1 TOWN OF DENNIS 10 YR COMPREHENSIVE DREDGE PERMIT SEPTEMBER 10, 2013
2 WHAT IS IT? ALL NECESSARY PERMITS FOR DREDGING FOR PORTIONS OF BASS RIVER, SWAN POND RIVER, SESUIT HARBOR AND CHASE GARDEN CREEK ONE PACKAGE. WILL INCLUDE: NAVIGATION CHANNELS, DOCK & PEIR ACCESS, MOORING BASINS, DEWATERING SITES AND DISPOSAL SITE AND BEACH NOURISHMENT LOCATIONS VALID FOR 10 YEARS
3 WHY DO IT? VARIOUS AGENCY PERMITS FOR SWAN POND RIVER & SESUIT HARBOR ENTRANCE CHANNELS HAVE BEEN REQUESTED AS NEEDED. THEY HAVE DIFFERENT RESTRICTIONS AND EXPIRATION DATES.
4 Agency DenConsCom MADEP Wetlands Table 2 4. Permits for Swan Pond River Permit Order of Conditions Water Quality Cert. Expiration Date 4/21/2012 5/12/ /20/2014 MADEP Waterways Chapter 91 Permit 1/19/2020 US Army Corps of Engineers Prog. General Permit 1/20/2015 Rev 1/20/2010 Activities Permitted Dredge 20,000 cy Beach nourishment at W. D Beach Dredge 20,000 cy; placement as beach nourishment at W. Dennis Dredge 20,000 cy; placement as nourishment at W. D Beach Dredge 20,000 cy; placement as nourishment at W. D Beach place 10,000 cy at W. D B from other source Time of Year Restrictions No dredging Jan. 15 to Jun. 15 No nourishment from Apr. 1 to Aug. 31 No dredging Jan. 15 to Jun. 15. No nourishment from Apr. 1 to Aug. 31 No dredging Jan. 15 to Jun. 15 in inner channel (Sta to 60+00); no nourishment from Apr. 1 to Aug. 31 No beach nourishment in Plover habitat from Apr. 1 to Sep. 1
5 COMBINING PERMITTING: EASIER TO MANAGE EXISTING AND PROPOSED DREDGE LOCATIONS MORE COST EFFICIENT 2 TO 3 TIMES LONGER PERMITTED TIME BETTER FISCAL PLANNING FOR ANNUAL DREDGING REGULAR BEACH NOURISHMENT PRESERVES VALUABLE ECONOMIC RESOURCES ALLOWS MUNICIPAL/PRIVATE PARTNERSHIPS WHICH COULD REDUCE MUNICIPAL COSTS AND HELP WATERFRONT PROPERTIES DEAL WITH EROSION
6 WHAT IS INCLUDED?
7 NAVIGATION CHANNELS
8 DOCK & PIER ACCESS
9 MOORING BASINS
10 DEWATERING SITES DISPOSAL AREAS
11 BEACH NOURISHMENT AREAS
12 CURRENTLY PERMITTED NAVIGATION CHANNELS BASS RIVER LOWER CHANNEL (TOWN OF YARMOUTH OBTAINED 10 YEAR COMPREHENSIVE PERMIT FOR BASS RIVER CHANNEL FROM MOUTH TO GRAND COVE AREA IN 2010). SESUIT HARBOR ENTRANCE CHANNEL
13 CURRENTLY PERMITTED HABITAT IMPROVEMENT AREA SWAN POND ENTRANCE CHANNEL
14 CURRENTLY PERMITTED BEACH NOURISHMENT AREAS WEST DENNIS BEACH COLD STORAGE BEACH
15 CURRENTLY PERMITTED DEWATERING & DISPOSAL SITES NONE
16 PROPOSED NAVIGATION CHANNEL DREDGING BASS RIVER GRAND COVE TO FOLLINS POND BASS RIVER SPUR CHANNELS: WEIR CREEK, UNCLE FREEMAN, FERRY ST, BASS RIVER PARK, HORSEFOOT COVE, GRAND COVE, WILBUR COVE, FOLLINS POND.
17 PROPOSED MOORING BASIN DREDGE LOCATIONS STAGE ISLAND WEIR CREEK UNCLE FREEMANS CAPT. HARDING AUNT JULIA ANNS LITTLE COVE GRAND COVE
18 PROPOSED MOORING BASINS (CONT.) WILBUR COVE HIGH BANK KELLEY S BAY FOLLINS POND SESUIT INNER BASIN SESUIT INNER MOORING
19 PROPOSED HABITAT IMPROVEMENT AREA CHASE GARDEN CREEK CHANNEL CHASE GARDEN CREEK SHOAL
20 PROPOSED DEWATERING SITES WEST DENNIS BEACH PARKING LOT BASS RIVER PARK PARKING LOT HORSEFOOT COVE LANDING COVE ROAD LANDING, SD AUNT JULIA S LANDING OLD FISHERMAN S LANDING FOLLINS POND LANDING
21 PROPOSED DEWATERING SITES (CONT.) CHAPIN BEACH PARKING LOT SESUIT HARBOR WEST SIDE PARKING LOT SESUIT HARBOR EAST SIDE PARKING LOT COLD STORAGE BEACH PARKING LOT
22 PROPOSED DISPOSAL AREA EAST OF COMPOST AREA AT THE TRANSFER STATION ARMY CORPS OF ENGINEERS (ACOE) OFF SHORE MASSACHUSETTS BAY DISPOSAL SITE, BOSTON
23 Project Type Side/Spur Channel Mooring Basin Outer/Entrance Channel Inner Channel Mooring Basin Capacity 10 YR COMPREHENSIVE MATRIX Category ID Name Bass River Entrance ü Old Field Channel 1 ü Bass River Lower Channel ü B Ri Ch l Mid Ri 1 ü
24
25 GIS MAPPING
26 DREDGE VOLUMES & COSTS WOODS HOLE GROUP REPORTED THAT THE TOWN WAS, ON AVERAGE, DREDGING ABOUT 10,500 CY OF CLEAN SAND FOR BEACH NOURISHMENT. FUNDING: $100,000/YR. 10 YEAR PERMIT ESTIMATE: 153,000 CY OR 15,300 CY/YR. FUNDS NEEDED: $250,000/YR* BARNSTABLE COUNTY DREDGE RATES: FIRST 3,500 FT =$7/CY, 3,500 TO 12,000 FT = $11/CY OFF SITE DEWATERING & DISPOSAL $80 $100/CY * Conceptual estimate, requires survey to confirm
27 WHERE DO WE GO FROM HERE? POST MAP ON TOWN WEB PAGE FOR PUBLIC REVIEW AND COMMENT DISCUSS SUPPORT WITH TOWN OF YARMOUTH PRELIMINARY DISCUSSIONS WITH DEP FUND $250,000 FOR ENGINEERING TO OBTAIN FINAL PERMIT IN 2 TO 3 YEARS. FUNDING SCHEDULE: NOV2013 STM: $60K, MAY2014 ATM: $165K; MAY2015 ATM: $25K
28 DREDGE EQUIPMENT COST ESTIMATE
29 Minimum Dredge Equipment: Cost: Dredge (replacement 20 years) - $1,200,000 Booster pump - $300, Dia. Pipe (6,000 $40 per ft)- $240,000 Couplers for pipe or joint fusion- $25,000 Pipe floats $120,000 Push Barge w/ boom (150hp engine)- $50,000 Support boat (with 150hp engine) - $30,000
30 Boat trailers (2)barge & boat - $8,000 Loader (replacement 7 years)- $180,000 Crane (rental 5 $1,500)- $7,500 Flat bed trailer for hauling pipe, used- $8,000 Truck for flatbed trailer used - $15,000 Miscellaneous Safety equipment $15,000 Misc. tools & equipment $25,000 Subtotal: $2,223,500 Annual Operating Budget: $650,000 Total start-up cost first year - $2,873,500
31 Other Information Estimate does not include backup parts and equipment. Pipe storage either on town beach or hauled overland to town property. North side/south side mobilization measured in weeks. Equipment operates in highly corrosive environment. Requires qualified (licensed) work force.
32
33
34
Final Waterways Assets and Resources Survey Master Plan for Dredging and Beach Nourishment
Final Waterways Assets and Resources Survey Master Plan for Dredging and Beach Nourishment For, Massachusetts Prepared For: Dennis Town Hall P.O. Box 2060 485 Main Street Dennis, MA 02660 Prepared By:
More informationSaco River Maintenance Dredge PROJECT PLAN AND TIMELINE JUNE 15, 2017
Saco River Maintenance Dredge 2017-2018 PROJECT PLAN AND TIMELINE JUNE 15, 2017 Overview Last dredged in 1994 Removing ~150,000 cy of sand and silt from the upper and lower reaches Disposal sites: In-River
More informationNome Harbor Page 2 of 12
Nome Harbor Nome Harbor Page 2 of 12 Condition of Improvements 30 December 2015 Nome Harbor, Alaska (CWIS No. 010422, 012270, 072742, 087755) Authorization (1) Rivers and Harbors Act, 8 August 1917 (House
More information1-32 NOME HARBOR, ALASKA (CWIS NOS , 87755, 12270, & 10422) Condition of Improvement 30 September 2012
NOME HARBOR 1-32 NOME HARBOR, ALASKA (CWIS NOS. 72742, 87755, 12270, & 10422) Condition of Improvement 30 September 2012 AUTHORIZATION: (1) Rivers and Harbors Act, 8 August 1917 (House Doc. 1932, 64th
More informationJuneau Douglas Harbor
Juneau Douglas Harbor Douglas Harbor Page 2 of 8 Condition of Improvements 31 December 2015 Douglas Harbor, Alaska (CWIS No. 072789, 180942) Authorization Rivers and Harbors Act, 3 July 1958 (House Doc.
More informationPublic Notice U.S. Army Corps In Reply to Application Number CENAB-OP-RMS (NATIONAL HARBOR (FORMERLY PORT Baltimore District AMERICA])
Public Notice U.S. Army Corps In Reply to Application Number of Engineers CENAB-OP-RMS (NATIONAL HARBOR (FORMERLY PORT Baltimore District AMERICA]) 88-01361 PN 14-05 Comment Period: January 16, 2014 to
More information1-32 NOME HARBOR, ALASKA (CWIS NOS , 87755, & 10422) Condition of Improvement 30 September 2009
NOME HARBOR 1-32 NOME HARBOR, ALASKA (CWIS NOS. 72742, 87755, & 10422) Condition of Improvement 30 September 2009 AUTHORIZATION: (1) Rivers and Harbors Act, 8 August 1917 (House Doc. 1932, 64th Congress,
More informationTown of Duck, North Carolina
Tracking No. 00.00.2010 Erosion Mitigation And Shoreline Management Feasibility Study Town of Duck, North Carolina Coastal Planning & Engineering of North Carolina August 15, 2012 Tom Jarrett Robert Neal
More informationTown of Barnstable Mooring Program
Town of Barnstable Mooring Program Moorings Under Massachusetts General Laws, Ch 91, Sec 10A, a Harbormaster is empowered to authorize by permit, on a temporary basis, the mooring of floats and rafts held
More informationGrays Harbor Federal Project
Grays Harbor Federal Project Elizabeth Chien Coastal Navigation Program Manager Seattle District 27 October 2016 US Army Corps of Engineers Grays Harbor Navigation Channel Inner Harbor Dredging Summer
More informationFollets Island Nearshore Beach Nourishment Project
Coast & Harbor Engineering A division of Hatch Mott MacDonald Follets Island Nearshore Beach Nourishment Project Arpit Agarwal, P.E. April 1, 2016 Project Site!"#$% &'(% &)*+% )#,'-+% Shoreline Erosion
More informationSediment Management Plan Rehoboth Bay
Sediment Management Plan Rehoboth Bay STAC Meeting November 16, 2007 Goals of the Study Improve planning for future dredging needs Reduce the dependency on dredging Study Tasks Environmental data Historical
More informationNinilchik Harbor Page 2 of 11
Ninilchik Harbor Ninilchik Harbor Page 2 of 11 Condition of Improvements 31 December 2017 Ninilchik Harbor, Alaska (CWIS No. 012640, 087345) Authorization Rivers and Harbors Act, 3 July 1958 (P.L. 85-500
More informationNorwalk Harbor: The Jewel of Long Island Sound. A Presentation by the Norwalk Harbor Management Commission
Norwalk Harbor: The Jewel of Long Island Sound A Presentation by the Norwalk Harbor Management Commission 2018 State of the Harbor Meeting December 13, 2018 The City of Norwalk in Southwest Connecticut
More informationCity of Pittsfield HARBORMASTER RULES AND REGULATIONS on docks
City of Pittsfield HARBORMASTER RULES AND REGULATIONS on docks Definitions Dock: Any permanently fixed or floating structure extending from the upland into the water, capable of use for vessel mooring
More informationMOREHEAD CITY HARBOR, NC. Dredged Material Management Plan (DMMP)
MOREHEAD CITY HARBOR, NC Dredged Material Management Plan (DMMP) Public Meeting/Info Session 15 January 2014 US Army Corps of Engineers Morehead City Harbor DMMP Presentation Topics Morehead City Harbor
More informationWater Resources Report RKLD Annual Meeting July 30, 2016
Water Resources Report RKLD Annual Meeting 2016 July 30, 2016 Topics Hydrology Report Indianford Dam trash rack cleanout performance Experimental Project update Review of PAS project Twin floods- 1 to
More informationTrends in Shoreline Change and Hazard Impacts: Hot Spots and Management Challenges. Greg Berman CAPE COASTAL CONFERENCE.
CAPE COASTAL CONFERENCE Linking Science with Local Solu1ons and Decision- Making Trends in Shoreline Change and Hazard Impacts: Hot Spots and Management Challenges Presented By Greg Berman (WHOI Sea Grant
More informationCat Island Chain Restoration
Cat Island Chain Restoration 1820s Fox River Military Road Map to Fort Howard 1845 Chart of Green Bay & Fox River Cat Island Chain - 1938 Cat Island Brown County Aerial Photography, 1938 Historic Western
More informationGrays Harbor O&M and Deepening Dredging
Grays Harbor O&M and Deepening Dredging Elizabeth Chien Project Manager Seattle District 28 January 2016 US Army Corps of Engineers Grays Harbor Navigation Channel Inner Harbor O&M Dredging Summer 2015:
More informationEvaluation of Placement Alternatives for Matagorda Ship Channel Bottleneck Removal
Evaluation of Placement Alternatives for Matagorda Ship Channel Bottleneck Removal James Rosati III Ashley E. Frey CPT Grays Harbor, WA Wood Wood chips Flour Other CMS Shark River Inlet, NJ US Army Corps
More informationCORPS FACTS. Harbor Dredging U.S. ARMY CORPS OF ENGINEERS BUILDING STRONG
CORPS FACTS Harbor Dredging U.S. ARMY CORPS OF ENGINEERS BUILDING STRONG Disaster Response Sedimentation in the channel is caused by the normal cycle of silt movement, erosion from high water or heavy
More informationU.S. Army Corps of Engineers (USACE) P.O. Box 428 Smithville, MO
Applicant Information United States Army Corps of Engineers Kansas City District Principal Contact: Derek Dorsey, Natural Resource Manager U.S. Army Corps of Engineers P.O. Box 428 Smithville, MO 64089
More informationCondition of Improvements 30 December 2014 Wrangell Harbors, Alaska (CWIS No , )
Wrangell Harbors Condition of Improvements 30 December 2014 Wrangell Harbors, Alaska (CWIS No. 010435, 021500) Authorization (1) Rivers and Harbors Act, 22 September 1922 (House Doc. 161, 67th Congress,
More information30 DAY PUBLIC NOTICE MAINTENANCE DREDGING OF THE 8-FOOT CHANNEL OF THE FEDERAL NAVIGATION PROJECT IN KENNEBUNK RIVER KENNEBUNK & KENNEBUNKPORT, ME
fr.iiif.i ~ US Anny Corps of Engineers New England District 696 Virginia Road Concord, MA 01742-2751 Public Notice In Reply Refer to: Mr. Jack Karalius nae-pn-nav@usace.army.mil Programs/Project Management
More informationBEACH NOURISHMENT BY RAINBOWING FOR THE VISAKHAPATNAM PORT TRUST BY DCI. Capt. MVR MURTHY ABSTRACT
BEACH NOURISHMENT BY RAINBOWING FOR THE VISAKHAPATNAM PORT TRUST BY DCI Capt. MVR MURTHY ABSTRACT The coastal city of Visakhapatnam had a long wide beach. Over past three decades, this beach has progressively
More informationCity of Pittsfield Harbormaster APPLICATION FOR AN INDIVIDUAL MOORING PERMIT
City of Pittsfield Harbormaster APPLICATION FOR AN INDIVIDUAL MOORING PERMIT INSTRUCTIONS: This application may only be used for requests to place lake moorings. This application must be completed in its
More informationShoreline Studies Program, Department of Physical Sciences, VIMS
Living Shoreline Training Class 2017 1 Demonstration sites discussed in this talk. 2 A shoreline management plan for the entire creek made conceptual shoreline management recommendations along every stretch
More informationMaltester Channel Dredging. Shoreline Marina Committee. November 18, 2008
Maltester Channel Dredging Shoreline Marina Committee November 18, 2008 Shoaling Study Summary Report Completed in October 2008 Analyzed siltation rates at Marina Rate of siltation is dynamic ranging from
More informationInformation for File # SEW
Information for File #2014-02744-SEW Applicant: Minnesota Department of Transportation (MnDOT), District 3; c/o Mr. Robert Nibbe Corps Contact: Sarah Wingert, U.S. Army Corps of Engineers, 180 5 th Street
More informationFor more information or permission to reprint slides, please contact Donna Milligan at 1
For more information or permission to reprint slides, please contact Donna Milligan at milligan@vims.edu 1 For more information or permission to reprint slides, please contact Donna Milligan at milligan@vims.edu
More informationEstimated on-the-ground start and end dates: 1 June October 2018
A. Applicant Information Name of Organization: U.S. Army Corps of Engineers, Carlyle Lake 801 Lake Road, Carlyle, IL 62231 Contact Information: Robert Wilkins, Operations Manager, (618) 594-2484, Robert.Wilkins@usace.army.mil
More informationKetchikan Harbors Thomas Basin and Bar Point Harbor
Ketchikan Harbors Thomas Basin and Bar Point Harbor Condition of Improvements 30 December 2014 Thomas Basin & Bar Point Harbors Ketchikan, Alaska (CWIS No. 000631 & 087071) Authorization (1) Rivers and
More informationST. JOSEPH PENINSULA, GULF COUNTY, FLORIDA Beach Re-Nourishment and Environmental Enhancement Project RECOMMENDATIONS
ST. JOSEPH PENINSULA, GULF COUNTY, FLORIDA Beach Re-Nourishment and Environmental Enhancement Project RECOMMENDATIONS January 23, 2018 543 Harbor Boulevard, Suite 204 Destin, Florida 32541 850.654.1555
More informationPublic Notice. Corps File No. LRE Date: March 19, 2017 Expires: March 18, 2022
US Army Corps of Engineers Detroit District Public Notice Corps File No. LRE-2016-00006-100 Date: March 19, 2017 Expires: March 18, 2022 PUBLIC NOTICE ANNOUNCING REGIONAL CONDITIONS AND WATER QUALITY CERTIFICATIONS
More informationAttachment A. Pertinent Correspondence
Attachment A Pertinent Correspondence GREAT CHEBEAGUE ISLAND INITIAL APPRAISAL REPORT SPONSOR-PROVIDED DATA To: Army Corp. of Engineers From: Ronald Tozier: Harbor Master; Town of Chebeague Island
More informationUse of Conservation Moorings as a Component of Eelgrass Restoration in two Massachusetts Harbors
Use of Conservation Moorings as a Component of Eelgrass Restoration in two Massachusetts Harbors Massachusetts Bays Program Division of Marine Fisheries Jay Baker, Tay Evans, Mass Bays Program MarineFisheries
More informationNorth Shore of Long Island, Feasibility Study
North Shore of Long Island, Asharoken New York Asharoken, Feasibility Study Asharoken, NY Public Meeting June 30, 2015 US Army Corps of Engineers US Army Corps of Engineers New York BUILDING STRONG BUILDING
More informationSACO RIVER AND CAMP ELLIS BEACH SACO, MAINE SECTION 111 SHORE DAMAGE MITIGATION PROJECT APPENDIX F ECONOMIC ASSESSMENT
SACO RIVER AND CAMP ELLIS BEACH SACO, MAINE SECTION 111 SHORE DAMAGE MITIGATION PROJECT APPENDIX F ECONOMIC ASSESSMENT Department of the Army New England District, Corps of Engineers 696 Virginia Road
More informationPEASE DEVELOPMENT AUTHORITY DIVISION OF PORTS & HARBORS ANNUAL DREDGE REPORT
PEASE DEVELOPMENT AUTHORITY DIVISION OF PORTS & HARBORS ANNUAL DREDGE REPORT 2018 555 Market Street Portsmouth, New Hampshire 03801 Phone #603 436 8500 Fax #603 436 2780 TABLE OF CONTENTS Cover Page Table
More informationTown of Duck, North Carolina
Tracking No. 00.00.2010 Erosion Mitigation And Shoreline Management Feasibility Study Town of Duck, North Carolina Coastal Planning & Engineering of North Carolina February 28, 2013 Ken Willson 1 Tracking
More informationAppendix C3. Cost Engineering
Appendix C3 Cost Engineering November 2016 Costs generated in this appendix include the likely initial project cost to place dredged material from the source area (Lower Reach E Miah Maull and Brandywine
More informationX.B WETLANDS ROGUE RIVER ESTUARY
X.B WETLANDS ROGUE RIVER ESTUARY The Rogue River has a drainage area of 5,100 square miles, yet the estuary of the Rogue River is one of the smallest in Oregon, measuring approximately 1,880 acres during
More informationLong Term Success and Future Approach of the Captiva and Sanibel Islands Beach Renourishment Program
2017 National Conference on Beach Preservation Technology February 8-10, 2017; Stuart, Florida Long Term Success and Future Approach of the Captiva and Sanibel Islands Beach Renourishment Program Thomas
More informationCordova Harbor Page 2 of 9
Cordova Harbor Cordova Harbor Page 2 of 9 Condition of Improvements 30 December 2017 Cordova Harbor, Alaska (CWIS No. 087136, 087186, 087711) Authorization Rivers and Harbors Act, 30 August 1935 (R & H
More informationFINAL ENVIRONMENTAL IMPACT STATEMENT ON BROWARD COUNTY SHORE PROTECTION PROJECT SEGMENTS II AND III BROWARD COUNTY, FLORIDA
FINAL ENVIRONMENTAL IMPACT STATEMENT ON BROWARD COUNTY SHORE PROTECTION PROJECT SEGMENTS II AND III BROWARD COUNTY, FLORIDA 1. PROJECT PURPOSE AND NEED 1.1. PROJECT AUTHORITY. 1.1.1. INITIAL AUTHORIZATION.
More informationAPPENDIX M DREDGED MATERIAL MANAGEMENT PLAN (DMMP) FINAL INTEGRATED FEASIBILITY REPORT AND ENVIRONMENTAL ASSESSMENT
APPENDIX M DREDGED MATERIAL MANAGEMENT PLAN (DMMP) Brazos Island Harbor, Texas Channel Improvement Study FINAL INTEGRATED FEASIBILITY REPORT AND ENVIRONMENTAL ASSESSMENT This page is intentionally left
More informationDredging Keeping Our Underwater Highways Open
Dredging Keeping Our Underwater Highways Open Sedimentation Material that falls to the bottom of a liquid is called sediment. If enough sediment deposits to build a shallow spot on the river or ocean bottom,
More informationChapter I: Marine Resources
NOTE TO READERS: This is a draft of the Kennebunk Comprehensive Plan. The Comprehensive Plan provides us with a description of the town today in a range of categories, and identifies issues and recommendations
More informationINDIANA REGIONAL GENERAL CONDITIONS FOR THE STATE OF INDIANA
INDIANA REGIONAL GENERAL CONDITIONS FOR THE STATE OF INDIANA These regional conditions are in addition to but do not supersede the requirements in the Federal Register (Volume 82 No. 4 of January 6, 2017).
More informationNearshore Dredged Material Placement Pilot Study at Noyo Harbor, CA
1 Nearshore Dredged Material Placement Pilot Study at Noyo Harbor, CA Noyo Cove N 2011 National Conference on Beach Preservation Technology 9-11, February 2011 Lihwa Lin, Honghai Li, Mitchell Brown US
More informationCoastal Harbors and Waterways, NC (Shallow Draft Navigation) (O&M)
Coastal Harbors and Waterways, NC (Shallow Draft Navigation) (O&M) Shallow draft coastal harbors include a subsistence harbor at Silver Lake CONGRESSIONAL DISTRICT: NC 3, 7 DATE: 23 April 2018 1. AUTHORIZATION:
More informationCoastal Harbors and Waterways, NC (Shallow Draft Navigation) (O&M)
Coastal Harbors and Waterways, NC (Shallow Draft Navigation) (O&M) Shallow draft coastal harbors include a subsistence harbor at Silver Lake CONGRESSIONAL DISTRICT: NC 3 and 7 DATE: 23 February 2015 1.
More informationCharlottetown Marine Terminal Pipeline Decommissioning Project Description
Charlottetown Marine Terminal Pipeline Decommissioning Project Description 69 Marr Road Unit B Rothesay NB, E2E 3J9 Tel (506) 848-1920 Fax (506) 848-1929 Charlottetown Marine Terminal Pipeline Decommissioning
More informationFY-16 Ongoing Contracts FY-16 Scheduled Contracts
FY-16 Ongoing Contracts FY-16 Scheduled Contracts Christopher Frabotta Deputy Chief, Operations Division / Chief, Navigation Branch Southwestern Division - Galveston District 8 October 2015 Galveston District
More informationBeach Renourishment in Jacksonville
Beach Renourishment in Jacksonville Kevin Bodge, PhD, P.E. - Olsen Associates, Inc. 1978 Oct 2004 2000 2016 2011 Oct 2016 Coastal Duval County, FL Nassau Sound Blount Island Ft. George Inlet St. Johns
More informationHARBOR INFRASTRUCTURE INVENTORIES Marquette Harbor, Michigan
HARBOR INFRASTRUCTURE INVENTORIES Marquette Harbor, Michigan Harbor Location: Marquette Harbor is located in Marquette Bay on the south shore of Lake Superior, 160 miles west of Sault Ste. Marie, MI and
More informationA Single-Point Mooring System for Direct Pumpout of Hopper Dredges
..-0. -..- DRP-3-08 November 1992 Dredging Technical Research Notes A Single-Point Mooring System for Direct Pumpout of Hopper Dredges Purpose This technical note describes a direct pumpout (DPO) system
More informationDEPARTMENT OF THE ARMY GALVESTON DISTRICT, CORPS OF ENGINEERS P.O. BOX 1229 GALVESTON, TEXAS CESWG-CDR (1145)
DEPARTMENT OF THE ARMY GALVESTON DISTRICT, CORPS OF ENGINEERS P.O. BOX 1229 GALVESTON, TEXAS 77553-1229 REPLY TO ATTENTION OF CESWG-CDR (1145) TBD MEMORANDUM FOR All Galveston District Personnel. SUBJECT:
More informationCOMPARISON OF FIXED & VARIABLE RATES (25 YEARS) CHARTERED BANK ADMINISTERED INTEREST RATES - PRIME BUSINESS*
COMPARISON OF FIXED & VARIABLE RATES (25 YEARS) Fixed Rates Variable Rates FIXED RATES OF THE PAST 25 YEARS AVERAGE RESIDENTIAL MORTGAGE LENDING RATE - 5 YEAR* (Per cent) Year Jan Feb Mar Apr May Jun Jul
More informationGOAL: Collect product flowing over Onalaska spillway to protect downstream resources C&C 250 Y Y. Looking upstream at spillway
GOAL: Collect product flowing over Onalaska spillway to protect downstream resources BR5 Black n/a Onalaska Spillway Carry- In C&C 250 Y Y Looking upstream at spillway Implementation (Go to Aerial View)
More informationUnited States Department of the Interior
United States Department of the Interior John Kennelly, Chief Planning Branch Department of the Army New England District U.S. Army Corps of Engineers 696 Virginia Rd Concord, Massachusetts 01742 FISH
More informationCORPS ON THE COAST. North Carolina Coastal Conference Coastal Infrastructure Raleigh, NC April 14, Jim Medlock Chief, Programs Management Branch
CORPS ON THE COAST North Carolina Coastal Conference Coastal Infrastructure Raleigh, NC April 14, 2015 Jim Medlock Chief, Programs Management Branch US Army Corps of Engineers OVERVIEW What Are The Corps
More informationRedondo Pier Alternate Site Activity
Name: Section: Redondo Pier Alternate Site Activity (Fisherman s Wharf, Redondo Beach, CA 90277) Lab 14C-1 The purpose of this activity is for you to participate in water sampling. We will examine ocean
More informationBeach Nourishment Impact on Beach Safety and Surfing in the North Reach of Brevard County, Florida
Beach Nourishment Impact on Beach Safety and Surfing in the North Reach of Brevard County, Florida Prepared by John Hearin, Ph.D. Coastal Engineering Vice Chairman Cocoa Beach Chapter Port Canaveral Patrick
More informationBALD HEAD ISLAND, NC SAND SHARING SYSTEM OVERVIEW AND ASSESSMENT. Erik J. Olsen, P.E. olsen associates, inc.
BALD HEAD ISLAND, NC SAND SHARING SYSTEM OVERVIEW AND ASSESSMENT Erik J. Olsen, P.E. Olsen Associates, Inc. BACKGROUND Both the Village of Bald Head Island (VBHI) and the Bald Head Island Limited, LLC.
More informationAbandoned and Derelict Vessels in the Florida Keys National Marine Sanctuary
Abandoned and Derelict Vessels in the Florida Keys National Marine Sanctuary Steve Werndli Emergency Response and Enforcement Coordinator Florida Keys National Marine Sanctuary April 18, 2017 Derelict
More informationAPPENDIX D REAL ESTATE PLAN
NAVIGATION IMPROVEMENTS SITKA HARBOR, ALASKA CHANNEL ROCK BREAKWATERS DRAFT DEFICIENCY CORRECTION EVALUATION REPORT APPENDIX D REAL ESTATE PLAN JANUARY 2011 REAL ESTATE PLAN FOR SITKA HARBOR, ALASKA CHANNEL
More informationBuilding Coastal Resiliency at Plymouth Long Beach
Building Coastal Resiliency at Plymouth Long Beach Department of Marine and Environmental Affairs March 30, 2017 Introducing Green Infrastructure for Coastal Resiliency Plymouth Long Beach & Warren s Cove
More informationST. LOUIS SECTION PROJECT OF THE YEAR AWARD
ST. LOUIS SECTION PROJECT OF THE YEAR AWARD Originality and Innovation The St. Louis Harbor Project is located in the Upper Mississippi River between the entrance to the Chain of Rocks Canal at River
More informationShoalwater Bay Shorline Erosion Dredging
Shoalwater Bay Shorline Erosion Dredging ROSS ISLAND SAND & GRAVEL CO. Saving the Tokeland Penninsula Willapa Bay & Tokeland Penninsula Southwestern Washington Coast Shoalwater Bay Historic View Settlements
More informationAtlantic Coast of Long Island, Jones Inlet to East Rockaway Inlet, Long Beach Island, NY Construction Update
Atlantic Coast of Long Island, Jones Inlet to East Rockaway Inlet, Long Beach Island, NY Construction Update June 2016 US Army Corps of Engineers Project Purpose Three specific damage mechanisms of coastal
More informationCoastal Harbors and Waterways, NC (Shallow Draft Navigation) (O&M)
Coastal Harbors and Waterways, NC (Shallow Draft Navigation) (O&M) Shallow draft coastal harbors include a subsistence harbor at Silver Lake CONGRESSIONAL DISTRICT: NC 3 and 7 DATE: 23 February 2015 1.
More informationShellfish Division Annual Shellfish Resource Management Regulations
Shellfish Division 2017-2018 Annual Shellfish Resource Management Regulations September 10, 2018 1 TOWN OF FALMOUTH OYSTER REGULATIONS 2018-2019 SEASON Family/Recreational: Between October 1, 2018 and
More informationIssues facing this region include the status of the Sluice Creek tide gates, various tidal wetlands, and locations of public access:
5.6 Guilford Point to Madison Town Line Existing Resources This region extends from Guilford Point to the Madison town line. Named places include Grass Island and the East River. Residential, commercial,
More information{ } Jack Holland Page 1 of DOC
Background In 1957 the Florida Legislature created the Hillsboro Inlet District. This is a special independent district that can levy taxes to finance the maintenance and improvements to the Inlet. The
More informationRising Tide Oyster Company 2.0 Acre Bellamy Site Marine Aquaculture License Application
Rising Tide Oyster Company 2.0 Acre Bellamy Site Marine Aquaculture License Application Joshua and Jessica Carloni 264 Swain Road Barrington, N.H. 03825 Summary This is an amendment to our existing license
More informationFigure79. Location map for the 10 NJBPN profile sites in Atlantic County, NJ 155
154 Figure79. Location map for the 10 NJBPN profile sites in Atlantic County, NJ 155 ATLANTIC COUNTY SPRING 2009 to FALL 2010 The Atlantic County coastline consists of three barrier islands. Between Little
More informationFigure 262. Location map for the 10 NJBPN profile sites in Atlantic County, NJ 279
278 Figure 262. Location map for the 10 NJBPN profile sites in Atlantic County, NJ 279 ATLANTIC COUNTY SUMMARY The Atlantic County coastline consists of three barrier islands. The island of Little Beach
More informationSoutheast Volusia Coastal Projects Update
Southeast Volusia Coastal Projects Update Public Works Department Coastal Division August 15, 2016 2016 Dune Walkover Re-Decking Program Completed Dune Walkovers South End 8 th Ave. New Smyrna Beach* 12
More informationAPPLICANT: Pacific Northwest National Laboratory Attention: Mr. Charles Brandt 1529 West Sequim Bay Road Sequim, Washington 98382
US Army Corps of Engineers Seattle District Joint Public Notice Application for a Department of the Army Permit and a Washington Department of Ecology Water Quality Certification and/or Coastal Zone Management
More informationCHAPTER 6 10/29/2018 Clean Version REGULATING PIERS, WHARVES, MOORING BUOYS, SWIMMING RAFTS AND INFLATABLES ON ROCK LAKE
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 CHAPTER 6 10/29/2018 Clean Version REGULATING PIERS, WHARVES, MOORING BUOYS,
More informationLa Quinta Channel Extension Port of Corpus Christi Ingleside, Texas. Mark Coyle
La Quinta Channel Extension Port of Corpus Christi Ingleside, Texas Mark Coyle Corpus Christi Navigation Channel PCCA La Quinta Expansion Project History Corpus Christi Ship Channel Improvement Projects
More informationOcean Structures and Material Prof. Dr. Srinivasan Chandrasekaran Department of Ocean Engineering Indian Institute of Technology, Madras
Ocean Structures and Material Prof. Dr. Srinivasan Chandrasekaran Department of Ocean Engineering Indian Institute of Technology, Madras Module - 2 Lecture - 5 Dredging II In the fifth lecture we discussed
More informationUMass Boston Waterfront at a glance
UMass Boston Waterfront at a glance Fox Point Pavilion Over the years, the Fox Point Landing has been a rest area, an outdoor classroom and a general meeting place for students, staff and faculty of the
More informationCanal Dock Boathouse, Inc. (CDBi) Paddle-Sports Request for Proposal Q & A Posted to CDBi website 9/16/2017
Canal Dock Boathouse, Inc. (CDBi) Paddle-Sports Request for Proposal Q & A Posted to CDBi website 9/16/2017 *(All responses below are subject to further scrutiny by the City of New Haven and could be updated
More information3.7 River Navigation Affected Environment
3 Affected Environment and Environmental Consequences 3.7 River Navigation 3.7.1 Affected Environment Sterling Highway MP 45 60 Project Final EIS The Kenai River is approximately 82 river miles long in
More informationImpact of Dredging the Lower Narrow River on Circulation and Flushing
Impact of Dredging the Lower Narrow River on Circulation and Flushing Craig Swanson Ph.D. Swanson Environmental Alex Shaw Ocean Engineering, URI Prof. Malcolm L. Spaulding Ocean Engineering, URI 29 January
More informationSummary of Water Access for Marinas and Public Boat Ramps
Lake Tahoe Shoreline Plan Meeting Materials: Steering Committee Last Updated: 11-28-16 Summary of Water Access for Marinas and Public Boat Ramps Table 1: Marinas Buoy Field Assessment Marinas 1. North
More informationDALE HOLLOW LAKE TROOPER ISLAND IMPROVEMENT PROJECT Proposal for Reservoir Fisheries Habitat Partnership (RFHP)
DALE HOLLOW LAKE TROOPER ISLAND IMPROVEMENT PROJECT Proposal for Reservoir Fisheries Habitat Partnership (RFHP) A. Applicant Information: US Army Corps of Engineers, Dale Hollow Lake POC: Gregg Nivens
More informationCaloosahatchee River Citizen s Association
Caloosahatchee River Citizen s Association www.caloosahatchee.org Autumn 2002 Caloosahatchee Regional Park Plan Revised! Public Participation Pays off! Last fall the Lee County Parks & Recreation Department
More informationTanya M. Beck. Kelly Legault. Research Physical Scientist Coastal & Hydraulics Lab, ERDC Vicksburg, MS
Inlet And Adjacent Shoreline Processes at Cascading Time Scales Using the Coastal Modeling System and GenCade Tanya M. Beck Research Physical Scientist Coastal & Hydraulics Lab, ERDC Vicksburg, MS Kelly
More informationMILE POINT TRAINING WALL JACKSONVILLE, FL. Geotextile Tube Installation
MILE POINT TRAINING WALL JACKSONVILLE, FL Geotextile Tube Installation PROJECT DESIGN Remove portion of existing training wall Construct new eastern and western training walls Deepen new flow improvement
More informationFort Hancock Sailing Center
Response to the National Parks Service Request for Expressions of Interest to Redevelop Historic Structures at Fort Hancock in the Sandy Hook Unit of Gateway National Recreation Area Fort Hancock Sailing
More informationBuilding Beaches with Navigation Sand, Just Don t Forget the Dunes!!
Building Beaches with Navigation Sand, Just Don t Forget the Dunes!! Ken Willson Kenneth.Willson@CBI.com Introduction Decrease in Federal Funding (Shallow Draft Navigation Maintenance and Shore Protection)
More informationCreated by Luke and David Walden
Created by Luke and David Walden Copyright 1991, 2005, and 2008 by Luke and David Walden Waterside Publishing ISBN xxxxxxxxxxxx All rights reserved. No part of this book may be reproduced or utilized in
More informationNew Orleans Municipal Yacht Harbor
New Orleans Municipal Yacht Harbor Marina Schematic Design Update 601 Poydras St., Suite 1860 New Orleans, LA, 70130 504-648-3560 Post-Katrina Municipal Yacht Harbor: Introduction The MYH was an approximate
More informationCITY OF NEWPORT BEACH HARBOR COMMISSION STAFF REPORT
CITY OF NEWPORT BEACH HARBOR COMMISSION STAFF REPORT Agenda Item No. 2 TO: FROM: SUBJECT: HARBOR COMMISSION Harbor Resources Division (City Manager's Office) Chris Miller, Harbor Resources Supervisor,
More informationProtecting our Beaches
Protecting our Beaches South Amelia Island Shore Stabilization Project Nassau County, FL Mr. Drew Wallace President South Amelia Island Shore Stabilization Association (SAISSA) Mr. Bill Moore, AICP Project
More informationCE 535, Spring 2002 Preliminary Design Example 1 / 6
CE 535, Spring 2002 Preliminary Design Example 1 / 6 Perform a preliminary design for a bridge on a state highway over a large creek in rural Alabama. Produce a construction layout drawing showing profile
More information