1 TRANSPORT FOR LONDON RIVER CROSSINGS: EAST OF SILVERTOWN CROSSINGS SUPPORTING TECHNICAL DOCUMENTATION TRAFFIC IMPACT REPORT Neil Georgeson July 2014 This report examines the traffic impacts that potential river crossings would have on the highway network. Topics examined include: Background traffic growth; Changes in traffic and related delay; Connectivity; Cross river demand; Routings of trips; Origins of trips using crossings. This document contains information relevant to the following options: Woolwich Ferries Bridges Tunnels Gallions Reach Ferries Bridges Tunnels Belvedere Ferries Bridge Tunnels

2 East of Silvertown: Traffic Impact Report Transport for London July

3 Introduction This report provides a review of the highway traffic forecasts for the proposed options for new river crossings between East and South East London. Description of traffic models Transport for London (TfL) has used the London Regional Demand Model (LoRDM) to forecast the demand and traffic impacts of several options to provide new river crossings in East and South East London. LoRDM uses population and employment figures (as contained in the Mayor s 2009 London Plan) as well as assumptions from Government on economic growth to predict overall travel demand on both public transport and the highway network. The LoRDM model also estimates highway and public transport network conditions. On the highway side LoRDM includes TfL s River Crossings Highway Assignment Model (RXHAM), which represents the highway network in detail to determine the strategic routing of trips between their origins and destinations. TfL has modelled the impact of a number of potential river crossing options for the year The focus provided is on the weekday morning peak hour (08:00-09:00), however, results are also provided for some indicators for the average one hour interpeak (from 10:00-16:00), and for the evening peak hour (17:00-18:00). It should be noted that the RXHAM is strategic in nature and is used to identify broad changes in traffic patterns across the highway network, as well as the magnitude of this change. The results should not be taken as a definitive forecast of future flows, especially on minor roads or at individual junctions. Also the models do not yet assume any mitigation measures that might be introduced such as changes to junction capacities or new traffic calming measures. Further models which will more accurately represent traffic flows and individual junctions closer to the proposed river crossings are currently being developed by TfL. In addition traffic forecasts will be updated if population and employments forecasts as contained in the Mayor s London Plan are revised. The model results do not include any land use changes that could occur as a result of changes in travel accessibility. The model however does take into account how trips might redistribute between the locations of future population and job changes, and how mode share might be impacted. 2

4 Description of options tested The scenarios that were tested are outlined below: 1) A higher capacity ferry service at Woolwich Ferry (30% additional capacity each direction); 2) A ferry at Gallions Reach (double the capacity of the existing Woolwich Ferry) and the removal of Woolwich Ferry; 3) A bridge at Gallions Reach (comprising of one general traffic lane and one lane for HGV / buses in each direction) and the removal of the Woolwich Ferry; 4) A bridge at Belvedere (comprising of one general traffic lane and one lane for HGV / buses in each direction). In this scenario Woolwich Ferry remains but operates with an extra 30% capacity compared to today s levels. For all of the above options it was assumed that a new crossing (a tunnel) at Silvertown will be built connecting the North Greenwich Peninsula with the Royal Docks, with both the new crossing and Blackwall Tunnel being charged. It should be noted that the Current charges applied to the Dartford Crossing are as follows: Car 2.00 Van 2.50 HGV 5.00 It is assumed that these charges will increase over time, broadly in line with inflation and will reflect planned increases as set out by the DfT. With regards to TfL s modelling for the proposed crossings it was assumed that the following charges would be applied at Blackwall and Silvertown, and to Woolwich Ferry or its replacement. Northbound Southbound AM Peak Dartford rate 50% Dartford rate Inter Peak 50% Dartford rate 50% Dartford rate PM Peak 50% Dartford rate Dartford rate It should be noted that further work on the appropriate level of charge will be undertaken including work on potential discounts to any charge. To enable comparisons, TfL also forecast what highway conditions would be like in 2021 if: 1) no new river crossings were implemented at either Silvertown or further east along the River Thames compared to 2012; 2) just Silvertown Crossing was built and Blackwall were both charged. 3

5 This report will focus on how the proposed crossings impact the highway network by looking at the following themes: A) Assignment which routes are used by people in making their journey taking into account the new crossings; B) Connectivity how journey times change as a result of the new crossings; C) Distribution how people change their trip destination. This report does not address mode shift in detail as no bus routes have been added or extended to use a potential Gallions or Belvedere Bridge. As such the forecasts presented in this report represent a worst case in terms of impact on the highway network, as it would be expected that some cross river trips would transfer from car to bus. Further discussion on mode shift is presented later in the report. 4

6 Reference Case The Reference Case includes assumptions regarding the development of the transport network. On the highway network there are three main sets of changes from the 2012 base year: 1) the junctions of the A206 Woolwich Road / Gallions Road and Gallions Road / Bugsby s Way have been converted from priority control to signal control; 2) the road network in the Olympic Park area of Stratford changes significantly from 2012 with the addition of many new links for through traffic; 3) the reference networks include increases to the capacity of the Dartford crossing due to the introduction of free-flow electronic tolling. Public transport changes include upgrade schemes for National Rail (including Crossrail 1 and Tilbury & Southend) and DLR/ LUL. A full list of public transport assumptions is included as Appendix A. 5

7 Background changes from 2012 to 2021 The plot below shows the change in traffic flows in the am peak hour across East and South East London from 2012 to It can be seen that there are large increases in flows across the strategic road network, eg A13, North Circular, A102, A2 and M25 and to a lesser extent across large sections of the network. These increases are driven primarily by the forecast increase in population and emplyment within London and across the South East of England. Flow changes on the road network in the am peak hour from 2012 to

8 The plot below shows the impact that the increases in traffic flow has on junction delay between 2012 and 2021 in the am peak hour. Increases in delay can be seen across the highway network as a result of increased traffic flows. Some of the largest increases in junction delay occurs on the A13, M25, A2 and northbound approaches to the Blackwall Tunnel. Junction delay changes in the am peak hour from 2012 to 2021 From 2012 to 2021 in the am peak total delay pcu hours increase by 22% (41,533 to 50,660hrs). At a borough level delay increase by 15% in Newham, 19% in Havering, 27% in Bexley, 26% in Greenwich and 31% in Barking & Dagenham. 7

9 The plot below shows the change in traffic flows in the interpeak (average hour) across East and South East London from 2012 to As in the am peak, there are large increases in flows across the strategic road network, eg A13, North Circular, A102, A2 and M25 and to a lesser extent across large sections of the network. Flow changes on the road network in the interpeak (average hour) from 2012 to

10 The plot below shows the impact that the increases in traffic flow has on junction delay between 2012 and 2021 in the inter peak (average hour). Increases in delay can be seen across the highway network as a result of increased traffic flows. Compared to the am peak the level of increase in delay is smaller reflecting the lower levels of traffic on the network in the interpeak. Junction delay changes in the inter peak (average hour) from 2012 to 2021 From 2012 to 2021 in the interpeak (average hour) total delay pcu hours increase by 14% (27,728 to 31,530hrs). At a borough level delay increases by 10% in Newham, 13% in Bexley, 15% in Havering, 20% in Greenwich, 21% in Barking & Dagenham and 23% in Tower Hamlets. 9

11 The plot below shows the change in traffic flows in the pm peak across East and South East London from 2012 to As in the am and inter peaks, there are large increases in flows across the strategic road network, eg A13, North Circular, A102, A2 and M25 and to a lesser extent across whole sections of the network. Flow changes on the road network in the pm peak hour from 2012 to

12 The plot below shows the impact that the increases in traffic flow has on junction delay between 2012 and 2021 in the pm peak hour. Increases in delay can be seen across the highway network as a result of increased traffic flows. Some of the largest increases in junction delay occurs on the A13, M25, A2 and southbound approaches to the Blackwall Tunnel. Junction delay changes in the pm peak hour from 2012 to 2021 From 2012 to 2021 in the pm peak total delay pcu hours increase by 24% (48,442 to 60,239hrs). At a borough level, delay increases by 18% in Newham, 23% in Bexley, 25% in Havering, 28% in Greenwich, 32% in Barking & Dagenham and 43% in Tower Hamlets. 11

13 Impact of implementing Silvertown Tunnel, and charging both Blackwall and Silvertown Tunnels The plot below shows the change in traffic flows in the am peak hour in 2021 due to the implementation of Silvertown Tunnel and charging both Silvertown and Blackwall. It can be seen that there are increases in flows northbound on the Blackwall and Silvertown approach roads due to the extra capacity that Silvertown Tunnel provides. However, there are decreases southbound due to the charging regime included in the model (1/2 Dartford rate for southbound vehicles). This suggests that the level of delay experienced southbound is not significant enough for users to use the crossings and pay the potential charge in the same numbers as under the Blackwall only no charge scenario. Flow changes due to the implementation of Silvertown Tunnel and charging both Blackwall and Silvertown Tunnels in the am peak hour in

14 The plot below shows the change in junction delay as a result of implementing Silvertown Tunnel and charging both Silvertown and Blackwall in the am peak period in The plot shows that significant reductions in junction delay are achieved on the northbound approaches to Blackwall and Silvertown Tunnels. The implementation of Silvertown assists in removing a bottleneck for northbound traffic in the North Greenwich Penninsula. While charging both Blackwall and Silvertown Tunnels helps to manage overall traffic levels using these two crossings so that significant delays do not occur elsewhere on the highway network as a result of additional capacity being provided. Dartford and Woolwich Ferry also benefit from small reductions in delay due to trips transferring to use the less congested Blackwall / Silvertown cross river route. Junction delay changes in the am peak hour due to the implementation of Silvertown Tunnel and Blackwall both charged in the am peak hour in 2021 The construction of Silvertown Tunnel and charging both Silvertown and Blackwall Tunnels results in a decrease in congested hours across the highway network from 50,660 to 49,738 (-2%) in the am peak hour in At a borough level delay declines by 23% in Greenwich, increases by 5% in Tower Hamlets and remains broadly unchanged in Bexley, Havering, Newham and Barking & Dagenham. 13

15 The plot below shows the change in traffic flows in the inter peak (average hour) in 2021 due to the implementation of Silvertown Tunnel and charging both Silvertown and Blackwall. It can be seen that on the approaches in both directions the number of vehicles falls due to the charge applied to the crossings (1/2 Dartford rate for both southbound and northbound vehicles). A decrease in flows is also experienced on the A2, the western section of the A13 and the A102. An increase can be seen on the M25 and Dartford Crossing as people are no longer able to take advantage of a free crossing at Blackwall. Flow changes due to the implementation of Silvertown Tunnel and charging both Blackwall and Silvertown Tunnels in the interpeak (average hour) in

16 The plot below shows the change in junction delay as a result of implementing Silvertown Tunnel and charging both Silvertown and Blackwall in the inter peak (average hour) in The plot shows that delay at junctions reduces on the immediate approaches to Silvertown and Blackwall, although some increases do occur further west towards Rotherhite and Tower Bridge which still operate as charge free crossings. Junction delay changes in the inter peak (average hour) due to the implementation of Silvertown Tunnel and Blackwall, both charged in 2021 The construction of Silvertown Tunnel and charging both Silvertown and Blackwall Tunnels results in a slight decrease in congested hours across the highway network from 31,530 to 31,327 (-1%) in the inter peak in At a borough level, delay declines by 5% in Greenwich and 9% in Tower Hamlets, while remaining broadly unchanged in Havering, Barking & Dagenham, Bexley and Newham. 15

17 The plot below shows the change in traffic flows in the pm peak hour in 2021 due to the implementation of Silvertown Tunnel and charging both Silvertown and Blackwall. It can be seen that there are increases in flows southbound on the Blackwall and Silvertown approach roads due to the extra capacity that Silvertown Tunnel provides. However, there are decreases northbound due to the charges detering traffic which would have otherwise crossed at this location under a Blackwall (no charge) scenario. Flows also increase on the Dartford Crossing as Blackwall no longer provides a free alternative to cross the River Thames. Flow changes due to the implementation of Silvertown Tunnel and charging both Blackwall and Silvertown Tunnels in the pm peak hour in

18 The plot below shows the impact of the junction delay as a result of implementing Silvertown Tunnel and charging both Silvertown and Blackwall in the am peak period in Significant reductions in junction delay are achieved on the sorthbound approaches to Blackwall and Silvertown Tunnels. The implementation of Silvertown assists in removing a bottleneck for sorthbound traffic crossing into the North Greenwich Penninsula. It can be seen that additional delays occurs south of the River Thames due to heavier flows of traffic being able to cross the river at this location. Junction delay changes in the pm peak hour due to the implementation of Silvertown Tunnel and Blackwall, both charged in 2021 The construction of Silvertown Tunnel and Blackwall Tunnel both being charged results in a slight decrease in congested hours across the highway network from 60,239 to 59,113 (-2%) in the pm peak in At a borough level delay increases by 9% in Greenwich, and 6% in Bexley, while remaining broadly unchanged in Barking & Dagenham, Newham and Havering. Delay falls by 28% in Tower Hamlets. 17

19 Connectivity - Woolwich Ferry For Gallions Ferry, Gallions Bridge and Belvedere Bridge, maps have been produced showing changes in access to economically active population and jobs within 37mins travel time. This travel time is the average travel to work time for people in East and South East London boroughs as identified by TfL s London Travel Demand Survey. This analysis has not been presented for the Woolwich Ferry enhanced capacity option so not to overstate the potential impact that an enhanced ferry at the same location would provide, as: 1) only a limited number of additional vehicles (approx. 60 per hour) would be able to use the crossing, whereas much greater volumes of traffic would be able to use a bridge at Gallions or Belvedere. 2) the number of people using the ferry falls compared to the scenario in which Silvertown and Blackwall are charged, but the ferry remains at the same capacity and free to use, due to people diverting to use a faster crossing point at Silvertown / Blackwall. The table below shows the number of minutes saved for selected journeys from south to north of the River Thames and vice versa in the am peak hour in 2021 with the enhanced capacity ferry (charged) compared to the existing ferry service (not charged). Time savings can be achieved for cross river journeys through the increase in capacity at the crossing. It should be noted that for this connectivity analysis the quickest route between an origin and destination may not be via the new infrastructure provided in a particular scenario. Also the quickest route between two points may change between scenarios. For northbound journeys reductions of 13 mins from Thamesmead to Barking, 13 mins from Belvedere to Barking and 13 mins from Thamesmead to the Royals and 17 mins from Belvedere to the Royals are achieved. Due to slightly less congestion for southbound trips in the am peak, lower time savings are delivered with a reduction of 7 mins from Barking to Belvedere, 7 mins Barking to Thamesmead and 7 mins from the Royals to Thamesmead, but 16 mins from Dagenham to Thamesmead. Journey time savings due to Woolwich Ferry (am peak hour, 2021) Northbound To Stratford To Royals To Barking To Dagenham Woolwich Thamesmead Belvedere Bexleyheath Southbound To Woolwich To Thamesmead To Belvedere To Bexleyheath Stratford Royals Barking Dagenham

20 Gallions Ferry The plot below shows the change in the number of jobs accessible within 37 mins by zone in the am peak hour in 2021 from implementing Gallions Ferry (with Silvertown and Blackwall charged) compared to just implementing Silvertown and Blackwall charged. It can be seen that increases in accessiblity occur south of the Thames in North Bexley and East Greenwich, with a few zones gaining access to over 200,000 additional potential jobs. There is limited change to the number of jobs accessible within 37 mins north of the Thames, eg in Newham and Barking & Dagenham, as these boroughs have better existing access by road to jobs in areas such as Canary Wharf and the City. The River Thames does not act as a barrier to these locations compared to those locations south of the River Thames. Change in jobs accessible within 37 mins by zone as a result of Gallions Ferry (am peak period, 2021) 19

21 The plot below shows the change in the number of economically active people accessible within 37 mins by zone from implementing Gallions Ferry (with Silvertown and Blackwall charged) compared to just implementing Silvertown and Blackwall charged. This measure can be used as a proxy as to the potential attractiveness of a location for businesses being able to access a large workforce. The largest gains are south of the River Thames in North Bexley, and north of the River Thames in parts of Newham, the two areas closest to the new crossing. Change in economically active population within 37 mins by zone as a result of Gallions Ferry (am peak period, 2021) Both plots show the potential of Gallions Ferry to assist regeneration in East London, with south of the River Thames gaining improved access to a larger jobs market, and businesses to a larger potential workforce. While north of the River Thames areas primarily gain access to a larger potential workforce south of the Thames. Analysis has not been provided for the interpeak and pm peaks, as the morning period is when the majority of people begin their outward trip to reach their workplace. 20

22 The table below shows the number of minutes saved for selected journeys from south to north of the River Thames and vice versa in the am peak hour in 2021 with the introduction of Gallions Ferry. Greater time savings can be achieved for cross river journeys through the introduction of a new higher capacity ferry at a new location, than by increasing the capacity of Woolwich Ferry alone. These areas would benefit from a greater change in accessibility around Gallions Reach as the new crossing point is further removed from the existing crossing points of Silvertown and Blackwall than Woolwich. For northbound journeys, reductions of 27 mins from Thamesmead and Belvedere to Barking and 24 mins from Thamesmead and Belvedere to the Royals are achieved. Due to less congestion for southbound trips in the am peak, smaller time savings are delivered with a reduction of 18 mins from Barking to Belvedere and Thamesmead, 14 mins from the Royals to Thamesmead and Belvedere, and 15 mins from Dagenham to Thamesmead. Journey time savings due to Gallions Ferry (am peak hour, 2021) Northbound To Stratford To Royals To Barking To Dagenham Woolwich Thamesmead Belvedere Bexleyheath Southbound To Woolwich To Thamesmead To Belvedere To Bexleyheath Stratford Royals Barking Dagenham

23 Gallions Bridge The plot below shows the change in the number of jobs accessible within 37 mins by zone in the am peak hour in 2021 from implementing Gallions Bridge (with Silvertown and Blackwall charged) compared to just implementing Silvertown and Blackwall charged. It can be seen that large increases in accessiblity occur south of the Thames in North Bexley and East Greenwich, with many zones gaining access to over 200,000 additional potential jobs. The increase is significantly less north of the Thames, eg in Newham and Barking & Dagenham, as these boroughs have better access by road to jobs in areas such as Canary Wharf and the City. Also the River Thames does not act as a barrier to these locations compared to those locations south of the River Thames. Change in jobs accessible within 37 mins by zone as a result of Gallions Bridge (am peak period, 2021) 22

24 The plot below shows the change in the number of economically active people accessible within 37 mins by zone from implementing Gallions Bridge (with Silvertown and Blackwall charged) compared to just implementing Silvertown and Blackwall charged. This measure can be used as a proxy as to the potential attractiveness of a location for businesses being able to access a large workforce. The largest gains are south of the River Thames in East Greenwich and North Bexley, however, large increases are also seen north of the River Thames in parts of Newham, Barking & Dagenham and Redbridge. This is due to these areas gaining access to large population centres south of the River Thames. Change in economically active population within 37 mins by zone as a result of Gallions Bridge (am peak period, 2021) Both plots show the greater potential of Gallions Bridge (compared to Gallions Ferry) to assist regeneration in East and South East London, with areas south of the River Thames gaining improved access to a larger jobs market, and businesses to a larger potential workforce. Areas north of the Thames primarily gain access to a larger potential workforce south of the Thames. Significantly more areas gain from the increased improvement in accessibility provided by a bridge rather than a ferry at Gallions Reach, due to the bridge offering a higher capacity and faster way to cross the river. 23

25 The table below shows the number of minutes saved for selected journeys south to north of the River Thames and vice versa in the am peak hour in 2021 with the introduction of Gallions Bridge. Substantial time savings can be achieved for cross river journeys through the construction of a bridge at Gallions Reach. For northbound journeys reductions of 43 mins from Thamesmead to Barking, 40 mins from Belvedere to Barking and 39 mins from Thamesmead to the Royals are achieved. Due to less congestion for southbound trips in the am peak, significant but smaller time savings are delivered with a reduction of 31 mins from Barking to Belvedere, 30 mins Barking to Thamesmead and 26 mins from the Royals to Thamesmead and Belvedere. Journey time savings due to Gallions Bridge (am peak hour, 2021) Northbound To Stratford To Royals To Barking To Dagenham Woolwich Thamesmead Belvedere Bexleyheath Southbound To Woolwich To Thamesmead To Belvedere To Bexleyheath Stratford Royals Barking Dagenham

26 Belvedere Bridge The plot below shows the change in the number of jobs accessible within 37 mins by zone in the am peak hour in 2021 from implementing Belvedere Bridge (with Silvertown and Blackwall charged) compared to just implementing Silvertown and Blackwall charged. It can be seen that large increases in accessibility occur south of the Thames in North Bexley and West Greenwich, with some zones gaining access to over 150, ,000 additional potential jobs. The increase is less north of the Thames, eg in Newham and Barking & Dagenham, but more extensive than with either Gallions Ferry or Gallions Bridge. Change in jobs accessible within 37 mins by zone as a result of Belvedere Bridge (am peak period, 2021) 25

27 The plot below shows the change in the number of economically active people accessible within 37 mins by zone from implementing Belvedere Bridge (with Silvertown and Blackwall charged) compared to just implementing Silvertown and Blackwall charged. As with the previous plots for access to jobs the largest gains are south of the River Thames in east Greenwich and North Bexley, however, large increases are also seen north of the River Thames in parts of Newham, Barking & Dagenham and Havering. This is due to these areas gaining increased access to the large population centres south of the River Thames. Compared with a bridge at Gallions Reach, a bridge at Belvedere can be seen to be benefitting locations further east to the north of the River Thames due to its more easternly location, while providing less benefit to boroughs such as Greenwich and Tower Hamlets. Change in economically active population within 37 mins by zone as a result of Belvedere Bridge (am peak period, 2021) Both plots show the potential of Belvedere Bridge to assist regeneration in East London, with south of the River Thames gaining improved access to a larger jobs market, and businesses to a larger potential workforce. North of the Thames areas primarily gain access to a larger potential workforce south of the Thames. 26

28 The table below shows the number of minutes saved for selected journeys south to north of the River Thames and vice versa in the am peak hour in 2021 with the introduction of Belvedere Bridge. Substantial time savings can be achieved for cross river journeys through the construction of a bridge at Belvedere. For northbound journeys, reductions of 26 mins from Thamesmead to Barking and to Dagenham, 33 mins from Belvedere to Barking and 29 mins from Woolwich to Dagenham are achieved. Significant time savings are also delivered for southbound journeys with this option, with reductions of 41 mins from Dagenham to Thamesmead, 30 mins from Barking to Belvedere, and 24 mins from Barking to Thamesmead. Journey time savings due to Belvedere Bridge (am peak hour, 2021) Northbound To Stratford To Royals To Barking To Dagenham Woolwich Thamesmead Belvedere Bexleyheath Southbound To Woolwich To Thamesmead To Belvedere To Bexleyheath Stratford Royals Barking Dagenham

29 Re-distribution Cross River Demand The two graphs below show the number of vehicles crossing the river by direction in each of the scenarios in the am peak period. It can be seen that as a total across all eastern river crossings, from Rotherhithe to Dartford, the variation in total demand is less than 1000 vehicles in each direction. This is due to the charge that is applied to Blackwall and all new crossings managing overall cross river demand. The results demonstrate that the majority of trips using the proposed new crossings have changed their choice of crossing to complete their journey, rather than the new crossings encouraging significant numbers of new trips to cross the river. Cross river northbound traffic flows in the am peak hour, 2021 Cross river southbound traffic flows in the am peak hour,

30 The two graphs below show the number of vehicles crossing the river by direction in each of the scenarios in the interpeak (average hour). Overall total flow variance (approx 500 vehs in each direction) for all scenarios is less than in the am peak hour, however, the pattern of demand between crossings in each scenario is similar to the am peak. Cross river northbound traffic flows in the inter peak (average hr), 2021 Cross river southbound traffic flows in the inter peak (average hr) in

31 The two graphs below show the number of vehicles crossing the river by direction in each of the scenarios in the pm peak. Overall total flow variance (over 1000 vehs in each direction) for all scenarios is higher than in the am peak hour due to the additional traffic that is attracted to use Belvedere Bridge in the counter-peak direction (south to north) in the pm peak. Under the charging assumptions in this test Belvedere becomes a much more attractive route for some traffic that previously used Dartford to complete their journey, as Belvedere is charged at ½ the rate of the Dartford cash rate. It is also noted that the same increase occurs in the counter peak direction in the am peak which again is also charged at ½ the rate of Dartford. This may warrant further consideration. Cross river northbound traffic flows in the pm peak, 2021 Cross river southbound traffic flows in the pm peak,

32 The table below shows how much traffic is carried on each new crossing (within their own scenario) for all three time periods. As expected higher flows result from the introduction of the higher capacity bridge crossings at Gallions and Belvedere. River crossings traffic flow in 2021 Northbound Southbound AM peak Woolwich Ferry Gallions Ferry Gallions Bridge Belvedere Bridge Interpeak Woolwich Ferry Gallions Ferry Gallions Bridge Belvedere Bridge PM peak Woolwich Ferry Gallions Ferry Gallions Bridge Belvedere Bridge ) Figures rounded to the nearest 50 vehicles 31

33 Routing of trips that use the new crossings A charged higher capacity Woolwich Ferry The plot below shows the routing and number of trips that are forecast to use a charged higher capacity ferry in the am peak in Routing of trips using a charged higher capacity Woolwich Ferry (am peak 2021) It can be seen that the main roads used to access the ferry south the River Thames are Beresford Street, Western Way and Eastern Way, and north of the River Thames are Woolwich Manor Royal Docks Road and the North Circular. 32

34 A charged Gallions Ferry The plot below shows the routing and number of trips that are forecast to use a charged Gallions Ferry in the am peak in Higher flows are attracted to use Gallions Ferry rather than Woolwich Ferry, reflecting that Gallions Ferry has double the capacity of today s Woolwich Ferry, while the future upgrade of Woolwich Ferry would only increase capacity by 30%. The main roads used to access the bridge south the River Thames are Eastern Way, and Bronze Age Way. North of the River Thames, traffic predominately uses the Royal Docks Road and the North Circular. Routing of trips using a charged Gallions Ferry (am peak 2021) 33

35 A charged Gallions Bridge The plot below shows the routing and number of trips that are forecast to use a charged Gallions Bridge in the am peak in Routing of trips using a charged Gallions Bridge (am peak 2021) Much higher flows are attracted to use the bridge rather than the ferry at Gallions Reach. The main roads used to access the bridge south of the River Thames are Eastern Way, Bronze Age Way and the A206 to the M25. Traffic can also be seen to use Knee Hill and Harrow Manor Way to reach the crossing. North of the River Thames traffic predominately uses the Royal Docks Road, the North Circular and to a lesser extent the A13 and Royal Albert Way. 34

36 A charged Belvedere Bridge The plot below shows the routing and number of trips that are forecast to use a charged crossing at Belvedere in the am peak in Routing of trips using a charged Belvedere Bridge (am peak 2021) The main roads used to access the bridge south of the River Thames are Plumstead Road, Western Way, Eastern Way, Bronze Age Way and Picardy Manorway. North of the River Thames traffic predominately uses the A13, M25 and North Circular. 35

37 Origins of trips using new river crossings The plots below show the origin of trips using each new crossing in the am peak. As such these maps forecast the areas from which people will originate from that will use the new crossings, and hence most directly benefit from the additional connectivity provided by each new crossing. For the purposes of this analysis a local car trip is defined as having one or both ends of a trip in Tower Hamlets, Newham, Barking & Dagenham, Havering, Lewisham, Greenwich or Bexley. A charged higher capacity Woolwich Ferry The plot below shows the am peak hour origins for vehicles using Woolwich Ferry. It can be seen that the crossing is mainly used by residents from north Bexley, north east Greenwich, south east Newham and south Barking & Dagenham. 100% of car trips using the ferry in both directions are local. Origin of trips using a charged higher capacity Woolwich Ferry (am peak hour, 2021) 36

38 A charged Gallions Ferry The plot below shows the am peak hour origins for vehicles using Gallions Ferry. It can be seen that the crossing is mainly used by residents from north Bexley, north east Greenwich, south east Newham and south Barking & Dagenham. 100% of northbound car trips and 98% of southbounds car trips using the ferry are local. Origin of trips using a charged Gallions Ferry (am peak hour, 2021) 37

39 A charged Gallions Bridge The plot below shows the am peak hour origins for vehicles using Gallions Bridge. It can be seen that the crossing is mainly used by residents from north Bexley, north east Greenwich, south east Newham and south Barking & Dagenham. Other areas that generate trips are Havering and North Kent. In total the vast majority of car trips are local with 93% of car trips defined as such for northbound movements across Gallions Bridge, and a slightly lower figure of 87% for southbound car trips. Origin of trips using a charged Gallions Bridge (am peak hour, 2021) 38

40 A charged Belvedere Bridge The plot below shows the am peak hour origins for vehicles using Belvedere Bridge. It can be seen that the crossing is mainly used by residents from north Bexley, north east Greenwich, south east Newham and south Barking & Dagenham. Other areas that generate trips are Havering and North Kent. In total the vast majority of car trips are local with 97% of car trips defined as such for northbound movements across Belvedere Bridge, and a slightly lower figure of 91% for southbound car trips. Origin of trips using a charged Belvedere Bridge (am peak hour, 2021) 39

41 Assignment Impacts A charged higher capacity Woolwich Ferry Traffic flow and junction delay plots have not been presented for the charged higher capacity Woolwich scenario, as in total the enhanced ferry only provides additional capacity for approx 60 vehicles (per direction) over the existing ferry service. As previously stated the traffic model is strategic in nature and it would not be appropriate to use this type of model to identify small potential changes in flows and delays as a result of this scheme across a wide area. Forecast traffic flows using the enhanced charged Woolwich Ferry have been presented in the Cross River Demand section of the report. It is forecast that the two way combined flow on the ferry will fall by approximately 10% (50 vehicles) due to the charge that is applied to the service. As such it is expected that a change of this magnitude would have a very limited impact on the wider strategic network and a small impact on roads closer to the ferry. 40

42 Gallions Ferry Volume of traffic on the highway network in the am peak hour The figure below shows the change in flows in the am peak in 2021 with the introduction of Gallions Ferry (plus Silvertown Tunnel and Blackwall both charged) compared with only implementing Silvertown Tunnel and Blackwall both charged. There is some reduction in traffic in Woolwich, Bexleyheath and the M25. There are also increases in the Thamesmead area, notably on the A2016 Eastern Way and small increases on the A406 North Circular. Change in traffic flows due to Gallions Ferry (am peak hour, 2021) 41

43 Delays on the highway network in the am peak hour The figure below shows the change in delay at junctions for the am peak hour in 2021 with the introduction of a Gallions Ferry (plus Silvertown Tunnel and Blackwall both charged) compared with only implementing Silvertown Tunnel and Blackwall both charged. The delay that was previously experienced at the location of Woolwich Ferry has now been removed, and been replaced with similar delays at Gallions Reach. However, queuing traffic waiting to use Woolwich Ferry would have more of an adverse impact on other traffic due to the more physically constrained area available to queuing traffic. Change in junction delay due to Gallions Ferry (am peak, 2021) Gallions Ferry reduces congestion in the am peak by relieving alternative cross river routes with congested hours falling by 236 hours. At a borough level, Greenwich (2%), Bexley (2%) and Barking and Dagenham (3%) experience a fall in congested hours. 42

44 Volume of traffic on the highway network in the inter-peak The figure below shows the change in flows for an average hour in the inter-peak in 2021 with the introduction of Gallions Ferry (plus Silvertown Tunnel and Blackwall both charged) compared with only implementing Silvertown Tunnel and Blackwall both charged. There are similar changes in the inter-peak compared to the am peak with reductions in traffic in Woolwich. There are also increases in the Thamesmead area, notably on the A2016 Eastern Way and small increases on the A406 North Circular. Change in traffic flows due to Gallions Ferry (inter peak, 2021) 43

45 Delays on the highway network in the inter-peak The figure below shows the change in delay at junctions for an average hour in the inter peak in 2021 with the introduction of Gallions Ferry (plus Silvertown Tunnel and Blackwall charged) compared with only implementing Silvertown Tunnel and Blackwall both charged. The changes in delays experienced in the inter-peak are similar to those found in the am peak hour. The delay previously experienced in Woolwich has now been transferred to Gallions Reach. Change in junction delay due to Gallions Ferry (inter peak, 2021) Gallions Ferry reduces congestion in the interpeak by relieving alternative cross river routes with congested hours falling by 57 hours. At a borough level, Gallions Ferry has limited impact on borough level congestion with congestion falling by less than 1% in Greenwich. 44

46 Volume of traffic on the highway network in the pm peak hour The figure below shows the change in flows for the pm peak hour in 2021 with the introduction of Gallions Ferry (plus Silvertown Tunnel and Blackwall charged) compared with only implementing Silvertown Tunnel and Blackwall both charged. Southbound traffic in Silvertown Tunnel and on the approaches to where Woolwich Ferry was located falls, while flows increase on the approaches to Gallions Ferry and on Eastern Way. Change in traffic flows due to Gallions Ferry (pm peak hour, 2021) 45

47 Delays on the highway network in the pm peak The figure below shows the change in flows for the pm peak hour in 2021 with the introduction of Gallions Ferry (plus Silvertown Tunnel and Blackwall both charged) compared with only implementing Silvertown Tunnel and Blackwall both charged. The changes in delays experienced in the pm peak are similar to those found in the am peak hour and inter-peak. The delay previously experienced at the location of Woolwich Ferry has now been transferred to Gallions Reach. Change in junction delay due to Gallions Ferry (pm peak, 2021) Gallions Ferry reduces congestion in the pm peak by relieving alternative cross river routes with congested hours falling by 139 hours. At a borough level, Greenwich (2%) experiences a fall in congested hours. 46

48 Gallions Bridge Volume of traffic on the highway network in the am peak hour The figure below shows the change in flows in the am peak in 2021 with the introduction of Gallions Bridge (plus Silvertown Tunnel and Blackwall both charged) compared with only implementing Silvertown Tunnel and Blackwall both charged. It can be seen that there is a large increase on roads approaching the new crossing, on Eastern Way, Bronze Age Way and on the North Circular. However, there is a reduction in flows in Woolwich Town Centre and part of the Royal Docks due to the removal of Woolwich Ferry. Blackwall Tunnel, Silvertown Tunnel and Dartford Crossing also see falls in traffic due to the new crossing at Gallions offering a more direct / less congested route for some journeys. Traffic flows also fall on strategic roads such as on sections of the M25, A2 and A13. While in the north of Bexley some minor roads see falls and rises in flows as traffic shifts from using the Woolwich Ferry to the new crossing at Gallions Reach. Change in traffic flows due to Gallions Bridge (am peak hour, 2021) 47

49 Delays on the highway network in the am peak hour The figure below shows the change in delay at junctions for the am peak hour in 2021 with the introduction of Gallions Bridge (plus Silvertown Tunnel and Blackwall both charged) compared with only implementing Silvertown Tunnel and Blackwall both charged. As noted previously the RXHAM is strategic in nature and smaller changes in delay at junctions may not be attributable to the introduction of a new crossing. The figure shows that the largest reductions in delay at individual junctions (50 to 100 hours) are in Woolwich Town Centre due to the removal of the Woolwich Ferry and the associated vehicles which used the crossing. Smaller falls (under 10 hours) are also seen on the southern approaches to the Blackwall and Silvertown Tunnels as traffic diverts away from these routes. However, due to the introduction of a bridge at Gallions Reach, junction delay increases on the approaches to this crossing, eg on Eastern Way (10 to 50 hours), Bronze Age Way (under 10 hours), A13 (highest delay 50 to 100 hours) and A117 (under 10 hours). Change in junction delay due to Gallions Bridge (am peak, 2021) The introduction of a new charged river crossing reduces congestion by relieving alternative cross river routes with congestion hours falling by 310 hours. At a borough level, Greenwich (9%) and Barking Dagenham (4%) experience falls in congested hours, while delay in Newham (7%) increases due to a larger volume of traffic now being able to cross the river in the peak hour direction. Delay in Bexley increases by 1%. 48

50 Volume of traffic on the highway network in the interpeak The figure below shows the change in flows for an average hour in the interpeak in 2021 with the introduction of Gallions Bridge (plus Silvertown Tunnel and Blackwall both charged) compared with only implementing Silvertown Tunnel and Blackwall both charged. There is a large increase on roads immediately adjacent to the new crossing at Gallions Reach, on Eastern Way, Bronze Age Way and on the North Circular. However, there is a reduction in flows in Woolwich Town Centre and part of the Royal Docks due to the removal of Woolwich Ferry. Blackwall Tunnel, Silvertown Tunnel and Dartford Crossing also see falls in traffic flows due to the new crossing at Gallions offering a more direct/ less congested route for their journey. Traffic flows also fall on strategic roads such as on sections of the M25, A2, A12 and A13. While in the north of Bexley some minor roads see increases and decreases in flows as traffic shifts from using the Woolwich Ferry to the new crossing at Gallions Reach. Overall the pattern of change in traffic flows is similar compared to the am peak hour, although flows are lower. Change in traffic flows due to Gallions Bridge (inter peak, 2021) 49

51 Delays on the highway network in the interpeak The figure below shows that increases or decreases in delay as a result of changing traffic patterns are much less pronounced than in the am peak due to the lower flows that would have used the new crossing in the inter peak. Again the largest reductions in delay at individual junctions (10 to 50 hours) are in Woolwich Town Centre due to the removal of the Woolwich Ferry and the associated vehicles which used the crossing. While junction delay increases on the approaches to the new bridge on Eastern Way, A13, Harrow Manor Way and Knee Hill (under 10 hours). Increases of 10 to 50 hours are seen in Erith Town Centre. Change in junction delay due to Gallions Bridge (inter peak, 2021) The introduction of a new charged river crossing reduces congestion by relieving alternative cross river routes with congested hours falling by 90 hours. At a borough level, Greenwich experiences a fall in congested hours (4%), while delay in Bexley increases (3%). 50

52 Volume of traffic on the highway network in the pm peak hour The figure below shows the change in flows for the pm peak hour in 2021 with the introduction of Gallions Bridge (plus Silvertown Tunnel and Blackwall both charged) compared with only implementing Silvertown Tunnel and Blackwall both charged. Overall the pattern of change in traffic flows is broadly similar compared to the am peak and the inter peak average hour. However, due to higher flows it is noticable that more minor roads across Newham, Barking & Dagenham, Greenwich and Bexley show increases or decreases than in the other time periods. There is a large increase on roads immediately adjacent to the new crossing at Gallions Reach, on Eastern Way, Bronze Age Way and on the North Circular. However, there is a reduction in flows in Woolwich Town Centre and part of the Royal Docks due to the removal of Woolwich Ferry. Blackwall Tunnel, Silvertown Tunnel and Dartford Crossing also see falls in traffic flows due to the new crossing at Gallions offering a more direct/ less congested route for their journey. Traffic flows also falls on strategic roads such as on sections of the A2, A12 and A13. While in the north of Bexley and south of Newham some minor roads see increases and decreases in flows as traffic shifts from using the Woolwich Ferry to the new crossing at Gallions Reach. Change in traffic flows due to Gallions Bridge (pm peak, 2021) 51

53 Delays on the highway network in the pm peak The figure below shows the change in delay at junctions for the pm peak hour in 2021 with the introduction of Gallions Reach Bridge (plus Silvertown Tunnel and Blackwall both charged) compared with only implementing Silvertown Tunnel and Blackwall both charged. The figure shows that the largest reductions in delay at individual junctions (50 to 100 hours) are on the M25 and A13, with smaller reductions in Woolwich Town Centre (10 to 50 hours). Increases can be seen on Bronze Age Way (50 to 100 hours), with smaller increases (under 10 hours) spread out across East and South East London. Change in junction delay due to Gallions Bridge (pm peak, 2021) The introduction of a new charged river crossing reduces congestion by relieving alternative cross river routes with congested hours falling by 1089 hours. At a borough level, Greenwich (12%) and Newham (6%) experience falls in congested hours, while delay in Bexley (4%) increases. 52

54 Belvedere Bridge Volume of traffic on the highway network in the am peak hour The figure below shows the change in flows in the am peak in 2021 with the introduction of Belvedere Bridge (plus Silvertown Tunnel and Blackwall both charged) compared with only implementing Silvertown Tunnel and Blackwall both charged. In this scenario Woolwich Ferry remains but is charged and operates with an extra 30% capacity compared to today s levels. Belvedere Bridge reduces traffic at Blackwall, Silvertown, Woolwich and most notably Dartford. This does however increase traffic in Bexley, most notably on the A2016 Eastern Way and the B253 Picardy Manorway/Picardy Road. There are also increases on the A13 east of the new crossing due to the transfer of traffic from the Dartford Crossing to the Belvedere Bridge. Change in traffic flows due to Belvedere Bridge (am peak, 2021) 53

55 Delays on the highway network in the am peak hour The figure below shows the change in delay at junctions for the am peak hour in 2021 with the introduction of Belvedere Bridge (plus Silvertown Tunnel and Blackwall both charged) compared with only implementing Silvertown Tunnel and Blackwall both charged. There are relatively small amounts of increased delay on the approach routes to the new Belvedere crossing in north Bexley and also in Barking & Dagenham. There are some reductions in delay at the A406 and Dartford due to some traffic moving away from these routes. Change in junction delay due to Belvedere Bridge (am peak, 2021) The introduction of a new charged river crossing reduces congestion in the am peak by relieving alternative cross river routes with congested hours falling by 277 hours. At a borough level, Bexley (2%), Barking & Dagenham (1%) and Newham (3%) experience falls in congested hours, and delays in Thurrock (7%) also fall. 54

56 Volume of traffic on the highway network in the inter-peak The figure below shows the change in flows for an average hour in the inter-peak in 2021 with the introduction of Belvedere Bridge (plus Silvertown Tunnel and Blackwall both charged) compared with only implementing Silvertown Tunnel and Blackwall both charged. The changes in volume generated by the Belvedere crossing in the inter-peak are very similar to that of the am peak, with traffic from Blackwall, Silvertown, Woolwich and Dartford, transferring to the new Belvedere crossing. Thus increasing traffic on the A2016 Eastern Way, B253 Picardy Manorway/ Picardy Road and on the A13 east of the new crossing. Change in traffic flows due to Belvedere Bridge (inter peak, 2021) 55

57 Delays on the highway network in the inter-peak The figure below shows the change in delay at junctions for an average hour in the inter peak hour in 2021 with the introduction of Belvedere Bridge (plus Silvertown Tunnel and Blackwall both charged) compared with only implementing Silvertown Tunnel and Blackwall both charged. The changes in delay in the inter-peak are very similar to those of the am peak. Delays increase on the approach routes to the new Belvedere Bridge in both north Bexley and also in Barking & Dagenham. There are some reductions in delay on the A406 and at Dartford due to traffic transferring from Dartford. Change in junction delay due to Belvedere Bridge (inter peak, 2021) The introduction of a new charged river crossing has a broadly neutral impact on congestion in the inter peak with congestion hours falling by 49 hours. Thurrock (9%) and Greenwich (3%) see falls in congested, while Bexley (4%), Barking & Dagenham (2%) and Havering (1%) see increases. 56

58 Volume of traffic on the highway network in the pm peak hour The figure below shows the change in flows for an average hour in the pm peak hour in 2021 with the introduction of Belvedere Bridge (plus Silvertown Tunnel and Blackwall both charged) compared with only implementing Silvertown Tunnel and Blackwall both charged. Belvedere Bridge reduces traffic at Blackwall, Silvertown, Woolwich and most notably Dartford. This does however increase traffic in Bexley, most notably on the A2016 Eastern Way and the B253 Picardy Manorway/Picardy Road. There are also increases on the A13 east of the new crossing and on the M25. Change in traffic flows due to Belvedere Bridge (pm peak, 2021) 57

March Maidstone Integrated Transport Strategy Boxley Parish Council Briefing Note. Context. Author: Parish Clerk 2 March 2016

March Maidstone Integrated Transport Strategy Boxley Parish Council Briefing Note. Context. Author: Parish Clerk 2 March 2016 Context. Author: Parish Clerk 2 The Draft Integrated Transport Policy (DITS) sets out a vision and objectives, and identifies a detailed programme of interventions to support the Maidstone Borough Local

More information

The case study was drafted by Rachel Aldred on behalf of the PCT team.

The case study was drafted by Rachel Aldred on behalf of the PCT team. Rotherhithe Case Study: Propensity to Cycle Tool This case study has been written to use the Propensity to Cycle Tool (PCT: www.pct.bike) to consider the impact of a bridge in South-East London between

More information

Appendices. Atkins SBL Forecasting Report 54

Appendices. Atkins SBL Forecasting Report 54 Appendices Atkins 5103087 SBL 54 Atkins 5103087 SBL 55 Appendix A. Local Trip End Generation Rates A.1. A.1.1. Trip Rates The trip rates calculated from TRICS v6.8.1 are presented below for each of the

More information

MoPac South: Impact on Cesar Chavez Street and the Downtown Network

MoPac South: Impact on Cesar Chavez Street and the Downtown Network MoPac South: Impact on Cesar Chavez Street and the Downtown Network Prepared by: The University of Texas at Austin Center for Transportation Research Prepared for: Central Texas Regional Mobility Authority

More information

Building a sustainable world city: the role of transport and land use in London. London s relationship with transport

Building a sustainable world city: the role of transport and land use in London. London s relationship with transport Building a sustainable world city: the role of transport and land use in London Peter Wright Policy Manager, TfL Overview London s relationship with transport Past Current Future Questions? 1 London s

More information

ENFIELD TOWN THE REVISED DESIGN

ENFIELD TOWN THE REVISED DESIGN TOWN THE REVISED DESIGN We re turning Enfield into a borough that encourages walking and cycling, a place that s easy for all of us to get around however we choose to travel. A greener place, with safer

More information

London s Bus Priority

London s Bus Priority London s Bus Priority Presentation to NACTO Workshop Introducing Corridor Bus Priority in congested urban environments STEPHEN PALMER Head of Strategy, Transport for London 6th /7th April 2010 2 Presentation

More information

Living Streets response to the Draft London Plan

Living Streets response to the Draft London Plan Living Streets response to the Draft London Plan Contents Living Streets response to the Draft London Plan... 1 About Living Streets... 2 Summary... 2 Consultation response... 3 Chapter 1: Planning London

More information

North West Non-Technical Summary of the Transport Assessment September 2011

North West Non-Technical Summary of the Transport Assessment September 2011 North West Non-Technical Summary of the Transport Assessment September 2011 Introduction This is a Non-Technical Summary of the findings of the Transport assessment work undertaken for the proposed North

More information

CUERDEN TRANSPORT PROPOSALS

CUERDEN TRANSPORT PROPOSALS 1 CUERDEN TRANSPORT PROPOSALS The transport assessment, submitted with the Cuerden development planning application, looks at access to the site and the impact on the local road network in detail. This

More information

WHITE PAPER: TRANSIT SERVICE FOR SOUTH SHAGANAPPI

WHITE PAPER: TRANSIT SERVICE FOR SOUTH SHAGANAPPI 9/27/2012 TRANSIT PLANNING WHITE PAPER: TRANSIT SERVICE FOR SOUTH SHAGANAPPI 2012 Calgary Transit 1 Table of Contents Purpose... 3 Area of Change... 3 Background... 3 Access to destinations... 5 Connecting

More information

BELFAST RAPID TRANSIT. Ciarán de Búrca Director, Transport Projects Division Department for Regional Development

BELFAST RAPID TRANSIT. Ciarán de Búrca Director, Transport Projects Division Department for Regional Development BELFAST RAPID TRANSIT Ciarán de Búrca Director, Transport Projects Division Department for Regional Development Objectives of Belfast Rapid Transit To provide a modern, safe, efficient and high quality

More information

Wayfinding and Walking in London. Lilli Matson Transport for London May 2013

Wayfinding and Walking in London. Lilli Matson Transport for London May 2013 Wayfinding and Walking in London Lilli Matson Transport for London May 2013 I want to make walking in London as attractive and enjoyable as possible by making walking count Mayor of London Boris Johnson

More information

London Cycle Network Annual Report 2000

London Cycle Network Annual Report 2000 London Cycle Network Annual Report 2000 A cycle network for London by 2005 A cycle network for London by 2005 The London Cycle Network will: provide local links between residential neighbourhoods, railway

More information

MILTON ROAD ~ MITCHAM'S CORNER PARAMICS MODEL INITIAL OPTION TESTING

MILTON ROAD ~ MITCHAM'S CORNER PARAMICS MODEL INITIAL OPTION TESTING MILTON ROAD ~ MITCHAM'S CORNER PARAMICS MODEL INITIAL OPTION TESTING NOVEMBER 216 MILTON ROAD ~ MITCHAM'S CORNER PARAMICS MODEL INITIAL OPTION TESTING Cambridgeshire County Council Type of document (version)

More information

A127/A130 Fairglen Interchange Improvement Schemes. Information Leaflet February 2017

A127/A130 Fairglen Interchange Improvement Schemes. Information Leaflet February 2017 A127/A130 Fairglen Interchange Improvement Schemes Information Leaflet February 2017 1 2 Foreword By Councillor Kevin Bentley Essex is continuing to grow as a vibrant economic hub and as a fantastic place

More information

May Canal Cordon Report 2017

May Canal Cordon Report 2017 May 2018 Canal Cordon Report 2017 Report on trends in mode share of vehicles and people crossing the Canal Cordon to 2017 2 Analysis of trends in mode share of people crossing the canal cordon - 2017 Contents

More information

EXECUTIVE SUMMARY OF CALEDON TRANSPORTATION NEEDS STUDY

EXECUTIVE SUMMARY OF CALEDON TRANSPORTATION NEEDS STUDY EXECUTIVE SUMMARY OF CALEDON TRANSPORTATION NEEDS STUDY The Caledon Transportation Needs Study has been undertaken as a joint project by the Town of Caledon and the Region of Peel to determine the existing

More information

Traffic Impact Study. Westlake Elementary School Westlake, Ohio. TMS Engineers, Inc. June 5, 2017

Traffic Impact Study. Westlake Elementary School Westlake, Ohio. TMS Engineers, Inc. June 5, 2017 TMS Engineers, Inc. Traffic Impact Study Westlake Elementary School Westlake, Ohio June 5, 2017 Prepared for: Westlake City Schools - Board of Education 27200 Hilliard Boulevard Westlake, OH 44145 TRAFFIC

More information

11,000. P.M. Peak Hour Vehicles/Hour 10,000 9,000 8,000. Year

11,000. P.M. Peak Hour Vehicles/Hour 10,000 9,000 8,000. Year CONGESTION RELIEF TASK FORCE The problem today With traffic levels hampering downtown circulation, and long delays in west Salem, policy makers are evaluating potential transportation infrastructure, programs,

More information

Purpose and Need. Chapter Introduction. 2.2 Project Purpose and Need Project Purpose Project Need

Purpose and Need. Chapter Introduction. 2.2 Project Purpose and Need Project Purpose Project Need Chapter 2 Purpose and Need 2.1 Introduction The El Camino Real Bus Rapid Transit (BRT) Project (Project) would make transit and other transportation improvements along a 17.6-mile segment of the El Camino

More information

Chelmsford City Growth Package

Chelmsford City Growth Package Chelmsford City Growth Package Public Consultation Document Volume 2 West Chelmsford July - August 2017 Chelmsford City Growth Package Public Consultation Document - Volume 2 - West Chelmsford Contents

More information

Lower Thames Crossing. Pre-Consultation Scheme Assessment Report Volume 5: Traffic and Economics Appraisal Section 13: Appendices

Lower Thames Crossing. Pre-Consultation Scheme Assessment Report Volume 5: Traffic and Economics Appraisal Section 13: Appendices Lower Thames Crossing Pre-Consultation Scheme Assessment Report Volume 5: Traffic and Economics Appraisal Volume 5 Section 13: Appendices Lower Thames Crossing Route Consultation 2016 Contents Section

More information

Cork to Limerick Route Pre-Feasibility Study Update

Cork to Limerick Route Pre-Feasibility Study Update Cork to Limerick Route Pre-Feasibility Study Update November 2008 Document Title: Cork to Limerick Route Pre-Feasibility Study Update Document Ref(s). : Date Rev Status Originator Checked Approved 01/12/08

More information

CSRM Modelling Summary Report for Cambridge and South Cambridgeshire Local Plans July 2013

CSRM Modelling Summary Report for Cambridge and South Cambridgeshire Local Plans July 2013 CSRM Modelling Summary Report for Cambridge and South Cambridgeshire Local Plans July 2013 Prepared by WSP Group and Atkins EXECUTIVE SUMMARY This Summary Report outlines the work undertaken by WSP Group

More information

Appendix B: Forecasting and Traffic Operations Analysis Framework Document

Appendix B: Forecasting and Traffic Operations Analysis Framework Document Existing Conditions Report - Appendix Appendix B: Forecasting and Traffic Operations Analysis Framework Document This document defines the methodology and assumptions that will be used in the traffic forecasting

More information

London How will the capital s economy change? EXECUTIVE SUMMARY

London How will the capital s economy change? EXECUTIVE SUMMARY London 2030 How will the capital s economy change? EXECUTIVE SUMMARY London 2030 London s economy is growing strongly, easily outpacing both the UK and its nearest European rivals such as Paris and Frankfurt.

More information

Technical note. 1. Introduction

Technical note. 1. Introduction Project: A428 study - Phase 2 To: Adrian Shepherd Subject: Park & Ride site locations From: Atkins Date: Jun 3, 2016 cc: Ashley Heller 1. Introduction 1.1. Purpose of Technical Note The purpose of this

More information

Cynemon - Cycling Network Model for London

Cynemon - Cycling Network Model for London 1 MARCH 2017 Cynemon - Cycling Network Model for London Aled Davies TfL Planning 2 Background Investment in cycling has increased significantly in recent years We need robust appraisal to justify cycling

More information

A7 Transportation and Access: Application 2 - LBHF

A7 Transportation and Access: Application 2 - LBHF A7 Transportation and Access: Application 2 - LBHF Addendum to the Environmental Statement Volume I January 2012 Introduction A7.1 This Chapter of the Addendum to the June 2011 Environmental Statement

More information

Cycle network linking Wolverhampton city centre and Bilston town centre with employment sites and residential areas:

Cycle network linking Wolverhampton city centre and Bilston town centre with employment sites and residential areas: Context and Problems Corridor length 12.3 km; Population within 800m 59,922; Jobs within 800m 59,100; Unemployment 11%; Average Index of Multiple Deprivation 46; Households with no car 45%; Proportion

More information

The Cabinet Member for Highways & Streetscene. Aurang Zeb - Head of Highways & Transport

The Cabinet Member for Highways & Streetscene. Aurang Zeb - Head of Highways & Transport LONDON BOROUGH OF RICHMOND UPON THAMES Cabinet Member Decision DATE: January 2012 REPORT OF: LEAD OFFICER: SUBJECT: WARDS: The Cabinet Member for Highways & Streetscene Aurang Zeb - Head of Highways &

More information

ONS 2013 mid-year population estimates

ONS 2013 mid-year population estimates ONS 2013 mid-year population estimates June 2014 Key findings London s population is estimated to have grown by 108 thousand between mid-2012 and mid-2013 to reach 8.42 million usual residents. Annual

More information

Improving the Bus Network through Traffic Signalling. Henry Axon Transport for London

Improving the Bus Network through Traffic Signalling. Henry Axon Transport for London Improving the Bus Network through Traffic Signalling Henry Axon Transport for London Improving the Bus Network through Traffic Signalling Introduction Transport for London (TfL) operates the most frequent

More information

MARKHOUSE ROAD IMPROVEMENTS

MARKHOUSE ROAD IMPROVEMENTS MARKHOUSE ROAD IMPROVEMENTS www.enjoywalthamforest.co.uk Waltham Forest is changing and we want you to be part of it. Thanks to a funding pot of 27million from Transport for London, we re delivering the

More information

I write in response to the current consultation. I am copying this to Derrick Ashley and I will be posting this online.

I write in response to the current consultation. I am copying this to Derrick Ashley and I will be posting this online. Dear John Draft Local Transport Plan 2050 I write in response to the current consultation. I am copying this to Derrick Ashley and I will be posting this online. East Herts is a largely rural area, with

More information

Preliminary Transportation Analysis

Preliminary Transportation Analysis Preliminary Transportation Analysis Goals of a Robust, Multimodal Transportation Network Safe Accessible/Connected Efficient Comfortable Context-Sensitive Motor Vehicle: Continue to analyze the data to

More information

Memorandum. Fund Allocation Fund Programming Policy/Legislation Plan/Study Capital Project Oversight/Delivery Budget/Finance Contract/Agreement Other:

Memorandum. Fund Allocation Fund Programming Policy/Legislation Plan/Study Capital Project Oversight/Delivery Budget/Finance Contract/Agreement Other: Memorandum Date: November 20, 2017 To: Transportation Authority Board From: Eric Cordoba Deputy Director Capital Projects Subject: 12/5/17 Board Meeting: San Francisco Freeway Corridor Management Study

More information

2. Context. Existing framework. The context. The challenge. Transport Strategy

2. Context. Existing framework. The context. The challenge. Transport Strategy Transport Strategy Providing quality connections Contents 1. Introduction 2. Context 3. Long-term direction 4. Three-year priorities 5. Strategy tree Wellington City Council July 2006 1. Introduction Wellington

More information

Highway 217 Corridor Study. Phase I Overview Report

Highway 217 Corridor Study. Phase I Overview Report Highway 217 Corridor Study Phase I Overview Report November 3, 24 BACKGROUND AND OVERVIEW Study purpose The Highway 217 Corridor Study is developing multi-modal transportation solutions for traffic problems

More information

The Consultation has now ended.

The Consultation has now ended. The Consultation has now ended. We have received Cabinet Member approval to undertake implementation of the Baker Street Two Way scheme. You are not viewing the most recent documentation. Please visit

More information

FEASIBLE SOLUTIONS FOR REDUCING TRAFFIC FROM MEERAMAKKAM MOSQUE JUNCTION TO THOPAWANA TEMPLE AREA IN KANDY

FEASIBLE SOLUTIONS FOR REDUCING TRAFFIC FROM MEERAMAKKAM MOSQUE JUNCTION TO THOPAWANA TEMPLE AREA IN KANDY FEASIBLE SOLUTIONS FOR REDUCING TRAFFIC FROM MEERAMAKKAM MOSQUE JUNCTION TO THOPAWANA TEMPLE AREA IN KANDY A.M.Z. Zimar 1*, P. Sanjeevan 2 1 South Eastern University of Srilanka, Srilanka 2 Central Engineering

More information

North Coast Corridor:

North Coast Corridor: North Coast Corridor: Connecting People, Transportation & Environment Legislative Hearing: 11.8.10 1 North Coast Corridor Region s Lifeline A Regional Strategy Mobility, Economy & Environment North Coast

More information

Regional Bus Priority

Regional Bus Priority Regional Bus Priority Recommendation(s) That the Board: i) Notes the systematic review for bus priority measures on the proposed Frequent Transit Network (FTN). Executive summary The New Network public

More information

Cycle Superhighway CS4 Tower Bridge to Greenwich. 7 November

Cycle Superhighway CS4 Tower Bridge to Greenwich. 7 November Cycle Superhighway CS4 Tower Bridge to Greenwich 7 November 2017 https://consultations.tfl.gov.uk/roads/cs4/ This consultation response is on behalf of the London Cycling Campaign, the capital s leading

More information

Travel in Newham will be affected during the Games Olympic Games: 27 July 12 August 2012 Paralympic Games: 29 August 9 September 2012

Travel in Newham will be affected during the Games Olympic Games: 27 July 12 August 2012 Paralympic Games: 29 August 9 September 2012 Travel in Newham will be affected during the Games Olympic Games: 27 July 12 August 2012 Paralympic Games: 29 August 9 September 2012 Transport for London Plan ahead for easier journeys This year brings

More information

Cabinet Member for Highways & Streetscene. Highway Infrastructure Manager

Cabinet Member for Highways & Streetscene. Highway Infrastructure Manager LONDON BOROUGH OF RICHMOND UPON THAMES DATE: AUGUST 2015 DECISION MAKER: LEAD OFFICER: SUBJECT: WARDS: Cabinet Member for Highways & Streetscene Highway Infrastructure Manager PROPOSED CYCLING IMPROVEMENTS

More information

DOCKLANDS DEVELOPMENTS

DOCKLANDS DEVELOPMENTS DOCKLANDS DEVELOPMENTS Work continues apace on the upgrading of the Docklands Light Railway in time for the 2012 Olympic Games and beyond. Significant events since the last report (in Underground News

More information

Strategic Cycling Analysis. Identifying future cycling demand in London June 2017

Strategic Cycling Analysis. Identifying future cycling demand in London June 2017 Strategic Cycling Analysis Identifying future cycling demand in London June 2017 Contents Page Executive Summary 1 Introduction 3 PART ONE Chapter 1: The Strategic Cycling Analysis 8 Chapter 2: Cycling

More information

Appendix B27 - Weekend and off-peak benefits

Appendix B27 - Weekend and off-peak benefits Appendix B27 - Weekend and off-peak benefits Technical Note Project Title: MVA Project Number: Subject: SY BRT Northern - BAFFB C3a556 Report A5b: Off-Peak and Weekend Benefits Note Number: 56 Version:

More information

WEST AND SOUTH WEST RING ROAD DOWNSTREAM TRAFFIC IMPACTS

WEST AND SOUTH WEST RING ROAD DOWNSTREAM TRAFFIC IMPACTS Page 1 of 9 EXECUTIVE SUMMARY Alberta Transportation ( AT ) is preparing to construct the final sections of the Calgary Ring Road. This includes the South West Ring Road ( SWRR ) (from Lott Creek Blvd

More information

Appendix 3.2 D. Ridership Errata Sheet

Appendix 3.2 D. Ridership Errata Sheet Appendix 3.2 D Ridership Errata Sheet January 14, 2010 Since the release of the Alternatives Description for the South Coast Rail project, the Massachusetts Department of Transportation has identified

More information

Why Westminster Needs 20mph

Why Westminster Needs 20mph Mobilising communities for lower speeds! Why Westminster Needs 20mph 12th March 2014 Who are 20 s Plenty For Us Road Danger in Westminster Benefits of 20mph Speed Limits 20mph Progress in London 20 s Plenty

More information

Calgary Transit Route 302 Southeast BRT Year One Review June

Calgary Transit Route 302 Southeast BRT Year One Review June Calgary Transit Route 302 Southeast BRT Year One Review 2011 June Calgary Transit Route 302 Southeast BRT: Year One Review 2011 April Table of Contents 1.0 Executive Summary... 1 2.0 Introduction... 3

More information

Appendix N(b): Portishead Station Outline Travel Plan

Appendix N(b): Portishead Station Outline Travel Plan Portishead Branch Lane (MetroWest Phase 1): Environment Impact Assessment Appendix N(b): Portishead Station Outline Travel Plan Prepared for West of England Councils September 2017 1 The Square Temple

More information

Appendix 1 Transit Network Analysis

Appendix 1 Transit Network Analysis Appendix 1 Transit Network Analysis APPENDIX 1 TRANSIT NETWORK ANALYSIS The purpose of this appendix is to provide an update on the transit network analysis as it pertains to: i. SmartTrack ii. Scarborough

More information

1.5 On this basis it is fundamental that the Transport Strategy for the site focuses on the following key criteria,

1.5 On this basis it is fundamental that the Transport Strategy for the site focuses on the following key criteria, 1.0 Introduction 1.1 The Transport Assessment has been prepared on behalf of Eon and Roger Bullivant Ltd in respect of the proposed mixed use sustainable urban extension of Drakelow Park. 1.2 The methodology

More information

M6 Junction 10 Public Consultation

M6 Junction 10 Public Consultation M6 Junction 10 Public Consultation December 2015 Introduction Walsall Council and Highways England are developing plans to provide a long term improvement to M6 junction 10. We are holding this non-statutory

More information

Traffic Impact Analysis Chatham County Grocery Chatham County, NC

Traffic Impact Analysis Chatham County Grocery Chatham County, NC Chatham County Grocery Chatham County, NC TABLE OF CONTENTS 1. INTRODUCTION... 1 1.1. Location and Study Area... 1 1.2. Proposed Land Use and Access... 2 1.3. Adjacent Land Uses... 2 1.4. Existing ways...

More information

City of Wayzata Comprehensive Plan 2030 Transportation Chapter: Appendix A

City of Wayzata Comprehensive Plan 2030 Transportation Chapter: Appendix A A1. Functional Classification Table A-1 illustrates the Metropolitan Council s detailed criteria established for the functional classification of roadways within the Twin Cities Metropolitan Area. Table

More information

Corporate. Report COUNCIL DATE: June 26, 2006 NO: C012 COUNCIL-IN-COMMITTEE. TO: Mayor & Council DATE: June 22, 2006

Corporate. Report COUNCIL DATE: June 26, 2006 NO: C012 COUNCIL-IN-COMMITTEE. TO: Mayor & Council DATE: June 22, 2006 Corporate NO: C012 Report COUNCIL DATE: June 26, 2006 COUNCIL-IN-COMMITTEE TO: Mayor & Council DATE: June 22, 2006 FROM: General Manager, Engineering FILE: 0410-20(MoT/Gate) SUBJECT: Surrey Response on

More information

Cycling to work in London, 2011

Cycling to work in London, 2011 CIS2014-11 Cycling to work in London, 2011 September 2014 Introduction A key mayoral priority is to maximise the cycling potential in all areas of the city by encouraging more people to cycle in London,

More information

Cycle Superhighway 4 from Tower Bridge to Greenwich

Cycle Superhighway 4 from Tower Bridge to Greenwich Cycle Superhighway 4 from Tower Bridge to Greenwich About Sustrans Sustrans is the charity making it easier for people to walk and cycle. We are engineers and educators, experts and advocates. We connect

More information

Understanding changing travel demand in Greater Manchester

Understanding changing travel demand in Greater Manchester Understanding changing travel demand in Greater Manchester Which aspects of travel demand have changed in ways which have not been anticipated by traditional forecasting approaches in the past twenty years?

More information

TRANSPORTATION ANALYSIS REPORT US Route 6 Huron, Erie County, Ohio

TRANSPORTATION ANALYSIS REPORT US Route 6 Huron, Erie County, Ohio TRANSPORTATION ANALYSIS REPORT US Route 6 Huron, Erie County, Ohio December 12, 2012 Prepared for: The City of Huron 417 Main Huron, OH 44839 Providing Practical Experience Technical Excellence and Client

More information

Strategic Director for Environment. Enclosures Appendix A - Option drawings. Jamie Blake- Strategic Director for Environment

Strategic Director for Environment. Enclosures Appendix A - Option drawings. Jamie Blake- Strategic Director for Environment Chipping Barnet Area Committee 9 July 2018 Title Report of Wards Status Urgent Key Cromer Road Request for 20mph Zone Strategic Director for Environment High Barnet Public No No Enclosures Appendix A -

More information

UNIT V 1. What are the traffic management measures? [N/D-13] 2. What is Transportation System Management (TSM)? [N/D-14]

UNIT V 1. What are the traffic management measures? [N/D-13] 2. What is Transportation System Management (TSM)? [N/D-14] UNIT V 1. What are the traffic management measures? [N/D-13] Some of the well-known traffic management measures are: a) Restrictions on turning movements b) One - way streets c) Tidal - flow operations

More information

NEW YORK CENTRAL PARK SUBDIVISION BLAIS STREET/ST-PIERRE STREET EMBRUN, ONTARIO TRAFFIC IMPACT STUDY. Prepared for:

NEW YORK CENTRAL PARK SUBDIVISION BLAIS STREET/ST-PIERRE STREET EMBRUN, ONTARIO TRAFFIC IMPACT STUDY. Prepared for: NEW YORK CENTRAL PARK SUBDIVISION BLAIS STREET/ST-PIERRE STREET EMBRUN, ONTARIO TRAFFIC IMPACT STUDY Prepared for: Solidex Holdings Limited & Investissement Maurice Lemieux Investments Attn: Mr. Anthony

More information

AMETI PANMURE: A SUSTAINABLE TRANSPORT SOLUTION - OR NOT? Phil Harrison, Opus International Consultants

AMETI PANMURE: A SUSTAINABLE TRANSPORT SOLUTION - OR NOT? Phil Harrison, Opus International Consultants IPWEA Conference: 7 June 11 June 2015 Abstract AMETI PANMURE: A SUSTAINABLE TRANSPORT SOLUTION - OR NOT? Phil Harrison, Opus International Consultants The AMETI project is a package of multi-modal transport

More information

PUBLIC INQUIRY QUESTION

PUBLIC INQUIRY QUESTION M4 Corridor around Newport PUBLIC INQUIRY QUESTION REFERENCE NO. : PIQ/156 RAISED BY: The Inspector DATE: 31/01/18 RESPONDED BY: Matthew Jones DATE: 02/03/18 SUBJECT: The Welsh Government s response to

More information

APPENDIX S REVISED PAGES OF THE SUPPLEMENTAL TRAFFIC IMPACT ANALYSIS

APPENDIX S REVISED PAGES OF THE SUPPLEMENTAL TRAFFIC IMPACT ANALYSIS APPENDIX S REVISED PAGES OF THE SUPPLEMENTAL TRAFFIC IMPACT ANALYSIS The capacity of the toll plaza was estimated based on data from numerous studies as well as traffic counts conducted at the toll plaza

More information

Wellington Transport Strategy Model (WTSM) Update 2006

Wellington Transport Strategy Model (WTSM) Update 2006 Wellington Transport Strategy Model (WTSM) Update 2006 Final BASELINE FORECASTING REPORT February 2008 WTSM Update Baseline Forecasting Report Wellington Transport Strategy Model (WTSM) Update 2006 BASELINE

More information

EB1413. West Essex and East Hertfordshire Local Plans Modelling. Essex County Council Technical Note 5: East Harlow Corridor VISSIM Study (Sept 2016)

EB1413. West Essex and East Hertfordshire Local Plans Modelling. Essex County Council Technical Note 5: East Harlow Corridor VISSIM Study (Sept 2016) East H arlow C orridor VISSIM T echnical N ote Essex C ounty Council West Essex and East Hertfordshire Local Plans Modelling Essex County Council Technical Note 5: East Harlow Corridor VISSIM Study (Sept

More information

Mill Hill Broadway Capacity Improvement

Mill Hill Broadway Capacity Improvement 1 16 MARCH 2016 Mill Hill Broadway Capacity Improvement Presentation to Barnet Members and Mill Hill Residents Association 2 Background A1 is one of 23 Transport for London Road Network (TLRN) Strategic

More information

Douglas Land Use and Transportation Strategy (DLUTS) Summary. August 2013

Douglas Land Use and Transportation Strategy (DLUTS) Summary. August 2013 Douglas Land Use and Transportation Strategy (DLUTS) Summary August 2013 Background Douglas is a large and popular residential suburb of approximately 30,000 persons on the periphery of Cork City along

More information

Transportation Master Plan Advisory Task Force

Transportation Master Plan Advisory Task Force Transportation Master Plan Advisory Task Force Network Alternatives & Phasing Strategy February 2016 BACKGROUND Table of Contents BACKGROUND Purpose & Introduction 2 Linking the TMP to Key Council Approved

More information

No-car lanes in Tyneside results from modelling and stakeholder analysis

No-car lanes in Tyneside results from modelling and stakeholder analysis No-car lanes in Tyneside results from modelling and stakeholder analysis Dr Corinne Mulley, Newcastle University Dr Jessica Anderson, JMP Consulting Vilnius, September 2007 Belfast Brighton Glasgow Leeds

More information

ANNEX1 The investment required to achieve the Government s ambition to double cycling activity by 2025

ANNEX1 The investment required to achieve the Government s ambition to double cycling activity by 2025 ANNEX1 The investment required to achieve the Government s ambition to double cycling activity by 2025 May 2016 About Sustrans Sustrans makes smarter travel choices possible, desirable and inevitable.

More information

72 Crossrail Amendment of Provisions

72 Crossrail Amendment of Provisions 72 Crossrail Amendment of Provisions Manhattan Shaft Worksite 5.4.36 This new worksite is adjacent to the Tumbling Bay worksite and will occupy an area of land between the Manhattan Building and the Great

More information

Oxfordshire Local Transport Plan 4 Science Vale Cycle Network Project Proposal Didcot Ladygrove Link

Oxfordshire Local Transport Plan 4 Science Vale Cycle Network Project Proposal Didcot Ladygrove Link Overview of project: The Ladygrove Link will provide a modern, direct, off-road, active travel route from the new Didcot North East development and new leisure centre to the strategic Cow Lane Tunnel.

More information

Public transport and town planning from a retroactive point of view C. Wallstrom, S. Johansson et al

Public transport and town planning from a retroactive point of view C. Wallstrom, S. Johansson et al Public transport and town planning from a retroactive point of view C. Wallstrom, S. Johansson et al The aim of this project is to estimate the effect of town planning on traffic volumes and modal split

More information

Cycle journeys on the South-West City Way: a descriptive analysis. Karen McPherson. Glasgow Centre for Population Health

Cycle journeys on the South-West City Way: a descriptive analysis. Karen McPherson. Glasgow Centre for Population Health Cycle journeys on the South-West City Way: a descriptive analysis Karen McPherson Glasgow Centre for Population Health March 2017 Key points: There were 107,000 journeys made using the route during the

More information

Northbound San Jose Avenue & I-280 Off-Ramp Road Diet Pilot Project

Northbound San Jose Avenue & I-280 Off-Ramp Road Diet Pilot Project Project Overview Fed by a two-lane Interstate-280 (I-280) off-ramp, high vehicular volumes and speeds are longstanding issues along San Jose Avenue. Residents in the surrounding neighborhoods have expressed

More information

Road to the future What road users want from Highways England s Route Strategies Summary report November 2016

Road to the future What road users want from Highways England s Route Strategies Summary report November 2016 Road to the future What road users want from Highways England s 2020-25 Route Strategies Summary report November 2016 Road to the future Summary report Foreword Guy Dangerfield Transport Focus aims to

More information

Ormond & McKinnon Walks Response to Draft Glen Eira Community Plan

Ormond & McKinnon Walks Response to Draft Glen Eira Community Plan Response to Draft Glen Eira Community Plan We would like to take this opportunity to thank Glen Eira City Council for the opportunity to comment on the Glen Eira Draft Community Plan. Below is an outline

More information

SANTA CLARA COUNTYWIDE BICYCLE PLAN August 2008

SANTA CLARA COUNTYWIDE BICYCLE PLAN August 2008 SANTA CLARA COUNTYWIDE BICYCLE PLAN August 2008 To assist VTA and Member Agencies in the planning, development and programming of bicycle improvements in Santa Clara County. Vision Statement To establish,

More information

Standing Committee on Policy and Strategic Priorities

Standing Committee on Policy and Strategic Priorities POLICY REPORT Report Date: January 15, 2019 Contact: Steve Brown Contact No.: 604.873.9733 RTS No.: 12955 VanRIMS No.: 08-2000-20 Meeting Date: January 30, 2019 TO: FROM: SUBJECT: Standing Committee on

More information

Figure 1: East West Connector Alignment Alternatives Concept Drawing

Figure 1: East West Connector Alignment Alternatives Concept Drawing Page 2 of 9 Figure 1: East West Connector Alignment Alternatives Concept Drawing The Montebello Drive extension will run north south and connect Wilsonville Road to the Boones Ferry Road to Brown Road

More information

Determining bicycle infrastructure preferences A case study of Dublin

Determining bicycle infrastructure preferences A case study of Dublin *Manuscript Click here to view linked References 1 Determining bicycle infrastructure preferences A case study of Dublin Brian Caulfield 1, Elaine Brick 2, Orla Thérèse McCarthy 1 1 Department of Civil,

More information

Integrated Regional Traffic Management. Michael Aherne Technical Director POLIS Conference 2009

Integrated Regional Traffic Management. Michael Aherne Technical Director POLIS Conference 2009 Integrated Regional Traffic Management Michael Aherne Technical Director POLIS Conference 2009 M50 finish Public Transport and Pedestrians College Green The Spatial Perspective What Could has

More information

Chelmsford City Growth Package

Chelmsford City Growth Package Chelmsford City Growth Package Public Consultation Document Volume 5 South and East Chelmsford July - August 27 Chelmsford City Growth Package Contents Introduction 5 Army and Navy Roundabout Improvements:

More information

GD 0043/18 ACTIVE TRAVEL STRATEGY

GD 0043/18 ACTIVE TRAVEL STRATEGY GD 0043/18 ACTIVE TRAVEL STRATEGY 2018-2021 May 2018 Minister s Introduction There is strong evidence that regular physical activity reduces the risk of a range of health conditions. The best way to increase

More information

Current Travel Needs and Operating Conditions (See pages 4 9 of the Discussion Guide)

Current Travel Needs and Operating Conditions (See pages 4 9 of the Discussion Guide) Phase 1 Consultation: Understanding the Need Feedback Form Thank you for participating in this phase of planning for the George Massey Tunnel Replacement. Your feedback is important to us. Input received

More information

Interchange matters London TravelWatch 21 st June John Barry Head of Network Development - Buses Transport for London

Interchange matters London TravelWatch 21 st June John Barry Head of Network Development - Buses Transport for London Interchange matters London TravelWatch 21 st June 2017 John Barry Head of Network Development - Buses Transport for London Contents Importance of interchange Strengths and opportunities Lewisham Importance

More information

GETTING WHERE WE WANT TO BE

GETTING WHERE WE WANT TO BE CAMBRIDGESHIRE & peterborough GETTING WHERE WE WANT TO BE A GREEN PARTY TRANSPORT POLICY CONTENTS Our Campaign Priorities 4 Bus Franchising 6 Supporting Active Transport 8 Workplace Parking Levy 9 Tackling

More information

High Speed Rail: Is Liverpool on Track? Frank Rogers - Deputy Chief Executive & Director of Integrated Transport Services, Merseytravel

High Speed Rail: Is Liverpool on Track? Frank Rogers - Deputy Chief Executive & Director of Integrated Transport Services, Merseytravel High Speed Rail: Is Liverpool on Track? Frank Rogers - Deputy Chief Executive & Director of Integrated Transport Services, Merseytravel Championing the case for HS2 June 2013 HS2 Stakeholder engagement

More information

5 Highways and Transport Assessment

5 Highways and Transport Assessment 5 Highways and Transport Assessment INTRODUCTION 5.1 This chapter identifies and assesses the potential effects that the development, as described in Chapter 3 may have on the traffic, transport and access

More information

Ministry of Education Flat Bush School Notice of Requirement. Integrated Transportation Assessment Report. February 2016

Ministry of Education Flat Bush School Notice of Requirement. Integrated Transportation Assessment Report. February 2016 Ministry of Education Flat Bush School Notice of Requirement Integrated Transportation Assessment Report February 2016 TDG Ref: 12988-2 151105 ita flat bush.docx Ministry of Education Flat Bush School

More information

Ujari Mohite. Vijay Mahal and Vincent Sanders. Revised Ridership Forecasts for the Uptown DBL project. Date: August 17, 2015 INTRODUCTION/SUMMARY:

Ujari Mohite. Vijay Mahal and Vincent Sanders. Revised Ridership Forecasts for the Uptown DBL project. Date: August 17, 2015 INTRODUCTION/SUMMARY: To: From: Subject: Ujari Mohite Vijay Mahal and Vincent Sanders Revised Ridership Forecasts for the Uptown DBL project Date: August 17, 2015 INTRODUCTION/SUMMARY: This memorandum presents updated ridership

More information

Reducing Cycle Theft in London: A Partnership Approach

Reducing Cycle Theft in London: A Partnership Approach Reducing Cycle Theft in London: A Partnership Approach Sgt Titus Halliwell, Metropolitan Police Service Cycle Taskforce Sophie Brown, Transport for London Summary Scanning: London and the Cycling Revolution

More information