HS26 Working at Height Policy and Procedure

Size: px
Start display at page:

Download "HS26 Working at Height Policy and Procedure"

Transcription

1 HS26 Working at Height Policy and Procedure HS26: Working at Height Policy and Procedure v2-0.jun 2016 Page 1 of 8

2 1. Scope This policy applies to all staff, students and visitors to The Shared Learning Trust (TSLT) premises including contractors who will be expected to apply safety standards to at least the same level as that required of Trust staff and students. 2. Context Work at height is second only to slips, trips and falls in numbers of reportable accidents to people at work in the UK and results in more workplace deaths and serious injuries than any other single cause. Regulators regularly focus on working at height when conducting pro-active inspections with warnings and prosecutions taking place before any person has actually been injured as a result of unsafe working practices. 3. Aims TSLT is committed to ensure a safe environment is maintained where employees, students and visitors operate safe working practices and use access equipment appropriately and legislative requirements are met. Through the application of this policy the Trust aims to create an environment where no one is injured while working at height on TSLT premises. This will be achieved through: ensuring appropriate training for all staff and, as appropriate, students; regular checks and maintenance on all access equipment; planning of all work at height activity including risk assessment; review of all contractor safety method statements and risk assessments prior to allowing work at height to commence; monitoring of work at height whilst under way. 4. Statutory position Work at height is governed generally under the Health and Safety at Work etc Act 1974, the Management of Health and safety at Work Regulations 1999 as amended and the Work at Height regulations Procedure Detail A place is defined as at height if a person could be injured falling even if at or below ground level; in addition there is no minimum height from which to fall. For the purposes of this policy work includes moving around at a place of work but not travel to or from a place of work. HS26: Working at Height Policy and Procedure v2-0.jun 2016 Page 2 of 8

3 6. Responsibilities 6.1. Chief Executive To ensure that systems are in place ensuring all work at height within The Shared Learning Trust is properly managed and carried out safely and without injury to TSLT staff, employees, visitors and contractors. To monitor the management arrangements making changes where necessary prompted by for example, change in process, technological development or change to legislation Principals To ensure this policy is implemented at all TSLT locations and throughout all departments and that risk assessments are carried out for all work at height activity within their campuses. To ensure staff training takes place in all relevant facets of this policy. To ensure all access equipment is identified, maintained and records kept in accordance with this policy. To ensure any incidents involving work at height including near misses are reported in accordance with the TSLT Accident and First Aid Procedure Heads of Curriculum To ensure this policy is implemented within the curriculum and support areas as appropriate within their department. To ensure this policy and procedure is communicated to all department staff particularly including technicians and tutors and that regular training takes place on its content to ensure safe methods of work are maintained at all times and that said staff are competent to work at height from equipment they have been trained to use. To ensure risk assessments are carried out for any work at height conducted by the departments within the department. To ensure department staff are prohibited from using access equipment for which they have received no training. HS26: Working at Height Policy and Procedure v2-0.jun 2016 Page 3 of 8

4 6.4. Facility Manager To ensure the provisions of this procedure apply to any contractors appointed to carry out works on The Shared Learning Trust premises and that their arrangements for working at height are reviewed. Review to include activity specific risk assessments and method statements for the work to be carried out and monitoring to ensure such method statements are complied with whilst the work is undertaken. To ensure this policy and procedure is communicated to all Estates staff and that regular training takes place on its content to ensure safe methods of work are maintained at all times and that said staff are competent to work at height. To ensure that Estates staff are trained in the use of any access equipment they are required to use including hired equipment, and are prohibited from using equipment for which they have received no training. To ensure risk assessments are carried out for any work at height conducted either by TSLT estates staff or contractors. To ensure that all TSLT access equipment is regularly inspected and to maintain a central record of such inspections Health and Safety Manager To monitor the implementation of this policy paying particular attention to the efficacy of work at height risk assessments, training of The Shared Learning Trust staff on work at height and monitoring access equipment inspection processes All employees Comply with this policy and procedure and follow any training or instructions on work at height. Conduct or review a risk assessment prior to undertaking any work at height activity. Use any equipment or safety device supplied for work at height properly. Report to their line manager or the Health and Safety Manager any activity or defect relating to work at height which is likely to endanger himself or herself or another person (including contractors working on site). HS26: Working at Height Policy and Procedure v2-0.jun 2016 Page 4 of 8

5 7. General safe working method for work at height All staff must ensure the following: 7.1. Work at height is avoided if possible by ensuring that no work is done at height if it is safe and reasonably practicable to do it other than at height Risk assessment: A risk assessment is carried out under regulation 3 of the Management of Health and Safety at Work Regulations 1999 using the standard TSLT risk assessment process Planning: Any work at height is properly planned, appropriately supervised and carried out in as safe a way as reasonably practicable to prevent any persons or any objects falling a distance liable to cause injury External work at height: Any external work at height is postponed while weather conditions endanger health and safety Competency: Everyone involved in the work is competent or if being trained is supervised by a competent person. This includes anyone involved in the organisation, planning, supervision and the supply and maintenance of equipment Safe place of work: The place where work is done at height is safe and has features to prevent a fall Appropriate equipment: Any equipment for work at height is suitably selected and appropriately inspected Protection measures: Collective protection measures are given priority over personal protective measures Roof access: Where regular access is made onto roofs, managers must ensure that such areas are checked prior to work commencing e.g. checking every parapet, permanent rail etc Fragile surfaces: No one under their control goes onto or near a fragile surface unless that is the only reasonably practicable way for the worker to carry out the work safely and a risk assessment has been carried out and suitable fall arrest and protection measures put in place prior to work commencing Warnings: Appropriate warnings are in place to prevent anyone under their control going onto or near a fragile surface Falling objects: The risks from falling objects are properly controlled. HS26: Working at Height Policy and Procedure v2-0.jun 2016 Page 5 of 8

6 7.13. Prohibition: Access is prevented and clearly signed to areas where there is a risk of a person falling or being struck by a falling object Ladders: If a ladder is used for any work at height, that a risk assessment has demonstrated that the use of more suitable work equipment is not justified and the guidance in sections 4-7 is complied with and the inspection record in appendix B is completed. 8. Safe Use of Steps, Ladders and Scaffold Tower general information 8.1. Any stepladder or ladders must be fit for purpose (Class 1 industrial grade ladder or to EN131 light trade, not carrying excessive weights). Use of domestic ladders and stepladders is prohibited Any scaffold tower or other access equipment must be fit for purpose (BS2482 boards and BS5973 tubes and fittings) All access equipment is subject to routine inspection regimes but employees must check before each use that ladders and other access equipment is in good condition Damaged or repaired ladders or access equipment must not be used unless professionally certificated as safe for use. 9. Stepladders The following basic safe practice must always be applied: 9.1. Stepladders must be positioned correctly on stable ground and open to the full extent of the retaining bar. Stepladders should always be placed at a right angle to the work face to ensure stability. If this is not possible alternative access equipment should be used Stepladders must not be placed where they can be dislodged or struck by traffic or opening doors The users knees must always remain below the top of the steps Users must never stand on the top platform of stepladders. 10. Ladders The following basic safe practice must always be applied: Prior to using ladders the safest means of access must be considered and use of a suitable adjustable platform whenever possible. HS26: Working at Height Policy and Procedure v2-0.jun 2016 Page 6 of 8

7 10.2. Whenever using a ladder its condition must be inspected prior to use paying particular attention to the condition of the feet, damaged stiles or rungs, dents, bends and loose rivets Ladders should be positioned at a 75 degree angle on a firm and level base, evenly supported on both stiles (uprights) Rungs should be kept free of mud, boots should be cleaned before use Only one person should be on a ladder at any one time A second person should be at the base of the ladder to add stability and keep the area clear Users must tie off / stabilise ladders at all times either using a ladder stability device attached to the base of the stiles or using fixings attached to the wall When climbing / working from a ladder, users must maintain 3 points of contact i.e. 2 feet / 1 hand or 2 hands / 1 foot should be in contact with the ladder at all times A ladder must not rest against any fragile surface or fitting Placed ladders must not be left unattended Users must not over reach as this leads to over balancing and falls Users must not carry heavy / bulky items up a ladder; use a gin wheel or other lifting equipment Users must carry light tools and equipment in a shoulder bag or on a belt. 11. Scaffolds and towers TSLT employees are prohibited from working on scaffolds unless a suitable permit for work at height has been issued by a competent* TSLT Facilities Manager, Senior Management Team member or Head of Department / Curriculum Head Users must not assemble or use a scaffold tower or other access equipment without having first received training in correct methods of assembly and safe working practices Users must not move a scaffold tower when someone is occupying it. HS26: Working at Height Policy and Procedure v2-0.jun 2016 Page 7 of 8

8 11.4. Users must not use the rungs of a ladder to support boards for access. Intermediate landing places should be provided on a scaffold to ensure a maximum ladder height of 9 metres TSLT employees are not permitted to work on working at height access equipment without having first received training in its use. 12. Regular inspection All The Shared Learning Trust ladders and access equipment are subject to annual inspection by a competent person. A central record of inspection must be maintained by the Facility Manager. Inspection includes comprehensive formal visual checks on ladder, stepladder and other access equipment condition, details of which are included on the ladder / stepladder inspection register. Further guidance is provided in procedure HS26.1 Ladder / stepladder register and inspection procedure. HS26: Working at Height Policy and Procedure v2-0.jun 2016 Page 8 of 8

HEALTH & SAFETY ARRANGEMENTS FOR MANAGEMENT OF WORK AT HEIGHT

HEALTH & SAFETY ARRANGEMENTS FOR MANAGEMENT OF WORK AT HEIGHT HEALTH & SAFETY ARRANGEMENTS FOR MANAGEMENT OF WORK AT HEIGHT INTRODUCTION Cwmni CYNNAL recognises that accidents can arise from working at height. Falls from height can be a cause of injury and absence

More information

S31 Opening Statement Working at Height

S31 Opening Statement Working at Height S31 Opening Statement Working at Height Falls from height are by far the most common cause of workplace deaths and one of the main causes of major injury in the workplace. Latest figures reveal that 46

More information

Deans, Directors, Heads of Schools and Departments and Research Institute Directors and Managers

Deans, Directors, Heads of Schools and Departments and Research Institute Directors and Managers Working at Height 1. PURPOSE 1.1 To ensure that any work at height is carried out in accordance with the legal requirements and associated guidance. This includes the use of scaffolds, towers, ladders,

More information

Working at Height. Policy and Procedures. Author: Beth Webster Assistant Safety Advisor. On behalf of School Safety Committee.

Working at Height. Policy and Procedures. Author: Beth Webster Assistant Safety Advisor. On behalf of School Safety Committee. Working at Height Policy and Procedures Author: Beth Webster Assistant Safety Advisor Authorised by: Issued by: John Stephenson Safety Office On behalf of School Safety Committee Review Date: NO LATER

More information

Health and Safety Code of Practice. SCP38 Working at Height

Health and Safety Code of Practice. SCP38 Working at Height Health and Safety Code of Practice Responsibility for Policy: Relevant to: Approved by: Responsibility for Document Review: SCP38 Working at Height Date introduced: February 2007 Date(s) modified: Finance

More information

Working at Height Policy Edition 1 27 th October Authorized by. ... Managing Director

Working at Height Policy Edition 1 27 th October Authorized by. ... Managing Director Working at Height Policy Edition 1 27 th October 2007 Authorized by... Managing Director ISSUE CONTROL This Policy is a controlled document and amendments to this document are affected by the re-issue

More information

1. Objective of the initiative To ensure that all employees and subcontractors are aware of the risks associated with working at height.

1. Objective of the initiative To ensure that all employees and subcontractors are aware of the risks associated with working at height. Safety Initiative 02 Working at Height May 2011 CONTENTS 1. Objective of the initiative 2. Overview. 3. Implementation 4. Duties 5. Hierarchy of Controls 6. Workplace Inspections 7. Fragile Surfaces 8.

More information

LADDERS FIXED AND PORTABLE

LADDERS FIXED AND PORTABLE CONTRACTOR WHS HAZARD STANDARD LADDERS FIXED AND PORTABLE EXTERNAL USE ONLY Principles in the Optus Contractor WHS management process CONTRACTOR MANAGEMENT STAGES PRINCIPLES THIS STANDARD REQUISITION Requisition

More information

Working At Height Policy (including Safe Use of Stepladders guidance)

Working At Height Policy (including Safe Use of Stepladders guidance) LONG FIELD ACADEMY Working At Height Policy (including Safe Use of Stepladders guidance) Formulation Date: April 2014 Senior Team Responsibility Governors Reviewing Committee FRHP Reviewed: May 2017 Review

More information

Work at height Policy

Work at height Policy Work at Policy Introduction This policy procedure outlines the Forces responsibility to provide guidance to all police officers and staff when working at. Many serious incidents involving working at occur

More information

Safe Use of Access Equipment

Safe Use of Access Equipment Safe Use of Access Equipment Guidance Note 2 Nov 17 1 Safe Use of Access Equipment Introduction This Guidance Note gives practical information about using access equipment. Sample templates have been included

More information

Health & Safety Policy HSP 13 Working at Height Version Status Date Title of Reviewer Purpose/Outcome

Health & Safety Policy HSP 13 Working at Height Version Status Date Title of Reviewer Purpose/Outcome Health & Safety Policy HSP 13 Working at Height Version Status Date Title of Reviewer Purpose/Outcome 1.0 Draft 07.03.2016 David Maine 1 st Draft for consultation/review 1.1 Approved 10.01.2017 David Maine

More information

Chinthurst Preparatory School

Chinthurst Preparatory School Chinthurst Preparatory School Work At Height Policy Reviewed by TB/WB/SN/JV - September 2016 Next review date September 2017 Contents The Policy in 4 sections Work at Height Policy Appendix A Appendix

More information

Ormiston Academies Trust. Ormiston Horizon Academy. Working at Height Policy October 2016

Ormiston Academies Trust. Ormiston Horizon Academy. Working at Height Policy October 2016 Ormiston Academies Trust Ormiston Horizon Academy Working at Height Policy Project/job number: Author: Sharlene Smith/Handsam Date: 25/10/16 Contributors: Sharlene Smith Version number: 1.1 Reviewed by:

More information

The Work at Height Regulations 2005 A brief guide

The Work at Height Regulations 2005 A brief guide Off work sick and worried about your job? Steps you can take to help your return to work The Work at Height Regulations 2005 A brief guide Health and Safety Executive 1 In 2003/04 falls from height accounted

More information

The Work at Height Regulations 2005 A brief guide

The Work at Height Regulations 2005 A brief guide The Work at Height Regulations 2005 A brief guide In 2003/04 falls from height accounted for 67 fatal accidents at work and nearly 4000 major injuries. They remain the single biggest cause of workplace

More information

Keeping People Safe CHURCH HEALTH & SAFETY TOOLKIT LADDERS

Keeping People Safe CHURCH HEALTH & SAFETY TOOLKIT LADDERS Keeping People Safe CHURCH HEALTH & SAFETY TOOLKIT LADDERS Ladders and stepladders Ladders and stepladders are commonly used in churches. There is no ban on this and they offer a practical option for low

More information

Type: Policy. Working at Heights Policy. Register No: Status: Public. Developed in response to: Work at Height Regs 2007

Type: Policy. Working at Heights Policy. Register No: Status: Public. Developed in response to: Work at Height Regs 2007 Working at Heights Policy Type: Policy Register No: 09085 Status: Public Developed in response to: Work at Height Regs 2007 Contributes to CQC Outcome: Regulation 15 - Premises and equipment Consulted

More information

Keeping People Safe CHURCH HEALTH & SAFETY TOOLKIT. Working at Height

Keeping People Safe CHURCH HEALTH & SAFETY TOOLKIT. Working at Height Keeping People Safe CHURCH HEALTH & SAFETY TOOLKIT Working at Height Everyday tasks involving work at height are common in many churches and these can pose a risk of serious injury from falls. Thankfully

More information

Work At Height Health & Safety Management Standard Issue 3 (April 2011)

Work At Height Health & Safety Management Standard Issue 3 (April 2011) Work At Height Health & Safety Management Standard Issue 3 (April 2011) Introduction This document contains corporate standards and guidance on the management of risks arising from work at height. It is

More information

TUDOR PARK EDUCATION TRUST. Working at Heights and Risk Assessment

TUDOR PARK EDUCATION TRUST. Working at Heights and Risk Assessment TUDOR PARK EDUCATION TRUST Working at Heights and Risk Assessment Person(s) responsible for updating the policy: Chief Executive Officer Date Approved: Board of Directors on 7 July 2016 Period of Review:

More information

Working at Height Procedure

Working at Height Procedure Page: 1 of 16 Working at Height Procedure Approval & Authorisation Submitted by: Brett Chalkley Senior Consultant Stokes Associates Limited Approved by: Gary Stokes Managing Director Stokes Associates

More information

RISK ASSESSMENT FOR Philips Smart Touch Installation 03/04/2012

RISK ASSESSMENT FOR Philips Smart Touch Installation 03/04/2012 RISK ASSESSMENT FOR Philips Smart Touch Installation Myatt Garden Primary School Myatt Garden Primary School Rokeby Road London SE4 1DF Tel: 020 8691 0611 03/04/2012 INTRODUCTION The purpose of this method

More information

Key provisions of OSHA's new rule on walking/working surfaces, fall protection

Key provisions of OSHA's new rule on walking/working surfaces, fall protection ARTICLES CASES Key provisions of OSHA's new rule on walking/working surfaces, fall protection Although an overwhelming majority of general industry accidents stem from slips, trips and falls, Subpart D

More information

HEALTH AND SAFETY GUIDANCE NOTE WORK AT HEIGHT

HEALTH AND SAFETY GUIDANCE NOTE WORK AT HEIGHT HEALTH AND SAFETY GUIDANCE NOTE WORK AT HEIGHT INTRODUCTION Working at height remains one of the biggest causes of fatalities and major injuries. Work at height means work in any place where, if there

More information

J&S Cooper Utilities

J&S Cooper Utilities Working at Heights Inspection conducted for J&S Cooper Utilities Conducted on 17 Apr 2018 08:35 AM Location 11953 Tyler Rd, Red Bluff, CA 96080, USA Prepared by SafetyCulture Staff Completed on 17 Apr

More information

What we are already doing Working at Height comes within the framework of St. Matthew s Health and Safety and Fire arrangements policy

What we are already doing Working at Height comes within the framework of St. Matthew s Health and Safety and Fire arrangements policy Risk Assessment For: Assessment signed off by (Warden): Assessment signed off by (Clergy): Working at Height Please also see separate risk assessment for Use of Stepladders Assessment carried out by (H&S):

More information

Work at Height Procedure

Work at Height Procedure Work at Height Procedure Version Number 1.3 Effective from 01 April 2008 Author: Head of Operations Estates & Facilities Document Control Information Revision History incl. Authorisation: (most recent

More information

Health & Safety Policy & Plan. Rightway Roofing.

Health & Safety Policy & Plan. Rightway Roofing. Health & Safety Policy & Plan. Rightway Roofing. Valid: 02/2012-02/2013 Contents ( 1 ) Policy Statement. ( 2 ) Hazard Identification. ( 3 ) Hazard Management. ( 4 ) Induction & Training. ( 5 ) Monitoring

More information

Working at Height Regulation 2005

Working at Height Regulation 2005 1 Working at Height Regulation 2005 The Governors of the Ilford Ursuline Prep School are committed to the provision of a service that is fair, accessible and meets the needs of all individuals 1. Function

More information

Working at Height Procedure

Working at Height Procedure WILTSHIRE POLICE FORCE PROCEDURE Working at Height Procedure Effective from: 09.06.16 Version 8.0 09.06.16 Page 1 of 20 TABLE OF CONTENTS Identification... 3 Ownership... 3 Revision History... 3 Approvals...

More information

IMMANUEL CHURCH, CHICHESTER HEALTH AND SAFETY POLICY

IMMANUEL CHURCH, CHICHESTER HEALTH AND SAFETY POLICY IMMANUEL CHURCH, CHICHESTER HEALTH AND SAFETY POLICY Approved by the Trustees: November 2016 Health and Safety Policy Introduction The main piece of health and safety legislation is the Health and Safety

More information

GUIDANCE NOTES ON LOLER REGULATIONS FOR RIVERIA MK1.MK2 & MK3 AND BELLAVITA BATH LIFT. Lifting Operations and Lifting Equipment Regulations 1998

GUIDANCE NOTES ON LOLER REGULATIONS FOR RIVERIA MK1.MK2 & MK3 AND BELLAVITA BATH LIFT. Lifting Operations and Lifting Equipment Regulations 1998 GUIDANCE NOTES ON LOLER REGULATIONS FOR RIVERIA MK1.MK2 & MK3 AND BELLAVITA BATH LIFT Lifting Operations and Lifting Equipment Regulations 1998 (LOLER 98) Prepared by Mike Heath. Community Supply Manager/Bath

More information

Health and Safety Inspection Procedure

Health and Safety Inspection Procedure Template v4 WILTSHIRE POLICE FORCE PROCEDURE Health and Safety Inspection Procedure Effective from: 25.03.2012 Last Review Date: 10.05.2015 Version: 2.0 Next Review Date: 10.05.2018 TABLE OF CONTENTS PROCEDURE

More information

PRESSURE SYSTEMS POLICY

PRESSURE SYSTEMS POLICY PRESSURE SYSTEMS POLICY PRESSURE SYSTEMS POLICY 1. Introduction 2. Policy Statement 3. Scope 4. Background 5. Roles & Responsibilities 6. Training 7. Contractors 8. Policy Review 1. Introduction The Kilmarnock

More information

Keeping People Safe CHURCH HEALTH & SAFETY TOOLKIT. Tower Tours

Keeping People Safe CHURCH HEALTH & SAFETY TOOLKIT. Tower Tours Keeping People Safe CHURCH HEALTH & SAFETY TOOLKIT Tower Tours Tower tours are a great way to allow parishioners and other members of the public to enjoy the splendour of your church, while raising funds

More information

Working at Height Policy 2018

Working at Height Policy 2018 Estates Department Working at Height Policy 2018 Author Robert Hardman Estates Manager Last Policy Review Date 1/05/18 Next policy Review Date 1/05/19 Reviewed by 1 Policy The Laurus Trust; is committed

More information

LONE WORKING HEALTH AND SAFETY GUIDANCE

LONE WORKING HEALTH AND SAFETY GUIDANCE LONE WORKING HEALTH AND SAFETY GUIDANCE Revised March 2017: Version 3.1 Name of Policy: Purpose of the Policy: Policy Applies to: Approved by: Responsible for its Updating: Final Approval by: Lone Working

More information

You must NOT touch any equipment unless you are authorised to work on or with that equipment and you have followed correct safety procedures.

You must NOT touch any equipment unless you are authorised to work on or with that equipment and you have followed correct safety procedures. SYDNEY TOWN HALL 1 HIRER & CONTRACTOR SAFETY FACT SHEET Issue 2 September 2013 www.sydneytownhall.com.au City of Sydney - Venue Management will provide and maintain a safe working environment for the health,

More information

GENERAL MAINTENANCE & SAFETY GUIDANCE

GENERAL MAINTENANCE & SAFETY GUIDANCE GENERAL MAINTENANCE & SAFETY GUIDANCE GREAT BRITISH SPORTS EQUIPMENT DIRECT FROM THE MANUFACTURER 01502 711298 info@mhgoals.com www.mhgoals.com MH GOALS LTD, UNIT 7 10 WARWICK COURT, ELLOUGH INDUSTRIAL

More information

Mr. Teo Han Ping Head, Programme Management, Occupational Safety & Health Division, Ministry of Manpower

Mr. Teo Han Ping Head, Programme Management, Occupational Safety & Health Division, Ministry of Manpower WSH Regulations and Case Studies WSH Forum for Pest Management 20 Feb 14 Mr. Teo Han Ping Head, Programme Management, Occupational Safety & Health Division, Ministry of Manpower A Great Workforce A Great

More information

Prevention of Falls and Working at Heights

Prevention of Falls and Working at Heights Workplace Safety Schools Cleaning Prevention of Falls and Working at Heights It is the policy of the Company to avoid working at heights above 2 metres wherever practical. When avoidance is not an option,

More information

Gas Safety Management Policy

Gas Safety Management Policy Date approved: 1 April 2014 Approved by: Audit and Risk Committee 1. Introduction 1.1 Every year people die and many others suffer ill-health from carbon monoxide poisoning caused by gas appliances and

More information

Safety at Work. Rules for Staying Alive

Safety at Work. Rules for Staying Alive Safety at Work Rules for Staying Alive Safety at Work Rules for Staying Alive Introduction The purpose of Dana Gas Rules For Staying Alive is to address the key causes of deaths in our industry. These

More information

Don t let a fall shatter your life!

Don t let a fall shatter your life! Safety Training Courses 2014-2015 Don t let a fall shatter your life! Browns Ladders & Ceilings Ltd In House Safe Use & Pre-Use Inspection of Ladders & Steps What tests will I undertake? Lecture, theory

More information

FALL PROTECTION / ELEVATED WORK

FALL PROTECTION / ELEVATED WORK SEPTEMBER CORE REFRESHER HSE TOOL BOX FALL PROTECTION / ELEVATED WORK FALL PROTECTION Falls from elevations are one of the most common causes of death in this industry. OSHA requires fall protection when

More information

Staff Contractors. Public. Staff Contractors

Staff Contractors. Public. Staff Contractors 1. Vehicle movements In conjunction with the vehicle driver, venue management and the client, our staff should ensure the safe parking of vehicles for loading and unloading purposes. Depending upon circumstances

More information

HSE simplified guidance for working at height

HSE simplified guidance for working at height HSE simplified guidance for working at height Don Aers Technical Director PASMA About PASMA The Prefabricated Access Suppliers and Manufacturers Association Formed in 1974 Represents the mobile access

More information

Contractor handbook. Purpose

Contractor handbook. Purpose Page no: 1 / 6 Contractor handbook Purpose Mitie aims to ensure that the highest levels of performance are achieved by all persons working for us or on our behalf. We require the same level of performance

More information

User Instructions. Mobile Ladders with Platform to BS EN 131-7:2013

User Instructions. Mobile Ladders with Platform to BS EN 131-7:2013 User Instructions Mobile Ladders with Platform to BS EN 131-7:2013 User Instructions for Mobile Ladders with Platform to BS EN 131-7:2013 All mobile steps are built to the highest engineering standards

More information

1 AIM 2 4 REASONS FOR INCLUSION 3 6 PLANT AND EQUIPMENT REQUIREMENTS 4 7 SYSTEM AND PROCEDURAL REQUIREMENTS 4 8 PEOPLE REQUIREMENTS 6

1 AIM 2 4 REASONS FOR INCLUSION 3 6 PLANT AND EQUIPMENT REQUIREMENTS 4 7 SYSTEM AND PROCEDURAL REQUIREMENTS 4 8 PEOPLE REQUIREMENTS 6 CONTENTS PAGE 1 AIM 2 2 APPLICATION 2 3 DEFINITIONS 2 4 REASONS FOR INCLUSION 3 5 REQUIREMENTS 3 6 PLANT AND EQUIPMENT REQUIREMENTS 4 7 SYSTEM AND PROCEDURAL REQUIREMENTS 4 8 PEOPLE REQUIREMENTS 6 APPENDIX

More information

Chief Operating Officer Approved by. Responsible Officer. Vice-Chancellor Approved and commenced 25 September, 2017 Review by September, 2020

Chief Operating Officer Approved by. Responsible Officer. Vice-Chancellor Approved and commenced 25 September, 2017 Review by September, 2020 Work Health and Safety Policy Responsible Officer Chief Operating Officer Approved by Vice-Chancellor Approved and commenced 25 September, 2017 Review by September, 2020 Relevant Legislation, University

More information

HEALTH AND SAFETY POLICY APPENDIX B WORKING AT HEIGHT GUIDE AND RISK ASSESMENT

HEALTH AND SAFETY POLICY APPENDIX B WORKING AT HEIGHT GUIDE AND RISK ASSESMENT KENSWORTH PRIMARY SCHOOL HEALTH AND SAFETY POLICY APPENDIX B WORKING AT HEIGHT GUIDE AND RISK ASSESMENT KPS-005 RISK ASSESSMENT FOR: Title of activity / person Working at height low level activities What

More information

Compliance with Health & Safety legislation

Compliance with Health & Safety legislation Compliance with Health & Safety legislation The following is a brief description of some of the main duties required by the more generic safety legislation applicable to businesses, which the employers

More information

Thanks To Our Sponsors Platinum Sponsor NS Department of Labour and Workforce Development

Thanks To Our Sponsors Platinum Sponsor NS Department of Labour and Workforce Development March 25, 26, 27, 2009 Thanks To Our Sponsors Platinum Sponsor NS Department of Labour and Workforce Development Special Event Sponsor Workers Compensation Board of Nova Scotia Gold Sponsors Maxwell Promotions

More information

EXHIBITION Guide. Roles and Responsibilities OS11. A handbook for exhibitors and contractors

EXHIBITION Guide. Roles and Responsibilities OS11. A handbook for exhibitors and contractors Appendix 1 Health & Safety Declaration, Roles and Responsibilities Each exhibitor and Informa appointed contractor must complete the Health and Safety Declaration form provided below to confirm they have

More information

Health and Safety Policy

Health and Safety Policy Snowflake School Policy Reviewed September 2018 To be reviewed September 2019 Roy English Health and Safety Policy 1. STATEMENT OF INTENT The Trustees of Snowflake School will take steps to meet their

More information

This policy is a sub-policy of the main University Health and Safety Policy Statement

This policy is a sub-policy of the main University Health and Safety Policy Statement HR Services UEL Health and Safety Handbook POLICY ON WORKING AT HEIGHT This policy is a sub-policy of the main University Health and Safety Policy Statement 1.0 Introduction Working at height is a high-risk

More information

(Health, Safety, and Welfare)

(Health, Safety, and Welfare) An Appreciation of The Construction (Health, Safety, and Welfare) Regulations 1996 Course Notes Mark Mallen Health and Safety Manager Fenlock Hansen Ltd October 2002 The Construction Regs 1996: Version

More information

Safe Work Method Statement (SWMS)

Safe Work Method Statement (SWMS) Safe Work Method Statement (SWMS) Organisation Details : Organisation Name Northern Plumbing Contact ABN 17 15 41 4 Position Director Address 47 Thomas Street Edgeworth 85 Phone Number 0411 10 4 Project

More information

Fall Protection and Elevated Work

Fall Protection and Elevated Work Program No: SP-010 Page 1 1.0 PURPOSE AND INTRODUCTION Fall Protection and Elevated Work To establish fall protection safety procedures for Pitt County Schools employees engaged in any of the following

More information

SUBJECT: LIFTING OPERATIONS AND LIFTING EQUIPMENT (LOLER)

SUBJECT: LIFTING OPERATIONS AND LIFTING EQUIPMENT (LOLER) SUBJECT: LIFTING OPERATIONS AND LIFTING EQUIPMENT (LOLER) 1.0 INTRODUCTION The purpose of this procedure is to give direction on the responsibilities and requirements related to UK legislation covering

More information

Edinburgh Napier University Working at Heights Policy

Edinburgh Napier University Working at Heights Policy Edinburgh Napier University Working at Heights Policy Working at Heights Policy Date of Issue: May 2015 Policy Reference: WHP: 8.0 2015 Date of Review: May 2016 Lead Reviewer: Asst Director, Property &

More information

RISK ASSESSMENT POLICY

RISK ASSESSMENT POLICY RISK ASSESSMENT POLICY Document created: 30 April 2015, last modified: 12 May 2015 Next review: 30 April 2016 Sherfield School Risk Assessmemt Policy 2 RISK ASSESSMENT Purpose of this Section 1. The purpose

More information

Develop and sign off on risk assessment/work method statement for the task, considering task specifics elements that will affect the user s safety:

Develop and sign off on risk assessment/work method statement for the task, considering task specifics elements that will affect the user s safety: Safe Use Step 1 Complete your site induction with the RIS Altitude system owner and confirm that the users can demonstrate competence in the activity of working at heights by provision of a nationally

More information

8. Fall Protection Procedures WAC

8. Fall Protection Procedures WAC 1.0 Fall Protection Introduction 8. Fall Protection Procedures WAC 296-155-245 If an employee is exposed to a fall hazard of ten (10) feet or more in height, the employee must use a fall restraint, fall

More information

Facilities and Estates. Natural Gas: Standard Operating Procedure. Document Control Summary. Contents

Facilities and Estates. Natural Gas: Standard Operating Procedure. Document Control Summary. Contents Facilities and Estates Natural Gas: Standard Operating Procedure Document Control Summary Status: Version: Author/Title: Owner/Title: Approved by: Ratified: Related Trust Strategy and/or Strategic Aims

More information

MANUFACTURING TECHNICAL INSTRUCTIONS - SAFETY FALL HAZARD CONTROL REQUIREMENTS SERIES & NO. SMI - 157

MANUFACTURING TECHNICAL INSTRUCTIONS - SAFETY FALL HAZARD CONTROL REQUIREMENTS SERIES & NO. SMI - 157 1 of 6 1.0 PURPOSE To establish minimum requirements and guidelines for controlling hazardous exposure of personnel to falls from working elevations in conformance with Federal and State OSHA rules and

More information

Work At Heights Toolkit. for Supervisors

Work At Heights Toolkit. for Supervisors Work At Heights Toolkit for Supervisors For Supervisors How to use this toolkit? The toolkit aims to provide information for supervisor to communicate one topic a day to workers. Pictures are for illustration

More information

Suitability of Work Equipment

Suitability of Work Equipment These regulations came into effect on the 5th December 1998 and replace PUWER 1992. They cover almost all equipment used at work, including tool box tools such as hammers, knives etc. They also cover machinery

More information

Unit 302 Health & Safety in ICT. By Josh Gibson

Unit 302 Health & Safety in ICT. By Josh Gibson Unit 302 Health & Safety in ICT By Josh Gibson A hazard is an object/ situation which has the potential to cause harm to you. A risk is a situation which exposes you to danger. The types of Health & Safety

More information

OSHA s new walking working surfaces standards

OSHA s new walking working surfaces standards OSHA s new walking working surfaces standards changes and new requirements Inspection of walking working surfaces 1910.22(d) Regularly and as needed and correct, repair, or guard against hazardous conditions;

More information

Instructions for the Use of the Excel Spreadsheet. There are Three tabs at the bottom of this worksheet. Instructions tab is the one you are reading

Instructions for the Use of the Excel Spreadsheet. There are Three tabs at the bottom of this worksheet. Instructions tab is the one you are reading Instructions for the Use of the Excel Spreadsheet There are Three tabs at the bottom of this worksheet Instructions tab is the one you are reading H&S Plan Tab The Plan Tab is the front cover pages of

More information

CHAPTER 10 FALL PROTECTION

CHAPTER 10 FALL PROTECTION CHAPTER 10 FALL PROTECTION A. INTRODUCTION... 1 B. CHAPTER-SPECIFIC ROLES and RESPONSIBILITIES... 2 C. HAZARD IDENTIFICATION... 3 1. Job Hazard Analysis (Jha).... 3 2. Fall Hazards... 3 D. HAZARD CONTROL...

More information

This procedure must be read in conjunction with WHS-PRO-020: Emergency Procedures

This procedure must be read in conjunction with WHS-PRO-020: Emergency Procedures 1. Purpose Document No: WHS-PRO-021 Approval Date: 8/04/17 EMERGENCY WARDENS Approved By: G. Mowbray Review Date: 8/04/19 Responsible Officer: Expiry Date: N/A Employment Relations Advisor Issue No: 8/04/17

More information

CONTRACTOR SAFETY INDUCTION HANDBOOK

CONTRACTOR SAFETY INDUCTION HANDBOOK CONTRACTOR SAFETY INDUCTION HANDBOOK As a valued contractor for Total Group we would ask that you read and carefully consider the details included in this document. Total Group carry out work for a number

More information

Fall Protection for General Industry and Construction. Josh Flesher Assistant Regional Administrator for Cooperative and State Programs

Fall Protection for General Industry and Construction. Josh Flesher Assistant Regional Administrator for Cooperative and State Programs Fall Protection for General Industry and Construction Josh Flesher Assistant Regional Administrator for Cooperative and State Programs Workplace Injuries, Illnesses and Fatalities 4,585 workers were killed

More information

SAFETY FROM THE GROUND UP

SAFETY FROM THE GROUND UP SAFETY FROM THE GROUND UP Most accidents are preventable. Reducing death and injury resulting from falls is the Health and Safety Executive s No.1 priority in construction. Health & Safety Executive The

More information

DREW UNIVERSITY FALL PROTECTION PROCEDURE (DRAFT 12/11)

DREW UNIVERSITY FALL PROTECTION PROCEDURE (DRAFT 12/11) PURPOSE The objective of this policy & guideline is to eliminate the potential for injuries and fatalities to employees and contractors resulting from falls from elevated work areas at Drew University

More information

Health & Safety Contractor rules

Health & Safety Contractor rules Health & Safety Contractor rules Contents 1. Introduction... 1 2. The legal bit explaining our terminology... 1 2.1 Legal requirements... 1 3. Our health and safety requirements... 1 3.1 Access to BT premises...

More information

Work at Height Procedure Rooftop, Climbing & Equipment

Work at Height Procedure Rooftop, Climbing & Equipment Work at Height Procedure Rooftop, Climbing & Equipment Purpose The information within this procedure demonstrates how Cornerstone Telecommunications Infrastructure Ltd (CTIL) fulfill statutory obligations.

More information

Keeping People Safe CHURCH HEALTH & SAFETY TOOLKIT. Health and Safety Policy

Keeping People Safe CHURCH HEALTH & SAFETY TOOLKIT. Health and Safety Policy Keeping People Safe CHURCH HEALTH & SAFETY TOOLKIT Health and Safety Policy Our Health and Safety Policy Name of Church: Address: As a church we understand that we owe a duty of care to ensure the safety

More information

2.0 Management Systems and Documentation

2.0 Management Systems and Documentation SHE Rules BOW142.3 1.0 Introduction This document details the safety, health and environment rules that apply to anyone accessing Arqiva sites and describes the standards of performance expected. This

More information

COMPLIANCE GUIDELINES FOR. Departmental Health and Safety Inspections

COMPLIANCE GUIDELINES FOR. Departmental Health and Safety Inspections COMPLIANCE GUIDELINES FOR Departmental Health and Safety Inspections CONTENTS 1 INTRODUCTION...1 2 WHY INSPECTION...1 3 OBJECTIVES AND METHODS...2 3.1 Safety Tours...2 3.2 Safety Inspection...2 3.3 Other

More information

Lifting Operation & Lifting Equipment Procedure

Lifting Operation & Lifting Equipment Procedure SRSS Lifting Equipment Procedure 1. DOCUMENT CONTROL Management System Element Title SRSS SMS PROCEDURE Lifting Operation & Lifting Equipment Procedure SMS_HS_PR_033_ Version # & V1 10/08/2016 Lifting

More information

UK Contractors Group Mobile Elevating Work Platforms Good Practice Toolkit June June 2015 Page 1 of 16

UK Contractors Group Mobile Elevating Work Platforms Good Practice Toolkit June June 2015 Page 1 of 16 UK Contractors Group Mobile Elevating Work Platforms Good Practice Toolkit www.ukcg.org Page 1 of 16 Contents Foreword Reference Material Initial Considerations Planning and Preparation for MEWP Activities

More information

Safety Risk Assessment Working at Height: Mobile Tower Scaffold

Safety Risk Assessment Working at Height: Mobile Tower Scaffold Persons at (Groups) Assessor Appointment Tel. No. Description of Task or Activity A One Direct employees Mark Bloxidge H&S Manager 0208 821 5197 Working at height from Mobile Tower B Contractors/Sub contractors

More information

Health & Safety Guidance

Health & Safety Guidance St Bartholomew & All Saints Parochial Church Council Health & Safety Guidance Section C.04 Lone Working and Personal Safety Document No: SBC.06 Issue No: 01 Issue Date: Feb. 2010 Review Date: Feb. 2013

More information

HEIGHT SAFETY IT S EVERYONE S BUSINESS

HEIGHT SAFETY IT S EVERYONE S BUSINESS HEIGHT SAFETY IT S EVERYONE S BUSINESS WWW.SAYFA.COM.AU INTRODUCTION Providing a healthy and safe workplace is both a moral and a legal obligation. Safety is paramount when you have employees or contractors

More information

NEW FALL PROTECTION LEGISLATION. Presented by Michael McGovern, Roland Roy

NEW FALL PROTECTION LEGISLATION. Presented by Michael McGovern, Roland Roy NEW FALL PROTECTION LEGISLATION Presented by Michael McGovern, Roland Roy INTRODUCTION WHY ARE CHANGES BEING MADE? The Provincial Government has brought in changes to the fall protection requirements in

More information

Lifting Operations and Lifting Equipment Regulations (LOLER) Policy. Version No. 2. Review: May 2019

Lifting Operations and Lifting Equipment Regulations (LOLER) Policy. Version No. 2. Review: May 2019 Livewell Southwest Lifting Operations and Lifting Equipment Regulations (LOLER) Policy Version No. 2 Review: May 2019 Notice to staff using a paper copy of this guidance The policies and procedures page

More information

Harbour Town Gold Coast Site Induction

Harbour Town Gold Coast Site Induction Harbour Town Gold Coast Site Induction At Harbour Town Gold Coast we believe that safety is integral to the way we do business. We are committed to operating a safe environment for all where we are incident

More information

2.25 Work Equipment Policy and Procedure Table of Contents

2.25 Work Equipment Policy and Procedure Table of Contents Table of Contents Section 1 - Policy... 3 1.1 Purpose... 3 1.2 Scope... 3 1.3 Requirements... 3 1.4 Responsibilities... 3 Section 2 - Procedure... 4 Section 3 - References... 5 3.1 Statutory Documents...

More information

SOAS LONE WORKING GUIDANCE

SOAS LONE WORKING GUIDANCE SOAS LONE WORKING GUIDANCE Introduction This guidance is intended to assist managers and heads of department in assessing the risks associated with lone working and their staff. While there are no specific

More information

FATAL AND SEVERE RISK PROGRAM

FATAL AND SEVERE RISK PROGRAM FATAL AND SEVERE RISK PROGRAM LEADER SESSION FALL FROM HEIGHTS Only do the task if it can be done safely FALL FROM HEIGHTS OUR COMMITMENT LIFE SAVING BEHAVIOUR: I WILL ALWAYS USE ADEQUATE PROTECTION WHERE

More information

E PGN-11. Part of NTW (O)32 Estates Operations and Maintenance Policy Paul McCabe Head of Estates and Facilities-NTW Solution Ltd

E PGN-11. Part of NTW (O)32 Estates Operations and Maintenance Policy Paul McCabe Head of Estates and Facilities-NTW Solution Ltd Estates Operations and Maintenance Practice Guidance Note Management of Pressure Systems V01 Date Issued Planned Review PGN No: Issue 1 - Nov 2015 Issue 2 Nov 2017 Author / Designation Responsible Officer

More information

Lifting Equipment Protocol

Lifting Equipment Protocol Policy No: RM19 Version: 5.0 Name of Policy: Lifting Equipment Protocol Effective From: 31/05/2016 Date Ratified 12/05/2016 Ratified Health & Safety Committee Review Date 01/05/2018 Sponsor Deputy Chief

More information

WORKING AT HEIGHT RESOURCE BOOKLET. Working at Height 1

WORKING AT HEIGHT RESOURCE BOOKLET. Working at Height 1 WORKING AT HEIGHT RESOURCE BOOKLET Working at Height 1 Falls constantly top the HSENI Construction Group Statistics as the biggest cause of major injuries. The Construction Employers Federation Health

More information

Applying Construction Fall Protection Concepts to General Industry

Applying Construction Fall Protection Concepts to General Industry Applying Construction Fall Protection Concepts to General Industry Applying Construction Fall Protection Concepts to General Industry Michael Tesmer, CSP and David Jewell, CSP Conney Safety Products This

More information

Subparts D and I Walking-Working Surfaces & Personal Protective Equipment Final Rule

Subparts D and I Walking-Working Surfaces & Personal Protective Equipment Final Rule Subparts D and I Walking-Working Surfaces & Personal Protective Equipment Final Rule OSHA s Mission To Assure So Far as Possible Every Working Man and Woman in the Nation Safe and Healthful Working Conditions...

More information