Arterial Traffic Analysis Actuated Signal Control

Size: px
Start display at page:

Download "Arterial Traffic Analysis Actuated Signal Control"

Transcription

1 Arterial Traffic Analysis Actuated Signal Control Dr. Gang-Len Chang Professor and Director of Traffic Safety and Operations Lab. University of Maryland-College Park

2 Actuated Signal Control Fully Actuated Control Semi-actuated Control Main Detector: either loop detectors, or some image detectors Side Street A complete system shall include: a signal, controller, and a set of detectors

3 Operations of a Semi-actuated Control Mainline signal is always on a green phase, unless recalled by the side street controller The criteria to terminate the main line green phase: a) Max. No. of waiting vehicles b) Max. delay for waiting vehicles c) Max. total delay from last side-street green phase (account for both green time and volume) d) Pedestrian needs

4 Key parameters for actuated control Max. green time Unit extension time Min green time Recall switch (when no demand) Yellow and all-red phases Pedestrain walking time

5 Typical detector type Inductive loop; radar sensor Microloop; magnetic sensor If area detectors are available, one can use volume-density controller to offer: Variable min. green time Gap reduction: max and min unit extensions, gap reduction starting and ending times.

6

7 Key Parameters in Actuated Control (1/4) (A) Minimum Green Time detector L W The minimum green time is designed to allow all vehicles queued beyond the detectors to enter and pass through the intersection Gmin = (start-up delay) + (discharged saturation headway) (the Max. No. of queued vehicles)

8 Key Parameters in Actuated Control (2/4) Min Green time should also be consistent with the pedestrian requirements Gmin = 4 (sec) + [ 2 (sec) Integer (d/20) ] d distance between detectors and stop lines One can solve d, based on the required min. Green time How to determine the d?? 1. Pedestrian Requirements 2. Observe the number of queue vehicles per cycle under a pretimed control

9 Detection location Method-1: Based on the min green time which is constrained by the pedestrian walking speed (15 percentile) Method-2: If no pedestrian concern: set Gmin to process one or two vehicles Then, use Gmin to compute the detector location.

10 Gmin with an area detector, the mini green time can be a variable. Gmin = (start-up lost time) + 2. (number of queue vehicles in the detection area). Also may vary with the required pedestrian walking time.

11 Key Parameters in Actuated Control (3/4) (B) A unit extension time interval allow a vehicle detected by the detector to travel safely through the intersection Min G Actual Operation of an Actuated Control UE YAR :Yellow and all Red UE YAR UE YAR Max extension period Max Green time

12 Determine the unit extension time: Low bound: long enough for a subsequent vehicle operating in dense-traffic to retain a green signal. Upper bound: not so long that a straggling vehicle may retain the green extension. Traffic Detector Handbook recommends: 3.0 seconds for approaching speed < 30 mph 3.5 seconds for approaching speed > 30mph Longer than passage time= (Dis.)/15 th percentile speed

13 Key Parameters in Actuated Control (4/4) Gap-out strategy: If the detector reports No Vehicle over a specified Interval or Gap, then the green phase will be terminated and yellow all red phase shift Green time to other movements Q1: How to determine the Max Green time? Q2: Should the GMax change between the peak and off-peak periods? Q3: How to determine the appropriate Gap size for changing the Green-to-Yellow phase? Q4: Should the Gap size be varied between peak and off-peak periods?

14 Figure 22.4 Gap Reduction Feature on Volume-Density Controllers (Source: Used with Permission of Institute of Transportation Engineers, Traffic Detector Handbook, 2nd Edition, JHK & Associates, Tucson AZ, p. 68.)

15 Advantages of an Actuated Control Vs. Pretimed Control Minimize the loss of unused green durations per cycle ** The green phase will be gapped out if no traffic has been detected Fully utilize the effective green time, especially when traffic is under moderate congestion level Under peak-hour * mostly saturation traffic conditions? * which one can perform better?

16 Disadvantage of an Actuated Control a) Longer loss time due to frequent phase changes b) Need sensor or detectors, and higher maintenance cost c) May incur more delay if traffic signals are not properly coordinated platoon Gap size too large Causing the signal to change phases! the competing direction may have low volume or no queue exist such changes may not be beneficial to the intersection drivers

17 Semi-actuated control (Traffic Eng. By Roess, Prassas, and McShane)

18 Detector Placement Detectors are to be placed to produce a minimum green of 6 s for the side street.

19 Passage Time As a point detector is in use, the passage time (PT) should be set to the minimum allowable headway (MAH), which is generally set at 3.0 s. The passage time must be at least long enough to allow a vehicle to traverse the distance between the front edge of the detector and the intersection line:

20

21 Assuming that the standard default values for start up lost time and encroachment are in use, the total lost time in the cycle is equal to the sum of the yellow and all red intervals, or ( ) + ( ) = = 11.7 s

22 Maximum Green Time (Minor) and Minimum Green Time (Major)

23 **standard practice: 1.5 times of the computed green allocation time

24 This is not viable, as the maximum green time for the minor street (3.5 s) is less than the minimum green time of 6.0 s. A reasonable maximum green time for the side street will have to be determined, and a related minimum green time for the major street estimated. Given that the high volume SB minor street approach has a demand flow rate of 146 veh/h, the average arrival rate of vehicles would be 146/60 = 2.4 veh/min. The minimum green of 6 s allows two vehicles to be services (2.0 s start up lost time + 2 vehicles at 2.0 s). If the maximum green is set at the minimum green of 6 s plus one passage time (6 + 3 = 9 s), a third vehicle could be serviced on one green.

25 With the low demand, anything more than this would be excessive. The minimum main street green, however, should remain at the same multiple as indicated by the original timing computation

26 Critical Cycle Length The critical cycle length includes the minimum major street green, the maximum side street green, and the yellow and all red intervals for each street, or

27

28

29 Fully-actuated control (Traffic Eng. By Roess, Prassas, and McShane

30 Recommend a suitable phase plan for the signal; Mini. Green time/ Unit extension time Yellow and all-red phase Max. green Cycle length Pedestrian buttons needed or not?

31 Phase Plan There are no left turn lanes provided, so it would be very difficult to provide for protected left turns with this geometry. All left turn volumes are well under 200 veh/h, none of the cross products are anywhere near 50,000, and none of the ITE criteria are met. A two phase full actuated signal timing will be used. Passage Time Once again, with point detectors, the passage time (PT) is set equal to the maximum allowable gap (MAH), which will be set at 3.0 s. This must be at least sufficient to allow a vehicle to move from the detector to the intersection line, or:

32

33 Assuming standard default values for start up lost time and encroachment (both 2.0 s), the sum of the yellow and all red intervals is equal to the lost time in the cycle:

34 Maximum Green Times

35

36

37 Neither minimum green time provides this. Even with 3.9 s of yellow and 1.5 s of all red added, the EW Phase provides only = 13.4 s while the NS Phase provides only = 11.4 s. Both streets require pedestrian push buttons and pedestrian signals for safety. When activated by a pedestrian call, each phase will provide:

38

39 A fully actuated control Minimum Green Times/Detector Location Sixty foot area detectors, with the front edge located 2 ft from the STOP line are being used. The minimum green will, therefore, be variable, based upon the number of vehicles detected in the detection zone. The minimum greens will vary as follows:

40 Passage Time

41

42 Yellow and All Red Intervals

43

44

45

46

47 Critical Cycle Length The critical cycle length includes the maximum green for each phase, and all of the lost times in the cycle, or:

48

49

50 Potential Alternatives (1/2) (A) Multiple detectors or a long-loop detector (B) Adaptive control Prior to Gap-out or change the signal phase Objective: min total intersection delay Compare Cost of extending one more interval Benefits of extending one more interval

51 Potential Alternatives (2/2) Q1: How many intervals should be included in the cost-benefit comparison? This is the core concept of adaptive control

Actuated Signal Timing Design CIVL 4162/6162

Actuated Signal Timing Design CIVL 4162/6162 Actuated Signal Timing Design CIVL 4162/6162 Session Objective Explain terms related to actuated signals Explain why and where actuated signals are used Determine detector locations given traffic conditions

More information

Module 3 Developing Timing Plans for Efficient Intersection Operations During Moderate Traffic Volume Conditions

Module 3 Developing Timing Plans for Efficient Intersection Operations During Moderate Traffic Volume Conditions Module 3 Developing Timing Plans for Efficient Intersection Operations During Moderate Traffic Volume Conditions CONTENTS (MODULE 3) Introduction...1 Purpose...1 Goals and Learning Outcomes...1 Organization

More information

Synchro Studio 8. Overview. By Ioannis Psarros

Synchro Studio 8. Overview. By Ioannis Psarros Synchro Studio 8 Overview By Ioannis Psarros What is Synchro? Software for signal optimization Developed by Trafficware Optimization can be applied to: Cycle lengths Splits Offsets Source: http://bikewalklee.blogspot.com

More information

Chapter 5 5. INTERSECTIONS 5.1. INTRODUCTION

Chapter 5 5. INTERSECTIONS 5.1. INTRODUCTION Chapter 5 5. INTERSECTIONS 5.1. INTRODUCTION Intersections are the physical component of the roadways where two highways intersect. They are the most complex element of roadways, since it requires more

More information

Traffic Signal Design

Traffic Signal Design Traffic Signal Design Instructor: S. M. Mahdi Amiripour m.amiripour@gmail.com 2 Introduction Intersection is an area shared by two or more roads Designated for the vehicles to turn to different directions

More information

Unit 7 Speed, Travel Time and Delay Studies

Unit 7 Speed, Travel Time and Delay Studies Unit 7 Speed, Travel Time and Delay Studies Introduction Speed, travel time and delay are all related measures that are common used as indicators of performance for traffic facilities Measure of Effectiveness

More information

Chapter Capacity and LOS Analysis of a Signalized I/S Overview Methodology Scope Limitation

Chapter Capacity and LOS Analysis of a Signalized I/S Overview Methodology Scope Limitation Chapter 37 Capacity and LOS Analysis of a Signalized I/S 37.1 Overview The Highway Capacity Manual defines the capacity as the maximum howdy rate at which persons or vehicle can be reasonably expected

More information

HIGHWAY CAPACITY MANUAL 2010: NEW SIGNALIZED INTERSECTION METHODOLOGY. James A. Bonneson, Ph.D., P.E.

HIGHWAY CAPACITY MANUAL 2010: NEW SIGNALIZED INTERSECTION METHODOLOGY. James A. Bonneson, Ph.D., P.E. HIGHWAY CAPACITY MANUAL 2010: NEW SIGNALIZED INTERSECTION METHODOLOGY James A. Bonneson, Ph.D., P.E. Texas Transportation ti Institute t Housekeeping 2 All participant phone lines are muted to avoid distractions

More information

Intersection of Massachusetts Avenue and Maple Street in Lexington Signalized Intersection and Roundabout Comparison

Intersection of Massachusetts Avenue and Maple Street in Lexington Signalized Intersection and Roundabout Comparison Intersection of Massachusetts Avenue and Maple Street in Lexington Signalized Intersection and Roundabout Comparison Michael Wallwork, Roundabout Expert, Orange Park, Florida Tom Bertulis (MS, PE, PTOE),

More information

Capacity and Performance Analysis of Roundabout Metering Signals

Capacity and Performance Analysis of Roundabout Metering Signals Capacity and Performance Analysis of Roundabout Metering Signals TRB National Roundabout Conference Vail, Colorado, USA, 22-25 May 2005 Pictures modified to show driving on the right-hand side of the road

More information

Traffic Signals. Part I

Traffic Signals. Part I Traffic Signals Part I Part I The Islamic University of Gaza Civil Engineering Department Traffic Engineering (Optional Course) ECIV 5332 Instructor: Dr. Yahya Sarraj Associate Prof. in Transportation

More information

TABLE OF CONTENTS 1. INTRODUCTION 2. TRAFFIC ENGINEERING FUNDAMENTALS 9. SYSTEM CONTROL 3. DATA COLLECTION 4. SIGNAL PHASING 10. SPECIAL OPERATIONS

TABLE OF CONTENTS 1. INTRODUCTION 2. TRAFFIC ENGINEERING FUNDAMENTALS 9. SYSTEM CONTROL 3. DATA COLLECTION 4. SIGNAL PHASING 10. SPECIAL OPERATIONS TABLE OF CONTENTS 1. INTRODUCTION 2. TRAFFIC ENGINEERING FUNDAMENTALS A. Volume, Demand, and Capacity 2-1 B. Performance Measures 2-7 C. Critical Lane Volume Analysis 2-9 3. DATA COLLECTION 4. SIGNAL PHASING

More information

Traffic Signal Optimization Project (Hosman Road) (Future Coordinated Corridor)

Traffic Signal Optimization Project (Hosman Road) (Future Coordinated Corridor) Onondaga County Department of Transportation Traffic Signal Optimization Project (Hosman Road) (Future Coordinated Corridor) Prepared for: Syracuse Metropolitan Transportation Council 126 North Salina

More information

Arterial Traffic Analysis Some critical concepts. Prepared by Philip J. Tarnoff

Arterial Traffic Analysis Some critical concepts. Prepared by Philip J. Tarnoff Arterial Traffic Analysis Some critical concepts Prepared by Philip J. Tarnoff Agenda Fundamentals Signal timing concepts Actuated signal controllers Developing timing plans Types of signal control First

More information

Introduction to Traffic Signal Timing

Introduction to Traffic Signal Timing Introduction to Traffic Signal Timing Course No: C-7 Credit: PDH Jeffrey W. Buckholz, Ph.D., P.E., PTOE Continuing Education and Development, Inc. 9 Greyridge Farm Court Stony Point, NY 98 P: (877) -58

More information

Self-Organizing Signals: A Better Framework for Transit Signal Priority

Self-Organizing Signals: A Better Framework for Transit Signal Priority Portland State University PDXScholar TREC Friday Seminar Series Transportation Research and Education Center (TREC) 3-13-2015 Self-Organizing Signals: A Better Framework for Transit Signal Priority Peter

More information

Signalized Intersections

Signalized Intersections Signalized Intersections Kelly Pitera October 21, 2009 Topics to be Covered Introduction/Definitions D/D/1 Queuing Phasing and Timing Plan Level of Service (LOS) Signalized Intersections The good Reduce

More information

Design of Turn Lane Guidelines

Design of Turn Lane Guidelines Design of Turn Lane Guidelines CTS Transportation Research Conference May 24, 2012 Howard Preston, PE Minnesota Department of Transportation Research Services Office of Policy Analysis, Research & Innovation

More information

URBAN STREET CONCEPTS

URBAN STREET CONCEPTS CHAPTER 10 URBAN STREET CONCEPTS CONTENTS I. INTRODUCTION... 10-1 II. URBAN STREETS...10-1 Flow Characteristics... 10-3 Free-Flow Speed...10-3 Running Speed... 10-3 Travel Speed... 10-4 Time-Space Trajectory...10-4

More information

AN Basic Traffic Signal Timing and Advance Detection

AN Basic Traffic Signal Timing and Advance Detection AN-0001 Basic Traffic Signal Timing and Advance Detection This application note provides a basic introduction to the use of Continuous Tracking Advance Detectors (CTADs) for advance detection at signalized

More information

6. signalized Intersections

6. signalized Intersections 6. signalized Intersections 1 References 1. HCM 2000, chapter 16 2. safety.fhwa.dot.gov/intersection/signalized/sig_int_pps051508 /short/sigint_short.ppt 3. mason.gmu.edu/~aflaner/ceie_360/signalized%20intersectio

More information

Signal Timing Design CIVL 4162/6162

Signal Timing Design CIVL 4162/6162 Signal Timing Design CIVL 4162/6162 Summary of Signal Design Signal Phase Plans Treatment of Left Turns General Considerations Phase and Ring Diagrams Common Phase Plans and Their Use Vehicular Needs Change

More information

Evaluating Roundabout Capacity, Level of Service and Performance

Evaluating Roundabout Capacity, Level of Service and Performance Roundabouts with Metering Signals ITE 2009 Annual Meeting, San Antonio, Texas, USA, August 9-12, 2009 Evaluating Roundabout Capacity, Level of Service and Performance Presenter: Rahmi Akçelik rahmi.akcelik@sidrasolutions.com

More information

BLOSSOM AT PICKENS SIGNALIZED INTERSECTION IMPROVEMENT STUDY

BLOSSOM AT PICKENS SIGNALIZED INTERSECTION IMPROVEMENT STUDY BLOSSOM AT PICKENS SIGNALIZED INTERSECTION IMPROVEMENT STUDY Class Project Report for ECIV 542 Traffic Engineering Submitted by Omor Sharif Muchun Song Narges Kaveshgar Quyen Pham Chih-Yao Lin Submission

More information

Conversation of at Grade Signalized Intersection in to Grade Separated Intersection

Conversation of at Grade Signalized Intersection in to Grade Separated Intersection IJIRST International Journal for Innovative Research in Science & Technology Volume 2 Issue 05 October 2015 ISSN (online): 2349-6010 Conversation of at Grade Signalized Intersection in to Grade Separated

More information

Experience with Traffic Actuated Signals

Experience with Traffic Actuated Signals Experience with Traffic Actuated Signals E ric G. T h orson District Traffic Signal Engineer Illinois Division of Highways Elgin, Illinois The State of Illinois installed its first set of traffic actuated

More information

Design and Evaluation of Adaptive Traffic Control System for Heterogeneous flow conditions. SiMTraM & CosCiCost2G

Design and Evaluation of Adaptive Traffic Control System for Heterogeneous flow conditions. SiMTraM & CosCiCost2G Design and Evaluation of Adaptive Traffic Control System for Heterogeneous flow conditions SiMTraM & CosCiCost2G Tom Mathew IIT Bombay Outline 1. Heterogeneous traffic 2. Traffic Simulation 3. Traffic

More information

MUTCD Part 6G: Type of Temporary Traffic Control Zone Activities

MUTCD Part 6G: Type of Temporary Traffic Control Zone Activities MUTCD Part 6G: Type of Temporary Traffic Control Zone Activities 6G.01 Typical Applications Each temporary traffic control (TTC) zone is different. Many variables, such as location of work, highway type,

More information

Design and Evaluation of Adaptive Traffic Control System for Heterogeneous flow conditions

Design and Evaluation of Adaptive Traffic Control System for Heterogeneous flow conditions Design and Evaluation of Adaptive Traffic Control System for Heterogeneous flow conditions Tom Mathew IIT Bombay Outline 1. Heterogeneous traffic 2. Traffic Simulation 3. Traffic Signal control 4. Adaptive

More information

Simulation Analysis of Intersection Treatments for Cycle Tracks

Simulation Analysis of Intersection Treatments for Cycle Tracks Abstract Simulation Analysis of Intersection Treatments for Cycle Tracks The increased use of cycle tracks also known as protected bike lanes has led to investigations of how to accommodate them at intersections.

More information

Traffic Circulation Study for Neighborhood Southwest of Mockingbird Lane and Airline Road, Highland Park, Texas

Traffic Circulation Study for Neighborhood Southwest of Mockingbird Lane and Airline Road, Highland Park, Texas ARIZONA TEXAS NEW MEXICO OKLAHOMA February 13, 2015 Mr. Meran Dadgostar P.E., R.S. Town of Highland Park 4700 Drexel Dr. Highland Park, Texas 75205 Re: Traffic Circulation Study for Neighborhood Southwest

More information

Methodology for analysing capacity and level of service for signalized intersections (HCM 2000)

Methodology for analysing capacity and level of service for signalized intersections (HCM 2000) Methodology for analysing capacity and level of service for signalized intersections (HCM 2000) Ivana Nedevska 1, Slobodan Ognjenović 2,* and Elena Gusakova 3 1 GEING Krebs und Kiefer-Skopje, Macedonia

More information

EVALUATION OF GROUP-BASED SIGNAL CONTROL THROUGH FIELD OPERATIONAL TESTS *

EVALUATION OF GROUP-BASED SIGNAL CONTROL THROUGH FIELD OPERATIONAL TESTS * EVALUATION OF GROUP-BASED SIGNAL CONTROL THROUGH FIELD OPERATIONAL TESTS * By Nan KANG **, Wael ALHAJYASEEN ***, Hideki NAKAMURA ****, Miho ASANO ***** and Keshuang TANG ****** 1. Introduction At signalized

More information

Cycle Track Design Best Practices Cycle Track Sections

Cycle Track Design Best Practices Cycle Track Sections Design Best Practices Sections It is along street segments where the separation and protection methods of cycle tracks offer more comfort than conventional bicycle lanes, and are more attractive to a wide

More information

Shawn Leight, P.E., PTOE, PTP CBB Transportation Engineers + Planners ITE International President Washington University

Shawn Leight, P.E., PTOE, PTP CBB Transportation Engineers + Planners ITE International President Washington University JCE 3460 Traffic! Shawn Leight, P.E., PTOE, PTP CBB Transportation Engineers + Planners ITE International President Washington University sleight@cbbtraffic.com Primary Traffic References AASHTO Green

More information

3 TRAFFIC CONTROL SIGNAL TIMING AND SYNCHRONIZATION

3 TRAFFIC CONTROL SIGNAL TIMING AND SYNCHRONIZATION Report No. 8 of the Transportation Services Committee Regional Council Meeting of October 20, 2011 3 TRAFFIC CONTROL SIGNAL TIMING AND SYNCHRONIZATION The Transportation Services Committee recommends:

More information

SCOPE Application, Design, Operations,

SCOPE Application, Design, Operations, SCOPE Application, Design, Operations, Maintenance, etc.: Typical Traffic Control Signals Pedestrian Hybrid Beacons Emergency Vehicle One-Lane/Two-Way Facilities, Freeway Entrance Ramps, and Movable Bridges

More information

University of California, Davis Transit Signal Priority Implementation Study

University of California, Davis Transit Signal Priority Implementation Study Proposal University of California, Davis Transit Signal Priority Implementation Study Prepared for: Prepared by: University of California, Davis 2990 Lava Ridge Court Suite 200 Roseville, CA 95661 November

More information

Traffic Control Guidelines for Urban Arterial Work Zones

Traffic Control Guidelines for Urban Arterial Work Zones TRANSPORTATION RESEARCH RECORD 149 23 Traffic Control Guidelines for Urban Arterial Work Zones H. GENE HAWKINS, JR., AND KENT C. KACIR Urban arterial work zones have several unique characteristics that

More information

SIDRA INTERSECTION 6.1 UPDATE HISTORY

SIDRA INTERSECTION 6.1 UPDATE HISTORY Akcelik & Associates Pty Ltd PO Box 1075G, Greythorn, Vic 3104 AUSTRALIA ABN 79 088 889 687 For all technical support, sales support and general enquiries: support.sidrasolutions.com SIDRA INTERSECTION

More information

IMPACT OF TRANSIT SIGNAL PRIORITY (TSP) ON BUS TRAVEL TIMES, LATE BUS RECOVERY, DELAY AND LEVEL OF SERVICE (LOS)

IMPACT OF TRANSIT SIGNAL PRIORITY (TSP) ON BUS TRAVEL TIMES, LATE BUS RECOVERY, DELAY AND LEVEL OF SERVICE (LOS) IMPACT OF TRANSIT SIGNAL PRIORITY (TSP) ON BUS TRAVEL TIMES, LATE BUS RECOVERY, DELAY AND LEVEL OF SERVICE (LOS) Presenter: Sotonye Ikiriko 1, Deo Chimba 1 College of Engineering, Tennessee State University,

More information

TRAFFIC ENGINEERING SAB3843. CHE ROS BIN ISMAIL and OTHMAN BIN CHE PUAN

TRAFFIC ENGINEERING SAB3843. CHE ROS BIN ISMAIL and OTHMAN BIN CHE PUAN TRAFFIC ENGINEERING SAB3843 TRAFFIC SIGNAL CONTROL SYSTEM CHE ROS BIN ISMAIL and OTHMAN BIN CHE PUAN TRAFFIC SIGNAL CONTROL SYSTEM Traffic signal-all mechanical or electrical controlled devices used to

More information

An Analysis of Reducing Pedestrian-Walking-Speed Impacts on Intersection Traffic MOEs

An Analysis of Reducing Pedestrian-Walking-Speed Impacts on Intersection Traffic MOEs An Analysis of Reducing Pedestrian-Walking-Speed Impacts on Intersection Traffic MOEs A Thesis Proposal By XIAOHAN LI Submitted to the Office of Graduate Studies of Texas A&M University In partial fulfillment

More information

HCM Sixth Edition. Plus More. Rahim (Ray) Benekohal University of Illinois at Urban Champaign,

HCM Sixth Edition. Plus More. Rahim (Ray) Benekohal University of Illinois at Urban Champaign, HCM Sixth Edition What s New in the HCM Sixth Edition Plus More Rahim (Ray) Benekohal University of Illinois at Urban Champaign, 65 th Traffic Engineering and Safety Conference October 19 20, 2016 Institute

More information

Mathematics of Planet Earth Managing Traffic Flow On Urban Road Networks

Mathematics of Planet Earth Managing Traffic Flow On Urban Road Networks Mathematics of Planet Earth Managing Traffic Flow On Urban Road Networks Adrian George Manager Network Improvements Anthony Fitts Manager Signal Design Melbourne s transport demands are growing 5m people

More information

2009 PE Review Course Traffic! Part 1: HCM. Shawn Leight, P.E., PTOE, PTP Crawford Bunte Brammeier Washington University

2009 PE Review Course Traffic! Part 1: HCM. Shawn Leight, P.E., PTOE, PTP Crawford Bunte Brammeier Washington University 2009 PE Review Course Traffic! Part 1: HCM Shawn Leight, P.E., PTOE, PTP Crawford Bunte Brammeier Washington University sleight@cbbtraffic.com Topic Areas Highway Capacity Manual Highway Capacity Analysis

More information

Improving the Bus Network through Traffic Signalling. Henry Axon Transport for London

Improving the Bus Network through Traffic Signalling. Henry Axon Transport for London Improving the Bus Network through Traffic Signalling Henry Axon Transport for London Improving the Bus Network through Traffic Signalling Introduction Transport for London (TfL) operates the most frequent

More information

ISTTT20 Tutorials. Traffic Management and Control. A. Traffic Signal Control Introduction

ISTTT20 Tutorials. Traffic Management and Control. A. Traffic Signal Control Introduction ISTTT20 Tutorials Traffic Management and Control A. Traffic Signal Control Introduction Prof. Nathan H. Gartner University of Massachusetts Lowell, MA, USA NHGartner,UML, July 2013 Module Objectives: Describe

More information

ORANGE COUNTY PUBLIC WORKS TRAFFIC INVESTIGATIONS

ORANGE COUNTY PUBLIC WORKS TRAFFIC INVESTIGATIONS ORANGE COUNTY PUBLIC WORKS TRAFFIC INVESTIGATIONS STAFF REPORT OF: January 6, 2019 SUPERVISORIAL DISTRICT: 5 SUBJECT: LOCATION: INVESTIGATOR: O Neill Drive at Roanoke Drive; Ladera Ranch; TB 922-E6 Clever

More information

Demonstration of Possibilities to Introduce Semi-actuated Traffic Control System at Dhanmondi Satmasjid Road by Using CORSIM Simulation Software

Demonstration of Possibilities to Introduce Semi-actuated Traffic Control System at Dhanmondi Satmasjid Road by Using CORSIM Simulation Software Paper ID: TE-043 746 International Conference on Recent Innovation in Civil Engineering for Sustainable Development () Department of Civil Engineering DUET - Gazipur, Bangladesh Demonstration of Possibilities

More information

OTTAWA TRAIN YARDS PHASE 3 DEVELOPMENT CITY OF OTTAWA TRANSPORTATION IMPACT STUDY. Prepared for:

OTTAWA TRAIN YARDS PHASE 3 DEVELOPMENT CITY OF OTTAWA TRANSPORTATION IMPACT STUDY. Prepared for: OTTAWA TRAIN YARDS PHASE 3 DEVELOPMENT CITY OF OTTAWA TRANSPORTATION IMPACT STUDY Prepared for: The Ottawa Train Yards Inc. 223 Colonnade Road South, Suite 212 Nepean, Ontario K2E 7K3 January 17, 2012

More information

Probabilistic Models for Pedestrian Capacity and Delay at Roundabouts

Probabilistic Models for Pedestrian Capacity and Delay at Roundabouts Probabilistic Models for Pedestrian Capacity and Delay at Roundabouts HEUNGUN OH Doctoral Candidate VIRGINIA P. SISIOPIKU Assistant Professor Michigan State University Civil and Environmental Engineering

More information

Modeling vehicle delays at signalized junctions: Artificial neural networks approach

Modeling vehicle delays at signalized junctions: Artificial neural networks approach Journal of Scientific & Industrial Research Vol. 65, July 2006, pp. 558-564 Modeling vehicle delays at signalized junctions: Artificial neural networks approach Y Sazi Murat* and Özgür Baskan Civil Engineering

More information

THE INSTALLATION OF PRE-SIGNALS AT RAILROAD GRADE CROSSINGS

THE INSTALLATION OF PRE-SIGNALS AT RAILROAD GRADE CROSSINGS THE INSTALLATION OF PRE-SIGNALS AT RAILROAD GRADE CROSSINGS Lisa D. Sherman, Kenneth J. Petraglia, P.E. INTRODUCTION Each signalized intersection adjacent to a highway-rail grade crossing presents the

More information

Roundabout Model Calibration Issues and a Case Study

Roundabout Model Calibration Issues and a Case Study Roundabout Model Calibration Issues and a Case Study TRB National Roundabout Conference Vail, Colorado, USA, 22-25 May 2005 Pictures modified to show driving on the right-hand side of the road Rahmi Akçelik

More information

ALLEY 24 TRAFFIC STUDY

ALLEY 24 TRAFFIC STUDY ALLEY 24 TRAFFIC STUDY in City of Frostburg, Maryland January 2013 3566 Teays Valley Road Hurricane, WV Office: (304) 397-5508 www.denniscorporation.com Alley 24 Traffic Study January 2013 Frostburg, Maryland

More information

1982 by Prentice-Hall, Inc., Englewood Cliffs, N.J Library of Congress Catalog Card Number: ISBN:

1982 by Prentice-Hall, Inc., Englewood Cliffs, N.J Library of Congress Catalog Card Number: ISBN: 1982 by Prentice-Hall, Inc., Englewood Cliffs, N.J. 07632 All rights reserved. No part of this book may be reproduced in any form or by any means without permission in writing from the publisher. Library

More information

TABLE OF CONTENTS. 1 Overview Introduction Timing Goals Review of Signal Timing

TABLE OF CONTENTS. 1 Overview Introduction Timing Goals Review of Signal Timing June 2015 TABLE OF CONTENTS 1 Overview... 1 1 1.1 Introduction... 1 1 1.2 Timing Goals... 1 1 Review of Signal Timing... 1 1 2 Data Collection and Information Needed... 2 1 2.1 Data Collection... 2 1

More information

Stanley Street/Shotover Street, Queenstown. Traffic Modelling Report

Stanley Street/Shotover Street, Queenstown. Traffic Modelling Report Stanley Street/Shotover Street, Queenstown Traffic Modelling Report Stanley Street/Shotover Street, Queenstown Traffic Modelling Report Prepared By Chris Morahan Transportation Engineer/Traffic Modeller

More information

TECHNICAL MEMORANDUM VDOT Central Region On Call Task Order

TECHNICAL MEMORANDUM VDOT Central Region On Call Task Order Kittelson & Associates, Inc. T R A N S P O R T A T I O N E N G I N E E R I N G / P L A N N I N G 1850 Centennial Park Drive, Suite 130, 20191 P 703-885-8970 F 703-885-8971 TECHNICAL MEMORANDUM VDOT Central

More information

INTERCHANGE RAMP TERMINALS

INTERCHANGE RAMP TERMINALS CHAPTER 26 INTERCHANGE RAMP TERMINALS CONTENTS I. INTRODUCTION...26-1 Types of Interchanges...26-1 Diamond Interchanges...26-1 Partial Cloverleaf Interchanges...26-1 Influence of Interchange Type on Turning

More information

Tight Diamond Interchange versus Single Point Urban Interchange: Pedestrians Prospective

Tight Diamond Interchange versus Single Point Urban Interchange: Pedestrians Prospective Tight Diamond Interchange versus Single Point Urban Interchange: Pedestrians Prospective Ahmed Amer, M.S. Ph.D. Candidate Graduate Research/Teaching Assistant Department of Civil & Environmental Engineering

More information

for Railroad Preemption at Signalized Intersections

for Railroad Preemption at Signalized Intersections IDesign Guidelines for Railroad Preemption at Signalized Intersections BY PETERS MARSHALL AND WILLIAM D BERG Preemption of traffic signal controllers near railroad grade crossings equipped with active

More information

Traffic Signal Optimization Project (Electronics Parkway/Henry Clay Boulevard) (Future Coordinated Corridor)

Traffic Signal Optimization Project (Electronics Parkway/Henry Clay Boulevard) (Future Coordinated Corridor) Onondaga County Department of Transportation Traffic Signal Optimization Project (Electronics Parkway/Henry Clay Boulevard) (Future Coordinated Corridor) Prepared for: Syracuse Metropolitan Transportation

More information

TRAFFIC SIGNALS AND SIGNALISED ROUNDABOUTS

TRAFFIC SIGNALS AND SIGNALISED ROUNDABOUTS TRAFFIC SIGNALS AND SIGNALISED ROUNDABOUTS Ian Routledge - OBJECTIVE OF PRESENTATION I have 32 years experience of traffic signal and systems design, implementation, operation and maintenance There are

More information

INDUSTRIAL BUILDING 3009 HAWTHORNE ROAD CITY OF OTTAWA TRANSPORTATION OVERVIEW REVISED. Prepared for: Canada Inc.

INDUSTRIAL BUILDING 3009 HAWTHORNE ROAD CITY OF OTTAWA TRANSPORTATION OVERVIEW REVISED. Prepared for: Canada Inc. INDUSTRIAL BUILDING 3009 HAWTHORNE ROAD CITY OF OTTAWA TRANSPORTATION OVERVIEW REVISED Prepared for: 7849648 Canada Inc. Octiober 1, 2015 114-598 Overview_2.doc D. J. Halpenny & Associates Ltd. Consulting

More information

SUPERSTREETS IN TEXAS. ITS Texas Annual Meeting San Marcos, Texas Session 6A - Operations November 11, 2011

SUPERSTREETS IN TEXAS. ITS Texas Annual Meeting San Marcos, Texas Session 6A - Operations November 11, 2011 SUPERSTREETS IN TEXAS ITS Texas Annual Meeting San Marcos, Texas Session 6A - Operations November 11, 2011 1 Superstreet Corridor Location 2 3 US Highway 281 2007 Looking south above Evans Road, pm peak

More information

The SCOOT Urban Traffic Control System

The SCOOT Urban Traffic Control System The SCOOT Urban Traffic Control System 1 Contents Introduction of SCOOT SCOOT System Architecture The SCOOT Traffic Model The SCOOT Signal Optimiser Several New Functions Discussion: Deficiencies of SCOOT

More information

Yellow and Red Intervals It s Just a Matter of Time. 58 th Annual Alabama Transportation Conference February 9, 2015

Yellow and Red Intervals It s Just a Matter of Time. 58 th Annual Alabama Transportation Conference February 9, 2015 Yellow and Red Intervals It s Just a Matter of Time 58 th Annual Alabama Transportation Conference February 9, 2015 Presentation Content Background on Timing Methodology Findings and Recommendations from

More information

OFFICE/RETAIL DEVELOPMENT 1625 BANK STREET OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for: Canada Inc.

OFFICE/RETAIL DEVELOPMENT 1625 BANK STREET OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for: Canada Inc. OFFICE/RETAIL DEVELOPMENT 1625 BANK STREET OTTAWA, ONTARIO TRANSPORTATION BRIEF Prepared for: 9402209 Canada Inc. December 15, 2015 115-625 Report_2.doc D. J. Halpenny & Associates Ltd. Consulting Transportation

More information

Signal Warrant Studies

Signal Warrant Studies Signal Warrant Studies Seven Locations Piqua, Ohio December 12, 217 Signal Warrant Studies Seven Locations Piqua, Ohio TABLE OF CONTENTS Executive Summary... 3 Introduction... 5 Study Location... 5 Data

More information

Broad Street Bicycle Boulevard Design Guidelines

Broad Street Bicycle Boulevard Design Guidelines Broad Street Bicycle Boulevard Design Guidelines Building from the strategies introduced in the 2013 Bicycle Transportation Plan and community input received thus far, City Transportation Staff have identified

More information

TECHNIQUES TO IMPROVE SAFETY AND OPERATIONS AT SIGNALIZED DIAMOND INTERCHANGES IN NEVADA

TECHNIQUES TO IMPROVE SAFETY AND OPERATIONS AT SIGNALIZED DIAMOND INTERCHANGES IN NEVADA TECHNIQUES TO IMPROVE SAFETY AND OPERATIONS AT SIGNALIZED DIAMOND INTERCHANGES IN NEVADA FINAL REPORT Prepared for Nevada Department of Transportation Authors Zong Z. Tian, PhD, PE Ahmed Abdel Dayem Department

More information

Operation, Analysis, and Design of Signalized Intersections

Operation, Analysis, and Design of Signalized Intersections Operation, Analysis, and Design of Signalized Intersections A Module for the Introductory Course in Transportation Engineering Michael Kyte Maria Tribelhorn University of Idaho 2014.01.04 ii 2014.01.02

More information

Effects of Traffic Signal Retiming on Safety. Peter J. Yauch, P.E., PTOE Program Manager, TSM&O Albeck Gerken, Inc.

Effects of Traffic Signal Retiming on Safety. Peter J. Yauch, P.E., PTOE Program Manager, TSM&O Albeck Gerken, Inc. Effects of Traffic Signal Retiming on Safety Peter J. Yauch, P.E., PTOE Program Manager, TSM&O Albeck Gerken, Inc. Introduction It has long been recognized that traffic signal timing can have an impact

More information

SCHOOL CROSSING PROTECTION CRITERIA

SCHOOL CROSSING PROTECTION CRITERIA CITY OF MADISON TRAFFIC ENGINEERING SCHOOL CROSSING PROTECTION CRITERIA AUGUST 1990 Adopted as Policy on August 31, 1976, by Common Council by Amended Resolution #29,540 Amended on September 14, 1976,

More information

TRAFFIC SIGNAL WARRANT STUDY

TRAFFIC SIGNAL WARRANT STUDY TRAFFIC SIGNAL WARRANT STUDY 5 th STREET & ENCHANTED PINES DRIVE JANUARY 2013 TRAFFIC OPERATIONS ENGINEERING SERVICES/PUBLIC WORKS DEPARTMENT TABLE OF CONTENTS INTERSECTION LOCATION MAP ii INTRODUCTION

More information

INTERSECTION DESIGN TREATMENTS

INTERSECTION DESIGN TREATMENTS Designing for Bicyclist Safety INTERSECTION DESIGN TREATMENTS LEARNING OUTCOMES Understand intersection design options and features Select appropriate design feature for a bikeway in a given context C1

More information

HIGHWAY CAPACITY MANUAL

HIGHWAY CAPACITY MANUAL HISTORY OF THE HIGHWAY CAPACITY MANUAL TexITE - Houston Chapter November 10, 2010 Michael Y. Ereti City of Houston Department of Public Works & Engineering THE NEW GUY (Michael Ereti) Consultant (10 years)

More information

Washington St. Corridor Study

Washington St. Corridor Study FIGURE 7.17 Bridge Alternatives - Cross Sections 86 Discarded Alternative: Short-Term Bridge Repair Short-term repairs and west bridge span replacement were considered during analysis. Short-term repairs

More information

An Analysis of the Travel Conditions on the U. S. 52 Bypass. Bypass in Lafayette, Indiana.

An Analysis of the Travel Conditions on the U. S. 52 Bypass. Bypass in Lafayette, Indiana. An Analysis of the Travel Conditions on the U. S. 52 Bypass in Lafayette, Indiana T. B. T readway Research Assistant J. C. O ppenlander Research Engineer Joint Highway Research Project Purdue University

More information

City and County of San Francisco APS Safety & Access Tool. Cover Sheet. Total score = crosswalk worksheet score + intersection worksheet score

City and County of San Francisco APS Safety & Access Tool. Cover Sheet. Total score = crosswalk worksheet score + intersection worksheet score City and County of San Francisco APS Safety & Access Tool Location of Intersection or Crosswalk: Cover Sheet Evaluator Name: Date Evaluation Completed: Total score = crosswalk worksheet score + intersection

More information

Gap Acceptance Cycles for Modelling Roundabout Capacity and Performance

Gap Acceptance Cycles for Modelling Roundabout Capacity and Performance 15th Scientific and Technical Conference Transport Systems Theory and Practice Department of Transport Systems and Traffic Engineering, Faculty of Transport, Silesian University of Technology, Katowice,

More information

51. Uncontrolled Intersection

51. Uncontrolled Intersection Chapter 51 Uncontrolled Intersection 51.1 Introduction Uncontrolled intersections are the traffic junctions where there is no explicit traffic control measures are adopted. The important aspects that will

More information

FHWA Experimentation #4-298(E) Modified HAWK Signal and Bike Signal - Draft Report

FHWA Experimentation #4-298(E) Modified HAWK Signal and Bike Signal - Draft Report FHWA Experimentation #4-298(E) Modified HAWK Signal and Bike Signal - Draft Report August 2, 2010 Table of Contents Preface... 1 Problem Statement... 1 Study Objectives... 2 Data Collection Methods...

More information

Bus Speed Control System

Bus Speed Control System Oct. 16 th, 2015 Research Update Bus Speed Control System Hyeonmi Kim INTRODUCTION BUS Bunching stops stops stops stops 2 2 2 2 1 1 1 1 8:00 8:15 8:30 time 8:00 8:15 8:30 time 8:00 8:15 8:30 time 8:00

More information

METHODOLOGY. Signalized Intersection Average Control Delay (sec/veh)

METHODOLOGY. Signalized Intersection Average Control Delay (sec/veh) Chapter 5 Traffic Analysis 5.1 SUMMARY US /West 6 th Street assumes a unique role in the Lawrence Douglas County transportation system. This principal arterial street currently conveys commuter traffic

More information

Transit Signal Priority Demonstration Project Fargo-Moorhead Metro Area Transit

Transit Signal Priority Demonstration Project Fargo-Moorhead Metro Area Transit 430 IACC Building Fargo, ND 58105 Tel 701-231-8058 Fax 701-231-1945 www.ugpti.org www.atacenter.org Transit Signal Priority Demonstration Project Fargo-Moorhead Metro Area Transit Final Report June 2008

More information

Uncontrolled Intersection

Uncontrolled Intersection Uncontrolled Intersection Lecture Notes in Transportation Systems Engineering Prof. Tom V. Mathew 1 Introduction Uncontrolled intersections are the traffic junctions where there is no explicit traffic

More information

Estimating Base Saturation Flow Rate for Selected Signalized Intersections in Khartoum State, Sudan

Estimating Base Saturation Flow Rate for Selected Signalized Intersections in Khartoum State, Sudan International Journal of Scientific and Research Publications, Volume 7, Issue 12, December 2017 119 Estimating Base Saturation Flow Rate for Selected Signalized Intersections in Khartoum State, Sudan

More information

Operational Comparison of Transit Signal Priority Strategies

Operational Comparison of Transit Signal Priority Strategies Operational Comparison of Transit Signal Priority Strategies Revision Submitted on: November, 0 Author: Adriana Rodriguez, E.I Assistant Engineer Parsons Brinckerhoff 0 South Orange Avenue, Suite 00 Orlando,

More information

Transit Signal Priority: Help or Hype? Peter G. Furth Northeastern University

Transit Signal Priority: Help or Hype? Peter G. Furth Northeastern University Transit Signal Priority: Help or Hype? Peter G. Furth Northeastern University Transit Signal Priority Help or Hype? Zurich: nearly zero traffic delay and impeccable punctuality for trams Portland, San

More information

Impact of Signalized Intersection on Vehicle Queue Length At Uthm Main Entrance Mohd Zulhilmi Abdul Halim 1,b, Joewono Prasetijo 2,b

Impact of Signalized Intersection on Vehicle Queue Length At Uthm Main Entrance Mohd Zulhilmi Abdul Halim 1,b, Joewono Prasetijo 2,b Impact of Signalized Intersection on Vehicle Queue Length At Uthm Main Entrance Mohd Zulhilmi Abdul Halim 1,b, Joewono Prasetijo 2,b 1,2 Smart Driving Research Center, Faculty of Civil and Environmental

More information

COMMERCIAL DEVELOPMENT 2015 ROBERTSON ROAD OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for:

COMMERCIAL DEVELOPMENT 2015 ROBERTSON ROAD OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for: COMMERCIAL DEVELOPMENT 2015 ROBERTSON ROAD OTTAWA, ONTARIO TRANSPORTATION BRIEF Prepared for: First Bay Properties Inc. 311 Richmond Road, Suite 203 Ottawa, ON K1Z 6X3 August 8, 2017 117-663 Brief_1.doc

More information

Lincoln Avenue Road Diet Trial

Lincoln Avenue Road Diet Trial Lincoln Avenue Road Diet Trial Data Collection Report June 1, 2015 Department of Transportation Table of Contents I. Introduction...... 3 II. Data Collection Methodology & Results...... 5 A. Traffic Volume

More information

Making Signals Work for Bicyclists and Pedestrians

Making Signals Work for Bicyclists and Pedestrians Making Signals Work for Bicyclists and Pedestrians Peter Koonce, PE Portland, OR October 18, 2017 PBIC Webinar pedbikeinfo.org @pedbikeinfo Housekeeping Problems with audio? Dial into the phone line instead

More information

Analysis of Unsignalized Intersection

Analysis of Unsignalized Intersection International Journal of Constructive Research in Civil Engineering (IJCRCE) Volume 2, Issue 1, 2016, PP 30-36 ISSN 2454-8693 (Online) www.arcjournals.org Analysis of Unsignalized Intersection B.Ramkumar

More information

Analysis of Signalized Intersections

Analysis of Signalized Intersections Analysis of Signalized Intersections What is Intersection analysis Inverse application of the signal timing design In signal timing design, green times are estimated to provide necessary capacity In intersection

More information

TRAFFIC IMPACT STUDY CRITERIA

TRAFFIC IMPACT STUDY CRITERIA Chapter 6 - TRAFFIC IMPACT STUDY CRITERIA 6.1 GENERAL PROVISIONS 6.1.1. Purpose: The purpose of this document is to outline a standard format for preparing a traffic impact study in the City of Steamboat

More information

Highway Capacity. 1. A traffic stream is carrying 4500 veh/hr in three lanes in one direction. What is the average headway per lane?

Highway Capacity. 1. A traffic stream is carrying 4500 veh/hr in three lanes in one direction. What is the average headway per lane? Mini-Exercise June 2003 Highway Capacity 1. A traffic stream is carrying 4500 veh/hr in three lanes in one direction. What is the average headway per lane? 2. With the 4500 veh/hr in three lanes; a. What

More information