PEABODY SQUARE RECONSTRUCTION PROJECT

Size: px
Start display at page:

Download "PEABODY SQUARE RECONSTRUCTION PROJECT"

Transcription

1 FINAL DESIGN PRESENTATION HEARING Thursday April 23, 2015 with Peabody City Council Peabody, Massachusetts 6:00 PM PEABODY SQUARE RECONSTRUCTION PROJECT 239 LITTLETON ROAD, SUITE 3, WESTFORD, MA TEL (978) FAX (978)

2 Meeting Purpose Present brief history Identify existing issues and concerns Present proposed design Discuss plan going forward

3 Goals Maintain or Improve operational efficiency and safety of intersection Enhance and beautify the Square Improve public access to monument Improve pedestrian access through intersection Create pedestrian friendly usable space Extend Main Street improvements into Square

4 History Originally a part of Project 1 Developed two Square configuration alternatives Presented alternatives to key City Agencies (Veterans, Fire, Police, Mayor, DPS, CDP) Conventional 4-legged alternative was preferred by all Reviewed existing conditions operations Developed ideas for landscape treatments Presented Concept Plans to public and City Council in 2012 Received generally positive feedback

5 History Project 1 was put on hold by the City in 2012 Community Development and Planning applied for MassWorks Grant in 2013 CDP received $1.5 million grant in 2014 to implement Square improvements Design is being finalized Constitution Park improvements removed Walnut Street intersection improvements added Wallis Street improvements added as bid alternate Presented design to PDAT on April 8, 2015

6 Existing Configuration Slip ramps safety concerns Multiple conflict points Lane configuration Multiple pedestrian crossings required Fragmented public space Minimal pedestrian space at base of monument Mix of new and outdated traffic signal equipment Signals don t all communicate with each other

7 Proposed Improvements Provide a conventional 4 legged intersection Create larger public areas Improve pedestrian accessibility/safety Improve vehicular safety and traffic operations Provide new signal equipment Coordinate signals between Main Street through to Walnut Street Provide ADA compliant sidewalks and plaza space Improved landscaping Minor drainage improvements Extend Main Street improvements into Square

8 Traffic Operations Existing Conditions Long cycle lengths Limited signal coordination Inefficient configuration Outdated Walnut Proposed Improvements New Equipment Optimized timing and phasing Coordinated signals Enhanced pedestrian accommodations (ADA) Design for 2032 projected traffic volumes

9 Traffic Simulation Models Existing Conditions PM peak hour is highest volume 2012 traffic volumes PM peak hour Proposed Conditions 2032 traffic volumes

10 Pedestrian and Traffic Management The Square improvements will be completed in four major stages. No detours are proposed Pedestrian traffic will be maintained at all times aside from minor disruptions to place new sidewalks Night work required for some activities.

11 Summary Supported by Veterans, Police, Fire, CDP, DPS and other City Departments Improved pedestrian safety and access Improved vehicular safety Feedback has been positive Improved traffic operation Enhanced lighting Improved monument access Larger and improved public space Final Design to be completed in late April 2015 Project advertisement scheduled for May 2015 Construction scheduled to be complete June 2016 Anticipated construction cost is approximately $3.5 million

12 Questions/Comments

Water Street Promenade. Engineering and Design Services. Public Information Meeting No. 2. Education / Infrastructure / Innovation. Maplewood Avenue &

Water Street Promenade. Engineering and Design Services. Public Information Meeting No. 2. Education / Infrastructure / Innovation. Maplewood Avenue & Public Information Meeting No. 2 Water Street Promenade Maplewood Avenue & Engineering and Design Services Adjacent Areas July 16,2014Portsmouth, NH May 10, 2016 Education / Infrastructure / Innovation

More information

Frequently Asked Questions

Frequently Asked Questions Frequently Asked Questions Business US 190 in Copperas Cove From Avenue D to Constitution Drive What is access management? A. Access Management is a growing effort by government agencies to improve how

More information

Capital Metro Downtown Multimodal Station

Capital Metro Downtown Multimodal Station Capital Metro Downtown Multimodal Station Open House December 11, 2015 Project Goals & Objectives 1 2 3 4 Address near- and long- term MetroRail operational needs Address existing safety issues and modal

More information

Approximately 360 trail users cross during a typical summer weekday and 420 cross during a typical summer

Approximately 360 trail users cross during a typical summer weekday and 420 cross during a typical summer 5. PARKR ROAD AT MISSISSIPPI AVN CROSSIN xisting Conditions The High ine Canal trail crosses Parker Road near the Mississippi Avenue intersection (crossing location #3 on Figure 1). South of Parker, the

More information

Building Great Neighbourhoods QUEEN ALEXANDRA

Building Great Neighbourhoods QUEEN ALEXANDRA Building Great Neighbourhoods QUEEN ALEXANDRA We are here today to Explain how the City is investing in improving your neighbourhood and how your neighbourhood will be improved to meet current City standards.

More information

Scarlett Road Bridge & Road Improvements Lambton Park Community School - Gymnasium Tuesday November 28 th, 2017

Scarlett Road Bridge & Road Improvements Lambton Park Community School - Gymnasium Tuesday November 28 th, 2017 Scarlett Road Bridge & Road Improvements Lambton Park Community School - Gymnasium Tuesday November 28 th, 2017 PROJECT LOCATION 2 SCARLETT ROAD BRIDGE Constructed in 1912, the bridge carries 4 active

More information

Building Great Neighbourhoods BELLEVUE AND VIRGINIA PARK

Building Great Neighbourhoods BELLEVUE AND VIRGINIA PARK Building Great Neighbourhoods BELLEVUE AND VIRGINIA PARK This is Meeting 2 Unfortunately, some residents in Bellevue and Virginia Park received the wrong information for this public open house (Meeting

More information

Southbend to Prima Vista. October 30, Floresta Corridor Master Plan

Southbend to Prima Vista. October 30, Floresta Corridor Master Plan Application of a Complete Street initiative and how it might function operationally 8 8 Southbend to Prima Vista October 30, 2017 Presentation Agenda 2 Perspective and History Traffic projections, Levels

More information

Public Involvement Outreach Requirements for Public Information Open House Meeting: C.N , HSIP-5003(12) 132 nd and West Center Road, Omaha

Public Involvement Outreach Requirements for Public Information Open House Meeting: C.N , HSIP-5003(12) 132 nd and West Center Road, Omaha To: NDOR Environmental From: Randy McCart, HDR Date: 4 April 2017 RE: Public Involvement Summary Report, HSIP-5003(12) 132 nd and West Center Road, Omaha; C.N. 22629 Public Involvement Outreach Requirements

More information

California Department of Transportation, District 4. Sloat Boulevard Project Skyline Blvd. to 19 th Ave. Community Update January 13, 2016

California Department of Transportation, District 4. Sloat Boulevard Project Skyline Blvd. to 19 th Ave. Community Update January 13, 2016 California Department of Transportation, District 4 Sloat Boulevard Project Skyline Blvd. to 19 th Ave. Community Update January 13, 2016 Agenda Welcome and introductions Project overview, history and

More information

Application of a Complete Street

Application of a Complete Street Application of a Complete Street Southbend to Prima Vista Update May 14, 2018 Meeting Agenda Perspective and History Public input received Typical sections being considered Presentation of the 2-lane master

More information

Welcome to the Open House

Welcome to the Open House Leslie Street Between 19 th Avenue and Stouffville Road Addendum to Class Environmental Assessment Study Welcome to the Open House Please sign in at the front desk. March 28, 2017 Richmond Green Sports

More information

Richmond-Adelaide Cycle Tracks

Richmond-Adelaide Cycle Tracks Public Drop-In Event Richmond-Adelaide Cycle Tracks June 25, 2018 12:00 p.m. 3:00 p.m. 4:30 p.m. 7:30 p.m. Metro Hall, Rotunda 55 John Street 1 Purpose of Event In Scope Communicate an update about the

More information

Building Great Neighbourhoods LANSDOWNE

Building Great Neighbourhoods LANSDOWNE Building Great Neighbourhoods LANSDOWNE We are here today to Explain how the City is investing in improving your neighbourhood and how your neighbourhood will be improved to meet current City standards.

More information

Simulation Analysis of Intersection Treatments for Cycle Tracks

Simulation Analysis of Intersection Treatments for Cycle Tracks Abstract Simulation Analysis of Intersection Treatments for Cycle Tracks The increased use of cycle tracks also known as protected bike lanes has led to investigations of how to accommodate them at intersections.

More information

Lincoln Way Multimodal Safety and Operations Study. City and University Summary Presentation

Lincoln Way Multimodal Safety and Operations Study. City and University Summary Presentation Lincoln Way Multimodal Safety and Operations Study City and University Summary Presentation February 27, 2018 Agenda Introductions Study Overview: Phase 1 - Discovery Phase 2 Improvement Recommendations

More information

Omaha s Complete Streets Policy

Omaha s Complete Streets Policy Omaha s Complete Streets Policy (Adopted August 2015) VISION To create great places and enhance our quality of life, the City of Omaha will provide safe, accessible streets for all users. Complete Streets

More information

Route 79/Davol Street Corridor Study

Route 79/Davol Street Corridor Study Route 79/Davol Street Corridor Study Fall River, MA Public Information Meeting #2 November 21, 2013 Fall River Heritage State Park Fall River, MA Agenda Welcome and Introductions Overview of Study Process

More information

Building Great Neighbourhoods BONNIE DOON

Building Great Neighbourhoods BONNIE DOON Building Great Neighbourhoods BONNIE DOON We Are Here Today To Explain the Neighbourhood Renewal Process Show you the Westwood Preliminary Design Ask for local knowledge Highlight the Local Improvement

More information

Edgewater Drive & Vassar Street Area Traffic Study

Edgewater Drive & Vassar Street Area Traffic Study Edgewater Drive & Vassar Street Area Traffic Study STUDY BACKGROUND Past studies of Edgewater Drive and Vassar Street o No consensus for change was established Edgewater Vision Plan process o Edgewater

More information

I-10 AT SCENIC LOOP RD. Open House

I-10 AT SCENIC LOOP RD. Open House I-10 AT SCENIC LOOP RD Open House General Information I-10 At Scenic Loop Rd KENDALL COUNTY OPEN HOUSE June 30, 2015 Currey Creek Baptist Church 35 Cascade Cavern 5:00 7:00 Boerne, TX 78015 2 Public Meeting

More information

INNOVATIVE INTERSECTION SOLUTIONS. Jay Bockisch, PE, PTOE Senior Associate

INNOVATIVE INTERSECTION SOLUTIONS. Jay Bockisch, PE, PTOE Senior Associate INNOVATIVE INTERSECTION SOLUTIONS Jay Bockisch, PE, PTOE Senior Associate INNOVATIVE INTERSECTION SOLUTIONS Innovative intersection overview Case studies Continuous flow intersection Modern roundabouts

More information

122 Avenue: 107 Street to Fort Road

122 Avenue: 107 Street to Fort Road : 107 Street to Fort Road November 24, 2015 4:30 8:00 p.m. Meeting Purpose Summarize project work completed to date Share results of public input from Phase 1 Share the draft concept plan and proposed

More information

Proposed. City of Grand Junction Complete Streets Policy. Exhibit 10

Proposed. City of Grand Junction Complete Streets Policy. Exhibit 10 Proposed City of Grand Junction Complete Streets Policy Exhibit 10 1 City of Grand Junction Complete Streets Policy Vision: The Complete Streets Vision is to develop a safe, efficient, and reliable travel

More information

THE UNIVERSITY OF TENNESSEE THE TOWN OF TREZEVANT. John Chlarson, P.E. 11/29/2010

THE UNIVERSITY OF TENNESSEE THE TOWN OF TREZEVANT. John Chlarson, P.E. 11/29/2010 THE UNIVERSITY OF TENNESSEE SCHOOL ZONE ISSUES THE TOWN OF TREZEVANT John Chlarson, P.E. 11/29/2010 The main issue is the safety of the children, who walk to and from school; secondary concerns were those

More information

Proposed Language as approved by the NCUTCD on June 23, 2011, for new section on Pedestrian Channelizing Devices

Proposed Language as approved by the NCUTCD on June 23, 2011, for new section on Pedestrian Channelizing Devices 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 Proposed Language as approved by the NCUTCD on June 23, 2011, for new section on Pedestrian Channelizing

More information

/ ARLINGTON COUNTY, VIRGINIA

/ ARLINGTON COUNTY, VIRGINIA / ARLINGTON COUNTY, VIRGINIA County Board Agenda Item Meeting of September 24, 2016 DATE: August 11, 2016 SUBJECT: Amendment of the Master Transportation Plan (MTP) Streets Element to include new local

More information

ARLINGTON COUNTY, VIRGINIA

ARLINGTON COUNTY, VIRGINIA ARLINGTON COUNTY, VIRGINIA County Board Agenda Item Meeting of October 15, 2016 DATE: October 7, 2016 SUBJECT: Adoption of amendments to the Master Transportation Plan (MTP) to create a new Pedestrian

More information

Public Works Committee Meeting Richard E. Mastrangelo Council Chamber November 20, 2017

Public Works Committee Meeting Richard E. Mastrangelo Council Chamber November 20, 2017 Public Works Committee Meeting Richard E. Mastrangelo Council Chamber November 20, 2017 Purpose of Meeting Why are we here? Project Recap/Updates Project Limits/Segments Road Diet Concept Lessons Learned

More information

Hennepin Avenue Reconstruction Washington Avenue to 12 th Street

Hennepin Avenue Reconstruction Washington Avenue to 12 th Street CITY OF MINNEAPOLIS Hennepin Avenue Reconstruction Washington Avenue to 12 th Street April 2016 1 Upcoming Opportunities Public Meeting #2 April 25, 2016 Minneapolis Central Library Doty Board Room Repeat

More information

Southcote Road Improvements Class Environmental Assessment Study

Southcote Road Improvements Class Environmental Assessment Study 1 Southcote Road Improvements Class Environmental Assessment Study Public Information Centre #1 May 24, 2018 Study Area 2 3 Welcome The Ancaster Transportation Master Plan (2011) outlined a long range

More information

Welcome. If you have any questions or comments on the project, please contact:

Welcome. If you have any questions or comments on the project, please contact: Welcome This drop-in public open house is intended to provide information about the Bay Street bike lanes project. This project proposes a dedicated cycling facility along Bay Street between Aberdeen Avenue

More information

Corpus Christi Metropolitan Transportation Plan Fiscal Year Introduction:

Corpus Christi Metropolitan Transportation Plan Fiscal Year Introduction: Introduction: The Safe, Accountable, Flexible, Efficient Transportation Equity Act: A Legacy for Users (SAFETEA-LU) has continued the efforts started through the Intermodal Surface Transportation Efficiency

More information

Design Public Hearing MassDOT Project # February 19, 2015 Chatham Town Hall Annex 7:00 P.M.

Design Public Hearing MassDOT Project # February 19, 2015 Chatham Town Hall Annex 7:00 P.M. Design Public Hearing MassDOT Project #606596 February 19, 2015 Chatham Town Hall Annex 7:00 P.M. Overview Process to date Project goals Data collection results Existing conditions Alternative analysis

More information

Measure A Pedestrian & Bicycle Program Update. April 4, 2019 Board of Directors Agenda Item #10 (b)

Measure A Pedestrian & Bicycle Program Update. April 4, 2019 Board of Directors Agenda Item #10 (b) Measure A Pedestrian & Bicycle Program Update April 4, 2019 Board of Directors Agenda Item #10 (b) Overview Program background Program allocations & delivery status Feature Project: California Drive Roundabout

More information

APPENDIX E Evaluation of Improvement Alternatives

APPENDIX E Evaluation of Improvement Alternatives APPENDIX E Evaluation of Improvement Alternatives Table E-1 Preliminary Comparison of Design Alternatives, Concord Table E-2 Preliminary Comparison of Route 2 Improvement Packages, Acton and Concord TABLE

More information

HIGHBURY AVENUE/HAMILTON ROAD INTERSECTION IMPROVEMENTS PUBLIC INFORMATION CENTRE 1 MAY 14, 2015

HIGHBURY AVENUE/HAMILTON ROAD INTERSECTION IMPROVEMENTS PUBLIC INFORMATION CENTRE 1 MAY 14, 2015 HIGHBURY AVENUE/HAMILTON ROAD INTERSECTION IMPROVEMENTS Municipal Class Environmental Assessment PUBLIC INFORMATION CENTRE 1 MAY 14, 2015 ACCESSIBILITY Under the Accessibility Standards 2015 for Customer

More information

TRANSPORTATION NEEDS ASSESSMENT

TRANSPORTATION NEEDS ASSESSMENT TRANSPORTATION NEEDS ASSESSMENT A travel demand analysis was carried out to determine the operational issues and the potential benefit that adding traffic capacity would have on the road network. All the

More information

RHODE ISLAND TROLLEY TRAIL From Charles Armentrout Dr to Farragut St

RHODE ISLAND TROLLEY TRAIL From Charles Armentrout Dr to Farragut St RHODE ISLAND TROLLEY TRAIL From Charles Armentrout Dr to Farragut St Kidus Debasu Transportation Engineer, Office of Highway Development MDOT State Highway Administration Kdebasu@sha.state.md.us Project

More information

Knox Street Complete Streets Project

Knox Street Complete Streets Project Knox Street Complete Streets Project Meeting Purpose Get community feedback on two conceptual street design options Meeting Agenda Presentation (20 minutes) Project background and schedule Summary of preferences

More information

Improving Cyclist Safety at the Dundas Street West and Sterling Road Intersection

Improving Cyclist Safety at the Dundas Street West and Sterling Road Intersection STAFF REPORT ACTION REQUIRED Improving Cyclist Safety at the Dundas Street West and Sterling Road Intersection Date: August 17, 2012 To: From: Wards: Reference Number: Public Works and Infrastructure Committee

More information

BUDGET FOR RESEDA BOULEVARD, STREET RECONSTRUCTION / VISION ZERO PROGRAM, REPORT BACK, COUNCIL FILE

BUDGET FOR RESEDA BOULEVARD, STREET RECONSTRUCTION / VISION ZERO PROGRAM, REPORT BACK, COUNCIL FILE FORM GEN. 160 (Rev. 11-02) CITY OF LOS ANGELES INTERDEPARTMENTAL CORRESPONDENCE Date: To: Honorable City Council From: Gary Lee Moore, City Engineer Bureau of Engineering 7%mt /Electronically signed by

More information

Summary of Comments Public Information Meeting Wieuca Road at Phipps Boulevard Intersection Improvements June 7, 2017

Summary of Comments Public Information Meeting Wieuca Road at Phipps Boulevard Intersection Improvements June 7, 2017 The Public Meeting for the Wieuca Road at Phipps Boulevard Intersection Improvement project was held on at the Wieuca Road Baptist Church, located at 3626 Peachtree Road, Atlanta, GA 30326. There were

More information

Public Works and Infrastructure Committee. General Manager, Transportation Services

Public Works and Infrastructure Committee. General Manager, Transportation Services STAFF REPORT ACTION REQUIRED Extending the Bay Street Bicycle Lanes Date: May 16, 2013 To: From: Public Works and Infrastructure Committee General Manager, Transportation Services Wards: Toronto Centre

More information

Brighton Boulevard Public Input Summary December 2015

Brighton Boulevard Public Input Summary December 2015 Brighton Boulevard Public Input Summary December 2015 The final design-focused public meeting for the Brighton Boulevard Redevelopment Project was held as a part of the larger North Denver Cornerstone

More information

Vehicular and Pedestrian Access to Herndon Metrorail Station. Robert B. Boxer, Director John Stuart, Clark Nexen October 28, 2015

Vehicular and Pedestrian Access to Herndon Metrorail Station. Robert B. Boxer, Director John Stuart, Clark Nexen October 28, 2015 Vehicular and Pedestrian Access to Herndon Metrorail Station Robert B. Boxer, Director John Stuart, Clark Nexen Project Location The project is located in the Town of Herndon along Herndon Parkway between

More information

Water Street Promenade Engineering and Design Services

Water Street Promenade Engineering and Design Services Preliminary Design Presentation Parking & Traffic Safety Committee Water Street Promenade Engineering and Design Services July 16,2014 November 3, 2016 Education / Infrastructure / Innovation 1 Project

More information

Accommodating Pedestrians in the Work Zone

Accommodating Pedestrians in the Work Zone Accommodating Pedestrians in the Work Zone Guidance for Section C Plan Preparers Some impacts cannot be avoided and those impacts apply to residents, businesses, motorists, and pedestrians alike. However,

More information

Environmental Assessment Findings & Recommendations. Public Hearing November 13, 2014

Environmental Assessment Findings & Recommendations. Public Hearing November 13, 2014 Environmental Assessment Findings & Recommendations Public Hearing November 13, 2014 Welcome! Welcome and Introductions Project and Environmental Assessment Overview Public Comments Adjourn Purpose of

More information

Intersection Improvement: Sturgeon Road, Silver Avenue and Murray Park Road Roundabout. Welcome. Public Information Session

Intersection Improvement: Sturgeon Road, Silver Avenue and Murray Park Road Roundabout. Welcome. Public Information Session Intersection Improvement: 1 Welcome WHY IS AN INTERSECTION IMPROVEMENT NEEDED? 2 Traffic volumes for Sturgeon Road, Silver Avenue and Murray Park Road exceed the capacity of the existing 4-way stop controlled

More information

Commerce Street Complete Street Project from Good Latimer Expressway to Exposition Avenue

Commerce Street Complete Street Project from Good Latimer Expressway to Exposition Avenue Commerce Street Complete Street Project from Good Latimer Expressway to Exposition Avenue T A N Y A B R O O K S A S S I S T A N T D I R E C T O R M O B I L I T Y P L A N N I N G M O B I L I T Y A N D S

More information

ALLEY 24 TRAFFIC STUDY

ALLEY 24 TRAFFIC STUDY ALLEY 24 TRAFFIC STUDY in City of Frostburg, Maryland January 2013 3566 Teays Valley Road Hurricane, WV Office: (304) 397-5508 www.denniscorporation.com Alley 24 Traffic Study January 2013 Frostburg, Maryland

More information

Welcome. Thank you for attending tonight s open house. The purpose of this open house is to give you an opportunity to:

Welcome. Thank you for attending tonight s open house. The purpose of this open house is to give you an opportunity to: Welcome Thank you for attending tonight s open house. The purpose of this open house is to give you an opportunity to: Review the circulation plan concept Give us your input Why a circulation plan? During

More information

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY THIS PRINT COVERS CALENDAR ITEM NO. : 11 DIVISION: Sustainable Streets BRIEF DESCRIPTION: SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY Approving traffic modifications on Twin Peaks Boulevard between Christmas

More information

Fulton Market Streetscape

Fulton Market Streetscape Fulton Market Streetscape Ogden Avenue to Halsted Street Public Meeting Recommended Improvements December 10th, 2014 Meeting Purpose and Goals Present Existing Conditions Community Input and Charrette

More information

Toronto and East York Community Council. Director, Transportation Services, Toronto and East York District

Toronto and East York Community Council. Director, Transportation Services, Toronto and East York District No Turn on Red Regulations STAFF REPORT ACTION REQUIRED Date: June 1, 2010 To: From: Toronto and East York Community Council Director, Transportation Services, Toronto and East York District Wards: Trinity

More information

Derby Street. Project Updates. Salem, Massachusetts

Derby Street. Project Updates. Salem, Massachusetts Derby Street Project Updates Salem, Massachusetts September 13, 2017 Project Limits Derby Street Project Objectives 1. Improve complete streets elements on Derby Street 2. Improve sidewalks on finger streets

More information

7 June 2018 OUR REF:

7 June 2018 OUR REF: 7 June 2018 OUR REF: 476729-01000 Mirtillo Estates Inc. 1681 Langstaff Road, Unit 1 Vaughan, Ontario, L4K 5T3 Attention: Joran Weiner Vice-President Dear Mr. Weiner: Re: Mirtillo Estates Sales Office Transportation

More information

Request for Authorization to Open Public Comment Period

Request for Authorization to Open Public Comment Period Request for Authorization to Open Public Comment Period May 12, 2015 LRP, TIPs, and Conformity Reasons for Requested Action: LRP and TIP Amendment to Connections 2040 LRP, and Draft FY 2016 TIP for New

More information

Kansas City Area Transportation Authority. Downtown Transit Improvement Vision 2/11/15

Kansas City Area Transportation Authority. Downtown Transit Improvement Vision 2/11/15 Kansas City Area Transportation Authority Downtown Transit Improvement Vision 2/11/15 Today s Meetings Downtown Transit Vision Long Term Vision for Downtown Bus Service Priorities for Short Term Implementation

More information

Granger Ave from State to Packard Pilot On Street Parking and Pavement Marking Discussion Summary and Feedback Reponses

Granger Ave from State to Packard Pilot On Street Parking and Pavement Marking Discussion Summary and Feedback Reponses Date: Tuesday, July 25, 2018 Time: 6:00 p.m. to 7:30 p.m. Location: Ann Arbor Senior Center (1320 Baldwin Ave) Attendees: Public present: 13; refer to Appendix B for sign in sheet Council members present:

More information

Roundabouts and Bikes: Like Oil and Water or Peanut Butter and Bananas?

Roundabouts and Bikes: Like Oil and Water or Peanut Butter and Bananas? Roundabouts and Bikes: Like Oil and Water or Peanut Butter and Bananas? 2017 APBP PDS Conference Memphis, Tennessee Alek Pochowski, AICP, PE Darren Buck June 27, 2017 Columbus Circle, New York City In

More information

PennDOT ICE Policy An Introduction

PennDOT ICE Policy An Introduction PennDOT ICE Policy An Introduction January 2018 What is Intersection Control Evaluation (ICE)? Purpose: To consistently consider and screen among many proven combinations of geometry and traffic control

More information

Cycle Track Design Best Practices Cycle Track Sections

Cycle Track Design Best Practices Cycle Track Sections Design Best Practices Sections It is along street segments where the separation and protection methods of cycle tracks offer more comfort than conventional bicycle lanes, and are more attractive to a wide

More information

Project Team Project Background Project Improvements Proposed Construction Approach Traffic Impact and Mitigation Next Steps Questions/Comments

Project Team Project Background Project Improvements Proposed Construction Approach Traffic Impact and Mitigation Next Steps Questions/Comments Project Team Project Background Project Improvements Proposed Construction Approach Traffic Impact and Mitigation Next Steps Questions/Comments 1 City of Beverly Hills Samer Elayyan, Project Manager Mark

More information

Terwillegar Drive Expressway Draft Concept Plan

Terwillegar Drive Expressway Draft Concept Plan Terwillegar Drive Expressway Draft Concept Plan Anthony Henday Drive to Whitemud Drive November 28 5:00-8:00 p.m. December 1 10:00 a.m. - 3:00 p.m. Let s Talk Today you can: Learn about the new direction

More information

North Avenue Corridor Study

North Avenue Corridor Study North Avenue Corridor Study City Council October 6, 2014 Presentation Outline Project Initiation & Process Corridor Conditions & Issues Vision & Goals Concept Development - Development/Evaluation Implementation

More information

Fitting Light Rail through Well-established Communities

Fitting Light Rail through Well-established Communities Fitting Light Rail through Well-established Communities San Francisco 2008 Michael D. Madden Chief, Project Development, Maryland Transit Administration Project Setting Located inside the Capital Beltway

More information

MINERAL AVENUE CORRIDOR ASSESSMENT STUDY IMPLEMENTATION STRATEGY

MINERAL AVENUE CORRIDOR ASSESSMENT STUDY IMPLEMENTATION STRATEGY MINERAL AVENUE CORRIDOR ASSESSMENT STUDY IMPLEMENTATION STRATEGY INTRODUCTION City Personnel Sign-in Sheet Comment Forms Please Write Down Any Feedback INTRODUCTION List of Topics for Presentation Study

More information

PEDESTRIAN ACCOMMODATIONS DPS 201 AT INTERCHANGES

PEDESTRIAN ACCOMMODATIONS DPS 201 AT INTERCHANGES PEDESTRIAN ACCOMMODATIONS DPS 201 AT INTERCHANGES UNDERSTANDING THE ISSUES Intersections of freeway ramp terminals at crossroads are the most critical components of an interchange Challenge: balance mobility

More information

Report Purpose To seek Council s approval of the Wye Road Functional Planning Study (January 2015).

Report Purpose To seek Council s approval of the Wye Road Functional Planning Study (January 2015). COUNCIL MEETING Meeting Date: March 10, 2015 Agenda Item #: 13.1 Wye Road Functional Planning Study (January 2015) Report Purpose To seek Council s approval of the Wye Road Functional Planning Study (January

More information

PROJECT FACT SHEET March 21, 2018

PROJECT FACT SHEET March 21, 2018 SITE CHALLENGES & PROJECT BACKGROUND In 2014, the City of Aspen identified the Castle Creek Bridge and Hallam Street corridor as a deficient link in Aspen s bicycle and pedestrian network. Safe and efficient

More information

Replacement of N. Carlin Springs Road Bridge over George Mason Dr.

Replacement of N. Carlin Springs Road Bridge over George Mason Dr. Replacement of N. Carlin Springs Road Bridge over George Mason Dr. Approximate schedule with phases and proposed Maintenance of Travel (MOT) plans February 2017 Project Elements Removal of existing bridge

More information

COMPLETE STREETS CHECKLIST City of Philadelphia The City of Philadelphia's Complete Streets policies are designed ensure that city streets are safe, comfortable and convenient for people of all ages and

More information

Traffic Improvements for the Transit Oriented Development District (TODD) Meriden Public Library March 11, 2014

Traffic Improvements for the Transit Oriented Development District (TODD) Meriden Public Library March 11, 2014 Traffic Improvements for the Transit Oriented Development District (TODD) Meriden Public Library March 11, 2014 Project Overview Coordinate roadway improvements with other major projects HUB Flood Control

More information

Municipal Class EA To Address Traffic Congestion On The Ontario Street Corridor (Grand Bend) Public Information Meeting June 4, 2018

Municipal Class EA To Address Traffic Congestion On The Ontario Street Corridor (Grand Bend) Public Information Meeting June 4, 2018 Municipal Class EA To Address Traffic Congestion On The Ontario Street Corridor (Grand Bend) Public Information Meeting June 4, 2018 Background Agenda Traffic Study Update Class EA Alternatives Bridge

More information

INNER LOOP EAST. AIA Rochester Annual Meeting November 13, 2013 TRANSFORMATION PROJECT. Bret Garwood, NBD Erik Frisch, DES

INNER LOOP EAST. AIA Rochester Annual Meeting November 13, 2013 TRANSFORMATION PROJECT. Bret Garwood, NBD Erik Frisch, DES INNER LOOP EAST TRANSFORMATION PROJECT AIA Rochester Annual Meeting November 13, 2013 Bret Garwood, NBD Erik Frisch, DES Why? We are building a city that encourages walking, biking and enjoying the outdoor

More information

El Camino Real Specific Plan. TAC/CAC Meeting #2 Aug 1, 2018

El Camino Real Specific Plan. TAC/CAC Meeting #2 Aug 1, 2018 El Camino Real Specific Plan TAC/CAC Meeting #2 Aug 1, 2018 Land Use Alternatives Goals and Tradeoffs Parks & open space Housing Retail & services Civic spaces Parking Community gathering spaces 3 Alternatives

More information

HUDSON, MA PUBLIC FEEDBACK SUMMARY Second Public Meeting October 26, :30pm Welcome and Rotary Trivia - 7:00-8:30pm Event

HUDSON, MA PUBLIC FEEDBACK SUMMARY Second Public Meeting October 26, :30pm Welcome and Rotary Trivia - 7:00-8:30pm Event MAIN STREET ROTARY HUDSON, MA PUBLIC FEEDBACK SUMMARY Second Public Meeting October 26, 2016-6:30pm Welcome and Rotary Trivia - 7:00-8:30pm Event The Second Public Meeting for the redesign of the Main

More information

ADA on Construction. Guidance for Section C Plan Preparers

ADA on Construction. Guidance for Section C Plan Preparers ADA on Construction Guidance for Section C Plan Preparers Some impacts cannot be avoided and those impacts apply to residents, businesses, motorists, and pedestrians alike. However, good planning can minimize

More information

COWETA HIGH SCHOOL AND EAST HIGHWAY 51

COWETA HIGH SCHOOL AND EAST HIGHWAY 51 COWETA HIGH SCHOOL AND EAST HIGHWAY 51 Lack of sidewalks along Ben Lumpkin Rd. Lack of crosswalks and ramps at intersection. Hwy 51 is wide to cross as a pedestrian. No ADA compliance or connection to

More information

Clybourn Ave. Protected Bike Lane Study Halsted St. to Division St.

Clybourn Ave. Protected Bike Lane Study Halsted St. to Division St. Clybourn Ave. Protected Bike Lane Study Halsted St. to Division St. Nathan Roseberry, Senior Engineer Pam Broviak, Project Manager July 24, 2014 Agenda Project Goals Existing Roadway Conditions Traffic

More information

Review and Comment ACHD s FY Five Year Work Program Draft for Adoption

Review and Comment ACHD s FY Five Year Work Program Draft for Adoption Date: January 5, 2006 To: From: Mayor and City Council Karen Gallagher Planning and Development Services Meeting: January 10, 2006 Re: Review and Comment ACHD s FY 2007-2011Five Year Work Program Draft

More information

St. Francis Drive through the City of Santa Fe Corridor Study

St. Francis Drive through the City of Santa Fe Corridor Study VII. ENGINEERING AND ENVIRONMENTAL EVALUATION TRAIL CONNECTIVITY In the southern portion of the Corridor there is a lack of a sidewalk, trail or bicycle facility within the right-ofway. However, the City

More information

Front and Myrtle Improvement Project

Front and Myrtle Improvement Project Front and Myrtle Improvement Project MAKING BOISE THE MOST LIVABLE CITY IN THE COUNTRY DOWNTOWN: Our unique and vibrant urban neighborhood GUIDING PRINCIPLES: Innovation Celebration Transportation Downtown

More information

North Avenue Corridor Study

North Avenue Corridor Study North Avenue Corridor Study Transportation, Energy and Utilities Committee September 10, 2014 Presentation Outline Project Initiation: Why North Avenue? Existing Conditions + Issues Vision + Goals Improvement

More information

Frome Street Bicycle Route

Frome Street Bicycle Route The Adelaide City Council invites engagement from the community about Frome Street Bicycle Route Project Summary Adelaide City Council is seeking feedback on design options to construct bicycle facilities

More information

Transportation Assessment

Transportation Assessment Transportation Assessment Midtown Open House February 10, 2018 Overview Midtown in Focus Overview & Purpose of Today Transportation Assessment overview Summary of Transportation work to date Review & Analysis

More information

WHITE STREET/ ENGLISH PLAZA STREETSCAPE IMPROVEMENT PROJECT

WHITE STREET/ ENGLISH PLAZA STREETSCAPE IMPROVEMENT PROJECT WHITE STREET/ ENGLISH PLAZA STREETSCAPE IMPROVEMENT PROJECT 1 Project Goals 1 Improved Safety: Lighting, Multi-Modal Circulation, Emergency Access, Tripping Hazards; Stormwater 4 Environmental Performance:

More information

Non-Motorized Transportation 7-1

Non-Motorized Transportation 7-1 Non-Motorized Transportation 7-1 Transportation facilities no longer mean just accommodating a vehicle powered by a combustion engine. Pedestrian and non-motorized facilities are important modes of travel

More information

Road Alterations - Wellington Street East, Church Street, and Front Street Intersection

Road Alterations - Wellington Street East, Church Street, and Front Street Intersection REPORT FOR ACTION Road Alterations - Wellington Street, Church Street, and Front Street Intersection Date: November 1, 2016 To: Toronto and York Community Council From: Director, Public Realm Section,

More information

PROJECT OBJECTIVES. Improve vehicle capacity for the intersection. Improve pedestrian and bicycle access

PROJECT OBJECTIVES. Improve vehicle capacity for the intersection. Improve pedestrian and bicycle access COMMUNITY MEETING Project Update March 15, 2010 Purcellville, Virginia OVERVIEW Project need / objectives Project recap Design elements Proposed improvements Summary of project benefits / next steps PROJECT

More information

M-58 HIGHWAY ACCESS MANAGEMENT STUDY Mullen Road to Bel-Ray Boulevard. Prepared for CITY OF BELTON. May 2016

M-58 HIGHWAY ACCESS MANAGEMENT STUDY Mullen Road to Bel-Ray Boulevard. Prepared for CITY OF BELTON. May 2016 M-58 HIGHWAY ACCESS MANAGEMENT STUDY Prepared for CITY OF BELTON By May 2016 Introduction Missouri State Highway 58 (M-58 Highway) is a major commercial corridor in the City of Belton. As development has

More information

Brian McHugh, Buckhead Community Improvement District. SUBJECT: Wieuca Road at Phipps Boulevard Intersection Improvements Project

Brian McHugh, Buckhead Community Improvement District. SUBJECT: Wieuca Road at Phipps Boulevard Intersection Improvements Project MEMO TO: FROM: Brian McHugh, Buckhead Community Improvement District Jagan Kaja, AICP, WSP Parsons Brinckerhoff SUBJECT: Wieuca Road at Phipps Boulevard Intersection Improvements Project DATE: October

More information

Highway 111 Corridor Study

Highway 111 Corridor Study Highway 111 Corridor Study June, 2009 LINCOLN CO. HWY 111 CORRIDOR STUDY Draft Study Tea, South Dakota Prepared for City of Tea Sioux Falls Metropolitan Planning Organization Prepared by HDR Engineering,

More information

Lessons Learned from Cycle Tracks (Class IV Bikeways) Design Practice

Lessons Learned from Cycle Tracks (Class IV Bikeways) Design Practice Lessons Learned from Cycle Tracks (Class IV Bikeways) Design Practice By: Min Zhou, P.E., Principal/Vice President KOA Corporation 1 What is a Cycle Track (Class IV) TYPICAL BIKEWAY CLASSIFICATION CLASS

More information

Road Diets FDOT Process

Road Diets FDOT Process Florida Department of TRANSPORTATION Road Diets FDOT Process Humberto Castillero, PE, PTOE Roadway Design Office Purpose of Guide Develop a statewide lane elimination review process Balance state & local

More information

Meeting Schedule 7:00-7:15 Open House 7:15-7:45 Existing Conditions/Short-Term Improvements Study Presentation 7:45-8:00 Q&A Session 8:00-8:10

Meeting Schedule 7:00-7:15 Open House 7:15-7:45 Existing Conditions/Short-Term Improvements Study Presentation 7:45-8:00 Q&A Session 8:00-8:10 Meeting Schedule 7:00-7:15 Open House 7:15-7:45 Existing Conditions/Short-Term Improvements Study Presentation 7:45-8:00 Q&A Session 8:00-8:10 Long-Term Study Presentation 8:10-8:40 Table Discussions 8:40-9:00

More information

S.R. 3009, Section A20 South Park & Logan Road Intersection Improvement Project

S.R. 3009, Section A20 South Park & Logan Road Intersection Improvement Project Open House Public Meeting S.R. 3009, Section A20 South Park & Logan Road Intersection Improvement Project Municipality of Bethel Park, Allegheny County Bethel Park Municipal Building 5001 West Library

More information

Minor Amendments to the Street and Traffic By-law 2849 and Skateboards in Protected Bike Lanes

Minor Amendments to the Street and Traffic By-law 2849 and Skateboards in Protected Bike Lanes ADMINISTRATIVE REPORT Report Date: October 31, 2017 Contact: Lon LaClaire Contact No.: 604.873.7336 RTS No.: 12241 VanRIMS No.: 08-2000-20 Meeting Date: November 15, 2017 TO: FROM: SUBJECT: Standing Committee

More information