Pier 8 Wave Overtopping Analysis (65 Guise Street East) Our File:

Size: px
Start display at page:

Download "Pier 8 Wave Overtopping Analysis (65 Guise Street East) Our File:"

Transcription

1 Shoreplan Engineering Limited 55 Eglinton Avenue E., Suite 800 Toronto, ON Canada M4P 1G8 T) F) E) March 31, 2016 Mr. Ed English Senior Project Manager Waterfront Development Office City of Hamilton 77 James Street North, Suite 400 Hamilton, Ontario L8P 4Y5 Dear Sir: Re: Pier 8 Wave Overtopping Analysis (65 Guise Street East) Our File: We have completed our wave overtopping analysis for Pier 8 in Hamilton Harbour and have concluded that the overtopping that will occur during design conditions is significant, but manageable. We carried out separate analyses for the western, northern, and eastern pier walls, as described below. Figures 1 and 2, respectively, show a location plan and a site plan for Pier 8. The pier is exposed to waves generated with Hamilton Harbour. Shoreplan Engineering Limited was retained to complete a wave overtopping analysis for the western, northern, and eastern facing pier walls. The walls are constructed of steel-sheet piles with either a concrete or steel cap. Figure 3 shows current typical conditions along the east, west and north walls. The area landward of the walls can be generally characterized as hard paved and sloped to provide drainage back towards the harbour. Overtopping rates are related to the type of shore structure and the top elevation of the structure being overtopped. The site plan of Figure 2 shows elevations from two OLS surveys provided either by you or by the City of Hamilton on other recent projects. The wall caps are relatively flat but there is some variation in top elevation that is not visually obvious due to the length and overall uniform appearance of the paved areas landward of the walls. The top elevation along the west wall varies between and metres. The top elevation along the north wall varies between and metres, with lower area near the northwest corner of the pier. Elevations along the top of the east wall vary between metres and metres with the exception of the northeast corner of the pier where the elevation is metres.

2 Our overtopping analysis was undertaken to define the extent of the flood hazard at this site, as required by the Hamilton Conservation Authority (HCA). HCA regulates development along the shoreline of their watershed through the administration of Ontario Regulation 161/06. Under provincial procedures flooding hazards along the shoreline of the Great Lakes should be assessed for wave uprush and overtopping associated with an approximately 20-year return period storm event occurring at the 100-year instantaneous water level. We also examined the 100-year storm event occurring at the 100-year water level as a design condition for the pier surface adjacent to the walls. Under their planning and regulation policies and guidelines, HCA has adopted a water level of 76.0 m IGLD for the flood level, which is the 100- year instantaneous water level. Design wave conditions were determined using the CMS-Wave spectral wave numerical model developed by the U.S. Army Corps of Engineers. An extreme value analysis of annual maxima wind speeds measured at Hamilton Airport provided input wind conditions to the CMS-Wave model. Design wave conditions along the western and northern wall were uniform along the length of the wall. Conditions varied along the eastern wall due to the sheltering provided by the entrance to Haida basin. Waves diffract into the basin after passing through the narrower entrance and the diffraction effect produces lower wave heights along the eastern wall of Pier 8. Table 1 Design Wave Heights for Overtopping Analysis Design Wave Height (m) 25 yr 100 yr west wall north wall, oblique waves north wall, perpendicular waves east wall Two different wave conditions were considered for the north wall as the highest waves, which originate from a north-easterly direction, strike the wall at an angle of approximately 30 degrees. Waves striking perpendicular to a wall produce higher overtopping flows for a given wave height, so the smaller perpendicular waves were also examined in case they produced more overtopping than the bigger oblique waves.. Figure 4 is a wave height contour and vector plot showing design wave conditions during a File 2377,

3 northeasterly wind. The diffraction effect that produces varying wave heights along the east pier wall can be seen in Figure 4. Under the conditions described above, significant wave overtopping will occur. The overtopping waves will flood some distance inland due to the very gently sloped, paved backshore. There are no accurate and practical means of estimating the extent of inland flooding when this level of overtopping occurs on such a flat backshore. Overtopping rates for the three walls were estimated using the methods described in the Overtopping Manual (EurOtop, Wave Overtopping of Sea Defences and Related Structures: Assessment Manual, Environmental Agency UK, Expertise Netwerk Waterkeren, NL, KFKI, DE, August 2007.). This manual is considered to represent state-of-the-art procedures for estimating overtopping of coastal structures. Figure 5 shows mean overtopping rates in litres per second per metre length of wall, for the west and north walls which have uniform wave conditions along the length of the walls. That figure shows the overtopping rate as a function of the top of wall elevation, which varies slightly along the walls. Assuming an average top elevation of 76.5 metres for the west wall and 76.6 metres for the north wall would give mean overtopping rates of 23 and 50 l/s/s during the 20-year event, and 27 and 60 l/s/m during the 100-year event, for the west and north walls, respectively. Figure 6 shows overtopping rates for the 20-year and 100-year wave condition for the east face of Pier 8. That figure shows the mean overtopping rate as a function of the distance along the wall, measured from the northeast corner of the pier. There is a much greater variation in overtopping rates along the length of the wall due to both the greater differences in elevation along the top of the wall and the change in design wave height along the wall associated with the greater sheltering at the south end of the wall. One section, approximately 45 to 60m south of the north face of the pier, has a top of wall elevation of approximately 76.05m, which is only 0.05m above the design water level for this analysis. Overtopping rates at that location will be approximately 125 and 140 l/s/m during the 20-year and 100-year conditions, respectively. As noted above, the 20-year event is considered when assessing the flood hazard. Overtopping rates of 20 to 125 l/s/m are significant and extensive flooding of the areas immediately adjacent to the walls should be expected. Although it is not certain to what extent that overtopping water will flow inland under existing conditions, it can be reasonably concluded that it will flow into areas where development will be proposed. Therefore, the solution is to manage the overtopping flow as part of the site design. File 2377,

4 The most practical means of managing the overtopping flow is through the use of a low secondary wall located back from the water s edge, combined with site grading. The wall would have to be at least 6 metres back from the edge of the pier to allow maintenance access to the face of the pier walls. The secondary wall location and height are subject to detailed design, but as general guidance, on the north pier face we would expect that a wall located 6m back from the face would need to be in the order of 0.4 to 0.5m high to manage the mean overtopping rate of 40 to 60 l/s/m. A secondary wall located 6m back from the west pier face would be expected to be in the order of 0.2 to 0.3m high to manage the 20 to 30 l/s/m mean overtopping rate that would be expected there. If a uniform height wall were to be constructed 6m back from the east pier face it would probably need to be in the order of 0.6m high to deal with the 125 l/s/m overtopping rate where the wall is lowest. Each of those wall heights could be reduced somewhat by locating them further back from the pier face. The area between the pier face and the secondary wall should be hard paved in order to withstand the overtopping that occurs during the 100-year event. The overtopping manual notes that mean overtopping rates in the order of 50 l/s/m will damage vegetated or lightly protected surfaces One alternative to a secondary wall would be to construct a low berm as part of a landscaping feature, but that berm would likely need to be constructed more than 6m back from the north pier face in order to withstand the forces of the overtopping water. The location and shape/composition of the berm is a design detail, but as general guidance we would expect that a berm would have to be at least 10m back from the north wall. A berm 6m back from the west wall might be feasible. A berm is not likely to be practical or feasible for the higher overtopping areas on the east wall. Another alternative would be to modify the crest of the concrete cap when maintenance or replacement of the seawalls is undertaken in the future. Increasing the wall crest elevation and possibly also incorporating a wave return or bullnose could significantly reduce overtopping volumes. Such modifications would need to be associated with appropriate drainage design in the back shore. Even small crest elevation changes in the order of 0.2 to 0.3 m can notably reduce the wave overtopping rate. To summarize the above, Figures 5 and 6 show mean overtopping rates under design conditions for the west, north, and east faces of Pier 8. Due to the flat nature of the hard-paved top of the pier, there are no means of accurately and practically estimating how far inland that overtopping water will flow. Instead, the overtopping water should be managed, most practically File 2377,

5 with the use of secondary walls located some distance back from the face of the pier, combined with site grading. The location and height of those walls is subject to detailed design but we have provided some estimated wall heights for general guidance. Landscaped berms located further back from the wall face or modifications to the wall crest during future maintenance could also be considered. We trust that this letter provides a sufficient description of the overtopping related flood risks at this site. Please feel free to contact us if you have any questions. Yours truly, Shoreplan Engineering Limited Bruce Pinchin, P. Eng. File 2377,

6 Scale 1:5000 Hamilton Harbour Pier 8 Figure 1 Location Plan

7 Legend: Elevations based on survey by MacKay, MacKay & Peters Limited (November 5, 2013) Elevations by on drawings by S. Llewellyn & Associates Limited Figure 2 Scale 1:1500 Hamilton Harbour Pier 8 Site Plan

8 Figure 3 Existing Conditions (March 2016) File 2377,

9 Figure 4 20-Year Return Period Wave Height Contours and Vectors, Northeast Winds File 2377,

10 Figure 5 80 Wave Overtopping Rates for the North and West Walls Mean Overtopping Rate (l/s/m) Top of Wall Elevation (m) north wall (100yr) north wall (20 yr) west wall (100yr) west wall (20yr) Figure Wave Overtopping Rates for the East Wall Mean Overtopping Rate (l/s/m) Distance Along the Wall, Measured from Northeast Corner (m) 20 yr wave 100 yr wave File 2377,

Technical Brief - Wave Uprush Analysis Island Harbour Club, Gananoque, Ontario

Technical Brief - Wave Uprush Analysis Island Harbour Club, Gananoque, Ontario Technical Brief - Wave Uprush Analysis RIGGS ENGINEERING LTD. 1240 Commissioners Road West Suite 205 London, Ontario N6K 1C7 October 31, 2014 Table of Contents Section Page Table of Contents... i List

More information

Technical Brief - Wave Uprush Analysis 129 South Street, Gananoque

Technical Brief - Wave Uprush Analysis 129 South Street, Gananoque Technical Brief - Wave Uprush Analysis 129 South Street, Gananoque RIGGS ENGINEERING LTD. 1240 Commissioners Road West Suite 205 London, Ontario N6K 1C7 June 12, 2013 Table of Contents Section Page Table

More information

OECS Regional Engineering Workshop September 29 October 3, 2014

OECS Regional Engineering Workshop September 29 October 3, 2014 B E A C H E S. M A R I N A S. D E S I G N. C O N S T R U C T I O N. OECS Regional Engineering Workshop September 29 October 3, 2014 Coastal Erosion and Sea Defense: Introduction to Coastal/Marine Structures

More information

BILLY BISHOP TORONTO CITY AIRPORT PRELIMINARY RUNWAY DESIGN COASTAL ENGINEERING STUDY

BILLY BISHOP TORONTO CITY AIRPORT PRELIMINARY RUNWAY DESIGN COASTAL ENGINEERING STUDY Bâtiment Infrastructures municipales Transport Industriel Énergie Environnement BILLY BISHOP TORONTO CITY AIRPORT PRELIMINARY RUNWAY DESIGN COASTAL ENGINEERING STUDY N. Guillemette 1, C. Glodowski 1, P.

More information

Bay County, MI Coastal Hazard Analysis Flood Risk Review Meeting. May 14, 2018

Bay County, MI Coastal Hazard Analysis Flood Risk Review Meeting. May 14, 2018 Bay County, MI Coastal Hazard Analysis Flood Risk Review Meeting May 14, 2018 Agenda Introductions Coastal Flood Risk Study and Mapping Program Current Status Technical Overview of Study and Mapping Floodplain

More information

Evaluation of June 9, 2014 Federal Emergency Management Agency Flood Insurance Study for Town of Weymouth, Norfolk, Co, MA

Evaluation of June 9, 2014 Federal Emergency Management Agency Flood Insurance Study for Town of Weymouth, Norfolk, Co, MA Evaluation of June 9, 2014 Federal Emergency Management Agency Flood Insurance Study for Town of Weymouth, Norfolk, Co, MA Prepared For: Woodard & Curran 95 Cedar Street, Suite 100 Providence, RI 02903

More information

Volume and Shoreline Changes along Pinellas County Beaches during Tropical Storm Debby

Volume and Shoreline Changes along Pinellas County Beaches during Tropical Storm Debby Volume and Shoreline Changes along Pinellas County Beaches during Tropical Storm Debby Ping Wang and Tiffany M. Roberts Coastal Research Laboratory University of South Florida July 24, 2012 Introduction

More information

DUXBURY WAVE MODELING STUDY

DUXBURY WAVE MODELING STUDY DUXBURY WAVE MODELING STUDY 2008 Status Report Duncan M. FitzGerald Peter S. Rosen Boston University Northeaster University Boston, MA 02215 Boston, MA 02115 Submitted to: DUXBURY BEACH RESERVATION November

More information

Estuarine Shoreline Stabilization

Estuarine Shoreline Stabilization Estuarine Shoreline Stabilization Property Owner s Guide to Determining the Most Appropriate Stabilization Method Estuarine shorelines are dynamic features that experience continued erosion. Land is lost

More information

Appendix 7. Wind and Comfort Impact Analysis

Appendix 7. Wind and Comfort Impact Analysis Appendix 7 Wind and Comfort Impact Analysis Donald Ballanti Consulting Meteorologist 1424 Scott Street El Cerrito, CA 94530 (510) 234-6087 Abe Leider Rincon Consultants 449 15th Street, Suite 303 Oakland,

More information

LAB: WHERE S THE BEACH

LAB: WHERE S THE BEACH Name: LAB: WHERE S THE BEACH Introduction When you build a sandcastle on the beach, you don't expect it to last forever. You spread out your towel to sunbathe, but you know you can't stay in the same spot

More information

HURRICANE SANDY LIMITED REEVALUATION REPORT UNION BEACH, NEW JERSEY DRAFT ENGINEERING APPENDIX SUB APPENDIX D SBEACH MODELING

HURRICANE SANDY LIMITED REEVALUATION REPORT UNION BEACH, NEW JERSEY DRAFT ENGINEERING APPENDIX SUB APPENDIX D SBEACH MODELING HURRICANE SANDY LIMITED REEVALUATION REPORT UNION BEACH, NEW JERSEY DRAFT ENGINEERING APPENDIX SUB APPENDIX D SBEACH MODELING Rev. 18 Feb 2015 1 SBEACH Modeling 1.0 Introduction Following the methodology

More information

HARBOUR SEDIMENTATION - COMPARISON WITH MODEL

HARBOUR SEDIMENTATION - COMPARISON WITH MODEL HARBOUR SEDIMENTATION - COMPARISON WITH MODEL ABSTRACT A mobile-bed model study of Pointe Sapin Harbour, in the Gulf of St. Lawrence, resulted in construction of a detached breakwater and sand trap to

More information

To: William Woods, Jenni Austin Job No: CentrePort Harbour Deepening Project - Comments on community queries

To: William Woods, Jenni Austin Job No: CentrePort Harbour Deepening Project - Comments on community queries Memo To: William Woods, Jenni Austin From: Richard Reinen-Hamill Date: Subject: cc: 1 Purpose This memo sets out our response to issues raised at and after Seatoun community consultation sessions held

More information

Shorelines Earth - Chapter 20 Stan Hatfield Southwestern Illinois College

Shorelines Earth - Chapter 20 Stan Hatfield Southwestern Illinois College Shorelines Earth - Chapter 20 Stan Hatfield Southwestern Illinois College The Shoreline A Dynamic Interface The shoreline is a dynamic interface (common boundary) among air, land, and the ocean. The shoreline

More information

Northwest Hydraulic Consultants (NHC) is pleased to submit this assessment of the wave climate at Lazo Road, Comox.

Northwest Hydraulic Consultants (NHC) is pleased to submit this assessment of the wave climate at Lazo Road, Comox. 405 495 Dunsmuir Street Nanaimo, B.C. V9R 6B9 250.754.6425 www.nhcweb.com NHC Ref. No. 03000276 21 November 2014 Wedler Engineering LLP #211-2459 Cousins Avenue Courtenay, BC V9N 3N6 Attention: Andrew

More information

Redondo Beach Boat Launch Ramp Facility

Redondo Beach Boat Launch Ramp Facility Redondo Beach Boat Launch Ramp Facility Feasibility Report for the California Department of Boating and Waterways 2015 Grant Cycle For the City of Redondo Beach Submitted by March 13, 2014 Table of Contents

More information

Modeling Sediment Transport Along the Upper Texas Coast

Modeling Sediment Transport Along the Upper Texas Coast Modeling Sediment Transport Along the Upper Texas Coast David B. King Jr. Jeffery P. Waters William R. Curtis Highway 87 roadbed, Jefferson County Galveston District Corps Sabine Pass to San Luis Pass

More information

North Shore of Long Island, Feasibility Study

North Shore of Long Island, Feasibility Study North Shore of Long Island, Asharoken New York Asharoken, Feasibility Study Asharoken, NY Public Meeting June 30, 2015 US Army Corps of Engineers US Army Corps of Engineers New York BUILDING STRONG BUILDING

More information

Photo by: Darryl Hatheway, 2011

Photo by: Darryl Hatheway, 2011 Photo by: Darryl Hatheway, 2011 September 11, 2015 Presentation Discussion Examine PFD V-Zone Mapping in Wave Runup Dominated West Coast Application of PFD V-Zone Mapping Criteria in Pacific G&S PFD V-Zone

More information

RE: Hurricane Matthew Beach Damage Assessment and Recommendations [CSE 2416]

RE: Hurricane Matthew Beach Damage Assessment and Recommendations [CSE 2416] October 25, 2016 Iris Hill Town Administrator Town of Edisto Beach 2414 Murray St Edisto Beach SC 29438 RE: Hurricane Matthew Beach Damage Assessment and Recommendations [CSE 2416] Dear Iris, Hurricane

More information

ATLANTIC COUNTY 2006 to 2008

ATLANTIC COUNTY 2006 to 2008 ATLANTIC COUNTY 2006 to 2008 The Atlantic County oceanfront shoreline consists of three barrier islands where the northern one, Little Beach Island and a third of the second, Brigantine Island, are undeveloped

More information

Chapter 15 SEASONAL CHANGES IN BEACHES OP THE NORTH ATLANTIC COAST OF THE UNITED STATES

Chapter 15 SEASONAL CHANGES IN BEACHES OP THE NORTH ATLANTIC COAST OF THE UNITED STATES Chapter 15 SEASONAL CHANGES IN BEACHES OP THE NORTH ATLANTIC COAST OF THE UNITED STATES By John M. Darling Hydraulic Engineer, Research Division U. S. Army Coastal Engineering Research Center Corps of

More information

Water Research Laboratory (WRL), School of Civil and Environmental Engineering, UNSW Australia, Manly Vale, NSW 2

Water Research Laboratory (WRL), School of Civil and Environmental Engineering, UNSW Australia, Manly Vale, NSW 2 Wave Forces and Overtopping on Stepped Seawalls B Modra, I Coghlan, J Carley, G Blumberg 2, W Boyd 3 Water Research Laboratory (WRL), School of Civil and Environmental Engineering, UNSW Australia, Manly

More information

GONE! Coastal Erosion Happens During Storms! Why Worry About Coastal Setbacks? Goals for Today

GONE! Coastal Erosion Happens During Storms! Why Worry About Coastal Setbacks? Goals for Today RI Regulatory Setbacks & Buffers: Coastal Zone Management Issues New England Onsite Wastewater Training Program @ URI OWT 155 November 21, 2013 Goals for Today Understand the impacts of storms, coastal

More information

WOODFIBRE LNG VESSEL WAKE ASSESSMENT

WOODFIBRE LNG VESSEL WAKE ASSESSMENT Woodfibre LNG Limited WOODFIBRE LNG VESSEL WAKE ASSESSMENT Introduction Woodfibre LNG Limited (WLNG) intends to build a new LNG export terminal at Woodfibre, Howe Sound, British Columbia. WLNG has engaged

More information

FINDING OF NO SIGNIFICANT IMPACT

FINDING OF NO SIGNIFICANT IMPACT DEPARTMENT OF THE ARMY CHARLESTON DISTRICT, CORPS OF ENGINEERS 69A HAGOOD AVENUE CHARLESTON, SOUTH CAROLINA 29403-5107 FINDING OF NO SIGNIFICANT IMPACT EDISTO BEACH COASTAL STORM DAMAGE REDUCTION GENERAL

More information

ST LEONARDS COASTAL HAZARD VULNERABILITY ASSESSMENT

ST LEONARDS COASTAL HAZARD VULNERABILITY ASSESSMENT Level 12, 333 Collins Street Melbourne VIC 3000 Australia Telephone: +61 3 8676 3500 Facsimile: +61 3 8676 3505 www.worleyparsons.com WorleyParsons Services Pty Ltd ABN 61 001 279 812 23 November 2011

More information

PUBLIC EXHIBITION OF COASTAL ZONE MANAGEMENT PLAN FOR COLLAROY-NARRABEEN BEACH AND FISHERMANS BEACH

PUBLIC EXHIBITION OF COASTAL ZONE MANAGEMENT PLAN FOR COLLAROY-NARRABEEN BEACH AND FISHERMANS BEACH ITEM 8.3 REPORTING MANAGER TRIM FILE REF 2014/110936 ATTACHMENTS PUBLIC EXHIBITION OF COASTAL ZONE MANAGEMENT PLAN FOR COLLAROY-NARRABEEN BEACH AND FISHERMANS BEACH GROUP MANAGER NATURAL ENVIRONMENT 1

More information

Dear Ms. Maw: Qualitative Pedestrian Level Wind Assessment St-Charles Market, 135 Barrette Street, Ottawa GWE File No.

Dear Ms. Maw: Qualitative Pedestrian Level Wind Assessment St-Charles Market, 135 Barrette Street, Ottawa GWE File No. December 11, 2015 Jenna Maw LineBox Studio Inc. 126 York Street, Suite 502 Ottawa, Ontario K1N 5T2 Dear Ms. Maw: Re: Qualitative Pedestrian Level Wind Assessment St-Charles Market, 135 Barrette Street,

More information

RI Regulatory Setbacks & Buffers: Coastal Management Issues

RI Regulatory Setbacks & Buffers: Coastal Management Issues RI Regulatory Setbacks & Buffers: Coastal Management Issues New England Onsite Wastewater Training Program @ URI OWT 155 - November 29, 2012 James Boyd - Coastal Policy Analyst Photo: October 30, 2012

More information

SUPPLEMENTAL DOCUMENT SEA LEVEL RISE SCENARIO SELECTION AND DESIGN TIDE CALCULATION

SUPPLEMENTAL DOCUMENT SEA LEVEL RISE SCENARIO SELECTION AND DESIGN TIDE CALCULATION SUPPLEMENTAL DOCUMENT SEA LEVEL RISE SCENARIO SELECTION AND DESIGN TIDE CALCULATION FOR THE GUIDANCE FOR INCORPORATING SEA LEVEL RISE INTO CAPITAL PLANNING IN SAN FRANCISCO: ASSESSING VULNERABILITY AND

More information

SELECTION OF THE PREFERRED MANAGEMENT OPTION FOR STOCKTON BEACH APPLICATION OF 2D COASTAL PROCESSES MODELLING

SELECTION OF THE PREFERRED MANAGEMENT OPTION FOR STOCKTON BEACH APPLICATION OF 2D COASTAL PROCESSES MODELLING SELECTION OF THE PREFERRED MANAGEMENT OPTION FOR STOCKTON BEACH APPLICATION OF 2D COASTAL PROCESSES MODELLING C Allery 1 1 DHI Water and Environment, Sydney, NSW Abstract This paper presents an approach

More information

I would like to welcome Parish President VJ St. Pierre, Councilwoman Carolyn Schexnaydre and Councilman Terry Authement who are here.

I would like to welcome Parish President VJ St. Pierre, Councilwoman Carolyn Schexnaydre and Councilman Terry Authement who are here. IER 1, 2 and 3 Public Meeting Thursday, December 6, 2007 Location Time Attendees Format Handouts Facilitator Ramada New Orleans Airport 110 James Drive East St. Rose, LA 70087 6:00 p.m. Open House 7:00

More information

New Orleans Municipal Yacht Harbor

New Orleans Municipal Yacht Harbor New Orleans Municipal Yacht Harbor Marina Schematic Design Update 601 Poydras St., Suite 1860 New Orleans, LA, 70130 504-648-3560 Post-Katrina Municipal Yacht Harbor: Introduction The MYH was an approximate

More information

APPENDIX K CULVERT INSPECTION MEMO

APPENDIX K CULVERT INSPECTION MEMO APPENDIX K CULVERT INSPECTION MEMO McCORMICK RANKIN CORPORATION 2655 North Sheridan Way Mississauga, Ontario, L5K 2P8 Tel: (905)823-8500 Fax: (905) 823-8503 E-mail: mrc@mrc.ca Website: www.mrc.ca MEMO

More information

IMPACTS OF COASTAL PROTECTION STRATEGIES ON THE COASTS OF CRETE: NUMERICAL EXPERIMENTS

IMPACTS OF COASTAL PROTECTION STRATEGIES ON THE COASTS OF CRETE: NUMERICAL EXPERIMENTS IMPACTS OF COASTAL PROTECTION STRATEGIES ON THE COASTS OF CRETE: NUMERICAL EXPERIMENTS Tsanis, I.K., Saied, U.M., Valavanis V. Department of Environmental Engineering, Technical University of Crete, Chania,

More information

St. Louis County, MN Coastal Hazard Analysis Flood Risk Review Meeting. May 2, 2018

St. Louis County, MN Coastal Hazard Analysis Flood Risk Review Meeting. May 2, 2018 St. Louis County, MN Coastal Hazard Analysis Flood Risk Review Meeting May 2, 2018 Agenda Introductions Coastal Flood Risk Study and Mapping Program Current Status Technical Overview of Study and Mapping

More information

SITE AND BUILDING INFORMATION

SITE AND BUILDING INFORMATION Page 1 Mr. Maneesh Poddar YORK Developments 303 Richmond St, Suite 201 London, ON N6B 2H8 Re: Preliminary Pedestrian Wind Assessment London, Ontario RWDI Reference Number: 1701848 Email: maneesh.poddar@yorkdev.ca

More information

SHORE PROTECTION AND HABITAT CREATION AT SHAMROCK ISLAND, TEXAS ABSTRACT

SHORE PROTECTION AND HABITAT CREATION AT SHAMROCK ISLAND, TEXAS ABSTRACT SHORE PROTECTION AND HABITAT CREATION AT SHAMROCK ISLAND, TEXAS M. Cameron Perry, P.E., and Daniel J. Heilman, P.E. Coastal Engineer Shiner Moseley & Associates., Inc. 555 N. Carancahua Corpus Christi,

More information

UPPER BEACH REPLENISHMENT PROJECT RELATED

UPPER BEACH REPLENISHMENT PROJECT RELATED ASSESSMENT OF SAND VOLUME LOSS at the TOWNSHIP of UPPER BEACH REPLENISHMENT PROJECT RELATED to the LANDFALL OF HURRICANE SANDY - PURSUANT TO NJ-DR 4086 This assessment is in response to Hurricane Sandy

More information

PILE FENCE TO ENHANCE DUNE RESILIENCY

PILE FENCE TO ENHANCE DUNE RESILIENCY PILE FENCE TO ENHANCE DUNE RESILIENCY Rebecca Quan 1, Nobuhisa Kobayashi 2 and Berna Ayat 3 A beach with a berm and dune provides storm protection but wave overtopping and overwash of the dune may lead

More information

LESLIE BARNS & CONNECTION TRACK. Construction Liaison Group Meeting #2

LESLIE BARNS & CONNECTION TRACK. Construction Liaison Group Meeting #2 LESLIE BARNS & CONNECTION TRACK Construction Liaison Group Meeting #2 July 23, 2013 1 UPDATE (SINCE LAST CLG) Cyclist safety walk (June 26) to review current construction configurations and discuss how

More information

Bayfield & Ashland Counties, WI Coastal Hazard Analysis Flood Risk Review Meeting. June 05, 2018

Bayfield & Ashland Counties, WI Coastal Hazard Analysis Flood Risk Review Meeting. June 05, 2018 Bayfield & Ashland Counties, WI Coastal Hazard Analysis Flood Risk Review Meeting June 05, 2018 Agenda Introductions Coastal Flood Risk Study and Mapping Program Current Status Technical Overview of Study

More information

Chapter 11. Culverts and Bridges Design Checklist for Culvert Design

Chapter 11. Culverts and Bridges Design Checklist for Culvert Design Yes No N/A Design Requirements I. GENERAL DESIGN GUIDELINES Chapter 11. Culverts and Bridges A. Culvert design is in accordance with the Culverts chapter of Volume 2 of the UDFCD Manual for additional

More information

SPECIAL SPRING 2018 STORM REPORT ON THE CONDITION OF THE MUNICIPAL BEACHES FOR THE BOROUGH OF STONE HARBOR, CAPE MAY COUNTY, NEW JERSEY

SPECIAL SPRING 2018 STORM REPORT ON THE CONDITION OF THE MUNICIPAL BEACHES FOR THE BOROUGH OF STONE HARBOR, CAPE MAY COUNTY, NEW JERSEY SPECIAL SPRING 2018 STORM REPORT ON THE CONDITION OF THE MUNICIPAL BEACHES FOR THE BOROUGH OF STONE HARBOR, CAPE MAY COUNTY, NEW JERSEY Aerial photograph taken April 21, 2018 showing the view up the beach

More information

REVETMENTS. Purposes and Operational Constraints. Purposes Erosion control o o. Revetment Design 4/5/2016. CE A676 Coastal Engineering

REVETMENTS. Purposes and Operational Constraints. Purposes Erosion control o o. Revetment Design 4/5/2016. CE A676 Coastal Engineering REVETMENTS Ijsseldam, the Netherlands Orson P. Smith, PE, Ph.D. Instructor Purposes and Operational Constraints Purposes Erosion control o o Embankment Toe protection for a seawall, retaining wall or other

More information

Beach profile surveys and morphological change, Otago Harbour entrance to Karitane May 2014 to June 2015

Beach profile surveys and morphological change, Otago Harbour entrance to Karitane May 2014 to June 2015 Beach profile surveys and morphological change, Otago Harbour entrance to Karitane May 2014 to June 2015 Prepared for Port Otago Ltd Martin Single September 2015 Shore Processes and Management Ltd Contact

More information

COASTAL ENVIRONMENTS. 454 lecture 12

COASTAL ENVIRONMENTS. 454 lecture 12 COASTAL ENVIRONMENTS Repeated movement of sediment & water constructs a beach profile reflecting the balance between average daily or seasonal wave forces and resistance of landmass to wave action Coasts

More information

Important note To cite this publication, please use the final published version (if applicable). Please check the document version above.

Important note To cite this publication, please use the final published version (if applicable). Please check the document version above. Delft University of Technology Galveston Bay Area Land Barrier preliminary design van Berchum, Erik; de Vries, P.A.L.; de Kort, R.P.J. Publication date 2016 Document Version Publisher's PDF, also known

More information

Baraga County, MI Coastal Hazard Analysis Flood Risk Review Meeting. July 12, 2018

Baraga County, MI Coastal Hazard Analysis Flood Risk Review Meeting. July 12, 2018 Baraga County, MI Coastal Hazard Analysis Flood Risk Review Meeting July 12, 2018 Agenda Introductions Coastal Flood Risk Study and Mapping Program Current Status Technical Overview of Study and Mapping

More information

April 7, Prepared for: The Caribbean Disaster Emergency Response Agency Prepared by: CEAC Solutions Co. Ltd.

April 7, Prepared for: The Caribbean Disaster Emergency Response Agency Prepared by: CEAC Solutions Co. Ltd. April 7, 2006 Prepared for: The Caribbean Disaster Emergency Response Agency Prepared by: Introduction CEAC Solutions Co. Ltd was commissioned in May 2005 to prepare coastal beach erosion hazard maps for

More information

S E SKELLY ENGINEERING

S E SKELLY ENGINEERING May 5, 2004 Mr. Joel Baldwin Earth Investigation Consultants P.O. Box 795 Pacifica, CA 94044 SUBJECT: Reference: Coastal Hazard Study Proposed Legacy Quest Condominiums, 1567 Beach Boulevard, Pacifica.

More information

Oceans and Coasts. Chapter 18

Oceans and Coasts. Chapter 18 Oceans and Coasts Chapter 18 Exploring the oceans The ocean floor Sediments thicken and the age of the seafloor increases from ridge to shore The continental shelf off the northeast United States Constituent

More information

Inspection of Clarence City Beaches following Winter 2011 Storm Events

Inspection of Clarence City Beaches following Winter 2011 Storm Events 18 July 2011 WRL Ref: WRL10086TDS L20110718 Messrs P Watson & I Preece Clarence City Council PO Box 96 Rosny Park TAS 7018 By email: pwatson@ccc.tas.gov.au ipreece@ccc.tas.gov.au Dear Phil/Ian, Inspection

More information

Impact of Hurricane Matthew on the Atlantic Coast of Florida

Impact of Hurricane Matthew on the Atlantic Coast of Florida Impact of Hurricane Matthew on the Atlantic Coast of Florida A coastal engineer was driving across country and his jeep broke down in front of a monastery. It was late in the day and the monks invited

More information

Julebæk Strand. Effect full beach nourishment

Julebæk Strand. Effect full beach nourishment Julebæk Strand Effect full beach nourishment Aim of Study This study is a part of the COADAPT funding and the aim of the study is to analyze the effect of beach nourishment. In order to investigate the

More information

Chiswell and Chesil Beach (to Wyke Narrows) 6a02 and 6a03 SUMMARY OF PREFERRED PLAN RECOMMENDATIONS AND JUSTIFICATION

Chiswell and Chesil Beach (to Wyke Narrows) 6a02 and 6a03 SUMMARY OF PREFERRED PLAN RECOMMENDATIONS AND JUSTIFICATION Location reference: Policy Unit reference: Plan: Chiswell and Chesil Beach (to Wyke Narrows) 6a02 and 6a03 SUMMARY OF PREFERRED PLAN RECOMMENDATIONS AND JUSTIFICATION The long term aim for this section

More information

APPENDIX J HYDROLOGY AND WATER QUALITY

APPENDIX J HYDROLOGY AND WATER QUALITY APPENDIX J HYDROLOGY AND WATER QUALITY J-1 Technical Report on Airport Drainage, Northern Sector Airport and Ordinance Creek Watershed / Preliminary Creek Constructed Natural Channel Culvert J-2 Preliminary

More information

Door County, WI Coastal Hazard Analysis Flood Risk Review Meeting. August 21, 2017

Door County, WI Coastal Hazard Analysis Flood Risk Review Meeting. August 21, 2017 Door County, WI Coastal Hazard Analysis Flood Risk Review Meeting August 21, 2017 Agenda Introductions Coastal Flood Risk Study and Mapping Program Current Status Technical Overview of Study and Mapping

More information

Atlantic Coast of Long Island, Jones Inlet to East Rockaway Inlet, Long Beach Island, NY Construction Update

Atlantic Coast of Long Island, Jones Inlet to East Rockaway Inlet, Long Beach Island, NY Construction Update Atlantic Coast of Long Island, Jones Inlet to East Rockaway Inlet, Long Beach Island, NY Construction Update June 2016 US Army Corps of Engineers Project Purpose Three specific damage mechanisms of coastal

More information

1-32 NOME HARBOR, ALASKA (CWIS NOS , 87755, & 10422) Condition of Improvement 30 September 2009

1-32 NOME HARBOR, ALASKA (CWIS NOS , 87755, & 10422) Condition of Improvement 30 September 2009 NOME HARBOR 1-32 NOME HARBOR, ALASKA (CWIS NOS. 72742, 87755, & 10422) Condition of Improvement 30 September 2009 AUTHORIZATION: (1) Rivers and Harbors Act, 8 August 1917 (House Doc. 1932, 64th Congress,

More information

Shoreline Response to an Offshore Wave Screen, Blairgowrie Safe Boat Harbour, Victoria, Australia

Shoreline Response to an Offshore Wave Screen, Blairgowrie Safe Boat Harbour, Victoria, Australia Shoreline Response to an Offshore Wave Screen, Blairgowrie Safe Boat Harbour, Victoria, Australia T.R. Atkins and R. Mocke Maritime Group, Sinclair Knight Merz, P.O. Box H615, Perth 6001, Australia ABSTRACT

More information

1-32 NOME HARBOR, ALASKA (CWIS NOS , 87755, 12270, & 10422) Condition of Improvement 30 September 2012

1-32 NOME HARBOR, ALASKA (CWIS NOS , 87755, 12270, & 10422) Condition of Improvement 30 September 2012 NOME HARBOR 1-32 NOME HARBOR, ALASKA (CWIS NOS. 72742, 87755, 12270, & 10422) Condition of Improvement 30 September 2012 AUTHORIZATION: (1) Rivers and Harbors Act, 8 August 1917 (House Doc. 1932, 64th

More information

LaSalle Park Marina Wave Break

LaSalle Park Marina Wave Break LaSalle Park Marina Wave Break Federal and Municipal Environmental Assessment Background History of the Marina and LaSalle Park The LaSalle Park Marina is located in LaSalle Park at the foot of LaSalle

More information

TROUT CREEK WATERSHED (Second Year of Snowline Data)

TROUT CREEK WATERSHED (Second Year of Snowline Data) Extent of Snow Cover During the 2002 Spring Freshet For the TROUT CREEK WATERSHED (Second Year of Snowline Data) (Penticton Forest District) 1.0 INTRODUCTION The extent of snow cover over a watershed basin

More information

USING A LABYRINTH WEIR TO INCREASE HYDRAULIC CAPACITY. Dustin Mortensen, P.E. 1 Jake Eckersley, P.E. 1

USING A LABYRINTH WEIR TO INCREASE HYDRAULIC CAPACITY. Dustin Mortensen, P.E. 1 Jake Eckersley, P.E. 1 USING A LABYRINTH WEIR TO INCREASE HYDRAULIC CAPACITY Dustin Mortensen, P.E. 1 Jake Eckersley, P.E. 1 Plum Creek Floodwater Retarding Structure No. 6 is located in an area of Kyle, Texas, that is currently

More information

Shoreline Studies Program, Department of Physical Sciences, VIMS

Shoreline Studies Program, Department of Physical Sciences, VIMS Living Shoreline Training Class 2017 1 Demonstration sites discussed in this talk. 2 A shoreline management plan for the entire creek made conceptual shoreline management recommendations along every stretch

More information

APPENDIX A FINAL REPORT. Town

APPENDIX A FINAL REPORT. Town APPENDIX A FINAL REPORT Phase Two of the Feasibility and Capacity Study Town of Oakville prepared by Engineering Limited May 2018 Harbours Master Plan: : Conceptual Marinas Phase Two of the Feasibility

More information

ATLANTIC COAST OF LONG ISLAND, JONES INLET TO EAST ROCKAWAY INLET, LONG BEACH ISLAND, NY. Contract #2 Construction Scope. April 18th-19th 2018

ATLANTIC COAST OF LONG ISLAND, JONES INLET TO EAST ROCKAWAY INLET, LONG BEACH ISLAND, NY. Contract #2 Construction Scope. April 18th-19th 2018 ATLANTIC COAST OF LONG ISLAND, JONES INLET TO EAST ROCKAWAY INLET, LONG BEACH ISLAND, NY Contract #2 Construction Scope April 18th-19th 2018 New York District PLAN COMPONENTS Length of Beachfill 35,000

More information

Blakely Island, N Thatcher Bay. Restoration Recommendation: Rank Score (total score)

Blakely Island, N Thatcher Bay. Restoration Recommendation: Rank Score (total score) Soft Shore Protection/Structure Removal Blueprint for San Juan County Forage Fish Beaches Appendix 2: Recommendations for sites scoring below the top ten, sorted by island (east to west) Blakely Island,

More information

Anatomy of Coastal Regions

Anatomy of Coastal Regions The Coast I. BEACH ANATOMY Anatomy of Coastal Regions Terms for different parts of beaches and coastal regions Are all about ENERGY- ie, where the ocean s energy Mostly through tides and waves, and shape

More information

FEMA Region V. Great Lakes Coastal Flood Study. Pilot Study Webinar. Berrien County, Michigan. February 26, 2014

FEMA Region V. Great Lakes Coastal Flood Study. Pilot Study Webinar. Berrien County, Michigan. February 26, 2014 FEMA Region V Great Lakes Coastal Flood Study Pilot Study Webinar Berrien County, Michigan February 26, 2014 2 Pilot Study Webinar Agenda Great Lakes Coastal Flood Study Background Demonstration Project

More information

City of Port Aransas Shoreline Analysis and Improvements

City of Port Aransas Shoreline Analysis and Improvements City of Port Aransas Shoreline Analysis and Improvements FINAL Technical Report August 24, 2016 Submitted To: City of Port Aransas Prepared for: City of Port Aransas This document is intended for planning

More information

Juneau Douglas Harbor

Juneau Douglas Harbor Juneau Douglas Harbor Douglas Harbor Page 2 of 8 Condition of Improvements 31 December 2015 Douglas Harbor, Alaska (CWIS No. 072789, 180942) Authorization Rivers and Harbors Act, 3 July 1958 (House Doc.

More information

Taranaki Tsunami Inundation Analysis. Prepared for Taranaki Civil Defence Emergency Management Group. Final Version

Taranaki Tsunami Inundation Analysis. Prepared for Taranaki Civil Defence Emergency Management Group. Final Version Taranaki Tsunami Inundation Analysis Prepared for Taranaki Civil Defence Emergency Management Group Final Version June 2012 AM 12/07 HBRC Plan Number 4362 Asset Management Group Technical Report Prepared

More information

section 4 Existing Conditions, Issues, and Options

section 4 Existing Conditions, Issues, and Options section 4 Existing Conditions, Issues, and Options 4.0 Existing Conditions, Issues, and Options This section analyzes each segment of the corridor on a street to street basis. Each segment is discussed

More information

The Failure of the Kamaishi Tsunami Protection Breakwater

The Failure of the Kamaishi Tsunami Protection Breakwater PT-13: Coastal and Ocean Engineering ENGI.8751 Undergraduate Student Forum Faculty of Engineering and Applied Science, Memorial University, St. John s, NL, Canada March, 2013 Paper Code. (PT-13 - Tucker)

More information

APPENDIX C Coastal Processes Final Report

APPENDIX C Coastal Processes Final Report CREDIT VALLEY CONSERVATION LAKE ONTARIO INTEGRATED SHORELINE STRATEGY BACKGROUND REVIEW AND DATA GAP ANALYSIS APPENDIX C Coastal Processes Final Report Prepared By: SHOREPLAN ENGINEERING LIMITED #800 55

More information

INVESTIGATION OF WAVE AGITATION INSIDE THE NEW FISHERY PORT (CASE STUDY: NEW MRZOUKA FISHERY PORT, LIBYA)

INVESTIGATION OF WAVE AGITATION INSIDE THE NEW FISHERY PORT (CASE STUDY: NEW MRZOUKA FISHERY PORT, LIBYA) INVESTIGATION OF WAVE AGITATION INSIDE THE NEW FISHERY PORT (CASE STUDY: NEW MRZOUKA FISHERY PORT, LIBYA) Abdelazim M. Ali Researcher, The Hydraulics Research Institute, National Water Research Center,

More information

CHAPTER 132. Roundhead Stability of Berm Breakwaters

CHAPTER 132. Roundhead Stability of Berm Breakwaters CHAPTER 132 Roundhead Stability of Berm Breakwaters Jergen Juhl 1, Amir Alikham, Peter Sloth, Renata Archetti Abstract Three-dimensional (3D) model tests were carried out for studying the stability of

More information

PLACEMENT OF SIGNS RECOMMENDED PRACTICES SUB-SECTION

PLACEMENT OF SIGNS RECOMMENDED PRACTICES SUB-SECTION Page 1 of 6 RECOMMENDED PRACTICES PART SECTION SUB-SECTION HIGHWAY SIGNS GENERAL General Proper positioning of signs is an important element in the overall control of traffic within a roadway network.

More information

CORPS FACTS. Harbor Dredging U.S. ARMY CORPS OF ENGINEERS BUILDING STRONG

CORPS FACTS. Harbor Dredging U.S. ARMY CORPS OF ENGINEERS BUILDING STRONG CORPS FACTS Harbor Dredging U.S. ARMY CORPS OF ENGINEERS BUILDING STRONG Disaster Response Sedimentation in the channel is caused by the normal cycle of silt movement, erosion from high water or heavy

More information

Rushey Weir: Background to the Thames weirs

Rushey Weir: Background to the Thames weirs Rushey Weir Richard Harding BEng (Hons) CEng Project Executive Thames Weirs projects 1 Rushey Weir: Background to the Thames weirs The Environment Agency owns, operates and maintains 195 weir sets across

More information

Chapter 4 EM THE COASTAL ENGINEERING MANUAL (Part I) 1 August 2008 (Change 2) Table of Contents. Page. I-4-1. Background...

Chapter 4 EM THE COASTAL ENGINEERING MANUAL (Part I) 1 August 2008 (Change 2) Table of Contents. Page. I-4-1. Background... Chapter 4 EM 1110-2-1100 THE COASTAL ENGINEERING MANUAL (Part I) 1 August 2008 (Change 2) Table of Contents I-4-1. Background... Page I-4-1 a. Shore Protection Planning and Design, TR 4... I-4-1 b. Shore

More information

STUDY PROCESS & SCHEDULE

STUDY PROCESS & SCHEDULE STUDY PROCESS & SCHEDULE Route Centennial Bridge Study KDOT Project No. -52 KA-3229-01 STUDY OVERVIEW STUDY SCHEDULE The Kansas Department of Transportation (KDOT) has identified a future need to replace

More information

Comparisons of Physical and Numerical Model Wave Predictions with Prototype Data at Morro Bay Harbor Entrance, California

Comparisons of Physical and Numerical Model Wave Predictions with Prototype Data at Morro Bay Harbor Entrance, California Comparisons of Physical and Numerical Model Wave Predictions with Prototype Data at Morro Bay Harbor Entrance, California by Robert R. Bottin, Jr. and Edward F. Thompson PURPOSE: This Coastal and Hydraulics

More information

VIRGINIA SOIL AND WATER CONSERVATION BOARD GUIDANCE DOCUMENT ON DAM BREAK INUNDATION ZONE AND INCREMENTAL DAMAGE ANALYSIS AND MAPPING PROCEDURES

VIRGINIA SOIL AND WATER CONSERVATION BOARD GUIDANCE DOCUMENT ON DAM BREAK INUNDATION ZONE AND INCREMENTAL DAMAGE ANALYSIS AND MAPPING PROCEDURES (Approved XXXXX, 2010) Working Draft Version January 14, 2010 VIRGINIA SOIL AND WATER CONSERVATION BOARD GUIDANCE DOCUMENT ON DAM BREAK INUNDATION ZONE AND INCREMENTAL DAMAGE ANALYSIS AND MAPPING PROCEDURES

More information

Structure Failure Modes

Structure Failure Modes US Army Corps Monitoring and Maintenance of Coastal Infrastructure Structure Failure Modes Steven A. Hughes, PhD, PE Coastal and Hydraulics Laboratory US Army Engineer Research and Development Center Waterways

More information

10.0 CURB EXTENSIONS GUIDELINE

10.0 CURB EXTENSIONS GUIDELINE 10.0 CURB EXTENSIONS GUIDELINE Road Engineering Design Guidelines Version 1.0 March 2017 City of Toronto, Transportation Services City of Toronto Page 0 Background In early 2014, Transportation Services

More information

DESIGN CODE. Enterprise West Harlow London Road North Design Code 21

DESIGN CODE. Enterprise West Harlow London Road North Design Code 21 DESIGN CODE Enterprise West Essex @ Harlow London Road North Design Code 21 4 MAXIMUM BUILDING HEIGHTS 4.1 Table 4A sets out maximum building height standards for each character area within the LDO boundary.

More information

Coastal Hazards Study

Coastal Hazards Study Coastal Hazards Study 2212 Beach Boulevard, Pacifica Prepared for: EXECUTIVE SUMMARY City of Pacifica 170 Santa Maria Ave Pacifica, CA 94044 Prepared by: moffatt & nichol 2185 N. California Blvd. Walnut

More information

Hard Hat Services ph: hardhatinc.com 932 N. Wright St., Suite 160 Naperville, IL 60563

Hard Hat Services ph: hardhatinc.com 932 N. Wright St., Suite 160 Naperville, IL 60563 Interstate Power and Light Company Ottumwa Generation Station CCR Surface Impoundment Annual Inspection Report 154.018.012.003 Report issued: December 21, 2016 Hard Hat Services ph: 877-630-7428 hardhatinc.com

More information

Dominica. Wise practices for coping with. i b bea n Se a

Dominica. Wise practices for coping with. i b bea n Se a Wise practices for coping with Dominica Car i b bea n Se a Forestry,Wildlife and Parks Division, Dominica University of Puerto Rico, Sea Grant College Program Caribbean Development Bank UNESCO Environment

More information

Absecon Island Shore Protection The planning behind the project

Absecon Island Shore Protection The planning behind the project Absecon Island Shore Protection The planning behind the project Most residents of Atlantic City, Ventnor, Margate and Longport are now aware of upcoming plans to protect their common coastline with a beachfill

More information

Hamilton Public Health Services 2014 Beach Monitoring Report

Hamilton Public Health Services 2014 Beach Monitoring Report Public Health Services Health Protection Division 110 King Street West, 2nd Floor, Hamilton, ON L8P 4S6 Phone: (905) 546-2424, ext. 3570 Fax: (905) 546-2787 Hamilton Public Health Services 2014 Beach Monitoring

More information

Case study 64. Shoreham Harbour Shingle Bypassing and Recycling

Case study 64. Shoreham Harbour Shingle Bypassing and Recycling Case study 64. Shoreham Harbour Shingle Bypassing and Recycling Authors: Tony Parker, Uwe Dornbusch Main driver: Improved defences Project stage: Ongoing construction/operation since 1992 Photo 1: Shoreham

More information

Future Condi,ons coastal hazard modeling and mapping

Future Condi,ons coastal hazard modeling and mapping Future Condi,ons coastal hazard modeling and mapping Presented by Bob Ba:alio, PE Environmental Science Associates, Inc. (ESA) On behalf of the physical processes team (USGS, TerraCosta- Scripps, ESA)

More information

The History of Coastal Flood Hazard Assessments in the Great Lakes

The History of Coastal Flood Hazard Assessments in the Great Lakes The History of Coastal Flood Hazard Assessments in the Great Lakes Brian A. Caufield, P.E., CFM June 23, 2016 2 The Great Lakes Some Statistics Courtesy of Great Lakes Information Network One-fifth of

More information

HARBOR INFRASTRUCTURE INVENTORIES Marquette Harbor, Michigan

HARBOR INFRASTRUCTURE INVENTORIES Marquette Harbor, Michigan HARBOR INFRASTRUCTURE INVENTORIES Marquette Harbor, Michigan Harbor Location: Marquette Harbor is located in Marquette Bay on the south shore of Lake Superior, 160 miles west of Sault Ste. Marie, MI and

More information