1 CORPS ON THE COAST North Carolina Coastal Conference Coastal Infrastructure Raleigh, NC April 14, 2015 Jim Medlock Chief, Programs Management Branch US Army Corps of Engineers

2 OVERVIEW What Are The Corps Responsibilities/Missions? Coastal Activities/Challenges: Navigation Coastal Storm Damage Reduction Ecosystem Restoration Regulatory Takeaways Port of Wilmington, Eagle Island in background 2 BUILDING STRONG

3 CORPS OF ENGINEERS RESPONSIBILITIES/MISSIONS Defend Nation by Enhancing our Military and Economic Capabilities Wilmington District operates in North Carolina and southern Virginia Civil Works Program (many activities are cost shared) includes: Conduct of Studies Construction Operation and Maintenance Civil Works Missions include: Navigation Flood Risk Management incl. Coastal Storm Damage Reduction Ecosystem Restoration Recreation/Hydropower/Water Supply/Environmental Regulatory Permit Program Readiness Contingency Operations/Emergency Management 3

4 NAVIGATION PROJECTS in NC Roanoke Asheville VA Greensboro NC Washington Manteo Manteo (Shallowbag) Bay {Oregon Inlet} Charlotte William O. Huske Lock and Dam 2 Lock and Dam 1 Raleigh Fayetteville Wilmington Lockwoods Folly River Inlet Wilmington Harbor Morehead City Bogue Inlet New River Inlet New Topsail Inlet Masonboro Inlet Carolina Beach Inlet Morehead City Harbor 4

5 Hilton RR Bridge Cape Fear Memorial Bridge End of Federal Harbor Project (30.8 mi. from mouth) Wilmington, NC State Port N.C. S.C. VA. N.C. Raleigh Wilmington WILMINGTON HARBOR, NC. Cape Fear River N N Brunswick Co. MOTSU (Sunny Point) Mouth of Cape Fear River ANCHORAGE BASIN BATTERY ISLAND TURN CHANNEL ENTRANCE O&M for Dredging Contracts & associated costs FY 2015 BUDGET FY2015 ALLOCATION (incl. Work Plan) FY 2016 BUDGET $14,127,000 $13,986,000 $15,019,000 -Study finishing w/battery Island Turn & Channel Entrance Realignment via O&M - Further Studies 5

6 Morehead City Harbor, NC O&M for Dredging Contracts & associated costs FY 2015 BUDGET FY2015 ALLOCATION (incl. Work Plan) FY 2016 BUDGET $4,855,000 $8,906,000 $8,796,000 6

7 Manteo (Shallowbag) Bay, NC O&M for Hydrographic Surveys & minimal Dredging by Gov t Plant & associated costs FY 2015 BUDGET FY2015 ALLOCATION (incl. Work Plan) FY 2016 BUDGET $800,000 $1,992,000 $2,000,000 7

8 Rollinson Channel and Alternate Ferry Route Silver Lake Harbor FY 2015 BUDGET FY2015 ALLOCATION (incl. Work Plan) FY 2016 BUDGET ROLLINSON CHANNEL inc. Hatteras Ferry Channel $550,000 $545,000 $300,000 SILVER LAKE HARBOR, NC $300,000 $297,000 $300,000 8

9 Coastal Storm Damage Reduction in NC Roanoke VA NC Dare County Beaches / Bodie Island Greensboro Manteo Asheville Raleigh Charlotte Ocean Isle Beach Wilmington Oak Island, Caswell, and Holden Beaches 9 Morehead City Bogue Banks N. Topsail, Surf City Topsail Beach Wrightsville Beach Carolina Beach Kure Beach

10 West Onslow (Topsail Beach) and Surf City / North Topsail Beach, NC Project Location Need Construction New Start Appropriations; Sunset to Authorizations? 10

11 Carolina Beach and Vicinity, NC - Nourishment contract late summer Still awaiting WRRDA implementation guidance on 15 year extension analysis 11

12 Ecosystem Restoration in NC MANTEO SEC Creation of 15 Acres Oyster Habitat near Old House Channel MANTEO (SHALLOWBAG) BAY - Creation of 42 acres of oyster habitat for mitigation for prior dredging of Wanchese Harbor 12

13 Regulatory Terminal Groins, NC In 2011, the North Carolina General Assembly lifted a 25-year ban on the construction of terminal groins (TG) along the coast of North Carolina. The Corps has or is reviewing 4 TG proposals including Bald Head Island, Figure Eight Island, Ocean Isle Beach and Holden Beach. 13

14 Regulatory - Shallow Draft Inlets, NC State/local governments anticipated to request permits to perform maintenance dredging in Federal channels including: Bogue Inlet, Carolina Beach Inlet Lockwoods Folly River New River Inlet New Topsail Inlet and Shallotte Inlet Carolina Beach Inlet 14

15 Regulatory Coastal Nourishment Projects, NC Permits being requested for numerous coastal nourishment projects are being undertaken and funded by municipalities. Recent projects include: Topsail Beach North Topsail Beach Oak Island Town Of Nags Head (completed) Duck, Kitty Hawk and Kill Devil Hills Topsail Beach 15

16 Takeaways Active civil works program on the coast of North Carolina Federal funding to meet all challenges not certain New strategies for moving forward: Contributed funds Sponsors taking action in era of Federal fiscal constraints 16

17 17

US Beach Nourishment Experience:

US Beach Nourishment Experience: Beach Nourishment: Introduction of new sand to the beach by truck or dredge Large beach >1 million cubic yards (100,000 dump truck loads) Funding is a combination of federal, state, local & private Also

More information

September 2017 MLS Statistical Report. Residential Inventory

September 2017 MLS Statistical Report. Residential Inventory September 217 MLS Statistical Report Residential Inventory 2 2 1 1 21 216 217 Summary Inventories: Residential inventory is down 1%, Lots / Land inventory is down 13% and commercial inventory was down

More information

GenCade Application at Onslow Bay, North Carolina

GenCade Application at Onslow Bay, North Carolina GenCade Application at Onslow Bay, North Carolina by Ashley E. Frey, Sophie Munger, Greg L. Williams, Michael J. Wutkowski, and Kevin B. Conner PURPOSE: This Coastal and Hydraulics Engineering Technical

More information

Louisiana CPRA SJB Group, Baton Rouge Coastal Engineering Consultants U.S. Army Corps of Engineers Federal and State PDT Members

Louisiana CPRA SJB Group, Baton Rouge Coastal Engineering Consultants U.S. Army Corps of Engineers Federal and State PDT Members Louisiana CPRA SJB Group, Baton Rouge Coastal Engineering Consultants U.S. Army Corps of Engineers Federal and State PDT Members Project Setting and Background Island Restoration Plans Pre-Screening Analysis

More information

Sediment Management Plan Rehoboth Bay

Sediment Management Plan Rehoboth Bay Sediment Management Plan Rehoboth Bay STAC Meeting November 16, 2007 Goals of the Study Improve planning for future dredging needs Reduce the dependency on dredging Study Tasks Environmental data Historical

More information

Saco River Maintenance Dredge PROJECT PLAN AND TIMELINE JUNE 15, 2017

Saco River Maintenance Dredge PROJECT PLAN AND TIMELINE JUNE 15, 2017 Saco River Maintenance Dredge 2017-2018 PROJECT PLAN AND TIMELINE JUNE 15, 2017 Overview Last dredged in 1994 Removing ~150,000 cy of sand and silt from the upper and lower reaches Disposal sites: In-River

More information

1-32 NOME HARBOR, ALASKA (CWIS NOS , 87755, 12270, & 10422) Condition of Improvement 30 September 2012

1-32 NOME HARBOR, ALASKA (CWIS NOS , 87755, 12270, & 10422) Condition of Improvement 30 September 2012 NOME HARBOR 1-32 NOME HARBOR, ALASKA (CWIS NOS. 72742, 87755, 12270, & 10422) Condition of Improvement 30 September 2012 AUTHORIZATION: (1) Rivers and Harbors Act, 8 August 1917 (House Doc. 1932, 64th

More information

Humboldt Bay s Harbor

Humboldt Bay s Harbor Humboldt Bay s Harbor Humboldt Bay is the second largest natural bay in California The only deep water harbor along ~400 miles of coast between San Francisco, CA and Coos Bay, OR One of only 11 deep water

More information

Partnerships and Collaborations

Partnerships and Collaborations Welcome Day One Partnerships and Collaborations People Bobbie Faircloth Bobbie Seafood I have been catching sea food all my life. Objectives Understand the economic development potential Share progress

More information

Dauphin Island East End Beach and Barrier Island Restoration Project. Beau Buhring South Coast Engineers

Dauphin Island East End Beach and Barrier Island Restoration Project. Beau Buhring South Coast Engineers Dauphin Island East End Beach and Barrier Island Restoration Project Beau Buhring South Coast Engineers Funding Funded with qualified outer continental shelf oil and gas revenues by the Coastal Impact

More information

Climate Change Impacts to KSC Launch Complex

Climate Change Impacts to KSC Launch Complex Climate Change Impacts to KSC Launch Complex Presented to: 2010 International Workshop on Environment and Energy By: John Shaffer NASA Environmental Management Branch Kennedy Space Center Hurricane Season

More information

CROSS-SHORE SEDIMENT PROCESSES

CROSS-SHORE SEDIMENT PROCESSES The University of the West Indies Organization of American States PROFESSIONAL DEVELOPMENT PROGRAMME: COASTAL INFRASTRUCTURE DESIGN, CONSTRUCTION AND MAINTENANCE A COURSE IN COASTAL DEFENSE SYSTEMS I CHAPTER

More information

North Carolina Wildlife Resources Commission Agency Overview. Appropriations Subcommittee on Natural and Economic Resources February 22, 2011

North Carolina Wildlife Resources Commission Agency Overview. Appropriations Subcommittee on Natural and Economic Resources February 22, 2011 Agency Overview Appropriations Subcommittee on Natural and Economic Resources February 22, 2011 Agency Background Key Funding Elements Agency Board Economic Impacts Background Agency Purpose derived from

More information

Pacific Ocean Division. Navigation Program Overview. Association of Pacific Ports 2016 Winter Conference Waikaloa, Hawaii.

Pacific Ocean Division. Navigation Program Overview. Association of Pacific Ports 2016 Winter Conference Waikaloa, Hawaii. Pacific Ocean Division Navigation Program Overview Association of Pacific Ports 2016 Winter Conference Waikaloa, Hawaii David Lau Pacific Ocean Division Chief, Civil Works Integration Division January

More information

Check in to an oceanfront hotel, to be determined. Evening activity at the Lost Colony Waterside Theatre:

Check in to an oceanfront hotel, to be determined. Evening activity at the Lost Colony Waterside Theatre: History, Mystery and Eco Systems An Outer Banks Itinerary for a Student Field Trip (includes Cape Hatteras National Seashore) Day One Afternoon arrival to the Outer Banks of North Carolina 2:30pm Wright

More information

Mouth of the Columbia River Jetties Three-Phase Construction Plan

Mouth of the Columbia River Jetties Three-Phase Construction Plan Mouth of the Columbia River Jetties Three-Phase Construction Plan Project Overview October 9, 2012 US Army Corps of Engineers MCR Jetties Major Rehabilitation Sand Island pile dikes 1930-1935 Columbia

More information

Under the Boardwalk: Coastal Geomorphology

Under the Boardwalk: Coastal Geomorphology Under the Boardwalk: Coastal Geomorphology What to look for while you're on the beach during spring break. What Causes Changes in Sea Level? Answer Varies with Time Scale. Long-Term Changes in Sea Level

More information

The Fisheries Reform Act of The Joint Legislative Commission on Seafood and Aquaculture March 30, 2010

The Fisheries Reform Act of The Joint Legislative Commission on Seafood and Aquaculture March 30, 2010 The Fisheries Reform Act of 1997 The Joint Legislative Commission on Seafood and Aquaculture March 30, 2010 History July 1, 1994 Moratorium on Commercial Fishing Licenses Based on wide range of concerns

More information

ST. LUCIE COUNTY, FLORIDA

ST. LUCIE COUNTY, FLORIDA ST. LUCIE COUNTY, FLORIDA COASTAL STORM RISK MANAGEMENT STUDY Draft Feasibility Study & Integrated Environmental Assessment Public Meeting Presented by U.S. Army Corps of Engineers Jacksonville District

More information

Nome Harbor Page 2 of 12

Nome Harbor Page 2 of 12 Nome Harbor Nome Harbor Page 2 of 12 Condition of Improvements 30 December 2015 Nome Harbor, Alaska (CWIS No. 010422, 012270, 072742, 087755) Authorization (1) Rivers and Harbors Act, 8 August 1917 (House

More information

U.S. Fish and Wildlife Service Native American Crosscut Funding

U.S. Fish and Wildlife Service Native American Crosscut Funding U.S. Fish and Wildlife Service Native American Crosscut Funding Tribal / Interior Budget Council National Budget Meeting L Enfant Plaza Hotel Washington, DC November 8, 2013 U.S. Fish and Wildlife Service

More information

Department of Economics Working Paper

Department of Economics Working Paper Department of Economics Working Paper Number 13-21 September 2013 A Recreation Demand Model of the North Carolina For-Hire Fishery: A Comparison of Primary and Secondary Purpose Anglers John C. Whitehead

More information

Sailing South Seminar October 6, 2016 ICW Slides

Sailing South Seminar October 6, 2016 ICW Slides Sailing South Seminar October 6, 2016 ICW Slides The ICW seminar is undergoing updates and changes as Hurricane Matthew approaches the Florida Coast. These slides include screen shots of all of the trouble

More information

The proper location of the mouth of the Salinas River is a very difficult problem. - U.S. Surveyor General for California (1879)

The proper location of the mouth of the Salinas River is a very difficult problem. - U.S. Surveyor General for California (1879) The proper location of the mouth of the Salinas River is a very difficult problem - U.S. Surveyor General for California (1879) 1854 1854 early 1830s early 1830s early 1830s late 1830s late 1830s early

More information

For each benefit category listed above, several measures of economic benefits were calculated:

For each benefit category listed above, several measures of economic benefits were calculated: EXECUTIVE SUMMARY The objective of this study was to examine the economic benefits of Oregon Inlet navigability to Dare County, North Carolina and the surrounding region, including northeastern North Carolina

More information

BALD HEAD ISLAND, NC SAND SHARING SYSTEM OVERVIEW AND ASSESSMENT. Erik J. Olsen, P.E. olsen associates, inc.

BALD HEAD ISLAND, NC SAND SHARING SYSTEM OVERVIEW AND ASSESSMENT. Erik J. Olsen, P.E. olsen associates, inc. BALD HEAD ISLAND, NC SAND SHARING SYSTEM OVERVIEW AND ASSESSMENT Erik J. Olsen, P.E. Olsen Associates, Inc. BACKGROUND Both the Village of Bald Head Island (VBHI) and the Bald Head Island Limited, LLC.

More information

DRAFT Business Plan September 2013

DRAFT Business Plan September 2013 DRAFT Business Plan September 2013 Contents EXECUTIVE SUMMARY... 2 Background... 4 Summary... 5 INITIAL ACTIVITIES... 6 Marketing North Carolina as a Sailing Destination... 6 Recruiting Sailing Industry

More information

PLAQUEMINES PARISH BARRIER ISLAND RESTORATION & SUSTAINABILITY. MVD/Gulf Coast Regional Dredging Meeting November 5, 2013

PLAQUEMINES PARISH BARRIER ISLAND RESTORATION & SUSTAINABILITY. MVD/Gulf Coast Regional Dredging Meeting November 5, 2013 PLAQUEMINES PARISH BARRIER ISLAND RESTORATION & SUSTAINABILITY MVD/Gulf Coast Regional Dredging Meeting November 5, 2013 OVERVIEW 1. Barrier Island Restoration Projects in Plaquemines Parish 2. Plaquemines

More information

Ketchikan Harbors Thomas Basin and Bar Point Harbor

Ketchikan Harbors Thomas Basin and Bar Point Harbor Ketchikan Harbors Thomas Basin and Bar Point Harbor Condition of Improvements 30 December 2014 Thomas Basin & Bar Point Harbors Ketchikan, Alaska (CWIS No. 000631 & 087071) Authorization (1) Rivers and

More information

New Coastal Times By Donna Callea

New Coastal Times By Donna Callea New Coastal Times By Donna Callea Environment reporter Mark Schleifstein, seen here flying to a tour of Louisiana barrier island restoration projects, will lead The Times-Picayune's new Coastal Designed

More information

Oceanside Carlsbad. Solana Beach

Oceanside Carlsbad. Solana Beach Oceanside Carlsbad Solana Beach BACKGROUND AND PURPOSE OF THE PROGRAM Many beaches in Southern California are actively eroding; A deficit of natural sand delivery to the beaches exists due to flood control

More information

Regular Workshop October 20, 2014 Agenda Item: Dr. Albert E. Browder, PE; Olsen Associates, Inc.

Regular Workshop October 20, 2014 Agenda Item: Dr. Albert E. Browder, PE; Olsen Associates, Inc. Regular Workshop October 20, 2014 Agenda Item 8 Agenda Item: Presenter: Summary: Beach Update Town Manager; Dr. Albert E. Browder, PE; Olsen Associates, Inc. At the January 21, 2014 Regular Workshop Meeting,

More information

NC BEACH AND INLET MANAGEMENT PLAN FINAL REPORT

NC BEACH AND INLET MANAGEMENT PLAN FINAL REPORT VIII. Region 1 Region 1 encompasses Brunswick County from the North Carolina/South Carolina Border to the Brunswick County/New Hanover County line. The Towns of Sunset Beach, Ocean Isle Beach, Holden Beach,

More information

La Quinta Channel Extension Port of Corpus Christi Ingleside, Texas. Mark Coyle

La Quinta Channel Extension Port of Corpus Christi Ingleside, Texas. Mark Coyle La Quinta Channel Extension Port of Corpus Christi Ingleside, Texas Mark Coyle Corpus Christi Navigation Channel PCCA La Quinta Expansion Project History Corpus Christi Ship Channel Improvement Projects

More information

GEOLOGY 101 Under the Boardwalk: Coastal Geomorphology

GEOLOGY 101 Under the Boardwalk: Coastal Geomorphology GEOLOGY 101 Under the Boardwalk: Coastal Geomorphology What to look for while you're on the beach during spring break. J.S. Kite, WVU What Causes Changes in Sea Level? Answer Varies with Time Scale. Long-Term

More information

1-32 NOME HARBOR, ALASKA (CWIS NOS , 87755, & 10422) Condition of Improvement 30 September 2009

1-32 NOME HARBOR, ALASKA (CWIS NOS , 87755, & 10422) Condition of Improvement 30 September 2009 NOME HARBOR 1-32 NOME HARBOR, ALASKA (CWIS NOS. 72742, 87755, & 10422) Condition of Improvement 30 September 2009 AUTHORIZATION: (1) Rivers and Harbors Act, 8 August 1917 (House Doc. 1932, 64th Congress,

More information

DUNE STABILIZATION AND BEACH EROSION

DUNE STABILIZATION AND BEACH EROSION DUNE STABILIZATION AND BEACH EROSION CAPE HATTERAS NATIONAL SEASHORE NORTH CAROLINA ROBERT DOLAN PAUL GODFREY U. S. DEPARTMENT OF INTERIOR NATIONAL PARK SERVICE OFFICE OF NATURAL SCIENCE WASHINGTON, D.

More information

VIDEO AUDIO Slide 1. Slide 2 Old timey 18 th century map of east coast

VIDEO AUDIO Slide 1. Slide 2 Old timey 18 th century map of east coast VIDEO AUDIO Slide 1 1A Welcome to the Cooper River Rediversion Project at St. Stephen, Montage of exteriors of facility, South Carolina! Since 1985, this boating, fish runs, fishing, facility has served

More information

Planning Considerations for Nearshore Placement of Mixed Dredged Sediments

Planning Considerations for Nearshore Placement of Mixed Dredged Sediments Planning Considerations for Nearshore Placement of Mixed Dredged Sediments PURPOSE: Dredging planning and management decisions are based on a combination of engineering and economic factors tempered by

More information

The 2017 Panama City Beaches Beach Interim Renourishment Project. Answers to Common Questions

The 2017 Panama City Beaches Beach Interim Renourishment Project. Answers to Common Questions The 2017 Panama City Beaches Beach Interim Renourishment Project The fourth renourishment of the Panama City Beaches will be under construction during March and April 2017, with a planned completion by

More information

Protecting the Lost Colony of Roanoke with Innovative Shoreline Stabilization Solutions

Protecting the Lost Colony of Roanoke with Innovative Shoreline Stabilization Solutions Protecting the Lost Colony of Roanoke with Innovative Shoreline Stabilization Solutions Matthew Starr, PG Jeff Tabar, PE, D.CE Corbitt Kerr, PhD, PE February 8, 2018 Agenda 1 Lost Colony History 2 Project

More information

WILMINGTON URBAN AREA Metropolitan Planning Organization

WILMINGTON URBAN AREA Metropolitan Planning Organization WILMINGTON URBAN AREA Metropolitan Planning Organization P.O. Box 1810 Wilmington, North Carolina 28402 910 341 3258 910 341 7801 FAX Members: City of WILMINGTON Lead Planning Agency Town of CAROLINA BEACH

More information

Why We do Preventive Maintenance

Why We do Preventive Maintenance Why We do Preventive Maintenance James S. Moulthrop, P.E. Executive Director FP 2 Inc. North Dakota Asphalt Conference March 28-29, 2017 Bismarck, ND Presentation Outline What is FP 2 Inc.? Mission Preventive

More information

COAST GUARD ADVISORY NOTICE (CGAN ) To: Distribution Date: September 1, 2017

COAST GUARD ADVISORY NOTICE (CGAN ) To: Distribution Date: September 1, 2017 Commander United States Coast Guard Sector New York 212 Coast Guard Drive Staten Island, NY 10305 Staff Symbol: (spw) Phone: (718) 354-2353 Fax: (718) 354-4190 COAST GUARD ADVISORY NOTICE (CGAN 2017-016)

More information

Q1. What are the primary causes/contributors to coastal erosion at Westshore and the concept of longshore / littoral drift.

Q1. What are the primary causes/contributors to coastal erosion at Westshore and the concept of longshore / littoral drift. Q1. What are the primary causes/contributors to coastal erosion at Westshore and the concept of longshore / littoral drift. In order of (timing related) contribution to present problem 1. Beach is too

More information

The Stockton University Coastal

The Stockton University Coastal Hurricane Sandy: Beach-dune recovery at New Jersey Beach Profile Network (NJBPN) sites By Kimberly K. McKenna 1, Stewart C. Farrell 1, and Jeffrey A. Gebert 2 1 Stockton University Coastal Research Center

More information

HERBERT HOOVER DIKE REHABILITATION PROJECT

HERBERT HOOVER DIKE REHABILITATION PROJECT HERBERT HOOVER DIKE REHABILITATION PROJECT Update to the Broward County Water Advisory Board 19 September 2013 Ingrid Bon, PE Project Manager Forward Initial Levees Along Lake Okeechobee Authorized by

More information

Atlantic Sturgeon Workshop

Atlantic Sturgeon Workshop Atlantic Sturgeon Workshop Emily B. Hughes Wilmington Regulatory Field Office September 3, 2013 US Army Corps of Engineers Introduction The Atlantic sturgeon (Acipenser oxyrinchus; means "sharp snout )

More information

3.9 Marine Transportation

3.9 Marine Transportation 3.9 Marine Transportation 3. Affected Environment and Environmental Analysis 3.9 Marine Transportation 3.9.1 Introduction This section describes existing marine vessel transportation within the Port, the

More information

Delaware River Vessel Reporting System Mariners Advisory Committee For

Delaware River Vessel Reporting System Mariners Advisory Committee For Delaware River Vessel Reporting System Mariners Advisory Committee For the Bay and River Delaware The Mariner's Advisory Committee is comprised of Master Mariners, River Pilots, and concerns itself with

More information

Union Pacific Railroad

Union Pacific Railroad Input Questions: 404/401 Pre Application Meeting, December 18, 2013, Portland, Oregon 1. What is the project purpose and need? The purpose of the project is to improve the efficiency and average velocity

More information

National Oceanic and Atmospheric Administration (NOAA)/ Mulberry Phosphate Trustee Council September 12, 2013

National Oceanic and Atmospheric Administration (NOAA)/ Mulberry Phosphate Trustee Council September 12, 2013 OYSTER REEF CREATION PROJECT DESIGN AND IMPLEMENTATION IN HILLSBOROUGH BAY, FLORIDA TAMPA BAY REGIONAL PLANNING COUNCIL AGENCY ON BAY MANAGEMENT MEETING National Oceanic and Atmospheric Administration

More information

AGREEMENT BETWEEN THE U.S. FISH AND WILDLIFE SERVICE AND THE U.S. ARMY CORPS OF ENGINEERS FOR CONDUCTING FISH AND WILDLIFE COORDINATION ACT ACTIVITIES

AGREEMENT BETWEEN THE U.S. FISH AND WILDLIFE SERVICE AND THE U.S. ARMY CORPS OF ENGINEERS FOR CONDUCTING FISH AND WILDLIFE COORDINATION ACT ACTIVITIES AGREEMENT BETWEEN THE U.S. FISH AND WILDLIFE SERVICE AND THE U.S. ARMY CORPS OF ENGINEERS FOR CONDUCTING FISH AND WILDLIFE COORDINATION ACT ACTIVITIES ARTICLE I- INTRODUCTION a. Section 1 of the Fish and

More information

14 NOISE AND VIBRATION

14 NOISE AND VIBRATION 14 NOISE AND VIBRATION 14.1 EXISTING ENVIRONMENT 14.1.1 The noise environment within Poole Harbour is generally characterised by low to medium noise levels depending on location. For example, certain areas

More information

Proceedings, 2001National Conference on Beach Preservation Technology, pp COASTAL INLET BANK EROSION. William C.

Proceedings, 2001National Conference on Beach Preservation Technology, pp COASTAL INLET BANK EROSION. William C. Proceedings, 2001National Conference on Beach Preservation Technology, pp. 274-283 COASTAL INLET BANK EROSION William C. Seabergh 1 Abstract: Much focus is placed on beach erosion on the open coast. However,

More information

NAVIGABLE WATERS OF THE UNITED STATES (Section 10 of the Rivers and Harbors Act)

NAVIGABLE WATERS OF THE UNITED STATES (Section 10 of the Rivers and Harbors Act) NAVIGABLE WATERS OF THE UNITED STATES (Section 10 of the Rivers and Harbors Act) Revised March 5, 2010: It amends the old list to address certain waterways that are known to support interstate commerce

More information

Topsail Island Coastal Living Guide

Topsail Island Coastal Living Guide Topsail Island Coastal Living Guide Welcome to Topsail Island, North Carolina Imagine taking the boat for a cruise on the Intracoastal Waterway, just by walking out your back door. Or, picture yourself

More information

Overview. Beach Features. Coastal Regions. Other Beach Profile Features. CHAPTER 10 The Coast: Beaches and Shoreline Processes.

Overview. Beach Features. Coastal Regions. Other Beach Profile Features. CHAPTER 10 The Coast: Beaches and Shoreline Processes. Overview CHAPTER 10 The Coast: Beaches and Shoreline Processes Coastal regions constantly change. The beach is a dominant coastal feature. Wave activity continually modifies the beach and coastal areas.

More information

Savannah River, Georgia and South Carolina

Savannah River, Georgia and South Carolina Scope of Work for Use of the Fish Bypass at New Savannah Bluff Lock and Dam for the Savannah Harbor Expansion Project Monitoring and Adaptive Management Program Savannah River, Georgia and South Carolina

More information

Coastal and Hydraulics Laboratory

Coastal and Hydraulics Laboratory ERDC/CHL TR-17-13 Regional Sediment Management (RSM) Program Sediment Budget Analysis; Masonboro Inlet, North Carolina Kevin B. Conner and Linda S. Lillycrop August 2017 Coastal and Hydraulics Laboratory

More information

Thursday 18th January Race Day 2: Starting 1040 Hrs (all classes except J/24) From 1800 Hrs The Red Cap Party at Mount Gay, Brandons

Thursday 18th January Race Day 2: Starting 1040 Hrs (all classes except J/24) From 1800 Hrs The Red Cap Party at Mount Gay, Brandons Programme of Events Tuesday 16th January From 1200 Hrs: Registration at the Radisson Aquatica Hotel 1800 Hrs: Skipper s Briefing at the Radisson Aquatica Hotel And afterwards at the Barbados Cruising Club

More information

RESTORING 400 ACRES OF TIDAL MARSH IN THE SNOHOMISH RIVER DELTA

RESTORING 400 ACRES OF TIDAL MARSH IN THE SNOHOMISH RIVER DELTA RESTORING 400 ACRES OF TIDAL MARSH IN THE SNOHOMISH RIVER DELTA Marya Moses, Danny Moses, Neil Moses, and Robert Moses fish on Tulalip Bay, near the mouth of the Snohomish River Estuary. QWULOOLT IS A

More information

Coastal Erosion Impact on Rincón Infrastructure

Coastal Erosion Impact on Rincón Infrastructure Lessons Learned and Best Practices: Resilience of Coastal Infrastructure Coastal Erosion Impact on Rincón Infrastructure Luis D. Aponte, Ph.D. P.E. luisd.aponte@upr.edu Professor University of Puerto Rico

More information

Blakely Island, N Thatcher Bay. Restoration Recommendation: Rank Score (total score)

Blakely Island, N Thatcher Bay. Restoration Recommendation: Rank Score (total score) Soft Shore Protection/Structure Removal Blueprint for San Juan County Forage Fish Beaches Appendix 2: Recommendations for sites scoring below the top ten, sorted by island (east to west) Blakely Island,

More information

OREGON DEPARTMENT OF FISH AND WILDLIFE

OREGON DEPARTMENT OF FISH AND WILDLIFE OREGON DEPARTMENT OF FISH AND WILDLIFE Ladd Marsh Wildlife Area 1 Benefits for all Oregonians 2 The Mission To protect and enhance Oregon's fish and wildlife and their habitats for use and enjoyment by

More information

Harbor Safety Committee HEAVY WEATHER (WX)

Harbor Safety Committee HEAVY WEATHER (WX) HEAVY WEATHER (WX) SOC Quick Reference Risk Petroleum transfers Mooring buoys- Operating Policies and Weather Criteria General mooring policies, breakaway prevention Derelict and unattended vessels (abandoned

More information

Environmental Review and Permitting for Wild Trout

Environmental Review and Permitting for Wild Trout Environmental Review and Permitting for Wild Trout Tom Shervinskie Wild Trout Summit Watershed Analysis Section August 26, 2017 Division of Environmental Services The mission of the Pennsylvania Fish and

More information

Sunset Beach Annexation LOCAL AGENCY FORMATION COMMISSION MEETING OCTOBER 11, 2017

Sunset Beach Annexation LOCAL AGENCY FORMATION COMMISSION MEETING OCTOBER 11, 2017 Sunset Beach Annexation LOCAL AGENCY FORMATION COMMISSION MEETING OCTOBER 11, 2017 History Sunset Beach is a beach-front community of approximately 970 people. It was an unincorporated area of the County

More information

Fishing for Red Drum

Fishing for Red Drum Fishing for Red Drum Overview: Grade Level 5 th -8 th Objectives * To be able generate a graph based on current fishery data. * To be able to predict red drum weights and ages based on length. * To understand

More information

Trends in Shoreline Change and Hazard Impacts: Hot Spots and Management Challenges. Greg Berman CAPE COASTAL CONFERENCE.

Trends in Shoreline Change and Hazard Impacts: Hot Spots and Management Challenges. Greg Berman CAPE COASTAL CONFERENCE. CAPE COASTAL CONFERENCE Linking Science with Local Solu1ons and Decision- Making Trends in Shoreline Change and Hazard Impacts: Hot Spots and Management Challenges Presented By Greg Berman (WHOI Sea Grant

More information

Shoreline Change in Response to Sea Level Rise on Florida s Panhandle Coast. Jim Houston `

Shoreline Change in Response to Sea Level Rise on Florida s Panhandle Coast. Jim Houston ` Shoreline Change in Response to Sea Level Rise on Florida s Panhandle Coast Jim Houston james.r.houston @usace.army.mil ` Approach Calculate historical shoreline change by county (1867-2015) Determine

More information

MARINE SAFETY PLAN

MARINE SAFETY PLAN PORT MARINE SAFETY CODE MARINE SAFETY PLAN 2015-2017 Introduction As required at article 3.20 of the Port Marine Safety Code (PMSC), the Port of London Authority (PLA) publishes its Marine Safety Plan

More information

& Under Membership Report

& Under Membership Report 2014-2015 8 & Under Membership Report Table of Contents Background... Page 1 National Analysis... Page 2 Carolina Analysis... Pages 3-4 2 and 2 Challenge... Pages 5-6 Carolina s 2014-15 Association Performance...

More information

Implications of proposed Whanganui Port and lower Whanganui River dredging

Implications of proposed Whanganui Port and lower Whanganui River dredging PO Box 637 Wanganui 4540 Attention: Rowan McGregor Dear Rowan 1 Summary We understand that it has been proposed to bring large vessels into the Port at Whanganui requiring the excavation of a channel up

More information

Addressing Overcapacity in the Small-Scale Marine Fisheries of Vietnam. Robert Pomeroy Principal Scientist WorldFish Center Penang, Malaysia

Addressing Overcapacity in the Small-Scale Marine Fisheries of Vietnam. Robert Pomeroy Principal Scientist WorldFish Center Penang, Malaysia Addressing Overcapacity in the Small-Scale Marine Fisheries of Vietnam Robert Pomeroy Principal Scientist WorldFish Center Penang, Malaysia Presentation Overview Government policy towards the small-scale

More information

Nicholas Brown. 31 Bennett Rd Wolfeboro NH Application submitted

Nicholas Brown. 31 Bennett Rd Wolfeboro NH Application submitted Nicholas Brown 31 Bennett Rd Wolfeboro NH 03894 603-856-5454 Nick4634@gmail.com Application submitted 8-12-2017 Description of proposed project A. General Methodology The site located approximately 600

More information

Massachusetts Stream Crossing Case Studies

Massachusetts Stream Crossing Case Studies Massachusetts Stream Crossing Case Studies Amy Singler Associate Director, River Restoration Program Carrie Banks River Continuity Coordinator Case Studies: Public Benefits: Movement of goods and people

More information

TITLE: The Importance of Model Validation: Two Case Studies. AUTHOR:Julie Thomas. Scripps Institution of Oceanography, La Jolla, CA.

TITLE: The Importance of Model Validation: Two Case Studies. AUTHOR:Julie Thomas. Scripps Institution of Oceanography, La Jolla, CA. TITLE: The Importance of Model Validation: Two Case Studies AUTHOR:Julie Thomas Scripps Institution of Oceanography, La Jolla, CA jothomas@ucsd.edu CO-AUTHOR: Corey Olfe Scripps Institution of Oceanography,

More information

BEACH NOURISHMENT PROJECTS IN CARBONATE MATERIAL BEACH

BEACH NOURISHMENT PROJECTS IN CARBONATE MATERIAL BEACH Submitted February, 2006 BEACH NOURISHMENT PROJECTS IN CARBONATE MATERIAL BEACH Ryuichiro Nishi 1, Robert G. Dean 2 and Mario P. de Leon 1 1 Department of Ocean Civil Engineering, Kagoshima University,

More information

CITY OF DANA POINT AGENDA REPORT BRIAN MCCLURE, DEPUTY DIRECTOR COMMUNITY SERVICES SHERRY MURPHY, RECREATION MANAGER

CITY OF DANA POINT AGENDA REPORT BRIAN MCCLURE, DEPUTY DIRECTOR COMMUNITY SERVICES SHERRY MURPHY, RECREATION MANAGER 02/06/18 Page 1 Item #12 CITY OF DANA POINT AGENDA REPORT Reviewed By: DH X CM X CA DATE: FEBRUARY 6, 2018 TO: FROM: SUBJECT: CITY MANAGER/CITY COUNCIL BRIAN MCCLURE, DEPUTY DIRECTOR COMMUNITY SERVICES

More information

INTRODUCTION TO COASTAL ENGINEERING

INTRODUCTION TO COASTAL ENGINEERING The University of the West Indies Organization of American States PROFESSIONAL DEVELOPMENT PROGRAMME: COASTAL INFRASTRUCTURE DESIGN, CONSTRUCTION AND MAINTENANCE A COURSE IN COASTAL DEFENSE SYSTEMS I CHAPTER

More information

Hazard-Specific Annex Tsunami Annex Horry County, South Carolina

Hazard-Specific Annex Tsunami Annex Horry County, South Carolina Section 6-4 Hazard-Specific Tsunami Plan Hazard-Specific Annex Tsunami Annex Horry County, South Carolina 6-4 Hazard-Specific Tsunami Plan Comprehensive Emergency Management Plan Hazard Specific Annex

More information

Abandoned and Derelict Vessels in the Florida Keys National Marine Sanctuary

Abandoned and Derelict Vessels in the Florida Keys National Marine Sanctuary Abandoned and Derelict Vessels in the Florida Keys National Marine Sanctuary Steve Werndli Emergency Response and Enforcement Coordinator Florida Keys National Marine Sanctuary April 18, 2017 Derelict

More information

BRUNSWICK NUCLEAR PLANT

BRUNSWICK NUCLEAR PLANT BRUNSWICK NUCLEAR PLANT Brunswick - Summary BRUNSWICK NUCLEAR PLANT SOUTHPORT, BRUNSWICK COUNTY Progress Energy operates the Brunswick Nuclear Plant (BNP) located approximately 2.5 miles north of Southport,

More information

Blyth Estuary Green Travel Project

Blyth Estuary Green Travel Project Blyth Estuary Green Travel Project Green Infrastructure Case Study Creating the UK s first Active Travel Town The Connect 2 Blyth Estuary Green Travel Project shows how green infrastructure can enable

More information

3.9 Marine Transportation

3.9 Marine Transportation 3.9 Marine Transportation 3. Affected Environment and Environmental Analysis 3.9 Marine Transportation 3.9.1 Introduction This section describes existing marine vessel transportation within the Port, the

More information

Case Studies. Georg Umgiesser and Natalja Čerkasova KU, Lithuania

Case Studies. Georg Umgiesser and Natalja Čerkasova KU, Lithuania Case Studies Georg Umgiesser and Natalja Čerkasova KU, Lithuania Case 1: A beach in the Curonian Lagoon Beach Current situation in Curonian lagoon Beach in Kintai In the past, especially in Baltic inner

More information

SA New Trial Artificial Reef Project

SA New Trial Artificial Reef Project BACKGROUND PAPER SA New Trial Artificial Reef Project Development of options for the trial artificial reef 1. Summary CONTENTS Each year, an estimated 236,000 South Australians participate in recreational

More information

Appendix 12: Marine Transportation Study. (Gartner Lee Ltd. 2008)

Appendix 12: Marine Transportation Study. (Gartner Lee Ltd. 2008) Appendix 12: Marine Transportation Study (Gartner Lee Ltd. 2008) memorandum to: John Woods, Minas Basin Pulp and Power Co. Ltd from: Joseph Kozak date: ref: GLL 80308 re: FINAL Technical Marine Transportation

More information

GOAL: Collect product flowing over Onalaska spillway to protect downstream resources C&C 250 Y Y. Looking upstream at spillway

GOAL: Collect product flowing over Onalaska spillway to protect downstream resources C&C 250 Y Y. Looking upstream at spillway GOAL: Collect product flowing over Onalaska spillway to protect downstream resources BR5 Black n/a Onalaska Spillway Carry- In C&C 250 Y Y Looking upstream at spillway Implementation (Go to Aerial View)

More information

Waikanae River Environmental Strategy. 12. Arapawaiti/Otaihanga Reach

Waikanae River Environmental Strategy. 12. Arapawaiti/Otaihanga Reach 74 Waikanae River Environmental Strategy 12. Arapawaiti/Otaihanga Reach Figure 12: Arapawaiti/Otaihanga Reach 75 PART C: Protecting and Improving the River Corridor / Arapawaiti/Otaihanga Reach Waikanae

More information

Case Studies Georg Umgiesser and Natalja Čerkasova KU, Lithuania

Case Studies Georg Umgiesser and Natalja Čerkasova KU, Lithuania Case Studies Georg Umgiesser and Natalja Čerkasova KU, Lithuania Case 1: A beach in the Curonian Lagoon 1 Beach Current situation in Curonian lagoon Beach in Kintai In the past, especially in Baltic inner

More information

SECTION II CORRECTIONS TO C. G. LIGHT LIST, VOLUME I ATLANTIC COAST, (4) Characteristic. (5) Height. Fl G 4s 4 Green. Fl G 4s 4 Green.

SECTION II CORRECTIONS TO C. G. LIGHT LIST, VOLUME I ATLANTIC COAST, (4) Characteristic. (5) Height. Fl G 4s 4 Green. Fl G 4s 4 Green. CORRECTIONS TO C. G. LIGHT LIST, VOLUME I ATLANTIC COAST, 2010 742 Fishing Grounds Obstruction Shoal Buoy 6 40 25 25 N 73 52 20 W Red. * 745 New York Bight Dumping Ground Lighted Buoy 3 4555 Two Bush Ledge

More information

1-22. KETCHIKAN, ALASKA (Thomas and Bar Point Basins) (CWIS NOS & 87071) Condition of Improvement 30 September 2007

1-22. KETCHIKAN, ALASKA (Thomas and Bar Point Basins) (CWIS NOS & 87071) Condition of Improvement 30 September 2007 KETCHIKAN HARBOR 1-22 KETCHIKAN, ALASKA (Thomas and Bar Point Basins) (CWIS NOS. 00631 & 87071) Condition of Improvement 30 September 2007 AUTHORIZATION: (1) Rivers and Harbors Act, 3 July 1930 (House

More information

Carolina On My Mind By Jill Branson Hammergren Word Count: 1,500 Written for ABTA Golf Publication

Carolina On My Mind By Jill Branson Hammergren Word Count: 1,500 Written for ABTA Golf Publication Carolina On My Mind By Jill Branson Hammergren Word Count: 1,500 Written for ABTA Golf Publication Listen to the strains of that old James Taylor song, Carolina on my Mind, and you ll understand the charm

More information

California Steelhead: Management, Monitoring and Recovery Efforts

California Steelhead: Management, Monitoring and Recovery Efforts California Steelhead: Management, Monitoring and Recovery Efforts Jonathan Nelson Steelhead Management, Research and Restoration Program Oncorhynchus mykiss irideus California Steelhead - Hot Topics Implementation

More information

University of Victoria Campus Cycling Plan Terms of Reference. 1.0 Project Description

University of Victoria Campus Cycling Plan Terms of Reference. 1.0 Project Description University of Victoria Campus Cycling Plan Terms of Reference 1.0 Project Description The Campus Cycling Plan, a first for the University, will provide a comprehensive and coordinated approach to support

More information

DRAFT. Malibu Bluffs Park Skate Park Facility Site Assessment. Prepared For: The City of Malibu Parks and Recreation Department

DRAFT. Malibu Bluffs Park Skate Park Facility Site Assessment. Prepared For: The City of Malibu Parks and Recreation Department Malibu Bluffs Park Skate Park Facility Site Assessment Prepared For: The City of Malibu Parks and Recreation Department Prepared on February 28, 2013 By: 1 INTRODUCTION AND PROJECT BACKGROUND For more

More information

Army Compatible Use Buffers (ACUB) Program

Army Compatible Use Buffers (ACUB) Program Army Compatible Use Buffers (ACUB) Program Region IV DoD/EPA/States Environmental Conference Janmichael Graine 29 June 2005 Janmichael Graine / SFIM-AEC-TSR / 410-436-1579 / DSN 584-1579 / janmichael.graine@us.army.mil

More information

Phase II Final Report Port Canaveral Lionfish Project

Phase II Final Report Port Canaveral Lionfish Project Phase II Final Report Port Canaveral Lionfish Project Contract PO # P14685 Report prepared for Carol Noble Director, Environmental Plans and Programs Canaveral Port Authority Suite 301 445 Challenger Road

More information