1 Rhebogue Neighbourhood Greenway Road Safety Audit Stage 2 Report Number: 12/007/00/00057 July 2014 Mid West National Road Design Office Lissanalta House, Dooradoyle County Limerick Tel: Fax: info@midwestroads.ie
2
3 1. INTRODUCTION This report describes a Stage 2 Road Safety Audit carried out on the Rhebogue Neighbourhood Greenway in Rhebogue, Limerick. 1.1 The audit team members were as follows: Tim Fitzgerald Mid West National Road Design Office Team Leader Jari Howard Mid West National Road Design Office Team Member 1.2 This Stage 2 audit comprised an examination of the drawings and documents relating to the Rhebogue Neighbourhood Greenway designed by Limerick Smarter Travel for Limerick City & County Council and a day time site visit on 7 th July The proposed traffic calming scheme includes the introduction of a special 30kph speed limit, raised platforms, widened/new footpaths, cycle ways, signage and ancillary works. 1.3 This Stage 2 audit has been carried out in accordance with the relevant sections of NRA HD 19/12. The team has examined only those issues within the design relating to the road safety implications of the scheme, and has therefore not examined or verified the compliance of the design to any other criteria. 1.4 All of the problems described in this report are considered by the audit team to affect the safety of the scheme. 1.5 Appendix A describes the drawings and other information examined by the audit team and includes a copy of the main drawings. 1.6 Appendix B includes the NRA Letter of approval for the Road Safety Audit team (not required as not an NRA project).
4 2. ITEMS ARISING FROM THE AUDIT 2.1 Problem: Connection with Old Dublin Road scheme under construction The scheme ties into a separate scheme (Groody Roundabout) currently under construction. The drawings indicate an existing planned table top junction at the junction between Rhebogue Rd and the old Dublin Rd. There is existing cycle lanes on the old Dublin Rd for which the connection to the proposed cycle lanes on Rhebogue is not shown. The large gateway signs may impede cyclists from moving between Old Dublin Rd and Rhebogue Road cycle tracks. The designer should ensure that the overlapping schemes are consistent at this location and ensure there are clearly identified routes for pedestrians and cyclists to connect from Old Dublin Road to Rhebogue Road.
5 2.2 Problem: Pedestrian railings a risk to cyclists The scheme introduces a cycle along the edge of carriageway along the first section of Rhebogue Road. The existing pedestrian railing along the western footpath may force cyclists further out in the road and the start of the railings at the entrance to Formula for Fun and at the start of the bend are particular risks for cyclists striking them with their handlebars. The designer should review the existing pedestrian barrier along this section of road and consider removing or relocating this to minimise risk to cyclists.
6 2.3 Problem: Dropped kerb across entrance to Formula for Fun There is no dropped kerb at the southern side of the crossing at the entrance to Formula for Fun complex. Pedestrians with mobility restrictions and pushchairs may have difficulty mounting the kerb at this entrance and therefore increase the risk of conflict with traffic using the entrance. The designer should provide dropped kerbs at crossing locations.
7 2.4 Problem: Limited space for cyclists on bend at junction with Rhebogue Meadows The design terminated the cycle land just before the bend with no guidance or provision for the cyclists with no dropped kerbs, placement of end of cycle lane signs. The combination of the tight bend, central islands and pedestrian railing along the kerb leave any cyclists at risk of collision with vehicles on the bend. The designer should review the design to ensure that cyclists have clear guidance and space to negotiate this bend. This could involve the removal or relocation of the pedestrian railing or the provision of a cycle accessible shared surface around the bend. 2.5 Problem: Location of Proposed Lighting Columns The proposed location of some of the new public lighting is shown in the middle of the footpath or across existing entrances. This will impact the use of the footpath and existing entrances. The designer should review the proposed locations of public lighting columns and ensure they are located appropriately.
8 2.6 Problem: Concrete bollards at existing ramps There are low concrete bollards in the footpath adjacent to a number of existing ramps to warn drivers of their location. These bollards are a hazard to pedestrians. The designer should remove the concrete bollards along with the ramps which are being removed. 2.7 Problem: Existing access and raised platform at Junction 2 There is an existing entrance to the south of Junction 2. There is a risk that users of this entrance may have difficulty as there will be level differences between the entrance and the raised junction. The designer should review this entrance to ensure it will tie into the proposed junction table.
9 2.8 Problem: Proposed Cark Parking / Bus Bay near Junction 3 The design indicates a proposed car parking bay / future bus stop between Junction 3 and the Rail Bridge. There is no provision shown for this area as the footpath is being built out. Without removal of the new footpath any parking / bus bay here would encroach into the carriageway just before the pinch point under the railway bridge. The designer should review the proposed location of new signs within this widened footpath if they wish to remove it in the future. 2.9 Problem: Existing tactile pavement at Junction 3 The design provides for widening of the footpath on the southern approach to Junction 3 with new tactile pavement being provided at the crossing. There is existing tactile paving which would not coincide with the new crossing. This could lead to confusion for mobility restricted pedestrians. The designer should remove the existing tactile pavements.
10 2.10 Problem: Northern Footpath on eastern approach to Rail Bridge The existing footpath on the northern side follows the set back of the entrances immediately prior to the railway bridge. The drawings indicate a widening of this footpath over an entrance to a property. This will restrict access to and from the property. Due to the restricted visibility through the bridge pedestrians were observed to follow the northern edge of carriageway through the bridge. Pedestrians going under the bridge would not follow the existing footpath as the visibility through the bridge from this recess is poor. The designer should consider introducing a shared surface footpath along the line of the carriageway through these entrances to the proposed ramp at eastern side of bridge.
11 2.11 Problem: Raised Platform under Rail Bridge The existing rail bridge has a height restriction of 3.55m. It is evident that the bridge has been struck on the western approach which would have the lessor clearance due to the fall in the road. The design proposed a raised platform through the bridge. This could further reduce the vertical clearance under the bridge and lead to further bridge strikes. The designer should consider introducing a raised platform either side of the bridge with no increase in pavement levels under the bridge. The red surfacing could be continued under the bridge between these two platforms to help warn drivers of the hazard and use by pedestrians.
12 2.12 Problem: Advance warning of narrow bridge For drivers approaching the bridge from the west there is limited visibility of the width of restricted width of the bridge. There is a risk that non local drivers would approach the bridge at higher speed from the west and increase the risk of head on collision or conflict with pedestrians on the road under the bridge. Whilst the design includes road narrow warning signs this may not adequately warn drivers of the narrow bridge and risk of pedestrians. The designer should consider providing LED warning signs that indicate the nature of the hazard and the likelihood of pedestrians using the carriageway Problem: Pedestrian crossing west of the Rail Bridge The geometry of the western approach to the bridge leads pedestrians to pass under the bridge on the northern side of the carriageway. Therefore pedestrians are likely to want to cross the road between Junction 4 and the bridge. There are no proposed uncontrolled crossings on this section of road.
13 The designer should provide an uncontrolled crossing on this section of road Problem: Existing pole east of Junction 4 limiting restricting footpath width An existing utility pole creates a pinch point in the northern footpath which will remain if the current design is constructed. This will require pedestrians to step down onto the carriageway to avoid the pole and increase the risk of collision with passing vehicles.
14 The designer should consider relocating the existing pole and widening the footpath to the north to provide a minimum width footpath.
15 2.15 Problem: Southern approach at Junction 4 The design has a local widening of new footpath on the western side of the southern approach to Junction 4. This widening may force drivers to approach the junction at an angle and lead to conflict with turning vehicles. The designer should consider realigning the approach road over a distance rather than with a radial build out at the stop line Problem: Tactile pavement on northern approach at Junction 4 The drawing does not indicate any tactile paving for a crossing on the northern approach to junction 4. The designer should provide crossing locations on all arms of the junction if possible Problem: Existing ramps not indicated on drawings east of Junction 5 The existing ramps just east of Junction 5 are not indicated on the drawings. If not removed they would be inconsistent with the route approach to raised platforms. The designer should remove the existing ramps.
16 2.18 Problem: Entrance onto proposed raised platform at Junction 5 There is an existing entrance to the south of Junction 5. There is a risk that users of this entrance may have difficulty as there will be level differences between the entrance and the raised junction. The designer should review this entrance to ensure it will tie into the proposed junction table Problem: Existing ramps not indicated on drawings south of raised table 4 The existing ramps just south of Raised Table 4 are not indicated on the drawings. If not removed they would be inconsistent with the route approach to raised platforms. The designer should remove the existing ramps Problem: Tactile pavement missing from Raised Table 4 and Junctions 6 & 7 The drawing does not indicate tactile paving for all crossings crossing on raised table 4 and Junctions 6 & 7. The designer should provide crossing locations on all arms of the table / junctions if possible.
17 2.21 Problem: Trip hazard in footpath north of Junction 6 There is a significant level difference at the joint of the footpath adjacent to Junction 6. The designer should consider replacing this section of the existing footpath to remove this trip hazard Problem: Narrowing of existing entrance at Junction 7 The design shows the entrance in to Mount Richmond Court (Junction 7) being narrowed which will not allow anyone to enter the entrance whilst a car is waiting to exit. This may lead to increased risk of rear end collisions. The existing entrance is not excessive and does not facilitate high speed entrance or exit. The designer should consider retaining the existing width of the entrance as per Junction 6. NONE OTHER COMMENTS BY AUDIT TEAM
18
19 Appendices Rhebogue Greenway Road Safety Audit Stage 2 APPENDIX A LIST OF DRAWINGS AND OTHER INFORMATION EXAMINED: Drawings & Reports Drawing:- Rhebogue Neighbourhood Greenway LST-R3-L1-01 to 14 Rev A 26 June 2014 NRA Approval for Audit Team [Not Required]
20 FEEDBACK FORM Rhebogue Greenway Road Safety Audit Stage 2 SAFETY AUDIT FORM FEEDBACK ON AUDIT REPORTS Scheme: Rhebogue Neighbourhood Greenway Road Safety Audit Stage: 2 Date Audit Completed: 7 th July 2014 Paragraph No. In Safety Audit Report 2.1 Problem accepted (Yes/No) Recommended measure accepted (Yes/No) Alternative Measures (describe) Alternative measure accepted by Safety Auditor (Yes/No)
21 FEEDBACK FORM Rhebogue Greenway Road Safety Audit Stage Signed.Project Team Leader Please complete and return to safety auditor. Date. Road Safety Audit Sign off: Audit Team Leader: Date: Scheme Project Manager: Date:
22
Ulster Canal Greenway Phase 1 Stage 2 Road Safety Audit
Monaghan County Council July 2013 Ulster Canal Greenway Phase 1 Stage 2 Road Safety Audit Prepared by:... Checked by:... Johanne Browne Brian McMahan Senior Consultant Senior Engineer Approved by:... Joe
More informationFrascati Road and Temple Hill Route Improvements. Outline Design Report to Accompany Public consultation
Frascati Road and Temple Hill Route Improvements Outline Design Report to Accompany Public consultation September 2013 Background: Dún Laoghaire-Rathdown is committed to providing high quality pedestrian
More informationDún Laoghaire Rathdown County Council. Luas to Dart via UCD Cycle and Pedestrian Route
Dún Laoghaire Rathdown County Council Luas to Dart via UCD Cycle and Pedestrian Route October 2012 Luas to Dart via UCD Cycle and Pedestrian Route DOCUMENT CONTROL SHEET Client: Project Title: Document
More informationAppendix D Stage 1 Road Safety Audit
N2 Monaghan Town to Emyvale Road Improvements Part 8 Application Description of Proposed Development Appendi D N2 Monaghan Town to Emyvale, County Monaghan Proposed Pavement and Minor Improvement Scheme
More informationTGSI Tactile Ground Surface Indicators
TGSI Tactile Ground Surface Indicators Introduction: This Design Note, No 11, provides guidelines and requirements for the use and installation of Tactile Ground Surface Indicators (TGSI s). References
More informationThe Rower Traffic Management Scheme
KILKENNY COUNTY COUNCIL Comhairle Chontae Chill Chainnigh Section 38 of the Road Traffic Act, 1994 as amended by the Public Transport Regulation Act, 2009 (Section 46) The Rower Traffic Management Scheme
More informationEntry Treatments. Traffic Advisory Leaflet 2/94 August Introduction. Design. Vertical Deflections. Locations
Traffic Advisory Leaflet 2/94 August 1994 Entry Treatments Introduction Entry treatments have been developed for use at side roads so that drivers leaving a major road are in no doubt that they are entering
More informationA105 Green Lanes junction with Bourne Hill / Hedge Lane
Cycle Enfield - Section 5 A105 Green Lanes junction with Bourne Hill / Hedge Lane Stage 2 Road Safety Audit Ref: 2759.03.05/032/A105/BOR/2016 Prepared for: London Borough of Enfield By: Road Safety Audit,
More informationSLOUGH Stage 3 Road Safety Audit of A4 London Road, M4 J5 to Sutton Lane
SLOUGH Stage 3 Road Safety Audit of A4 London Road, M4 J5 to Sutton Lane Exception Report Client Officer Rudo Beremauro Date 20 January 2015 RSA /Project Sponsor s Contents Section 3 Project Sponsor's
More informationKings Road, Herne Bay: Proposed Crash Remedial Measure
Kings Road, Herne Bay: Proposed Crash Remedial Measure To: Canterbury Joint Transportation Board 17 February 2015 By: Classification: Ward: Tim Read - Head of Transportation Unrestricted Herne Bay Summary:
More informationSandyford Cycle Route (Kilgobbin / Drummartin Link Road)
Sandyford Cycle Route (Kilgobbin / Drummartin Link Road) Public Consultation Report on Submissions Client: Dun Laoghaire-Rathdown County Council Date: May 2018 Job Number: 15_116B Clifton Scannell Emerson
More informationImproving Cyclist Safety at the Dundas Street West and Sterling Road Intersection
STAFF REPORT ACTION REQUIRED Improving Cyclist Safety at the Dundas Street West and Sterling Road Intersection Date: August 17, 2012 To: From: Wards: Reference Number: Public Works and Infrastructure Committee
More informationCHECKLIST 2: PRELIMINARY DESIGN STAGE AUDIT
CHECKLIST 2: PRELIMINARY DESIGN STAGE AUDIT 2.1 General topics 2.1.1 Changes since previous audit Do the conditions for which the scheme was originally designed still apply? (for example, no changes to
More informationCabinet Member for Highways & Streetscene. Highway Infrastructure Manager
LONDON BOROUGH OF RICHMOND UPON THAMES DATE: AUGUST 2015 DECISION MAKER: LEAD OFFICER: SUBJECT: WARDS: Cabinet Member for Highways & Streetscene Highway Infrastructure Manager PROPOSED CYCLING IMPROVEMENTS
More informationDesign and Installation of Low Level Cycle Signals
Transport for London Surface Transport Management System Document Guidance Note Design and Installation of Low Level Cycle Signals Document reference: SQA-0651 - Issue: Draft out of date information. 1
More informationAppendix A Type of Traffic Calming Measures Engineering Solutions
Appendix A Type of Traffic Calming Measures Engineering Solutions PHYSICAL MEASURES Central Hatching The major consideration of this feature is that, these markings can only be laid down the centre of
More informationCURRENT ORIGINAL REFERENCE SECTIONS. (Typical Section) (Typical Section) The Parade Island Bay : Concept Option Summary Sheets.
ORIGINAL (Typical Section) CURRENT (Typical Section) 3,900 3,000 2,000 1,500 3,100 1,600 3,100 1,500 2,000 2,500 3,900 3,000 1,800 600 2,000 3,000 3,000 2,000 600 1,800 2,500 Existing Planting Traffic
More informationAudit No. RSA Stage 1 Road Safety Audit Bermuda Park, Nuneaton Getting West Nuneaton Moving: Bermuda Connection
Audit No. RSA 2199 Stage 1 Road Safety Audit Bermuda Park, Nuneaton Getting West Nuneaton Moving: Bermuda Connection 1 1.0 INTRODUCTION 1.1 This report results from a Stage 1 Road Safety Audit for a highways
More informationNRA New Divided Road Types: Type 2 and Type 3 Dual - Carriageways
NRA New Divided Road Types: Type 2 and Type 3 Dual - Carriageways DN-GEO-03059 December 2007 DN Design Technical TRANSPORT INFRASTRUCTURE IRELAND (TII) PUBLICATIONS About TII Transport Infrastructure Ireland
More informationPark Bridge and Park Road
Traffic Reassignment, Traffic Calming and Pedestrian and Cyclist Improvements Part 8 August 2014 i Rhebogue Neighbourhood Greenway Table of Contents 1 Application Documentation... 1 1.1 Part 8 Application
More informationIAN WHITE ASSOCIATES. Crawley Station Gateway Public Realm
IAN WHITE ASSOCIATES Crawley Station Gateway Public Realm contents 1. objectives & client brief 2. site appraisal 3. best practice guidance 4. design concept 1. objectives & client brief Crawley Train
More informationHISTON ROAD Have your say on better public transport, cycling and walking journeys
HISTON ROAD Have your say on better public transport, cycling and walking journeys Have your say: Please complete the survey inside this leaflet or online at www.greatercambridge.org.uk/histonconsultation
More informationMaynooth Cycling Submission on North South Corridor
Maynooth Cycling Submission on North South Corridor Maynooth Cycling welcomes the intention to improve facilities and quality of service for pedestrians and cyclists in Maynooth. In particular, we strongly
More informationDMURS - Practical Implications
Comhairle Contae Fhine Gall DMURS - Practical Implications Sean McGrath. 13 November 2013 Planning and Strategic Infrastructure Department DMURS Practical Implications What DMURS means for: Street Layouts
More informationIMPROVEMENT OPTIONS REPORT - WONERSH VILLAGE. for WONERSH PARISH COUNCIL. March V3.0 stilwell-ltd.co.uk
IMPROVEMENT OPTIONS REPORT - WONERSH VILLAGE for WONERSH PARISH COUNCIL March 2016 V3.0 stilwell-ltd.co.uk Improvement Options Report Wonersh Village, Wonersh Date of Prepared Checked Revision Comments
More informationDESIGN CODE. Enterprise West Harlow London Road North Design Code 21
DESIGN CODE Enterprise West Essex @ Harlow London Road North Design Code 21 4 MAXIMUM BUILDING HEIGHTS 4.1 Table 4A sets out maximum building height standards for each character area within the LDO boundary.
More informationPART 5 TD 51/17 SUMMARY
DESIGN MANUAL FOR ROADS AND BRIDGES VOLUME 6 SECTION 3 ROAD GEOMETRY HIGHWAY FEATURES PART 5 TD 51/17 SEGREGATED LEFT TURN LANES AND SUBSIDIARY DEFLECTION ISLANDS AT ROUNDABOUTS SUMMARY This document sets
More informationEvaluation of Road Safety Audit Reports
Evaluation of Road Safety Audit Reports Peter Monahan 5 th April 2016 Task Overview Review sample of RSA Reports in TII Database and: 1. Identify the most commonly recurring Problems or category of Problems
More informationThe Ins and Outs of Roundabouts
The Ins and Outs of Roundabouts Safety Auditors Perspective April 2000 TABLE OF CONTENTS PAGE Preface 3 Introduction 4 Road Safety Audits 5 List of Common Road Safety Problems at Roundabouts 6 Commonly
More informationA105 South of Ecclesbourne Gardens to Oakthorpe Road
Cycle Enfield - Section 1 A105 South of Ecclesbourne Gardens to Oakthorpe Road Stage 2 Road Safety Audit Ref: 2759.03.01/032/A105/BOR/2016 Prepared for: London Borough of Enfield By: Road Safety Audit,
More informationLimerick City & County Council Traffic Calming Policy for Urban Areas DRAFT
Limerick City & County Council Traffic Calming Policy for Urban Areas DRAFT Physical Development Directorate February 2018 Traffic Calming in Limerick City Minister Donohue launches 30kph Slow Zone Sign
More informationAccess to Brownswood Quarry, Enniscorthy, Co. Wexford ROAD SAFETY AUDIT STAGE 1/2. March Consent of copyright owner required for any other use.
11012 Access to Brownswood Quarry, Enniscorthy, Co. Wexford ROAD SAFETY AUDIT STAGE 1/2 March 2011 7, Ormonde Road Kilkenny Tel: 056 7795800 Fax: 056 7702999 Access to Brownswood Quarry, Enniscorthy, Co.
More informationRAILWAY LEVEL CROSSING CHECKLIST Road Safety Review of Railway Crossings
RAILWAY LEVEL CROSSING CHECKLIST Road Safety Review of Railway Crossings Location: Crossing No. Date of On-Site Inspection: (Day) / / (Night) / / Weather: CHECKLIST 5. - GENERAL TOPICS Level of control
More informationCHECKLIST 4: PRE-OPENING STAGE AUDIT
CHECKLIST 4: PRE-OPENING STAGE AUDIT 4.1 General topics 4.1.1 Changes since previous audit; translation of design into practice General check: have any matters that have changed since a previous audit
More informationPART 5 TD 51/03 SEGREGATED LEFT TURN LANES AND SUBSIDIARY DEFLECTION ISLANDS AT ROUNDABOUTS SUMMARY
DESIGN MANUAL FOR ROADS AND BRIDGES VOLUME 6 SECTION 3 ROAD GEOMETRY HIGHWAY FEATURES PART 5 TD 51/03 SEGREGATED LEFT TURN LANES AND SUBSIDIARY DEFLECTION ISLANDS AT ROUNDABOUTS SUMMARY This document sets
More informationAppendix F CAPITA Technical Audit
Appendix F CAPITA Technical Audit West Hendon - Major Review of Technical Audit Responses 14 June 2016 Quality Management Quality Management Job No Project Location Title CS/086106 West Hendon - Major
More informationRe: N71 Muckross Road Traffic Calming Scheme Part 8 and Section 38
Administrative Officer, Kerry County Council, Roads, Transportation & Safety Department, Room 115, Áras an Chontae, Rathass, Tralee, Co. Kerry. The Tailor's Hall, Back Lane, Dublin 8. The Tailor's Hall,
More informationRoad Markings. Lecture Notes in Transportation Systems Engineering. Prof. Tom V. Mathew
Road Markings Lecture Notes in Transportation Systems Engineering Prof. Tom V. Mathew 1 Overview The essential purpose of road markings is to guide and control traffic on a highway. They supplement the
More informationBramshaw traffic calming proposal
- 1 - Bramshaw traffic calming proposal Initial options appraisal report July 2017 - 2-1. Project background Hampshire Country Council has commissioned Test Valley Borough Council to carry out an option
More informationAgenda Item 34. N11 - Brewery Road Improvement Scheme
Agenda Item 34 N11 - Brewery Road Improvement Scheme Public Consultation Report on Submissions Client: Dún Laoghaire-Rathdown County Council Date: November 2017 Job Number: 13_066A Document Pack Page 11
More information1. TRANSFORM CITY ROAD WEST INTO A GREAT CENTRAL city street
1. TRANSFORM CITY ROAD WEST INTO A GREAT CENTRAL city street Understanding City Road West City Road West (between Clarendon Street and ower Street) is a local street, and can be significantly enhanced
More informationCHECKLIST 6: EXISTING ROADS: ROAD SAFETY AUDIT
CHECKLIST 6: EXISTING ROADS: ROAD SAFETY AUDIT 6.1 Road alignment and cross-section 6.1.1 Visibility; sight distance Is sight distance adequate for the speed of traffic using the route? Is adequate sight
More informationIntroduction. Prince Street Cycling Ambition Fund Public Realm Project
Introduction The (CAF) project will create a high quality, 8-80 s cycle route up the west side of Prince Street from Cumberland Road, over Prince Street bridge to the Centre. This is part of the City Centre
More informationCHECKLIST 5: ROADWORK TRAFFIC SCHEME AUDIT
CHECKLIST 5: ROADWORK TRAFFIC SCHEME AUDIT 5.1 General items 5.1.1 Alignment Are the roadworks located safely with respect to horizontal and vertical alignment? If not, does works signing cater for this?
More informationThe Cabinet Member for Highways & Streetscene. Aurang Zeb - Head of Highways & Transport
LONDON BOROUGH OF RICHMOND UPON THAMES Cabinet Member Decision DATE: January 2012 REPORT OF: LEAD OFFICER: SUBJECT: WARDS: The Cabinet Member for Highways & Streetscene Aurang Zeb - Head of Highways &
More informationDouglas LUTS - Work Packages WP1, WP2 & WP11
The Tailor's Hall, Back Lane, Dublin 8. E: Damien.otuama@antaisce.org T: 01-7077064 M: +353-87-2840799 Peter O'Donoghue SE Traffic and Transportation Section Cork County Council Floor 10 County Hall Carrigrohane
More informationThe Safe System Approach
There are very few areas of public discussion and sentiment which generate as much consensus as road safety. Everyone wants safer roads for all users, and road safety is a key priority for governments,
More informationAppendix A Guiding Principles for Cycling Safety in Work Zones
Appendix A Guiding Principles for Cycling Safety in Work Zones 1. Identify Existing Cycling Facility and Requirements This step should be part of the permitting/approval processes for construction zones
More informationCAR PARKING [15] General provision
CAR PARKING [15] 1 1. General provision Provision should be made for car parking spaces for disabled motorists (Blue (formerly Orange) Badge holders) wherever conventional parking spaces are provided.
More informationPerne Rd / Radegund Rd Roundabout Cambridge
Perne Rd / Radegund Rd Roundabout Cambridge The conversion of an conventional urban roundabout to continental geometry A little bit of history The first traffic roundabout was built in Sollershott, Letchworth
More informationReview of Guidelines for Cycleway Safety Fencing
Review of Guidelines for Cycleway 1.0 PURPOSE 1.1 This document is meant to provide a review of available reference documents for determining appropriate fencing requirements for cycleway paths and shared
More informationRoad Safety Audit training course. Motorways - safety issues of the motorway design
Road Safety Audit training course Motorways - safety issues of the motorway design Jesper Mertner, Road safety auditor, COWI A/S 1 ROAD SAFETY AUDITING COURSE Content 1. Safety 2. Cross sections 3. Horizontal
More information(HIGHWAY GEOMETRIC DESIGN -1)
LECTURE HOUR-19 TE-1(10CV56) UNIT-3 (HIGHWAY GEOMETRIC DESIGN -1) Width of carriage way: Width of the carriage way or the width of the pavement depends on the width of the traffic lane and number of lanes.
More informationGuidance on Minor Improvements to National Roads (Including Erratum No. 1)
Volume 6 Section 1 Part 1 NRA TA 85/11 Guidance on Minor Improvements to National Roads November 2011 (Including Erratum No. 1, February 2012) St. Martin s House, Waterloo Road, Dublin 4. Tel:+353 1 660
More informationNRA New Divided Road Types: Type 2 and Type 3 Dual-carriageways
NRA New Divided Road Types: Type 2 and Type 3 Dual-carriageways BENEFITS of the TYPE 2 and TYPE 3 DUAL CARRIAGEWAY ROAD TYPE There are significant safety and economic benefits associated with the Type
More informationThe Wincheap Society
The Wincheap Society s on sections of: Thanington 4th Arm Slip Road, Walking, Cycling & Horse-Riding Assessment & Review Report, by Peter Brett Associates, October 2017, on behalf of Pentland Properties
More informationTS 109 DURHAM ROAD QTC PHASE 4 PROJECT PROPOSAL. Page 1
TS 109 DURHAM ROAD QTC PHASE 4 PROJECT PROPOSAL Page 1 Table of Contents 1.0 Introduction... 3 2.0 Project Overview... 3 3.0 Project Proposals... 4 3.1 Enfield Road / Durham Road Junction... 3 5 3.2 Summerfield
More informationEaston Safer Streets - Final Project Report BRISTOL
- Final Project Report BRISTOL A Sustrans Community Street Design Project in partnership with Bristol City Council February 07 About Sustrans Sustrans makes smarter travel choices possible, desirable and
More informationA105 Oaktree Avenue to Carpenters Gardens
Cycle Enfield - Section 6 A105 Oaktree Avenue to Carpenters Gardens Stage 2 Road Safety Audit Ref: 2759.03.06/032/A105/BOR/2016 Prepared for: London Borough of Enfield By: Road Safety Audit, TfL Asset
More informationSevenways Roundabout, and the need for a Road Safety Scheme:
Sevenways Roundabout, and the need for a Road Safety Scheme: The way the current roundabout has evolved has obviously created an environment that is dangerous for all road users, motorists, cyclists and
More informationFrome Street Bicycle Route
The Adelaide City Council invites engagement from the community about Frome Street Bicycle Route Project Summary Adelaide City Council is seeking feedback on design options to construct bicycle facilities
More informationChelmsford City Growth Package
Chelmsford City Growth Package Public Consultation Document Volume 2 West Chelmsford July - August 2017 Chelmsford City Growth Package Public Consultation Document - Volume 2 - West Chelmsford Contents
More informationPERFORMANCE ACTIVITY 405 LIMB MANAGEMENT
PERFORMANCE ACTIVITY 405 LIMB MANAGEMENT 405 LIMB MANAGEMENT ACTIVITY DESCRIPTION Cut and/or remove and/or grind tree limbs from the right-of-way. TRAFFIC CONTROL Utilize intermittent mobile operations
More informationWest Midlands Cycle Design Guidance Cycling and the Midland Metro
Transport for the West Midlands Cycling and the Midland Metro September 2017 Project Code: 02821 Phil Jones Associates Ltd Seven House High Street Longbridge Birmingham B31 2UQ philjonesassociates.co.uk
More informationM9/A90/M90 Edinburgh to Fraserburgh Trunk Road. A90 Tealing. Moving Cursor Programme Junction Study
A90 Tealing Moving Cursor Programme Junction Study This is an unpublished report prepared for the Transport Scotland, Trunk Road and Bus Operations Division (TRBO) and must not be referred to in any publication
More informationTraffic Control Inspection Checklist Segment:
Traffic Control Inspection Checklist Segment: Simon Contractors Simon Contractors Originator: Description Reviewed by: Initials Date Distribution: Traffic Quality Manager, Site Assistant Traffic Manager
More informationDesign Criteria. Design Criteria
F Design Criteria Design Criteria Ministry of Transportation Ministère des Transports DESIGN CRITERIA Page: 1 of 13 WORK PROJECT NO. N/A GO Bloomington Station TYPE OF PROJECT LOCATION Bloomington Road
More informationDRAFT. Jesmond Vale Lane. Meldon Terrace. Heaton Road. King John Street. Newcastle City Council
Remove footway build-out and reposition crossing equipment & tactile paving uild-out kerb to reduce turning speeds Jesmond Vale Lane Provide gap in parking for right turning cycles Light segregation set-back
More informationWicklow County Council Chomairle Chontae Chill Mhantáin. Traffic Calming Policy
Chomairle Chontae Chill Mhantáin Adopted by Wicklow County Council on the 11th of June, 2012 Contents Section Page 1. Introduction 3 2. Legislation 3 3. Guidance Documentation 3 4. Policy Objectives &
More informationTechnical Director, Jacobs IHT Urban Design Panel. Challenge of MfS Acknowledgements visibility forward SSD side road SSD
for Public Realm Schemes for Public Realm Schemes IHT London Branch evening meeting 30 September 009 Ken Huddart Kate Carpenter Technical Director, Jacobs IHT Urban Design Panel Kate Carpenter IHT Road
More informationSCHEME DESIGN AND ENGINEERING
THE NORTH SOMERSET COUNCIL (SOUTH BRISTOL LINK CLASSIFIED ROAD) SIDE ROADS ORDER 2013 THE NORTH SOMERSET COUNCIL (SOUTH BRISTOL LINK) COMPULSORY PURCHASE ORDER 2013 THE NORTH SOMERSET COUNCIL (SOUTH BRISTOL
More informationPublic Consultation on Braintree Integrated Transport Package (ITP) HAVE YOUR. Consultation open from 24 September to 5 November 2018 SAY
Public Consultation on Braintree Integrated Transport Package (ITP) HAVE YOUR SAY Consultation open from 24 September to 5 November 2018 Contents Introduction 3 Background 4 Springwood Drive Roundabout
More information6. BREENS/GARDINERS/HAREWOOD INTERSECTION - SAFETY IMPROVEMENT PROJECT
6. BREENS/GARDINERS/HAREWOOD INTERSECTION - SAFETY IMPROVEMENT PROJECT General Manager responsible: Officer responsible: Author: Jane Parfitt General Manager City Environment DDI 941 8656 Michael Aitken
More information1 This technical note considers the issues associated with the use of tidal flow bus lanes on key public transport corridors in Cambridge.
TECHNICAL NOTE: TIDAL FLOW BUS LANE OPTION ASSESSMENT Purpose 1 This technical note considers the issues associated with the use of tidal flow bus lanes on key public transport corridors in Cambridge.
More informationDodder Greenway Emerging Preferred Route Consultation - October 2018
Dodder Greenway Emerging Preferred Route Consultation - October 2018 1.0 Introduction Dublin Cycling Campaign is the advocacy group for cycling in Dublin. Dublin Cycling Campaign is the leading member
More informationChapter 4 - Links Within the Highway. Suitability of Routes
Chapter 4 - Links Within the Highway Suitability of Routes Most cycling takes place on existing urban roads; this will also be the case with the National Cycle Network. As well as following lightly trafficked
More informationOffaly Local Authorities Traffic Calming Policy April 2016
Offaly Local Authorities Traffic Calming Policy April 2016 Charlie McCarthy, Senior Engineer, Roads and Infrastructure, Offaly County Council, Aras An Chontae, Charleville Road, Tullamore, Co. Offaly.
More informationNational Cycle Network Route 81 Wolverhampton Cross City Route August 2005
Page 12 Buses often stop in Lichfield Street and there is no space to pass. Should an NCN route be following a road which is heavily congested with buses and diesel fumes? 14. Railway Drive The dropped
More informationLocal Highway Panels Members Guide. 5 Crossing Facilities
Local Highway Panels Members Guide 5 2 Local Highway Panels (LHP) Members Guide 2016/17 1. Introduction On the Network where there are sufficient crossing opportunities most individuals are able to cross
More informationTRAFFIC CALMING GUIDE FOR TORONTO CITY OF TORONTO TRANSPORTATION SERVICES DIVISION
TRAFFIC CALMING GUIDE FOR TORONTO CITY OF TORONTO TRANSPORTATION SERVICES DIVISION CITY OF TORONTO TRANSPORTATION SERVICES DIVISION 2016 TRAFFIC CALMING GUIDE FOR TORONTO TABLE OF CONTENTS Introduction
More informationFootpath design. A guide to creating footpaths that are safe, comfortable, and easy to use
Footpath design A guide to creating footpaths that are safe, comfortable, and easy to use November 2013 Contents Introduction / 1 Zoning system / 2 Width / 4 Height / 5 Surface / 5 Footpath elements /
More informationIntroduction Methodology Study area and data collection Results and recommendation Conclusion References
Introduction Methodology Study area and data collection Results and recommendation Conclusion References It is formal procedure for assessing accident potential and safety performance in the provision
More informationUrban Street Design with DMURS. Sean McGrath Senior Executive Engineer Fingal County Council
Urban Street Design with DMURS Sean McGrath Senior Executive Engineer Fingal County Council Urban versus Rural Design Rural Road Design Prefer higher speed Release constraints Work within fence line Urban
More informationMinta Farm Berwick S96A Transport Impact Assessment
Minta Farm Berwick S96A Transport Impact Assessment 170310TIA001I-F 4 October 2017 onemilegrid ABN: 79 168 115 679 (03) 9939 8250 1/59 Keele Street COLLINGWOOD, VIC 3066 www.onemilegrid.com.au DOCUMENT
More informationCITY OF SASKATOON COUNCIL POLICY
ORIGIN/AUTHORITY Clause 1, Report No. 1-1980 and Clause 4, Report No. 22-1990 of the Works and Utilities Committee; Clause 6, Report No. 17-2004 of the Planning and Operations Committee; and Clause D5,
More informationRoad Safety Audits of Traffic Signal Schemes
Road Safety Audits of Traffic Signal Schemes David Prior Waterman Infrastructure & Environment Abstract This paper examines the following elements of Road Safety Audits (RSAs) of traffic signal schemes:
More informationAttachment A: Traffic Mitigation Measures
Attachment A: Traffic Mitigation Measures Central Interceptor Main Project Works Watercare Services Limited This appendix outlines examples of detailed mitigation measures that could be implemented for
More informationInfrastructure Requirements for Personal Safety in Respect of Clearances and Access
Infrastructure Requirements for Personal Safety in Respect of Clearances and Access Synopsis This document sets out the design, construction and maintenance requirements for means of access onto, along
More informationSouthside Road. Prepared for: City of St. John s Police & Traffic Committee. Prepared by: City of St. John s Traffic Division
Southside Road Prepared for: City of St. John s Police & Traffic Committee Prepared by: City of St. John s Traffic Division January 2007 Southside Road - Traffic Report Page 1 of 9 BACKGROUND: th At the
More informationFOCUS AREA 1 - Alberta Avenue Pocket Park 3 (121 Ave and 92 St)
FOCUS AREA 1 - Alberta Avenue Pocket Park 3 (121 Ave and 92 St) New benches Plant evergreen trees Widen existing sidewalk from 1.5m to 1.8m Marked crosswalk 1.8m wide sidewalk Add pedestrian oriented lights
More informationBallybrack Valley Pedestrian and Cycle Route, Phase 4
Ballybrack Valley Pedestrian and Cycle Route, Phase 4 Cork County Council Project number: 60578872 Quality information Prepared by Checked by Approved by Conor Luttrell Senior Engineer Michael Condon Principal
More informationTraffic Assets Section Proposed Removal of Street Lighting Road Safety Review Report No 48
Street Lighting Section Unique Reference: o. 48 Traffic Assets Section Report o 48 Reviewer: Ellie Briggs, BEng (Hons) CEng MICE Highway Classification / umber Road / Street ame: District / Settlement:
More informationComments on the Hailsham to Eastbourne Sustainable Transport Corridor
Comments on the Hailsham to Eastbourne Sustainable Transport Corridor Version 1.1 25/01/2015 Paul Humphreys 1 Table of Contents Version Control... 2 Summary... 2 Rationale provided by ESCC... 3 The ESCC
More informationMarcus Jones, TRL. Presented by Name Here Job Title - Date
Segregation Insert the title and of priority your at presentation junctions: a here discussion Marcus Jones, TRL Presented by Name Here Job Title - Date Background: TfL cycle facility trials Infrastructure
More informationWalkability Audit. 19 th January St. Michael s College, Ailesbury Road, Dublin 4. Roll Number: 6O561G
Walkability Audit 19 th January 2016 St. Michael s College, Ailesbury Road, Dublin 4. Roll Number: 6O561G St. Michael s College is voluntary secondary school for boys. The school was founded in 1944 by
More informationINDEX. Geometric Design Guide for Canadian Roads INDEX
Acceleration lane, see Lanes, Acceleration Access, 8.1 Access Management and Functional Classification 8.2 Access Management by Design Classification 8.3 Access Configuration 8.4 Building Set-Back Guidelines
More informationPolicy Statement. Objective. Context. References and Supporting Documentation
Policy Statement Subject Placement of Distribution Poles Along Roads With Speed Limits Not Exceeding 70km/h Approved by Robert Rogerson Signature & Date Distribution Standards and Policy Manager Authorised
More informationSPEED CONTROL AT ROUNDABOUTS USE OF MAXIMUM ENTRY PATH RADII
23 rd ARRB Conference Research Partnering with Practitioners, Adelaide Australia, 2008 SPEED CONTROL AT ROUNDABOUTS USE OF MAXIMUM ENTRY PATH RADII Dr Owen Arndt, Queensland Department of Main Roads, Australia
More informationLEA BRIDGE ROAD - A STREET FOR EVERYONE Public consultation document
LEA BRIDGE ROAD - A STREET FOR EVERYONE Public consultation document TELL US Bakers Arms to Leyton Green Road (Section D, E, F) Leyton Green Road to Whipps Cross Roundabout (Section G) YOUR VIEWS www.enjoywalthamforest.co.uk
More informationROUNDABOUTS. Improving Safety and Efficiency. SR83 & Smithville Western Rd. Joel Montgomery, PE Director of Administration
ROUNDABOUTS Improving Safety and Efficiency SR83 & Smithville Western Rd. Joel Montgomery, PE Director of Administration The Ohio Department of Transportation District 3 906 North Clark Ave. Ashland, OH
More information