1 BENNING ROAD & BRIDGES TRANSPORTATION IMPROVEMENTS CRASH DATA AND SAFETY ANALYSIS TECHNICAL MEMORANDUM DRAFT MAY 2016

2 This page left intentionally blank.

3 Table of Contents 1.0 Introduction Crash Data for Key Intersections Relation of Build Alternative Alignments to Key Intersections Intersection Collision Diagrams and Detailed Analysis of Collisions Benning Road and Minnesota Avenue Intersection Benning Road and East Capitol Street Intersection Minnesota Avenue and Nannie Helen Burroughs (NHB) Avenue Intersection Benning Road and 36 th Street Intersection Benning Road and Anacostia Avenue Intersection Benning Road and 34 th Street Intersection Benning Road and 45 th Street Intersection Benning Road and Central Avenue Intersection Minnesota Avenue and Dix Street Intersection Minnesota Avenue and Grant Street Intersection Minnesota Avenue and Hayes Street Intersection Minnesota Avenue and Gault Place Intersection APPENDIX A-i

4 This page left intentionally blank.

5 1.0 Introduction This crash data and safety analysis technical memorandum identifies existing safety problems along the project corridor. The analysis provides crash data for the study intersections in order to evaluate safety conditions and identify factors contributing to collisions. The analysis is based on data provided by the District Department of Transportation (DDOT) spanning the period from 2011 through 2013 from DDOT s Traffic Accident Reporting and Analysis System. Note that no crash data was available at Benning Road and Oklahoma Avenue, Benning Road and 42 nd Street, and Benning Road and 44 th Street intersections, and thus not included in the analysis. 1.1 Crash Data for Key Intersections Crash data was provided for twelve key intersections within the study area. The crash data includes type of crashes (e.g., rear end, side swiped), crash severity (e.g., injuries involved), the crash location, and also indicates whether any pedestrians were involved in the accident. The crash data analysis was performed in two steps. The first step calculated the crash rate at the study intersections and provided a summary of crash data statistics at an intersection level. The second step developed collision diagrams (i.e., visual representation of crashes) at every intersection to identify potential problem areas and safety deficiencies at intersections. Crash rate for intersections is expressed as crashes per million entering vehicles (MEV), and is calculated as follows: RRRRRRRR = (CC 1,000,000)/(nn 365 VV) where C is the total number of intersection-related crashes (also known as crash frequency) in the study period, n is the number of years data (i.e., analysis period), and V is the daily traffic volumes entering the intersection. Daily traffic volumes were calculated using the peak-hour traffic volumes entering the intersection and a peak hour factor of daily volumes calculated based on the historic annual average daily traffic (AADT) data. Because crash data includes crashes occurred between 2011 and 2013, Peak-hour traffic volumes from the Feasibility Study were used in the analysis because crash data provided occurred between 2011 and The summary of crash rate at the study intersections is provided in Figure 1. Table 1 provides detailed statistics about crash data. APPENDIX A-1

6 Principal observations from Figure 1 and Table 1 include: Just over half (7) of the 12 key crash intersections in the study area are located along Benning Road, which is the project corridor for the two Build Alternatives. The highest crash rate location is at Benning Road and Minnesota Avenue with an MEV of The second highest crash rate location is at Benning Road and East Capitol Street with an MEV of The third highest crash rate location is at Minnesota Avenue and Nannie Helen Burroughs Avenue with an MEV of The annual average for the number of crashes for the 12 key intersections from 2011 to 2013 was 129, while the annual average for crashes resulting in injury was 50. Figure 1: Benning Road and Minnesota Avenue Crash Diagram A-2 APPENDIX

7 Table 1: Crash Data Summary at the Study Intersections Intersection Benning Rd and Anacostia Ave Benning Rd and 34 th St Benning Rd and 36 th St Benning Rd and Minnesota Ave Benning Rd and 45 th St Benning Rd and Central Ave Benning Rd and East Capitol St Number of Crashes Crash Rate (MEV) Rear-end Sideswipe Right Angle Collision Type ( ) Head on Left Turn Hit Veh Left Turn Hit Ped Right Turn Hit Veh Right Turn Hit Ped Straight Hit Ped Crashes Resulting in Injury % 17% 17% 4% % 25% 6% 6% 19% 13% % 31% 4% 4% 8% % 31% 4% 3% 12% 1% 7% 4% 5% % 42% 8% 8% 8% % 40% 10% 10% 10% % 27% 8% 4% 6% 9% 2% 7% 32 Minnesota Ave and Dix St % 0% 6% 19% 13% 6% 9 Minnesota Ave and Grant St % 19% 13% 7 Minnesota Ave and Hayes St % 50% 0 Minnesota Ave and Gault Pl % 50% 17% 1 Minnesota Ave and NHB Ave % 27% 12% 6% 6% 6% 22 APPENDIX A-3

8 2.0 Relation of Build Alternative Alignments to Key Intersections Table 2 lists the 12 key intersections, and show which intersections are located along or in close proximity to each of the two Build Alternative alignments. This table also identifies intersections (with an *) that are near to a potential station. Overall, the table shows that six key intersections are closely associated with both Build Alternatives. Table 2: High Crash Intersections Along the Build Alternatives Intersection Build Alternative 1 Build Alternative 2 Benning Rd and Anacostia Ave X X Benning Rd and 34 th St X* X* Benning Rd and 36 th St X X Benning Rd and Minnesota Ave X X Benning Rd and 45 th St X X Benning Rd and Central Ave Benning Rd and East Capitol St X* X* Minnesota Ave and Dix St Minnesota Ave and Grant St Minnesota Ave and Hayes St Minnesota Ave and Gault Pl Minnesota Ave and NHB Ave *Denotes potential station at intersection. A-4 APPENDIX

9 3.0 Intersection Collision Diagrams and Detailed Analysis of Collisions This section displays collision diagrams for each intersection and provides a brief discussion for the potential causes of crashes. Collision diagrams are prepared to understand the crash pattern, safety problem and also deficiency of the intersection operation. Note that collision discussion is provided only at intersections and approaches for high frequency of crashes. 3.1 Benning Road and Minnesota Avenue Intersection Figure 2 and Table 3 provide crash analysis information for the Benning Road and Minnesota Avenue intersection. Figure 2: Benning Road and Minnesota Avenue Crash Diagram APPENDIX A-5

10 Table 3: Potential Causes of Crashes at Benning Road and Minnesota Avenue Intersection Movement Collision Type Potential Causes of Crashes Speeding (Downhill approach) Stop and go traffic due to peak hour congestion Eastbound left turn queue spillover due to heavy left turn volume Eastbound Benning Inadequate green time Road Westbound Benning Road Northbound Minnesota Avenue Southbound Minnesota Avenue Right Turn Hit Pedestrians Left Turn Hit Pedestrians Protected and permissive phasing Not adequate green time during the protected phase leading to more aggressive gap acceptance during the permitted phase Location of crosswalk (not at the tangent point) Permissive only left turn phasing Only permissive phase is permitted Heavy opposing through traffic causing more aggressive gap acceptance Heavy pedestrian volumes crossing the intersection on the south side of the intersection Stop and go traffic due to peak hour congestion Speeding and more aggressive behavior due to cycle overflows (i.e., queue cannot clear the intersection in the current cycle) Inadequate storage lane, causing queue spillover and lane change for the through vehicles A-6 APPENDIX

11 3.2 Benning Road and East Capitol Street Intersection Figure 3 and Table 4 provide crash analysis information for the Benning Road and East Capitol Street intersection. Figure 3: Benning Road and East Capitol Street Crash Diagram East Capitol St and Benning Rd NE N Table 4: Potential Causes of Crashes at Benning Road and East Capitol Street Intersection Movement Collision Type Potential Causes of Crashes Northbound Benning Road Inadequate storage space for northbound left turn traffic Heavy left turn volume in the morning peak hour (450 vehicles) Split phasing, which may cause lane changes during queue clearance Stop and go traffic due to peak hour congestion Speeding and more aggressive behavior due to cycle overflows (i.e., queue cannot clear the intersection in the current cycle) Eastbound East Stop and go traffic due to peak hour congestion Capitol Street Speeding and more aggressive behavior due to cycle overflows (i.e., queue cannot clear the intersection in the current cycle) APPENDIX A-7

12 3.3 Minnesota Avenue and Nannie Helen Burroughs (NHB) Avenue Intersection Figure 4 and Table 5 provide crash analysis information for the Minnesota Avenue and Nannie Helen Burroughs (NHB) Avenue intersection. Figure 4: Minnesota Avenue and Nannie Helen Burroughs Avenue Crash Diagram Minnesota Ave and NHB Ave NE N A-8 APPENDIX

13 Table 5: Potential Causes of Crashes at Minnesota Avenue and Nannie Helen Burroughs Avenue Intersection Movement Collision Type Potential Causes of Crashes Eastbound Nannie Helen Burroughs Avenue Northbound Minnesota Avenue 3.4 Benning Road and 36 th Street Intersection Visibility issues due to the existing bridge Left turn is shared with through (also lagging left turn), which may cause sudden stops (sideswiped collisions can also be attributed to shared left turn operation) Stop and go traffic due to peak hour congestion Speeding and more aggressive behavior due to cycle overflows (i.e., queue cannot clear the intersection in the current cycle) Figure 5 and Table 6 provide crash analysis information for the Benning Road and 36 th Street intersection. Figure 5: Benning Road and 36 th Street Crash Diagram Benning Rd and 36 th St NE N APPENDIX A-9

14 Table 6: Potential Causes of Crashes at Benning Road and 36 th Street Intersection Movement Collision Type Potential Causes of Crashes Eastbound Benning Road Lack of proper signage for the off-ramp Lane change and slowing down to get onto off-ramp Westbound Benning Road Possible conflict with merging traffic (might have also caused sideswiped collisions) 3.5 Benning Road and Anacostia Avenue Intersection Figure 6 provides crash analysis information for the Benning Road and Anacostia Avenue intersection. No high frequency of crashes is present at the intersection. Figure 6: Benning Road and Anacostia Avenue Crash Diagram Benning Rd and Anacostia Ave NE N A-10 APPENDIX

15 3.6 Benning Road and 34 th Street Intersection Figure 7 provides crash analysis information for the Benning Road and 34 th Street intersection. No high frequency of crashes is present at the intersection. Figure 7: Benning Road and 34th Street Crash Diagram Benning Rd and 34 th St NE N APPENDIX A-11

16 3.7 Benning Road and 45 th Street Intersection Figure 8 provides crash analysis information for the Benning Road and 45 th Street intersection. No high frequency of crashes is present at the intersection. Figure 8: Benning Road and 45 th Street Crash Diagram Benning Rd and 45 th St NE N A-12 APPENDIX

17 3.8 Benning Road and Central Avenue Intersection Figure 9 provides crash analysis information for the Benning Road and Central Avenue intersection. No high frequency of crashes is present at the intersection. Figure 9: Benning Road and Central Avenue Crash Diagram Benning Rd and Central Ave NE N APPENDIX A-13

18 3.9 Minnesota Avenue and Dix Street Intersection Figure 10 provides crash analysis information for the Minnesota Avenue and Dix Street intersection. No high frequency of crashes is present at the intersection. Figure 10: Minnesota Avenue and Dix Street Crash Diagram Minnesota Ave and Dix Rd NE N A-14 APPENDIX

19 3.10 Minnesota Avenue and Grant Street Intersection Figure 11 provides crash analysis information for the Minnesota Avenue and Grant Street intersection. No high frequency of crashes is present at the intersection. Figure 11: Minnesota Avenue and Grant Street Crash Diagram Minnesota Ave and Grant St NE N APPENDIX A-15

20 3.11 Minnesota Avenue and Hayes Street Intersection Figure 12 provides crash analysis information for the Minnesota Avenue and Hayes Street intersection. No high frequency of crashes is present at the intersection. Figure 12: Minnesota Avenue and Hayes Street Crash Diagram Minnesota Ave and Hayes St NE N A-16 APPENDIX

21 3.12 Minnesota Avenue and Gault Place Intersection Figure 13 provides crash analysis information for the Minnesota Avenue and Gault Place intersection. No high frequency of crashes is present at the intersection. Figure 13: Minnesota Avenue and Gault Place Crash Diagram Minnesota Ave and Gault Pl NE N APPENDIX A-17

22 This page left intentionally blank.

I-95 NORTHBOUND AT US 1 (EXIT 126) ALTERNATIVES DESIGN ANALYSIS

I-95 NORTHBOUND AT US 1 (EXIT 126) ALTERNATIVES DESIGN ANALYSIS FAMPO Policy Committee Briefing June 18, 2018 I-95 NORTHBOUND AT US 1 (EXIT 126) ALTERNATIVES DESIGN ANALYSIS WHAT IS THE STARS PROGRAM? Program to develop solutions to reduce crashes and congestion bottlenecks

More information

Pearl Street / Prospect Street / Colchester Avenue Intersection Scoping Study. April 11, 2013 Steering Committee Meeting #3

Pearl Street / Prospect Street / Colchester Avenue Intersection Scoping Study. April 11, 2013 Steering Committee Meeting #3 Pearl Street / Prospect Street / Colchester Avenue Intersection Scoping Study April 11, 2013 Steering Committee Meeting #3 Meeting Agenda Welcome & Introductions Review Project Purpose & Needs Results

More information

EXISTING (2006) CONDITIONS

EXISTING (2006) CONDITIONS Section 2 EXISTING (2006) CONDITIONS This section provides a description of the existing transportation system in the study area and a comprehensive analysis of existing traffic operations and crash history.

More information

METHODOLOGY. Signalized Intersection Average Control Delay (sec/veh)

METHODOLOGY. Signalized Intersection Average Control Delay (sec/veh) Chapter 5 Traffic Analysis 5.1 SUMMARY US /West 6 th Street assumes a unique role in the Lawrence Douglas County transportation system. This principal arterial street currently conveys commuter traffic

More information

Queensboro Bridge Bus Priority Study: Summary of Recommendations. Presentation to Manhattan Community Board 8 May 4, 2011

Queensboro Bridge Bus Priority Study: Summary of Recommendations. Presentation to Manhattan Community Board 8 May 4, 2011 : Summary of Recommendations Presentation to Manhattan Community Board 8 May 4, 2011 1 Overview Study Goal: Identify cost-effective ways to improve bus speed and reliability for local and express buses

More information

Dell Range Boulevard Corridor Study Powderhouse Road to College Drive. Prepared for: Cheyenne Metropolitan Planning Organization

Dell Range Boulevard Corridor Study Powderhouse Road to College Drive. Prepared for: Cheyenne Metropolitan Planning Organization Dell Range Boulevard Corridor Study Powderhouse Road to College Drive Prepared for: Cheyenne Metropolitan Planning Organization Draft August 2014 Dell Range Boulevard Corridor Study (Powderhouse Road to

More information

APPENDIX E Evaluation of Improvement Alternatives

APPENDIX E Evaluation of Improvement Alternatives APPENDIX E Evaluation of Improvement Alternatives Table E-1 Preliminary Comparison of Design Alternatives, Concord Table E-2 Preliminary Comparison of Route 2 Improvement Packages, Acton and Concord TABLE

More information

Military Road Safety Improvements

Military Road Safety Improvements Military Road Safety Improvements 26 th Road North to 31 st Street North SUMMARY OF DATA REVIEW AND PRELIMINARY RECOMMENDATIONS Prepared for: Department of Environmental Services Traffic Engineering and

More information

Memorandum 1. INTRODUCTION. To: Cc: From: Denise Marshall Northumberland County

Memorandum 1. INTRODUCTION. To: Cc: From: Denise Marshall Northumberland County 255 Adelaide Street West Toronto, ON M5H 1X9 www.hdrinc.com File: 4.0 Memorandum To: Cc: From: Denise Marshall Northumberland County Tony Reitmeier HDR Guinevere Ngau HDR Andrew O Connor HDR Date: August

More information

Overview. Updated pictures of the intersection are shown in Exhibits 1 thru 4, and the aerial photo provided by Google Maps is shown in Exhibit 5.

Overview. Updated pictures of the intersection are shown in Exhibits 1 thru 4, and the aerial photo provided by Google Maps is shown in Exhibit 5. Overview The (here in after referred to as the Village ) is submitting the follow up interim RLRC Safety Report for the intersection of Lincoln Highway (US 30) at Orchard Drive. Additional reports, as

More information

Draft North Industrial Area-Wide Traffic Plan

Draft North Industrial Area-Wide Traffic Plan Summary of North Industrial and Hudson Bay Industrial Recommended Improvements Table 1. Summary of s Item Location 1 2 3 4 5 6 7 8 9 10 11 12 Millar Ave north of 51st St Super 8 Motel back lane 400 Block

More information

WISCONSIN AVENUE EXTENSION SECOND PUBLIC INFORMATION MEETING. March 28, 2017

WISCONSIN AVENUE EXTENSION SECOND PUBLIC INFORMATION MEETING. March 28, 2017 WISCONSIN AVENUE EXTENSION SECOND PUBLIC INFORMATION MEETING March 28, 2017 STUDY AREA N MEETING AGENDA Introductions Study Background Alternatives Studied Recommended Alternative Discussion STUDY BACKGROUND

More information

STATUS OF 2009 PEDESTRIAN MASTER PLAN (AS OF DECEMBER 2013)

STATUS OF 2009 PEDESTRIAN MASTER PLAN (AS OF DECEMBER 2013) Appendix P.1 STATUS OF 2009 PEDESTRIAN MASTER PLAN (AS OF DECEMBER 2013) The 2009 Pedestrian Master Plan establishes 21 core recommendations in three goal areas to improve pedestrian transportation in

More information

CITY OF LOS ANGELES INTER-DEPARTMENTAL MEMORANDUM

CITY OF LOS ANGELES INTER-DEPARTMENTAL MEMORANDUM CITY OF LOS ANGELES INTER-DEPARTMENTAL MEMORANDUM Date: April 1, 219 To: Honorable City Council c/o City Clerk, Room 395, City Hall Attention: Honorable Mike Bonin, Chair, Transportation Committee From:

More information

FM #: ETDM #: 11241

FM #: ETDM #: 11241 SR 826/Palmetto Expressway PD&E Study From SR 93/I 75 to the Golden Glades Interchange FM #: 418423 1 22 01 ETDM #: 11241 Agency/ Kick Off Meeting October 27, 2011 2 Location Map From SR 93/I 75 to Golden

More information

Appendix B. Safety Performance Report

Appendix B. Safety Performance Report Appendix B Safety Performance Report Appendix B 100 Consilium Place, Suite 200, Toronto, ON., M1H 3E3, Canada, www.timcon-eng.com Tel: 647-714-8403 Fax: 416 915 3910 Memorandum Date: (Updated) To: David

More information

Route 28 (South Orleans Road)/Route 39 (Harwich Road)/Quanset Road Intersection

Route 28 (South Orleans Road)/Route 39 (Harwich Road)/Quanset Road Intersection TRAFFIC FEASIBILITY STUDY Route 28 (South Orleans Road)/Route 39 (Harwich Road)/Quanset Road Intersection Orleans, Massachusetts Prepared for: Town of Orleans Prepared by: Fay, Spofford & Thorndike, LLC

More information

Iowa Highway 58 Corridor Improvement Study

Iowa Highway 58 Corridor Improvement Study 1 Iowa Highway 58 Corridor Improvement Study Public Informational Meeting May 6, 2014 2 Welcome and Introductions Randy Lorenzen, City of Cedar Falls Engineer 3 Outline of Presentation Review of Project

More information

Regional Applications

Regional Applications Regional Applications Richmond Regional Transportation Planning Organization September 1, 2016 Barbara Nelson Sarah Rhodes Richmond Regional Transportation Planning Organization Action Smart Scale Regional

More information

AGENDA ITEM 6 D THOMASVILLE ROAD (HERMITAGE BOULEVARD TO LIVE OAK PLANTATION ROAD) ROADWAY SAFETY AUDIT

AGENDA ITEM 6 D THOMASVILLE ROAD (HERMITAGE BOULEVARD TO LIVE OAK PLANTATION ROAD) ROADWAY SAFETY AUDIT May 15, 2018 AGENDA ITEM 6 D THOMASVILLE ROAD (HERMITAGE BOULEVARD TO LIVE OAK PLANTATION ROAD) ROADWAY SAFETY AUDIT TYPE OF ITEM: Discussion STATEMENT OF ISSUE The Florida Department of Transportation

More information

Evaluation of M-99 (Broad Street) Road Diet and Intersection Operational Investigation

Evaluation of M-99 (Broad Street) Road Diet and Intersection Operational Investigation Evaluation of M-99 (Broad Street) Road Diet and Intersection Operational Investigation City of Hillsdale, Hillsdale County, Michigan June 16, 2016 Final Report Prepared for City of Hillsdale 97 North Broad

More information

180 Grand Avenue, Suite x117 Dowling Associates, Inc.

180 Grand Avenue, Suite x117 Dowling Associates, Inc. 180 Grand Avenue, Suite 250 510.839.1742 x117 Oakland, CA 94612 510.839.0871 fax www.dowlinginc.com mbowman@dowlinginc.com Dowling Associates, Inc. Date: Memorandum To: CC: From: Ms. Leah Greenblat City

More information

Summary: Mercer County Princeton Avenue & Spruce Street Study January 2009

Summary: Mercer County Princeton Avenue & Spruce Street Study January 2009 Summary: Several recent studies have assessed potential development and redevelopment opportunities in the Mercer Crossing area of Trenton, Ewing, and Lawrence. This Princeton Avenue and Spruce Street

More information

WELCOME. Stakeholder Involvement Group Meeting #2 Round Lake Public Works October 24, 2018

WELCOME. Stakeholder Involvement Group Meeting #2 Round Lake Public Works October 24, 2018 WELCOME Stakeholder Involvement Group Meeting #2 Round Lake Public Works October 24, 2018 MEETING AGENDA 1. Welcome and Introductions 2. Study Progress Update 3. Problem Statement 4. Technical Analysis

More information

MEMORANDUM. Layout Of Study Intersections And Traffic Control

MEMORANDUM. Layout Of Study Intersections And Traffic Control BOSTON REGION METROPOLITAN PLANNING ORGANIZATION Richard A. Davey, MassDOT Secretary and CEO and MPO Chairman Karl H. Quackenbush, Executive Director, MPO Staff DATE November 15, 2012 TO FROM RE Town of

More information

Lincoln Way Multimodal Safety and Operations Study. City and University Summary Presentation

Lincoln Way Multimodal Safety and Operations Study. City and University Summary Presentation Lincoln Way Multimodal Safety and Operations Study City and University Summary Presentation February 27, 2018 Agenda Introductions Study Overview: Phase 1 - Discovery Phase 2 Improvement Recommendations

More information

Existing Conditions. Date: April 16 th, Dan Holderness; Coralville City Engineer Scott Larson; Coralville Assistant City Engineer

Existing Conditions. Date: April 16 th, Dan Holderness; Coralville City Engineer Scott Larson; Coralville Assistant City Engineer Date: April 16 th, 2015 To: From: Re: Dan Holderness; Coralville City Engineer Scott Larson; Coralville Assistant City Engineer Darian Nagle-Gamm, Traffic Engineering Planner Highway 6 (2 nd Street) /

More information

I-95 Northbound at US 1 (Exit 126) Design and Study Final Report

I-95 Northbound at US 1 (Exit 126) Design and Study Final Report I-95 Northbound at US 1 (Exit 126) Design and Study Final Report July 2018 Prepared by: Prepared for: TABLE OF CONTENTS 1 Introduction... 1 Study Area Limits... 1 Purpose and Need of the Study... 1 Safety

More information

CONTENTS EXECUTIVE SUMMARY 1

CONTENTS EXECUTIVE SUMMARY 1 CONTENTS CHAPTER PAGE EXECUTIVE SUMMARY 1 1 ISSUES AND PURPOSE OF THE ANALYSIS 2 1.1 Background 2 1.2 Analysis Area 2 1.3 Issues and Observations 3 1.4 Project and Public Meetings 3 2 LIST OF PREFERRED

More information

Spring Hill Corridor Study

Spring Hill Corridor Study Regional Intergovernmental Council Spring Hill Corridor Study South Charleston, West Virginia 2015 CONTENTS List of Tables... 1 List of Figures... 1 Study Area... 2 Goals and Objectives... 4 Outreach and

More information

Per the Illinois Compiled Statutes, 625 ILCS 5/ Automated Traffic Law Enforcement System:

Per the Illinois Compiled Statutes, 625 ILCS 5/ Automated Traffic Law Enforcement System: Per the Illinois Compiled Statutes, 625 ILCS 5/11-208.6 Automated Traffic Law Enforcement System: (k-7) A municipality or county operating an automated traffic law enforcement system shall conduct a statistical

More information

Interstate Route 77 / US Route 62 / State Route 687 (Fulton Road) Transportation Improvement Project. Prepared September 6, 2017

Interstate Route 77 / US Route 62 / State Route 687 (Fulton Road) Transportation Improvement Project. Prepared September 6, 2017 EODOT Project: ODOT Project: STA-IR 77-.50; PID 00290 Interstate Route 77 / US Route 62 / State Route 687 (Fulton Road) Transportation Improvement Project Summary of Public Comments Received and Responses

More information

LINCOLNWOOD POLICE DEPARTMENT

LINCOLNWOOD POLICE DEPARTMENT LINCOLNWOOD POLICE DEPARTMENT 6900 N. Lincoln Avenue, Lincolnwood, IL 60712 (847) 673-2167 Robert LaMantia Chief of Police September 19, 2017 Illinois Department of Transportation Traffic Operations Bureau

More information

Forest Hills Improvement Initiative

Forest Hills Improvement Initiative Forest Hills Improvement Initiative Transportation Action Plan Short Term Recommendations ONLY Final Draft as of April 30, 2008 For Community Review and Feedback Prepared for: The City of Boston Boston

More information

CAPITOL DRIVE & FOND DU LAC AVENUE INTERSECTION ANALYSIS. Urban Planning 772 SARAH BREGANT, RYAN PETERSON, & MATT WERDERITCH

CAPITOL DRIVE & FOND DU LAC AVENUE INTERSECTION ANALYSIS. Urban Planning 772 SARAH BREGANT, RYAN PETERSON, & MATT WERDERITCH CAPITOL DRIVE & FOND DU LAC AVENUE INTERSECTION ANALYSIS Urban Planning 772 SARAH BREGANT, RYAN PETERSON, & MATT WERDERITCH OVERVIEW N 51 ST BOULEVARD N 51 ST BOULEVARD 12,100 44,700 W CAPITOL DRIVE 52,600

More information

Approximately 360 trail users cross during a typical summer weekday and 420 cross during a typical summer

Approximately 360 trail users cross during a typical summer weekday and 420 cross during a typical summer 5. PARKR ROAD AT MISSISSIPPI AVN CROSSIN xisting Conditions The High ine Canal trail crosses Parker Road near the Mississippi Avenue intersection (crossing location #3 on Figure 1). South of Parker, the

More information

DEPARTMENT OF ENVIRONMENTAL SERVICES. North Harrison Street (Lee Highway to Little Falls Road) Comparative Analysis. Prepared for:

DEPARTMENT OF ENVIRONMENTAL SERVICES. North Harrison Street (Lee Highway to Little Falls Road) Comparative Analysis. Prepared for: DEPARTMENT OF ENVIRONMENTAL SERVICES North Harrison Street (Lee Highway to Little Falls Road) Comparative Analysis Prepared for: Arlington County Department of Environmental Services 2100 Clarendon Boulevard,

More information

Joshua Saak, P.E., PTOE Traffic Design Engineer Ada County Highway District May 23, 2013

Joshua Saak, P.E., PTOE Traffic Design Engineer Ada County Highway District May 23, 2013 Joshua Saak, P.E., PTOE Traffic Design Engineer Ada County Highway District May 23, 2013 Creating Great Streets Through Road Diets and Conversions The Charlotte Experience Topics to Discuss Charlotte s

More information

2009 PE Review Course Traffic! STUDIES. Shawn Leight, P.E., PTOE, PTP Crawford Bunte Brammeier Washington University

2009 PE Review Course Traffic! STUDIES. Shawn Leight, P.E., PTOE, PTP Crawford Bunte Brammeier Washington University 2009 PE Review Course Traffic! STUDIES Shawn Leight, P.E., PTOE, PTP Crawford Bunte Brammeier Washington University sleight@cbbtraffic.com Topic Areas Functional Classification Safety Financing Parking

More information

Edgemont Village Traffic and Parking Technical Report January 2014

Edgemont Village Traffic and Parking Technical Report January 2014 Edgemont Village Traffic and Parking Technical Report January 2014 In the fall of 2013, the District of North Vancouver engaged consultants to assess existing intersection and parking conditions in Edgemont

More information

Project Report. South Kirkwood Road Traffic Study. Meadows Place, TX October 9, 2015

Project Report. South Kirkwood Road Traffic Study. Meadows Place, TX October 9, 2015 Meadows Place, TX October 9, 2015 Contents 1 Introduction... 1 2 Data Collection... 1 3 Existing Roadway Network... 2 4 Traffic Volume Development... 2 5 Warrant Analysis... 3 6 Traffic Control Alternative

More information

Capital Region Council of Governments

Capital Region Council of Governments March 23, 2018 Capital Region Council of Governments PROJECT CONCEPT REPORT Realignment of Swamp and Northfield Road s approaches to Route 44 (Boston Turnpike) Town of Coventry SUMMARY: The Town of Coventry

More information

Date: April 4, Project #: Re: A Street/Binford Street Traffic/Intersection Assessment

Date: April 4, Project #: Re: A Street/Binford Street Traffic/Intersection Assessment To: Peter Cavanaugh General Electric From: David Bohn, PE Ryan White, PE Date: April 4, 217 Project #: 13421. Re: / Traffic/Intersection Assessment Consistent with the Cooperation Agreement between the

More information

TRAFFIC ACCIDENT ANALYSIS

TRAFFIC ACCIDENT ANALYSIS TRAFFIC ACCIDENT ANALYSIS Westheimer at Chimney Rock and Westheimer at Dunvale Prepared for Prepared by Klotz Associates, Inc. 1160 Dairy Ashford, Suite 500 Houston, Texas 77079 The preparation of this

More information

ROAD SAFETY AUDIT. State Road (Route 6) Corridor Town of Dartmouth. March Prepared For: MassDOT

ROAD SAFETY AUDIT. State Road (Route 6) Corridor Town of Dartmouth. March Prepared For: MassDOT ROAD SAFETY AUDIT State Road (Route 6) Corridor Town of Dartmouth March 2015 Prepared For: MassDOT Prepared By: McMahon Associates, Inc. 300 Myles Standish Blvd. Suite 201 Taunton, MA 02780 Table of Contents

More information

Chapter V Transportation Concept Alternatives

Chapter V Transportation Concept Alternatives Chapter V Transportation Concept Alternatives Three (3) fundamentally different approaches to meeting vehicular travel needs in the corridor were considered. One approach is to leave the road as it is

More information

Toronto and East York Community Council. Director, Transportation Services, Toronto and East York District

Toronto and East York Community Council. Director, Transportation Services, Toronto and East York District No Turn on Red Regulations STAFF REPORT ACTION REQUIRED Date: June 1, 2010 To: From: Toronto and East York Community Council Director, Transportation Services, Toronto and East York District Wards: Trinity

More information

Boston Post Road Design Feasibility Study

Boston Post Road Design Feasibility Study Boston Post Road Design Feasibility Study Prepared for the City of Rye Final Report July 18, 2007 Prepared by: Buckhurst Fish & Jacquemart (BFJ) 115 Fifth Avenue New York, NY 10003 www.bfjplanning.com

More information

Glenn Avenue Corridor Traffic Operational Evaluation

Glenn Avenue Corridor Traffic Operational Evaluation Glenn Avenue Corridor Traffic Operational Evaluation PREPARED FOR: THE CITY OF AUBURN PREPARED BY: DECEMBER 2007 Glenn Avenue Corridor Study--Auburn, Alabama TABLE OF CONTENTS Introduction... 1 Background

More information

INTERSECTION SAFETY STUDY State Route 57 / Seville Road

INTERSECTION SAFETY STUDY State Route 57 / Seville Road INTERSECTION SAFETY STUDY State Route 57 / Seville Road City of Wadsworth, Medina County, Ohio Prepared For: City of Wadsworth Engineering Department 120 Maple Street Wadsworth, OH 44281 Prepared By: GPD

More information

FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT 7 DISTRICT WIDE BICYCLE/PEDESTRIAN ACCESS TO TRANSIT SAFETY ASSESSMENT AND IMPROVEMENT PLAN

FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT 7 DISTRICT WIDE BICYCLE/PEDESTRIAN ACCESS TO TRANSIT SAFETY ASSESSMENT AND IMPROVEMENT PLAN FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT 7 DISTRICT WIDE BICYCLE/PEDESTRIAN ACCESS TO TRANSIT SAFETY ASSESSMENT AND IMPROVEMENT PLAN TRANSIT SAFETY ASSESSMENT SR 55/US 19 AT 80 TH AVE N DRAFT JUNE

More information

INNOVATIVE INTERSECTION DESIGN

INNOVATIVE INTERSECTION DESIGN INNOVATIVE INTERSECTION DESIGN J. Eddie Valtier, P.E. ELP TP&D Director Introduction Why Do We Need To Start Looking For Innovative Intersection Designs? Congestion is worsening and traffic volumes and

More information

Realignment & Intersection Improvement Alternatives for the Intersection of Lorain Road & Brookpark Road

Realignment & Intersection Improvement Alternatives for the Intersection of Lorain Road & Brookpark Road Realignment & Intersection Improvement Alternatives for the Intersection of Lorain Road & Brookpark Road City of North Olmsted, Ohio September 2011 Prepared By noaca.org 5854t 2 5854t 3 1) Title & Subtitle:

More information

Traffic Study of Fuller Street, Cady Street, West Street and West Avenue. Final Report

Traffic Study of Fuller Street, Cady Street, West Street and West Avenue. Final Report Traffic Study of Fuller Street, Cady Street, West Street and West Avenue Final Report July 2005 Prepared for: Town of Ludlow Prepared by: Pioneer Valley Planning Commission 26 Central Street West Springfield,

More information

ROAD SAFETY AUDIT. Blue Hill Avenue (Route 28) and Warren Street High Crash Locations City of Boston. November 1, 2016

ROAD SAFETY AUDIT. Blue Hill Avenue (Route 28) and Warren Street High Crash Locations City of Boston. November 1, 2016 ROAD SAFETY AUDIT Blue Hill Avenue (Route 28) and Warren Street High Crash Locations City of Boston November 1, 2016 Prepared For: MassDOT Highway Division Prepared By: BETA Group, Inc. Table of Contents

More information

TRAFFIC CONTROL DEVICES ON EDGEWATER BOULEVARD AT PORT ROYAL AVENUE (NORTH)

TRAFFIC CONTROL DEVICES ON EDGEWATER BOULEVARD AT PORT ROYAL AVENUE (NORTH) Attachment 2 DATE: August 6, 2012 TO: VIA: FROM: SUBJECT: Mayor and Members of the City Council James C. Hardy, City Manager Ramon Towne, Director of Public Works Leah Edwards, Assistant Engineer TRAFFIC

More information

Conversion of One-Way Couplet Streets to Two-Way

Conversion of One-Way Couplet Streets to Two-Way Conversion of One-Way Couplet Streets to Two-Way May 5, 2016 Oklahoma Traffic Engineers Association 2016 Spring Meeting, Tulsa, OK Kevin St. Jacques, P.E., PTOE, PTP Freese and Nichols Overview Initial

More information

Comments EXECUTIVE SUMMARY

Comments EXECUTIVE SUMMARY Comments 1. Under any Alternatives, MCDOT should provide better at-grade pedestrian crossing of Georgia Avenue and Forest Glen Road, including improved crosswalks with wider medians and adequate signal

More information

STH 57 & STH 100 Intersection Village of Brown Deer Milwaukee County November 2015

STH 57 & STH 100 Intersection Village of Brown Deer Milwaukee County November 2015 STH 57 & STH 100 Intersection Village of Brown Deer Milwaukee County November 2015 Introduction How we got to here WIS 57 Bridge over WIS 100 in need of replacement Local support favors At-Grade Intersection

More information

M-58 HIGHWAY ACCESS MANAGEMENT STUDY Mullen Road to Bel-Ray Boulevard. Prepared for CITY OF BELTON. May 2016

M-58 HIGHWAY ACCESS MANAGEMENT STUDY Mullen Road to Bel-Ray Boulevard. Prepared for CITY OF BELTON. May 2016 M-58 HIGHWAY ACCESS MANAGEMENT STUDY Prepared for CITY OF BELTON By May 2016 Introduction Missouri State Highway 58 (M-58 Highway) is a major commercial corridor in the City of Belton. As development has

More information

TRAFFIC IMPACT ANALYSIS

TRAFFIC IMPACT ANALYSIS TRAFFIC IMPACT ANALYSIS FOR THE CHAMPAIGN UNIT#4 SCHOOL DISTRICT PROPOSED HIGH SCHOOL (SPALDING PARK SITE) IN THE CITY OF CHAMPAIGN Final Report Champaign Urbana Urbanized Area Transportation Study 6/24/2014

More information

Bicycle - Motor Vehicle Collisions on Controlled Access Highways in Arizona

Bicycle - Motor Vehicle Collisions on Controlled Access Highways in Arizona Bicycle - Motor Vehicle Collisions on Controlled Access Highways in Arizona Analysis from January 1, 1991 to June 30, 2002 Richard C. Moeur, PE Traffic Design Manager, Northern Region Michelle N. Bina

More information

COMMUNITY MEETING AGENDA

COMMUNITY MEETING AGENDA COMMUNITY MEETING AGENDA Welcome and Introductions SAFE Presentation Project Presentation Priorities Feedback Next Steps Q&A Santa Cruz Avenue Corridor Study 1 Santa Cruz Avenue Corridor Study Community

More information

Traffic Impact Analysis Walton Acres at Riverwood Athletic Club Clayton, NC

Traffic Impact Analysis Walton Acres at Riverwood Athletic Club Clayton, NC Traffic Impact Analysis Walton Acres at Riverwood Athletic Club Clayton, NC 1. TABLE OF CONTENTS INTRODUCTION...1 1.1. Site Location and Study Area...1 1.2. Proposed Land Use and Site Access...2 1.3.

More information

Per the Illinois Compiled Statutes, 625 ILCS 5/ Automated Traffic Law Enforcement System:

Per the Illinois Compiled Statutes, 625 ILCS 5/ Automated Traffic Law Enforcement System: Per the Illinois Compiled Statutes, 625 ILCS 5/11-208.6 Automated Traffic Law Enforcement System: (k-7) A municipality or county operating an automated traffic law enforcement system shall conduct a statistical

More information

Road Safety Audit for the Intersection of VFW Highway & Bridge Street in Lowell, Massachusetts

Road Safety Audit for the Intersection of VFW Highway & Bridge Street in Lowell, Massachusetts Road Safety Audit for the Intersection of VFW Highway & Bridge Street in Lowell, Massachusetts Prepared by University of Massachusetts Traffic Safety Research Program Prepared for Massachusetts Highway

More information

Public Meeting. I-35 Corridor from John Kilpatrick Turnpike North to Waterloo Road October 26, 6:00pm Edmond Community Center Auditorium

Public Meeting. I-35 Corridor from John Kilpatrick Turnpike North to Waterloo Road October 26, 6:00pm Edmond Community Center Auditorium Public Meeting I-35 Corridor from John Kilpatrick Turnpike North to Waterloo Road October 26, 2017 @ 6:00pm Edmond Community Center Auditorium Before we get started Please turn off or mute any electronic

More information

Memorandum. TO: Town of Lysander Comprehensive Plan Update Committee

Memorandum. TO: Town of Lysander Comprehensive Plan Update Committee Memorandum TO: Town of Lysander Comprehensive Plan Update Committee FROM: Meghan Vitale, SMTC DATE: January 7, 2015 RE: Accident data analysis () ~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~

More information

City of Bellevue s Adaptive Left Turn Phasing. Presented by : Mark Poch, PE, PTOE City of Bellevue, WA

City of Bellevue s Adaptive Left Turn Phasing. Presented by : Mark Poch, PE, PTOE City of Bellevue, WA City of Bellevue s Adaptive Left Turn Phasing Presented by : Mark Poch, PE, PTOE City of Bellevue, WA May 1, 2015 130,000 pop. 197 signals The Challenge Protected Only Turns The Challenge Protected Only

More information

Downtown Traffic Study

Downtown Traffic Study City of Lynn Massachusetts Downtown Traffic Study March 2005 315 Norwood Park South, Norwood, MA 02062 781.255.1982 email: beta@beta-inc.com LYNN DOWNTOWN TRAFFIC STUDY INTRODUCTION The City of Lynn is

More information

CHAPTER 9: SAFETY 9.1 TRAFFIC SAFETY INTERSECTION COLLISIONS

CHAPTER 9: SAFETY 9.1 TRAFFIC SAFETY INTERSECTION COLLISIONS CHAPTER 9: SAFETY 9.1 TRAFFIC SAFETY Creating a transportation network that is not only efficient but also safe is a key objective of the General Plan and the WBCMP. To assess the current safety conditions

More information

MEMORANDUM. DATE March 1, 2012 TO Town of Milton Mark Abbott, Seth Asante, and Efi Pagitsas Boston Region MPO Staff

MEMORANDUM. DATE March 1, 2012 TO Town of Milton Mark Abbott, Seth Asante, and Efi Pagitsas Boston Region MPO Staff MEMORANDUM DATE March 1, 212 TO Town of Milton FROM RE Mark Abbott, Seth Asante, and Efi Pagitsas Boston Region MPO Staff FFY 211 Safety and Operations Analyses at Selected Boston Region MPO Intersections:

More information

Reference: Laguna Canyon Road Traffic Conditions Data Collection Summary

Reference: Laguna Canyon Road Traffic Conditions Data Collection Summary Stantec Consulting Services Inc. 38 Technology Drive Suite 100, Irvine CA 92618-5312 September 8, 2017 File: 2073014320 Attention: Mark Trestik, Assistant City Engineer City of Beach Department of Public

More information

Cheyenne Metropolitan Planning Organization

Cheyenne Metropolitan Planning Organization Dell Range Boulevard Corridor Study PHASE II SECTION 20 DRAFT Prepared for: Cheyenne Metropolitan Planning Organization November 20, 2015 (Section 20 is bordered by Powderhouse Road on the west, Storey

More information

Bay to Bay Boulevard Complete Streets Project

Bay to Bay Boulevard Complete Streets Project Bay to Bay Boulevard Complete Streets Project Dale Mabry Highway to Bayshore Boulevard February 08, 2018 Photo Source: Tampa Bay Times Alessandra Da Pra Meeting Format Introduction Resurfacing Information

More information

Route 7 Corridor Study

Route 7 Corridor Study Route 7 Corridor Study Executive Summary Study Area The following report analyzes a segment of the Virginia State Route 7 corridor. The corridor study area, spanning over 5 miles in length, is a multi

More information

PEDESTRIAN SAFETY STUDY

PEDESTRIAN SAFETY STUDY PEDESTRIAN SAFETY STUDY SR 699 (BLIND PASS RD/GULF BLVD) FROM 93 RD AVENUE TO PINELLAS BAYWAY PINELLAS COUNTY SECTION NO.: 15100 MILEPOST: 0.111 3.569 STUDY LIMITS Prepared For: Florida Department of Transportation

More information

Princeton Avenue and Spruce Street Transportation and Site Access Enhancements Project

Princeton Avenue and Spruce Street Transportation and Site Access Enhancements Project Princeton Avenue and Spruce Street Transportation and Site Access Enhancements Project Mercer County Planning Division AECOM Transportation (formerly DMJM Harris) January 29, 2009 Agenda Project Status

More information

ROAD SAFETY AUDIT. County Street at Hart Street. City of Taunton. January 30, Prepared For: Massachusetts Department of Transportation

ROAD SAFETY AUDIT. County Street at Hart Street. City of Taunton. January 30, Prepared For: Massachusetts Department of Transportation ROAD SAFETY AUDIT County Street at Hart Street City of Taunton January 30, 2015 Prepared For: Massachusetts Department of Transportation Prepared By: Toole Design Group 33 Broad Street, 4 th Floor Boston,

More information

Delaware Avenue Corridor Study

Delaware Avenue Corridor Study Delaware Avenue Corridor Study City of Marysville, Ohio February 19, 2009 ms consultants, inc. engineers, architects, planners 2221 Schrock Road Columbus, Ohio 43229-1547 ms ms consultants, inc. engineers

More information

ROAD SAFETY AUDIT. Granite Avenue at Interstate 93 Ramps. Town of Milton. May 22, Prepared for: MassDOT

ROAD SAFETY AUDIT. Granite Avenue at Interstate 93 Ramps. Town of Milton. May 22, Prepared for: MassDOT ROAD SAFETY AUDIT Granite Avenue at Interstate 93 Ramps Town of Milton May 22, 2017 Prepared for: MassDOT Prepared by: Toole Design Group 2 Oliver Street, Suite 305 Boston, MA 02109 Table of Contents Background...

More information

Washington St. Corridor Study

Washington St. Corridor Study FIGURE 7.17 Bridge Alternatives - Cross Sections 86 Discarded Alternative: Short-Term Bridge Repair Short-term repairs and west bridge span replacement were considered during analysis. Short-term repairs

More information

Memorandum. Bob Doyle - SGJJR. Chris Wall Wade Trim. Date: 5/16/2018. Huron Traffic Study Analysis Summary

Memorandum. Bob Doyle - SGJJR. Chris Wall Wade Trim. Date: 5/16/2018. Huron Traffic Study Analysis Summary Memorandum To: From: Bob Doyle - SGJJR Chris Wall Wade Trim Date: 5/16/218 Subject: Huron Traffic Study Analysis Summary Overview As part of the Huron Street Improvement project, the Downtown Development

More information

CAPE COD COMMISSION 3225 MAIN STREET P.O. BOX 226 BARNSTABLE, MA (508) Fax (508) Transportation Safety Report

CAPE COD COMMISSION 3225 MAIN STREET P.O. BOX 226 BARNSTABLE, MA (508) Fax (508) Transportation Safety Report CAPE COD COMMISSION 3225 MAIN STREET P.O. BOX 226 BARNSTABLE, MA 02630 (508) 362-3828 Fax (508) 362-3136 2006 Transportation Safety Report Bourne: Otis Rotary Harwich: Route 137/Route 39 Orleans: Route

More information

ROAD SAFETY AUDIT. South Street (Route 1A) at East Bacon Street (Route 106) and West Bacon Street Town of Plainville.

ROAD SAFETY AUDIT. South Street (Route 1A) at East Bacon Street (Route 106) and West Bacon Street Town of Plainville. ROAD SAFETY AUDIT South Street (Route 1A) at East Bacon Street (Route 106) and West Bacon Street Town of Plainville March 15, 2018 Prepared For: MassDOT On Behalf Of: Town of Plainville Prepared By: BETA

More information

Terwillegar Drive Expressway Draft Concept Plan

Terwillegar Drive Expressway Draft Concept Plan Terwillegar Drive Expressway Draft Concept Plan Anthony Henday Drive to Whitemud Drive November 28 5:00-8:00 p.m. December 1 10:00 a.m. - 3:00 p.m. Let s Talk Today you can: Learn about the new direction

More information

Blair/Williamson Intersection Expressed Needs

Blair/Williamson Intersection Expressed Needs Blair/Williamson Intersection Expressed Needs NORTH Blair Street is a barrier for pedestrians and bicycles Relocate Capitol City Trail crossing from Blair Street and John Nolen Drive intersection to Williamson

More information

Study Area and Location District PSA Ward ANC Phase Description B Existing 2500 Block Naylor Road Southeast Northbound

Study Area and Location District PSA Ward ANC Phase Description B Existing 2500 Block Naylor Road Southeast Northbound Speed Limit and Safety Nexus Studies for Automated Enforcement Locations in the District of Columbia 25 Block Naylor Road SE Study Area and Location District PSA Ward ANC Phase Description 7 71 7 7B Existing

More information

Per the Illinois Compiled Statutes, 625 ILCS 5/ Automated Traffic Law Enforcement System:

Per the Illinois Compiled Statutes, 625 ILCS 5/ Automated Traffic Law Enforcement System: Per the Illinois Compiled Statutes, 625 ILCS 5/11-208.6 Automated Traffic Law Enforcement System: (k-7) A municipality or county operating an automated traffic law enforcement system shall conduct a statistical

More information

ROAD SAFETY AUDIT. Route 114 at Interstate I-495 Northbound Ramps. City of Lawrence. July 30, 2015

ROAD SAFETY AUDIT. Route 114 at Interstate I-495 Northbound Ramps. City of Lawrence. July 30, 2015 ROAD SAFETY AUDIT Route 114 at Interstate I-495 Northbound Ramps City of Lawrence July 30, 2015 Prepared For: Massachusetts Department of Transportation Prepared By: Toole Design Group 33 Broad Street,

More information

Truck Climbing Lane Traffic Justification Report

Truck Climbing Lane Traffic Justification Report ROUTE 7 (HARRY BYRD HIGHWAY) WESTBOUND FROM WEST MARKET STREET TO ROUTE 9 (CHARLES TOWN PIKE) Truck Climbing Lane Traffic Justification Report Project No. 6007-053-133, P 101 Ι UPC No. 58599 Prepared by:

More information

Date: 09/22/2016 Subject: To: From: PennDOT Engineering District 5-0. Dear Applicant,

Date: 09/22/2016 Subject: To: From: PennDOT Engineering District 5-0. Dear Applicant, Date: 09/22/2016 Subject: Highway Occupancy Permit Application No. 112807 Returned For Revisions To: Wal-Mart Real Estate Business Trust 2001 SE 10th Street Bentonville, AR 72716 From: PennDOT Engineering

More information

Per the Illinois Compiled Statutes, 625 ILCS 5/ Automated Traffic Law Enforcement System:

Per the Illinois Compiled Statutes, 625 ILCS 5/ Automated Traffic Law Enforcement System: Per the Illinois Compiled Statutes, 625 ILCS 5/11-208.6 Automated Traffic Law Enforcement System: (k-7) A municipality or county operating an automated traffic law enforcement system shall conduct a statistical

More information

ROAD SAFETY AUDIT. Mass Pike Interchange 6, I-291 and Burnett Road. City of Chicopee. November 4, Prepared For: MassDOT Highway Division

ROAD SAFETY AUDIT. Mass Pike Interchange 6, I-291 and Burnett Road. City of Chicopee. November 4, Prepared For: MassDOT Highway Division ROAD SAFETY AUDIT Mass Pike Interchange 6, I-291 and Burnett Road City of Chicopee November 4, 2013 Prepared For: MassDOT Highway Division Prepared By: BETA Group, Inc. Table of Contents Project Data...

More information

INTERSECTION SAFETY AUDIT: STH 16/67 AND CTH Z

INTERSECTION SAFETY AUDIT: STH 16/67 AND CTH Z WISCONSIN DEPARTMENT OF TRANSPORTATION INTERSECTION SAFETY AUDIT: STH 16/67 AND CTH Z OCONOMOWOC, WI WISCONSIN DEPARTMENT OF TRANSPORTATION INTERSECTION SAFETY AUDIT: STH 16/67 AND CTH Z OCONOMOWOC, WI

More information

Chapter 4 Traffic Analysis

Chapter 4 Traffic Analysis Chapter 4 Traffic Analysis PURPOSE The traffic analysis component of the K-68 Corridor Management Plan incorporates information on the existing transportation network, such as traffic volumes and intersection

More information

Intersection Traffic Control Feasibility Study

Intersection Traffic Control Feasibility Study Intersection Traffic Control Feasibility Study CSAH 9 at CSAH 60 (185th Avenue) Prepared For: Dakota County Transportation Department Western Service Center 14955 Galaxie Avenue, 3rd Floor Apple Valley,

More information

Brian McHugh, Buckhead Community Improvement District. SUBJECT: Wieuca Road at Phipps Boulevard Intersection Improvements Project

Brian McHugh, Buckhead Community Improvement District. SUBJECT: Wieuca Road at Phipps Boulevard Intersection Improvements Project MEMO TO: FROM: Brian McHugh, Buckhead Community Improvement District Jagan Kaja, AICP, WSP Parsons Brinckerhoff SUBJECT: Wieuca Road at Phipps Boulevard Intersection Improvements Project DATE: October

More information

Public Involvement Kickoff Meeting. April 29, 2015

Public Involvement Kickoff Meeting. April 29, 2015 Public Involvement Kickoff Meeting April 29, 2015 Title VI Compliance The Florida Department of Transportation complies with various non-discrimination laws and regulations, including Title VI of the Civil

More information

HIGHBURY AVENUE/HAMILTON ROAD INTERSECTION IMPROVEMENTS PUBLIC INFORMATION CENTRE 1 MAY 14, 2015

HIGHBURY AVENUE/HAMILTON ROAD INTERSECTION IMPROVEMENTS PUBLIC INFORMATION CENTRE 1 MAY 14, 2015 HIGHBURY AVENUE/HAMILTON ROAD INTERSECTION IMPROVEMENTS Municipal Class Environmental Assessment PUBLIC INFORMATION CENTRE 1 MAY 14, 2015 ACCESSIBILITY Under the Accessibility Standards 2015 for Customer

More information