1 TECHNICAL MEMORANDUM Albany - Washington Avenue Traffic Calming Evaluation Matrix of Conceptual Alternatives Date: May 17, 2017 Project #: To: Aleida Andrino-Chavez From: Laurence Lewis, Sara Muse, Evan Reed, and Lee Rodegerdts This technical memorandum provides a summary of a range of alternatives proposed for the Washington Avenue corridor between Pierce Street and Cerrito Street in Albany, California. The evaluation begins with a summary of the guiding objectives for the evaluation, followed by summary evaluations at the segment and intersection levels. OBJECTIVES Four primary objectives have been identified for this corridor for use in this evaluation: Provide a pedestrian pathway along the corridor Minimize loss of on-street parking for residents Reduce speeding along the corridor Reduce the potential for cut-through traffic along the corridor A fifth objective, other considerations, has been added to capture considerations not captured by the four primary objectives. FILENAME: H:\PROJFILE\ ALBANY (CA) WASHINGTON AVE TRAFFIC CALM\RESPONSE TO DEC 2016 CONCEPTS\EVALUATION MATRIX OF ALTERNATIVES DOCX
2 Albany - Washington Avenue Traffic Calming Project #: May 15, 2017 Page 2 SEGMENT CONCEPTS Concept Objective Parking Restrictions along Midblock Raised Convert Segment to One Way Provide Selected Parking Cut-Outs (Neighborhood Concept presented at Segment (Red Curb) Crosswalk December 2016 Community Meeting)* Provide pedestrian pathway Restores use of existing sidewalk by removing parking on sidewalk No impact on pedestrian path away from midblock crossing Restores use of existing sidewalk by removing one travel lane and shifting parking from sidewalk back to street Restores use of existing sidewalk or provides minimum-width sidewalk adjacent to new parking cut-outs Minimize loss of parking Reduce speeding Reduce potential cut-through traffic Removes substantial amount of parking Parking impact limited to only the vicinity of crosswalk for visibility of Parking is maintained Provides up to 16 stalls along the length of the corridor pedestrians Speeding may increase due to lack of friction on the side of Raised crosswalk reduces speeds in the vicinity of the Speeding eliminated in the direction of travel that is prohibited the street with parking restrictions crosswalk; little impact away from crosswalk Speeding may increase in the direction of travel due to absence of conflicting flow No effect likely No effect likely Cut-through traffic eliminated in direction of travel that is prohibited Retention of parking and minimum clear width likely to provide sufficient friction to minimize excessive speeding No effect likely
3 Albany - Washington Avenue Traffic Calming Project #: May 15, 2017 Page 3 Objective, cont. Other considerations (includes cost and schedule) Parking Restrictions along Segment (Red Curb) Can be implemented at very low cost Shortest implementation timeframe Midblock Raised Crosswalk Can be implemented at low to moderate cost Short implementation timeframe Convert Segment to One Way *A fatal flaw evaluation of each proposed parking stall is included as an appendix. Can be implemented at low to moderate cost Moderate implementation timeframe Significant out-of-direction travel induced for residents (likely environmental impact due to increase in vehicle miles traveled [VMT]) Reduced lane widths would likely impact emergency vehicle response time Provide Selected Parking Cut-Outs (Neighborhood Concept presented at December 2016 Community Meeting)* Can be implemented at moderate to high cost Longest implementation timeframe Most parking stalls appear to have moderate to significant challenges for implementation (0 with high feasibility, 10 with medium feasibility, 10 with low feasibility). Challenges: o Retaining walls likely needed for several proposed parking stalls due to side slopes, which adds substantially to costs and impacts to landscaping. Order of magnitude costs for a 2 ½ ft. tall retaining wall are $70 to $200 per linear foot. o Some parking stalls may need to be shifted to avoid utility poles o Some proposed stalls are too short relative to existing driveway locations o One proposed stall is located within an intersection
4 Albany - Washington Avenue Traffic Calming Project #: May 15, 2017 Page 4 INTERSECTION CONCEPTS Concept Objective All-way stop control at Parking Restrictions Bulb-outs at Mini-Roundabouts Raised Crosswalk at Entrance Barriers (without Gateview Avenue and at Intersections Intersections Intersections segment restrictions to one- Pierce Street (Red Curb) way travel) Provide pedestrian pathway Minimize loss of parking Reduce speeding Reduce potential cutthrough traffic No effect Required by California law to provide visibility of pedestrians at intersections No effect Loss of 20 feet of parking upstream, 7 to 10 feet downstream Possible localized reduction in speed but minimal over segment Low probability of conflict increases potential for running stop signs Potential reduction in cutthrough traffic Higher visibility of pedestrians at intersection crossing locations, less exposure to vehicular traffic Parking restrictions in the vicinity of the bulbout No effect likely due to localized impact Narrow width of roadway between bulb-outs is likely to reduce through speeds and especially turning speeds in the vicinity of the bulbout Crosswalks located further away from intersection Larger parking impacts at intersection due to splitter islands on each approach Minimal speed reduction effect is likely due to inability to provide proper design within site constraints Provides more visible crossing location No additional parking impacts beyond those required by California law (red curbs) Reduces through and turning speeds at intersection Wider sidewalks possible in the vicinity of the barrier Parking will likely be impacted in the vicinity of the barrier Requires cars to alternate to pass through barrier, which likely will induce a significant speed reduction Likely environmental impact due to increase in vehicle miles travel (VMT) No effect likely No effect likely No effect likely No effect likely Cut-through traffic eliminated in direction of travel that is prohibited
5 Albany - Washington Avenue Traffic Calming Project #: May 15, 2017 Page 5 Objective, cont. All-way stop control at Gateview Avenue and Pierce Street Parking Restrictions at Intersections (Red Curb) Bulb-outs at Intersections Mini-Roundabouts Raised Crosswalk at Intersections Entrance Barriers (without segment restrictions to oneway travel) Other considerations (including cost and schedule) Minimal cost Not warranted in California MUTCD due to insufficient vehicular volume Minimal cost Facilitates emergency vehicle access Likely to impact turning movements of emergency vehicles and waste collection vehicles Emergency vehicle and garbage truck turning movements need to be carefully evaluated Largest impact area of intersection alternatives None noted Increased potential for head-on collisions Minimum width needed for emergency vehicles and garbage trucks
6 LEGEND High Feasibility Medium Feasibility Low Feasibility
7 WASHINGTON CERRITO WASHINGTON LEGEND High Feasibility Medium Feasibility Low Feasibility POLK
8 Page i APPENDIX Parking Concept Fatal Flaw Analysis The fatal flaw analysis represents a general evaluation of the parking concept s feasibility. The analysis is intended to address the most critical transportation engineering issues and is based on a review of available base mapping and aerial photos. It does not include a complete review of vertical elements, underground elements, or specific right-of-way boundaries. The following standards and design constraints apply to this evaluation: The community concept has proposed a clear travel width of 14 ft. Note that the California Fire Code requires a clear width of 20 ft. to allow emergency vehicles to pass. The community concept has proposed parking stalls that are 6.5 ft. wide by 15 ft. long. If a 6.5 ft. stall is used, portions of the vehicle such as mirrors may extend into the travel way. Note that the City of Albany uses a width of 7 to 8 ft. for parking stalls. A transition taper is needed between the existing curb and the recessed curb at each end of the parking cutout and is assumed to be at a 45-degree angle. As a result, approximately 12 ft. is needed to provide transition tapers for a parking cutout that is recessed by 6 ft. The community concept has proposed parking stall lengths of 15 ft. Not that the City of Albany uses a minimum length of either 15 ft. (one space) or 18 to 20 ft. (two or more spaces in tandem). For one or two vehicles in a parking cutout, it is our opinion that 15 ft. parking spaces are minimally feasible with 6 ft. transition tapers behind or in front of vehicles. If there are more than two vehicles in a parking cutout, the interior parking spaces should be 20 ft. long to enable ingress and egress between parked vehicles. The following feasibility scoring system has been used: Feasibility Score = High if all of the following are true: Cross Section Width - minimum cross section width exists based on the dimensions provided in the community concept: 6.5 ft. parking stalls, 4 ft. sidewalks, and 14 ft. travel lane, as measured in CAD; Parking Stall Length minimum 15 ft. per stall exists plus transition tapers and a length allowance for interior parking spaces in a series of three or more as noted above; Conflicts no physical conflicts exist (other than observed shrubbery or minor landscaping); and Adverse Conditions - no adverse conditions exist (i.e. sight line impacts, stall located in/near intersection, require retaining walls, etc.). Feasibility Score = Medium if any of the above exist that can be reasonably accommodated or mitigated. Feasibility Score = Low if any of the above exist and cannot be readily mitigated.
9 Page ii Parking Stalls 1, 2, & 3, between Pierce Street and Gateview Avenue Feasibility Score = Medium Cross Section Width: Minimal (See Figure 1) Parking Stall Length: Adequate for two standard stalls, slightly too short for three minimum stalls (48 available after including two 6 transition tapers, which allows stalls of 24 and 24 or 15, 18, and 15 ). Conflicts: Potential utility pole conflict with Stall 1 (possibly avoidable); significant landscaping Adverse Conditions: Will need a retaining wall approximately high due to side slope Figure 1: Supporting CAD snip for stalls 1, 2 & 3
10 Page iii Parking Stall 4, between Pierce Street and Gateview Avenue Feasibility Score = Low Cross Section Width: Minimal (see Figure 2) Parking Stall Length: Not feasible (only 12 ft. available between driveways) Conflicts: Adjacent driveways Adverse Conditions: Very small parking space due to adjacent driveways Figure 2: Supporting CAD snip for stall 4
11 Page iv Parking Stall 5, between Pierce Street and Gateview Avenue Feasibility Score = Medium Cross Section Width: Minimal (See Figure 3) Parking Stall Length: Adequate (leaves 25 ft. for one standard stall after including two 6 transition tapers) Conflicts: Utility pole, could likely be avoided due to length of stall; landscaping Adverse Conditions: Would likely require a retaining wall due to side slopes Figure 3: Supporting CAD snip for stall 5
12 Page v Parking Stalls 6 & 7, between Pierce Street and Gateview Avenue Feasibility Score = Medium Cross Section Width: Minimal (See Figure 4) Parking Stall Length: Adequate (leaves 32 ft. for two minimum stalls after including two 6 transition tapers) Conflicts: Landscaping; sight distance constraint (Stall 7 is approximately 13 from intersection) Adverse Conditions: Significant landscaping; likely requires a retaining wall Figure 4: Supporting CAD snip for stalls 6 & 7
13 Page vi Parking Stalls 8 & 9, between Gateview Avenue and Polk Street Feasibility Score = Medium for 8, Low for 9 Cross Section Width: Meets 14 minimum width and CA Fire Code travel lane standard of 20 Parking Stall Length: Adequate for one minimum stall only (18 available after including two 6 transition tapers (See Figure 5) Conflicts: None Adverse Conditions: Nearing an intersection; likely requires retaining wall. Stall 9 blocks a driveway for 839 Washington and is not feasible. Figure 5: Supporting CAD snip for stalls 8 & 9
14 Page vii Parking Stall 10, at Polk Street Feasibility Score = Low Cross Section Width: Significantly more than 14 minimum, but still does not meet CA Fire Code 20 standard. Parking Stall Length: Adequate (20 for Stall 10 but constrained with crosswalk and intersection) Conflicts: Intersection Adverse Conditions: Located in an intersection. Sight distance constraint. Not Feasible. Figure 6: Supporting CAD snip for stall 10
15 Page viii Parking Stall 11, between Polk Street and Cerrito Street (north side of street) Feasibility Score = Low Cross Section Width: Significantly more than 14 minimum, but still does not meet CA Fire Code 20 standard. Parking Stall Length: Adequate. No sight distance conflicts, as it is 22 from existing crosswalk Conflicts: Utility Pole. Adverse Conditions: Utility pole impact. Parking Stalls 17 & 18, between Polk Street and Cerrito Street (south side of street) Feasibility Score = Medium Cross Section Width: Adequately more than 14 minimum, but still does not meet 20 standard. Parking Stall Length: Adequate (68 available for three standard stalls) Conflicts: Significant landscaping, irrigation, new concrete sidewalk and curb, existing crosswalk. Adverse Conditions: Located adjacent to intersection. Figure 7: Supporting CAD snip for stall 11, 17, & 18
16 Page ix Parking Stalls 12 & 13, between Polk Street and Cerrito Street (north side of street) Feasibility Score = Low Cross Section Width: Signficantly more than 14 minimum, but still does not meet CA Fire Code 20 standard. Parking Stall Length: Adequate for two standard or three minimum stalls (53 available after including two 6 transition tapers) Conflicts: Significant landscaping, steep side slopes Adverse Conditions: Likely to require retaining wall on northwest side Parking Stall 19 & 20, between Polk Street and Cerrito Street (south side of street) Feasibility Score = Low Cross Section Width: Signficantly more than 14 minimum, but still does not meet CA Fire Code 20 standard. Parking Stall Length: Adequate for two minimum stalls (32 available after including two 6 transition tapers) Conflicts: Significant landscaping; relocation of School sign for Stall 20 Adverse Conditions: N/A Figure 8: Supporting CAD snip for stalls 12, 13, 19 & 20
17 Page x Parking Stall 14, between Polk Street and Cerrito Street Feasibility Score = Medium Cross Section Width: Minimal (see Figure 9) Parking Stall Length: Adequate for one minimum stall (17 available after including two 6 transition tapers) Conflicts: Significant landscaping, steep side slopes Adverse Conditions: Retaining walls on northwest side Figure 9: Supporting CAD snip for stall 14
18 Page xi Parking Stall 15, between Polk Street and Cerrito Street Feasibility Score = Low Cross Section Width: Minimal (see Figure 10) Parking Stall Length: Adequate for one minimum stall (17 available after including two 6 transition tapers) Conflicts: Significant landscaping, fence impacts; potential building impacts, manhole Adverse Conditions: Retaining walls on west side, impacts to house/building Figure 10: Supporting CAD snip for stall 15
19 Page xii Parking Stall 16, between Polk Street and Cerrito Street Feasibility Score = Low Cross Section Width: Minimal (see Figure 11) Parking Stall Length: Adequate for one minimum stall (17 available after including two 6 transition tapers) Conflicts: Significant landscaping, fence impacts potential building impacts, existing utility pole Adverse Conditions: Retaining walls on northwest side. Figure 11: Supporting CAD snip for stall 16
20 Page xiii
10.0 CURB EXTENSIONS GUIDELINE
10.0 CURB EXTENSIONS GUIDELINE Road Engineering Design Guidelines Version 1.0 March 2017 City of Toronto, Transportation Services City of Toronto Page 0 Background In early 2014, Transportation Services
More informationAppendix T CCMP TRAIL TRAFFIC & TRANSPORTATION DESIGN STANDARD
Appendix T CCMP 3.3.4 TRAIL TRAFFIC & TRANSPORTATION DESIGN STANDARD 3.3.4 Trail Traffic and Transportation Design Multi-use trails have certain design standards, which vary depending on the agency that
More informationCity of Elizabeth City Neighborhood Traffic Calming Policy and Guidelines
City of Elizabeth City Neighborhood Traffic Calming Policy and Guidelines I. Purpose: The City of Elizabeth City is committed to ensure the overall safety and livability of residential neighborhoods. One
More informationChapter 4 TOOLBOX AND SAMPLE BIKE BOULEVARD LAYOUT
Chapter 4 TOOLBOX AND SAMPLE BIKE BOULEVARD LAYOUT OVERVIEW This chapter describes a cohesive set of strategies to create a bicycle boulevard, namely to make streets safer and more efficient for bicycle
More informationROUNDABOUTS/TRAFFIC CIRCLES
GENERAL 1. Description This standard identifies minimum requirements that shall be met for Roundabouts and Neighborhood Traffic Circles in the design and construction of elements for Arlington County Horizontal
More informationMission-Geneva Transportation Study Community Workshop 2 July 8, 2006
Community Workshop 2 July 8, 2006 Small Group Workbook 1 Basic Improvements on Mission Street Streetscape. Pedestrian-scale lighting; landscaping; community art on utility boxes; more (possibly unique)
More informationDriveway Design Criteria
Design Manual Chapter 5 - Roadway Design 5L - Access Management 5L-4 Driveway Design Criteria A. General For efficient and safe operations, access drives and minor public street intersections can be improved
More informationsection 4 Existing Conditions, Issues, and Options
section 4 Existing Conditions, Issues, and Options 4.0 Existing Conditions, Issues, and Options This section analyzes each segment of the corridor on a street to street basis. Each segment is discussed
More informationChapter 3: Multi-Modal Circulation and Streetscapes
CHAPTER 3: MULTI-MODAL CIRCULATION AND STREETSCAPES Chapter 3: Multi-Modal Circulation and Streetscapes Overview Streetscape improvements have already been completed for Depot Street between Main Avenue
More informationTonight is for you. Learn everything you can. Share all your ideas.
Strathcona Neighbourhood Renewal Draft Concept Design Tonight is for you. Learn everything you can. Share all your ideas. What is Neighbourhood Renewal? Creating a design with you for your neighbourhood.
More informationCITY OF LOS ANGELES INTER-DEPARTMENTAL MEMORANDUM
CITY OF LOS ANGELES INTER-DEPARTMENTAL MEMORANDUM Date: April 1, 219 To: Honorable City Council c/o City Clerk, Room 395, City Hall Attention: Honorable Mike Bonin, Chair, Transportation Committee From:
More informationSouthside Pilot Proposal
To improve bicycle access and mobility to UC Berkeley, Downtown Berkeley, and the Southside area, a pilot project could include a two-way parking-protected cycle track. Turn pockets and island bus stops
More informationAppendix C. TRAFFIC CALMING PROGRAM TOOLBOX
Appendix C. TRAFFIC CALMING PROGRAM TOOLBOX PHASE I...2 Do Not Enter Sign...3 One-Way Sign...4 Turn Prohibition...5 Pavement Markings...6 Speed Monitoring Trailer...7 Neighborhood Speed Watch...8 Police
More informationCaltrans Sloat Boulevard Pedestrian Safety Project Response to Community Questions, Comments & Concerns
Caltrans Sloat Boulevard Pedestrian Safety Project Response to Community Questions, Comments & Concerns Revised: May 10, 2016 The California Department of Transportation (Caltrans) is planning various
More informationALLEY 24 TRAFFIC STUDY
ALLEY 24 TRAFFIC STUDY in City of Frostburg, Maryland January 2013 3566 Teays Valley Road Hurricane, WV Office: (304) 397-5508 www.denniscorporation.com Alley 24 Traffic Study January 2013 Frostburg, Maryland
More informationTHE ALAMEDA CONCEPT DESIGN COMMUNITY MEETING 3. A Plan for The Beautiful Way JANUARY 28, 2010
CONCEPT DESIGN COMMUNITY MEETING 3 JANUARY 28, 2010 AGENDA INTRODUCTION COMMUNITY INPUT ROADWAY STUDIES STREETSCAPE DESIGN STATIONS DISCUSSION SUMMARY AND DISCUSSION NEXT STEPS CLOSE INTRODUCTION SCHEDULE
More informationScarlett Road Bridge & Road Improvements Lambton Park Community School - Gymnasium Tuesday November 28 th, 2017
Scarlett Road Bridge & Road Improvements Lambton Park Community School - Gymnasium Tuesday November 28 th, 2017 PROJECT LOCATION 2 SCARLETT ROAD BRIDGE Constructed in 1912, the bridge carries 4 active
More informationHARRISON STREET/OAKLAND AVENUE COMMUNITY TRANSPORTATION PLAN
HARRISON STREET/OAKLAND AVENUE Community Workshop #4: Draft Plan Review December 3, 2009 D E S I G N, C O M M U N I T Y & E N V I R O N M E N T INTRODUCTIONS Key Project Staff: Alisa Shen, Project Manager,
More informationMulti-Modal Traffic Analysis. Parisi and Associates
Mill Valley to Corte Madera Bicycle and Pedestrian Corridor Study Appendix D: Multi-Modal Traffic Analysis Prepared by Parisi and Associates August 2009 Appendix D - Multi-Modal Traffic Analysis Table
More informationSmall Area Study U.S. Route 220 and VA Route 615 Intersection. Bath County, Virginia
Small Area Study U.S. Route 220 and VA Route 615 Intersection Bath County, Virginia Prepared by the Central Shenandoah Planning District Commission Final Report February 2018 Table of Contents 1. INTRODUCTION...
More informationMEMORANDUM. Date: 9/13/2016. Citywide Crosswalk Policy
MEMORANDUM Date: 9/13/2016 Re: Citywide Crosswalk Policy Foreword Through the s Circulation Element and Complete Streets Policy, it is the City s goal to promote walking trips and provide safe facilities
More informationSummary: Mercer County Princeton Avenue & Spruce Street Study January 2009
Summary: Several recent studies have assessed potential development and redevelopment opportunities in the Mercer Crossing area of Trenton, Ewing, and Lawrence. This Princeton Avenue and Spruce Street
More informationEUCLID AVENUE PARKING STUDY CITY OF SYRACUSE, ONONDAGA COUNTY, NEW YORK
EUCLID AVENUE PARKING STUDY CITY OF SYRACUSE, ONONDAGA COUNTY, NEW YORK CITY OF SYRACUSE DEPARTMENT OF PUBLIC WORKS 1200 CANAL STREET EXTENSION SYRACUSE, NEW YORK 13210 DRAFT REPORT DATE: November 13,
More informationFOCUS AREA 1 - Alberta Avenue Pocket Park 3 (121 Ave and 92 St)
FOCUS AREA 1 - Alberta Avenue Pocket Park 3 (121 Ave and 92 St) New benches Plant evergreen trees Widen existing sidewalk from 1.5m to 1.8m Marked crosswalk 1.8m wide sidewalk Add pedestrian oriented lights
More informationDISTRIBUTION: Electronic Recipients List TRANSMITTAL LETTER NO. (17-01) MINNESOTA DEPARTMENT OF TRANSPORTATION. MANUAL: Road Design English Manual
DISTRIBUTION: Electronic Recipients List MINNESOTA DEPARTMENT OF TRANSPORTATION DEVELOPED BY: Design Standards Unit ISSUED BY: Office of Project Management and Technical Support TRANSMITTAL LETTER NO.
More informationCity of Albert Lea Policy and Procedure Manual 4.10 ALBERT LEA CROSSWALK POLICY
4.10 ALBERT LEA CROSSWALK POLICY PURPOSE: Pedestrian crosswalks are an integral part of our transportation infrastructure. To be effective and promote safety, marked crosswalks must be installed after
More informationChapter 3 BUS IMPROVEMENT CONCEPTS
Chapter 3 BUS IMPROVEMENT CONCEPTS The purpose of this chapter is to describe potential bus improvement strategies and potential impacts or implications associated with BRT implementation within the existing
More informationMilitary Road Safety Improvements
Military Road Safety Improvements 26 th Road North to 31 st Street North SUMMARY OF DATA REVIEW AND PRELIMINARY RECOMMENDATIONS Prepared for: Department of Environmental Services Traffic Engineering and
More informationHidden Oaks Elementary School
Hidden Oaks Elementary School SCHOOL ROUTE PLAN For HIDDEN OAKS ELEMENTARY SCHOOL LOCATION 13 ORANGE COUNTY Prepared for: ORANGE COUNTY SCHOOL ASSESSMENT PROGRAM ORANGE COUNTY PUBLIC WORKS Traffic Engineering
More informationAgenda. Overview PRINCE GEORGE S PLAZA METRO AREA PEDESTRIAN PLAN
PRINCE GEORGE S PLAZA METRO AREA PEDESTRIAN PLAN May 28, 2008 Agenda Welcome and introductions Project overview and issue identification Planning context and strengths Design challenges and initial recommendations
More informationAGENDA REPORT. Issue: Discussion of potential improvements on Barnwell Road at Niblick Drive
AGENDA REPORT To: From: By: Honorable Mayor and City Council Members Warren Hutmacher, City Manager Tom Black, Public Works Director Date: March 23, 2016 Agenda: March 28, 2016 WORK SESSION AGENDA: Barnwell
More informationDr. M.L. King, Jr. Street North Complete Streets Resurfacing Opportunities HOUSING, LAND USE, AND TRANSPORTATION COMMITTEE MARCH 22, 2018
Dr. M.L. King, Jr. Street North Complete Streets Resurfacing Opportunities HOUSING, LAND USE, AND TRANSPORTATION COMMITTEE MARCH 22, 2018 What s Happening The City plans to mill and resurface Dr. M.L.
More informationBroad Street Bicycle Boulevard Design Guidelines
Broad Street Bicycle Boulevard Design Guidelines Building from the strategies introduced in the 2013 Bicycle Transportation Plan and community input received thus far, City Transportation Staff have identified
More informationA. Arlington County Master Transportation Plan Pedestrian Element B. Arlington County Horizontal Standards H-3.1 Driveway Entrances
GENERAL 1. Description This standard identifies minimum requirements that shall be met for all accessible ramps in the design and construction of elements for Arlington County Horizontal Design Standards.
More informationChapter 2: Standards for Access, Non-Motorized, and Transit
Standards for Access, Non-Motorized, and Transit Chapter 2: Standards for Access, Non-Motorized, and Transit The Washtenaw County Access Management Plan was developed based on the analysis of existing
More informationProject Goal and Description. Why Broadway? Broadway SFMTA.COM/BROADWAY. The goal of the Broadway Safety Improvement
PROJECT OVERVIEW Project Goal and Description The goal of the Broadway Safety Improvement d St Van Ness Ave Project is to improve safety and comfort for all who Franklin St Hyde St Octavia St Gough St
More informationCommunity Transportation Plan
Community Transportation Plan Appendix A: Traffic Calming CITY OF DECATUR COMMUNITY TRANSPORTATION PLAN Appendix A: City of Decatur City-wide Residential Traffic Calming Program Process & Procedures The
More informationDesigning for Pedestrian Safety. Alabama Department of Transportation Pre-Construction Conference May 2016
Designing for Pedestrian Safety Alabama Department of Transportation Pre-Construction Conference May 2016 1 Designing for Pedestrians Marking Crosswalks at Signalized intersections High Visibility Markings
More informationWELCOME Public Information Centre
WELCOME Public Information Centre Fernforest Drive Brampton Soccer Centre Community Room #2 Tuesday January 19, 2016 6:30 p.m.to 9:00 p.m. Please sign in Neighbourhood Traffic Calming Guide Background
More informationImproving Cyclist Safety at the Dundas Street West and Sterling Road Intersection
STAFF REPORT ACTION REQUIRED Improving Cyclist Safety at the Dundas Street West and Sterling Road Intersection Date: August 17, 2012 To: From: Wards: Reference Number: Public Works and Infrastructure Committee
More informationPublic Information Centre
WELCOME Public Information Centre Father Tobin Road Lougheed Middle School - Library Wednesday November 7, 2012 7:00 p.m.to 9:00 p.m. Please sign in Neighbourhood Traffic Calming Guide Background The City
More informationPeer Review of Highlands Neighborhood Traffic and Pedestrian Safety Plan
FINAL REPORT March 14, 2017 Prepared for: Ada County Highway District Prepared by: SIX MILE ENGINEERING, PA Executive Summary The (Highlands Safety Plan) developed by the Ada County Highway District (ACHD)
More informationSouthside Road. Prepared for: City of St. John s Police & Traffic Committee. Prepared by: City of St. John s Traffic Division
Southside Road Prepared for: City of St. John s Police & Traffic Committee Prepared by: City of St. John s Traffic Division January 2007 Southside Road - Traffic Report Page 1 of 9 BACKGROUND: th At the
More informationTown of Mooresville, North Carolina Neighborhood Traffic Calming and Control Device Policy
Town of Mooresville, North Carolina Neighborhood Traffic Calming and Control Device Policy Adopted January 6, 2014 Town of Mooresville Development Services Department TOWN OF MOORESVILLE NEIGHBORHOOD TRAFFIC
More informationNeighborhood Pedestrian Safety and Traffic Calming Study
Neighborhood Pedestrian Safety and Traffic Calming Study for the area bounded by Foster Avenue, Bedford Avenue, Farragut Road and Ocean Avenue Flatbush, Brooklyn, New York prepared by Michael King, miking@trafficcalmer.com
More informationComplete Streets. Designing Streets for Everyone. Sarnia
Complete Streets Designing Streets for Everyone Sarnia Complete Streets ~ Sarnia ~ 2018 Introduction Our City is made up of a network of streets that we use to go for a walk, cycle to work, drive to the
More information5 CIRCULATION AND STREET DESIGN
5 CIRCULATION AND STREET DESIGN This chapter describes circulation and streetscape improvements proposed for the Northwest Chico Specific Plan Area. It includes detailed design specifications for existing
More informationWashington St. Corridor Study
FIGURE 7.17 Bridge Alternatives - Cross Sections 86 Discarded Alternative: Short-Term Bridge Repair Short-term repairs and west bridge span replacement were considered during analysis. Short-term repairs
More informationAppendix A: Crosswalk Policy
Appendix A: Crosswalk Policy Appendix A: Crosswalk Policy Introduction This citywide Crosswalk Policy is aimed at improving pedestrian safety and enhancing pedestrian mobility by providing a framework
More informationTRAFFIC ACTION PLAN. Laurie Meadows Neighborhood CITY OF SAN MATEO
TRAFFIC ACTION PLAN Laurie Meadows Neighborhood CITY OF SAN MATEO Draft January 2017 Table of Contents Introduction... 2 The Traffic Forum Process... 5 Neighborhood Traffic Issues... 7 Neighborhood Recommendations
More informationWEST AVENUE AND NEW ROAD TRAFFIC STUDY PART III WEST AVENUE CLOSURE ALTERNATIVES ANALYSIS
WEST AVENUE AND NEW ROAD TRAFFIC STUDY PART III WEST AVENUE CLOSURE ALTERNATIVES ANALYSIS CITY OF LINWOOD ATLANTIC COUNTY, NEW JERSEY March 30, 2006 PREPARED FOR: City of Linwood 400 Poplar Avenue Linwood,
More informationAccess Management Regulations and Standards
Access Management Regulations and Standards January 2014 Efficient highway operation Reasonable property access Concept of Access Management The way to manage access to land development while preserving
More informationFigure 3B-1. Examples of Two-Lane, Two-Way Marking Applications
Figure 3B-1. Examples of Two-Lane, Two-Way Marking Applications A - Typical two-lane, two-way marking with passing permitted in both directions B - Typical two-lane, two-way marking with no-passing zones
More informationSAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY
THIS PRINT COVERS CALENDAR ITEM NO. : 10.2 DIVISION: Sustainable Streets BRIEF DESCRIPTION: SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY Adopting Conceptual Proposal for Streetscape Improvements to Broadway,
More informationProject Goals and Objectives
Project Goals and Objectives Goal 1: Goal 2: Goal 3: Transform Coast Highway into a Complete Street that accommodates all roadway users (pedestrians, bicyclists, and autos) Objectives: Improve the pedestrian
More informationLee s Summit Road Improvement Study Public Open House June 7, 2007 Summary of Comment Card Responses
Lee s Summit Road Improvement Study Public Open House June 7, 2007 Summary of Comment Card Responses Introduction At the Lee s Summit Road Improvement Study Public Open House held Thursday, June 7, 2007
More informationAccess Location, Spacing, Turn Lanes, and Medians
Design Manual Chapter 5 - Roadway Design 5L - Access Management 5L-3 Access Location, Spacing, Turn Lanes, and Medians This section addresses access location, spacing, turn lane and median needs, including
More informationRideau Canal Corridor Pedestrian Crossing Study. Queen Elizabeth Dr.: Preston St. to Laurier Ave. & Colonel By Drive: Hog s Back to Daly Ave.
Rideau Canal Corridor Pedestrian Crossing Study Queen Elizabeth Dr.: Preston St. to Laurier Ave. & Colonel By Drive: Hog s Back to Daly Ave. Background: Canal parkways evolved over past 100 years Today
More informationSaskatchewan Drive Roadway Rehabilitation and Shared-Use Path Widening
Saskatchewan Drive Roadway Rehabilitation and Shared-Use Path Widening We are here today to present the draft plan for the Saskatchewan Drive Roadway Rehabilitation and Shared-Use Path Widening project
More information11/28/2016 VIA
11/28/2016 VIA EMAIL Ethan Meltzer, Assistant Planner City of Sacramento Community Development Department 300 Richards Blvd., 3 rd Floor Sacramento, Ca 95811 RE: Natomas Corporate Center Commercial Building
More informationTOWN OF CHAPEL HILL POLICY AND PROCEDURES FOR TRAFFIC CALMING MEASURES
TOWN OF CHAPEL HILL POLICY AND PROCEDURES FOR TRAFFIC CALMING MEASURES (Adopted by the Town Council on June 30, 2004) (Revised December 6, 2010) (Revised February 8, 2016) POLICY AND PROCEDURES FOR TRAFFIC
More informationItem No. 14 Town of Atherton
Item No. 14 Town of Atherton CITY COUNCIL STAFF REPORT CONSENT AGENDA TO: THROUGH: FROM: HONORABLE MAYOR AND CITY COUNCIL GEORGE RODERICKS, CITY MANAGER MICHAEL KASHIWAGI, COMMUNITY SERVICES DIRECTOR MARTY
More informationBoard of Supervisors February 27, 2017
: Traffic Analysis Results & Draft Conceptual Plan Board of Supervisors February 27, 2017 Transportation Solutions Building Better Communities Presentation Overview Background Summary of Traffic Analysis
More informationOcean Park Boulevard Streetscape Improvement Project Alternatives & Trade Offs
City Council Study Session January 27, 2009 Ocean Park Boulevard Streetscape Improvement Project Alternatives & Trade Offs Scope of Work Purpose of Tonight s Meeting Review work to date and direct staff
More informationFigure 1: Vicinity Map of the Study Area
ARIZONA TEXAS NEW MEXICO OKLAHOMA May 5, 2016 Mr. Anthony Beach, P.E. BSP Engineers 4800 Lakewood Drive, Suite 4 Waco, Texas 76710 Re: Intersection and Access Analysis along Business 190 in Copperas Cove
More informationAddendum to SDDCTEA Pamphlet 55 17: Better Military Traffic Engineering Revision 1 Effective: 24 Aug Crosswalk Guidelines
Addendum to SDDCTEA Pamphlet 55 17: Better Military Traffic Engineering Revision 1 Effective: 24 Aug 2017 Crosswalk Guidelines Warrants for Uncontrolled Crosswalk Locations Crosswalks at Midblock Locations
More informationBicycle and Pedestrian Facilities Toolbox (Excerpt from Figure 3.1)
Appendix B Neighborhood Connections Summaries This Appendix is a supplement to the information presented in Chapter 3 Connect People. The Appendix includes a summary or profile for each of the proposed
More informationRoundabout Feasibility Memorandum
Roundabout Feasibility Memorandum To From Gwen Pipkin Bill Howell Date June 18, 2013 Subject Roundabout Feasibility Study SR 29 PD&E Study From Oil Well Road to SR 82 Collier County, FL FPID 417540-1-22-01
More informationDEPARTMENT OF ENVIRONMENTAL SERVICES. North Harrison Street (Lee Highway to Little Falls Road) Comparative Analysis. Prepared for:
DEPARTMENT OF ENVIRONMENTAL SERVICES North Harrison Street (Lee Highway to Little Falls Road) Comparative Analysis Prepared for: Arlington County Department of Environmental Services 2100 Clarendon Boulevard,
More informationAccess Management in the Vicinity of Intersections
Access Management in the Vicinity of Intersections FHWA-SA-10-002 Technical Summary Photo: Ralph Bentley (used with permission) 0 Access Management is: The design, implementation and management of entry
More informationTRAFFIC CALMING TOOLBOX
TRAFFIC CALMING TOOLBOX Traffic control devices are those official signs and striping placed in the public right-of-way and recognized by the public such as STOP signs, curve warning signs, centerline
More informationSouthview Blvd & 3 rd Avenue Improvement Project. Public Open House December 4, to 7pm
Southview Blvd & 3 rd Avenue Improvement Project Public Open House December 4, 2014 5 to 7pm Southview Blvd & 3 rd Avenue Public Information Meeting Agenda Presentation 5:30 to 6:15 pm Purpose of Project
More informationTECHNICAL MEMORANDUM VDOT Central Region On Call Task Order
Kittelson & Associates, Inc. T R A N S P O R T A T I O N E N G I N E E R I N G / P L A N N I N G 1850 Centennial Park Drive, Suite 130, 20191 P 703-885-8970 F 703-885-8971 TECHNICAL MEMORANDUM VDOT Central
More informationCity of Charlottesville Traffic Calming Handbook
City of Charlottesville Traffic Calming Handbook July 2008 CITY OF CHARLOTTESVILLE NEIGHBORHOOD DEVELOPMENT SERVICES Telephone: (434)970-3182 Fax: (434) 970-3359 Introduction The City of Charlottesville
More informationAGENDA ITEM SUMMARY SPECIAL AGENDA ITEM NO. _1A_
AGENDA ITEM SUMMARY AGENCY: City Council MEETING DATE: June 25, 2012 DEPARTMENT: Community Dev PREPARED BY: T Spade DEPT. DIR. APPROVAL: MJ CITY MGR. APPROVAL: LR PRESENTED BY: T Spade TITLE: RECEIVE REPORT
More informationFLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT 7 DISTRICT WIDE BICYCLE/PEDESTRIAN ACCESS TO TRANSIT SAFETY ASSESSMENT AND IMPROVEMENT PLAN
FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT 7 DISTRICT WIDE BICYCLE/PEDESTRIAN ACCESS TO TRANSIT SAFETY ASSESSMENT AND IMPROVEMENT PLAN TRANSIT SAFETY ASSESSMENT SR 55/US 19 AT 80 TH AVE N DRAFT JUNE
More informationEast Burke Transportation, Safety and Capacity Improvements
East Burke Transportation, Safety and Capacity Improvements The purpose of this project is to increase mobility and improve safety for pedestrians, cyclists, and motor vehicles along VT Route 114 in the
More informationCITY OF ROCK HILL, SOUTH CAROLINA. Neighborhood Traffic Calming Program A Policy for Use of Traffic Calming on Local (Residential) Streets
CITY OF ROCK HILL, SOUTH CAROLINA Neighborhood Traffic Calming Program A Policy for Use of Traffic Calming on Local (Residential) Streets I. Statement of Purpose: This program provides a process and a
More informationCURBSIDE ACTIVITY DESIGN
5 CURBSIDE ACTIVITY DESIGN This chapter provides design guidance for separated bike lanes adjacent to curbside activities including parking, loading and bus stops. Typical configurations are presented
More information2.0 LANE WIDTHS GUIDELINE
2.0 LANE WIDTHS GUIDELINE Road Engineering Design Guidelines Version 2.0.1 May 2018 City of Toronto, Transportation Services City of Toronto Page 0 Background In early 2014, Transportation Services initiated
More informationCycle Track Design Best Practices Cycle Track Sections
Design Best Practices Sections It is along street segments where the separation and protection methods of cycle tracks offer more comfort than conventional bicycle lanes, and are more attractive to a wide
More informationTraffic Circulation & Pedestrian Safety Study
Lyons Township High School North Campus La Grange, Illinois Parking Lot Vaughan Building N Main Building Prepared for: Prepared by: July 23, 2015 Contents List of Figures, iii 1. Introduction...1 2. Existing
More informationRecommended Roadway Plan Section 2 - Land Development and Roadway Access
Recommended Roadway Plan Section 2 - Land Development and Roadway Access SECTION 2 Land Development and Roadway Access 2.1 Land Use and Access Management The Federal Highway Administration (FHWA) defines
More informationFigure 4-10: Pedestrian Improvements Types of Potential Station Area Improvements - Place-Making Improvements
INCORPORATE FEATURE PAVIN IN CROSSWALK AND INTERSECTION FIELDS Identifies high-priority pedestrian areas and create a station identity through colorful and interesting patterns ADD CURB EXTENSIONS Extending
More informationDRAFT. Scholls Ferry Road Conceptual Design Plan Technical Memorandum Multi-Modal Examples. Multnomah County 1600 SE 190th Avenue Portland, OR 97233
Technical Memorandum Multi-Modal Examples Prepared for 1600 SE 190th Avenue Portland, OR 97233 December 2008 CITATION This project is partially funded by a grant from the Transportation and Growth Management
More informationAtwood Avenue Fair Oaks Avenue Cottage Grove Road
Atwood Avenue Fair Oaks Avenue Cottage Grove Road Agenda Purpose Review project scope & goals Present design alternatives Gather feedback Answer Questions Format Open House Presentation Q&A Open House
More information2014/2015 BIKE ROUTE PLAN 83 AVENUE PROTECTED BIKE LANE
About the Project The City of Edmonton is planning a major bike route on the southside of Edmonton. The Strathcona Bike Route will connect the communities of Strathcona, Garneau and the University area,
More information12/4/2016 VIA . RE: Grocery Outlet Del Paso (DR16-328)
12/4/2016 VIA EMAIL Ethan Meltzer, Assistant Planner City of Sacramento Community Development Department 300 Richards Blvd, 3 rd Floor Sacramento, CA 95811 RE: Grocery Outlet Del Paso (DR16-328) Dear Mr.
More information6.4 RECOMMENDED IMPROVEMENTS
6.4 RECOMMENDED IMPROVEMENTS 6.4.1 Williston Road Recommendations While all alternatives would be an improvement over existing conditions, Alternative 3B is recommended over the others because it provides
More informationDeveloped by: The American Traffic Safety Services Association (ATSSA) 15 Riverside Parkway, Suite 100 Fredericksburg, VA
Addendum Developed by: The American Traffic Safety Services Association (ATSSA) 15 Riverside Parkway, Suite 100 Fredericksburg, VA 22406-1022 800-272-8772 This material is based upon work supported by
More informationNeighborhood Traffic Calming Policy & Guidelines
Policy & Guidelines Town of Lantana 500 Greynolds Circle Lantana, FL 33462-4594 Index Topic Page Introduction 3 Definitions 4 Objectives 5 Policies 5 Process 6 Phases of Traffic Calming Study 7 Rating
More informationPRINCE GEORGE S PLAZA METRO AREA PEDESTRIAN PLAN
PRINCE GEORGE S PLAZA METRO AREA PEDESTRIAN PLAN May 28, 2008 Agenda Welcome and introductions Project overview and issue identification Planning context and strengths Design challenges and initial recommendations
More informationGuidance. ATTACHMENT F: Draft Additional Pages for Bicycle Facility Design Toolkit Separated Bike Lanes: Two-Way to One-Way Transitions
ATTACHMENT F: Draft Additional Pages for Bicycle Facility Design Toolkit Separated Bike Lanes: Two-Way to One-Way Transitions This treatment provides a transition from two-way separated bike lanes to one-way
More informationCOWETA HIGH SCHOOL AND EAST HIGHWAY 51
COWETA HIGH SCHOOL AND EAST HIGHWAY 51 Lack of sidewalks along Ben Lumpkin Rd. Lack of crosswalks and ramps at intersection. Hwy 51 is wide to cross as a pedestrian. No ADA compliance or connection to
More informationOcean Park Boulevard Green Street Project Alternatives & Trade Offs
Planning Commission March 4, 2009 Ocean Park Boulevard Green Street Project Alternatives & Trade Offs Purpose of Tonight s Meeting Review concept plans and options Provide input on alternatives and trade-offs
More informationPoor pavement condition Substandard Intersections. / Substandard bike/pedestrian/transit accommodations. Driveway access Environmental concerns
Public Informational Meeting University Avenue (Allen Boulevard Segoe Road) March 23, 2011 City of Madison City of Middleton Village of Shorewood Hills Dane County Existing Roadway Conditions Poor pavement
More informationCommunity Meeting February 27, 2007 Dorchester Avenue Transportation & Streetscape Improvements Action Plan February 27, 2007
Community Meeting Tonight s Agenda 6:00 Introductions South Boston/Dot Ave Improvement Study Background 6:15 Consultant Introductions Review of Scope and Schedule Review of Proposed Corridor Wide Guidelines
More informationTOWN OF PAYSON TRAFFIC CALMING MANUAL
TOWN OF PAYSON TRAFFIC CALMING MANUAL APPROVED BY THE PAYSON TOWN COUNCIL SEPTEMBER 6, 2007 TOWN OF PAYSON TRAFFIC CALMING POLICY 1.0 Introduction Traffic Calming involves retrofitting physical devices
More informationFinal Sidewalk Feasibility Study
Garfield Drive From Anastasia Drive to Elizabeth Place City of South Daytona July 23, 2009 Final Sidewalk Feasibility Study Prepared for: Prepared by: Final Sidewalk Feasibility Study Garfield Drive 2
More informationORANGE COUNTY PUBLIC WORKS TRAFFIC INVESTIGATIONS
ORANGE COUNTY PUBLIC WORKS TRAFFIC INVESTIGATIONS STAFF REPORT OF: January 6, 2019 SUPERVISORIAL DISTRICT: 5 SUBJECT: LOCATION: INVESTIGATOR: O Neill Drive at Roanoke Drive; Ladera Ranch; TB 922-E6 Clever
More information