Mission Street Medical Office Development

Size: px
Start display at page:

Download "Mission Street Medical Office Development"

Transcription

1 reet Medical Office Development Traffic Impact Analysis Prepared for: Palo Alto Medical Foundation February 23, 2012 Hexagon Office: 7888 Wren Avenue, Suite B121 Gilroy, CA Hexagon Job Number: 11RD11 Phone: Client Name: Palo Alto Medical Foundation

2 Table of Contents Executive Summary... iv 1. Introduction Existing Conditions Existing Plus Project Conditions Cumulative Conditions Other Transportation Issues Conclusions Appendices Appendix A Appendix B Appendix C Appendix D Traffic Counts Volume Summary Level of Service Calculations Site Access Analysis List of Tables Table ES 1 Table ES 2 Table ES 3 Intersection Level of Service Summary... viii Signal Warrant Analysis Summary... ix TIRE Analysis Summary... x Table 1 Signalized Intersection Level of Service Definitions Based on Control Delay... 5 Table 2 Unsignalized Intersection Level of Service Definitions Based on Control Delay... 6 Table 3 Existing Intersection Levels of Service Table 4 Project Trip Generation Estimates Table 5 Existing Plus Project Intersection Levels of Service Table 6 Cumulative Intersection Levels of Service Table 7 Unsignalized Intersection Analysis Summary Table 8 TIRE Index Analysis Page ii

3 List of Figures Figure 1 Site Location and Study Intersections... 2 Figure 2 Site Plan... 3 Figure 3 Existing Bicycle Facilities Figure 4 Existing Transit Services Figure 5 Existing Lane Configurations Figure 6 Existing Traffic Volumes Figure 7 Project Trip Distribution Figure 8 Project Trip Assignment Figure 9 Existing Plus Project Traffic Volumes Figure 10 Cumulative No Project Traffic Volumes Figure 11 Cumulative Plus Project Traffic Volumes Page iii

4 Executive Summary This report presents the results of the traffic impact analysis conducted for the proposed Palo Alto Medical Foundation (PAMF) reet medical office development in Santa Cruz, California. The project site is located along reet between Laurent Street and Van Ness Avenue. Several retail buildings and single-family residences currently occupy the project site. The proposed project consists of replacing the existing retail and residential uses on site with new medical office buildings totaling 18,000 square feet. The existing PAMF facility and services at 1203 reet will be relocated to the proposed project site. It should be noted that the traffic analysis for the proposed project does not reflect a shift in trips that will likely occur due to the location of services to the Westside area. Currently patients from the Westside area must travel to the Eastside PAMF facility located along Soquel Avenue. The proposed project will locate some services now offered at the Eastside facility. Therefore, the trips currently made to the Eastside facility will shift to the Westside facility resulting in shorter trips. Two fullaccess entrances, one along Van Ness Avenue and one along Laurent Street, will serve the project. The results of the analysis completed as part of this traffic study indicate that the traffic associated with the proposed project will not result in a significant impact to the surrounding roadway network based on the City of Santa Cruz significance criteria. However, several potential improvements were identified that would improve intersection operational problems at intersections in the immediate vicinity of the project. Scope of Study The purpose of the study is to identify the potential traffic impacts related to the proposed project. The potential impacts related to the proposed development were evaluated following the standards and methodologies set forth by the City of Santa Cruz. The study includes an analysis of AM and PM peak-hour traffic conditions for four signalized intersections, four unsignalized intersections, and three roadway segments. The study intersections were evaluated using TRAFFIX software based on the operations methodology described in the 2000 Highway Capacity Manual. The study also includes a signal warrant analysis, an evaluation of site access, and an evaluation of the effects of project traffic on surrounding neighborhood streets. Traffic conditions at all of the study intersections were analyzed for the weekday AM and PM peak hours. The weekday AM peak hour of traffic is generally between 7:00 and 9:00 AM and the weekday PM peak hour is typically between 4:00 and 6:00 PM. It is during these periods that the most congested traffic conditions occur on a typical weekday. Project Trip Generation The magnitude of traffic produced by a new development is typically estimated by applying the size of the project to the applicable trip generation rates contained in the Institute of Transportation Engineers (ITE) Trip Generation Manual. However, there is an existing PAMF medical office located one block from the proposed project site at 1203 reet. Therefore, the trip generation of the proposed project was Page iv

5 estimated utilizing trip generation rates developed based on driveway counts at the existing medical office and compared with those recommended by ITE. Peak hour driveway counts were conducted at the existing clinic in June Based on the trip generation rates developed from the driveway counts, the proposed clinic is expected to generate 53 AM peak-hour trips (49 inbound trips and 4 outbound trips) and 91 PM peak-hour trips (42 inbound trips and 49 outbound trips). Based on the ITE rates, it is estimated that the proposed project will generate 41 AM peak-hour trips (32 inbound trips and 9 outbound trips) and 62 PM peak-hour trips (17 inbound trips and 45 outbound trips). The project was evaluated using the surveyed rates since they are more reflective of the expected mode of travel of patients to the proposed clinic and result in a more conservative analysis than the ITE rates. The surveyed rates also reflect the transportation demand management (TDM) program that is currently implemented by the Palo Alto Medical Foundation at all of its facilities. The TDM program provides financial incentives to encourage the use of alternative modes of transportation (public transit, carpooling, walking, bicycling) by its employees to reduce vehicular trips and parking demands. Existing retail and residential uses currently occupy the project site. Based upon peak-hour driveway counts completed on June 7, 2011, the existing uses on site generate 16 AM and 20 PM peak-hour trips. Credits for the existing uses on the project site are subtracted from the estimated trips to be generated by the proposed project, as described above. The trips associated with the existing site uses were added to the roadway network under project conditions as negative trips. Based on the surveyed trip rates and existing trip credits, the proposed project was estimated to generate a net additional 37 AM peak-hour trips (43 inbound and -6 outbound) and 71 PM peak-hour trips (32 inbound and 39 outbound). Intersection Level of Service Analysis The intersection level of service for each of the study scenarios is summarized in Table ES 1. The results of the intersection level of service analysis under project conditions show that no study intersections would be impacted by the project according to City of Santa Cruz level of service standards. However, the minor street northbound approaches at the unsignalized intersections of Van Ness Avenue and Mission Street and Laurent Street and reet would operate at a poor LOS during the peak hours under each of the scenarios studied. The poor LOS is due to the continuous flow of traffic on reet, which does not allow adequate gaps for left turning traffic from the minor streets. A detailed analysis and discussion of unsignalized intersections is provided in Chapter 5. The results of the study intersection level of service analysis under cumulative conditions indicate that all study intersections with the exception of Bay Street and reet would operate within the City s level of service standards during each of the peak hours both without and with the project under cumulative conditions. The intersection levels of service analysis for cumulative conditions without the proposed project indicate that the Bay Street and reet intersection would operate at LOS E and F during the AM and PM peak hours, respectively. The proposed project will account for only 3% of total projected traffic volume growth at the intersection. The addition of project traffic to the study intersections would not result in a degradation of levels of service when compared to cumulative no project conditions. Therefore, the project would not have a cumulatively significant impact at the study intersections. To address long-range impacts the City of Santa Cruz has established a Traffic Impact Fee (TIF) program. This program enables the City to levy a traffic impact fee on all projects in a TIF area. This program insures that all traffic impacts, including those from this project, are addressed. Other Transportation Issues Other issues related to transportation were evaluated to determine if any deficiencies would exist under project conditions that may not be specifically linked to environmental impact reporting. These may not be Page v

6 considered environmental issues, and may not be evaluated in the environmental assessment, but have been included in the traffic study to meet the requirements of the local jurisdiction. The other transportation issues considered are signal warrants, vehicle queuing requirements, impacts to adjacent neighborhoods, bicycle, pedestrian, transit issues, and site access and on-site circulation issues. For deficiencies identified, improvements are formulated that could improve or remedy the particular deficiency. Unsignalized Intersection Analysis Signal warrant analysis indicates that neither of the unsignalized study intersections would warrant a traffic signal. In addition, the delays at all intersection movements would be acceptable, except for the minor street northbound approaches at Van Ness Avenue and Laurent Street with reet. The addition of a separate right-turn lanes from Van Ness Avenue and Laurent Street to northbound Mission Street would reduce delays experienced on Van Ness Avenue and Laurent Street. Parking along the north side of Van Ness Avenue, at its intersection with reet, will need to be prohibited approximately feet (4 to 5 vehicles) to accommodate the right-turn lane on Van Ness Avenue. The proposed project could provide the necessary four feet of right-of way to implement the separate rightturn lane along Laurent Street. Site Access A review of the project site plan was performed to determine if adequate site access is provided and to identify any access or circulation issues that should be improved. One driveway along Van Ness Avenue and one driveway along Laurent Street are proposed to serve the project site. The Van Ness Avenue driveway will be located approximately 60 feet south of reet. The site plan indicates approximately a 24-foot wide driveway. The driveways throat length, or the distance from the driveway to the first point of access to parking aisles or parking stalls, appears to be a minimum of approximately 30 feet long. This is enough to provide storage for one vehicle prior to spilling back onto Van Ness Avenue. The Laurent Street driveway will be located approximately 160 feet south of reet. The site plan indicates approximately a 24-foot wide driveway serving a 24-foot drive aisle through the surface parking lot. The driveways throat length, or the distance from the driveway to the first point of access to parking aisles or parking stalls, appears to be a minimum of approximately 25 feet long. This is enough to provide storage for one vehicle prior to spilling back onto Laurent Street. A vehicular queuing analysis also was completed at the project driveway along Laurent Street to evaluate potential conflicts due to its close spacing to the Laurent Street and reet intersection. The southbound left-turn movement into the project site at the driveway and the northbound movements at the Laurent Street and reet intersection were evaluated during each of the peak hours. The 95 th percentile queue for the left-turn movement into the project driveway is estimated to be no more than one vehicle (25 feet) during all peak hours analyzed. The 95 th percentile northbound queue at the Laurent Street and reet intersection is estimated to be a maximum of two vehicles (50 feet). The total distance between the project driveway along Laurent Street and the Laurent Street and reet intersection is approximately 160 feet. Therefore, the analysis indicates that the left-turn movement into the project driveway will not be inhibited by the northbound queue from the Laurent Street and Mission Street intersection and the inbound left-turn queue will not back up to the Laurent Street and Mission Street intersection. Transit, Pedestrian and Bicycle Analysis Bicycle and Pedestrian Circulation The volume of bicycle trips generated by the project would not exceed the bicycle-carrying capacity of streets surrounding the site, and the increase in bicycle trips would not require new off-site bicycle facilities. Page vi

7 The volume of pedestrian trips generated by the project would not exceed the carrying capacity of the existing sidewalks on streets surrounding the site or necessitate improvements to pedestrian facilities. However, the project is proposing to improve the sidewalk along its frontage with the addition of street trees that will create a buffer between street traffic and pedestrians. Transit Service The estimated new transit riders generated by the proposed project could be accommodated by the available capacity of the eight local bus routes, which have stops located within walking distance of the site. Thus, no improvements to the existing transit facilities would be needed in conjunction with the proposed project. However, the project is proposing to construct a new covered bus stop location along its reet frontage. Parking Based on the City of Santa Cruz s parking code requirements for medical offices (Municipal Code ) the development should provide 1 space per 200 s.f. of floor area. Therefore, the project as proposed would require 90 total parking spaces. However, the City allows for a 10% reduction in provided parking for development that provides transportation demand management (TDM) program. The Palo Alto Medical Foundation intends to implement a TDM program at the proposed site as is currently implemented at all of its facilities. The TDM program provides financial incentives to encourage the use of alternative modes of transportation (public transit, carpooling, walking, bicycling) by its employees to reduce vehicular trips and parking demands. The project proposes to provide a total of 88 parking spaces on site, including three handicapped parking spaces. Therefore, the proposed parking will meet the City of Santa Cruz parking requirements. In addition, the project also is proposing to provide a total of 20 onsite bicycle parking facilities, which exceeds the City s requirements of 15 bicycle spaces. Neighborhood Traffic Issues Residential areas are especially sensitive to traffic increases because traffic can impact the livability of the street. To that end, the addition of project trips to surrounding residential streets may affect the neighborhood. One method for evaluating the effect on residential neighborhoods of traffic added by development projects is the Traffic Infusion on Residential Environment (TIRE) method. The TIRE method provides a means for qualitatively measuring impacts on the character of residential streets caused by increased traffic levels. The TIRE methodology assigns an index value based on the daily traffic volumes on the subject street segments. The index values range from 0.0 to 5.0, with 3.0 or higher representing a street that operates as an auto-dominated street. According to the TIRE methodology, a traffic volume increase that causes at least a 0.1 increase in the TIRE index would be noticeable to street residents. Each TIRE index value has a specific minimum average daily traffic volume increase threshold that must be met in order to trigger a change of 0.1 or more in the index value (i.e., a noticeable change). When the volume thresholds are exceeded, the traffic volume change would be noticeable to street residents. The TIRE analysis was conducted for each of the three study roadway segments. The TIRE analysis is summarized in Table ES 3. Project traffic is expected to be added to each of the studied roadways. However, the addition of project traffic on each of the studied roadway segments would not exceed the volume threshold that would trigger a noticeable change in traffic volumes (i.e., a full increase of 0.1 in the TIRE index). However, the TIRE index methodology is only one analytical tool by which to measure the effects of traffic increases and the perceived effects of increased traffic may vary from resident to resident. Nonetheless, the existing traffic calming measures (speed humps and bulb-outs) already in place along each of the surrounding residential streets as well as the proposed right-turn lanes at the Van Ness Avenue and Laurent Street intersections with reet will serve to minimize the effects of the additional project traffic. Page vii

8 Table ES 1 Intersection Level of Service Summary Existing Plus Project Cumulative No Project Existing Study Existing Peak Count Avg. Avg. Avg. Avg. Cumulative Plus Project Number Intersection Control Hour Date Delay 1 LOS Delay 1 LOS Delay 1 LOS Delay 1 LOS 1 Laurent Street and California Street Unsignalized AM 06/07/ A 0.8 A 0.7 A 0.7 A PM 06/07/ A 1.4 A 1.2 A 1.4 A 2 Van Ness Avenue and California Street Unsignalized AM 06/07/ A 0.5 A 0.5 A 0.5 A PM 06/07/ A 0.9 A 0.7 A 0.8 A 3 Walnut Avenue and reet Signal AM 06/07/ B 13.1 B 15.6 B 15.7 B PM 06/07/ B 13.9 B 17.2 B 17.3 B 4 Laurel Street and reet Signal AM 06/07/ B 19.1 B 19.7 B 19.7 B PM 06/07/ C 23.3 C 27.6 C 28.1 C 5 Van Ness Avenue and reet Unsignalized AM 06/07/ A 0.6 A 1.2 A 1.3 A PM 06/07/ A 1.5 A 2.7 A 12.0 B 6 Laurent Street and reet Unsignalized AM 06/07/ A 0.4 A 0.4 A 0.4 A PM 06/07/ A 1.4 A 0.8 A 14.4 B 7 Bay Street and reet Signal AM 06/07/ D 38.2 D 55.9 E 56.3 E PM 06/07/ D 44.1 D 80.1 F 81.4 F 8 Almar Avenue/Younglove Avenue and reet Signal AM 06/07/ B 15.9 B 17.8 B 17.8 B PM 06/07/ C 21.8 C 32.1 C 32.4 C Notes: 1 Whole intersection weighted average control delay expressed in seconds per vehicle. Page viii

9 Table ES 2 Signal Warrant Analysis Summary Warrant Met? Study Existing Existing Plus Project Cumulative No Project Cumulative with Project Number Intersection AM PM AM PM AM PM AM PM Existing Unsignalized Intersections 1 Laurent Street and California Street No No No No No No No No 2 Van Ness Avenue and California Street No No No No No No No No 5 Van Ness Avenue and reet No No No No No No No No 6 Laurent Street and reet No No No No No No No No Notes: Signal warrant analysis based on the Peak Hour Signal Warrant #3, Figure 4C Caltrans MUTCD 2010 Edition. Page ix

10 Table ES 3 TIRE Analysis Summary Existing Conditions Existing Plus Project Conditions Existing TIRE Δ ADT Traffic Vol. ADT % TIRE ADT Threshold Roadway Segment ADT /a/ Index Threshold /b/ Change /c/ Increase Index Exceeded? 1. Laurent Street between Seaside Street and California Street ,004 19% 3.0 No 2. Van Ness Avenue between reet and California Street % 2.9 No 3. California Street between Laurent Street and Van Ness Avenue 7, , ,242 2% 3.9 No Notes: "ADT" = Average Daily Traffic Volume. /a/ Source of existing daily traffic volumes: 24-hour mechanical (tube) counts conducted on June 6, /b/ The change in ADT threshold is the minimum daily volume increase from this scenario to the next that is needed to cause a full 0.1 increase in the TIRE index. /c/ The daily traffic volume change under project conditions is that which is due to new vehicular trips added by the project. Page x

11 1. Introduction This report presents the results of the traffic impact analysis conducted for the proposed Palo Alto Medical Foundation (PAMF) reet medical office development in Santa Cruz, California. The project site is located along reet between Laurent Street and Van Ness Avenue. Several retail buildings and single-family residences currently occupy the project site. The proposed project consists of replacing the existing retail and residential uses on site with new medical office buildings totaling 18,000 square feet. Two full-access entrances, one along Van Ness Avenue and one other along Laurent Street, will serve the project. The project site location and the surrounding study area are shown on Figure 1. The project site plan is shown on Figure 2. Scope of Study The potential impacts related to the proposed development were evaluated following the standards and methodologies set forth by the City of Santa Cruz. The study included an analysis of AM and PM peakhour traffic conditions for four signalized intersections, four unsignalized intersections, and three roadway segments. The study also includes a signal warrant analysis, an evaluation of site access, and an evaluation of the effects of project traffic on surrounding neighborhood streets. The study intersections are identified below and shown in Figure 1. Study Intersections Roadway Segments 1. California Street and Laurent Street 2. California Street and Van Ness Avenue 3. reet and Walnut Avenue 4. reet and Laurel Street 5. reet and Van Ness Avenue 6. reet and Laurent Street 7. reet and Bay Street 8. reet and Almar Avenue/Younglove Avenue 1. Laurent Street between reet and California Street 2. Van Ness Avenue between reet and California Street 3. California Street between Van Ness Avenue and Laurent Street Traffic conditions at all of the study intersections were analyzed for the weekday AM and PM peak hours. The weekday AM peak hour of traffic is generally between 7:00 and 9:00 AM and the weekday PM peak hour is typically between 4:00 and 6:00 PM. It is during these periods that the most congested traffic conditions occur on a typical weekday. Traffic conditions were evaluated for the following scenarios: Page 1

12 Figure 1 Site Location and Study Intersections Page 2

13 Figure 2 Site Plan Page 3

14 Scenario 1: Scenario 2: Scenario 3: Scenario 4: Existing Conditions. Existing conditions were represented by existing peak-hour traffic volumes on the existing roadway network. Existing traffic volumes were obtained from recent traffic counts. Existing Plus Project Conditions. Project-generated traffic volumes were added to existing traffic volumes to estimate existing plus project conditions. Existing plus project conditions were evaluated relative to existing conditions in order to determine potential project impacts. Cumulative Conditions. Cumulative conditions include traffic growth projected to occur due to approved development projects and other proposed but not yet approved (pending) development projects. Cumulative traffic volumes were estimated by adding to existing peak-hour volumes the projected volumes from approved and pending developments. Approved and pending projects were obtained from the City of Santa Cruz TRAFFIX database. Cumulative Plus Project Conditions. Project-generated traffic was added to the cumulative volumes from Scenario 3 to obtain traffic volumes for cumulative plus project conditions. These volumes were used to determine the intersection operations under cumulative plus project conditions. Cumulative plus project conditions were evaluated relative to cumulative conditions in order to determine potential cumulative plus project impacts. Methodology This section presents the methods used to determine the traffic conditions for each scenario described above. It includes descriptions of the data requirements, the analysis methodologies, and the applicable level of service standards. Data Requirements The data required for the analysis were obtained from previous traffic studies, new counts, the City of Santa Cruz, and field observations. The following data were collected from these sources: existing traffic volumes lane configurations signal timing and phasing Approved and pending projects Analysis Methodologies and Level of Service Standards Traffic conditions at the study intersections were evaluated using level of service (LOS). Level of Service is a qualitative description of operating conditions ranging from LOS A, or free-flow conditions with little or no delay, to LOS F, or jammed conditions with excessive delays. The analysis methods are described below. Signalized Intersections Signalized study intersections are subject to the City of Santa Cruz level of service standards. The City of Santa Cruz level of service methodology is TRAFFIX, which is based on the 2000 Highway Capacity Manual (HCM) method for signalized intersections. TRAFFIX evaluates signalized intersections operations based on average delay time for all vehicles at the intersection. All intersections within the City of Santa Cruz are required to meet the City s LOS standard of LOS D. The correlation between average delay and level of service for signalized intersections is shown in Table 1. Page 4

15 Table 1 Signalized Intersection Level of Service Definitions Based on Control Delay Level of Service Description Average Control Delay Per Vehicle (Sec.) A Operations with very low delay occurring with favorable progression and/or short cycle lengths. Up to 10.0 B Operations with low delay occurring with good progression and/or short cycle lengths to 20.0 C D E F Operation with average delays resulting from fair progression and/or longer cycle lengths. Individual cycle failures begin to appear. Operations with longer delays due to a combination of unfavorable progression, long cycle lengths or high V/C rations. Many vehicles stop and individual cycle failures are noticeable. Operations with high delay values indicating poor progression, long cycle lengths, and high V/C ratios. Individual cycle failures are frequent occurrences. This is considered to be the limit of acceptable delay. Operations with delays unacceptable to most drivers occurring due to over saturation, poor progression, or very long cycle lengths to to to 80.0 Greater than 80.0 Source: Transportation Research Board, 2000 Highway Capacity Manual, (Washington, D.C., 2000) Unsignalized Intersections The methodology used to determine the level of service for unsignalized intersections is also TRAFFIX and the 2000 Highway Capacity Manual methodology for unsignalized intersection analysis. This method is applicable for both two-way and all-way stop-controlled intersections. For the analysis of stop-controlled intersections, the 2000 HCM methodology evaluates intersection operations on the basis of average control delay time for all vehicles on the stop-controlled approaches. For the purpose of reporting level of service for one- and two-way stop-controlled intersections, the delay and corresponding level of service for the stop-controlled minor street approach with the highest delay is reported. For all-way stopcontrolled intersections, the reported average delay and corresponding level of service is the average for all approaches at the intersection. The correlation between average delay and level of service for unsignalized intersections is shown in Table 2. The level of service analysis at unsignalized intersections is supplemented with an assessment of the need for signalization of the intersection. The need for signalization of unsignalized intersections is assessed based on the Peak Hour Volume Warrant (Warrant 3) described in the California Manual on Uniform Traffic Control Devices for Streets and Highways (CA MUTCD), Part 4, Highway Traffic Signals, This method makes no evaluation of intersection level of service, but simply provides an indication whether vehicular peak hour traffic volumes are, or would be, sufficient to justify installation of a traffic signal. Intersections that meet the peak hour warrant are subject to further analysis before determining that a traffic signal is necessary. Additional analysis may include unsignalized level of service analysis and/or operational analysis such as evaluating vehicle queuing and delay. Other options such as traffic control devices, signage, or geometric changes may be preferable based on existing field conditions. Page 5

16 Table 2 Unsignalized Intersection Level of Service Definitions Based on Control Delay Level of Service Description Average Control Delay Per Vehicle (Sec.) A Operations with very low delays occurring with favorable progression. Up to 10.0 B Operations with low delays occurring with good progression to 15.0 C Operations with average delays resulting from fair progression to 25.0 D Operation with longer delays due to a combination of unfavorable progression of high V/C ratios to 35.0 E F Operation with high delay values indicating poor progression and high V/C ratios. This is considered to be the limited of acceptable delay. Operation with delays unacceptable to most drivers occurring due to oversaturation and poor progression to 50.0 Greater than 50.0 Source: Transportation Research Board, 2000 Highway Capacity Manual. (Washington, D.C., 2000) Significant Impact Criteria The City of Santa Cruz has established several significance criteria to determine whether a project would cause a significant transportation impact. A project impact is considered significant if: It would conflict with an applicable plan, ordinance or policy establishing measures of effectiveness for the performance of the circulation system, taking into account all modes of transportation including mass transit and non-motorized travel and relevant components of the circulation system, including but not limited to intersections, streets, highways and freeways, pedestrian and bicycle paths, and mass transit. It would cause an intersection operations to exceed the City s current level of service standard of LOS D. It would change the peak hour level of service of a State Highway roadway segment from acceptable operation to deficient operation with the addition of project-generated traffic. It would conflict with adopted policies, plans or programs regarding public transit, bicycle, or pedestrian facilities, or otherwise decrease the performance or safety of such facilities). It would substantially increases hazards due to a design feature (e.g., sharp curves or dangerous intersections) or incompatible uses (e.g., farm equipment); or It would result in inadequate emergency access. The following criteria are not subject to CEQA significance criteria but must be addressed as appropriate in the findings of the traffic study. If the project site design does not have adequate parking or circulation capacity to accommodate the anticipated demand. Parking demand shall be measured first using the City Parking Page 6

17 requirements but may be adjusted using ITE 85 percentile parking generation rates and shared parking analysis factors at the discretion of the City Engineer and Senior Planner. The City Parking Ordinance allows reductions for shared parking and transportation management strategies but these must be substantiated and quantified in the analysis. If the project would result in inadequate internal circulation to accommodate project traffic. To address long-range impacts the City of Santa Cruz has established a Traffic Impact Fee (TIF) program. This program enables the City to levy a traffic impact fee on all projects in a TIF area. This program insures that all traffic impacts, including this study, are addressed. Report Organization The remainder of this report is divided into five chapters. Chapter 2 describes existing conditions in terms of the existing roadway network, transit service, and existing bicycle and pedestrian facilities. Chapter 3 presents the project impact on the transportation system and describes the recommended mitigation measures under existing plus project conditions. Chapter 4 presents the traffic conditions in the study area under cumulative conditions without and with the addition of project traffic. Chapter 6 presents the conclusions of the traffic impact analysis. Chapter 5 presents the analysis of other transportation related issues, including site access and parking. Page 7

18 2. Existing Conditions This chapter describes the existing conditions for all of the major transportation facilities in the vicinity of the site, including the roadway network, transit service, and bicycle and pedestrian facilities. Existing Roadway Network Regional access to the project site is provided via Highway 1 and SR 17. These facilities are described below. Highway 1 is a four-lane roadway in the vicinity of the site and is referred to as reet between its interchange with SR 17 and Swift Street. Highway 1 extends north and south along the coast of the State of California. It links the City of Santa Cruz with Capitola and the Monterey Peninsula to the south and the Cities of Half Moon Bay, Pacifica, and San Francisco to the north. Access to and from the project site is provided via its intersections with Van Ness Avenue and Laurent Street. SR 17 is a four-lane roadway in the vicinity of the project site that extends northerly from the City of Santa Cruz to Santa Clara County, where it becomes I-880. SR 17 provides access to the project study area via its interchange at Highway 1. Local access to the site is provided by reet, Walnut Avenue, Laurel Street, Bay Street, California Street, Laurent Street and Van Ness Avenue. It should be noted that reet is considered to run in an east-west direction within this study. These roadways are described below. reet (SR 1) is an east-west roadway that runs from Front Street to Swift Street at which point it transitions to Cabrillo Highway. reet is a two-lane road between Front Street and SR 1. West of SR 1, reet widens to a four-lane roadway to Swift Street with a posted speed limit of 25-mph. West of Swift Street, the roadway narrows to two lanes and changes designation to Cabrillo Highway. Access to the project site is provided via its intersections with Van Ness Avenue and Laurent Street. Walnut Avenue is a two-lane north-south roadway located east of the project site. Walnut Avenue begins at its intersection with Pacific Avenue and extends northward to its intersection with Escalona Drive. Walnut Avenue provides access to the project site via reet and California Street. Laurel Street is a two-lane north-south roadway located just east of the project site. Laurel Street begins at its intersection with Escalona Drive and extends southward to the San Lorenzo River at which point it transitions to Broadway. Laurel Street provides access to the project site via reet and California Street. Bay Street is a two-lane north-south roadway located west of the project site. Bay Street begins at its intersection with West Cliff Drive and extends northward to High Street at which point it transitions to Glenn Coolidge Drive. Bay Street provides access to the project site via reet and California Street. Page 8

19 California Street is an east-west roadway that runs from Bay Street to Walnut Avenue. California Street is a two-lane road with bike lanes and a posted speed limit of 25-mph. Access to the project site is provided via its intersections with Van Ness Avenue and Laurent Street. Laurent Street is a two-lane north-south roadway that forms the western boundary of the project site. Laurent Street begins at its intersection with California Street and extends northward to Ross Street. There is street parking and sidewalks on both sides of the roadway. One driveway located along Laurent Street will provide direct access to the project site. Van Ness Avenue is a two-lane north-south roadway that forms the eastern boundary of project site. Van Ness Avenue begins at its intersection with California Street and extends northward to Escalona Drive. There is street parking and sidewalks on both sides of the roadway. A driveway located along Van Ness Avenue will provide direct access to the project site. Existing Bicycle and Pedestrian Facilities Bicycle and pedestrian facilities are currently provided in the vicinity of the proposed site. Class II bike lanes are provided on California Street between Laurel Street and Bay Street and along some segments of Laurel Street and Bay Street. A low traffic alternative route, with appropriate signage, is provided on Walnut Avenue. The existing bicycle facilities within the study area are shown on Figure 3. Pedestrian facilities are provided in the vicinity of the project. Existing pedestrian facilities in the immediate project area include sidewalks on the both sides of all roadways. Crosswalks are present for crossing in all-directions at every major intersection in the vicinity of the project. Existing Transit Service Existing public transit service to the study area is provided by the Santa Cruz Metropolitan Transit District (SCMTD). A total of eight local bus routes provide service near the project site, however three of the eight bus lines operate during the UCSC school term only. A walking distance of approximately ¼ of a mile to a transit stop is considered acceptable for most transit patrons. There are several bus stops within generally accepted walking distances from the project site. The transit services are described below and shown on Figure 4. Local Route 12 provides service between the Capitola Mall Transit Center and the University of California Santa Cruz campus. Route 12 operates one bus on weekdays, during the UCSC school term only, that departs from the Capitola Transit Center at 7:10 am. In the project vicinity, Route 12 operates on reet and Laurel Street. Local Route 13 provides service between the Santa Cruz Metro Center in downtown Santa Cruz and the University of California Santa Cruz campus. Route 13 operates on 60-minute headways, during the UCSC school term only, from 7:20 am to 6:20 pm on weekdays. In the project vicinity, Route 13 operates on reet and Walnut Avenue. Local Route 15 provides service between the Santa Cruz Metro Center in downtown Santa Cruz and the University of California Santa Cruz campus. Route 15 operates on headways varying from 8-30-minutes, during the UCSC school term only, from 7:38 am to 7:50 pm on weekdays. In the project vicinity, Route 15 operates on reet and Laurel Street. Local Route 16 provides service between the Santa Cruz Metro Center in downtown Santa Cruz and the University of California Santa Cruz campus. Route 16 operates on 30-minute headways from 6:25 am to 11:45 pm on weekdays and 60-minute headways from 7:00 am to 11:20 pm on weekends, with additional busses during the school term. In the project vicinity, Route 16 operates on reet and Laurel Street. Page 9

20 Figure 3 Existing Bicycle Facilities Page 10

21 Figure 4 Existing Transit Services Page 11

22 Local Route 16N provides service between the Santa Cruz Metro Center in downtown Santa Cruz and the University of California Santa Cruz campus. Route 16N operates eight busses on weekdays and four busses on weekends. The busses depart from the UCSC campus at 12:00 am, 12:40 am, 1:25 am, and 2:05 am. In the project vicinity, Route 16N operates on reet and Laurel Street. Local Route 40 provides service between the Santa Cruz Metro Center in downtown Santa Cruz and Highway 1 and Waddell Creek. Route 40 operates four busses on weekdays that depart from Highway 1 and Waddell Creek at 6:15 am, 8:10 am, 12:30 pm, and 3:25 pm. On weekends, two buses depart from Highway 1 and Waddell Creek at 8:30 am and 4:30 pm. In the project vicinity, Route 40 operates on reet and Laurel Street. Local Route 41 provides service between the Santa Cruz Metro Center in downtown Santa Cruz and Bonny Doon. Route 41 operates four busses. On weekdays, the busses depart from Bonny Doon at 6:05 am, 8:00 am, 3:30 pm, and 5:30 pm. On weekends, one buss departs from Bonny Doon at 9:30 am. In the project vicinity, Route 41 operates on reet and Laurel Street. Local Route 42 provides service between the Santa Cruz Metro Center in downtown Santa Cruz and Davenport. Route 42 operates one bus on weekdays that departs from Davenport at 8:30 pm. On weekends, two buses depart from Davenport at 12:30 pm and 5:30 pm. In the project vicinity, Route 42 operates on reet and Laurel Street. Existing Intersection Lane Configurations The existing lane configurations at the study intersections were obtained from field observations and the City of Santa Cruz. The existing intersection lane configurations are shown on Figure 5. Existing Traffic Volumes Existing peak-hour traffic volumes were obtained from new peak-hour counts collected at each of the study intersections in June The existing peak-hour intersection volumes are shown on Figure 6. Intersection turning-movement counts conducted for this analysis are presented in Appendix A. Existing Intersection Levels of Service The results of the level of service analysis under existing conditions are summarized in Table 3. The results show that, measured against the City of Santa Cruz level of service standards, all the study intersections currently operate at an acceptable level of service under existing conditions during each of the peak hours analyzed. However, the minor street northbound approach at the unsignalized intersection of Van Ness Avenue and reet currently operates at a poor LOS during the PM peak hour. The poor LOS is due to the continuous flow of traffic on reet, which does not allow adequate gaps for left turning traffic from the minor streets. A detailed analysis and discussion of unsignalized intersections is provided in Chapter 5. The level of service calculation sheets are included in Appendix C. Page 12

23 Almar Ave Walnut Ave reet Medical Office Development February 23, STOP California St Laurent St STOP California St Van Ness Ave Walnut Ave Laurel St STOP STOP Van Ness Ave STOP Laurent St STOP Bay St Almar Ave Younglove Ave NORTH Not to Scale 3 King St Van Ness Ave 4 Laurel St Bay St * Laurent St 1 2 California St LEGEND X* = Site Location = Study Intersection STOP = Signalized Intersection =Unsignalized Intersection = No-Left Turn (4-6PM) 8 Younglove Ave California Ave Figure 5 Existing Lane Configurations Page 13

24 Figure 6 Existing Traffic Volumes Page 14

25 Table 3 Existing Intersection Levels of Service Study Existing Peak Count Avg. Number Intersection Control Hour Date Delay 1 LOS 1 Laurent Street and California Street Unsignalized AM 06/07/ A PM 06/07/ A 2 Van Ness Avenue and California Street Unsignalized AM 06/07/ A PM 06/07/ A 3 Walnut Avenue and reet Signal AM 06/07/ B PM 06/07/ B 4 Laurel Street and reet Signal AM 06/07/ B PM 06/07/ C 5 Van Ness Avenue and reet Unsignalized AM 06/07/ A PM 06/07/ A 6 Laurent Street and reet Unsignalized AM 06/07/ A PM 06/07/ A 7 Bay Street and reet Signal AM 06/07/ D PM 06/07/ D 8 Almar Avenue/Younglove Avenue and reet Signal AM 06/07/ B PM 06/07/ C Notes: 1 Whole intersection weighted average control delay expressed in seconds per vehicle. Page 15

26 3. Existing Plus Project Conditions This chapter describes existing plus project traffic conditions, significant project impacts, and measures that are recommended to mitigate project impacts. Included are descriptions of the significance criteria that define an impact, estimates of project-generated traffic, identification of the impacts, and descriptions of the mitigation measures. Existing plus project conditions are represented by existing traffic conditions with the addition of traffic generated by the proposed project. Transportation Network under Existing Plus Project Conditions It is assumed in this analysis that the roadway network and intersection configurations under existing plus project conditions would be the same as described under existing conditions. Project Trip Estimates The magnitude of traffic produced by a new development and the locations where that traffic would appear are estimated using a three-step process: (1) trip generation, (2) trip distribution, and (3) trip assignment. In determining project trip generation, the magnitude of traffic entering and exiting the site is estimated for the AM and PM peak hours. As part of the project trip distribution step, an estimate is made of the directions to and from which the project trips would travel. In the project trip assignment step, the project trips are assigned to specific streets and intersections in the study area. These procedures are described further in the following sections. Trip Generation The magnitude of traffic produced by a new development is typically estimated by applying the size of the project to the applicable trip generation rates contained in the Institute of Transportation Engineers (ITE) Trip Generation Manual. However, there is an existing PAMF medical office located one block from the proposed project site at 1203 reet. Therefore, the trip generation of the proposed project was estimated utilizing trip generation rates developed based on driveway counts at the existing medical office and compared with those recommended by ITE. Peak hour driveway counts were conducted at the existing clinic in June The driveway counts at the existing clinic did not make a distinction between trips to the pharmacy and those to the medical offices. The proposed project will not include a pharmacy. Therefore, the driveway counts at the existing clinic were reduced based on receipt information provided by the pharmacy operator. Based on the trip generation rates developed from the driveway counts, the proposed clinic is expected to generate 53 AM peak-hour trips (49 inbound trips and 4 outbound trips) and 91 PM peak-hour trips (42 inbound trips and 49 outbound trips). On the basis of the ITE rates, it is estimated that the proposed Page 16

27 project will generate 41 AM peak-hour trips (32 inbound trips and 9 outbound trips) and 62 PM peak-hour trips (17 inbound trips and 45 outbound trips). The project was evaluated using the surveyed rates since they are more reflective of the expected mode of travel of patients to the proposed clinic and result in a more conservative analysis than the ITE rates. The surveyed rates also reflect the transportation demand management (TDM) program that is currently implemented by the Palo Alto Medical Foundation at all of its facilities. The TDM program provides financial incentives to encourage the use of alternative modes of transportation (public transit, carpooling, walking, bicycling) by its employees to reduce vehicular trips and parking demands. Existing retail and residential uses currently occupy the project site. Based upon peak hour driveway counts completed on June 7, 2011, the existing uses on site generate 16 AM and 20 PM peak-hour trips. Credits for the existing uses on the project site are subtracted from the estimated trips to be generated by the proposed project, as described above. The trips associated with the existing site uses were added to the roadway network under project conditions as negative trips. Based on the surveyed trip rates and existing trip credits, the proposed project was estimated to generate a net additional 37 AM peak-hour trips (43 inbound and -6 outbound) and 71 PM peak-hour trips (32 inbound and 39 outbound).the project trip generation estimates are presented in Table 4. Trip Distribution Peak hour project traffic was distributed to the transportation network based on existing travel patterns on the surrounding roadway system and the locations of complementary land uses. Directions of approach and departure at the existing PAMF medical offices at 1203 reet were used to determine existing travel patterns. The project trip distribution pattern is shown graphically on Figure 7. Trip Assignment The peak-hour trips associated with the proposed project were added to the transportation network in accordance with the distribution pattern discussed above. Figure 8 shows the assignment of project traffic on the local transportation network. It should be noted that the assignment of project trips for the proposed project does not reflect a shift in trips that will likely occur due to the location of services to the Westside area. Currently patients from the Westside area must travel to the Eastside PAMF facility located along Soquel Avenue. The proposed project will locate some services now offered at the Eastside facility. Therefore, the trips currently made to the Eastside facility will shift to the Westside facility resulting in shorter trips. A tabular summary of project traffic at each study intersection is contained in Appendix B. Existing Plus Project Traffic Volumes Project trips, as represented in the above project trip assignment, were added to existing traffic volumes to obtain existing plus project traffic volumes. The existing plus project traffic volumes are shown on Figure 9. Existing Plus Project Intersection Analysis The results of the level of service analysis under existing plus project conditions are summarized in Table 5. The results show that, measured against the City of Santa Cruz level of service standards, all the study intersections are projected to operate at an acceptable level of service under existing plus project conditions during each of the peak hours analyzed. Therefore, no study intersections would be significantly impacted by the project, according to City s level of service impact criteria. However, the minor street northbound approaches at the unsignalized intersections of Van Ness Avenue and Mission Street and Laurent Street and reet would operate at a poor LOS during the peak hours under Page 17

Magnolia Place. Traffic Impact Analysis. Prepared for: City of San Mateo. Prepared by: Hexagon Transportation Consultants, Inc.

Magnolia Place. Traffic Impact Analysis. Prepared for: City of San Mateo. Prepared by: Hexagon Transportation Consultants, Inc. Magnolia Place Traffic Impact Analysis Prepared for: City of San Mateo Prepared by: Hexagon Transportation Consultants, Inc. Updated January 4, 2010 Table of Contents 1. Introduction...1 2. Existing Conditions...6

More information

Abrams Associates. Transportation Impact Analysis. City of Rocklin. Prepared for: David Mohlenbrok City of Rocklin 4081 Alvis Court Rocklin, CA 95677

Abrams Associates. Transportation Impact Analysis. City of Rocklin. Prepared for: David Mohlenbrok City of Rocklin 4081 Alvis Court Rocklin, CA 95677 Transportation Impact Analysis Sierra College Boulevard Commercial Project City of Rocklin Prepared for: David Mohlenbrok City of Rocklin 081 Alvis Court Rocklin, CA 95677 Prepared by: 1875 Olympic Boulevard,

More information

3.9 - Transportation and Traffic

3.9 - Transportation and Traffic Transportation and Traffic 3.9 - Transportation and Traffic This section describes the potential transportation and traffic effects of project implementation on the project site and its surrounding area.

More information

TABLE OF CONTENTS TABLE OF CONTENTS... I APPENDICES... III LIST OF EXHIBITS... V LIST OF TABLES... VII LIST OF ABBREVIATED TERMS...

TABLE OF CONTENTS TABLE OF CONTENTS... I APPENDICES... III LIST OF EXHIBITS... V LIST OF TABLES... VII LIST OF ABBREVIATED TERMS... TABLE OF CONTENTS TABLE OF CONTENTS... I APPENDICES... III LIST OF EXHIBITS... V LIST OF TABLES... VII LIST OF ABBREVIATED TERMS... IX 1 INTRODUCTION... 1 1.1 Project Overview... 1 1.2 Analysis Scenarios...

More information

5.3 TRAFFIC, CIRCULATION AND PARKING

5.3 TRAFFIC, CIRCULATION AND PARKING 5.3 TRAFFIC, CIRCULATION AND PARKING This section is based upon the Downtown Lancaster Specific Plan Traffic Impact Analysis (April 2, 2008) and the Downtown Lancaster Specific Plan Parking Analysis (May

More information

D.13 Transportation and Traffic

D.13 Transportation and Traffic This section addresses transportation and traffic issues and impacts related to the Proposed Project. Section D.13.1 provides a description of the affected environment for the Proposed Project. Applicable

More information

TRAFFIC IMPACT ANALYSIS

TRAFFIC IMPACT ANALYSIS TRAFFIC IMPACT ANALYSIS FOR THE CHAMPAIGN UNIT#4 SCHOOL DISTRICT PROPOSED HIGH SCHOOL (SPALDING PARK SITE) IN THE CITY OF CHAMPAIGN Final Report Champaign Urbana Urbanized Area Transportation Study 6/24/2014

More information

Transportation Impact Study for Abington Terrace

Transportation Impact Study for Abington Terrace Transportation Impact Study for Abington Terrace Abington Township, Montgomery County, PA Sandy A. Koza, P.E., PTOE PA PE License Number PE059911 Prepared by McMahon Associates, Inc. 425 Commerce Drive,

More information

Traffic Circulation Study for Neighborhood Southwest of Mockingbird Lane and Airline Road, Highland Park, Texas

Traffic Circulation Study for Neighborhood Southwest of Mockingbird Lane and Airline Road, Highland Park, Texas ARIZONA TEXAS NEW MEXICO OKLAHOMA February 13, 2015 Mr. Meran Dadgostar P.E., R.S. Town of Highland Park 4700 Drexel Dr. Highland Park, Texas 75205 Re: Traffic Circulation Study for Neighborhood Southwest

More information

APPENDIX H TRAFFIC REPORT

APPENDIX H TRAFFIC REPORT APPENDIX H TRAFFIC REPORT Keith Higgins Traffic En ginee r WEST END SAND CITY TRAFFIC IMPACT ANALYSIS DRAFT REPORT SAND CITY, CALIFORNIA Prepared for DBO Development No. 3 Monterey, CA Prepared by Keith

More information

TRAFFIC IMPACT STUDY CRITERIA

TRAFFIC IMPACT STUDY CRITERIA Chapter 6 - TRAFFIC IMPACT STUDY CRITERIA 6.1 GENERAL PROVISIONS 6.1.1. Purpose: The purpose of this document is to outline a standard format for preparing a traffic impact study in the City of Steamboat

More information

EAST AND SOUTH STREET CITY OF ANAHEIM, CALIFORNIA

EAST AND SOUTH STREET CITY OF ANAHEIM, CALIFORNIA T R A F F I C I M P A C T A N A LY S I S EAST AND SOUTH STREET CITY OF ANAHEIM, CALIFORNIA April 217 T R A F F I C I M P A C T A N A LY S I S EAST AND SOUTH STREET CITY OF ANAHEIM, CALIFORNIA Submitted

More information

Complete Street Analysis of a Road Diet: Orange Grove Boulevard, Pasadena, CA

Complete Street Analysis of a Road Diet: Orange Grove Boulevard, Pasadena, CA Complete Street Analysis of a Road Diet: Orange Grove Boulevard, Pasadena, CA Aaron Elias, Bill Cisco Abstract As part of evaluating the feasibility of a road diet on Orange Grove Boulevard in Pasadena,

More information

TRAFFIC IMPACT STUDY COMPREHENSIVE UPDATE TOWN OF THOMPSON S STATION, TENNESSEE PREPARED FOR: THE TOWN OF THOMPSON S STATION

TRAFFIC IMPACT STUDY COMPREHENSIVE UPDATE TOWN OF THOMPSON S STATION, TENNESSEE PREPARED FOR: THE TOWN OF THOMPSON S STATION TRAFFIC IMPACT STUDY COMPREHENSIVE UPDATE TOWN OF THOMPSON S STATION, TENNESSEE PREPARED FOR: THE TOWN OF THOMPSON S STATION Transportation Consultants, LLC 1101 17 TH AVENUE SOUTH NASHVILLE, TN 37212

More information

TRAFFIC STUDY GUIDELINES Clarksville Street Department

TRAFFIC STUDY GUIDELINES Clarksville Street Department TRAFFIC STUDY GUIDELINES Clarksville Street Department 9/1/2009 Introduction Traffic studies are used to help the city determine potential impacts to the operation of the surrounding roadway network. Two

More information

TRAFFIC ASSESSMENT River Edge Colorado

TRAFFIC ASSESSMENT River Edge Colorado TRAFFIC ASSESSMENT River Edge Colorado Submitted by: Fehr & Peers 621 17th Street, Ste. 231 Denver, CO 8293 (33) 296-43 December, 21 App. M-2 Traffic Assessment River Edge Colorado December 21 TABLE OF

More information

Lincoln Avenue Road Diet Trial

Lincoln Avenue Road Diet Trial Lincoln Avenue Road Diet Trial Data Collection Report June 1, 2015 Department of Transportation Table of Contents I. Introduction...... 3 II. Data Collection Methodology & Results...... 5 A. Traffic Volume

More information

Bridge Street Corridor Study Report

Bridge Street Corridor Study Report Bridge Street Corridor Study Report Prepared for: Prepared by: BRIDGE STREET CORRIDOR STUDY REPORT PREPARED FOR: CITY OF ARROYO GRANDE COMMUNITY DEVELOPMENT DEPARTMENT 300 EAST BRANCH STREET ARROYO GRANDE,

More information

TABLE TRAFFIC ANALYSIS SCENARIOS

TABLE TRAFFIC ANALYSIS SCENARIOS 4.11 TRANSPORTATION The potential traffic impacts of the proposed project are evaluated in the Buena Park Beach/Orangethorpe Mixed Use Project Traffic Analysis (Traffic Analysis) by Austin-Foust Associates

More information

B. TRANSPORTATION, CIRCULATION AND PARKING

B. TRANSPORTATION, CIRCULATION AND PARKING FEBRUARY 0 89 EL CAMINO REAL PROJECT EIR This section describes the existing traffic, circulation, parking, and transit conditions in the vicinity of the project site and provides an analysis of the project

More information

Highway 111 Corridor Study

Highway 111 Corridor Study Highway 111 Corridor Study June, 2009 LINCOLN CO. HWY 111 CORRIDOR STUDY Draft Study Tea, South Dakota Prepared for City of Tea Sioux Falls Metropolitan Planning Organization Prepared by HDR Engineering,

More information

6.14 Traffic and Circulation

6.14 Traffic and Circulation 6.14 Traffic and Circulation 6.14.1 Introduction The analysis in this section summarizes the findings and recommendations presented in the "Marywood Development Traffic Impact Study, City of Orange, California"

More information

Traffic Impact Analysis

Traffic Impact Analysis Traffic Impact Analysis TRAFFIC IMPACT ANALYSIS FOR A PROPOSED NEIGHBORHOOD SHOPPING CENTER Civic Center Way and Cross Creek Road City of Malibu Prepared for: Goldman Firth Rossi Architects Prepared by:

More information

Gateway Transportation Study

Gateway Transportation Study Gateway Transportation Study Amherst, Massachusetts SUBMITTED TO University of Massachusetts Amherst Town of Amherst SUBMITTED BY Vanasse Hangen Brustlin, Inc. Watertown, Massachusetts March 213 Back of

More information

Traffic Impact Study for Rolling Ridge Redevelopment

Traffic Impact Study for Rolling Ridge Redevelopment Traffic Impact Study for Rolling Ridge Redevelopment Webster Groves, Missouri October 19, 2018 Prepared For: Gershman Commercial Real Estate 150 North Meramec Avenue Suite 500 St. Louis, Missouri 63105

More information

TRAFFIC IMPACT STUDY And A TRAFFIC SIGNAL WARRANT ANALYSIS FOR A SENIOR LIVING AND APARTMENT DEVELOPMENT

TRAFFIC IMPACT STUDY And A TRAFFIC SIGNAL WARRANT ANALYSIS FOR A SENIOR LIVING AND APARTMENT DEVELOPMENT TRAFFIC IMPACT STUDY And A TRAFFIC SIGNAL WARRANT ANALYSIS FOR A SENIOR LIVING AND APARTMENT DEVELOPMENT DEERFIELD TOWNSHIP, WARREN COUNTY, OHIO Nantucket Circle and Montgomery Road () Prepared for: ODLE

More information

4.10 TRAFFIC AND CIRCULATION

4.10 TRAFFIC AND CIRCULATION 4.10 TRAFFIC AND CIRCULATION The following section is based on a traffic and circulation study prepared by Fehr & Peers, Inc. (November 2003; refer to Appendix F for technical calculations). The effects

More information

Chapter 16: Traffic and Parking A. INTRODUCTION

Chapter 16: Traffic and Parking A. INTRODUCTION Chapter 6: Traffic and Parking A. ITRODUCTIO This chapter examines the potential traffic and parking impacts of the proposed Fresh Kills Park roads. The analysis of transit and pedestrians is presented

More information

INDUSTRIAL BUILDING 3009 HAWTHORNE ROAD CITY OF OTTAWA TRANSPORTATION OVERVIEW REVISED. Prepared for: Canada Inc.

INDUSTRIAL BUILDING 3009 HAWTHORNE ROAD CITY OF OTTAWA TRANSPORTATION OVERVIEW REVISED. Prepared for: Canada Inc. INDUSTRIAL BUILDING 3009 HAWTHORNE ROAD CITY OF OTTAWA TRANSPORTATION OVERVIEW REVISED Prepared for: 7849648 Canada Inc. Octiober 1, 2015 114-598 Overview_2.doc D. J. Halpenny & Associates Ltd. Consulting

More information

4. ENVIRONMENTAL IMPACT ANALYSIS 9. TRANSPORTATION AND TRAFFIC

4. ENVIRONMENTAL IMPACT ANALYSIS 9. TRANSPORTATION AND TRAFFIC 4. ENVIRONMENTAL IMPACT ANALYSIS 9. TRANSPORTATION AND TRAFFIC 4.9.1 INTRODUCTION The following section addresses the Proposed Project s impact on transportation and traffic based on the Traffic Study

More information

List of Attachments. Location Map... Site Plan... City of Lake Elsinore Circulation Element... City of Lake Elsinore Roadway Cross-Sections...

List of Attachments. Location Map... Site Plan... City of Lake Elsinore Circulation Element... City of Lake Elsinore Roadway Cross-Sections... List of Attachments Exhibits Location Map... Site Plan... City of Lake Elsinore Circulation Element... City of Lake Elsinore Roadway Cross-Sections... Existing Lane Geometry and Traffic Controls... Existing

More information

Traffic Impact Study. Westlake Elementary School Westlake, Ohio. TMS Engineers, Inc. June 5, 2017

Traffic Impact Study. Westlake Elementary School Westlake, Ohio. TMS Engineers, Inc. June 5, 2017 TMS Engineers, Inc. Traffic Impact Study Westlake Elementary School Westlake, Ohio June 5, 2017 Prepared for: Westlake City Schools - Board of Education 27200 Hilliard Boulevard Westlake, OH 44145 TRAFFIC

More information

1609 E. FRANKLIN STREET HOTEL TRAFFIC IMPACT STUDY EXECUTIVE SUMMARY

1609 E. FRANKLIN STREET HOTEL TRAFFIC IMPACT STUDY EXECUTIVE SUMMARY 1609 E. FRANKLIN STREET HOTEL TRAFFIC IMPACT STUDY EXECUTIVE SUMMARY Prepared for: The Town of Chapel Hill Public Works Department Traffic Engineering Division Prepared by: HNTB North Carolina, PC 343

More information

Traffic Analysis and Design Report. NW Bethany Boulevard. NW Bronson Road to NW West Union Road. Washington County, Oregon

Traffic Analysis and Design Report. NW Bethany Boulevard. NW Bronson Road to NW West Union Road. Washington County, Oregon Traffic Analysis and Design Report NW Bethany Boulevard NW Bronson Road to NW West Union Road Washington County, Oregon May 2011 Table of Contents Table of Contents Section 1 Executive Summary... 2 Section

More information

Henderson Avenue Mixed-Use Development

Henderson Avenue Mixed-Use Development Zoning Case: Z145-3 Traffic Impact Analysis Henderson Avenue Mixed-Use Development Dallas, TX October 26 th, 216 Kimley-Horn and Associates, Inc. Dallas, Texas Project #644827 Registered Firm F-928 Traffic

More information

5858 N COLLEGE, LLC N College Avenue Traffic Impact Study

5858 N COLLEGE, LLC N College Avenue Traffic Impact Study 5858 N COLLEGE, LLC nue Traffic Impact Study August 22, 2016 Contents Traffic Impact Study Page Preparer Qualifications... 1 Introduction... 2 Existing Roadway Conditions... 5 Existing Traffic Conditions...

More information

Los Coyotes Country Club Development Plan Traffic Impact Analysis

Los Coyotes Country Club Development Plan Traffic Impact Analysis Los Coyotes Country Club Development Plan Traffic Impact Analysis Prepared For: Phil Martin Associates 2073007450 Los Coyotes Country Club Development Plan Traffic Impact Analysis June 19, 2014 Prepared

More information

This document may be reprinted or extracted without permission, provided credit to the City of Pasadena Department of Transportation

This document may be reprinted or extracted without permission, provided credit to the City of Pasadena Department of Transportation TRANSPORTATION IMPACT ANALYSIS CURRENT PRACTICE & GUIDELINES Prepared by: Transportation Complete Streets Division Department of Transportation 20150925 This document may be reprinted or extracted without

More information

METHODOLOGY. Signalized Intersection Average Control Delay (sec/veh)

METHODOLOGY. Signalized Intersection Average Control Delay (sec/veh) Chapter 5 Traffic Analysis 5.1 SUMMARY US /West 6 th Street assumes a unique role in the Lawrence Douglas County transportation system. This principal arterial street currently conveys commuter traffic

More information

Technical Memorandum TRAFFIC IMPACT STUDY. RIDLEY ROAD CONVENIENCE STORE Southampton County, VA. Prepared for: Mr. David Williams.

Technical Memorandum TRAFFIC IMPACT STUDY. RIDLEY ROAD CONVENIENCE STORE Southampton County, VA. Prepared for: Mr. David Williams. Technical Memorandum TRFFIC IMPCT STUDY RIDLEY ROD CONVENIENCE STORE Southampton County, V Prepared for: Mr. David Williams By: Charles Smith, P.E., PTOE EPR Charlottesville, V July 2014 1 TBLE OF CONTENTS

More information

OTTAWA TRAIN YARDS PHASE 3 DEVELOPMENT CITY OF OTTAWA TRANSPORTATION IMPACT STUDY. Prepared for:

OTTAWA TRAIN YARDS PHASE 3 DEVELOPMENT CITY OF OTTAWA TRANSPORTATION IMPACT STUDY. Prepared for: OTTAWA TRAIN YARDS PHASE 3 DEVELOPMENT CITY OF OTTAWA TRANSPORTATION IMPACT STUDY Prepared for: The Ottawa Train Yards Inc. 223 Colonnade Road South, Suite 212 Nepean, Ontario K2E 7K3 January 17, 2012

More information

CITY OF OAKLAND. 27th Street Bikeway Feasibility and Design. Final Report (v3) March 23, Kimley-Horn and Associates, Inc.

CITY OF OAKLAND. 27th Street Bikeway Feasibility and Design. Final Report (v3) March 23, Kimley-Horn and Associates, Inc. CITY OF OAKLAND 27th Street Bikeway Feasibility and Design Final Report (v3) March 23, 2007 PREPARED BY: Kimley-Horn and Associates, Inc. Table of Contents 1. Introduction 3 2. 27 th Street/Bay Place Corridor

More information

NEPA and CEQA Transportation Operation Analysis

NEPA and CEQA Transportation Operation Analysis 3.1 Introduction Chapter 3 Transportation Operation Analysis This chapter includes a transportation analysis of the operational impacts of the following: The National Environmental Policy Act (NEPA) Alternatives

More information

OFFICE/RETAIL DEVELOPMENT 1625 BANK STREET OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for: Canada Inc.

OFFICE/RETAIL DEVELOPMENT 1625 BANK STREET OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for: Canada Inc. OFFICE/RETAIL DEVELOPMENT 1625 BANK STREET OTTAWA, ONTARIO TRANSPORTATION BRIEF Prepared for: 9402209 Canada Inc. December 15, 2015 115-625 Report_2.doc D. J. Halpenny & Associates Ltd. Consulting Transportation

More information

TRAFFIC IMPACT ANALYSIS OF PROPOSED CHESTNUT HILL COLLEGE MASTER PLAN DEVELOPMENT

TRAFFIC IMPACT ANALYSIS OF PROPOSED CHESTNUT HILL COLLEGE MASTER PLAN DEVELOPMENT TRAFFIC IMPACT ANALYSIS OF PROPOSED CHESTNUT HILL COLLEGE MASTER PLAN DEVELOPMENT Prepared by Orth-Rodgers & Associates, Inc. December 14, 2009 Updated November 9, 2010 230 South Broad Street Philadelphia

More information

List of Exhibits...ii

List of Exhibits...ii One Brickell Traffic Study TABLE OF CONTENTS List of Exhibits...ii EXECUTIVE SUMMARY...1 1. INTRODUCTION...2 1.1 Study Area...2 1.2 Study Objective...5 2. EXISTING TRAFFIC CONDITIONS...6 2.1 Data Collection...6

More information

Figure 1: Vicinity Map of the Study Area

Figure 1: Vicinity Map of the Study Area ARIZONA TEXAS NEW MEXICO OKLAHOMA May 5, 2016 Mr. Anthony Beach, P.E. BSP Engineers 4800 Lakewood Drive, Suite 4 Waco, Texas 76710 Re: Intersection and Access Analysis along Business 190 in Copperas Cove

More information

TRAFFIC IMPACT STUDY CANYON HILLS PROJECT LOS ANGELES, CALIFORNIA INTRODUCTION This traffic analysis has been conducted to identify and evaluate the potential traffic impacts of the proposed Canyon Hills

More information

3.13 TRANSPORTATION AND TRAFFIC

3.13 TRANSPORTATION AND TRAFFIC 3.13 TRANSPORTATION AND TRAFFIC INTRODUCTION This section of the Draft EIR describes the transportation and traffic based on the Transportation Impact Analysis (TIA) prepared by Overland Traffic Consultants,

More information

TRANSPORTATION ANALYSIS REPORT US Route 6 Huron, Erie County, Ohio

TRANSPORTATION ANALYSIS REPORT US Route 6 Huron, Erie County, Ohio TRANSPORTATION ANALYSIS REPORT US Route 6 Huron, Erie County, Ohio December 12, 2012 Prepared for: The City of Huron 417 Main Huron, OH 44839 Providing Practical Experience Technical Excellence and Client

More information

HENDERSON DEVELOPMENT 213, 217, 221, 221 ½, 223 HENDERSON AVENUE and 65 TEMPLETON STREET OTTAWA, ONTARIO TRANSPORTATION OVERVIEW.

HENDERSON DEVELOPMENT 213, 217, 221, 221 ½, 223 HENDERSON AVENUE and 65 TEMPLETON STREET OTTAWA, ONTARIO TRANSPORTATION OVERVIEW. HENDERSON DEVELOPMENT 213, 217, 221, 221 ½, 223 HENDERSON AVENUE and 65 TEMPLETON STREET OTTAWA, ONTARIO TRANSPORTATION OVERVIEW Prepared for: 2294170 Ontario Inc. February 2, 2017 117-652 Report_1.doc

More information

4.11 TRANSPORTATION 4.11 TRANSPORTATION Environmental Setting Intersection, Roadway, and Freeway Evaluation Methodology

4.11 TRANSPORTATION 4.11 TRANSPORTATION Environmental Setting Intersection, Roadway, and Freeway Evaluation Methodology 4.11 TRANSPORTATION This section describes the road transportation system in the vicinity of the proposed Project and the potential impacts to this system from the proposed Project. The analysis in this

More information

Project Report. South Kirkwood Road Traffic Study. Meadows Place, TX October 9, 2015

Project Report. South Kirkwood Road Traffic Study. Meadows Place, TX October 9, 2015 Meadows Place, TX October 9, 2015 Contents 1 Introduction... 1 2 Data Collection... 1 3 Existing Roadway Network... 2 4 Traffic Volume Development... 2 5 Warrant Analysis... 3 6 Traffic Control Alternative

More information

Prescott Plaza TRAFFIC IMPACT ANALYSIS TOWN OF YUCCA VALLEY

Prescott Plaza TRAFFIC IMPACT ANALYSIS TOWN OF YUCCA VALLEY Prescott Plaza TRAFFIC IMPACT ANALYSIS TOWN OF YUCCA VALLEY PREPARED BY: Aric Evatt, PTP aevatt@urbanxroads.com (949) 660-1994 x204 Charlene So, PE cso@urbanxroads.com (949) 660-1994 x222 OCTOBER 18, 2018

More information

4.13 TRANSPORTATION AND TRAFFIC

4.13 TRANSPORTATION AND TRAFFIC 4.13 This chapter describes the regulatory framework and existing conditions in the vicinity of the Project site related to transportation and traffic, and the potential impacts of the proposed Project

More information

Michael A. Werthmann, PE, PTOE Principal

Michael A. Werthmann, PE, PTOE Principal 9575 West Higgins Road, Suite 400 Rosemont, Illinois 60018 p: 847-518-9990 f: 847-518-9987 MEMORANDUM TO: FROM: Brian Lorenc GHB-630, LLC Michael A. Werthmann, E, TOE rincipal Luay R. Aboona, E rincipal

More information

MEDICAL/OFFICE BUILDING 1637 BANK STREET OTTAWA, ONTARIO TRANSPORTATION OVERVIEW. Prepared for:

MEDICAL/OFFICE BUILDING 1637 BANK STREET OTTAWA, ONTARIO TRANSPORTATION OVERVIEW. Prepared for: MEDICAL/OFFICE BUILDING 1637 BANK STREET OTTAWA, ONTARIO TRANSPORTATION OVERVIEW Prepared for: 2434984 Ontario Inc. 13-5510 Canotek Road Ottawa, Ontario K1J 9J5 June 4, 2015 115-613 Report_2.doc D. J.

More information

4.12 TRANSPORTATION Executive Summary. Setting

4.12 TRANSPORTATION Executive Summary. Setting 4.12 TRANSPORTATION 4.12.1 Executive Summary This section is based on the Multimodal Transportation Impact Study (TIS; 2016) prepared by Omni-Means, Ltd. to evaluate projected transportation impact conditions

More information

4.0 TRAFFIC IMPACT STUDIES

4.0 TRAFFIC IMPACT STUDIES SECTION 4 4.0 TRAFFIC IMPACT STUDIES 4.1 TRAFFIC IMPACT STUDY REQUIREMENTS The City has established Traffic Impact Study (TIS) requirements for the purpose of ensuring that both the quantitative and qualitative

More information

6060 North Central Expressway Mixed-Use Site Dallas, Texas

6060 North Central Expressway Mixed-Use Site Dallas, Texas Volume 1 Traffic Impact Analysis 6060 North Central Expressway Mixed-Use Site Dallas, Texas April 30, 2018 Kimley-Horn and Associates, Inc. Dallas, Texas Project #063238300 Registered Firm F-928 Traffic

More information

V. ENVIRONMENTAL IMPACT ANALYSIS K. TRANSPORTATION AND CIRCULATION

V. ENVIRONMENTAL IMPACT ANALYSIS K. TRANSPORTATION AND CIRCULATION V. ENVIRONMENTAL IMPACT ANALYSIS K. TRANSPORTATION AND CIRCULATION ENVIRONMENTAL SETTING The following section is based on the Draft Traffic Circulation Study for the Malibu La Paz Project (Traffic Study),

More information

CHAPTER 3. Transportation and Circulation

CHAPTER 3. Transportation and Circulation CHAPTER 3 Transportation and Circulation 3.0 TRANSPORTATION AND CIRCULATION This chapter evaluates traffic circulation, transit, parking, pedestrian, bicycle, and rail operational conditions in the Project

More information

Traffic Study North Shore School District 112

Traffic Study North Shore School District 112 Traffic Study North Shore School District 112 Proposed Expansion of Northwood Junior High School Prepared By: May 1, 2015 1. Introduction Kenig, Lindgren, O Hara, Aboona, Inc. (KLOA, Inc.) has been retained

More information

City of Elizabeth City Neighborhood Traffic Calming Policy and Guidelines

City of Elizabeth City Neighborhood Traffic Calming Policy and Guidelines City of Elizabeth City Neighborhood Traffic Calming Policy and Guidelines I. Purpose: The City of Elizabeth City is committed to ensure the overall safety and livability of residential neighborhoods. One

More information

Traffic Impact Study WestBranch Residential Development Davidson, NC March 2016

Traffic Impact Study WestBranch Residential Development Davidson, NC March 2016 Traffic Impact Study WestBranch Residential Development Davidson, NC March 216 TRAFFIC IMPACT STUDY FOR THE WestBranch Residential Development LOCATED IN DAVIDSON, NC Prepared For: Lennar Carolinas, LLC

More information

TRAFFIC IMPACT ANALYSIS. Photo here CAL MET ROYAL MRF EXPANSION. City of Paramount, CA. arch beach C O N S U L T I N G.

TRAFFIC IMPACT ANALYSIS. Photo here CAL MET ROYAL MRF EXPANSION. City of Paramount, CA. arch beach C O N S U L T I N G. TRAFFIC IMPACT ANALYSIS z Photo here CAL MET ROYAL MRF EXPANSION City of Paramount, CA arch beach C O N S U L T I N G June 23, 214 TRAFFIC IMPACT ANALYSIS CAL MET ROYAL MATERIALS RECOVERY FACILITY (MRF)

More information

Appendix B. Environmental Resource Technical Memorandum. Assessment on Travel Pattern and Access Impacts

Appendix B. Environmental Resource Technical Memorandum. Assessment on Travel Pattern and Access Impacts Appendix B Environmental Resource Technical Memorandum Assessment on Travel Pattern and Access Impacts TECHNICAL MEMORANDUM ENVIRONMENTAL RE-EVALUATION FOR UNION STATION TO OAK CLIFF DALLAS STREETCAR To:

More information

Traffic Impact Analysis Chatham County Grocery Chatham County, NC

Traffic Impact Analysis Chatham County Grocery Chatham County, NC Chatham County Grocery Chatham County, NC TABLE OF CONTENTS 1. INTRODUCTION... 1 1.1. Location and Study Area... 1 1.2. Proposed Land Use and Access... 2 1.3. Adjacent Land Uses... 2 1.4. Existing ways...

More information

Appendix C. NORTH METRO STATION AREA TRAFFIC IMPACT STATEMENT 88th Avenue Station

Appendix C. NORTH METRO STATION AREA TRAFFIC IMPACT STATEMENT 88th Avenue Station Appendix C NORTH METRO STATION AREA TRAFFIC IMPACT STATEMENT 88th Avenue Station Prepared for: Regional Transportation Department and URS Corporation as part of the North Metro EIS David Evans and Associates,

More information

Table of Contents FIGURES TABLES APPENDICES. Traffic Impact Study Hudson Street Parking Garage MC Project No.: A Table of Contents

Table of Contents FIGURES TABLES APPENDICES. Traffic Impact Study Hudson Street Parking Garage MC Project No.: A Table of Contents Traffic Impact Study Hudson Street Parking Garage MC Project No.: 151714A Table of Contents Table of Contents I. INTRODUCTION... 2 II. EXISTING CONDITIONS... 5 III. 215 EXISTING TRAFFIC CONDITIONS... 6

More information

Date: April 4, Project #: Re: A Street/Binford Street Traffic/Intersection Assessment

Date: April 4, Project #: Re: A Street/Binford Street Traffic/Intersection Assessment To: Peter Cavanaugh General Electric From: David Bohn, PE Ryan White, PE Date: April 4, 217 Project #: 13421. Re: / Traffic/Intersection Assessment Consistent with the Cooperation Agreement between the

More information

4.11 Transportation and Traffic

4.11 Transportation and Traffic 4.11.1 Introduction This section evaluates whether implementation of the Russian River Estuary Management Project (Estuary Management Project) would result in potential adverse impacts related to transportation

More information

VIVA RETIREMENT COMMUNITIES OAKVILLE TRAFFIC IMPACT STUDY

VIVA RETIREMENT COMMUNITIES OAKVILLE TRAFFIC IMPACT STUDY VIVA RETIREMENT COMMUNITIES OAKVILLE TRAFFIC IMPACT STUDY VIVA RETIREMENT COMMUNITIES OAKVILLE TRAFFIC IMPACT STUDY DECEMBER 2012 READ, VOORHEES & ASSOCIATES TORONTO, ONTARIO Read, Voorhees & Associates

More information

Northbound San Jose Avenue & I-280 Off-Ramp Road Diet Pilot Project

Northbound San Jose Avenue & I-280 Off-Ramp Road Diet Pilot Project Project Overview Fed by a two-lane Interstate-280 (I-280) off-ramp, high vehicular volumes and speeds are longstanding issues along San Jose Avenue. Residents in the surrounding neighborhoods have expressed

More information

Corporation of the Town of Oakville. December 16, 2013

Corporation of the Town of Oakville. December 16, 2013 Corporation of the Town of Oakville Transportation Impact Analysis and Parking Study for Proposed Secondary School, Oakville Draft Final Report Submitted by: HDR Corporation 100 York Boulevard, Suite 300

More information

APPENDIX C TRAFFIC IMPACT ANALYSIS AND TECHNICAL APPENDIX FOR TEMPLO LA HERMOSA CHURCH: MERCED COUNTY, CALIFORNIA

APPENDIX C TRAFFIC IMPACT ANALYSIS AND TECHNICAL APPENDIX FOR TEMPLO LA HERMOSA CHURCH: MERCED COUNTY, CALIFORNIA APPENDIX C TRAFFIC IMPACT ANALYSIS AND TECHNICAL APPENDIX FOR TEMPLO LA HERMOSA CHURCH: MERCED COUNTY, CALIFORNIA TRAFFIC IMPACT ANALYSIS FOR TEMPLO LA HERMOSA CHURCH Merced County, California Prepared

More information

Traffic Impact Memorandum. May 22, 2018

Traffic Impact Memorandum. May 22, 2018 BISHOP PROFESSIONAL DEVELOPMENT BUILDING Proposed Land-use Change & Parking Modification 3601 SW 31st Street Topeka, Kansas 66614 CFS Project No. 185077 Traffic Impact Memorandum May 22, 2018 Prepared

More information

Figure 1: East West Connector Alignment Alternatives Concept Drawing

Figure 1: East West Connector Alignment Alternatives Concept Drawing Page 2 of 9 Figure 1: East West Connector Alignment Alternatives Concept Drawing The Montebello Drive extension will run north south and connect Wilsonville Road to the Boones Ferry Road to Brown Road

More information

Planning Committee STAFF REPORT March 7, 2018 Page 2 of 4 The following MTSOs are being used across the five subregions: Intersection Level of Service

Planning Committee STAFF REPORT March 7, 2018 Page 2 of 4 The following MTSOs are being used across the five subregions: Intersection Level of Service Planning Committee STAFF REPORT Meeting Date: March 7, 2018 Subject Summary of Issues Recommendations Financial Implications Options Attachments Changes from Committee Review Draft 2017 Multimodal Transportation

More information

9 Leeming Drive Redevelopment Ottawa, ON Transportation Brief. Prepared By: Stantec Consulting Ltd.

9 Leeming Drive Redevelopment Ottawa, ON Transportation Brief. Prepared By: Stantec Consulting Ltd. 9 Leeming Drive Redevelopment Ottawa, ON Transportation Brief Prepared By: Stantec Consulting Ltd. TIA GUIDELINES CHECKLIST Report Context Municipal Address Comment: Section 1.1 Location relative to major

More information

EXECUTIVE SUMMARY. Page 1 of 6

EXECUTIVE SUMMARY. Page 1 of 6 EXECUTIVE SUMMARY The purpose of this report is to identify conformance with the original traffic impact study for the proposed retail development on Lot 5 of Riverdale Retail Filing No. 1 located on the

More information

COMMERCIAL DEVELOPMENT 2015 ROBERTSON ROAD OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for:

COMMERCIAL DEVELOPMENT 2015 ROBERTSON ROAD OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for: COMMERCIAL DEVELOPMENT 2015 ROBERTSON ROAD OTTAWA, ONTARIO TRANSPORTATION BRIEF Prepared for: First Bay Properties Inc. 311 Richmond Road, Suite 203 Ottawa, ON K1Z 6X3 August 8, 2017 117-663 Brief_1.doc

More information

THIS PAGE LEFT BLANK INTENTIONALLY

THIS PAGE LEFT BLANK INTENTIONALLY GA SR 25 Spur at Canal Road Transportation Impact Analysis PREPARED FOR GLYNN COUNTY, GEORGIA 1725 Reynolds Street, Suite 300 Brunswick, Georgia 31520 PREPARED BY 217 Arrowhead Boulevard Suite 26 Jonesboro,

More information

ALLEY 24 TRAFFIC STUDY

ALLEY 24 TRAFFIC STUDY ALLEY 24 TRAFFIC STUDY in City of Frostburg, Maryland January 2013 3566 Teays Valley Road Hurricane, WV Office: (304) 397-5508 www.denniscorporation.com Alley 24 Traffic Study January 2013 Frostburg, Maryland

More information

Caltrans Sloat Boulevard Pedestrian Safety Project Response to Community Questions, Comments & Concerns

Caltrans Sloat Boulevard Pedestrian Safety Project Response to Community Questions, Comments & Concerns Caltrans Sloat Boulevard Pedestrian Safety Project Response to Community Questions, Comments & Concerns Revised: May 10, 2016 The California Department of Transportation (Caltrans) is planning various

More information

South Albion-Bolton Community Plan North Hill Supermarket Transportation Study Part B: Evaluation of Alternatives

South Albion-Bolton Community Plan North Hill Supermarket Transportation Study Part B: Evaluation of Alternatives Community Plan North Hill Supermarket Transportation Study Part B: Evaluation of Alternatives Prepared for: The Town of Caledon August 9 Transportation Solutions Ltd. 43 Forest Road Cambridge, ON N1S 3B4

More information

J Street and Folsom Boulevard Lane Conversion Project (T ) Before and After Traffic Evaluation

J Street and Folsom Boulevard Lane Conversion Project (T ) Before and After Traffic Evaluation J Street and Folsom Boulevard Lane Conversion Project (T15125400) Before and After Traffic Evaluation Prepared by Transportation Division June 2014 Executive Summary On February 12, 2013, the City of Sacramento

More information

University Hill Transportation Study Technical Memorandum Alternatives Modeling and Analysis May 2007

University Hill Transportation Study Technical Memorandum Alternatives Modeling and Analysis May 2007 Technical Memorandum May 2007 Syracuse Metropolitan Transportation Council Edwards and Kelcey with Wallace Roberts and Todd Alta Planning and Design CONTENTS SECTION ONE- INTRODUCTION...1 SECTION TWO-

More information

Lake Whitney Elementary School

Lake Whitney Elementary School Lake Whitney Elementary School SCHOOL ROUTE PLAN For LAKE WHITNEY ELEMENTARY SCHOOL LOCATION 18 ORANGE COUNTY Prepared for: ORANGE COUNTY SCHOOL ASSESSMENT PROGRAM ORANGE COUNTY PUBLIC WORKS Traffic Engineering

More information

APPENDIX F SUPPLEMENTAL TRAFFIC DATA

APPENDIX F SUPPLEMENTAL TRAFFIC DATA APPENDIX F SUPPLEMENTAL TRAFFIC DATA Environmental and Planning Consultants 440 Park Avenue South 7th Floor New York, NY 10016 tel: 212 696-0670 fax: 212 213-3191 www.akrf.com Draft Memorandum To: Michael

More information

Walmart (Store # ) 60 th Street North and Marion Road Sioux Falls, South Dakota

Walmart (Store # ) 60 th Street North and Marion Road Sioux Falls, South Dakota Walmart (Store #4865-00) 60 th Street North and Marion Road Sioux Falls, South Dakota Prepared for: Wal-Mart Stores, Inc. Bentonville, Arkansas Prepared by: Kimley-Horn and Associates, Inc. ã2013 Kimley-Horn

More information

Arlington Public Schools Thomas Jefferson Site Evaluation Transportation Networks. Thomas Jefferson Working Group Meeting #6 November 10, 2014

Arlington Public Schools Thomas Jefferson Site Evaluation Transportation Networks. Thomas Jefferson Working Group Meeting #6 November 10, 2014 Arlington Public Schools Thomas Jefferson Site Evaluation Transportation Networks Thomas Jefferson Working Group Meeting #6 November 10, 2014 2 3 INTRODUCTION 4 Goal of our work: Identify and assess multi-modal

More information

TRAFFIC SIGNAL WARRANT STUDY

TRAFFIC SIGNAL WARRANT STUDY TRAFFIC SIGNAL WARRANT STUDY 5 th STREET & ENCHANTED PINES DRIVE JANUARY 2013 TRAFFIC OPERATIONS ENGINEERING SERVICES/PUBLIC WORKS DEPARTMENT TABLE OF CONTENTS INTERSECTION LOCATION MAP ii INTRODUCTION

More information

FRONT RANGE CROSSINGS TRAFFIC IMPACT STUDY

FRONT RANGE CROSSINGS TRAFFIC IMPACT STUDY FRONT RANGE CROSSINGS TRAFFIC IMPACT STUDY Prepared for: City of Thornton And Colorado Department of Transportation Prepared by: 11 Blake Street, Suite 2 Denver, Colorado 822 Contact: Brian Bern, PE, PTOE

More information

INDUSTRIAL BUILDING 1660 COMSTOCK ROAD CITY OF OTTAWA TRANSPORTATION OVERVIEW. Prepared for:

INDUSTRIAL BUILDING 1660 COMSTOCK ROAD CITY OF OTTAWA TRANSPORTATION OVERVIEW. Prepared for: INDUSTRIAL BUILDING 1660 COMSTOCK ROAD CITY OF OTTAWA TRANSPORTATION OVERVIEW Prepared for: Simluc Contractors Limited 2550 Blackwell Street, Ottawa K1B 5R1 October 18, 2013 113-584 Overview_1.doc D. J.

More information

TAKOMA METRO STATION

TAKOMA METRO STATION TKOM METRO STTION Traffic nalysis Technical Memorandum Station Planning in Support of Joint evelopment Job No. 13-FQ165-LN-2 November 213 WSHINGTON METROPOLITN RE TRNSIT UTHORITY (WMT) Takoma Metro Station

More information

5.16 TRAFFIC AND CIRCULATION

5.16 TRAFFIC AND CIRCULATION 5.16 TRAFFIC AND CIRCULATION This section is based upon the Tierra Robles Traffic Impact Study (May 2015) and Supplemental Traffic Impact Analysis (August 2017) prepared by Omni-Means Engineering Solutions,

More information

Troutbeck Farm Development

Troutbeck Farm Development Troutbeck Farm Development Willistown Township, Chester County PA For Submission To: Willistown Township Last Revised: October, 4 TPD# INLM.A. 5 E. High Street Suite 65 Pottstown, PA 9464 6.36.3 TPD@TrafficPD.com

More information

QUICKIE C STORE AND GAS BAR 1780 HERON ROAD OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for:

QUICKIE C STORE AND GAS BAR 1780 HERON ROAD OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for: QUICKIE C STORE AND GAS BAR 1780 HERON ROAD OTTAWA, ONTARIO TRANSPORTATION BRIEF Prepared for: Quickie Convenience Stores Larny Holdings Ltd. c/o PBC Group April 15, 2015 115-615 Report_1.doc D. J. Halpenny

More information

2.0 LANE WIDTHS GUIDELINE

2.0 LANE WIDTHS GUIDELINE 2.0 LANE WIDTHS GUIDELINE Road Engineering Design Guidelines Version 2.0.1 May 2018 City of Toronto, Transportation Services City of Toronto Page 0 Background In early 2014, Transportation Services initiated

More information