1 BENNING ROAD & BRIDGES TRANSPORTATION IMPROVEMENTS CRASH DATA AND SAFETY ANALYSIS TECHNICAL MEMORANDUM DRAFT MAY 2016
2 This page left intentionally blank.
3 Table of Contents 1.0 Introduction Crash Data for Key Intersections Relation of Build Alternative Alignments to Key Intersections Intersection Collision Diagrams and Detailed Analysis of Collisions Benning Road and Minnesota Avenue Intersection Benning Road and East Capitol Street Intersection Minnesota Avenue and Nannie Helen Burroughs (NHB) Avenue Intersection Benning Road and 36 th Street Intersection Benning Road and Anacostia Avenue Intersection Benning Road and 34 th Street Intersection Benning Road and 45 th Street Intersection Benning Road and Central Avenue Intersection Minnesota Avenue and Dix Street Intersection Minnesota Avenue and Grant Street Intersection Minnesota Avenue and Hayes Street Intersection Minnesota Avenue and Gault Place Intersection APPENDIX A-i
4 This page left intentionally blank.
5 1.0 Introduction This crash data and safety analysis technical memorandum identifies existing safety problems along the project corridor. The analysis provides crash data for the study intersections in order to evaluate safety conditions and identify factors contributing to collisions. The analysis is based on data provided by the District Department of Transportation (DDOT) spanning the period from 2011 through 2013 from DDOT s Traffic Accident Reporting and Analysis System. Note that no crash data was available at Benning Road and Oklahoma Avenue, Benning Road and 42 nd Street, and Benning Road and 44 th Street intersections, and thus not included in the analysis. 1.1 Crash Data for Key Intersections Crash data was provided for twelve key intersections within the study area. The crash data includes type of crashes (e.g., rear end, side swiped), crash severity (e.g., injuries involved), the crash location, and also indicates whether any pedestrians were involved in the accident. The crash data analysis was performed in two steps. The first step calculated the crash rate at the study intersections and provided a summary of crash data statistics at an intersection level. The second step developed collision diagrams (i.e., visual representation of crashes) at every intersection to identify potential problem areas and safety deficiencies at intersections. Crash rate for intersections is expressed as crashes per million entering vehicles (MEV), and is calculated as follows: RRRRRRRR = (CC 1,000,000)/(nn 365 VV) where C is the total number of intersection-related crashes (also known as crash frequency) in the study period, n is the number of years data (i.e., analysis period), and V is the daily traffic volumes entering the intersection. Daily traffic volumes were calculated using the peak-hour traffic volumes entering the intersection and a peak hour factor of daily volumes calculated based on the historic annual average daily traffic (AADT) data. Because crash data includes crashes occurred between 2011 and 2013, Peak-hour traffic volumes from the Feasibility Study were used in the analysis because crash data provided occurred between 2011 and The summary of crash rate at the study intersections is provided in Figure 1. Table 1 provides detailed statistics about crash data. APPENDIX A-1
6 Principal observations from Figure 1 and Table 1 include: Just over half (7) of the 12 key crash intersections in the study area are located along Benning Road, which is the project corridor for the two Build Alternatives. The highest crash rate location is at Benning Road and Minnesota Avenue with an MEV of The second highest crash rate location is at Benning Road and East Capitol Street with an MEV of The third highest crash rate location is at Minnesota Avenue and Nannie Helen Burroughs Avenue with an MEV of The annual average for the number of crashes for the 12 key intersections from 2011 to 2013 was 129, while the annual average for crashes resulting in injury was 50. Figure 1: Benning Road and Minnesota Avenue Crash Diagram A-2 APPENDIX
7 Table 1: Crash Data Summary at the Study Intersections Intersection Benning Rd and Anacostia Ave Benning Rd and 34 th St Benning Rd and 36 th St Benning Rd and Minnesota Ave Benning Rd and 45 th St Benning Rd and Central Ave Benning Rd and East Capitol St Number of Crashes Crash Rate (MEV) Rear-end Sideswipe Right Angle Collision Type ( ) Head on Left Turn Hit Veh Left Turn Hit Ped Right Turn Hit Veh Right Turn Hit Ped Straight Hit Ped Crashes Resulting in Injury % 17% 17% 4% % 25% 6% 6% 19% 13% % 31% 4% 4% 8% % 31% 4% 3% 12% 1% 7% 4% 5% % 42% 8% 8% 8% % 40% 10% 10% 10% % 27% 8% 4% 6% 9% 2% 7% 32 Minnesota Ave and Dix St % 0% 6% 19% 13% 6% 9 Minnesota Ave and Grant St % 19% 13% 7 Minnesota Ave and Hayes St % 50% 0 Minnesota Ave and Gault Pl % 50% 17% 1 Minnesota Ave and NHB Ave % 27% 12% 6% 6% 6% 22 APPENDIX A-3
8 2.0 Relation of Build Alternative Alignments to Key Intersections Table 2 lists the 12 key intersections, and show which intersections are located along or in close proximity to each of the two Build Alternative alignments. This table also identifies intersections (with an *) that are near to a potential station. Overall, the table shows that six key intersections are closely associated with both Build Alternatives. Table 2: High Crash Intersections Along the Build Alternatives Intersection Build Alternative 1 Build Alternative 2 Benning Rd and Anacostia Ave X X Benning Rd and 34 th St X* X* Benning Rd and 36 th St X X Benning Rd and Minnesota Ave X X Benning Rd and 45 th St X X Benning Rd and Central Ave Benning Rd and East Capitol St X* X* Minnesota Ave and Dix St Minnesota Ave and Grant St Minnesota Ave and Hayes St Minnesota Ave and Gault Pl Minnesota Ave and NHB Ave *Denotes potential station at intersection. A-4 APPENDIX
9 3.0 Intersection Collision Diagrams and Detailed Analysis of Collisions This section displays collision diagrams for each intersection and provides a brief discussion for the potential causes of crashes. Collision diagrams are prepared to understand the crash pattern, safety problem and also deficiency of the intersection operation. Note that collision discussion is provided only at intersections and approaches for high frequency of crashes. 3.1 Benning Road and Minnesota Avenue Intersection Figure 2 and Table 3 provide crash analysis information for the Benning Road and Minnesota Avenue intersection. Figure 2: Benning Road and Minnesota Avenue Crash Diagram APPENDIX A-5
10 Table 3: Potential Causes of Crashes at Benning Road and Minnesota Avenue Intersection Movement Collision Type Potential Causes of Crashes Speeding (Downhill approach) Stop and go traffic due to peak hour congestion Eastbound left turn queue spillover due to heavy left turn volume Eastbound Benning Inadequate green time Road Westbound Benning Road Northbound Minnesota Avenue Southbound Minnesota Avenue Right Turn Hit Pedestrians Left Turn Hit Pedestrians Protected and permissive phasing Not adequate green time during the protected phase leading to more aggressive gap acceptance during the permitted phase Location of crosswalk (not at the tangent point) Permissive only left turn phasing Only permissive phase is permitted Heavy opposing through traffic causing more aggressive gap acceptance Heavy pedestrian volumes crossing the intersection on the south side of the intersection Stop and go traffic due to peak hour congestion Speeding and more aggressive behavior due to cycle overflows (i.e., queue cannot clear the intersection in the current cycle) Inadequate storage lane, causing queue spillover and lane change for the through vehicles A-6 APPENDIX
11 3.2 Benning Road and East Capitol Street Intersection Figure 3 and Table 4 provide crash analysis information for the Benning Road and East Capitol Street intersection. Figure 3: Benning Road and East Capitol Street Crash Diagram East Capitol St and Benning Rd NE N Table 4: Potential Causes of Crashes at Benning Road and East Capitol Street Intersection Movement Collision Type Potential Causes of Crashes Northbound Benning Road Inadequate storage space for northbound left turn traffic Heavy left turn volume in the morning peak hour (450 vehicles) Split phasing, which may cause lane changes during queue clearance Stop and go traffic due to peak hour congestion Speeding and more aggressive behavior due to cycle overflows (i.e., queue cannot clear the intersection in the current cycle) Eastbound East Stop and go traffic due to peak hour congestion Capitol Street Speeding and more aggressive behavior due to cycle overflows (i.e., queue cannot clear the intersection in the current cycle) APPENDIX A-7
12 3.3 Minnesota Avenue and Nannie Helen Burroughs (NHB) Avenue Intersection Figure 4 and Table 5 provide crash analysis information for the Minnesota Avenue and Nannie Helen Burroughs (NHB) Avenue intersection. Figure 4: Minnesota Avenue and Nannie Helen Burroughs Avenue Crash Diagram Minnesota Ave and NHB Ave NE N A-8 APPENDIX
13 Table 5: Potential Causes of Crashes at Minnesota Avenue and Nannie Helen Burroughs Avenue Intersection Movement Collision Type Potential Causes of Crashes Eastbound Nannie Helen Burroughs Avenue Northbound Minnesota Avenue 3.4 Benning Road and 36 th Street Intersection Visibility issues due to the existing bridge Left turn is shared with through (also lagging left turn), which may cause sudden stops (sideswiped collisions can also be attributed to shared left turn operation) Stop and go traffic due to peak hour congestion Speeding and more aggressive behavior due to cycle overflows (i.e., queue cannot clear the intersection in the current cycle) Figure 5 and Table 6 provide crash analysis information for the Benning Road and 36 th Street intersection. Figure 5: Benning Road and 36 th Street Crash Diagram Benning Rd and 36 th St NE N APPENDIX A-9
14 Table 6: Potential Causes of Crashes at Benning Road and 36 th Street Intersection Movement Collision Type Potential Causes of Crashes Eastbound Benning Road Lack of proper signage for the off-ramp Lane change and slowing down to get onto off-ramp Westbound Benning Road Possible conflict with merging traffic (might have also caused sideswiped collisions) 3.5 Benning Road and Anacostia Avenue Intersection Figure 6 provides crash analysis information for the Benning Road and Anacostia Avenue intersection. No high frequency of crashes is present at the intersection. Figure 6: Benning Road and Anacostia Avenue Crash Diagram Benning Rd and Anacostia Ave NE N A-10 APPENDIX
15 3.6 Benning Road and 34 th Street Intersection Figure 7 provides crash analysis information for the Benning Road and 34 th Street intersection. No high frequency of crashes is present at the intersection. Figure 7: Benning Road and 34th Street Crash Diagram Benning Rd and 34 th St NE N APPENDIX A-11
16 3.7 Benning Road and 45 th Street Intersection Figure 8 provides crash analysis information for the Benning Road and 45 th Street intersection. No high frequency of crashes is present at the intersection. Figure 8: Benning Road and 45 th Street Crash Diagram Benning Rd and 45 th St NE N A-12 APPENDIX
17 3.8 Benning Road and Central Avenue Intersection Figure 9 provides crash analysis information for the Benning Road and Central Avenue intersection. No high frequency of crashes is present at the intersection. Figure 9: Benning Road and Central Avenue Crash Diagram Benning Rd and Central Ave NE N APPENDIX A-13
18 3.9 Minnesota Avenue and Dix Street Intersection Figure 10 provides crash analysis information for the Minnesota Avenue and Dix Street intersection. No high frequency of crashes is present at the intersection. Figure 10: Minnesota Avenue and Dix Street Crash Diagram Minnesota Ave and Dix Rd NE N A-14 APPENDIX
19 3.10 Minnesota Avenue and Grant Street Intersection Figure 11 provides crash analysis information for the Minnesota Avenue and Grant Street intersection. No high frequency of crashes is present at the intersection. Figure 11: Minnesota Avenue and Grant Street Crash Diagram Minnesota Ave and Grant St NE N APPENDIX A-15
20 3.11 Minnesota Avenue and Hayes Street Intersection Figure 12 provides crash analysis information for the Minnesota Avenue and Hayes Street intersection. No high frequency of crashes is present at the intersection. Figure 12: Minnesota Avenue and Hayes Street Crash Diagram Minnesota Ave and Hayes St NE N A-16 APPENDIX
21 3.12 Minnesota Avenue and Gault Place Intersection Figure 13 provides crash analysis information for the Minnesota Avenue and Gault Place intersection. No high frequency of crashes is present at the intersection. Figure 13: Minnesota Avenue and Gault Place Crash Diagram Minnesota Ave and Gault Pl NE N APPENDIX A-17
22 This page left intentionally blank.
I-95 NORTHBOUND AT US 1 (EXIT 126) ALTERNATIVES DESIGN ANALYSIS
FAMPO Policy Committee Briefing June 18, 2018 I-95 NORTHBOUND AT US 1 (EXIT 126) ALTERNATIVES DESIGN ANALYSIS WHAT IS THE STARS PROGRAM? Program to develop solutions to reduce crashes and congestion bottlenecks
More informationPearl Street / Prospect Street / Colchester Avenue Intersection Scoping Study. April 11, 2013 Steering Committee Meeting #3
Pearl Street / Prospect Street / Colchester Avenue Intersection Scoping Study April 11, 2013 Steering Committee Meeting #3 Meeting Agenda Welcome & Introductions Review Project Purpose & Needs Results
More informationEXISTING (2006) CONDITIONS
Section 2 EXISTING (2006) CONDITIONS This section provides a description of the existing transportation system in the study area and a comprehensive analysis of existing traffic operations and crash history.
More informationMETHODOLOGY. Signalized Intersection Average Control Delay (sec/veh)
Chapter 5 Traffic Analysis 5.1 SUMMARY US /West 6 th Street assumes a unique role in the Lawrence Douglas County transportation system. This principal arterial street currently conveys commuter traffic
More informationQueensboro Bridge Bus Priority Study: Summary of Recommendations. Presentation to Manhattan Community Board 8 May 4, 2011
: Summary of Recommendations Presentation to Manhattan Community Board 8 May 4, 2011 1 Overview Study Goal: Identify cost-effective ways to improve bus speed and reliability for local and express buses
More informationDell Range Boulevard Corridor Study Powderhouse Road to College Drive. Prepared for: Cheyenne Metropolitan Planning Organization
Dell Range Boulevard Corridor Study Powderhouse Road to College Drive Prepared for: Cheyenne Metropolitan Planning Organization Draft August 2014 Dell Range Boulevard Corridor Study (Powderhouse Road to
More informationAPPENDIX E Evaluation of Improvement Alternatives
APPENDIX E Evaluation of Improvement Alternatives Table E-1 Preliminary Comparison of Design Alternatives, Concord Table E-2 Preliminary Comparison of Route 2 Improvement Packages, Acton and Concord TABLE
More informationMilitary Road Safety Improvements
Military Road Safety Improvements 26 th Road North to 31 st Street North SUMMARY OF DATA REVIEW AND PRELIMINARY RECOMMENDATIONS Prepared for: Department of Environmental Services Traffic Engineering and
More informationMemorandum 1. INTRODUCTION. To: Cc: From: Denise Marshall Northumberland County
255 Adelaide Street West Toronto, ON M5H 1X9 www.hdrinc.com File: 4.0 Memorandum To: Cc: From: Denise Marshall Northumberland County Tony Reitmeier HDR Guinevere Ngau HDR Andrew O Connor HDR Date: August
More informationOverview. Updated pictures of the intersection are shown in Exhibits 1 thru 4, and the aerial photo provided by Google Maps is shown in Exhibit 5.
Overview The (here in after referred to as the Village ) is submitting the follow up interim RLRC Safety Report for the intersection of Lincoln Highway (US 30) at Orchard Drive. Additional reports, as
More informationDraft North Industrial Area-Wide Traffic Plan
Summary of North Industrial and Hudson Bay Industrial Recommended Improvements Table 1. Summary of s Item Location 1 2 3 4 5 6 7 8 9 10 11 12 Millar Ave north of 51st St Super 8 Motel back lane 400 Block
More informationWISCONSIN AVENUE EXTENSION SECOND PUBLIC INFORMATION MEETING. March 28, 2017
WISCONSIN AVENUE EXTENSION SECOND PUBLIC INFORMATION MEETING March 28, 2017 STUDY AREA N MEETING AGENDA Introductions Study Background Alternatives Studied Recommended Alternative Discussion STUDY BACKGROUND
More informationSTATUS OF 2009 PEDESTRIAN MASTER PLAN (AS OF DECEMBER 2013)
Appendix P.1 STATUS OF 2009 PEDESTRIAN MASTER PLAN (AS OF DECEMBER 2013) The 2009 Pedestrian Master Plan establishes 21 core recommendations in three goal areas to improve pedestrian transportation in
More informationCITY OF LOS ANGELES INTER-DEPARTMENTAL MEMORANDUM
CITY OF LOS ANGELES INTER-DEPARTMENTAL MEMORANDUM Date: April 1, 219 To: Honorable City Council c/o City Clerk, Room 395, City Hall Attention: Honorable Mike Bonin, Chair, Transportation Committee From:
More informationFM #: ETDM #: 11241
SR 826/Palmetto Expressway PD&E Study From SR 93/I 75 to the Golden Glades Interchange FM #: 418423 1 22 01 ETDM #: 11241 Agency/ Kick Off Meeting October 27, 2011 2 Location Map From SR 93/I 75 to Golden
More informationAppendix B. Safety Performance Report
Appendix B Safety Performance Report Appendix B 100 Consilium Place, Suite 200, Toronto, ON., M1H 3E3, Canada, www.timcon-eng.com Tel: 647-714-8403 Fax: 416 915 3910 Memorandum Date: (Updated) To: David
More informationRoute 28 (South Orleans Road)/Route 39 (Harwich Road)/Quanset Road Intersection
TRAFFIC FEASIBILITY STUDY Route 28 (South Orleans Road)/Route 39 (Harwich Road)/Quanset Road Intersection Orleans, Massachusetts Prepared for: Town of Orleans Prepared by: Fay, Spofford & Thorndike, LLC
More informationIowa Highway 58 Corridor Improvement Study
1 Iowa Highway 58 Corridor Improvement Study Public Informational Meeting May 6, 2014 2 Welcome and Introductions Randy Lorenzen, City of Cedar Falls Engineer 3 Outline of Presentation Review of Project
More informationRegional Applications
Regional Applications Richmond Regional Transportation Planning Organization September 1, 2016 Barbara Nelson Sarah Rhodes Richmond Regional Transportation Planning Organization Action Smart Scale Regional
More informationAGENDA ITEM 6 D THOMASVILLE ROAD (HERMITAGE BOULEVARD TO LIVE OAK PLANTATION ROAD) ROADWAY SAFETY AUDIT
May 15, 2018 AGENDA ITEM 6 D THOMASVILLE ROAD (HERMITAGE BOULEVARD TO LIVE OAK PLANTATION ROAD) ROADWAY SAFETY AUDIT TYPE OF ITEM: Discussion STATEMENT OF ISSUE The Florida Department of Transportation
More informationEvaluation of M-99 (Broad Street) Road Diet and Intersection Operational Investigation
Evaluation of M-99 (Broad Street) Road Diet and Intersection Operational Investigation City of Hillsdale, Hillsdale County, Michigan June 16, 2016 Final Report Prepared for City of Hillsdale 97 North Broad
More information180 Grand Avenue, Suite x117 Dowling Associates, Inc.
180 Grand Avenue, Suite 250 510.839.1742 x117 Oakland, CA 94612 510.839.0871 fax www.dowlinginc.com mbowman@dowlinginc.com Dowling Associates, Inc. Date: Memorandum To: CC: From: Ms. Leah Greenblat City
More informationSummary: Mercer County Princeton Avenue & Spruce Street Study January 2009
Summary: Several recent studies have assessed potential development and redevelopment opportunities in the Mercer Crossing area of Trenton, Ewing, and Lawrence. This Princeton Avenue and Spruce Street
More informationWELCOME. Stakeholder Involvement Group Meeting #2 Round Lake Public Works October 24, 2018
WELCOME Stakeholder Involvement Group Meeting #2 Round Lake Public Works October 24, 2018 MEETING AGENDA 1. Welcome and Introductions 2. Study Progress Update 3. Problem Statement 4. Technical Analysis
More informationMEMORANDUM. Layout Of Study Intersections And Traffic Control
BOSTON REGION METROPOLITAN PLANNING ORGANIZATION Richard A. Davey, MassDOT Secretary and CEO and MPO Chairman Karl H. Quackenbush, Executive Director, MPO Staff DATE November 15, 2012 TO FROM RE Town of
More informationLincoln Way Multimodal Safety and Operations Study. City and University Summary Presentation
Lincoln Way Multimodal Safety and Operations Study City and University Summary Presentation February 27, 2018 Agenda Introductions Study Overview: Phase 1 - Discovery Phase 2 Improvement Recommendations
More informationExisting Conditions. Date: April 16 th, Dan Holderness; Coralville City Engineer Scott Larson; Coralville Assistant City Engineer
Date: April 16 th, 2015 To: From: Re: Dan Holderness; Coralville City Engineer Scott Larson; Coralville Assistant City Engineer Darian Nagle-Gamm, Traffic Engineering Planner Highway 6 (2 nd Street) /
More informationI-95 Northbound at US 1 (Exit 126) Design and Study Final Report
I-95 Northbound at US 1 (Exit 126) Design and Study Final Report July 2018 Prepared by: Prepared for: TABLE OF CONTENTS 1 Introduction... 1 Study Area Limits... 1 Purpose and Need of the Study... 1 Safety
More informationCONTENTS EXECUTIVE SUMMARY 1
CONTENTS CHAPTER PAGE EXECUTIVE SUMMARY 1 1 ISSUES AND PURPOSE OF THE ANALYSIS 2 1.1 Background 2 1.2 Analysis Area 2 1.3 Issues and Observations 3 1.4 Project and Public Meetings 3 2 LIST OF PREFERRED
More informationSpring Hill Corridor Study
Regional Intergovernmental Council Spring Hill Corridor Study South Charleston, West Virginia 2015 CONTENTS List of Tables... 1 List of Figures... 1 Study Area... 2 Goals and Objectives... 4 Outreach and
More informationPer the Illinois Compiled Statutes, 625 ILCS 5/ Automated Traffic Law Enforcement System:
Per the Illinois Compiled Statutes, 625 ILCS 5/11-208.6 Automated Traffic Law Enforcement System: (k-7) A municipality or county operating an automated traffic law enforcement system shall conduct a statistical
More informationInterstate Route 77 / US Route 62 / State Route 687 (Fulton Road) Transportation Improvement Project. Prepared September 6, 2017
EODOT Project: ODOT Project: STA-IR 77-.50; PID 00290 Interstate Route 77 / US Route 62 / State Route 687 (Fulton Road) Transportation Improvement Project Summary of Public Comments Received and Responses
More informationLINCOLNWOOD POLICE DEPARTMENT
LINCOLNWOOD POLICE DEPARTMENT 6900 N. Lincoln Avenue, Lincolnwood, IL 60712 (847) 673-2167 Robert LaMantia Chief of Police September 19, 2017 Illinois Department of Transportation Traffic Operations Bureau
More informationForest Hills Improvement Initiative
Forest Hills Improvement Initiative Transportation Action Plan Short Term Recommendations ONLY Final Draft as of April 30, 2008 For Community Review and Feedback Prepared for: The City of Boston Boston
More informationCAPITOL DRIVE & FOND DU LAC AVENUE INTERSECTION ANALYSIS. Urban Planning 772 SARAH BREGANT, RYAN PETERSON, & MATT WERDERITCH
CAPITOL DRIVE & FOND DU LAC AVENUE INTERSECTION ANALYSIS Urban Planning 772 SARAH BREGANT, RYAN PETERSON, & MATT WERDERITCH OVERVIEW N 51 ST BOULEVARD N 51 ST BOULEVARD 12,100 44,700 W CAPITOL DRIVE 52,600
More informationApproximately 360 trail users cross during a typical summer weekday and 420 cross during a typical summer
5. PARKR ROAD AT MISSISSIPPI AVN CROSSIN xisting Conditions The High ine Canal trail crosses Parker Road near the Mississippi Avenue intersection (crossing location #3 on Figure 1). South of Parker, the
More informationDEPARTMENT OF ENVIRONMENTAL SERVICES. North Harrison Street (Lee Highway to Little Falls Road) Comparative Analysis. Prepared for:
DEPARTMENT OF ENVIRONMENTAL SERVICES North Harrison Street (Lee Highway to Little Falls Road) Comparative Analysis Prepared for: Arlington County Department of Environmental Services 2100 Clarendon Boulevard,
More informationJoshua Saak, P.E., PTOE Traffic Design Engineer Ada County Highway District May 23, 2013
Joshua Saak, P.E., PTOE Traffic Design Engineer Ada County Highway District May 23, 2013 Creating Great Streets Through Road Diets and Conversions The Charlotte Experience Topics to Discuss Charlotte s
More information2009 PE Review Course Traffic! STUDIES. Shawn Leight, P.E., PTOE, PTP Crawford Bunte Brammeier Washington University
2009 PE Review Course Traffic! STUDIES Shawn Leight, P.E., PTOE, PTP Crawford Bunte Brammeier Washington University sleight@cbbtraffic.com Topic Areas Functional Classification Safety Financing Parking
More informationEdgemont Village Traffic and Parking Technical Report January 2014
Edgemont Village Traffic and Parking Technical Report January 2014 In the fall of 2013, the District of North Vancouver engaged consultants to assess existing intersection and parking conditions in Edgemont
More informationProject Report. South Kirkwood Road Traffic Study. Meadows Place, TX October 9, 2015
Meadows Place, TX October 9, 2015 Contents 1 Introduction... 1 2 Data Collection... 1 3 Existing Roadway Network... 2 4 Traffic Volume Development... 2 5 Warrant Analysis... 3 6 Traffic Control Alternative
More informationCapital Region Council of Governments
March 23, 2018 Capital Region Council of Governments PROJECT CONCEPT REPORT Realignment of Swamp and Northfield Road s approaches to Route 44 (Boston Turnpike) Town of Coventry SUMMARY: The Town of Coventry
More informationDate: April 4, Project #: Re: A Street/Binford Street Traffic/Intersection Assessment
To: Peter Cavanaugh General Electric From: David Bohn, PE Ryan White, PE Date: April 4, 217 Project #: 13421. Re: / Traffic/Intersection Assessment Consistent with the Cooperation Agreement between the
More informationTRAFFIC ACCIDENT ANALYSIS
TRAFFIC ACCIDENT ANALYSIS Westheimer at Chimney Rock and Westheimer at Dunvale Prepared for Prepared by Klotz Associates, Inc. 1160 Dairy Ashford, Suite 500 Houston, Texas 77079 The preparation of this
More informationROAD SAFETY AUDIT. State Road (Route 6) Corridor Town of Dartmouth. March Prepared For: MassDOT
ROAD SAFETY AUDIT State Road (Route 6) Corridor Town of Dartmouth March 2015 Prepared For: MassDOT Prepared By: McMahon Associates, Inc. 300 Myles Standish Blvd. Suite 201 Taunton, MA 02780 Table of Contents
More informationChapter V Transportation Concept Alternatives
Chapter V Transportation Concept Alternatives Three (3) fundamentally different approaches to meeting vehicular travel needs in the corridor were considered. One approach is to leave the road as it is
More informationToronto and East York Community Council. Director, Transportation Services, Toronto and East York District
No Turn on Red Regulations STAFF REPORT ACTION REQUIRED Date: June 1, 2010 To: From: Toronto and East York Community Council Director, Transportation Services, Toronto and East York District Wards: Trinity
More informationBoston Post Road Design Feasibility Study
Boston Post Road Design Feasibility Study Prepared for the City of Rye Final Report July 18, 2007 Prepared by: Buckhurst Fish & Jacquemart (BFJ) 115 Fifth Avenue New York, NY 10003 www.bfjplanning.com
More informationGlenn Avenue Corridor Traffic Operational Evaluation
Glenn Avenue Corridor Traffic Operational Evaluation PREPARED FOR: THE CITY OF AUBURN PREPARED BY: DECEMBER 2007 Glenn Avenue Corridor Study--Auburn, Alabama TABLE OF CONTENTS Introduction... 1 Background
More informationINTERSECTION SAFETY STUDY State Route 57 / Seville Road
INTERSECTION SAFETY STUDY State Route 57 / Seville Road City of Wadsworth, Medina County, Ohio Prepared For: City of Wadsworth Engineering Department 120 Maple Street Wadsworth, OH 44281 Prepared By: GPD
More informationFLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT 7 DISTRICT WIDE BICYCLE/PEDESTRIAN ACCESS TO TRANSIT SAFETY ASSESSMENT AND IMPROVEMENT PLAN
FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT 7 DISTRICT WIDE BICYCLE/PEDESTRIAN ACCESS TO TRANSIT SAFETY ASSESSMENT AND IMPROVEMENT PLAN TRANSIT SAFETY ASSESSMENT SR 55/US 19 AT 80 TH AVE N DRAFT JUNE
More informationINNOVATIVE INTERSECTION DESIGN
INNOVATIVE INTERSECTION DESIGN J. Eddie Valtier, P.E. ELP TP&D Director Introduction Why Do We Need To Start Looking For Innovative Intersection Designs? Congestion is worsening and traffic volumes and
More informationRealignment & Intersection Improvement Alternatives for the Intersection of Lorain Road & Brookpark Road
Realignment & Intersection Improvement Alternatives for the Intersection of Lorain Road & Brookpark Road City of North Olmsted, Ohio September 2011 Prepared By noaca.org 5854t 2 5854t 3 1) Title & Subtitle:
More informationTraffic Study of Fuller Street, Cady Street, West Street and West Avenue. Final Report
Traffic Study of Fuller Street, Cady Street, West Street and West Avenue Final Report July 2005 Prepared for: Town of Ludlow Prepared by: Pioneer Valley Planning Commission 26 Central Street West Springfield,
More informationROAD SAFETY AUDIT. Blue Hill Avenue (Route 28) and Warren Street High Crash Locations City of Boston. November 1, 2016
ROAD SAFETY AUDIT Blue Hill Avenue (Route 28) and Warren Street High Crash Locations City of Boston November 1, 2016 Prepared For: MassDOT Highway Division Prepared By: BETA Group, Inc. Table of Contents
More informationTRAFFIC CONTROL DEVICES ON EDGEWATER BOULEVARD AT PORT ROYAL AVENUE (NORTH)
Attachment 2 DATE: August 6, 2012 TO: VIA: FROM: SUBJECT: Mayor and Members of the City Council James C. Hardy, City Manager Ramon Towne, Director of Public Works Leah Edwards, Assistant Engineer TRAFFIC
More informationConversion of One-Way Couplet Streets to Two-Way
Conversion of One-Way Couplet Streets to Two-Way May 5, 2016 Oklahoma Traffic Engineers Association 2016 Spring Meeting, Tulsa, OK Kevin St. Jacques, P.E., PTOE, PTP Freese and Nichols Overview Initial
More informationComments EXECUTIVE SUMMARY
Comments 1. Under any Alternatives, MCDOT should provide better at-grade pedestrian crossing of Georgia Avenue and Forest Glen Road, including improved crosswalks with wider medians and adequate signal
More informationSTH 57 & STH 100 Intersection Village of Brown Deer Milwaukee County November 2015
STH 57 & STH 100 Intersection Village of Brown Deer Milwaukee County November 2015 Introduction How we got to here WIS 57 Bridge over WIS 100 in need of replacement Local support favors At-Grade Intersection
More informationM-58 HIGHWAY ACCESS MANAGEMENT STUDY Mullen Road to Bel-Ray Boulevard. Prepared for CITY OF BELTON. May 2016
M-58 HIGHWAY ACCESS MANAGEMENT STUDY Prepared for CITY OF BELTON By May 2016 Introduction Missouri State Highway 58 (M-58 Highway) is a major commercial corridor in the City of Belton. As development has
More informationTRAFFIC IMPACT ANALYSIS
TRAFFIC IMPACT ANALYSIS FOR THE CHAMPAIGN UNIT#4 SCHOOL DISTRICT PROPOSED HIGH SCHOOL (SPALDING PARK SITE) IN THE CITY OF CHAMPAIGN Final Report Champaign Urbana Urbanized Area Transportation Study 6/24/2014
More informationBicycle - Motor Vehicle Collisions on Controlled Access Highways in Arizona
Bicycle - Motor Vehicle Collisions on Controlled Access Highways in Arizona Analysis from January 1, 1991 to June 30, 2002 Richard C. Moeur, PE Traffic Design Manager, Northern Region Michelle N. Bina
More informationCOMMUNITY MEETING AGENDA
COMMUNITY MEETING AGENDA Welcome and Introductions SAFE Presentation Project Presentation Priorities Feedback Next Steps Q&A Santa Cruz Avenue Corridor Study 1 Santa Cruz Avenue Corridor Study Community
More informationTraffic Impact Analysis Walton Acres at Riverwood Athletic Club Clayton, NC
Traffic Impact Analysis Walton Acres at Riverwood Athletic Club Clayton, NC 1. TABLE OF CONTENTS INTRODUCTION...1 1.1. Site Location and Study Area...1 1.2. Proposed Land Use and Site Access...2 1.3.
More informationPer the Illinois Compiled Statutes, 625 ILCS 5/ Automated Traffic Law Enforcement System:
Per the Illinois Compiled Statutes, 625 ILCS 5/11-208.6 Automated Traffic Law Enforcement System: (k-7) A municipality or county operating an automated traffic law enforcement system shall conduct a statistical
More informationRoad Safety Audit for the Intersection of VFW Highway & Bridge Street in Lowell, Massachusetts
Road Safety Audit for the Intersection of VFW Highway & Bridge Street in Lowell, Massachusetts Prepared by University of Massachusetts Traffic Safety Research Program Prepared for Massachusetts Highway
More informationPublic Meeting. I-35 Corridor from John Kilpatrick Turnpike North to Waterloo Road October 26, 6:00pm Edmond Community Center Auditorium
Public Meeting I-35 Corridor from John Kilpatrick Turnpike North to Waterloo Road October 26, 2017 @ 6:00pm Edmond Community Center Auditorium Before we get started Please turn off or mute any electronic
More informationMemorandum. TO: Town of Lysander Comprehensive Plan Update Committee
Memorandum TO: Town of Lysander Comprehensive Plan Update Committee FROM: Meghan Vitale, SMTC DATE: January 7, 2015 RE: Accident data analysis () ~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
More informationCity of Bellevue s Adaptive Left Turn Phasing. Presented by : Mark Poch, PE, PTOE City of Bellevue, WA
City of Bellevue s Adaptive Left Turn Phasing Presented by : Mark Poch, PE, PTOE City of Bellevue, WA May 1, 2015 130,000 pop. 197 signals The Challenge Protected Only Turns The Challenge Protected Only
More informationDowntown Traffic Study
City of Lynn Massachusetts Downtown Traffic Study March 2005 315 Norwood Park South, Norwood, MA 02062 781.255.1982 email: beta@beta-inc.com LYNN DOWNTOWN TRAFFIC STUDY INTRODUCTION The City of Lynn is
More informationCHAPTER 9: SAFETY 9.1 TRAFFIC SAFETY INTERSECTION COLLISIONS
CHAPTER 9: SAFETY 9.1 TRAFFIC SAFETY Creating a transportation network that is not only efficient but also safe is a key objective of the General Plan and the WBCMP. To assess the current safety conditions
More informationMEMORANDUM. DATE March 1, 2012 TO Town of Milton Mark Abbott, Seth Asante, and Efi Pagitsas Boston Region MPO Staff
MEMORANDUM DATE March 1, 212 TO Town of Milton FROM RE Mark Abbott, Seth Asante, and Efi Pagitsas Boston Region MPO Staff FFY 211 Safety and Operations Analyses at Selected Boston Region MPO Intersections:
More informationReference: Laguna Canyon Road Traffic Conditions Data Collection Summary
Stantec Consulting Services Inc. 38 Technology Drive Suite 100, Irvine CA 92618-5312 September 8, 2017 File: 2073014320 Attention: Mark Trestik, Assistant City Engineer City of Beach Department of Public
More informationCheyenne Metropolitan Planning Organization
Dell Range Boulevard Corridor Study PHASE II SECTION 20 DRAFT Prepared for: Cheyenne Metropolitan Planning Organization November 20, 2015 (Section 20 is bordered by Powderhouse Road on the west, Storey
More informationBay to Bay Boulevard Complete Streets Project
Bay to Bay Boulevard Complete Streets Project Dale Mabry Highway to Bayshore Boulevard February 08, 2018 Photo Source: Tampa Bay Times Alessandra Da Pra Meeting Format Introduction Resurfacing Information
More informationRoute 7 Corridor Study
Route 7 Corridor Study Executive Summary Study Area The following report analyzes a segment of the Virginia State Route 7 corridor. The corridor study area, spanning over 5 miles in length, is a multi
More informationPEDESTRIAN SAFETY STUDY
PEDESTRIAN SAFETY STUDY SR 699 (BLIND PASS RD/GULF BLVD) FROM 93 RD AVENUE TO PINELLAS BAYWAY PINELLAS COUNTY SECTION NO.: 15100 MILEPOST: 0.111 3.569 STUDY LIMITS Prepared For: Florida Department of Transportation
More informationPrinceton Avenue and Spruce Street Transportation and Site Access Enhancements Project
Princeton Avenue and Spruce Street Transportation and Site Access Enhancements Project Mercer County Planning Division AECOM Transportation (formerly DMJM Harris) January 29, 2009 Agenda Project Status
More informationROAD SAFETY AUDIT. County Street at Hart Street. City of Taunton. January 30, Prepared For: Massachusetts Department of Transportation
ROAD SAFETY AUDIT County Street at Hart Street City of Taunton January 30, 2015 Prepared For: Massachusetts Department of Transportation Prepared By: Toole Design Group 33 Broad Street, 4 th Floor Boston,
More informationDelaware Avenue Corridor Study
Delaware Avenue Corridor Study City of Marysville, Ohio February 19, 2009 ms consultants, inc. engineers, architects, planners 2221 Schrock Road Columbus, Ohio 43229-1547 ms ms consultants, inc. engineers
More informationROAD SAFETY AUDIT. Granite Avenue at Interstate 93 Ramps. Town of Milton. May 22, Prepared for: MassDOT
ROAD SAFETY AUDIT Granite Avenue at Interstate 93 Ramps Town of Milton May 22, 2017 Prepared for: MassDOT Prepared by: Toole Design Group 2 Oliver Street, Suite 305 Boston, MA 02109 Table of Contents Background...
More informationWashington St. Corridor Study
FIGURE 7.17 Bridge Alternatives - Cross Sections 86 Discarded Alternative: Short-Term Bridge Repair Short-term repairs and west bridge span replacement were considered during analysis. Short-term repairs
More informationMemorandum. Bob Doyle - SGJJR. Chris Wall Wade Trim. Date: 5/16/2018. Huron Traffic Study Analysis Summary
Memorandum To: From: Bob Doyle - SGJJR Chris Wall Wade Trim Date: 5/16/218 Subject: Huron Traffic Study Analysis Summary Overview As part of the Huron Street Improvement project, the Downtown Development
More informationCAPE COD COMMISSION 3225 MAIN STREET P.O. BOX 226 BARNSTABLE, MA (508) Fax (508) Transportation Safety Report
CAPE COD COMMISSION 3225 MAIN STREET P.O. BOX 226 BARNSTABLE, MA 02630 (508) 362-3828 Fax (508) 362-3136 2006 Transportation Safety Report Bourne: Otis Rotary Harwich: Route 137/Route 39 Orleans: Route
More informationROAD SAFETY AUDIT. South Street (Route 1A) at East Bacon Street (Route 106) and West Bacon Street Town of Plainville.
ROAD SAFETY AUDIT South Street (Route 1A) at East Bacon Street (Route 106) and West Bacon Street Town of Plainville March 15, 2018 Prepared For: MassDOT On Behalf Of: Town of Plainville Prepared By: BETA
More informationTerwillegar Drive Expressway Draft Concept Plan
Terwillegar Drive Expressway Draft Concept Plan Anthony Henday Drive to Whitemud Drive November 28 5:00-8:00 p.m. December 1 10:00 a.m. - 3:00 p.m. Let s Talk Today you can: Learn about the new direction
More informationBlair/Williamson Intersection Expressed Needs
Blair/Williamson Intersection Expressed Needs NORTH Blair Street is a barrier for pedestrians and bicycles Relocate Capitol City Trail crossing from Blair Street and John Nolen Drive intersection to Williamson
More informationStudy Area and Location District PSA Ward ANC Phase Description B Existing 2500 Block Naylor Road Southeast Northbound
Speed Limit and Safety Nexus Studies for Automated Enforcement Locations in the District of Columbia 25 Block Naylor Road SE Study Area and Location District PSA Ward ANC Phase Description 7 71 7 7B Existing
More informationPer the Illinois Compiled Statutes, 625 ILCS 5/ Automated Traffic Law Enforcement System:
Per the Illinois Compiled Statutes, 625 ILCS 5/11-208.6 Automated Traffic Law Enforcement System: (k-7) A municipality or county operating an automated traffic law enforcement system shall conduct a statistical
More informationROAD SAFETY AUDIT. Route 114 at Interstate I-495 Northbound Ramps. City of Lawrence. July 30, 2015
ROAD SAFETY AUDIT Route 114 at Interstate I-495 Northbound Ramps City of Lawrence July 30, 2015 Prepared For: Massachusetts Department of Transportation Prepared By: Toole Design Group 33 Broad Street,
More informationTruck Climbing Lane Traffic Justification Report
ROUTE 7 (HARRY BYRD HIGHWAY) WESTBOUND FROM WEST MARKET STREET TO ROUTE 9 (CHARLES TOWN PIKE) Truck Climbing Lane Traffic Justification Report Project No. 6007-053-133, P 101 Ι UPC No. 58599 Prepared by:
More informationDate: 09/22/2016 Subject: To: From: PennDOT Engineering District 5-0. Dear Applicant,
Date: 09/22/2016 Subject: Highway Occupancy Permit Application No. 112807 Returned For Revisions To: Wal-Mart Real Estate Business Trust 2001 SE 10th Street Bentonville, AR 72716 From: PennDOT Engineering
More informationPer the Illinois Compiled Statutes, 625 ILCS 5/ Automated Traffic Law Enforcement System:
Per the Illinois Compiled Statutes, 625 ILCS 5/11-208.6 Automated Traffic Law Enforcement System: (k-7) A municipality or county operating an automated traffic law enforcement system shall conduct a statistical
More informationROAD SAFETY AUDIT. Mass Pike Interchange 6, I-291 and Burnett Road. City of Chicopee. November 4, Prepared For: MassDOT Highway Division
ROAD SAFETY AUDIT Mass Pike Interchange 6, I-291 and Burnett Road City of Chicopee November 4, 2013 Prepared For: MassDOT Highway Division Prepared By: BETA Group, Inc. Table of Contents Project Data...
More informationINTERSECTION SAFETY AUDIT: STH 16/67 AND CTH Z
WISCONSIN DEPARTMENT OF TRANSPORTATION INTERSECTION SAFETY AUDIT: STH 16/67 AND CTH Z OCONOMOWOC, WI WISCONSIN DEPARTMENT OF TRANSPORTATION INTERSECTION SAFETY AUDIT: STH 16/67 AND CTH Z OCONOMOWOC, WI
More informationChapter 4 Traffic Analysis
Chapter 4 Traffic Analysis PURPOSE The traffic analysis component of the K-68 Corridor Management Plan incorporates information on the existing transportation network, such as traffic volumes and intersection
More informationIntersection Traffic Control Feasibility Study
Intersection Traffic Control Feasibility Study CSAH 9 at CSAH 60 (185th Avenue) Prepared For: Dakota County Transportation Department Western Service Center 14955 Galaxie Avenue, 3rd Floor Apple Valley,
More informationBrian McHugh, Buckhead Community Improvement District. SUBJECT: Wieuca Road at Phipps Boulevard Intersection Improvements Project
MEMO TO: FROM: Brian McHugh, Buckhead Community Improvement District Jagan Kaja, AICP, WSP Parsons Brinckerhoff SUBJECT: Wieuca Road at Phipps Boulevard Intersection Improvements Project DATE: October
More informationPublic Involvement Kickoff Meeting. April 29, 2015
Public Involvement Kickoff Meeting April 29, 2015 Title VI Compliance The Florida Department of Transportation complies with various non-discrimination laws and regulations, including Title VI of the Civil
More informationHIGHBURY AVENUE/HAMILTON ROAD INTERSECTION IMPROVEMENTS PUBLIC INFORMATION CENTRE 1 MAY 14, 2015
HIGHBURY AVENUE/HAMILTON ROAD INTERSECTION IMPROVEMENTS Municipal Class Environmental Assessment PUBLIC INFORMATION CENTRE 1 MAY 14, 2015 ACCESSIBILITY Under the Accessibility Standards 2015 for Customer
More information