Interstate Route 77 / US Route 62 / State Route 687 (Fulton Road) Transportation Improvement Project. Prepared September 6, 2017

Size: px
Start display at page:

Download "Interstate Route 77 / US Route 62 / State Route 687 (Fulton Road) Transportation Improvement Project. Prepared September 6, 2017"

Transcription

1 EODOT Project: ODOT Project: STA-IR ; PID Interstate Route 77 / US Route 62 / State Route 687 (Fulton Road) Transportation Improvement Project Summary of Public Comments Received and Responses to Comments Open House Public Meeting Canton City and Plain Township, Stark County, Ohio Thursday, July 6, 207 5:00 PM to 7:00 PM Prepared September 6, 207 Documentation of Public Involvement performed for the project, including all written comments received as a result of the July 6, 207 Open House Public Involvement Meeting, is provided in the Project File Public Involvement/Project Information folder.

2 Table Public Comments Received and Responses to Comments Number of comments 6 Comment/Concern A traffic signal is needed at the Fulton Road/Clearview Avenue intersection based on existing traffic conditions and/or potential future conditions (including) anticipated increased traffic from closure of Blake Avenue north of Fulton Road. Traffic signals on Fulton Road should be timed/interconnected to ensure effective operation. Response to Comments ODOT adheres to federal guidelines (Manual on Uniform Traffic Control Devices - MUTCD) that establish minimum conditions under which a traffic signal installation should be considered. A series of traffic signal warrants have been developed to define the minimum traffic conditions that should be present before a traffic signal is installed. If no warrants are met, a traffic signal will not be installed. Based on analysis of peak hour traffic performed at the Fulton Road/Clearview Avenue intersection, traffic conditions do not warrant installation of a traffic signal. The project will coordinate all traffic signals on Fulton Road within the project limits. 5 4 The left turn signal phase at the Fulton Road/Broad Avenue intersection traffic signal is too short. Why can t the project leave a right turn from Fulton Road onto Blake Avenue North or, make Blake Avenue North a right-in/out? Comment in favor of the proposed Blake Avenue North cul-de-sec at Fulton Road with addition of a traffic signal at the Fulton Road/Clearview Avenue intersection. Comment opposed to the proposed Blake Avenue North cul-de-sec at Fulton Road. Comments expressing opposition to the cul-de-sec commonly references issues with increased traffic on Clearview Avenue, increased traffic on 26 th Street, impacts to on-street parking along 26 th Street, excessive speed on 26 th Street, property devaluation on Clearview Avenue and 26 th Street, and potential increased cut through traffic on private property at the Fulton Drive/Clearview Avenue intersection. The existing left turn signal phase timing is tailored to specific facility conditions. The project will evaluate the Fulton Road/Broad Avenue intersection signal timing and coordination to determine if adjustments are needed during project construction. Following completion of project construction, the signal timing will be reevaluated/adjusted accordingly. The project improvements are recommended in conjunction with elimination of access to Blake Avenue north of Fulton Road (i.e., Blake Avenue North). This action coupled with widening the I-77 southbound ramp approach improves capacity for the heavy right turn movement and allows sufficient green time to be devoted to the heavy eastbound through movement on Fulton Road. The resulting revision in the signal phasing allows the westbound left turn, northbound right turn, and southbound right turn maneuvers to occur simultaneously which dramatically improves intersection operation and the operation in the Fulton Road corridor. Simultaneous westbound left turn, northbound right turn, and southbound right turn maneuvers is not feasible with right-in or right-in/out access to Blake Avenue North and this undesirable condition results in unacceptable congestion at the Fulton Road/I-77 Southbound Ramp/US Route 62 Westbound Ramp intersection and negatively impacts the Fulton Road corridor. Based on analysis of peak hour traffic (4:00pm 6:00pm) performed at the Fulton Road/Clearview Avenue intersection, traffic conditions do not warrant installation of a traffic signal at the Fulton Road/Clearview Avenue intersection. Further, based on the highest single hour traffic volume counted (5:00pm 6:00pm) on Blake Avenue North, the closure of Blake Avenue North will result in an increase of approximately 2 vehicles per hour during the peak hour at the Fulton Road/Clearview Avenue intersection. Installation of a traffic signal at the Fulton Road/Clearview Avenue intersection is not warranted and would result in additional traffic flow disruption along the Fulton Road corridor. Vehicle turning movement counts were collected at the Fulton Road/Blake Avenue North intersection and the Fulton Road/Clearview Avenue intersection from 7:00am to 9:00am and from 4:00pm to 6:00pm. The count data captures the highest volumes using Blake Avenue North and Clearview Avenue at Fulton Road. Based on the highest single hour traffic volume counted (5:00pm 6:00pm), the closure of Blake Avenue North will result in an increase of approximately 2 vehicles per hour on 26 th Street and at the Fulton Road/Clearview Avenue intersection. Existing conditions on both 26 th Street and Clearview Avenue can accommodate the expected minor increase in traffic resulting from the elimination of the Blake Avenue North access point on Fulton Road. The project will not change the legal speed limit on 26 th Street. The proposed project improvements are unrelated to vehicle travel speed on the side streets and the project will not eliminate existing on-street parking. The proposed project improvements will improve traffic flow and reduce congestion along the Fulton Road corridor providing increased gaps for southbound left-turning vehicles on Clearview Avenue and may reduce any cut through traffic occurring at the Fulton Road/Clearview Avenue intersection. Lastly, the proposed elimination of the Blake Avenue North access point on Fulton Road will not result in devaluation of any properties along 26 th Street and/or Clearview Avenue. ODOT operates under the Uniform Relocation Assistance and Acquisition Policies Act of 970 and amendments of 987, and every effort will be made to acquire any needed right-of-way in a fair and equitable manner.

3 2 3 Are there plans to reroute traffic onto Orchard Park to access I-77 North? Will any signage be erected directing traffic north on Clearview to Orchard Park to access I-77 North? Comment received indicating opposition to possible Canton City annexation of Plain Township land in the project vicinity. Project only cares about the National Football League (NFL) and/or the Pro Football Hall of Fame. The project is a benefit to the Pro Football hall of Fame and they should pay for the project. The project is not needed. There are a limited number of people who visit the Football Hall of Fame (HOF) on a typical day. With all the infrastructure needs, is this the best way to spend limited funds? Why have real estate taxes increased when properties have lost value? Will the project effect my property value? Will taxes be assessed on Plain Township Residents for any of this project? The project, as proposed, will not reroute traffic onto Orchard Park to access I-77 North and no signage will be erected directing traffic north on Clearview Avenue to Orchard Park to access I-77 North. ODOT maintains State Route 687 (Fulton Road), US Route 62 and I-77 mainline and ramps within the project limits and the Department has no involvement with potential Canton City annexation in the project vicinity. The Department will continue to improve and maintain the State Route 687, US Route 62 and I-77 infrastructure accordingly, respond to Federal and State data reporting mandates and make any required updates due to changes in roadway characteristics and/or other changes including annexations. Recommended Transportation improvements were developed based on a Traffic Impact Study (February 28, 207) performed on the project study area to analyze existing and future capacity for the I-77/US Route 62/Fulton Road interchange and the adjacent intersections using current traffic counts, predicted traffic forecasts for 209 and 2039, origin destination (O-D) data on US 62 and Fulton Road, and known commercial and residential development information for the project study area. The project has been designed to benefit the traveling public and funding for the project has been secured from appropriate federal and state transportation funding sources. As documented in the Traffic Impact Study (February 28, 207), proposed improvements were developed and evaluated on the basis of improving traffic flow and reducing congestion in the project study area without impacting freeway operations on I-77 and US Route 62. Further, an Interchange Operations Study (March 20, 207) was completed and the study determined the recommended improvements will improve operations of the I-77 southbound/us Route 62 westbound weave area to Fulton Road as well as the I-77 northbound exit and I-77 southbound/us Route 62 westbound exit ramp intersections with Fulton Road. The proposed improvements are needed and therefore recommended for implementation. Real estate tax assessment property value and rate is determined by the appropriate tax jurisdiction (e.g., City of Canton or Stark County). ODOT has no involvement with determining real estate taxes. If purchase of additional permanent right-of-way and/or construction easements and temporary right-of-way from private property is required. ODOT will ensure that every effort is made to acquire the needed right-of-way in a fair and equitable manner following the Uniform Relocation Assistance and Acquisition Policies Act of 970 and amendments of 987 and all other applicable state and federal acts, laws, regulations and policies. Funding for the project has been secured from appropriate federal and state transportation funding sources and ODOT will not assess Plain Township Residents for any part of the project. Is there any current or future plan to widen Broad Avenue? No improvements are recommended for Broad Avenue as part of the proposed Interstate Route 77 / US Route 62 / State Route 687 (Fulton Road) transportation improvement project and ODOT is not aware of any current or future plan to widen Broad Avenue. Concern about potential contractor fraud during project construction. ODOT will provide construction administration and project monitoring to ensure construction of high quality infrastructure while minimizing construction time, costs, traffic delays and litigation. A stop sign at the I-77 south ramp will eliminate the need for the four proposed ramp lanes. As documented in the Traffic Impact Study (February 28, 207), proposed improvements are needed to improve traffic flow and reduce congestion in the project study area. Further, an Interchange Operations Study (March 20, 207) was completed and the study determined the recommended improvements will improve operations of the I-77 southbound/us Route 62 westbound weave area to Fulton Road as well as the I-77 northbound exit and I-77 southbound/us Route 62 westbound exit ramp intersections with Fulton Road. The proposed improvements are needed and therefore recommended for implementation. Installation of a stop sign at the I-77 southbound ramp approach to Fulton Road does address the needs established for the project is not recommended.

4 3 4 It is not clear how the proposed improvements will improve operation of the I-77 southbound / US Route 62 westbound exit ramps to Fulton Road. Additional lanes are needed on Fulton Road between Harrison and Clarendon and an additional lane on to northbound and southbound I-77 to further reduce congestion. I-77 southbound ramp traffic does not yield to US 62 westbound ramp traffic as directed in the current signage. More enforcement action is needed. Will I-77 southbound traffic have to yield to the US 62 westbound traffic exiting to Fulton Road? The left turn lane on Fulton Road to the eastbound US 62 on ramp is not long enough and regularly blocks the left lane on Fulton Road. The I-77 southbound exit to 3 th Street needs to be widened to two lanes, lights on 3 th Street should be better controlled/timed and other access improvements are needed on 3 th Street. The proposed ramp modifications improve both safety and operations of the existing weave by addressing the primary deficiencies of the current condition. In the existing condition, vehicles westbound on US 62 wishing to access Fulton Road must change lanes into the I-77 Southbound exit lane. Vehicles merging from US 62 Westbound have the right-of-way while the I-77 Southbound exit ramp traffic must yield to US 62. The proposed condition provides an add-lane through this weave area, eliminating the merge condition. In addition, the heaviest movement through the existing weave area, US 62 Westbound traffic continuing onto I-77 Southbound, is physically separated, and therefore removed from the weave area in the proposed condition. The existing weave also occurs over a distance of approximately 300 feet. In the proposed condition, vehicles are provided a distance of approximately 850 feet to complete the optional weave. The possibility of adding additional through lanes on Fulton Road was not dismissed in the traffic planning phase of this project. However, it was not carried forward because the recommended alternative reduces congestion while minimizing impacts to private properties. As recommended the proposed project improvements are prudent and feasible. I-77 southbound ramp traffic will no longer have to yield to US 62 westbound traffic. Signage will be installed on the I-77 southbound and US 62 westbound ramps requiring motorists changing lanes to yield. Lengthening the eastbound left turn lane to eastbound US 62 would result in elimination of the westbound left turn lane to the southbound I-77 entrance ramp or require shifting the southbound I-77 entrance ramp further west to keep the westbound to southbound I-77 left turn lane. This shift would result in elimination of George Halas Drive. Lengthening the eastbound left turn lane on Fulton Road to eastbound US 62 would add substantive cost and increase project impacts and therefore, is not feasible for this project. Comment noted. The I-77 southbound exit to 3 th Street and the 3 th Street corridor is not located within the study area established for this project. The project should provide a direct access without stoppage into the Hall of Fame (HOF) Village area by way of a bridge over or a Tunnel Under Fulton Drive. Construction of a dedicated ramp bridge or ramp tunnel to the Pro Football Hall of Fame does not address the needs established for the project and is not recommended. 8 The use of Broad Avenue, a township street, as a detour route will result in increased traffic, noise and degradation of the Broad Avenue road infrastructure. State Routes should be utilized for the project detour. As a result of comments received from Plain Township and the public, Broad Avenue will not be utilized as a detour route for this project. Closure of the I-77 South and US 62 West will cause a backups at the exit ramps to Fulton Road. Traffic will be maintained on I-77 and US 62 at times during project construction. Phase I shows no change on the I-77 North entrance ramp at Fulton Road. Does this mean future phases will alter this ramp? Will the I-77 northbound ramp from Fulton Road be expanded/widened with the project or a future project? Request for comments / conversations / consultation with Plain Local School District and Canton City School District regarding considerations for student / staff / parental accessibility and traffic patterns and the same comments / considerations / consults with school transportation departments regarding bus traffic and routing. The project will not reconstruct or otherwise alter the I-77 North entrance ramp at Fulton Road. There is no other current or future plan to widen or otherwise alter the I-77 North entrance ramp at Fulton Road. Plain Local School District and Canton City School District representatives were invited to attend the open house public involvement meeting. To date, no comments have been received from Plain Local School District and/or Canton City School District regarding the project.

5 Will the dual right turn lanes on the I-77 create an issue for traffic turning right on Clearview Avenue; will it be difficult for the traffic in the inner right turn lane to merge? Vehicles changing lanes must yield and safely change lanes. The 2 th Street project should be finished prior to the start of this project construction. ODOT will continue to coordinate with Canton City regarding the completion of the 2 th Street Bridge Replacement Project. Request for copies of the Phase I Environmental Site Assessment Report, Interchange Operation Study and Traffic Impact Study. The requested information was provided via electronic mail, dated July 7, 207. Request received for resurfacing on approximately 300 linear feet of Fulton Rd. between the US 62 Eastbound (EB) Entrance Ramp and Park Road. The project does not address the weave resulting from the I-77 Southbound (SB) off ramp traffic turning left onto Fulton Road while the US 62 exiting traffic predominately wants to turn right. Was any consideration given to physically separating these two ramps such that I- 77 SB traffic would continue to Fulton Road opposite Blake Avenue? The US 62 traffic would then parallel its counterpart ramp around the curve and then exit onto Fulton Drive opposite the I-77 SB on ramp, likely warranting a signal at this intersection. The number of lanes at each off ramp is also reduced, presumably a right thru and left only at each ramp. This results in complete separation of these two ramps with signalized intersections spaced 500 or so distant between the I-77 Northbound (NB) off ramp and I-77 SB on ramp and another 700 to the Blake Avenue intersection. George Halas Drive to remain right in-right out. I can t speak to the ramp geometry; magnitude of cost escalation to the overall project; potential right of way impacts to the cell tower; intersection sight lines; and resulting traffic progression along Fulton Drive. It would result in the elimination of what I perceived to be the predominate exit ramp traffic pattern and my perception of the major contributing cause of these crashes; that is, the inherent weave that results. The resurfacing requested by the Stark County Engineer s Office has been added to the project scope of work. ODOT recently completed a Safety Summary Report to review crash data within the I 77/US 62/Fulton Road project area, including the I-77 SB Exit Ramp/US 62 Westbound (WB) Exit Ramp weave. Based on crash data from 202 through 204, six crashes occurred in the weave area, four of which were directly related to the weave movement. ODOT also reviewed crashes at the weave area in 202, focusing on crash data from 2009 through 20. In that 3-year period, one crash was identified as directly related to the weave movement. ODOT and their consultant, Mott MacDonald, reviewed several alternatives at this location during the traffic planning phase of this project. The focus of the alternatives was to maintain and/or improve conditions (geometrics, safety, operations) given the existing and expected additional traffic generated by the Hall of Fame development. Separating the I-77 SB Exit Ramp and the US 62 WB Exit Ramp to Fulton Road, similar to the scenario described, was explored. From a traffic operations standpoint, the positive impact of separating the ramps would be the elimination of any weaving movement. The expected negative impact would be increased travel time along Fulton Road due to the additional signal and delays associated with the new signal along with impacts to the adjacent signals at Blake Ave and the I-77 NB exit. As stated, the majority of US 62 WB vehicles would turn right onto Fulton Road, reentering the Blake Ave intersection they were removed from. Separating the US-62 Ramp from the I-77 SB Exit Ramp and aligning with the Fulton Road Ramp to I-77 SB would require traversing a 28-foot elevation drop and connecting to Fulton Road parallel and adjacent to the existing I-77 bridge in approximately 600 feet of roadway. This would create an intersection angle of ~65 with Fulton Road, skewing away from the predominant, right-hand-turning movement. The intersection location would also require installation of retaining walls to mitigate impacts to the existing I-77 side slopes. The adjacent I-77 bridge would obstruct sight distance along Fulton Road for the new signals, potentially requiring additional, post mounted signals that would be visible below the bridge. Furthermore, the grading for new ramp alignment would impact the telecommunications tower to the south and west, requiring an additional retaining wall structure. The proposed ramp modifications improve both safety and operations of the existing weave by addressing the primary deficiencies of the current condition. In the existing condition, vehicles westbound on US 62 wishing to access Fulton Road must change lanes into the I-77 SB exit lane. Vehicles merging from US 62 WB have the right-of-way while the I-77 SB exit ramp traffic must yield to US 62. The proposed condition provides an add-lane through this weave area, eliminating the merge condition. In addition, the heaviest movement through the existing weave area, US 62 WB traffic continuing onto I-77 SB, is physically separated, and therefore removed from the weave area in the proposed condition. The existing weave also occurs over a distance of approximately 300 feet. In the proposed condition, vehicles are provided a distance of approximately 850 feet to complete the optional weave. The possibility of separating the I-77 SB Exit Ramp and the US 62 WB Exit Ramp was not dismissed in the traffic planning phase of this project, but it was not carried forward because a) crash data does not support separating the ramps, b) creating an additional signalized intersection on Fulton Road increased delay and vehicle travel time, and c) the preferred alternative addressed the purpose and need of this project, which is to maintain and improve current conditions (geometrics, safety, operations) given the existing and expected additional traffic generated by the Hall of Fame development.

Traffic Circulation Study for Neighborhood Southwest of Mockingbird Lane and Airline Road, Highland Park, Texas

Traffic Circulation Study for Neighborhood Southwest of Mockingbird Lane and Airline Road, Highland Park, Texas ARIZONA TEXAS NEW MEXICO OKLAHOMA February 13, 2015 Mr. Meran Dadgostar P.E., R.S. Town of Highland Park 4700 Drexel Dr. Highland Park, Texas 75205 Re: Traffic Circulation Study for Neighborhood Southwest

More information

Donahue Drive Corridor Traffic Operational Evaluation

Donahue Drive Corridor Traffic Operational Evaluation Donahue Drive Corridor Traffic Operational Evaluation PREPARED FOR: THE CITY OF AUBURN PREPARED BY: JANUARY 2007 Donahue Drive Corridor Study--Auburn, Alabama TABLE OF CONTENTS Introduction... 1 Background

More information

Glenn Avenue Corridor Traffic Operational Evaluation

Glenn Avenue Corridor Traffic Operational Evaluation Glenn Avenue Corridor Traffic Operational Evaluation PREPARED FOR: THE CITY OF AUBURN PREPARED BY: DECEMBER 2007 Glenn Avenue Corridor Study--Auburn, Alabama TABLE OF CONTENTS Introduction... 1 Background

More information

Design Criteria. Design Criteria

Design Criteria. Design Criteria F Design Criteria Design Criteria Ministry of Transportation Ministère des Transports DESIGN CRITERIA Page: 1 of 13 WORK PROJECT NO. N/A GO Bloomington Station TYPE OF PROJECT LOCATION Bloomington Road

More information

METHODOLOGY. Signalized Intersection Average Control Delay (sec/veh)

METHODOLOGY. Signalized Intersection Average Control Delay (sec/veh) Chapter 5 Traffic Analysis 5.1 SUMMARY US /West 6 th Street assumes a unique role in the Lawrence Douglas County transportation system. This principal arterial street currently conveys commuter traffic

More information

Traffic Impact Analysis Chatham County Grocery Chatham County, NC

Traffic Impact Analysis Chatham County Grocery Chatham County, NC Chatham County Grocery Chatham County, NC TABLE OF CONTENTS 1. INTRODUCTION... 1 1.1. Location and Study Area... 1 1.2. Proposed Land Use and Access... 2 1.3. Adjacent Land Uses... 2 1.4. Existing ways...

More information

Highway 49, Highway 351 and Highway 91 Improvements Feasibility Study Craighead County

Highway 49, Highway 351 and Highway 91 Improvements Feasibility Study Craighead County Highway 49, Highway 351 and Highway 91 Improvements Feasibility Study Craighead County Executive Summary March 2015 Highway 49, Highway 351 and Highway 91 Improvements Feasibility Study Craighead County

More information

Traffic Impact Analysis Walton Acres at Riverwood Athletic Club Clayton, NC

Traffic Impact Analysis Walton Acres at Riverwood Athletic Club Clayton, NC Traffic Impact Analysis Walton Acres at Riverwood Athletic Club Clayton, NC 1. TABLE OF CONTENTS INTRODUCTION...1 1.1. Site Location and Study Area...1 1.2. Proposed Land Use and Site Access...2 1.3.

More information

CHAPTER 3 STUDY AREA OPERATIONAL OVERVIEW

CHAPTER 3 STUDY AREA OPERATIONAL OVERVIEW HPTER 3 STUY RE OPERTIONL OVERVIEW This chapter describes the overall traffic operations within the study area under existing and future conditions and focuses on individual intersections not directly

More information

Shockoe Bottom Preliminary Traffic and Parking Analysis

Shockoe Bottom Preliminary Traffic and Parking Analysis Shockoe Bottom Preliminary Traffic and Parking Analysis Richmond, Virginia August 14, 2013 Prepared For City of Richmond Department of Public Works Prepared By 1001 Boulders Pkwy Suite 300, Richmond, VA

More information

DUNBOW ROAD FUNCTIONAL PLANNING

DUNBOW ROAD FUNCTIONAL PLANNING DUNBOW ROAD FUNCTIONAL PLANNING Final Report August 3, 216 #31, 316 5th Avenue NE Calgary, AB T2A 6K4 Phone: 43.273.91 Fax: 43.273.344 wattconsultinggroup.com Dunbow Road Functional Planning Final Report

More information

Offset Single Point Interchange I-25 at Rio Bravo Boulevard Albuquerque, New Mexico

Offset Single Point Interchange I-25 at Rio Bravo Boulevard Albuquerque, New Mexico Offset Single Point Interchange I-25 at Rio Bravo Boulevard Albuquerque, New Mexico INSTITUTE OF TRANSPORTATION ENGINEERS 2016 WESTERN DISTRICT MEETING JULY 11, 2016 7/11/2016 1 Project Vicinity Map 7/11/2016

More information

Evaluation of M-99 (Broad Street) Road Diet and Intersection Operational Investigation

Evaluation of M-99 (Broad Street) Road Diet and Intersection Operational Investigation Evaluation of M-99 (Broad Street) Road Diet and Intersection Operational Investigation City of Hillsdale, Hillsdale County, Michigan June 16, 2016 Final Report Prepared for City of Hillsdale 97 North Broad

More information

Summary: Mercer County Princeton Avenue & Spruce Street Study January 2009

Summary: Mercer County Princeton Avenue & Spruce Street Study January 2009 Summary: Several recent studies have assessed potential development and redevelopment opportunities in the Mercer Crossing area of Trenton, Ewing, and Lawrence. This Princeton Avenue and Spruce Street

More information

TRAFFIC SIGNAL WARRANT STUDY

TRAFFIC SIGNAL WARRANT STUDY TRAFFIC SIGNAL WARRANT STUDY 5 th STREET & ENCHANTED PINES DRIVE JANUARY 2013 TRAFFIC OPERATIONS ENGINEERING SERVICES/PUBLIC WORKS DEPARTMENT TABLE OF CONTENTS INTERSECTION LOCATION MAP ii INTRODUCTION

More information

TRANSPORTATION IMPACT STUDY PROPOSED RIVERFRONT 47 MIXED USE DEVELOPMENT

TRANSPORTATION IMPACT STUDY PROPOSED RIVERFRONT 47 MIXED USE DEVELOPMENT November 2016 TRANSPORTATION IMPACT STUDY PROPOSED RIVERFRONT 47 MIXED USE DEVELOPMENT & Aspinwall Borough, Sharpsburg Borough & O Hara Township, Allegheny County, Pennsylvania Prepared for: Riverfront

More information

THIS PAGE LEFT BLANK INTENTIONALLY

THIS PAGE LEFT BLANK INTENTIONALLY GA SR 25 Spur at Canal Road Transportation Impact Analysis PREPARED FOR GLYNN COUNTY, GEORGIA 1725 Reynolds Street, Suite 300 Brunswick, Georgia 31520 PREPARED BY 217 Arrowhead Boulevard Suite 26 Jonesboro,

More information

Route 7 Corridor Study

Route 7 Corridor Study Route 7 Corridor Study Executive Summary Study Area The following report analyzes a segment of the Virginia State Route 7 corridor. The corridor study area, spanning over 5 miles in length, is a multi

More information

I-264 CORRIDOR EVALUATION STUDY. September 7, 2016 Eric Stringfield VDOT Planning Director Chris Lawrence AECOM Senior Transportation Engineer

I-264 CORRIDOR EVALUATION STUDY. September 7, 2016 Eric Stringfield VDOT Planning Director Chris Lawrence AECOM Senior Transportation Engineer I-264 CORRIDOR EVALUATION STUDY September 7, 2016 Eric Stringfield VDOT Planning Director Chris Lawrence AECOM Senior Transportation Engineer Study Overview Interchange Locations Study Context Follow-up

More information

Intersection Traffic Control Feasibility Study

Intersection Traffic Control Feasibility Study Intersection Traffic Control Feasibility Study CSAH 9 at CSAH 60 (185th Avenue) Prepared For: Dakota County Transportation Department Western Service Center 14955 Galaxie Avenue, 3rd Floor Apple Valley,

More information

Harrah s Station Square Casino

Harrah s Station Square Casino Transportation Analysis Harrah s Station Square Casino Pittsburgh, Pennsylvania Submitted To: City of Pittsburgh and Pennsylvania Gaming Control Board Prepared By: DKS Associates GAI Consultants December

More information

March 11, Lynnfield Board of Selectmen Town of Lynnfield 55 Summer Street Lynnfield, MA Walnut Street Traffic Assessment

March 11, Lynnfield Board of Selectmen Town of Lynnfield 55 Summer Street Lynnfield, MA Walnut Street Traffic Assessment March 11, 2015 Lynnfield Board of Selectmen Town of Lynnfield 55 Summer Street Lynnfield, MA 01940 Re: Walnut Street Traffic Assessment Dear Board of Selectmen Members: As requested, BETA Group, Inc. (BETA)

More information

TRANSPORTATION ANALYSIS REPORT US Route 6 Huron, Erie County, Ohio

TRANSPORTATION ANALYSIS REPORT US Route 6 Huron, Erie County, Ohio TRANSPORTATION ANALYSIS REPORT US Route 6 Huron, Erie County, Ohio December 12, 2012 Prepared for: The City of Huron 417 Main Huron, OH 44839 Providing Practical Experience Technical Excellence and Client

More information

ALLEY 24 TRAFFIC STUDY

ALLEY 24 TRAFFIC STUDY ALLEY 24 TRAFFIC STUDY in City of Frostburg, Maryland January 2013 3566 Teays Valley Road Hurricane, WV Office: (304) 397-5508 www.denniscorporation.com Alley 24 Traffic Study January 2013 Frostburg, Maryland

More information

Welcome! San Jose Avenue Open House August 25, 2015

Welcome! San Jose Avenue Open House August 25, 2015 Welcome! San Jose Avenue Open House August 25, 2015 Vision Zero The City and County of San Francisco adopted Vision Zero San Francisco Vision Zero High Injury Network as a policy in 2014, committing an

More information

MoPac South: Impact on Cesar Chavez Street and the Downtown Network

MoPac South: Impact on Cesar Chavez Street and the Downtown Network MoPac South: Impact on Cesar Chavez Street and the Downtown Network Prepared by: The University of Texas at Austin Center for Transportation Research Prepared for: Central Texas Regional Mobility Authority

More information

INTERSECTION SAFETY STUDY State Route 57 / Seville Road

INTERSECTION SAFETY STUDY State Route 57 / Seville Road INTERSECTION SAFETY STUDY State Route 57 / Seville Road City of Wadsworth, Medina County, Ohio Prepared For: City of Wadsworth Engineering Department 120 Maple Street Wadsworth, OH 44281 Prepared By: GPD

More information

Traffic Impact Study Little Egypt Road Development Denver, North Carolina June 2017

Traffic Impact Study Little Egypt Road Development Denver, North Carolina June 2017 Traffic Impact Study Little Egypt Road Development Denver, North arolina June 2017 N. Little Egypt Road DQ\ QDQFLQJ VDOHV RU RWKHU SHUIRUPDQFH EDVHG FULWHULD Proposed Site Driveways Site Driveway 1 TRAFFI

More information

Iowa Highway 58 Corridor Improvement Study

Iowa Highway 58 Corridor Improvement Study 1 Iowa Highway 58 Corridor Improvement Study Public Informational Meeting May 6, 2014 2 Welcome and Introductions Randy Lorenzen, City of Cedar Falls Engineer 3 Outline of Presentation Review of Project

More information

University Hill Transportation Study Technical Memorandum Alternatives Modeling and Analysis May 2007

University Hill Transportation Study Technical Memorandum Alternatives Modeling and Analysis May 2007 Technical Memorandum May 2007 Syracuse Metropolitan Transportation Council Edwards and Kelcey with Wallace Roberts and Todd Alta Planning and Design CONTENTS SECTION ONE- INTRODUCTION...1 SECTION TWO-

More information

City of Prince Albert Statement of POLICY and PROCEDURE. Department: Public Works Policy No. 66. Section: Transportation Issued: July 14, 2014

City of Prince Albert Statement of POLICY and PROCEDURE. Department: Public Works Policy No. 66. Section: Transportation Issued: July 14, 2014 Page: 1 of 8 1 POLICY 1.01 The City shall follow all of the specifications in the Manual of Uniform Traffic Control Devices for Canada, prepared by the National Committee of Uniform Traffic Control, and

More information

Appendix D: Concept Screening

Appendix D: Concept Screening Concept Description Concept #1 Route 288 Roadway Widening This concept consists of constructing a third lane on northbound and southbound Route 288 between Powhite Parkway and US 360. This improvement

More information

Capital Region Council of Governments

Capital Region Council of Governments March 23, 2018 Capital Region Council of Governments PROJECT CONCEPT REPORT Realignment of Swamp and Northfield Road s approaches to Route 44 (Boston Turnpike) Town of Coventry SUMMARY: The Town of Coventry

More information

TRAFFIC IMPACT STUDY COMPREHENSIVE UPDATE TOWN OF THOMPSON S STATION, TENNESSEE PREPARED FOR: THE TOWN OF THOMPSON S STATION

TRAFFIC IMPACT STUDY COMPREHENSIVE UPDATE TOWN OF THOMPSON S STATION, TENNESSEE PREPARED FOR: THE TOWN OF THOMPSON S STATION TRAFFIC IMPACT STUDY COMPREHENSIVE UPDATE TOWN OF THOMPSON S STATION, TENNESSEE PREPARED FOR: THE TOWN OF THOMPSON S STATION Transportation Consultants, LLC 1101 17 TH AVENUE SOUTH NASHVILLE, TN 37212

More information

CONTENTS EXECUTIVE SUMMARY 1

CONTENTS EXECUTIVE SUMMARY 1 CONTENTS CHAPTER PAGE EXECUTIVE SUMMARY 1 1 ISSUES AND PURPOSE OF THE ANALYSIS 2 1.1 Background 2 1.2 Analysis Area 2 1.3 Issues and Observations 3 1.4 Project and Public Meetings 3 2 LIST OF PREFERRED

More information

Traffic Circulation & Pedestrian Safety Study

Traffic Circulation & Pedestrian Safety Study Lyons Township High School North Campus La Grange, Illinois Parking Lot Vaughan Building N Main Building Prepared for: Prepared by: July 23, 2015 Contents List of Figures, iii 1. Introduction...1 2. Existing

More information

CITY OF SASKATOON COUNCIL POLICY

CITY OF SASKATOON COUNCIL POLICY ORIGIN/AUTHORITY Clause 1, Report No. 1-1980 and Clause 4, Report No. 22-1990 of the Works and Utilities Committee; Clause 6, Report No. 17-2004 of the Planning and Operations Committee; and Clause D5,

More information

Gwinnett County Department of Transportation SR 324 / Gravel Springs Road at I-85 / SR 403 Interchange Project Number F , PI No.

Gwinnett County Department of Transportation SR 324 / Gravel Springs Road at I-85 / SR 403 Interchange Project Number F , PI No. June 4, 2015 Dear Resident: Thank you for attending this public information meeting for the proposed SR 324 / Gravel Springs Road at I-85 Interchange. The purpose of this meeting is two-fold: to provide

More information

Walton Acres at Riverwood Athletic Club Clayton, North Carolina

Walton Acres at Riverwood Athletic Club Clayton, North Carolina 9. CONCLUSIONS This Traffic Impact Analysis Update was conducted to determine the potential traffic impacts of the proposed Walton Acres at Riverwood Athletic Club residential development, located east

More information

Walmart (Store # ) 60 th Street North and Marion Road Sioux Falls, South Dakota

Walmart (Store # ) 60 th Street North and Marion Road Sioux Falls, South Dakota Walmart (Store #4865-00) 60 th Street North and Marion Road Sioux Falls, South Dakota Prepared for: Wal-Mart Stores, Inc. Bentonville, Arkansas Prepared by: Kimley-Horn and Associates, Inc. ã2013 Kimley-Horn

More information

SECTION 7 INVENTORY OF SELECTED INTERSECTIONS AND RECOMMENDATIONS FOR FURTHER STUDY

SECTION 7 INVENTORY OF SELECTED INTERSECTIONS AND RECOMMENDATIONS FOR FURTHER STUDY SECTION 7 INVEY OF SELECTED INTERSECTIONS AND RECOMMENDATIONS FOR FURTHER STUDY The study corridor includes a total of 19 signalized intersections. Through consultation with Campbell County and the KYTC,

More information

3.0 PROJECT DESCRIPTION

3.0 PROJECT DESCRIPTION The following section of the Draft EIR contains a description of the proposed Elk Grove Boulevard/SR 99 Interchange Modification project, consistent with the requirements of CEQA Guidelines Section 15124.

More information

MEMORANDUM. David Mohlenbrok, Environmental Services Manager

MEMORANDUM. David Mohlenbrok, Environmental Services Manager MEMORANDUM DATE: August 10, 2017 TO: FROM: RE: Planning Commission Members David Mohlenbrok, Environmental Services Manager Blue Memo # 1 for Rocklin Station Project Comments Received on Initial Study/Mitigated

More information

APPENDIX E Evaluation of Improvement Alternatives

APPENDIX E Evaluation of Improvement Alternatives APPENDIX E Evaluation of Improvement Alternatives Table E-1 Preliminary Comparison of Design Alternatives, Concord Table E-2 Preliminary Comparison of Route 2 Improvement Packages, Acton and Concord TABLE

More information

ROUTE 22 CORRIDOR STUDY: CORRIDOR MANAGEMENT PLAN APPENDIX A A-12

ROUTE 22 CORRIDOR STUDY: CORRIDOR MANAGEMENT PLAN APPENDIX A A-12 ROUTE 22 CORRIDOR STUDY: CORRIDOR MANAGEMENT PLAN APPENDIX A A-12 3.0 HARLEM VALLEY TRANSPORTATION PLAN Incorporates transportation systems management and safety improvements. Location: Route 22 corridor

More information

Cricket Valley Energy Project Dover, NY Updated Traffic Impact Study

Cricket Valley Energy Project Dover, NY Updated Traffic Impact Study Updated Traffic Impact Study Community Resources 6.3A Traffic and Transportation Amended This amended Traffic Study incorporates comments from NYSDOT, provided after their review of the original Traffic

More information

Poor pavement condition Substandard Intersections. / Substandard bike/pedestrian/transit accommodations. Driveway access Environmental concerns

Poor pavement condition Substandard Intersections. / Substandard bike/pedestrian/transit accommodations. Driveway access Environmental concerns Public Informational Meeting University Avenue (Allen Boulevard Segoe Road) March 23, 2011 City of Madison City of Middleton Village of Shorewood Hills Dane County Existing Roadway Conditions Poor pavement

More information

TRAFFIC IMPACT STUDY And A TRAFFIC SIGNAL WARRANT ANALYSIS FOR A SENIOR LIVING AND APARTMENT DEVELOPMENT

TRAFFIC IMPACT STUDY And A TRAFFIC SIGNAL WARRANT ANALYSIS FOR A SENIOR LIVING AND APARTMENT DEVELOPMENT TRAFFIC IMPACT STUDY And A TRAFFIC SIGNAL WARRANT ANALYSIS FOR A SENIOR LIVING AND APARTMENT DEVELOPMENT DEERFIELD TOWNSHIP, WARREN COUNTY, OHIO Nantucket Circle and Montgomery Road () Prepared for: ODLE

More information

Truck Climbing Lane Traffic Justification Report

Truck Climbing Lane Traffic Justification Report ROUTE 7 (HARRY BYRD HIGHWAY) WESTBOUND FROM WEST MARKET STREET TO ROUTE 9 (CHARLES TOWN PIKE) Truck Climbing Lane Traffic Justification Report Project No. 6007-053-133, P 101 Ι UPC No. 58599 Prepared by:

More information

4 DISRUPTION MANAGEMENT PLAN HIGHWAY 7 RAPIDWAY CONSTRUCTION BETWEEN BAYVIEW AVENUE AND WARDEN AVENUE TOWNS OF MARKHAM AND RICHMOND HILL

4 DISRUPTION MANAGEMENT PLAN HIGHWAY 7 RAPIDWAY CONSTRUCTION BETWEEN BAYVIEW AVENUE AND WARDEN AVENUE TOWNS OF MARKHAM AND RICHMOND HILL 4 DISRUPTION MANAGEMENT PLAN HIGHWAY 7 RAPIDWAY CONSTRUCTION BETWEEN BAYVIEW AVENUE AND WARDEN AVENUE TOWNS OF MARKHAM AND RICHMOND HILL The Transportation Services Committee recommends the adoption of

More information

Traffic Control Inspection Checklist Segment:

Traffic Control Inspection Checklist Segment: Traffic Control Inspection Checklist Segment: Simon Contractors Simon Contractors Originator: Description Reviewed by: Initials Date Distribution: Traffic Quality Manager, Site Assistant Traffic Manager

More information

AGENDA REPORT. Issue: Discussion of potential improvements on Barnwell Road at Niblick Drive

AGENDA REPORT. Issue: Discussion of potential improvements on Barnwell Road at Niblick Drive AGENDA REPORT To: From: By: Honorable Mayor and City Council Members Warren Hutmacher, City Manager Tom Black, Public Works Director Date: March 23, 2016 Agenda: March 28, 2016 WORK SESSION AGENDA: Barnwell

More information

Washington St. Corridor Study

Washington St. Corridor Study FIGURE 7.17 Bridge Alternatives - Cross Sections 86 Discarded Alternative: Short-Term Bridge Repair Short-term repairs and west bridge span replacement were considered during analysis. Short-term repairs

More information

Traffic Technical Environmental Study

Traffic Technical Environmental Study Traffic Technical Environmental Study US Department of Transportation Federal Highway Administration New Jersey Department of Transportation Table of Contents I. Introduction Project Background. 1 Purpose

More information

I-215 / NEWPORT ROAD INTERCHANGE PROJECT PRESS KIT

I-215 / NEWPORT ROAD INTERCHANGE PROJECT PRESS KIT I-215 / NEWPORT ROAD INTERCHANGE PROJECT PRESS KIT March I-215 / NEWPORT ROAD INTERCHANGE PROJECT Fact Sheet Project Overview This project will reconstruct the existing interchange located on Interstate

More information

WEST AVENUE AND NEW ROAD TRAFFIC STUDY PART III WEST AVENUE CLOSURE ALTERNATIVES ANALYSIS

WEST AVENUE AND NEW ROAD TRAFFIC STUDY PART III WEST AVENUE CLOSURE ALTERNATIVES ANALYSIS WEST AVENUE AND NEW ROAD TRAFFIC STUDY PART III WEST AVENUE CLOSURE ALTERNATIVES ANALYSIS CITY OF LINWOOD ATLANTIC COUNTY, NEW JERSEY March 30, 2006 PREPARED FOR: City of Linwood 400 Poplar Avenue Linwood,

More information

7.0 FREEWAYS CONGESTION HOT SPOT PROBLEM & IMPROVEMENT PROJECT ANALYSIS & DEFINITION

7.0 FREEWAYS CONGESTION HOT SPOT PROBLEM & IMPROVEMENT PROJECT ANALYSIS & DEFINITION 7.0 FREEWAYS CONGESTION HOT SPOT PROBLEM & IMPROVEMENT PROJECT ANALYSIS & DEFINITION 7.1 INTRODUCTION & METHODOLOGY FEASIBILITY REPORT Congestion hot spot problem locations have been assessed using the

More information

Scarlett Road Bridge & Road Improvements Lambton Park Community School - Gymnasium Tuesday November 28 th, 2017

Scarlett Road Bridge & Road Improvements Lambton Park Community School - Gymnasium Tuesday November 28 th, 2017 Scarlett Road Bridge & Road Improvements Lambton Park Community School - Gymnasium Tuesday November 28 th, 2017 PROJECT LOCATION 2 SCARLETT ROAD BRIDGE Constructed in 1912, the bridge carries 4 active

More information

WASHINGTON CITY TELEGRAPH ROAD & GREEN SPRINGS DRIVE INTERSECTION STUDY

WASHINGTON CITY TELEGRAPH ROAD & GREEN SPRINGS DRIVE INTERSECTION STUDY WASHINGTON CITY TELEGRAPH ROAD & GREEN SPRINGS DRIVE INTERSECTION STUDY February 6, 2014 PREPARED BY: 11 North 300 West Washington, UT 84780 (435) 652-8450 phone (435) 652-8416 fax WASHINGTON CITY TELEGRAPH

More information

East 12 th Street Bikeway Feasibility Study

East 12 th Street Bikeway Feasibility Study Final Report East 12 th Street Bikeway Feasibility Study Prepared for: City of Oakland Public Works Agency Submitted by: 180 Grand Avenue, Suite 250 Oakland, CA 94612 Phone: (510) 839-1742; Fax: (510)

More information

NEW YORK CENTRAL PARK SUBDIVISION BLAIS STREET/ST-PIERRE STREET EMBRUN, ONTARIO TRAFFIC IMPACT STUDY. Prepared for:

NEW YORK CENTRAL PARK SUBDIVISION BLAIS STREET/ST-PIERRE STREET EMBRUN, ONTARIO TRAFFIC IMPACT STUDY. Prepared for: NEW YORK CENTRAL PARK SUBDIVISION BLAIS STREET/ST-PIERRE STREET EMBRUN, ONTARIO TRAFFIC IMPACT STUDY Prepared for: Solidex Holdings Limited & Investissement Maurice Lemieux Investments Attn: Mr. Anthony

More information

INTERSTATE 540 IMPROVEMENT STUDY

INTERSTATE 540 IMPROVEMENT STUDY INTERSTATE 540 IMPROVEMENT STUDY WASHINGTON COUNTY AND BENTON COUNTY APRIL, 2006 INTERSTATE 540 IMPROVEMENT STUDY WASHINGTON COUNTY AND BENTON COUNTY April, 2006 Prepared by Parsons Transportation Group

More information

MUTCD Part 6G: Type of Temporary Traffic Control Zone Activities

MUTCD Part 6G: Type of Temporary Traffic Control Zone Activities MUTCD Part 6G: Type of Temporary Traffic Control Zone Activities 6G.01 Typical Applications Each temporary traffic control (TTC) zone is different. Many variables, such as location of work, highway type,

More information

Transportation Impacts: Toronto York Spadina Subway Extension

Transportation Impacts: Toronto York Spadina Subway Extension STAFF REPORT ACTION REQUIRED Transportation Impacts: Toronto York Spadina Subway Extension Date: June 6, 2011 To: From: Wards: Reference Number: North York Community Council Director, Transportation Services

More information

Chapter 4 Traffic Analysis

Chapter 4 Traffic Analysis Chapter 4 Traffic Analysis PURPOSE The traffic analysis component of the K-68 Corridor Management Plan incorporates information on the existing transportation network, such as traffic volumes and intersection

More information

A plan for improved motor vehicle access on Railroad Avenue in Provincetown

A plan for improved motor vehicle access on Railroad Avenue in Provincetown A plan for improved motor vehicle access on Railroad Avenue in Provincetown February 2011 A plan for improved motor vehicle access on Railroad Avenue in Provincetown INTRODUCTION AND PROBLEM IDENTIFICATION

More information

Public Involvement Outreach Requirements for Public Information Open House Meeting: C.N , HSIP-5003(12) 132 nd and West Center Road, Omaha

Public Involvement Outreach Requirements for Public Information Open House Meeting: C.N , HSIP-5003(12) 132 nd and West Center Road, Omaha To: NDOR Environmental From: Randy McCart, HDR Date: 4 April 2017 RE: Public Involvement Summary Report, HSIP-5003(12) 132 nd and West Center Road, Omaha; C.N. 22629 Public Involvement Outreach Requirements

More information

Northbound San Jose Avenue & I-280 Off-Ramp Road Diet Pilot Project

Northbound San Jose Avenue & I-280 Off-Ramp Road Diet Pilot Project Project Overview Fed by a two-lane Interstate-280 (I-280) off-ramp, high vehicular volumes and speeds are longstanding issues along San Jose Avenue. Residents in the surrounding neighborhoods have expressed

More information

Traffic Impact Study WestBranch Residential Development Davidson, NC March 2016

Traffic Impact Study WestBranch Residential Development Davidson, NC March 2016 Traffic Impact Study WestBranch Residential Development Davidson, NC March 216 TRAFFIC IMPACT STUDY FOR THE WestBranch Residential Development LOCATED IN DAVIDSON, NC Prepared For: Lennar Carolinas, LLC

More information

Los Altos Hills Town Council - June 18, 2015 Palo Alto City Council June 22, AGENDA ITEM #2.B Presentation

Los Altos Hills Town Council - June 18, 2015 Palo Alto City Council June 22, AGENDA ITEM #2.B Presentation Los Altos Hills Town Council - June 18, 2015 Palo Alto City Council June 22, 2015 AGENDA ITEM #2.B Presentation Previous Presentations Los Altos Hills Town Council in May 2014 and February 2015 Palo Alto

More information

Northwest Corridor Project Interchange Modification, Interchange Justification and System Analysis Report Reassessment (Phase I)

Northwest Corridor Project Interchange Modification, Interchange Justification and System Analysis Report Reassessment (Phase I) Northwest Corridor Project Interchange Modification, Interchange Justification and System Analysis Report Reassessment (Phase I) Introduction The Georgia Department of Transportation (GDOT) prepared a

More information

Albany Shaker Road Corridor Study Public Meeting # 2

Albany Shaker Road Corridor Study Public Meeting # 2 Albany Shaker Road Corridor Study Public Meeting # 2 Scope / Meeting Purpose This project is a CDTC Linkage Study. The Linkage Program is designed to implement the adopted planning and investment principles

More information

I-395 Express Lanes Northern Extension Project Public Hearings

I-395 Express Lanes Northern Extension Project Public Hearings I-395 Express Lanes Northern Extension Project Public Hearings Susan Shaw, PE, Megaprojects Director Virginia Department of Transportation Amanda Baxter, Special Projects Manager Virginia Department of

More information

PRELIMINARY DRAFT WADDLE ROAD / I-99 INTERCHANGE PROJECT ALTERNATIVE ANALYSIS FINAL TRAFFIC SUMMARY REPORT

PRELIMINARY DRAFT WADDLE ROAD / I-99 INTERCHANGE PROJECT ALTERNATIVE ANALYSIS FINAL TRAFFIC SUMMARY REPORT PRELIMINARY DRAFT WADDLE ROAD / I-99 INTERCHANGE PROJECT ALTERNATIVE ANALYSIS FINAL TRAFFIC SUMMARY REPORT Prepared by: In Association with: November 2013 EXECUTIVE SUMMARY Patton Township, in partnership

More information

Purpose: Financial Implications and Impact Statement: It is estimated that the cost to implement:

Purpose: Financial Implications and Impact Statement: It is estimated that the cost to implement: Various Modifications Lower Jarvis Street and Lake Shore Boulevard East; Lower Jarvis Street, east side, between Lake Shore Boulevard East and The Esplanade - 45-77 Lower Jarvis Street; and Lower Jarvis

More information

Traffic Impact Study. Westlake Elementary School Westlake, Ohio. TMS Engineers, Inc. June 5, 2017

Traffic Impact Study. Westlake Elementary School Westlake, Ohio. TMS Engineers, Inc. June 5, 2017 TMS Engineers, Inc. Traffic Impact Study Westlake Elementary School Westlake, Ohio June 5, 2017 Prepared for: Westlake City Schools - Board of Education 27200 Hilliard Boulevard Westlake, OH 44145 TRAFFIC

More information

AGENDA ITEM 6 D THOMASVILLE ROAD (HERMITAGE BOULEVARD TO LIVE OAK PLANTATION ROAD) ROADWAY SAFETY AUDIT

AGENDA ITEM 6 D THOMASVILLE ROAD (HERMITAGE BOULEVARD TO LIVE OAK PLANTATION ROAD) ROADWAY SAFETY AUDIT May 15, 2018 AGENDA ITEM 6 D THOMASVILLE ROAD (HERMITAGE BOULEVARD TO LIVE OAK PLANTATION ROAD) ROADWAY SAFETY AUDIT TYPE OF ITEM: Discussion STATEMENT OF ISSUE The Florida Department of Transportation

More information

2015 MAJOR TRANSPORTATION CONSTRUCTION PROJECTS UPDATE

2015 MAJOR TRANSPORTATION CONSTRUCTION PROJECTS UPDATE 2015 MAJOR TRANSPORTATION CONSTRUCTION PROJECTS UPDATE 2015 MAJOR TRANSPORTATION CONSTRUCTION PROJECTS HOLD HARD ROAD & SAWMILL ROAD INTERSECTION HARD ROAD WIDENING RIVERSIDE DRIVE REALIGNMENT I-270/US

More information

SH-6 Corridor Improvement Study Policy Committee Progress Report M O N D AY, J U N E 1 0, B R A Z O S C E N T E R

SH-6 Corridor Improvement Study Policy Committee Progress Report M O N D AY, J U N E 1 0, B R A Z O S C E N T E R SH-6 Corridor Improvement Study Policy Committee Progress Report M O N D AY, J U N E 1 0, 2 0 1 3 B R A Z O S C E N T E R Project Overview Study Goals and Objectives» Improve traffic flow» Reduce delay»

More information

Joshua Jester, E.I., Florida Department of Transportation, District One

Joshua Jester, E.I., Florida Department of Transportation, District One MEMORANDUM To: From: Joshua Jester, E.I., Florida Department of Transportation, District One Michael Garau, P.E., Kimley-Horn and Associates, Inc. Date: October 5, 2018 Subject: at Gulfstream Avenue Intersection

More information

Feasibility Study of Pedestrian Crossings Along Route 7, East of Cascades Parkway and West of Dranesville Road. October 3, 2017

Feasibility Study of Pedestrian Crossings Along Route 7, East of Cascades Parkway and West of Dranesville Road. October 3, 2017 Feasibility Study of Pedestrian Crossings Along Route 7, East of Cascades Parkway and West of Dranesville Road October 3, 2017 Study Area (area within a ¼-mile radius of the study intersections) Route

More information

Gene Dillon Elementary School Traffic Study Division Street Site

Gene Dillon Elementary School Traffic Study Division Street Site To: From: Dr. James Hess, Superintendent Jordan Schwarze, PE, Senior Engineer Matt Pacyna, PE, Senior Associate Date: March 30, 2016 Subject: Gene Dillon Elementary School Traffic Study reet Site Memorandum

More information

Toronto and East York Community Council. Director, Transportation Services, Toronto and East York District

Toronto and East York Community Council. Director, Transportation Services, Toronto and East York District No Turn on Red Regulations STAFF REPORT ACTION REQUIRED Date: June 1, 2010 To: From: Toronto and East York Community Council Director, Transportation Services, Toronto and East York District Wards: Trinity

More information

Subject: Solberg Avenue / I-229 Grade Separation: Traffic Analysis

Subject: Solberg Avenue / I-229 Grade Separation: Traffic Analysis MEMORANDUM Transportation Bill Troe, AICP Jason Carbee, AICP 12120 Shamrock Plaza Suite 300 Omaha, NE 68154 (402) 334-8181 (402) 334-1984 (Fax) To: Project File Date: Subject: Solberg Avenue / I-229 Grade

More information

Southwest Bus Rapid Transit (SW BRT) Functional Planning Study - Executive Summary January 19 LPT ATTACHMENT 2.

Southwest Bus Rapid Transit (SW BRT) Functional Planning Study - Executive Summary January 19 LPT ATTACHMENT 2. Southwest Bus Rapid Transit (SW BRT) Functional Planning Study - Executive Summary 2011 January 19 1 of 19 Introduction This executive summary presents the results of the Southwest Bus Rapid Transit (SW

More information

VT15 / Allen Martin Drive Intersection Scoping Study

VT15 / Allen Martin Drive Intersection Scoping Study VT15 / Allen Martin Drive Intersection Scoping Study ALTERNATIVES PRESENTATION MEETING DECEMBER 19, 2016 Agenda Study Area Project Background Existing Conditions Identified Issues Proposed Alternatives

More information

Overview. Updated pictures of the intersection are shown in Exhibits 1 thru 4, and the aerial photo provided by Google Maps is shown in Exhibit 5.

Overview. Updated pictures of the intersection are shown in Exhibits 1 thru 4, and the aerial photo provided by Google Maps is shown in Exhibit 5. Overview The (here in after referred to as the Village ) is submitting the follow up interim RLRC Safety Report for the intersection of Lincoln Highway (US 30) at Orchard Drive. Additional reports, as

More information

CITY OF OAKLAND. 27th Street Bikeway Feasibility and Design. Final Report (v3) March 23, Kimley-Horn and Associates, Inc.

CITY OF OAKLAND. 27th Street Bikeway Feasibility and Design. Final Report (v3) March 23, Kimley-Horn and Associates, Inc. CITY OF OAKLAND 27th Street Bikeway Feasibility and Design Final Report (v3) March 23, 2007 PREPARED BY: Kimley-Horn and Associates, Inc. Table of Contents 1. Introduction 3 2. 27 th Street/Bay Place Corridor

More information

Comments EXECUTIVE SUMMARY

Comments EXECUTIVE SUMMARY Comments 1. Under any Alternatives, MCDOT should provide better at-grade pedestrian crossing of Georgia Avenue and Forest Glen Road, including improved crosswalks with wider medians and adequate signal

More information

Delaware Avenue Corridor Study

Delaware Avenue Corridor Study Delaware Avenue Corridor Study City of Marysville, Ohio February 19, 2009 ms consultants, inc. engineers, architects, planners 2221 Schrock Road Columbus, Ohio 43229-1547 ms ms consultants, inc. engineers

More information

Bay to Bay Boulevard Complete Streets Project

Bay to Bay Boulevard Complete Streets Project Bay to Bay Boulevard Complete Streets Project Dale Mabry Highway to Bayshore Boulevard February 08, 2018 Photo Source: Tampa Bay Times Alessandra Da Pra Meeting Format Introduction Resurfacing Information

More information

Final Project Prioritization Plan

Final Project Prioritization Plan Final Project Prioritization Plan For the NM 599 Corridor Executive Summary I. EXECUTIVE SUMMARY NM 599 serves as a North/South by-pass for vehicles traveling through Santa Fe and a WIPP route for low

More information

FY 2006 TRANSPORTATION CAPITAL PROGRAM

FY 2006 TRANSPORTATION CAPITAL PROGRAM Eden Lane Bridge over Whippany River NS9908 The existing structure was built in 1972 as a temporary single-span structure. The bridge consists of simply supported steel acrow panel trusses and is supported

More information

THE LANDMARK AT TALBOT PARK

THE LANDMARK AT TALBOT PARK TRAFFIC IMPACT STUDY FOR THE LANDMARK AT TALBOT PARK IN NORFOLK, VA INTERMODAL ENGINEERING, P.C. OCTOBER, 200 The Landmark at Talbot Park is a proposed redevelopment of the existing apartments along the

More information

Existing Conditions. Date: April 16 th, Dan Holderness; Coralville City Engineer Scott Larson; Coralville Assistant City Engineer

Existing Conditions. Date: April 16 th, Dan Holderness; Coralville City Engineer Scott Larson; Coralville Assistant City Engineer Date: April 16 th, 2015 To: From: Re: Dan Holderness; Coralville City Engineer Scott Larson; Coralville Assistant City Engineer Darian Nagle-Gamm, Traffic Engineering Planner Highway 6 (2 nd Street) /

More information

Caltrans Sloat Boulevard Pedestrian Safety Project Response to Community Questions, Comments & Concerns

Caltrans Sloat Boulevard Pedestrian Safety Project Response to Community Questions, Comments & Concerns Caltrans Sloat Boulevard Pedestrian Safety Project Response to Community Questions, Comments & Concerns Revised: May 10, 2016 The California Department of Transportation (Caltrans) is planning various

More information

CONTENTS EXECUTIVE SUMMARY. 1 SUMMARY OF EXISTING CONDITIONS Issues and Observations Public Meeting (December 2005) 1

CONTENTS EXECUTIVE SUMMARY. 1 SUMMARY OF EXISTING CONDITIONS Issues and Observations Public Meeting (December 2005) 1 CONTENTS CHAPTER PAGE EXECUTIVE SUMMARY ES-1 1 SUMMARY OF EXISTING CONDITIONS 1 1.1 Issues and Observations 1 1.2 Public Meeting (December 2005) 1 2 LIST OF POTENTIAL IMPROVEMENT STRATEGIES 2 2.1 Traffic

More information

Figure 1: East West Connector Alignment Alternatives Concept Drawing

Figure 1: East West Connector Alignment Alternatives Concept Drawing Page 2 of 9 Figure 1: East West Connector Alignment Alternatives Concept Drawing The Montebello Drive extension will run north south and connect Wilsonville Road to the Boones Ferry Road to Brown Road

More information

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects ROUTE/ Project ID No. TIP No. Electrical Load Center Replacement - North 04324 04324 This project will provide for the betterment of the existing highway lighting facilities located along Routes 3, 17

More information

DESIGN MEMORANDUM WITH DESIGN EXCEPTIONS SP SP

DESIGN MEMORANDUM WITH DESIGN EXCEPTIONS SP SP DRAFT NOT FINAL (Note: document was not finalized due to an eastbound stopping site distance design issue that requires more detailed bridge and roadway design considerations. This discussion starts on

More information