1 Prepared for HDR Engineering, Inc. River Quarry at Park Center 412 E. Parkcenter Blvd., Suite 100 Boise, ID Prepared by 5561 N Glenwood Street, Suite B Boise, ID

2 CERTIFICATION The technical material and data contained in this document were prepared under the supervision and direction of the undersigned, whose seal, as a professional engineer licensed to practice as such, is affixed below. Prepared by Joseph Tate III, P.E., P.T.O.E. Reviewed by Pierson Dewit

3 TABLE OF CONTENTS EXECUTIVE SUMMARY... ES-1 1. PROJECT BACKGROUND AND DESCRIPTION PROJECT INTENT AND PURPOSE TRAFFIC STUDY PURPOSE EXISTING TRAFFIC CONDITIONS CHRONOLOGICAL STEPS OF TRAFFIC ANALYSIS TRAFFIC FORECASTS PRELIMINARY REVIEW OF TRAFFIC FORECASTS (ADT) COMPREHENSIVE TRAFFIC ANALYSIS (PEAK HOUR) STUDY OPTIONS TRAFFIC VOLUMES LEVEL OF SERVICE ANALYSIS Assumptions Level of Service Results Further Investigation using Revised Set of Demographics ACCESS TO 30TH STREET CURSORY ANALYSIS OF POTENTIAL PARK ENTRANCES NEIGHBORHOOD ANALYSIS SUMMARY LIST OF FIGURES Figure 1. Project Area... 3 Figure 2. Existing Roadway Network... 6 Figure 3. Existing Traffic Count Information... 7 Figure 4. Traffic Analysis Zones for Project Vicinity April i

4 TABLE OF CONTENTS CONTINUED LIST OF TABLES Table 1. LOS Criteria for Signalized Intersections Table 2. LOS Criteria for Roadway Segments Table 3. Results of LOS Analysis for Study Intersections Table 4. Results of LOS Analysis for Study Roadway Segments Table 5. Revised Set of Demographics Table 6. Results of LOS Analysis for Study Intersections for Revised Set of Demographics Table 7. Results of LOS Analysis for Study Roadway Segments for Revised Set of Demographics APPENDICES A B C D COMPASS MODEL FORECASTS BASED ON TREND DEMOGRAPHICS COMPASS MODEL FORECASTS BASED ON COMMUNITY CHOICES DEMOGRAPHICS SYNCHRO SUMMARY REPORTS COMPASS MODEL FORECASTS BASED ON REVISED DEMOGRAPHICS April ii

5 ACRONYMS ACHD ADT COMPASS LOS Ada County Highway District Average Daily Traffic Traffic Study Community Planning Association of Southwest Idaho Level of Service April iii

6 EXECUTIVE SUMMARY Traffic Study The is an in-depth study of the land use and multi-modal transportation opportunities connected with the extension of 30th Street in Boise, Idaho. The new alignment is being referred to as 30th Street, even though there is another 30th Street intersection on State Street and the new 30th Street actually connects to State Street at the existing Rose Street intersection. The overall study area encompasses approximately 240 acres. A series of events has created a timely opportunity to re-address the vision, land use plans and transportation needs along this corridor. The is a joint venture with the City of Boise and the Ada County Highway District (ACHD). The study boundaries for the are State Street and Irene Street to the north; the I-184 Connector to the south; the Boise River, Clithero Drive and Riviera Drive to the west; and 23rd Street to the east. The purpose of this traffic study is to evaluate the traffic operations of the identified project alternatives using the 2030 design year traffic conditions and to identify the project alternative that will provide the best traffic operations for the anticipated future conditions. Additionally, this traffic study will address potential impacts from the proposed alternative to existing neighborhoods north of State Street and adjacent to the proposed 30th Street Extension corridor. This traffic study will not identify or assess any future transit related improvements within the study boundaries. A detailed traffic analysis was completed utilizing the traffic forecasts based on the Trend demographics for three development scenarios including: No Build 3-Lane 30 th Street Extension w/ existing 4-lane 27 th Street 5-Lane 30 th Street Extension w/ a 3-lane 27 th Street No-Build Option (Option 1) This option does not adequately serve the traffic demands for the area. Also, Option 1 would not result in reducing traffic volumes on 27th Street, one of the major objectives of the 30th Street Extension. 3-Lane 30th Street Option (Option 2) The results indicate that Option 2 would result in minor improvements in LOS conditions when compared to Option 1. Also, Option 2 would not result in reducing traffic volumes on 27th Street, one of the major objectives of the 30th Street Extension. 5-Lane 30th Street Option (Option 3) Overall, the results indicated that Option 3 would result in major improvements in LOS conditions within the study area when compared to Option 1 and Option 2. Option 3 would also drastically reduce the traffic volumes on 27th Street. This would make 27th Street more conducive to the neighborhood, because the reduced traffic volumes along with the reduced number of travel lanes will make 27th Street more pedestrian friendly and less of a barrier dividing the neighborhood. This is one of the major objectives of the 30th Street Extension. For the aforementioned reasons, this study recommends the implementation of a multilane 30th Street Extension. This would include two thru-lanes in each direction with a center median and turn bays where appropriate. April ES-1

7 5-Lane 30th Street Option w/ 3-Lane Main and 3-Lane Fairview (Charrette Option ) Overall, the results indicated that the Charrette Option would accommodate the traffic demand in the area as well as potentially make Main Street and Fairview Avenue attractive to new development. However, there are some concerns with allowing on-street parking on these arterial roadways. ACHD s general policy is to only allow on-street parking on arterials under special circumstances. If this study s vision of new land use in this area along with a new character of these roadways is achieved, ACHD may agree to allowing on-street parking on Main Street and Fairview Avenue. Also, the State Street/33rd Street intersection and the State Street/30th Street intersection are predicted to worsen to LOS E in the 2030 peak hour as a result of implementing the Charrette Option. For the aforementioned reasons, this study recommends consideration of removing one travel lane on both Main Street and Fairview Avenue. Access to 30th Street The 30th Street extension will be classified as a minor arterial roadway. It is necessary to limit the accesses/intersections along the 30th Street Extension in order for the roadway to perform optimally. Signalized intersections will be necessary on 30th Street at State Street, Main Street (currently a signalized intersection), and Fairview Avenue. All of the east-west roadways in the study area between Main Street and State Street are classified as local streets. It is recommended that the majority of these local streets not be connected to 30th Street in order to preserve the function of 30th Street and also to discourage increased traffic on these local streets. It is recommended that Idaho, Pleasanton, Stewart, and Jordan be considered for connection to 30th Street and that the other local streets not be connected to 30th Street. Neighborhood Analysis Based on the existing traffic control devices currently in place, it is reasonable to assume that additional cut-through traffic will most likely not occur in the neighborhood portion of the study area, north of State Street, between Irene Street and 23 rd Street. No additional traffic calming is recommended for this area at this time. It is recommended that separate further study be completed in the future to evaluate potential improvements on Pleasanton Avenue that would discourage cut-through traffic. At a minimum, it is recommended that a directional traffic count as well as a speed study be conducted in the summer months along Pleasanton Avenue between 27 th and 31 st Street. It is recommended that this separate study be completed in the near future, prior to the construction of the 30th Street Extension, due to the fact that traffic volumes are projected to continue to increase on Pleasanton Avenue during the next few years, especially as phases of the park are constructed. April ES-2

8 1. PROJECT BACKGROUND AND DESCRIPTION The is an in-depth study of the land use and multi-modal transportation opportunities connected with the extension of 30th Street in Boise, Idaho. The overall study area encompasses approximately 240 acres. A series of events has created a timely opportunity to re-address the vision, land use plans and transportation needs along this corridor. The is a joint venture with the City of Boise and the Ada County Highway District (ACHD). Figure 1 identifies the study boundaries of the. The boundaries are State Street and Irene Street to the north; the I-184 Connector to the south; the Boise River, Clithero Drive and Riviera Drive to the west; and 23rd Street to the east. The Boise City Comprehensive Plan has identified a mix of land uses and densities along the 30 th Street corridor including commercial at the southern end, medium density residential and mixed use along the middle, as well as office space in the northern portion. Since the Boise City Comprehensive Plan was adopted, conditions have changed significantly in the study area. They include the following: The large car dealerships formerly located in the southern portion of the study area around Main and Fairview, near the Boise River, have moved to the western edge of Boise. This vacancy has left a sizeable amount of unutilized acreage just one mile from downtown. The City of Boise owns a vacant 8-acre site in this area. The Idaho Transportation Department (ITD) owns a 46-acre site at the northern end of the study area, bounded by State Street, the Boise River and the new 30 th Street arterial. ITD has expressed interest in participating in the planning efforts to explore the possibility of redevelopment of this site. A group of interested parties has developed a plan for a whitewater activity park on the Boise River adjacent to the study area. This plan has already attracted one new business to the study area. The City of Boise received an extraordinary gift of a 55-acre park site adjacent to the 30th Street corridor along the Boise River. The "Esther Simplot Park" will be developed as a regional park and will include athletic activity fields and still-water canoeing facilities. Much of the proposed mixed use identified in the study area is currently within the park site. The City believes that the study area in general still presents a good opportunity for mixed use development. Bus Rapid Transit and street car service are two types of transit services envisioned in the study area and these services are not likely to impact the roadway LOS. Transit options will be studied in the future under a State Street Transit and Traffic Operations Plan. The Communities in Motion Regional Transportation Plan was recently completed and the Blueprint for Good Growth Study is still ongoing at this time. Both plans envision intensifying land uses through infill development in key locations within the City of Boise. The plans envision that the more intense (higher density) land uses will support new transit services, better utilize existing infrastructure (i.e. Main/Fairview couplet) and reduce the consumption of open land in the region. This study area is a prime candidate for such intensification of land use. Current real estate trends have created momentum for redevelopment of the now underutilized lands within the study boundaries. Pressure is building for redevelopment in the near future. One new office building has already been April

9 completed. If redevelopment occurs before this area plan is completed, that development will not be able to take full advantage of the changed conditions. The 30th Street Extension was identified in 1995 as a part of the Bench/Valley Transportation Study. The Bench/Valley Study incorporated technical analysis, public involvement, and public agency participation to determine effective improvements to the transportation system linking the Boise River valley to the geographic bench south of the river. In conjunction with alternative transportation solutions and traffic demand management strategies, conceptual alignments and cost estimates were developed for seven road improvement corridors. The Bench/Valley Study recommended proceeding with the 30th Street Extension once development and redevelopment became prevalent in the project area. In response to development applications and inquiries, ACHD, with the aid of CH2M HILL, performed an alignment study for the 30th Street Extension between Fairview Avenue and State Street along Rose Street, in The goal of the study was to determine a preferred alignment in sufficient detail to determine conceptual right-of-way needs and impacts to future developments. The study area presents a rare opportunity for the City of Boise to plan for a new transit supported mixed use district approximately one mile from the downtown core. The adopted Communities in Motion Plan allows, through the conditional use and rezone process, the opportunity for various mixed use land development. However, the plan does not encourage or identify incentives associated with the integration of a regional transit hub within the study area. Before potential redevelopment results in missed opportunities, the City of Boise believes that now is the time for proceeding with a new vision and enabling regulations for this area. April

10 Figure 1. Project Area April

11 1.1 PROJECT INTENT AND PURPOSE The intent of the project is to use an all-inclusive process to produce a new guiding vision and enabling regulations for the study area. That vision should reflect the interests of participating stakeholders, the district residents, the proposed conditions in the study area, and the desire to intensify land use in key identified infill areas. This project will create a plan and necessary regulatory changes that will enable future development and redevelopment in the study area in keeping with the newly established vision. Another intent of this study is to work closely with ACHD and Valley Regional Transit to understand the multi-modal transportation needs of the study area so that the ACHD can proceed to design a new arterial corridor. This corridor will serve the transportation needs of the adopted vision. The study includes identifying significant land use opportunities including potential transit and mixed use nodes, connections to adjacent land uses and transportation systems, and pedestrian friendly streetscapes using an inclusive public process. Lastly, the study included preparing and leading a 30th Street Charrette that identified significant land use opportunities including potential transit and mixed use nodes, redevelopment sites, street circulation in the area, a detailed streetscape, and a pedestrian and bicycle pathway plan. The Charrette was conducted the week of February 12, 2007 pursuant to the standards of the National Charrette Institute. 2. TRAFFIC STUDY PURPOSE The purpose of this traffic study is to evaluate the traffic operations of the identified project alternatives using the 2030 design year traffic conditions and to identify the project alternative that will provide the best traffic operations for the anticipated future conditions. Additionally, this traffic study will address potential impacts from the proposed alternative to existing neighborhoods north of State Street and adjacent to the proposed 30th Street Extension corridor. This traffic study will not identify or assess any future transit related improvements within the study boundaries. 3. EXISTING TRAFFIC CONDITIONS Existing Roadway Network The existing roadway network is shown in Figure 2. Descriptions of the key roadway segments are listed below: 23rd Street 23rd Street is functionally classified as a collector with a speed limit of 30 mph. The roadway has one travel lane in each direction and parking on both sides of the road throughout the study area. 28th Street (north of State Street) 28th Street (north of State Street) is functionally classified as a collector with a speed limit of 30 mph. The roadway has one travel lane in each direction and on-street parking throughout the study area. April

12 Irene Street Irene Street is functionally classified as a collector with a speed limit of 20 mph. The roadway has one travel lane in each direction throughout the study area. A traffic chicane is located along Irene between 23 rd and 24 th street to allow pedestrian access to Elm Grove Park. 27th Street 27th Street is functionally classified as a minor arterial with a speed limit of 30 mph. The roadway has two travel lanes in each direction south of State Street, and one travel lane in each direction north of State Street. On-street parking is available throughout the study area. State Street State Street is functionally classified as a principal arterial with a speed limit of 35 mph. The roadway has two travel lanes in each direction and a Two-Way-Left-Turn Lane throughout the study area. Main Street Main Street is functionally classified as a principal arterial with a speed limit of 35 mph. This is a one-way roadway with four travel lanes in the westbound direction throughout the study area. Bike lanes are striped along both sides of Main Street at certain locations within the study area. Fairview Avenue Fairview Avenue is functionally classified as a principal arterial with a speed limit of 35 mph. This is a one-way roadway with four travel lanes in the eastbound direction throughout the study area. Bike lanes are striped along both sides of Fairview Avenue throughout the study area. Other Roadways All other roadways within the project limits are classified as local streets with a speed limit of 20 mph. The roadways have one lane in each direction throughout the study area. April

13 Existing Traffic Counts Figure 2. Existing Roadway Network Existing Average Daily Traffic (ADT) count information was obtained from ACHD for roadways within the study limits. The ADT count information provided by ACHD was the only information that was available, and was collected in recent years. Refer to Figure 3 for the existing traffic count information provided by ACHD. April

14 Figure 3. Existing Traffic Count Information April

15 4. CHRONOLOGICAL STEPS OF TRAFFIC ANALYSIS Step 1 Traffic forecast information was provided by the Community Planning Association of Southwest Idaho (COMPASS). Separate 2030 forecasts were provided based on the Community Choices demographics, as well as the Trend demographics. This was necessary to analyze the roadway network including 23 rd Street, 27 th Street, 30 th Street, Main Street, Fairview Avenue, and State Street links; and the associated intersections. There was minimal difference between the traffic forecasts using the Trend demographics in comparison to using the Community Choices demographics. Through analysis of the traffic forecast information, the project team determined that it was most appropriate to move forward using the traffic forecasts based on the Trend demographics. Step 2 A detailed traffic analysis was completed utilizing the traffic forecasts based on the Trend demographics for three development scenarios including: Step 3 No Build 3-Lane 30 th Street Extension w/ existing 4-lane 27 th Street 5-Lane 30 th Street Extension w/ a 3-lane 27 th Street The project team developed a new Revised set of demographics for the project vicinity two weeks prior to Charrette as a result of the economic and housing market analysis. This new set of demographics includes changes such as increased residential densities, and increased office and retail uses in the project vicinity. Step 4 Due to project specific guidelines that were set prior to Charrette and agreed to by both the City of Boise and ACHD, it was determined during Charrette that all additional analysis would be performed for a 30 th Street Extension with 5 lanes (2 lanes in each direction with a center turn lane). This was decided due to the fact that this was the only option that met the specific guidelines set for the project. Step 5 One unanticipated roadway development that occurred through the Charrette process was the notion of narrowing Main Street and Fairview Avenue from 4 lanes to 3 lanes with parking and bike lanes. This option was deemed necessary due to the perception that these roadways are currently wide and under-utilized. The basic premise behind this option is to make these roadways attractive to new development by providing on-street parking, street car transportation, an improved pedestrian environment, and bike lanes. This option consists of removing one travel-lane from both Main Street and Fairview Avenue and reducing the width of the travel lanes along with other changes within the right-of-way. These changes would allow for on-street parking and bike lanes on both sides of the roadway. Bus Rapid Transit and street car service are two types of transit services envisioned in the study area and these services are not likely to impact the roadway LOS. April

16 Step 6 During Charrette, a brief traffic analysis was completed for the option of narrowing Main Street and Fairview Avenue from 4 lanes to 3 lanes in conjunction with a 5-lane 30th Street Extension. This analysis indicated that the intersection of 27 th Street and Main Street as well as the segment of Main Street from N. 23rd Street to N. 30th Street are predicted to function at unacceptable levels-of-service (LOS F) by the year Step 7 While analyzing the problem with the projected LOS for the intersection of 27th Street and Main Street it was determined to re-model the intersection with a dual left-turn lane for the northbound left-turn movement from 27th Street onto Main Street. This change improved the projected LOS of the intersection from LOS F to LOS B. Step 8 While analyzing the problem with the projected LOS for the segment of Main Street from N. 23rd Street to N. 30th Street it was determined to re-model the roadway with right-turn lanes at the major intersections. This is possible by removing on-street parking approximately 200 feet prior to the major intersections (23rd Street, 27th Street, and 30th Street). This solution is predicted to change the LOS from F to E. However, the COMPASS model had never been re-run with a three-lane Main Street and Fairview Avenue scenario. This is important because the COMPASS Model will reallocate traffic based upon capacity, thus if Main and Fairview are limited in their capacity, the model will send traffic to other facilities to balance the traffic flow in the area. Step 9 During Charrette week the new traffic forecasts with the 3-lane scenario for Main Street and Fairview Avenue were received from COMPASS. A cursory traffic analysis was performed with the new traffic volumes for a link analysis only. This resulted in Main Street being predicted to operate at LOS C in the 2030 peak hour and Fairview Avenue being predicted to operate at LOS C/D in the 2030 peak hour. Step 10 Post-Charrette there was a need to conduct a comprehensive re-run of the SYNCHRO model. This comprehensive analysis was based upon a revised set of demographics to accurately reflect the expected condition, along with the addition of the right-turn pockets on Main Street at the major intersections, and the additional northbound left-turn lane at the intersection of 27th Street and Main Street. This resulted in Main Street being predicted to operate at LOS D in the 2030 peak hour and Fairview Avenue being predicted to operate at LOS C in the 2030 peak hour. However, westbound State Street, from N. 23rd Street to N. 33rd Street, is predicted to change from LOS D to LOS E. Also, the State Street/33rd Street intersection and the State Street/30th Street intersection are predicted to change from LOS D to LOS E in the 2030 peak hour. 5. TRAFFIC FORECASTS Traffic Forecast information was provided by COMPASS. The 2030 forecasts were based on both the Trend demographics and the Community Choices demographics, a product of the Communities in Motion planning process. Refer to Appendix A for the model output based on the Trend demographics provided by COMPASS. Refer to Appendix B for the model output based on the Community Choices demographics provided by COMPASS. April

17 6. PRELIMINARY REVIEW OF TRAFFIC FORECASTS (ADT) The traffic forecast information was studied to determine which set of demographics was more appropriate to carry forward for this study. The traffic forecasts for both sets of demographics were actually quite similar. However, the traffic forecasts based on the Trend demographics are the most conservative (higher projected ADT and peak hour traffic volumes). Also, the Trend demographics accounted for the most growth within the project area. For this reason ACHD in accord with the City of Boise decided that it was in the best interest of the study to proceed with using the traffic forecasts based on the Trend demographics. 7. COMPREHENSIVE TRAFFIC ANALYSIS (PEAK HOUR) The study intersections and roadway segments were analyzed using Trafficware s Synchro 6 (build 614) software program. SYNCHRO s LOS calculations utilize the methodology outlined in the Highway Capacity Manual 2000 Update, and Special Report 209, Transportation Research Board. As part of this analysis, several roadways and intersections were analyzed for 2030 traffic conditions under no-build and build alternatives. The following roadway segments were included as part of the SYNCHRO network: W. State Street: N. 23rd Street to N. 33rd Street, W. Main Street: N. 23rd Street to N. 30th Street, W. Fairview Avenue: N. 23rd Street to N. 30th Street, N. 30th Street: W. State Street to W. Fairview Avenue, N. 27th Street: W. State Street to W. Fairview Avenue, and N. 23rd Street: W. State Street to W. Fairview Avenue. The following intersections were included as part of the SYNCHRO network: W. State Street at N. 33rd Street, W. State Street at N. 32nd Street (with no-build alternative), W. State Street at N. 30th Street (with build alternatives), W. State Street at N. 28th Street, W. State Street at N. 27th Street, W. State Street at N. 23rd Street, W. Main Street at N. 30th Street (with build alternatives), W. Main Street at N. 27th Street, W. Main Street at N. 23rd Street, W. Fairview Avenue at N. 30th Street (with build alternatives), W. Fairview Avenue at N. 27th Street, and W. Fairview Avenue at N. 23rd Street. April

18 7.1 STUDY OPTIONS Traffic Study The following three alternatives were analyzed as part of this analysis for the 2030 design year based on the COMPASS Trend demographics: Option 1: No-Build: This alternative assumes that the study area roadway network, including link and intersection channelization and geometry, would remain as it currently exists today. The 30th Street connection between W. State Street and W. Fairview Avenue does not exist with this alternative. It is also assumed that the existing speed limits and traffic control in the study area would remain as it exists today. Option 2: 3-Lane 30th Street Extension: This alternative assumes the study area roadway network would remain as it currently exists today with the following exceptions: o o o o o A new 30th Street connection between W. State Street and W. Fairview Avenue would be built to serve the north-south traffic in the study area vicinity. The proposed 30th Street corridor would be a 3-lane facility (one northbound thru-lane, one southbound thru-lane, and one two-way left-turn lane) with a 30 mph speed limit between W. State Street and W. Fairview Avenue. The intersection of W. State Street and N. 30th Street would be signalized and the channelization at this intersection would include two thru lanes with exclusive left-turn pockets in each direction along W. State Street, one northbound left-turn pocket, one northbound thru lane, one southbound leftturn pocket, and one southbound thru lane. The existing signal at the intersection of W. State Street and N. 32nd Street would be removed due to its close proximity to the proposed signal at N. 30th Street. The analysis assumed that left turn ingress and egress movements are restricted at this intersection of W. State Street and N. 32nd Street, with the left turns diverted to adjacent intersections along W. State Street. The channelization at the intersection of W. Main Street and N. 30th Street would include an additional exclusive northbound left-turn lane. The intersection of W. Fairview Avenue and N. 30th Street would be signalized and the channelization at this intersection would include an additional exclusive southbound left-turn pocket. Option 3: 5-Lane 30th Street Extension: This alternative assumes the study area roadway network would remain as it currently exists today with the following exceptions: o o A new 30th Street connection between W. State Street and W. Fairview Avenue would be built to serve the north-south traffic in the study area. The proposed 30th Street corridor would be a five-lane facility (two northbound lanes, two southbound lanes, and a two-way left-turn lane) with a 35 mph speed limit between W. State Street and W. Fairview Avenue. The intersection of W. State Street and N. 30th Street would be signalized and the channelization at this intersection would include two thru lanes with an exclusive left-turn lane in each direction along W. State Street, dual April

19 o o o o o o northbound left-turn lanes, one shared northbound thru/right turn lane, one shared southbound thru/right-turn lane, and one southbound left-turn lane. The existing signal at the intersection of W. State Street and N. 32nd Street would be removed due to its close proximity to the proposed signal at N. 30th Street. The analysis assumed that left turn ingress and egress movements are restricted at this intersection of W. State Street and N. 32nd Street with the left turns diverted to adjacent intersections along W. State Street. The existing signal at the intersection of W. State Street and N. 33rd Street would remain in place with the existing lane configurations. N. 27th Street would be re-striped as a three-lane facility (one northbound lane, one southbound lane, and a two-way left-turn lane) between W. State Street and W. Fairview Avenue. The corridor would have a 25 mph posted speed limit. The channelization at the intersection of W. Main Street and N. 30th Street would include an additional exclusive northbound left-turn lane and an additional northbound and southbound thru lane. The intersection of W. Fairview Avenue and N. 30th Street would be signalized and the channelization at this intersection would include an additional exclusive southbound left -turn pocket. The revised channelization at the intersection of W. State Street and N. 27th Street would eliminate one southbound departing lane. The revised channelization at the intersection of W Main Street and N. 27th Street would include four westbound lanes, one northbound left-turn pocket, one northbound thru lane, and one southbound thru lane. 7.2 TRAFFIC VOLUMES The design year used for the analysis was year traffic volumes used for the analysis were based on the p.m. peak hour turning movement volumes provided by the COMPASS travel demand model (using the Trend demographics), which was run independently for each alternative. It was noticed that turning movement volumes were missing for a few approaches/movements at some of the study intersections provided by the COMPASS model. The missing 2030 volumes were estimated using historic turning movement counts at those locations and applying an appropriate growth rate. The traffic volumes were then balanced along the W. State Street, W. Main Street, and W. Fairview Avenue corridors. 7.3 LEVEL OF SERVICE ANALYSIS Assumptions The following assumptions were used in conducting the LOS analysis of the study intersections and roadway segments for the study alternatives: No pedestrian or bicycle volumes were included as part of this analysis. An intersection peak hour factor (PHF) of 0.95 was used for all study intersections. April

20 7.3.2 Level of Service Results The traffic stream was assumed to consist of a 2 % heavy vehicle-mix throughout the network. No bus blockages were included as part of this analysis. No blockages from adjacent street parking were included as part of this analysis. Network signal timings were optimized. Refer to Appendix C for the Synchro summary reports for all three options studied. Measures of effectiveness used to report LOS for this analysis included average delay in seconds per vehicle (sec/veh) at the study intersections and arterial speed in miles per hour (mph) along the roadway segments. Table 1 displays the LOS criteria for signalized intersections, utilized for this study. Table 2 displays the LOS criteria for roadway segments, utilized for this study. The information provided in Table 1 and Table 2 was gathered from the criteria outlined in the 2000 Highway Capacity Manual. Table 1. LOS Criteria for Signalized Intersections Table 2. LOS Criteria for Roadway Segments April

21 Table 3 and Table 4 summarize the results of the LOS analysis for the study intersections and roadway segments, respectively. Table 3. Results of LOS Analysis for Study Intersections April

22 Table 4. Results of LOS Analysis for Study Roadway Segments April

23 No-Build Option (Option 1) Table 3 indicates that the study intersections along W. State Street at N. 28th and N. 27th Streets would operate at LOS E and LOS F, respectively, during the peak hour under the 2030 No-Build traffic conditions. Table 4 indicates that both directions of N. 27th Street corridor, northbound movement along N. 23rd Street, and westbound movements along W. State Street and W. Main Street corridors would operate at LOS E under Option 1 during the peak hour. This option does not adequately serve the traffic demands for the area. Also, Option 1 would not result in reducing traffic volumes on 27th Street, one of the major objectives of the 30th Street Extension. 3-Lane 30th Street Option (Option 2) Under Option 2, the intersection of W. State Street and N. 27th Street would continue to operate at LOS E. The intersection of W. State Street and N. 28th Street would continue to operate at LOS F, however the average delay would decrease by approximately 10 seconds per vehicle. Under Option 2, both directions of N. 27th Street corridor, westbound movement along W. State Street, and northbound movements along N. 23rd Street and N. 30th Street corridors would operate at LOS E. The southbound movement on the 30th Street Extension would operate at LOS D. The results indicate that Option 2 would result in minor improvements in LOS conditions when compared to Option 1. Also, Option 2 would not result in reducing traffic volumes on 27th Street, one of the major objectives of the 30th Street Extension. 5-Lane 30th Street Option (Option 3) Under Option 3, all the study intersections would operate at LOS D or better under 2030 p.m. peak hour conditions. Under Option 3, westbound movement along W. Main Street and the northbound movement along N. 23rd Street would operate at LOS E under the 2030 p.m. peak hour conditions. All other segments would operate at LOS D or better. The northbound and southbound movements on the 30th Street Extension would operate at LOS C, a drastic improvement from Option 2. Overall, the results indicated that Option 3 would result in major improvements in LOS conditions within the study area when compared to Option 1 and Option 2. Option 3 would also drastically reduce the traffic volumes on 27th Street. This would make 27th Street more conducive to the neighborhood, because the reduced traffic volumes along with the reduced number of travel lanes will make 27th Street more pedestrian friendly and less of a barrier dividing the neighborhood. This is one of the major objectives of the 30th Street Extension Further Investigation using Revised Set of Demographics The project team developed a Revised set of demographics for the project vicinity based upon the findings of the economic and housing market analysis. This new set of demographics includes changes such as increased residential densities, and increased office and retail uses in the project vicinity. These changes to the demographics were formulated by the project team by visualizing potential changes to the proposed land uses in the project vicinity directly as a result of the 30th Street Extension. Figure 4 displays the traffic analysis zones for the project vicinity. Table 5 displays the assumptions utilized for the revised demographics in comparison to the Trend demographics. As shown in the table, TAZ 209 has increased population, increased households, and fewer vehicles. This reduced vehicle ownership trend is a result of a suburban to urban lifestyle shift.. April

24 Figure 4. Traffic Analysis Zones for Project Vicinity April

25 Table 5. Revised Set of Demographics Traffic forecast information was provided by COMPASS for the Revised demographics for the 5-lane 30th Street Extension with 3 lanes on Main Street and Fairview Avenue (Charrette Option) Refer to Appendix D for the model output for the Charrette Option based on the Revised demographics provided by COMPASS. April

26 Table 6 and Table 7 summarize the results of this LOS analysis for the study intersections and roadway segments, respectively. Table 6. Results of LOS Analysis for Study Intersections for Revised Set of Demographics April

27 Table 7. Results of LOS Analysis for Study Roadway Segments for Revised Set of Demographics April

28 As a result of this analysis, Main Street is predicted to operate at LOS D in the 2030 peak hour and Fairview Avenue is predicted to operate at LOS C in the 2030 peak hour. The northbound segment of N. 23rd Street would improve to LOS D and the southbound segment of N. 23rd Street would improve to LOS C. However, there are some concerns with allowing on-street parking on these arterial roadways. ACHD s general policy is to only allow onstreet parking on arterials under special circumstances. If this study s vision of new land use in this area along with a new character of these roadways is achieved, ACHD may agree to allowing on-street parking on Main Street and Fairview Avenue. Also, westbound State Street, from N. 23rd Street to N. 33rd Street, is predicted to worsen to LOS E. The State Street/33rd Street intersection and the State Street/30th Street intersection are predicted to worsen to LOS E in the 2030 peak hour as a result of implementing the Charrette Option. An additional westbound thru-lane on State Street would be required to improve the LOS for the two aforementioned intersections as well as the westbound segment of State Street. Overall, the Charrette Option would accommodate the traffic demand in the area as well as make Main Street and Fairview Avenue attractive to new development. Bus Rapid Transit and street car service are two types of transit services envisioned in the study area and these services are not likely to impact the roadway LOS. 8. ACCESS TO 30TH STREET The 30th Street extension will be classified as a minor arterial roadway. It is necessary to limit the accesses/intersections along the 30th Street Extension in order for the roadway to perform optimally. Signalized intersections will be necessary on 30th Street at State Street, Main Street (currently a signalized intersection), and Fairview Avenue. All of the east-west roadways in the study area between Main Street and State Street are classified as local streets. It is recommended that the majority of these local streets not be connected to 30th Street in order to preserve the function of 30th Street and also to discourage increased traffic on these local streets. It is recommended that Idaho, Pleasanton, Stewart, and Jordan be considered for connection to 30th Street and that the other local streets not be connected to 30th Street. The existing signalized intersection for ITD, located at 33rd and State Street, is the ideal location for ITD traffic to continue to get their access. There is potential for a substantial amount of additional deveoplment on the existing ITD site. This additional development may require the need for a full access intersection on 30th Street as well as an additional partial access intersection on 30th Street. ACHD guidelines for access spacing on arterial roadways will need to be followed in determining the proper location for any necessary access on 30th Street. 9. CURSORY ANALYSIS OF POTENTIAL PARK ENTRANCES The Esther Simplot Park consists of 55 acres dedicated to the City through the major contribution by the Simplot family. The conceptual plan for the park includes athletic fields, trails, and natural areas for fishing, still water canoeing and viewing of wildlife habitat. The City of Boise has partnered with interested white water enthusiasts to develop a white water facility at the park. The design of the park layout is in the initial conceptual phase. Locations for the main vehicle entrance(s) to the park off of the 30th Street Extension are still being considered. The potential locations for the main entrance(s) include Pleasanton Avenue, Stewart Avenue, and Woodlawn Avenue. It is recommended that the major access to the park be constructed at Stewart Avenue or at Woodlawn Avenue. A major entrance at one of these locations would function better than a major entrance at Pleasanton Avenue. A necessary horizontal curve of the 30th Street alignment at Pleasanton Avenue and a necessary offset intersection at April

29 10. NE 11. SU Pleasanton (due to the existing geometrics) make this location less desirable for the major entrance to the park. A traffic signal or an other effective traffic control treatment (i.e. roundabout) would most likely be needed at the major park entrance. An engineering study and traffic signal warrant analysis for this intersection will need to be completed during subsequent design phases of the park. Other accesses that would allow right-in and right-out movements only are also being considered for the park. ACHD s design guidelines including minimum acces spacing will be utilized during the design phase to ensure a safe and efficient design. No SYNCHRO analysis was conducted for the park entrances as a part of this study. IGHBORHOOD ANALYSIS The neighborhood portion of the study area, north of State Street, between Irene Street and 23 rd Street, was investigated to determine if the 30th Street Extension could potentially cause increased traffic in this neighborhood due to cut-through traffic. Multiple traffic control devices are currently in place in this portion of the study area. Throughout this area, two-way stop control has been implemented at alternating intersections, a result of the North End Traffic Analysis conducted in All-way stop controlled intersections also exist at multiple locations within this area. Based on the existing traffic control devices currently in place, it is reasonable to assume that additional cut-through traffic will not occur within this section of the study limits. No additional traffic calming is recommended for this area at this time. The neighborhood portion of the study area, south of State Street, between the 30th Street Extension and 23 rd Street, was also studied to determine if the 30th Street Extension could potentially cause increased traffic in this neighborhood due to cut-through traffic. The majority of the local roadways within this neighborhood do not have any prevalent characteristics that indicate the potential for additional cut-through traffic. However, Pleasanton Avenue is a relatively wide street that appears to have some characteristics of a collector roadway. The Pleasanton Avenue road section has one travel lane in each direction with on-street parking along both sides of the roadway. Idaho River Sports is located at the intersection of Pleasanton Avenue and 31 st Street and input from the public indicated that traffic volumes increase during the summer months as a result of this business. Based on this public input and the nature of the seasonal business, it is recommended that separate further study be completed in the future to evaluate potential improvements on Pleasanton Avenue that would discourage cut-through traffic, if warranted. At a minimum, it is recommended that a directional traffic count as well as a speed study be conducted in the summer months along Pleasanton Avenue between 27 th and 31 st Street. It is recommended that this separate study be completed in the near future, prior to the construction of the 30th Street Extension, due to the fact that traffic volumes are projected to continue to increase on Pleasanton Avenue during the next few years, especially as phases of the park are constructed. It is also recommended that further study be completed for Woodlawn Avenue, Regan Avenue, and Stewart Avenue in the future to evaluate potential improvements that would discourage cutthrough traffic, if warranted. If Woodlawn Avenue and Regan Avenue are not connected to 30th Street, as recommended, cut-through traffic should not be an issue. MMARY No-Build Option (Option 1) This option does not adequately serve the traffic demands for the area. Also, Option 1 would not result in reducing traffic volumes on 27th Street, one of the major objectives of the 30th Street Extension. April

30 3-Lane 30th Street Option (Option 2) The results indicate that Option 2 would result in minor improvements in LOS conditions when compared to Option 1. Also, Option 2 would not result in reducing traffic volumes on 27th Street, one of the major objectives of the 30th Street Extension. 5-Lane 30th Street Option (Option 3) Overall, the results indicated that Option 3 would result in major improvements in LOS conditions within the study area when compared to Option 1 and Option 2. Option 3 would also drastically reduce the traffic volumes on 27th Street. This would make 27th Street more conducive to the neighborhood, because the reduced traffic volumes along with the reduced number of travel lanes will make 27th Street more pedestrian friendly and less of a barrier dividing the neighborhood. This is one of the major objectives of the 30th Street Extension. For the aforementioned reasons, this study recommends the implementation of a multilane 30th Street Extension. This would include two thru-lanes in each direction with a center median and turn bays where appropriate. 5-Lane 30th Street Option w/ 3-Lane Main and 3-Lane Fairview (Charrette Option) Overall, the Charrette Option would accommodate the traffic demand in the area as well as potentially make Main Street and Fairview Avenue attractive to new development. However, there are some concerns with allowing on-street parking on these arterial roadways. ACHD s general policy is to only allow on-street parking on arterials under special circumstances. If this study s vision of new land use in this area along with a new character of these roadways is achieved, ACHD may agree to allowing on-street parking on Main Street and Fairview Avenue. Also, the State Street/33rd Street intersection and the State Street/30th Street intersection are predicted to worsen to LOS E in the 2030 peak hour as a result of implementing the Charrette Option. For the aforementioned reasons, this study recommends consideration of removing one travel lane on both Main Street and Fairview Avenue. Access to 30th Street The 30th Street extension will be classified as a minor arterial roadway. It is necessary to limit the accesses/intersections along the 30th Street Extension in order for the roadway to perform optimally. Signalized intersections will be necessary on 30th Street at State Street, Main Street (currently a signalized intersection), and Fairview Avenue. All of the east-west roadways in the study area between Main Street and State Street are classified as local streets. It is recommended that the majority of these local streets not be connected to 30th Street in order to preserve the function of 30th Street and also to discourage increased traffic on these local streets. It is recommended that Idaho, Pleasanton, Stewart, and Jordan be considered for connection to 30th Street and that the other local streets not be connected to 30th Street. April

31 APPENDIX A COMPASS MODEL FORECASTS BASED ON TREND DEMOGRAPHICS

32 APPENDIX B COMPASS MODEL FORECASTS BASED ON COMMUNITY CHOICES DEMOGRAPHICS

33 APPENDIX C SYNCHRO SUMMARY REPORTS

34 APPENDIX D COMPASS MODEL FORECASTS BASED ON REVISED DEMOGRAPHICS

4. ENVIRONMENTAL IMPACT ANALYSIS 9. TRANSPORTATION AND TRAFFIC

4. ENVIRONMENTAL IMPACT ANALYSIS 9. TRANSPORTATION AND TRAFFIC 4. ENVIRONMENTAL IMPACT ANALYSIS 9. TRANSPORTATION AND TRAFFIC 4.9.1 INTRODUCTION The following section addresses the Proposed Project s impact on transportation and traffic based on the Traffic Study

More information

5858 N COLLEGE, LLC N College Avenue Traffic Impact Study

5858 N COLLEGE, LLC N College Avenue Traffic Impact Study 5858 N COLLEGE, LLC nue Traffic Impact Study August 22, 2016 Contents Traffic Impact Study Page Preparer Qualifications... 1 Introduction... 2 Existing Roadway Conditions... 5 Existing Traffic Conditions...

More information

TRAFFIC IMPACT STUDY COMPREHENSIVE UPDATE TOWN OF THOMPSON S STATION, TENNESSEE PREPARED FOR: THE TOWN OF THOMPSON S STATION

TRAFFIC IMPACT STUDY COMPREHENSIVE UPDATE TOWN OF THOMPSON S STATION, TENNESSEE PREPARED FOR: THE TOWN OF THOMPSON S STATION TRAFFIC IMPACT STUDY COMPREHENSIVE UPDATE TOWN OF THOMPSON S STATION, TENNESSEE PREPARED FOR: THE TOWN OF THOMPSON S STATION Transportation Consultants, LLC 1101 17 TH AVENUE SOUTH NASHVILLE, TN 37212

More information

TRAFFIC IMPACT STUDY CRITERIA

TRAFFIC IMPACT STUDY CRITERIA Chapter 6 - TRAFFIC IMPACT STUDY CRITERIA 6.1 GENERAL PROVISIONS 6.1.1. Purpose: The purpose of this document is to outline a standard format for preparing a traffic impact study in the City of Steamboat

More information

City of Wayzata Comprehensive Plan 2030 Transportation Chapter: Appendix A

City of Wayzata Comprehensive Plan 2030 Transportation Chapter: Appendix A A1. Functional Classification Table A-1 illustrates the Metropolitan Council s detailed criteria established for the functional classification of roadways within the Twin Cities Metropolitan Area. Table

More information

TRAFFIC IMPACT ANALYSIS

TRAFFIC IMPACT ANALYSIS TRAFFIC IMPACT ANALYSIS FOR THE CHAMPAIGN UNIT#4 SCHOOL DISTRICT PROPOSED HIGH SCHOOL (SPALDING PARK SITE) IN THE CITY OF CHAMPAIGN Final Report Champaign Urbana Urbanized Area Transportation Study 6/24/2014

More information

Chapter 4 Traffic Analysis

Chapter 4 Traffic Analysis Chapter 4 Traffic Analysis PURPOSE The traffic analysis component of the K-68 Corridor Management Plan incorporates information on the existing transportation network, such as traffic volumes and intersection

More information

5.0 Roadway System Plan

5.0 Roadway System Plan Southwest Boise Transportation Study Page 16 5.0 Roadway System Plan The Roadway System Plan outlines roadway improvements in the Initial Study Area. It forecasts future deficiencies on the arterial system,

More information

Highway 111 Corridor Study

Highway 111 Corridor Study Highway 111 Corridor Study June, 2009 LINCOLN CO. HWY 111 CORRIDOR STUDY Draft Study Tea, South Dakota Prepared for City of Tea Sioux Falls Metropolitan Planning Organization Prepared by HDR Engineering,

More information

TRAFFIC STUDY GUIDELINES Clarksville Street Department

TRAFFIC STUDY GUIDELINES Clarksville Street Department TRAFFIC STUDY GUIDELINES Clarksville Street Department 9/1/2009 Introduction Traffic studies are used to help the city determine potential impacts to the operation of the surrounding roadway network. Two

More information

Traffic Impact Study. Westlake Elementary School Westlake, Ohio. TMS Engineers, Inc. June 5, 2017

Traffic Impact Study. Westlake Elementary School Westlake, Ohio. TMS Engineers, Inc. June 5, 2017 TMS Engineers, Inc. Traffic Impact Study Westlake Elementary School Westlake, Ohio June 5, 2017 Prepared for: Westlake City Schools - Board of Education 27200 Hilliard Boulevard Westlake, OH 44145 TRAFFIC

More information

Lyons Avenue/Dockweiler Road Extension Project Draft Environmental Impact Report. Appendix I Traffic Impact Study

Lyons Avenue/Dockweiler Road Extension Project Draft Environmental Impact Report. Appendix I Traffic Impact Study Lyons Avenue/Dockweiler Road Extension Project Draft Environmental Impact Report Appendix I Traffic Impact Study Street 0 80-1947 500.4501 RITA ld Court 0 91355-1096 400.7401 LA n Avenue 0 590-3745 300-9301

More information

CITY OF COCOA BEACH 2025 COMPREHENSIVE PLAN. Section VIII Mobility Element Goals, Objectives, and Policies

CITY OF COCOA BEACH 2025 COMPREHENSIVE PLAN. Section VIII Mobility Element Goals, Objectives, and Policies CITY OF COCOA BEACH 2025 COMPREHENSIVE PLAN Section VIII Mobility Element Goals, Objectives, and Policies Adopted August 6, 2015 by Ordinance No. 1591 VIII MOBILITY ELEMENT Table of Contents Page Number

More information

City of Homewood Transportation Plan

City of Homewood Transportation Plan City of Homewood Transportation Plan Prepared for: City of Homewood, Alabama Prepared by: Skipper Consulting, Inc. May 2007 TABLE OF CONTENTS INTRODUCTION... 1 BACKGROUND INFORMATION... 1 EXISTING TRANSPORTATION

More information

TRAFFIC IMPACT STUDY. Creekside Thornton, Colorado. For. August 2015 November 2015 Revised: August Prepared for:

TRAFFIC IMPACT STUDY. Creekside Thornton, Colorado. For. August 2015 November 2015 Revised: August Prepared for: TRAFFIC IMPACT STUDY For Creekside Thornton, Colorado August 215 November 215 Revised: August 216 Prepared for: Jansen Strawn Consulting Engineers 45 West 2 nd Avenue Denver, Colorado 8223 Prepared by:

More information

DUNBOW ROAD FUNCTIONAL PLANNING

DUNBOW ROAD FUNCTIONAL PLANNING DUNBOW ROAD FUNCTIONAL PLANNING Final Report August 3, 216 #31, 316 5th Avenue NE Calgary, AB T2A 6K4 Phone: 43.273.91 Fax: 43.273.344 wattconsultinggroup.com Dunbow Road Functional Planning Final Report

More information

Traffic Impact Analysis Chatham County Grocery Chatham County, NC

Traffic Impact Analysis Chatham County Grocery Chatham County, NC Chatham County Grocery Chatham County, NC TABLE OF CONTENTS 1. INTRODUCTION... 1 1.1. Location and Study Area... 1 1.2. Proposed Land Use and Access... 2 1.3. Adjacent Land Uses... 2 1.4. Existing ways...

More information

Appendix B. Environmental Resource Technical Memorandum. Assessment on Travel Pattern and Access Impacts

Appendix B. Environmental Resource Technical Memorandum. Assessment on Travel Pattern and Access Impacts Appendix B Environmental Resource Technical Memorandum Assessment on Travel Pattern and Access Impacts TECHNICAL MEMORANDUM ENVIRONMENTAL RE-EVALUATION FOR UNION STATION TO OAK CLIFF DALLAS STREETCAR To:

More information

Shockoe Bottom Preliminary Traffic and Parking Analysis

Shockoe Bottom Preliminary Traffic and Parking Analysis Shockoe Bottom Preliminary Traffic and Parking Analysis Richmond, Virginia August 14, 2013 Prepared For City of Richmond Department of Public Works Prepared By 1001 Boulders Pkwy Suite 300, Richmond, VA

More information

Exhibit 1 PLANNING COMMISSION AGENDA ITEM

Exhibit 1 PLANNING COMMISSION AGENDA ITEM Exhibit 1 PLANNING COMMISSION AGENDA ITEM Project Name: Grand Junction Circulation Plan Grand Junction Complete Streets Policy Applicant: City of Grand Junction Representative: David Thornton Address:

More information

Transportation Impact Study for Abington Terrace

Transportation Impact Study for Abington Terrace Transportation Impact Study for Abington Terrace Abington Township, Montgomery County, PA Sandy A. Koza, P.E., PTOE PA PE License Number PE059911 Prepared by McMahon Associates, Inc. 425 Commerce Drive,

More information

METHODOLOGY. Signalized Intersection Average Control Delay (sec/veh)

METHODOLOGY. Signalized Intersection Average Control Delay (sec/veh) Chapter 5 Traffic Analysis 5.1 SUMMARY US /West 6 th Street assumes a unique role in the Lawrence Douglas County transportation system. This principal arterial street currently conveys commuter traffic

More information

City of Elizabeth City Neighborhood Traffic Calming Policy and Guidelines

City of Elizabeth City Neighborhood Traffic Calming Policy and Guidelines City of Elizabeth City Neighborhood Traffic Calming Policy and Guidelines I. Purpose: The City of Elizabeth City is committed to ensure the overall safety and livability of residential neighborhoods. One

More information

C C C

C C C C-012-001 Thank you for your support for the creation of new public space and nonmotorized access between downtown and the waterfront through the Overlook Walk, the East-West Connections, and the Promenade.

More information

List of Attachments. Location Map... Site Plan... City of Lake Elsinore Circulation Element... City of Lake Elsinore Roadway Cross-Sections...

List of Attachments. Location Map... Site Plan... City of Lake Elsinore Circulation Element... City of Lake Elsinore Roadway Cross-Sections... List of Attachments Exhibits Location Map... Site Plan... City of Lake Elsinore Circulation Element... City of Lake Elsinore Roadway Cross-Sections... Existing Lane Geometry and Traffic Controls... Existing

More information

State Street and Pierce Park Lane Intersection Concept Report

State Street and Pierce Park Lane Intersection Concept Report State Street and Pierce Park Lane Intersection Prepared for September 2017 Prepared by CITATION Parametrix. 2017. State Street & Pierce Park Lane Intersection. Prepared by Parametrix, Boise, ID. September

More information

DRAFT. Corridor study. Honeysuckle Road. October Prepared for the City of Dothan, AL. Prepared by Gresham, Smith and Partners

DRAFT. Corridor study. Honeysuckle Road. October Prepared for the City of Dothan, AL. Prepared by Gresham, Smith and Partners DRAFT Corridor study Honeysuckle Road October 2017 Prepared for the City of Dothan, AL Prepared by TABLE OF CONTENTS SECTION I... 1 STUDY SUMMARY... 1 INTRODUCTION... 1 CONCLUSIONS... 5 SECTION II... 7

More information

Giles Run Connector Road

Giles Run Connector Road Giles Run Connector Road Laurel Hill Adaptive Reuse Area to Laurel Crest Drive South County Federation Meeting June 14, 2016 History Connector road included in the Laurel Hill Comprehensive Plan amendment

More information

TRANSPORTATION ANALYSIS REPORT US Route 6 Huron, Erie County, Ohio

TRANSPORTATION ANALYSIS REPORT US Route 6 Huron, Erie County, Ohio TRANSPORTATION ANALYSIS REPORT US Route 6 Huron, Erie County, Ohio December 12, 2012 Prepared for: The City of Huron 417 Main Huron, OH 44839 Providing Practical Experience Technical Excellence and Client

More information

City of Memphis On-Street Parking Modification Guidelines

City of Memphis On-Street Parking Modification Guidelines City of Memphis Effective Date: December 1, 2013 Bicycle/Pedestrian Program 125 N. Main Street Memphis, TN 38103 (901) 576-6710 www.bikepedmemphis.com City of Memphis Executive Summary It is current practice

More information

APPENDIX 2 LAKESHORE ROAD TRANSPORTATION REVIEW STUDY EXECUTIVE SUMMARY

APPENDIX 2 LAKESHORE ROAD TRANSPORTATION REVIEW STUDY EXECUTIVE SUMMARY APPENDIX 2 LAKESHORE ROAD TRANSPORTATION REVIEW STUDY EXECUTIVE SUMMARY Appendix 2 City of Mississauga Lakeshore Road FINAL REPORT Transportation Review Study December 2010 EXECUTIVE SUMMARY Study Purpose

More information

List of Exhibits...ii

List of Exhibits...ii One Brickell Traffic Study TABLE OF CONTENTS List of Exhibits...ii EXECUTIVE SUMMARY...1 1. INTRODUCTION...2 1.1 Study Area...2 1.2 Study Objective...5 2. EXISTING TRAFFIC CONDITIONS...6 2.1 Data Collection...6

More information

Bridge Street Corridor Study Report

Bridge Street Corridor Study Report Bridge Street Corridor Study Report Prepared for: Prepared by: BRIDGE STREET CORRIDOR STUDY REPORT PREPARED FOR: CITY OF ARROYO GRANDE COMMUNITY DEVELOPMENT DEPARTMENT 300 EAST BRANCH STREET ARROYO GRANDE,

More information

ALLEY 24 TRAFFIC STUDY

ALLEY 24 TRAFFIC STUDY ALLEY 24 TRAFFIC STUDY in City of Frostburg, Maryland January 2013 3566 Teays Valley Road Hurricane, WV Office: (304) 397-5508 www.denniscorporation.com Alley 24 Traffic Study January 2013 Frostburg, Maryland

More information

APPENDIX G: INTERSECTION NEEDS AT OKEECHOBEE BOULEVARD

APPENDIX G: INTERSECTION NEEDS AT OKEECHOBEE BOULEVARD APPENDIX G: INTERSECTION NEEDS AT OKEECHOBEE BOULEVARD INTERSECTION NEEDS AT SR 7 and OKEECHOBEE BOULEVARD SR 7 Extension Project Development and Environment (PD&E) Study From Okeechobee Boulevard (SR

More information

Traffic Impact Study WestBranch Residential Development Davidson, NC March 2016

Traffic Impact Study WestBranch Residential Development Davidson, NC March 2016 Traffic Impact Study WestBranch Residential Development Davidson, NC March 216 TRAFFIC IMPACT STUDY FOR THE WestBranch Residential Development LOCATED IN DAVIDSON, NC Prepared For: Lennar Carolinas, LLC

More information

Highway 49, Highway 351 and Highway 91 Improvements Feasibility Study Craighead County

Highway 49, Highway 351 and Highway 91 Improvements Feasibility Study Craighead County Highway 49, Highway 351 and Highway 91 Improvements Feasibility Study Craighead County Executive Summary March 2015 Highway 49, Highway 351 and Highway 91 Improvements Feasibility Study Craighead County

More information

#!! "$% ##! &! # '#! % $ #!

#!! $% ##! &! # '#! % $ #! Executive Summary US Highway 16 (US 16) is the primary corridor connecting Rapid City to the Black Hills region. It serves a growing population of commercial and residential traffic, as well as seasonal

More information

SECTION 1 - TRAFFIC PLANNING

SECTION 1 - TRAFFIC PLANNING SECTION 1 - TRAFFIC PLANNING 1.1 TRAFFIC OPERATIONS 1.1.1 Roadway Functional Classification The Multnomah County Comprehensive Framework Plan s Policy 34: Trafficways and the Functional Classification

More information

Traffic Impact Study. Roderick Place Columbia Pike Thompson s Station, TN. Transportation Group, LLC Traffic Engineering and Planning

Traffic Impact Study. Roderick Place Columbia Pike Thompson s Station, TN. Transportation Group, LLC Traffic Engineering and Planning F i s c h b a c h Transportation Group, LLC Traffic Engineering and Planning Traffic Impact Study Roderick Place Columbia Pike Thompson s Station, TN Prepared March 2016 Ms. Gillian L. Fischbach, P.E.,

More information

Traffic Impact Analysis Walton Acres at Riverwood Athletic Club Clayton, NC

Traffic Impact Analysis Walton Acres at Riverwood Athletic Club Clayton, NC Traffic Impact Analysis Walton Acres at Riverwood Athletic Club Clayton, NC 1. TABLE OF CONTENTS INTRODUCTION...1 1.1. Site Location and Study Area...1 1.2. Proposed Land Use and Site Access...2 1.3.

More information

Chapter 2: Standards for Access, Non-Motorized, and Transit

Chapter 2: Standards for Access, Non-Motorized, and Transit Standards for Access, Non-Motorized, and Transit Chapter 2: Standards for Access, Non-Motorized, and Transit The Washtenaw County Access Management Plan was developed based on the analysis of existing

More information

Project Report. South Kirkwood Road Traffic Study. Meadows Place, TX October 9, 2015

Project Report. South Kirkwood Road Traffic Study. Meadows Place, TX October 9, 2015 Meadows Place, TX October 9, 2015 Contents 1 Introduction... 1 2 Data Collection... 1 3 Existing Roadway Network... 2 4 Traffic Volume Development... 2 5 Warrant Analysis... 3 6 Traffic Control Alternative

More information

Executive Summary Route 30 Corridor Master Plan

Executive Summary Route 30 Corridor Master Plan Route Corridor Master Plan Project Overview The Route Corridor Master Plan is a coordinated multimodal transportation and land use plan for the entire stretch of Route through East Whiteland Township,

More information

Table of Contents FIGURES TABLES APPENDICES. Traffic Impact Study Hudson Street Parking Garage MC Project No.: A Table of Contents

Table of Contents FIGURES TABLES APPENDICES. Traffic Impact Study Hudson Street Parking Garage MC Project No.: A Table of Contents Traffic Impact Study Hudson Street Parking Garage MC Project No.: 151714A Table of Contents Table of Contents I. INTRODUCTION... 2 II. EXISTING CONDITIONS... 5 III. 215 EXISTING TRAFFIC CONDITIONS... 6

More information

Evaluation of M-99 (Broad Street) Road Diet and Intersection Operational Investigation

Evaluation of M-99 (Broad Street) Road Diet and Intersection Operational Investigation Evaluation of M-99 (Broad Street) Road Diet and Intersection Operational Investigation City of Hillsdale, Hillsdale County, Michigan June 16, 2016 Final Report Prepared for City of Hillsdale 97 North Broad

More information

FINAL DESIGN TRAFFIC TECHNICAL MEMORANDUM

FINAL DESIGN TRAFFIC TECHNICAL MEMORANDUM FINAL DESIGN TRAFFIC TECHNICAL MEMORANDUM July 2014 FINAL (SR 43) Project Development and Environment Study From State Road 60 (Adamo Drive) to I-4 (SR 400) Hillsborough County, Florida Work Program Item

More information

Traffic Impact Study for Rolling Ridge Redevelopment

Traffic Impact Study for Rolling Ridge Redevelopment Traffic Impact Study for Rolling Ridge Redevelopment Webster Groves, Missouri October 19, 2018 Prepared For: Gershman Commercial Real Estate 150 North Meramec Avenue Suite 500 St. Louis, Missouri 63105

More information

OTTAWA TRAIN YARDS PHASE 3 DEVELOPMENT CITY OF OTTAWA TRANSPORTATION IMPACT STUDY. Prepared for:

OTTAWA TRAIN YARDS PHASE 3 DEVELOPMENT CITY OF OTTAWA TRANSPORTATION IMPACT STUDY. Prepared for: OTTAWA TRAIN YARDS PHASE 3 DEVELOPMENT CITY OF OTTAWA TRANSPORTATION IMPACT STUDY Prepared for: The Ottawa Train Yards Inc. 223 Colonnade Road South, Suite 212 Nepean, Ontario K2E 7K3 January 17, 2012

More information

TOWN OF CHAPEL HILL POLICY AND PROCEDURES FOR TRAFFIC CALMING MEASURES

TOWN OF CHAPEL HILL POLICY AND PROCEDURES FOR TRAFFIC CALMING MEASURES TOWN OF CHAPEL HILL POLICY AND PROCEDURES FOR TRAFFIC CALMING MEASURES (Adopted by the Town Council on June 30, 2004) (Revised December 6, 2010) (Revised February 8, 2016) POLICY AND PROCEDURES FOR TRAFFIC

More information

TRAFFIC ASSESSMENT River Edge Colorado

TRAFFIC ASSESSMENT River Edge Colorado TRAFFIC ASSESSMENT River Edge Colorado Submitted by: Fehr & Peers 621 17th Street, Ste. 231 Denver, CO 8293 (33) 296-43 December, 21 App. M-2 Traffic Assessment River Edge Colorado December 21 TABLE OF

More information

MEMORANDUM. Our project study area included the following locations:

MEMORANDUM. Our project study area included the following locations: MEMORANDUM Date: To: From: Subject: Najib O. Habesch Nick M. Fomenko, PE, PTOE Bushnell Park North Traffic Assessment BETA Project #: 4461 As part of our contract to undertake the design of the Bushnell

More information

ENHANCED PARKWAY STUDY: PHASE 2 CONTINUOUS FLOW INTERSECTIONS. Final Report

ENHANCED PARKWAY STUDY: PHASE 2 CONTINUOUS FLOW INTERSECTIONS. Final Report Preparedby: ENHANCED PARKWAY STUDY: PHASE 2 CONTINUOUS FLOW INTERSECTIONS Final Report Prepared for Maricopa County Department of Transportation Prepared by TABLE OF CONTENTS Page EXECUTIVE SUMMARY ES-1

More information

INDUSTRIAL BUILDING 3009 HAWTHORNE ROAD CITY OF OTTAWA TRANSPORTATION OVERVIEW REVISED. Prepared for: Canada Inc.

INDUSTRIAL BUILDING 3009 HAWTHORNE ROAD CITY OF OTTAWA TRANSPORTATION OVERVIEW REVISED. Prepared for: Canada Inc. INDUSTRIAL BUILDING 3009 HAWTHORNE ROAD CITY OF OTTAWA TRANSPORTATION OVERVIEW REVISED Prepared for: 7849648 Canada Inc. Octiober 1, 2015 114-598 Overview_2.doc D. J. Halpenny & Associates Ltd. Consulting

More information

Grant Avenue Streetscape

Grant Avenue Streetscape REPORT TYPE GOES HERE Grant Avenue Streetscape PREPARED FOR City of Manassas 9027 Center Street Manassas, VA 20110 PREPARED BY 8300 Boone Boulevard Suite 700 Vienna, Virginia 22182 571.389.8121 July 31,

More information

University Hill Transportation Study Technical Memorandum Alternatives Modeling and Analysis May 2007

University Hill Transportation Study Technical Memorandum Alternatives Modeling and Analysis May 2007 Technical Memorandum May 2007 Syracuse Metropolitan Transportation Council Edwards and Kelcey with Wallace Roberts and Todd Alta Planning and Design CONTENTS SECTION ONE- INTRODUCTION...1 SECTION TWO-

More information

Figure 1: Vicinity Map of the Study Area

Figure 1: Vicinity Map of the Study Area ARIZONA TEXAS NEW MEXICO OKLAHOMA May 5, 2016 Mr. Anthony Beach, P.E. BSP Engineers 4800 Lakewood Drive, Suite 4 Waco, Texas 76710 Re: Intersection and Access Analysis along Business 190 in Copperas Cove

More information

Appendix C. NORTH METRO STATION AREA TRAFFIC IMPACT STATEMENT 88th Avenue Station

Appendix C. NORTH METRO STATION AREA TRAFFIC IMPACT STATEMENT 88th Avenue Station Appendix C NORTH METRO STATION AREA TRAFFIC IMPACT STATEMENT 88th Avenue Station Prepared for: Regional Transportation Department and URS Corporation as part of the North Metro EIS David Evans and Associates,

More information

Summary: Mercer County Princeton Avenue & Spruce Street Study January 2009

Summary: Mercer County Princeton Avenue & Spruce Street Study January 2009 Summary: Several recent studies have assessed potential development and redevelopment opportunities in the Mercer Crossing area of Trenton, Ewing, and Lawrence. This Princeton Avenue and Spruce Street

More information

Glenn Avenue Corridor Traffic Operational Evaluation

Glenn Avenue Corridor Traffic Operational Evaluation Glenn Avenue Corridor Traffic Operational Evaluation PREPARED FOR: THE CITY OF AUBURN PREPARED BY: DECEMBER 2007 Glenn Avenue Corridor Study--Auburn, Alabama TABLE OF CONTENTS Introduction... 1 Background

More information

Preliminary Transportation Analysis

Preliminary Transportation Analysis Preliminary Transportation Analysis Goals of a Robust, Multimodal Transportation Network Safe Accessible/Connected Efficient Comfortable Context-Sensitive Motor Vehicle: Continue to analyze the data to

More information

INNER LOOP EAST. AIA Rochester Annual Meeting November 13, 2013 TRANSFORMATION PROJECT. Bret Garwood, NBD Erik Frisch, DES

INNER LOOP EAST. AIA Rochester Annual Meeting November 13, 2013 TRANSFORMATION PROJECT. Bret Garwood, NBD Erik Frisch, DES INNER LOOP EAST TRANSFORMATION PROJECT AIA Rochester Annual Meeting November 13, 2013 Bret Garwood, NBD Erik Frisch, DES Why? We are building a city that encourages walking, biking and enjoying the outdoor

More information

Executive Summary June 2015

Executive Summary June 2015 Executive Summary June 2015 Highway 112 Corridor Study Benton and Washington Counties Executive Summary June 2015 Prepared by Transportation Planning and Policy Division Arkansas State Highway and Transportation

More information

Intersection Traffic Control Feasibility Study

Intersection Traffic Control Feasibility Study Intersection Traffic Control Feasibility Study CSAH 9 at CSAH 60 (185th Avenue) Prepared For: Dakota County Transportation Department Western Service Center 14955 Galaxie Avenue, 3rd Floor Apple Valley,

More information

Balancing Operation & Safety for Motorized and Non-Motorized Traffic

Balancing Operation & Safety for Motorized and Non-Motorized Traffic Balancing Operation & Safety for Motorized and Non-Motorized Traffic Brian Willham, PE, PTOE Iowa Director - MOVITE June 30, 2014 Learning Objectives: When & Why should we measure the performance of complete

More information

Operational Comparison of Transit Signal Priority Strategies

Operational Comparison of Transit Signal Priority Strategies Operational Comparison of Transit Signal Priority Strategies Revision Submitted on: November, 0 Author: Adriana Rodriguez, E.I Assistant Engineer Parsons Brinckerhoff 0 South Orange Avenue, Suite 00 Orlando,

More information

Chapter 6: Transportation

Chapter 6: Transportation Chapter 6: Transportation I. INTRODUCTION The purpose of the Transportation Plan element of the Comprehensive Plan is to provide guidance to the City of North Mankato, as well as existing and future landowners

More information

Vision: Traditional hamlet with an attractive business/pedestrian friendly main street connected to adjacent walkable neighborhoods

Vision: Traditional hamlet with an attractive business/pedestrian friendly main street connected to adjacent walkable neighborhoods N D. Focus Area II Vision: Traditional hamlet with an attractive business/pedestrian friendly main street connected to adjacent walkable neighborhoods Transit Road Focus Area II is located in the Hamlet

More information

ADOT Statewide Bicycle and Pedestrian Program Summary of Phase IV Activities APPENDIX B PEDESTRIAN DEMAND INDEX

ADOT Statewide Bicycle and Pedestrian Program Summary of Phase IV Activities APPENDIX B PEDESTRIAN DEMAND INDEX ADOT Statewide Bicycle and Pedestrian Program Summary of Activities APPENDIX B PEDESTRIAN DEMAND INDEX May 24, 2009 Pedestrian Demand Index for State Highway Facilities Revised: May 29, 2007 Introduction

More information

Circulation in Elk Grove includes: Motor vehicles, including cars and trucks

Circulation in Elk Grove includes: Motor vehicles, including cars and trucks Circulation, as it is used in this General Plan, refers to the many ways people and goods move from place to place in Elk Grove and the region. Circulation in Elk Grove includes: Motor vehicles, including

More information

CITY OF SASKATOON COUNCIL POLICY

CITY OF SASKATOON COUNCIL POLICY ORIGIN/AUTHORITY Clause 1, Report No. 1-1980 and Clause 4, Report No. 22-1990 of the Works and Utilities Committee; Clause 6, Report No. 17-2004 of the Planning and Operations Committee; and Clause D5,

More information

Design Traffic Technical Memorandum

Design Traffic Technical Memorandum State Road 7 Extension PD&E Study Design Traffic Technical Memorandum Palm Beach County, FL October 2010 State Road 7 Extension PD&E Study Design Traffic Technical Memorandum Palm Beach County, FL Prepared

More information

Clackamas County Comprehensive Plan

Clackamas County Comprehensive Plan ROADWAYS The County s road system permits the movement of goods and people between communities and regions, using any of a variety of modes of travel. Roads provide access to virtually all property. They

More information

CHAPTER 7 ACCESS MANAGEMENT. Background. Principles of Access Management. Hennepin County Transportation Systems Plan (HC-TSP)

CHAPTER 7 ACCESS MANAGEMENT. Background. Principles of Access Management. Hennepin County Transportation Systems Plan (HC-TSP) CHAPTER 7 ACCESS MANAGEMENT Background Principles of Access Management Hennepin County Transportation Systems Plan (HC-TSP) Chapter 7 Access Management 7.1 Background Access management has become an important

More information

WEST AND SOUTH WEST RING ROAD DOWNSTREAM TRAFFIC IMPACTS

WEST AND SOUTH WEST RING ROAD DOWNSTREAM TRAFFIC IMPACTS Page 1 of 9 EXECUTIVE SUMMARY Alberta Transportation ( AT ) is preparing to construct the final sections of the Calgary Ring Road. This includes the South West Ring Road ( SWRR ) (from Lott Creek Blvd

More information

Main-McVay Transit Study: Phase 2 Options Definition and High Level Constraints Evaluation

Main-McVay Transit Study: Phase 2 Options Definition and High Level Constraints Evaluation Main-McVay Transit Study: Phase 2 Options Definition and High Level Constraints Evaluation APRIL 2016 A collaborative study between: For Additional Information or to Comment If you would like additional

More information

Technical Memorandum TRAFFIC IMPACT STUDY. RIDLEY ROAD CONVENIENCE STORE Southampton County, VA. Prepared for: Mr. David Williams.

Technical Memorandum TRAFFIC IMPACT STUDY. RIDLEY ROAD CONVENIENCE STORE Southampton County, VA. Prepared for: Mr. David Williams. Technical Memorandum TRFFIC IMPCT STUDY RIDLEY ROD CONVENIENCE STORE Southampton County, V Prepared for: Mr. David Williams By: Charles Smith, P.E., PTOE EPR Charlottesville, V July 2014 1 TBLE OF CONTENTS

More information

Welcome. If you have any questions or comments on the project, please contact:

Welcome. If you have any questions or comments on the project, please contact: Welcome This drop-in public open house is intended to provide information about the Bay Street bike lanes project. This project proposes a dedicated cycling facility along Bay Street between Aberdeen Avenue

More information

THIS PAGE LEFT BLANK INTENTIONALLY

THIS PAGE LEFT BLANK INTENTIONALLY GA SR 25 Spur at Canal Road Transportation Impact Analysis PREPARED FOR GLYNN COUNTY, GEORGIA 1725 Reynolds Street, Suite 300 Brunswick, Georgia 31520 PREPARED BY 217 Arrowhead Boulevard Suite 26 Jonesboro,

More information

Walmart (Store # ) 60 th Street North and Marion Road Sioux Falls, South Dakota

Walmart (Store # ) 60 th Street North and Marion Road Sioux Falls, South Dakota Walmart (Store #4865-00) 60 th Street North and Marion Road Sioux Falls, South Dakota Prepared for: Wal-Mart Stores, Inc. Bentonville, Arkansas Prepared by: Kimley-Horn and Associates, Inc. ã2013 Kimley-Horn

More information

CITY OF WEST LAKE HILLS. Forest View Neighborhood Traffic Calming Study

CITY OF WEST LAKE HILLS. Forest View Neighborhood Traffic Calming Study CITY OF WEST LAKE HILLS 901 South Mopac Expressway Building V, Suite 220 Austin, Texas 78746 Texas P.E. Firm Registration No. F-929 Klotz Associates Final Report Submittal: March 20, 2015 Revised Final

More information

TRAFFIC IMPACT STUDY And A TRAFFIC SIGNAL WARRANT ANALYSIS FOR A SENIOR LIVING AND APARTMENT DEVELOPMENT

TRAFFIC IMPACT STUDY And A TRAFFIC SIGNAL WARRANT ANALYSIS FOR A SENIOR LIVING AND APARTMENT DEVELOPMENT TRAFFIC IMPACT STUDY And A TRAFFIC SIGNAL WARRANT ANALYSIS FOR A SENIOR LIVING AND APARTMENT DEVELOPMENT DEERFIELD TOWNSHIP, WARREN COUNTY, OHIO Nantucket Circle and Montgomery Road () Prepared for: ODLE

More information

Moving Towards Complete Streets MMLOS Applications

Moving Towards Complete Streets MMLOS Applications Moving Towards Complete Streets MMLOS Applications Transportation Education Series May 18 th, 2012 It s not just for cars! Presentation Overview The Complete Streets Movement What is Multi-Modal Level

More information

INDUSTRIAL BUILDING 1660 COMSTOCK ROAD CITY OF OTTAWA TRANSPORTATION OVERVIEW. Prepared for:

INDUSTRIAL BUILDING 1660 COMSTOCK ROAD CITY OF OTTAWA TRANSPORTATION OVERVIEW. Prepared for: INDUSTRIAL BUILDING 1660 COMSTOCK ROAD CITY OF OTTAWA TRANSPORTATION OVERVIEW Prepared for: Simluc Contractors Limited 2550 Blackwell Street, Ottawa K1B 5R1 October 18, 2013 113-584 Overview_1.doc D. J.

More information

Community Transportation Plan

Community Transportation Plan Community Transportation Plan Appendix A: Traffic Calming CITY OF DECATUR COMMUNITY TRANSPORTATION PLAN Appendix A: City of Decatur City-wide Residential Traffic Calming Program Process & Procedures The

More information

Roadway Classification Design Standards and Policies. Pueblo, Colorado November, 2004

Roadway Classification Design Standards and Policies. Pueblo, Colorado November, 2004 Roadway Classification Design Standards and Policies Pueblo, Colorado November, 2004 Table of Contents Page Chapter 1. General Provisions 1.1 Jurisdiction 3 1.2 Purpose and Intent 3 1.3 Modification 3

More information

CarMax Auto Superstore/ Reconditioning Center #6002 Murrieta, California

CarMax Auto Superstore/ Reconditioning Center #6002 Murrieta, California CarMax Auto Superstore/ Reconditioning Center #6002 Murrieta, California TUSTIN 17782 17th Street Suite 200 Tustin, CA 92780-1947 714.665.4500 Fax: 714.665.4501 LOS ANGELES 145 S. Spring Street Suite 120

More information

Traffic Analysis and Design Report. NW Bethany Boulevard. NW Bronson Road to NW West Union Road. Washington County, Oregon

Traffic Analysis and Design Report. NW Bethany Boulevard. NW Bronson Road to NW West Union Road. Washington County, Oregon Traffic Analysis and Design Report NW Bethany Boulevard NW Bronson Road to NW West Union Road Washington County, Oregon May 2011 Table of Contents Table of Contents Section 1 Executive Summary... 2 Section

More information

LIVERPOOL TRANSPORTATION MODELING TECHNICAL MEMO MAY 2009

LIVERPOOL TRANSPORTATION MODELING TECHNICAL MEMO MAY 2009 LIVERPOOL TRANSPORTATION MODELING TECHNICAL MEMO MAY 2009 Syracuse Metropolitan Transportation Council 100 Clinton Square 126 N. Salina Street, Suite 100 Syracuse, NY 13202 Telephone (315) 422-5716; Fax

More information

DIMARCO CANANDAIGUA PROPERTIES HOUSING PROJECT CANANDAIGUA, ONTARIO COUNTY, NEW YORK

DIMARCO CANANDAIGUA PROPERTIES HOUSING PROJECT CANANDAIGUA, ONTARIO COUNTY, NEW YORK TRAFFIC IMPACT STUDY FOR THE DIMARCO CANANDAIGUA PROPERTIES HOUSING PROJECT CANANDAIGUA, ONTARIO COUNTY, NEW YORK MARCH 14, 2017 PREPARED FOR: 1950 Brighton Henrietta Town Line Rd Rochester, NY 14623 PREPARED

More information

King Soopers #116 Thornton, Colorado

King Soopers #116 Thornton, Colorado Traffic Impact Study King Soopers #116 Thornton, Colorado Prepared for: Galloway & Company, Inc. 1.0 EXECUTIVE SUMMARY King Soopers #116, a grocery marketplace anchored commercial development, is proposed

More information

Committed to Service

Committed to Service Development Services Department Committed to Service TO: FROM: Ada County Highway District Commissioners Mindy Wallace, AICP Planner III COMISSION HEARING: January 27, 2016 SUBJECT: Syringa Valley Specific

More information

Existing Conditions. Date: April 16 th, Dan Holderness; Coralville City Engineer Scott Larson; Coralville Assistant City Engineer

Existing Conditions. Date: April 16 th, Dan Holderness; Coralville City Engineer Scott Larson; Coralville Assistant City Engineer Date: April 16 th, 2015 To: From: Re: Dan Holderness; Coralville City Engineer Scott Larson; Coralville Assistant City Engineer Darian Nagle-Gamm, Traffic Engineering Planner Highway 6 (2 nd Street) /

More information

Traffic Impact Study Little Egypt Road Development Denver, North Carolina June 2017

Traffic Impact Study Little Egypt Road Development Denver, North Carolina June 2017 Traffic Impact Study Little Egypt Road Development Denver, North arolina June 2017 N. Little Egypt Road DQ\ QDQFLQJ VDOHV RU RWKHU SHUIRUPDQFH EDVHG FULWHULD Proposed Site Driveways Site Driveway 1 TRAFFI

More information

RZC Appendix 8A Marymoor Subarea Street Requirements

RZC Appendix 8A Marymoor Subarea Street Requirements RZC Appendix 8A Marymoor Subarea Street Requirements For additional design details for Marymoor Subarea infrastructure, refer to the 2017 Marymoor Subarea Infrastructure Planning Report. STREET REQUIREMENTS

More information

PRELIMINARY DRAFT WADDLE ROAD / I-99 INTERCHANGE PROJECT ALTERNATIVE ANALYSIS FINAL TRAFFIC SUMMARY REPORT

PRELIMINARY DRAFT WADDLE ROAD / I-99 INTERCHANGE PROJECT ALTERNATIVE ANALYSIS FINAL TRAFFIC SUMMARY REPORT PRELIMINARY DRAFT WADDLE ROAD / I-99 INTERCHANGE PROJECT ALTERNATIVE ANALYSIS FINAL TRAFFIC SUMMARY REPORT Prepared by: In Association with: November 2013 EXECUTIVE SUMMARY Patton Township, in partnership

More information

CITY OF BLOOMINGTON COMPLETE STREETS POLICY

CITY OF BLOOMINGTON COMPLETE STREETS POLICY CITY OF BLOOMINGTON COMPLETE STREETS POLICY POLICY OBJECTIVE: The City of Bloomington will enhance safety, mobility, accessibility and convenience for transportation network users of all ages and abilities,

More information

CITY MANUALS AND STANDARDS REVIEW

CITY MANUALS AND STANDARDS REVIEW GEORGETOWN SIDEWALK MASTER PLAN CITY MANUALS AND STANDARDS REVIEW RESOURCES AND STANDARDS As part of the Master Plan process, a review and evaluation of current City documents and policies relevant to

More information

Princeton Avenue and Spruce Street Transportation and Site Access Enhancements Project

Princeton Avenue and Spruce Street Transportation and Site Access Enhancements Project Princeton Avenue and Spruce Street Transportation and Site Access Enhancements Project Mercer County Planning Division AECOM Transportation (formerly DMJM Harris) January 29, 2009 Agenda Project Status

More information

Project Development & Environment (PD&E) Study. November 17, SR 90 (SW 8th Street and SW 7th Street) SW 8 th Street/SW 7 th Street PD&E Study 1

Project Development & Environment (PD&E) Study. November 17, SR 90 (SW 8th Street and SW 7th Street) SW 8 th Street/SW 7 th Street PD&E Study 1 Financial Management Number: 432639-6-22-01 Federal Aid Project Number: 0202-054-P Efficient Transportation Decision Making Number: 14230 Project Development & Environment (PD&E) Study SR 90 (SW 8th Street

More information