1 APPENDIX C VEGETATED EMERGENCY SPILLWAY VERSION 1.0 March 1, 2011 [NOTE: Could use a better photo more clearly showing the emergency spillway in the context of the dam.] SECTION C-1: DESCRIPTION OF PRACTICE A vegetated emergency spillway is an open channel, usually trapezoidal in cross-section, that is constructed beside an embankment. It consists of an inlet channel, a control section, and an exit channel, and is lined with erosion-resistant vegetation. The purpose of a vegetated emergency spillway is to convey flows that are greater than the principal spillway s design discharge at a non-erosive velocity to an adequate receiving channel. Not applicable. SECTION C-2: PERFORMANCE CRITERIA Introduction: Appendix C: Veg. Emerg. Spillways 1 of 9 Version 1.0, March 1, 2011

2 SECTION C-3: PRACTICE APPLICATIONS AND FEASIBILITY A vegetated emergency spillway is appropriate to use when the required maximum design flood volume may exceed the capacity of the principal spillway system. A vegetated emergency spillway may also be used as a safety feature to pass flood flows when or if the principal spillway becomes clogged. SECTION C-4: ENVIRONMENTAL AND COMMUNITY CONSIDERATIONS The adjacent topography (steepness of the abutments), the existing or proposed land use, and other factors (such as a roadway over the embankment) influence the design and construction of a vegetated emergency spillway. Vegetated emergency spillways must be built in existing ground or cut. Even though an emergency spillway helps to extend the life expectancy of an impoundment and lowers the associated downstream hazard conditions, it should not be located on any portion of the embankment fill. Therefore, additional land disturbance beside the embankment must be accounted for during the planning stages of a project. Sometimes, an emergency spillway may not be practical due to this or other considerations. If site topography or other constraints preclude the use of a vegetated emergency spillway in cut, the principal spillway can be oversized to pass the additional flows or an armored emergency spillway may be provided. A cost analysis may be helpful to aid in the selection of the spillway type. If armoring is chosen, then riprap, concrete or any other permanent, nonerodible surface may be used. Note, however, that an armored emergency spillway over the top of an embankment should be designed by a qualified professional. Vegetated emergency spillways should be used only where the soils and topography will permit safe discharge of the peak flow at a point downstream from the embankment and at a velocity that will not cause appreciable erosion. Additional flood storage in the reservoir may be provided to reduce the design flow or the frequency with which the spillway is used. (?) Not applicable. SECTION C-5: DESIGN APPLICATIONS AND VARIATIONS SECTION C-6: SIZING AND TESTING GUIDELINES Introduction: Appendix C: Veg. Emerg. Spillways 2 of 9 Version 1.0, March 1, 2011

3 SECTION C-7: DESIGN CRITERIA A vegetated emergency spillway is designed to convey a pre-determined design flood discharge without excessive velocities and without overtopping the embankment. The maximum design water surface elevation through the emergency spillway should be at least 1 foot lower than the settled top of the embankment. In general, it is recommended that a vegetated emergency spillway be designed to operate during the 100-year frequency storm. Layout Vegetated spillways should be constructed in undisturbed earth in the abutments at one or both ends of an earthen embankment or over a topographic saddle anywhere on the periphery of the basin. The channel should be excavated into undisturbed earth or rock and the water surface, under maximum design flood discharge, should be confined by undisturbed earth or rock. Excavated spillways consist of three elements: (1) an inlet channel, (2) a level section, and( 3) an exit channel (see Figure C-1). Flow enters the spillway through the inlet channel. The depth of flow, H p, located upstream from the level section, is controlled in the level section and then discharged through the exit channel. Flow in the inlet channel is sub-critical. Flow in the exit channel can be either critical or supercritical. The control section is, therefore, the point on the spillway where the flow passes through critical depth. It is recommended that the control section be installed close to the intersection of the earthen embankment and the emergency spillway centerlines. The topography must be carefully considered when constructing an emergency spillway. The alignment of the exit channel must be straight to a point far enough below the embankment to insure that any flow escaping the exit channel cannot damage the embankment. This may result in additional clearing and/or grading requirements beside the abutments, property line, etc. Figure C-1 shows profiles along the centerline of a typical vegetated spillway. To reduce losses through the inlet channel, the cross-sectional area of flow in the inlet channel should be large in comparison to the flow area at the control section. Where the depth of the channel changes to provide for the increased flow area, the bottom width should be altered gradually to avoid abrupt changes in the shape of the sloping channel banks. The exit channel must have an adequate slope to discharge the peak flow within the channel. However, the slope must be no greater than that which will produce maximum permissible velocities for the soil type or the planned grass cover. Introduction: Appendix C: Veg. Emerg. Spillways 3 of 9 Version 1.0, March 1, 2011

4 Soil Types and Vegetative Cover The type of soil and vegetative cover used in an emergency spillway can be used to establish the spillway design dimensions. Soil types are classified as erosion resistant and easily erodible. Erosion resistant soils are those with a high clay content and high plasticity. Typical soil textures for erosion resistant soils are silty clay, sandy clay, and clay. Easily erodible soils are those with a high content of fine sand or silt, and a low plasticity or non-plastic. Typical soil textures for easily erodible soils are fine sand, silt, sandy loam, and silty loam. Table C-1 provides permissible velocities for a vegetated spillway based on its soil type, vegetated cover, and exit channel slope. The maximum permissible velocity may be increased by 25% when the anticipated average use is less than once in 10 years. Table C-1. Permissible Velocities for Vegetated Spillways 1 Permissible Velocity 2 (ft./sec.) Erosion Resistant Soils 3 Easy Erodible Soils 4 Vegetative Cover Slope of Exit Channel Slope of Exit Channel 0-5% 5 10% 0 5% 5 10% Bermuda Grass Bahiagrass Buffalograss Kentucky Bluegrass Smooth Bromegrass Tall Fescue Reed Canary Grass Sod Forming Grass-Legume Mixtures Lespedeza Weeping Lovegrass Yellow Bluestem Native Grass Mixtures 1 USDA-NRCS TP-61 2 Increase values 25 percent when the anticipated average use of the spillway is not more frequent than once in 10 years. 3 Those with a high clay content and high plasticity. Typical soil textures are silty clay, sandy clay, and clay 4 Those with a high content of fine sand or silt and lower plasticity or non-plastic. Typical soil textures are fine sand, silt, sandy loam, and silty loam. Source: USDA-NRCS Engineering Field Manual The type and length of vegetative cover affect the design of a vegetated spillway. Vegetation provides a degree of retardance to the flow through the spillway. Table C-2 gives retardance values for various heights of vegetative cover. Retardance for a given spillway will depend mostly upon the height and density of the cover chosen. Generally, after the cover is selected, retardance with a good, uncut condition should be used to find the capacity. Since a condition offering less protection and less retardance exists during the establishment period and after mowing, a lower degree of retardance should be used when designing for stability. Refer to the Introduction: Appendix C: Veg. Emerg. Spillways 4 of 9 Version 1.0, March 1, 2011

5 sample exercises for the design of vegetated spillways found in Chapter 13 of the Virginia Stormwater Management Handbook (2009). [NOTE: Be sure this chapter reference is correct.] Table C-2. Retardance Classifications for Vegetative Channel Linings Retardance Vegetative Cover Stand Condition Tall Fescue Good Unmowed 18 Sericea Lespedeza Good Unmowed 18 B Grass-Legume Mixture Good Unmowed 20 Small Grains, Mature Good Uncut 19 Bermuda Grass Good Tall 12 Reed Canary Grass Good Mowed 14 Bermuda Grass Good Mowed 6 Redtop Good Headed 18 C Grass-Legume Mixture Summer Good Unmowed 7 Kentucky Bluegrass Good Headed 9 Small Grains, Mixture Poor Uncut 19 Tall Fescue Good Mowed 6 Bermuda Grass Good Mowed 2.5 D Red Fescue Good Headed 15 Grass-Legume Mixture Spring and Fall Good Mowed 2 Sericea Lespedeza Good Mowed 2 Source: USDA-NRCS Hydraulic Design The hydraulic design of earthen spillways can be simplified if the effects of spillway storage are ignored. Stormwater facilities designed for compliance with state or local stormwater management regulations are typically small, resulting in minimal storage effects on the flood routing. Two design calculation procedures are presented in Chapters 16 and 17 of the Virginia Stormwater Management Handbook (2009) [NOTE: Be sure these chapter references are correct.]. The first (Procedure 1) is a conservative design procedure which is also found in the Virginia Erosion & Sediment Control Handbook (VESCH) 1992 edition, (Std., & Spec. 3.14). This procedure is typically acceptable for stormwater management basins. The second method (Procedure 2) utilizes the roughness, or retardance, and durability of the vegetation and soils within the vegetated spillway. This second design is appropriate for larger or regional stormwater facilities where the construction inspection and permanent maintenance are more readily enforced. These larger facilities typically control relatively large watersheds and are located such that the stability of the emergency spillway is essential to safeguard downstream features. If the inflow is known (from the post-developed condition hydrology) and either the desired maximum water surface elevation, or the approximate width of the proposed emergency spillway (established by the embankment geometry and the adjacent topography), then the relationship Introduction: Appendix C: Veg. Emerg. Spillways 5 of 9 Version 1.0, March 1, 2011

6 between H p, the depth of flow through the emergency spillway, and b, the emergency spillway bottom width, can be established using design Procedure 1 (Chapters 16 and 17) [NOTE: Be sure these chapter references are correct.] and Table [NOTE: This note refers to a table on page 5-77 in the Engineering Calculations Chapter of the 1999 Virginia Stormwater Management Handbook. Be sure to update this reference to the new Table numbers in the revised Handbook (2009).] If the required discharge capacity, Q, permissible velocity, V (see Table C-1), degree of retardance, C (see Table C-2), and the natural slope of the exit channel, s o, are known, then the bottom width, b, of the level and exit sections and the depth of flow, H p, may be computed using design Procedure 2 (Chapters 16 and 17) and Table However, Tables 16-13(a-d) is not appropriate for bottom widths less than 8 feet. [NOTE: This note refers to the tables on page 5-78 through 5-80 in the Engineering Calculations Chapter of the 1999 Virginia Stormwater Management Handbook. Be sure to update this reference to the new Table numbers in the revised Handbook (2009).] The hydraulic design of a vegetated emergency spillway should comply with the following: 1. The maximum permissible velocity for vegetated spillways should be selected using Table C The slope range of the exit channel provided in Table (Chapter 16) [NOTE: This note refers to a table on page 5-62 in the Engineering Calculations Chapter of the 1999 Virginia Stormwater Management Handbook. Be sure to update this reference to the new Table numbers in the revised Handbook (2009).], is a minimum slope range needed to insure supercritical flow in the exit channel. 3. Spillway side slopes should be no steeper than 3H:1V unless the spillway is excavated into rock. 4. For a given H p, a decrease in the exit slope from s o, as given in Table (Chapter 16), decreases the spillway discharge, but increasing the exit slope from s o does not increase discharge. 5. The exit channel should have a straight alignment and grade and, at a minimum, the same cross-section as the control section. 6. The inlet channel should have a straight alignment and grade. 7. The selected bottom width of the spillway should not exceed 35 times the design depth of flow. Where this ratio of bottom width to depth is exceeded, the spillway is likely to be damaged by meandering flow and accumulated debris. Whenever the required bottom width of the spillway is excessive, consideration should be given to the use of a spillway at each end of the dam. The two spillways do not need to be of equal width if their total capacity meets design requirements. If the required discharge capacity exceeds the ranges shown in the referenced tables, or topographic conditions preclude the construction of the exit channel Introduction: Appendix C: Veg. Emerg. Spillways 6 of 9 Version 1.0, March 1, 2011

7 bottom using a slope that falls within the designated ranges, alternate design procedures should be used. 8. Vegetated emergency spillways should be designed for use with the 100-year frequency storm or greater. Not applicable. SECTION C-8: REGIONAL AND CLIMATE DESIGN VARIATIONS SECTION C-9: TYPICAL GRAPHICAL DETAILS Figure C-1. Typical Plan and Profiles Along the Centerline of an Earth Spillway Introduction: Appendix C: Veg. Emerg. Spillways 7 of 9 Version 1.0, March 1, 2011

8 Figure C-2. Emergency Spillway Draining into a Concrete Channel [NOTE: Not sure how appropriate this photo is, since this Appendix focuses on vegetated emergency spillways and does not address this type of design. Perhaps we should delete this photo?] Not applicable. (?) SECTION C-10: MATERIAL SPECIFICATIONS SECTION C-11: CONSTRUCTION SEQUENCE AND INSPECTION Overall, widely acceptable construction standards and specifications for a vegetated emergency spillway on an embankment, such as those developed by the USDA-Natural Resource Conservation Service or the U. S. Army Corps of Engineers, should be followed. Further guidance can be found in the USDA-NRCS Engineering Field Manual and the National Engineering Handbook. Specifications for all earthwork and any other related work should conform to the methods and procedures that apply to the site and the purpose of the structure. The specifications should also satisfy any requirements of the local government. Installation of a vegetated emergency spillway consists of the following: (a) excavating the proper bottom width and side slopes according to the approved plan; (b) backfilling with 12 Introduction: Appendix C: Veg. Emerg. Spillways 8 of 9 Version 1.0, March 1, 2011

9 inches of topsoil (minimum); and (c) stabilizing the area following the Virginia Erosion and Sediment Control Handbook (VESCH, 1992). SECTION C-12: OPERATION AND MAINTENANCE The following maintenance and inspection guidelines are recommendations. The engineer must decide if additional criteria are needed based upon the size and scope of the facility. 1. Vegetated emergency spillway channels should be mowed concurrently with the embankment and should not be cut to less than 6 to 8 inches in height. 2. The emergency spillway approach and discharge channels should be cleared of brush and other woody growth periodically. 3. After any flow has passed through the emergency spillway, the spillway crest (control section) and exit channel should be inspected for erosion. All eroded areas should be repaired and stabilized. SECTION C-13: REFERENCES USDA Natural Resource Conservation Service. Engineering Field Manual. USDA Natural Resource Conservation Service. National Engineering Handbook. USDA Natural Resource Conservation Service. Technical Release No. 60: Earth Dams and Reservoirs. U. S. Department of the Interior. Design of Small Dams Virginia Department of Environmental Quality. Virginia Erosion and Sediment Control Handbook (VESCH), Introduction: Appendix C: Veg. Emerg. Spillways 9 of 9 Version 1.0, March 1, 2011

Sediment Basin 7E-12. Design Manual Chapter 7 - Erosion and Sediment Control 7E - Design Information for ESC Measures BENEFITS.

Sediment Basin 7E-12. Design Manual Chapter 7 - Erosion and Sediment Control 7E - Design Information for ESC Measures BENEFITS. 7E-12 Design Manual Chapter 7 - Erosion and Sediment Control 7E - Design Information for ESC Measures Sediment Basin BENEFITS Flow Control Erosion Control Sediment Control Runoff Reduction Flow Diversion

More information

STRUCTURAL STABILITY ASSESSMENT

STRUCTURAL STABILITY ASSESSMENT STRUCTURAL STABILITY ASSESSMENT CFR 257.73(d) Fly Ash Reservoir II Cardinal Plant Brilliant, Ohio October, 2016 Prepared for: Cardinal Operating Company Cardinal Plant Brilliant, Ohio Prepared by: Geotechnical

More information

Technical Report Culvert A Hydraulic Analysis

Technical Report Culvert A Hydraulic Analysis DATE: November 3, 2011 Technical Report Culvert A Hydraulic Analysis TO: FROM: RE: Jim Reiser, P.E. Project Manager Parsons Brinckerhoff, Inc. Kurt Killian, P.E., CFM Parsons Brinckerhoff, Inc. Design

More information

General Information for Culvert Design

General Information for Culvert Design Design Manual Chapter 2 - Stormwater 2E - Culvert Design 2E-1 General Information for Culvert Design A. Introduction A culvert is a conduit under an embankment that transports stormwater from one side

More information

APPENDIX J HYDROLOGY AND WATER QUALITY

APPENDIX J HYDROLOGY AND WATER QUALITY APPENDIX J HYDROLOGY AND WATER QUALITY J-1 Technical Report on Airport Drainage, Northern Sector Airport and Ordinance Creek Watershed / Preliminary Creek Constructed Natural Channel Culvert J-2 Preliminary

More information

HYDRAULIC JUMP AND WEIR FLOW

HYDRAULIC JUMP AND WEIR FLOW HYDRAULIC JUMP AND WEIR FLOW 1 Condition for formation of hydraulic jump When depth of flow is forced to change from a supercritical depth to a subcritical depth Or Froude number decreases from greater

More information

D.B. Wilson Station CCR Landfill

D.B. Wilson Station CCR Landfill D.B. Wilson Station CCR Landfill Disposal of Coal Combustion Residuals (CCR) from Electric Utilities Final Rule Closure and Post-closure Care Plan October 11, 2016 Prepared By: Project ID: 160030A Big

More information

Road Design Guidelines for Low Impact to Hydrology *

Road Design Guidelines for Low Impact to Hydrology * Five Counties Salmonid Conservation Program P.O. Box 2819 Weaverville, CA 96093 (530) 623-1351 Ext. 5 FAX (530) 623-1353 email: mlancaster@trinitycounty.org Road Design Guidelines for Low Impact to Hydrology

More information

HY-8 Version 7.2 Build Date January 17, Federal Highway Administration.

HY-8 Version 7.2 Build Date January 17, Federal Highway Administration. HY-8 Version 7.2 Build Date January 17, 2012 Federal Highway Administration http://www.fhwa.dot.gov/engineering/hydraulics/software/hy8/index.cfm SIMPLE Simple to use Use for simple culverts and bridges

More information

Illinois State Water Survey

Illinois State Water Survey Illinois State Water Survey HYDROLOGY DIVISION SWS Contract Report 508 COMPARISON OF 1987 AND 1989 BED PROFILE SURVEYS OF THE LOWER CACHE RIVER by Richard Allgire Office of Sediment and Wetland Studies

More information

HURRICANE SANDY LIMITED REEVALUATION REPORT UNION BEACH, NEW JERSEY DRAFT ENGINEERING APPENDIX SUB APPENDIX D SBEACH MODELING

HURRICANE SANDY LIMITED REEVALUATION REPORT UNION BEACH, NEW JERSEY DRAFT ENGINEERING APPENDIX SUB APPENDIX D SBEACH MODELING HURRICANE SANDY LIMITED REEVALUATION REPORT UNION BEACH, NEW JERSEY DRAFT ENGINEERING APPENDIX SUB APPENDIX D SBEACH MODELING Rev. 18 Feb 2015 1 SBEACH Modeling 1.0 Introduction Following the methodology

More information

APPENDIX B HYDRAULIC DESIGN DATA FOR CULVERTS

APPENDIX B HYDRAULIC DESIGN DATA FOR CULVERTS TM 5-820-4/AFM 88-5, Chap 4 APPENDIX B HYDRAULIC DESIGN DATA FOR CULVERTS B-1. General. a. This appendix presents diagrams, charts, coefficients and related information useful in design of culverts. The

More information

Culvert Design for Low and High Gradient Streams in the Midwest. Dale Higgins, Hydrologist Chequamegon-Nicolet National Forest

Culvert Design for Low and High Gradient Streams in the Midwest. Dale Higgins, Hydrologist Chequamegon-Nicolet National Forest Culvert Design for Low and High Gradient Streams in the Midwest Dale Higgins, Hydrologist Chequamegon-Nicolet National Forest Overview Culvert Design Considerations Hydraulic Terms Culvert Impacts Low

More information

Trout Unlimited Comments on the Scope of Environmental Impact Statement for the Constitution Pipeline Project, Docket No. PF12-9

Trout Unlimited Comments on the Scope of Environmental Impact Statement for the Constitution Pipeline Project, Docket No. PF12-9 October 9, 2012 Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, NE, Room 1A Washington, DC 20426 RE: Trout Unlimited Comments on the Scope of Environmental Impact Statement

More information

Access Management Standards

Access Management Standards Access Management Standards Section 1: Application of Access Standards This chapter describes the Department's access management standards for access connections on the county roadway system. The standards

More information

TABLE OF CONTENTS 1.0 INTRODUCTION PLAN CERTIFICATION (B)(4) 1

TABLE OF CONTENTS 1.0 INTRODUCTION PLAN CERTIFICATION (B)(4) 1 TABLE OF CONTENTS 1.0 INTRODUCTION 1 2.0 PLAN CERTIFICATION 257.102(B)(4) 1 3.0 WRITTEN CLOSURE PLAN 2 3.1 Narrative 2 3.2 CCR Removal 2 3.3 CCR Left in Place 3 3.4 Maximum CCR Inventory 3 3.5 Maximum

More information

Components of a Barrage

Components of a Barrage Components of a Barrage Definition The only difference between a weir and a barrage is of gates, that is the flow in barrage is regulated by gates and that in weirs, by its crest height. Barrages are costlier

More information

LIST OF FIGURES Figure Title

LIST OF FIGURES Figure Title TABLE OF CONTENTS Table of Contents... 1 List of Figures... 2 44-1A Critical Length of Grade for Trucks... 3 44-1B Critical Length of Grade for Recreational Vehicles... 3 44-1C Measurement for Length of

More information

The Basics of Culvert and Inlet Design

The Basics of Culvert and Inlet Design PDHonline Course C619 (8 PDH) The Basics of Culvert and Inlet Design Jerry D. Morrow, PE 2013 PDH Online PDH Center 5272 Meadow Estates Drive Fairfax, VA 22030 6658 Phone & Fax: 703 988 0088 www.pdhonline.org

More information

Driveway Design Criteria

Driveway Design Criteria Design Manual Chapter 5 - Roadway Design 5L - Access Management 5L-4 Driveway Design Criteria A. General For efficient and safe operations, access drives and minor public street intersections can be improved

More information

What Happens Downstream Stays Downstream, or Does It? Potential Failure Modes from Spillway Exit Flows

What Happens Downstream Stays Downstream, or Does It? Potential Failure Modes from Spillway Exit Flows What Happens Downstream Stays Downstream, or Does It? Potential Failure Modes from Spillway Exit Flows Gregory Richards, P.E., CFM, Gannett Fleming, Inc. Paul Schweiger, P.E., CFM, Gannett Fleming, Inc.

More information

Culvert Design Basics

Culvert Design Basics PDHonline Course C287 (4 PDH) Culvert Design Basics Instructor: George E. Thomas, PE 2012 PDH Online PDH Center 5272 Meadow Estates Drive Fairfax, VA 22030-6658 Phone & Fax: 703-988-0088 www.pdhonline.org

More information

then extrapolated to larger area just based on the length of bank [that actually falls in this category].

then extrapolated to larger area just based on the length of bank [that actually falls in this category]. Ken Rood: Good morning, all. You'll probably be glad to know I'm the last speaker of the day. I'm never sure if that's a good thing or not. But [lucky me]. And I'm going to talk today -- the title of the

More information

APPENDIX C ESTIMATING SCOUR IN BOTTOMLESS ARCH CULVERTS

APPENDIX C ESTIMATING SCOUR IN BOTTOMLESS ARCH CULVERTS OFFICE OF STRUCTURES MANUAL FOR HYDROLOGIC AND HYDRAULIC DESIGN CHAPTER 11, EVALUATING SCOUR AT BRIDGES APPENDIX C ESTIMATING SCOUR IN BOTTOMLESS ARCH CULVERTS APRIL 2011 APPENDIX C ESTIMATING SCOUR IN

More information

Outlet Structures T-12

Outlet Structures T-12 Description This section provides guidance and details for outlet structures for use primarily with BMPs utilizing sedimentation, (i.e., extended detention basins (EDBs), retention ponds, and constructed

More information

Figure 1: Graphical definitions of superelevation in terms for a two lane roadway.

Figure 1: Graphical definitions of superelevation in terms for a two lane roadway. Iowa Department of Transportation Office of Design Superelevation 2A-2 Design Manual Chapter 2 Alignments Originally Issued: 12-31-97 Revised: 12-10-10 Superelevation is the banking of the roadway along

More information

VIMS CCRM Coastal Management Decision Tools. Decision Tree for Undefended Shorelines and Those with Failed Structures

VIMS CCRM Coastal Management Decision Tools. Decision Tree for Undefended Shorelines and Those with Failed Structures VIMS CCRM Coastal Management Decision Tools Decision Tree for Undefended Shorelines and Those with Failed Structures Center for Coastal Resources Management Virginia Institute of Marine Science Gloucester

More information

Hydraulic Modeling of Stream Enhancement Methods

Hydraulic Modeling of Stream Enhancement Methods Hydraulic Modeling of Stream Enhancement Methods Matthew J. Curry John J. Levitsky Abstract Development within watersheds increases the amounts of runoff causing stream erosion and degradation of stream

More information

Lecture 10 : Sewer Appurtenances

Lecture 10 : Sewer Appurtenances 1 P age Module 8 : Sewer Appurtenances Lecture 10 : Sewer Appurtenances 2 P age The structures, which are constructed at suitable intervals along the sewerage system to help its efficient operation and

More information

Designing Pedestrian Facilities for Accessibility. Module 3 Curb Ramps & Blended Transitions

Designing Pedestrian Facilities for Accessibility. Module 3 Curb Ramps & Blended Transitions Module 3 & Other Purpose: Allow pedestrians to transition between the street and sidewalks, islands, etc. Typically installed at: Intersections (1 ramp at each end of each crosswalk) Mid-block crossings

More information

Trout Buffer Variance

Trout Buffer Variance Trout Buffer Variance Ashley L. Rodgers, PE Spring 2015 Why a Trout Buffer Capturing pollutants in runoff to keep the water clean. Capturing sediment to keep mud out of the water. Providing shade to keep

More information

CLEANING, INSPECTION, AND TESTING OF SEWERS

CLEANING, INSPECTION, AND TESTING OF SEWERS CLEANING, INSPECTION, AND TESTING OF SEWERS PART 1 - GENERAL 1.01 SECTION INCLUDES A. Cleaning, Inspecting, and Testing Sanitary Sewers B. Cleaning, Inspecting, and Testing Storm Sewers C. Cleaning and

More information

October 2004 REVISIONS (2) SUPERELEVATION DEVELOPMENT 11.3(2)

October 2004 REVISIONS (2) SUPERELEVATION DEVELOPMENT 11.3(2) October 2004 REVISIONS (2) Chapter 11 HORIZONTAL ALIGNMENT SUPERELEVATION DEVELOPMENT 11.3(2) Chapter 12 VERTICAL ALIGNMENT VERTICAL CURVES PASSING SIGHT DISTANCE 12.5(2) VERTICAL CURVES STOPPING SIGHT

More information

APPENDIX A STRUCTURE DESCRIPTIONS AND RATING CURVES. Lake Okeechobee & EAA Vol 3 A-i December 2005 Version 1 Draft 4

APPENDIX A STRUCTURE DESCRIPTIONS AND RATING CURVES. Lake Okeechobee & EAA Vol 3 A-i December 2005 Version 1 Draft 4 1 1 1 1 1 1 1 1 0 1 0 1 0 APPENDIX A STRUCTURE DESCRIPTIONS AND RATING CURVES Lake Okeechobee & EAA Vol A-i December 00 1 1 1 1 1 1 1 1 0 1 from the drainage area served, under a design head of. feet pool

More information

POOL AND SPA REPLASTERING AND/OR REMODELING REQUIREMENTS

POOL AND SPA REPLASTERING AND/OR REMODELING REQUIREMENTS POOL AND SPA REPLASTERING AND/OR REMODELING REQUIREMENTS Effective January 1, 2017 PLAN SUBMITTAL Any person proposing to renovate, replaster, reconstruct or alter a public pool or its ancillary facilities,

More information

Massachusetts Stream Crossing Case Studies

Massachusetts Stream Crossing Case Studies Massachusetts Stream Crossing Case Studies Amy Singler Associate Director, River Restoration Program Carrie Banks River Continuity Coordinator Case Studies: Public Benefits: Movement of goods and people

More information

* Appalachian Mountains -the mountain range in the Eastern U.S. which terminates in north-central Alabama

* Appalachian Mountains -the mountain range in the Eastern U.S. which terminates in north-central Alabama MR. SAND TEACHER'S MANUAL INTRODUCTION: Although Mr. Sand is a cartoon presentation that is attractive to children (of all ages), the material is technically accurate and quite significant to our understanding

More information

f Agricultural S c i e n c SMALL EARTH DAMS LLOYD N. BROWN ^ CALIFORNIA AGRICULTURAL CIRCULAR 467 \ Experiment Station Extension Service

f Agricultural S c i e n c SMALL EARTH DAMS LLOYD N. BROWN ^ CALIFORNIA AGRICULTURAL CIRCULAR 467 \ Experiment Station Extension Service f Agricultural S c i e n c SMALL EARTH DAMS LLOYD N. BROWN ^ CALIFORNIA AGRICULTURAL \ Experiment Station Extension Service CIRCULAR 467 Crest of dam Dry face slope 2 to 1 Downstream toe About 10,000 small

More information

Specifier Note: Retain or delete material(s) below to conform to project requirements.

Specifier Note: Retain or delete material(s) below to conform to project requirements. SECTION 32 15 40 DECOMPOSED GRANITE SURFACING NOTE: These specifications were current at the time of publication but are subject to change at any time without notice. Please confirm the accuracy of these

More information

22. Specialty Valves.

22. Specialty Valves. 22. Specialty Valves. a. Types of Specialty Valves. 1) Use of the following specialty valves is covered in this section: Altitude Valve, Pressure Reducing Valve, Pressure Relief Valve, Swing Check Valve,

More information

SPM Version 3 Orientation Learning Exercise - Loading Rates Answer Key

SPM Version 3 Orientation Learning Exercise - Loading Rates Answer Key SPM Version 3 Orientation Learning Exercise - Loading Rates Answer Key These exercises are intended to support your self-directed learning. Answer the questions based on the SPM Version 3 standards and

More information

Mouth of the Columbia River North Jetty Erosion Stabilization

Mouth of the Columbia River North Jetty Erosion Stabilization Utah State University DigitalCommons@USU International Symposium on Hydraulic Structures Jun 28th, 1:30 PM Mouth of the Columbia River North Jetty Erosion Stabilization C. C. Humphrey US Army Corps of

More information

3D NUMERICAL MODELLING OF THE CAPACITY FOR A PARTIALLY PRESSURIZED SPILLWAY

3D NUMERICAL MODELLING OF THE CAPACITY FOR A PARTIALLY PRESSURIZED SPILLWAY 3D NUMERICAL MODELLING OF THE CAPACITY FOR A PARTIALLY PRESSURIZED SPILLWAY Samuel Vingerhagen 1 & Nils Reidar B. Olsen 1 1 Department of Hydraulic and Environmental Engineering, The Norwegian Univeristy

More information

Water Hammer In Irrigation Systems 1

Water Hammer In Irrigation Systems 1 CIR828 1 G. A. Clark and D. Z. Haman 2 Irrigation system design includes pump sizing and selection, valve sizing and selection, and pipe sizing as well as the proper selection and placement of many other

More information

Pole Foundation Design with Spreadsheet

Pole Foundation Design with Spreadsheet PDHonline Course S235 (1 PDH) Pole Foundation Design with Spreadsheet Instructor: John W. Andrew, PE 2012 PDH Online PDH Center 5272 Meadow Estates Drive Fairfax, VA 22030-6658 Phone & Fax: 703-988-0088

More information

Consult with manufacturers concerning permeation of the pipe walls, jointing materials, valve seats, etc.

Consult with manufacturers concerning permeation of the pipe walls, jointing materials, valve seats, etc. Design Manual Chapter 4 - Water Mains 4C - Facility Design 4C-1 Facility Design A. General Water mains and appurtenances, including hydrants and valves, should be provided along all streets including connections

More information

Summary of HEC 18, Evaluating Scour at Bridges FHWA NHI Should really follow HEC 18, but this summary will get you the main points.

Summary of HEC 18, Evaluating Scour at Bridges FHWA NHI Should really follow HEC 18, but this summary will get you the main points. Summary of HEC 18, Evaluating Scour at Bridges FHWA NHI 01-001 Should really follow HEC 18, but this summary will get you the main points. 1: Determine scour analysis variables 2: Analyze long-term bed

More information

CHAPTER 6 VERTICAL ALIGNMENT

CHAPTER 6 VERTICAL ALIGNMENT CHAPTER 6 VERTICAL ALIGNMENT Introduction 6-3 Vertical Alignment Controls 6-3 Figure 6-1 Contrast of Poor Grade Line Design (Left) with Preferred Grade Line Design (Right) Figure 6-2 Example of a Hidden

More information

Geomorphic Stream Classification A Classification of Natural Rivers, Rosgen, D.L.

Geomorphic Stream Classification A Classification of Natural Rivers, Rosgen, D.L. Geomorphic Stream Classification A Classification of Natural Rivers, Rosgen, D.L. Why is Stream Classification Physical stream channel evolution Essential? Similar stream types manifest similar patterns

More information

Technical Brief - Wave Uprush Analysis Island Harbour Club, Gananoque, Ontario

Technical Brief - Wave Uprush Analysis Island Harbour Club, Gananoque, Ontario Technical Brief - Wave Uprush Analysis RIGGS ENGINEERING LTD. 1240 Commissioners Road West Suite 205 London, Ontario N6K 1C7 October 31, 2014 Table of Contents Section Page Table of Contents... i List

More information

Subject: Developed fish ladder alternatives for Pastori Avenue at San Anselmo Creek

Subject: Developed fish ladder alternatives for Pastori Avenue at San Anselmo Creek Page 1 of 18 SENT VIA EMAIL Sandra Guldman Friends of Corte Madera Creek Watershed Box 415 Larkspur, CA 94977 Subject: Developed fish ladder alternatives for Pastori Avenue at San Anselmo Creek Dear Sandra,

More information

Module 4 Hydraulic Structures for Flow Diversion and Storage

Module 4 Hydraulic Structures for Flow Diversion and Storage Module 4 Hydraulic Structures for Flow Diversion and Storage Lesson 3 Design of Barrage Appurtenant Structures and Rules for Barrage Operation Instructional objectives On completion of this lesson, the

More information

Design & Maintenance of Culverts

Design & Maintenance of Culverts While every effort is made to ensure that information held within this document is accurate and up to date, Croft Consultants will not be held responsible for any loss, damage, injury, or inconvenience

More information

Habitat Conditions, Design Strategies,

Habitat Conditions, Design Strategies, Habitat Conditions, Design Strategies, Coho on Cedar Ck. five years after analog-based stream restoration work. and Stream Classification In river work, computer modeling is an insidious procedure in which

More information

WASHINGTON CONSERVATION DISTRICT STANDARD OPERATING PROCEDURE (S.O.P.)

WASHINGTON CONSERVATION DISTRICT STANDARD OPERATING PROCEDURE (S.O.P.) Page 1 of 18 Water Monitoring Program WASHINGTON CONSERVATION DISTRICT STANDARD OPERATING PROCEDURE (S.O.P.) No. 1 FLOW MONITORING Page 2 of 18 Water Monitoring Program Standard Operating Procedure No.

More information

CHAPTER 1 STANDARD PRACTICES

CHAPTER 1 STANDARD PRACTICES CHAPTER 1 STANDARD PRACTICES OBJECTIVES 1) Functions and Limitations 2) Standardization of Application 3) Materials 4) Colors 5) Widths and Patterns of Longitudinal Pavement Marking Lines 6) General Principles

More information

Minnesota Department of Natural Resources Division of Fish and Wildlife Section of Fisheries. Stream Survey Report. Luxemburg Creek.

Minnesota Department of Natural Resources Division of Fish and Wildlife Section of Fisheries. Stream Survey Report. Luxemburg Creek. Minnesota F-29-R(P)-24 Area 315 Study 3 March 2016 Minnesota Department of Natural Resources Division of Fish and Wildlife Section of Fisheries Stream Survey Report Luxemburg Creek 2015 Mark Pelham Sauk

More information

OF HYRUM DAM AUXILIARY

OF HYRUM DAM AUXILIARY HYDRAULIC MODEL STUDY OF HYRUM DAM AUXILIARY LABYRINTH SPILLWAY May 7983 Engineering and Research Center S. Department of the Interior Bureau of Reclamation Division of Research Hydraulics Branch 7-2090

More information

MODEL STUDY OF SPILLWAY CHARACTERISTICS

MODEL STUDY OF SPILLWAY CHARACTERISTICS Circular No. 20 1937 STATE OF ILLINOIS HENRY HORNER, Governor MODEL STUDY OF SPILLWAY CHARACTERISTICS 1935-37 A joint publication by the University of Illinois Engineering Experiment Station and the Illinois

More information

DUNE STABILIZATION AND BEACH EROSION

DUNE STABILIZATION AND BEACH EROSION DUNE STABILIZATION AND BEACH EROSION CAPE HATTERAS NATIONAL SEASHORE NORTH CAROLINA ROBERT DOLAN PAUL GODFREY U. S. DEPARTMENT OF INTERIOR NATIONAL PARK SERVICE OFFICE OF NATURAL SCIENCE WASHINGTON, D.

More information

Operation and Maintenance Manual. First Defense and First Defense High Capacity. Vortex Separator for Stormwater Treatment

Operation and Maintenance Manual. First Defense and First Defense High Capacity. Vortex Separator for Stormwater Treatment Operation and Maintenance Manual First Defense and First Defense High Capacity Vortex Separator for Stormwater Treatment Page 2 Page 3 Table of Contents I. First Defense by Hydro International 3 First

More information

Appendix G. Alternative Solutions Details. Krosno Creek Flood Reduction Project PROJECT FILE REPORT CITY OF PICKERING

Appendix G. Alternative Solutions Details. Krosno Creek Flood Reduction Project PROJECT FILE REPORT CITY OF PICKERING Krosno Creek Flood Reduction Project PROJECT FILE REPORT CITY OF PICKERING Appendix G Alternative Solutions Details TMIG THE MUNICIPAL INFRASTRUCTURE GROUP LTD Krosno Creek Flood Reduction Project PROJECT

More information

CLOSURE PLAN. CFR (b) Document ID: GERS Bottom Ash Complex. Mountaineer Plant New Haven, West Virginia.

CLOSURE PLAN. CFR (b) Document ID: GERS Bottom Ash Complex. Mountaineer Plant New Haven, West Virginia. CLOSURE PLAN CFR 257.102(b) Bottom Ash Complex Mountaineer Plant New Haven, West Virginia October, 2016 Prepared for : Appalachian Power Company - Mountaineer Plant New Haven, West Virginia Prepared by:

More information

Historic dam failures and recent incidents. Tracey Williamson Associate Director Water (Dams & Reservoirs) British Dam Society Chairman

Historic dam failures and recent incidents. Tracey Williamson Associate Director Water (Dams & Reservoirs) British Dam Society Chairman Historic dam failures and recent incidents Tracey Williamson Associate Director Water (Dams & Reservoirs) British Dam Society Chairman 1 Agenda 1. Dams in all their beauty 2. Hazards associated with dams

More information

STANDARD TEST METHOD AND PERFORMANCE SPECIFICATION FOR NEWLY MANUFACTURED SOCCER SHIN GUARDS. NOCSAE DOC (ND) m15

STANDARD TEST METHOD AND PERFORMANCE SPECIFICATION FOR NEWLY MANUFACTURED SOCCER SHIN GUARDS. NOCSAE DOC (ND) m15 STANDARD TEST METHOD AND PERFORMANCE SPECIFICATION FOR NEWLY MANUFACTURED SOCCER SHIN GUARDS NOCSAE DOC (ND) 090 06m15 Prepared By NATIONAL OPERATING COMMITTEE ON STANDARDS FOR ATHLETIC EQUIPMENT Modified

More information

CARL BLACKWELL LAKE MANAGEMENT PLAN

CARL BLACKWELL LAKE MANAGEMENT PLAN CARL BLACKWELL LAKE MANAGEMENT PLAN Background Lake Carl Blackwell impounds Stillwater Creek, 10 miles west of Stillwater in Payne County, Oklahoma (Figure 1). The lake covers 3,370 surface acres and was

More information

OTC MS. Free Span Rectification by Pipeline Lowering (PL) Method N. I. Thusyanthan, K. Sivanesan & G. Murphy

OTC MS. Free Span Rectification by Pipeline Lowering (PL) Method N. I. Thusyanthan, K. Sivanesan & G. Murphy OTC-24699-MS Free Span Rectification by Pipeline Lowering (PL) Method N. I. Thusyanthan, K. Sivanesan & G. Murphy Copyright 2014, Offshore Technology Conference This paper was prepared for presentation

More information

FOREST SERVICE HANDBOOK NATIONAL HEADQUARTERS (WO) WASHINGTON, DC

FOREST SERVICE HANDBOOK NATIONAL HEADQUARTERS (WO) WASHINGTON, DC Page 1 of 14 FOREST SERVICE HANDBOOK NATIONAL HEADQUARTERS (WO) WASHINGTON, DC FSH 7709.55 - TRAVEL PLANNING HANDBOOK Amendment No.: 7709.55-2009-3 Effective Date: January 8, 2009 Duration: This amendment

More information

RISK AND STANDARDS BASED APPROACH TO RIP RAP DESIGN ALTERNATIVES FOR GRAHAMSTOWN DAM STAGE 2 AUGMENTATION

RISK AND STANDARDS BASED APPROACH TO RIP RAP DESIGN ALTERNATIVES FOR GRAHAMSTOWN DAM STAGE 2 AUGMENTATION RISK AND STANDARDS BASED APPROACH TO RIP RAP DESIGN ALTERNATIVES FOR GRAHAMSTOWN DAM STAGE 2 AUGMENTATION M. B. Barker 1 and D. Holroyde 2 ABSTRACT. A detailed study was completed for the Stage 2 works

More information

Chapter 10 SWIMMING POOLS

Chapter 10 SWIMMING POOLS 4-10-1: COMPLIANCE REQUIRED: Chapter 10 SWIMMING POOLS It shall be unlawful to construct, maintain, install or enlarge any swimming pool in the City except in compliance with the provisions of this Chapter.

More information

ATTACHMENT NO. 18 GMI-C. National Committee on Uniform Traffic Control Devices GMI SIGNS TECHNICAL COMMITTEE RECOMMENDATION

ATTACHMENT NO. 18 GMI-C. National Committee on Uniform Traffic Control Devices GMI SIGNS TECHNICAL COMMITTEE RECOMMENDATION 1 2 3 ATTACHMENT NO. 18 GMI-C 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 GMI agenda item II.H.2., January 19, 2012 National Committee on Uniform

More information

Roadway Vertical Alignments

Roadway Vertical Alignments Roadway Vertical Alignments by Gregory J. Taylor, P.E. INTRODUCTION This course summarizes and highlights the design of vertical alignments for modern roads and highways. The contents of this document

More information

Alberta Infrastructure HIGHWAY GEOMETRIC DESIGN GUIDE AUGUST 1999

Alberta Infrastructure HIGHWAY GEOMETRIC DESIGN GUIDE AUGUST 1999 Alberta Infrastructure HIGHWAY GEOMETRIC DESIGN GUIDE AUGUST 1999,1'(; A ACCELERATION Data on acceleration from stop D-29 Effects of grade D-35 Intersections D-97, D-99 Lanes D-97, F-5, F-7, F-15, F-21,

More information

Section 10 - Hydraulic Analysis

Section 10 - Hydraulic Analysis Section 10 - Hydraulic Analysis Methodology Documentation Functionality Summary Sizing Methodology Fixed/Resize Combined Flow Storm: Sizing as per d/d Structures.dat Storm vs. Sanitary Methodology HGL/EGL

More information

Chapter 11. Beach Fill and Soft Engineering Structures

Chapter 11. Beach Fill and Soft Engineering Structures Chapter 11 Beach Fill and Soft Engineering Structures Solutions to Coastal Erosion Soft Structures Hard Structures Retreat No such thing as low cost coastal protection Beach Nourishment Beach Filling Beach

More information

Attachment No. 17 GMI No. 1. National Committee on Uniform Traffic Control Devices GMI SIGNS TECHNICAL COMMITTEE RECOMMENDATION

Attachment No. 17 GMI No. 1. National Committee on Uniform Traffic Control Devices GMI SIGNS TECHNICAL COMMITTEE RECOMMENDATION 1 2 3 Attachment No. 17 GMI No. 1 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 GMI agenda item II.H.2., January 19, 2012 National Committee on Uniform

More information

Environmental Review and Permitting for Wild Trout

Environmental Review and Permitting for Wild Trout Environmental Review and Permitting for Wild Trout Tom Shervinskie Wild Trout Summit Watershed Analysis Section August 26, 2017 Division of Environmental Services The mission of the Pennsylvania Fish and

More information

FLOW CONSIDERATIONS IN INDUSTRIAL SILENCER DESIGN

FLOW CONSIDERATIONS IN INDUSTRIAL SILENCER DESIGN FLOW CONSIDERATIONS IN INDUSTRIAL SILENCER DESIGN George Feng, Kinetics Noise Control, Inc., 3570 Nashua Drive, Mississauga, Ontario Vadim Akishin, Kinetics Noise Control, Inc., 3570 Nashua Drive, Mississauga,

More information

Advanced Hydraulics Prof. Dr. Suresh A. Kartha Department of Civil Engineering Indian Institute of Technology, Guwahati

Advanced Hydraulics Prof. Dr. Suresh A. Kartha Department of Civil Engineering Indian Institute of Technology, Guwahati Advanced Hydraulics Prof. Dr. Suresh A. Kartha Department of Civil Engineering Indian Institute of Technology, Guwahati Module - 4 Hydraulics Jumps Lecture - 4 Features of Hydraulic Jumps (Refer Slide

More information

Packwood Lake Intake Screen Velocity Test Report for Energy Northwest's Packwood Lake Hydroelectric Project FERC No Lewis County, Washington

Packwood Lake Intake Screen Velocity Test Report for Energy Northwest's Packwood Lake Hydroelectric Project FERC No Lewis County, Washington for Energy Northwest's Packwood Lake Hydroelectric Project FERC No. 2244 Lewis County, Washington Submitted to P.O. Box 968 Richland, Washington 99352-0968 Submitted by EES Consulting 1155 North State

More information

LAB: WHERE S THE BEACH

LAB: WHERE S THE BEACH Name: LAB: WHERE S THE BEACH Introduction When you build a sandcastle on the beach, you don't expect it to last forever. You spread out your towel to sunbathe, but you know you can't stay in the same spot

More information

Fish Migration Barrier Severity and Steelhead Habitat Quality in the Malibu Creek Watershed

Fish Migration Barrier Severity and Steelhead Habitat Quality in the Malibu Creek Watershed Fish Migration Barrier Severity and Steelhead Habitat Quality in the Malibu Creek Watershed Produced for California State Coastal Conservancy and California Department of Parks and Recreation By: Heal

More information

Geometric Design Tables

Geometric Design Tables Design Manual Chapter 5 - Roadway Design 5C - Geometric Design Criteria 5C-1 Geometric Design Tables A. General The following sections present two sets of design criteria tables - Preferred Roadway Elements

More information

SKIATOOK LAKE MANAGEMENT PLAN

SKIATOOK LAKE MANAGEMENT PLAN SKIATOOK LAKE MANAGEMENT PLAN Background Skiatook Lake impounds Hominy Creek, 5 miles west of Skiatook in Osage County, Oklahoma (Figure 1). Skiatook Lake covers 10,540 surface acres and was constructed

More information

CENGRS GEOTECHNICA PVT. LTD. Job No Sheet No. 1

CENGRS GEOTECHNICA PVT. LTD. Job No Sheet No. 1 CENGRS GEOTECHNICA PVT. LTD. Job No. 214030 Sheet No. 1 INTERIM REPORT ON GEOTECHNICAL INVESTIGATION FOR PROPOSED 66 KV GRID PLOT AT G-7, DWARKA, NEW DELHI. 1.0 INTRODUCTION 1.1 Project Description M/s.

More information

Stormwater Management Report for the Macri Dixon Condo Block

Stormwater Management Report for the Macri Dixon Condo Block for the Macri Dixon Condo Block Town of Milton February 2017 JFSA Ref. No.: 1287-15 Prepared for : Prepared by : David Schaeffer Engineering Ltd. 52 Springbrook Drive, Ottawa, ON K2S 1B9 tel.: 613.836.3884,

More information

Proceedings, 2001National Conference on Beach Preservation Technology, pp COASTAL INLET BANK EROSION. William C.

Proceedings, 2001National Conference on Beach Preservation Technology, pp COASTAL INLET BANK EROSION. William C. Proceedings, 2001National Conference on Beach Preservation Technology, pp. 274-283 COASTAL INLET BANK EROSION William C. Seabergh 1 Abstract: Much focus is placed on beach erosion on the open coast. However,

More information

FIGURES APPENDIX A SYMBOL SAMPLING DESCRIPTION Location of sample obtained in general accordance with ASTM D 1586 Standard Penetration Test with recovery Location of sample obtained using thin-wall

More information

SECTION A-1-GEOMETRIC DESIGN STANDARDS

SECTION A-1-GEOMETRIC DESIGN STANDARDS APPENDIX A SECTION A-1-GEOMETRIC DESIGN STANDARDS Introduction... A-1 Flexibility In Design... A-1 Secondary Project Improvements... A-2 Roadway Width... A-3 Design Speed (V)... A-3 Operating Speed...

More information

GOM Diving Safety Work Group

GOM Diving Safety Work Group GOM Diving Safety Work Group COMMITTEE WORK GROUP Underwater Excavation with Hand Jetting July 14, 2015 DISCLAIMER This US GOM DSWG document is not meant to be all inclusive, and not every rule and regulation

More information

Analysis of Packery Channel Public Access Boat Ramp Shoreline Failure

Analysis of Packery Channel Public Access Boat Ramp Shoreline Failure Journal of Coastal Research SI 59 150-155 West Palm Beach, Florida 2011 Analysis of Packery Channel Public Access Boat Ramp Shoreline Failure Christopher W. Reed and Lihwa Lin URS Corporation 1625 Summit

More information

Bases, Ballasts, and Paving

Bases, Ballasts, and Paving Sections Included In This Standard: 1.1 Paving and Surfacing 1.2 Protection of the Work 1.3 Repair of Pavement 1.4 Pavement Marking 1.1 PAVING AND SURFACING A. DESIGN REQUIREMENTS 1. Applicable Design

More information

Introduction to Roadway Design

Introduction to Roadway Design Chapter Introduction to Roadway Design 1 This chapter lays the foundation for the Roadway Design course. You examine the roadway design workflow and the completed drawing files and review the project scope,

More information

Design and Installation of two Permanent Booms at La Romaine-2 to resist Ice, retain Debris and serve as Safety Booms.

Design and Installation of two Permanent Booms at La Romaine-2 to resist Ice, retain Debris and serve as Safety Booms. CGU HS Committee on River Ice Processes and the Environment 18 th Workshop on the Hydraulics of Ice Covered Rivers Quebec City, QC, Canada, August 18-20, 2015 Design and Installation of two Permanent Booms

More information

City of Margate, Florida. Neighborhood Traffic Management Manual

City of Margate, Florida. Neighborhood Traffic Management Manual City of Margate, Florida Neighborhood Traffic Management Manual Table of Contents Page No. I. INTRODUCTION... 1 II. TRAFFIC CALMING REQUEST AND PROCESSING PROCEDURES... 2 1. COMPLETE AND SUBMIT PROJECT

More information

Union Pacific Railroad

Union Pacific Railroad Input Questions: 404/401 Pre Application Meeting, December 18, 2013, Portland, Oregon 1. What is the project purpose and need? The purpose of the project is to improve the efficiency and average velocity

More information

ENGINEER S PRELIMINARY REPORT. for the #######-###### COLLISION

ENGINEER S PRELIMINARY REPORT. for the #######-###### COLLISION ENGINEER S PRELIMINARY REPORT for the #######-###### COLLISION By: Lance E. Robson, P.E. October 3, 2005 1 INVESTIGATION OF THE #######-###### COLLISION ENGINEER S PRELIMINARY REPORT October 3, 2005 ---------------------------------------------------------------------------------------------------------------

More information

Minnesota Department of Natural Resources Division of Fish and Wildlife Section of Fisheries. Stream Survey Report. Cold Spring Creek.

Minnesota Department of Natural Resources Division of Fish and Wildlife Section of Fisheries. Stream Survey Report. Cold Spring Creek. Minnesota F-29-R(P)-24 Area 315 Study 3 March 2013 Minnesota Department of Natural Resources Division of Fish and Wildlife Section of Fisheries Stream Survey Report Cold Spring Creek 2012 Mark Pelham Montrose

More information

Red River Basin and FM Diversion Hydrology. North Dakota Water Education Foundation Executive Briefing July 13, 2012

Red River Basin and FM Diversion Hydrology. North Dakota Water Education Foundation Executive Briefing July 13, 2012 Red River Basin and FM Diversion Hydrology North Dakota Water Education Foundation Executive Briefing July 13, 2012 Red River Basin Total Drainage Area: 45,000 square miles North Dakota Fargo, ND Moorhead,

More information

Section 7 Complete Green Street Guidelines DRAFT

Section 7 Complete Green Street Guidelines DRAFT Section 7 Complete Green Street Guidelines DRAFT 1 Section: 7.0 COMPLETE GREEN STREET GUIDELINES These guidelines serve as options to mitigate the environmental impact of a project as well as guide the

More information