1 MEDICAL/OFFICE BUILDING 1637 BANK STREET OTTAWA, ONTARIO TRANSPORTATION OVERVIEW Prepared for: Ontario Inc Canotek Road Ottawa, Ontario K1J 9J5 June 4, Report_2.doc D. J. Halpenny & Associates Ltd. Consulting Transportation Engineers P.O. Box 774, Manotick, ON K4M 1A7 - Tel (613) Fax (613)
2 TABLE OF CONTENTS PAGE 1. INTRODUCTION Scope of Work EXISTING ROADS AND INTERSECTIONS PROPOSED DEVELOPMENT Trip Generation TRANSPORTATION IMPACT Background Traffic Volumes Total Traffic Volumes Traffic Analysis Site Circulation Transportation Demand Management (TDM) FINDINGS AND RECOMMENDATIONS APPENDIX LIST OF FIGURES 1.1 SITE LOCATION PLAN EXISTING PEAK AM AND PM HOUR TRAFFIC COUNTS CONCEPTUAL SITE PLAN WEEKDAY PEAK AM AND PM HOUR SITE GENERATED TRIPS YEAR 2017 PEAK AM AND PM HOUR BACKGROUND TRAFFIC YEAR 2022 PEAK AM AND PM HOUR BACKGROUND TRAFFIC YEAR 2017 PEAK AM AND PM HOUR TOTAL TRAFFIC YEAR 2022 PEAK AM AND PM HOUR TOTAL TRAFFIC LIST OF TABLES 3.1 TRIP GENERATION RATES SITE GENERATED TRIPS COLLINS/SITE ACCESS LoS & Delay BANK/COLLINS LoS & Delay... 15
3 MEDICAL/OFFICE BUILDING 1637 BANK STREET OTTAWA, ONTARIO TRANSPORTATION OVERVIEW 1. INTRODUCTION The owners of a parcel of land at 1637 Bank Street are proposing to construct a medical office building on the property. The site is located on the east side of Bank Street approximately 165 m south of the intersection of Bank Street and Heron Road. The site is at the northeast corner of the Bank/Collins intersection. The location of the proposed medical office building is shown in Figure 1.1. The site is currently vacant, but originally had a single building which contained the business office for a driving instructor which was removed approximately two years ago. Although vacant, the site still contains an access onto Collins Avenue. The Site Plan proposes one four storey building which would be used as a medical office building with a gross floor area of approximately 1,232 m 2 (13,261 ft 2 ). The site will have one access onto Collins Avenue at approximately the same location as the original access at 30 m (centreline to centreline) from the Bank/Collins intersection. The proposed medical office development is expected to be completed and operational by As part of the Site Plan Application of the lands, the City of Ottawa has requested that a Transportation Assessment report be prepared which would determine the number of trips from the medical office building, and the operation of the site access onto Collins Avenue and the Bank/Collins intersection. As determined from the City of Ottawa Transportation Impact Assessment Guidelines, the number of site generated trips would not trigger the preparation of a Transportation Impact Assessment report. Following discussions with staff of the City of Ottawa, the owner has retained the firm of D. J. Halpenny & Associates Ltd. to prepare a report in support of the Site Plan Application for site which will examine the operation of the Collins Avenue access and Bank/Collins intersection. 1.1 Scope of Work The will utilize the most recent Site Plan for the development. The study will address the operation of the site access onto Collins Avenue and the Bank/Collins intersection. The analysis will be completed for the existing 2014 traffic counts at the Bank/Collins intersection, and for the expected traffic at build out of the site in 2017 and at the year 2022 which represents five years following the completion of the medical office for both the site access and Bank/Collins intersection. The time period for the study was taken as the weekday peak AM and PM hours of the adjacent traffic along Bank Street.
4 2 FIGURE 1.1 SITE LOCATION PLAN
5 3 2. EXISTING ROADS AND INTERSECTIONS Bank Street (Ottawa Road 31) adjacent to the site is a four lane arterial roadway with a back-toback centre left turn lane. The speed limit along Bank Street is unposted at 50 km./h. The 2014 traffic counts along Bank Street past the site determined that the Annual Average Daily Traffic volume (AADT) was approximately 26,750 vehicles. Pedestrian sidewalks exist along both sides of Bank Street. There are no cycling lanes on Bank Street in the vicinity of the site. The site proposes an access onto Collins Avenue. Collins Avenue is an east-west two lane local street with a rural cross section having a pavement width of approximately 6 m. The speed limit is unposted at 50 km./h. There are no sidewalks along either side of Collins Avenue and parking is prohibited along the north side of the street in the vicinity of the site. The intersection of Bank Street and Collins Avenue is a four approach intersection where Bank Street forms the northbound and southbound approaches, Collins Avenue the westbound approach to the intersection, and Wildwood Avenue the eastbound approach. Wildwood Avenue provides access to the Canadian Tire store, Esso gas bar/car wash and convenience store/tim Hortons, and other commercial buildings to the west of Bank Street. The intersection is controlled by stop signs places at the westbound Collins Avenue approach and eastbound Wildwood Avenue approach. The intersection has the following lane configuration: Bank St. Northbound approach - Bank St. Southbound approach - 1 centre shared back-to-back left turn lane 2 through lanes 1 right turn lane (nearside Bus Bay) 1 centre shared back-to-back left turn lane 1 through lane 1 shared through/right lane Collins Ave. Westbound approach - 1 shared left/through/right lane Wildwood Eastbound approach - 1 shared left/through/right lane Figure 2.1 shows the existing 2014 traffic along Bank Street past the site for the weekday peak AM and PM hours which were extrapolated from counts taken by City of Ottawa staff at the Bank/Erie intersection on February 12, The counts include turning movements to/from Collins Avenue and Wildwood Avenue which were taken by the consultant on May 20/21, The peak AM hour occurred between 7:30 and 8:30, and peak PM hour between 4:30 and 5: PROPOSED DEVELOPMENT A Site Plan proposal is being prepared for the construction of a medical office building on a parcel of land at 1637 Bank Street. The site is currently vacant but was previously occupied by one building containing a driving school which had one access onto Collins Avenue. The property for the medical office is 1,010 m 2 (10,871 ft 2 ) in size and is currently zoned General Urban Area Arterial Mainstreet AM1 [1913]. Development along Bank Street in the vicinity of the site is mainly commercial with an Arterial Mainstreet zoning. Development along Collins Avenue comprises of residential homes with the lands zoned for residential.
6 4 FIGURE 2.1 EXISTING PEAK AM AND PM HOUR TRAFFIC COUNTS
7 5 The development will be a four storey building with a gross floor area of 1,232 m 2 (13,261 ft 2 ). The medical office building would contain a walk-in clinic on the first floor, and medical equipment and lab on the second floor with the remaining space medical offices. The site will have one 6.2 m wide access onto Collins Avenue. The centre of the access will be located approximately 15 m from the westbound Collins Avenue stop bar. The site will contain 20 parking spaces which include 1 barrier free space. The building will have a parking garage which will contain 6 spaces, with the remaining 14 spaces provided as surface parking. The site plan also provides a 5 bicycle storage rack which will be located next to the vehicular parking spaces. A sidewalk is provided at the main access which connects to Bank Street and a second access and sidewalk to Collins Avenue. Figure 3.1 presents a Conceptual Site Plan of the site. 3.1 Trip Generation The expected trips from the proposed medical office building were determined by utilizing the trip generation statistical data published in the Institute of Transportation Engineers (ITE) document, Trip Generation. The analysis used the data for a Medical-Dental Office Building, ITE Land Use 720, and a gross building floor area of 13,261 ft 2. Table 3.1 shows the trip generation rates which were used to determine the expected site generated trips for the proposed site. TABLE 3.1 TRIP GENERATION RATES LAND USE Weekday Peak AM hr. TRIP RATES Weekday Peak PM hr. ITE Land Use 720 Medical-Dental Office Building 2.30 Trips/1000 ft Trips/1000 ft 2 All of the site generated trips are considered primary trips which are trips where the primary destination is to/from the proposed development. Table 3.2 shows the expected number of peak hour site generated trips which also incorporates a 10 percent modal shared reduction. TABLE 3.2 SITE GENERATED TRIPS LAND USE WEEKDAY PEAK AM HR. WEEKDAY PEAK PM HR. Total Enter Exit Total Enter Exit Medical-Dental Building (79%) 7 (21%) (27%) 35 (73%) Modal Trip Reduction (10%) Total Trips
8 6 FIGURE 3.1 CONCEPTUAL SITE PLAN
9 7 The medical building is assumed to be central to the area which would attract patrons. The majority of trips are assumed to arrive and depart from Bank Street, with some trips assigned east along Collins Avenue which would be trips from the adjacent residential area or trips from either Heron Road or Alta Vista Drive which would arrive and depart along Ridgemont Avenue and Edge Hill Place. The study has therefore assigned site trips to the following distribution: To/From the North (Bank Street) - 50 percent To/From the South (Bank Street) - 45 percent To/From the East (Collins Avenue) - 5 percent Figure 3.2 shows the weekday peak AM and PM hour distribution of site generated trips. 4. TRANSPORTATION IMPACT 4.1 Background Traffic Volumes The background traffic volumes along Bank Street would represent the expected traffic volumes which would not include the trips to/from the proposed medical office building. The increase in background traffic was determined from the examination of historical traffic counts taken at the Bank/Erie intersection. Traffic counts taken in 2005 were compared to the 2014 counts which showed a 2 to 3 percent drop in traffic during both peak AM and PM hours with the exception of the northbound Bank Street peak AM hour approach which had a 3 percent increase over the nine year period. With the surrounding community essentially built out and the volume of traffic along northbound and southbound Bank Street showing little or no growth, it was assumed that the background traffic would increase at an annual rate of 1.0 percent along both Bank Street, Collin Avenue and Wildwood Avenue. The following is the rate of increase in traffic for an annual compounded increase of 1.0 percent: Counts Horizon Year Growth Factor = = The above growth factors were applied to all 2014 movements at the intersection of Bank Street and Collins Avenue (Figure 2.1), resulting in the expected background traffic at build out of the site in 2017 and at five years beyond build out at the year Figure 4.1 shows the expected 2017 background traffic and Figure 4.2 the 2022 background traffic. 4.2 Total Traffic Volumes The total expected weekday peak AM and PM hour traffic was determined by the addition of the expected site generated trips which are shown in Figure 3.2 and the background traffic. The result are the expected total traffic volumes which are shown in Figure 4.3 for the 2017 total traffic (build out) and Figure 4.4 for the 2022 total traffic (5 years beyond completion).
10 8 FIGURE 3.2 WEEKDAY PEAK AM AND PM HOUR SITE GENERATED TRIPS
11 9 FIGURE 4.1 YEAR 2017 PEAK AM AND PM HOUR BACKGROUND TRAFFIC
12 10 FIGURE 4.2 YEAR 2022 PEAK AM AND PM HOUR BACKGROUND TRAFFIC
13 11 FIGURE 4.3 YEAR 2017 PEAK AM AND PM HOUR TOTAL TRAFFIC
14 12 FIGURE 4.4 YEAR 2022 PEAK AM AND PM HOUR TOTAL TRAFFIC
15 Traffic Analysis The study will examine the operation of the medical office building access onto Collins Avenue, and the Bank/Collins intersection. The analysis will use the Highway Capacity Software, which utilizes the intersection capacity analysis procedure as documented in the Highway Capacity Manual For unsignalized intersections, the level of service of each lane movement is determined as a function of the delay of vehicles at the approach. The following relates the level of service of each lane movement with the expected delay at the approach. LEVEL OF SERVICE DELAY Level of Service A 0-10 sec./vehicle Little or No Delay Level of Service B >10-15 sec./vehicle Short Traffic Delays Level of Service C >15-25 sec./vehicle Average Traffic Delays Level of Service D >25-35 sec./vehicle Long Traffic Delays Level of Service E >35-50 sec./vehicle Very Long Traffic Delays Level of Service F >50 sec./vehicle Extreme Delays Demand Exceeds Capacity The expected length of queue at the critical lane movements for an unsignalized intersection was determined by the calculation of the 95 th percentile queue at the lane approach. The 95 th percentile queue length is the calculated 95 th greatest queue length out of 100 occurrences at a movement during a 15-minute peak period. The 95 th percentile queue length is a function of the capacity of a movement and the total expected traffic, with the calculated value determining the magnitude of the queue by representing the queue length as fractions of vehicles. The time period for the analysis would be the weekday peak AM and PM hours of the adjacent roads. The results of the analysis are discussed in detail in the following sections: Collins Avenue and Site Access The Site Plan proposes a full movement access onto Collins Avenue. The access would be 6.2 m in width and would provide left and right turning movements onto Collins Avenue. The access would be located across from the parking area which serves the IDA Proactive Pharmacy on the south side of Collins Avenue. The access would have a clear throat distance of approximately 6.5 m (1 car length). The 2017 operational analysis (completion of the medical office building) determined that the southbound shared left/right turn movement at the site exit would function at a Level of Service (LoS) A during both the weekday peak AM and PM hour. The eastbound Collins Avenue shared left/through would also function at a LoS A during the peak AM and PM hours. Table 4.1 summarizes the operation of the intersection with Exhibit 1 in the Appendix providing the operational analysis for the peak AM hour and Exhibit 2 the peak PM hour. At the year 2022, which represents five years beyond the opening of the medical office building, the southbound left/right exiting movement from the site would continue to function at a LoS A during the peak AM and PM hours. The eastbound Collins Avenue shared left/through movement would also function at a LoS A during the peak AM and PM hours. Table 4.1 summarizes the intersection operation with the analysis sheets provided as Exhibit 3 and 4. The
16 14 95 th percentile queue at the southbound exiting movement would be 0.10 vehicles during the 2022 peak PM hour with the site plan providing a clear throat distance of 1 vehicle (6.5 m). The 95 th percentile queue at the eastbound Collins Avenue approach to the access would be 0.04 vehicles during the peak 2022 AM hour. With the distance from the centre of the access to the westbound stop bar being approximately 15 m (2 vehicles), the expected queueing of eastbound Collins Avenue vehicles entering the site would not interfere with the operation of the Bank/Collins intersection. TABLE 4.1 COLLINS/SITE ACCESS LoS & Delay Intersection Approach WEEKDAY PEAK AM HR. YEAR 2017 (2022) WEEKDAY PEAK PM HR. YEAR 2017 (2022) LoS Delay (sec.) LoS Delay (sec.) EB Left/Through Collins A (A) 7.2 (7.2) A (A) 7.2 (7.2) SB Left/Right Site Access A (A) 8.3 (8.3) A (A) 8.5 (8.5) There would be no requirement for modifications to Collins Avenue beyond that of obtaining a Private Approach Permit. Bank Street and Collins Avenue Intersection The Bank/Collins intersection is a two-way stop controlled intersection with Collins Avenue and Wildwood Avenue forming the westbound and eastbound stop controlled approaches, and Bank Street the northbound and southbound approaches. Bank Street has a centre shared left turn lane. The existing 2014 traffic from counts (Collins and Wildwood were 2015 counts) determined that during the peak AM hour the northbound Banks Street left turn movement would function at a LoS A and southbound left onto Collins Avenue at a LoS B. The westbound Collins Avenue approach would function at a LoS B and eastbound Wildwood Avenue approach at a LoS C. The peak AM hour operation of the intersection is provided in the analysis sheets as Exhibit 5 with Table 4.2 summarizing the results. During the 2014 peak PM hour the northbound and southbound Bank Street left turn movements would function at a LoS B, the westbound Collins Avenue approach at a LoS C and eastbound Wildwood Avenue approach at a LoS E. Table 4.2 summarizes the peak PM hour operation of the intersection with the analysis sheets provided as Exhibit 6. The expected 95 th percentile queue during the peak PM hour at the westbound Collins Avenue approach was determined to be 0.11 vehicles (1 vehicle), with the 2015 traffic counts observing a maximum queue of 1 vehicle at the approach. The 95 th percentile queue at the eastbound Wildwood Avenue approach was 2.6 vehicles (3 vehicles) with the traffic counts observing a maximum queue of 4 vehicles on 5 occasions during the PM peak hour.
17 15 At the completion of the medical office building in 2017, the northbound Bank Street left turn movement onto Wildwood Avenue would function at a LoS A during the peak AM hour and southbound Bank Street left turn movement onto Collins Avenue at a LoS B. The westbound Collins Avenue approach would function at a LoS E and eastbound Wildwood Avenue approach at a LoS C. During the 2017 peak PM hour the northbound and southbound Bank Street left turn movements would function at a LoS B, the westbound Collins Avenue approach at a LoS F and eastbound Wildwood Avenue approach at a LoS E. The 2017 analysis sheets are provided as Exhibit 7 and Exhibit 8. TABLE 4.2 BANK/COLLINS LoS & Delay Intersection Approach WEEKDAY PEAK AM HR. YEAR (2022) WEEKDAY PEAK PM HR. YEAR (2022) LoS Delay (sec.) LoS Delay (sec.) NB Left Site Access A A (A) (9.2) B B (B) (12.8) SB Left Site Access B B (B) (14.2) B B (B) (10.5) WB Left/Through/Right Collins B E (F) (54.9) C F (F) (100.3) EB Left/Through/Right Wildwood C C (C) (17.9) E E (F) (61.0) At five years beyond the completion of the medical office building in 2022, the northbound and southbound Bank Street left turn lanes would function at a LoS A and B respectively during the peak AM hour, and the westbound Collins Avenue approach at a LoS F and eastbound Wildwood Avenue approach at a LoS C. During the peak PM hour both the northbound and southbound Bank Street left turn movements will function at a LoS B and both the westbound Collins Avenue and eastbound Wildwood Avenue approaches would function at a LoS F. Table 4.2 summarizes the 2022 operation of the intersection with the analysis sheets provided as Exhibit 9 and Exhibit 10. During the 2022 peak PM hour the westbound Collins Avenue queue is 2.29 vehicles (3 vehicles or 21 m). The centre of the site access is located approximately 15 m or 2 vehicles. During the peak PM hour the queue at the westbound Collins Avenue approach would periodically extend to the proposed site access with exiting site vehicles queueing on site. The situation may be improved during the peak PM time period by some of the site trips travelling to Erie Avenue and turning southbound on Bank Street at the signalized intersection. Although the westbound Collins Avenue approach functioned at a LoS F, the 2022 peak PM hour approach delay was determined to be seconds. There would be no requirement for modifications to the Bank/Collins intersection due to the development of the medical office building site.
18 Site Circulation The proposed medical office building will contain a total of 20 parking spaces which includes 1 barrier free space. The layout of parking will provide the easy movement of vehicles with a clear throat distance of 1 vehicle at the site exit onto Collins Avenue with the 2022 analysis determining the 95 th percentile queue during the peak PM hour at the exit to be 0.10 vehicles. The underground garage will provide 6 parking spaces with the remaining 14 spaces as surface parking. Any additional parking can be accommodated along the south side of Collins Avenue (parking prohibited along the north side within a block of the site). Delivery trucks to the site would mainly comprise of a small cube van or parcel delivery vehicle. The Site Plan designates one shared loading space located close to the Collins Avenue entrance to the building. 4.5 Transportation Demand Management (TDM) The City of Ottawa is implementing Transportation Demand Management (TDM) measures as a plan to reduce peak hour traffic along the City s transportation network. The Site Plan does serve the principals of TDM by locating the site in close proximity to pedestrian, and transit facilities. The following list the facilities which would reduce the volumes of peak hour vehicular traffic: 1. The site is centrally located within the surrounding residential community. Patrons of a medical office would generally travel to the closest and most convenient location. With the medical office building close to the residential areas, travel distances by car would be reduced. 2. Bank Street and Heron Road have sidewalks along both sides of the road. The sidewalks provide safe and convenient access from the residential areas and bus stops to the medical office building. 3. OC Transpo Regular Route 1 travels past the site along Bank Street. Bus stops are located in close proximity to the site. The northbound bus stop is located at the Bank/Collins intersection, and the southbound bus stops are located at both the Bank/Erie and Bank/Heron signalized intersections. 4. Bank Street, Heron Road and Alta Vista Drive are all designated as a primary cycling routes in the City of Ottawa Transportation Master Plan (TMP). The Site Plan provides a bicycle rack for the storage of 5 bicycles near the Collins Avenue entrance to the building.
19 17 5. FINDINGS AND RECOMMENDATIONS The medical office building is located at 1637 Bank Street in the City of Ottawa. The site is currently vacant but was previously occupied by a single building used by a driving instructor. The original building, which was demolished two years ago, had one access onto Collins Avenue which still exists. The owners of the parcel of land are preparing a Site Plan Application which proposes the construction of a four storey medical office building. The 1,232 m 2 building is expected to be completed and occupied by the year The time period for the traffic study analysis was the weekday peak AM and PM hours of the adjacent roads. The analysis examined the operation of the office building s access onto Collins Avenue and the Bank/Collins intersection. The study examined the operation of the site access for the expected 2017 traffic when build out of the site is expected, and at the year 2022 which represents five years beyond completion of the site. The Bank/Collins intersection was examined using the 2014 traffic counts and the expected traffic at the years 2017 and The report is being prepared in support of the Site Plan Application for the property. The findings and recommendations of the study are summarized in the following points: 1) The medical office building is expected to generate 23 trips entering and 6 trips exiting the site during the weekday peak AM hour for a total of 29 trips. During the peak PM hour the site will generate 12 trips entering and 31 trips exiting for a total of 43 trips. The site generated trips incorporate a 10 percent trip reduction for public transit. The total number of site generated trips would not trigger the preparation of a Transportation Impact Assessment report as documented in the City of Ottawa Transportation Impact Assessment Guidelines, October City of Ottawa staff has requested that a report be prepared to address the operation and location of the site access onto Collins Avenue and the operation of the Bank/Collins intersection. 2) The site will have one access onto Collins Avenue which will have a width of 6.2 m. The centre of the access will be located approximately 15 m from the westbound Collins Avenue stop bar. 3) The site access onto Collins Avenue would operate at an acceptable level of service for the expect 2022 peak AM and PM hour traffic. The operation of the site access would have only a minor impact on the operation of the Bank/Collins intersection. There would be no requirement for roadway modifications to Collins Avenue. Only a Private Approach Permit is required. 4) The intersection of Bank Street and Collins Avenue currently operates at an acceptable level of service during both the peak AM and PM hours. At the year 2022 with the increasing background traffic and trips from the medical office building, the northbound and southbound Bank Street left turn movement would operate at an acceptable level of service, but the westbound Collins Avenue approach would operate at a Level of Service (LoS) F during both the peak AM and peak PM hours. During the peak PM hour the
20 18 delay at the approach would be second which although long, is acceptable and approaches the delay experienced at some signalized intersections. The 95 th percentile queue during the peak PM hour is 2.29 vehicles or 21 m. With the distance between the stop bar at the westbound Collins Avenue approach to the Bank/Collins intersection and the centre of the site access being 15 m, the queue during the peak PM hour at the westbound Collins Avenue approach to Bank/Collins may periodically extend past the access to the site. There would be no requirement for intersection modification to the Bank/Collins intersection due to the proposed medical office building. Prepared by: David J. Halpenny, M. Eng., P. Eng.
21 19 APPENDIX OPERATIONAL ANALYSIS WORK SHEETS
22 20 EXHIBIT 1 YEAR 2017 PEAK AM HOUR TRAFFIC Site Access/Collins Avenue HCS+: Unsignalized Intersections Release 5.6 TWO-WAY STOP CONTROL SUMMARY Analysis Time Period: Peak AM Hour Intersection: Site Access/Collins Analysis Year: Year 2017 Project ID: Medical-Dental Building Bank Street East/West Street: Collins Avenue North/South Street: Site Access Intersection Orientation: EW Study period (hrs): 0.25 Vehicle Volumes and Adjustments Major Street: Approach Eastbound Westbound Movement Volume Peak-Hour Factor, PHF Hourly Flow Rate, HFR Percent Heavy Vehicles Median Type/Storage Undivided / RT Channelized? Lanes Configuration LT TR Upstream Signal? No No Minor Street: Approach Northbound Southbound Movement Volume 0 6 Peak Hour Factor, PHF Hourly Flow Rate, HFR 0 6 Percent Heavy Vehicles 0 0 Percent Grade (%) 0 0 Flared Approach: Exists?/Storage / No / Lanes 0 0 Configuration LR Delay, Queue Length, and Level of Service Approach EB WB Northbound Southbound Movement Lane Config LT LR v (vph) 23 6 C(m) (vph) v/c % queue length Control Delay LOS A A Approach Delay 8.3 Approach LOS A
23 21 EXHIBIT 2 YEAR 2017 PEAK PM HOUR TRAFFIC Site Access/Collins Avenue HCS+: Unsignalized Intersections Release 5.6 TWO-WAY STOP CONTROL SUMMARY Analysis Time Period: Peak PM Hour Intersection: Site Access/Collins Analysis Year: Year 2017 Project ID: Medical-Dental Building Bank Street East/West Street: Collins Avenue North/South Street: Site Access Intersection Orientation: EW Study period (hrs): 0.25 Vehicle Volumes and Adjustments Major Street: Approach Eastbound Westbound Movement Volume Peak-Hour Factor, PHF Hourly Flow Rate, HFR Percent Heavy Vehicles Median Type/Storage Undivided / RT Channelized? Lanes Configuration LT TR Upstream Signal? No No Minor Street: Approach Northbound Southbound Movement Volume 2 29 Peak Hour Factor, PHF Hourly Flow Rate, HFR 2 31 Percent Heavy Vehicles 0 0 Percent Grade (%) 0 0 Flared Approach: Exists?/Storage / No / Lanes 0 0 Configuration LR Delay, Queue Length, and Level of Service Approach EB WB Northbound Southbound Movement Lane Config LT LR v (vph) C(m) (vph) v/c % queue length Control Delay LOS A A Approach Delay 8.5 Approach LOS A
24 22 EXHIBIT 3 YEAR 2022 PEAK AM HOUR TRAFFIC Site Access/Collins Avenue HCS+: Unsignalized Intersections Release 5.6 TWO-WAY STOP CONTROL SUMMARY Analysis Time Period: Peak AM Hour Intersection: Site Access/Collins Analysis Year: Year 2022 Project ID: Medical-Dental Building Bank Street East/West Street: Collins Avenue North/South Street: Site Access Intersection Orientation: EW Study period (hrs): 0.25 Vehicle Volumes and Adjustments Major Street: Approach Eastbound Westbound Movement Volume Peak-Hour Factor, PHF Hourly Flow Rate, HFR Percent Heavy Vehicles Median Type/Storage Undivided / RT Channelized? Lanes Configuration LT TR Upstream Signal? No No Minor Street: Approach Northbound Southbound Movement Volume 0 6 Peak Hour Factor, PHF Hourly Flow Rate, HFR 0 6 Percent Heavy Vehicles 0 0 Percent Grade (%) 0 0 Flared Approach: Exists?/Storage / No / Lanes 0 0 Configuration LR Delay, Queue Length, and Level of Service Approach EB WB Northbound Southbound Movement Lane Config LT LR v (vph) 23 6 C(m) (vph) v/c % queue length Control Delay LOS A A Approach Delay 8.3 Approach LOS A
25 23 EXHIBIT 4 YEAR 2022 PEAK PM HOUR TRAFFIC Site Access/Collins Avenue HCS+: Unsignalized Intersections Release 5.6 TWO-WAY STOP CONTROL SUMMARY Analysis Time Period: Peak PM Hour Intersection: Site Access/Collins Analysis Year: Year 2022 Project ID: Medical-Dental Building Bank Street East/West Street: Collins Avenue North/South Street: Site Access Intersection Orientation: EW Study period (hrs): 0.25 Vehicle Volumes and Adjustments Major Street: Approach Eastbound Westbound Movement Volume Peak-Hour Factor, PHF Hourly Flow Rate, HFR Percent Heavy Vehicles Median Type/Storage Undivided / RT Channelized? Lanes Configuration LT TR Upstream Signal? No No Minor Street: Approach Northbound Southbound Movement Volume 2 29 Peak Hour Factor, PHF Hourly Flow Rate, HFR 2 31 Percent Heavy Vehicles 0 0 Percent Grade (%) 0 0 Flared Approach: Exists?/Storage / No / Lanes 0 0 Configuration LR Delay, Queue Length, and Level of Service Approach EB WB Northbound Southbound Movement Lane Config LT LR v (vph) C(m) (vph) v/c % queue length Control Delay LOS A A Approach Delay 8.5 Approach LOS A
26 24 EXHIBIT 5 YEAR 2014 EXISTING PEAK AM HOUR TRAFFIC Bank Street/Collins Avenue HCS+: Unsignalized Intersections Release 5.6 TWO-WAY STOP CONTROL SUMMARY Analysis Time Period: Peak AM Hour Intersection: Bank/Collins Analysis Year: Year 2014 Project ID: Medical-Dental Building Bank Street East/West Street: Collins Avenue North/South Street: Bank Street Intersection Orientation: NS Study period (hrs): 0.25 Vehicle Volumes and Adjustments Major Street: Approach Northbound Southbound Movement Volume Peak-Hour Factor, PHF Hourly Flow Rate, HFR Percent Heavy Vehicles Median Type/Storage Undivided / RT Channelized? No Lanes Configuration L T R L T TR Upstream Signal? No No Minor Street: Approach Westbound Eastbound Movement Volume Peak Hour Factor, PHF Hourly Flow Rate, HFR Percent Heavy Vehicles Percent Grade (%) 0 0 Flared Approach: Exists?/Storage No / No / Lanes Configuration LTR LTR Delay, Queue Length, and Level of Service Approach NB SB Westbound Eastbound Movement Lane Config L L LTR LTR v (vph) C(m) (vph) v/c % queue length Control Delay LOS A B B C Approach Delay Approach LOS B C
27 25 EXHIBIT 6 YEAR 2014 EXISTING PEAK PM HOUR TRAFFIC Bank Street/Collins Avenue HCS+: Unsignalized Intersections Release 5.6 TWO-WAY STOP CONTROL SUMMARY Analysis Time Period: Peak PM Hour Intersection: Bank/Collins Analysis Year: Year 2014 Project ID: Medical-Dental Building Bank Street East/West Street: Collins Avenue North/South Street: Bank Street Intersection Orientation: NS Study period (hrs): 0.25 Vehicle Volumes and Adjustments Major Street: Approach Northbound Southbound Movement Volume Peak-Hour Factor, PHF Hourly Flow Rate, HFR Percent Heavy Vehicles Median Type/Storage Undivided / RT Channelized? No Lanes Configuration L T R L T TR Upstream Signal? No No Minor Street: Approach Westbound Eastbound Movement Volume Peak Hour Factor, PHF Hourly Flow Rate, HFR Percent Heavy Vehicles Percent Grade (%) 0 0 Flared Approach: Exists?/Storage No / No / Lanes Configuration LTR LTR Delay, Queue Length, and Level of Service Approach NB SB Westbound Eastbound Movement Lane Config L L LTR LTR v (vph) C(m) (vph) v/c % queue length Control Delay LOS B B C E Approach Delay Approach LOS C E
28 26 EXHIBIT 7 YEAR 2017 PEAK AM HOUR TOTAL TRAFFIC Bank Street/Collins Avenue HCS+: Unsignalized Intersections Release 5.6 TWO-WAY STOP CONTROL SUMMARY Analysis Time Period: Peak AM Hour Intersection: Bank/Collins Analysis Year: Year 2017 Project ID: Medical-Dental Building Bank Street East/West Street: Collins Avenue North/South Street: Bank Street Intersection Orientation: NS Study period (hrs): 0.25 Vehicle Volumes and Adjustments Major Street: Approach Northbound Southbound Movement Volume Peak-Hour Factor, PHF Hourly Flow Rate, HFR Percent Heavy Vehicles Median Type/Storage Undivided / RT Channelized? No Lanes Configuration L T R L T TR Upstream Signal? No No Minor Street: Approach Westbound Eastbound Movement Volume Peak Hour Factor, PHF Hourly Flow Rate, HFR Percent Heavy Vehicles Percent Grade (%) 0 0 Flared Approach: Exists?/Storage No / No / Lanes Configuration LTR LTR Delay, Queue Length, and Level of Service Approach NB SB Westbound Eastbound Movement Lane Config L L LTR LTR v (vph) C(m) (vph) v/c % queue length Control Delay LOS A B E C Approach Delay Approach LOS E C
29 27 EXHIBIT 8 YEAR 2017 PEAK PM HOUR TOTAL TRAFFIC Bank Street/Collins Avenue HCS+: Unsignalized Intersections Release 5.6 TWO-WAY STOP CONTROL SUMMARY Analysis Time Period: Peak PM Hour Intersection: Bank/Collins Analysis Year: Year 2017 Project ID: Medical-Dental Building Bank Street East/West Street: Collins Avenue North/South Street: Bank Street Intersection Orientation: NS Study period (hrs): 0.25 Vehicle Volumes and Adjustments Major Street: Approach Northbound Southbound Movement Volume Peak-Hour Factor, PHF Hourly Flow Rate, HFR Percent Heavy Vehicles Median Type/Storage Undivided / RT Channelized? No Lanes Configuration L T R L T TR Upstream Signal? No No Minor Street: Approach Westbound Eastbound Movement Volume Peak Hour Factor, PHF Hourly Flow Rate, HFR Percent Heavy Vehicles Percent Grade (%) 0 0 Flared Approach: Exists?/Storage No / No / Lanes Configuration LTR LTR Delay, Queue Length, and Level of Service Approach NB SB Westbound Eastbound Movement Lane Config L L LTR LTR v (vph) C(m) (vph) v/c % queue length Control Delay LOS B B F E Approach Delay Approach LOS F E
30 28 EXHIBIT 9 YEAR 2022 PEAK AM HOUR TOTAL TRAFFIC Bank Street/Collins Avenue HCS+: Unsignalized Intersections Release 5.6 TWO-WAY STOP CONTROL SUMMARY Analysis Time Period: Peak AM Hour Intersection: Bank/Collins Analysis Year: Year 2022 Project ID: Medical-Dental Building Bank Street East/West Street: Collins Avenue North/South Street: Bank Street Intersection Orientation: NS Study period (hrs): 0.25 Vehicle Volumes and Adjustments Major Street: Approach Northbound Southbound Movement Volume Peak-Hour Factor, PHF Hourly Flow Rate, HFR Percent Heavy Vehicles Median Type/Storage Undivided / RT Channelized? No Lanes Configuration L T R L T TR Upstream Signal? No No Minor Street: Approach Westbound Eastbound Movement Volume Peak Hour Factor, PHF Hourly Flow Rate, HFR Percent Heavy Vehicles Percent Grade (%) 0 0 Flared Approach: Exists?/Storage No / No / Lanes Configuration LTR LTR Delay, Queue Length, and Level of Service Approach NB SB Westbound Eastbound Movement Lane Config L L LTR LTR v (vph) C(m) (vph) v/c % queue length Control Delay LOS A B F C Approach Delay Approach LOS F C
31 29 EXHIBIT 10 YEAR 2022 PEAK PM HOUR TOTAL TRAFFIC Bank Street/Collins Avenue HCS+: Unsignalized Intersections Release 5.6 TWO-WAY STOP CONTROL SUMMARY Analysis Time Period: Peak PM Hour Intersection: Bank/Collins Analysis Year: Year 2022 Project ID: Medical-Dental Building Bank Street East/West Street: Collins Avenue North/South Street: Bank Street Intersection Orientation: NS Study period (hrs): 0.25 Vehicle Volumes and Adjustments Major Street: Approach Northbound Southbound Movement Volume Peak-Hour Factor, PHF Hourly Flow Rate, HFR Percent Heavy Vehicles Median Type/Storage Undivided / RT Channelized? No Lanes Configuration L T R L T TR Upstream Signal? No No Minor Street: Approach Westbound Eastbound Movement Volume Peak Hour Factor, PHF Hourly Flow Rate, HFR Percent Heavy Vehicles Percent Grade (%) 0 0 Flared Approach: Exists?/Storage No / No / Lanes Configuration LTR LTR Delay, Queue Length, and Level of Service Approach NB SB Westbound Eastbound Movement Lane Config L L LTR LTR v (vph) C(m) (vph) v/c % queue length Control Delay LOS B B F F Approach Delay Approach LOS F F
INDUSTRIAL BUILDING 1660 COMSTOCK ROAD CITY OF OTTAWA TRANSPORTATION OVERVIEW. Prepared for:
INDUSTRIAL BUILDING 1660 COMSTOCK ROAD CITY OF OTTAWA TRANSPORTATION OVERVIEW Prepared for: Simluc Contractors Limited 2550 Blackwell Street, Ottawa K1B 5R1 October 18, 2013 113-584 Overview_1.doc D. J.
More informationOFFICE/RETAIL DEVELOPMENT 1625 BANK STREET OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for: Canada Inc.
OFFICE/RETAIL DEVELOPMENT 1625 BANK STREET OTTAWA, ONTARIO TRANSPORTATION BRIEF Prepared for: 9402209 Canada Inc. December 15, 2015 115-625 Report_2.doc D. J. Halpenny & Associates Ltd. Consulting Transportation
More informationURBAN QUARRY HEADQUARTERS 2717 STEVENAGE DRIVE CITY OF OTTAWA TRANSPORTATION OVERVIEW. Prepared for: Urban Quarry 4123 Belgreen Drive, Ottawa K1G 3N2
URBAN QUARRY HEADQUARTERS 2717 STEVENAGE DRIVE CITY OF OTTAWA TRANSPORTATION OVERVIEW Prepared for: Urban Quarry 4123 Belgreen Drive, Ottawa K1G 3N2 February 27, 2014 113-584 Overview_1.doc D. J. Halpenny
More informationQUICKIE C STORE AND GAS BAR 1780 HERON ROAD OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for:
QUICKIE C STORE AND GAS BAR 1780 HERON ROAD OTTAWA, ONTARIO TRANSPORTATION BRIEF Prepared for: Quickie Convenience Stores Larny Holdings Ltd. c/o PBC Group April 15, 2015 115-615 Report_1.doc D. J. Halpenny
More informationINDUSTRIAL BUILDING 3009 HAWTHORNE ROAD CITY OF OTTAWA TRANSPORTATION OVERVIEW REVISED. Prepared for: Canada Inc.
INDUSTRIAL BUILDING 3009 HAWTHORNE ROAD CITY OF OTTAWA TRANSPORTATION OVERVIEW REVISED Prepared for: 7849648 Canada Inc. Octiober 1, 2015 114-598 Overview_2.doc D. J. Halpenny & Associates Ltd. Consulting
More informationMEETING FACILITY 2901 GIBFORD DRIVE CITY OF OTTAWA TRANSPORTATION BRIEF. Prepared for: Holiday Inn Express 2881 Gibford Drive Ottawa, ON K1V 2L9
MEETING FACILITY 2901 GIBFORD DRIVE CITY OF OTTAWA TRANSPORTATION BRIEF Prepared for: Holiday Inn Express 2881 Gibford Drive Ottawa, ON K1V 2L9 December 18, 2012 112-566 Brief_1.doc D. J. Halpenny & Associates
More informationAPARTMENT BUILDING DEVELOPMENT 1161 HERON ROAD OTTAWA, ONTARIO TRANSPORTATION IMPACT STUDY. Prepared for:
APARTMENT BUILDING DEVELOPMENT 1161 HERON ROAD OTTAWA, ONTARIO TRANSPORTATION IMPACT STUDY Prepared for: 1649362 Ontario Inc. c/o Manor Park Management 231 Brittany Drive, Suite D Ottawa ON K1K 0R8 July
More informationHOLIDAY INN HOTEL 235 KING EDWARD AVENUE CITY OF OTTAWA TRANSPORTATION BRIEF. Prepared for:
HOLIDAY INN HOTEL 235 KING EDWARD AVENUE CITY OF OTTAWA TRANSPORTATION BRIEF Prepared for: Momentum Planning & Communications 1165 Greenlawn Crescent Ottawa, ON K1L 6C2 June 29, 2015 115-618 Brief_1.doc
More informationFAIRFIELD INN & SUITES HOTEL 135 THAD JOHNSON PRIVATE OTTAWA TRANSPORTATION BRIEF. Prepared for:
FAIRFIELD INN & SUITES HOTEL 135 THAD JOHNSON PRIVATE OTTAWA TRANSPORTATION BRIEF Prepared for: Bona Building & Management Co. Ltd. Place Vanier, 333 North River Road Vanier, Ontario K1L 8B9 August 12,
More informationHILTON GARDEN INN HOTEL HOTEL EXPANSION 2400 ALERT ROAD, OTTAWA TRANSPORTATION BRIEF. Prepared for:
HILTON GARDEN INN HOTEL HOTEL EXPANSION 2400 ALERT ROAD, OTTAWA TRANSPORTATION BRIEF Prepared for: Bona Building & Management Co. Ltd. Place Vanier, 333 North River Road Vanier, Ontario K1L 8B9 October
More informationHENDERSON DEVELOPMENT 213, 217, 221, 221 ½, 223 HENDERSON AVENUE and 65 TEMPLETON STREET OTTAWA, ONTARIO TRANSPORTATION OVERVIEW.
HENDERSON DEVELOPMENT 213, 217, 221, 221 ½, 223 HENDERSON AVENUE and 65 TEMPLETON STREET OTTAWA, ONTARIO TRANSPORTATION OVERVIEW Prepared for: 2294170 Ontario Inc. February 2, 2017 117-652 Report_1.doc
More informationOTTAWA TRAIN YARDS PHASE 3 DEVELOPMENT CITY OF OTTAWA TRANSPORTATION IMPACT STUDY. Prepared for:
OTTAWA TRAIN YARDS PHASE 3 DEVELOPMENT CITY OF OTTAWA TRANSPORTATION IMPACT STUDY Prepared for: The Ottawa Train Yards Inc. 223 Colonnade Road South, Suite 212 Nepean, Ontario K2E 7K3 January 17, 2012
More informationCOMMERCIAL DEVELOPMENT 2015 ROBERTSON ROAD OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for:
COMMERCIAL DEVELOPMENT 2015 ROBERTSON ROAD OTTAWA, ONTARIO TRANSPORTATION BRIEF Prepared for: First Bay Properties Inc. 311 Richmond Road, Suite 203 Ottawa, ON K1Z 6X3 August 8, 2017 117-663 Brief_1.doc
More informationNEW YORK CENTRAL PARK SUBDIVISION BLAIS STREET/ST-PIERRE STREET EMBRUN, ONTARIO TRAFFIC IMPACT STUDY. Prepared for:
NEW YORK CENTRAL PARK SUBDIVISION BLAIS STREET/ST-PIERRE STREET EMBRUN, ONTARIO TRAFFIC IMPACT STUDY Prepared for: Solidex Holdings Limited & Investissement Maurice Lemieux Investments Attn: Mr. Anthony
More informationORLEANS GARDENS SHOPPING CENTRE 1615 ORLEANS BOULEVARD CITY OF OTTAWA, ONTARIO TRANSPORTATION IMPACT STUDY. Prepared for:
ORLEANS GARDENS SHOPPING CENTRE 1615 ORLEANS BOULEVARD CITY OF OTTAWA, ONTARIO TRANSPORTATION IMPACT STUDY Prepared for: Orleans Gardens Shopping Centre Inc. 2851 John Street, Suite 1 Markham, ON K3R 5R7
More informationBLUE SEA VILLAGE MER BLEUE 2159 MER BLEUE ROAD OTTAWA, ONTARIO TRANSPORTATION IMPACT ASSESSMENT. Prepared for: Ontario Limited.
BLUE SEA VILLAGE MER BLEUE 2159 MER BLEUE ROAD OTTAWA, ONTARIO TRANSPORTATION IMPACT ASSESSMENT Prepared for: 2534189 Ontario Limited April 6, 2018 117-668 TIA Report_2.doc D. J. Halpenny & Associates
More informationThe proposed development is located within 800m of an existing Transit Station where infill developments and intensification are encouraged.
Stantec Consulting Ltd. 1331 Clyde Avenue, Suite 4 Ottawa ON K2C 3G4 Tel: (613) 722-442 Fax: (613) 722-2799 May 14, 213 File: 1638823 Robinson Park Development Corp. 5699 Power Road Ottawa, ON, K1G 3N4
More information9 Leeming Drive Redevelopment Ottawa, ON Transportation Brief. Prepared By: Stantec Consulting Ltd.
9 Leeming Drive Redevelopment Ottawa, ON Transportation Brief Prepared By: Stantec Consulting Ltd. TIA GUIDELINES CHECKLIST Report Context Municipal Address Comment: Section 1.1 Location relative to major
More information5858 N COLLEGE, LLC N College Avenue Traffic Impact Study
5858 N COLLEGE, LLC nue Traffic Impact Study August 22, 2016 Contents Traffic Impact Study Page Preparer Qualifications... 1 Introduction... 2 Existing Roadway Conditions... 5 Existing Traffic Conditions...
More informationVIVA RETIREMENT COMMUNITIES OAKVILLE TRAFFIC IMPACT STUDY
VIVA RETIREMENT COMMUNITIES OAKVILLE TRAFFIC IMPACT STUDY VIVA RETIREMENT COMMUNITIES OAKVILLE TRAFFIC IMPACT STUDY DECEMBER 2012 READ, VOORHEES & ASSOCIATES TORONTO, ONTARIO Read, Voorhees & Associates
More informationHarrah s Station Square Casino
Transportation Analysis Harrah s Station Square Casino Pittsburgh, Pennsylvania Submitted To: City of Pittsburgh and Pennsylvania Gaming Control Board Prepared By: DKS Associates GAI Consultants December
More informationHenderson Avenue Mixed-Use Development
Zoning Case: Z145-3 Traffic Impact Analysis Henderson Avenue Mixed-Use Development Dallas, TX October 26 th, 216 Kimley-Horn and Associates, Inc. Dallas, Texas Project #644827 Registered Firm F-928 Traffic
More informationGlenn Avenue Corridor Traffic Operational Evaluation
Glenn Avenue Corridor Traffic Operational Evaluation PREPARED FOR: THE CITY OF AUBURN PREPARED BY: DECEMBER 2007 Glenn Avenue Corridor Study--Auburn, Alabama TABLE OF CONTENTS Introduction... 1 Background
More informationTraffic Impact Analysis Chatham County Grocery Chatham County, NC
Chatham County Grocery Chatham County, NC TABLE OF CONTENTS 1. INTRODUCTION... 1 1.1. Location and Study Area... 1 1.2. Proposed Land Use and Access... 2 1.3. Adjacent Land Uses... 2 1.4. Existing ways...
More informationCPC Parking Lot Riverside Drive. Transportation Brief
CPC Parking Lot 2785 Riverside Drive Transportation Brief Prepared By: NOVATECH Suite 2, 24 Michael Cowpland Drive Ottawa, Ontario K2M P6 7 / 5 / 25 Novatech File: 49 Ref: R-25-22 July 5 th, 25 City of
More informationTHE LANDMARK AT TALBOT PARK
TRAFFIC IMPACT STUDY FOR THE LANDMARK AT TALBOT PARK IN NORFOLK, VA INTERMODAL ENGINEERING, P.C. OCTOBER, 200 The Landmark at Talbot Park is a proposed redevelopment of the existing apartments along the
More informationTraffic Impact Study. Roderick Place Columbia Pike Thompson s Station, TN. Transportation Group, LLC Traffic Engineering and Planning
F i s c h b a c h Transportation Group, LLC Traffic Engineering and Planning Traffic Impact Study Roderick Place Columbia Pike Thompson s Station, TN Prepared March 2016 Ms. Gillian L. Fischbach, P.E.,
More informationDonahue Drive Corridor Traffic Operational Evaluation
Donahue Drive Corridor Traffic Operational Evaluation PREPARED FOR: THE CITY OF AUBURN PREPARED BY: JANUARY 2007 Donahue Drive Corridor Study--Auburn, Alabama TABLE OF CONTENTS Introduction... 1 Background
More informationREDEVELOPMENT TRAFFIC IMPACT STUDY
REDEVELOPMENT TRAFFIC IMPACT STUDY For Wendy s Parker, Colorado January 215 Prepared for: Sterling Design Associates, LLC 29 W. Littleton Boulevard #3 Littleton, Colorado 812 Prepared by: 1233 Airport
More informationProposed Addition to Pickering Islamic Centre
TRAFFIC IMPACT STUDY, PARKING STUDY, SITE CIRCULATION REVIEW & TDM PLAN Proposed Addition to Pickering Islamic Centre 265 Brock Road City of Pickering, Ontario Prepared for: Pickering Islamic Centre Masjid
More informationTRAFFIC IMPACT STUDY And A TRAFFIC SIGNAL WARRANT ANALYSIS FOR A SENIOR LIVING AND APARTMENT DEVELOPMENT
TRAFFIC IMPACT STUDY And A TRAFFIC SIGNAL WARRANT ANALYSIS FOR A SENIOR LIVING AND APARTMENT DEVELOPMENT DEERFIELD TOWNSHIP, WARREN COUNTY, OHIO Nantucket Circle and Montgomery Road () Prepared for: ODLE
More informationList of Exhibits...ii
One Brickell Traffic Study TABLE OF CONTENTS List of Exhibits...ii EXECUTIVE SUMMARY...1 1. INTRODUCTION...2 1.1 Study Area...2 1.2 Study Objective...5 2. EXISTING TRAFFIC CONDITIONS...6 2.1 Data Collection...6
More informationTroutbeck Farm Development
Troutbeck Farm Development Willistown Township, Chester County PA For Submission To: Willistown Township Last Revised: October, 4 TPD# INLM.A. 5 E. High Street Suite 65 Pottstown, PA 9464 6.36.3 TPD@TrafficPD.com
More informationDraft Report. Traffic Impact Study. Superstore, Wal-Mart, and Kent Development. Yarmouth, Nova Scotia. Prepared for
oad & Traffic Management Road & Traffic Management R Atlantic Traffic Engineering Specialists Draft Report Traffic Impact Study Superstore, Wal-Mart, and Kent Development Yarmouth, Nova Scotia Prepared
More informationDUNBOW ROAD FUNCTIONAL PLANNING
DUNBOW ROAD FUNCTIONAL PLANNING Final Report August 3, 216 #31, 316 5th Avenue NE Calgary, AB T2A 6K4 Phone: 43.273.91 Fax: 43.273.344 wattconsultinggroup.com Dunbow Road Functional Planning Final Report
More informationPlace Vanier 250 Montreal Road Transportation Impact Study Addendum. Prepared for Broccolini Construction September 20 th, 2012
Update for the May 31 st, 2012 Traffic Impact Study Prepared for Broccolini Construction 111-23596-00 September 20 th, 2012 2611 Queensview Drive, Suite 300, Ottawa, Ontario CANADA K2B 8K2 Telephone: 613-829-2800
More informationAPPENDIX C Additional Traffic Data
APPENDIX C Additional Traffic Data Raleigh and Heiden Properties FEIS F- ATTACHMENT Response.8- Traffic Count WEEKENDPEAK5MINUTECOUNTSPROJECTRaleighandHeidenPropertiesLOCATIONCR6,andCR9DATEFridayAugust6,TIME:PMto6:PM5MinuteTraficCR6SBCR9EBCR6NBSTARTENDleftthrurightTotalleftthrurightTotalleftthrurightTotalleftthrurightTotalGRANDTIMETIME56TAL-------------------:PM:5PM56:5PM:PM666566:PM:5PM685886:5PM:PM555585:PM:5PM5856889:5PM:PM8656:PM:5PM955656885:5PM:PM65986858:PM:5PM66855:5PM:PM69898:PM:5PM895858959:5PM:PM8589:PM:5PM85569:5PM:PM586985:PM:5PM55859565:5PM5:PM886559655:PM5:5PM56699595:5PM5:PM668955:PM5:5PM666856555:5PM6:PM95885-------------------TAL85896959688668
More informationList of Attachments. Location Map... Site Plan... City of Lake Elsinore Circulation Element... City of Lake Elsinore Roadway Cross-Sections...
List of Attachments Exhibits Location Map... Site Plan... City of Lake Elsinore Circulation Element... City of Lake Elsinore Roadway Cross-Sections... Existing Lane Geometry and Traffic Controls... Existing
More informationCo-ordinator Transportation Committee. Director, Mobility Services and Corporate Fleet Services Environment and Transportation Department
28 REGIONAL MUNICIPALITY OF OTTAWA-CARLETON MUNICIPALITÉ RÉGIONALE D OTTAWA-CARLETON REPORT RAPPORT Our File/N/Réf. Your File/V/Réf. 25 23-97-R016 DATE 15 April 1997 TO/DEST. FROM/EXP. SUBJECT/OBJET Co-ordinator
More informationBistro 6. City of Barrie. Traffic Impact Study for Pratt Hansen Group Inc. Type of Document: Final Report. Project Number: JDE 1748
City of Barrie Traffic Impact Study for Pratt Hansen Group Inc. Type of Document: Final Report Project Number: JDE 1748 Date Submitted: June 12 th, 2017 06/12/17 John Northcote, P.Eng. Professional License
More informationEXECUTIVE SUMMARY. Page 1 of 6
EXECUTIVE SUMMARY The purpose of this report is to identify conformance with the original traffic impact study for the proposed retail development on Lot 5 of Riverdale Retail Filing No. 1 located on the
More informationSignal Warrant Studies
Signal Warrant Studies Seven Locations Piqua, Ohio December 12, 217 Signal Warrant Studies Seven Locations Piqua, Ohio TABLE OF CONTENTS Executive Summary... 3 Introduction... 5 Study Location... 5 Data
More informationPINESTONE TRAFFIC IMPACT STUDY Travelers Rest, South Carolina
PINESTONE TRAFFIC IMPACT STUDY Travelers Rest, South Carolina Prepared for Longbranch Development Prepared by January 13, 219 ii Table of Contents Subject Page Signature Page... i Table of Contents...
More informationTRAFFIC IMPACT STUDY
675 Millcreek Drive, Unit 1 Mississauga, Ontario L5N 5M4 T: 416.213.7121 F: 95.89.8499 www.transtech.co TRAFFIC IMPACT STUDY PROPOSED MOSQUE DEVELOPMENT 4269 REGIONAL ROAD 25 TOWN OF OAKVILLE PREPARED
More informationTraffic Impact Study WestBranch Residential Development Davidson, NC March 2016
Traffic Impact Study WestBranch Residential Development Davidson, NC March 216 TRAFFIC IMPACT STUDY FOR THE WestBranch Residential Development LOCATED IN DAVIDSON, NC Prepared For: Lennar Carolinas, LLC
More informationFINAL REPORT Traffic Analysis Report Port Coquitlam Recreation Complex Port Coquitlam, BC
FINAL REPORT Traffic Analysis Report Port Coquitlam Recreation Complex Port Coquitlam, BC Howes Technical Advantage Ltd. This report was prepared by Howes Technical Advantage Ltd. for the City of Port
More informationTraffic Impact Analysis Walton Acres at Riverwood Athletic Club Clayton, NC
Traffic Impact Analysis Walton Acres at Riverwood Athletic Club Clayton, NC 1. TABLE OF CONTENTS INTRODUCTION...1 1.1. Site Location and Study Area...1 1.2. Proposed Land Use and Site Access...2 1.3.
More informationParking Lot P6C Transportation Impact Assessment
Transportation Carleton University Parking Lot P6C Transportation Impact Assessment Prepared by: AECOM 302 1150 Morrison Drive 613 820 8282 tel Ottawa, ON, Canada K2H 8S9 613 820 8338 fax www.aecom.com
More informationCITY OF OTTAWA ROADWAY MODIFICATION APPROVAL UNDER DELEGATED AUTHORITY
RMA-2015-ATM-038 CITY OF OTTAWA ROADWAY MODIFICATION APPROVAL UNDER DELEGATED AUTHORITY DATE: April 22, 2015 SUBJECT Approval of Roadway Modifications Recommended through an Area Traffic Management Study
More informationTRANSPORTATION ANALYSIS REPORT US Route 6 Huron, Erie County, Ohio
TRANSPORTATION ANALYSIS REPORT US Route 6 Huron, Erie County, Ohio December 12, 2012 Prepared for: The City of Huron 417 Main Huron, OH 44839 Providing Practical Experience Technical Excellence and Client
More informationJames M. Moore, Director of Planning & Building Services, Town of Fairfax. Victory Village Senior Housing Development Traffic Study
Traffic Study To: From: James M. Moore, Director of Planning & Building Services, Town of Fairfax David Parisi, PE, TE, Parisi Transportation Consulting Date: October 14, 216 Subject: Victory Village Senior
More informationTRAFFIC IMPACT STUDY
TRAFFIC IMPACT STUDY for the GLEN ELLEN COUNTRY CLUB SENIOR RESIDENTIAL REDEVELOPMENT 84 Millis, Massachusetts Prepared by: McMahon Associates, Inc. Prepared for: Toll Brothers, Inc. August 216 DRAFT
More informationTraffic Impact Study, Premier Gold Mines Limited, Hardrock Property
Traffic Impact Study, Premier Gold Mines Limited, Hardrock Property Prepared for: Premier Gold Mines Limited Prepared by: Stantec Consulting Ltd. November 2014
More informationTraffic Impact and Access Study PROPOSED DURKEE FARM ESTATES. Foster Street Littleton, Massachusetts. Prepared for: Grimes Road, LLC.
Traffic Impact and Access Study PROPOSED DURKEE FARM ESTATES Foster Street Littleton, Massachusetts Prepared for: Grimes Road, LLC. Westford, MA Prepared by: MDM Transportation Consultants, Inc. 28 Lord
More informationAMEC Earth and Environmental. Bovaird Drive Environmental Assessment. Traffic Study Final Report. August Excellence in Transportation Planning
AMEC Earth and Environmental Bovaird Drive Environmental Assessment Traffic Study Final Report August Excellence in Transportation Planning AMEC Earth and Environmental Bovaird Drive Class EA Traffic
More informationTraffic Impact Study. Crestline Piggly Wiggly Mountain Brook, Alabama. Goodwyn, Mills and Cawood, Inc. Birmingham, Alabama.
Traffic Impact Study Crestline Piggly Wiggly Mountain Brook, Alabama Prepared for: Goodwyn, Mills and Cawood, Inc. Birmingham, Alabama September 214 Revision 1 October 214 Crestline Piggly Wiggly Mountain
More informationAppendix C. NORTH METRO STATION AREA TRAFFIC IMPACT STATEMENT 88th Avenue Station
Appendix C NORTH METRO STATION AREA TRAFFIC IMPACT STATEMENT 88th Avenue Station Prepared for: Regional Transportation Department and URS Corporation as part of the North Metro EIS David Evans and Associates,
More informationRoad Conversion Study Plumas Street
Plumas Street Phase I Submitted to The Regional Transportation Commission of Washoe County Submitted by Zong Tian, Ph.D., P.E. Saeedeh Farivar Haiyuan Li, Ph.D. Center for Advanced Transportation Education
More informationTRAFFIC ASSESSMENT River Edge Colorado
TRAFFIC ASSESSMENT River Edge Colorado Submitted by: Fehr & Peers 621 17th Street, Ste. 231 Denver, CO 8293 (33) 296-43 December, 21 App. M-2 Traffic Assessment River Edge Colorado December 21 TABLE OF
More informationMagnolia Place. Traffic Impact Analysis. Prepared for: City of San Mateo. Prepared by: Hexagon Transportation Consultants, Inc.
Magnolia Place Traffic Impact Analysis Prepared for: City of San Mateo Prepared by: Hexagon Transportation Consultants, Inc. Updated January 4, 2010 Table of Contents 1. Introduction...1 2. Existing Conditions...6
More informationAPPENDIX E: Transportation Technical Report
New Jersey Pennsylvania Lackawanna Cut-Off Passenger Rail Service Reston Project Environmental Assessment APPENDIX E: Transportation Technical Report E.1 Introduction As part of the overall environmental
More informationChapter 4 Traffic Analysis
Chapter 4 Traffic Analysis PURPOSE The traffic analysis component of the K-68 Corridor Management Plan incorporates information on the existing transportation network, such as traffic volumes and intersection
More informationCastleGlenn Consultants Inc.
February 1 st, 2010 CastleGlenn Consultants Inc. Engineers, Project Managers & Planners Mr. Kevin Yemm Planning and Land Development Richraft Ltd. 2280 St. Laurent Boulevard Suite 201 Ottawa, Ontario (Tel:
More informationGateway Transportation Study
Gateway Transportation Study Amherst, Massachusetts SUBMITTED TO University of Massachusetts Amherst Town of Amherst SUBMITTED BY Vanasse Hangen Brustlin, Inc. Watertown, Massachusetts March 213 Back of
More informationTABLE OF CONTENTS TABLE OF CONTENTS... I APPENDICES... III LIST OF EXHIBITS... V LIST OF TABLES... VII LIST OF ABBREVIATED TERMS...
TABLE OF CONTENTS TABLE OF CONTENTS... I APPENDICES... III LIST OF EXHIBITS... V LIST OF TABLES... VII LIST OF ABBREVIATED TERMS... IX 1 INTRODUCTION... 1 1.1 Project Overview... 1 1.2 Analysis Scenarios...
More informationTransportation Impact Study for Abington Terrace
Transportation Impact Study for Abington Terrace Abington Township, Montgomery County, PA Sandy A. Koza, P.E., PTOE PA PE License Number PE059911 Prepared by McMahon Associates, Inc. 425 Commerce Drive,
More information2. Existing Conditions
2. Existing Conditions The existing traffic and parking conditions on the site and the surrounding area were reviewed based on the study methodology in Section 1.2. 2.1 Existing Land Use The portion of
More informationTraffic Impact Study Little Egypt Road Development Denver, North Carolina June 2017
Traffic Impact Study Little Egypt Road Development Denver, North arolina June 2017 N. Little Egypt Road DQ\ QDQFLQJ VDOHV RU RWKHU SHUIRUPDQFH EDVHG FULWHULD Proposed Site Driveways Site Driveway 1 TRAFFI
More information350 SPARKS STREET, OTTAWA HOTEL AND RESIDENTIAL DEVELOPMENT. Transportation Study. Prepared For: Morguard Real Estate Investment Trust.
SPARKS STREET, OTTAWA HOTEL AND RESIDENTIAL DEVELOPMENT Transportation Study Prepared For: Morguard Real Estate Investment Trust June, BA Consulting Group Ltd. St. Clair Avenue West, Suite Toronto, ON
More informationFINAL Albertville Business Park AUAR Update Traffic Study
FINAL Albertville Business Park AUAR Update Traffic Study Prepared for City of Albertville, MN July 20, 2017 SRF No. 10060.00 Table of Contents Introduction... 1 Existing Conditions... 1 Data Collection...
More information1609 E. FRANKLIN STREET HOTEL TRAFFIC IMPACT STUDY EXECUTIVE SUMMARY
1609 E. FRANKLIN STREET HOTEL TRAFFIC IMPACT STUDY EXECUTIVE SUMMARY Prepared for: The Town of Chapel Hill Public Works Department Traffic Engineering Division Prepared by: HNTB North Carolina, PC 343
More informationTRANSPORTATION IMPACT STUDY
Dundas MEP Developments Inc. City of Toronto 219 and 231 Dundas Street East, Proposed Mixed-Use Development TRANSPORTATION IMPACT STUDY 9782/2 April 216 LEA Consulting Ltd. Consulting Engineers & Planners
More informationDate: September 7, Project #: Re: Spaulding Youth Center Northfield, NH Property. Traffic Impact Study
To: Ms. Susan C. Ryan Spaulding Youth Center 72 Spaulding Road Northfield, NH 03276 Date: September 7, 2017 Project #: 52455.00 From: Robin Bousa Director of Transportation Systems Re: Spaulding Youth
More informationAPPENDIX D. Traffic Impact Study Creighton Manning Engineering, LLP
APPENDIX D Traffic Impact Study Creighton Manning Engineering, LLP Traffic Impact Study Catskill Access Evaluation NYS Thruway Exit 21 Town of Catskill, New York CM Project No. 114-232 Prepared For: Greene
More informationCPC Parking Lot Riverside Drive. Transportation Rationale
CPC Parking Lot Transportation Rationale Prepared By: NOVATECH Suite 200, 240 Michael Cowpland Drive Ottawa, Ontario K2M 1P6 September 2015 Novatech File: 114093 Ref: R-2015-153 Table of Contents 1.0 INTRODUCTION...
More informationRef. No February 19, Ms. Ashley Blissett, P. Eng., Senior Development Engineer City of Halifax PO Box 1749 HALIFAX NS B3J 3A5
Ref. No. 151-00564-01 February 19, 2015 Ms. Ashley Blissett, P. Eng., Senior Development Engineer City of Halifax PO Box 1749 HALIFAX NS B3J 3A5 RE: Traffic Impact Statement, Proposed Multi-Tenant Residential
More informationSouth Albion-Bolton Community Plan North Hill Supermarket Transportation Study Part B: Evaluation of Alternatives
Community Plan North Hill Supermarket Transportation Study Part B: Evaluation of Alternatives Prepared for: The Town of Caledon August 9 Transportation Solutions Ltd. 43 Forest Road Cambridge, ON N1S 3B4
More informationPublic Involvement Meeting Tuesday, June 13, Albany Shaker Road Corridor Study
Public Involvement Meeting Tuesday, June 13, 2017 Albany Shaker Road Corridor Study Agenda / Meeting Outline 1. Introduce the project 2. Complete Streets 3. Share/confirm our findings 4. Your Opinion 5.
More informationMEMORANDUM. DATE March 1, 2012 TO Town of Milton Mark Abbott, Seth Asante, and Efi Pagitsas Boston Region MPO Staff
MEMORANDUM DATE March 1, 212 TO Town of Milton FROM RE Mark Abbott, Seth Asante, and Efi Pagitsas Boston Region MPO Staff FFY 211 Safety and Operations Analyses at Selected Boston Region MPO Intersections:
More informationSt. Stefan Serbian Orthodox Church 1989 and 1993 Prince of Wales Drive, Ottawa REVISED TRANSPORTATION BRIEF
St. Stefan Serbian Orthodox Church 1989 and 1993 Prince of Wales Drive, Ottawa REVISED TRANSPORTATION BRIEF Prepared By: NOVATECH ENGINEERING CONSULTANTS LTD. Suite 200, 240 Michael Cowpland Drive Ottawa,
More informationMETHODOLOGY. Signalized Intersection Average Control Delay (sec/veh)
Chapter 5 Traffic Analysis 5.1 SUMMARY US /West 6 th Street assumes a unique role in the Lawrence Douglas County transportation system. This principal arterial street currently conveys commuter traffic
More informationWalmart (Store # ) 60 th Street North and Marion Road Sioux Falls, South Dakota
Walmart (Store #4865-00) 60 th Street North and Marion Road Sioux Falls, South Dakota Prepared for: Wal-Mart Stores, Inc. Bentonville, Arkansas Prepared by: Kimley-Horn and Associates, Inc. ã2013 Kimley-Horn
More information485 Ancaster Avenue. Transportation Impact Assessment. Engineering. Planning. Landscape Architecture
Engineering Land / Site Development Municipal Infrastructure Environmental / Water Resources Traffic / Transportation Structural Recreational 485 Ancaster Avenue Transportation Impact Assessment Planning
More informationMay 5, 2009 File:
MMM Group Limited Suite 600 1455 West Georgia Street Vancouver, BC V6G 2T3 t: 604-685-9381 f: 604-683-8655 www.mmm.ca May 5, 2009 File: 50-09001-007 1420 1055 West Hastings Street Vancouver, BC V6E 2E9
More informationRoute 28 (South Orleans Road)/Route 39 (Harwich Road)/Quanset Road Intersection
TRAFFIC FEASIBILITY STUDY Route 28 (South Orleans Road)/Route 39 (Harwich Road)/Quanset Road Intersection Orleans, Massachusetts Prepared for: Town of Orleans Prepared by: Fay, Spofford & Thorndike, LLC
More informationSimons Run Corridor Study
Simons Run Corridor Study Campbell County & City of Lynchburg, Virginia Prepared on: September 30, 2014 Prepared for: Central Virginia Metropolitan Planning Organization 277 Bendix Road, Suite 500 Virginia
More informationStudent Housing Development
Traffic Impact Study for the proposed Student Housing Development City of Oneonta Otsego County, New York Project No. 3259 December 212 Revised February 13, 212 Prepared For: Newman Development Group,
More informationAbrams Associates. Transportation Impact Analysis. City of Rocklin. Prepared for: David Mohlenbrok City of Rocklin 4081 Alvis Court Rocklin, CA 95677
Transportation Impact Analysis Sierra College Boulevard Commercial Project City of Rocklin Prepared for: David Mohlenbrok City of Rocklin 081 Alvis Court Rocklin, CA 95677 Prepared by: 1875 Olympic Boulevard,
More informationCorporate. Report COUNCIL DATE: May 25, 1998 NO: R1500 REGULAR COUNCIL. TO: Mayor & Council DATE: April 27, 1998
R1500 : Traffic Safety at 25 Avenue and 128 Street Intersection Corporate NO: R1500 Report COUNCIL DATE: May 25, 1998 REGULAR COUNCIL TO: Mayor & Council DATE: April 27, 1998 FROM: General Manager, Engineering
More informationINTERSECTION OPERATIONAL ANALYSIS AND NECESSARY RECOMMENDATIONS CIVL 440 Project
INTERSECTION OPERATIONAL ANALYSIS AND NECESSARY RECOMMENDATIONS CIVL 44 Project INTERSECTION: 16TH AVENUE & EAST MALL FOR AM PEAK HOUR Group Work: Syed Shafaat Ali Shah (2347426) Mohammad Moudud Hasan
More informationTHIS PAGE LEFT BLANK INTENTIONALLY
GA SR 25 Spur at Canal Road Transportation Impact Analysis PREPARED FOR GLYNN COUNTY, GEORGIA 1725 Reynolds Street, Suite 300 Brunswick, Georgia 31520 PREPARED BY 217 Arrowhead Boulevard Suite 26 Jonesboro,
More informationTraffic Circulation Study for Neighborhood Southwest of Mockingbird Lane and Airline Road, Highland Park, Texas
ARIZONA TEXAS NEW MEXICO OKLAHOMA February 13, 2015 Mr. Meran Dadgostar P.E., R.S. Town of Highland Park 4700 Drexel Dr. Highland Park, Texas 75205 Re: Traffic Circulation Study for Neighborhood Southwest
More informationEvaluation of M-99 (Broad Street) Road Diet and Intersection Operational Investigation
Evaluation of M-99 (Broad Street) Road Diet and Intersection Operational Investigation City of Hillsdale, Hillsdale County, Michigan June 16, 2016 Final Report Prepared for City of Hillsdale 97 North Broad
More informationAPPENDIX D Traffic Impact Study (Draft Report)
ENVIRONMENTAL IMPACT ASSESSMENT (EIA) REGISTRATION, TRAFFIC IMPACT STUDY (DRAFT REPORT), AND WATER SUPPLY SOURCE ASSESSMENT (WSSA): CAMPING PLAGE ABOITEAU BEACH, CAP-PELÉ, NB APPENDIX D (Draft Report)
More informationCapital Region Council of Governments
March 23, 2018 Capital Region Council of Governments PROJECT CONCEPT REPORT Realignment of Swamp and Northfield Road s approaches to Route 44 (Boston Turnpike) Town of Coventry SUMMARY: The Town of Coventry
More informationSouth Street Campus Lands Development. City of London TRANSPORTATION IMPACT ASSESSMENT
South Street Campus Lands Development City of London TRANSPORTATION IMPACT ASSESSMENT TW1387 South Street Campus Lands Development City of London TRANSPORTATION IMPACT ASSESSMENT May 2013 South Street
More information2136 And 2148 Trafalgar Road Townhouse Development Traffic Brief. Paradigm Transportation Solutions Limited
2136 And 2148 Trafalgar Road Townhouse Development Traffic Brief Paradigm Transportation Solutions Limited March 217 March 217 Project: 1627 Diana Vlasic, M.C.I.P., R.P.P Metropolitan Consulting 445 Paletta
More informationTable of Contents FIGURES TABLES APPENDICES. Traffic Impact Study Hudson Street Parking Garage MC Project No.: A Table of Contents
Traffic Impact Study Hudson Street Parking Garage MC Project No.: 151714A Table of Contents Table of Contents I. INTRODUCTION... 2 II. EXISTING CONDITIONS... 5 III. 215 EXISTING TRAFFIC CONDITIONS... 6
More informationGrant Avenue Streetscape
REPORT TYPE GOES HERE Grant Avenue Streetscape PREPARED FOR City of Manassas 9027 Center Street Manassas, VA 20110 PREPARED BY 8300 Boone Boulevard Suite 700 Vienna, Virginia 22182 571.389.8121 July 31,
More informationPatuxent Green Golf Course
Patuxent Green Golf Course Laurel, Maryland February 23, 2018 Traffic Impact Analysis Prepared for: ADC Builders Alan Cohen 2701 Tower Oaks Boulevard, Suite 200 Rockville, Maryland 20852 TABLE OF CONTENTS
More information