AMERICAN ENERGY - PERMIAN BASIN, LLC UL Daily Drilling Partner Summary

Size: px
Start display at page:

Download "AMERICAN ENERGY - PERMIAN BASIN, LLC UL Daily Drilling Partner Summary"

Transcription

1 AEPB WELL NO. Report End Date: Report Number: 1 Rig: INTEGRITY, 3 Projected Days (days): 0 Drilling Days: : 70 : 0 Planned VS (ft): Current VS (ft): MIRU MIRU INTEGRITY Longitude Orig KB El$ RKB (ft) County 70 MIRU 0 19:00 22: RD AND MOB F/ WOODS 1 UNIT 1 RE 21027HA SURF VERT DRILL RIG UP/RIG DOWN 22:00 05: MIRU UNIVERSITY 12 RE 029HS SURF VERT DRILL RIG UP/RIG DOWN

2 AEPB WELL NO. Report End Date: 8/31/2015 Report Number: 2 Rig: INTEGRITY, 3 Projected Days (days): 0 Drilling Days: : 1,038 : 968 Planned VS (ft): Current VS (ft): TOOH FINISH MIRU, DRILL F/ 70ft TO 1038ft. PUMP SWEEP AND TOOH. 70 Longitude Orig KB El$ RKB (ft) County 1,038 RUN 133/8 CASING AND CEMENT. RUN GYRO :00 08: MIRU SURF VERT DRILL RIG UP/RIG DOWN 08:00 09: PICK UP BHA 1. SURF VERT DRILL P/U & L/D BHA 09:00 22: ,038 SPUDDED WELL AT 08:00hrs ON 0. ROTATE DRILL FROM 70ft ft, 968ft AT 74.46fph ROTATE DRILL: 968' IN 13 HOURS, FPH AVERAGE ROP 100% ROTATE, 0% SLIDE FULL RETURNS SURF VERT DRILL DRILL W/ AIR 22:00 22: ,038 1,038 PUMP SWEEP SURF VERT DRILL COND MUD & CIRC 22:30 00: ,038 1,038 TOOH SURF VERT DRILL TRIPS 74.5

3 AEPB WELL NO. Report End Date: 8/31/2015 Report Number: 3 Rig: INTEGRITY, 3 Projected Days (days): 0 Drilling Days: : 1,038 : 0 Planned VS (ft): Current VS (ft): WAIT ON BIG RIG LD DRILL PIPE AND BHA. RIG UP AND RUN 24 jts. 133/8 54.5# J-55 BTC CASING. LANDED AT 1038ft KB. RAN SURFACE CEMENT. CUTOFF 133/8in CASING AT GROUND LEVEL, RELEASED RIG AT 1830 hrs ,038 Longitude Orig KB El$ RKB (ft) County 1,038 WAIT ON BIG RIG 0 05:00 06: ,038 1,038 TOOH SURF VERT DRILL TRIPS 06:00 07: ,038 1,038 LD BHA SURF VERT DRILL P/U & L/D BHA 07:00 08: ,038 1,038 RIG UP CASING CREW SURF VERT CSG/CEMENT RIG UP/RIG DOWN 08:00 11: ,038 1,038 RAN 1008ft (24jts) OF in J ppf BTC SURFACE CASING. TAGGED BOTTOM AT 1038ft. ANTELOPE BOW SPRING CENTRALIZERS INSTALLED ON EVERY 4TH JOINT. ANTELOPE SHOE AT ft. ANTELOPE FLOAT COLLAR AT 998.3ft SURF VERT CSG/CEMENT RUN CASING 11:00 11: ,038 1,038 RU CREST CEMENTERS SURF VERT CSG/CEMENT RIG UP/RIG DOWN 11:30 14: ,038 1,038 R/U CREST CEMENT HEAD. MIXED AND PUMPED 133/8in SURFACE CASING PRIMARY CEMENT JOB AS FOLLOWS: 275bbls OF WATER AHEAD, 50bbls GEL SPACER, 20bbls FRESH WATER SPACER, 214bbls OF 12.8ppg LEAD SLURRY AT 5bpm, 100.6bbls OF 14.8ppg TAIL SLURRY AT 5bpm. DROPPED UNIVERSAL TOP PLUG AND DISPLACED CEMENT WITH 150bbls OF WATER AT 5bpm. BUMPED PLUG WITH 890psi FCP. OBSERVED 100bbls OF GOOD CEMENT TO SURFACE. RIGGED DOWN CEMENT HEAD AND CREST CEMENTERS. LEAD SLURRY: 214bbls (650sx) 35/65 POZ CLASS C WITH 3% CaCl, 0.25lb/bbl POLY-E-FLAKE, TAIL SLURRY: 100.6bbls (425sx) CLASS C WITH 2% CaCl, 0.25lb/bbl POLY-E- FLAKE SURF VERT CSG/CEMENT RUN CEMENT 14:30 18: ,038 1,038 RUN GYRO WHILE WOC. RELEASED RIG 08/31/15 AT 18:30 SURF VERT CSG/CEMENT WAIT ON CEMENT

4 Report End Date: 9/24/2015 Report Number: 5 Drilling Days: : 1,038 : 0 Planned VS (ft): Current VS (ft): RIGGING UP TRANSPORT RIG FROM WOODS RE HA TO THE, SET IN PITS, PUMPS AND GEN PACKAGE Longitude Orig KB El RKB (ft) , CONTINUE SETTING IN RIG AND RIGGING UP County REAGAN 100% RIG DOWN & MOVED, 50% SET IN, 20% RIGGED UP 48 HOURS SINCE RIG RELEASE 1ST WELL ON 1 WELL PAD ESTIMATED SPUD DATE: 9/26/2015 1,038 1, :00 08: ,038 1,038 CONTINUE RIGGING DOWN AND PREPAIRING RIG FOR TRUCKS WHILE WAITING ON DAY LIGHT TO START TRANSPORTING RIG MOB MOB MOB RIG UP/RIG DOWN 08:00 05: ,038 1,038 HOLD PJSM WITH RIG CREW AND LIGHTENING TRUCKING, TRANSPORT RIG FROM THE WOODS RE HA TO THE UNIVERSITY RE 0209HS AND SET IN MUD PITS, SCR, FESTOON, GENERATOR PACKAGE, MUD PUMPS, WATER TANK, DIESEL TANKS: TRUCKING COMPANY SHUT DOWN AT 19:30, RIG CREW CONTINUED TO RIG UP. 100% MOVED, 50% SET IN, 20% RIGGED UP MOB MOB MOB RIG UP/RIG DOWN

5 Report End Date: 9/25/2015 Report Number: 6 Drilling Days: : 1,038 : 0 Planned VS (ft): Current VS (ft): RIGGING UP CONTINUE SETTING IN RIG AND RIGGING UP RIG EQUIPMENT Longitude Orig KB El RKB (ft) , CONTINUE RIGGING UP RIG EQUIPMENT County REAGAN 100% MOVED, 100% SET IN, 85% RIGGED UP 72 HOURS SINCE RIG RELEASE NEXT WELL COPE HA ( MOVE ) ESTIMATED SPUD DATE: 9/26/2015 1,038 1, :00 07: ,038 1,038 RIG UP WITH NIGHT CREW WHILE WAITING ON LIGHTENING TRUCKING OPERATORS MOB MOB MOB RIG UP/RIG DOWN 07:00 18: ,038 1,038 HOLD PJSM WITH RIG CREW AND LIGHTENING TRUCKING, SET IN AND STACK SUBS, CENTER STEEL, TROLLEY BEAMS,WINCHES, DRAWWORKS. PIN STRONGBACK TO A-LEGS. SET ODS HOUSE, DRILLERS CABIN, STAIRS, DERRICK, MONKEY BOARD. PRE DERRICK TO RAISE. ( HELD PRE-JOB SAFITY MEETING ON RAISING THE DERRICK ) THE DERRICK WAS RAISED AND 17:45 PM. 100% MOVED, 100% SET IN, 80% RIGGED UP 18:00 05: ,038 1,038 HUNG THE BOP'S, FLOW LINE. SET IRON ROUGHNECK AND ALL FLOOR PLATES, HYDRAULIC CATWALK. TRUCKING COMPANY SHUT DOWN AT 19:30, RIG CREW CONTINUED TO RIG UP. HOOK UP LIGHTS ON OFF D/S, RIG TONGS, GAS BUSTER, PORCH ON D/S, SPOOL UP DRAWWORKS,AIR HOIST'S, UNPIN BLOCKS, HOOK UP TO TOP DRIVE.RIG UP :MAKE UP KELLY HOSE TO TOPDRIVE MOB MOB MOB RIG UP/RIG DOWN MOB MOB MOB RIG UP/RIG DOWN

6 Report End Date: 9/27/2015 Report Number: 8 Drilling Days: 1 : 1,173 : 135 Current VS (ft): 2 DRILLING TANGENT 1,173 ft INSTALL WEAR BUSHING, P/U DIRECTIONAL BHA, ORIENT AND TEST SAME, P/U 6' DRILL COLLARS, HEAVY WEIGHT DRILL PIPE AND 4 1/2" DRILL PIPE, TAG CEMENT AT 976ft, DRILL OUT & DRILL TANGENT Longitude Orig KB El RKB (ft) , County REAGAN CONTINUE DRILLING TANGENT TO PROJECTED CASING POINT 6,195 ft NEXT WELL COPE HA ( MOVE ) ESTIMATED SPUD DATE: 9/26/2015 1,038 1, :00 09: ,038 1,038 INSTALL WEAR BUSHING, FILL UP LINES, CATCH PAN, DRAIN HOSES, BLEED OFF LINE, RIG UP TURN BUCKLES, CENTER STACK, INSTALL TRIP NIPPLE (LAY OUT, STRAP AND CALIPER BHA ) MOB MOB MOB BOP/OTHER 09:00 12: ,038 1,038 P/U DIRECTIONAL BHA AND ORIENT SAME, TEST MOTOR, M/U BIT No. 3, HALLIBURTON MM65D 11in SN: , /in DRILL COLLARS, 18 JOINTS HEAVY WEIGHT DRILL PIPE MOB MOB MOB DIRECTIONAL WORK 12:00 14: ,038 1,038 PICK UP 2 JOINTS 4 1/2in IEU DRILL PIPE, TAGGED CEMENT AT 976ft MOB MOB MOB TRIPS :30 21: ,038 1,038 BUILD STANDS AND RACK BACK IN THE DERRICK ( WHILE WAITING ON SAVER SUB, GRABBER DIES AND STABBING GUIDE FOR TOP DRIVE) 21:00 22: ,038 1,038 C/O TOP DRIVE SAVER SUB, GRABBER DIES AND STABBING GUIDE. TEST SAVER SUB TO 250 LOW 5,000 HIGH WITH YELLO JACKET TESTERS MOB MOB MOB TRIPS MOB MOB MOB TEST B.O.P 22:30 23: ,038 1,038 DISPLACE FRESH WATER WITH 8.9 PPG. OIL BASE MUD MOB MOB MOB COND MUD & CIRC 23:30 01: ,038 1,038 PULL TRIP NIPPLE AND INSTALL ROTATING HEAD MOB MOB MOB BOP/OTHER 01:30 03: ,038 1,038 DRILL CEMENT AND FLOAT EQUIPMENT FROM 976 ft. to 1,038 ft MOB MOB MOB REAMING 03:30 05: ,038 1,173 ROTATE/SLIDE FROM 1,038 ft TO 1,173 ft, 135 ft AT 90 FPH ROTATE 135 ft IN 1.5 HOURS, 90 FPH AVERAGE ROP SLIDE: 0 ft IN 0 HOUR, 0 FPH AVERAGE ROP 100% ROTATE, 0% SLIDE FULL RETURNS 20 MIN. CONNECTIONS DO TO NEW DRILLER INT DIR DRILL DRILL W/ MUD

7 Report End Date: 9/28/2015 Report Number: 9 Drilling Days: 2 : 3,650 : 2,477 Current VS (ft): -128 DRILLING TANGENT 3,650 ft DRILLING AHEAD FROM 1,173ft TO 3,650 ft LAST SURVEY AT: 3,521 ft,inc: 2.9, Azm: 160,TVD: 3,515 ft VS: ft, DLS: 1.05, 4 ft A, 4 ft R CONTINUE DRILLING TANGENT TO PROJECTED CASING POINT 6,195 ft SPUD DATE: 9/27/15 AT 3:00 PM 1,173 3,650 2, :00 12: ,173 2,061 ROTATE/SLIDE FROM 1,173ft TO 2,061ft, 888ft AT 118.4fph ROTATE 873ft IN 7 HOURS, 124.7fph AVERAGE ROP SLIDE: 15ft IN 0.5 HOUR, 30fph AVERAGE ROP 93% ROTATE, 7% SLIDE FULL RETURNS INT DIR DRILL DRILL W/ MUD 12:30 13: ,061 2,061 SERVICE RIG, GREASE BLOCKS, TOP DRIVE - VISUALLY INSPECT TOP DRIVE AND DERRICK FOR LOOSE KEEPERS AND BOLTS, (ALL GOOD) 13:00 05: ,061 3,650 ROTATE/SLIDE FROM 2,061ft TO 3,650 ft, 1,589 ft AT 99 fph ROTATE 1,458 ft IN 11 HOURS, 133 fph AVERAGE ROP SLIDE: 140 ft IN 5 HOUR, 28 fph AVERAGE ROP 91% ROTATE, 9% SLIDE FULL RETURNS INT DIR DRILL LUBRICATE RIG INT DIR DRILL DRILL W/ MUD 105.4

8 Report End Date: 9/29/2015 Report Number: 10 Drilling Days: 3 : 6,201 : 2,551 Current VS (ft): -159 CIRCULATE DRILLING AHEAD FROM 3,650ft TO 6,201 ft,circulate FINISH CIRCULATING, POOH,PICK UP CURVE BHA LAST SURVEY AT: 6,137 ft,inc: 0.6, Azm: 203.8,TVD: 6, ft VS: ft, DLS:.18, 9 ft B, 3 ft R 3,650 6,201 2, :00 13: ,650 4,816 ROTATE/SLIDE FROM 3,650ft TO 4,816ft,1166ft AT 145.8fph ROTATE 1,136ft IN 7 HOURS, fph AVERAGE ROP SLIDE: 10 ft IN 1 HOUR, 30 fph AVERAGE ROP 90% ROTATE, 10% SLIDE FULL RETURNS INT DIR DRILL DRILL W/ MUD 13:00 13: ,816 4,816 SERVICE RIG, GREASE BLOCKS, TOP DRIVE - VISUALLY INSPECT TOP DRIVE AND DERRICK FOR LOOSE KEEPERS AND BOLTS, (ALL GOOD) 13:30 03: ,816 6,201 ROTATE/SLIDE FROM 4,816ft TO 6,201 ft, 1,385 ft AT 103 fph ROTATE 1,358 ft IN 12.5 HOURS, 109 fph AVERAGE ROP SLIDE: 27 ft IN 1 HOUR, 27 fph AVERAGE ROP 98% ROTATE, 2% SLIDE FULL RETURNS INT DIR DRILL LUBRICATE RIG INT DIR DRILL DRILL W/ MUD 03:00 05: ,201 6,201 CIRCULATE TWO SWEEP AROUND AND CLEAN THE HOLE INT DIR DRILL COND MUD & CIRC 118.7

9 Report End Date: 9/30/2015 Report Number: 11 Drilling Days: 4 : 6,475 : 274 Current VS (ft): -158 BUILDING CURVE AT 6,475 ft FINISH CIRCULATING, POOH TO BHA, L/O SAME, PICK UP 7 7/8 CURVE BHA AND DRILL TO KOP AT 6,307 ft, DRILL CURVE AS PER APPROVED DIRECTIONAL PLAN # 2 CONTINUE TO DRILL AND LAND CURVE, DRILL LATERAL AS PER DIRECTIONAL PLAN #2 TO PROPOSED + - ft LAST SURVEY AT: 6,346 ft,inc: 6.3, Azm: 353.5,TVD: 6, ft VS: ft, DLS: 15.12, DLN: 8.6, 3 ft B, 1 ft R 6,201 6, :00 08: ,201 6,201 CIRCULATE AND DUST MUD WEIGHT UP TO 9.05, WELL BORE STABLE INT DIR DRILL COND MUD & CIRC 08:00 08: ,201 6,201 CHECK FLOW, WELL STATIC, PUMP SLUG INT DIR DRILL TRIPS 08:30 13: ,201 6,201 TRIP OUT FROM 6,201 TO 362ft ( SLM, DRILLERS TALLEY , STRAP ) 13:00 16: ,201 6,201 LAID OUT BHA No. 2 FROM 362ft TO SURFACE. GRADED 11 in BIT No.2, HALLIBURTON MM65D 1-1-CT-S-1-1-CT-BHA. 16:00 16: ,201 6,201 SERVICE RIG, GREASE BLOCKS, TOP DRIVE - VISUALLY INSPECT TOP DRIVE 16:30 19: ,201 6,201 P/U DIRECTIONAL BHA, ORIENT AND TEST SAME, M/U BIT No. 3, HALLIBURTON MMD54DM SN# INT DIR DRILL TRIPS INT DIR DRILL TRIPS INT DIR DRILL LUBRICATE RIG INT DIR DRILL P/U & L/D BHA 19:30 00: ,201 6,201 T.I.H. FROM 171 ft TO 6,201 ft, NO HOLE PROBLEMS, NO FILL INT DIR DRILL TRIPS 00:30 02: ,201 6,307 ROTATE/SLIDE FROM 6,201 ft TO 6,307 ft,106 ft AT 71 fph ROTATE 106 ft IN 1.5 HOURS, 71 fph AVERAGE ROP SLIDE: 0 ft IN 0 HOUR, 0 fph AVERAGE ROP 100% ROTATE, 0% SLIDE FULL RETURNS 02:00 05: ,307 6,475 ROTATE/SLIDE DRILLED, BUILDING CURVE FROM 6,307 ft TO 6,475 ft, 168 ft AT 56 FPH ROTATE 168 ft IN 3 HOURS, 56 FPH AVERAGE ROP SLIDE: 0 ft IN 0 HOURS, 0 FPH AVERAGE ROP 100 % ROTATE, 0% SLIDE FULL RETURNS INT DIR DRILL DRILL W/ MUD PROD CURVE DRILL DRILL W/ MUD 60.9

10 Report End Date: 10/1/2015 Report Number: 12 Drilling Days: 5 : 8,525 : 2,050 Current VS (ft): 1,466 DRILL LATERAL TO 8,525 ft DRILL CURVE FROM 6,475 ft TO 7,289 ft,drill LATERAL 7,289 ft TO 8,525 ft LAST SURVEY AT: 8,375 ft,inc: 90.3, Azm: 1.9,TVD: 6,933.6 ft VS: 1, ft, DLS:.53, 6 ft A, 1 ft L 6,475 8,525 CONTINUE TO DRILL LATERAL AS PER DIRECTIONAL PLAN #2 TO PROPOSED + - ft 2, :00 13: ,475 6,528 ROTATE/SLIDE DRILLED FROM 6,475 ft TO 6,814 ft 339 ft AT 42 FPH ROTATE 12 ft IN.5 HOURS, 24 FPH AVERAGE ROP SLIDE: 327 ft IN 7.5 HOURS, 44 FPH AVERAGE ROP 3% ROTATE, 97% SLIDE FULL RETURNS PROD CURVE DRILL DRILL W/ MUD 13:00 13: ,528 6,528 SERVICE RIG, GREASE BLOCKS, TOP DRIVE - VISUALLY INSPECT TOP DRIVE 13:30 18: ,528 7,194 ROTATE/SLIDE DRILLED FROM 6,814 ft TO 7,194 ft 380 ft AT 76 FPH ROTATE 0 ft IN 0 HOURS, 0 FPH AVERAGE ROP SLIDE: 380 ft IN 5 HOURS, 76 FPH AVERAGE ROP 0% ROTATE, 100% SLIDE FULL RETURNS PROD CURVE DRILL LUBRICATE RIG PROD CURVE DRILL DRILL W/ MUD 18:30 19: ,194 7,194 CHANGE OUT LEAKING ROTATING HEAD WITH NEW ONE PROD CURVE DRILL BOP/OTHER Yes 19:00 20: ,194 7,289 ROTATE/SLIDE DRILLED FROM 7,194 ft TO 7,289 ft 95 ft AT 63 FPH ROTATE 0 ft IN 0 HOURS, 0 FPH AVERAGE ROP SLIDE: 95 ft IN 1.5 HOURS, 63 FPH AVERAGE ROP 0% ROTATE, 100% SLIDE FULL RETURNS 20:30 05: ,289 8,525 ROTATE/SLIDE DRILLED FROM 7,289 ft TO 8,525 ft 1,236 ft AT 145 FPH ROTATE 1,198 ft IN 7 HOURS, 171 FPH AVERAGE ROP SLIDE: 38 ft IN 1.5 HOURS, 25 FPH AVERAGE ROP 97 % ROTATE, 3 % SLIDE FULL RETURNS PROD CURVE DRILL DRILL W/ MUD 89.1

11 Report End Date: 10/2/2015 Report Number: 13 Drilling Days: 6 : 11,823 : 3,298 Current VS (ft): 4,859 DRILL LATERAL TO 11,823 ft DRILL LATERAL 8,525 ft TO 11,823 ft LAST SURVEY AT: 11,674 ft,inc: 91.1, Azm: 2.1,TVD: 6, ft VS: 4, ft, DLS:.2.5, 2 ft B, 18 ft R 8,525 11,823 CONTINUE TO DRILL LATERAL AS PER DIRECTIONAL PLAN #2 TO PROPOSED + - ft 3, :00 16: ,525 10,139 ROTATE/SLIDE FROM 8,525 ft TO 10,139 ft 1,614 ft AT 147 FPH ROTATE 1,567 ft IN 9.5 HOURS, 165 FPH AVERAGE ROP SLIDE: 48 ft IN 1.5 HOURS, 32 FPH AVERAGE ROP 97 % ROTATE, 3 % SLIDE FULL RETURNS 16:00 16: ,139 10,139 SERVICE RIG, GREASE BLOCKS, TOP DRIVE - VISUALLY INSPECT TOP DRIVE 16:30 21: ,139 10,886 ROTATE/SLIDE FROM 10,139 ft TO 10,886 ft 747 ft AT 166 FPH ROTATE 725 ft IN 3.5 HOURS, 207 FPH AVERAGE ROP SLIDE: 22 ft IN 1 HOURS, 22 FPH AVERAGE ROP 97 % ROTATE, 3 % SLIDE FULL RETURNS PROD LAT DRILL LUBRICATE RIG 21:00 22: ,886 10,886 CHANGE OUT HYDR. LINE ON TOP DRIVE PROD LAT DRILL REPAIR RIG Yes 22:00 05: ,886 11,823 ROTATE/SLIDE FROM 10,886 ft TO 11,823 ft 937 ft AT 134 FPH ROTATE 925 ft IN 6.5 HOURS, 142 FPH AVERAGE ROP SLIDE: 12 ft IN.5 HOURS, 24 FPH AVERAGE ROP 99 % ROTATE, 1 % SLIDE FULL RETURNS 143.4

12 Report End Date: 10/3/2015 Report Number: 14 Drilling Days: 7 : 15,050 : 3,227 Current VS (ft): 8,083 DRILL LATERAL TO 15,050 ft DRILL LATERAL 11,823 ft TO 15,050 ft LAST SURVEY AT: 14,900 ft,inc: 88.4, Azm: 1.6,TVD: 6, ft VS: 8, ft, DLS:.2.2, 0 ft A/B, 3 ft L 11,823 15,050 CONTINUE TO DRILL LATERAL AS PER DIRECTIONAL PLAN #2 TO PROPOSED + - ft 3, :00 12: ,823 12,767 ROTATE/SLIDE FROM 11,823ft TO 12,767 ft 944 ft AT 135 FPH ROTATE 907 ft IN 5 HOURS, 181 FPH AVERAGE ROP SLIDE: 35 ft IN 2 HOURS, 18 FPH AVERAGE ROP 99 % ROTATE, 1 % SLIDE FULL RETURNS 12:00 12: ,767 12,767 SERVICE RIG, GREASE BLOCKS, TOP DRIVE - VISUALLY INSPECT TOP DRIVE 12:30 15: ,767 13,289 ROTATE/SLIDE FROM 12,767 ft TO 13,289 ft 522 ft AT 209 FPH ROTATE 522 ft IN 2.5 HOURS, 209 FPH AVERAGE ROP SLIDE: 0 ft IN 0 HOURS, 0 FPH AVERAGE ROP 100% ROTATE, 0% SLIDE FULL RETURNS PROD LAT DRILL LUBRICATE RIG 15:00 15: ,289 13,289 CHANGE OUT SUCTION GASKET ON #2 MUD PUMP PROD LAT DRILL COND MUD & CIRC Yes 15:30 05: ,289 15,050 ROTATE/SLIDE FROM 13,289 ft TO 15,050 ft 1,761 ft AT 130 FPH ROTATE 1,699 ft IN 10.5 HOURS, 162 FPH AVERAGE ROP SLIDE: 62 ft IN 3 HOURS, 21 FPH AVERAGE ROP 96% ROTATE, 4% SLIDE FULL RETURNS 140.3

13 Report End Date: 10/4/2015 Report Number: 15 Drilling Days: 8 : : 2,078 Current VS (ft): 10,255 Total Depth Date 10/4/2015 CIRC. CLEAN UP CYCLE DRILL LATERAL 15,050 ft TO ft TD, CIRC. CLEAN UP CYCLE Rig Release Date Target Formation CONTINUE CIRC. CLEAN UP CYCLE, LAY DOWN DRILL PIPE LAST SURVEY AT: 17,073 ft,inc: 89.7, Azm: 356.5,TVD: 7, ft VS: 10, ft, DLS:.2.07, 3 ft A, 4 ft R 15,050 2, :00 13: ,050 16,162 ROTATE/SLIDE FROM 15,050 ft TO 16,162 ft 1,112 ft AT 139 FPH ROTATE 1,057 ft IN 6 HOURS, 176 FPH AVERAGE ROP SLIDE: 45 ft IN 2 HOURS, 23 FPH AVERAGE ROP 95% ROTATE, 5% SLIDE FULL RETURNS 13:00 13: ,162 16,162 SERVICE RIG, GREASE BLOCKS, TOP DRIVE - VISUALLY INSPECT TOP DRIVE 13:30 14: ,162 16,192 ROTATE/SLIDE FROM 16,162 ft TO 16,192 ft 30 ft AT 60 FPH ROTATE 30 ft IN.5 HOURS, 60 FPH AVERAGE ROP SLIDE: 45 ft IN 2 HOURS, 0 FPH AVERAGE ROP 100% ROTATE, 0% SLIDE FULL RETURNS 14:00 15: ,192 16,192 CHANGE OUT SUCTION GASKET ON #2 MUD PUMP & TROUBLE SHOOT #1 MP FOUND MODULE BODY WASHED OUT 15:30 02: ,192 ROTATE/SLIDE FROM 16,192 ft TO ft 936 ft AT 85 FPH ROTATE 845 ft IN 6 HOURS, 141 FPH AVERAGE ROP SLIDE: 91 ft IN 5 HOURS, 18 FPH AVERAGE ROP 90% ROTATE, 10% SLIDE FULL RETURNS 02:30 05: CLEAN UP CYCLE: PUMP SWEEP BOTTOMS UP : 80% SHAKER SCREEN COVERAGE, STARTING TQ 10, ENDING TQ 9 PROD LAT DRILL LUBRICATE RIG PROD LAT DRILL COND MUD & CIRC Yes PROD LAT DRILL COND MUD & CIRC 106.6

14 Report End Date: 10/5/2015 Report Number: 16 Drilling Days: 9 : : 0 Current VS (ft): 10,255 Total Depth Date 10/4/2015 Rig Release Date PULL WEAR BUSHING FINISH CIRCULATING CLEAN UP CYCLE & LAY DOWN DRILL STRING FROM ft TO SURFACE, PULL WEAR BUSHING Target Formation INSTALL WELL HEAD BUSHING, R/U CASING EQUIPMENT & BEGIN RUNNING 5.5" CASING LAST SURVEY AT: 17,073 ft,inc: 89.7, Azm: 356.5,TVD: 7, ft VS: 10, ft, DLS:.2.07, 3 ft A, 4 ft R 0 05:00 11: FINISH CIRCULATING CLEAN CYCLE, CHECK FLOW AND PUMP SLUG 3RD CIRCULATION: 50% SHAKER SCREEN COVERAGE, STARTING TQ 6, ENDING TQ 5 4TH CIRCULATION: 30% SHAKER SCREEN COVERAGE, STARTING TQ 5, ENDING TQ 5 5TH CIRCULATION:15% SHAKER SCREEN COVERAGE, STARTING TQ 5, ENDING TQ 4 6TH CIRCULATION:SHAKERS CLEAN, STARTING TQ 4, ENDING TQ 4 CONTINUOUS 80 RPM'S, 550 GPM'S PROD LAT DRILL COND MUD & CIRC 11:00 02: LAY DOWN DRILL PIPE FROM ft TO 170 ft (INITIAL P/U WEIGHT 230K OFF BOTTOM, HOLE TAKING PROPER FILL) 02:00 04: LAID OUT BHA No. 2 FROM 170 ft TO SURFACE. GRADED 7.875in BIT No.3, HALLIBURTON MMD54DM 1-1-NO-G-1-1-NO-TD 04:30 05: PULL WEAR BUSHING & INSTALL WELL HEAD BUSHING S# J (WASH OFF RIG FLOOR OF OBM) PROD LAT DRILL TRIPS PROD LAT DRILL P/U & L/D BHA PROD LAT DRILL BOP/OTHER

15 Report End Date: 10/6/2015 Report Number: 17 Drilling Days: 10 : : 0 Current VS (ft): 10,255 Total Depth Date 10/4/2015 Rig Release Date PERCULATE CASING SET 13 5/8 in BUSHING, R/U AND RAN 5.5 in CASING TO ft,perculate CASING LAST SURVEY AT: 17,073 ft,inc: 89.7, Azm: 356.5,TVD: 7, ft VS: 10, ft, DLS:.2.07, 3 ft A, 4 ft R Target Formation FINISH PERCULATE CASING, CIRCULATE 1 1/2 TIMES INNER CAPACITY & SWAP LINES TO CEMENT TRUCK 0 05:00 08: FINISH PULLING WEAR BUSHING, INSTALL 13 5/8 in WELL HEAD BUSHING TEST TO 5000 PSI GOOD TEST PROD LAT DRILL BOP/OTHER 08:00 09: SAFETY MEETING WITH EXPRESS CASING CREW & RIG HANDS; RIG UP EXPRESS CASING EQUIPMENT. 09:00 04: MAKE UP SHOETRACK, CHECK FLOATS (GOOD) AND RAN ft (389 jnts) OF 5.5 in PRODUCTION CASING AS FOLLOWS, FROM TOP TO BOTTOM ft (20 jts) TO OF 5.5 in 17# RYS-110 LTC SOUR SERVICE. 5,387 ft (121 jts) OF 5.5 in 17# RYS SOUR SERVICE BOND COATED ft (29 jts) OF 5.5 in 17# HCP-110 LTC 1,209.9 ft (27 jts) OF 5.5 in RYS-110 SOUR SERVICE 8, ft (185 jts) OF 5.5 in 17# HCP-110 LTC TAGGED BOTTOM AT ft. CENTEK SOLID BODY CENTRALIZER PLACEMENT: EVERY JOINT FROM ft TO 7,276 ft, DAVIVS LYNCH BOWSPRING CENTRALIZERS 5.5 in x 7 7/8 in 3 PER 2 JOINTS FROM 7,276 ftto 6,311 ft, 1 PER 3 JOINTS FROM 6,129 ft TO 199 ft, HALLIBURTON BOW SPRING CENTRALIZERS 5.75 in x 12 in BOW SPRING CENTRALIZERS TRICAN SHOE AT ft TRICAN FLOAT COLLAR AT 17,080 ft. CALLED 10:OO PM TALKED TO PAM PROD PROD CSG/CEMENT RUN CASING PROD PROD CSG/CEMENT RUN CASING 04:00 05: INSTALL CREST CIRCULATING IRON, FILL PIPE, RUPTURED TRICAN FLOTATION DISK AT 2,800 PSI, PERCULATE CASING PROD PROD CSG/CEMENT COND MUD & CIRC

16 Report End Date: 10/7/2015 Report Number: 18 Drilling Days: 11 : : 0 Current VS (ft): 10,255 Total Depth Date 10/4/2015 Rig Release Date 10/7/2015 RIG RELEASED FINISH PERCULATING CASING, CIRCULATE 1.5 TIMES ANNULAR CAPACITY, CEMENT 5.5 in PRODUCTION CASING, RAISE STACK, CSET 5.5" CASING SLIPS, CUT CASING, NIPPLE DOWN BOPS & NIPPLE UP WELL CAP. LAST SURVEY AT: 17,073 ft,inc: 89.7, Azm: 356.5,TVD: 7, ft VS: 10, ft, DLS:.2.07, 3 ft A, 4 ft R Target Formation RELEASE RIG ON 10/7/15 AT 0500 HRS FROM TO COPE HA 0 05:00 10: FINISH PERCULATING CASING & CIRCULTE 1.5 TIMES ANNULAR CAPACITY PROD PROD CSG/CEMENT COND MUD & CIRC 10:00 11: HELD SAFETY MEETING WITH CREST CEMENTING & RIG PERSONNEL; RIG UP CEMENT HEAD AND CIRCULATING IRON 11:30 18: HELD PJSM, RIG UP CREST CEMENTING: TEST LINES TO 7,500 psi & BEGIN 5.5 in PRODUCTION CASING CEMENT JOB, 300 bbsl FRESH WATER SPACER WITH BIOCIDE + COR INHIBITOR, 100 bbls WEIGHTED SPACER AT 9.4 ppg, LEAD = 1395 SACK (732 bbls) 50/50 POZ-H AT 11.2 ppg, 2.95 YIELD & TAIL= 1580 SACKS (397 bbls) 50/50 POZ-H AT 14.4 ppg, 1.28 YIELD, PUMP RATE 8.4 bbls/min. PUMPED 50 bbls SUGAR & BIOCIDE WATER, 347 bbls TREATED WATER W/BIOCIDE + INHIBITOR DISPLACEMENT, PUMP RATE 8.5 bbls/min, SLOWED PUMP RATE TO 4.5 bbls/min FOR LAST 20 bbls BUMP PLUG, PRESSURE BEFORE BUMPING PLUG WAS 1900, psi, BUMP PLUG WITH 900 psi OVER FCP AS PER TRICAN TECH INSTRUCTION, BUMPED WITH 2,800 psi HELD FOR 3 min, BLED OFF PRESSURE, BLED BACK 4 bbls, FLOATS HELD. ESTIMATED TOP OF LEAD AT 37 ft, ESTIMATED TOP OF TAIL AT 5941 ft, TOTAL CEMENT BACK TO SURFACE: 205 bbls, ESTIMATED SPACER BACK TO SURFACE: 400 bbls (FULL RETURNS THRU OUT CEMENT JOB) R/D CEMENTERS SAME PROD PROD CSG/CEMENT RUN CASING PROD PROD CSG/CEMENT RUN CASING 18:00 21: WASH THRU BOP STACKS, PUMPS, TDS & CHOKE, FLOW LINE. DRAIN STACK, REMOVE DRIP PAN, HOOK UP BOP HANDELER, REMOVE FLOW LINE & TURN BUCKLES (BEGIN WASHING MUD TANKS AT 17:30 HRS ON 10/6/15) 21:00 03: SAFETY MEETING WITH YELLOW JACKET, SWECO TECH & RIG CREW. BREAK AND RAISE STACK, SET 5.5" SWECO SLIPS (SN: PT ) 108kips FULL VERTICLE TENSION OF CSG TO KOP (6,300 ft). CUT CASING, LAY DOWN CUT OFF, MOVE OVER AND TIE DOWN BOP STACK 03:00 05: FINAL CUT 5.5" CASING. INSTALLED AND TORQUE DOWN WELLHEAD CAP (SN: MC ). PREP RIG FOR MOVE (FINISH WASHING MUD TANKS AND OPEN TOPS AT 05:00 HRS ON 10/7/15) RELEASE RIG FROM AT 05:00 ON 10/7/2015 PROD PROD CSG/CEMENT NIPPLE UP B.O.P./WELLHEAD PROD PROD CSG/CEMENT NIPPLE UP B.O.P./WELLHEAD PROD PROD CSG/CEMENT NIPPLE UP B.O.P./WELLHEAD

PERMIAN RESOURCES, LLC UL Daily Drilling Partner Summary

PERMIAN RESOURCES, LLC UL Daily Drilling Partner Summary PRES WELL NO. Report End Date: 5/19/2016 Report Number: 3 Rig: INTEGRITY, 3 Projected Days (days): 0 Drilling Days: : : 0 Planned VS (ft): Current VS (ft): WOC WOC, CONTACTED TRRC, SPOKE TO ABRAHAM, ADVISED

More information

University 31E 4. Ward County, TX. Rig: Union Drlg Rig 229. AFE: $1,393, DHC: $761, WI: Notes: Workover:

University 31E 4. Ward County, TX. Rig: Union Drlg Rig 229. AFE: $1,393, DHC: $761, WI: Notes: Workover: Zone: War-Wink Cherry Canyon TD: 7250' Rig: Union Drlg Rig 229 Status: WOC Spud Date: 1/26/2013 RR Date: 2/12/2013 First Sales: AFE: $1,393,293.00 DHC: $761,963.00 WI: Notes: Date Activity 11/14/2012 11/14/12

More information

Terrace Petroleum Corporation Cunning Wolf UL No. 602H, 1980 FNL and 467 FWL Section 6, Block 23, ULS Pecos County, Texas

Terrace Petroleum Corporation Cunning Wolf UL No. 602H, 1980 FNL and 467 FWL Section 6, Block 23, ULS Pecos County, Texas Terrace Petroleum Corporation Cunning Wolf UL No. 602H, 1980 FNL and 467 FWL Section 6, Block 23, ULS Pecos County, Texas 3-29-13 DAY 1 Previously built location, roads, built and lined reserve pits. Move

More information

D & V Oil Co. LP. Daily Completion Report - University CN A #6 API # /23/2016. Perfs ' ' Activity :

D & V Oil Co. LP. Daily Completion Report - University CN A #6 API # /23/2016. Perfs ' ' Activity : Daily Completion Report - University CN A #6 API # 42-105-42334 12/23/2016 Activity at Report Time: Perfs - 2512' - 2632' Depth at Report Time Put Well on Production 2655' - PBTD Activity : Arrive Location.

More information

Wellwork Chronological Regulatory Report

Wellwork Chronological Regulatory Report Well Name: UNIVERSITY 49 #0808H Field: Lin (Wolfcamp) S/T/R: / / County, State: Location Desc: Operator: Enduring Resources, LLC Project Type: Completion District: Southern Project AFE: DV02151 AFE's Associated:

More information

PROPOSED NEW SUB- CODE 1 RIG UP AND TEAR. Possibly Fits into Existing Code. 7/26/2018 Review PROPOSED NEW CODE EXISTING OPERATION

PROPOSED NEW SUB- CODE 1 RIG UP AND TEAR. Possibly Fits into Existing Code. 7/26/2018 Review PROPOSED NEW CODE EXISTING OPERATION NW NW 1 RIG UP AND TAR 1 no sub-code RIG UP AND TAR DOWN Start: Rig released from previous well, nd: Rig fully rigged up, acceptance tests successfully completed, and signed off. DOWN 1 1 Rig Under Tow

More information

BENEDUM (DEVONIAN, GAS) API # UPTON COUNTY, TX DRILLING PERMIT # DAILY REPORTS

BENEDUM (DEVONIAN, GAS) API # UPTON COUNTY, TX DRILLING PERMIT # DAILY REPORTS 11/17/2011 11/18/2011 11/19/2011 AFE dated 11/18/2011 - pull tbg out of hole and make a mill run. Run packer on tbg and attempt to reestablish production from Devonian Formation. MIRU Great Basin Pulling

More information

ENDEAVOR ENERGY RESOURCES

ENDEAVOR ENERGY RESOURCES ENDEAVOR ENERGY RESOURCES Lease WELL NO FIELD PBTD PERFORATIONS FOREMAN TOOLPUSHER API NUMBER DATE University 5-20-21 #1H 14,223' Tony Cody 07/02/13 OART WEATHER FLUID SUMMARY W/O UNIT DATA W/L UNIT DATA

More information

Drilling Morning Report

Drilling Morning Report REPORT DATE 5/0/200 Report # AFE # Casing OD(in) WT(lbs/ft) Grade Btm MD(ft) Btm TVD(ft) DCRB04 TVD: 32 MD: 32 Progress: 32 Planned TD:,500 Current Hole Size: Days From Spud: Spud Date: 5//0 Days on Well:

More information

EP WELLS DAILY OPERATIONS REPORT Report 38 07/18/2017

EP WELLS DAILY OPERATIONS REPORT Report 38 07/18/2017 1 Company Type bore WBS No/API No PERMIAN Development 30265014 / 4230133171.00 Event Summary Event Type Completion only Event Start Date 04/28/2017 Days on Location 37.00 Objective Install Completion Original

More information

FORGE Energy UL 21 Freedom 1 API Number:

FORGE Energy UL 21 Freedom 1 API Number: FORGE Energy UL 21 Freedom 1 API Number: 42-371-39061 07/13/2013 RU E&P WL Open well RIH correlate GR log to get on depth. Run BL found cement to surface. Tag 7566' PBTD. RU Rising Star test lines to 5000

More information

Wellwork Chronological Regulatory Report

Wellwork Chronological Regulatory Report Well Name: UNIVERSITY 09A #1003H Field: Lin (Wolfcamp) S/T/R: / / County, State: Location Desc: Operator: Enduring Resources, LLC Project Type: Completion District: Southern - ERPBU Project AFE: DV02251

More information

BP SIT Testing Franks Facility Lafayette

BP SIT Testing Franks Facility Lafayette BP SIT Testing Franks Facility Lafayette General Information Status: Franks test well Lafayette La. Rig: Franks Test Rig Casing: 13 3/8, 0 to 4,600 Workstring: 4 ½ IF Brine: Fresh Water Directional: Straight

More information

Casing Design. Casing Design. By Dr. Khaled El-shreef

Casing Design. Casing Design. By Dr. Khaled El-shreef Casing Design By Dr. Khaled El-shreef 1 Casing Design CONTENTS Function of Casing Casing Types & Tools Strength Properties Casing Specification Casing Design 2 1 RUNNING AND CEMENTING CASING Reasons for

More information

Deepwater Horizon Incident Internal Investigation

Deepwater Horizon Incident Internal Investigation Not all Information has been verified or corroborated. Subject to review based on additional information or analysis. Deepwater Horizon Incident Internal Investigation 1 Areas of Discussion Investigation

More information

BLACK HILLS PLATEAU PRODUCTION COMPANY

BLACK HILLS PLATEAU PRODUCTION COMPANY BLACK HILLS PLATEAU PRODUCTION COMPANY DRILLING PROGRAM Homer Deep Unit 9 11CH SHL: 300 FNL, 200 FWL, NWNW Sect. 9 T8S R98W BHL: 1350 FSL, 2100 FEL NWSE Sect. 15 T8S R98W Garfield & Mesa Counties, Colorado

More information

Float Equipment TYPE 925/926

Float Equipment TYPE 925/926 Type 925 Float Collar Plunger Valve Float Equipment For less demanding well conditions, such as shallower depths or lower pressures, Top- Co offers economical float equipment certified to API RP 10F category

More information

Daily Drilling Report

Daily Drilling Report Daily Drilling Report Well Name UTL 38-17-1H Report Date 05/05/2014 Field University Lands Supervisor Nate Baxter Report No. 97 Location 990' FNL & 300' FEL Supervisor 2 Kevin Evans DFS 94 County Ward

More information

1. The well has been shut in on a kick and the kill operation has not started.

1. The well has been shut in on a kick and the kill operation has not started. Well Control Methods Day 2 1. The well has been shut in on a kick and the kill operation has not started. Shut in drill pipe pressure Shut in casing pressure 500 psi 700 psi After stabilization, both pressures

More information

FORGE Energy UL 21 Pahaska 1H API Number:

FORGE Energy UL 21 Pahaska 1H API Number: FORGE Energy UL 21 Pahaska 1H API Number: 42-495-33740 10/26/2016 07:00 HPJM 07:15 Install 1502 Adapter Flanges to Well Head. RU Pump Truck test lines to 1000 PSI no leaks. Load hole w/ 15 bbls fresh water.

More information

SUBSEA KILL SHEET EXERCISE No. 5

SUBSEA KILL SHEET EXERCISE No. 5 Subsea Kill Sheet Exercise No. 5 SUBSEA KILL SHEET EXERCISE No. 5 Name: Date: Complete the Subsea vertical kill sheet provided on pages 2 and 3. Then answer questions 1 to 12. Please round calculations

More information

Chapter 5 HORIZONTAL DRILLING

Chapter 5 HORIZONTAL DRILLING Chapter 5 HORIZONTAL DRILLING Chapter 5 How much money am I about to put on the table for a horizontal well? Did I do sufficient planning? Keys to Successful Horizontal Wells Multi-disciplined teams working

More information

Niko Deepwater Weatherford MPD DODI Ocean Monarch Nelson Emery Niko Indonesia Drilling Superintendent

Niko Deepwater Weatherford MPD DODI Ocean Monarch Nelson Emery Niko Indonesia Drilling Superintendent Niko Deepwater Weatherford MPD DODI Ocean Monarch Nelson Emery Niko Indonesia Drilling Superintendent 26 Feb - 2014 SPE Thailand 1 Outline Drivers for MPD: 1. Safety of personnel in remote operations 2.

More information

Study Guide IADC WellSharp Driller and Supervisor

Study Guide IADC WellSharp Driller and Supervisor Times to Flow Check: Before pulling out of the hole Before pulling BHA into the BOP When bit is pulled into the casing Increase in cuttings at shakers with same ROP On connections Upon abnormal trip tank

More information

float equipment OPERATING MANUAL TYPE 505/506 Float Equipment 1. INFORMATION & RECOMMENDATIONS Float Equipment

float equipment OPERATING MANUAL TYPE 505/506 Float Equipment 1. INFORMATION & RECOMMENDATIONS Float Equipment Contents 1. GENERAL INFORMATION & RECOMMENDATIONS 1 2. INSTALLATION FLOAT EQUIPMENT 2 2.1 PRE-USE FIELD INSPECTION 2 2.2 POSITION FLOAT ON CASING STRING 3 3. RUNNING OF FLOAT EQUIPMENT 3 3.1 CIRCULATION

More information

PHE KE30-A8 WORKOVER PROGRAM

PHE KE30-A8 WORKOVER PROGRAM PHE WMO KE30-A8 WORKOVER PROGRAM PHE KE30-A8 WORKOVER PROGRAM Prepared by: Ross Webber. Hendra Wahyudi. Chandra Maulana. George Lattimore Adi Benanjaya Achmad Soendaroe. Tri Wiyono DRILLING ENGINEER SR.

More information

DAY ONE. 2. Referring to the last question, what mud weight would be required to BALANCE normal formation pressure?

DAY ONE. 2. Referring to the last question, what mud weight would be required to BALANCE normal formation pressure? DAY ONE 1. Normal formation pressure gradient is generally assumed to be: A..496 psi/ft B..564 psi/ft C..376 psi/ft D..465 psi/ft 2. Referring to the last question, what mud weight would be required to

More information

OCEAN DRILLING PROGRAM

OCEAN DRILLING PROGRAM BIH OCEAN DRILLING PROGRAM www.oceandrilling.org Scientifi c Application Packers A packer is an inflatable rubber element that inflates to seal the annular space between the drill string and the borehole

More information

W I L D W E L L C O N T R O L CIRCULATION & WELL CONTROL

W I L D W E L L C O N T R O L CIRCULATION & WELL CONTROL CIRCULATION & WELL CONTROL Learning Objectives You will learn: The importance of pump rates and pressures during well control operations Pressure relationships Basic calculations necessary in well control

More information

Type 967 Diamond Broaching Type 968 Sidewinder reamer shoe

Type 967 Diamond Broaching Type 968 Sidewinder reamer shoe Type 965 float collar Type 966 float shoe 1. GENERAL INFORMATION & RECOMMENDATIONS Type 967 Diamond Broaching Type 968 Sidewinder reamer shoe Type 969 Sidewinder reamer shoe Float Equipment Top-Co Float

More information

Rig Math. Page 1.

Rig Math. Page 1. Page 1 The Calculator and Main Keyboard Display Numerical 10-key pad used for entering numerical values Trigonometric Functions These keys will be used where wellbore angle is an issue These are the keys

More information

Elevation Resources DAILY OPERATIONS. Clean and prep location, MIRU pulling unit to mill liner top

Elevation Resources DAILY OPERATIONS. Clean and prep location, MIRU pulling unit to mill liner top DAYS FROM SPUD: 35 DAYS ON 0 Mar 1 2016 RIG SUPERVISOR: Tyler Clean and prep location, MIRU pulling unit to mill liner top Blade location, set anchors. Bring surface and int CSG valves to surface and fill

More information

"Sharing To Be Better. Influx through failed cement in shoetrack during completion operations

Sharing To Be Better. Influx through failed cement in shoetrack during completion operations "Sharing To Be Better Influx through failed cement in shoetrack during completion operations 2 Well status completion operations Seabed @ 364m 7" liner cemented across reservoir Well filled with 1.54 SG

More information

Zarvona DAILY WORKOVER / COMPLETION REPORT

Zarvona DAILY WORKOVER / COMPLETION REPORT Lease/Well No: CURRENT WELL TEST: PURPOSE OF WORK: MIRU service companies/start frac PULLING UNIT: KOP 10,429' TD: 15,906' KB ABOVE GL: 30 10,713' PBTD: 15,885' INT CSG: 60 10,998' TVD: 10,950' PROD CSG:

More information

DUO-SQUEEZE H LCM Mixing Tables and Operating Procedures

DUO-SQUEEZE H LCM Mixing Tables and Operating Procedures BAROID DUO-SQUEEZE H LCM Mixing Tables and Operating Procedures Prepared for: Prepared by: Submitted by: Submittal Date: All Customers Sharath Savari, Donald L. Whitfill Halliburton January 2014 1 Copyright

More information

Horizontal Marmaton Wells in Beaver County, OK

Horizontal Marmaton Wells in Beaver County, OK Horizontal Marmaton Wells in Beaver County, OK Drilling Improvements & Lessons Learned Presented by: Michael Dunn Drilling Engineer Unit Petroleum Forward Looking Statement DISCLAIMER It is understood

More information

Air and Gas Drilling

Air and Gas Drilling Air and Gas Drilling Air and Gas Drilling It is a technique in which the more common drilling fluids, (water or mud) are replaced by highly compressible Air or Natural gas. But Compressibility makes pressure

More information

BANDAR PANJI-1 WELL CONTROL INCIDENT REPORT

BANDAR PANJI-1 WELL CONTROL INCIDENT REPORT BANDAR PANJI-1 WELL CONTROL INCIDENT REPORT EXECUTIVE SUMMARY I was requested by management to review the Banjar Panji-1 drilling operations from the conception of the Integrated Drilling Management approach

More information

6-3/4 DUAL PORTED PBL BYPASS SYSTEM (Applicable to sizes 6-1/4 & 6-1/2 also)

6-3/4 DUAL PORTED PBL BYPASS SYSTEM (Applicable to sizes 6-1/4 & 6-1/2 also) RECEIVING PBL AT RIG SITE TITLE: Operating Instructions for -3/4 PBL -3/4 DUAL PORTED PBL BYPASS SYSTEM (Applicable to sizes -1/4 & -1/2 also) OPERATING INSTRUCTIONS 1. On receipt of PBL Bypass Tools at

More information

Zarvona Energy LLC DAILY OPERATIONS

Zarvona Energy LLC DAILY OPERATIONS DAYS FROM SPUD: 120 DAYS ON 0 Jun 28 2016 RIG SUPERVISOR: Tyler Dupriest MIRU pulling unit MIRU pulling unit, move in and tally TBG. SDFN RIH with RBP DAYS FROM SPUD: 121 DAYS ON 1 Jun 29 2016 RIG SUPERVISOR:

More information

2-7/8 TRIPLE PORTED PBL BYPASS SYSTEM

2-7/8 TRIPLE PORTED PBL BYPASS SYSTEM RECEIVING PBL AT RIG SITE TITLE: Operating Instructions for 2-7/8 Triple Port PBL 1-10-201 2-7/8 TRIPLE PORTED PBL BYPASS SYSTEM OPERATING INSTRUCTIONS 1. On receipt of PBL Bypass Tools at Rig site, the

More information

IWCF Equipment Sample Questions (Surface Stack)

IWCF Equipment Sample Questions (Surface Stack) IWCF Equipment Sample Questions (Surface Stack) 1. During a well control operation 4000 psi was shut in below the middle pipe rams. Ram type BOP data: Model: Cameron U type Rated Working Pressure: 15000

More information

W I L D W E L L C O N T R O L AIR DRILLING

W I L D W E L L C O N T R O L AIR DRILLING AIR DRILLING Air Drilling Learning Objectives You will learn the basics of: Air drilling equipment Types of air drilling Differences between mud and air drilling You will learn how to apply well control

More information

NeoProducts, LLC 1201 Dealers Ave. Harahan, LA Ph:

NeoProducts, LLC 1201 Dealers Ave. Harahan, LA Ph: Please read this entire document. It concerns all 9⅝ Vented Thru-tubing Bridge Plugs Read this document before proceeding to NeoProducts Recommended Best Practices for 9⅝ vented T- TBPs. Whenever running

More information

Shell Castor & Pollux Rig Equipment Primary Items

Shell Castor & Pollux Rig Equipment Primary Items Shell Castor & Pollux Rig Equipment Primary Items DRAW WORKS WITH SKID Lift Type: Non-Routine Complex Tandem Lift 2 Cranes Total Weight: 39,000 lbs Estimated construction Weight 21,800kg Crane #1: Sub

More information

Perforating Options Currently Available in Horizontal Shale Oil and Gas Wells. Kerry Daly, Global BD Manager- DST TCP

Perforating Options Currently Available in Horizontal Shale Oil and Gas Wells. Kerry Daly, Global BD Manager- DST TCP MENAPS 2013 Perforating Options Currently Available in Horizontal Shale Oil and Gas Wells Kerry Daly, Global BD Manager- DST TCP MENAPS 13-17 WELL FLOW MANAGEMENT TM Scope/ Contents: MENAPS 13-17 Study

More information

Practice Exam IADC WellSharp Driller and Supervisor

Practice Exam IADC WellSharp Driller and Supervisor Workover & Completion Day 4 1. In a workover operation of a shut in well a Lubricator is being used together with a Wireline BOP / Wireline Valve. Which Barrier is classified as the Primary Barrier? A.

More information

RIH intermediate section casing in Bazian-1 exploration oil well

RIH intermediate section casing in Bazian-1 exploration oil well Energy and Sustainability V 559 RIH intermediate section casing in Bazian-1 exploration oil well A. K. Darwesh Petroleum Engineering Department, Engineering Faculty, Koya University, Kurdistan Abstract

More information

IWCF Equipment Sample Questions (Combination of Surface and Subsea Stack)

IWCF Equipment Sample Questions (Combination of Surface and Subsea Stack) IWCF Equipment Sample Questions (Combination of Surface and Subsea Stack) 1. Given the volumes below, how much hydraulic fluid will be required to carry out the following operations (no safety margin)?

More information

Abandonment Program for Paramount Fort Liard F 36

Abandonment Program for Paramount Fort Liard F 36 Abandonment Program for Paramount Fort Liard F 36 Well Name: Paramount et al Liard F 36 Area: 60 0 10 N, 123 0 15 W Location: Latitude: 60 0 05 27 Longitude: 123 0 22 00 UWI: 300F366010123150 WID: 1841

More information

JULY AUG 2010 INNOVATING WHILE DRILLING REGIONAL FOCUS: EUROPE & THE NORTH SEA

JULY AUG 2010 INNOVATING WHILE DRILLING REGIONAL FOCUS: EUROPE & THE NORTH SEA DRILLING C O N T R A C T O R OFFICIAL MAGAZINE OF THE INTERNATIONAL ASSOCIATION OF DRILLING S C O N T R A C T O R Multi-zone, expandable completions JULY AUG 2010 New technologies provide more options

More information

INTERMEDIATE CASING SELECTION FOR COLLAPSE, BURST AND AXIAL DESIGN FACTOR LOADS EXERCISE

INTERMEDIATE CASING SELECTION FOR COLLAPSE, BURST AND AXIAL DESIGN FACTOR LOADS EXERCISE INTERMEDIATE CASING SELECTION FOR COLLAPSE, BURST AND AXIAL DESIGN FACTOR LOADS EXERCISE Instructions Use the example well data from this document or the powerpoint notes handout to complete the following

More information

EP WELLS DAILY OPERATIONS REPORT Report 29 04/21/2017

EP WELLS DAILY OPERATIONS REPORT Report 29 04/21/2017 4/22/217 8:23:32 Report Version: 4.1.16R9 Generated from data in EDM/Opens/PROFILE 1 RESTRICTED Report 29 4/21/217 Company Type bore WBS No/API No PERMIAN Development 3256997 / 42313354. Event Summary

More information

EP WELLS DAILY OPERATIONS REPORT Report 19 05/26/2016

EP WELLS DAILY OPERATIONS REPORT Report 19 05/26/2016 Report 19 5/26/216 Company Type WBS No/API No PERMIAN Exploration 324861 / 423132849. Event Summary Event Type Drilling only Event Start Date 4/24/216 Days on Location 18.67 Objective Drill - Wolfcamp

More information

MOCS. Multiple Opening Circulation Sub. Fluid Bypass Valve

MOCS. Multiple Opening Circulation Sub. Fluid Bypass Valve MOCS Multiple Opening Circulation Sub Fluid Bypass Valve 1 Applications BHA Protection o o Pumping LCM Spotting Acid Work-over and completions o o o Well bore cleanout Fluid displacements Bottoms-up circulation

More information

HydroPull. Extended-Reach Tool. Applications

HydroPull. Extended-Reach Tool. Applications Extended-Reach Tool HydroPull This tool incorporates a cycling valve that momentarily interrupts the flow to create water-hammer pressure pulses inside coiled or jointed tubing used in horizontal well

More information

Performance and Value of the invision System : Offshore in Coiled Tubing Operations

Performance and Value of the invision System : Offshore in Coiled Tubing Operations Performance and Value of the invision System : Offshore in Coiled Tubing Operations Case Study #0004 Date November 01 21, 2017 Location Gulf of Mexico, Deep Water Introduction Intelligent Wellhead Systems

More information

EP WELLS DAILY OPERATIONS REPORT Report 29 05/19/2017

EP WELLS DAILY OPERATIONS REPORT Report 29 05/19/2017 5/2/27 5:23:5 Report Version: 4..6R9 Generated from data in EDM/Opens/PROFILE Report 29 5/9/27 Company Type WBS No/API No PERMIAN Development UNIVERSITY 9 PW UNIT 56H UNIVERSITY 9 PW UNIT 56H 32656 / 4233326.

More information

EP WELLS DAILY OPERATIONS REPORT Report 1 02/02/2017

EP WELLS DAILY OPERATIONS REPORT Report 1 02/02/2017 Report 2/2/27 Company Type WBS No/API No PERMIAN Development 3259585 / 423337 Event Summary Event Type Drilling only Event Start Date 2/2/27 Days on Location.94 Objective Drill - Wolfcamp Shale Original

More information

OPERATING MANUAL DOUBLE ACTING DRILLING INTENSIFIER HYDRAULIC TYPE

OPERATING MANUAL DOUBLE ACTING DRILLING INTENSIFIER HYDRAULIC TYPE Page 1 of 8 OPERATING MANUAL DOUBLE ACTING DRILLING INTENSIFIER HYDRAULIC TYPE Size Series 6.50" 478 Reviewed And Approved By: Signature: Initials: Date: Page 2 of 8 Section OPERATING MANUAL DOUBLE ACTING

More information

Engineered solutions for complex pressure situations

Engineered solutions for complex pressure situations SPECIAL SERVICES Engineered solutions for complex pressure situations Cudd Energy Services (CES) delivers custom engineered solutions to resolve complex pressure situations resulting from equipment failure

More information

Extended leak off testing

Extended leak off testing Extended leak off testing Rev: 1.0 03/01/01 Purpose To ensure minimal operational time and risk exposure to personnel, process, production and equipment. The following extended leak off test procedures

More information

Why Do Not Disturb Is a Safety Message for Well Integrity

Why Do Not Disturb Is a Safety Message for Well Integrity Why Do Not Disturb Is a Safety Message for Well Integrity Presented at the Practical Well Integrity Conference 9-10 December, 2014 in Houston By Ron Sweatman, Principal Advisor, Reservoir Development Services,

More information

Worked Questions and Answers

Worked Questions and Answers Worked Questions and Answers A Learning Document for prospective Candidates For the Rotary Drilling Well Control Test Programme Copyright, IWCF June 2000 Revision No.1, November 2000 IWCF 2000 page 1 of

More information

Well Control Drill Guide Example Only. Drill Guide is the list of drills, questions and attributes that are in DrillPad.

Well Control Drill Guide Example Only. Drill Guide is the list of drills, questions and attributes that are in DrillPad. Well Control Drill Guide Example Only Drill Guide is the list of drills, questions and attributes that are in DrillPad. This Well Control Drill Guide will be used in conjunction with the rig-specific well

More information

and and Norton J. Lapeyrouse CONTENTS

and and Norton J. Lapeyrouse CONTENTS and and Norton J. Lapeyrouse CONTENTS Chapter 1 Basic Formulas P. 3 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. 14. 15. 16. 17. 18. 19. Pressure Gradient Hydrostatic Pressure Converting Pressure into Mud

More information

W I L D W E L L C O N T R O L SNUBBING OPERATIONS

W I L D W E L L C O N T R O L SNUBBING OPERATIONS SNUBBING OPERATIONS Snubbing Operations Learning Objectives You will learn - Various activities suitable for snubbing operations. Best practices and techniques for conducting snubbing operations. The types

More information

RIG CAPABILITIES For Multi Well/Pad Development

RIG CAPABILITIES For Multi Well/Pad Development RIG CAPABILITIES For Multi Well/Pad Development Advantages to Multi-Well Pad - Continuous Operations Minimize EHS Risk Less iron to move Less trucking Less risks for spills Fewer or no Well Heads to avoid

More information

Hydro-Mech Bridge Plug

Hydro-Mech Bridge Plug Manual No: 0620000303 Revision: F Approved By: Quality Engineer Date: 2014-9-9 Hydro-Mech Bridge Plug DESCRIPTION: Map Hydro-Mech Bridge Plug is hydraulically actuated and mechanically set. Compact, with

More information

Chapter 5 Drilling and Well Testing Practices

Chapter 5 Drilling and Well Testing Practices Chapter 5 Drilling and Well Testing Practices Drilling and Well Testing Practices Activities in rotary drilling, completing, testing and maintaining a well. Health and safety requirements shall be covered

More information

SCORPION HIGH-QUALITY, FULLY COMPOSITE PLUGS

SCORPION HIGH-QUALITY, FULLY COMPOSITE PLUGS SCORPION HIGH-QUALITY, FULLY COMPOSITE PLUGS A DIFFERENT KIND OF ENERGY COMPANY Nine Energy Service isn t your typical oilfield services company. Our success stems from a culture driven by performance

More information

Coiled Tubing string Fatigue Management in High Pressure Milling Operation- Case Study

Coiled Tubing string Fatigue Management in High Pressure Milling Operation- Case Study Coiled Tubing string Fatigue Management in High Pressure Milling Operation- Case Study Abstract: Paper Presenter: Ebrahim Rabbani 1 e.rabbani@mehranservices.com Ebrahim Rabbani, Danial Davoodi 2, Fatemeh

More information

E NGINEERED C EMENTING S OLUTIONS

E NGINEERED C EMENTING S OLUTIONS DART CATCHER TOOL Blackhawk s Dart Catcher Tool provides indication of the exact location of downhole fluids during inner string cement jobs, cementing squeezes, or balanced cement plugs for temporary/permanent

More information

Investigation of Blowout and Fire Eugene Island Block 284 OCS-G 0991 Well A-13 March 1, 2001

Investigation of Blowout and Fire Eugene Island Block 284 OCS-G 0991 Well A-13 March 1, 2001 OCS Report MMS 2001-084 Investigation of Blowout and Fire Eugene Island Block 284 OCS-G 0991 Well A-13 March 1, 2001 Gulf of Mexico Off the Louisiana Coast U.S. Department of the Interior Minerals Management

More information

RPSEA UDW Forum June 22 & 23, Secure Energy for America

RPSEA UDW Forum June 22 & 23, Secure Energy for America RPSEA UDW Forum June 22 & 23, 2010 Secure Energy for America PROJECT TEAM RPSEA Operator Advisory Committee Anadarko Chevron Shell ConocoPhillips Subcontractors IntecSea NOV CTES General Marine Contractors

More information

August 21, Deepwater MPD / PMCD

August 21, Deepwater MPD / PMCD August 21, 2011 Deepwater MPD / PMCD Managed Pressure Drilling (MPD) Pressure held on top of riser while drilling. Drill in overbalance condition Pressurized Mud Cap Drilling (PMCD) Pressure of mud column

More information

Borais Petroleum Investment Co. SLOT RECOVERY SERVICE General Procedures

Borais Petroleum Investment Co. SLOT RECOVERY SERVICE General Procedures Borais Petroleum Investment Co. SLOT RECOVERY SERVICE General Procedures Slot Recovery Procedures: Slot Recovery Running Procedures 1. Cut And Retrieve Operation: Borais s cut and retrieve equipment: 1.

More information

Best Practices - Coiled Tubing Deployed Ball Drop Type Perforating Firing Systems

Best Practices - Coiled Tubing Deployed Ball Drop Type Perforating Firing Systems Best Practices - Coiled Tubing Deployed Ball Drop Type Perforating Firing Systems As a result of a recent job incident utilizing a Ball Drop Type firing system deployed on coiled tubing, the following

More information

Final Well Report. Revision: Version 0. Corp) Hole Name: Flat Bay Test Hole # 5 Rig: Duralite 800

Final Well Report. Revision: Version 0. Corp) Hole Name: Flat Bay Test Hole # 5 Rig: Duralite 800 Final Well Report Revision: Version 0 Operating Company: Vulcan Minerals Inc. (Investcan Energy Corp) Hole Name: Flat Bay Test Hole # 5 Rig: Duralite 800 Field: Flat Bay Location: Western Newfoundland,

More information

Top Drive System. 1. AC VFD Top Drive System. Technical characters

Top Drive System. 1. AC VFD Top Drive System. Technical characters Top Drive System The top drive system is a high-tech content products, which integrates mechanical, electrical hydraulic, and communications integration, and was used to replace traditional rotary table-kelly

More information

Faculty of Science and Technology MASTER S THESIS

Faculty of Science and Technology MASTER S THESIS Faculty of Science and Technology MASTER S THESIS Study program/specialization: Offshore Technology - Marine and Subsea Technology Spring semester, 2012 Open / Restricted access Author: John Normann Gundersen

More information

HPHT Annular Casing Packer. Obex Annular Casing Packer

HPHT Annular Casing Packer. Obex Annular Casing Packer HPHT Annular Casing Packer Obex Annular Casing Packer Industry Challenge Casing packer to support second stage cement Reduce hydrostatic pressure on formation Get cement to surface Annular gas migration

More information

IMPLEMENTATION DSIW-System ELDFISK ALPHA MARS 2011

IMPLEMENTATION DSIW-System ELDFISK ALPHA MARS 2011 IMPLEMENTATION DSIW-System ELDFISK ALPHA MARS 2011 Report: Wiping performance Pressure drop-rupture disc function-gas kick circulation Ketil Botnmark, Kjell Mikalsen 20.05.2011 This report resumes the

More information

STYLE 3414/3416 & 3421/3423 Apollo Monitor with Foldaway Legs OPERATING & MAINTENANCE INSTRUCTIONS

STYLE 3414/3416 & 3421/3423 Apollo Monitor with Foldaway Legs OPERATING & MAINTENANCE INSTRUCTIONS STYLE 3414/3416 & 3421/3423 Apollo Monitor with Foldaway Legs OPERATING & MAINTENANCE INSTRUCTIONS The Akron Style 3414/3416 & 3421/3423 Apollo Monitor is designed to provide efficient trouble-free operation

More information

Blowout during Workover Operation A case study Narration by: Tarsem Singh & Arvind Jain, OISD

Blowout during Workover Operation A case study Narration by: Tarsem Singh & Arvind Jain, OISD 1. Introduction An incident of gas leakage from a well took place during workover operations. Subsequently, the gas caught fire on the fourth day in which twelve persons were injured. Two contract workers,

More information

Casing! 07 An Overview!

Casing! 07 An Overview! Casing! 07 An Overview! Introduction to Well Engineering - 07 - Casing 1 Contents 1. Introduction 4 2. Component Parts Of A Casing 7 3. Casing Terminology 8 3.1 Conductor Casing (30" O.D.) 9 3.2 Surface

More information

RAILROAD COMMISSION OF TEXAS OIL WELL POTENTIAL TEST, COMPLETION OR RECOMPLETION REPORT, AND LOG

RAILROAD COMMISSION OF TEXAS OIL WELL POTENTIAL TEST, COMPLETION OR RECOMPLETION REPORT, AND LOG RAILROAD COMMISSION OF TEXAS 1701 N. Congress P.O. Box 12967 Austin, Texas 78701-2967 Status: Form W-2 OIL WELL POTENTIAL TEST, COMPLETION OR RECOMPLETION REPORT, AND LOG Date: Tracking No.: Approved 10/13/2015

More information

W I L D W E L L C O N T R O L SHUT-IN PROCEDURES

W I L D W E L L C O N T R O L SHUT-IN PROCEDURES SHUT-IN PROCEDURES Shut-in Procedures Learning Objectives You will learn general shut-in procedures: For surface BOPs. For subsea BOPs. You will learn to interpret shut-in pressures and be able to perform

More information

Bridge Plugs, Ball Drop & Caged Ball Plugs For Zone Isolation

Bridge Plugs, Ball Drop & Caged Ball Plugs For Zone Isolation Bridge Plugs, Ball Drop & Caged Ball Plugs For Zone Isolation ADVANTAGE composite bridge plug, caged ball and ball drop (flow thru) frac plug provide a means to isolate multiple zones during high pressure

More information

BaraBlend -665 LCM Standard Field Application Procedure

BaraBlend -665 LCM Standard Field Application Procedure BAROID BaraBlend -665 LCM Standard Field Application Procedure Prepared for: Prepared by: Submitted by: Submittal Date: All Customers Sharath Savari, Donald L. Whitfill Halliburton Apr 2016 1 Copyright

More information

Dilution-Based Dual Gradient Well Control. Presented at the 2011 IADC Dual Gradient Workshop, 5 May 2011 by Paul Boudreau, Dual Gradient Systems LLC

Dilution-Based Dual Gradient Well Control. Presented at the 2011 IADC Dual Gradient Workshop, 5 May 2011 by Paul Boudreau, Dual Gradient Systems LLC Dilution-Based Dual Gradient Well Control Presented at the 2011 IADC Dual Gradient Workshop, 5 May 2011 by Paul Boudreau, Dual Gradient Systems LLC In this very short presentation, we will Review Dilution-based

More information

Proper Pump Installation Practices

Proper Pump Installation Practices Proper Pump Installation Practices 80-779, Rev. 10/08 There is a Reason Every Unit Comes With This Bright Orange Tag! Proper Alignment and Coupling Installation Do Not Drive Coupling Onto Shaft Pump Alignment

More information

Standard Operating Procedures

Standard Operating Procedures Standard Operating Procedures GlassBore and GlassLine EUE 8RD Tubular Goods Composite Lining Systems Focus on Safety and Quality COMPOSITE LINING SYSTEMS Table of Contents Section 1 page 3 Arrival on Production

More information

SPE/IADC Abstract

SPE/IADC Abstract SPE/IADC 125311 Pressurized Mud Cap Drilling Drastically Reduces Non-Productive Time in Soka Field, South Sumatera Michael Runtuwene, Sanny Suprihono, and Dany Rizka, SPE, Medco E&P Indonesia, Andi Eka

More information

North American sealing solutions Bridge Plug Ball Drop Frac Plug Caged Ball Frac Plug

North American sealing solutions Bridge Plug Ball Drop Frac Plug Caged Ball Frac Plug North American sealing solutions Bridge Plug Ball Drop Frac Plug Caged Ball Frac Plug The North American Sealing Solutions composite bridge plug, caged ball and ball drop (flow thru) frac plug provide

More information

Offshore Managed Pressure Drilling Experiences in Asia Pacific. SPE paper

Offshore Managed Pressure Drilling Experiences in Asia Pacific. SPE paper Offshore Managed Pressure Drilling Experiences in Asia Pacific SPE paper 119875 Authors: Steve Nas, Shaun Toralde, Chad Wuest, SPE, Weatherford Solutions Sdn Bhd, SPE, Weatherford Indonesia SPE, Weatherford

More information

Commentary on the book by Andrew Hopkins. By Graham Dalzell

Commentary on the book by Andrew Hopkins. By Graham Dalzell Commentary on the book by Andrew Hopkins By Graham Dalzell How we drill oil wells The disaster itself how it happened; (anonymised)- oil, well and drilling companies Andrew s conclusions on the Human,

More information

Understanding pressure and pressure

Understanding pressure and pressure CHAPTER 1 1-1 PRESSURE BASICS Remember to think downhole. The concepts provided in this section cover the foundations for good well control. Understanding pressure and pressure relationships is important

More information

Index Table. Model 794. Installation, Operating and Maintenance Instructions

Index Table. Model 794. Installation, Operating and Maintenance Instructions CLOCKWISE MANUAL MAKING INTO CCW TABLE Index Table Model 794 Installation, Operating and Maintenance Instructions Black & Webster Products Division 545 Hupp Ave. P.O. Box 831, Jackson, Michigan 49204 2009

More information

RAILROAD COMMISSION OF TEXAS OIL WELL POTENTIAL TEST, COMPLETION OR RECOMPLETION REPORT, AND LOG

RAILROAD COMMISSION OF TEXAS OIL WELL POTENTIAL TEST, COMPLETION OR RECOMPLETION REPORT, AND LOG RAILROAD COMMISSION OF TEXAS 1701 N. Congress P.O. Box 12967 Austin, Texas 78701-2967 Status: Form W-2 OIL WELL POTENTIAL TEST, COMPLETION OR RECOMPLETION REPORT, AND LOG Date: Tracking No.: Approved 03/16/2016

More information