1 Intro ADA Operations Contact Info Todd Grugel ph: Joe Zilka ph: Harvey Unruh ph: Krysten Saatela ph: Tim Paul ph:
2 MnDOT ADA Training Module 3: Compliance Checklists
3 ADA Compliance Checklists must be filled out for all constructed pedestrian facilities. 3
4 ADA Compliance Checklist Guidance 4
5 Guidance Ramp Types: New for
6 NOTE: Documentation shall record the largest cross slope value, and running slope value after checking several locations. If any portion of the ramp is non-compliant provide a detailed explanation why ramp cannot be constructed fully compliant. 6
7 (1) PAR 1) Minimum 4 ft. wide Pedestrian Access Route (PAR) with maximum cross slope of 2% 7
8 2) Record landing slopes (max. 2% in any direction) 8
9 3) Landing dimensions are a minimum 4 x 4. 9
10 4) Landings are located at the top of each ramp. Is it over 5%? Is there a change in direction? 4 x4 min 4 x4 min 10
11 5) Ramp s running slope must be less than or equal to 8.3%. 11
12 6) Ramp s cross slope must be 2% maximum. 2% max 12
13 7) Record gutter flow line slope and inslope. 13
14 8) Spec C: Check ramp running slope with 10 straight edge. Look for bellies or ridges greater than 3 /16 inch. 14
15 9) Truncated domes cover the entire curb opening and meet setback criteria. Shall be 2 ft. max offset adjacent to walkable surface Detectable Warnings Minimum 4 wide Shall be 5 ft. max offset adjacent to non-walkable surface 15
16 9) Curb tapers are considered a detectable edge when tapers start within 3 of truncated domes and rise to a minimum 3 curb height min. 3 Minimum, 4 Preferred Curb Height Between Ramps Measured at Face of Curb
17 9) Truncated domes shall extend full width of the ramp landing or Blended transition within 3 on either end Truncated domes are not covering all of the 0 in. curb
18 9) Radial Detectable warnings shall be set back 3 to 6 from back of curb
19 9) Whenever rectangular domes are placed around a radius, they may be set back up to 9 in the middle and 3 at the corners
20 10) Check gutter line and ramps are draining properly and not holding water. Check after rain event. 20
21 11) No vertical discontinuities greater than ¼ inch anything over ½ inch and the panel should be replaced. 21
22 11) No vertical discontinuities greater than ¼ inch 22
23 12) If any portion of the ramp is not compliant and cannot be made to be compliant, be sure to document the pre-construction and postconstruction ramp conditions and explain why the ramp cannot be made to be fully compliant include photos with documentation. Also circle one of the given reasons that best describes why the ramp isn t compliant. 23
24 A) Surrounding Geography: The ramp could not be constructed to be compliant because of surrounding geography. Examples: Having to tie the walkway into doorways, entrances or steps Roadway adjacent to the walk has steep slopes so that it is impossible to construct the ramp using maximum slopes and staying within 30 of the back of curb Gutter flow line in front of truncated domes is too steep to maintain compliant ramp cross slope 24
25 B) Limited Scope of Project: Upgrading the ramp to meet standards would have required work that is outside the scope of the project. Examples: Utilities such as fire hydrants, street lights, signal poles, manholes, etc. that could not be moved as part of the project Standalone ADA projects without adjacent pavement work limit curb line elevation changes Lack of available right-of-way or could not agree with property owner 25
26 C) Contractor Performance: The ramp could have been constructed to be compliant, but the contractor failed in constructing the ramp. If any compliance standards are not met due to contractor performance, rework is required before the project is substantially complete. See Specification 1503 (Conformity with Plans and Specifications). 26
27 APS Compliance Checklist Documentation: Save originals for your records. And: completed checklists to *DOT_ADA Compliance Checklists (or mn.us for external users). 27
28 APS Compliance Checklist Compliance Checklists and Guidance on ADA web site. 28
29 APS Compliance Checklist 1) Push buttons stations are properly placed and the push button faces are oriented properly. 29
30 APS Compliance Checklist 2) Distance from crosswalk edge to push button face: 30
31 APS Compliance Checklist 3) There must be a 4 x 4 landing adjacent to the push button. 31
32 APS Compliance Checklist 4) Distance from the push buttons to the back of curb: 1.5 to 10 back of curb Ideally 4-6 back of curb 32
33 APS Compliance Checklist 5) Distance between the push buttons: 10 ft. minimum 33
34 APS Compliance Checklist 6) Push button height: Height of 42 +/
35 APS Compliance Checklist 7) The push button needs an unobstructed side reach of 10 maximum. Side Reach 10 Maximum 35
36 APS Compliance Checklist 8) If any of these standards are violated, provide an explanation describing which parameters were violated and why. Documentation: Save originals for your records. And: completed checklists to *DOT_ADA Compliance Checklists (or for external users). 36
37 Questions? 37
ADA Operations Contact Info
Intro ADA Operations Contact Info Todd Grugel ph: 651-366-3531 email: todd.grugel@state.mn.us Joe Zilka ph: 651-366-3311 email: joseph.zilka@state.mn.us Harvey Unruh ph: 651-216-2912 email: harvey.unruh@state.mn.us
More informationPreparing a Curb Ramp Project. December 15, 2010
Preparing a Curb Ramp Project December 15, 2010 3 Tiers of Project Types Non-Signalized Curb Ramp Reconstruction - Typically utilizing standard plans and identifying ramp types at each quadrant Signalized
More informationDesign Overview. Section 4 Standard Plans for Design. Pedestrian Access Routes. Pedestrian Access Routes. Overview. Cross Slope
Design Overview Section 4 Standard Plans for Design Fall, 2017 Ann Johnson, PE Services Brady Rutman, SRF Consulting Group Overview Design Basics Recommendations: The Zone System Driveway Crossings Pedestrian
More informationADA Design Overview. Section 2. ADA Design Overview. Pedestrian Access Routes. Pedestrian Access Routes. Overview
ADA Design Overview Section 2 ADA Design Overview Overview Accessible Pedestrian Signals Alternate Fall, 2017 Ann Johnson, PE Services Brady Rutman, SRF Consulting Group 2 Pedestrian Access Route (PAR)
More informationADA Training Standard Plans
ADA Training Standard Plans SCREEN READABLE VERSION IS IN THE MAKING AND WILL BE MADE AVAILABLE SOON 2018 MnDOT 2 Standard Plans 2017 Overview Overview PROWAG and Curb Ramp Basics Curb Ramp Types ADA Curb
More informationADA Training Accessible Pedestrian Signal (APS) 2018 MnDOT
ADA Training Accessible Pedestrian Signal (APS) 2018 MnDOT APS and ADA APS is not currently an ADA Standard and is provided at the discretion of the Title II entity APS is recognized in the MnMUTCD, but
More informationCity of East Grand Forks. ADA Transition Plan. Inventory Manual. June, 2018 DRAFT
ADA Transition Plan City of East Grand Forks Inventory Manual June, 2018 DRAFT ADA Transition Plan City of East Grand Forks Inventory Manual Client City of East Grand Forks Consultant Team SRF Consulting
More informationPaul Vraney Bureau of Project Development 02/11/2016
Paul Vraney Bureau of Project Development 02/11/2016 ADA background & alterations definition Design considerations Provide sufficient layout data Curb ramp selection Maximum curb ramp and gutter slopes
More informationAmericans with Disabilities Act and Curb Ramps
Americans with Disabilities Act and Curb Ramps Katherine Smutzer Standards Engineer, INDOT Purdue Road School Wednesday March 9, 2016 Two Items to Remember All curb ramps, sidewalks and sidewalk driveway
More informationAPPENDIX F DESIGN STANDARDS REVIEW SUMMARIES AND REDLINES
APPENDIX F DESIGN STANDARDS REVIEW SUMMARIES AND REDLINES 092775000 Carson City ADA Transition Plan 2015-03-25 Carson City ADA Transition Plan.docx March 2015 APPENDIX This page intentionally left blank.
More informationField guide for Accessible Public Rights-of-Way Edition
Field guide for Accessible Public Rights-of-Way 2017 Edition CONTENTS PEDESTRIAN FACILITIES IN THE PUBLIC RIGHT-OF-WAY Pedestrian access routes 3 Components 3 Continuous width 3 Median and pedestrian refuge
More informationADA Technical Frequently Asked Questions
ADA Technical Frequently Asked Questions 1. What is the correct way to select and label curb ramp types using the Standard Construction Details?... 2 2. When do you label a curb ramp as modified (e.g.
More informationCurb Ramp Guidelines. October Version 1.0
Curb Ramp Guidelines October 2010 Version 1.0 Table of Contents INTRODUCTION... 3 DEFINITIONS... 3 BASIC CURB RAMP COMPONENTS... 4 PEDESTRIAN RAMP TYPES... 6 Selecting ramp types... 7 PERPENDICULAR CURB
More informationADA PRESENTATION (CURB RAMPS)
ADA PRESENTATION (CURB RAMPS) ACECNJ/NJDOT/FHWA DESIGN SUMMIT Warren Howard New Jersey Department of Transportation May 21, 2013 ADA Curb Ramps NJDOT wants curb ramps to be designed & constructed properly
More informationDISTRIBUTION: Electronic Recipients List TRANSMITTAL LETTER NO. (17-01) MINNESOTA DEPARTMENT OF TRANSPORTATION. MANUAL: Road Design English Manual
DISTRIBUTION: Electronic Recipients List MINNESOTA DEPARTMENT OF TRANSPORTATION DEVELOPED BY: Design Standards Unit ISSUED BY: Office of Project Management and Technical Support TRANSMITTAL LETTER NO.
More informationROADWAY AND PARKING DETAILS TYPICAL STREET SECTIONS PRINCIPAL ARTERIAL NOT TO SCALE
NOTES: O:\Division Information\Engineering\Documents\Engineering and Construction\COMMERCE CITY\CAD files\2016 Updated Files\307-01 thru 307-09 (Roadway & Parking Typical Sections).dwg 6' SIDEWALK MAY
More informationDesigning Pedestrian Facilities for Accessibility. Module 3 Curb Ramps & Blended Transitions
Module 3 & Other Purpose: Allow pedestrians to transition between the street and sidewalks, islands, etc. Typically installed at: Intersections (1 ramp at each end of each crosswalk) Mid-block crossings
More informationPROWAG/ADAAG Standards Guidance For Temporary Pedestrian Access Route (TPAR) Facilities and Devices
INTRODUCTION: PROWAG/ADAAG Standards Guidance For Temporary Pedestrian Access Route (TPAR) Facilities and Devices Minnesota Department of Transportation DRAFT Document DRAFT This document was developed
More informationDepartment of Public Works Office of Disability Affairs February 23, 2017 Presented by Mark Zwoyer, PE
ADA Ramp Construction Department of Public Works Office of Disability Affairs February 23, 2017 Presented by Mark Zwoyer, PE Agenda Opening Statements/Welcome PROWAG, ADAAG, INDOT and DPW Standards Inspector
More informationCHAPTER 8 STAKING SIGNALS AND LIGHTING FIELD GUIDE. 8.1 Staking Traffic Control Signal Systems
CHAPTER 8 STAKING STAKING Correct staking of traffic control signal or lighting systems is critical to the appropriate placement of system components. 8.1 Traffic Control Signal Systems Locating the components
More informationScenarios. The following slides will show existing pictures that deny access, followed by a retrofitted picture that provides access.
Scenarios. The following slides will show existing pictures that deny access, followed by a retrofitted picture that provides access. For the following slides assume an overlay project and provide pedestrian
More informationAmericans with Disabilities Act Transition Plan for Public Right-of-Way Improvements
Americans with Disabilities Act Transition Plan for Public Right-of-Way Improvements Prepared by: Public Works Department Engineering Division October 2015 Table of Contents Section I Introduction.. 3
More informationDriveway Design Criteria
Design Manual Chapter 5 - Roadway Design 5L - Access Management 5L-4 Driveway Design Criteria A. General For efficient and safe operations, access drives and minor public street intersections can be improved
More informationDesigning Accessible Traffic Signals
Designing Accessible Traffic Signals Adam Allen, P.E., TSOS ADA Compliance Crackdown Draft Public Rights of Way Accessibility Guidelines (PROWAG) 2009 Manual on Uniform Traffic Control Devices (MUTCD)
More informationADA & Public Rights of Way
ADA & Public Rights of Way Overview of Current and Up-coming Requirements FDOT Design Training Expo 2012 Orlando, FL Dean Perkins, RA - ADA Coordinator Florida Department of Transportation Office of Design,
More informationStandards vs. Guidelines. Public Right-of Way Accessibility Guidelines (PROWAG)
www.access-board.gov Public Right-of Way Accessibility Guidelines (PROWAG) Juliet Shoultz, P.E Transportation Systems Engineer US Access Board Standards vs. Guidelines Guidelines are developed by the Access
More informationField guide for Accessible Public Rights-of-Way Edition
Field guide for Accessible Public Rights-of-Way 2015 Edition BRIEFING MEMO SUBJECT: Department of Justice/Department of Transportation Joint Technical Assistance on Title II of the Americans with Disabilities
More informationSTAKING TRAFFIC CONTROL SIGNAL SYSTEMS
Locating the components of a traffic control signal is not an exact science; many factors influence the location of the components. These factors include: lane widths, radii, pedestrian curb ramp requirements,
More informationCURB RAMP INSPECTION REPORT
11.9% St Ltg Box Pac Bell Elec St Ltg Box CURB RAMP INSPECTION REPORT 149 BLUXOME STREET - SAN FRANCISCO - 5TH STREET & TOWNSEND STREET APPLICANT: ZAYO GROUP DATE: 2/9/17 1 0.3% 1.4% 12.1% 0.3% 0.6% 12.7%
More informationADA on Construction. Guidance for Section C Plan Preparers
ADA on Construction Guidance for Section C Plan Preparers Some impacts cannot be avoided and those impacts apply to residents, businesses, motorists, and pedestrians alike. However, good planning can minimize
More informationAccommodating Pedestrians in the Work Zone
Accommodating Pedestrians in the Work Zone Guidance for Section C Plan Preparers Some impacts cannot be avoided and those impacts apply to residents, businesses, motorists, and pedestrians alike. However,
More informationDETECTABLE WARNING SURFACES SHALL BE PROVIDED AT THE FOLLOWING LOCATIONS ON PEDESTRIAN ACCESS ROUTES:
GENERAL NOTES: CURB NOTES: 5'-0" MIN 5'-0" 5'-0" MIN 1. 2. THESE SHEETS ARE IN ACCORDANCE WITH THE AMERICANS WITH DISABILITIES ACT (ADA), AND THE REQUIREMENTS OF THE 2011 PROPOSED ACCESSIBILITY GUIDELINES
More informationSection 4: Inventory Methodology and Findings
Section 4: Inventory Methodology and Findings Section 4.1: Purpose and Summary of the Inventory Effort The purpose of the inventory is to show a baseline of existing pedestrian facilities in the City of
More informationRC-67M has been updated to include more details to be consistent with both ADAAG and PROWAG. The following slides discusses the general notes found
RC-67M has been updated to include more details to be consistent with both ADAAG and PROWAG. The following slides discusses the general notes found on Sheet 1. RC-67M note Construct curb ramps with a minimum
More informationCitywide Sidewalk and Crosswalk Programs
Citywide Sidewalk and Crosswalk Programs Council Meeting October 20, 2015 Presented by Rita Hu and Jamal Mahmoud Program Goals Implement the City s comprehensive plan. Provide pedestrian with safe walking
More informationTown of Roseland. Americans with Disabilities Act Transition Plan: Pedestrian Facilities in the Public Right-of-Way
Town of Roseland Americans with Disabilities Act Transition Plan: Pedestrian Facilities in the Public Right-of-Way Table of Contents Introduction... 1 Legal Requirements... 1 Identified Obstacles to the
More informationTown of Bourbon. Americans with Disabilities Act Transition Plan: Pedestrian Facilities in the Public Right-of-Way
Town of Bourbon Americans with Disabilities Act Transition Plan: Pedestrian Facilities in the Public Right-of-Way Table of Contents Introduction... 1 Legal Requirements... 1 Identified Obstacles to the
More informationL C E C.P. #2. BASIS OF BEARINGS: Texas Coordinate System of 1983 (NAD83), North Central Zone (4202) as tied to GEOSHACK VRS SYSTEM.
L C E L C E T.B.M. #4 T.B.M. #3 C.P. #2 BASIS OF BEARINGS: Texas Coordinate System of 1983 (NAD83), North Central Zone (4202) as tied to GEOSHACK VRS SYSTEM. CONTROL (C.P.): EXCEPT FOR CONTROL POINT No.
More informationField Design, Construction and inspection of ADA compliant Curb ramps. Mike Anderson City of Lee s Summit Construction Manager (816)
Field Design, Construction and inspection of ADA compliant Curb ramps Mike Anderson City of Lee s Summit Construction Manager (816)969-1800 Today s Agenda Definitions & Acronyms Access Board vs. PROWAAC
More informationTown of Wakarusa. Americans with Disabilities Act Transition Plan: Pedestrian Facilities in the Public Right-of-Way
Town of Wakarusa Americans with Disabilities Act Transition Plan: Pedestrian Facilities in the Public Right-of-Way Table of Contents Introduction... 1 Legal Requirements... 1 Identified Obstacles to the
More information12A Accessible Sidewalk Requirements. 12A Protruding Objects
TOC Design Manual Chapter 12 - Sidewalks and Bicycle Facilities Table of Contents Table of Contents Chapter 12 - Sidewalks and Bicycle Facilities 12A Sidewalks 12A-1---------------------------------General
More informationAccessible Sidewalk Requirements
Accessible Sidewalk Requirements A. Introduction 12A-2 Design Manual Chapter 12 - Sidewalks and Bicycle Facilities 12A - Sidewalks SUDAS and Iowa DOT jointly developed this section based on the July 26,
More informationDesigning Pedestrian Facilities for Accessibility. Module 8 Maintenance of Pedestrian Facilities and Alternate Pedestrian Access Routes in Work Zones
Designing Pedestrian Facilities for Accessibility Module 8 Maintenance of Pedestrian Facilities and Alternate Pedestrian Access Routes in s Maintenance of Accessible Features Title II (28 CFR 35.133(a))
More informationADA REFERENCE GUIDE DISTRICT 6-0. October June 20, 2017 Revision
ADA REFERENCE GUIDE June 20, 2017 Revision October 2010 DISTRICT 6-0 DISTRICT 6-0 ADA Design Guidance FOREWORD The Pennsylvania Department of Transportation, Engineering District 6-0 has produced this
More informationFOR HISTORICAL REFERENCE ONLY
To: From: Subject: Electronic Distribution Recipients MINNESOTA DEPARTMENT OF TRANSPORTATION Engineering Services Division Technical Memorandum No. 12-14-B-03 December 18, 2012 Jon M. Chiglo, P.E. Division
More informationChapter 5. General Site and Building Elements
AMERICAN NATIONAL STANDARD Chapter 5. General Site and Building Elements Chapter 5. General Site and Building Elements 501 General 501.1 Scope. General site and building elements required to be accessible
More informationScoping and Design Considerations for APS and ADA Curb Ramps. Adam Tyra, PE INDOT Greenfield District Traffic
Scoping and Design Considerations for APS and ADA Curb Ramps Adam Tyra, PE INDOT Greenfield District Traffic Background and Perspective Scoping and Asset Management for traffic signals for INDOT s Greenfield
More informationCity/ Town: Route: Intersection Name; Street Names:
City/ Town: Route: Intersection Name; Street Names: RAMP AND LEVEL LANDING Blank Identify Ramp Type (From Sketches If not identifiable, sketch Ramp.) 2 Is vertical curb blocking path of travel (Y/N) If
More informationCHAPTER 16 PEDESTRIAN FACILITIES DESIGN AND TECHNICAL CRITERIA TABLE OF CONTENTS
CHAPTER 16 PEDESTRIAN FACILITIES DESIGN AND TECHNICAL CRITERIA TABLE OF CONTENTS Section Title Page 16.1 General... 16-1 16.1.1 AASHTO Reference... 16-1 16.1.2 ADA Requirements... 16-1 16.2 Sidewalks...
More informationDPW Order No:
DPW Order No: 184350 ESTABLISHING REGULATIONS AND GUIDELINES FOR THE EVALUATION AND CONSTRUCTION OF NEW CURB RAMPS OR RECONSTRUCTION/UPGRADE OF EXISTING CURB RAMPS AND ADDITIONAL PEDESTRIAN SAFETY IMPROVEMENTS
More informationCITY OF PAPILLION, NEBRASKA
CITY OF PAPILLION, NEBRASKA PROJECT REPORT For TRANSITION PLAN FOR PEDESTRIAN FACILITIES IN THE PUBLIC RIGHT OF WAY April 2010 Introduction The City of Papillion created an initial Transition Plan in the
More informationGEOMETRIC DESIGN STANDARDS FOR NEW RESIDENTIAL SUBDIVISION STREETS TABLE 1A CG-6 CURB AND GUTTER SECTION
TABLE 1A CG-6 CURB AND GUTTER SECTION HORIZONTAL AND VERTICAL CONTROLS CURB AND GUTTER ROADWAYS MAXIMUM 3:1 CUT OR FILL SLOPE CURVE DATA MIN. SIGHT DISTANCE PROJECTED TRAFFIC VOLUME (ADT) MIN. DESIGN SPEED
More informationCHAPTER 10 ADA / Public Right of Way. Overview
Chapter 10: ADA/Public Right of Way CHAPTER 10 ADA / Public Right of Way Overview This chapter provides guidelines to the Engineering Services Division staff regarding processes and procedures to be followed
More informationA. Arlington County Master Transportation Plan Pedestrian Element B. Arlington County Horizontal Standards H-3.1 Driveway Entrances
GENERAL 1. Description This standard identifies minimum requirements that shall be met for all accessible ramps in the design and construction of elements for Arlington County Horizontal Design Standards.
More informationSeptember 2008 REVISIONS (1) SYMMETRICAL VERTICAL CURVE EQUATIONS 12.5(12) VERTICAL CURVE COMPUTATIONS 12.5(14) TURNING LANE LENGTHS 15.
September 2008 REVISIONS (1) CHAPTER 12 VERTICAL ALIGNMENTS SYMMETRICAL VERTICAL CURVE EQUATIONS 12.5(12) VERTICAL CURVE COMPUTATIONS 12.5(14) CHAPTER 15 INTERSECTIONS TURNING LANE LENGTHS 15.5(10) CHAPTER
More informationMarshall County. Americans with Disabilities Act Transition Plan: Pedestrian Facilities in the Public Right-of-Way
Marshall County Americans with Disabilities Act Transition Plan: Pedestrian Facilities in the Public Right-of-Way 2012 Table of Contents Introduction... 1 Transition Plan History and Overview... 1 Legal
More informationNOT TO SCALE PUBLIC WORKS STANDARD DETAILS CURB DETAILS DATE: MARCH 2013 FILE NAME: CURB.DWG
NOT TO SCALE PUBLIC WORKS STANDARD DETAILS CURB DETAILS DATE: MARCH 2013 FILE NAME: CURB.DWG NOT TO SCALE PUBLIC WORKS STANDARD DETAILS SIDEWALK RAMPS DATE: MARCH 2013 FILE NAME: SIDEWALK RAMPS.DWG NOT
More information12A Accessible Sidewalk Requirements
TOC Design Manual Chapter 12 - Sidewalks and Bicycle Facilities Table of Contents Table of Contents Chapter 12 - Sidewalks and Bicycle Facilities 12A Sidewalks 12A-1---------------------------------General
More informationCity of Albert Lea Policy and Procedure Manual 4.10 ALBERT LEA CROSSWALK POLICY
4.10 ALBERT LEA CROSSWALK POLICY PURPOSE: Pedestrian crosswalks are an integral part of our transportation infrastructure. To be effective and promote safety, marked crosswalks must be installed after
More informationPROCEDURE FOR ACCOMMODATING PEDESTRIANS IN WORK ZONES FOR CONSTRUCTION AND MAINTENANCE
PROCEDURE FOR ACCOMMODATING PEDESTRIANS IN WORK ZONES FOR CONSTRUCTION AND MAINTENANCE A.1 STANDARD Measures shall be taken to accommodate pedestrian traffic through and/or around Work Zones for Construction
More informationAMERICANS WITH DISABILITIES ACT TRANSITION PLAN LEON COUNTY FOR CURB RAMPS AND SIDEWALKS DEPARTMENT OF PUBLIC WORKS. 1 P age
AMERICANS WITH DISABILITIES ACT TRANSITION PLAN FOR CURB RAMPS AND SIDEWALKS 2015 LEON COUNTY DEPARTMENT OF PUBLIC WORKS 1 P age INTRODUCTION The goal of the Americans with Disabilities Act (ADA) Transition
More informationSegment Number Quick Pathways Accessibility Tool. Name of Street: Segment Identification:
Quick Pathways Accessibility Tool Name of Street: Segment Identification: Date of survey: / / Name of surveyor(s): About this assessment: QPAT UIC Dept. of Disability and Human Development Page 1 of 15
More informationPortland Peninsula Sidewalk and Ramp Inventory
Portland Peninsula Sidewalk and Ramp Inventory Conducted June and July of 2008 By Anne Krikorian and Ryan Carmichael Performed under the authority of: Greater Portland Council of Governments And with the
More informationR A M P U P! - City of Tacoma's Curb Ramp Installation Matrix
R A M P U P! - City of Tacoma's Curb Ramp Installation Matrix DESCRIPTION OF WORK NEW CONSTR. ALTERATION MAINT. COMMENTS STREET PAVING New street paving or overlay through an intersection (Figures 1 &
More informationSCOPE Application, Design, Operations,
SCOPE Application, Design, Operations, Maintenance, etc.: Typical Traffic Control Signals Pedestrian Hybrid Beacons Emergency Vehicle One-Lane/Two-Way Facilities, Freeway Entrance Ramps, and Movable Bridges
More informationFigure 3B-1. Examples of Two-Lane, Two-Way Marking Applications
Figure 3B-1. Examples of Two-Lane, Two-Way Marking Applications A - Typical two-lane, two-way marking with passing permitted in both directions B - Typical two-lane, two-way marking with no-passing zones
More informationBUREAU OF LOCAL ROADS & STREETS 42-3(12) BICYCLE FACILITIES Jan 2006
UREU OF LOCL RODS & STREETS 42-3(2) ICYCLE FCILITIES Jan 2006 MINIMUM CROSS SECTIONS FOR CURED STREETS WITHOUT PRKING (Marked icycle Lanes) Figure 42-3G b. Curbed Streets with Parking. The bicycle lane
More informationDesigning for Individuals who are visually impaired or blind
Designing for Individuals who are visually impaired or blind Janet M. Barlow Accessible Design for the Blind NACTO Designing Cities Conference October 25, 2012 What do we mean by visually impaired or blind?
More informationADA TRANSITION PLAN. TOWN OF DeMOTTE
ADA TRANSITION PLAN TOWN OF DeMOTTE December 17, 2012 Table of Contents Introduction... 1 Transition Plan Development... 2 A. ADA Coordinator... 2 B. Grievance Procedure... 2 C. Self-Evaluation and Inventory...
More informationARLINGTON COUNTY PAVEMENT MARKING SPECIFICATIONS
DEPARTMENT OF ENVIRONMENTAL SERVICES ARLINGTON COUNTY PAVEMENT MARKING SPECIFICATIONS MAY 2017 Table of Contents 1. General... 2 2. Design Criteria... 3 3. Marking Plan Preparation... 4 Exhibits... 5 MK
More informationUpdated There is no park access points beyond the limit of the phase I work. roadway to be constructed Viewport has been along full limits of the park
The signs will be installed as Temporary signs the color (Orange/White) have been added to the plans. Need to specify color to be used for stripes. Closures that may be in place for extended periods need
More informationINDEX. Geometric Design Guide for Canadian Roads INDEX
Acceleration lane, see Lanes, Acceleration Access, 8.1 Access Management and Functional Classification 8.2 Access Management by Design Classification 8.3 Access Configuration 8.4 Building Set-Back Guidelines
More informationADA COMPLIANCE IN PUBLIC RIGHTS-OF-WAY. Ali Everett Accessibility Issues Coordinator City of Pasadena January 25, 2018
ADA COMPLIANCE IN PUBLIC RIGHTS-OF-WAY Ali Everett Accessibility Issues Coordinator City of Pasadena January 25, 2018 Americans with Disabilities Act CIVIL RIGHTS LAW BUILT ON THE PRINCIPLES OF: EQUAL
More informationPedestrian, Bicycle and Traffic Calming Strategic Implementation Plan. January 18, 2011
Pedestrian, Bicycle and Traffic Calming Strategic Implementation Plan January 18, 2011 Tonight s Agenda Receive update on project Provide feedback on two policy issues Complete Streets Policy Project Prioritization
More informationTraffic Engineering and Highway Safety Bulletin Accessibility Compliance for Military Installations
Traffic Engineering and Highway Safety Bulletin 12-01 Accessibility Compliance for Military Installations February 2012 Did You Know? More than 54 million Americans, almost 20 percent of the U.S. population,
More informationCURBSIDE ACTIVITY DESIGN
5 CURBSIDE ACTIVITY DESIGN This chapter provides design guidance for separated bike lanes adjacent to curbside activities including parking, loading and bus stops. Typical configurations are presented
More informationACCESSIBLE PUBLIC RIGHTS- OF-WAY FOR PEOPLE WITH DISABILITIES
ACCESSIBLE PUBLIC RIGHTS- OF-WAY FOR PEOPLE WITH DISABILITIES Presented by Lois Chaplin Cornell Local Roads Program Bicycle and Pedestrian Specialist Paul Evans New York State DOT Landscape Architecture
More informationChapter 10: Pedestrian Facility Design. ACCESS MINNEAPOLIS Design Guidelines for Streets & Sidewalks
Chapter 10: Pedestrian Facility Design ACCESS MINNEAPOLIS Design Guidelines for Streets & Sidewalks October 26, 2009 TABLE OF CONTENTS 10 PEDESTRIAN FACILITY DESIGN... 10-1 10.0 INTRODUCTION... 10 1 10.0.1
More informationDesigning Pedestrian Facilities for Accessibility
Designing Pedestrian Facilities for Accessibility Laws, Regulations and Pedestrian Characteristics John H. Miller, PE - FHWA ACECNJ/NJDOT/FHWA 2013 DESIGN SUMMIT Legal Background Architectural Barriers
More informationADA COMPLIANCE CHECKLIST (RESTAURANT) Meet Fail N/A. Parking Lot
ADA COMPLIANCE CHECKLIST (RESTAURANT) Parking Lot Tow away warning at entrance to lot Accessible spaces - minimum 1, and at least 1 for each 25 spaces (e.g., 26 spaces requires 2 accessible spaces) Accessible
More informationMultimodal Design Guidance. October 23, 2018 ITE Fall Meeting
Multimodal Design Guidance October 23, 2018 ITE Fall Meeting Introductions Jessica Wilson TDOT Multimodal Division Office of Multimodal Planning Program Supervisor Jessica.L.Wilson@tn.gov Ali Hangul TDOT
More informationFirst Annual Colorado Chapter Conference Englewood, CO. Accessible Pedestrian Facilities in the
First Annual Colorado Chapter Conference Englewood, CO Accessible Pedestrian Facilities in the Public Right-of-Way October 14 th, 2014 Mode of Transportation Photo: Mountain Waters Rafting, LLC Session
More informationHennepin County Pedestrian Plan Public Comment Report
Hennepin County Pedestrian Plan Public Comment Report On May 31, 2013, the draft Hennepin County Pedestrian Plan was released for a 45-day public comment period ending July 15, 2013. The county received
More information301 Roadway Criteria... 1
300 Cross Section Design TABLE OF CONTENTS 301 Roadway Criteria... 1 301.1 Pavement... 1 301.1.1 General... 1 301.1.1.1 Disposition of Pavement Required Due to Maintenance of Traffic... 1 301.1.2 Lane
More informationWhat Is a Complete Street?
Session 5 Charleen Zimmer, AICP, Zan Associates May 5-7, 2010 What Is a Complete Street? May 2010 5-1 Not a Complete Street More of a Complete Street May 2010 5-2 Benefits of Complete Streets Safety for
More informationTown of Osceola. Americans with Disabilities Act Transition Plan: Pedestrian Facilities in the Public Right-of-Way
Town of Osceola Americans with Disabilities Act Transition Plan: Pedestrian Facilities in the Public Right-of-Way Table of Contents Introduction... 1 Legal Requirements... 1 Identified Obstacles to the
More informationADA TRANSITION PLAN 2013
ADA TRANSITION PLAN 2013 TABLE OF CONTENTS Contents Introduction 1 Purpose 2 Identified Obstacles to the Public Right of Way 3 Criteria for Determining Impediments at Village Facilities 4 Removing Barriers
More informationFIRE & LIFE SAFETY STANDARD
Title: Effective Date: 08/01/2006 Revised Date:01/01/2014 Code References: California Fire Code Note: This standard is a summary of Fire Department clarifications of City and State Codes. Information contained
More informationRoadway Design Manual
Roadway Design Manual Manual Notice Archive by Texas Department of Transportation (512) 302-2453 all rights reserved Manual Notice 2009-1 From: Manual: Mark A. Marek, P.E Roadway Design Manual Effective
More informationSteps to Conducting a Complete Streets Assessment
Steps to Conducting a Complete Streets Assessment Familiarize yourself with Complete Streets Read through the Complete Streets Assessment Guidelines. This will give you an idea of what Complete Streets
More informationCITY OF CASSELBERRY WINTER PARK DRIVE IMPROVEMENT STUDY
CITY OF CASSELBERRY WINTER PARK DRIVE IMPROVEMENT STUDY Preliminary Recommendations October 2018 2014 HDR, Inc., all rights reserved. PROJECT BACKGROUND WALKING AUDIT FINDINGS PROPOSED IMPROVEMENT CONCEPTS
More information6. UNIVERSAL PEDESTRIAN ACCESS
6. UNIVERSAL PEDESTRIAN ACCESS INTRODUCTION...1 ESSENTIAL PRINCIPLES OF UNIVERSAL PEDESTRIAN ACCESS.2 LEGAL FRAMEWORK...2 USERS AND NEEDS...5 People with Mobility Impairments....5 People with Visual Impairments..6
More informationGENERAL. 1. Description
GENERAL 1. Description This standard identifies minimum requirements that shall be met for all Bus Stops in the design and construction of elements for Arlington County Horizontal Design Standards. This
More informationBuilding Great Neighbourhoods STRATHEARN
Building Great Neighbourhoods STRATHEARN Public Involvement Community League Meeting #1: October 5, 2015 Public Meeting #2: March 15, 2016 Public Meeting #3: January 17, 2017 Building Great Neighbourhoods
More informationCity and County of San Francisco APS Safety & Access Tool. Cover Sheet. Total score = crosswalk worksheet score + intersection worksheet score
City and County of San Francisco APS Safety & Access Tool Location of Intersection or Crosswalk: Cover Sheet Evaluator Name: Date Evaluation Completed: Total score = crosswalk worksheet score + intersection
More informationDRAFT. Lecompton. Table of Contents. Background
Lecompton Table of Contents Existing Infrastructure 98 Funding 100 Policy and Program Recommendations 102 Infrastructure Recommendations 104 Conclusion 109 Douglas County Lecompton Background Located at
More information300 Cross Section Design
300 Cross Section Design Table of Contents 301 Roadway Criteria... 3-1 301.1 Pavement... 3-1 301.1.1 General... 3-1 301.1.1.1 Disposition of Pavement Required Due to Maintenance of Traffic... 3-1 301.1.2
More informationNorth Avenue Rail Station Accessibility Assessment
North Avenue Rail Station Accessibility Assessment Joel Anders, Arnaud Huguet, and Alex Poznanski 30 July 2012 Table of Contents EXECUTIVE SUMMARY... 1 MISSION STATEMENT... 2 INTRODUCTION... 2 CROSSWALKS
More informationDesigning for the Visually Impaired
Designing for the Visually Impaired Melanie White Janet M. Barlow Environmental Access Committee Orientation and Mobility Division Association for Education and Rehabilitation of the Blind and Visually
More informationPlease feel free to print this PDF form. The document is below. Please scroll down.
ADA Accessibility Guidelines: Detectable Warnings Please feel free to print this PDF form. The document is below. Please scroll down. For more relevant information, please visit the Armor Tile website.