NORTHAMPTON COUNTY WETLANDS BOARD Minutes December 15, 2010

Size: px
Start display at page:

Download "NORTHAMPTON COUNTY WETLANDS BOARD Minutes December 15, 2010"

Transcription

1 NORTHAMPTON COUNTY WETLANDS BOARD Minutes December 15, 2010 This was the regular meeting of the Northampton County Wetlands Board held on Wednesday, December 15, 2010, in the former Northampton Middle School located at 7247 Young Street in Machipongo, Va., for the purpose of conducting regular business. Those members present were Vice-Chair Bowdoin Lusk, Mark Gates, Dot Field, Nancy Wells Drury, John Chubb and Robert Meyers. The member absent was Marshall Cox, Chair. Also attending were Hank Badger with the Virginia Marine Resources Commission (VMRC), Melissa Kellam, Zoning Administrator; Katrina Hickman, Zoning Inspector; and Kay Downing, Secretary to the Board. The Vice-Chair called the meeting to order at 11:34 a.m. and established a quorum and those wishing to speak at today s meeting were sworn in. It is noted for the record that Ms. Hickman, Zoning Inspector, had left the county office at 9:00 a.m. today with those Board members present to conduct the scheduled field visits with the exception of Mr. Lusk who was not present at that time. Public hearing: A. VMRC : P. Richard Anderson has applied to augment existing sill structures and install approximately 10 feet of new sill length as previously permitted, repair approximately 115 feet of a storm damaged rip rap structure, and install approximately 148 feet of new rip rap. The property, located on the cul-de-sac of Peaceful Way Drive, is described as being Tax Map 12C, double circle 1, parcel A with frontage on the Chesapeake Bay. Ms. Kellam then presented the decision tree information submitted to the Board as follows. As of the writing of this memorandum: (1) no VIMS report was available. When this report is received, it will be forwarded to immediately for your review; and (2) no adjacent property owners have commented on the proposed project. Below you will find a decision tree completed by County staff in conjunction with a site visit conducted on November 30, During your site visit on December 15, 2010, Katrina Hickman, Zoning Inspector, will have the file copy of the decision tree available if the Board wishes to revise the decision tree path based on their finding on-site. Minutes Dec. 15, 2010 Wetlands Board. 1

2 DECISION TREE FOR UNDEFENDED SHORELINE AND THOSE WITH FAILED STRUCTURED 1. What type of bank erosion is present? Low proceed to 1a. High and / or undercut proceed to 2. 1a. Is the shoreline forested? Yes 1a. (1). VEGETAION MANAGEMENT: FOREST STEWARDSHIP No 1a. (2). VEGETAION MANAGEMENT OF MARSH AND / OR RIPARIAN AREA 2. Is the shoreline forested? Yes proceed to 2a. No proceed to 3. 2a. What is the bank height? 0 30 ft. 2a (1). MANAGE THE FOREST TO PREVENT TREE FALL AND PROCEED TO 5. Greater than 30 ft. 2a. (2). GRADE THE BANK AND USE GOOF UPLAND MANAGEMENT PRACTICES TO PREVENT FURTHER EROSION AND PROCEDD TO Does the structure or other improvement location prohibit grading? Yes 3a. MOVE THE IMPROVEMENT, IF POSSIBLE; CONSULT WITH AN EXPERT No Proceed to GRADE BANK AND VEGETATE AND Proceed to Is there marsh present? Yes, <15 ft. wide Proceed to 5a. Yes, >or =to 15 ft. wide Proceed to 5b. No Proceed to 6. 5a. How long is the fetch? Low (<½mile) 5a. (1). EXPAND THE MARSH, USE A FIBER LOG FOR TOE PROTECTION Moderate or High (>or =to ½mile) 5a. (2). EXPAND THE MARSH, USE A SILL FOR MARSH TOE PROTECTION 5b. How long is the fetch? Low (< ½ mile) 5b. (1). MANAGE RIPARIAN BUFFER AND MARSH VEGETATION TO PREVENT FURTURE EROSION Moderate or High (>or =to ½mile) 5b. (2). BUILD A ROCK SILL FOR TOE PROTECTION 6. Is there a beach? Minutes Dec. 15, 2010 Wetlands Board. 2

3 Yes 6a. NOURISH THE BEACH WITH SAND; ADD SILL OR BREAKWATER WHERE NECESSARY No Proceed to How long is the fetch? Low (<½mile) Proceed to 7a. Moderate (between ½ mile and 2 miles) Proceed to 7b. High (>2 mile) Proceed to 7c. 7a. What is the near shore water depth? Shallow (at 30 ft. channel ward for MLW, water depth is < or = to 3 ft.) - 7a. (1). CREATE A MARSH, PROTECT THE TOE WITH FIBER LOG Deep (at 30 ft. channel ward for MLW, water depth is > 3 ft.) 7a. (2). CONSTRUCT A REVETMENT, PLACE IT ONSHORE TO THE EXTENT POSSIBLE 7b. What is the near shore water depth? Shallow (at 30 ft. channel ward for MLW, water depth is <or = to 3 ft.) 7b. (1). CREATE A MARSH, PROTECT THE TOE WITH A SILL Deep (at 30 ft. channel ward for MLW, water depth is > 3 ft.) 7b. (2). CONSTRUCT A REVETMENT, PLACE IT ONSHORE TO THE EXTENT POSSIBLE 7c. CONSTRUCT A BREAKWATER AND ADD BEACH NOURISHMENT Ms. Kellam noted that the VIMS report had been received and read the recommendations as follows. VIMS RECOMMENDATIONS SUMMARY: *Improve revetment and sill designs as proposed *Grade the bank to move revetment landward *Consider beach nourishment to further increase the level of erosion protection At this time Ms. Ellen Grimes, agent for the applicant, submitted a formal written request asking the Board to defer this matter at this time. The letter was read into the record by Ms. Kellam as follows. RE: Anderson VMRC # Ms. Kellam: With this letter CRM, LLC is requesting a defferal from the Wetalnds Board regarding a discussion and decision on the above referneced VMRC application for shoreline work on Mr Anderson s lot in Peaceful Beach. The reason for the request is that the applicant has reassessed his goals for the project and believes these goals can be better met by devising another project plan. Minutes Dec. 15, 2010 Wetlands Board. 3

4 The rip rap structure previously installed along the embankment has now failed. The current request is to repair and add to the length of that structure. The embayment created by the construction of the two northern most breakwaters continues to seek equilibrium by progressing landward. One of VIMS s suggestions pertaining to the currently submitted plans is to grade the embankment landward to accommodate the embayment. We believe, while being a good idea, this lot is not suited to this approach because the lot is surrounded on three sides by the 100-foot RPA buffer. Cutting into the bank would further diminish the size of the lot s building envelope. Therefore, we are entertaining the idea of, with revised drawings and re-advertising, re-building the two northern breakwaters farther from the shoreline and installing a toe protection rip rap structure with bank grading at the base of the embankment. The dimensions and encroachment of the rebuilt breakwater structures are uncertain at this pint but plans for same will be provided as soon as they become available. To recap, we are respectfully requesting a deferral of this application to said time as revised drawings can be submitted, reviewed by staff and re-advertised so that this application may be brought before the Wetlands Board. I am available to answer any questions at Thank you for your time Sincerely, Ellen R Grimes MS MFS Coastal Resource Management, LLC 14 December 2010 Ms. Grimes explained that the original application plan was to cut into the upland and massage the area but the applicant has changed plans as outlined in the written request to defer. The goal of revising the plan is to preserve as much upland building envelope as possible while maintaining and preserving the shoreline. Mr. Meyers voiced his support of the new plan and to defer this matter until a later time. Mr. Chubb asked if the sill would still be topped as originally proposed and Ms. Grimes stated yes. When asked by the Board she noted that the two northern sills would be moved slightly and that the footprint may be increased. No oral or written public comments were received on this matter. Mr. Chubb noted that the matter would need to be re-advertised if the Board defers as requested by the applicant. Action Motion to defer this matter until such time new drawings and plans are submitted was made by Mr. Meyers. Second was made by Mr. Gates and the motion carried unanimously with a 6 to 0 vote. Minutes Dec. 15, 2010 Wetlands Board. 4

5 When asked by Mr. Lusk, Ms. Hickman explained that the bay measurement was taken at the top of the sill for the Anderson application and not at the toe of the slope. Mr. Badger stated that in order to determine the area of the Board s jurisdiction measuring should commence at the top of the sill in this case or if a bulkhead existed then the measurement should be taken at the bulkhead. Ms. Grimes added that the toe of the slope will probably be moved backwards horizontally as new plans are finalized. Old Business The Board then discussed the status of Susan Emerson s as built drawings. Upon reviewing the drawings Mr. Chubb noted that the green stone area was not as built. Ms. Grimes stated he was right and that the green area is proposed. She explained that George Dilley, the contractor, had placed flags along the beach to prevent channelward encroachment. It was noted that staff was to do a field inspection before any additional work is done just to make sure the flags were placed correctly. Ms. Hickman stated that a field inspection was conducted and the placement approved per the Board s recommendation. Ms. Grimes also stated that there is Class III stone in the revetment that is not visible due to the smaller stone placed on top; therefore, there is no need to try to place additional large stone in the revetment. Action Motion was made by Mr. Gates to accept the as-built drawings as presented which was seconded by Mr. Meyers. The motion was approved with a 6 to 0 vote. Motion was made by Mr. Meyers to grant an extension for county wetlands permit # (Susan Emerson) to expire June 1, Second was made by Mr. Chubb and carried unanimously with a 6 to 0 vote. The Board then discussed the status of the Cherrydale violation on property owned by Paul Forst. It was noted that Karen Duhring of VIMS had conducted a field inspection of the violation area along with Mr. Badger and Ms. Hickman. Ms. Duhring s letter describing her observations of the violation was reviewed and is included as part of the official record as follows. December 8, 2010 Northampton County Wetlands Board Northampton County P.O. Box 538 Eastville, VA Minutes Dec. 15, 2010 Wetlands Board. 5

6 Subject: VIMS inspection of Cherrydale by the Sea Community Pier Dr. Paul Forst VMRC # Dear Northampton Wetlands Board Members: The Northampton Wetlands Board requested a VIMS site visit and recommendations for tidal marsh restoration actions at the Cherrydale community pier. Your questions included whether the site has been properly restored and if not, what additional actions should be taken. I first reviewed information and photographs provided by Katrina Hickman, Zoning Inspector. I also looked at aerial photographs taken before and after the pier was constructed (2002, 2007, 2009). I then conducted a site visit on November 30, 2010 with Katrina Hickman and Hank Badger (VMRC). It is my opinion based on site observations and other supporting information that no additional restoration actions are necessary at this time. The reasoning behind this conclusion includes the following: 1) There has been noticeable recovery of desirable tidal wetland vegetation in all areas disturbed by pier construction equipment. Natural recover is expected to continue. 2) There is no evidence of new Phragmites australis invasion into the disturbed areas next to the pier (does not include other upland and marsh areas away from pier). 3) While parallel ruts are still visible in Section 1 between the upland and marsh island, completely removing these ruts would likely require significant new land disturbance actions. The high marsh in this area appears to be recovering normal functions and vegetation patterns. New land disturbance does not appear to be necessary. 4) Some of the non-vegetated areas present now were not vegetated in 2002, prior to pier construction. Natural limiting factors on vegetation growth are still present in these areas, such as tidal channels, small tidal ponds, and salt panes with high salinity levels in the soil (for example, see photos of Section 2-A below). Additional sand fill and/or planting marsh vegetation would likely be compromised by these natural features. Minutes Dec. 15, 2010 Wetlands Board. 6

7 Sec. 2 A 2007 Sec. 2 A November 30, 2010 Note small tidal channel in center of non vegetated area. If the additional pier extension and boat slips authorized by VMRC # will be constructed in the future, then additional considerations for access should be made at that time to prevent new tidal marsh impacts in the recovering areas. Please contact me if there are any questions about this evaluation or if you need additional information or advice from VIMS. Minutes Dec. 15, 2010 Wetlands Board. 7

8 Sincerely, Karen A Duhring, Marine Scientist e-copy: Hank Badger, VMRC Mr. Meyers stated his opinion that the VIMS evaluation should close this violation. However, Mr. Lusk was concerned that a precedent would be set if the Board releases the landowner from any further actions as it was his opinion that the area had not been adequately restored. Ms. Hickman stated that the county could still monitor the site. Ms. Kellam added that if the landowner is notified that the violation matter is closed then no future access to the site would be afforded to staff or Board without date specific permission from the landowner which does not have to be automatically granted. Ms. Kellam suggested that the landowner be notified that the Board and staff will want to reinspect the violation area again no later than July 30, Mr. Chubb suggested that the VIMS letter be kept as part of the official file record and that the landowner be informed that it is the intention of the Board to re-inspect the area in the future. Mr. Meyers suggested that if a letter is sent from the Board then the landowner should be thanked for his current efforts in trying to correct the violation; that it is the desire of the Board to re-inspect the area in 2012; and that the landowner is encouraged to do everything possible in the meantime to protect and maintain the area. Ms. Field noted that at the Board s last meeting it was our intent to abide with whatever was reported by VIMS on this matter after a field inspection was conducted. It was her opinion that the violation area would never to be completely restored as it was originally because the aspects of the area have changed with the installation of the commercial pier. Mr. Lusk was of the opinion that the Board wanted the damaged area repaired and restored period. Mr. Meyers reiterated his previous statement about notifying the landowner and suggested that the landowner be encouraged to document any future damages that may occur from storm impacts, etc., in order to keep the county informed about the status of the property. Ms. Field inquired as to how much time is generally involved for a violation to be fully processed from beginning to end. Ms. Hickman responded that a violation can take an average of 3 to 5 years especially when marshland or resource protection area buffers are involved. Mr. Lusk added that the original project was difficult to install due to existing topography and the applicant was warned about that; and it was his opinion that the contractor, in this case, was negligent while installing the pier. However, the property owner is ultimately responsible. Minutes Dec. 15, 2010 Wetlands Board. 8

9 Ms. Field noted that the landowner had planted grasses in the damaged area and that the Board did do a field inspection a year later. Ms. Drury stated that VIMS anticipates 3 to 5 years for complete restoration and that Mr. Forst should be informed of this. Mr. Lusk agreed noting that the Board should let the landowner know that this matter is not yet closed. He stated his concern again about a precedent being set in future violation cases if the Board determines that such wetlands damage is impossible to repair and landowners are not held responsible. Mr. Meyers suggested that VIMS should inform the landowner that this case would take 3 to 5 years before a determination is made that the violation can be closed. Mr. Lusk agreed and stated that the Board should defer this matter back to VIMS and that VIMS be made aware of the Board s concerns. When asked, Mr. Badger noted that such violation cases can be worrisome to resolve but that a friendly approach is always the best way to proceed in such matters. Mr. Meyers added that conflict resolution is worth the effort in most cases. Ms. Kellam explained the county process in such cases whereby the landowner is sent a violation notice, then a compliance notice and next a notice of a final deadline. If the landowner does not comply after three notices, the matter is taken to the district court for a decision. Ms. Hickman asked if fill was installed in the damaged area as Ms. Duhring had observed that the rut areas appeared not be filled as was required. Mr. Badger stated his opinion that it was a precarious area to fill but the damaged area is definitely improved and is healing better than he expected. However, Mr. Meyers stated it was evident that the low areas are causing some channeling as witnessed in the photograph contained in the VIMS letter. The Board then discussed the status of the Raccoon Island/Holly Bluff violation. It was noted that Ms. Hickman and Mr. Badger had conducted a recent field inspection of the site. Ms. Hickman explained that the landowner had been issued an emergency joint permit application to place concrete blocks behind the existing bulkhead only. However, it is evident that the area backfilled is greater in scope and that concrete was placed in front of the bulkhead as well along with concrete poles, mat and fill. It was her observation that rubble was basically dumped and pushed around and there is some metal interspersed among the debris as well. She noted that the geo-tube area was cut in and unstable rock installed. It was estimated that 1,200 tons of rock have been placed in this violation area. Mr. Lusk stated his opinion that nothing was done as approved in the emergency joint permit application that was issued. Minutes Dec. 15, 2010 Wetlands Board. 9

10 The Board asked that staff submit to each Board member all previous background information involving this property along with copies of permits and photos that are available as soon as possible. Mr. Chubb asked if the Army Corp of Engineers had made any concerns known to staff. Mr. Meyers added that the beach area is the dredged material placed there by the Corp many years ago. Ms. Kellam noted that the Corp was concerned about the excavator that went to the backside or south end of the island where dredging appears to have taken place. Then the dredged material was transported to the violation area. Ms. Hickman added that Mr. Robert Cole with the Corp did see the dredged area when he visited the island during the field inspection trip and verified that no dredge permit was issued. Staff added that there are three existing violations for this property: (1) a dredging violation; (2) a buffer violation; and (3) an erosion and sediment control violation. At this time Ms. Kellam relayed Mr. Val Valentine s concerns about being treated fairly by the Wetlands Board due to his past history with the county. She noted that Mr. Ben Mears is now consulting and providing advice to the property owner who is not Val Valentine. Mr. Lusk stated that the permit is not in Mr. Valentine s name nor is he the responsible party in this case. He also noted that the property owner is the responsible party and added that the Board treats everyone fairly. The Board then deferred discussion and action on the existing Wetlands Board By-Laws until the Chair returns. New Business Ms. Kellam reported that there may be three new applications to come before the Board next month. Ms. Hickman offered no new information in the Zoning Inspector s report. Statements from the Public: none received. Consideration of Minutes: The minutes of the October 20, 2010 were considered and approved with the following corrections: the date should be corrected in the heading and in the first paragraph; page 3, paragraph 3, first sentence, insert be after the word to ; and in paragraph 4, the second sentence the word country should be changed to county. Motion to approve as amended was made by Mr. Chubb and seconded by Mr. Gates. The motion carried with a unanimous vote of 6 to 0. Minutes Dec. 15, 2010 Wetlands Board. 10

11 Adjournment There being no other business the meeting was adjourned at 11:40 a.m. upon proper motion. Chairman Secretary Minutes Dec. 15, 2010 Wetlands Board. 11

NORTHAMPTON COUNTY WETLANDS BOARD Minutes May 15, 2013

NORTHAMPTON COUNTY WETLANDS BOARD Minutes May 15, 2013 NORTHAMPTON COUNTY WETLANDS BOARD Minutes May 15, 2013 This was the regular meeting of the Northampton County Wetlands Board held on Wednesday, May 15, 2013 in the Board Chambers located at 16404 Courthouse

More information

VIMS CCRM Coastal Management Decision Tools. Decision Tree for Undefended Shorelines and Those with Failed Structures

VIMS CCRM Coastal Management Decision Tools. Decision Tree for Undefended Shorelines and Those with Failed Structures VIMS CCRM Coastal Management Decision Tools Decision Tree for Undefended Shorelines and Those with Failed Structures Center for Coastal Resources Management Virginia Institute of Marine Science Gloucester

More information

Design and Construction of Living

Design and Construction of Living Design and Construction of Living Shorelines A course for living shorelines professionals September 29, 2010 This course made possible by a grant from the Virginia Coastal Zone Management Program NOAA

More information

Shoreline Erosion Control Failures and How To Avoid Them

Shoreline Erosion Control Failures and How To Avoid Them 2008 Illinois Lake Management Association Shoreline Erosion Control Failures and How To Avoid Them by: Hank Sutton, President, Lake Rip Rap, Inc. www.lakeriprap.com - www.macoupinboats.com Setting the

More information

For more information or permission to reprint slides, please contact Donna Milligan at 1

For more information or permission to reprint slides, please contact Donna Milligan at 1 For more information or permission to reprint slides, please contact Donna Milligan at milligan@vims.edu 1 For more information or permission to reprint slides, please contact Donna Milligan at milligan@vims.edu

More information

The Falmouth Conservation Commission MEETING MINUTES - WEDNESDAY, DECEMBER 12, 2018 Selectmen s Meeting Room, Falmouth Town Hall, 7:00 p.m.

The Falmouth Conservation Commission MEETING MINUTES - WEDNESDAY, DECEMBER 12, 2018 Selectmen s Meeting Room, Falmouth Town Hall, 7:00 p.m. The Falmouth Conservation Commission MEETING MINUTES - WEDNESDAY, DECEMBER 12, 2018 Selectmen s Meeting Room, Falmouth Town Hall, 7:00 p.m. Present: Absent: Jamie Mathews, Vice-Chair Betsy Gladfelter Maurie

More information

Estuarine Shoreline Stabilization

Estuarine Shoreline Stabilization Estuarine Shoreline Stabilization Property Owner s Guide to Determining the Most Appropriate Stabilization Method Estuarine shorelines are dynamic features that experience continued erosion. Land is lost

More information

ALTERNATIVES FOR COASTAL STORM DAMAGE MITIGATION

ALTERNATIVES FOR COASTAL STORM DAMAGE MITIGATION ALTERNATIVES FOR COASTAL STORM DAMAGE MITIGATION Dave Basco Old Dominion University, Norfolk, Virginia, USA National Park Service Photo STRUCTURAL (changes to natural, physical system) hardening (seawalls,

More information

Chesapeake Bay Preservation Area Board

Chesapeake Bay Preservation Area Board City of Chesapeake MINUTES The Chesapeake Bay Preservation Area Board Planning Department 306 Cedar Road PO Box 15225 Chesapeake, Virginia 23328 (757) 382-6176 FAX: (757) 382-6406 Chesapeake Bay Preservation

More information

ALTERNATIVES FOR COASTAL STORM DAMAGE MITIGATION AND FUNCTIONAL DESIGN OF COASTAL STRUCTURES

ALTERNATIVES FOR COASTAL STORM DAMAGE MITIGATION AND FUNCTIONAL DESIGN OF COASTAL STRUCTURES The University of the West Indies Organization of American States PROFESSIONAL DEVELOPMENT PROGRAMME: COASTAL INFRASTRUCTURE DESIGN, CONSTRUCTION AND MAINTENANCE A COURSE IN COASTAL DEFENSE SYSTEMS I CHAPTER

More information

RE: Hurricane Matthew Beach Damage Assessment and Recommendations [CSE 2416]

RE: Hurricane Matthew Beach Damage Assessment and Recommendations [CSE 2416] October 25, 2016 Iris Hill Town Administrator Town of Edisto Beach 2414 Murray St Edisto Beach SC 29438 RE: Hurricane Matthew Beach Damage Assessment and Recommendations [CSE 2416] Dear Iris, Hurricane

More information

Public Notice U.S. Army Corps In Reply to Application Number CENAB-OP-RMS (NATIONAL HARBOR (FORMERLY PORT Baltimore District AMERICA])

Public Notice U.S. Army Corps In Reply to Application Number CENAB-OP-RMS (NATIONAL HARBOR (FORMERLY PORT Baltimore District AMERICA]) Public Notice U.S. Army Corps In Reply to Application Number of Engineers CENAB-OP-RMS (NATIONAL HARBOR (FORMERLY PORT Baltimore District AMERICA]) 88-01361 PN 14-05 Comment Period: January 16, 2014 to

More information

June 25, Re: Camping Platform Permitting (NSGLC )

June 25, Re: Camping Platform Permitting (NSGLC ) June 25, 2013 Curtis W. Smith Director of Planning Accomack-Northampton Planning District Commission P.O. Box 417, 23372 Front Street Accomac, VA 23301 Re: Camping Platform Permitting (NSGLC-12-04-03)

More information

Shoreline Studies Program, Department of Physical Sciences, VIMS

Shoreline Studies Program, Department of Physical Sciences, VIMS Living Shoreline Training Class 2017 1 Demonstration sites discussed in this talk. 2 A shoreline management plan for the entire creek made conceptual shoreline management recommendations along every stretch

More information

Issues facing this region include the status of the Sluice Creek tide gates, various tidal wetlands, and locations of public access:

Issues facing this region include the status of the Sluice Creek tide gates, various tidal wetlands, and locations of public access: 5.6 Guilford Point to Madison Town Line Existing Resources This region extends from Guilford Point to the Madison town line. Named places include Grass Island and the East River. Residential, commercial,

More information

Water Resources Report RKLD Annual Meeting July 30, 2016

Water Resources Report RKLD Annual Meeting July 30, 2016 Water Resources Report RKLD Annual Meeting 2016 July 30, 2016 Topics Hydrology Report Indianford Dam trash rack cleanout performance Experimental Project update Review of PAS project Twin floods- 1 to

More information

MINUTES OF THE ST. MARY S COUNTY BOARD OF APPEALS MEETING ROOM 14 * GOVERNMENTAL CENTER * LEONARDTOWN, MARYLAND Thursday, October 9, 2003

MINUTES OF THE ST. MARY S COUNTY BOARD OF APPEALS MEETING ROOM 14 * GOVERNMENTAL CENTER * LEONARDTOWN, MARYLAND Thursday, October 9, 2003 MINUTES OF THE ST. MARY S COUNTY BOARD OF APPEALS MEETING ROOM 14 * GOVERNMENTAL CENTER * LEONARDTOWN, MARYLAND Thursday, October 9, 2003 Marie Underwood, Chairperson George Allan Hayden, Sr., Vice Chair

More information

13 August 14, 2013 Public Hearing

13 August 14, 2013 Public Hearing 13 August 14, 2013 Public Hearing APPLICANT/ PROPERTY OWNER: POCAHONTAS LANDING, L.L.C. STAFF PLANNER: Ray Odom REQUEST: Condition Use Permit (Non-Commercial Marina) ADDRESS / DESCRIPTION6: Terminus of

More information

Trout Unlimited Comments on the Scope of Environmental Impact Statement for the Constitution Pipeline Project, Docket No. PF12-9

Trout Unlimited Comments on the Scope of Environmental Impact Statement for the Constitution Pipeline Project, Docket No. PF12-9 October 9, 2012 Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, NE, Room 1A Washington, DC 20426 RE: Trout Unlimited Comments on the Scope of Environmental Impact Statement

More information

CONSERVATION COMMISSION Meeting Minutes THURSDAY May 10, :00 p.m. Stoughton Police Department 26 Rose Street, Stoughton, MA 02072

CONSERVATION COMMISSION Meeting Minutes THURSDAY May 10, :00 p.m. Stoughton Police Department 26 Rose Street, Stoughton, MA 02072 CONSERVATION COMMISSION Meeting Minutes THURSDAY May 10, 2018 6:00 p.m. Stoughton Police Department 26 Rose Street, Stoughton, MA 02072 The May 10, 2018 meeting of the Conservation Commission was called

More information

TO: FROM: Y.102/MIN

TO: FROM: Y.102/MIN TO: FROM: Hastings-on-Hudson Shoreline Committee Amanda Ludlow and Kathryn Sommo, Roux Associates, Inc. DATE: March 13, 2017 RE: Meeting with NYSDEC Region 3 Hastings-on-Hudson Conceptual Shoreline Plans

More information

Greg Berman (WHOI Sea Grant & Cape Cod Cooperative Extension) November 2, 2017

Greg Berman (WHOI Sea Grant & Cape Cod Cooperative Extension) November 2, 2017 November 2, 2017 Are You Ready for the Next Big Storm?: A Workshop for Hardy Cape Codders Greg Berman (WHOI Sea Grant & Cape Cod Cooperative Extension) Outline: ~30 min talk & time for questions Practical

More information

DEPARTMENT OF THE ARMY GALVESTON DISTRICT, CORPS OF ENGINEERS P.O. BOX 1229 GALVESTON, TEXAS CESWG-CDR (1145)

DEPARTMENT OF THE ARMY GALVESTON DISTRICT, CORPS OF ENGINEERS P.O. BOX 1229 GALVESTON, TEXAS CESWG-CDR (1145) DEPARTMENT OF THE ARMY GALVESTON DISTRICT, CORPS OF ENGINEERS P.O. BOX 1229 GALVESTON, TEXAS 77553-1229 REPLY TO ATTENTION OF CESWG-CDR (1145) TBD MEMORANDUM FOR All Galveston District Personnel. SUBJECT:

More information

CHAPTER 4 - SHORELINE PROTECTION STUDY AND PLAN

CHAPTER 4 - SHORELINE PROTECTION STUDY AND PLAN CHAPTER 4 Shoreline Protection Study and Plan 4-1 CHAPTER 4 - SHORELINE PROTECTION STUDY AND PLAN I. SHORELINE PROTECTION STUDY Lancaster County is a coastal community that has, as previously stated, approximately

More information

Beach profile surveys and morphological change, Otago Harbour entrance to Karitane May 2014 to June 2015

Beach profile surveys and morphological change, Otago Harbour entrance to Karitane May 2014 to June 2015 Beach profile surveys and morphological change, Otago Harbour entrance to Karitane May 2014 to June 2015 Prepared for Port Otago Ltd Martin Single September 2015 Shore Processes and Management Ltd Contact

More information

Spartanburg County Planning and Development Department

Spartanburg County Planning and Development Department Spartanburg County Planning and Development Department MINUTES Planning and Development Commission County Council Chambers, 4:30 p.m. August 8, 2017 Members Present: Whit Kennedy, Chairman Toby McCall,

More information

Blakely Island, N Thatcher Bay. Restoration Recommendation: Rank Score (total score)

Blakely Island, N Thatcher Bay. Restoration Recommendation: Rank Score (total score) Soft Shore Protection/Structure Removal Blueprint for San Juan County Forage Fish Beaches Appendix 2: Recommendations for sites scoring below the top ten, sorted by island (east to west) Blakely Island,

More information

ANNUAL INSPECTION BY A QUALIFIED PROFESSIONAL ENGINEER ALL CCR IMPOUNDMENTS CCR Rule Section (b)

ANNUAL INSPECTION BY A QUALIFIED PROFESSIONAL ENGINEER ALL CCR IMPOUNDMENTS CCR Rule Section (b) ANNUAL INSPECTION BY A QUALIFIED PROFESSIONAL ENGINEER ALL CCR IMPOUNDMENTS ASBURY POWER PLANT 21133 Uphill Lane Asbury, Missouri 64832 January 18, 2017 EMPIRE DISTRICT ELECTRIC COMPANY Prepared by: Rachel

More information

4/20/17. #32 - Coastal Erosion Case Histories - Lake Michigan

4/20/17. #32 - Coastal Erosion Case Histories - Lake Michigan Writing Assignment Due Monday by 11:59 pm #32 - Coastal Erosion Case Histories - Lake Michigan See main class web pages for detailed instructions Submit papers Illinois Compass No copying: Compass will

More information

July 14, The Beaches Conference Greg Berman (WHOI Sea Grant & Cape Cod Cooperative Extension)

July 14, The Beaches Conference Greg Berman (WHOI Sea Grant & Cape Cod Cooperative Extension) July 14, 2017 The Beaches Conference 2017 Greg Berman (WHOI Sea Grant & Cape Cod Cooperative Extension) Annual downscaled global tropical cyclones, averaged over the six models. Uses data from IPCC Fifth

More information

Tracy E. Skrabal. October 2, 2012

Tracy E. Skrabal. October 2, 2012 Tracy E. Skrabal October 2, 2012 Jurisdiction Living Shorelines/Sills Timeline for Permit Bulkhead/Revetments North Atlantic Division New England Division suspended all nationwide permits March 20, 2012

More information

Spartanburg County Planning and Development Department

Spartanburg County Planning and Development Department Spartanburg County Planning and Development Department MINUTES Unified Land Management Board of Appeals May 24, 2016 Members Present: Members Absent: Staff Present: Michael Padgett, Chairman Thomas Davies,

More information

Puget Sound Nearshore Ecosystem Restoration Project Restore America s Estuaries Conference 2012 Tampa, FL

Puget Sound Nearshore Ecosystem Restoration Project Restore America s Estuaries Conference 2012 Tampa, FL Restore America s Estuaries Conference 2012 Tampa, FL presented by: Theresa Mitchell, WA Dept. of Fish & Wildlife Nearshore General Investigation Change Analysis: Comparison of historical and current

More information

THE CORPORATION OF THE TOWNSHIP OF KING COMMITTEE OF ADJUSTMENT MEETING AGENDA. WEDNESDAY, JUNE 18, 2014 at 7:30PM

THE CORPORATION OF THE TOWNSHIP OF KING COMMITTEE OF ADJUSTMENT MEETING AGENDA. WEDNESDAY, JUNE 18, 2014 at 7:30PM THE CORPORATION OF THE TOWNSHIP OF KING COMMITTEE OF ADJUSTMENT MEETING AGENDA WEDNESDAY, JUNE 18, 2014 at 7:30PM MUNICIPAL OFFICE - COUNCIL CHAMBERS 2075 KING ROAD, KING CITY Page 1. DECLARATIONS OF PECUNIARY

More information

OECS Regional Engineering Workshop September 29 October 3, 2014

OECS Regional Engineering Workshop September 29 October 3, 2014 B E A C H E S. M A R I N A S. D E S I G N. C O N S T R U C T I O N. OECS Regional Engineering Workshop September 29 October 3, 2014 Coastal Erosion and Sea Defense: Introduction to Coastal/Marine Structures

More information

29 National Estuarine Research Reserves

29 National Estuarine Research Reserves Estuarine habitat is where it's at! Living Shorelines for Erosion Control Whitney Jenkins North Carolina Coastal Reserve & National Estuarine Research Reserve Division of Coastal Management 29 National

More information

Ninilchik Harbor Page 2 of 11

Ninilchik Harbor Page 2 of 11 Ninilchik Harbor Ninilchik Harbor Page 2 of 11 Condition of Improvements 31 December 2017 Ninilchik Harbor, Alaska (CWIS No. 012640, 087345) Authorization Rivers and Harbors Act, 3 July 1958 (P.L. 85-500

More information

Estimated on-the-ground start and end dates: 1 June October 2018

Estimated on-the-ground start and end dates: 1 June October 2018 A. Applicant Information Name of Organization: U.S. Army Corps of Engineers, Carlyle Lake 801 Lake Road, Carlyle, IL 62231 Contact Information: Robert Wilkins, Operations Manager, (618) 594-2484, Robert.Wilkins@usace.army.mil

More information

The Falmouth Conservation Commission MEETING MINUTES - WEDNESDAY, FEBRUARY 1, 2017 Selectmen s Meeting Room, Falmouth Town Hall, 7:00 p.m.

The Falmouth Conservation Commission MEETING MINUTES - WEDNESDAY, FEBRUARY 1, 2017 Selectmen s Meeting Room, Falmouth Town Hall, 7:00 p.m. The Falmouth Conservation Commission MEETING MINUTES - WEDNESDAY, FEBRUARY 1, 2017 Selectmen s Meeting Room, Falmouth Town Hall, 7:00 p.m. Present: Absent: Russ Robbins, Chair Mary Schumacher, Vice-Chair

More information

GONE! Coastal Erosion Happens During Storms! Why Worry About Coastal Setbacks? Goals for Today

GONE! Coastal Erosion Happens During Storms! Why Worry About Coastal Setbacks? Goals for Today RI Regulatory Setbacks & Buffers: Coastal Zone Management Issues New England Onsite Wastewater Training Program @ URI OWT 155 November 21, 2013 Goals for Today Understand the impacts of storms, coastal

More information

La Quinta Channel Extension Port of Corpus Christi Ingleside, Texas. Mark Coyle

La Quinta Channel Extension Port of Corpus Christi Ingleside, Texas. Mark Coyle La Quinta Channel Extension Port of Corpus Christi Ingleside, Texas Mark Coyle Corpus Christi Navigation Channel PCCA La Quinta Expansion Project History Corpus Christi Ship Channel Improvement Projects

More information

SPO Regional Challenge Grant Creation of a Sea Level Adaption Working Group for Biddeford, Saco, OOB and Scarborough J.T. Lockman, AICP, Planning

SPO Regional Challenge Grant Creation of a Sea Level Adaption Working Group for Biddeford, Saco, OOB and Scarborough J.T. Lockman, AICP, Planning SPO Regional Challenge Grant Creation of a Sea Level Adaption Working Group for Biddeford, Saco, OOB and Scarborough J.T. Lockman, AICP, Planning Director Southern Maine Regional Planning Commission jlockman@smrpc.org

More information

CHAPTER 6 10/29/2018 Clean Version REGULATING PIERS, WHARVES, MOORING BUOYS, SWIMMING RAFTS AND INFLATABLES ON ROCK LAKE

CHAPTER 6 10/29/2018 Clean Version REGULATING PIERS, WHARVES, MOORING BUOYS, SWIMMING RAFTS AND INFLATABLES ON ROCK LAKE 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 CHAPTER 6 10/29/2018 Clean Version REGULATING PIERS, WHARVES, MOORING BUOYS,

More information

RLRC COMMUNITIES EAST GRAND FORKS AREA CHARACTER THE RED LAKE RIVER & THE RED RIVER OF THE NORTH CONFLUENCE EAGLE POINT BOAT LAUNCH DESIGN

RLRC COMMUNITIES EAST GRAND FORKS AREA CHARACTER THE RED LAKE RIVER & THE RED RIVER OF THE NORTH CONFLUENCE EAGLE POINT BOAT LAUNCH DESIGN AREA CHARACTER THE RED LAKE RIVER & THE RED RIVER OF THE NORTH CONFLUENCE EAGLE POINT BOAT LAUNCH DESIGN DESIGN DETAILS 135 AREA CHARACTER East Grand Forks a city of 7,501 people is located across the

More information

SHORE EROSION CONTROL GUIDELINES

SHORE EROSION CONTROL GUIDELINES SHORE EROSION CONTROL GUIDELINES For Waterfront Property Owners Contact Information Updated 10/06 Original production of this report was made possible by funding provided by the Coastal Resources Division,

More information

September 9, Planning and Land Development Regulation Commission (PLDRC)

September 9, Planning and Land Development Regulation Commission (PLDRC) Page 1 of 19 GROWTH AND RESOURCE MANAGEMENT DEPARTMENT PLANNING AND DEVELOPMENT SERVICES DIVISION CURRENT PLANNING ACTIVITY 123 W. Indiana Avenue, Room 202, DeLand, FL 32720 (386) 943-7059 PUBLIC HEARING:

More information

Dune Monitoring Data Update Summary: 2013

Dune Monitoring Data Update Summary: 2013 Dune Monitoring Data Update Summary: 13 Shoreline Studies Program Virginia Institute of Marine Science College of William & Mary Gloucester Point, Virginia September 13 Dune Monitoring Data Update Summary:

More information

INADVERTENT RETURN PLAN FOR HORIZONTAL DIRECTIONAL DRILLING (HDD)

INADVERTENT RETURN PLAN FOR HORIZONTAL DIRECTIONAL DRILLING (HDD) INADVERTENT RETURN PLAN FOR HORIZONTAL DIRECTIONAL DRILLING (HDD) FACILITY OPERATOR: NextEra Energy Resources, LLC 700 Universe Boulevard Juno Beach, FL 33408 For Horizontal Directional Drilling Contents

More information

City of Pittsfield Harbormaster APPLICATION FOR AN INDIVIDUAL MOORING PERMIT

City of Pittsfield Harbormaster APPLICATION FOR AN INDIVIDUAL MOORING PERMIT City of Pittsfield Harbormaster APPLICATION FOR AN INDIVIDUAL MOORING PERMIT INSTRUCTIONS: This application may only be used for requests to place lake moorings. This application must be completed in its

More information

Design Considerations for Living Shorelines in Connecticut. Jennifer E.D. O Donnell Department of Marine Sciences University of Connecticut

Design Considerations for Living Shorelines in Connecticut. Jennifer E.D. O Donnell Department of Marine Sciences University of Connecticut Design Considerations for Living Shorelines in Connecticut Jennifer E.D. O Donnell Department of Marine Sciences University of Connecticut October 2015 1 Contents Contents... 2 1 Why Living Shorelines?...

More information

ST. JOSEPH PENINSULA, GULF COUNTY, FLORIDA Beach Re-Nourishment and Environmental Enhancement Project RECOMMENDATIONS

ST. JOSEPH PENINSULA, GULF COUNTY, FLORIDA Beach Re-Nourishment and Environmental Enhancement Project RECOMMENDATIONS ST. JOSEPH PENINSULA, GULF COUNTY, FLORIDA Beach Re-Nourishment and Environmental Enhancement Project RECOMMENDATIONS January 23, 2018 543 Harbor Boulevard, Suite 204 Destin, Florida 32541 850.654.1555

More information

JAP Additional Information Sheet

JAP Additional Information Sheet JAP Additional Information Sheet Block 15: Purpose and Need The USACE purpose of the project is to provide a safe and reliable whitewater park for the recreational public in a city park, which will provide

More information

1-32 NOME HARBOR, ALASKA (CWIS NOS , 87755, 12270, & 10422) Condition of Improvement 30 September 2012

1-32 NOME HARBOR, ALASKA (CWIS NOS , 87755, 12270, & 10422) Condition of Improvement 30 September 2012 NOME HARBOR 1-32 NOME HARBOR, ALASKA (CWIS NOS. 72742, 87755, 12270, & 10422) Condition of Improvement 30 September 2012 AUTHORIZATION: (1) Rivers and Harbors Act, 8 August 1917 (House Doc. 1932, 64th

More information

ORDINANCE NO AN ORDINANCE OF THE CITY OF FOLSOM AMENDING CHAPTER OF THE FOLSOM MUNICIPAL CODE CONCERNING SWIMMING POOLS, SPAS AND HOT TUBS

ORDINANCE NO AN ORDINANCE OF THE CITY OF FOLSOM AMENDING CHAPTER OF THE FOLSOM MUNICIPAL CODE CONCERNING SWIMMING POOLS, SPAS AND HOT TUBS ORDINANCE NO. 1267 AN ORDINANCE OF THE CITY OF FOLSOM AMENDING CHAPTER 14.28 OF THE FOLSOM MUNICIPAL CODE CONCERNING SWIMMING POOLS, SPAS AND HOT TUBS THE CITY COUNCIL OF THE CITY OF FOLSOM HEREBY DOES

More information

Beach Prisms. Shoreline Erosion Control And Beach Replenishment Performance Summary

Beach Prisms. Shoreline Erosion Control And Beach Replenishment Performance Summary Beach Prisms Shoreline Erosion Control And Beach Replenishment Performance Summary Location: Terrapin Nature Park, Kent Island, Queen Anne s County, MD Prepared by: Lane Engineering, LLC 117 Bay Street

More information

Energy Attenuation & Hybrid Living Shorelines: A Viable Tool for Coastal Resilience

Energy Attenuation & Hybrid Living Shorelines: A Viable Tool for Coastal Resilience Energy & Hybrid Living Shorelines: A Viable Tool for Coastal Resilience Hot Topic Session Delaware Estuary Science & Environmental Summit Balancing Progress & Protection 10 Years of Science in Action January

More information

Brief History of Headland Breakwaters Usage in Chesapeake Bay, USA. 25 Years of Rock, Sand and Plants for Shore Protection

Brief History of Headland Breakwaters Usage in Chesapeake Bay, USA. 25 Years of Rock, Sand and Plants for Shore Protection Brief History of Headland Breakwaters Usage in Chesapeake Bay, USA. 25 Years of Rock, Sand and Plants for Shore Protection Beach Tech 2011 C. Scott Hardaway, Jr., Geologist, Virginia Institute of Marine

More information

HURRICANE SANDY LIMITED REEVALUATION REPORT UNION BEACH, NEW JERSEY DRAFT ENGINEERING APPENDIX SUB APPENDIX D SBEACH MODELING

HURRICANE SANDY LIMITED REEVALUATION REPORT UNION BEACH, NEW JERSEY DRAFT ENGINEERING APPENDIX SUB APPENDIX D SBEACH MODELING HURRICANE SANDY LIMITED REEVALUATION REPORT UNION BEACH, NEW JERSEY DRAFT ENGINEERING APPENDIX SUB APPENDIX D SBEACH MODELING Rev. 18 Feb 2015 1 SBEACH Modeling 1.0 Introduction Following the methodology

More information

Fact Sheet Ordinance Regulating Erosion Threatened Structures

Fact Sheet Ordinance Regulating Erosion Threatened Structures Fact Sheet Ordinance Regulating Erosion Threatened Structures Town of Duck, North Carolina August 15, 2011 What is being considered? The Town of Duck Council is considering an ordinance to limit the encroachment

More information

RI Regulatory Setbacks & Buffers: Coastal Management Issues

RI Regulatory Setbacks & Buffers: Coastal Management Issues RI Regulatory Setbacks & Buffers: Coastal Management Issues New England Onsite Wastewater Training Program @ URI OWT 155 - November 29, 2012 James Boyd - Coastal Policy Analyst Photo: October 30, 2012

More information

2012 GRIEVANCE PROCEDURES GUIDELINES FOR LOCAL AND STATE LEAGUE COORDINATORS GRIEVANCE AND GRIEVANCE APPEAL COMMITTEES As of June 23, 2011

2012 GRIEVANCE PROCEDURES GUIDELINES FOR LOCAL AND STATE LEAGUE COORDINATORS GRIEVANCE AND GRIEVANCE APPEAL COMMITTEES As of June 23, 2011 2012 GRIEVANCE PROCEDURES GUIDELINES FOR LOCAL AND STATE LEAGUE COORDINATORS GRIEVANCE AND GRIEVANCE APPEAL COMMITTEES As of June 23, 2011 In an attempt to provide guidance for Grievance Procedures to

More information

Beach Renourishment in Jacksonville

Beach Renourishment in Jacksonville Beach Renourishment in Jacksonville Kevin Bodge, PhD, P.E. - Olsen Associates, Inc. 1978 Oct 2004 2000 2016 2011 Oct 2016 Coastal Duval County, FL Nassau Sound Blount Island Ft. George Inlet St. Johns

More information

AIRPORT RD. EROSION HOMEOWNER FOCUS GROUP SUMMARY 1/1/ PM NATURE COAST BIOLOGICAL STATION

AIRPORT RD. EROSION HOMEOWNER FOCUS GROUP SUMMARY 1/1/ PM NATURE COAST BIOLOGICAL STATION AIRPORT RD. EROSION HOMEOWNER FOCUS GROUP SUMMARY 1/1/2018 6 8 PM NATURE COAST BIOLOGICAL STATION This workshop was the fourth in a series of workshops about coastal erosion in Cedar Key hosted by the

More information

Building Coastal Resiliency at Plymouth Long Beach

Building Coastal Resiliency at Plymouth Long Beach Building Coastal Resiliency at Plymouth Long Beach Department of Marine and Environmental Affairs March 30, 2017 Introducing Green Infrastructure for Coastal Resiliency Plymouth Long Beach & Warren s Cove

More information

ST. TAMMANY PARISH COUNCIL ORDINANCE

ST. TAMMANY PARISH COUNCIL ORDINANCE ST. TAMMANY PARISH COUNCIL ORDINANCE ORDINANCE CALENDAR NO: 4748 COUNCIL SPONSOR: GOULD/BRISTER INTRODUCED BY: MR. STEFANCIK ORDINANCE COUNCIL SERIES NO: PROVIDED BY: PLANNING SECONDED BY: MR. ARTIGUE

More information

Salt Ponds Shore Zone Modeling for Breakwater Placement: Summary Report

Salt Ponds Shore Zone Modeling for Breakwater Placement: Summary Report Salt Ponds Shore Zone Modeling for Breakwater Placement: Summary Report Virginia Institute of Marine Science May 2014 Salt Ponds Shore Zone Modeling for Breakwater Placement: Summary Report For Waterway

More information

RESPONSE TO COMMENT: 45

RESPONSE TO COMMENT: 45 45 a. 45 b. RESPONSE TO COMMENT: 45 California State Lands Commission (Stephen L. Jenkins) 45-a: The comment states that the State Lands Commission will not require a lease at this time but may require

More information

Urban Planning and Land Use

Urban Planning and Land Use Urban Planning and Land Use 701 North 7 th Street, Room 423 Phone: (913) 573-5750 Kansas City, Kansas 66101 Fax: (913) 573-5796 Email: planninginfo@wycokck.org www.wycokck.org/planning To: From: City Planning

More information

FINAL HARRIS CHAIN OF LAKES RESTORATION COUNCIL SITE VISIT SUMMARY. of the. Projects Tour March 3, 2006

FINAL HARRIS CHAIN OF LAKES RESTORATION COUNCIL SITE VISIT SUMMARY. of the. Projects Tour March 3, 2006 FINAL HARRIS CHAIN OF LAKES RESTORATION COUNCIL SITE VISIT SUMMARY of the Projects Tour March 3, 2006 The regular meeting of the Harris Chain of Lakes Restoration Council (Council) was cancelled to facilitate

More information

Napa County Planning Commission Board Agenda Letter

Napa County Planning Commission Board Agenda Letter Agenda Date: 8/17/2016 Agenda Placement: 9D Napa County Planning Commission Board Agenda Letter TO: FROM: Napa County Planning Commission John McDowell for David Morrison - Director Planning, Building

More information

SACO RIVER AND CAMP ELLIS BEACH SACO, MAINE SECTION 111 SHORE DAMAGE MITIGATION PROJECT APPENDIX F ECONOMIC ASSESSMENT

SACO RIVER AND CAMP ELLIS BEACH SACO, MAINE SECTION 111 SHORE DAMAGE MITIGATION PROJECT APPENDIX F ECONOMIC ASSESSMENT SACO RIVER AND CAMP ELLIS BEACH SACO, MAINE SECTION 111 SHORE DAMAGE MITIGATION PROJECT APPENDIX F ECONOMIC ASSESSMENT Department of the Army New England District, Corps of Engineers 696 Virginia Road

More information

APPENDIX C VEGETATED EMERGENCY SPILLWAY. VERSION 1.0 March 1, 2011

APPENDIX C VEGETATED EMERGENCY SPILLWAY. VERSION 1.0 March 1, 2011 APPENDIX C VEGETATED EMERGENCY SPILLWAY VERSION 1.0 March 1, 2011 [NOTE: Could use a better photo more clearly showing the emergency spillway in the context of the dam.] SECTION C-1: DESCRIPTION OF PRACTICE

More information

Lake Shamineau Association Spring Membership Meeting May 27, 2006 Scandia Valley Town Hall

Lake Shamineau Association Spring Membership Meeting May 27, 2006 Scandia Valley Town Hall Lake Shamineau Association Spring Membership Meeting May 27, 2006 Scandia Valley Town Hall Board members present: Vern Sowada, Mike Fedde, George Gammon, Terry Sandstrom, Al Doree, Deryl Ramey, Pat Crawford,

More information

Eelgrass and Macroalgae Presence/Absence Preliminary Surveys BHP Proposed Grays Harbor Potash Export Facility A Task 400

Eelgrass and Macroalgae Presence/Absence Preliminary Surveys BHP Proposed Grays Harbor Potash Export Facility A Task 400 Memorandum 40600-HS-MEM-55036 Revision 0 Date: 26 July 2018 Subject: Eelgrass and Macroalgae Presence/Absence Preliminary Surveys BHP Proposed Grays Harbor Potash Export Facility A17.0202.00 Task 400 INTRODUCTION

More information

MINUTES CITY OF SAN DIEGO PARK AND RECREATION DEPARTMENT SUNSET CLIFFS NATURAL PARK COUNCIL. August 6, 2018

MINUTES CITY OF SAN DIEGO PARK AND RECREATION DEPARTMENT SUNSET CLIFFS NATURAL PARK COUNCIL. August 6, 2018 CALL TO ORDER MINUTES CITY OF SAN DIEGO PARK AND RECREATION DEPARTMENT SUNSET CLIFFS NATURAL PARK COUNCIL August 6, 2018 Meeting held at: Mailing address is: Cabrillo Recreation Center Park and Recreation/DRP

More information

Bristol Township Zoning Commission

Bristol Township Zoning Commission 1. Chairman Weeks called the meeting to order at 7:00 PM. 2. The Pledge of Allegiance 3. Roll Call Members Present Ken Weeks Tim Pleso Charles McMonagle Carol Bowlin Members absent Christopher Fagan 4.

More information

Trends in Shoreline Change and Hazard Impacts: Hot Spots and Management Challenges. Greg Berman CAPE COASTAL CONFERENCE.

Trends in Shoreline Change and Hazard Impacts: Hot Spots and Management Challenges. Greg Berman CAPE COASTAL CONFERENCE. CAPE COASTAL CONFERENCE Linking Science with Local Solu1ons and Decision- Making Trends in Shoreline Change and Hazard Impacts: Hot Spots and Management Challenges Presented By Greg Berman (WHOI Sea Grant

More information

Figure 1. Schematic illustration of the major environments on Mustang Island.

Figure 1. Schematic illustration of the major environments on Mustang Island. STOP #1: PACKERY CHANNEL BEACH TO BAY We will start this field guide near the north jetty of Packery Channel and hike across the island to Corpus Christi Bay (fig. 1). The island emerges from the Gulf

More information

CONDITION ASSESSMENT REPORT

CONDITION ASSESSMENT REPORT CONDITION ASSESSMENT REPORT ALAMEDA ISLES PROPERTY ASSOCIATION - SMALL CRAFT HARBOR PREPARED BY: 564 AVALON PARK BLVD. E., SUITE 1 # 111 ORLANDO, FLORIDA 88 C.O.A. # 876 SCES Job No.: 106.05-15 MAY 015

More information

Protecting our Beaches

Protecting our Beaches Protecting our Beaches South Amelia Island Shore Stabilization Project Nassau County, FL Mr. Drew Wallace President South Amelia Island Shore Stabilization Association (SAISSA) Mr. Bill Moore, AICP Project

More information

ANNUAL INSPECTION BY A QUALIFIED PROFESSIONAL ENGINEER ALL CCR IMPOUNDMENTS CCR Rule Section (b)

ANNUAL INSPECTION BY A QUALIFIED PROFESSIONAL ENGINEER ALL CCR IMPOUNDMENTS CCR Rule Section (b) ANNUAL INSPECTION BY A QUALIFIED PROFESSIONAL ENGINEER ALL CCR IMPOUNDMENTS ASBURY POWER PLANT 21133 Uphill Lane Asbury, Missouri 64832 January 18, 2019 LIBERTY UTILITIES Empire District Prepared by: Rachel

More information

PRACTICE STANDARDS AND NR 328. Choosing a Technique and Getting a Permit

PRACTICE STANDARDS AND NR 328. Choosing a Technique and Getting a Permit PRACTICE STANDARDS AND NR 328 Choosing a Technique and Getting a Permit CHOOSING A TECHNIQUE Define cause of erosion Upland runoff? Impervious areas? Velocities? Wave energies? Boat or wind generated?

More information

CCR Certification: Fugitive Dust Control Plan (b) for the. West Ash Pond. at the. F. B. Culley Generating Station.

CCR Certification: Fugitive Dust Control Plan (b) for the. West Ash Pond. at the. F. B. Culley Generating Station. Submitted to Southern Indiana Gas & Electric Company dba Vectren Power Supply, Inc. (SIGECO) One Vectren Square Evansville, IN 47708 Submitted by AECOM 9400 Amberglen Boulevard Austin, Texas 78729 CCR

More information

UPPER BEACH REPLENISHMENT PROJECT RELATED

UPPER BEACH REPLENISHMENT PROJECT RELATED ASSESSMENT OF SAND VOLUME LOSS at the TOWNSHIP of UPPER BEACH REPLENISHMENT PROJECT RELATED to the LANDFALL OF HURRICANE SANDY - PURSUANT TO NJ-DR 4086 This assessment is in response to Hurricane Sandy

More information

(Revised February,2005) CULVERTS, BRIDGES, AND FORDS

(Revised February,2005) CULVERTS, BRIDGES, AND FORDS GUIDE TO STREAM CROSSINGS (Revised February,2005) CULVERTS, BRIDGES, AND FORDS Culverts, bridges, and fords are all methods used to cross-streams. Culverts are the most common stream crossing structure.

More information

The 2017 Panama City Beaches Beach Interim Renourishment Project. Answers to Common Questions

The 2017 Panama City Beaches Beach Interim Renourishment Project. Answers to Common Questions The 2017 Panama City Beaches Beach Interim Renourishment Project The fourth renourishment of the Panama City Beaches will be under construction during March and April 2017, with a planned completion by

More information

Reading Material. Inshore oceanography, Anikouchine and Sternberg The World Ocean, Prentice-Hall

Reading Material. Inshore oceanography, Anikouchine and Sternberg The World Ocean, Prentice-Hall Reading Material Inshore oceanography, Anikouchine and Sternberg The World Ocean, Prentice-Hall BEACH PROCESSES AND COASTAL ENVIRONMENTS COASTAL FEATURES Cross section Map view Terminology for Coastal

More information

Broad Beach Sand & Dune Habitat Restoration Project. Revetment Owners Meeting July 12, 2017

Broad Beach Sand & Dune Habitat Restoration Project. Revetment Owners Meeting July 12, 2017 Broad Beach Sand & Dune Habitat Restoration Project Revetment Owners Meeting July 12, 2017 Status of Project Entitlement Coastal Commission CDP approved 10/15 (consolidated with City of Malibu), PTI conditions

More information

2016 Annual Inspection Report

2016 Annual Inspection Report 2016 Annual Inspection Report for Compliance with the Coal Combustion Residuals Rule (40 CFR Part 257) Pawnee Station 14940 Morgan County Road 24 Brush, Colorado 80723 January 18, 2017 Table of Contents

More information

ADA Operations Contact Info

ADA Operations Contact Info Intro ADA Operations Contact Info Todd Grugel ph: 651-366-3531 email: todd.grugel@state.mn.us Joe Zilka ph: 651-366-3311 email: joseph.zilka@state.mn.us Harvey Unruh ph: 651-216-2912 email: harvey.unruh@state.mn.us

More information

Annual CCR Landfill Inspection OML Existing Landfill OML Expansion Phase 1

Annual CCR Landfill Inspection OML Existing Landfill OML Expansion Phase 1 Annual CCR Landfill Inspection OML Existing Landfill OML Expansion Phase 1 Ottumwa-Midland Landfill Prepared for: Ottumwa-Midland Landfill 15300 130 th Street Ottumwa, Iowa 52501 Prepared by: SCS ENGINEERS

More information

NEW FALL PROTECTION LEGISLATION. Presented by Michael McGovern, Roland Roy

NEW FALL PROTECTION LEGISLATION. Presented by Michael McGovern, Roland Roy NEW FALL PROTECTION LEGISLATION Presented by Michael McGovern, Roland Roy INTRODUCTION WHY ARE CHANGES BEING MADE? The Provincial Government has brought in changes to the fall protection requirements in

More information

Nome Harbor Page 2 of 12

Nome Harbor Page 2 of 12 Nome Harbor Nome Harbor Page 2 of 12 Condition of Improvements 30 December 2015 Nome Harbor, Alaska (CWIS No. 010422, 012270, 072742, 087755) Authorization (1) Rivers and Harbors Act, 8 August 1917 (House

More information

Lecture Outlines PowerPoint. Chapter 15 Earth Science, 12e Tarbuck/Lutgens

Lecture Outlines PowerPoint. Chapter 15 Earth Science, 12e Tarbuck/Lutgens Lecture Outlines PowerPoint Chapter 15 Earth Science, 12e Tarbuck/Lutgens 2009 Pearson Prentice Hall This work is protected by United States copyright laws and is provided solely for the use of instructors

More information

SPECIAL SPRING 2018 STORM REPORT ON THE CONDITION OF THE MUNICIPAL BEACHES FOR THE BOROUGH OF STONE HARBOR, CAPE MAY COUNTY, NEW JERSEY

SPECIAL SPRING 2018 STORM REPORT ON THE CONDITION OF THE MUNICIPAL BEACHES FOR THE BOROUGH OF STONE HARBOR, CAPE MAY COUNTY, NEW JERSEY SPECIAL SPRING 2018 STORM REPORT ON THE CONDITION OF THE MUNICIPAL BEACHES FOR THE BOROUGH OF STONE HARBOR, CAPE MAY COUNTY, NEW JERSEY Aerial photograph taken April 21, 2018 showing the view up the beach

More information

A by-law to regulate pool enclosures within the Town of Oakville

A by-law to regulate pool enclosures within the Town of Oakville THE CORPORATION OF THE TOWN OF OAKVILLE BY-LAW NUMBER 2006-071 A by-law to regulate pool enclosures within the Town of Oakville WHEREAS section 11 of the Municipal Act, 2001, S.O. 2001, c. 25, as amended,

More information

AD-A II~lllII I I 7

AD-A II~lllII I I 7 AD-A284 157 II~lllII CONSTRUCTION OF BREAK WATERS AND BEACEFILL AT THE NAVAL AIR STATION, PATUXENT RIVER, MARYLAND C D.W.Yang, J.McWilliams 2, S.Ming 2 ABSTRACT Construction of the breakwaters and beach

More information

Friends of the Detroit River Habitat Restoration Project Update

Friends of the Detroit River Habitat Restoration Project Update Friends of the Detroit River Habitat Restoration Project Update 11 Beneficial Use Impairments (BUIs) were originally identified to be associated with the Detroit River: 1. Restrictions on fish and wildlife

More information

CFH Boise City Parks and Recreation

CFH Boise City Parks and Recreation CFH13-00029 Boise City Parks and Recreation Summary The Parks and Recreation Department requests approval of a Boise River System Permit for the repair of ±200 feet of river bank generally located at 5845

More information

UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO CSAH NO. 7 OVER THE SNAKE RIVER DISTRICT 1 - PINE COUNTY

UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO CSAH NO. 7 OVER THE SNAKE RIVER DISTRICT 1 - PINE COUNTY UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO. 58506 CSAH NO. 7 OVER THE SNAKE RIVER DISTRICT 1 - PINE COUNTY PREPARED FOR THE MINNESOTA DEPARTMENT OF TRANSPORTATION BY COLLINS ENGINEERS, INC. JOB NO.

More information