1 SBCAG STAFF REPORT SUBJECT: 2017 Federal Transportation Improvement Program MEETING DATE: January 19, 2017 AGENDA ITEM: 5E STAFF CONTACT: Anne Jensen RECOMMENDATION: Adopt Resolution approving Amendment 2 to the 2017 Federal Transportation Improvement Program (FTIP) to program changes to the Highway Safety Improvement Program (HSIP) grouped project and to program recently awarded Active Transportation Program (ATP) Cycle 3 projects. SUMMARY: The Federal Transportation Improvement Program (FTIP) is adopted by SBCAG and serves as a single reference document that the public and government agencies can review to understand where, when and how federal transportation funding will be spent in Santa Barbara County. An accurate project description, including scope and funding allocated, must be listed in SBCAG s Federal Transportation Improvement Program before federal funds can be expended on the projects. After adoption, the FTIP must be periodically amended to facilitate expenditure. SBCAG s role is to amend the funding changes into the FTIP. The recommended action is not a project under the California Environmental Quality Act (CEQA) pursuant to sections and/or of the CEQA guidelines. DISCUSSION: Amendment #2 makes the following changes to the 2017 FTIP: Active Transportation Program (ATP) The following four projects were recently awarded funding by the California Transportation Commission from Cycle 3 of the state Active Transportation Program and must be added to the FTIP: o SR2S Improvements at the Intersection of Highway 246 and Sycamore Drive: (MPO ID: BUELL07): The City of Buellton was awarded 684,000 in ATP funds in FY 2019/20 to install a high visibility crosswalk, roadway tapering, extended curbs, and updated ADA ramps at the intersection of Highway 246 and Sycamore Drive. The City is providing a Measure A match of 100,000.

2 o o o Eastside Green Lanes & Bike Boulevard Gap Closure: (MPO ID: SBCITY23): The City of Santa Barbara was awarded 2,736,000 in ATP funds in FYs 2019/ /21 to construct new bike lanes along Cota and Ortega Streets, green lanes on Cota and Haley Streets, bike boulevards on Alisos Street, sidewalk infill, and create three enhanced school crosswalks. The City is providing a local match of 27,000. Westside Bike Boulevard Gap Closure: (MPO ID: SBCITY22): The City of Santa Barbara was awarded 4,437,000 in ATP funds in FYs 2019/ /21 to design and construct a 3.8 mile bike boulevard through Santa Barbara s westside neighborhood to downtown and the east side. The project is located along Chino, Micheltorena, Castillo, Sola, Salsipuedes, Anapamu and Nopal Streets. The City is providing a local match of 45,000. Rincon Multi-Use Trail: (MPO ID: SBCAG29): SBCAG was awarded 6,833,000 in ATP funds in FY 2019/20 to construct the Rincon Multi-use Trail project. The trail will be accessible to both pedestrian and cyclists, and eliminate a gap which forces users to use the shoulder of US 101 or trespass across the UPRR tracks. The completion of this project will also close a gap in the California Coastal Trail. Highway Safety Improvement Program (HSIP) The goal of the federal Highway Safety Improvement Program is to achieve a significant reduction in traffic fatalities and serious injuries on all public roads, including non-state owned public roads and roads on tribal lands. The HSIP requires a data-driven, strategic approach to improving highway safety on all public roads that focuses on performance. In California, the program is administered by Caltrans. Projects are selected through a call for projects process. Grouped Projects for Safety Improvement HSIP: (MPO ID: LOCALHSIP): Three new City of Santa Barbara projects awarded funding in HSIP Cycle 8 are being programmed. Additionally, unspent funds for incomplete projects from previous cycles are moved into the current FTIP period. Project details are included in Attachment C. The recommended action is not a project under the California Environmental Quality Act (CEQA) pursuant to section (b)(4) of the CEQA Guidelines. COMMITTEE REVIEW: When possible, FTIP amendments are presented to the TTAC as an announcement. Since TTAC did not meeting in January, ATP-related amendment information was sent to the respective local agencies for review. All amendments are posted on the SBCAG website for public review one week prior to board approval. ATTACHMENTS: Attachment A Amendment #2 Resolution Attachment B EZTrak Report Amendment #2 Attachment C HSIP Backup List 2

3

4

5

6 SBCAG ID BUELL07 Rose Hess BUELL07 784,000 (805) B-PL-102 Amendment 2 SR2S Improvements at the Intersection of Highway 246 and Sycamore Drive Installation of a high visibility crosswalk, roadway tapering, extended curbs, and updated ADA ramps at the intersection. Implementing Agency Santa Barbara County Association of Governments 2017 Federal Transportation Improvement Project List Buellton, City of 15/16 16/17 19/20 Measure A Measure A ATP 30,000 30,000 70,000 70, , , , , ,000 Federal Total Cost 784,000 SBCAG ID SBCITY23 Ashleigh Shue SBCITY23 2,763,000 (805) SB-PL-303 Amendment 2 Eastside Green Lanes & Bike Boulevard Gap Closure Construct new bike lanes along Cota and Ortega Streets; install green lanes on Cota and Haley Streets; bike boulevard on Alisos Street; sidewalk infill; three enhanced school crosswalks. Implementing Agency Santa Barbara, City of 19/20 ATP 280, ,000 19/20 Loc Funds - City Funds 27,000 27,000 20/21 ATP 18,000 2,438,000 2,456, ,000 18,000 2,438,000 2,763,000 Federal Total Cost 2,763,000 Page 1 Wednesday, January 4, 2017

7 SBCAG ID SBCITY22 Ashleigh Shue SBCITY22 4,482,000 (805) SB-PL-303 Westside Bike Boulevard Gap Closure Amendment 2 Implementing Agency Santa Barbara County Association of Governments 2017 Federal Transportation Improvement Project List Santa Barbara, City of 19/20 19/20 20/21 ATP Loc Funds - City Funds ATP 355, ,000 45,000 45, ,000 40,000 4,042,000 4,082,000 40,000 4,042,000 4,482,000 Design and construct a 3.8 mile bike boulevard through Santa Barbara's westside neighborhood to downtown and the east side. Located along Chino, Micheltorena, Castillo, Sola, Salsipuedes, Anapamu and Nopal Streets. Federal Total Cost 4,482,000 Page 2 Wednesday, January 4, 2017

8 SBCAG ID SBCAG29 Fred Luna SBCAG29 7,828,000 Rincon Multi-use Trail (805) C-PL-304 Amendment 2 Construct a multi-use trail to eliminate a gap in the California Coastal trail, which forces cyclists and pedestrians to use the shoulder of U.S. 101 or choose an alternate route trespassing across UPRR tracks or traveling 4 miles out of direction. Implementing Agency Santa Barbara County Association of Governments 2017 Federal Transportation Improvement Project List SBCAG 14/15 14/15 14/15 14/15 14/15 16/17 19/20 Coastal Conservancy Coastal Enhancement Loc Funds - City Funds Measure A Measure A Measure A ATP 50,000 50,000 25,000 25,000 75,000 75, , ,000 75,000 75, , , ,000 6,833,000 6,833,000 6,833,000 7,333,000 Federal Total Cost 7,333,000 Previously Approved FTIP SBCAG29 Fred Luna 7,828,000 Rincon Multi-use Trail Adoption (805) C-PL /15 Coastal Conservancy 50,000 50,000 14/15 Coastal Enhancement 25,000 25,000 14/15 Loc Funds - City Funds 75,000 75,000 14/15 Measure A 75,000 75,000 14/15 Measure A 175, ,000 16/17 Measure A 100, , , ,000 Construct a multi-use trail to eliminate a gap in the California Coastal trail, which forces cyclists and pedestrians to use the shoulder of U.S. 101 or choose an alternate route trespassing across UPRR tracks or traveling 4 miles out of direction. Other Total Cost 500,000 Page 3 Wednesday, January 4, 2017

9 SBCAG ID LOCALHSIP Garin Schneider LOCALHSIP 8,143,700 (805) LOCAL (HSIP) Amendment 2 Grouped Projects for Safety Improvement - HSIP Reduce the frequency and severity of collisions on all public roads. Projects are consistent with the applicable classifications under 23 CFR (c) and (d). Implementing Agency Santa Barbara County Association of Governments 2017 Federal Transportation Improvement Project List Various Agencies 15/16 16/17 16/17 16/17 17/18 18/19 18/19 19/20 HSIP HSIP Loc Funds - City Funds Loc Funds - County Funds HSIP HSIP Loc Funds - City Funds HSIP 192, ,400 2,364,250 2,364, , , , , , ,800 2,216,800 2,216, , ,000 1,793,600 1,793,600 8,143,700 8,143,700 Federal Total Cost 8,143,700 Previously Approved FTIP LOCALHSIP Garin Schneider 9,400,700 Adoption (805) LOCAL (HSIP) Grouped Projects for Safety Improvement - HSIP Reduce the frequency and severity of collisions on all public roads. Projects are consistent with the applicable classifications under 23 CFR (c) and (d). 14/15 HSIP 3,899,053 3,899,053 14/15 Loc Funds - City Funds 1,325,684 1,325,684 15/16 HSIP 174, ,889 15/16 Loc Funds - City Funds 2,511 2,511 16/17 HSIP 1,211,450 1,211,450 16/17 Loc Funds - City Funds 185, ,650 17/18 HSIP 386, ,800 7,186,037 7,186,037 Federal Project Total Cost 7,186,037 Page 4 Wednesday, January 4, 2017

10 HSIP Cycle Number Agency FTIP ID Location/Description FY PE RW CONST Project Cost Local Match HSIP Amount Total Funding 1 Buellton LOCALHSIP 5 SB County LOCALHSIP Appendix 6A- SBCAG 2017 FTIP Grouped Project Listings - Highway Safety Improvement Program (Grouped Project ID: LOCALHSIP) Mcmurray Road Intersection with State Highway 246; traffic signal upgrade, left turn phasing, restriping and widening. Clark Ave./SR 101 NB on and off-ramps; install traffic signals, realign roadway FTIP 2016/ , ,200 41, , ,000 HSIP / , , , ,000 1,822,400 HSIP Uncontrolled pedestrian crossings at the intersections of Hollister Avenue at Chapel Street and Calle Real and Kingston Avenue. Installation of Prior ,300 7 Goleta LOCALHSIP pedestrian croswalk improvements consisting of Rectangular Rapid 237,780 26, , ,200 HSIP Flashing Beacons (RRFBs) at Hollister and Chapel and a Pedestrian Hybrid Beacon (HAWK signal) at Calle Real and Kingston Ave. 2016/ ,480 7 Santa Barbara LOCALHSIP 23 signalized intersections within the City of Santa Barbara. Improve visibiilty of vehicluar indications by increasing head size from 8' to 12'. Prior , / , ,220 21, , ,900 HSIP Santa Barbara LOCALHSIP Two intersections: 1) Alamar Ave. at Puesta Del Sol; 3) La Cumbre Road and Calle Cita. Provide enhanced crosswalk features including curb extensions, street lighting, and rectangular rapid flashing beacons. Prior , / , , , ,800 HSIP N. Blosser Rd (from W. Taylor St. to Atlantic Ave.). Construct a central Prior ,800 7 Santa Maria LOCALHSIP median barrier and complete the road diet feature at N. Blosser Rd. 667, , , ,800 (between W. Taylor St. and Atlantic Ave.). 2016/ ,280 7 Santa Maria LOCALHSIP N. Broadway (SR-135) between Main St. (SR-166) and Mill St. Remove part of existing median & replace with extended left turn lane, new striping and PCC median extension. Prior , / ,070 HSIP ,370 19, , ,200 HSIP Santa Barbara LOCALHSIP Permiter around downtown Santa Babrara, including parts of De La Vina Street, Chapala Street, Sola Street, Anacapa Street, and Gutierrez Street; install new corridor and crosswalk lighting, new marked pedestrian crosswalks, yield lines, and warnings signs, and install new edgelines. 2018/ ,966,800 1,966,800-1,966,800 1,966,800 HSIP Santa Barbara LOCALHSIP Carillo St. between Miramonte Dr. and Bath St. and Miramonte St. between Carrillo St. and Bel Monte Dr.; add segment lighting and install protected leftturn phase. 2019/ ,793,600 1,793,600-1,793,600 1,793,600 HSIP Santa Barbara LOCALHSIP Various intersections within the City of Santa Barbara; install new pedestrian countdown timers at one location (added to existing traffic signal), and install enhanced pavement markings, pedestrian access ramps, warnings signs, and improve sight lines at twenty-two (22) uncontrolled crosswalks. 2018/ , , , , ,000 HSIP TOTAL - - 6,884,850 6,884,850 1,258,850 6,884,850 8,143,700

CITY OF SIGNAL HILL Cherry Avenue Signal Hill, CA

CITY OF SIGNAL HILL Cherry Avenue Signal Hill, CA CITY OF SIGNAL HILL 2175 Cherry Avenue Signal Hill, CA 90755-3799 AGENDA ITEM TO: HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL FROM: STEVE MYRTER, P. E. DIRECTOR OF PUBLIC WORKS SUBJECT: SPRING STREET

More information

SBCAG STAFF REPORT. SUBJECT: Draft 2018 Regional Transportation Improvement Program Programming Proposal

SBCAG STAFF REPORT. SUBJECT: Draft 2018 Regional Transportation Improvement Program Programming Proposal SBCAG STAFF REPORT SUBJECT: Draft 2018 Regional Transportation Improvement Program Programming Proposal MEETING DATE: October 19, 2017 AGENDA ITEM: 5 STAFF CONTACT: Sarkes Khachek RECOMMENDATION: Review

More information

CRESTON ROAD COMPLETE AND SUSTAINABLE STREETS CORRIDOR PLAN

CRESTON ROAD COMPLETE AND SUSTAINABLE STREETS CORRIDOR PLAN CRESTON ROAD COMPLETE AND SUSTAINABLE STREETS CORRIDOR PLAN Preferred Plan Community Presentation September 27, 2017 City of El Paso de Robles in partnership with: Local Government Commission, W-Trans,

More information

Highway Safety Improvement

Highway Safety Improvement Highway Safety Improvement Tracy Turpin, PE. Highway Safety Improvement Program Manager Virginia Department of Transportation Presented at Chesapeake and Virginia Chapters of ATSSA Meeting October 13 th,2016

More information

PRESS RELEASE San Joaquin Council of Governments

PRESS RELEASE San Joaquin Council of Governments PRESS RELEASE San Joaquin Council of Governments For Immediate Release February 23, 2018 Contact: Nicole Gorham, 235-0582 gorham@sjcog.org SJCOG Board Awards $19.63 Million in Measure K Bicycle, Pedestrian,

More information

Freeway ramp intersection study

Freeway ramp intersection study Freeway ramp intersection study Supporting Vision Zero: Zero traffic deaths in San Francisco by 2024 Study Goals: Primary Improve Safety Improve Accessibility Secondary Provide Efficient Circulation Accommodate

More information

Dr. M.L. King, Jr. Street North Complete Streets Resurfacing Opportunities HOUSING, LAND USE, AND TRANSPORTATION COMMITTEE MARCH 22, 2018

Dr. M.L. King, Jr. Street North Complete Streets Resurfacing Opportunities HOUSING, LAND USE, AND TRANSPORTATION COMMITTEE MARCH 22, 2018 Dr. M.L. King, Jr. Street North Complete Streets Resurfacing Opportunities HOUSING, LAND USE, AND TRANSPORTATION COMMITTEE MARCH 22, 2018 What s Happening The City plans to mill and resurface Dr. M.L.

More information

PEDESTRIAN CROSSING TREATMENTS

PEDESTRIAN CROSSING TREATMENTS PEDESTRIAN CROSSING TREATMENTS BEST PRACTICES Presented by: Doug Enderson, P.E., PTOE Cody Salo, P.E. 1 PRESENTER INTRODUCTIONS Doug Enderson, P.E., PTOE Ped Crossing Experience: ADA Design-Build ADA Inventory

More information

AGENDA ACTIVE TRANSPORTATION PROGRAM (ATP) CYCLE 4 MPO COMPONENT FOR ACTION

AGENDA ACTIVE TRANSPORTATION PROGRAM (ATP) CYCLE 4 MPO COMPONENT FOR ACTION VENTURA COUNTY TRANSPORTATION COMMISSION Transportation Technical Advisory Committee (TTAC) City of Camarillo Administrative Conference Room 601 Carmen Road, Camarillo, CA Thursday, January 17, 2019 9:00

More information

Draft North Industrial Area-Wide Traffic Plan

Draft North Industrial Area-Wide Traffic Plan Summary of North Industrial and Hudson Bay Industrial Recommended Improvements Table 1. Summary of s Item Location 1 2 3 4 5 6 7 8 9 10 11 12 Millar Ave north of 51st St Super 8 Motel back lane 400 Block

More information

System Performance Innovation FACT Sheet Hawk Pedestrian Beacon

System Performance Innovation FACT Sheet Hawk Pedestrian Beacon Hawk Pedestrian Beacon Description of the Challenge or Opportunity Hawk Pedestrian Beacon Understanding the motivation. Describe the pre-existing product/process that is the subject of the innovation:

More information

PRESENTER: Christopher J. Blunk, Deputy Public Works Director / City Engineer

PRESENTER: Christopher J. Blunk, Deputy Public Works Director / City Engineer STAFF REPORT MEETING DATE: October 1, 217 TO: City Council FROM: Petr Skala, Assistant Engineer 922 Machin Avenue Novato, CA 94945 415/ 899-89 FAX 415/ 899-8213 www.novato.org PRESENTER: Christopher J.

More information

ACTION TRANSMITTAL No

ACTION TRANSMITTAL No Transportation Advisory Board of the Metropolitan Council of the Twin Cities DATE: January 5, 2017 TO: FROM: ACTION TRANSMITTAL No. 2017-04 Transportation Advisory Board TAC Funding & Programming Committee

More information

Active Transportation Facility Glossary

Active Transportation Facility Glossary Active Transportation Facility Glossary This document defines different active transportation facilities and suggests appropriate corridor types. Click on a facility type to jump to its definition. Bike

More information

SAN MATEO COUNTY TRANSPORTATION AUTHORITY STAFF REPORT

SAN MATEO COUNTY TRANSPORTATION AUTHORITY STAFF REPORT SAN MATEO COUNTY TRANSPORTATION AUTHORITY STAFF REPORT AGENDA ITEM # 10 (a) MARCH 3, 2016 TO: THROUGH: Transportation Authority Jim Hartnett Executive Director FROM: April Chan Eli Kay Gigi Harrington

More information

Pedestrian Project List and Prioritization

Pedestrian Project List and Prioritization To: Kyle Wagenschutz, City of Memphis CC: From: Anne Conlon and John Cock, Alta Planning + Design Date: December, 2014 Re: Project List Development (Task 3.1-3.2) and Project List Prioritization (Task

More information

MEASURE B AND MEASURE BB Annual Program Compliance Report Reporting Fiscal Year AGENCY CONTACT INFORMATION

MEASURE B AND MEASURE BB Annual Program Compliance Report Reporting Fiscal Year AGENCY CONTACT INFORMATION MEASURE B AND MEASURE BB Annual Program Compliance Report Reporting Fiscal Year 2016-2017 AGENCY CONTACT INFORMATION Agency Name: City of Livermore Date: 12/4/2017 Primary Point of Contact Name: Debbie

More information

City of Albert Lea Policy and Procedure Manual 4.10 ALBERT LEA CROSSWALK POLICY

City of Albert Lea Policy and Procedure Manual 4.10 ALBERT LEA CROSSWALK POLICY 4.10 ALBERT LEA CROSSWALK POLICY PURPOSE: Pedestrian crosswalks are an integral part of our transportation infrastructure. To be effective and promote safety, marked crosswalks must be installed after

More information

CITY OF LANCASTER PROPOSED NEW PROJECTS

CITY OF LANCASTER PROPOSED NEW PROJECTS CITY OF LANCASTER 2013-2014 PROPOSED NEW PROJECTS Project Code 11 Facilities and Fixtures Project Title 1 11BS018 Main. Yard Storage Bldg, Phase 2 2 11GS007 Parks Improvements 3 11GS008 Dog Park AHP 4

More information

Downtown Signals Traffic Analysis

Downtown Signals Traffic Analysis Downtown Signals Traffic Analysis City of St. Mary s April 16, 2018 Presented by: Allan Heitbrink, P.E. & Craig Eley, P.E. Who We Are Craig Eley, P.E o o o Previously the ODOT D7 Traffic and Safety Engineer.

More information

F L E T C H E R A V E N U E

F L E T C H E R A V E N U E Jan. 29, 2014 Introduction F L E T C H E R A V E N U E FDOT Local Agency Program (LAP) Project FPN: 428214-1-58-01 CIP 63090 Hillsborough County, Traffic Engineering, PWD Stake holders and partners are

More information

Broad Street Bicycle Boulevard Design Guidelines

Broad Street Bicycle Boulevard Design Guidelines Broad Street Bicycle Boulevard Design Guidelines Building from the strategies introduced in the 2013 Bicycle Transportation Plan and community input received thus far, City Transportation Staff have identified

More information

Pinellas County Safety Initiatives

Pinellas County Safety Initiatives Florida Department of TRANSPORTATION Pinellas County Safety Initiatives Whit Blanton, FAICP Pinellas County MPO A Distinctive County A unique geography Multi-jurisdictional Key demographics seniors and

More information

including shade trees; Recommend minimum 13 ft total sidewalk

including shade trees; Recommend minimum 13 ft total sidewalk Appendix B Projects From Other Plans Location Type of Project Description West. Julian St. Intersection and streetscape along West Julian St. Intersection and scape : Add high visibility side street crosswalks

More information

Operations -- Transit From: N/A To: N/A. Improvement Type: Regionally Significant: No

Operations -- Transit From: N/A To: N/A. Improvement Type: Regionally Significant: No Central Puget Sound Regional 2017-2020 Transportation Improvement Program Amendments and Corrections to be included in the 2017-20 STIP PSRC's Amendment 2017-08 County: King List of 17-08 Amendment Projects:

More information

Document 2 - City of Ottawa Pedestrian Crossover (PXO) Program

Document 2 - City of Ottawa Pedestrian Crossover (PXO) Program 40 Document 2 - City of Ottawa Pedestrian Crossover (PXO) Program OVERVIEW The City of Ottawa Pedestrian Crossover (PXO) Program provides the basis for PXO implementation in Ottawa. The program s processes

More information

Oakland Pedestrian Master Plan Oakland Pedestrian Plan Draft Recommendations Chapter Outline

Oakland Pedestrian Master Plan Oakland Pedestrian Plan Draft Recommendations Chapter Outline EISEN LETUNIC T R A N S P O R T A T I O N, ENVIRO N M E N TA L A N D URBAN PLANNIN G MEMORANDUM To Oakland Pedestrian Plan Technical Advisory Committee & Pedestrian Advisory Group From Victoria Eisen Date

More information

City of San Diego Vision Zero Draft Strategic Plan FY 2017

City of San Diego Vision Zero Draft Strategic Plan FY 2017 City of San Diego Vision Zero Draft Strategic Plan FY 2017 Engineering Objective: To develop and implement a strategy that employs best planning, design and engineering practices. Background: Over the

More information

City of Scotts Valley CITY COUNCIL STAFF REPORT

City of Scotts Valley CITY COUNCIL STAFF REPORT DATE: April 19, 2017 City of Scotts Valley CITY COUNCIL STAFF REPORT AGENDA ITEM 2 DATE: 4-19-2017 TO: FROM: APPROVED: SUBJECT: Honorable Mayor and City Council Scott Hamby, Public Works Director Jenny

More information

COMMUNITY MEETING AGENDA

COMMUNITY MEETING AGENDA COMMUNITY MEETING AGENDA Welcome and Introductions SAFE Presentation Project Presentation Priorities Feedback Next Steps Q&A Santa Cruz Avenue Corridor Study 1 Santa Cruz Avenue Corridor Study Community

More information

2019 Federal Transportation Improvement Program

2019 Federal Transportation Improvement Program VEN051211 Ventura SCCAB VEN051211 CAX63 L NON-EXEMPT 0 Description: PTC 4,417 Agency CAMARILLO LAS POSAS ROAD FROM VENTURA BLVD TO PLEASANT VALLEY ROAD WIDEN FROM 2 TO 6 LANES CITY FUNDS 4,417 4,417 4,417

More information

Attachment 1. Summary of Changes to the 2017 FTIP

Attachment 1. Summary of Changes to the 2017 FTIP Attachment 1 Summary of Changes to the 2017 FTIP Agency: Various Amendment Type: Administrative Modification (Type I) Amendment #: 8 Project Identification 2017 FTIP SUMMARY OF CHANGES Funding Existing

More information

Transportation Planning Division

Transportation Planning Division Transportation Planning Division Presentation Outline Study Tasks Recap of Previous Meetings Data Collected Focus Areas within Study Limits Design Principles Tool Box Recommended Concepts Schedule Moving

More information

PEDESTRIAN SAFETY IMPROVEMENT EVALUATION GUIDELINE FOR UNCONTROLLED CROSSINGS

PEDESTRIAN SAFETY IMPROVEMENT EVALUATION GUIDELINE FOR UNCONTROLLED CROSSINGS PEDESTRIAN SAFETY IMPROVEMENT EVALUATION GUIDELINE FOR UNCONTROLLED CROSSINGS Traffic Safety Engineering Division Updated: April 2018 EXECUTIVE SUMMARY NDOT Traffic Safety Engineering Division developed

More information

California Department of Transportation, District 4. Sloat Boulevard Project Skyline Blvd. to 19 th Ave. Community Update January 13, 2016

California Department of Transportation, District 4. Sloat Boulevard Project Skyline Blvd. to 19 th Ave. Community Update January 13, 2016 California Department of Transportation, District 4 Sloat Boulevard Project Skyline Blvd. to 19 th Ave. Community Update January 13, 2016 Agenda Welcome and introductions Project overview, history and

More information

Chapter 4: Funding and Implementation

Chapter 4: Funding and Implementation Chapter 4: Funding and Implementation 83 84 Cost Estimating Cost estimating is an iterative process. When a project is in the conceptual stage, preliminary cost estimates are also provided conceptually,

More information

Route 7 Corridor Study

Route 7 Corridor Study Route 7 Corridor Study Executive Summary Study Area The following report analyzes a segment of the Virginia State Route 7 corridor. The corridor study area, spanning over 5 miles in length, is a multi

More information

San Jose Transportation Policy

San Jose Transportation Policy San Jose Transportation Policy Protected Intersections in LOS Policies to Support Smart Growth Presented by: Manuel Pineda City of San Jose Department of Transportation Bay Area Map San Francisco Oakland

More information

Acknowledgements. Mr. David Nicol 3/23/2012. Daniel Camacho, P.E. Highway Engineer Federal Highway Administration Puerto Rico Division

Acknowledgements. Mr. David Nicol 3/23/2012. Daniel Camacho, P.E. Highway Engineer Federal Highway Administration Puerto Rico Division Daniel Camacho, P.E. Highway Engineer Federal Highway Administration Puerto Rico Division Acknowledgements Mr. David Nicol Director, FHWA Office of Safety FHWA Office of Safety http://safety.fhwa.dot.gov/provencountermeasures/

More information

FUNDING SOURCES CHAPTER 6

FUNDING SOURCES CHAPTER 6 CHAPTER 6 6.1 BICYCLE 6.1.1 Local 6.1.2 Regional 6.1.3 State 6.1.4 Federal 6.1.5 Public Facilities 6.1.6 Bicycle Registration and Licensing Fees 6.1.7 Summary Table 6.1 of Bicycle Funding Sources 6 2 6.2

More information

Staff Report. Within the $10 million funding limit, ten projects submitted by six different jurisdictions are recommended for funding:

Staff Report. Within the $10 million funding limit, ten projects submitted by six different jurisdictions are recommended for funding: ITEM 7A Staff Report Subject: Contact: 2017 CVAG Bicycle and Pedestrian Safety Program Eric Cowle, Transportation Program Manager (ecowle@cvag.org) Recommendation: Approve ten project applications submitted

More information

Sloat Blvd. Pedestrian Safety Improvement Project

Sloat Blvd. Pedestrian Safety Improvement Project Sloat Blvd. Pedestrian Safety Improvement Project Department of Public Works Project team and background Budget Schedule Scope of work Sloat Blvd - Everglade Drive Sloat Blvd - Forest View Drive Sloat

More information

Lynchburg District Update

Lynchburg District Update Lynchburg District Update Virginia Statewide Bicycle and Pedestrian Advisory Committee Spring Meeting May 16 th, 2017 David Cook Transportation Planner, VDOT Lynchburg District Table of Contents Active

More information

Annual Listing of Obligated MPO Projects

Annual Listing of Obligated MPO Projects Thurston Regional Planning Council Annual Listing of Obligated MPO Projects CY 2015 March, 2016 2424 Heritage Court SW, Suite A, Olympia, WA 98502 360.956.7575 www.trpc.org About TRPC, established in 1967,

More information

Sarasota/Manatee MPO Project Priorities 2016 Adopted April 25, 2016

Sarasota/Manatee MPO Project Priorities 2016 Adopted April 25, 2016 All projects on the following priority lists should be implemented in the priority sequence listed, as consistent with the fiscal constraints identified in the MPO s adopted Long Range Transportation Plan

More information

The DC Pedestrian Master Plan

The DC Pedestrian Master Plan The DC Pedestrian Master Plan September 28, 2010 George Branyan Pedestrian Program Coordinator District Department of Transportation Presentation Agenda Scope of the Plan Methodology Recommendations Implementation

More information

Pedestrian and Bicycle Conditions

Pedestrian and Bicycle Conditions Pedestrian and Bicycle Conditions Geary Citizens Advisory Committee May 8, 2014 SAN FRANCISCO COUNTY TRANSPORTATION AUTHORITY SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY Topics Pedestrian Conditions

More information

Item 08M 1 of 9

Item 08M 1 of 9 MEETING DATE: December 20, 2017 PREPARED BY: Christopher L. Magdosku, City Engineer DEPT DIRECTOR: Brenda Wisneski DEPARTMENT: Development Services CITY MANAGER: Karen P. Brust SUBJECT: Interim North Coast

More information

MPO Staff Report MPO Technical Advisory Committee: December 13, 2017 MPO Executive Board: December 20, 2017

MPO Staff Report MPO Technical Advisory Committee: December 13, 2017 MPO Executive Board: December 20, 2017 MPO Staff Report MPO Technical Advisory Committee: December 13, 2017 MPO Executive Board: December 20, 2017 RECOMMENDED ACTION: Consider HSIP Candidate Projects for the FY2019-2022 TIP as Being Consistent

More information

APPENDIX A: Complete Streets Checklist DRAFT NOVEMBER 2016

APPENDIX A: Complete Streets Checklist DRAFT NOVEMBER 2016 APPENDIX A: Complete Streets Checklist DRAFT NOVEMBER 2016 Complete Streets Checklist MetroPlan Orlando s Complete Streets Checklist is an internal planning tool for staff to further implementation of

More information

Memo. Introduction. Memphis STP Pedestrian Sidewalk Project

Memo. Introduction. Memphis STP Pedestrian Sidewalk Project Memo Memphis STP Pedestrian Sidewalk Project To: Kyle Wagenshutz, City of Memphis From: Matthew Berkow, Collin Chesston, and Anne Eshleman, Alta Planning + Design Date: June 2014 Re: Photo Inventory Introduction

More information

Designing for Pedestrian Safety in Washington, DC

Designing for Pedestrian Safety in Washington, DC Designing for Pedestrian Safety in Washington, DC February 25, 2014 George Branyan Pedestrian Program Coordinator District Department of Transportation DC Journey to work mode split: 2012 Means of Transportation

More information

SR 693 (Pasadena Avenue) Corridor Study from Shore Drive South to 66 th Street

SR 693 (Pasadena Avenue) Corridor Study from Shore Drive South to 66 th Street Welcome and Introduction Sign-in and comment sheets Restrooms and exits Meeting agenda and timeline Meeting goals / expectations Provide input to guide study recommendations Actively participate throughout

More information

Thank you for attending the first Public Open House for the Thunder Bay Transportation Master Plan!

Thank you for attending the first Public Open House for the Thunder Bay Transportation Master Plan! Welcome Thank you for attending the first Public Open House for the Thunder Bay Transportation Master Plan! Please take this opportunity to learn about the study and to tell us your ideas and vision for

More information

HARRISON STREET/OAKLAND AVENUE COMMUNITY TRANSPORTATION PLAN

HARRISON STREET/OAKLAND AVENUE COMMUNITY TRANSPORTATION PLAN HARRISON STREET/OAKLAND AVENUE Community Workshop #4: Draft Plan Review December 3, 2009 D E S I G N, C O M M U N I T Y & E N V I R O N M E N T INTRODUCTIONS Key Project Staff: Alisa Shen, Project Manager,

More information

TOWN OF MORAGA MORAGA WAY AND CAMINO PABLO/CANYON ROAD IMPROVEMENTS Town Council Meeting March 13, 2019

TOWN OF MORAGA MORAGA WAY AND CAMINO PABLO/CANYON ROAD IMPROVEMENTS Town Council Meeting March 13, 2019 TOWN OF MORAGA MORAGA WAY AND CAMINO PABLO/CANYON ROAD IMPROVEMENTS Town Council Meeting March 13, 2019 1 Edric Kwan, Public Works Director Josh Peterman, Principal, Fehr and Peers Shawn Knapp, Senior

More information

Northbound San Jose Avenue & I-280 Off-Ramp Road Diet Pilot Project

Northbound San Jose Avenue & I-280 Off-Ramp Road Diet Pilot Project Project Overview Fed by a two-lane Interstate-280 (I-280) off-ramp, high vehicular volumes and speeds are longstanding issues along San Jose Avenue. Residents in the surrounding neighborhoods have expressed

More information

Background Planning Committee STAFF REPORT March 7, 2018 Page 2 of 2 On June 21, 2017, the Authority approved the programming of second cycle One Bay

Background Planning Committee STAFF REPORT March 7, 2018 Page 2 of 2 On June 21, 2017, the Authority approved the programming of second cycle One Bay Planning Committee STAFF REPORT Meeting Date: March 7, 2018 Subject Summary of Issues Recommendations Financial Implications Options Attachments Approval of Resolution 18-11-G Appropriating Measure J TLC

More information

Overview of Pinellas County Pedestrian Safety Programs and Initiatives

Overview of Pinellas County Pedestrian Safety Programs and Initiatives Overview of Pinellas County Pedestrian Safety Programs and Initiatives FHWA Pedestrian Safety Peer Exchange Miami, FL August 2, 2012 Peter Hsu, P.E. District Safety & Special Projects Engineer Florida

More information

Watertown Complete Streets Prioritization Plan. Public Meeting #1 December 14, 2017

Watertown Complete Streets Prioritization Plan. Public Meeting #1 December 14, 2017 Watertown Complete Streets Prioritization Plan Public Meeting #1 December 14, 2017 Goals for Public Meeting Overview of MassDOT Complete Streets Funding Program Educate the community on Complete Streets

More information

Appendix T CCMP TRAIL TRAFFIC & TRANSPORTATION DESIGN STANDARD

Appendix T CCMP TRAIL TRAFFIC & TRANSPORTATION DESIGN STANDARD Appendix T CCMP 3.3.4 TRAIL TRAFFIC & TRANSPORTATION DESIGN STANDARD 3.3.4 Trail Traffic and Transportation Design Multi-use trails have certain design standards, which vary depending on the agency that

More information

GLOSSARY CROSSWALK. CROSSING TYPES

GLOSSARY CROSSWALK.   CROSSING TYPES CROSSWALK The part of a roadway at an intersection included within the connections of the lateral lines of the sidewalks on opposite sides of the street measured from the curbs, or in the absence of curbs

More information

Pedestrian Safety and the Highway Safety Improvement Program

Pedestrian Safety and the Highway Safety Improvement Program Pedestrian Safety and the Highway Safety Improvement Program Karen Scurry, FHWA Office of Safety Kohinoor Kar, Arizona Department of Transportation David Cohen, FHWA California Division March 13, 2014

More information

Commerce Street Complete Street Project from Good Latimer Expressway to Exposition Avenue

Commerce Street Complete Street Project from Good Latimer Expressway to Exposition Avenue Commerce Street Complete Street Project from Good Latimer Expressway to Exposition Avenue T A N Y A B R O O K S A S S I S T A N T D I R E C T O R M O B I L I T Y P L A N N I N G M O B I L I T Y A N D S

More information

Lessons Learned from Cycle Tracks (Class IV Bikeways) Design Practice

Lessons Learned from Cycle Tracks (Class IV Bikeways) Design Practice Lessons Learned from Cycle Tracks (Class IV Bikeways) Design Practice By: Min Zhou, P.E., Principal/Vice President KOA Corporation 1 What is a Cycle Track (Class IV) TYPICAL BIKEWAY CLASSIFICATION CLASS

More information

BICYCLE AND TRAILS ADVISORY COMMISSION Meeting Minutes

BICYCLE AND TRAILS ADVISORY COMMISSION Meeting Minutes BICYCLE AND TRAILS ADVISORY COMMISSION Meeting Minutes February 9, 2017 The Bicycle and Trails Advisory Commission was called to order at 4:00 p.m. by Chair Hasser in the City Hall Committee Room, located

More information

ST. PETERSBURG CITY COUNCIL. Consent Agenda. Meeting of February 5, The Honorable Charlie Gerdes, Chair and Members of City Council

ST. PETERSBURG CITY COUNCIL. Consent Agenda. Meeting of February 5, The Honorable Charlie Gerdes, Chair and Members of City Council ST. PETERSBURG CITY COUNCIL Consent Agenda Meeting of February 5, 2015 TO: The Honorable Charlie Gerdes, Chair and Members of City Council SUBJECT: Authorizing the Mayor or his designee to execute Supplement

More information

General Plan Circulation Element Update Scoping Meeting April 16, 2014 Santa Ana Senior Center, 424 W. 3rd Street, Santa Ana, CA 92701

General Plan Circulation Element Update Scoping Meeting April 16, 2014 Santa Ana Senior Center, 424 W. 3rd Street, Santa Ana, CA 92701 General Plan Circulation Element Update Scoping Meeting April 16, 2014 Santa Ana Senior Center, 424 W. 3rd Street, Santa Ana, CA 92701 Meeting Agenda 1. Purpose of Scoping Meeting 2. Project Overview 3.

More information

Pedestrian Crossing Guidelines 2016

Pedestrian Crossing Guidelines 2016 Pedestrian Crossing Guidelines 2016 Engineering Services 1.0 Introduction and Background The City of Kingston s first Pedestrian Crossing Guidelines were approved by Council in 2008 in order to provide

More information

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY THIS PRINT COVERS CALENDAR ITEM NO. : 11 DIVISION: Sustainable Streets BRIEF DESCRIPTION: SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY Approving traffic modifications on Twin Peaks Boulevard between Christmas

More information

Hillsborough Pedestrian Safety Action Plan 2015 Update. Hillsborough MPO BPAC May 2015

Hillsborough Pedestrian Safety Action Plan 2015 Update. Hillsborough MPO BPAC May 2015 Hillsborough Pedestrian Safety Action Plan 2015 Update Hillsborough MPO BPAC May 2015 Presentation Overview Pedestrian Safety Action Plan (PSAP) Review Pedestrian Crash Trends Stakeholder Activities Engineering

More information

TRANSPORTATION TRAINING TOPICS. April 6, 2010

TRANSPORTATION TRAINING TOPICS. April 6, 2010 TRANSPORTATION TRAINING TOPICS April 6, 2010 Roles of Transportation Providers Context and Policy Makers Division of Transportation and Traffic Other City Operations Other Transportation Operators CMA

More information

Pedestrian & Bicycle Safety Innovations & Applications

Pedestrian & Bicycle Safety Innovations & Applications Pedestrian & Bicycle Safety Innovations & Applications County Engineers Association of Maryland Spring, 2017 Conference May 25, 2017 George Branyan Pedestrian Program Coordinator District Department of

More information

Military Road Safety Improvements

Military Road Safety Improvements Military Road Safety Improvements 26 th Road North to 31 st Street North SUMMARY OF DATA REVIEW AND PRELIMINARY RECOMMENDATIONS Prepared for: Department of Environmental Services Traffic Engineering and

More information

ICBC invests $738,000 to make Surrey, White Rock and Delta roads safer

ICBC invests $738,000 to make Surrey, White Rock and Delta roads safer For release: Immediately Page: 1 of 5 Date: April 2, 2012 Ref #: 2012-11 Media contacts: Karon Trenaman, 604-527-8766 ICBC invests $738,000 to make Surrey, White Rock and Delta roads safer You ve likely

More information

Bay to Bay Boulevard Complete Streets Project

Bay to Bay Boulevard Complete Streets Project Bay to Bay Boulevard Complete Streets Project Dale Mabry Highway to Bayshore Boulevard February 08, 2018 Photo Source: Tampa Bay Times Alessandra Da Pra Meeting Format Introduction Resurfacing Information

More information

Duwamish Way-finding and CTR Report

Duwamish Way-finding and CTR Report V. North Tukwila When the North Tukwila Manufacturing and Industrial Center was designated in 1992 as part of the region s land use and transportation plan, the plan called for the area to set a light-rail

More information

Citywide Sidewalk and Crosswalk Programs

Citywide Sidewalk and Crosswalk Programs Citywide Sidewalk and Crosswalk Programs Council Meeting October 20, 2015 Presented by Rita Hu and Jamal Mahmoud Program Goals Implement the City s comprehensive plan. Provide pedestrian with safe walking

More information

SHSP Action Plan Development. Intersection EA Team

SHSP Action Plan Development. Intersection EA Team SHSP Action Plan Development Intersection EA Team March 7, 2018 Agenda Welcome and Introductions Review Completed Action Plans Developed by Working Groups Next Steps STRATEGIES: INTERSECTION SAFETY EMPHASIS

More information

AGENDA ITEM NO. 5b HCAOG TAC meeting of May 8, 2014

AGENDA ITEM NO. 5b HCAOG TAC meeting of May 8, 2014 Humboldt County Association of Governments Eureka, CA, 95501 AGENDA ITEM NO. 5b HCAOG TAC meeting of May 8, 2014 DATE: May 1, 2014 TO: HCAOG Technical Advisory Committee (TAC) FROM:, SUBJECT: Letters of

More information

Mandan Commission Meeting August 2, 2016 Mandan City Hall

Mandan Commission Meeting August 2, 2016 Mandan City Hall Mandan-Bismarck Corridor Improvement Study Mandan Commission Meeting August 2, 2016 Mandan City Hall 2014 HDR, Inc., all rights reserved. Mandan Corridors Study Schedule 2015 2016 Study Kick Off August

More information

BD RESOLUTION NO RESOLUTION ADOPTING THE VISION ZERO RAMP INTERSECTION STUDY PHASE 1

BD RESOLUTION NO RESOLUTION ADOPTING THE VISION ZERO RAMP INTERSECTION STUDY PHASE 1 BD00 RESOLUTION NO. - RESOLUTION ADOPTING THE VISION ZERO RAMP INTERSECTION STUDY PHASE [NTIP PLANNING] FINAL REPORT WHEREAS, The Vision Zero Ramp Intersection Study Phase was recommended by Commissioner

More information

Central Avenue Bikeway Traffic and Safety Impact Assessment

Central Avenue Bikeway Traffic and Safety Impact Assessment FEBRUARY 2018 Lead Agency: San Diego Association of Governments (SANDAG) 401 B Street, Suite 800 San Diego, CA 92101 Contact: Chris Carterette, AICP, Project Manager 619.699.7319 chris.carterette@sandag.org

More information

Welcome to the Quebec Alternatives Analysis Public Meeting

Welcome to the Quebec Alternatives Analysis Public Meeting Welcome to the Public Meeting Please sign in. Public Comment Please fill out a comment card and tell us what you think. Check back or comment any time at: www.quebecalternatives.com Project Area Technical

More information

U.S. HIGHWAY 50 IMPROVEMENT PROJECT

U.S. HIGHWAY 50 IMPROVEMENT PROJECT U.S. HIGHWAY 50 IMPROVEMENT PROJECT in the City of South Lake Tahoe Project Purpose and Need Planned Improvements Project Cost and Delivery Schedule Proposed Construction Staging Project Partners: HIGHWAY

More information

What Engineering Can Do for You! Low Cost Countermeasures for Transportation Safety

What Engineering Can Do for You! Low Cost Countermeasures for Transportation Safety What Engineering Can Do for You! Low Cost Countermeasures for Transportation Safety Adam Larsen Safety Engineer Federal Highway Administration 360-619-7751 Adam.Larsen@DOT.GOV Adam Larsen TTP Safety Engineer

More information

FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT 7 DISTRICT WIDE BICYCLE/PEDESTRIAN ACCESS TO TRANSIT SAFETY ASSESSMENT AND IMPROVEMENT PLAN

FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT 7 DISTRICT WIDE BICYCLE/PEDESTRIAN ACCESS TO TRANSIT SAFETY ASSESSMENT AND IMPROVEMENT PLAN FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT 7 DISTRICT WIDE BICYCLE/PEDESTRIAN ACCESS TO TRANSIT SAFETY ASSESSMENT AND IMPROVEMENT PLAN TRANSIT SAFETY ASSESSMENT SR 55/US 19 AT 80 TH AVE N DRAFT JUNE

More information

Non-Motorized Transportation 7-1

Non-Motorized Transportation 7-1 Non-Motorized Transportation 7-1 Transportation facilities no longer mean just accommodating a vehicle powered by a combustion engine. Pedestrian and non-motorized facilities are important modes of travel

More information

FDOT s Bicycle & Pedestrian Focused Initiative

FDOT s Bicycle & Pedestrian Focused Initiative Florida Department of TRANSPORTATION FDOT s Bicycle & Pedestrian Focused Initiative Brenda Young, PE Passenger Operations Manager, FDOT District 5 Agenda Background of initiative, why it s needed What

More information

Road Diets FDOT Process

Road Diets FDOT Process Florida Department of TRANSPORTATION Road Diets FDOT Process Humberto Castillero, PE, PTOE Roadway Design Office Purpose of Guide Develop a statewide lane elimination review process Balance state & local

More information

ROAD SAFETY AUDIT. Granite Avenue at Interstate 93 Ramps. Town of Milton. May 22, Prepared for: MassDOT

ROAD SAFETY AUDIT. Granite Avenue at Interstate 93 Ramps. Town of Milton. May 22, Prepared for: MassDOT ROAD SAFETY AUDIT Granite Avenue at Interstate 93 Ramps Town of Milton May 22, 2017 Prepared for: MassDOT Prepared by: Toole Design Group 2 Oliver Street, Suite 305 Boston, MA 02109 Table of Contents Background...

More information

Hennepin County Pedestrian Plan Public Comment Report

Hennepin County Pedestrian Plan Public Comment Report Hennepin County Pedestrian Plan Public Comment Report On May 31, 2013, the draft Hennepin County Pedestrian Plan was released for a 45-day public comment period ending July 15, 2013. The county received

More information

Pine Hills Road Pedestrian/Bicycle Safety Study Board of County Commissioners Work Session

Pine Hills Road Pedestrian/Bicycle Safety Study Board of County Commissioners Work Session Pine Hills Road Pedestrian/Bicycle Safety Study Board of County Commissioners Work Session February 20, 2018 Meeting Agenda Study Overview Existing Conditions Access Management Potential Gateway Features

More information

North Avenue Corridor Study

North Avenue Corridor Study North Avenue Corridor Study Advisory Committee Meeting #6 July 1, 2014 Agenda Concept Revisions based on Advisory Committee feedback Review of New Concept Scoring & Costs Concept Discussion/Questions Voting:

More information

Complete Street Analysis of a Road Diet: Orange Grove Boulevard, Pasadena, CA

Complete Street Analysis of a Road Diet: Orange Grove Boulevard, Pasadena, CA Complete Street Analysis of a Road Diet: Orange Grove Boulevard, Pasadena, CA Aaron Elias, Bill Cisco Abstract As part of evaluating the feasibility of a road diet on Orange Grove Boulevard in Pasadena,

More information

INTERSECTION CRASH COUNTERMEASURES

INTERSECTION CRASH COUNTERMEASURES INTERSECTION CRASH COUNTERMEASURES ALL SEVERE INTERSECTION (include gap CRASHES High Friction Surface Treatment - Intersection Markings - advanced acceptance and intersection approaches to intersections

More information

PEDESTRIAN ACCOMMODATIONS DPS 201 AT INTERCHANGES

PEDESTRIAN ACCOMMODATIONS DPS 201 AT INTERCHANGES PEDESTRIAN ACCOMMODATIONS DPS 201 AT INTERCHANGES UNDERSTANDING THE ISSUES Intersections of freeway ramp terminals at crossroads are the most critical components of an interchange Challenge: balance mobility

More information

MEMORANDUM. Nick Hutchinson, P.E., City Engineer Public Services Area Project Management Services Unit

MEMORANDUM. Nick Hutchinson, P.E., City Engineer Public Services Area Project Management Services Unit MEMORANDUM DATE: September 9, 2013 TO: FROM: RE: Steve Powers, City Administrator Nick Hutchinson, P.E., City Engineer Public Services Area Project Management Services Unit Status of Pedestrian Crossing

More information

Water Street Promenade Engineering and Design Services

Water Street Promenade Engineering and Design Services Preliminary Design Presentation Parking & Traffic Safety Committee Water Street Promenade Engineering and Design Services July 16,2014 November 3, 2016 Education / Infrastructure / Innovation 1 Project

More information

Arlington Public Schools New Elementary School at Thomas Jefferson Site Off-Site Transportation. Thomas Jefferson BLPC / PFRC Meeting July 27, 2016

Arlington Public Schools New Elementary School at Thomas Jefferson Site Off-Site Transportation. Thomas Jefferson BLPC / PFRC Meeting July 27, 2016 Arlington Public Schools New Elementary School at Thomas Jefferson Site Off-Site Transportation Thomas Jefferson BLPC / PFRC Meeting July 27, 2016 1.Review of Analysis 2.Key Transportation Issues 3.Recommendations