1 Proposed Plan Change Integrated Transportation Assessment Report 23 October 2017

2

3 Project: Report title: Document reference: Kings College, Otahuhu Integrated Transportation Assessment Report J00700 Kings College ITA-final4 Date: 23 October 2017 Report Status Prepared By Reviewed By Approved By Final Report Nabi Mussa Mike Nixon Mike Nixon

4 Integrated Transportation Assessment Report Table of Contents Executive Summary... i 1 Introduction Existing Environment Site Location Road Network Mangere Road Hospital Road Accessibility Private Vehicles Public Transport Walking Cycling Traffic Volumes Crash History Proposed Development Overview Transport Connectivity Internal Road Design Trip Generation Site Trip Generation (With Plan Change) Acceptability of Trip Rates Site Trip Generation (Without Plan Change) Wider Area Trip Generation Trip Distribution / Model Generation Distribution Assumptions Additional Traffic Movements Proposed Traffic Movements... 25

5 Integrated Transportation Assessment Report 5 Assessment of Effects Assessment Methodology Road Network Assessment Great South Road/ Mangere Road Intersection Mangere Road/ Walmsley Road intersection Indicative Mangere Road/ Site Access Intersection Parking Proposed Auckland Unitary Plan Requirements On-street Parking Cycle Parking Accessible Parking Servicing Access Site Access Access to Individual Sites Integration with Future Transport Network General Auckland Plan Regional Policy Statement Auckland Regional Land Transport Plan Auckland Regional Public Transport Plan Auckland Unitary Plan Auckland Transport Code of Practice Auckland Design Manual Construction Traffic Consultation Implementation Plan Conclusions... 40

6 Integrated Transportation Assessment Report Attachment A SIDRA Output... 41

7 Integrated Transportation Assessment Report Page i EXECUTIVE SUMMARY Commute Transportation Consultants (Commute) has been engaged by King s College (King s) to prepare an Integrated Transport Assessment (ITA) for a proposed Plan Change at their campus and neighbouring land in Otahuhu, Auckland (referred to as the site ). King s currently own property on Mangere Road, Hospital Avenue, Middlemore Road and Golf Avenue. The land owned by King s is currently zoned Special Purpose School Zone and it is proposed to re-zone 3.11 ha of their land, in the north-western section of the campus, as Residential Terrace Housing and Apartment Building Zone (THAB Zone). As part of this proposed Plan Change, some 1.55 ha of neighbouring THAB Zone and Residential Single House Zone (SHZ) land owned by the Royal Auckland and Grange Gold Club (RAGGC) will be re-zoned Special Purpose School Zone. The proposed plan change areas are shown below. Proposed Plan Change Proposed Residential Terrace Housing and Apartment Building Zone Proposed Special Purpose School Zone The development potential of the 3.11 ha THAB zone has been assessed using a development intensity of 100 dwellings/ha. This is a conservative estimate as no preliminary development schemes have been prepared at this stage. The THAB zone has been assessed to accommodate 311 dwellings and generate some 143 trips in the morning and evening peak hours. All vehicle trips are proposed to enter and exit the site via a new intersection on Mangere Road. In order to accommodate right turn movements out of the site safely and to assist future residents walking to the nearby Otahuhu Town Centre, traffic signals are likely to be the preferred intersection control. This can be confirmed at Resource Consent stage depending on the yield of proposed residential development. Based on the assessments undertaken in this report, it is concluded:

8 Integrated Transportation Assessment Report Page ii the THAB zoned land is compatible with the neighbouring zones (THAB zone to the west and Business Mixed Use Zone to the east). the site has good accessibility to various transport modes: walking, cycling, bus and private vehicle. the effects of the proposed increase in vehicles are expected to be minor with all surrounding roads and intersections capable of accommodating site generated traffic. the Auckland-wide rules of the Unitary Plan enable assessment of the traffic effects of the vehicle access onto Mangere Road regardless of the underlying zone (vehicle access onto an Arterial Road). A new intersection on Mangere Road can be established to serve the new THAB zoned land once development plans are clarified. A signalised intersection can accommodate the proposed development traffic with minimal delays and queues to traffic on Mangere Road. Land on the development site would be vested to Auckland Council to accommodate the new intersection. the potential residential development under the proposed THAB zoning is consistent with, and encourages key regional and district transport policies. In addition, future improvements to the public transport network are planned to occur as a result of rail improvements including the City Rail Link which will add further capacity to rail services at Middlemore Station. In addition, other projects such as the Walmsley Transit Lane, and walking and cycling improvements, will also better cater for multi-modal travel near the site. Accordingly, it is concluded that the proposed Plan Change is acceptable from a transport planning perspective.

9 Integrated Transportation Assessment Report Page 1 1 INTRODUCTION Commute Transportation Consultants (Commute) has been engaged by King s College (King s) to prepare an Integrated Transport Assessment (ITA) for a proposed Plan Change at their campus and neighbouring land in Otahuhu, Auckland (referred to as the Plan Change area ). King s currently own property on Mangere Road, Hospital Avenue, Middlemore Road and Golf Avenue. The land owned by King s is currently zoned Special Purpose School Zone and it is proposed to re-zone 3.11 ha of land in the north-western section of the campus, as Residential Terrace Housing and Apartment Building Zone (THAB Zone). As part of this proposed Plan Change, some 1.55 ha of neighbouring THAB Zone and Residential Single House Zone (SHZ) land owned by the Royal Auckland and Grange Gold Club (RAGGC) will be re-zoned Special Purpose School Zone. The development potential of the 3.11 ha THAB zone has been assessed using a development intensity of 100 dwellings/ha. This is a conservative estimate as no preliminary development schemes have been prepared at this stage. Vehicles have been assessed to access the site via a new intersection on Mangere Road which will likely connect to an internal road, likely a cul-de-sac or crescent road. Key transportation considerations of the proposed Plan Change are: Compatibility with neighbouring land uses the accessibility of the site to the various modes of transport; and the ability of the surrounding road network to safely and efficiently accommodate traffic generated by potential development. These and other transportation issues will be addressed in this report.

10 Integrated Transportation Assessment Report Page 2 2 EXISTING ENVIRONMENT 2.1 SITE LOCATION Figure 1 shows the location of the site in relation to the surrounding road environment. Figure 1: Site Location King s College campus (shown in gray) Proposed Plan Change on King s College campus Proposed Plan Change area on RAGGC land The Plan Change area (site) is located in Otahuhu, Auckland. The site comprises land currently owned by King s College and RAGGC. The area is bounded by Mangere Road to the north, Hospital Road to the west, RAGGC to the south and residential and business zoned land to the east. The King s College land is currently zoned as Special Purpose School Zone in the Unitary Plan while the RAGGC land is currently zoned as THAB and SHZ. 2.2 ROAD NETWORK MANGERE ROAD Mangere Road is classified as an Arterial Road in the Unitary Plan and is a major route (Urban Route 14) between SH1 and SH20A. Mangere Road connects to Great South Road to the east and Massey Road to the west. Photograph 1 and Photograph 2 show Massey Road near the proposed site access.

11 Integrated Transportation Assessment Report Page 3 Photograph 1: Mangere Road (looking east toward Great South Road) Photograph 2: Mangere Road (looking west toward Walmsley Road) Mangere Road has a road reserve width of approximately 20.1 m with a sealed carriageway of approximately 13.0 m. Mangere Road between Walmsley Road and Great South Road provides a single lane in each direction with additional lanes on the approaches to the Great South Road/ Mangere Road and Walmsley Road/ Mangere Road intersections. Mangere Road between Walmsley Road and Hospital Road provides two lanes in each direction with additional lanes on the approach to the Walmsley Road/ Mangere Road intersection. Pedestrian footpaths are provided on both sides of Mangere Road. There is a signalised pedestrian crossing on Mangere Road some 180 m east of Walmsley Road and bus stops are provided nearby.

12 Integrated Transportation Assessment Report Page 4 Signalised pedestrian crossing movements are also provided at the Great South Road/ Mangere Road, Walmsley Road/ Mangere Road and Mangere Road/ Hospital Road intersections. Intermittent on-street parking is permitted on both sides of Mangere Road between Walmsley Road and Great South Road, however No Stopping At All Times (NSAAT) markings are provided on both sides of Mangere Road between Walmsley Road and Hospital Road. Mangere Road has a posted speed limit of 50 km/hr HOSPITAL ROAD Hospital Road is not classified as an Arterial Road in the Unitary Plan. Hospital Road runs in a northsouth direction between Mangere Road to the north and Swaffield Road to the south. Photograph 3 and Photograph 4 show Hospital Road near the RAGGC land within the Plan Change area. Photograph 3: Hospital Road (looking north toward Mangere Road)

13 Integrated Transportation Assessment Report Page 5 Photograph 4: Hospital Road (looking south toward Middlemore Train Station Hospital Road has a road reserve width of approximately 20.1 m outside the King s College entrance with a sealed carriageway of approximately 13.0 m. The road reserve narrows on the approach to Mangere Road. Hospital Road between Mangere Road and Swaffield Road provides a single lane in each direction. Pedestrian footpaths are provided on both sides of Hospital Road. There is a pedestrian refuge on Hospital Road some 240 m south of Mangere Road and bus stops are provided nearby. A signalised pedestrian crossing is provided between the Middlemore Hospital (the Hospital ) main entrance and Middlemore Train Station some 870 m south of Mangere Road (some 300 m south of the RAGGC land within the Plan Change area). On-street parking is permitted on both sides of Hospital Road from a location approximately 300 m south of Mangere Road and further south toward the Hospital. NSAAT markings are provided on both sides of Hospital Road north of this location due to a narrower road reserve on the approach to Mangere Road. Hospital Road has a posted speed limit of 50 km/hr. 2.3 ACCESSIBILITY PRIVATE VEHICLES The site is well located with regards to road connectivity to the wider Auckland Region. As noted, Mangere Road is part of Urban Route 14 that provides a link between SH1 and SH20A. The SH1 Princes Street interchange is located approximately 2.3 km east of the proposed THAB zoned land in the north-eastern part of the site. The SH20 Massey Road interchange is located approximately 2.5 km west of Hospital Road with the SH20A Kirkbride interchange a further 2.8 km west. The site is some 17.0 km from the Auckland city centre and 9.0 km from Manukau City Centre. At peak times, travel times between the site and the City Centre range from 30 minutes to 1 hour and are sensitive to SH1 motorway flows and the associated demands at the Princes Street interchange.

14 Integrated Transportation Assessment Report Page PUBLIC TRANSPORT A number of bus routes pass the site along Mangere Road and Hospital Road. The nearby bus routes are summarised in Table 1. Table 1: Nearby Bus Routes Bus Route Stop Location Route Description Frequency 32 Mangere Road between Walmsley Road and Hospital Road Sylvia Park to Mangere Town Centre Frequent Service. 7 am to 7 pm, 7 days a week. Every 15 minutes. 33 Great South Road between Mangere Road and Cracroft Street Papakura Rail Station to Otahuhu Rail Station Frequent Service. 7 am to 7 pm, 7 days a week. Every 15 minutes. 321 Mangere Road between Walmsley Road and Hospital Road, or Hospital Road Middlemore Hospital to Britomart Local Service. 7 am to 7 pm, Monday to Friday only. Every 30 minutes. 325 Mangere Road between Walmsley Road and Hospital Road Mangere Town Centre to Manukau Train Station Connector Service. 7 am to 7 pm, 7 days a week. Every 30 minutes. 326 Mangere Road between Walmsley Road and Great South Road Mangere Town Centre to Otahuhu Train Station Local Service. 7 am to 7 pm, 7 days a week. Every 30 minutes Monday to Friday, every hour on weekends. The two closest bus stops to the proposed THAB zone are on Mangere Road near the entrance to Otahuhu College (some 250 m west). As those bus stops only serve Route 326, which has a lower frequency service, it is expected most people would walk to the Otahuhu Interchange or Otahuhu Bus Station which are located 1.2 km from the site (approximately 15 minute walk). Auckland Transport ( AT ) have advised 1 that route 326 is earmarked for review and may be shortened to run between Mangere and Middlemore, with an increased frequency. This would have the result of removing the bus stops on Mangere Road between Walmsley Road and Great South Road (near the proposed THAB zone) as no other routes use these stops. AT have identified that new stops to serve the proposed THAB zone could potentially be established on Great South Road at the Great South Road/ Mangere Road intersection that would also better serve students of the two nearby colleges (as the current stops on Great South Road are located some 350 m south of Mangere Road, and the nearest stop to the north is not paired with a stop on the other side of the 1 Page 5, Auckland Transport Memorandum, Response to King s College Proposed Private Plan Change, 18 October 2017

15 Integrated Transportation Assessment Report Page 7 road). These new Great South Road stops would be located on Route 33 (a frequent bus route providing connectivity between Otahuhu and Papakura). The effects of these changes on the development are considered neutral, as noted, the majority of residents are expected to walk to the nearby Otahuhu Interchange or Otahuhu Bus Station. The Otahuhu Interchange provides connectivity to several bus services as well as train services on the southern line. Trains currently operate on 10 minute frequencies and following the completion of CRL, there are expected to be 5 minute train frequencies using a combination of eastern line and southern line services. Figure 2 shows an extract of the bus routes operating near the site. Figure 3 shows the post-crl train frequencies near the site. Figure 2: Bus Routes Site

16 Integrated Transportation Assessment Report Page 8 Figure 3: Post-CRL Train Frequencies Site In order to improve public transport connectivity to and from the Otahuhu Interchange, transit lanes and improved walking and cycling facilities are currently being investigated by AT 2 along Walmsley Road between Mangere Road and Station Road. The works will also improve cycling and walking connectivity to the Otahuhu Interchange and are located near the proposed THAB zone (some 320 m, or 4 minute walk, east of Walmsley Road). 2

17 Integrated Transportation Assessment Report Page WALKING The Austroads Guide to Traffic Engineering Practice Part 13 Pedestrians indicates that the practical walking distance for non-recreational walking trips is in the order of 1.5 km. Using the practical walking distance of 1.5 km and the 15 th percentile walking speed of a typical fit, healthy adult of 1.3 m/s, gives a journey time of some 20 minutes. This is in line with New Zealand data in the Pedestrian Planning and Design Guide, which states that for walking trips, half are more than 10 minutes and 18% are more than 20 minutes. The primary catchment area for pedestrians has therefore been based on a 1.5 km radius of the centre of the site as shown in Figure 4. Figure 4: Walking Catchment Otahuhu Interchange Otahuhu Bus Station Approximate 1.5 km walking catchment Otahuhu Town Centre Otahuhu College King s College Site Middlemore Hospital Middlemore Train Station As shown above, the Otahuhu Town Centre, Otahuhu Interchange, Middlemore Train Station, Middlemore Hospital and two schools are located within walking distance of the site. As noted, the aforementioned walking and cycling improvements along Walmsley Road currently being investigated by AT, will improve walking accessibility between the proposed THAB zone and the Otahuhu Interchange. Overall, the site is considered to be well connected to neighbouring activities CYCLING The Auckland Regional Cycle Network classifies Mangere Road and Hospital Road as a Cycle Connector. A Cycle Metro is located to the east of the site along SH1 and extends between the Auckland City Centre and Manukau City Centre.

18 Integrated Transportation Assessment Report Page 10 Figure 5: Auckland Regional Cycle Network The timeframe for AT implementing any connection along Mangere Road or Hospital Road is currently unknown however it is likely to be after 2023 based on the Auckland Cycling Investment Programme Otahuhu works have been identified as being in a Later Construction period. As noted however, the Walmsley Road transit lanes, and walking and cycling improvements are currently being investigated and will improved cycling connectivity to the Otahuhu Interchange. AT have also advised 4 that a link to Middlemore Hospital will also be investigated and likely run along Hospital Road. All of these proposed improvements can serve the proposed THAB zone and School zone. Based on New Zealand Transport Agency Research Report 426, the average cycling trip length is approximately 3 km. Figure 6 shows an indicative cycling catchment for the site Page 5, Auckland Transport Memorandum, Response to King s College Proposed Private Plan Change, 18 October 2017

19 Integrated Transportation Assessment Report Page 11 Figure 6: Cycling Catchment Approximate 3.0 km cycling catchment Otahuhu Industrial Highbrook Business Park Site MIT Papatoetoe Town Centre In addition to the locations identified within the walking catchment, the cycling catchment includes industrial activities at Highbrook Business Park and along James Fletcher Drive. MIT is also located to the east and Papatoetoe Town Centre is just outside the catchment to the south. The site is considered to offer excellent cycling connectivity to a wider range of employment, education, recreational and commercial activities however limited infrastructure is currently in place to accommodate cycle demands.

20 Integrated Transportation Assessment Report Page TRAFFIC VOLUMES AUCKLAND TRANSPORT TRAFFIC VOLUMES Table 2 outlines traffic volumes of various roads surrounding the site. Table 2: Traffic Volumes Road Location Date 7-Day ADT (veh/ day) Peak hour volume (veh/ hr) Mangere Road Near Kurunui Place April ,017 2,155 2,122 Hospital Road Between Mangere Road and St George Street N/A 1,500 N/A N/A As shown above, Mangere Road carries relatively high daily and peak hourly traffic volumes. However, the area in general is developed and the site is expected to add minimal levels of traffic to Mangere Road. Hospital Road has low traffic volumes in the order of 1,500 vehicles per day (vpd) SURVEYED TRAFFIC VOLUMES SCATS traffic signal detector counts and manual traffic counts (for shared movement lanes) were undertaken in the week beginning 31 July 2017 at the following intersections: Great South Road/ Mangere Road Mangere Road Signalised Pedestrian Crossing Mangere Road/ Walmsley Road/ Golf Avenue Mangere Road/ Hospital Road The surveys were undertaken during the weekday morning commuter peak period (7:00 to 9:00 am) and the weekday evening commuter peak period (2:30 to 6:00 pm). The results of the surveys are summarised in Figure 7 and Figure 8.

21 Massey Road Golf Avenue Site Access Great South Road Kings College, Otahuhu Integrated Transportation Assessment Report Page 13 Figure 7: Surveyed Traffic Volumes AM Peak Hour Mangere Road Chelsea Avenue Middlemore Road 184 Hospital Road 222

22 Massey Road Golf Avenue Site Access Great South Road Kings College, Otahuhu Integrated Transportation Assessment Report Page 14 Figure 8: Surveyed Traffic Volumes PM Peak Hour Mangere Road Chelsea Avenue Middlemore Road 159 Hospital Road CRASH HISTORY A search of the road safety record using the New Zealand Transport Agency Crash Analysis System (CAS) has been carried out to identify all reported crashes near the site during the five-year period from 2012 to 2016 as well as all available data in The search focused on all reported crashes occurring on Mangere Road (between Great South Road and Massey Road) and Hospital Road (between Mangere Road and the northern roundabout), and within 50 m of the following intersections: Mangere Road/ Great South Road intersection. Mangere Road/ Awa Street intersection. Mangere Road/ Walmsley Road/ Golf Avenue intersection. Mangere Road/ Middlemore Road/ Chelsea Avenue intersection. Mangere Road/ McDonald Place intersection. Mangere Road/ Hospital Road/ Massey Road intersection. A total of 188 crashes were identified. The crashes are summarised in Table 3.

23 Integrated Transportation Assessment Report Page 15 Table 3: Crash History Summary Location Number of Crashes/ Predominant Crash Types Injuries Great South Road/ Mangere Road Intersection 50 crashes 40% rear end collisions and 32% loss of control crashes 1 fatal, 7 minor injury and 42 non-injury crashes 0 pedestrian crashes and 1 bicycle crash (minor injury) Mangere Road midblock between Great South Road and Walmsley Road 21 crashes 38% rear end collisions and 38% loss of control crashes 4 serious injury, 3 minor injury and 14 non-injury crashes 1 pedestrian crash (serious injury) and 0 bicycle crashes Mangere Road/ Walmsley Road Intersection 46 crashes 43% rear end collisions, 26% crossing/ turning crashes and 22% loss of control crashes 1 fatal, 1 serious injury, 8 minor injury and 36 non-injury crashes 0 pedestrian crashes and 0 bicycle crashes Mangere Road midblock between Walmsley Road and Middlemore Road 5 crashes 40% crossing/ turning crashes and 40% loss of control crashes 1 fatal, 1 serious injury and 3 non-injury crashes 0 pedestrian crashes and 0 bicycle crashes Mangere Road/ Middlemore Road/ Chelsea Avenue intersection 10 crashes 50% rear end collisions and 40% crossing/ turning crashes 10 non-injury crashes 0 pedestrian crashes and 0 bicycle crashes Mangere Road midblock between Chelsea Avenue and Hospital Road 4 crashes 50% loss of control crashes and 25% rear end collisions 4 non-injury crashes 0 pedestrian crashes and 0 bicycle crashes Mangere Road/ Hospital Road intersection 43 crashes 40% crossing/ turning crashes and 37% rear end collisions 1 serious injury, 8 minor injury and 34 non-injury crashes 0 pedestrian crashes and 0 bicycle crashes Hospital Road midblock between Mangere Road and northern roundabout 9 crashes 67% rear end collisions 3 minor injury and 6 non-injury crashes 0 pedestrian crashes and 0 bicycle crashes

24 Integrated Transportation Assessment Report Page 16 The predominant crash types were rear end collisions and loss of control crashes over the crash study area. This is not unexpected on high volume roads with a number of signalised intersections. As will be described, the proposed development is considered to add relatively small additional traffic movements onto Mangere Road and is therefore not expected to significantly affect the operation and safety of the nearby intersections. 3 PROPOSED DEVELOPMENT 3.1 OVERVIEW As noted, it is proposed to re-zone 3.11 ha of King s land, in the north-western section of the campus, as Residential Terrace Housing and Apartment Building Zone (THAB Zone). As part of this proposed Plan Change, some 1.55 ha of neighbouring THAB Zone land owned by the Royal Auckland and Grange Gold Club (RAGGC) will be re-zoned Special Purpose School Zone. The proposed plan change areas are shown below. Figure 9: Proposed Plan Change Proposed Residential Terrace Housing and Apartment Building Zone (currently Special Purpose -School Zone ) Proposed Special Purpose School Zone (currently THAB and SHZ) 3.2 TRANSPORT CONNECTIVITY Access to the site either for education purposes (under the current school zone) or residential development (under the proposed THAB zone) will require vehicle access onto Mangere Road. Based on the survey data, and the development scenario assessed, there is a need to safely accommodate right turn entry and exit movements to and from the site. This is best achieved via a new signalised intersection with Mangere Road however access solutions may change depending on the configuration and intensity of any proposed development (which has not yet been decided). This design would be confirmed at the time of any development through the resource consent process.

25 Integrated Transportation Assessment Report Page 17 Due to the neighbouring land to the south being predominantly developed, there is no potential for public road connectivity to Jellicoe Street for instance. As such, a cul-de-sac road or crescent road would likely be provided into the THAB zone. This would also be assessed at the time of any development through the resource consent process. Given that a signalised intersection is likely to occupy the greatest area, a worst-case scenario has been assessed to understand whether a signalised intersection on Mangere Road could be established. An indicative signalised intersection is shown in Figure 10. Figure 10: Indicative Signalised Intersection The location of the indicative signalised intersection has been chosen to fit between residential driveways on the northern side of Mangere Road. Two possible locations were considered: In front of 49 and 51 Mangere Road, or In front of 43 and 45 Mangere Road. The preferred location, if traffic signals are progressed, is considered to be in front of 43 and 45 Mangere Road. The alternative option in front of 49 and 51 Mangere Road, was considered to have potential conflicts between right turn movements into the site and right turn movements into Sturges Park. The traffic signals are located some 230 m from the mid-block signalised pedestrian crossing to the west and 150 m to the Great South Road/ Mangere Road intersection to the east. These separation distances are considered appropriate and typical of many town centre arterial road intersections (Mt Wellington Highway at Sylvia Park for instance). Due to the proposed cycle route along Mangere Road, the indicative signalised intersection can be integrated with a future cycleway design once neighbouring land is acquired by Auckland Transport (either directly, or at the time land is developed). Along the site boundary, it is likely that some land may need to be kept clear of buildings due to the indicative future road boundary (shown in red on the above figure). The indicative signalised intersection with cycleway integration is shown in Figure 11.

26 Integrated Transportation Assessment Report Page 18 Figure 11: Indicative Signalised Intersection with Cycleway Integration 3.3 INTERNAL ROAD DESIGN As noted, the internal road is likely to be a crescent road or cul-de-sac however could change depending on the size of any proposed residential development. An indicative cross section width for the internal road would be 18 m. If a cul-de-sac was progressed, a cul-de-sac head could be provided at the end of the road to enable vehicles, particularly rubbish vehicles, to turn around at the end of the road. The cul-de-sac would likely be designed to meet ATCOP GD006 Type A specification. The proposed indicative cross-section is shown in Figure 12. Figure 12: Proposed Internal Road Cross Section

27 Integrated Transportation Assessment Report Page 19 The proposed cross-section can accommodate on-street parking within the traffic lane and leave sufficient carriageway width for two-way traffic flow. It is envisaged that kerb buildouts between parking bays would enable room for street trees and act to reduce vehicle speeds on the internal road. 4 TRIP GENERATION 4.1 SITE TRIP GENERATION (WITH PLAN CHANGE) As noted previously, the 3.11 ha of Kings College land currently zoned Special Purpose School Zone is proposed to be zoned THAB. The 1.55 ha of THAB zoned land (owned by RAGGC) fronting Hospital Road is proposed to be zoned Special Purpose School Zone. The effects of these changes, for the purposes of the trip generation assessment, are summarised as follows: The proposed 3.11 ha THAB zoned land would generate all vehicle traffic onto Mangere Road. This is a fundamental change to the existing environment which has limited vehicle movements to and from Mangere Road (the majority of school traffic currently enters and exits via Golf Road). However, it is noted that redevelopment of the site for education purposes (under current zoning) such as student day houses could also be undertaken with vehicle access onto Mangere Road. Vehicle access onto Mangere Road is therefore not a unique feature of the proposed Plan Change this may occur anyway under the current zoning. The number of vehicle movements generated by King s College remains unchanged. The newly zoned 1.55 ha of school zoned land is proposed to be accessed via the existing school gate on Golf Road however there may be some site access from Hospital Road. In any event, the 1.55 ha of development potential is less than the 3.11 ha of existing school land being lost as a result of the THAB zoning noted above. No additional school related development has been assessed however any additional school development (on the RAGGC land) generating vehicle movements onto Golf Road and/or Hospital Road would be offset by the removal of vehicle trips associated with residential development that could occur on the RAGGC THAB and SHZ zoned land. Essentially therefore, the traffic assessment of the proposed Plan Change conservatively focusses on 3.11 ha of potential residential development within the proposed THAB zone at the northern end of the site and how this affects the existing operation of the nearby Mangere Road/ Walmsley Road and Great South Road/ Mangere Road intersections. The peak hour trip generation of dwelling houses is typically estimated using the predictive models within the RTA Guide 5. An assessment has been undertaken using an indicative development potential of 100 dwellings per hectare (311 dwellings in total). This housing density is indicative of an apartment dwelling typology however for the purposes of this assessment, Medium Density Residential Flat Building trip rates have been used. A trip rate of 0.45 trips per dwelling has been used for the 1 to 2-bedroom apartments (assessed as 45% of the residential yield each) and a trip rate of 0.55 trips per dwelling for 3-bedroom + dwellings (assessed as 10% of the residential yield). The number of generated trips is summarised in Table 4. 5 Roads and Traffic Authority of NSW, Guide to Traffic Generating Developments, Version 2.2, October 2002

28 Integrated Transportation Assessment Report Page 20 Table 4: RTA Guide Traffic Generation Dwelling Type Number of Dwellings Trip Rate Indicative Trips 3+ Bedrooms Bedroom Bedroom TOTAL Based on the above, the overall trip generation for the site is 143 traffic movements per hour. The overall trip rate is therefore 0.46 trips per dwelling. 4.2 ACCEPTABILITY OF TRIP RATES The Auckland Transport Integrated Transport Assessment Guidelines ( ITA Guidelines ) recommends that trip rates for each mode of travel be developed based on the number of people anticipated to be residing within the development and sources such as Census data and other surveys. The results of such analyses can be confirmed by referring to traditional vehicle trip generation rates provided in New Zealand databases and documents such as the RTA Guide. To check the acceptability of the above RTA rates, reference has been made to existing car ownership details for Otahuhu West (Census 2013) and comparing this to the parking requirements recommended for Medium Density Residential Flat Buildings in the RTA guide. If the existing parking ownership patterns in Otahuhu align with recommended RTA parking provisions, the RTA trip rates are likely to align also. The site is located within the Otahuhu West area unit (521901) as defined by Statistics NZ. Household car ownership patterns from Census 2013 revealed the following: 16% of households (192 households) had no motor vehicle 41% of households (474 households) had one motor vehicle 31% of households (360 households) had two motor vehicles, and 12% of households (138 households) had three or more motor vehicles. For a total of 1,161 households, there is estimated to be 1,677 vehicles (assuming the 138 households with three or more spaces have an average of 3.5 spaces per household). This equates to 1.44 parking spaces per household. The RTA Guide recommends a minimum parking requirement for Medium Density Residential Flat Buildings of: 1 space for each unit, plus an additional space for each 5 x 2 bedroom unit, plus an additional space for each 2 x 3 bedroom unit, plus 1 space per 5 units (for visitors) For the 311 proposed dwellings, with the typology mix outlined in Table 4, a minimum parking provision of 417 spaces is recommended, or 1.34 parking spaces per dwelling. As the minimum RTA parking requirement is aligned to the RTA trip data (they use the same data sources) and the RTA minimum parking requirement aligns well to existing car ownership patterns in the area, the trip rates used for assessment are considered appropriate. It should also be noted that the proposed dwellings are likely be capped to a maximum of two parking spaces per dwelling.

29 Integrated Transportation Assessment Report Page SITE TRIP GENERATION (WITHOUT PLAN CHANGE) If the King s land was not rezoned, and the RAGGC land parcel was not available, Kings College would likely intensify their existing school activities on the 3.11 ha parcel of land (Special Purpose School Zone) fronting Mangere Road. This could include an increase in day houses and potential student pick up and drop off vehicle movements at this entrance. If the Plan Change is not accepted, there are two potential school development scenarios on the 3.11 ha School-zoned land parcel. These are summarised as: 15 dwellings with all vehicle access to and from Mangere Road and day houses for 400 students; and Separate primary school with 500 students. It is estimated that 15 dwellings would generate in the order of 8 trips (using a trip generation rate of 0.55 trips per dwelling) and the day houses could generate up to 150 trips assuming 50% students arriving by public transport, walking and cycling, 25% students arriving by vehicles driven by a student (2 students per vehicle), and 25% students arriving by vehicle driven by a caregiver (2 students per vehicle). These trips would only coincide with the morning commuter peak hour. In terms of the primary school, based on NZTA Research Report 453 6, peak school trip generation occurs in the morning peak hour with 0.62 trips per pupil. For the proposed 500 student school, the school can therefore be expected to generate 310 trips during the morning peak hour however some of that traffic is staff related (32 trips 7 ) while the remainder is pick up/drop off related (278 trips). Staff trips are expected to be tidal, predominantly inbound in the morning and outbound in the afternoon, while pick up/drop off traffic will likely comprise two trips in the same hour (one inbound and one outbound). The school will close prior to the evening peak hour, therefore school traffic would only coincide with morning peak hour commuter traffic. The differences in peak hour trips in Mangere Road between what could be generated by the existing school zone and the proposed THAB zone are summarised Table 5 below. Table 5: Trip Generation Existing School Zone vs Proposed THAB Zone Zone Morning Peak Hour Evening Peak Hour Existing School Zone 468 trips 0 trips Proposed THAB Zone 143 trips 143 trips Given the trip generating potential of school zone based activities, it is likely traffic signals would be required in order to control right turn movements into and out of the site. 6 NZ Transport Agency research report 453, Trips and parking related to land use, November Calculated by using research report 453 trip rates of 0.62 trips per pupil or 8.86 trips per staff member. A trip total of 310 trips therefore equates to 500 pupils and 35 staff. In addition, 90% of staff are assumed to drive therefore equating to approximately 32 staff trips

30 Integrated Transportation Assessment Report Page 22 As can be seen, the primary difference between the existing School zone activities and proposed THAB zone activities is the additional 143 trips in the evening peak hour. The THAB development in the morning peak hour is considered to offer significant benefits over further school activities on this larger portion of the site. 4.4 WIDER AREA TRIP GENERATION The Auckland Council Auckland Regional Transport (ART) model uses detailed projections of household and employment growth across the Auckland region to calculate likely traffic volumes on key roads. The ART model is a strategic transport model and is not suitable for detailed site analysis. Nevertheless, it does provide an indication of modelled land use throughout the region. ART model inputs (forecast projections of households and employment numbers) have been provided by JMAC 8 for ART Zone 428 (Otahuhu) which includes the subject site. The development site represents approximately 3% of the total area of ART Zone 428. Figure 13 shows the proposed ART Zone output. Figure 13: ART Zone Output ART 3.2A Zone Summary Graph Enter zone number in yellow cell ART3.2A Zone Otahuhu HH_ScenI_MOD Pop_ScenI_MOD Emp_ScenI_MOD Zone Otahuhu HH_ScenI_MOD 2000 Pop_ScenI_MOD Emp_ScenI_MOD Joint Modelling Application Centre, a partnership between Auckland Council, Auckland Transport and the NZ Transport Agency. Modified Scenario I v9 ART Inputs, 8 August 2015

31 Integrated Transportation Assessment Report Page 23 As shown above, there is proposed to be an increase in households within Otahuhu of some 400 dwellings between 2016 and The development potential of the site with an assessed increase of 300 dwellings represents a significant proportion of this future modelled development. Based on current housing demands, it is therefore likely that the number of dwellings likely to be established within the area will exceed what Council has predicted to be established. As will be discussed however, the traffic generated can be accommodated by the existing road network and the site is well placed to take advantage of alternative transport modes. It should also be noted that the net result of the proposed plan change is 1.56 ha of new THAB land or 156 dwellings (72 trips per hour). This is not considered a fundamental change to the potential yield of dwellings within the area. AT have expressed some initial concern that the location of these new trips represents a more significant change i.e. that the location of the current THAB zone may be better located as it fronts a lower volume road (Hospital Road). In this respect, it is considered that the proposed THAB zone on Mangere Road is wholly compatible with the zoning to the east and west of the site (THAB and Business- Mixed Use zones respectively). While Mangere Road is a busy arterial road, it is located in close proximity to the Otahuhu Town Centre and therefore represents an appropriate transport planning outcome (intensification around centres). Furthermore, the existing THAB zone located on Hospital Road was likely not established due to efficiency in accessing the road network but rather due to its close proximity to the Middlemore rail station (intensification around RTN). 4.5 TRIP DISTRIBUTION / MODEL GENERATION DISTRIBUTION ASSUMPTIONS All trips associated with the 311 dwellings have been added to the existing road network traffic volumes summarised in Section In terms of inbound/outbound percentages, the following has been assumed: Morning Peak Hour 80% outbound, 20% inbound Evening Peak Hour 20% outbound, 80% inbound. In terms of directional split, 50% of vehicles are assumed to travel to/from the east (i.e. Great North Road) while 50% of vehicles are assumed to travel to/from the west (i.e. Walmsley Road). This has been based on Mangere Road traffic volumes which are generally 50% eastbound and 50% westbound during both peak hours. The key intersections for assessment are the Great South Road/ Mangere Road intersection and Mangere Road/ Walmsley Road intersection. Additional vehicle movements have been assigned to the network based on existing turning movement patterns ADDITIONAL TRAFFIC MOVEMENTS Figure 14 and Figure 15 show the estimated development traffic movements generated by the site.

32 Golf Avenue Site Access Great South Road Golf Avenue Site Access Great South Road Kings College, Otahuhu Integrated Transportation Assessment Report Page 24 Figure 14: Additional Traffic Movements Weekday Morning Peak Hour Mangere Road Figure 15: Additional Traffic Movements Weekday Evening Peak Hour 45 6 Mangere Road

33 Golf Avenue Site Access Great South Road Golf Avenue Site Access Great South Road Kings College, Otahuhu Integrated Transportation Assessment Report Page PROPOSED TRAFFIC MOVEMENTS The proposed traffic movements including existing and additional traffic movements are summarised in Figure 16 and Figure 17. Figure 16: Proposed Traffic Movements Weekday Morning Peak Hour Mangere Road Figure 17: Proposed Traffic Movements Weekday Evening Peak Hour Mangere Road ASSESSMENT OF EFFECTS 5.1 ASSESSMENT METHODOLOGY The traffic effects of the indicative development potential of the THAB zoned land have been assessed using the traffic modelling software SIDRA. The modelling does not allow for additional traffic movements that could be achieved under the existing School zoning and are therefore conservative in terms of assessing traffic effects of the proposed Plan Change.

34 Integrated Transportation Assessment Report Page 26 The results presented in this report include the Degree of Saturation, which is a measure of available capacity and the Level of Service ( LOS ), which is a generalised function of delay. For signal controlled intersections, a Degree of Saturation of less than 0.90 is considered to be acceptable. LOS A and B are very good and indicative of free-flow conditions; C is good; D is acceptable; and E and F are indicative of congestion and unstable conditions. The assessment below identifies the effect of the additional vehicle trips. 5.2 ROAD NETWORK ASSESSMENT GREAT SOUTH ROAD/ MANGERE ROAD INTERSECTION EXISTING INTERSECTION PERFORMANCE The Great South Road/ Mangere Road intersection is a signal controlled intersection with free left turn slip lanes into both Mangere Road and Great South Road. The existing intersection performance is summarised in Table 6 and Table 7 below. Table 6: Great South Road/ Mangere Road Existing Intersection Performance Morning Peak Hour

35 Integrated Transportation Assessment Report Page 27 Table 7: Great South Road/ Mangere Road Existing Intersection Performance Evening Peak Hour As shown above, the morning peak hour shows similar patterns to the evening peak hour. The intersection operates with an overall LOS of C and the maximum degree of saturation is 84%. The queues are considered typical of a major arterial road intersection PROPOSED INTERSECTION PERFORMANCE As noted, the proposed traffic volumes are summarised in Figure 16 and Figure 17. The proposed Great South Road/ Mangere Road intersection performance is summarised in Table 8 and Table 9. Table 8: Great South Road/ Mangere Road Proposed Intersection Performance Morning Peak Hour

36 Integrated Transportation Assessment Report Page 28 Table 9: Great South Road/ Mangere Road Proposed Intersection Performance Evening Peak Hour As shown above, the intersection continues to work acceptably. The intersection continues to operate at overall LOS C and the average delays increase from 33.1 seconds to 34.6 seconds in the morning peak hour and from 28.4 seconds to 28.7 seconds in the evening peak hour. The maximum queue increases by 10 m. Overall, the effects of the potential development volumes on the existing intersection are considered negligible.

37 Integrated Transportation Assessment Report Page MANGERE ROAD/ WALMSLEY ROAD INTERSECTION EXISTING INTERSECTION PERFORMANCE The Mangere Road/ Walmsley Road intersection is a signal controlled intersection with a free left turn slip lane into Mangere Road from Walmsley Road. The existing intersection performance is summarised in Table 10 and Table 11 below. Table 10: Mangere Road/ Walmsley Road Existing Intersection Performance Morning Peak Hour

38 Integrated Transportation Assessment Report Page 30 Table 11: Mangere Road/ Walmsley Road Existing Intersection Performance Evening Peak Hour As shown above, the morning peak hour shows similar patterns to the evening peak hour. The intersection operates with an overall LOS of C and the maximum degree of saturation is 92%. The queues are considered typical of a major arterial road intersection PROPOSED INTERSECTION PERFORMANCE The proposed Mangere Road/ Walmsley Road intersection performance is summarised in Table 12 and Table 13.

39 Integrated Transportation Assessment Report Page 31 Table 12: Mangere Road/ Walmsley Road Proposed Intersection Performance Morning Peak Hour Table 13: Mangere Road/ Walmsley Road Proposed Intersection Performance Evening Peak Hour

40 Integrated Transportation Assessment Report Page 32 As shown above, the intersection continues to work acceptably. The intersection continues to operate at overall LOS C and the average delays increase from 20.8 seconds to 21.2 seconds in the morning peak hour and from 28.1 seconds to 28.7 seconds in the evening peak hour. The maximum queue increases by 18 m. Overall, the effects of the development volumes on the existing intersection are considered negligible INDICATIVE MANGERE ROAD/ SITE ACCESS INTERSECTION INDICATIVE INTERSECTION PERFORMANCE The proposed Mangere Road/ Site Access intersection performance is summarised in Table 14 and Table 15. Table 14: Mangere Road/ Site Access Proposed Intersection Performance Morning Peak Hour Table 15: Mangere Road/ Site Access Proposed Intersection Performance Evening Peak Hour

41 Integrated Transportation Assessment Report Page 33 As shown above, the morning peak hour shows similar patterns to the evening peak hour. The intersection operates with an overall LOS of A and the worse movements are the outbound movements from the site access and the right turn entry movement into the site. These movements continue to operate satisfactorily and the maximum queue length is 28 m. The queues are considered typical of a major arterial road intersection and fit within the available queue storage lengths. 6 PARKING 6.1 PROPOSED AUCKLAND UNITARY PLAN REQUIREMENTS The Unitary Plan outlines the relevant rules against which potential development should be assessed. As noted, 3.11 ha of school zoned land is proposed to re-zoned as THAB. Table 16 summarises the Unitary Plan parking requirements. Table 16: Unitary Plan Minimum Parking Requirements Activity Unitary Plan Parking Requirement Residential Terrace Housing and Apartment Building Zone All dwellings in the Terrace Housing and Apartment Building Zone No minimum No maximum As noted, there are potentially 311 dwellings in total. On this basis, there is no minimum or maximum parking requirement and any provision of parking would meet Unitary Plan requirements. Realistically however, it is considered that some dwellings may provide no parking while other dwellings may provide up to two parking spaces. It is unlikely any dwellings would provide more than two parking spaces. 6.2 ON-STREET PARKING On-street parking on the internal road can be determined at future resource consent stages however it is generally considered that a minimum of 1 space per 4 dwellings is an appropriate design standard. This would equate to some 78 parking spaces for the 3.11 ha of THAB zoned land. This may require investigation of on-street angled parking and the provision of time restrictions to avoid residents using on-street parking as informal resident parking. 6.3 CYCLE PARKING Table 17 outlines the Unitary Plan bicycle parking requirements for the THAB zoned land. Table 17: Unitary Plan Bicycle Parking Requirements Activity Short Stay Long Stay Residential (Developments of 20 or more dwellings) 1 per 20 dwellings 1 per dwelling without a dedicated garage All dwellings are assumed to be terraces or apartments. Terraces would likely provide internal garaging therefore there would be no need for cycle parking however apartments would likely have a shared at-grade or basement parking area (no dedicated garages). On this basis, bicycle parking spaces would be required for the apartment typologies.

Auranga B1 Proposed Plan Change, Bremner Road, Drury. Integrated Transportation Assessment Report

Auranga B1 Proposed Plan Change, Bremner Road, Drury. Integrated Transportation Assessment Report Auranga B1 Proposed Plan Change, Bremner Road, Drury Integrated Transportation Assessment Report 12 May 2017 Project: Report title: Document reference: Proposed Plan Change, Bremner Road, Drury Integrated

More information

Transport Assessment. Curtis Street Plan Change

Transport Assessment. Curtis Street Plan Change Transport Assessment Curtis Street Plan Change Transport Assessment for Curtis Street Plan Change i Contents 1. Introduction... 1 2. Existing Conditions... 2 2.1 Location... 2 2.2 Study Area... 3 2.3

More information

Ministry of Education Flat Bush School Notice of Requirement. Integrated Transportation Assessment Report. February 2016

Ministry of Education Flat Bush School Notice of Requirement. Integrated Transportation Assessment Report. February 2016 Ministry of Education Flat Bush School Notice of Requirement Integrated Transportation Assessment Report February 2016 TDG Ref: 12988-2 151105 ita flat bush.docx Ministry of Education Flat Bush School

More information

Shotover Country. Proposed Private Plan Change. Transportation Assessment Report. February 2010

Shotover Country. Proposed Private Plan Change. Transportation Assessment Report. February 2010 Shotover Country Proposed Private Plan Change February 2010 PO Box 13 835, Armagh Christchurch 8141 P: +64 3 379 2404 www.tdg.co.nz New Zealand Shotover Country Proposed Private Plan Change Quality Assurance

More information

Harriet Fraser Traffic Engineering & Transportation Planning

Harriet Fraser Traffic Engineering & Transportation Planning Appendix 5: Traffic Assessment 71 26 February 2015 Mr James Beban Senior Resource Consents Planner Cuttriss Consultants Ltd PO Box 30429 Lower Hutt PO Box 40170 Upper Hutt 5140 P 04 526 2979 M 027 668

More information

HENDERSON DEVELOPMENT 213, 217, 221, 221 ½, 223 HENDERSON AVENUE and 65 TEMPLETON STREET OTTAWA, ONTARIO TRANSPORTATION OVERVIEW.

HENDERSON DEVELOPMENT 213, 217, 221, 221 ½, 223 HENDERSON AVENUE and 65 TEMPLETON STREET OTTAWA, ONTARIO TRANSPORTATION OVERVIEW. HENDERSON DEVELOPMENT 213, 217, 221, 221 ½, 223 HENDERSON AVENUE and 65 TEMPLETON STREET OTTAWA, ONTARIO TRANSPORTATION OVERVIEW Prepared for: 2294170 Ontario Inc. February 2, 2017 117-652 Report_1.doc

More information

Traffic Impact Analysis Walton Acres at Riverwood Athletic Club Clayton, NC

Traffic Impact Analysis Walton Acres at Riverwood Athletic Club Clayton, NC Traffic Impact Analysis Walton Acres at Riverwood Athletic Club Clayton, NC 1. TABLE OF CONTENTS INTRODUCTION...1 1.1. Site Location and Study Area...1 1.2. Proposed Land Use and Site Access...2 1.3.

More information

Response to further information request Ministry of Education Notice of Requirement (200 & 252 Park Estate Road)

Response to further information request Ministry of Education Notice of Requirement (200 & 252 Park Estate Road) 21 Pitt Street PO Box 6345, Auckland 1141, New Zealand T: +64 9 300 9000 // F: +64 9 300 9300 E: info@beca.com // www.beca.com Auckland Council Private Bag 92300 Victoria Street West Auckland 1142 15 August

More information

Ministry of Education Notice of Requirement, North City High School. Transportation Assessment Report. July 2010

Ministry of Education Notice of Requirement, North City High School. Transportation Assessment Report. July 2010 Ministry of Education Notice of Requirement, North City High School Transportation Assessment July 2010 PO Box 1261, Level 1, 7 Hardley Street Hamilton 3240 P: +64 7 839 550 www.tdg.co.nz New Zealand 10574ta_v6.doc

More information

METHODOLOGY. Signalized Intersection Average Control Delay (sec/veh)

METHODOLOGY. Signalized Intersection Average Control Delay (sec/veh) Chapter 5 Traffic Analysis 5.1 SUMMARY US /West 6 th Street assumes a unique role in the Lawrence Douglas County transportation system. This principal arterial street currently conveys commuter traffic

More information

Appendix 5 Traffic Assessment

Appendix 5 Traffic Assessment Appendix 5 Traffic Assessment 44 Harrison Transportation Best Start Educare Shelly Bay Road Beachlands Transportation Assessment Report September 2017 PO Box 11 557 Palm Beach Papamoa 3151 Reference: 187

More information

Transportation Impact Study for Abington Terrace

Transportation Impact Study for Abington Terrace Transportation Impact Study for Abington Terrace Abington Township, Montgomery County, PA Sandy A. Koza, P.E., PTOE PA PE License Number PE059911 Prepared by McMahon Associates, Inc. 425 Commerce Drive,

More information

APPENDIX H EXISTING TRAFFIC CONDITIONS ANALYSIS

APPENDIX H EXISTING TRAFFIC CONDITIONS ANALYSIS APPENDIX H EXISTING TRAFFIC CONDITIONS ANALYSIS MEMO : Peter Steacy, P.Eng. Date: December 3, 2014 : Ian Borsuk, P.Eng. Job No.: 3414015-000 Subject: City of Ottawa O-Train Extension Planning & EA Study

More information

TRAFFIC IMPACT ANALYSIS

TRAFFIC IMPACT ANALYSIS TRAFFIC IMPACT ANALYSIS FOR THE CHAMPAIGN UNIT#4 SCHOOL DISTRICT PROPOSED HIGH SCHOOL (SPALDING PARK SITE) IN THE CITY OF CHAMPAIGN Final Report Champaign Urbana Urbanized Area Transportation Study 6/24/2014

More information

EXECUTIVE SUMMARY Callan Park accommodates travel from a wide range of transport modes, including walking, cycling, bus and light rail.

EXECUTIVE SUMMARY Callan Park accommodates travel from a wide range of transport modes, including walking, cycling, bus and light rail. TRANSPORT AND ACCESS EXECUTIVE SUMMARY Callan Park accommodates travel from a wide range of transport modes, including walking, cycling, bus and light rail. Whilst there are some walking facilities within

More information

AMETI PANMURE: A SUSTAINABLE TRANSPORT SOLUTION - OR NOT? Phil Harrison, Opus International Consultants

AMETI PANMURE: A SUSTAINABLE TRANSPORT SOLUTION - OR NOT? Phil Harrison, Opus International Consultants IPWEA Conference: 7 June 11 June 2015 Abstract AMETI PANMURE: A SUSTAINABLE TRANSPORT SOLUTION - OR NOT? Phil Harrison, Opus International Consultants The AMETI project is a package of multi-modal transport

More information

MEETING FACILITY 2901 GIBFORD DRIVE CITY OF OTTAWA TRANSPORTATION BRIEF. Prepared for: Holiday Inn Express 2881 Gibford Drive Ottawa, ON K1V 2L9

MEETING FACILITY 2901 GIBFORD DRIVE CITY OF OTTAWA TRANSPORTATION BRIEF. Prepared for: Holiday Inn Express 2881 Gibford Drive Ottawa, ON K1V 2L9 MEETING FACILITY 2901 GIBFORD DRIVE CITY OF OTTAWA TRANSPORTATION BRIEF Prepared for: Holiday Inn Express 2881 Gibford Drive Ottawa, ON K1V 2L9 December 18, 2012 112-566 Brief_1.doc D. J. Halpenny & Associates

More information

9 Leeming Drive Redevelopment Ottawa, ON Transportation Brief. Prepared By: Stantec Consulting Ltd.

9 Leeming Drive Redevelopment Ottawa, ON Transportation Brief. Prepared By: Stantec Consulting Ltd. 9 Leeming Drive Redevelopment Ottawa, ON Transportation Brief Prepared By: Stantec Consulting Ltd. TIA GUIDELINES CHECKLIST Report Context Municipal Address Comment: Section 1.1 Location relative to major

More information

Chapter 4 Traffic Analysis

Chapter 4 Traffic Analysis Chapter 4 Traffic Analysis PURPOSE The traffic analysis component of the K-68 Corridor Management Plan incorporates information on the existing transportation network, such as traffic volumes and intersection

More information

DYNAMIC LANES FOR AUCKLAND

DYNAMIC LANES FOR AUCKLAND Dynamic Lanes for Auckland MENEZES M. and INMAN R. Page 1 DYNAMIC LANES FOR AUCKLAND Authors: INMAN, Robert BA (Hons) Previously Auckland Transport Senior Traffic Engineer Now Aurecon Robert.Inman@aurecongroup.com

More information

Appendix C. NORTH METRO STATION AREA TRAFFIC IMPACT STATEMENT 88th Avenue Station

Appendix C. NORTH METRO STATION AREA TRAFFIC IMPACT STATEMENT 88th Avenue Station Appendix C NORTH METRO STATION AREA TRAFFIC IMPACT STATEMENT 88th Avenue Station Prepared for: Regional Transportation Department and URS Corporation as part of the North Metro EIS David Evans and Associates,

More information

Guidelines for Providing Access to Public Transportation Stations APPENDIX C TRANSIT STATION ACCESS PLANNING TOOL INSTRUCTIONS

Guidelines for Providing Access to Public Transportation Stations APPENDIX C TRANSIT STATION ACCESS PLANNING TOOL INSTRUCTIONS APPENDIX C TRANSIT STATION ACCESS PLANNING TOOL INSTRUCTIONS Transit Station Access Planning Tool Instructions Page C-1 Revised Final Report September 2011 TRANSIT STATION ACCESS PLANNING TOOL INSTRUCTIONS

More information

Magnolia Place. Traffic Impact Analysis. Prepared for: City of San Mateo. Prepared by: Hexagon Transportation Consultants, Inc.

Magnolia Place. Traffic Impact Analysis. Prepared for: City of San Mateo. Prepared by: Hexagon Transportation Consultants, Inc. Magnolia Place Traffic Impact Analysis Prepared for: City of San Mateo Prepared by: Hexagon Transportation Consultants, Inc. Updated January 4, 2010 Table of Contents 1. Introduction...1 2. Existing Conditions...6

More information

Latter-day Saints (LDS) project team for approximately four years. My early work on

Latter-day Saints (LDS) project team for approximately four years. My early work on IN THE MATTER OF the Resource Management Act 1991 AND IN THE MATTER OF an application by the Church of Jesus Christ of Latter-day Saints Trust Board for the Temple View Project CDP1 and removal of DOM

More information

INDUSTRIAL BUILDING 3009 HAWTHORNE ROAD CITY OF OTTAWA TRANSPORTATION OVERVIEW REVISED. Prepared for: Canada Inc.

INDUSTRIAL BUILDING 3009 HAWTHORNE ROAD CITY OF OTTAWA TRANSPORTATION OVERVIEW REVISED. Prepared for: Canada Inc. INDUSTRIAL BUILDING 3009 HAWTHORNE ROAD CITY OF OTTAWA TRANSPORTATION OVERVIEW REVISED Prepared for: 7849648 Canada Inc. Octiober 1, 2015 114-598 Overview_2.doc D. J. Halpenny & Associates Ltd. Consulting

More information

TRANSPORTATION ANALYSIS REPORT US Route 6 Huron, Erie County, Ohio

TRANSPORTATION ANALYSIS REPORT US Route 6 Huron, Erie County, Ohio TRANSPORTATION ANALYSIS REPORT US Route 6 Huron, Erie County, Ohio December 12, 2012 Prepared for: The City of Huron 417 Main Huron, OH 44839 Providing Practical Experience Technical Excellence and Client

More information

Traffic and Transport Assessment

Traffic and Transport Assessment Traffic and Transport Assessment Section 96 Residential Subdivision, Davis Road Tarneit CG120370 Prepared for Stockland Pty Ltd 19 February 2013 Document Information Prepared for Stockland Pty Ltd Project

More information

City of Wayzata Comprehensive Plan 2030 Transportation Chapter: Appendix A

City of Wayzata Comprehensive Plan 2030 Transportation Chapter: Appendix A A1. Functional Classification Table A-1 illustrates the Metropolitan Council s detailed criteria established for the functional classification of roadways within the Twin Cities Metropolitan Area. Table

More information

Shockoe Bottom Preliminary Traffic and Parking Analysis

Shockoe Bottom Preliminary Traffic and Parking Analysis Shockoe Bottom Preliminary Traffic and Parking Analysis Richmond, Virginia August 14, 2013 Prepared For City of Richmond Department of Public Works Prepared By 1001 Boulders Pkwy Suite 300, Richmond, VA

More information

TRAFFIC STUDY GUIDELINES Clarksville Street Department

TRAFFIC STUDY GUIDELINES Clarksville Street Department TRAFFIC STUDY GUIDELINES Clarksville Street Department 9/1/2009 Introduction Traffic studies are used to help the city determine potential impacts to the operation of the surrounding roadway network. Two

More information

4. ENVIRONMENTAL IMPACT ANALYSIS 9. TRANSPORTATION AND TRAFFIC

4. ENVIRONMENTAL IMPACT ANALYSIS 9. TRANSPORTATION AND TRAFFIC 4. ENVIRONMENTAL IMPACT ANALYSIS 9. TRANSPORTATION AND TRAFFIC 4.9.1 INTRODUCTION The following section addresses the Proposed Project s impact on transportation and traffic based on the Traffic Study

More information

INDUSTRIAL BUILDING 1660 COMSTOCK ROAD CITY OF OTTAWA TRANSPORTATION OVERVIEW. Prepared for:

INDUSTRIAL BUILDING 1660 COMSTOCK ROAD CITY OF OTTAWA TRANSPORTATION OVERVIEW. Prepared for: INDUSTRIAL BUILDING 1660 COMSTOCK ROAD CITY OF OTTAWA TRANSPORTATION OVERVIEW Prepared for: Simluc Contractors Limited 2550 Blackwell Street, Ottawa K1B 5R1 October 18, 2013 113-584 Overview_1.doc D. J.

More information

Update June 2018 OUR 2017 PUBLIC ENGAGEMENT

Update June 2018 OUR 2017 PUBLIC ENGAGEMENT Update June 2018 Hi, Let s Get Wellington Moving (LGWM) is developing a Recommended Programme of Investment (RPI) that meets our programme objectives and supports the city s and region s growth. As part

More information

MEDICAL/OFFICE BUILDING 1637 BANK STREET OTTAWA, ONTARIO TRANSPORTATION OVERVIEW. Prepared for:

MEDICAL/OFFICE BUILDING 1637 BANK STREET OTTAWA, ONTARIO TRANSPORTATION OVERVIEW. Prepared for: MEDICAL/OFFICE BUILDING 1637 BANK STREET OTTAWA, ONTARIO TRANSPORTATION OVERVIEW Prepared for: 2434984 Ontario Inc. 13-5510 Canotek Road Ottawa, Ontario K1J 9J5 June 4, 2015 115-613 Report_2.doc D. J.

More information

HILTON GARDEN INN HOTEL HOTEL EXPANSION 2400 ALERT ROAD, OTTAWA TRANSPORTATION BRIEF. Prepared for:

HILTON GARDEN INN HOTEL HOTEL EXPANSION 2400 ALERT ROAD, OTTAWA TRANSPORTATION BRIEF. Prepared for: HILTON GARDEN INN HOTEL HOTEL EXPANSION 2400 ALERT ROAD, OTTAWA TRANSPORTATION BRIEF Prepared for: Bona Building & Management Co. Ltd. Place Vanier, 333 North River Road Vanier, Ontario K1L 8B9 October

More information

BROMPTON LODGE, CRANBOURNE PRECINCT STRUCTURE PLAN TRAFFIC ENGINEERING ASSESSMENT WOLFDENE PTY LTD PREPARED FOR

BROMPTON LODGE, CRANBOURNE PRECINCT STRUCTURE PLAN TRAFFIC ENGINEERING ASSESSMENT WOLFDENE PTY LTD PREPARED FOR BROMPTON LODGE, CRANBOURNE PRECINCT STRUCTURE PLAN TRAFFIC ENGINEERING ASSESSMENT PREPARED FOR WOLFDENE PTY LTD TRAFFIC ENGINEERING ASSESSMENT PRECINCT STRUCTURE PLAN AT BROMPTON LODGE, CRANBOURNE Document

More information

VIVA RETIREMENT COMMUNITIES OAKVILLE TRAFFIC IMPACT STUDY

VIVA RETIREMENT COMMUNITIES OAKVILLE TRAFFIC IMPACT STUDY VIVA RETIREMENT COMMUNITIES OAKVILLE TRAFFIC IMPACT STUDY VIVA RETIREMENT COMMUNITIES OAKVILLE TRAFFIC IMPACT STUDY DECEMBER 2012 READ, VOORHEES & ASSOCIATES TORONTO, ONTARIO Read, Voorhees & Associates

More information

Using smartphones for cycle planning Authors: Norman, G. and Kesha, N January 2015

Using smartphones for cycle planning Authors: Norman, G. and Kesha, N January 2015 Using smartphones for cycle planning Authors: Norman, G. and Kesha, N January 2015 Abstract There has been an inherent lack of information available to transport and urban planners when looking at cycle

More information

Regional Cycle Programme Update

Regional Cycle Programme Update Agenda Item 10 (ii) Regional Cycle Programme Update Glossary Auckland Council Auckland Transport Cycle Action Auckland New Zealand Transport Agency Regional Cycle Network (AC) (AT) (CAA) (NZTA) (RCN) Executive

More information

North West Non-Technical Summary of the Transport Assessment September 2011

North West Non-Technical Summary of the Transport Assessment September 2011 North West Non-Technical Summary of the Transport Assessment September 2011 Introduction This is a Non-Technical Summary of the findings of the Transport assessment work undertaken for the proposed North

More information

PROPOSED RESIDENTIAL SUBDIVISION

PROPOSED RESIDENTIAL SUBDIVISION PROPOSED RESIDENTIAL SUBDIVISION PART OF TARNEIT ROAD & 1121 DOHERTYS ROAD, TARNEIT Prepared For: TCG (RM) Developments Pty Ltd MARCH 2014 OUR REF: 16740R#1 PROPOSED RESIDENTIAL SUBDIVISION PART OF TARNEIT

More information

Berwick Health and Education Precinct: Casey Amendment C207 (Part 1) Submission to Planning Panels Victoria

Berwick Health and Education Precinct: Casey Amendment C207 (Part 1) Submission to Planning Panels Victoria Berwick Health and Education Precinct: Casey Amendment C207 (Part 1) Submission to Planning Panels Victoria August 2018 CONTENTS 1 Executive summary... 1 2 Summary of the amendment... 2 3 Submission...

More information

The proposed development is located within 800m of an existing Transit Station where infill developments and intensification are encouraged.

The proposed development is located within 800m of an existing Transit Station where infill developments and intensification are encouraged. Stantec Consulting Ltd. 1331 Clyde Avenue, Suite 4 Ottawa ON K2C 3G4 Tel: (613) 722-442 Fax: (613) 722-2799 May 14, 213 File: 1638823 Robinson Park Development Corp. 5699 Power Road Ottawa, ON, K1G 3N4

More information

Gateway Transportation Study

Gateway Transportation Study Gateway Transportation Study Amherst, Massachusetts SUBMITTED TO University of Massachusetts Amherst Town of Amherst SUBMITTED BY Vanasse Hangen Brustlin, Inc. Watertown, Massachusetts March 213 Back of

More information

Traffic Assessment for Woodhaven Redevelopment. City of Rome Oneida County, New York. March 2, 2018

Traffic Assessment for Woodhaven Redevelopment. City of Rome Oneida County, New York. March 2, 2018 March 2, 2018 Traffic Assessment for Woodhaven Redevelopment City of Rome Oneida County, New York Prepared for: City of Rome 198 N. Washington Street Rome, NY 13440 Prepared by: C.T. MALE ASSOCIATES 50

More information

Memorandum INTRODUCTION METHODOLOGY. Smart Growth. Bruce Robinson, Transport Advisor, Infrastructure Planning

Memorandum INTRODUCTION METHODOLOGY. Smart Growth. Bruce Robinson, Transport Advisor, Infrastructure Planning Memorandum To: Smart Growth From: Bruce Robinson, Transport Advisor, Infrastructure Planning Subject: Te Tumu Transportation Assessment: Stage 1 Sensitivity Analysis Date: 1 June 2016 INTRODUCTION This

More information

Classification Criteria

Classification Criteria SCHEDULE D TO RECOMMENDED OFFICIAL PLAN AMENDMENT NO. 40 SCHEDULE C-4 Road Criteria Criteria Traffic Service Objective Land Service/Access Typical Daily Traffic Volume Flow characteristics Travel Speed

More information

LSC TRANSPORTATION CONSULTANTS, INC. 516 North Tejon Street Colorado Springs, CO (719) FAX (719)

LSC TRANSPORTATION CONSULTANTS, INC. 516 North Tejon Street Colorado Springs, CO (719) FAX (719) LSC TRANSPORTATION CONSULTANTS, INC. 516 North Tejon Street Colorado Springs, CO 80903 (719) 633-2868 FAX (719) 633-5430 E-mail: lsc@lsccs.com May 15, 2009 Mr. Davis Farrar Western Slope Consulting, LLC

More information

A127/A130 Fairglen Interchange Improvement Schemes. Information Leaflet February 2017

A127/A130 Fairglen Interchange Improvement Schemes. Information Leaflet February 2017 A127/A130 Fairglen Interchange Improvement Schemes Information Leaflet February 2017 1 2 Foreword By Councillor Kevin Bentley Essex is continuing to grow as a vibrant economic hub and as a fantastic place

More information

Traffic Impact Study WestBranch Residential Development Davidson, NC March 2016

Traffic Impact Study WestBranch Residential Development Davidson, NC March 2016 Traffic Impact Study WestBranch Residential Development Davidson, NC March 216 TRAFFIC IMPACT STUDY FOR THE WestBranch Residential Development LOCATED IN DAVIDSON, NC Prepared For: Lennar Carolinas, LLC

More information

Manukau City Council Plan Change 20 - Flatbush Stage 2. Integrated Transport Assessment (ITA)

Manukau City Council Plan Change 20 - Flatbush Stage 2. Integrated Transport Assessment (ITA) Manukau City Council Plan Change 20 - Flatbush Stage 2 Integrated Transport Assessment (ITA) October 2010 Flatbush Stage 2 Integrated Transport Assessment 51/28971/01/Flatbush ITA_V01.doc Contents 1. Introduction

More information

Barwon Heads Road, Armstrong Creek Traffic Impact Assessment Prepared for: Newland Developers Pty Ltd

Barwon Heads Road, Armstrong Creek Traffic Impact Assessment Prepared for: Newland Developers Pty Ltd 892 990 Barwon Heads Road, Armstrong Creek Traffic Impact Assessment Prepared for: Newland Developers Pty Ltd JULY 2015 TABLE OF CONTENTS 1 INTRODUCTION... 1 1.1 BACKGROUND... 1 1.2 SCOPE... 1 1.3 AIM

More information

Highway 49, Highway 351 and Highway 91 Improvements Feasibility Study Craighead County

Highway 49, Highway 351 and Highway 91 Improvements Feasibility Study Craighead County Highway 49, Highway 351 and Highway 91 Improvements Feasibility Study Craighead County Executive Summary March 2015 Highway 49, Highway 351 and Highway 91 Improvements Feasibility Study Craighead County

More information

Capital Region Council of Governments

Capital Region Council of Governments March 23, 2018 Capital Region Council of Governments PROJECT CONCEPT REPORT Realignment of Swamp and Northfield Road s approaches to Route 44 (Boston Turnpike) Town of Coventry SUMMARY: The Town of Coventry

More information

Transit boulevard: A new road type for Sydney s Growth Centres

Transit boulevard: A new road type for Sydney s Growth Centres Transit boulevard: A new road type for Sydney s Growth Centres Cleaver, M. A., de Roos, M. P., NSW Centre for Road Safety, Roads and Traffic Authority, NSW Collins, G., Network Services, Roads and Traffic

More information

Statement of Evidence of Judith Makinson

Statement of Evidence of Judith Makinson In the Matter of: The Resource Management Act 1991 and In the Matter of: Podium Sports Lodge, 18 20 Peake Road Application By: Brian Perry Charitable Trust Statement of Evidence of Judith Makinson TDG

More information

Regional Bus Priority

Regional Bus Priority Regional Bus Priority Recommendation(s) That the Board: i) Notes the systematic review for bus priority measures on the proposed Frequent Transit Network (FTN). Executive summary The New Network public

More information

WHANGAREI IMPROVEMENTS

WHANGAREI IMPROVEMENTS WHANGAREI IMPROVEMENTS PROJECT OVERVIEW The NZ Transport Agency (NZTA) is working with Whangarei District Council (WDC) to improve the state highway through Whangarei. In addition to the recently completed

More information

1609 E. FRANKLIN STREET HOTEL TRAFFIC IMPACT STUDY EXECUTIVE SUMMARY

1609 E. FRANKLIN STREET HOTEL TRAFFIC IMPACT STUDY EXECUTIVE SUMMARY 1609 E. FRANKLIN STREET HOTEL TRAFFIC IMPACT STUDY EXECUTIVE SUMMARY Prepared for: The Town of Chapel Hill Public Works Department Traffic Engineering Division Prepared by: HNTB North Carolina, PC 343

More information

OFFICE/RETAIL DEVELOPMENT 1625 BANK STREET OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for: Canada Inc.

OFFICE/RETAIL DEVELOPMENT 1625 BANK STREET OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for: Canada Inc. OFFICE/RETAIL DEVELOPMENT 1625 BANK STREET OTTAWA, ONTARIO TRANSPORTATION BRIEF Prepared for: 9402209 Canada Inc. December 15, 2015 115-625 Report_2.doc D. J. Halpenny & Associates Ltd. Consulting Transportation

More information

Figure 1: East West Connector Alignment Alternatives Concept Drawing

Figure 1: East West Connector Alignment Alternatives Concept Drawing Page 2 of 9 Figure 1: East West Connector Alignment Alternatives Concept Drawing The Montebello Drive extension will run north south and connect Wilsonville Road to the Boones Ferry Road to Brown Road

More information

TOWN OF CHAPEL HILL POLICY AND PROCEDURES FOR TRAFFIC CALMING MEASURES

TOWN OF CHAPEL HILL POLICY AND PROCEDURES FOR TRAFFIC CALMING MEASURES TOWN OF CHAPEL HILL POLICY AND PROCEDURES FOR TRAFFIC CALMING MEASURES (Adopted by the Town Council on June 30, 2004) (Revised December 6, 2010) (Revised February 8, 2016) POLICY AND PROCEDURES FOR TRAFFIC

More information

Complete Street Analysis of a Road Diet: Orange Grove Boulevard, Pasadena, CA

Complete Street Analysis of a Road Diet: Orange Grove Boulevard, Pasadena, CA Complete Street Analysis of a Road Diet: Orange Grove Boulevard, Pasadena, CA Aaron Elias, Bill Cisco Abstract As part of evaluating the feasibility of a road diet on Orange Grove Boulevard in Pasadena,

More information

5. The speed camera site outside the Parkwood Rest Home opposite Linwood College is a valuable deterrent. The speed camera site should be retained.

5. The speed camera site outside the Parkwood Rest Home opposite Linwood College is a valuable deterrent. The speed camera site should be retained. 27. ALDWINS ROAD SPEED LIMIT General Manager responsible: General Manager City Environment, DDI 941-8656 Officer responsible: Author: PURPOSE OF THE REPORT Unit Manager, Transport and Greenspace Brian

More information

At each type of conflict location, the risk is affected by certain parameters:

At each type of conflict location, the risk is affected by certain parameters: TN001 April 2016 The separated cycleway options tool (SCOT) was developed to partially address some of the gaps identified in Stage 1 of the Cycling Network Guidance project relating to separated cycleways.

More information

PAEKĀKĀRIKI HILL ROAD / BEACH ROAD / SH1 INTERSECTION PROGRESS REPORT

PAEKĀKĀRIKI HILL ROAD / BEACH ROAD / SH1 INTERSECTION PROGRESS REPORT Chairperson and Committee Members ENVIRONMENT AND COMMUNITY DEVELOPMENT COMMITTEE 6 DECEMBER 2011 Meeting Status: Public Purpose of Report: For Decision PAEKĀKĀRIKI HILL ROAD / BEACH ROAD / SH1 INTERSECTION

More information

QUICKIE C STORE AND GAS BAR 1780 HERON ROAD OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for:

QUICKIE C STORE AND GAS BAR 1780 HERON ROAD OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for: QUICKIE C STORE AND GAS BAR 1780 HERON ROAD OTTAWA, ONTARIO TRANSPORTATION BRIEF Prepared for: Quickie Convenience Stores Larny Holdings Ltd. c/o PBC Group April 15, 2015 115-615 Report_1.doc D. J. Halpenny

More information

Traffic Impact Study for Rolling Ridge Redevelopment

Traffic Impact Study for Rolling Ridge Redevelopment Traffic Impact Study for Rolling Ridge Redevelopment Webster Groves, Missouri October 19, 2018 Prepared For: Gershman Commercial Real Estate 150 North Meramec Avenue Suite 500 St. Louis, Missouri 63105

More information

OTTAWA TRAIN YARDS PHASE 3 DEVELOPMENT CITY OF OTTAWA TRANSPORTATION IMPACT STUDY. Prepared for:

OTTAWA TRAIN YARDS PHASE 3 DEVELOPMENT CITY OF OTTAWA TRANSPORTATION IMPACT STUDY. Prepared for: OTTAWA TRAIN YARDS PHASE 3 DEVELOPMENT CITY OF OTTAWA TRANSPORTATION IMPACT STUDY Prepared for: The Ottawa Train Yards Inc. 223 Colonnade Road South, Suite 212 Nepean, Ontario K2E 7K3 January 17, 2012

More information

2. Context. Existing framework. The context. The challenge. Transport Strategy

2. Context. Existing framework. The context. The challenge. Transport Strategy Transport Strategy Providing quality connections Contents 1. Introduction 2. Context 3. Long-term direction 4. Three-year priorities 5. Strategy tree Wellington City Council July 2006 1. Introduction Wellington

More information

Stanley Street/Shotover Street, Queenstown. Traffic Modelling Report

Stanley Street/Shotover Street, Queenstown. Traffic Modelling Report Stanley Street/Shotover Street, Queenstown Traffic Modelling Report Stanley Street/Shotover Street, Queenstown Traffic Modelling Report Prepared By Chris Morahan Transportation Engineer/Traffic Modeller

More information

1223 Michael Street, Suite 100, Ottawa, Ontario, K1J 7T2 P: l F: l

1223 Michael Street, Suite 100, Ottawa, Ontario, K1J 7T2 P: l F: l 1223 Michael Street, Suite 100, Ottawa, Ontario, K1J 7T2 P: +1 613.738.4160 l F: +1 613.739.7105 l www.parsons.com City of Ottawa 2017 TIA Guidelines Date July 3, 2018 TIA Screening Form Project 116 York

More information

Clackamas County Comprehensive Plan

Clackamas County Comprehensive Plan ROADWAYS The County s road system permits the movement of goods and people between communities and regions, using any of a variety of modes of travel. Roads provide access to virtually all property. They

More information

Auckland Transport Monthly Indicators Report 2018/19

Auckland Transport Monthly Indicators Report 2018/19 Attachment 1 Auckland Transport Monthly Indicators Report 218/19 August 218 Table of Contents Page 2. 1. Summary of indicators 1.1 SOI performance measures 1.2 AT Metro patronage breakdown 2. Monthly indicators

More information

EUCLID AVENUE PARKING STUDY CITY OF SYRACUSE, ONONDAGA COUNTY, NEW YORK

EUCLID AVENUE PARKING STUDY CITY OF SYRACUSE, ONONDAGA COUNTY, NEW YORK EUCLID AVENUE PARKING STUDY CITY OF SYRACUSE, ONONDAGA COUNTY, NEW YORK CITY OF SYRACUSE DEPARTMENT OF PUBLIC WORKS 1200 CANAL STREET EXTENSION SYRACUSE, NEW YORK 13210 DRAFT REPORT DATE: November 13,

More information

HANNA STREET, NOBLE PARK PROPOSED RESIDENTIAL REZONING TRAFFIC ENGINEERING ASSESSMENT YARRAMAN PARK DEVELOPMENTS PREPARED FOR JUNE, 2012

HANNA STREET, NOBLE PARK PROPOSED RESIDENTIAL REZONING TRAFFIC ENGINEERING ASSESSMENT YARRAMAN PARK DEVELOPMENTS PREPARED FOR JUNE, 2012 48-146 HANNA STREET, NOBLE PARK PROPOSED RESIDENTIAL REZONING TRAFFIC ENGINEERING ASSESSMENT PREPARED FOR YARRAMAN PARK DEVELOPMENTS JUNE, 2012 14034R#1 TRAFFIC ENGINEERING ASSESSMENT PROPOSED RESIDENTIAL

More information

APPENDIX E: Transportation Technical Report

APPENDIX E: Transportation Technical Report New Jersey Pennsylvania Lackawanna Cut-Off Passenger Rail Service Reston Project Environmental Assessment APPENDIX E: Transportation Technical Report E.1 Introduction As part of the overall environmental

More information

TRAFFIC IMPACT STUDY CRITERIA

TRAFFIC IMPACT STUDY CRITERIA Chapter 6 - TRAFFIC IMPACT STUDY CRITERIA 6.1 GENERAL PROVISIONS 6.1.1. Purpose: The purpose of this document is to outline a standard format for preparing a traffic impact study in the City of Steamboat

More information

APPELLANT S STATEMENT OF CASE

APPELLANT S STATEMENT OF CASE TOWN & COUNTRY PLANNING ACT 1990 (AS AMENDED) APPEAL BY FOCUS INTERNATIONAL CHRISTIAN CENTRE (FICC) AGAINST REFUSAL OF PLANNING PERMISSION BY THE LONDON BOROUGH OF HILLINGDON PLANNING PERMISSION IS SOUGHT

More information

CUERDEN TRANSPORT PROPOSALS

CUERDEN TRANSPORT PROPOSALS 1 CUERDEN TRANSPORT PROPOSALS The transport assessment, submitted with the Cuerden development planning application, looks at access to the site and the impact on the local road network in detail. This

More information

Community Advisory Committee

Community Advisory Committee Community Advisory Committee Meeting #1 November 19, 2014 Presentation Team Matt Fulda, Greater Bridgeport Regional Council Chris Granatini, P.E., Tighe & Bond Craig Yannes, P.E., PE PTOE, Tighe & Bond

More information

SECTION 1 - TRAFFIC PLANNING

SECTION 1 - TRAFFIC PLANNING SECTION 1 - TRAFFIC PLANNING 1.1 TRAFFIC OPERATIONS 1.1.1 Roadway Functional Classification The Multnomah County Comprehensive Framework Plan s Policy 34: Trafficways and the Functional Classification

More information

Anzac Street West Precinct Plan Change. Integrated Transport Assessment. October 2010

Anzac Street West Precinct Plan Change. Integrated Transport Assessment. October 2010 Integrated Transport Assessment October 2010 Project: Anzac Street West Precinct Plan Change Title: Integrated Transport Assessment Document Reference: S:\nscc\090\R1D101013.doc Prepared by: Sandy Halligan/Michelle

More information

SH1 Western Belfast Bypass Transportation Assessment

SH1 Western Belfast Bypass Transportation Assessment SH1 Western Belfast Bypass Transportation Assessment WBB- Transportation Assessment i This report has been prepared on behalf of the NZ Transport Agency (NZTA). No liability is accepted by this company

More information

DUNBOW ROAD FUNCTIONAL PLANNING

DUNBOW ROAD FUNCTIONAL PLANNING DUNBOW ROAD FUNCTIONAL PLANNING Final Report August 3, 216 #31, 316 5th Avenue NE Calgary, AB T2A 6K4 Phone: 43.273.91 Fax: 43.273.344 wattconsultinggroup.com Dunbow Road Functional Planning Final Report

More information

South Albion-Bolton Community Plan North Hill Supermarket Transportation Study Part B: Evaluation of Alternatives

South Albion-Bolton Community Plan North Hill Supermarket Transportation Study Part B: Evaluation of Alternatives Community Plan North Hill Supermarket Transportation Study Part B: Evaluation of Alternatives Prepared for: The Town of Caledon August 9 Transportation Solutions Ltd. 43 Forest Road Cambridge, ON N1S 3B4

More information

JONESBORO HIGHWAY 63 HIGHWAY 18 CONNECTOR STUDY

JONESBORO HIGHWAY 63 HIGHWAY 18 CONNECTOR STUDY JONESBORO HIGHWAY 63 HIGHWAY 18 CONNECTOR STUDY Craighead County May 2007 JONESBORO HIGHWAY 63 HIGHWAY 18 CONNECTOR STUDY Craighead County May 2007 Prepared by Planning and Research Division Arkansas State

More information

Truck Climbing Lane Traffic Justification Report

Truck Climbing Lane Traffic Justification Report ROUTE 7 (HARRY BYRD HIGHWAY) WESTBOUND FROM WEST MARKET STREET TO ROUTE 9 (CHARLES TOWN PIKE) Truck Climbing Lane Traffic Justification Report Project No. 6007-053-133, P 101 Ι UPC No. 58599 Prepared by:

More information

Proposed Residential & Retail Development at Geelong Rd Portarlington

Proposed Residential & Retail Development at Geelong Rd Portarlington Batman Invest Traffic Impact Assessment Proposed Residential & Retail Development at 30-32 Geelong Rd Portarlington Batman Invest Traffic & Parking Impact Assessment for Proposed Residential & Retail Development

More information

Overview. Existing Conditions. Corridor Description. Assessment

Overview. Existing Conditions. Corridor Description. Assessment Overview A study of the 23 rd Street corridor was undertaken to document the existing conditions, analyze traffic operations, and recommend remedies for deficient situations Although 23 rd Street is frequently

More information

Traffic Impact Analysis

Traffic Impact Analysis Traffic Impact Analysis Isle of Capri Casinos, Inc. Waterloo, Iowa SEH No. A-CLAAS0501.00 November 16, 2004 Table of Contents (Continued) Table of Contents Certification Page Table of Contents Page 1.0

More information

Traffic Impact Study. Westlake Elementary School Westlake, Ohio. TMS Engineers, Inc. June 5, 2017

Traffic Impact Study. Westlake Elementary School Westlake, Ohio. TMS Engineers, Inc. June 5, 2017 TMS Engineers, Inc. Traffic Impact Study Westlake Elementary School Westlake, Ohio June 5, 2017 Prepared for: Westlake City Schools - Board of Education 27200 Hilliard Boulevard Westlake, OH 44145 TRAFFIC

More information

TECHNICAL NOTE THROUGH KERBSIDE LANE UTILISATION AT SIGNALISED INTERSECTIONS

TECHNICAL NOTE THROUGH KERBSIDE LANE UTILISATION AT SIGNALISED INTERSECTIONS TECHNICAL NOTE THROUGH KERBSIDE LANE UTILISATION AT SIGNALISED INTERSECTIONS Authors: Randhir Karma NDip: Eng (Civil) B. Tech Eng (Civil) M Eng (Hons) (Transportation) Auckland Traffic Service Group Manager

More information

Technical note. 1. Introduction

Technical note. 1. Introduction Project: A428 study - Phase 2 To: Adrian Shepherd Subject: Park & Ride site locations From: Atkins Date: Jun 3, 2016 cc: Ashley Heller 1. Introduction 1.1. Purpose of Technical Note The purpose of this

More information

Frome Street Bicycle Route

Frome Street Bicycle Route The Adelaide City Council invites engagement from the community about Frome Street Bicycle Route Project Summary Adelaide City Council is seeking feedback on design options to construct bicycle facilities

More information

URBAN QUARRY HEADQUARTERS 2717 STEVENAGE DRIVE CITY OF OTTAWA TRANSPORTATION OVERVIEW. Prepared for: Urban Quarry 4123 Belgreen Drive, Ottawa K1G 3N2

URBAN QUARRY HEADQUARTERS 2717 STEVENAGE DRIVE CITY OF OTTAWA TRANSPORTATION OVERVIEW. Prepared for: Urban Quarry 4123 Belgreen Drive, Ottawa K1G 3N2 URBAN QUARRY HEADQUARTERS 2717 STEVENAGE DRIVE CITY OF OTTAWA TRANSPORTATION OVERVIEW Prepared for: Urban Quarry 4123 Belgreen Drive, Ottawa K1G 3N2 February 27, 2014 113-584 Overview_1.doc D. J. Halpenny

More information

5858 N COLLEGE, LLC N College Avenue Traffic Impact Study

5858 N COLLEGE, LLC N College Avenue Traffic Impact Study 5858 N COLLEGE, LLC nue Traffic Impact Study August 22, 2016 Contents Traffic Impact Study Page Preparer Qualifications... 1 Introduction... 2 Existing Roadway Conditions... 5 Existing Traffic Conditions...

More information

Tonight is an opportunity to learn about the Study and ask questions of the Study Team members.

Tonight is an opportunity to learn about the Study and ask questions of the Study Team members. Exhibit 1 Welcome Second Open House Tonight is an opportunity to learn about the Study and ask questions of the Study Team members. A first Public Open House was held on September 18th, 2013 which presented

More information

TRAFFIC IMPACT STUDY

TRAFFIC IMPACT STUDY TRAFFIC IMPACT STUDY for the GLEN ELLEN COUNTRY CLUB SENIOR RESIDENTIAL REDEVELOPMENT 84 Millis, Massachusetts Prepared by: McMahon Associates, Inc. Prepared for: Toll Brothers, Inc. August 216 DRAFT

More information

2136 And 2148 Trafalgar Road Townhouse Development Traffic Brief. Paradigm Transportation Solutions Limited

2136 And 2148 Trafalgar Road Townhouse Development Traffic Brief. Paradigm Transportation Solutions Limited 2136 And 2148 Trafalgar Road Townhouse Development Traffic Brief Paradigm Transportation Solutions Limited March 217 March 217 Project: 1627 Diana Vlasic, M.C.I.P., R.P.P Metropolitan Consulting 445 Paletta

More information