope This document describes procedures for determining or confirming the fill condition of

More information

Transferring and Storage

Transferring and Storage Organometallics Transferring and Storage A dip tube is available for Container 2 which can be screwed into the neck to permit safe transfer of product. Small quantities of metal alkyl can be withdrawn

More information

Management Plan for Confined Spaces

Management Plan for Confined Spaces IEA, INC. W A S ECA P U B L I C S C H O O L S I S D # 829 Contact Us: BROOKLYN PARK OFFICE 9201 W. BROADWAY, #600 BROOKLYN PARK, MN 55445 763-315-7900 MANKATO OFFICE 610 N. RIVERFRONT DRIVE MANKATO, MN

More information

Rockhampton Office Brisbane Office Tarong Site. Barron Gorge Hydro PS Kareeya Hydro PS Mica Creek PS

Rockhampton Office Brisbane Office Tarong Site. Barron Gorge Hydro PS Kareeya Hydro PS Mica Creek PS Business Procedure Hot Work Document Number OHS-PROC-128 This document applies to the following sites: All Sites Rockhampton Office Brisbane Office Tarong Site Barron Gorge Hydro PS Kareeya Hydro PS Mica

More information

24L OIL FREE AIR COMPRESSOR MODEL NO: TIGER 7/250 PART NO: OPERATION & MAINTENANCE INSTRUCTIONS LS10/13

24L OIL FREE AIR COMPRESSOR MODEL NO: TIGER 7/250 PART NO: OPERATION & MAINTENANCE INSTRUCTIONS LS10/13 24L OIL FREE AIR COMPRESSOR MODEL NO: TIGER 7/250 PART NO: 2244030 OPERATION & MAINTENANCE INSTRUCTIONS LS10/13 INTRODUCTION Thank you for purchasing this product. Before attempting to use this product,

More information

BCGA GUIDANCE NOTE 17

BCGA GUIDANCE NOTE 17 BCGA GUIDANCE NOTE 17 BCGA POLICY AND GUIDANCE FOR THE SAFE FILLING OF THIRD-PARTY OWNED AND / OR MAINTAINED TANKS Revision 2: 2013 BCGA GUIDANCE NOTE 17 BCGA POLICY AND GUIDANCE FOR THE SAFE FILLING OF

More information

Bitumen Delivery Driver Inductions Eurobitume UK

Bitumen Delivery Driver Inductions Eurobitume UK Bitumen Delivery Driver Inductions Eurobitume UK The information in this module is given in good faith and belief in its accuracy at the time of publication, but does not imply any legal liability or responsibility

More information

CITY AND COUNTY OF DENVER CR&CF RISK UNIT Compressed Gas Safety Standard

CITY AND COUNTY OF DENVER CR&CF RISK UNIT Compressed Gas Safety Standard CITY AND COUNTY OF DENVER CR&CF RISK UNIT 65.5.11 Compressed Gas Safety Standard 1.0 Introduction 2.0 Scope This standard has been developed to protect all City and County of Denver employees and contractors

More information

Method Statement Author

Method Statement Author Plan Bee Limited 3.3 Etna Industrial estate Clamp Road Motherwell Scotland ML2 7XQ Tel: 01698580572 Method Statement Method Statement Details Method Statement Number 7 Method Statement Date Monday 3rd

More information

Return the completed questionnaire, OSHA 300A Summary form and EMR Rating via e- mail.

Return the completed questionnaire, OSHA 300A Summary form and EMR Rating via e- mail. EHS CONTRACTOR SAFETY It is the Mission of Olin Brass to Create an environment of safety excellence where an injuryfree work place is achieved through continuously confronting and correcting unsafe conditions

More information

Understanding health and safety in gas utilisation

Understanding health and safety in gas utilisation Level: 3 Credit value: 11 URN: M/502/8461 Unit aim This unit aims to provide learners with the knowledge and understanding of the general health and safety requirements for working in the gas industry.

More information

FM Approved - Automatic Water Control Valve as standard deluge valve. No formal approval available for coating. Foam Concentrate

FM Approved - Automatic Water Control Valve as standard deluge valve. No formal approval available for coating. Foam Concentrate December 6, 2010 Foam 21a 1. Description With Multiple Foam/Water Deluge Systems Supplied by a Bladder Tank, multiple deluge foam risers can be supplied from a single foam concentrate source. Where a bladder

More information

INSTALLATION & MAINTENANCE INSTRUCTION

INSTALLATION & MAINTENANCE INSTRUCTION ARCHON Industries, Inc Liquid Level Gauges Models: BT-LLG ND-LLG INSTALLATION & MAINTENANCE INSTRUCTION Instruction No.: 1014.2 Revision Issued: 3/01/03 Approved: Engineering Manager Warning ONLY QUALIFIED

More information

UBP32 Sealed Balanced Pressure Thermostatic Steam Trap for use with PC_ Pipeline Connectors Installation and Maintenance Instructions

UBP32 Sealed Balanced Pressure Thermostatic Steam Trap for use with PC_ Pipeline Connectors Installation and Maintenance Instructions 1270750/7 IM-P127-02 ST Issue 7 UBP32 Sealed Balanced Pressure Thermostatic Steam Trap for use with PC_ Pipeline Connectors Installation and Maintenance Instructions 1 General safety information 2 General

More information

VERTICAL AIR COMPRESSORS

VERTICAL AIR COMPRESSORS VERTICAL AIR COMPRESSORS MODEL NO: VE15C150, VE18C150, VE25C150 PART NO: 2226010, 2226020, 2226025 OPERATION & MAINTENANCE INSTRUCTIONS LS0715 INTRODUCTION Thank you for purchasing this CLARKE Vertical

More information

DUPLEX PRESSURE REDUCING SET

DUPLEX PRESSURE REDUCING SET DUPLEX PRESSURE REDUCING SET Phoenix Pipeline Products Limited. Unit 8, McKenzie Industrial Park, Tel No.: 44 (0) 161 428 7200 Bird Hall Lane, Fax No.: 44 (0) 161 428 7010 Stockport, Email: info@p3-phoenix.com

More information

Spiratec ST14, ST16 and ST17 Sensor Chambers and sensors

Spiratec ST14, ST16 and ST17 Sensor Chambers and sensors 0862050/1 IM-P086-18 MI Issue 1 Spiratec ST14, ST16 and ST17 Sensor Chambers and sensors Installation and Maintenance Instructions 1. Safety Information 2. General product information 3. Installation 4.

More information

MST21 Stainless Steel Balanced Pressure Thermostatic Steam Trap

MST21 Stainless Steel Balanced Pressure Thermostatic Steam Trap 1250650/6 IM-P125-07 ST Issue 6 MST21 Stainless Steel Balanced Pressure Thermostatic Steam Trap Installation and Maintenance Instructions 1. Safety information 2. General product information 3. Installation

More information

PRESSURE TEST PUMP OPERATING & MAINTENANCE INSTRUCTIONS. Model No: PTP100. Part No: GC01/09

PRESSURE TEST PUMP OPERATING & MAINTENANCE INSTRUCTIONS. Model No: PTP100. Part No: GC01/09 PRESSURE TEST PUMP Model No: PTP00 Part No: 06020 OPERATING & MAINTENANCE INSTRUCTIONS GC0/09 INTRODUCTION Thank you for purchasing this CLARKE Pressure Testing Pump. Before attempting to use the product,

More information

Method Statement. Method Statement Details. Signatures. Emergency Contact Details 1/5

Method Statement. Method Statement Details. Signatures. Emergency Contact Details 1/5 Highway Traffic Safety Ltd Lakeside House, 1 Furzeground Way Stockley Business Park Heathrow London UB11 1BD Tel: 02071 111655 Method Statement Method Statement Details Method statement number 4 Method

More information

High Pressure Inlet Kits for CONCOA BlendMites and BlendMasters

High Pressure Inlet Kits for CONCOA BlendMites and BlendMasters ADI 3210-A ADI 3210-A Certified ISO 9001 Certified ISO 9001 High Pressure Inlet Kits for CONCOA BlendMites and BlendMasters Warning: An appropriately sized pressure relief device downstream of the regulator

More information

ANDERSON GREENWOOD SERIES 9000 POSRV INSTALLATION AND MAINTENANCE INSTRUCTIONS

ANDERSON GREENWOOD SERIES 9000 POSRV INSTALLATION AND MAINTENANCE INSTRUCTIONS Procedure-assembly-functional test and performance requirements 1 SCOPE 1.1 This document establishes the general procedure for assembly, functional testing and normal performance requirements of low Series

More information

50L BELT DRIVEN AIR COMPRESSOR

50L BELT DRIVEN AIR COMPRESSOR 50L BELT DRIVEN AIR COMPRESSOR MODEL NO: BOXER 14/50P PART NO: 2245200, 2245203 OPERATION & MAINTENANCE INSTRUCTIONS ORIGINAL INSTRUCTIONS LS0118 - ISS 4 INTRODUCTION Thank you for purchasing this CLARKE

More information

The following instructions were provided by the manufacturer.

The following instructions were provided by the manufacturer. Giant Weed Torch (PT615) The following instructions were provided by the manufacturer. Please read this manual before operating your weed torch and retain this information for future reference. For your

More information

OPERATING INSTRUCTIONS Sherlock Chamber Testing System

OPERATING INSTRUCTIONS Sherlock Chamber Testing System OPERATING INSTRUCTIONS Sherlock Chamber Testing System Arrangement Equipment Kit FL90 & FL100 Corbel Test Plate with Gasket Seal S8, S14, S15 & S16 Sump Test Plate with Gasket Seal S7 & S5 Chamber Test

More information

HEALTH AND SAFETY METHOD STATEMENT AIR CONDITIONING/REFRIGERATION MAINTENANCE/SERVICE. 2. Clean filters and screens when necessary

HEALTH AND SAFETY METHOD STATEMENT AIR CONDITIONING/REFRIGERATION MAINTENANCE/SERVICE. 2. Clean filters and screens when necessary HEALTH AND SAFETY METHOD STATEMENT AIR CONDITIONING/REFRIGERATION MAINTENANCE/SERVICE Air Conditioning Indoor/Outdoor Unit as applicable 1. Check Pressures 2. Clean filters and screens when necessary 3.

More information

Safety at Work. Rules for Staying Alive

Safety at Work. Rules for Staying Alive Safety at Work Rules for Staying Alive Safety at Work Rules for Staying Alive Introduction The purpose of Dana Gas Rules For Staying Alive is to address the key causes of deaths in our industry. These

More information

Confined Spaces. This procedure applies to all workers of the Diocese of Maitland Newcastle (DoMN).

Confined Spaces. This procedure applies to all workers of the Diocese of Maitland Newcastle (DoMN). Purpose To provide guidance in controlling the risks associated with confined spaces including identifying confined spaces, working in a confined space and issuing confined space entry permits. Scope This

More information

AVM7 Stainless Steel Thermostatic Air Vent

AVM7 Stainless Steel Thermostatic Air Vent 1231850/4 IM-P123-23 ST Issue 4 AVM7 Stainless Steel Thermostatic Air Vent Installation and Maintenance Instructions 1. Safety information 2. General product information 3. Installation 4. Commissioning

More information

MAINTENANCE MECHANIC RCF

MAINTENANCE MECHANIC RCF REPAIRING AND REPLACING VALVES AND COILS MAINTENANCE MECHANIC Activity Hazard Identification Required Precautions 1. Walking to and from work site. 1a. Back ache; overexertion from carrying heavy weight.

More information

COMPRESSOR OPERATION & MAINTENANCE INSTRUCTIONS MODEL NO: WARRIOR 55 PART NO: (110V) , (230V) , LS0512

COMPRESSOR OPERATION & MAINTENANCE INSTRUCTIONS MODEL NO: WARRIOR 55 PART NO: (110V) , (230V) , LS0512 COMPRESSOR MODEL NO: WARRIOR 55 PART NO: (110V) 2323010, (230V) 2322020, OPERATION & MAINTENANCE INSTRUCTIONS LS0512 INTRODUCTION Thank you for purchasing this CLARKE Compressor. Before attempting to use

More information