1 Table Of Contents

2 This study provides Midway Companies with a site plan and transportation analysis for, a proposed development near the Texas A&M University campus in College Station, Texas. is envisioned as a true mixed-use development, which will attract residents, employers and visitors to create a vibrant community. Some of the guiding principles in the development of are to: Promote synergistic land uses and a walkable and human-oriented environment. Provide residences, offices, shopping and recreational facilities within minutes of each other Provide convenient, multi-modal access both within and to the site. Ensure a marketable mix of features and amenities catering to a broad range of demographic and income groups Provide world-class facilities including a hotel and conference center Interface with the Texas A&M University to maximize patronage from the university campus Create a one-of-a- kind destination in central Texas. This report provides an overview of the proposed phased approach to developing a site plan for. A detailed site plan is provided for the first phase, including a description of the roadway types, road network, pedestrian amenities, etc. This first phase is expected to be fully built-out and occupied by The proposed site plan for Phase 1 was developed to reflect the above principles, by locating land uses synergistically, and by maximizing opportunities to share parking and promote walkability within the site. mitigation measures were also proposed for the network to minimize the impact on the existing roadway network. Furthermore, additional changes were proposed to improve access to the site for pedestrians crossing over from the university. This report also documents the findings from a multi-modal transportation analysis, a traffic impact analysis, and a parking generation/shared parking study, and provides Midway Companies with the required information and resources to make an investment decision regarding and to develop a well-planned and commercially viable mixed-use development. 2

3 Proposed Site Plan and Design The proposed Campus Point development is composed of a variety of uses, so as to create a vibrant mixed-use community. The following table summarizes these uses composed within Phase 1. Description of Land Uses in Phase 1 Land Use Residential 600 units married student apartments 400 loft apartments (600 sq. ft. each) Hotel 300 rooms Conference Center 30,000 sq. ft. Offices 200,000 sq. ft. Cinema 15,000 sq. ft. Retail Stores 66,500 sq. ft. Fitness Center 120,000 sq. ft. Restaurants 30,000 sq. ft. Fine Dining Restaurants 20,000 sq. ft. Casual Restaurants 13,500 sq. ft. Fast Food Restaurants Bowling Alley 30,000 sq. ft. Central Plaza 1.5 Acres The development for Phase 1 is contained within a 30-acre area. In order to maintain a true, mixed-use feel, all retail stores and restaurants are housed on the ground floor of buildings; office and residential are on upper floors of the buildings. The fitness center is meant to serve not only the residents, but guests at the hotel and employees in the offices. All the uses are arranged in a way to provide a truly walkable environment; consequently, the density of this development is higher than the rest of College Station. On street parking, parking garages, and minimal surface parking is provided; every use on the site is able to be access by a less than ¼ mile walk from a parking location. The site plan can be viewed in the following figure. 3

4 Hotel 2. Conference Center 3. Plaza 4. Cinema 5. Bowling Alley 6. Ftness Center 7. Park/Open Space 8. Residential/Retail Mixed 9. Office/Retail Mixed 10. Retail 11. Structured Parking 12. Surface Parking Scale ft N 4

5 Phase 2 will have development patterns similar to those in Phase 1; additional ground floor retail and upper level office and residential uses are expected. Phase 3 is expected to contain a company headquarters in the Northeast corner. In the end, the Campus Point development is expected to become a thriving mixed-use development used by students, professionals, and those looking for recreation. The proposed locations for the development in each phase are shown in the following figure. phase 3 existing phase phase 2 phase 1 N 5

6 Roadway Network The roadway network and transportation facilities are an integral part of a vibrant site development. The roadway design elements are crucial to providing safe and adequate facilities for pedestrians, bicyclists, and motorists. Specifically, the site is composed of three major roadway types: Boulevard, Urban Street, and One-Way Downtown Street. Additionally, the site is surrounded by three major arterials and one minor collector, as described in the College Station Thoroughfare Plan. This section summarizes the entire roadway network within and surrounding the site, as shown in the figure below. Roadway Network Scale ft N 6

7 Surrounding Roadways The site is bounded by South College Avenue, University Drive, and Texas Avenue, Hensel Drive, and extends to the intersections between Texas Avenue and Rosemary Drive, and South College Avenue and Hensel Drive in the north/northeast direction. The main roadway characteristics are as shown in the table below. Major Roadway Characteristics Roadway Functional Classification 1 Number of Lanes Speed Limit South College Avenue Major Arterial 4 40 University Drive Major Arterial 6 40 Texas Avenue Major Arterial 4 40 Hensel Drive Minor Collector From the College Station Thoroughfare Plan, May 2006 On-Site Network All streets within the development were classified as one of the following types: Boulevard, One-Way Downtown, or Urban Street. Cross sections are provided below for each street type. The street network focuses on multimodal transportation to include bicycling, walking, public transportation, and personal automobiles. In order to promote the use of alternative transportation, emphasis was placed on street designs, including lighting, shade, adequate sidewalk width, and appropriate speed limits. The following figure shows the classification of each proposed roadway within the site. 7

8 8

9 9

10 10

11 The transportation network is the base to any well planned development. It provides access to any location in the site and ensures that people and goods have efficient ways to move around. Overall, the development will attract a large number of people using a variety of transportation modes. Additionally, due to its proximity to the University, the can expect a large number of student pedestrians and transit users. Overall, it is important to safely accommodate all non-motorized modes of transportation in and around the site. Pedestrian and Bicycle Access Pedestrian pathways are clearly defined and provide adequate access to and from the site. It is expected to have a large number of pedestrians accessing the site from the University; in order to accommodate these persons, pedestrian crosswalks are prominent at the three stop lights into the development along University Drive. Additionally, the intersection at University Drive and South College Avenue was slightly reconfigured to address pedestrian traffic. As opposed to having separated right turn lanes, which forced pedestrians to cross the right turn lane to a median and then the 6 lane street, the right turn is now at a 90 degree angle. This reduces the pedestrian crossing distance at this intersection from approximately 350 feet to 150 feet. Additionally, by making the turn a 90 degree angle, vehicle speeds will be slower and motorists will be more aware of pedestrian traffic. Within the site, sidewalks are prevalent on every roadway. Additionally, a pedestrian walking path also travels between a number of the buildings, providing additional pedestrian connectivity. The pedestrian connectivity can be seen in the following figure. Bicycle connectivity is also important for the development due to the large proportion of the population in College Station utilizing bicycles as a main form of transportation. Bike routes are prominent throughout the site, being located along every roadway; specifically, the bike lanes will be 6 feet wide and well highlighted along the roadways to ensure motorists are aware. In particular, the bike lanes will be painted a different color nearby intersections so as to increase bicycle visibility in an area that may be prone to vehicular conflicts. Bicycle signage will also be prominent to further increase awareness. 11

12 Pedestrian/Bicycle Access Scale N Pedestrian Corridor Shortened Crossings Multi-Use Path Major Pedestrian/Bike Crossings ft A large multi-use path, of approximately 10 feet, will surround the entire perimeter of the site providing access to both pedestrians and bicyclists. This will facilitate multi-modal transportation around the site, in addition to safe and aesthetically pleasing entrances and exits to the site. 12

13 Transit Access The map below provides a suggested transit route for the site. Currently, the Texas A&M University bus service operates a bus route through the existing married student housing located adjacent to. The development of Phase 1 of Campus Point will provide an opportunity to integrate the bus service with the site s internal circulation network, through two transit stops, one serving the residential areas on the site, and the other providing access to a more central location on the site, close to retail and restaurants. The Brazos Valley s transit company (The District) also currently provides fixed-route service on Texas Avenue, South College Avenue and University Drive adjacent to. The District s Transit Service can also be modified in the future to serve directly as well. Transit Access Map Legend Transit Route Transit Stop Scale ft N 13

14 In addition to ensuring connectivity of pedestrian and bicycle paths and adequate transit access, it is important to consider the amenities provided to individuals on the site. The following section describes in detail a number of pedestrian amenities that should be included to ensure a comfortable and inviting environment. Pedestrian Amenities As stated above, it is expected that a large proportion of those visiting the site will be utilizing alternate transportation modes. Consequently, it is important to provide amenities that can be utilized by pedestrians, bicyclists, and transit users. By including simple amenities and aesthetic features, the Campus Point development can create an environment that is inviting to pedestrians and transit users. Particular amenities that can be included to provide a pedestrian friendly atmosphere include: sidewalks, planters/trees, benches, lighting, and trash cans. Sidewalks Sidewalks are located along both sides of every street within the development. They are 13 feet wide to provide ample room for pedestrians to navigate throughout the site. All sidewalks will also satisfy any ADA requirements on width and ramps at intersections. Various materials may be considered to provide a more inviting environment, such as the following examples: Planters/Trees Street landscaping will be along every roadway within the development and within the median on the Boulevard Street. Landscaping may be in the form of street trees and planters which will provide shade from the stifling Texas heat; overall, landscaping provides a more enjoyable and pleasant environment for pedestrians. Examples of planters and trees are shown in the following photographs. 14

15 Benches Benches will be located along all streets to provide a location to rest and wait, which is particularly beneficial to any elderly or injured accessing the site. Overall, they will allow for pedestrians to sit and enjoy a snack or cup of coffee while people watching. Additionally, they are a great addition to an urban area to promote interaction and a sense of community. Possible benches are displayed below. 15

16 Lighting Adequate lighting is extremely crucial in creating a welcoming pedestrian environment. A lack of lighting creates unknown spaces that become worrisome to pedestrians. Unlit spaces are considered more dangerous and uninviting because it is unknown who or what may be hidden there. Adequate lighting will be provided along every street so as to create a safe environment for pedestrians at all times of the day. Examples of lighting options are shown below. 16

17 Trash Cans Trash cans will be located along every street to help foster a clean environment and a convenience for pedestrians, while still being aesthetically pleasing. A decorative style of trash can be considered, so as not to detract from the inviting environment of. Examples can be seen below. 17

18 Vehicular Access The map below provides an overview of the major vehicular access routes to the site. The site layout made use of many existing intersections and driveways to the site, along with signalization or intersection improvements where needed to accommodate the additional incoming and exiting traffic. These are discussed in further detail in the traffic impact analysis in the next section, which provides a quantitative analysis of the vehicle trips and their impact on the adjoining roadway network. The major entrances/exits for vehicles include: Intersection between University Drive and Calvin Moore Avenue (signalized with left turns allowed from and onto University) Intersection between University Drive and Polo Avenue Entrance/Exit at the Meadowland Drive/ University Drive intersection (only right turns allowed in and out of the site) Entrance/Exit off South College Avenue between University Drive and Hensel Drive (only right turns allowed in and out of the site) Intersection between Hensel Street and Texas Avenue (signalized) Intersection between Hensel Drive and South College Avenue (with separate left and right turn lanes on Hensel Drive to accommodate larger exiting volumes). 18

19 Vehicular Access Scale ft N Vehicular Access Points 19

20 Parking Requirements The following section summarizes the parking demand for the proposed development. The concept of shared parking was used in this analysis. Shared parking is the concept of a parking space serving more than one land use without conflict. This concept is effective due to two main reasons: (1) there are variations in parking demand by hour, day, or season at individual land uses and (2) the relationship between land uses prompts individuals to visit more than one land use on the same automobile trip. Overall, shared parking finds the balance between providing an adequate amount of parking and providing excessive parking, which leads to additional land and resources for parking 1. The phase 1 development is separated into four parking districts. Each district encompasses an equal amount of space, approximately 7.5 acres, of the site. Additionally, each has a parking garage and on street parking and some has surface parking to match the parking needs for those land uses. A shared parking analysis was done for each district, to determine how those uses work together. The following variables are considered in a shared parking analysis: Design Month: this variable is shown in the Month Adjustment category. As expressed in the project outlines, April 2015 was to be the design month for this development; consequently, the recommended monthly adjustment factors were used in this analysis. These values were taken directly from Shared Parking. Mode Adjustment: this variable adjusts the parking demand by considering the local transportation options, such as transit and pedestrian facilities. These values were developed using our best judgment on general transportation trends in the College Station area. Data from the 2010 American Community Survey determined that 4.9% and 4.3% of the population used public transit and walking, respectively, to commute to work; these were considered in deciding the final values. Additionally, due to the site s proximity to Texas A&M University, it is likely to draw more pedestrian and university bus trips. Noncaptive Ratio: this variable is an estimate of the percentage of vehicles at a land use in the mixed-use development, which are not already being counted as being parked at another land use. In general, it will be common for a person to park and visit more than one land use, without generating any additional parking demand. These values were developed in the Traffic Impact in the Internal Trip Capture Percentages by Land Use. It was assumed that the number of cars would be similar to the number of trips; therefore, the number of parking spots decreased by internal trip capture rates would be similar. First, the total number of parking, without considering shared parking, was determined by using the recommended base parking ratios from Shared Parking. This provided a certain number of spots required for each visitor and employee on weekdays and weekends per the number of 1 Smith, Mary S. Shared Parking. Second Edition. Washington, D.C.: ULI the Urban Land Institute and the International Council of Shopping Centers,

21 thousand square feet of gross leasable area (ksf GLA). Additionally, particular uses like the movie theater, hotel, and apartments utilized other units, such as a particular number of spots per seat, room, and unit, respectively. The results of this analysis are summarized in the following table. Unadjusted Parking Requirements for Each Land Use Parking Demand Value Actual Number of Spots Needed Land Use Weekday Weekend Weekday Weekend Total Parking Spots Visitor Employee Visitor Employee Unit Number of Unit Visitor Employee Visitor Employee Weekday Weekend Movie Theater Seat Fine Dining (3 restaurants) ksf GLA Casual Dining (4 restaurants) ksf GLA Fast Food (9 restaurants) ksf GLA Bowling Alley* Fitness Center ksf GLA Office ksf GLA Hotel Room Conference Center ksf GLA Retail Stores (all stores) ksf GLA Apartments Unit * Values decided by best judgement due to lack of information on this use These total parking spots needed were used in the shared parking analysis. The total number of parking spots required for the entire site is summarized in the following table. This considers both the weekend and weekday demand, and uses the number of spots that is higher for each use; this assumes the worst case scenario for parking, to ensure that there are enough spaces for either day. The shared parking analysis was then completed utilizing the variables described above. Again, both weekend and weekday demand was considered, and the number of spots that was higher between the two periods was used. The total number of spots required using shared parking for all parking districts is shown in the following table. The total parking analysis and data can be found in Appendix A. 21

22 Total Number of Parking Spots with Shared Parking Land Use Parking Required Movie Theater 43 Employee 4 Fine Dining (1 restaurant) 269 Employee 63 Casual Dining (1 restaurant) 180 Employee 42 Fast Food (1 restaurants) 91 Employee 21 Bowling Alley* 89 Employee - Fitness Center 196 Employee 23 Office 29 Employee 650 Hotel 143 Employee 75 Conference Center 175 Employee - Retail Stores (all stores) 32 Employee 37 Apartments 26 Employee 570 2,756 22

23 Traffic Impact A traffic impact analysis for the site was conducted considering full build out and occupancy for April The analysis was conducted for the PM peak period, for two scenarios, as follows: No-Build Scenario projected traffic conditions for 2015 without the development of Phase 1 Build Scenario projected traffic conditions for 2015 with a full build out of Phase 1. The Phase 1 development included in the impact analysis is listed below. The existing 600 units of married student apartments are not included in the analysis, as their impact is considered to be a part of the existing baseline conditions. 400 units of loft apartments 300 room hotel 30,000 sq. ft. conference center 200,000 sq. ft. of office space 66,500 sq. ft. of retail 120,000 sq. ft. fitness center 30,000 sq. ft. bowling alley 30,000 sq. ft. movie theater 30,000 sq. ft. of fine dining restaurants 20,000 sq. ft. of casual dining restaurants 13,5000 sq. ft. of casual dining restaurants Traffic Volume Data for Traffic Turning movement counts from the PM Peak at intersections 1 through 7 were provided for the year The base ( no-build ) traffic conditions were extrapolated from these counts assuming a 2% annual growth rate. Appendix B contains details of the traffic volumes for the No-Build condition used for the analysis, along with the volumes calculated for the Build scenario based on the trip generation and assignment calculations described in the following sections of this report. 23

24 Study Area and Intersection Configurations The area considered for the traffic analysis is bounded by South College Avenue, University Drive, and Texas Avenue, and extends to the intersections between Texas Avenue and Rosemary Drive, and South College Avenue and Hensel Drive in the north/northeast direction. The characteristics of these main roadways are described in previous sections. The 7 intersections included in the analysis are: 1. South College and Hensel Drive (currently unsignalized) 2. South College and University (currently signalized) 3. University and Calvin Moore (currently unsignalized, with only right turns allowed into adjacent land uses) 4. University and Polo (currently signalized) 5. University and Texas (currently signalized) 6. Texas and Hensel Road (currently unsignalized) 7. Texas and Rosemary (currently signalized) The maps on the following pages show the layout of each intersection for the Build and No-Build analysis scenarios. For the No-Build scenario, the intersection configurations are considered to remain unchanged from the conditions that currently exist. For the Build scenario, the following changes are proposed to the intersection layouts: Separate left and right lanes on Westbound approach for South College and Hensel Drive. Removal of channelized right turns at South College and University to create a more compact, pedestrian-friendly intersection, replaced with right turn lanes instead. Converting University and Calvin Moore to a signalized intersection with left turns into the site from University and out of the site from Calvin Moore, creating a major entrance to the Phase 1 development. Converting intersection at Texas and Hensel to a signalized intersection, with a left turn lane replacing the existing two-way left turn lane. The Manual for Uniform Traffic Control Devices (MUTCD) 2 provides information about warrants that need to be met for signalization of intersections. In this case, however, a full traffic signal warrant analysis could not be conducted due to the lack of availability of 4-hour or 8-hour traffic volume data. However, it is expected that such warrants would be met, and furthermore, the pedestrian activity expected across University Drive, and the heavy through volumes on Texas Avenue also make a case for the new signals at Calvin Moore and Hensel, respectively. 2 Manual for Uniform Traffic Control Devices, 2009, Accessed April

25 Existing Intersection Configurations Signaled Intersection Signaled Intersection Signaled Intersection Signaled Intersection 25

26 Proposed Intersection Configurations Signalized Intersection Signalized Intersection Signalized Intersection Signalized Intersection Signalized Intersection Signalized Intersection 26

27 Trip Generation The trip generation for each of the land uses and the associated floor areas or unit sizes was calculated based on the 8 th Edition of ITE Trip Generation 3 ITE Trip Generation Manual (8 th Edition). The ITE trip generation rates did not include the rates for the conference center land use type, and these are not included in the trip generation results as it is assumed to be covered in the trip generation estimates for the hotel. The table below shows the results of the trip generation for Phase 1 full build out, and comprises a total of 2319 PM peak period trips (1167 entering and 1151 exiting the development). Description and ITE Code Units PM Peak Period Rate % PM In % PM Out Calculated Daily Trips PM Peak Trips Total Entering Exiting Residential 400 DU % 33% 2, Condo/Townhouse (230) Hotel (310) 300 Rooms % 47% 2, Health Club (492) 120 KSF % 43% 3, Bowling Alley (494) 30 KSF % 65% 1, General Office (710) 200 KSF % 83% 2, Movie Theater w/ matinee 4 Movie (444) Screens Shopping Center (820) 66.5 KSF % 51% 2, Quality Restaurant (931) 30 KSF % 33% 2, High Turnover/Sit Down 20 KSF % 41% 2, Restaurant (932) Fast Food Restaurant without drive through (933) 13.5 KSF % 49% 9, Total Trip Generation, Institute of Engineers, Washington D.C.,

28 28

29 Internal Trip Capture Internal trip capture is applied to reduce the trip generation estimates for the site, resulting in reduced external vehicle trips estimated as entering and exiting the site. NCHRP Report was used for the internal trip capture estimates. The six land use categories included in the NCHRP methodology are office, retail, restaurant, cinema/entertainment, residential and hotel. For purposes of this analysis, the bowling alley was included in the cinema/entertainment category, and the health club was categorized as other and not included in the estimates. The average distances between various land use pairs were estimated per the site plan and used for the calculations. The internal trip capture rates were computed using the spreadsheet based tool provided with the NCHRP report, for the PM Peak Period. The results from this spreadsheet are shown in Appendix C. After adjusting for trip capture estimates, the total number of PM peak hour vehicle trips entering and exiting the site is 654 and 695, respectively. Traffic Assignment for Additional Vehicle Trips The total number of added vehicle trips on the network, entering and exiting the site during the PM peak period are 654 vehicles and 695 vehicles respectively. These additional trips were assigned to the network and overlaid on the base (no build) volumes to conduct the 2015 build scenario traffic analysis (for full build out of Phase 1). The assignment of these additional trips were based on assumptions regarding the origin and destination of the vehicles entering/exiting the site, as well as our knowledge of known entrances and exits and the site layout. The assignment of the trips is shown in the diagram on the next page. As seen in the diagram, a majority of incoming trips are anticipated to come through Texas Avenue and University Drive (from the East), and from the university campus (from west and south). For exiting trips, a large number are assigned to University Drive and Texas Avenue (going towards Highway 6) and to Bryan in the North. 4 Enhancing Internal Trip Capture Estimation for Mixed-Use s, National Cooperative Highway Research Program,

30 30

31 Traffic for No-Build and Build Scenarios As discussed previously, the 2015 traffic volumes used for the No-Build scenario are extrapolated from 2010 traffic count data that was provided for the PM Peak period. The additional entering and exiting volumes for the Build scenario were calculated based on the traffic assignment described in the previous section. Appendix B contains the increased turning movement counts for the Build scenario which are used for the traffic analysis. The analysis for the Build scenario took into account the changed intersection configurations and added traffic signals as described in the Study Area and Intersection Configuration sections. The build and no build scenarios were analyzed in Synchro 5 and the detailed results are provided in D and E. The table below summarizes the intersection level of service and control delay reported for each intersection. S. No. Intersection No-Build Scenario Build Scenario Level of Service Delay (s) Level of Service Delay (s) 1 South College and Hensel Not reported for intersection Not reported for intersection 2 South College and University C 32.1 D University and Calvin Moore Not Applicable A University and Polo B 16.5 B University and Texas E 64.3 E Texas and Hensel Not reported for intersection A Texas and Rosemary B 10.6 B 10.6 As seen in the table, the only intersection that experiences deterioration in Level of Service (LOS) is the intersection of South College and University, which goes from LOS C to LOS D. This is attributable to both the increased volumes due to traffic from, as well as the changed intersection configuration due to the removal of channelized right turns. The intersection of Texas Avenue and University Drive also experiences an increase in the delay, though the LOS remains at E. This is expected, given that University and Texas are both high-volume roads experiencing peak period congestion, and these roadways also serve as the major routes for vehicles entering and exiting the site. The right-turn only entrances and exits to at Meadowland and off South College (between University and Hensel) serve to alleviate the impacts of added traffic on intersections downstream of them. 31

32 Findings and This report provided a site plan and transportation analysis for Phase 1 of the mixed-use development in College Station, Texas. The site was developed to contain a mix of residential, office, retail, restaurant and entertainment facilities, along with ample green and open space. The site was also developed to provide easy access to the site for pedestrians and convenient access points and parking for motorists. The following are the main findings and conclusions based on the various elements of the site planning and transportation analysis exercise: Land Use Mix The land use mix proposed for the Phase 1 ensures a vibrant mix located to optimize accessibility of the various land use types, with a central hotel, conference center and plaza serving as an anchor to the development. The mix and location of land uses also ensures that there is a high level of internal trip capture (approximately 30% overall), which also reduces the impact of the development on the existing transportation network by reducing the number of external vehicle trips. Bike, Pedestrian and Transit Access The site was developed to allow bike and pedestrian access to the site from the University through the signalized intersections at University Drive and South College, Calvin Moore and Polo Road. The reconfiguration of the intersection at South College and University will also serve to open out the site and improve overall non-motorized access. The site plan takes into account the Texas A&M University Transit service and proposes transit stops on site to maximize the use of transit. On-Site Roadway Network The on-site roadway network includes one-way streets around the plaza and hotel area near the main entrance, and urban and boulevard street cross-sections at other part of the site. These streets are designed to have bike lanes, wide sidewalks, on-street parking (on the boulevards) and other pedestrian-friendly amenities such as marked crosswalks. The on-site roadway network provides the feel of an urban downtown and promotes walking and biking around. Parking Parking on is provided as a mix of on-street, surface and garage parking. Parking garages and lots are located to be easily accessible to the site s main entrances and exits, allowing visitors to park conveniently and explore the site on foot. Parking is also spread across the site to ensure that all the buildings have reasonably close access to parking. The site plan was also designed to maximize shared parking when appropriate, to ensure optimal use of the site s parking spaces. The calculations regarding the required parking spaces were conducted based on ITE s parking generation and shared parking guidance. Traffic Impacts and Mitigation A traffic impact analysis was conducted for Phase 1 of, for the year 2015, assuming a full build out and occupancy. The analysis was conducted for the PM Peak period, and included trip generation, internal trip capture and traffic assignment based on established ITE and NCHRP procedures. The following changes to the traffic network were considered for the Build scenario, to accommodate the new requirements for access to the site, and to mitigate potential traffic problems at other intersections: 32

33 o o o o Separate left and right lanes were provided on the Westbound approach for South College and Hensel Drive. The removal of channelized right turns (and replacement with right turn lanes) at South College and University to create a more compact, pedestrian-friendly intersection. Converting University and Calvin Moore to a signalized intersection with left turns into the site from University and out of the site from Calvin Moore, creating a major entrance to the Phase 1 development. Converting the intersection at Texas and Hensel to a signalized intersection, to better serve left-turning traffic out of Hensel onto Texas Avenue. The traffic impact analysis indicated that the Campus Point would have a marginal negative effect on traffic in the surrounding roadway network. However, only the intersection between University and South College demonstrated a reduction in overall level of service (from C to D). The intersection between Texas Avenue and University Drive remained at LOS E (with an increase in average control delay). Other intersections were all found to operate at LOS C or higher. Individual approaches on these intersections were found to have varying approach LOS values, and further traffic signal timing optimization may alleviate poor approach LOS values at some locations. Since both the Build and No- Build scenarios indicate problems for the Texas Avenue-University Drive intersection, Midway Companies could consider working with the City of College Station and with the Texas Department of to explore longer-term, strategic solutions to alleviate the traffic congestion along these roadways. The development of beyond Phase 1 (to include Phases 2 and 3) will almost certainly result in levels of service deteriorating to Level F. Grade separation, creation of parallel arterial/bypass facilities, and other such options may help address some of these issues in the longer term. 33

CONNECTING PEOPLE TO PLACES

CONNECTING PEOPLE TO PLACES CONNECTING PEOPLE TO PLACES 82 EAST BENCH MASTER PLAN 07 Introduction The East Bench transportation system is a collection of slow moving, treelined residential streets and major arteries that are the

More information

TRAFFIC IMPACT ANALYSIS

TRAFFIC IMPACT ANALYSIS TRAFFIC IMPACT ANALYSIS FOR THE CHAMPAIGN UNIT#4 SCHOOL DISTRICT PROPOSED HIGH SCHOOL (SPALDING PARK SITE) IN THE CITY OF CHAMPAIGN Final Report Champaign Urbana Urbanized Area Transportation Study 6/24/2014

More information

HENDERSON DEVELOPMENT 213, 217, 221, 221 ½, 223 HENDERSON AVENUE and 65 TEMPLETON STREET OTTAWA, ONTARIO TRANSPORTATION OVERVIEW.

HENDERSON DEVELOPMENT 213, 217, 221, 221 ½, 223 HENDERSON AVENUE and 65 TEMPLETON STREET OTTAWA, ONTARIO TRANSPORTATION OVERVIEW. HENDERSON DEVELOPMENT 213, 217, 221, 221 ½, 223 HENDERSON AVENUE and 65 TEMPLETON STREET OTTAWA, ONTARIO TRANSPORTATION OVERVIEW Prepared for: 2294170 Ontario Inc. February 2, 2017 117-652 Report_1.doc

More information

List of Attachments. Location Map... Site Plan... City of Lake Elsinore Circulation Element... City of Lake Elsinore Roadway Cross-Sections...

List of Attachments. Location Map... Site Plan... City of Lake Elsinore Circulation Element... City of Lake Elsinore Roadway Cross-Sections... List of Attachments Exhibits Location Map... Site Plan... City of Lake Elsinore Circulation Element... City of Lake Elsinore Roadway Cross-Sections... Existing Lane Geometry and Traffic Controls... Existing

More information

Bicycle and Pedestrian Advisory Committee (BPAC) November 21, 2013

Bicycle and Pedestrian Advisory Committee (BPAC) November 21, 2013 Bicycle and Pedestrian Advisory Committee (BPAC) November 21, 2013 OVERALL LAND USE CONCEPT Overall Broadway Valdez District: 95.5 acres (35.1 acres right-of ways + 60.4 acres developable land) Plan Subareas:

More information

ALLEY 24 TRAFFIC STUDY

ALLEY 24 TRAFFIC STUDY ALLEY 24 TRAFFIC STUDY in City of Frostburg, Maryland January 2013 3566 Teays Valley Road Hurricane, WV Office: (304) 397-5508 www.denniscorporation.com Alley 24 Traffic Study January 2013 Frostburg, Maryland

More information

Traffic Impact Analysis Chatham County Grocery Chatham County, NC

Traffic Impact Analysis Chatham County Grocery Chatham County, NC Chatham County Grocery Chatham County, NC TABLE OF CONTENTS 1. INTRODUCTION... 1 1.1. Location and Study Area... 1 1.2. Proposed Land Use and Access... 2 1.3. Adjacent Land Uses... 2 1.4. Existing ways...

More information

Shockoe Bottom Preliminary Traffic and Parking Analysis

Shockoe Bottom Preliminary Traffic and Parking Analysis Shockoe Bottom Preliminary Traffic and Parking Analysis Richmond, Virginia August 14, 2013 Prepared For City of Richmond Department of Public Works Prepared By 1001 Boulders Pkwy Suite 300, Richmond, VA

More information

TRANSPORTATION ANALYSIS REPORT US Route 6 Huron, Erie County, Ohio

TRANSPORTATION ANALYSIS REPORT US Route 6 Huron, Erie County, Ohio TRANSPORTATION ANALYSIS REPORT US Route 6 Huron, Erie County, Ohio December 12, 2012 Prepared for: The City of Huron 417 Main Huron, OH 44839 Providing Practical Experience Technical Excellence and Client

More information

Traffic Impact Memorandum. May 22, 2018

Traffic Impact Memorandum. May 22, 2018 BISHOP PROFESSIONAL DEVELOPMENT BUILDING Proposed Land-use Change & Parking Modification 3601 SW 31st Street Topeka, Kansas 66614 CFS Project No. 185077 Traffic Impact Memorandum May 22, 2018 Prepared

More information

1609 E. FRANKLIN STREET HOTEL TRAFFIC IMPACT STUDY EXECUTIVE SUMMARY

1609 E. FRANKLIN STREET HOTEL TRAFFIC IMPACT STUDY EXECUTIVE SUMMARY 1609 E. FRANKLIN STREET HOTEL TRAFFIC IMPACT STUDY EXECUTIVE SUMMARY Prepared for: The Town of Chapel Hill Public Works Department Traffic Engineering Division Prepared by: HNTB North Carolina, PC 343

More information

o n - m o t o r i z e d transportation is an overlooked element that can greatly enhance the overall quality of life for the community s residents.

o n - m o t o r i z e d transportation is an overlooked element that can greatly enhance the overall quality of life for the community s residents. N o n - m o t o r i z e d transportation is an overlooked element that can greatly enhance the overall quality of life for the community s residents. 84 Transportation CHAPTER 11 INTRODUCTION Transportation

More information

Magnolia Place. Traffic Impact Analysis. Prepared for: City of San Mateo. Prepared by: Hexagon Transportation Consultants, Inc.

Magnolia Place. Traffic Impact Analysis. Prepared for: City of San Mateo. Prepared by: Hexagon Transportation Consultants, Inc. Magnolia Place Traffic Impact Analysis Prepared for: City of San Mateo Prepared by: Hexagon Transportation Consultants, Inc. Updated January 4, 2010 Table of Contents 1. Introduction...1 2. Existing Conditions...6

More information

5858 N COLLEGE, LLC N College Avenue Traffic Impact Study

5858 N COLLEGE, LLC N College Avenue Traffic Impact Study 5858 N COLLEGE, LLC nue Traffic Impact Study August 22, 2016 Contents Traffic Impact Study Page Preparer Qualifications... 1 Introduction... 2 Existing Roadway Conditions... 5 Existing Traffic Conditions...

More information

A CHANGING CITY. of Edmonton, it is essential that it reflects the long-term vision of the City.

A CHANGING CITY. of Edmonton, it is essential that it reflects the long-term vision of the City. A CHANGING CITY By the year 2040, Edmonton will be home to more than 1 million people. To accommodate growth and support a healthy and compact city, we need a new approach to development/redevelopment

More information

THIS PAGE LEFT BLANK INTENTIONALLY

THIS PAGE LEFT BLANK INTENTIONALLY GA SR 25 Spur at Canal Road Transportation Impact Analysis PREPARED FOR GLYNN COUNTY, GEORGIA 1725 Reynolds Street, Suite 300 Brunswick, Georgia 31520 PREPARED BY 217 Arrowhead Boulevard Suite 26 Jonesboro,

More information

Highway 111 Corridor Study

Highway 111 Corridor Study Highway 111 Corridor Study June, 2009 LINCOLN CO. HWY 111 CORRIDOR STUDY Draft Study Tea, South Dakota Prepared for City of Tea Sioux Falls Metropolitan Planning Organization Prepared by HDR Engineering,

More information

Route 7 Corridor Study

Route 7 Corridor Study Route 7 Corridor Study Executive Summary Study Area The following report analyzes a segment of the Virginia State Route 7 corridor. The corridor study area, spanning over 5 miles in length, is a multi

More information

Bridge Street Corridor Study Report

Bridge Street Corridor Study Report Bridge Street Corridor Study Report Prepared for: Prepared by: BRIDGE STREET CORRIDOR STUDY REPORT PREPARED FOR: CITY OF ARROYO GRANDE COMMUNITY DEVELOPMENT DEPARTMENT 300 EAST BRANCH STREET ARROYO GRANDE,

More information

SECTION 1 - TRAFFIC PLANNING

SECTION 1 - TRAFFIC PLANNING SECTION 1 - TRAFFIC PLANNING 1.1 TRAFFIC OPERATIONS 1.1.1 Roadway Functional Classification The Multnomah County Comprehensive Framework Plan s Policy 34: Trafficways and the Functional Classification

More information

TRAFFIC IMPACT STUDY COMPREHENSIVE UPDATE TOWN OF THOMPSON S STATION, TENNESSEE PREPARED FOR: THE TOWN OF THOMPSON S STATION

TRAFFIC IMPACT STUDY COMPREHENSIVE UPDATE TOWN OF THOMPSON S STATION, TENNESSEE PREPARED FOR: THE TOWN OF THOMPSON S STATION TRAFFIC IMPACT STUDY COMPREHENSIVE UPDATE TOWN OF THOMPSON S STATION, TENNESSEE PREPARED FOR: THE TOWN OF THOMPSON S STATION Transportation Consultants, LLC 1101 17 TH AVENUE SOUTH NASHVILLE, TN 37212

More information

Traffic Impact Study for Rolling Ridge Redevelopment

Traffic Impact Study for Rolling Ridge Redevelopment Traffic Impact Study for Rolling Ridge Redevelopment Webster Groves, Missouri October 19, 2018 Prepared For: Gershman Commercial Real Estate 150 North Meramec Avenue Suite 500 St. Louis, Missouri 63105

More information

REGIONAL BICYCLE AND PEDESTRIAN DESIGN GUIDELINES

REGIONAL BICYCLE AND PEDESTRIAN DESIGN GUIDELINES REGIONAL BICYCLE AND PEDESTRIAN DESIGN GUIDELINES November 16, 2011 Deb Humphreys North Central Texas Council of Governments Bicycle and Pedestrian Advisory Committee Snapshot of the Guide 1. Introduction

More information

CITY OF COCOA BEACH 2025 COMPREHENSIVE PLAN. Section VIII Mobility Element Goals, Objectives, and Policies

CITY OF COCOA BEACH 2025 COMPREHENSIVE PLAN. Section VIII Mobility Element Goals, Objectives, and Policies CITY OF COCOA BEACH 2025 COMPREHENSIVE PLAN Section VIII Mobility Element Goals, Objectives, and Policies Adopted August 6, 2015 by Ordinance No. 1591 VIII MOBILITY ELEMENT Table of Contents Page Number

More information

Corpus Christi Metropolitan Transportation Plan Fiscal Year Introduction:

Corpus Christi Metropolitan Transportation Plan Fiscal Year Introduction: Introduction: The Safe, Accountable, Flexible, Efficient Transportation Equity Act: A Legacy for Users (SAFETEA-LU) has continued the efforts started through the Intermodal Surface Transportation Efficiency

More information

Chapter 2: Standards for Access, Non-Motorized, and Transit

Chapter 2: Standards for Access, Non-Motorized, and Transit Standards for Access, Non-Motorized, and Transit Chapter 2: Standards for Access, Non-Motorized, and Transit The Washtenaw County Access Management Plan was developed based on the analysis of existing

More information

APPENDIX A: Complete Streets Checklist DRAFT NOVEMBER 2016

APPENDIX A: Complete Streets Checklist DRAFT NOVEMBER 2016 APPENDIX A: Complete Streets Checklist DRAFT NOVEMBER 2016 Complete Streets Checklist MetroPlan Orlando s Complete Streets Checklist is an internal planning tool for staff to further implementation of

More information

Chapter 6 Transportation Plan

Chapter 6 Transportation Plan Chapter 6 Transportation Plan Transportation Plan Introduction Chapter 6 Transportation Plan Transportation Plan Introduction This chapter describes the components of Arvada s transportation system, comprised

More information

Henderson Avenue Mixed-Use Development

Henderson Avenue Mixed-Use Development Zoning Case: Z145-3 Traffic Impact Analysis Henderson Avenue Mixed-Use Development Dallas, TX October 26 th, 216 Kimley-Horn and Associates, Inc. Dallas, Texas Project #644827 Registered Firm F-928 Traffic

More information

Report. Typical Sections. City of Middleton, WI

Report. Typical Sections. City of Middleton, WI Report Typical Sections City of Middleton, WI December 2006 Report for City of Middleton, Wisconsin Typical Sections repared by: Traffic Associates LLC and STRAND ASSOCIATES, INC. 910 West Wingra Drive

More information

Complete Street Analysis of a Road Diet: Orange Grove Boulevard, Pasadena, CA

Complete Street Analysis of a Road Diet: Orange Grove Boulevard, Pasadena, CA Complete Street Analysis of a Road Diet: Orange Grove Boulevard, Pasadena, CA Aaron Elias, Bill Cisco Abstract As part of evaluating the feasibility of a road diet on Orange Grove Boulevard in Pasadena,

More information

CITY OF ALPHARETTA DOWNTOWN MASTER PLAN TRAFFIC EVALUATION

CITY OF ALPHARETTA DOWNTOWN MASTER PLAN TRAFFIC EVALUATION CITY OF ALPHARETTA DOWNTOWN MASTER PLAN TRAFFIC EVALUATION June 2015 CITY OF ALPHARETTA DOWNTOWN MASTER PLAN TRAFFIC EVALUATION Introduction The Alpharetta Downtown Master Plan was developed in the fall

More information

Following are our comments and findings based on the site visit and review of the complete Traffic Impact Study:

Following are our comments and findings based on the site visit and review of the complete Traffic Impact Study: 3600 Horizon Boulevard Suite 250 Trevose, Pennsylvania 19053-4900 Voice 215.355.3577 Fax 215.355.3147 www.ekcorp.com November 1, 2006 Pennsylvania Department of Transportation Bureau of Highway Safety

More information

TRAFFIC ASSESSMENT River Edge Colorado

TRAFFIC ASSESSMENT River Edge Colorado TRAFFIC ASSESSMENT River Edge Colorado Submitted by: Fehr & Peers 621 17th Street, Ste. 231 Denver, CO 8293 (33) 296-43 December, 21 App. M-2 Traffic Assessment River Edge Colorado December 21 TABLE OF

More information

Multimodal Through Corridors and Placemaking Corridors

Multimodal Through Corridors and Placemaking Corridors 68 Multimodal Through Corridors and Placemaking Corridors Corridors have different functions in a region. Some corridors are used to get smoothly and rapidly through a region or to get quickly to major

More information

TRAFFIC IMPACT STUDY And A TRAFFIC SIGNAL WARRANT ANALYSIS FOR A SENIOR LIVING AND APARTMENT DEVELOPMENT

TRAFFIC IMPACT STUDY And A TRAFFIC SIGNAL WARRANT ANALYSIS FOR A SENIOR LIVING AND APARTMENT DEVELOPMENT TRAFFIC IMPACT STUDY And A TRAFFIC SIGNAL WARRANT ANALYSIS FOR A SENIOR LIVING AND APARTMENT DEVELOPMENT DEERFIELD TOWNSHIP, WARREN COUNTY, OHIO Nantucket Circle and Montgomery Road () Prepared for: ODLE

More information

Project Report. South Kirkwood Road Traffic Study. Meadows Place, TX October 9, 2015

Project Report. South Kirkwood Road Traffic Study. Meadows Place, TX October 9, 2015 Meadows Place, TX October 9, 2015 Contents 1 Introduction... 1 2 Data Collection... 1 3 Existing Roadway Network... 2 4 Traffic Volume Development... 2 5 Warrant Analysis... 3 6 Traffic Control Alternative

More information

VIVA RETIREMENT COMMUNITIES OAKVILLE TRAFFIC IMPACT STUDY

VIVA RETIREMENT COMMUNITIES OAKVILLE TRAFFIC IMPACT STUDY VIVA RETIREMENT COMMUNITIES OAKVILLE TRAFFIC IMPACT STUDY VIVA RETIREMENT COMMUNITIES OAKVILLE TRAFFIC IMPACT STUDY DECEMBER 2012 READ, VOORHEES & ASSOCIATES TORONTO, ONTARIO Read, Voorhees & Associates

More information

5 CIRCULATION AND STREET DESIGN

5 CIRCULATION AND STREET DESIGN 5 CIRCULATION AND STREET DESIGN This chapter describes circulation and streetscape improvements proposed for the Northwest Chico Specific Plan Area. It includes detailed design specifications for existing

More information

NEWMARKET UPHAM S CORNER

NEWMARKET UPHAM S CORNER SOUTH STATION Planning Initiative NEWMARKET UPHAM S CORNER COLUMBIA ROAD (P) FOUR CORNERS/GENEVA Working Advisory Group (WAG) Meeting #5 TALBOT AVENUE MORTON STREET BLUE HILL AVE/CUMMINS HWY (P) RIVER

More information

S T A T I O N A R E A P L A N

S T A T I O N A R E A P L A N The Circulation and Access Plan describes vehicle, pedestrian, and transit improvements recommended within the Concept Plan. In order to create and sustain a vibrant business district that provides pedestrian-friendly

More information

Traffic Impact Study. Westlake Elementary School Westlake, Ohio. TMS Engineers, Inc. June 5, 2017

Traffic Impact Study. Westlake Elementary School Westlake, Ohio. TMS Engineers, Inc. June 5, 2017 TMS Engineers, Inc. Traffic Impact Study Westlake Elementary School Westlake, Ohio June 5, 2017 Prepared for: Westlake City Schools - Board of Education 27200 Hilliard Boulevard Westlake, OH 44145 TRAFFIC

More information

D.13 Transportation and Traffic

D.13 Transportation and Traffic This section addresses transportation and traffic issues and impacts related to the Proposed Project. Section D.13.1 provides a description of the affected environment for the Proposed Project. Applicable

More information

EUCLID AVENUE PARKING STUDY CITY OF SYRACUSE, ONONDAGA COUNTY, NEW YORK

EUCLID AVENUE PARKING STUDY CITY OF SYRACUSE, ONONDAGA COUNTY, NEW YORK EUCLID AVENUE PARKING STUDY CITY OF SYRACUSE, ONONDAGA COUNTY, NEW YORK CITY OF SYRACUSE DEPARTMENT OF PUBLIC WORKS 1200 CANAL STREET EXTENSION SYRACUSE, NEW YORK 13210 DRAFT REPORT DATE: November 13,

More information

Exhibit 1 PLANNING COMMISSION AGENDA ITEM

Exhibit 1 PLANNING COMMISSION AGENDA ITEM Exhibit 1 PLANNING COMMISSION AGENDA ITEM Project Name: Grand Junction Circulation Plan Grand Junction Complete Streets Policy Applicant: City of Grand Junction Representative: David Thornton Address:

More information

NJDOT Complete Streets Checklist

NJDOT Complete Streets Checklist Background The New Jersey Department of Transportation s Complete Streets Policy promotes a comprehensive, integrated, connected multi-modal network by providing connections to bicycling and walking trip

More information

Traffic Assessment for Woodhaven Redevelopment. City of Rome Oneida County, New York. March 2, 2018

Traffic Assessment for Woodhaven Redevelopment. City of Rome Oneida County, New York. March 2, 2018 March 2, 2018 Traffic Assessment for Woodhaven Redevelopment City of Rome Oneida County, New York Prepared for: City of Rome 198 N. Washington Street Rome, NY 13440 Prepared by: C.T. MALE ASSOCIATES 50

More information

5/31/2016 VIA . Arwen Wacht City of Sacramento Community Development Department 300 Richards Blvd., 3 rd Floor Sacramento, CA 95811

5/31/2016 VIA  . Arwen Wacht City of Sacramento Community Development Department 300 Richards Blvd., 3 rd Floor Sacramento, CA 95811 5/31/2016 VIA EMAIL Arwen Wacht City of Sacramento Community Development Department 300 Richards Blvd., 3 rd Floor Sacramento, CA 95811 RE: El Pollo Loco (P16-028) Dear Ms. Wacht: WALKSacramento has reviewed

More information

Table #6 VISION CHARACTERISTICS

Table #6 VISION CHARACTERISTICS Table #6 VISION White Flint is a place to live, work, play, shop, and walk with sufficient density to encourage quality redevelopment. Vibrant streets and consistent streetscapes are important. CHARACTERISTICS

More information

5 Circulation & Parking

5 Circulation & Parking 5 Circulation & Parking Downtown Parking & Circulation Strategy. Downtown Wayne has a somewhat disconnected system of local public streets to connect downtown with the residential neighborhoods, and primary

More information

Employment 8,881 17,975 9,094. Households 18,990 31,936 12,946

Employment 8,881 17,975 9,094. Households 18,990 31,936 12,946 This section describes the future transportation environment of the UW Tacoma campus and surrounding area. A description of the future conditions on campus in terms of the street system, traffic and intersection

More information

Access Management Regulations and Standards

Access Management Regulations and Standards Access Management Regulations and Standards January 2014 Efficient highway operation Reasonable property access Concept of Access Management The way to manage access to land development while preserving

More information

STONY PLAIN ROAD STREETSCAPE

STONY PLAIN ROAD STREETSCAPE Jasper Place Revitalization Strategy: Vision The people involved in the Jasper Place Revitalization Strategy envision: Goal 1: Feeling safe in our community Create a community where feeling safe is common--where

More information

Executive Summary Route 30 Corridor Master Plan

Executive Summary Route 30 Corridor Master Plan Route Corridor Master Plan Project Overview The Route Corridor Master Plan is a coordinated multimodal transportation and land use plan for the entire stretch of Route through East Whiteland Township,

More information

Harrah s Station Square Casino

Harrah s Station Square Casino Transportation Analysis Harrah s Station Square Casino Pittsburgh, Pennsylvania Submitted To: City of Pittsburgh and Pennsylvania Gaming Control Board Prepared By: DKS Associates GAI Consultants December

More information

Chapter 14 PARLIER RELATIONSHIP TO CITY PLANS AND POLICIES. Recommendations to Improve Pedestrian Safety in the City of Parlier (2014)

Chapter 14 PARLIER RELATIONSHIP TO CITY PLANS AND POLICIES. Recommendations to Improve Pedestrian Safety in the City of Parlier (2014) Chapter 14 PARLIER This chapter describes the current status and future plans for biking and walking in the City of Parlier. RELATIONSHIP TO CITY PLANS AND POLICIES The Parlier General Plan is the primary

More information

In station areas, new pedestrian links can increase network connectivity and provide direct access to stations.

In station areas, new pedestrian links can increase network connectivity and provide direct access to stations. The Last Mile Planning for Pedestrians Planning around stations will put pedestrians first. Making walking to stations safe and easy is important; walking will be a part of every rapid transit Accessible

More information

Appendix B: Forecasting and Traffic Operations Analysis Framework Document

Appendix B: Forecasting and Traffic Operations Analysis Framework Document Existing Conditions Report - Appendix Appendix B: Forecasting and Traffic Operations Analysis Framework Document This document defines the methodology and assumptions that will be used in the traffic forecasting

More information

Vision: Traditional hamlet with an attractive business/pedestrian friendly main street connected to adjacent walkable neighborhoods

Vision: Traditional hamlet with an attractive business/pedestrian friendly main street connected to adjacent walkable neighborhoods N D. Focus Area II Vision: Traditional hamlet with an attractive business/pedestrian friendly main street connected to adjacent walkable neighborhoods Transit Road Focus Area II is located in the Hamlet

More information

7/23/2017 VIA . Michael Hanebutt City of Sacramento Community Development Department 300 Richards Boulevard, 3 rd Floor Sacramento, CA 95811

7/23/2017 VIA  . Michael Hanebutt City of Sacramento Community Development Department 300 Richards Boulevard, 3 rd Floor Sacramento, CA 95811 7/23/2017 VIA EMAIL Michael Hanebutt City of Sacramento Community Development Department 300 Richards Boulevard, 3 rd Floor Sacramento, CA 95811 RE: 65 th Street Apartments (DR17-220) Dear Mr. Hanebutt:

More information

4. ENVIRONMENTAL IMPACT ANALYSIS 9. TRANSPORTATION AND TRAFFIC

4. ENVIRONMENTAL IMPACT ANALYSIS 9. TRANSPORTATION AND TRAFFIC 4. ENVIRONMENTAL IMPACT ANALYSIS 9. TRANSPORTATION AND TRAFFIC 4.9.1 INTRODUCTION The following section addresses the Proposed Project s impact on transportation and traffic based on the Traffic Study

More information

Chapter 4 Traffic Analysis

Chapter 4 Traffic Analysis Chapter 4 Traffic Analysis PURPOSE The traffic analysis component of the K-68 Corridor Management Plan incorporates information on the existing transportation network, such as traffic volumes and intersection

More information

Figure 1: East West Connector Alignment Alternatives Concept Drawing

Figure 1: East West Connector Alignment Alternatives Concept Drawing Page 2 of 9 Figure 1: East West Connector Alignment Alternatives Concept Drawing The Montebello Drive extension will run north south and connect Wilsonville Road to the Boones Ferry Road to Brown Road

More information

Appendix A: Crosswalk Policy

Appendix A: Crosswalk Policy Appendix A: Crosswalk Policy Appendix A: Crosswalk Policy Introduction This citywide Crosswalk Policy is aimed at improving pedestrian safety and enhancing pedestrian mobility by providing a framework

More information

HIGHBURY AVENUE/HAMILTON ROAD INTERSECTION IMPROVEMENTS PUBLIC INFORMATION CENTRE 1 MAY 14, 2015

HIGHBURY AVENUE/HAMILTON ROAD INTERSECTION IMPROVEMENTS PUBLIC INFORMATION CENTRE 1 MAY 14, 2015 HIGHBURY AVENUE/HAMILTON ROAD INTERSECTION IMPROVEMENTS Municipal Class Environmental Assessment PUBLIC INFORMATION CENTRE 1 MAY 14, 2015 ACCESSIBILITY Under the Accessibility Standards 2015 for Customer

More information

Transportation Impact Study for Abington Terrace

Transportation Impact Study for Abington Terrace Transportation Impact Study for Abington Terrace Abington Township, Montgomery County, PA Sandy A. Koza, P.E., PTOE PA PE License Number PE059911 Prepared by McMahon Associates, Inc. 425 Commerce Drive,

More information

Cycle Track Design Best Practices Cycle Track Sections

Cycle Track Design Best Practices Cycle Track Sections Design Best Practices Sections It is along street segments where the separation and protection methods of cycle tracks offer more comfort than conventional bicycle lanes, and are more attractive to a wide

More information

IV. Environmental Impact Analysis B.3 Pedestrian Circulation and Bicycle and Pedestrian Safety

IV. Environmental Impact Analysis B.3 Pedestrian Circulation and Bicycle and Pedestrian Safety IV. Environmental Impact Analysis B.3 Pedestrian Circulation and Bicycle and Pedestrian Safety 1. Introduction This section analyzes the potential impacts of the Project on pedestrian circulation and bicycle

More information

City of Novi Non-Motorized Master Plan 2011 Executive Summary

City of Novi Non-Motorized Master Plan 2011 Executive Summary City of Novi Non-Motorized Master Plan 2011 Executive Summary Prepared by: February 28, 2011 Why Plan? Encouraging healthy, active lifestyles through pathway and sidewalk connectivity has been a focus

More information

Streetscape: Core Shopping District

Streetscape: Core Shopping District Streetscape: Core Shopping District DRAFT DRAFT DRAFT May 00 Core Shopping District: Phase Blue Island s Core Shopping District is located along Western Avenue, between Grove and Union Streets. Streetscape

More information

C C C

C C C C-012-001 Thank you for your support for the creation of new public space and nonmotorized access between downtown and the waterfront through the Overlook Walk, the East-West Connections, and the Promenade.

More information

TECHNICAL MEMORANDUM. Introduction

TECHNICAL MEMORANDUM. Introduction TECHNICAL MEMORANDUM To: From: John M. Welsh Chris Furlong AHC, Inc. Andrew T. Smith, P.E. Edward Y. Papazian, P.E. Kimley-Horn and Associates, Inc. Date: July 6, 2017 Subject: 200 9 th reet South Redevelopment

More information

Solana Beach Comprehensive Active Transportation Strategy (CATS)

Solana Beach Comprehensive Active Transportation Strategy (CATS) Solana Beach Comprehensive Active Transportation Strategy (CATS) 3.0 Goals & Policies The Solana Beach CATS goals and objectives outlined below were largely drawn from the Solana Beach Circulation Element

More information

Traffic Impact Study WestBranch Residential Development Davidson, NC March 2016

Traffic Impact Study WestBranch Residential Development Davidson, NC March 2016 Traffic Impact Study WestBranch Residential Development Davidson, NC March 216 TRAFFIC IMPACT STUDY FOR THE WestBranch Residential Development LOCATED IN DAVIDSON, NC Prepared For: Lennar Carolinas, LLC

More information

METHODOLOGY. Signalized Intersection Average Control Delay (sec/veh)

METHODOLOGY. Signalized Intersection Average Control Delay (sec/veh) Chapter 5 Traffic Analysis 5.1 SUMMARY US /West 6 th Street assumes a unique role in the Lawrence Douglas County transportation system. This principal arterial street currently conveys commuter traffic

More information

Preliminary Transportation Analysis

Preliminary Transportation Analysis Preliminary Transportation Analysis Goals of a Robust, Multimodal Transportation Network Safe Accessible/Connected Efficient Comfortable Context-Sensitive Motor Vehicle: Continue to analyze the data to

More information

David DiPierro, John Amberson. Steering Committee Meeting #4 Overview

David DiPierro, John Amberson. Steering Committee Meeting #4 Overview IBI GROUP 18401 Von Karman Avenue Suite 110 Irvine CA 92612 USA tel 949 833 5588 fax 949 833 5511 ibigroup.com Memorandum To/Attention Steering Committee Members Date February 17, 2016 From IBI Group Project

More information

Traffic Impact Analysis Walton Acres at Riverwood Athletic Club Clayton, NC

Traffic Impact Analysis Walton Acres at Riverwood Athletic Club Clayton, NC Traffic Impact Analysis Walton Acres at Riverwood Athletic Club Clayton, NC 1. TABLE OF CONTENTS INTRODUCTION...1 1.1. Site Location and Study Area...1 1.2. Proposed Land Use and Site Access...2 1.3.

More information

Environmental Assessment Findings & Recommendations. Public Hearing November 13, 2014

Environmental Assessment Findings & Recommendations. Public Hearing November 13, 2014 Environmental Assessment Findings & Recommendations Public Hearing November 13, 2014 Welcome! Welcome and Introductions Project and Environmental Assessment Overview Public Comments Adjourn Purpose of

More information

Glenn Avenue Corridor Traffic Operational Evaluation

Glenn Avenue Corridor Traffic Operational Evaluation Glenn Avenue Corridor Traffic Operational Evaluation PREPARED FOR: THE CITY OF AUBURN PREPARED BY: DECEMBER 2007 Glenn Avenue Corridor Study--Auburn, Alabama TABLE OF CONTENTS Introduction... 1 Background

More information

Abrams Associates. Transportation Impact Analysis. City of Rocklin. Prepared for: David Mohlenbrok City of Rocklin 4081 Alvis Court Rocklin, CA 95677

Abrams Associates. Transportation Impact Analysis. City of Rocklin. Prepared for: David Mohlenbrok City of Rocklin 4081 Alvis Court Rocklin, CA 95677 Transportation Impact Analysis Sierra College Boulevard Commercial Project City of Rocklin Prepared for: David Mohlenbrok City of Rocklin 081 Alvis Court Rocklin, CA 95677 Prepared by: 1875 Olympic Boulevard,

More information

Item to be Addressed Checklist Consideration YES NO N/A Required Description Complete Streets Guidelines

Item to be Addressed Checklist Consideration YES NO N/A Required Description Complete Streets Guidelines Passaic County Complete Streets Checklist - Concept Development Project Name Item to be Addressed Checklist Consideration YES NO N/A Required Description Complete Streets Guidelines Existing Plans Have

More information

Tonight is for you. Learn everything you can. Share all your ideas.

Tonight is for you. Learn everything you can. Share all your ideas. Strathcona Neighbourhood Renewal Draft Concept Design Tonight is for you. Learn everything you can. Share all your ideas. What is Neighbourhood Renewal? Creating a design with you for your neighbourhood.

More information

Sixth Line Development - Transit Facilities Plan

Sixth Line Development - Transit Facilities Plan Memorandum Date: November 13, 2012 To: From: c.c. Subject: Rob Freeman (Freeman Planning) Kevin Phillips Sixth Line Development - Transit Facilities Plan 33016631 This memo was prepared to review the transit

More information

ATTACHMENT 4 - TDM Checklist. TDM Checklist Overview

ATTACHMENT 4 - TDM Checklist. TDM Checklist Overview ATTACHMENT 4 - TDM Checklist TDM Checklist Overview The proposed checklist rates developments on the degree to which they are TDM and transit supportive. Points are assigned based on the level of transit

More information

City of Homewood Transportation Plan

City of Homewood Transportation Plan City of Homewood Transportation Plan Prepared for: City of Homewood, Alabama Prepared by: Skipper Consulting, Inc. May 2007 TABLE OF CONTENTS INTRODUCTION... 1 BACKGROUND INFORMATION... 1 EXISTING TRANSPORTATION

More information

Arlington Public Schools Thomas Jefferson Site Evaluation Transportation Networks. Thomas Jefferson Working Group Meeting #6 November 10, 2014

Arlington Public Schools Thomas Jefferson Site Evaluation Transportation Networks. Thomas Jefferson Working Group Meeting #6 November 10, 2014 Arlington Public Schools Thomas Jefferson Site Evaluation Transportation Networks Thomas Jefferson Working Group Meeting #6 November 10, 2014 2 3 INTRODUCTION 4 Goal of our work: Identify and assess multi-modal

More information

Appendix C. NORTH METRO STATION AREA TRAFFIC IMPACT STATEMENT 88th Avenue Station

Appendix C. NORTH METRO STATION AREA TRAFFIC IMPACT STATEMENT 88th Avenue Station Appendix C NORTH METRO STATION AREA TRAFFIC IMPACT STATEMENT 88th Avenue Station Prepared for: Regional Transportation Department and URS Corporation as part of the North Metro EIS David Evans and Associates,

More information

TRAFFIC IMPACT STUDY CRITERIA

TRAFFIC IMPACT STUDY CRITERIA Chapter 6 - TRAFFIC IMPACT STUDY CRITERIA 6.1 GENERAL PROVISIONS 6.1.1. Purpose: The purpose of this document is to outline a standard format for preparing a traffic impact study in the City of Steamboat

More information

CHAPTER 3. Transportation and Circulation

CHAPTER 3. Transportation and Circulation CHAPTER 3 Transportation and Circulation 3.0 TRANSPORTATION AND CIRCULATION This chapter evaluates traffic circulation, transit, parking, pedestrian, bicycle, and rail operational conditions in the Project

More information

Roads and Vehicular Traffic Design Principles. Roads and Vehicular Traffic Recommendations

Roads and Vehicular Traffic Design Principles. Roads and Vehicular Traffic Recommendations CIRCULATION AND PARKING roads and vehicular traffic The Campus Master Plan updates the campus transportation network through a multi-modal approach that encourages walking and biking while improving vehicular

More information

INTRODUCTION THOROUGHFARE SYSTEM CLASSIFICATIONS

INTRODUCTION THOROUGHFARE SYSTEM CLASSIFICATIONS INTRODUCTION The thoroughfare plan will assist public officials in the development of a specialized system for efficient and safe movement of vehicular traffic while minimizing potential conflicts with

More information

Evaluation of M-99 (Broad Street) Road Diet and Intersection Operational Investigation

Evaluation of M-99 (Broad Street) Road Diet and Intersection Operational Investigation Evaluation of M-99 (Broad Street) Road Diet and Intersection Operational Investigation City of Hillsdale, Hillsdale County, Michigan June 16, 2016 Final Report Prepared for City of Hillsdale 97 North Broad

More information

Gateway Transportation Study

Gateway Transportation Study Gateway Transportation Study Amherst, Massachusetts SUBMITTED TO University of Massachusetts Amherst Town of Amherst SUBMITTED BY Vanasse Hangen Brustlin, Inc. Watertown, Massachusetts March 213 Back of

More information

Overview. Existing Conditions. Corridor Description. Assessment

Overview. Existing Conditions. Corridor Description. Assessment Overview A study of the 23 rd Street corridor was undertaken to document the existing conditions, analyze traffic operations, and recommend remedies for deficient situations Although 23 rd Street is frequently

More information

Balancing Operation & Safety for Motorized and Non-Motorized Traffic

Balancing Operation & Safety for Motorized and Non-Motorized Traffic Balancing Operation & Safety for Motorized and Non-Motorized Traffic Brian Willham, PE, PTOE Iowa Director - MOVITE June 30, 2014 Learning Objectives: When & Why should we measure the performance of complete

More information

This chapter describes the proposed circulation system and transportation alternatives associated with

This chapter describes the proposed circulation system and transportation alternatives associated with 5.0 Circulation 5.1 OVERVIEW This chapter describes the proposed circulation system and transportation alternatives associated with West Landing, and summarize the information contained in the Existing

More information

Chapter 16: Traffic and Parking A. INTRODUCTION

Chapter 16: Traffic and Parking A. INTRODUCTION Chapter 6: Traffic and Parking A. ITRODUCTIO This chapter examines the potential traffic and parking impacts of the proposed Fresh Kills Park roads. The analysis of transit and pedestrians is presented

More information

Access Management Regulations and Standards

Access Management Regulations and Standards Access Management Regulations and Standards Efficient highway operation Reasonable property access Concept of Access Management The way to manage access to land development while simultaneously preserving

More information

RESOLUTION NO ?? A RESOLUTION OF THE CITY OF NEPTUNE BEACH ADOPTING A COMPLETE STREETS POLICY

RESOLUTION NO ?? A RESOLUTION OF THE CITY OF NEPTUNE BEACH ADOPTING A COMPLETE STREETS POLICY RESOLUTION NO. 2018-?? A RESOLUTION OF THE CITY OF NEPTUNE BEACH ADOPTING A COMPLETE STREETS POLICY WHEREAS, safe, convenient, and accessible transportation for all users is a priority of the City of Neptune