3 Central Puget Sound Regional Transportation Improvement Program Amendments and Corrections to be included in the STIP PSRC's Amendment County: King List of Amendment Projects: Approved 9/12/2017 Jurisdiction: King County Department of Transportation (Transit) Project Number: MET-215 Title: Atlantic Base Maintenance Building HVAC Replacement Equipment /30/2018 Local $0 $0 $720,376 $720,376 Equipment /30/ HIFG $2,881,504 $0 $0 $2,881,504 Equipment /30/2019 Local $0 $0 $1,754,061 $1,754,061 Equipment /30/ HIFG $7,016,242 $0 $0 $7,016,242 WSDOT PIN: Totals: $9,897,746 $0 $2,474,437 $12,372,183 Functional Class: Not applicable (transit, enhancements, Etc.) Location: Atlantic Base th Ave S, Seattle, WA Operations -- Transit From: To: Total Cost: $12,372,183 Environmental Status: CE Replace HVAC system at KC Metro's Atlantic Base as it has reached the end of its useful life. Atlantic Base supports Metro's trolley bus system operations. A new HVAC system will provide opportunities to use new mechanical/electrical technologies, be more energy efficient and reduce operating costs. A - 1

4 County: King List of Amendment Projects: Approved 9/12/2017 Jurisdiction: North Bend Project Number: NB-6 Title: E North Bend Way/Downing Ave/E Park St Roundabout Construction /1/2019 STP(US) $1,000,000 $0 $0 $1,000,000 Construction /1/2019 Local $0 $0 $1,000,000 $1,000,000 WSDOT PIN: STPUS-17A1(002) Totals: $1,000,000 $0 $1,000,000 $2,000,000 Functional Class: Rural Minor Arterial Location: Intersection of North Bend Way and Park Street Single Intersection -- Roadway From: North Bend Way and Park Street To: North Bend Way and Park Street Total Cost: $2,270,000 Environmental Status: DNS This project will provide a single-lane roundabout at the intersection of E. North Bend Way and E. Park St. The roundabout will feature a landscaped center island, planted/hardscaped splitter islands, a new illumination system, and stormwater improvements. The project will also provide a shared use sidewalk and trail connections for pedestrians and bikes, ADA compliant access, and minor parking and driveway reconfigurations. Additional work includes irrigation of planted areas, planting of street trees, permanent signing, and potentially undergrounding of existing overhead utilities. A - 2

5 County: Kitsap List of Amendment Projects: Approved 9/12/2017 Jurisdiction: Bremerton Project Number: BRE-22 Title: Kitsap Lake Elementary SRTS P/E-Design /1/2018 Safe Routes To Schools $392,140 $0 $0 $392,140 ROW /1/2018 Safe Routes To Schools $10,000 $0 $0 $10,000 ROW /1/2018 Local $0 $0 $10,000 $10,000 Construction /31/2018 Safe Routes To Schools $1,352,208 $0 $0 $1,352,208 WSDOT PIN: Totals: $1,754,348 $0 $10,000 $1,764,348 Functional Class: Rural Major Collector Location: Harlow Drive Sidewalk From: Osprey Circle To: Kitsap Way Total Cost: $1,764,348 Environmental Status: CE Project includes sidewalk, curb, gutter, curb ramps, crosswalk markings, street lights, RRFBs, signing, and stormwater conveyance. A - 3

6 County: Kitsap List of Amendment Projects: Approved 9/12/2017 Jurisdiction: Kitsap County Project Number: KTCO-38 Title: Washington Boulevard Corridor Improvement Project Construction /1/2019 STP(US) $450,000 $0 $0 $450,000 Construction /1/2019 Local $0 $0 $915,000 $915,000 WSDOT PIN: Totals: $450,000 $0 $915,000 $1,365,000 Functional Class: Rural Local Access Location: Washington Boulevard NA Sidewalk From: Central Ave NE To: NE 3rd Street Total Cost: $2,220,000 Environmental Status: CE Construction of pedestrian facilities on Washington Blvd from NE 3rd Street to Central Avenue NE and construction of bicycle facilities on Washington Blvd from NE 3rd Street to SR 104 outbound (aka NE First St) and from SR 104 inbound to Central Avenue NE. The project includes ADA ramps on SR 104 as needed, luminaires as required, pedestrian lighting, sidewalks and stormwater facilities. This project will complement the proposed Port of Kingston Park located adjacent to the ferry terminal car holding lanes. It is anticipated that a portion of the sidewalk will be constructed on the park property. A - 4

7 County: Pierce List of Amendment Projects: Approved 9/12/2017 Jurisdiction: Tacoma Project Number: TAC-110 Title: First Creek Middle School Safe Routes to School P/E-Design /1/2017 Safe Routes To Schools $22,000 $0 $0 $22,000 P/E-Design /1/2017 Local $0 $0 $15,000 $15,000 Construction /1/2019 Safe Routes To Schools $296,885 $0 $0 $296,885 Construction /1/2019 Local $0 $0 $50,000 $50,000 WSDOT PIN: Totals: $318,885 $0 $65,000 $383,885 Functional Class: Not applicable (transit, enhancements, Etc.) Location: Portland Ave. Other -- nonmotorized From: East 52nd Street To: East 52nd Street Total Cost: $383,885 Environmental Status: CE The project includes high-intensity activated crosswalk beacons signal, flashing beacons, sidewalk, crosswalk, and signs. A - 5

8 County: Pierce List of Amendment Projects: Approved 9/12/2017 Project Number: TAC-111 Title: Lister Elementary School Safe Routes to School P/E-Design /1/2017 Safe Routes To Schools $41,500 $0 $0 $41,500 P/E-Design /1/2017 Local $0 $0 $26,000 $26,000 Construction /31/2018 Safe Routes To Schools $389,711 $0 $0 $389,711 Construction /31/2018 Local $0 $0 $49,000 $49,000 Equipment /1/2017 Safe Routes To Schools $18,904 $0 $0 $18,904 Equipment /1/2017 Local $0 $0 $10,000 $10,000 WSDOT PIN: Totals: $450,115 $0 $85,000 $535,115 Functional Class: Not applicable (transit, enhancements, Etc.) Location: East 44th Street Other -- nonmotorized From: E T Street To: E 44th Street Total Cost: $535,115 Environmental Status: CE The project includes sidewalk, curb, gutter, crosswalk, Americans with Disabilities Act curb ramps, flashing beacons, curb extensions, safety education, and encouragement. A - 6

9 County: Snohomish List of Amendment Projects: Approved 9/12/2017 Jurisdiction: Bothell Project Number: BOTH-49 Title: 19th Ave SE/232nd St SE / 23rd Ave SE Non-motorized Improvements P/E-Design /30/2017 Local $0 $0 $114,400 $114,400 P/E-Design /30/2017 Safe Routes To Schools $96,600 $0 $0 $96,600 Construction /16/2018 Safe Routes To Schools $652,200 $0 $0 $652,200 Construction /16/2018 Local $0 $0 $534,800 $534,800 WSDOT PIN: Totals: $748,800 $0 $649,200 $1,398,000 Functional Class: Proposed Collector Location: 19th Ave SE / 232nd St SE / 23rd Ave SE Sidewalk From: 228th St SE / 19th Ave SE To: 23rd Ave SE / 236th St SE Total Cost: $1,398,000 Environmental Status: CE The project includes sidewalk, bike lanes, curb, gutter, storm water drainage, ADA curb ramps, crosswalks, rectangular rapid flashing beacons and crosswalk flags. A - 7

10 County: Snohomish List of Amendment Projects: Approved 9/12/2017 Project Number: BOTH-50 Title: 7th Ave SE/88th Ave NE Non-Motorized Improvements P/E-Design /30/2017 State $0 $79,200 $0 $79,200 P/E-Design /30/2017 Local $0 $0 $52,800 $52,800 Construction /15/2019 State $0 $531,000 $0 $531,000 Construction /15/2019 Local $0 $0 $354,000 $354,000 WSDOT PIN: Totals: $0 $610,200 $406,800 $1,017,000 Functional Class: Proposed Collector Location: 7th Ave SE/ 88th Ave NE Sidewalk From: 240th St SE/7th Ave SE To: 88the Ave NE/NE 195th St Total Cost: $1,017,000 Environmental Status: CE The project includes sidewalk, bike lane, curb, gutter, storm water drainage, ADA curb ramps, crosswalk, crosswalk flags, rectangular rapid flashing beacons, and signs. A - 8

11 County: Snohomish List of Amendment Projects: Approved 9/12/2017 Project Number: BOTH-51 Title: 188th St Non-motorized Improvements P/E-Design /30/2017 Local $0 $0 $60,000 $60,000 P/E-Design /30/2017 HSIP(SRTS) $90,000 $0 $0 $90,000 Construction /15/2019 Local $0 $0 $388,400 $388,400 Construction /15/2019 HSIP(SRTS) $582,600 $0 $0 $582,600 WSDOT PIN: Totals: $672,600 $0 $448,400 $1,121,000 Functional Class: Not applicable (transit, enhancements, Etc.) Location: NE 188th St Sidewalk From: NE 188th St/Bothell Everett Hw To: NE 188th St/92nd Ave NE Total Cost: $1,121,000 Environmental Status: CE This project includes sidewalk, bike lanes, planter strip, curb, gutter, storm water drainage, retaining wall, pedestrian railings, ADA curb ramps, crosswalks, and speed feedback signs. A - 9

12 County: WSDOT List of Amendment Projects: Approved 9/12/2017 Jurisdiction: WSDOT Northwest Region Project Number: WDNW-1113 Title: I-90/Lacey V Murrow Bridge - Replace Anchor Cables Construction /10/2017 Local $0 $0 $99,666 $99,666 Construction /14/2017 NHPP $4,883,629 $0 $0 $4,883,629 WSDOT PIN: M Totals: $4,883,629 $0 $99,666 $4,983,295 Functional Class: Urban Interstate Location: Lake Washington Bridge Rehabilitation From: MP 4.49 To: MP 5.79 Total Cost: $5,187,614 Replace anchor cables on the Lacey V Murrow floating bridge. Environmental Status: DCE Project Number: WDNW-1115 Title: I-90/Homer M Hadley Bridge - Replace Anchor Cables Construction /10/2017 Local $0 $0 $53,511 $53,511 Construction /14/2017 NHPP $2,622,055 $0 $0 $2,622,055 WSDOT PIN: N Totals: $2,622,055 $0 $53,511 $2,675,566 Functional Class: Urban Interstate Location: Lake Washington Bridge Rehabilitation From: MP 4.53 To: MP 5.60 Total Cost: $2,760,116 Replace anchor cables on the Homer M Hadley floating bridge. Environmental Status: DCE A - 10

13 County: WSDOT List of Amendment Projects: Approved 9/12/2017 Project Number: WDNW-1134 Title: US 2/Bickford Ave SE to Fryelands Blvd SE Vicinity - Corridor Improvements P/E-Design /10/2017 State $0 $1,003,472 $0 $1,003,472 P/E-Design /10/2017 HSIP $83,328 $0 $0 $83,328 Construction /14/2019 State $0 $1,169,235 $0 $1,169,235 Construction /14/2019 HSIP $8,292,525 $0 $0 $8,292,525 WSDOT PIN: J 1 Totals: $8,375,853 $2,172,707 $0 $10,548,560 Functional Class: Urban Principal Arterial Location: West of Monroe Safety -- Roadway From: MP 3.80 To: MP Total Cost: $10,548,560 Environmental Status: CE This project will reduce the risk of collisions by constructing a 6 foot median from the vicinity of Bickford Ave SE to Roosevelt Rd with median concrete barrier between the vicinity of Bickford Ave SE to 109th Ave SE. The scoping cost estimate was based on the construction of 6 foot median with rumble strips and median concrete barrier as outlined above. The selection of a Preferred Alternative and final estimate will be determined during the design phase using Practical Design methodology. A - 11

14 County: WSDOT List of Amendment Projects: Approved 9/12/2017 Project Number: WDNW-1136 Title: SR 529/SB Union Slough Bridge - Rehabilitation P/E-Design /10/2017 State $0 $44,212 $0 $44,212 P/E-Design /10/2017 NHPP $1,061,098 $0 $0 $1,061,098 ROW /20/2017 State $0 $430 $0 $430 ROW /20/2017 NHPP $21,090 $0 $0 $21,090 Construction /13/2018 State $0 $157,967 $0 $157,967 Construction /13/2018 NHPP $7,740,393 $0 $0 $7,740,393 WSDOT PIN: E Totals: $8,822,581 $202,609 $0 $9,025,190 Functional Class: Urban Principal Arterial Location: Everett Bridge Rehabilitation From: MP 4.93 To: MP 5.44 Total Cost: $9,025,190 Environmental Status: CE The project will repair the deteriorated concrete columns of bridge no. 529/15W on SR 529; the repair work will be applied to the columns and crossbeam bolsters of piers 2 through 12. The scour repair will be applied over and around piers 4,5,8,9 and 11 by placing heavy loose riprap with quarry spalls. A - 12

15 County: WSDOT List of Amendment Projects: Approved 9/12/2017 Project Number: WDNW-1152 Title: I5/NB Holgate St Vicinity to SB Boren Ave Vicinity - Sign Structure Replacements P/E-Design /9/2017 State $0 $4,448 $0 $4,448 P/E-Design /9/2017 NHPP $106,753 $0 $0 $106,753 Construction /4/2018 State $0 $18,008 $0 $18,008 Construction /4/2018 NHPP $882,388 $0 $0 $882,388 WSDOT PIN: E Totals: $989,141 $22,456 $0 $1,011,597 Functional Class: Urban Interstate Location: Downtown Seattle Bridge Rehabilitation From: MP To: MP Total Cost: $1,011,597 Environmental Status: CE The sign bridges on I-5 NB near Holgate St and on I-5 SB near Boren Ave are structurally deficient and will be replaced. A - 13

16 County: WSDOT List of Amendment Projects: Approved 9/12/2017 Project Number: WDNW-1154 Title: SR 518/Des Moines Way S to Airport Expressway Bridges - Deck Overlay P/E-Design /6/2017 State $0 $6,050 $0 $6,050 P/E-Design /6/2017 NHPP $145,206 $0 $0 $145,206 Construction /5/2018 State $0 $31,190 $0 $31,190 Construction /5/2018 NHPP $1,472,396 $0 $0 $1,472,396 WSDOT PIN: F Totals: $1,617,602 $37,240 $0 $1,654,842 Functional Class: Urban Principal Arterial Location: SeaTac & Burien Bridge Rehabilitation From: MP 0.58 To: MP 2.33 Total Cost: $1,654,842 Environmental Status: CE The asphalt bridge decks of Bridges 518/10, 518/14, and 518/14N-W are deteriorating and in need of repaving. Grinding and inlaying the bridge decks will preserve the pavement structure over these bridges. A - 14

17 County: WSDOT List of Amendment Projects: Approved 9/12/2017 Project Number: WDNW-1155 Title: US 2/Fryelands Blvd SE Vicinity to Cascade View Dr Vicinity - ADA Compliance P/E-Design /15/2017 State $0 $3,226 $0 $3,226 P/E-Design /15/2017 NHPP $77,433 $0 $0 $77,433 Construction /14/2019 State $0 $9,368 $0 $9,368 Construction /14/2019 NHPP $459,034 $0 $0 $459,034 WSDOT PIN: C Totals: $536,467 $12,594 $0 $549,061 Functional Class: Urban Principal Arterial Location: Monroe Safety -- Roadway From: MP To: MP Total Cost: $549,061 This project will evaluate and replace pedestrian ramps within the project limits for compliance with ADA guidelines. Environmental Status: CE A - 15

18 County: WSDOT List of Amendment Projects: Approved 9/12/2017 Jurisdiction: WSDOT Olympic Region Project Number: WDO-454 Title: OR Region Wide Basic Safety - Signing P/E-Design /11/2018 State $0 $2,800 $0 $2,800 P/E-Design /11/2018 HSIP $67,200 $0 $0 $67,200 Construction /16/2018 State $0 $5,177 $0 $5,177 Construction /16/2018 HSIP $253,675 $0 $0 $253,675 WSDOT PIN: S Totals: $320,875 $7,977 $0 $328,852 Functional Class: Not applicable (transit, enhancements, Etc.) Location: Regionwide NA Safety -- Roadway From: various To: various Total Cost: $328,852 Environmental Status: CE To address region wide work and/or non-operational signing which may also include sign posts. This will assist the traveling public with sign visibility. Replace signing. A - 16

Totals: #Error #Error #Error #Error. Improvement Type: Resurfacing From: Muckleshoot Plaza SE. Regionally Significant: No

Totals: #Error #Error #Error #Error. Improvement Type: Resurfacing From: Muckleshoot Plaza SE. Regionally Significant: No Central Puget Sound Regional 2017-2020 Transportation Improvement Program Amendments and Corrections to be included in the 2017-20 STIP PSRC's Amendment 2017-02 County: King List of 17-02 Amendment Projects:

More information

Annual Listing of Obligated MPO Projects

Annual Listing of Obligated MPO Projects Thurston Regional Planning Council Annual Listing of Obligated MPO Projects CY 2015 March, 2016 2424 Heritage Court SW, Suite A, Olympia, WA 98502 360.956.7575 www.trpc.org About TRPC, established in 1967,

More information

Pedestrian and Bicycle Safety Program Leg Agency Title of Project Project Description Dist

Pedestrian and Bicycle Safety Program Leg Agency Title of Project Project Description Dist 2015-17 and Bicycle Safety Program Leg Lummi Nation 42 Kennewick 8 Lummi Nation 42 Jamestown S'Klallam 24 WSDOT-- NW 32 Port of Vancouver 49 Spokane 3 Seattle 46 Shoreline 32 Lummi Shore Drive Columbia

More information

Appendix A. Detailed Project Listings. as of October 28, 2016

Appendix A. Detailed Project Listings. as of October 28, 2016 Appendix A Detailed Project Listings as of October 28, 2016 This appendix includes projects with federal, state and /or local funding in the years 2017-2020. Central Puget Sound 2017-2020 - Regional Transportation

More information

Citywide Sidewalk and Crosswalk Programs

Citywide Sidewalk and Crosswalk Programs Citywide Sidewalk and Crosswalk Programs Council Meeting October 20, 2015 Presented by Rita Hu and Jamal Mahmoud Program Goals Implement the City s comprehensive plan. Provide pedestrian with safe walking

More information

CITY OF WOODINVILLE ONGOING CAPITAL IMPROVEMENT PROJECT UPDATES

CITY OF WOODINVILLE ONGOING CAPITAL IMPROVEMENT PROJECT UPDATES CITY OF WOODINVILLE ONGOING CAPITAL IMPROVEMENT PROJECT UPDATES PROJECT LOCATION MAP (1) DEYOUNG PARK IMPROVEMENTS Project Description - DeYoung Park Improvements include treehouse deck, play area, new

More information

City of Madison, East Johnson Street North Baldwin Street to First Street Local Street Dane County

City of Madison, East Johnson Street North Baldwin Street to First Street Local Street Dane County City of Madison, East Johnson Street North Baldwin Street to First Street Local Street Dane County Public Involvement Meeting Thursday, April 28, 2016 6 to 8 P.M. Lapham Elementary School 1045 E. Dayton

More information

PEDESTRIAN CROSSING TREATMENTS

PEDESTRIAN CROSSING TREATMENTS PEDESTRIAN CROSSING TREATMENTS BEST PRACTICES Presented by: Doug Enderson, P.E., PTOE Cody Salo, P.E. 1 PRESENTER INTRODUCTIONS Doug Enderson, P.E., PTOE Ped Crossing Experience: ADA Design-Build ADA Inventory

More information

WYDOT DESIGN GUIDES. Guide for. NHS Arterial (Non-Interstate)

WYDOT DESIGN GUIDES. Guide for. NHS Arterial (Non-Interstate) WYDOT DESIGN GUIDES Guide for NHS Arterial (Non-Interstate) 2014 GUIDE FOR NATIONAL HIGHWAY SYSTEM (NHS) HIGHWAYS (NHS ARTERIALS, Non-Interstate) PRESERVATION REHABILITATION RECONSTRUCTION INTRODUCTION

More information

Atwood Avenue Fair Oaks Avenue Cottage Grove Road

Atwood Avenue Fair Oaks Avenue Cottage Grove Road Atwood Avenue Fair Oaks Avenue Cottage Grove Road Agenda Purpose Review project scope & goals Present design alternatives Gather feedback Answer Questions Format Open House Presentation Q&A Open House

More information

PRESS RELEASE San Joaquin Council of Governments

PRESS RELEASE San Joaquin Council of Governments PRESS RELEASE San Joaquin Council of Governments For Immediate Release February 23, 2018 Contact: Nicole Gorham, 235-0582 gorham@sjcog.org SJCOG Board Awards $19.63 Million in Measure K Bicycle, Pedestrian,

More information

C C C

C C C C-012-001 Thank you for your support for the creation of new public space and nonmotorized access between downtown and the waterfront through the Overlook Walk, the East-West Connections, and the Promenade.

More information

CITY OF CASSELBERRY WINTER PARK DRIVE IMPROVEMENT STUDY

CITY OF CASSELBERRY WINTER PARK DRIVE IMPROVEMENT STUDY CITY OF CASSELBERRY WINTER PARK DRIVE IMPROVEMENT STUDY Preliminary Recommendations October 2018 2014 HDR, Inc., all rights reserved. PROJECT BACKGROUND WALKING AUDIT FINDINGS PROPOSED IMPROVEMENT CONCEPTS

More information

Roosevelt Estates Neighborhood Improvements

Roosevelt Estates Neighborhood Improvements Roosevelt Estates Neighborhood Improvements Transportation Alternatives Application May 5 th, 2016 Qualifying Activities Construction of on-road and off-road trail facilities for pedestrians, bicyclists,

More information

BETHEL ROAD AND SEDGWICK ROAD CORRIDOR STUDY

BETHEL ROAD AND SEDGWICK ROAD CORRIDOR STUDY DRAFT PLAN City Council Meeting August 14, 2017 STUDY AREA Sedgwick Corridor State Route 160, principal arterial with Class 3 access management designation, commuter and freight route, connection to SR

More information

INDEX. Geometric Design Guide for Canadian Roads INDEX

INDEX. Geometric Design Guide for Canadian Roads INDEX Acceleration lane, see Lanes, Acceleration Access, 8.1 Access Management and Functional Classification 8.2 Access Management by Design Classification 8.3 Access Configuration 8.4 Building Set-Back Guidelines

More information

Brooklyn Boulevard (County Road 152) Reconstruction Project Phase I. OPEN HOUSE June 20, 2017

Brooklyn Boulevard (County Road 152) Reconstruction Project Phase I. OPEN HOUSE June 20, 2017 Brooklyn Boulevard (County Road 152) Reconstruction Project Phase I OPEN HOUSE June 20, 2017 Brooklyn Boulevard (County Road 152) Phase I Project Partners Project Lead Other Project Partners include Brooklyn

More information

F L E T C H E R A V E N U E

F L E T C H E R A V E N U E Jan. 29, 2014 Introduction F L E T C H E R A V E N U E FDOT Local Agency Program (LAP) Project FPN: 428214-1-58-01 CIP 63090 Hillsborough County, Traffic Engineering, PWD Stake holders and partners are

More information

CMAQ $ 23,775,198 STP

CMAQ $ 23,775,198 STP PSRC's 2017-2020 FHWA Funding: FINAL BALANCING MAY 2017 Note: the State TIP is being amended to include the information referenced here, with approval expected in mid-june. Table 1 - FFY 2017 Projects

More information

SAFE SCHOOL WALK ROUTES (SSWR) TASKFORCE ADVISORY COMMITTEE 7 TH MEETING MEETING AGENDA

SAFE SCHOOL WALK ROUTES (SSWR) TASKFORCE ADVISORY COMMITTEE 7 TH MEETING MEETING AGENDA SAFE SCHOOL WALK ROUTES (SSWR) TASKFORCE ADVISORY COMMITTEE 7 TH MEETING MEETING AGENDA DATE: MONDAY, 5/22/2017 TIME: 6:00 8:00 P.M. LOCATION: CITY HALL, CONFERENCE ROOM #107 Call to Order/Approval of

More information

Bluffdale/ UDOT South High-T Intersection Project Type Operations

Bluffdale/ UDOT South High-T Intersection Project Type Operations Bluffdale/ UDOT 14600 South High-T Intersection Project Type Operations 14600 South and Redwood Road $ 600,000 $ 550,000 This project is to install a new High-T intersection at Redwood Road and 14600 South

More information

Houma-Thibodaux Metropolitan Planning Organization STP<200K Funding Application APPLICATION

Houma-Thibodaux Metropolitan Planning Organization STP<200K Funding Application APPLICATION APPLICATION HOUMA-THIBODAUX METROPOLITAN PLANNING ORGANIZATION (HTMPO) FOR SURFACE TRANSPORTATION PROGRAM (STP

More information

o n - m o t o r i z e d transportation is an overlooked element that can greatly enhance the overall quality of life for the community s residents.

o n - m o t o r i z e d transportation is an overlooked element that can greatly enhance the overall quality of life for the community s residents. N o n - m o t o r i z e d transportation is an overlooked element that can greatly enhance the overall quality of life for the community s residents. 84 Transportation CHAPTER 11 INTRODUCTION Transportation

More information

City of Gainesville Transportation/Roadway Needs PROJECT SUMMARY

City of Gainesville Transportation/Roadway Needs PROJECT SUMMARY A1 Roadway Resurfacing $23,846,000 TYPE: Preservation of existing system Roadway resurfacing A2 Signal Replacement $6,000,000 TYPE: Preservation of existing system Replace traffic signals. B1 W 6th St

More information

PROJECT KEY TYPICAL SECTION 1 =60

PROJECT KEY TYPICAL SECTION 1 =60 6 WASHINGTON BLVD - BETWEEN NE 1ST ST AND NE 3RD ST Washington Boulevard is a low volume, low speed one-way road, signed for no street between NE 1st Street and NE 2nd Street, and closed to traffic between

More information

Poor pavement condition Substandard Intersections. / Substandard bike/pedestrian/transit accommodations. Driveway access Environmental concerns

Poor pavement condition Substandard Intersections. / Substandard bike/pedestrian/transit accommodations. Driveway access Environmental concerns Public Informational Meeting University Avenue (Allen Boulevard Segoe Road) March 23, 2011 City of Madison City of Middleton Village of Shorewood Hills Dane County Existing Roadway Conditions Poor pavement

More information

R A M P U P! - City of Tacoma's Curb Ramp Installation Matrix

R A M P U P! - City of Tacoma's Curb Ramp Installation Matrix R A M P U P! - City of Tacoma's Curb Ramp Installation Matrix DESCRIPTION OF WORK NEW CONSTR. ALTERATION MAINT. COMMENTS STREET PAVING New street paving or overlay through an intersection (Figures 1 &

More information

SR-203 Sidewalks and Town-Wide Mobility Improvements. Town Council Presentation September 7, 2016

SR-203 Sidewalks and Town-Wide Mobility Improvements. Town Council Presentation September 7, 2016 SR-203 Sidewalks and Town-Wide Mobility Improvements Town Council Presentation September 7, 2016 SR-203 Sidewalks and Town- Wide Mobility Improvements SR-203 Sidewalks and Appurtenances Town-Wide Mobility

More information

TRANSPORTATION ALTERNATIVES PROGRAM: SELECTED PROJECTS AND FUNDING ALLOCATIONS

TRANSPORTATION ALTERNATIVES PROGRAM: SELECTED PROJECTS AND FUNDING ALLOCATIONS ITEM #9: TRANSPORTATION ALTERNATIVES PROGRAM: SELECTED PROJECTS AND FUNDING ALLOCATIONS The Transportation Alternatives Program (TAP) created by MAP-21 requires that 50% of the program funds received by

More information

Transportation 2040 Update - Financial Strategy Balancing

Transportation 2040 Update - Financial Strategy Balancing Move PROJECTS TO BE MOVED FROM CONSTRAINED TO UNPROGRAMMED AUBURN 4513 White River Trail Bicycle/ Pedestrian P 27 2030 $6,000,000 Auburn 4514 Williams Trail Bicycle/ Pedestrian P 25 2020 $2,000,000 AUBURN

More information

Draft North Industrial Area-Wide Traffic Plan

Draft North Industrial Area-Wide Traffic Plan Summary of North Industrial and Hudson Bay Industrial Recommended Improvements Table 1. Summary of s Item Location 1 2 3 4 5 6 7 8 9 10 11 12 Millar Ave north of 51st St Super 8 Motel back lane 400 Block

More information

CHAPTER 16 PEDESTRIAN FACILITIES DESIGN AND TECHNICAL CRITERIA TABLE OF CONTENTS

CHAPTER 16 PEDESTRIAN FACILITIES DESIGN AND TECHNICAL CRITERIA TABLE OF CONTENTS CHAPTER 16 PEDESTRIAN FACILITIES DESIGN AND TECHNICAL CRITERIA TABLE OF CONTENTS Section Title Page 16.1 General... 16-1 16.1.1 AASHTO Reference... 16-1 16.1.2 ADA Requirements... 16-1 16.2 Sidewalks...

More information

Item to be Addressed Checklist Consideration YES NO N/A Required Description Complete Streets Guidelines

Item to be Addressed Checklist Consideration YES NO N/A Required Description Complete Streets Guidelines Passaic County Complete Streets Checklist - Concept Development Project Name Item to be Addressed Checklist Consideration YES NO N/A Required Description Complete Streets Guidelines Existing Plans Have

More information

CITY OF LANCASTER PROPOSED NEW PROJECTS

CITY OF LANCASTER PROPOSED NEW PROJECTS CITY OF LANCASTER 2013-2014 PROPOSED NEW PROJECTS Project Code 11 Facilities and Fixtures Project Title 1 11BS018 Main. Yard Storage Bldg, Phase 2 2 11GS007 Parks Improvements 3 11GS008 Dog Park AHP 4

More information

City of Sammamish. Welcome. Issaquah-Fall City Road Improvements Project Phase I Design: 242nd Avenue SE to Klahanie Drive SE

City of Sammamish. Welcome. Issaquah-Fall City Road Improvements Project Phase I Design: 242nd Avenue SE to Klahanie Drive SE Welcome Welcome to the third community meeting for the Issaquah-Fall City Road Improvements Project. AGENDA 6:00 p.m. Welcome and sign-in 6:10 p.m. Presentation 6:50 p.m. Open house Learn about the roadway

More information

5 CIRCULATION AND STREET DESIGN

5 CIRCULATION AND STREET DESIGN 5 CIRCULATION AND STREET DESIGN This chapter describes circulation and streetscape improvements proposed for the Northwest Chico Specific Plan Area. It includes detailed design specifications for existing

More information

City of Redmond Transportation Improvement Program Adopted: September 16, 2014 Table of Contents

City of Redmond Transportation Improvement Program Adopted: September 16, 2014 Table of Contents City of Redmond 2015-2012 Transportation Improvement Program Adopted: September 16, 2014 Table of Contents 1. What is the Six-Year Transportation Improvement Program (TIP)?... 1 2. What is included in

More information

The DC Pedestrian Master Plan

The DC Pedestrian Master Plan The DC Pedestrian Master Plan September 28, 2010 George Branyan Pedestrian Program Coordinator District Department of Transportation Presentation Agenda Scope of the Plan Methodology Recommendations Implementation

More information

APPENDIX A: Complete Streets Checklist DRAFT NOVEMBER 2016

APPENDIX A: Complete Streets Checklist DRAFT NOVEMBER 2016 APPENDIX A: Complete Streets Checklist DRAFT NOVEMBER 2016 Complete Streets Checklist MetroPlan Orlando s Complete Streets Checklist is an internal planning tool for staff to further implementation of

More information

MEASURE B AND MEASURE BB Annual Program Compliance Report Reporting Fiscal Year AGENCY CONTACT INFORMATION

MEASURE B AND MEASURE BB Annual Program Compliance Report Reporting Fiscal Year AGENCY CONTACT INFORMATION MEASURE B AND MEASURE BB Annual Program Compliance Report Reporting Fiscal Year 2016-2017 AGENCY CONTACT INFORMATION Agency Name: City of Livermore Date: 12/4/2017 Primary Point of Contact Name: Debbie

More information

NJDOT Complete Streets Checklist

NJDOT Complete Streets Checklist Background The New Jersey Department of Transportation s Complete Streets Policy promotes a comprehensive, integrated, connected multi-modal network by providing connections to bicycling and walking trip

More information

Local Communities. Where We re Growing: Planning Together for a Sustainable Region

Local Communities. Where We re Growing: Planning Together for a Sustainable Region w Multimodal e l c Transportation o m e for Local Communities Where We re Growing: Planning Together for a Sustainable Region Kitsap Transit s Fast-Ferry Plan 2016 Kitsapferries.com Three Routes Why

More information

WYDOT DESIGN GUIDES. Guide for. Non-NHS State Highways

WYDOT DESIGN GUIDES. Guide for. Non-NHS State Highways WYDOT DESIGN GUIDES Guide for Non-NHS State Highways 2014 GUIDE FOR Non-NATIONAL HIGHWAY SYSTEM (Non-NHS) STATE HIGHWAYS PRESERVATION REHABILITATION RECONSTRUCTION INTRODUCTION This Guide is directed to

More information

122 Avenue: 107 Street to Fort Road

122 Avenue: 107 Street to Fort Road : 107 Street to Fort Road November 24, 2015 4:30 8:00 p.m. Meeting Purpose Summarize project work completed to date Share results of public input from Phase 1 Share the draft concept plan and proposed

More information

Tacoma Streets Initiative 2017 Progress Report City of Tacoma Public Works Transportation Commission February 21, 2017

Tacoma Streets Initiative 2017 Progress Report City of Tacoma Public Works Transportation Commission February 21, 2017 Tacoma Streets Initiative 2017 Progress Report City of Tacoma Public Works Transportation Commission February 21, 2017 1 OVERVIEW Background Streets Initiative Overview 2017 Budget vs. Actuals 2017 Expenditures

More information

City of Madison, East Johnson Street North Baldwin Street to First Street Local Street Dane County

City of Madison, East Johnson Street North Baldwin Street to First Street Local Street Dane County City of Madison, East Johnson Street North Baldwin Street to First Street Local Street Dane County Public Involvement Meeting Thursday, November 10, 2016 5:30 to 7 P.M. Festival Foods 810 E. Washington

More information

2011 Capital Projects University Area - Community Council Priority List Municipality of Anchorage

2011 Capital Projects University Area - Community Council Priority List Municipality of Anchorage 2011 Capital Projects University Area - Community Council Priority List Municipality of Anchorage 2 Project Management and Engineering Projects on 40th Ave Extension - Lake Otis Pkwy to Dale St $18,103,000

More information

FY 2016 TRANSPORTATION ALTERNATIVES PROGRAM PROJECT SELECTION

FY 2016 TRANSPORTATION ALTERNATIVES PROGRAM PROJECT SELECTION AGENDA ITEM #8: FY 2016 TRANSPORTATION ALTERNATIVES PROGRAM PROJECT SELECTION The Transportation Alternatives Program (TAP) created by MAP-21 requires that 50% of the program funds received by the state

More information

City of Seattle Edward B. Murray, Mayor

City of Seattle Edward B. Murray, Mayor City of Seattle Edward B. Murray, Mayor Department of Transportation Scott Kubly, Director Eastlake Community Council 117 E Louisa St. #1 Seattle, WA 98102-3278 January 28, 2016 RE: Roosevelt to Downtown

More information

Building Great Neighbourhoods BELLEVUE AND VIRGINIA PARK

Building Great Neighbourhoods BELLEVUE AND VIRGINIA PARK Building Great Neighbourhoods BELLEVUE AND VIRGINIA PARK This is Meeting 2 Unfortunately, some residents in Bellevue and Virginia Park received the wrong information for this public open house (Meeting

More information

Complete Streets Policy DAVID CRONIN, P.E., CITY ENGINEER

Complete Streets Policy DAVID CRONIN, P.E., CITY ENGINEER Complete Streets Policy DAVID CRONIN, P.E., CITY ENGINEER Complete Streets City Commission adopted a Complete Streets policy in 2012 Complete Streets are road networks that are designed for all users:

More information

APPENDIX L. Design Criteria

APPENDIX L. Design Criteria APPENDIX L Design Criteria DRAFT PRELIMINARY DESIGN CRITERIA Page 1 of 18 APPROVALS MANAGER, ENGINEERING CITY OF HAMILTON MANAGER, ENGINEERING REGION OF HALTON DATE This Design Criteria for the New East-West

More information

RZC Appendix 8A Marymoor Subarea Street Requirements

RZC Appendix 8A Marymoor Subarea Street Requirements RZC Appendix 8A Marymoor Subarea Street Requirements For additional design details for Marymoor Subarea infrastructure, refer to the 2017 Marymoor Subarea Infrastructure Planning Report. STREET REQUIREMENTS

More information

Lynchburg District Update

Lynchburg District Update Lynchburg District Update Virginia Statewide Bicycle and Pedestrian Advisory Committee Spring Meeting May 16 th, 2017 David Cook Transportation Planner, VDOT Lynchburg District Table of Contents Active

More information

FDOT Treasure Coast Traffic Report

FDOT Treasure Coast Traffic Report July 6, 2018 Barbara Kelleher, 954 777 4090 Barbara.Kelleher@dot.state.fl.us FDOT Treasure Coast Traffic Report July 6 through July 13, 2018 TREASURE COAST Construction and maintenance related lane closures

More information

Transportation Planning Division

Transportation Planning Division Transportation Planning Division Presentation Outline Study Tasks Recap of Previous Meetings Data Collected Focus Areas within Study Limits Design Principles Tool Box Recommended Concepts Schedule Moving

More information

Roadway Project Recommendations:

Roadway Project Recommendations: Northwest RTPO Regional Transportation Improvement Program Recommendations (RTIPR) for NMDOT District 6 (Cibola, McKinley) & District 5 (San Juan) 2018-2023 for 5 Year STIP (FY 2018 through FY 2023) way

More information

Fleur Drive Reconstruction

Fleur Drive Reconstruction Fleur Drive Reconstruction October 29, 2018 1 Agenda: Fleur Drive Reconstruction Project Scope & Cost Overview Fleur Drive Cross Section Elements - Travel Lane Widths - Sidewalk Widths - Parkway Widths

More information

Hennepin County Transportation Department

Hennepin County Transportation Department Hennepin County Transportation Department Complete Streets Design and Implementation Prepared for the Complete Streets Task Force Craig Twinem, P.E. Design Division Manager Tom Johnson, P.E. Transportation

More information

CITY OF SPOKANE VALLEY Request for Council Action

CITY OF SPOKANE VALLEY Request for Council Action CITY OF SPOKANE VALLEY Request for Council Action Meeting Date: December 16, 2014 Department Director Approval: Check all that apply: consent old business new business public hearing information admin.

More information

Watertown Complete Streets Prioritization Plan. Public Meeting #1 December 14, 2017

Watertown Complete Streets Prioritization Plan. Public Meeting #1 December 14, 2017 Watertown Complete Streets Prioritization Plan Public Meeting #1 December 14, 2017 Goals for Public Meeting Overview of MassDOT Complete Streets Funding Program Educate the community on Complete Streets

More information

Chapter 4: Funding and Implementation

Chapter 4: Funding and Implementation Chapter 4: Funding and Implementation 83 84 Cost Estimating Cost estimating is an iterative process. When a project is in the conceptual stage, preliminary cost estimates are also provided conceptually,

More information

DISTRICT BICYCLE PROGRAM

DISTRICT BICYCLE PROGRAM DISTRICT BICYCLE PROGRAM TxDOT Fort Worth District Public Hearing Bicycle Use on the State Highway System Public Hearing Agenda 1 2 3 4 5 6 Introduction Susan Howard TxDOT Public Involvement Specialist

More information

Pedestrian, Bicycle and Traffic Calming Strategic Implementation Plan. January 18, 2011

Pedestrian, Bicycle and Traffic Calming Strategic Implementation Plan. January 18, 2011 Pedestrian, Bicycle and Traffic Calming Strategic Implementation Plan January 18, 2011 Tonight s Agenda Receive update on project Provide feedback on two policy issues Complete Streets Policy Project Prioritization

More information

WELCOME! OPEN HOUSE SHAW ROAD IMPROVEMENT PROJECT JUNE 30, 2015

WELCOME! OPEN HOUSE SHAW ROAD IMPROVEMENT PROJECT JUNE 30, 2015 WELCOME! OPEN HOUSE SHAW ROAD IMPROVEMENT PROJECT JUNE 30, 2015 Traffic Improvements Project Goals Widen roadway to construction two-way left turn lanes-greatly decreases congestion Ease access to & from

More information

Active Transportation Facility Glossary

Active Transportation Facility Glossary Active Transportation Facility Glossary This document defines different active transportation facilities and suggests appropriate corridor types. Click on a facility type to jump to its definition. Bike

More information

Dr. M.L. King, Jr. Street North Complete Streets Resurfacing Opportunities HOUSING, LAND USE, AND TRANSPORTATION COMMITTEE MARCH 22, 2018

Dr. M.L. King, Jr. Street North Complete Streets Resurfacing Opportunities HOUSING, LAND USE, AND TRANSPORTATION COMMITTEE MARCH 22, 2018 Dr. M.L. King, Jr. Street North Complete Streets Resurfacing Opportunities HOUSING, LAND USE, AND TRANSPORTATION COMMITTEE MARCH 22, 2018 What s Happening The City plans to mill and resurface Dr. M.L.

More information

Mandan Commission Meeting August 2, 2016 Mandan City Hall

Mandan Commission Meeting August 2, 2016 Mandan City Hall Mandan-Bismarck Corridor Improvement Study Mandan Commission Meeting August 2, 2016 Mandan City Hall 2014 HDR, Inc., all rights reserved. Mandan Corridors Study Schedule 2015 2016 Study Kick Off August

More information

Broad Street Bicycle Boulevard Design Guidelines

Broad Street Bicycle Boulevard Design Guidelines Broad Street Bicycle Boulevard Design Guidelines Building from the strategies introduced in the 2013 Bicycle Transportation Plan and community input received thus far, City Transportation Staff have identified

More information

Project Team. Refined Pedestrian Crossing Toolbox. Problem Statement. Aerial of Study Corridor. Crossing Accommodations and Pedestrian Fatalities

Project Team. Refined Pedestrian Crossing Toolbox. Problem Statement. Aerial of Study Corridor. Crossing Accommodations and Pedestrian Fatalities Project Team Refined Pedestrian Crossing Toolbox Treatments on Wide, High Speed Urban Roadways Developed as Part of the Springfield Main Street (OR 126) Safety Study Consultants Scott Mansur, P.E., P.T.O.E.

More information

ADA Training Accessible Pedestrian Signal (APS) 2018 MnDOT

ADA Training Accessible Pedestrian Signal (APS) 2018 MnDOT ADA Training Accessible Pedestrian Signal (APS) 2018 MnDOT APS and ADA APS is not currently an ADA Standard and is provided at the discretion of the Title II entity APS is recognized in the MnMUTCD, but

More information

Memo. Introduction. Memphis STP Pedestrian Sidewalk Project

Memo. Introduction. Memphis STP Pedestrian Sidewalk Project Memo Memphis STP Pedestrian Sidewalk Project To: Kyle Wagenshutz, City of Memphis From: Matthew Berkow, Collin Chesston, and Anne Eshleman, Alta Planning + Design Date: June 2014 Re: Photo Inventory Introduction

More information

42nd Ave N Reconstruction

42nd Ave N Reconstruction CITY OF MINNEAPOLIS 42nd Ave N Reconstruction Community Meeting #2 May 2016 6:00 7:30 p.m. 5/16/2016 1 Purpose of Meeting Inform: Provide an overview of project, identify anticipated scope of work, and

More information

5. RUNNINGWAY GUIDELINES

5. RUNNINGWAY GUIDELINES 5. RUNNINGWAY GUIDELINES These guidelines should be considered collectively when making runningway decisions. A runningway is the linear component of the transit system that forms the right-of-way reserved

More information

Southcote Road Improvements Class Environmental Assessment Study

Southcote Road Improvements Class Environmental Assessment Study 1 Southcote Road Improvements Class Environmental Assessment Study Public Information Centre #1 May 24, 2018 Study Area 2 3 Welcome The Ancaster Transportation Master Plan (2011) outlined a long range

More information

2010 Regional Bicycle and Pedestrian Count Report

2010 Regional Bicycle and Pedestrian Count Report 2010 Regional Bicycle and Pedestrian Count Report Table of Contents: I. Overview II. III. IV. Bicycle Counts a. Methodology b. Count Location Selection c. Results d. Top 10 Helmet Utilization Bicycles

More information

U.S. HIGHWAY 50 IMPROVEMENT PROJECT

U.S. HIGHWAY 50 IMPROVEMENT PROJECT U.S. HIGHWAY 50 IMPROVEMENT PROJECT in the City of South Lake Tahoe Project Purpose and Need Planned Improvements Project Cost and Delivery Schedule Proposed Construction Staging Project Partners: HIGHWAY

More information

TECHNICAL MEMORANDUM. Introduction

TECHNICAL MEMORANDUM. Introduction TECHNICAL MEMORANDUM To: From: John M. Welsh Chris Furlong AHC, Inc. Andrew T. Smith, P.E. Edward Y. Papazian, P.E. Kimley-Horn and Associates, Inc. Date: July 6, 2017 Subject: 200 9 th reet South Redevelopment

More information

TOWN OF MORAGA MORAGA WAY AND CAMINO PABLO/CANYON ROAD IMPROVEMENTS Town Council Meeting March 13, 2019

TOWN OF MORAGA MORAGA WAY AND CAMINO PABLO/CANYON ROAD IMPROVEMENTS Town Council Meeting March 13, 2019 TOWN OF MORAGA MORAGA WAY AND CAMINO PABLO/CANYON ROAD IMPROVEMENTS Town Council Meeting March 13, 2019 1 Edric Kwan, Public Works Director Josh Peterman, Principal, Fehr and Peers Shawn Knapp, Senior

More information

CURRENT AND VOTER APPROVED SOUND TRANSIT SERVICE

CURRENT AND VOTER APPROVED SOUND TRANSIT SERVICE CURRENT AND VOTER AROVED SOUND TRANSIT SERVICE Everett MA KEY Link Light Rail Mukilteo Link (SeaTac/Airport University of Washington) Tacoma Link (Tacoma Dome Theater District) Under Construction In Design

More information

CONNECTIVITY PLAN. Adopted December 5, 2017 City of Virginia Beach

CONNECTIVITY PLAN. Adopted December 5, 2017 City of Virginia Beach CONNECTIVITY PLAN Adopted December 5, 2017 City of Virginia Beach CONTENTS 1.0 Background & Purpose... 2 2.0 Existing Inventory & Analysis... 3 ViBe District Existing Walking Conditions... 4 3.0 ViBe District

More information

Building Great Neighbourhoods BONNIE DOON

Building Great Neighbourhoods BONNIE DOON Building Great Neighbourhoods BONNIE DOON We Are Here Today To Explain the Neighbourhood Renewal Process Show you the Westwood Preliminary Design Ask for local knowledge Highlight the Local Improvement

More information

Omaha s Complete Streets Policy

Omaha s Complete Streets Policy Omaha s Complete Streets Policy (Adopted August 2015) VISION To create great places and enhance our quality of life, the City of Omaha will provide safe, accessible streets for all users. Complete Streets

More information

West Dimond Blvd Upgrade Jodhpur Street to Sand Lake Road

West Dimond Blvd Upgrade Jodhpur Street to Sand Lake Road West Dimond Blvd Jodhpur St to Sand Lake CSS Transportation Project Summary Municipality of Anchorage Project # 05 005 Project Manager: John Smith, P.E. (MOA PM&E) Project Administrator: Julie Makela,

More information

PEDESTRIAN SAFETY IMPROVEMENT EVALUATION GUIDELINE FOR UNCONTROLLED CROSSINGS

PEDESTRIAN SAFETY IMPROVEMENT EVALUATION GUIDELINE FOR UNCONTROLLED CROSSINGS PEDESTRIAN SAFETY IMPROVEMENT EVALUATION GUIDELINE FOR UNCONTROLLED CROSSINGS Traffic Safety Engineering Division Updated: April 2018 EXECUTIVE SUMMARY NDOT Traffic Safety Engineering Division developed

More information

What Is a Complete Street?

What Is a Complete Street? Session 5 Charleen Zimmer, AICP, Zan Associates May 5-7, 2010 What Is a Complete Street? May 2010 5-1 Not a Complete Street More of a Complete Street May 2010 5-2 Benefits of Complete Streets Safety for

More information

SBCAG STAFF REPORT Federal Transportation Improvement Program. MEETING DATE: January 19, 2017 AGENDA ITEM: 5E

SBCAG STAFF REPORT Federal Transportation Improvement Program. MEETING DATE: January 19, 2017 AGENDA ITEM: 5E SBCAG STAFF REPORT SUBJECT: 2017 Federal Transportation Improvement Program MEETING DATE: January 19, 2017 AGENDA ITEM: 5E STAFF CONTACT: Anne Jensen RECOMMENDATION: Adopt Resolution 17-01 approving Amendment

More information

Houma-Thibodaux Metropolitan Planning Organization STP<200K Funding Application APPLICATION

Houma-Thibodaux Metropolitan Planning Organization STP<200K Funding Application APPLICATION APPLICATION HOUMA-THIBODAUX METROPOLITAN PLANNING ORGANIZATION (HTMPO) FOR SURFACE TRANSPORTATION PROGRAM (STP

More information

Orange Center Elementary School

Orange Center Elementary School Drag and drop pic and stretch/crop to the limits of the blue rectangle (delete this text box) Orange Center Elementary School Drag and drop pic and stretch/crop to the limits of the blue rectangle (delete

More information

Interim Transit Ridership Forecast Results Technical Memorandum

Interim Transit Ridership Forecast Results Technical Memorandum Interim Transit Ridership 401 South Jackson Street Seattle, WA 98104-2826 September 2012 Table of Contents 1 INTRODUCTION... 1-1 1.1 Project Background... 1-1 2 RIDERSHIP FORECASTS... 2-1 2.1 System Ridership

More information

SD Highway 50 in Yankton (4 TH Street) Reconstruction Project NH 0050(99)381 PCN By Josh Larson McLaury Engineering Inc.

SD Highway 50 in Yankton (4 TH Street) Reconstruction Project NH 0050(99)381 PCN By Josh Larson McLaury Engineering Inc. SD Highway 50 in Yankton (4 TH Street) Reconstruction Project NH 0050(99)381 PCN 6926 By Josh Larson McLaury Engineering Inc. Project Limits SD 50 from Broadway to Burleigh and from Marne Creek to Archery

More information

UPTOWN REGIONAL BIKE CORRIDORS PROJECT SAN DIEGO ASSOCIATION OF GOVERNMENTS

UPTOWN REGIONAL BIKE CORRIDORS PROJECT SAN DIEGO ASSOCIATION OF GOVERNMENTS UPTOWN REGIONAL BIKE CORRIDORS PROJECT SAN DIEGO ASSOCIATION OF GOVERNMENTS SUMMARY REPORT: COMMUNITY UPDATE MEETING February 6, 2014 6 8:30 p.m. Roosevelt Middle School Library 3366 Park Blvd, San Diego

More information

New Measure A Expenditure Categories DEFINITIONS OF ELIGIBLE EXPENDITURES Adopted March 8, 2007

New Measure A Expenditure Categories DEFINITIONS OF ELIGIBLE EXPENDITURES Adopted March 8, 2007 New Measure A Expenditure Categories DEFINITIONS OF ELIGIBLE EXPENDITURES Adopted March 8, 2007 City Street and County Road Maintenance Program The preservation and keeping of public street and road rights-of-way

More information

Lake to Sound Trail FEASIBILITY STUDY. February 2009

Lake to Sound Trail FEASIBILITY STUDY. February 2009 Lake to Sound Trail FEASIBILITY STUDY February 2009 Acknowledgements King County City of Renton City of Tukwila City of SeaTac City of Burien City of Des Moines Sound Transit Washington State Department

More information

BPP / SUB

BPP / SUB Development Services Department Project/File: Lead Agency: Site address: Millwell Place Subdivision/ BPP15-0031/ SUB15-0064 This is a preliminary plat application to allow for the development of 68 building

More information

Complete Streets Funding Program Project Prioritization Plan

Complete Streets Funding Program Project Prioritization Plan Funding Program Project Prioritization Plan Location and Type Needs South Street Crosswalk Installation Stripe a new formalized crosswalk across South Street at the Anne T. Dunphy School pedestrian path

More information

WELCOME! Please complete a comment sheet as we value your feedback. 4 pm to 8 pm. September 15, Hosted by: AECOM on behalf of City of Calgary

WELCOME! Please complete a comment sheet as we value your feedback. 4 pm to 8 pm. September 15, Hosted by: AECOM on behalf of City of Calgary WELCOME! Thank you for attending our open house. There will be no formal presentation today so please take the time to read the boards. If you have any questions, please do not hesitate to approach one

More information

SIOUX FALLS MPO 2018 OBLIGATED TRANSPORTATION IMPROVEMENT PROJECTS

SIOUX FALLS MPO 2018 OBLIGATED TRANSPORTATION IMPROVEMENT PROJECTS TOTAL LETTING DATE AWARD DATE NOTES Interstate Maintenance s 2.00 IM 0020(155) 04X N McCook Minnehaha 0.0 Mitchell Region on I90 Scour Protection $873,000 $960,000 Cancelled $0 $0 Minor Arterial 1.00 Minor

More information

INDOT Complete Streets Guideline & Policy

INDOT Complete Streets Guideline & Policy INDOT Complete Streets Guideline & Policy INTRODUCTION The Complete Streets guidelines build upon multiple efforts and promote a multimodal transportation system that is integrated and sustains land use

More information

Downey Road. Transportation Improvement Study

Downey Road. Transportation Improvement Study Downey Road Transportation Improvement Study Workshop 2 Participant Handbook Workshop 1 May 18 and 19, 2016 Workshop 2 June 23 and 28, 2016 Prepared By: City of Guelph Paradigm Transportation Solutions

More information