1 Traffic Study of Fuller Street, Cady Street, West Street and West Avenue Final Report July 2005 Prepared for: Town of Ludlow Prepared by: Pioneer Valley Planning Commission 26 Central Street West Springfield, MA Prepared in cooperation with the Executive Office of Transportation, the Massachusetts Highway Department and the U.S. Department of Transportation - Federal Highway Administration and the Federal Transit Administration.

2

3 TABLE OF CONTENTS TABLE OF CONTENTS... I I. INTRODUCTION...3 A. STUDY AREA...3 II. EXISTING TRANSPORTATION CONDITIONS...7 A. DATA COLLECTION Daily Vehicle Volume Hourly Vehicle Volume...7 B. CRASH EXPERIENCE...8 C. ANALYSIS PROCEDURES Capacity Analysis Signal Warrant Analysis Multi-Way Stop Applications Traffic Signal Control...17 III. FUTURE CONDITIONS...20 IV. TRANSPORTATION RECOMMENDATIONS Fuller Street with Cady Street Fuller Street with Cherry Street West Avenue with Fuller Street West Street with Cady Street Center Street with West Avenue...24 B. PRIORITY LIST OF RECOMMENDATIONS...25 C. PUBLIC PARTICIPATION...26 SUMMARY OF TABLES TABLE I-1 FULLER STREET STUDY AREA INTERSECTIONS...3 TABLE II-1 AVERAGE DAILY TRAFFIC VOLUMES...7 TABLE II-2 CRASH HISTORY SUMMARY...8 TABLE II-3 LEVEL OF SERVICE DESIGNATIONS - UNSIGNALIZED INTERSECTIONS...13 TABLE II-4- LEVEL OF SERVICE OF STUDY AREA INTERSECTIONS...14 TABLE II-5 SIGNAL WARRANT ANALYSIS RESULTS...15 TABLE II-6 LEVEL OF SERVICE UNDER MULTI-WAY STOP APPLICATION...17 TABLE II-7 - LEVEL OF SERVICE DESIGNATIONS - SIGNALIZED INTERSECTIONS...18 TABLE II-8 LEVEL OF SERVICE OF INTERSECTIONS OPERATING UNDER TRAFFIC SIGNAL CONTROL...19 TABLE III-1 FUTURE LEVEL OF SERVICE COMPARISON...21 SUMMARY OF FIGURES FIGURE I-1 LUDLOW STUDY AREA...5 FIGURE II-1 AVERAGE DAILY TRAFFIC VOLUMES...9 FIGURE II-2 MORNING PEAK HOUR TURNING MOVEMENT COUNTS...9 FIGURE II-3 AFTERNOON PEAK HOUR TURNING MOVEMENT COUNTS...10 i

4

5 I. INTRODUCTION The Town of Ludlow requested the Pioneer Valley Planning Commission (PVPC) to perform a safety study of existing transportation conditions at the intersections of Fuller Street with Cady Street and Fuller Street with Cherry Street as part of the FY 2005 Unified Planning Work Program. Based on field observations of existing traffic conditions, the PVPC expanded the study area to include the intersections of West Street with Cady Street, West Avenue with Fuller Street and Center Street (Route 21) with West Avenue. This study identifies the existing transportation and safety conditions for this intersection and provides recommendations to improve existing traffic conditions. A. STUDY AREA West Avenue is an alternative route to the Massachusetts Turnpike for commuting traffic from Belchertown, Palmer and Wilbraham. Many motorists use the Route 21 bridge and side streets connecting Center Street and East Street to access West Avenue. Once on West Avenue, vehicles can turn right onto Fuller Street to utilize either Cady Street or Holyoke Avenue to access Interstate 291 in Chicopee via Burnett Road. The upgrade and realignment of Shawinigan Drive is also a popular alternate route to access Chicopee and Interstate 291. A list of the study area intersections is presented in Table I-1. Figure I-1 presents a map of the study area. Table I-1 Fuller Street Study Area Intersections Intersection Fuller Street with Cady Street Fuller Street with Cherry Street West Street with Cady Street West Avenue with Fuller Street Center Street (Route 21) with West Avenue Fuller Street primarily serves residential land uses at its intersection with Cady Street. Cady Street serves as the minor approach at this three-way intersection and operates under STOP control. One travel lane is provided for each approach at this intersection with a posted speed limit of 25 miles per hour on Fuller Street. A pedestrian cross-walk and sidewalks are provided, however the crosswalk is difficult to see due to the poor condition of its pavement markings. Pavement conditions were observed to be in good to fair condition. In the vicinity of its intersection with Cherry Street, Fuller Street serves residential land use providing one travel lane for the northbound and southbound approaches. Cherry Street connects Fuller Street with Center Street and is widely used as a cut-through route to bypass the intersection of Center Street with West Avenue and access the existing shopping plaza. Cherry Street operates under STOP control and provides one travel lane in each direction. Pavement conditions and sidewalk conditions were observed to be in fair to good condition, however the pavement markings were very faded making it difficult to see the crosswalk across Fuller Street. The posted speed limit is 25 miles per hour on Fuller Street. West Avenue forms a three-way intersection with Fuller Street and serves a variety of residential and commercial land uses. West Avenue provides one travel lane in each 3

6 direction and sidewalks are provided on the westerly side of the street. Fuller Street operates under STOP control and provides a one lane approach at its intersection with West Avenue. The pavement conditions and sidewalks were observed to be in fair to good condition. At the time of the field inventory, the pavement markings were observed to be very faded and with no pedestrian crosswalks provided. A small commercial plaza is located on the eastern side of the intersection. This plaza has one large, unrestricted curb cut that allows vehicles to enter and exit at any point on the corner of the intersection. No curbing is provided in this area and the edge of the road is defined by a painted single white edge line. Fuller Street intersects West Avenue at an acute angle. This, combined with the presence of an existing house on the northwest corner of the intersection, creates sight distance restrictions for vehicles attempting to make a left turn from Fuller Street. The intersection of Cady Street with West Street is a four-way intersection operating under all-way STOP control. West Street has a posted speed limit of 35 miles per hour. There are no crosswalks or sidewalks provided for pedestrians and the intersection lane markings are very faded. A park is located on the southeast corner of the intersection and a convenience store with gas pumps is located on the southwest corner of the intersection. Intersection Ahead signs and faded STOP AHEAD pavement markings are posted on all four approaches to the intersection. Many vehicles were observed to ignore the STOP sign on the northbound approach to the intersection during the field inventory and intersection traffic counts. Center Street (Route 21) intersects with West Avenue and Howard Street to form a four way unsignalized intersection. Howard Street is designated ONE WAY in the eastbound direction and intersects with Center Street approximately 50 feet to the south of West Avenue. Center Street provides one lane of traffic in the vicinity of the intersection and an exclusive left turn lane in the northbound direction. Pavement markings for this intersection were observed to be very faded at the time of the field inventory. Lane markings for the exclusive left turn lane on Center Street were very difficult to see. West Avenue also provides one lane of traffic in each direction and operates under STOP sign control. Sidewalks are provided at each approach and the pavement condition was observed to be in fair to good condition. Land uses in the vicinity of the intersection are a mix of residential and commercial uses. A gas station is located on the northwest corner of the intersection. There are two curb cuts for this gas station on Center Street and one long uncontrolled curb cut for the gas station on West Avenue. The speed limit along Center Street is 25 miles per hour and West Avenue has a speed limit of 30 miles per hour. 4

7 Figure I-1 Ludlow Study Area West Avenue Center Street (Route 21) Cady Street with West Street N Fuller Street West Avenue Cherry Street Cady Street Fuller Street Ludlow, Massachusetts Transportation Safety Study Area N Copyright, 2002 Pictometry International 5

8 6

9 II. EXISTING TRANSPORTATION CONDITIONS This section provides a technical evaluation of the transportation components throughout the study area. It includes a presentation of the data collected, crash experience and operations analyses to the overall performance and safety of these intersections. A. DATA COLLECTION Comprehensive data collection was conducted for this study to identify existing deficiencies. This activity consisted of obtaining traffic volumes, crash experience, and observations of traffic patterns throughout the study area. 1. Daily Vehicle Volume Vehicle volume data was collected for use in the safety analysis of the study area in order to measure the travel demands on an average weekday. Average Daily Traffic (ADT) volumes were compiled for typical weekday 48-hour periods at various mid-block locations within the study area using Automatic Traffic Recorders (ATRs). All ADT volumes were factored to represent Average Annual Daily Traffic (AADT) levels. A total of thirteen daily traffic counts were conducted in the study area. Table II-l and Figure II-1 present a summary of the study area weekday AADT volumes. Location Table II-1 Average Daily Traffic Volumes Cady Street west of West Street Cady Street east of West Street West Street south of Cady Street West Street north of Cady Street Fuller Street between Cady and Cherry Streets Fuller Street south of Cherry Street Cherry Street east of Fuller Street West Avenue west of Fuller Street West Avenue between Fuller and Center Streets Center Street south of West Avenue Center Street north of West Avenue Cady Street west of Fuller Street Fuller Street north of Cady Street NB = Northbound, SB = Southbound, EB = Eastbound, WB = Westbound 2. Hourly Vehicle Volume NB/EB SB/WB Total Manual Turning Movement Counts (TMC s) were conducted at the five intersections within the study area. The TMC s were conducted during the peak commuter periods. The peak period occurs during the morning hours of 7:00 AM to 9:00 AM and the afternoon hours of 4:00 PM to 6:00 PM. At each location the TMC s were conducted to identify the highest four consecutive 15-minute periods of traffic through the intersection. These consecutive peak 15-minute periods constitute a location's "Peak Hour Volume". The peak hour of traffic volume represents the most critical period for operations and will be the focus for some of the analyses conducted in this Study. 7

10 As traffic volumes tend to fluctuate over the course of the year, the Massachusetts Highway Department (MassHighway) develops traffic volume adjustment factors to reflect monthly variations. These factors were examined to determine how traffic conditions in the study area compare to average month conditions in accordance with the month that each intersection was studied. Based on the MassHighway data, traffic volumes during the month of January are estimated to be slightly lower than the annual average. Therefore, the traffic count data was adjusted to reflect average month conditions. Turning movement count data for the morning and afternoon peak hours are summarized on Figures II-2 and II-3. B. CRASH EXPERIENCE Crash information was gathered for all five intersections based on the information provided by the Ludlow Police Department to identify any existing safety problems. A crash rate analysis was performed to compare each intersection to the state average. Table II-2 summarizes the number of crashes by location and type for a period of three years ( ) to identify any common conditions and possible causes. Table II-2 Crash History Summary Intersection Year # of Crashes Crash Type Time Crash Rate Fuller Street with Cady Street Angle 11 AM Peak Ped/Bike 0 PM Peak Rear-End 2 Other Object 2 Not Reported 1 Fuller Street with Cherry Street Angle 12 AM Peak Ped/Bike 0 PM Peak Rear-End 1 Other Object 1 Not Reported 2 Not Reported 2 West Street with Cady Street Angle 9 AM Peak Ped/Bike 0 PM Peak Rear-End 2 Other 8 14 Object 0 Not Reported 3 West Avenue with Fuller Street Angle 4 AM Peak Ped/Bike 0 PM Peak Rear-End 1 Other 6 8 Object 1 Not Reported 2 Center Street with West Avenue Angle 7 AM Peak Ped/Bike 1 PM Peak Rear-End 2 Other Object 0 Not Reported 1 Not Reported 4 Source: Ludlow Police Department,

11 Figure II-1 Average Daily Traffic Volumes West Street Fuller Street Cady Street N Cherry Street Fuller Street West Avenue Center Street (Route 21) Howard Street 9468 Figure II-2 Morning Peak Hour Turning Movement Counts 9

12 West Street Fuller Street Cady Street N Cherry Street Fuller Street West Avenue Center Street (Route 21) Howard Street Figure II-3 Afternoon Peak Hour Turning Movement Counts 10

13 West Street Cady Street Fuller Street N Cherry Street Fuller Street West Avenue Center Street (Route 21) Howard Street

14 The crash rate per million entering vehicles was calculated for each intersection. In theory, crash rates can increase as the traffic volume along the roadway increases or as the potential for conflict is increased. The crash rate per million entering vehicles takes into consideration the number of crashes at an intersection and the number of vehicles that enter the intersection over the course of an average day. Based on MassHighway data, the average crash rate for an unsignalized intersection in the MassHighway District 2 region is As can be seen from Table II-2, the intersections of Fuller Street with Cady Street and Fuller Street with Cherry Street had the most crashes with a total of 16 over a three year period. The majority of the crashes were angle-type crashes that occurred during off-peak hours. Also, most of the crashes did not occur during the morning or afternoon peak hour. The intersections of Fuller Street with Cady Street and Fuller Street with Cherry Street also have high calculated crash rates of 1.08 and 1.07 respectively. The intersection of Center Street (Route 21) with West Avenue also had a high number of crashes with a reported total of 14. This intersection has the highest traffic volumes and therefore more opportunities for conflict resulting in a crash rate of 0.83, just below the district average. No fatalities were reported at any of the intersections within the study area from 2002 to A number of factors can contribute to the crashes that have occurred in the study area. Exiting traffic from Cady Street at its intersection with Fuller Street can experience difficulties in viewing on-coming southbound traffic due to an existing curve on Fuller Street. This may contribute to the number of angle-type crashes at this intersection. In addition, vehicles making the through movement at the intersection of Fuller Street with Cherry Street in the northbound direction have been reported to still have their right turn signal on. This can contribute to driver confusion and lead to vehicle conflicts. A number of crashes at the intersection of West Street with Cady Street resulted from vehicles failing to come to a complete stop. Based on the crash data, 50% of the reported crashes at this intersection occurred as a result of vehicles failing to come to a complete stop on the westbound approach of Cady Street. High traffic volumes and the close proximity of Howard Street contribute to safety problems at the intersection of Center Street with West Avenue. Many vehicles make a right turn from Fuller Street onto Center Street and an immediate left turn from Center Street onto Howard Street. These left turning vehicles can begin to queue as a result of the high volume of opposing traffic in the northbound direction and contribute to congestion at the intersection. Many vehicles were observed to accept smaller gaps in the traffic stream as a result of the high traffic volumes in this area. C. ANALYSIS PROCEDURES 1. Capacity Analysis The study area was examined with regard to capacity and delay characteristics to determine the existing Level of Service (LOS). LOS is an indicator of the operating conditions which occur on a roadway under different volumes of traffic and is defined in 12

15 the 2000 Highway Capacity Manual by six levels, A through F. A number of operational factors can influence the LOS including geometry, travel speeds, and delay. Depending on the time of day and year, a roadway may operate at varying levels. Level of Service A represents the best operating conditions and is an indicator of ideal travel conditions with vehicles operating at or above posted speed limits with little or no delays. Conversely, LOS F, or failure, generally indicates forced flow conditions illustrated by long delays and vehicle queues. Level of Service C indicates a condition of stable flow and is generally considered satisfactory in rural areas. Under LOS D conditions, delays are considerably longer than under LOS C, but are considered acceptable in urban areas. At LOS E the roadway begins to operate at unstable flow conditions as the facility is operating at or near its capacity. A summary of the LOS at an unsignalized intersection is shown in Table II-3. Table II-3 Level of Service Designations - Unsignalized Intersections Average Control Delay (s/veh) LOS Expected Delay To Minor Street 0.0 to 10.0 A Little or no delay >10.0 to 15.0 B Short traffic delays >15.0 to 25.0 C Average traffic delays >25.0 to 35.0 D Long traffic delays >35.0 to 50.0 E Very long delays >50.0 F Extreme delays The basic assumption at an unsignalized intersection is that through moving traffic on the major street is not hindered by other movements. In reality, as minor street delays increase, vehicles are more likely to accept smaller gaps in the traffic stream causing through-moving vehicles to reduce speed and suffer some delay. The left turn movement off the minor street approach is the most heavily opposed movement and typically suffers the greatest delay. Therefore, this movement is used as a gage to determine the overall operations at an unsignalized intersection. Table II-4 presents a summary of the Level of Service for the five intersections in this study area. 13

16 Table II-4- Level of Service of Study Area Intersections AM PM Intersection Delay ** LOS* Delay** LOS* Fuller Street with Cady Street Fuller Street, NB All Directions 8.6 A 8.6 A Cady Street, EB All Directions 19.7 B 60.4 F Overall 14.2 B 34.5 D Fuller Street with Cherry Street Fuller Street, SB All Directions 8.1 A 9.8 A Cherry Street, WB All Directions 15.8 B F Overall 12.0 B 59.3 F West Street with Cady Street West Street, NB All Directions 17.0 B 35.6 D West Street, SB All Directions 21.4 C 18.8 B Cady Street, EB All Directions 11.3 B 15.0 B Cady Street, WB All Directions 18.3 B 14.0 B Overall 17 C 21 C West Avenue with Fuller Street Fuller Street, SB All Directions 44 D 381 F West Avenue, EB All Directions 8.6 A 9.7 A Overall 26.3 D F Center Street with West Avenue Center Street, NB Left Turns 9.5 A 9.8 A Center Street, SB All Directions 7.7 A 7.7 A West Avenue, EB All Directions F 464 F Overall 41.0 D F * = Level of Service ** = In Seconds Based on the results of the analysis, there is significantly more delay in the study area in the afternoon peak hour. The longest delays occur at the intersection of Center Street with West Avenue. Vehicles attempting to exit from West Avenue were calculated to operate at Level of Service (LOS) F during the afternoon peak hour. In addition, northbound left turns from Center Street while not calculated to experience significant delay, typically experience a long queue based on field observations. This can create difficulties for motorists attempting a left turn onto Howard Street and add to delays at the intersection. Long delays were also calculated for the southbound approach of Fuller Street at its intersection with West Avenue. In general most of the minor street approaches were calculated to operate at poor levels of service in the afternoon peak hour. The one exception occurred at the intersection of West Street with Cady Street where only the northbound approach of West Street was calculated to operate at unacceptable levels of delay. 2. Signal Warrant Analysis The intersections in the study area were examined to determine if the minimum warrants for the installation of a traffic signal are met. The 2003 edition of the Manual on Uniform Traffic Control Devices (MUTCD) sets forth the criteria for eight warrants of which one or more should be fully satisfied before a signal is installed. In addition, the installation of a traffic signal must improve the safety and operation of the location under study. Table 14

17 II-5 presents the results of the signal warrant analysis for each of the five study area intersections. Table II-5 Signal Warrant Analysis Results Warrant Description Fuller Street with Cady Street Fuller Street with Cherry Street West Street with Cady Street West Avenue with Fuller Street Center Street with West Avenue 1 Eight Hour Vehicular Volume Satisfied Satisfied Not Satisfied Satisfied Satisfied 2 Four Hour Vehicular Volume Satisfied Satisfied Satisfied Satisfied Satisfied 3 Peak Hour Volume Satisfied Satisfied Not Satisfied Not Satisfied Satisfied 4 Pedestrian Volume Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable 5 School Crossings Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable 6 Coordinated Signal System Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable 7 Crash Experience Satisfied Satisfied Potentially Not Satisfied Potentially 8 Roadway Network Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Of the eight total warrants for the installation of a traffic signal, Warrant #1 Eight Hour Vehicular Volume is generally considered the most important as it requires minimum volumes to be met on both the major and minor streets for at least eight hours. Warrant #2 Four Hour Vehicular Volume and Warrant #3 Peak Hour Volume also require minimum volumes to be met but over shorter timeframes. Warrant #7 Crash Experience requires 80% of the volume requirements of Warrant #1 to be satisfied and at least 5 crashes of a type correctable through traffic signalization to have occurred over the last year. This warrant also requires that less restrictive remedies such as improved signing and pavement markings be tried and have failed to reduce crashes before a signal can be installed. As can be seen from the table, four of the five intersections currently meet the volume requirements of Warrant #1. The only intersection that did not meet the requirements of Warrant #1 was the intersection of West Street with Cady Street. Some of the intersections were noted to be potentially satisfied for Warrant #7 because it was unclear from some of the crash data if the current safety problem would indeed be corrected by the installation of a traffic signal. In addition, less restrictive improvements must be implemented and shown to have failed to improve safety before this warrant is satisfied. Although the intersections of Fuller Street with Cady Street, Fuller Street with Cherry Street and Fuller Street with West Avenue meet the minimum volume requirements for the installation of a traffic signal, full signalization is not recommended at this time. It is the opinion of the PVPC that less restrictive remedies could improve safety and congestion in these areas. In addition, the installation of traffic signals at all four intersections could encourage more cut-through traffic in the study area. 3. Multi-Way Stop Applications A multi-way STOP requires all vehicles to come to a complete stop prior to advancing through the intersection. The first vehicle to arrive at the intersection is granted the right of way. Multi-way stop signs can increase safety in the long term by defining the right of way at the intersection, however it is not uncommon for crashes to increase in the short 15

18 term as traffic adjusts to the new flow procedure. STOP signs are not intended to act as a speed control device. The intersections along Fuller Street were identified as possible candidates to operate under multi-way stop control due to their existing safety problems and congestion. The Manual on Uniform Traffic Control Devices defines the criteria to install multi-way stop control as follows: 1. In the event that a traffic signal is warranted, a multi-way stop can be installed for a brief period of time until the traffic signal is constructed. 2. A crash problem, as indicated by 5 or more reported crashes in a 12-month period that are susceptible to correction by a multi-way stop installation. Such crashes include right and left turn collisions as well as right-angle collisions. 3. Minimum volumes for an intersection: The volume of vehicles entering the intersection from the major street approaches (the total of approaches coming from both directions) is at or exceeds 300 vehicles per hour for any 8 hours of a 24 hour period. The combination of vehicular, pedestrian and cyclists traffic entering the intersection from both of the approaches on the minor street is or exceeds 200 units per hour for the same 8 hours used for the volume of the major street for both approaches or have a delay of at least 30 seconds per vehicle during the highest hour, but If 85 percent of the approach speed for the major street traffic is higher than 40 miles per hour, the minimum vehicular volume warrants are 70 percent of the above values. All three intersections currently meet the requirements for the installation of multi-way stop signs. Multi-way stop signs would create gaps for left and right turning vehicles and potentially reduce delay for these movements; however, they would also create delay for through traffic on the major street approach which is not currently required to stop. At the intersection of Fuller Street with Cherry Street, multi-way stop signs could reduce the problem caused by vehicles that unintentionally leave on their right turn signal and travel straight through the intersection. Table II-6 provides a summary of the Level of Service if the multi-way stop was installed. Due to the close proximity of the intersections of Fuller Street with Cady Street and Fuller Street with Cherry Street it would not be feasible to install multi-way STOP signs at both intersections. Less than 200 feet separates Cady Street from Cherry Street. As a result, it could be possible for vehicles on Fuller Street to queue into the opposite intersection and interfere with proper operation. It is recommended that multi-way STOP signs be installed at one of these intersections. Based on the PVPC turning movement counts, multi-way STOP signs may operate more efficiently at the intersection of Fuller Street with Cherry Street as the volume of traffic on all three approaches is relatively close. The intersection of Fuller Street with West Avenue would require significant improvements before a multi-way STOP could be safely installed. Specifically, the 16

19 northeast corner of the intersection would need to be defined by installing curbing to clearly define the entry and exit points for the commercial plaza and develop a safe location to install a STOP sign for the westbound approach of West Avenue. Table II-6 Level of Service Under Multi-Way Stop Application AM Peak PM Peak Intersection Delay LOS Delay LOS Fuller S treet with West Avenue Fuller Street SB, All M ovements 12.1 B 16.5 C West Avenue, EB All M ovements 10.8 B 94.3 F West Avenue, WB All M ovements 16.4 C 37.5 E Overall 13.1 B 49.4 E Fuller S treet with Cady S treet Fuller Street NB, All M ovements 13.1 B 67.5 F 13.1 B 14 B 11.8 B 17.9 C 12.7 B 33.1 D Fuller Street SB, All M ovements Cady Street, EB All M ovements Overall Fuller S treet with Cherry S treet Fuller Street NB, All M ovements 10 B 38.4 E Fuller Street SB, All M ovements 14.7 B 31.6 D Cherry Street WB, All M ovements 9.9 A 20.3 C Overall 11.5 B 26.0 D * - In seconds ** - Level of Service As can be seen from the table, the intersections would operate with very little delay during the morning peak hour, but significantly longer delays in the afternoon peak hour. The intersection of Fuller Street with West Avenue has the lowest Level of Service (LOS), with the eastbound approach operating at LOS F due to the high vehicle volumes. Longer vehicle queues could occur at each of the intersections under multi-way stop control as a result to delay being added to through traffic on the major street. 4. Traffic Signal Control The efficiency of traffic operations at a signalized location is based on the stopped delay per vehicle for a 15-minute analysis period. These conditions are measured using the nationally accepted standard methodology outlined in the 2000 Highway Capacity Manual (HCM). The HCM's measure of efficiency is quantified in terms of "Level of Service" (LOS). The LOS refers to the quality of traffic flow along roadways and intersections. It is described in terms of A through F, where A represents the best possible conditions and F represents forced-flow of failing conditions. A basic assumption in assigning a value for LOS at an intersection is that vehicles stopped at a signalized intersection are willing to accept longer delays. Table II-7 describes the level of service designations for signalized intersections. 17

20 Table II-7 - Level of Service Designations - Signalized Intersections Category Description Delay LOS A LOS B LOS C LOS D LOS E LOS F Describes a condition of free flow, with low volumes and relatively high speeds. There is little or no reduction in maneuverability due to the presence of other vehicles, and drivers can maintain their desired speeds. Little or no delays result for side street motorists. Describes a condition of stable flow, with desired operating speeds relatively unaffected, but with a slight deterioration of maneuverability within the traffic stream. Side street motorists experience short delays. Describes a condition still representing stable flow, but speeds and maneuverability begin to be restricted. Motorists entering from side streets experience average delays. Describes a high-density traffic condition approaching unstable flow. Speeds and maneuverability become more restricted. Side street motorists may experience longer delays. Represents conditions at or near the capacity of the facility. Flow is usually unstable, and freedom to maneuver within the traffic stream becomes extremely difficult. Very long delays may result for side street motorists. Describes forced flow or breakdown conditions with significant queuing along critical approaches. Operating conditions are highly unstable as characterized by erratic vehicle movements along each approach. (in seconds) < 10.0 >10.0 to 20.0 >20.0 to 35.0 >35.0 to 55.0 >55.0 to 80.0 > 80.0 Each of the four study area intersections found to satisfy the requirements of Warrant #1 in the Manual on Uniform Traffic Control Devices were analyzed to determine the effects the installation of a traffic signal on current vehicular operation. Table II-8 presents the results from this analysis using existing volumes. As part of this analysis it was assumed that an exclusive left turn lane would be installed on the eastbound approach of West Avenue at its intersection with Fuller Street and on the northbound approach of Fuller Street at its intersection with Cady Street. In addition, the intersection of Center Street with West Avenue and Howard Street was analyzed at a four-way intersection. The feasibility of this scenario would need to be identified during the actual design process. 18

21 Table II-8 Level of Service of Intersections Operating Under Traffic Signal Control AM PM Intersection Delay* LOS** Delay* LOS** Fuller Street with Cady Street Fuller Street, NB Through Movement 4.1 A 9.9 A Fuller Street, NB Left Movement 5.9 A 13.6 B Cady Street, SB, All Movements 4.8 A 5.4 A Cady Street, EB All Movements 6.8 A 5.9 A Overall 5.4 A 8.7 B Fuller Street with Cherry Street Fuller Street, NB All Movements 4.4 A 6.4 A Fuller Street, SB Through Movement 4.6 A 6.0 A Fuller Street, SB Left Turn Movement 4.9 A 22.7 C Cherry Street, WB All Movements 7.5 A 8.4 A Overall 5.4 A 10.9 B West Avenue with Fuller Street Fuller Street, SB All Movements 8.2 A 9.8 A West Avenue, EB Through Movement 7.8 A 7.0 A West Avenue, EB Left Movement 9.1 A 21.8 C West Avenue, WB All Movements 9.8 A 4.1 A Overall 8.7 A 10.7 B Center Street with West Avenue Center Street, NB Through Movement 4.7 A 6.3 A Center Street, NB Left Movement 8.4 A 13.9 B Center Street, SB All Movements 18 C 19.2 C West Avenue, EB Right Movement 7.7 A 18.7 C Overall 9.7 B 14.5 B * -In seconds ** - Level of Service As can be seen from the table, all of the intersections are expected to operate with much lower delays under traffic signal control. Due to the close proximity of the intersection of Fuller Street with Cady Street and Fuller Street with Cherry Street, traffic signals for these intersections would need to be coordinated to minimize vehicle queues along Fuller Street between Cady Street and Cherry Street. Again, this analysis assumed a traffic signal at the intersection of Center Street with West Avenue could be designed to allow exiting traffic from West Avenue to access Howard Street without conflicting with northbound traffic on Center Street. In practice, this may not be feasible due to the existing roadway geometry and land uses in the vicinity of the intersection. This issue along with the impact of the existing curb cuts for the gas station on the northwest corner of the intersection would need to be addressed in the design process. Similarly, the existing intersection geometry and land uses in the vicinity of the intersections of West Avenue with Fuller Street, Fuller Street with Cherry Street and Fuller Street with Cady Street may not allow the installation of a traffic signal within the existing intersection right of way. As a result, traffic signals for these three intersections are not recommended by the PVPC at this time. The Town of Ludlow should consider developing conceptual improvement alternatives for each of the study area intersections to determine their true impact on the surrounding property if they would like to pursue the installation of traffic signals. 19

22 III. FUTURE CONDITIONS It is important to consider the impact of future growth on the existing transportation system. Site specific development can be expected to impact the existing flow of traffic and add to congestion and delay throughout the study area. Growth in population and employment in the Town of Ludlow and surrounding communities can also result in increases in traffic. A five year build out scenario was chosen for the purpose of this analysis. Using historical traffic count data and research from recent traffic studies completed in the region a background growth rate of 2% per year was selected. The traffic impacts of a proposed 241 unit low-rise condominium project were also factored into the future traffic volumes for the study area. This development is proposed to access Fuller Street north of the study area. PVPC staff estimated the traffic impacts of this development on the study area using The Institute of Transportation Engineers (ITE) Trip Generation Manual. This manual provides equations to estimate the number of trips expected to be generated by a variety of land uses based on actual traffic counts conducted across the country. Based on the description of the project, ITE Land Use Code #231 Low Rise Condominium was used to estimate the number of vehicle trips expected to be generated by the proposed development. If the proposed development were to be implemented, approximately 231 vehicle trips per day would be generated within the surrounding area. Table III-1 presents a summary of the Level of Service for the Existing Conditions, 2010 future conditions and under future traffic conditions with various transportation improvements 20

23 Inters ection Table III-1 Future Level of Service Comparison AM Exis ting Delay LOS Delay LOS Delay LOS Delay LOS Delay LOS Delay LOS Delay LOS Delay LOS Fuller Street with Cady Street Fuller Street, NB A ll Directions 8.6 A 8.6 A 8.9 A 8.9 A 15.1 C F 14.9 B 17.0 B Cady Street, EB A ll Directions 19.7 C 60.4 F 29.7 D F 13.2 B 21.7 C 17.9 B 24.9 C Overall 14.2 B 34.5 D 19.3 C 85.5 F 14.1 B 71.3 F 16.4 B 21.0 C Fuller Street with Cherry Street Fuller Street, SB A ll Directions 8.1 A 9.8 A 8.3 A 10.6 B 9.9 A 17.7 C 11.1 B 37.3 D Cherry Street, WB A ll Directions 15.8 C F 19.8 C F 8.0 A 10.6 B 22.7 C 34.2 C Overall 12.0 B 59.3 F 14.1 B F 9.0 A 14.2 B 16.9 B 35.8 D West Street with Cady Street Wes t Street, NB A ll Directions 17.0 C 35.6 D 22.7 C 74.9 F Wes t Street, SB A ll Directions 21.4 C 18.8 C 32.2 D 26.2 D Cady Street, EB A ll Directions 11.3 B 15.0 B 12.6 B 18.2 C Cady Street, WB A ll Directions 18.3 C 14.0 B 24.3 C 16.6 C Overall 17 C 21 C 23.0 C 34.0 D PM 2010 Proposed New AM Development 2010 Under Signalized Control West Avenue with Fuller Street Fuller Street, SB A ll Directions 44 E 381 F 44.2 E F 23.4 C 19.3 B 22.5 C 21.2 C Wes t A venue, EB A ll Directions 8.6 A 9.7 A 8.9 A 9.8 A 14.7 B F 11.8 B 20.5 C Overall 26.3 D F 26.6 D 99.0 F 19.1 B 79.5 E 17.2 B 20.9 C Center Street with West Avenue Center Street, NB Left Turns 9.6 A 9.8 A 10.2 B 10.5 B 23.8 C 41.0 D Center Street, SB A ll Directions 7.7 A 7.7 A 7.7 A 7.8 A 29.9 C 30.5 C Wes t A venue, EB A ll Directions F 464 F F F 25.5 C 31.1 C Overall 41.1 E F F 39.4 E 27.7 C 30.8 C PM 2010 Multi-Way Stop AM Control PM AM PM 21

24

25 As can be seen from the table, the increase in volumes in 2010 in addition with the increase in trip generations impose a considerable increase in vehicle volumes and delay throughout the study area. Even if the proposed development was not built, by 2010 the intersections would yet be suffering a considerable amount of delay. IV. TRANSPORTATION RECOMMENDATIONS Based on the results of the transportation study, a series of recommendations were developed to address existing traffic deficiencies and improve safety in the study area. The Town of Ludlow has maintenance authority over the study area intersections. The private site access and egress driveways fall under the jurisdiction of the respective property owners. 1. Fuller Street with Cady Street It was noted at the time of the field inventory that there is a slight curve north of this intersection. This may cause sight distance problems for motorists at the eastbound approach. Installing INTERSECTION AHEAD signs to the north of the intersection may be beneficial. At the time of the field inventory, the lane markings and crosswalks were very hard to see. Re-painting these lines can direct traffic and assist pedestrians when crossing Cady Street. The Town of Ludlow should consider reducing the existing radii on both corners of the eastbound approach of Cady Street. This could assist in reducing the travel speed of right turning traffic from the southbound approach of Fuller Street. Reducing the width of the approach lane on Cady Street could also assist right-turning traffic by not allowing left turning vehicles to pull forward and restrict the sight distance of rightturning vehicles. This intersection satisfies the warrant to operate under multi-way STOP signs at each approach. The intersection of Fuller Street with Cherry Street also satisfies the warrant for multi-way STOP control. Due to the close proximity of these intersections, it is recommended that only one of the two intersections operate under multi-way STOP control while the other intersection continues to operate under present conditions. It is also recommended to install any multi-way STOP signs on a trial basis to determine if they are having a positive impact on traffic operations. 2. Fuller Street with Cherry Street At the time of the field inventory, pavement markings in the vicinity of the intersection as well as the crosswalk on Fuller Street were noted to be faded in many areas. It is recommended that new pavement markings be installed to assist in traffic control in this area and allow pedestrians to safely cross the street. This intersection satisfies the warrant to operate under multi-way STOP signs at each approach. The intersection of Fuller Street with Cady Street also satisfies the warrant for multi-way STOP control. Due to the close proximity of these intersections, it is recommended that only one of the two intersections operate under multi-way STOP control while the other intersection continues to operate under present conditions. It is also recommended to install any multi-way STOP signs on a trial basis to determine if they are having a positive impact on traffic operations. 23

26 3. West Avenue with Fuller Street At the time of the field inventory, pavement markings in the vicinity of the intersection were noted to be faded in many areas. It is recommended that new pavement markings be installed to assist in traffic control in this area. The Town of Ludlow should consider obtaining the services of a licensed professional engineer to develop improvement alternatives to the existing intersection geometry. It might be possible to improve the angle at which Fuller Street intersects with West Avenue by reducing the width of the paved shoulder on West Avenue and improving the radius on the northwest corner. Right-turning traffic from the westbound approach of West Avenue can perform this maneuver at a high rate of speed. The reduction of this radius in combinations with the installation of granite curbing would serve to reduce the speed of right-turning traffic and clearly define the entrance and exit to the land uses on this corner. This would require the permission and cooperation of property owners in this area. 4. West Street with Cady Street At the time of the field inventory, pavement markings in the vicinity of the intersection were noted to be faded in many areas. It is recommended that new pavement markings be installed to assist in traffic control in this area. This should include the existing STOP AHEAD pavement markings on each approach to the intersection. At the intersection of West Street with Cady Street, there are two curb cuts on Cady Street and two curb cuts on West Street for the gas station. Consolidation of the curb cuts further away from the intersection would improve safety and traffic flow at the intersection. This will require permission from the property owners of this property. STOP signs are located on each side of the West Street approaches to the intersection, however, only one of the signs correctly displays the multi-way plaque beneath the sign. The multi-way plaque is required to be displayed beneath all STOP signs at a multi-way stop. At the time of the field inventory, many vehicles were observed to roll through the intersection without coming to a complete stop. Installing larger STOP signs as well as a painted STOP legend immediately prior to the stop line may help alleviate this problem. The Town of Ludlow should consider supplementing the existing multi-way stop signs with flashing red warning beacons. This could assist in enforcing the need to come to a complete stop at this intersection and would provide additional advance warning of the need to stop. It is recommended that this location be restudied in the future to determine if traffic signal control is warranted. 5. Center Street with West Avenue At the time of the field inventory, pavement markings as well as the crosswalks in the vicinity of the intersection were noted to be faded in many areas. It is recommended that new pavement markings be installed to assist in traffic control in this area. At the intersection of Center Street with West Avenue, there is one long curb cut for the GULF gas station on West Avenue. Consolidation of existing curb cuts could assist in improving safety and directing traffic. This will require permission from the property owner. 24

27 The Town of Ludlow should consider obtaining the services of a licensed professional engineer to determine if a traffic signal can be installed at this intersection. While the intersection satisfies the minimum criteria for the installation of a traffic signal it may not be possible as a result of the existing geometry and land uses in the vicinity of the intersection. The PVPC analysis assumed the intersection could operate similar to a traditional four-way intersection. This may require that each approach operate on an exclusive phase. While not the most efficient use of a traffic signal, this option could provide traffic signal control within the limits of the existing intersection right of way. Many vehicles were observed to turn right from West Avenue onto Center Street and make an immediate left turn onto Howard Street. This can both contribute to traffic congestion and decrease safety as many vehicles attempt to perform this maneuver diagonally across Center Street. The installation of a neckdown at the intersection of Center Street with Howard Street would reduce the width of the intersection to one entering travel lane and limit the ability of exiting traffic from West Avenue to perform the existing high speed maneuver across Center Street. This would also assist in defining the ONE WAY status of Howard Street. The Town of Ludlow should consider installing a DO NOT BLOCK INTERSECTION sign on the northbound approach of Center Street immediately prior to Howard Street to allow motorists to turn onto Howard Street. This could help reduce traffic congestion at the intersection of Center Street with West Avenue. Based on the results of the turning movement counts performed by the PVPC, very few vehicles turn left from West Avenue onto Center Street. Vehicles attempting to perform left turns from this approach can experience very long delays and create long vehicle queues on West Avenue. The Town of Ludlow should consider prohibiting left turns from West Avenue at this intersection. B. PRIORITY LIST OF RECOMMENDATIONS Based on the comments received from the Executive Office of Transportation on the draft report, the following is a priority list of the recommendations for the study area. At the time of the field inventory, pavement markings including the crosswalks in the vicinity of all five intersections were noted to be faded in many areas. It is recommended that new pavement markings be installed to assist in traffic control in the study area. This should include STOP AHEAD pavement markings on each approach to the intersection of West Street with Cady Street. The intersections of Fuller Street with Cady Street and Fuller Street with Cherry Street meet the requirements for the installation of all-way STOP signs. Due to the close proximity of these intersections, it is recommended that only one of the two intersections operate under multi-way STOP control while the other intersection continues to operate under present conditions. It is also recommended to install any multi-way STOP signs on a trial basis to determine if they are having a positive impact on traffic operations. The Town of Ludlow should consider obtaining the services of a licensed professional engineer to determine if a traffic signal can be installed at the intersection of West Avenue with Fuller Street. While the intersection satisfies the minimum criteria for the installation of a traffic signal it may not be possible as a result of the existing geometry and land uses in the vicinity of the intersection. The PVPC analysis 25

28 assumed the intersection could operate similar to a traditional four-way intersection. This may require that each approach operate on an exclusive phase. While not the most efficient use of a traffic signal, this option could provide traffic signal control within the limits of the existing intersection right of way. Right-turning traffic from the westbound approach of West Avenue can perform this maneuver at a high rate of speed. The reduction of this radius in combinations with the installation of granite curbing would serve to reduce the speed of right-turning traffic and clearly define the entrance and exit to the land uses on this corner. This would require the permission and cooperation of property owners in this area. The Town of Ludlow should consider reducing the existing radii on both corners of the eastbound approach of Cady Street. This could assist in reducing the travel speed of right turning traffic from the southbound approach of Fuller Street. Reducing the width of the approach lane on Cady Street could also assist right-turning traffic by not allowing left turning vehicles to pull forward and restrict the sight distance of rightturning vehicles. C. PUBLIC PARTICIPATION At the request of the Town of Ludlow, The Pioneer Valley Planning Commission had attended the Board of Selectmen s meeting on April 19, 2005 at the Ludlow Town Hall. An overview of the study was presented as well as some possible short-term and long term recommendations. The Board of Selectmen requested PVPC to attend the Safety Committee Meeting on May 12, The safety committee had a number of comments regarding the draft study as follows: Some members of the Safety Committee expressed concerns regarding the installation of multi- way stop signs at either the intersection of Fuller Street with Cady Street or the intersection of Fuller Street with Cherry Street due to the possibility of motorists not making a complete stop. The Safety Committee agreed with PVPC s recommendations to improve the geometry and reduce the width of the Cady Street approach at its intersection with Fuller Street. The recommendation to define the curve with curbing, improve existing geometry and consolidate curb cuts at the intersection of West Avenue with Fuller Street was well received. On a whole, the Safety Committee preferred the installation of traffic signals as a method to control traffic in the study area. 26

Route 28 (South Orleans Road)/Route 39 (Harwich Road)/Quanset Road Intersection

Route 28 (South Orleans Road)/Route 39 (Harwich Road)/Quanset Road Intersection TRAFFIC FEASIBILITY STUDY Route 28 (South Orleans Road)/Route 39 (Harwich Road)/Quanset Road Intersection Orleans, Massachusetts Prepared for: Town of Orleans Prepared by: Fay, Spofford & Thorndike, LLC

More information

Traffic Impact Analysis Walton Acres at Riverwood Athletic Club Clayton, NC

Traffic Impact Analysis Walton Acres at Riverwood Athletic Club Clayton, NC Traffic Impact Analysis Walton Acres at Riverwood Athletic Club Clayton, NC 1. TABLE OF CONTENTS INTRODUCTION...1 1.1. Site Location and Study Area...1 1.2. Proposed Land Use and Site Access...2 1.3.

More information

BELCHERTOWN. Intersection of Federal Steet (Route 9) and Bay Road MAY 2012

BELCHERTOWN. Intersection of Federal Steet (Route 9) and Bay Road MAY 2012 BELCHERTOWN Intersection of Federal Steet (Route 9) and Bay Road MAY 2012 Prepared Under the Direction of Pioneer Valley MPO By: Pioneer Valley Planning Commission 60 Congress Street Springfield 01104-3419

More information

Traffic Impact Analysis Chatham County Grocery Chatham County, NC

Traffic Impact Analysis Chatham County Grocery Chatham County, NC Chatham County Grocery Chatham County, NC TABLE OF CONTENTS 1. INTRODUCTION... 1 1.1. Location and Study Area... 1 1.2. Proposed Land Use and Access... 2 1.3. Adjacent Land Uses... 2 1.4. Existing ways...

More information

Glenn Avenue Corridor Traffic Operational Evaluation

Glenn Avenue Corridor Traffic Operational Evaluation Glenn Avenue Corridor Traffic Operational Evaluation PREPARED FOR: THE CITY OF AUBURN PREPARED BY: DECEMBER 2007 Glenn Avenue Corridor Study--Auburn, Alabama TABLE OF CONTENTS Introduction... 1 Background

More information

TRANSPORTATION ANALYSIS REPORT US Route 6 Huron, Erie County, Ohio

TRANSPORTATION ANALYSIS REPORT US Route 6 Huron, Erie County, Ohio TRANSPORTATION ANALYSIS REPORT US Route 6 Huron, Erie County, Ohio December 12, 2012 Prepared for: The City of Huron 417 Main Huron, OH 44839 Providing Practical Experience Technical Excellence and Client

More information

JONESBORO HIGHWAY 63 HIGHWAY 18 CONNECTOR STUDY

JONESBORO HIGHWAY 63 HIGHWAY 18 CONNECTOR STUDY JONESBORO HIGHWAY 63 HIGHWAY 18 CONNECTOR STUDY Craighead County May 2007 JONESBORO HIGHWAY 63 HIGHWAY 18 CONNECTOR STUDY Craighead County May 2007 Prepared by Planning and Research Division Arkansas State

More information

Evaluation of M-99 (Broad Street) Road Diet and Intersection Operational Investigation

Evaluation of M-99 (Broad Street) Road Diet and Intersection Operational Investigation Evaluation of M-99 (Broad Street) Road Diet and Intersection Operational Investigation City of Hillsdale, Hillsdale County, Michigan June 16, 2016 Final Report Prepared for City of Hillsdale 97 North Broad

More information

Traffic Circulation Study for Neighborhood Southwest of Mockingbird Lane and Airline Road, Highland Park, Texas

Traffic Circulation Study for Neighborhood Southwest of Mockingbird Lane and Airline Road, Highland Park, Texas ARIZONA TEXAS NEW MEXICO OKLAHOMA February 13, 2015 Mr. Meran Dadgostar P.E., R.S. Town of Highland Park 4700 Drexel Dr. Highland Park, Texas 75205 Re: Traffic Circulation Study for Neighborhood Southwest

More information

METHODOLOGY. Signalized Intersection Average Control Delay (sec/veh)

METHODOLOGY. Signalized Intersection Average Control Delay (sec/veh) Chapter 5 Traffic Analysis 5.1 SUMMARY US /West 6 th Street assumes a unique role in the Lawrence Douglas County transportation system. This principal arterial street currently conveys commuter traffic

More information

TRAFFIC IMPACT ANALYSIS

TRAFFIC IMPACT ANALYSIS TRAFFIC IMPACT ANALYSIS FOR THE CHAMPAIGN UNIT#4 SCHOOL DISTRICT PROPOSED HIGH SCHOOL (SPALDING PARK SITE) IN THE CITY OF CHAMPAIGN Final Report Champaign Urbana Urbanized Area Transportation Study 6/24/2014

More information

Traffic Impact Study WestBranch Residential Development Davidson, NC March 2016

Traffic Impact Study WestBranch Residential Development Davidson, NC March 2016 Traffic Impact Study WestBranch Residential Development Davidson, NC March 216 TRAFFIC IMPACT STUDY FOR THE WestBranch Residential Development LOCATED IN DAVIDSON, NC Prepared For: Lennar Carolinas, LLC

More information

Chapter 4 Traffic Analysis

Chapter 4 Traffic Analysis Chapter 4 Traffic Analysis PURPOSE The traffic analysis component of the K-68 Corridor Management Plan incorporates information on the existing transportation network, such as traffic volumes and intersection

More information

Project Report. South Kirkwood Road Traffic Study. Meadows Place, TX October 9, 2015

Project Report. South Kirkwood Road Traffic Study. Meadows Place, TX October 9, 2015 Meadows Place, TX October 9, 2015 Contents 1 Introduction... 1 2 Data Collection... 1 3 Existing Roadway Network... 2 4 Traffic Volume Development... 2 5 Warrant Analysis... 3 6 Traffic Control Alternative

More information

MEMORANDUM. Nantasket Road at Kingsley Road Kingsley Road at Sumner Street Kingsley Road at Revere Street Kingsley Road at Kenberma Street

MEMORANDUM. Nantasket Road at Kingsley Road Kingsley Road at Sumner Street Kingsley Road at Revere Street Kingsley Road at Kenberma Street MEMORANDUM Date: June 28, 2012 To: From: Subject: Mr. Joseph Stigliani, Director of Public Works Kenneth J. Petraglia, P.E., PTOE Greg E. Lucas, P.E., PTOE Kingsley Road Stop Sign Warrant Analysis BETA

More information

TRAFFIC IMPACT STUDY And A TRAFFIC SIGNAL WARRANT ANALYSIS FOR A SENIOR LIVING AND APARTMENT DEVELOPMENT

TRAFFIC IMPACT STUDY And A TRAFFIC SIGNAL WARRANT ANALYSIS FOR A SENIOR LIVING AND APARTMENT DEVELOPMENT TRAFFIC IMPACT STUDY And A TRAFFIC SIGNAL WARRANT ANALYSIS FOR A SENIOR LIVING AND APARTMENT DEVELOPMENT DEERFIELD TOWNSHIP, WARREN COUNTY, OHIO Nantucket Circle and Montgomery Road () Prepared for: ODLE

More information

ALLEY 24 TRAFFIC STUDY

ALLEY 24 TRAFFIC STUDY ALLEY 24 TRAFFIC STUDY in City of Frostburg, Maryland January 2013 3566 Teays Valley Road Hurricane, WV Office: (304) 397-5508 www.denniscorporation.com Alley 24 Traffic Study January 2013 Frostburg, Maryland

More information

Walmart (Store # ) 60 th Street North and Marion Road Sioux Falls, South Dakota

Walmart (Store # ) 60 th Street North and Marion Road Sioux Falls, South Dakota Walmart (Store #4865-00) 60 th Street North and Marion Road Sioux Falls, South Dakota Prepared for: Wal-Mart Stores, Inc. Bentonville, Arkansas Prepared by: Kimley-Horn and Associates, Inc. ã2013 Kimley-Horn

More information

OFFICE/RETAIL DEVELOPMENT 1625 BANK STREET OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for: Canada Inc.

OFFICE/RETAIL DEVELOPMENT 1625 BANK STREET OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for: Canada Inc. OFFICE/RETAIL DEVELOPMENT 1625 BANK STREET OTTAWA, ONTARIO TRANSPORTATION BRIEF Prepared for: 9402209 Canada Inc. December 15, 2015 115-625 Report_2.doc D. J. Halpenny & Associates Ltd. Consulting Transportation

More information

STILLWATER AVENUE CORRIDOR STUDY Old Town, Maine

STILLWATER AVENUE CORRIDOR STUDY Old Town, Maine Draft Study STILLWATER AVENUE CORRIDOR STUDY Old Town, Maine SUBMITTED TO: BANGOR AREA COMPREHENSIVE TRANSPORTATION SYSTEM SUBMITTED BY: I MAY 23, 2017 DRAFT STILLWATER AVENUE STUDY FINAL REPORT Table

More information

Draft North Industrial Area-Wide Traffic Plan

Draft North Industrial Area-Wide Traffic Plan Summary of North Industrial and Hudson Bay Industrial Recommended Improvements Table 1. Summary of s Item Location 1 2 3 4 5 6 7 8 9 10 11 12 Millar Ave north of 51st St Super 8 Motel back lane 400 Block

More information

5858 N COLLEGE, LLC N College Avenue Traffic Impact Study

5858 N COLLEGE, LLC N College Avenue Traffic Impact Study 5858 N COLLEGE, LLC nue Traffic Impact Study August 22, 2016 Contents Traffic Impact Study Page Preparer Qualifications... 1 Introduction... 2 Existing Roadway Conditions... 5 Existing Traffic Conditions...

More information

Shockoe Bottom Preliminary Traffic and Parking Analysis

Shockoe Bottom Preliminary Traffic and Parking Analysis Shockoe Bottom Preliminary Traffic and Parking Analysis Richmond, Virginia August 14, 2013 Prepared For City of Richmond Department of Public Works Prepared By 1001 Boulders Pkwy Suite 300, Richmond, VA

More information

TRAFFIC IMPACT STUDY

TRAFFIC IMPACT STUDY TRAFFIC IMPACT STUDY for the GLEN ELLEN COUNTRY CLUB SENIOR RESIDENTIAL REDEVELOPMENT 84 Millis, Massachusetts Prepared by: McMahon Associates, Inc. Prepared for: Toll Brothers, Inc. August 216 DRAFT

More information

Corporate. Report COUNCIL DATE: May 25, 1998 NO: R1500 REGULAR COUNCIL. TO: Mayor & Council DATE: April 27, 1998

Corporate. Report COUNCIL DATE: May 25, 1998 NO: R1500 REGULAR COUNCIL. TO: Mayor & Council DATE: April 27, 1998 R1500 : Traffic Safety at 25 Avenue and 128 Street Intersection Corporate NO: R1500 Report COUNCIL DATE: May 25, 1998 REGULAR COUNCIL TO: Mayor & Council DATE: April 27, 1998 FROM: General Manager, Engineering

More information

Harrah s Station Square Casino

Harrah s Station Square Casino Transportation Analysis Harrah s Station Square Casino Pittsburgh, Pennsylvania Submitted To: City of Pittsburgh and Pennsylvania Gaming Control Board Prepared By: DKS Associates GAI Consultants December

More information

NEW YORK CENTRAL PARK SUBDIVISION BLAIS STREET/ST-PIERRE STREET EMBRUN, ONTARIO TRAFFIC IMPACT STUDY. Prepared for:

NEW YORK CENTRAL PARK SUBDIVISION BLAIS STREET/ST-PIERRE STREET EMBRUN, ONTARIO TRAFFIC IMPACT STUDY. Prepared for: NEW YORK CENTRAL PARK SUBDIVISION BLAIS STREET/ST-PIERRE STREET EMBRUN, ONTARIO TRAFFIC IMPACT STUDY Prepared for: Solidex Holdings Limited & Investissement Maurice Lemieux Investments Attn: Mr. Anthony

More information

MEMORANDUM. DATE March 1, 2012 TO Town of Milton Mark Abbott, Seth Asante, and Efi Pagitsas Boston Region MPO Staff

MEMORANDUM. DATE March 1, 2012 TO Town of Milton Mark Abbott, Seth Asante, and Efi Pagitsas Boston Region MPO Staff MEMORANDUM DATE March 1, 212 TO Town of Milton FROM RE Mark Abbott, Seth Asante, and Efi Pagitsas Boston Region MPO Staff FFY 211 Safety and Operations Analyses at Selected Boston Region MPO Intersections:

More information

TRAFFIC SIGNAL WARRANT STUDY

TRAFFIC SIGNAL WARRANT STUDY TRAFFIC SIGNAL WARRANT STUDY 5 th STREET & ENCHANTED PINES DRIVE JANUARY 2013 TRAFFIC OPERATIONS ENGINEERING SERVICES/PUBLIC WORKS DEPARTMENT TABLE OF CONTENTS INTERSECTION LOCATION MAP ii INTRODUCTION

More information

1609 E. FRANKLIN STREET HOTEL TRAFFIC IMPACT STUDY EXECUTIVE SUMMARY

1609 E. FRANKLIN STREET HOTEL TRAFFIC IMPACT STUDY EXECUTIVE SUMMARY 1609 E. FRANKLIN STREET HOTEL TRAFFIC IMPACT STUDY EXECUTIVE SUMMARY Prepared for: The Town of Chapel Hill Public Works Department Traffic Engineering Division Prepared by: HNTB North Carolina, PC 343

More information

Access Location, Spacing, Turn Lanes, and Medians

Access Location, Spacing, Turn Lanes, and Medians Design Manual Chapter 5 - Roadway Design 5L - Access Management 5L-3 Access Location, Spacing, Turn Lanes, and Medians This section addresses access location, spacing, turn lane and median needs, including

More information

Traffic Impact Study. Westlake Elementary School Westlake, Ohio. TMS Engineers, Inc. June 5, 2017

Traffic Impact Study. Westlake Elementary School Westlake, Ohio. TMS Engineers, Inc. June 5, 2017 TMS Engineers, Inc. Traffic Impact Study Westlake Elementary School Westlake, Ohio June 5, 2017 Prepared for: Westlake City Schools - Board of Education 27200 Hilliard Boulevard Westlake, OH 44145 TRAFFIC

More information

Gateway Transportation Study

Gateway Transportation Study Gateway Transportation Study Amherst, Massachusetts SUBMITTED TO University of Massachusetts Amherst Town of Amherst SUBMITTED BY Vanasse Hangen Brustlin, Inc. Watertown, Massachusetts March 213 Back of

More information

URBAN QUARRY HEADQUARTERS 2717 STEVENAGE DRIVE CITY OF OTTAWA TRANSPORTATION OVERVIEW. Prepared for: Urban Quarry 4123 Belgreen Drive, Ottawa K1G 3N2

URBAN QUARRY HEADQUARTERS 2717 STEVENAGE DRIVE CITY OF OTTAWA TRANSPORTATION OVERVIEW. Prepared for: Urban Quarry 4123 Belgreen Drive, Ottawa K1G 3N2 URBAN QUARRY HEADQUARTERS 2717 STEVENAGE DRIVE CITY OF OTTAWA TRANSPORTATION OVERVIEW Prepared for: Urban Quarry 4123 Belgreen Drive, Ottawa K1G 3N2 February 27, 2014 113-584 Overview_1.doc D. J. Halpenny

More information

HIGHBURY AVENUE/HAMILTON ROAD INTERSECTION IMPROVEMENTS PUBLIC INFORMATION CENTRE 1 MAY 14, 2015

HIGHBURY AVENUE/HAMILTON ROAD INTERSECTION IMPROVEMENTS PUBLIC INFORMATION CENTRE 1 MAY 14, 2015 HIGHBURY AVENUE/HAMILTON ROAD INTERSECTION IMPROVEMENTS Municipal Class Environmental Assessment PUBLIC INFORMATION CENTRE 1 MAY 14, 2015 ACCESSIBILITY Under the Accessibility Standards 2015 for Customer

More information

Figure 1: Vicinity Map of the Study Area

Figure 1: Vicinity Map of the Study Area ARIZONA TEXAS NEW MEXICO OKLAHOMA May 5, 2016 Mr. Anthony Beach, P.E. BSP Engineers 4800 Lakewood Drive, Suite 4 Waco, Texas 76710 Re: Intersection and Access Analysis along Business 190 in Copperas Cove

More information

Date: April 4, Project #: Re: A Street/Binford Street Traffic/Intersection Assessment

Date: April 4, Project #: Re: A Street/Binford Street Traffic/Intersection Assessment To: Peter Cavanaugh General Electric From: David Bohn, PE Ryan White, PE Date: April 4, 217 Project #: 13421. Re: / Traffic/Intersection Assessment Consistent with the Cooperation Agreement between the

More information

Capital Region Council of Governments

Capital Region Council of Governments March 23, 2018 Capital Region Council of Governments PROJECT CONCEPT REPORT Realignment of Swamp and Northfield Road s approaches to Route 44 (Boston Turnpike) Town of Coventry SUMMARY: The Town of Coventry

More information

INDUSTRIAL BUILDING 3009 HAWTHORNE ROAD CITY OF OTTAWA TRANSPORTATION OVERVIEW REVISED. Prepared for: Canada Inc.

INDUSTRIAL BUILDING 3009 HAWTHORNE ROAD CITY OF OTTAWA TRANSPORTATION OVERVIEW REVISED. Prepared for: Canada Inc. INDUSTRIAL BUILDING 3009 HAWTHORNE ROAD CITY OF OTTAWA TRANSPORTATION OVERVIEW REVISED Prepared for: 7849648 Canada Inc. Octiober 1, 2015 114-598 Overview_2.doc D. J. Halpenny & Associates Ltd. Consulting

More information

TRAFFIC STUDY GUIDELINES Clarksville Street Department

TRAFFIC STUDY GUIDELINES Clarksville Street Department TRAFFIC STUDY GUIDELINES Clarksville Street Department 9/1/2009 Introduction Traffic studies are used to help the city determine potential impacts to the operation of the surrounding roadway network. Two

More information

A plan for improved motor vehicle access on Railroad Avenue in Provincetown

A plan for improved motor vehicle access on Railroad Avenue in Provincetown A plan for improved motor vehicle access on Railroad Avenue in Provincetown February 2011 A plan for improved motor vehicle access on Railroad Avenue in Provincetown INTRODUCTION AND PROBLEM IDENTIFICATION

More information

WEST AVENUE AND NEW ROAD TRAFFIC STUDY PART III WEST AVENUE CLOSURE ALTERNATIVES ANALYSIS

WEST AVENUE AND NEW ROAD TRAFFIC STUDY PART III WEST AVENUE CLOSURE ALTERNATIVES ANALYSIS WEST AVENUE AND NEW ROAD TRAFFIC STUDY PART III WEST AVENUE CLOSURE ALTERNATIVES ANALYSIS CITY OF LINWOOD ATLANTIC COUNTY, NEW JERSEY March 30, 2006 PREPARED FOR: City of Linwood 400 Poplar Avenue Linwood,

More information

PINESTONE TRAFFIC IMPACT STUDY Travelers Rest, South Carolina

PINESTONE TRAFFIC IMPACT STUDY Travelers Rest, South Carolina PINESTONE TRAFFIC IMPACT STUDY Travelers Rest, South Carolina Prepared for Longbranch Development Prepared by January 13, 219 ii Table of Contents Subject Page Signature Page... i Table of Contents...

More information

Transportation Impact Study for Abington Terrace

Transportation Impact Study for Abington Terrace Transportation Impact Study for Abington Terrace Abington Township, Montgomery County, PA Sandy A. Koza, P.E., PTOE PA PE License Number PE059911 Prepared by McMahon Associates, Inc. 425 Commerce Drive,

More information

Date: September 7, Project #: Re: Spaulding Youth Center Northfield, NH Property. Traffic Impact Study

Date: September 7, Project #: Re: Spaulding Youth Center Northfield, NH Property. Traffic Impact Study To: Ms. Susan C. Ryan Spaulding Youth Center 72 Spaulding Road Northfield, NH 03276 Date: September 7, 2017 Project #: 52455.00 From: Robin Bousa Director of Transportation Systems Re: Spaulding Youth

More information

M-58 HIGHWAY ACCESS MANAGEMENT STUDY Mullen Road to Bel-Ray Boulevard. Prepared for CITY OF BELTON. May 2016

M-58 HIGHWAY ACCESS MANAGEMENT STUDY Mullen Road to Bel-Ray Boulevard. Prepared for CITY OF BELTON. May 2016 M-58 HIGHWAY ACCESS MANAGEMENT STUDY Prepared for CITY OF BELTON By May 2016 Introduction Missouri State Highway 58 (M-58 Highway) is a major commercial corridor in the City of Belton. As development has

More information

Traffic Impact and Access Study PROPOSED DURKEE FARM ESTATES. Foster Street Littleton, Massachusetts. Prepared for: Grimes Road, LLC.

Traffic Impact and Access Study PROPOSED DURKEE FARM ESTATES. Foster Street Littleton, Massachusetts. Prepared for: Grimes Road, LLC. Traffic Impact and Access Study PROPOSED DURKEE FARM ESTATES Foster Street Littleton, Massachusetts Prepared for: Grimes Road, LLC. Westford, MA Prepared by: MDM Transportation Consultants, Inc. 28 Lord

More information

Traffic Impact Study Little Egypt Road Development Denver, North Carolina June 2017

Traffic Impact Study Little Egypt Road Development Denver, North Carolina June 2017 Traffic Impact Study Little Egypt Road Development Denver, North arolina June 2017 N. Little Egypt Road DQ\ QDQFLQJ VDOHV RU RWKHU SHUIRUPDQFH EDVHG FULWHULD Proposed Site Driveways Site Driveway 1 TRAFFI

More information

133 rd Street and 132 nd /Hemlock Street 132 nd Street and Foster Street MINI ROUNDABOUTS. Overland Park, Kansas

133 rd Street and 132 nd /Hemlock Street 132 nd Street and Foster Street MINI ROUNDABOUTS. Overland Park, Kansas 133 rd Street and 132 nd /Hemlock Street 132 nd Street and Foster Street MINI ROUNDABOUTS Overland Park, Kansas September 1, 2017 TABLE OF CONTENTS 1. INTRODUCTION... 1 2. LITERATURE REVIEW... 1 3. CONCEPT

More information

Ottawa Beach Road Study

Ottawa Beach Road Study Ottawa Beach Road Study Prepared For: Park Township September 30, 2014 Project No. G140303 OTTAWA BEACH ROAD STUDY PREPARED FOR: PARK TOWNSHIP SEPTEMBER 30, 2014 PROJECT NO. G140303 TABLE OF CONTENTS 1.0

More information

TRAFFIC CONTROL DEVICES ON EDGEWATER BOULEVARD AT PORT ROYAL AVENUE (NORTH)

TRAFFIC CONTROL DEVICES ON EDGEWATER BOULEVARD AT PORT ROYAL AVENUE (NORTH) Attachment 2 DATE: August 6, 2012 TO: VIA: FROM: SUBJECT: Mayor and Members of the City Council James C. Hardy, City Manager Ramon Towne, Director of Public Works Leah Edwards, Assistant Engineer TRAFFIC

More information

Subject: Solberg Avenue / I-229 Grade Separation: Traffic Analysis

Subject: Solberg Avenue / I-229 Grade Separation: Traffic Analysis MEMORANDUM Transportation Bill Troe, AICP Jason Carbee, AICP 12120 Shamrock Plaza Suite 300 Omaha, NE 68154 (402) 334-8181 (402) 334-1984 (Fax) To: Project File Date: Subject: Solberg Avenue / I-229 Grade

More information

HENDERSON DEVELOPMENT 213, 217, 221, 221 ½, 223 HENDERSON AVENUE and 65 TEMPLETON STREET OTTAWA, ONTARIO TRANSPORTATION OVERVIEW.

HENDERSON DEVELOPMENT 213, 217, 221, 221 ½, 223 HENDERSON AVENUE and 65 TEMPLETON STREET OTTAWA, ONTARIO TRANSPORTATION OVERVIEW. HENDERSON DEVELOPMENT 213, 217, 221, 221 ½, 223 HENDERSON AVENUE and 65 TEMPLETON STREET OTTAWA, ONTARIO TRANSPORTATION OVERVIEW Prepared for: 2294170 Ontario Inc. February 2, 2017 117-652 Report_1.doc

More information

List of Attachments. Location Map... Site Plan... City of Lake Elsinore Circulation Element... City of Lake Elsinore Roadway Cross-Sections...

List of Attachments. Location Map... Site Plan... City of Lake Elsinore Circulation Element... City of Lake Elsinore Roadway Cross-Sections... List of Attachments Exhibits Location Map... Site Plan... City of Lake Elsinore Circulation Element... City of Lake Elsinore Roadway Cross-Sections... Existing Lane Geometry and Traffic Controls... Existing

More information

EXECUTIVE SUMMARY. Page 1 of 6

EXECUTIVE SUMMARY. Page 1 of 6 EXECUTIVE SUMMARY The purpose of this report is to identify conformance with the original traffic impact study for the proposed retail development on Lot 5 of Riverdale Retail Filing No. 1 located on the

More information

Intersection Traffic Control Feasibility Study

Intersection Traffic Control Feasibility Study Intersection Traffic Control Feasibility Study CSAH 9 at CSAH 60 (185th Avenue) Prepared For: Dakota County Transportation Department Western Service Center 14955 Galaxie Avenue, 3rd Floor Apple Valley,

More information

MEMORANDUM. Layout Of Study Intersections And Traffic Control

MEMORANDUM. Layout Of Study Intersections And Traffic Control BOSTON REGION METROPOLITAN PLANNING ORGANIZATION Richard A. Davey, MassDOT Secretary and CEO and MPO Chairman Karl H. Quackenbush, Executive Director, MPO Staff DATE November 15, 2012 TO FROM RE Town of

More information

MEETING FACILITY 2901 GIBFORD DRIVE CITY OF OTTAWA TRANSPORTATION BRIEF. Prepared for: Holiday Inn Express 2881 Gibford Drive Ottawa, ON K1V 2L9

MEETING FACILITY 2901 GIBFORD DRIVE CITY OF OTTAWA TRANSPORTATION BRIEF. Prepared for: Holiday Inn Express 2881 Gibford Drive Ottawa, ON K1V 2L9 MEETING FACILITY 2901 GIBFORD DRIVE CITY OF OTTAWA TRANSPORTATION BRIEF Prepared for: Holiday Inn Express 2881 Gibford Drive Ottawa, ON K1V 2L9 December 18, 2012 112-566 Brief_1.doc D. J. Halpenny & Associates

More information

Table of Contents FIGURES TABLES APPENDICES. Traffic Impact Study Hudson Street Parking Garage MC Project No.: A Table of Contents

Table of Contents FIGURES TABLES APPENDICES. Traffic Impact Study Hudson Street Parking Garage MC Project No.: A Table of Contents Traffic Impact Study Hudson Street Parking Garage MC Project No.: 151714A Table of Contents Table of Contents I. INTRODUCTION... 2 II. EXISTING CONDITIONS... 5 III. 215 EXISTING TRAFFIC CONDITIONS... 6

More information

TRAFFIC IMPACT STUDY COMPREHENSIVE UPDATE TOWN OF THOMPSON S STATION, TENNESSEE PREPARED FOR: THE TOWN OF THOMPSON S STATION

TRAFFIC IMPACT STUDY COMPREHENSIVE UPDATE TOWN OF THOMPSON S STATION, TENNESSEE PREPARED FOR: THE TOWN OF THOMPSON S STATION TRAFFIC IMPACT STUDY COMPREHENSIVE UPDATE TOWN OF THOMPSON S STATION, TENNESSEE PREPARED FOR: THE TOWN OF THOMPSON S STATION Transportation Consultants, LLC 1101 17 TH AVENUE SOUTH NASHVILLE, TN 37212

More information

Technical Memorandum TRAFFIC IMPACT STUDY. RIDLEY ROAD CONVENIENCE STORE Southampton County, VA. Prepared for: Mr. David Williams.

Technical Memorandum TRAFFIC IMPACT STUDY. RIDLEY ROAD CONVENIENCE STORE Southampton County, VA. Prepared for: Mr. David Williams. Technical Memorandum TRFFIC IMPCT STUDY RIDLEY ROD CONVENIENCE STORE Southampton County, V Prepared for: Mr. David Williams By: Charles Smith, P.E., PTOE EPR Charlottesville, V July 2014 1 TBLE OF CONTENTS

More information

Traffic Impact Study. Roderick Place Columbia Pike Thompson s Station, TN. Transportation Group, LLC Traffic Engineering and Planning

Traffic Impact Study. Roderick Place Columbia Pike Thompson s Station, TN. Transportation Group, LLC Traffic Engineering and Planning F i s c h b a c h Transportation Group, LLC Traffic Engineering and Planning Traffic Impact Study Roderick Place Columbia Pike Thompson s Station, TN Prepared March 2016 Ms. Gillian L. Fischbach, P.E.,

More information

INTERSECTION SAFETY STUDY State Route 57 / Seville Road

INTERSECTION SAFETY STUDY State Route 57 / Seville Road INTERSECTION SAFETY STUDY State Route 57 / Seville Road City of Wadsworth, Medina County, Ohio Prepared For: City of Wadsworth Engineering Department 120 Maple Street Wadsworth, OH 44281 Prepared By: GPD

More information

INDUSTRIAL BUILDING 1660 COMSTOCK ROAD CITY OF OTTAWA TRANSPORTATION OVERVIEW. Prepared for:

INDUSTRIAL BUILDING 1660 COMSTOCK ROAD CITY OF OTTAWA TRANSPORTATION OVERVIEW. Prepared for: INDUSTRIAL BUILDING 1660 COMSTOCK ROAD CITY OF OTTAWA TRANSPORTATION OVERVIEW Prepared for: Simluc Contractors Limited 2550 Blackwell Street, Ottawa K1B 5R1 October 18, 2013 113-584 Overview_1.doc D. J.

More information

Highway 49, Highway 351 and Highway 91 Improvements Feasibility Study Craighead County

Highway 49, Highway 351 and Highway 91 Improvements Feasibility Study Craighead County Highway 49, Highway 351 and Highway 91 Improvements Feasibility Study Craighead County Executive Summary March 2015 Highway 49, Highway 351 and Highway 91 Improvements Feasibility Study Craighead County

More information

MEDICAL/OFFICE BUILDING 1637 BANK STREET OTTAWA, ONTARIO TRANSPORTATION OVERVIEW. Prepared for:

MEDICAL/OFFICE BUILDING 1637 BANK STREET OTTAWA, ONTARIO TRANSPORTATION OVERVIEW. Prepared for: MEDICAL/OFFICE BUILDING 1637 BANK STREET OTTAWA, ONTARIO TRANSPORTATION OVERVIEW Prepared for: 2434984 Ontario Inc. 13-5510 Canotek Road Ottawa, Ontario K1J 9J5 June 4, 2015 115-613 Report_2.doc D. J.

More information

Roundabout Feasibility Memorandum

Roundabout Feasibility Memorandum Roundabout Feasibility Memorandum To From Gwen Pipkin Bill Howell Date June 18, 2013 Subject Roundabout Feasibility Study SR 29 PD&E Study From Oil Well Road to SR 82 Collier County, FL FPID 417540-1-22-01

More information

Troutbeck Farm Development

Troutbeck Farm Development Troutbeck Farm Development Willistown Township, Chester County PA For Submission To: Willistown Township Last Revised: October, 4 TPD# INLM.A. 5 E. High Street Suite 65 Pottstown, PA 9464 6.36.3 TPD@TrafficPD.com

More information

MASER ASSOCIATES. Engineers Planners Surveyors TRAFFIC IMPACT ANALYSIS FOR PROPOSED RESIDENTIAL MULTI-FAMILY SEA GULL VILLAGE TOWNSHIP OF COLTS NECK

MASER ASSOCIATES. Engineers Planners Surveyors TRAFFIC IMPACT ANALYSIS FOR PROPOSED RESIDENTIAL MULTI-FAMILY SEA GULL VILLAGE TOWNSHIP OF COLTS NECK 000 MASER ASSOCIATES Engineers Planners Surveyors TRAFFIC IMPACT ANALYSIS FOR PROPOSED RESIDENTIAL MULTI-FAMILY DEVELOPMENT SEA GULL VILLAGE TOWNSHIP OF COLTS NECK MONMOUTH COUNTY Prepared By: Richard

More information

Lake Whitney Elementary School

Lake Whitney Elementary School Lake Whitney Elementary School SCHOOL ROUTE PLAN For LAKE WHITNEY ELEMENTARY SCHOOL LOCATION 18 ORANGE COUNTY Prepared for: ORANGE COUNTY SCHOOL ASSESSMENT PROGRAM ORANGE COUNTY PUBLIC WORKS Traffic Engineering

More information

Truck Climbing Lane Traffic Justification Report

Truck Climbing Lane Traffic Justification Report ROUTE 7 (HARRY BYRD HIGHWAY) WESTBOUND FROM WEST MARKET STREET TO ROUTE 9 (CHARLES TOWN PIKE) Truck Climbing Lane Traffic Justification Report Project No. 6007-053-133, P 101 Ι UPC No. 58599 Prepared by:

More information

FRONT RANGE CROSSINGS TRAFFIC IMPACT STUDY

FRONT RANGE CROSSINGS TRAFFIC IMPACT STUDY FRONT RANGE CROSSINGS TRAFFIC IMPACT STUDY Prepared for: City of Thornton And Colorado Department of Transportation Prepared by: 11 Blake Street, Suite 2 Denver, Colorado 822 Contact: Brian Bern, PE, PTOE

More information

March 11, Lynnfield Board of Selectmen Town of Lynnfield 55 Summer Street Lynnfield, MA Walnut Street Traffic Assessment

March 11, Lynnfield Board of Selectmen Town of Lynnfield 55 Summer Street Lynnfield, MA Walnut Street Traffic Assessment March 11, 2015 Lynnfield Board of Selectmen Town of Lynnfield 55 Summer Street Lynnfield, MA 01940 Re: Walnut Street Traffic Assessment Dear Board of Selectmen Members: As requested, BETA Group, Inc. (BETA)

More information

Existing Conditions. Date: April 16 th, Dan Holderness; Coralville City Engineer Scott Larson; Coralville Assistant City Engineer

Existing Conditions. Date: April 16 th, Dan Holderness; Coralville City Engineer Scott Larson; Coralville Assistant City Engineer Date: April 16 th, 2015 To: From: Re: Dan Holderness; Coralville City Engineer Scott Larson; Coralville Assistant City Engineer Darian Nagle-Gamm, Traffic Engineering Planner Highway 6 (2 nd Street) /

More information

Donahue Drive Corridor Traffic Operational Evaluation

Donahue Drive Corridor Traffic Operational Evaluation Donahue Drive Corridor Traffic Operational Evaluation PREPARED FOR: THE CITY OF AUBURN PREPARED BY: JANUARY 2007 Donahue Drive Corridor Study--Auburn, Alabama TABLE OF CONTENTS Introduction... 1 Background

More information

ORANGE COUNTY PUBLIC WORKS TRAFFIC INVESTIGATIONS

ORANGE COUNTY PUBLIC WORKS TRAFFIC INVESTIGATIONS ORANGE COUNTY PUBLIC WORKS TRAFFIC INVESTIGATIONS STAFF REPORT OF: January 6, 2019 SUPERVISORIAL DISTRICT: 5 SUBJECT: LOCATION: INVESTIGATOR: O Neill Drive at Roanoke Drive; Ladera Ranch; TB 922-E6 Clever

More information

OTTAWA TRAIN YARDS PHASE 3 DEVELOPMENT CITY OF OTTAWA TRANSPORTATION IMPACT STUDY. Prepared for:

OTTAWA TRAIN YARDS PHASE 3 DEVELOPMENT CITY OF OTTAWA TRANSPORTATION IMPACT STUDY. Prepared for: OTTAWA TRAIN YARDS PHASE 3 DEVELOPMENT CITY OF OTTAWA TRANSPORTATION IMPACT STUDY Prepared for: The Ottawa Train Yards Inc. 223 Colonnade Road South, Suite 212 Nepean, Ontario K2E 7K3 January 17, 2012

More information

THIS PAGE LEFT BLANK INTENTIONALLY

THIS PAGE LEFT BLANK INTENTIONALLY GA SR 25 Spur at Canal Road Transportation Impact Analysis PREPARED FOR GLYNN COUNTY, GEORGIA 1725 Reynolds Street, Suite 300 Brunswick, Georgia 31520 PREPARED BY 217 Arrowhead Boulevard Suite 26 Jonesboro,

More information

Walton Acres at Riverwood Athletic Club Clayton, North Carolina

Walton Acres at Riverwood Athletic Club Clayton, North Carolina 9. CONCLUSIONS This Traffic Impact Analysis Update was conducted to determine the potential traffic impacts of the proposed Walton Acres at Riverwood Athletic Club residential development, located east

More information

Windy Ridge Elementary School

Windy Ridge Elementary School Windy Ridge Elementary School SCHOOL ROUTE PLAN For WINDY RIDGE ELEMENTARY SCHOOL LOCATION 54 ORANGE COUNTY Prepared for: ORANGE COUNTY SCHOOL ASSESSMENT PROGRAM ORANGE COUNTY PUBLIC WORKS Traffic Engineering

More information

3.9 - Transportation and Traffic

3.9 - Transportation and Traffic Transportation and Traffic 3.9 - Transportation and Traffic This section describes the potential transportation and traffic effects of project implementation on the project site and its surrounding area.

More information

MEMORANDUM. Charlotte Fleetwood, Transportation Planner

MEMORANDUM. Charlotte Fleetwood, Transportation Planner MEMORANDUM Date: Updated August 22, 2017 To: Organization: Charlotte Fleetwood, Transportation Planner Boston Transportation Department From: Jason DeGray, P.E., PTOE, Regional Director of Engineering

More information

Meadow Woods Elementary School

Meadow Woods Elementary School Drag and drop pic and stretch/crop to the limits of the blue rectangle (delete this text box) Meadow Woods Elementary School Drag and drop pic and stretch/crop to the limits of the blue rectangle (delete

More information

Henderson Avenue Mixed-Use Development

Henderson Avenue Mixed-Use Development Zoning Case: Z145-3 Traffic Impact Analysis Henderson Avenue Mixed-Use Development Dallas, TX October 26 th, 216 Kimley-Horn and Associates, Inc. Dallas, Texas Project #644827 Registered Firm F-928 Traffic

More information

DEPARTMENT OF ENVIRONMENTAL SERVICES. North Harrison Street (Lee Highway to Little Falls Road) Comparative Analysis. Prepared for:

DEPARTMENT OF ENVIRONMENTAL SERVICES. North Harrison Street (Lee Highway to Little Falls Road) Comparative Analysis. Prepared for: DEPARTMENT OF ENVIRONMENTAL SERVICES North Harrison Street (Lee Highway to Little Falls Road) Comparative Analysis Prepared for: Arlington County Department of Environmental Services 2100 Clarendon Boulevard,

More information

Toronto and East York Community Council. Director, Transportation Services, Toronto and East York District

Toronto and East York Community Council. Director, Transportation Services, Toronto and East York District No Turn on Red Regulations STAFF REPORT ACTION REQUIRED Date: June 1, 2010 To: From: Toronto and East York Community Council Director, Transportation Services, Toronto and East York District Wards: Trinity

More information

6060 North Central Expressway Mixed-Use Site Dallas, Texas

6060 North Central Expressway Mixed-Use Site Dallas, Texas Volume 1 Traffic Impact Analysis 6060 North Central Expressway Mixed-Use Site Dallas, Texas April 30, 2018 Kimley-Horn and Associates, Inc. Dallas, Texas Project #063238300 Registered Firm F-928 Traffic

More information

South Albion-Bolton Community Plan North Hill Supermarket Transportation Study Part B: Evaluation of Alternatives

South Albion-Bolton Community Plan North Hill Supermarket Transportation Study Part B: Evaluation of Alternatives Community Plan North Hill Supermarket Transportation Study Part B: Evaluation of Alternatives Prepared for: The Town of Caledon August 9 Transportation Solutions Ltd. 43 Forest Road Cambridge, ON N1S 3B4

More information

Traffic Impact and Access Study. The Preserve at Abbyville Proposed 40B Residential Development. Norfolk, Massachusetts

Traffic Impact and Access Study. The Preserve at Abbyville Proposed 40B Residential Development. Norfolk, Massachusetts Traffic Impact and Access Study The Preserve at Abbyville Proposed 40B Residential Development Norfolk, Massachusetts Prepared for DiPlacido Development Corp. April 2017 Prepared by GREEN INTERNATIONAL

More information

Cricket Valley Energy Project Dover, NY Updated Traffic Impact Study

Cricket Valley Energy Project Dover, NY Updated Traffic Impact Study Updated Traffic Impact Study Community Resources 6.3A Traffic and Transportation Amended This amended Traffic Study incorporates comments from NYSDOT, provided after their review of the original Traffic

More information

DIMARCO CANANDAIGUA PROPERTIES HOUSING PROJECT CANANDAIGUA, ONTARIO COUNTY, NEW YORK

DIMARCO CANANDAIGUA PROPERTIES HOUSING PROJECT CANANDAIGUA, ONTARIO COUNTY, NEW YORK TRAFFIC IMPACT STUDY FOR THE DIMARCO CANANDAIGUA PROPERTIES HOUSING PROJECT CANANDAIGUA, ONTARIO COUNTY, NEW YORK MARCH 14, 2017 PREPARED FOR: 1950 Brighton Henrietta Town Line Rd Rochester, NY 14623 PREPARED

More information

NO BUILD TRAFFIC OPERATIONS

NO BUILD TRAFFIC OPERATIONS 3. 23 NO BUILD TRAFFIC OPERATIONS This section addresses the operations of the transportation system and details how it would be expected to function under year 23 No Build conditions with the projected

More information

Highway 111 Corridor Study

Highway 111 Corridor Study Highway 111 Corridor Study June, 2009 LINCOLN CO. HWY 111 CORRIDOR STUDY Draft Study Tea, South Dakota Prepared for City of Tea Sioux Falls Metropolitan Planning Organization Prepared by HDR Engineering,

More information

The Cape Cod Five Cents Savings Bank

The Cape Cod Five Cents Savings Bank TRAFFIC IMPACT AND ACCESS STUDY The Cape Cod Five Cents Savings Bank Hyannis, Massachusetts PREPARED FOR The Cape Cod Five Cents Savings Bank 19 West Road Orleans, Massachusetts 0263 PREPARED BY 1 Walnut

More information

Abrams Associates. Transportation Impact Analysis. City of Rocklin. Prepared for: David Mohlenbrok City of Rocklin 4081 Alvis Court Rocklin, CA 95677

Abrams Associates. Transportation Impact Analysis. City of Rocklin. Prepared for: David Mohlenbrok City of Rocklin 4081 Alvis Court Rocklin, CA 95677 Transportation Impact Analysis Sierra College Boulevard Commercial Project City of Rocklin Prepared for: David Mohlenbrok City of Rocklin 081 Alvis Court Rocklin, CA 95677 Prepared by: 1875 Olympic Boulevard,

More information

TRAFFIC IMPACT STUDY. Creekside Thornton, Colorado. For. August 2015 November 2015 Revised: August Prepared for:

TRAFFIC IMPACT STUDY. Creekside Thornton, Colorado. For. August 2015 November 2015 Revised: August Prepared for: TRAFFIC IMPACT STUDY For Creekside Thornton, Colorado August 215 November 215 Revised: August 216 Prepared for: Jansen Strawn Consulting Engineers 45 West 2 nd Avenue Denver, Colorado 8223 Prepared by:

More information

APPENDIXB. Traffic Operations Technical Memorandum

APPENDIXB. Traffic Operations Technical Memorandum APPENDIXB Traffic Operations Technical Memorandum Environmental Assessment - Lincoln County, SD 85 th Street: Sundowner Avenue to Louise Avenue November 2017 MEMORANDUM Transportation Jim Kollbaum, PE

More information

Orange Center Elementary School

Orange Center Elementary School Drag and drop pic and stretch/crop to the limits of the blue rectangle (delete this text box) Orange Center Elementary School Drag and drop pic and stretch/crop to the limits of the blue rectangle (delete

More information

Draft Report. Traffic Impact Study. Superstore, Wal-Mart, and Kent Development. Yarmouth, Nova Scotia. Prepared for

Draft Report. Traffic Impact Study. Superstore, Wal-Mart, and Kent Development. Yarmouth, Nova Scotia. Prepared for oad & Traffic Management Road & Traffic Management R Atlantic Traffic Engineering Specialists Draft Report Traffic Impact Study Superstore, Wal-Mart, and Kent Development Yarmouth, Nova Scotia Prepared

More information

DRAFT Davidson Elementary School Expansion Transportation Impact Analysis

DRAFT Davidson Elementary School Expansion Transportation Impact Analysis DRAFT Davidson Elementary School Expansion Transportation Impact Analysis Prepared for: Town of Davidson 216 S. Main Street Davidson, NC 28036 Prepared by: Stantec Consulting Services Inc. 2127 Ayrsley

More information