1 Central Freeway and Octavia Circulation Study Final Report Plans and Programs Committee San Francisco County Transportation Authority September 18, 2012
2 Presentation Outline Background and Study Purpose Travel Demand and Transportation Needs Goals Framework and Circulation Strategy Project Analysis Study Recommendations Graphic Source: SFCTA 2
3 Study Purpose Assess circulation since the completion of the Central Freeway/Octavia Boulevard project, recommend improvements, and develop a circulation strategy. Multimodal approach to analysis of needs and opportunities Circulation strategy to inform San Francisco Transportation Plan Develop near-term project opportunities Graphic Source: SFCTA 3
4 Market and Octavia Area Plan Plan Area Graphic Source: SF Planning Dept. 4
5 Study Area Due to its central location, the Study Area encompasses multiple levels: Analyze local conditions and community needs Assess major connections to rest of SF and region Examine issues and opportunities at regional, interdistrict, and citywide levels Graphic Source: Google Maps 5
6 Existing Conditions Key Challenges and Needs While the Boulevard project brought substantial urban design and land use benefits to the area, key transportation issues and needs remain: Chronically congested corridors and intersections Vehicle conflicts and poor motorist behavior Pedestrian safety needs; missing infrastructure and amenities Transit crowding, reliability, and delay issues through area Need for improved bicycle connections Graphic Source: SFCTA 6
7 Motorized Travel in the Market-Octavia Area (2010) ~270k Daily Trips with an origin and/or destination in the M-O Area ~760k Daily Trips pass through M-O with origin and destination elsewhere Transit 85,000 32% Transit 206,000 27% Auto 183,000 68% Source: SFCTA SF-CHAMP 4. Auto 557,000 73% 7
8 Motorized Travel in the Market-Octavia Area (2010) About three-quarters of motorized travel is pass-through Auto to/from 183,000 Transit to/from 85,000 Transit pass-through 206,000 Auto pass-through 557,000 Source: SFCTA SF-CHAMP 4. 8
9 Traffic Levels Historical Changes Weekday Daily Traffic Volumes Location Fell Street, west of Laguna, westbound Oak Street, west of Laguna, eastbound 1996 With Freeway 2005 No Freeway / Before Octavia 2006 After Octavia Change Change 43,000 18,000 33, % -30% 47,000 25,000 41, % -15% Source: SFMTA 9
10 Areawide Circulation Strategy Study Policy Framework Goals Improve circulation and the multimodal network Shift travel to transit and non-motorized modes Improve safety and walkability Circulation Strategy Purpose Examine circulation issues and needs in the overall study area Develop a high-level circulation strategy (corridor- and street-level) Guide the development of future projects and programs 10
11 Areawide Circulation Strategy Principles All surface streets should provide accessible and safe pedestrian access Streets with a significant traffic role warrant features to address safety and performance for other modes, particularly non-motorized and transit Multiple modal priorities are possible/important on many routes; corridors should be considered across multiple streets Graphic Source: SFCTA 11
12 Areawide Circulation Strategy Highlights of street-level recommendations (east-west) Turk and Golden Gate potential for key bicycle network function McAllister develop as Muni Rapid corridor for 5-Fulton service Grove improve pedestrian/streetscape connections to Civic Center BART Page bicycle priority corridor Haight complete two-way transit connection at Market Street 16 th Street transit priority design options (as developed through EN-TRIPS) 12
13 Areawide Circulation Strategy Highlights of street-level recommendations (north-south) Church-Fillmore transit priority improvements and parking management Octavia design improvements to address intersection operations Gough/Franklin focus on pedestrian amenities and features Polk bicycle network development and connectivity 7 th, 8 th, 9 th, 10 th circulation and traffic management strategies, to be further advanced through SFTP Core Circulation Study 13
14 Citywide/Programmatic Strategies Demand management Congestion pricing Parking pricing and parking management/provision policies Employer-based TDM Freeway access/egress demand management and design changes Local/regional transit connectivity County-level and regional investments/programs, such as: Freeway HOV studies Caltrain corridor improvements Daly City BART FastPass fare policy M-Line/19 th Avenue corridor BART Metro 14
15 Graphic Source: SFCTA Closed Crosswalk Analysis Closed crosswalks present at heavy turn locations Fell/Gough (south to west) Fell/Franklin (north to east) Oak/Franklin (east to north) Options: Lead interval with permissive turn Restrict turn movement to one-lane Protect two-lane turn movement (dedicated signal phase) 15
16 Crosswalk Analysis Findings Restricting through or turning movements results in some traffic impact Two-way Hayes generally reduces level of delay Recommend Fell/Gough as first location to re-open, either: Maintain two lane right turn, or Restrict to one lane right turn Additional analysis for design phase: Updated analysis with post-hayes/fell two-way volume data Include supporting improvements with circulation change 16
17 Octavia Boulevard Operations/Design Opportunities Graphic Source: SFMTA Overview Opportunities are limited, absent more robust demand management Some spot improvements possible without major traffic impacts 17
18 Oak/Octavia Design Concept Graphic Source: SFCTA Oak Street Lane Drop Variations possible, including circulation changes for eastern portion of Oak Land use at NW corner may present opportunity to coordinate improvements 18
19 San Jose Avenue Corridor Analysis Objectives for Expressway Segment analysis: Reduce NB San Jose from 2 to 3 lanes Improve northbound bicycle facility Better managed 3-way traffic merge Support reconfiguration of I-280 off-ramp Anticipate more robust planning process Graphic Source: SFCTA 19
20 Graphic Source: SFCTA San Jose Avenue Corridor Three Options Option 1: Close San Jose Ave at Tingley Street Option 2: Close Monterey ramp to motor vehicles Option 3: Signalize merging traffic flows 20
21 San Jose Corridor Closing Monterey flyover is the most promising option of the three Further community input required More detailed assessment of traffic impacts Reducing I-280 off-ramp lane configuration remains a community desire May be feasible based on off-ramp volumes Further near-term improvements to be considered with SFMTA and Caltrans Graphic Source: SFCTA 21
22 Overall Study Findings Boulevard brought significant urban design and land use benefits Given somewhat lower capacity, some traffic diverted elsewhere nearby, citywide These shifts accompanied by general growth in traffic Trips generated to/from/within neighborhood have high transit first mode shares But, trips through the Market-Octavia area are auto-dominated High traffic volumes impair the neighborhood s ability to grow, improve livability Addressing transportation needs is challenged by the diversity of travel patterns 22
23 Graphic Source: SFCTA Overall Study Recommendations As the design of streets is rebalanced to prioritize non-automobile modes, improvements to the transit and bicycle networks are crucial A range of TDM strategies and policies are warranted to managed demand Both within the neighborhood and in corridors leading to/from it Given their varying network roles, different modes warrant varying levels of priority and design accommodation on different streets in the study area 23
24 Next Steps Work with DPW/SFMTA on integrating ped. improvements into Franklin/Gough paving Support other currently projects in planning/design phase: Re-opening closed crosswalks Lower Polk bike network connection Advance other projects into design phase: Octavia intersection improvements; Oak Street reconfiguration Coordination with major corridor projects Van Ness BRT, Better Market Street Seek resources to advance planning and design for the San Jose Avenue corridor 24
25
Central Freeway and Octavia
Executive Summary ES.1 Study Background The San Francisco County Transportation Authority (Authority), in cooperation with partner agencies and the community, undertook a study of transportation needs
More informationPlans and Programs Committee September 18, 2012
09.13.12 Plans and Programs Committee September 18, 2012 Plans and Programs Committee: Commissioners Avalos (Chair), Kim (Vice Chair), Cohen, Farrell, Olague and Campos (Ex Officio) Tilly Chang Deputy
More informationCentral Freeway and Octavia Circulation Study DRAFT. Draft Final Report. June San Francisco County Transportation Authority
Draft June 2012 San Francisco County Transportation Authority This project was funded by the Metropolitan Transportation Commission and the San Francisco County Transportation Authority. Executive Summary
More informationWelcome! San Jose Avenue Open House August 25, 2015
Welcome! San Jose Avenue Open House August 25, 2015 Vision Zero The City and County of San Francisco adopted Vision Zero San Francisco Vision Zero High Injury Network as a policy in 2014, committing an
More informationVan Ness Avenue Bus Rapid Transit (BRT) San Francisco Environment Commission Policy Committee
Van Ness Avenue Bus Rapid Transit (BRT) San Francisco Environment Commission Policy Committee 04.30.12 Van Ness Avenue BRT Project Background Key north-south link in San Francisco s Rapid Transit network
More informationBetter Market Street Project Update. Urban Forestry Council September 17, 2014
Better Market Street Project Update Urban Forestry Council September 17, 2014 Project Area Limits Better Market Street Schedule Market Street City s busiest transit corridor Over 85 buses per hour 14 surface
More informationProject Goal and Description. Why Broadway? Broadway SFMTA.COM/BROADWAY. The goal of the Broadway Safety Improvement
PROJECT OVERVIEW Project Goal and Description The goal of the Broadway Safety Improvement d St Van Ness Ave Project is to improve safety and comfort for all who Franklin St Hyde St Octavia St Gough St
More informationSF Transportation Plan Update
SF Transportation Plan Update CAC Meeting #11 Existing Conditions and Future Baseline Needs Revised, Part I www.sfcta.org/movesmartsf twitter.com/sanfranciscota www.facebook.com/movesmartsf January 30,
More informationSanta Clara I-280 CORRIDOR STUDY
Santa Clara I-280 CORRIDOR STUDY OCTOBER 2017 PREPARED BY: 1.1 Background The I-280 Corridor Study within Santa Clara County is a high-level highway planning study led by the Santa Clara VTA, in partnership
More informationmodes, the increased roadway capacity is the implied solution, which, in turn, has been shown to lead to more driving (induced demand).
CONGESTION MANAGEMEN T PROGRAM DECEMBER, 201 7 EXECUTIVE SUMMARY A. Introduction Every two years, the San Francisco County Transportation Authority (SFCTA) prepares the San Francisco Congestion Management
More informationBetter Market Street Project. Project Update January 15, 2015
Better Market Street Project Project Update January 15, 2015 Better Market Street Project Area Limits Market Street 2.2 Miles Mission Street Better Market Street Schedule Market Street City s busiest transit
More informationWelcome! Thank you for joining us today for a Geary Rapid project open house. Geary Rapid Project. SFMTA.com/GearyRapid
Welcome! Thank you for joining us today for a Geary Rapid project open house. Get the most out of this event: 1. Sign in and get your feedback sheet 2. Visit project information stations hosted by project
More informationALTERNATIVES SCREENING REPORT
VAN NESS AVENUE BUS RAPID TRANSIT (BRT) ALTERNATIVES SCREENING REPORT Revised Draft, 3/28/08 San Francisco County Transportation Authority 1 Introduction The San Francisco County Transportation Authority
More informationVan Ness Avenue BRT Overview and Scoping Process. Geary BRT CAC January 8, 2009
Van Ness Avenue BRT Overview and Scoping Process Geary BRT CAC January 8, 2009 VAN NESS AVENUE S ROLE Identified in Prop K for BRT treatment Muni 47 and 49; 19 operates on Polk 20,000 daily riders on Van
More informationGeneva-Harney Bus Rapid Transit Feasibility Study
Geneva-Harney Bus Rapid Transit Feasibility Study Community Advisory Committee 24 Baseline Trends & Conditions SAN FRANCISCO COUNTY TRANSPORTATION AUTHORITY January 8, 215 Overview Expected 24 land use/network
More informationmodes, the increased roadway capacity is the implied solution, which, in turn, has been shown to lead to more driving (induced demand).
EXECUTIVE SUMMARY A. Introduction The San Francisco Congestion Management Program (CMP) is a biennial program conducted in accordance with state law to monitor congestion and adopt plans for mitigating
More informationSan Francisco Planning Department IPIC Report 2016
San Francisco Planning Department IPIC Report 2016 and Expenditure Plan FY 2017 2018 San Francisco Planning Commission January 7, 2016 IMPLEMENTING OUR COMMUNITY PLANS The Plan Implementation Team manages
More informationTransportation Analysis
Van Ness Avenue Bus Rapid Transit Project Chapter 3: Transportation Analysis CHAPTER SUMMARY: This chapter provides an overview of transportation in and around the project study area, with and without
More informationProtected Bike Lanes in San Francisco Mike Sallaberry SFMTA NACTO Workshop - Chicago IL
Protected Bike Lanes in San Francisco Mike Sallaberry SFMTA 10 14 2011 NACTO Workshop - Chicago IL San Francisco 2 nd Highest Density in the U.S. 47 square miles Mild Climate Market Population ~810,000
More informationVision Zero Priority Projects (March 2017)
Key in 201 or of Key Potrero Ave., from Division to Cesar Chavez Begin Construction Spring 201 Winter 201 Achieved Safety measures include dedicated transit lane, sidewalk widening, buffers for existing
More informationPurpose and Need. Chapter Introduction. 2.2 Project Purpose and Need Project Purpose Project Need
Chapter 2 Purpose and Need 2.1 Introduction The El Camino Real Bus Rapid Transit (BRT) Project (Project) would make transit and other transportation improvements along a 17.6-mile segment of the El Camino
More informationBALBOA AREA: TRANSPORTATION PROJECTS & PLANNING
BALBOA AREA: TRANSPORTATION PROJECTS & PLANNING TRANSPORTATION FOR ALL AGES, ABILITIES & MEANS CHANGING PATTERNS: TRENDING TO WALKING, BIKING, TRANSIT San Francisco s Change in Number of Commuters by Mode
More informationMemorandum. Fund Allocation Fund Programming Policy/Legislation Plan/Study Capital Project Oversight/Delivery Budget/Finance Contract/Agreement Other:
Memorandum Date: November 20, 2017 To: Transportation Authority Board From: Eric Cordoba Deputy Director Capital Projects Subject: 12/5/17 Board Meeting: San Francisco Freeway Corridor Management Study
More informationDistrict 6 & Citywide Non-Transit Project Delivery Status Report
District 6 & Citywide Non-Transit Project Delivery Status Report Prop K and Non-Prop K Active Projects October 23, 2012 SAN FRANCISCO COUNTY TRANSPORTATION AUTHORITY SAN FRANCISCO COUNTY TRANSPORTATION
More informationPARKMERCED. San Francisco Municipal Transportation Agency Board Meeting September 7, 2010
PARKMERCED San Francisco Municipal Transportation Agency Board Meeting September 7, 2010 Project Team OEWD: Overview Project Sponsor: Parkmerced Highlights SFMTA: Transportation Highlights, Process and
More informationREVIEW OF LOCAL TRAFFIC FLOW / LONG RANGE PLANNING SOLUTIONS STUDY
ITEM Town of Atherton TRANSPORTATION COMMITTEE STAFF REPORT TO: FROM: MEMBERS OF THE COMMITTEE ROBERT OVADIA, PUBLIC WORKS DIRECTOR DATE: FEBRUARY 12, 2019 SUBJECT: REVIEW OF LOCAL TRAFFIC FLOW / LONG
More informationFINAL REPORT DECEMBER 2011
FINAL REPORT DECEMBER 2011 AKNOWLEDGEMENTS SFMTA Staff Erin Miller, Project Manager Timothy Papandreou Jerry Robbins Pamela Stone Mike Sallaberry Chris Dimeling Emily Drennen Suzanne Chen-Harding San
More informationCommunity Task Force July 25, 2017
Community Task Force July 25, 2017 Welcome and Introductions Project Partners Regional Transportation District (RTD) Colorado Department of Transportation (CDOT) Denver Regional Council of Governments
More informationABOUT THIS STUDY The Tenderloin-Little Saigon Community-Based Transportation Plan
ABOUT THIS STUDY The Tenderloin-Little Saigon Community-Based Transportation Plan The Greater Tenderloin Community Study Milestones October Community based organizations (Tenderloin Housing Clinic and
More informationCaltrans Sloat Boulevard Pedestrian Safety Project Response to Community Questions, Comments & Concerns
Caltrans Sloat Boulevard Pedestrian Safety Project Response to Community Questions, Comments & Concerns Revised: May 10, 2016 The California Department of Transportation (Caltrans) is planning various
More informationIntro Strategic Plan SFTP TDM Facilities Transit Bicycle Pedestrian Taxi BICYCLE UPDATE. Presented by Timothy Papandreou, Strategic Planning & Policy
BICYCLE UPDATE Presented by Timothy Papandreou, Strategic Planning & Policy 114 Strategic Goals & Objectives Goal 1: Create a safer transportation experience for everyone Objective 1.3: Improve the safety
More informationSAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY
THIS PRINT COVERS CALENDAR ITEM NO.: 10.3 DIVISION: Sustainable Streets BRIEF DESCRIPTION: SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY Approving various traffic and parking modifications on Bay Street
More informationEXECUTIVE SUMMARY... vii 1 STUDY OVERVIEW Study Scope Study Area Study Objectives
Contents EXECUTIVE SUMMARY... vii 1 STUDY OVERVIEW... 1-1 1.1 Study Scope... 1-1 1.2 Study Area... 1-1 1.3 Study Objectives... 1-3 2 EXISTING CONDITIONS... 2-1 2.1 Existing Freeway Conditions... 2-4 2.1.1
More informationPreliminary Transportation Analysis
Preliminary Transportation Analysis Goals of a Robust, Multimodal Transportation Network Safe Accessible/Connected Efficient Comfortable Context-Sensitive Motor Vehicle: Continue to analyze the data to
More informationEliminate on-street parking where it will allow for a dedicated bus only lane %
Traffic Dashboard Priorities Survey Responses Introduction 1) Are you familiar with bus rapid transit (BRT)? a. No, BRT is new to me. 597 23.5% b. I ve heard of BRT, but I don t know much about it. 1,136
More informationNorthbound San Jose Avenue & I-280 Off-Ramp Road Diet Pilot Project
Project Overview Fed by a two-lane Interstate-280 (I-280) off-ramp, high vehicular volumes and speeds are longstanding issues along San Jose Avenue. Residents in the surrounding neighborhoods have expressed
More informationHighway 217 Corridor Study. Phase I Overview Report
Highway 217 Corridor Study Phase I Overview Report November 3, 24 BACKGROUND AND OVERVIEW Study purpose The Highway 217 Corridor Study is developing multi-modal transportation solutions for traffic problems
More informationUpper Market Street Bike Lane Project
Upper Market Street Bike Lane Project 17th Street to Octavia Boulevard 6 30 2010 SAN FRANCISCO, CALIFORNIA Agenda San Francisco & Sustainable Transportation Project Goals Outreach & Coordination Project
More informationSFMTA SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY
SFMTA SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY VAN NESS BUS RAPID TRANSIT PROJECT UPDATE PRESENTATION TO SFMTA BOARD OF DIRECTORS RELEASE OF DRAFT ENVIRONMENTAL IMPACT STATEMENT / REPORT 10 18 2011
More informationMcGrath Boulevard Project Development Public Meeting #2 May 28 th, 2015 East Somerville Community School
McGrath Boulevard Project Development Public Meeting #2 May 28 th, 2015 East Somerville Community School Agenda Introductions Project Context Current Construction McGrath Boulevard Project Development
More informationBetter Market Street. Engineering, Maintenance & Safety Committee (EMSC) February 28, 2018
Better Market Street Engineering, Maintenance & Safety Committee (EMSC) February 28, 2018 1 Market Street Market Street - San Francisco by rulenumberone2 2 Market Street is the... City s busiest pedestrian
More informationEL CAMINO REAL BUS RAPID TRANSIT (BRT) PROJECT
Agenda Item #4.2 EL CAMINO REAL BUS RAPID TRANSIT (BRT) PROJECT VTA BOARD WORKSHOP MAY 1, 2015 ABOUT THIS PRESENTATION CONTEXT Existing conditions and planning for growth WHAT IS THE PROJECT? Project alternatives
More informationRegional Transportation Needs Within Southeastern Wisconsin
Regional Transportation Needs Within Southeastern Wisconsin #118274 May 24, 2006 1 Introduction The Southeastern Wisconsin Regional Planning Commission (SEWRPC) is the official areawide planning agency
More informationRoute 7 Corridor Study
Route 7 Corridor Study Executive Summary Study Area The following report analyzes a segment of the Virginia State Route 7 corridor. The corridor study area, spanning over 5 miles in length, is a multi
More information25th Avenue Road Diet Project A One Year Evaluation. Transportation Fund for Clean Air Project #05R07
25th Avenue Road Diet Project A One Year Evaluation Transportation Fund for Clean Air Project #05R07 Submitted by: The San Francisco Municipal Transportation Agency Dan Provence May 22, 2009 EXECUTIVE
More informationData Analysis February to March Identified safety needs from reported collisions and existing travel patterns.
Welcome! Thank you for participating in today s Valencia Bikeway Improvements workshop. Data Analysis February to March Identified safety needs from reported collisions and existing travel patterns. Initial
More informationPolk Streetscape Project
What is this project? The Polk Streetscape Project is an effort to improve safety for everyone traveling on Polk Street between Union and McAllister streets. Also included in this project are paving, sewer
More informationINTRODUCTION. The focus of this study is to reduce congestion and improve mobility for all modes of transportation. Figure ES-1 Study Corridor Map
INTRODUCTION The I-280 Corridor Study is a highway planning study led by Santa Clara VTA, in partnership with the City of Cupertino and in coordination with other stakeholders in the study area. The study
More information3.16 TRANSPORTATION, CIRCULATION, AND PARKING Regulatory Setting Environmental Setting ROADWAY SYSTEM
3.16 TRANSPORTATION, CIRCULATION, AND PARKING This section assesses the potential for implementation of the Orchard Park Redevelopment component of the 2018 LRDP to result in impacts related to transportation,
More informationSan Jose Transportation Policy
San Jose Transportation Policy Protected Intersections in LOS Policies to Support Smart Growth Presented by: Manuel Pineda City of San Jose Department of Transportation Bay Area Map San Francisco Oakland
More information2014/2015 BIKE ROUTE PLAN 83 AVENUE PROTECTED BIKE LANE
About the Project 2014/2015 BIKE ROUTE PLAN The City of Edmonton is planning a major bike route on the south side of Edmonton. This bike route is one part of a plan to provide citizens with transportation
More informationSAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY
THIS PRINT COVERS CALENDAR ITEM NO. : 11 DIVISION: Sustainable Streets BRIEF DESCRIPTION: SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY Approving traffic modifications on Twin Peaks Boulevard between Christmas
More informationBerkeley Strategic Transportation Plan A-76
Berkeley Strategic Transportation Plan A-76 Appendices 1. A Team Effort 2. Where We ve Been A-11 Berkeley Strategic Transportation Plan Alameda County Transportation Plan Alameda County will be served
More informationFROM: CITY MANAGER DEPARTMENT: PLANNING AND COMMUNITY ENVIRONMENT DATE: OCTOBER 4, 2004 CMR:432:04
TO: HONORABLE CITY COUNCIL FROM: CITY MANAGER DEPARTMENT: PLANNING AND COMMUNITY ENVIRONMENT DATE: OCTOBER 4, 2004 CMR:432:04 SUBJECT: FINANCE COMMITTEE RECOMMENDATION TO ADOPT TRANSPORTATION STRATEGIC
More informationUniversity Hill Transportation Study Technical Memorandum Alternatives Modeling and Analysis May 2007
Technical Memorandum May 2007 Syracuse Metropolitan Transportation Council Edwards and Kelcey with Wallace Roberts and Todd Alta Planning and Design CONTENTS SECTION ONE- INTRODUCTION...1 SECTION TWO-
More informationGEARY BRT SIMULATION VISSIM Calibration and Existing Conditions Results
GEARY BRT SIMULATION VISSIM Calibration and Existing Conditions Results Geary BRT Citizens Advisory Committee February 17, 2011 www.gearybrt.org Presentation Objectives 1. Overview of modeling process
More informationCITY OF BLOOMINGTON COMPLETE STREETS POLICY
CITY OF BLOOMINGTON COMPLETE STREETS POLICY POLICY OBJECTIVE: The City of Bloomington will enhance safety, mobility, accessibility and convenience for transportation network users of all ages and abilities,
More informationABOUT MUNI FORWARD. Muni Forward is the SFMTA s initiative to make transit safer and more reliable.
TOPICS Service Planning Overview April 25 Service Increases Muni Forward General Update Haight Street Rapid Project McAllister Street Rapid Project New System Map and Related Bus Stop Changes 2 ABOUT MUNI
More informationPedestrian and Bicycle Conditions
Pedestrian and Bicycle Conditions Geary Citizens Advisory Committee May 8, 2014 SAN FRANCISCO COUNTY TRANSPORTATION AUTHORITY SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY Topics Pedestrian Conditions
More informationAppendix B: Forecasting and Traffic Operations Analysis Framework Document
Existing Conditions Report - Appendix Appendix B: Forecasting and Traffic Operations Analysis Framework Document This document defines the methodology and assumptions that will be used in the traffic forecasting
More informationSan Francisco Transportation Plan Update
San Francisco Transportation Plan Update PART 2.3: Needs Assessment (continued) Spring 2013 www.sfcta.org/movesmartsf twitter.com/sanfranciscota www.facebook.com/movesmartsf SFTP Needs Assessment Planned
More informationOutreach Approach RENEW SF served as the primary liaison with the North Beach community; the Chinatown. Executive Summary
Executive Summary Executive Summary The Columbus Avenue Neighborhood Transportation Study s objective is to identify changes to transportation infrastructure and policies that could enhance the livability
More informationNorth Shore Transportation Improvement Strategy
North Shore Transportation Improvement Strategy Preliminary, Near-term Recommendation 2016 April Transportation Improvement Strategy (TIS) Comprehensive and Analytical A multi-modal transportation strategy
More informationSFMTA PROJECT TIMELINE
SFMTA PROJECT TIMELIE Internal SFMTA Processes Opportunities for Public Input Data Collection and Analysis Car and bike volumes, safety (collision) data Roadway and intersection geometry June 2016 Pop
More information3.5 Pedestrian and Bicycle Transportation
3.5 Pedestrian and Bicycle Transportation 3.5.1 Regulatory Setting Several policies and plans guide the development of non-motorized transportation environments on and around the Geary corridor. 3.5.1.1
More informationBellevue Downtown Association Downtown Bike Series
Bellevue Downtown Association Downtown Bike Series Meeting 2 Franz Loewenherz Andreas Piller Kyle Potuzak Chris Long October 26, 2017 Today s Agenda: 1) Meeting Purpose 2) 9/28 Meeting Recap 3) Candidate
More informationSan Francisco 2009 Collisions Report April 21, 2011
San Francisco 29 Collisions Report April 21, 211 City and County of San Francisco San Francisco Municipal Transportation Agency 1 South Van Ness Avenue, 7 th Floor San Francisco CA 9413 CONTENTS About
More informationPRINCE GEORGE S PLAZA METRO AREA PEDESTRIAN PLAN
PRINCE GEORGE S PLAZA METRO AREA PEDESTRIAN PLAN May 28, 2008 Agenda Welcome and introductions Project overview and issue identification Planning context and strengths Design challenges and initial recommendations
More informationBus Rapid Transit on Silicon Valley s El Camino Real: Working Together to Create a Grand Boulevard Steven Fisher
Bus Rapid Transit on Silicon Valley s El Camino Real: Working Together to Create a Grand Boulevard Steven Fisher Senior Transportation Planner Santa Clara Valley Transportation Authority San Jose, CA How
More informationCalifornia Department of Transportation, District 4. Sloat Boulevard Project Skyline Blvd. to 19 th Ave. Community Update January 13, 2016
California Department of Transportation, District 4 Sloat Boulevard Project Skyline Blvd. to 19 th Ave. Community Update January 13, 2016 Agenda Welcome and introductions Project overview, history and
More informationMASONIC AVENUE STREET DESIGN STUDY Community Workshop 2. Masonic Ave Street Design Study Community Workshop 2 August 10, 2010
Masonic Ave Street Design Study Community Workshop 2 August 10, 2010 Introduction MASONIC AVENUE STREET DESIGN STUDY Community Workshop 2 SF Municipal Transportation Agency Javad Mirabdal, Project Manager
More informationGoodlettsville Bicycle and Pedestrian Plan Executive Summary
Goodlettsville Bicycle and Pedestrian Plan July 2010 In Cooperation with the Nashville Area Metropolitan Planning Executive Organization Summary Introduction Progressive and forward thinking communities
More informationEl Camino Real Bus Rapid Transit Conceptual Engineering. Los Altos Council Workshop January 24, 2012
El Camino Real Bus Rapid Transit Conceptual Engineering Los Altos Council Workshop January 24, 2012 Agenda Introduction Growth in the El Camino Real Corridor Benefits of BRT El Camino Real BRT Decision
More informationFOLSOM-HOWARD STREETSCAPE OVERVIEW
FOLSOM-HOWARD STREETSCAPE OVERVIEW SoMa residents should have the same kinds of amenities that other neighborhoods have. The Folsom- Howard Streetscape Project will make SoMa more livable by making it
More informationBridgewater Complete Streets Prioritization Plan and Pedestrian Safety Assessment
Bridgewater Complete Streets Prioritization Plan and Pedestrian Safety Assessment Presented by Luciano Rabito Manager of Complete Streets Presented to Bridgewater, MA Wednesday, April 26, 2017 6:30 P.M.
More informationEdit to Action 4.7:.to provide DIRECT AND improved access on all bridges connecting to San Francisco.
Josh Hart Comments on Bike Plan 2004 Policy Document June 30, 2004 431-2453 ext. 23 Joshua@sfbike.org Executive Summary Eliminate the word alternative from this first sentence- replace with mode. In general,
More informationWELCOME. Traffic & Parking Commission Special Meeting May 30, Iteris, Inc. All rights reserved.
WELCOME Traffic & Parking Commission Special Meeting May 30, 2018 WORKSHOP #2 CONCEPTS FOR IMPROVEMENT MAY 30, 2018 Agenda 1. Welcome 10 min 2. Project Presentation 25 min 3. Roundtable Dialogue 50 min
More informationIn station areas, new pedestrian links can increase network connectivity and provide direct access to stations.
The Last Mile Planning for Pedestrians Planning around stations will put pedestrians first. Making walking to stations safe and easy is important; walking will be a part of every rapid transit Accessible
More informationCommunity Advisory Committee of Market and Octavia Area Plan City and County of San Francisco. Meeting Minutes
Community Advisory Committee of Market and Octavia Area Plan City and County of San Francisco Meeting Minutes Monday, November 17, 7:00 PM Regular Meeting Committee Members Present: Jason Henderson, Robin
More informationBike San Mateo County San Mateo County Bicycle Plan Recommendations August 30, 2010
Policy and Procedures Develop and Implement a Complete Streets Policy to comply with DD-64-R1 and AB1358 Commencing January 1, 2011, AB1358 requires that the legislative body of a city or county, upon
More informationSouth King County High-Capacity Transit Corridor Study
HIGH-CAPACITY TRANSIT CORRIDOR STUDY South King County Corridor South King County High-Capacity Transit Corridor Study Corridor Report August 2014 South King County High Capacity Transit Corridor Report
More informationWELCOME Mission-Geneva Transportation Study
WELCOME Mission-Geneva Transportation Study Study Process and Schedule 2005 2006 Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sept Oct Task 2 Develop Outreach Plan Task 3 Document Existing Conditions/ Prioritize
More informationAgenda. Overview PRINCE GEORGE S PLAZA METRO AREA PEDESTRIAN PLAN
PRINCE GEORGE S PLAZA METRO AREA PEDESTRIAN PLAN May 28, 2008 Agenda Welcome and introductions Project overview and issue identification Planning context and strengths Design challenges and initial recommendations
More informationArlington Public Schools Thomas Jefferson Site Evaluation Transportation Networks. Thomas Jefferson Working Group Meeting #6 November 10, 2014
Arlington Public Schools Thomas Jefferson Site Evaluation Transportation Networks Thomas Jefferson Working Group Meeting #6 November 10, 2014 2 3 INTRODUCTION 4 Goal of our work: Identify and assess multi-modal
More informationMARKET STREET STUDY TECHNICAL REPORT
MARKET STREET STUDY TECHNICAL REPORT BICYCLE LANES BETWEEN EIGHTH and OCTAVIA STREETS This technical report is one of over a dozen reports prepared to support the Market Street Study. The purpose of the
More informationToronto and East York Community Council. Director, Transportation Services, Toronto and East York District
No Turn on Red Regulations STAFF REPORT ACTION REQUIRED Date: June 1, 2010 To: From: Toronto and East York Community Council Director, Transportation Services, Toronto and East York District Wards: Trinity
More informationReplace century-old sewer & water pipes Pedestrian-scale sidewalk lighting
PROJECT OVERVIEW The Masonic Avenue Streetscape Project is an effort to improve safety for everyone travelling on Masonic Avenue between Geary Boulevard and Fell Street. This project will bring a variety
More informationPublic Event 1 Community Workshops
Public Event 1 Community Workshops Nov. 24 & Dec. 3, 2016 Welcome Workshop Purpose We re looking to you for ideas and insights to help guide future transportation infrastructure planning in the Park Lawn
More informationBICYCLE STRATEGY UPDATE
SFMTA Municipal Transportation Agency Image: Bike locks in front of San Francisco main library BICYCLE STRATEGY UPDATE 2015 SAN FRANCISCO, CALIFORNIA Bicycle Strategy Overview Four Goals: 1. Improve safety
More informationCOLUMBUS AVENUE NEIGHBORHOOD TRANSPORTATION STUDY
COLUMBUS AVENUE NEIGHBORHOOD TRANSPORTATION STUDY Pedestrian Survey Findings Survey Main Findings: Transit and walking are the main two modes used by both visitors and residents of the area, regardless
More informationUniversity of Victoria Campus Cycling Plan Terms of Reference. 1.0 Project Description
University of Victoria Campus Cycling Plan Terms of Reference 1.0 Project Description The Campus Cycling Plan, a first for the University, will provide a comprehensive and coordinated approach to support
More informationSouthwest Bus Rapid Transit (SW BRT) Functional Planning Study - Executive Summary January 19 LPT ATTACHMENT 2.
Southwest Bus Rapid Transit (SW BRT) Functional Planning Study - Executive Summary 2011 January 19 1 of 19 Introduction This executive summary presents the results of the Southwest Bus Rapid Transit (SW
More informationSAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY
THIS PRINT COVERS CALENDAR ITEM NO.: 11 DIVISION: Transit Services BRIEF DESCRIPTION: SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY Approving the installation of traffic and parking modifications along
More informationLos Altos Hills Town Council - June 18, 2015 Palo Alto City Council June 22, AGENDA ITEM #2.B Presentation
Los Altos Hills Town Council - June 18, 2015 Palo Alto City Council June 22, 2015 AGENDA ITEM #2.B Presentation Previous Presentations Los Altos Hills Town Council in May 2014 and February 2015 Palo Alto
More informationProposed. City of Grand Junction Complete Streets Policy. Exhibit 10
Proposed City of Grand Junction Complete Streets Policy Exhibit 10 1 City of Grand Junction Complete Streets Policy Vision: The Complete Streets Vision is to develop a safe, efficient, and reliable travel
More informationBD RESOLUTION NO RESOLUTION ADOPTING THE VISION ZERO RAMP INTERSECTION STUDY PHASE 1
BD00 RESOLUTION NO. - RESOLUTION ADOPTING THE VISION ZERO RAMP INTERSECTION STUDY PHASE [NTIP PLANNING] FINAL REPORT WHEREAS, The Vision Zero Ramp Intersection Study Phase was recommended by Commissioner
More informationTelegraph Avenue Complete Streets DRAFT Recommendations. Oakland Public Works Department September 11 and 13, 2014 Open Houses
Telegraph Avenue Complete Streets DRAFT Recommendations Oakland Public Works Department September 11 and 13, 2014 Open Houses Presentation Overview What are complete streets? What problem are we trying
More informationMEMORANDUM INTRODUCTION/PURPOSE/OVERALL FINDINGS
MEMORANDUM Date: To: From: Subject: Steve, City of Tacoma Dan Grayuski and Will Lisska, Fehr & Peers Schuster Corridor Trail Project SE12-0265.00 INTRODUCTION/PURPOSE/OVERALL FINDINGS The City of Tacoma
More informationWelcome. Background. Goals. Vision
Welcome The formal Public Information Centre (PIC) for the Transportation Master Plan How We GO will be held in early 2017. At that time we will present the recommended transportation system for Niagara
More informationMain-McVay Transit Study: Phase 2 Options Definition and High Level Constraints Evaluation
Main-McVay Transit Study: Phase 2 Options Definition and High Level Constraints Evaluation APRIL 2016 A collaborative study between: For Additional Information or to Comment If you would like additional
More information