1 Pine Hills Road Pedestrian/Bicycle Safety Study Community Meeting #1 June 8, 2017

2 Meeting Agenda Study Overview Community Survey Existing Conditions Access Management Potential Safety Countermeasures Potential Gateway Features Connection to Pine Hills Trail Proposed Street Typicals Public Outreach Questions & Answers Forum

3 STUDY OVERVIEW

4 Study Overview Walk-Ride-Thrive! Making streets safer for pedestrians and bicyclists Improving roadways to promote pedestrian and bicycle safety Providing educational outreach regarding the importance of safety while biking and walking Reinforcing proper road use and behavior by all 3 Pedestrian/Bicycle Safety Studies (UCF, Oak Ridge, Pine Hills)

5 Study Overview Kicked Off: January 2017 Anticipated Completion: January 2018 Corridor Length: Approximately 3.6 miles Goal: Identify opportunities for implementing safety improvements for people walking, bicycling, driving or taking the bus

6 Study Overview Key Focus Areas Access management/median modifications Lighting evaluation Intersection/mid-block crossing improvements Connectivity and integration with Pine Hills Trail (Segment I & Segment II) and LYNX Pine Hills SuperStop Pine Hills Road at Silver Star Road Gateway Travel lane widths Median landscaping (where possible) Enhanced signage and way-finding

7 Study Overview Key Stakeholders Community Members

8 Study Schedule Data Collection & Analysis Development of Safety Measures & Access Management Identification of Preferred Improvements Refinement of Improvements & Cost Benefit Analysis Agency Coordination Meeting Community Meeting Newsletter LPA/BCC Meetings

9 Public Involvement Study Newsletter Study Website Agency Coordination Meetings Community Meetings LPA/BCC Public Meetings Comments received tonight or postmarked by June 15, 2017 will become part of the first public meeting summary. All comments received throughout this Study will become part of public record and included in Final Study Report.

10 COMMUNITY SURVEY

11 Community Survey Conducted March 1 st to April 15 th Developed in English, Spanish and Haitian-Creole Available online Paper copies provided at 3 locations along corridor Total of 161 responses Majority of respondents: ages and over 65 years of age Majority live/work in 32308

12 Community Survey Results Biggest Challenges: Crossing at intersections Bad driver behaviors (drivers do not yield) Crossing behavior: 38% always cross at intersection or crosswalk 12% always do not cross at intersection or crosswalk 50% often do not cross at intersections or crosswalk 42% cross all lanes at gaps/ breaks in traffic Most preferred improvements: Better lighting Increased presence of law enforcement Wider sidewalks with greater separation from road Pedestrian warning signs/flashing beacons at crosswalks Special signal phasing and pedestrian signs

13 EXISTING CONDITIONS

14 Existing Conditions: Previous Studies Evaluation also considered: FDOT Improvements (Silver Star Road Intersection, Median Plantings, and Sidewalk/Crosswalk Improvements) OC pedestrian island study and construction Pine Hills Trail design and construction Sheriff's Office Operation RISE

15 Existing Conditions: Roadway Features Minor Arterial Urban Section with Curb and Gutter 5 Lanes with Two-Way Continuous Left Turn Lane Varying right-of-way (100 south of Silver Star/85 north of Silver Star) High number of single and multiple driveways 40 mph Speed Limit Pedestrian Crossings Across Pine Hills Road: 7 midblock crossings 8 signalized intersections Along Pine Hills Road: 9 unsignalized intersections

16 Existing Conditions: Pedestrian/Bicycle Facilities Pedestrian Facilities Continuous sidewalks (both sides) South of Belco Drive 5 North of Belco Drive 7 on east side, 5 on west side Curb ramps needed in several locations Ensure sidewalk repair/ maintenance Bicycle Facilities 6 bicycle lanes along both sides south of Figwood Lane No bicycle lane north of Silver Star Road Majority of respondents indicated they prefer to bike off street on wider sidewalk/multipurpose path

17 Existing Conditions: Traffic, Speed, and Transit AM, Afternoon, School and PM peak hours AADT: 25,060 to 34,733 S of Silver Star Rd 29,606 to 32,671 N of Silver Star Rd Truck volumes: < 8.2% 4 LYNX Routes/33 Bus Stops 15% with landing pads 58% with seating 52% with lighting Only 1 Stop (# 28) has pad, shelter, seating and lighting Heaviest Boarding/Alighting: NB Colonial Dr. & Belco Dr. SB Lupez Dr. & Alhambra Dr. Location Posted Speed vs. Actual Speed S of Indian Hill Rd North of Balboa Dr Crosswalk South of Balboa Dr Crosswalk 85 th Percentile Speed Most of traffic travels 7 to 8 miles per hour over the posted speed

18 Existing Conditions: Lighting Luminosity Evaluation 11pm 4am Signalized intersection crosswalks, midblock crosswalks and transit stops Findings Conventional High Pressure Sodium (HPS) street lighting present along both sides throughout Lighting at intersections and mid-block locations Needs improvements 22 (67%) transit stops needs improvements (non-industry standard) 15 (45%) transit stops located farther than 30 from overhead light source High Pressure Sodium LED

19 Existing Conditions: Crash History Analysis Period: Jan Dec Crash History (Total Crashes: 1,214) Crashes Involving Pedestrian/Bicycle 71 (6% of total crashes) Crashes with Injuries 59 (83%) Crashes with Fatalities 5 (7%) Pedestrian Crashes 50 (70%) Bicycle Crashes 21 (30%) Conditions During Crashes Evening/Night Approx. 39% Highest Crash Locations Silver Star Rd. & Colonial Dr. Mostly Dry Conditions Crashes by Age Groups Adult Non-Senior (18 64): 63% Minor (Under 18): 32% Summary of Crashes by User Driver Pedestrian Bicycle Other Highest Causes: Failure to Yield to Vehicle & Dart/Dash Across Road Jan 1 Feb 28, 2017: 80 crashes (5 involved pedestrian/bicycle; 2 pedestrian fatalities)

20 Existing Conditions: Observed Pedestrian/Bicycle Volumes Total Observed Pedestrian/Bike Volumes* Crossing Type Ped Bike Highest Frequency Locations Mid-block (At & Near) N of Fir Dr, Figwood Ln, Silver Star Rd Signalized Intersections (Including School Hours) 1, Silver Star Rd & Belco Dr Unsignalized Intersections 1, Between Spring Hill Dr and Champagne Cir Major Driveways Faith Christian Center Church Total Observed: 3, * Based on highest four hours per day (counts collected over a 3-day period)

21 ACCESS MANAGEMENT

22 Access Management Benefits of Medians Reduces crashes caused by traffic turning left, head-on and crossover traffic and headlight glare Provides refuge for pedestrians Helps traffic flow more efficiently Can improve appearance of a corridor and lessen stormwater runoff

23 Access Management South Section Access Management Based on: Turning Movement Counts Observed Pedestrian/Bicycle Counts Standard Spacing Requirements Maintaining Median Openings for Majority of Major Side Streets

24 Access Management North Section Access Management Based on: Turning Movement Counts Observed Pedestrian/Bicycle Counts Standard Spacing Requirements Maintaining Median Openings for Majority of Major Side Streets

25 POTENTIAL COUNTERMEASURES

26 Potential Safety Measures

27 POTENTIAL GATEWAY FEATURES

28 Potential Gateway Features Gateway Features at Pine Hills Road/Silver Star Road Wider Colored/Textured Crosswalks Larger Colored/Textured Pedestrian Landings Gateway and Enhanced Wayfinding Signage Towers and Low Walls with Pine Hills Branding Realignment of Pine Hills Trail Phase II Landscaping Intersection Modifications Reconstruct Curb Returns To Reduce Crossing Distances All Gateway Features and Intersection Modifications Subject to FDOT Approvals, Funding and Memorandum of Agreements for Maintenance Being in Place.

29 CONNECTION TO PINE HILLS TRAIL

30 Connection to Pine Hills Trail Realign Phase II along Belco Drive Connect Trail to East Side of Pine Hills Rd Phase II Proposed New Alignment New Signal Phase II Begin Point Pine Hills Trail Phase I (Est. Complete Jan. 2018)

31 PROPOSED TYPICALS

32 Proposed Typical South Section

33 Proposed Typical North Section

34 PUBLIC OUTREACH

35 Study Schedule Next Steps Data Collection & Analysis Development of Safety Measures & Access Management Identification of Preferred Improvements Refinement of Improvements & Cost Benefit Analysis Agency Coordination Meeting Community Meeting Newsletter LPA/BCC Meetings

36 Study Contacts Anoch Whitfield, AICP Orange County Project Manager 4200 South John Young Parkway Orlando, FL Phone: Spanish Contact Esther Fernández Cañizares Orange County Engineer II 4200 South John Young Parkway Orlando, FL Phone: Greg Smith, PE. Consultant Project Manager 301 E. Pine Street, Suite 1020 Orlando, FL Phone: Haitian-Creole Contact Celestin Pierre Orange County Assistant Project Manager 4200 South John Young Parkway Orlando, FL Phone:

37 Thank you!! QUESTIONS & ANSWERS FORUM

Orange County s Transportation Planning and Multimodal Corridor Plan

Orange County s Transportation Planning and Multimodal Corridor Plan Orange County Transportation Planning Division Orange County s Transportation Planning and Multimodal Corridor Plan Presentation to UCF LIFE November 11, 2014 Alissa Barber Torres, Ph.D., AICP, PLS Presentation

More information

Waterford Lakes Small Area Study Report

Waterford Lakes Small Area Study Report Waterford Lakes Small Area Study Report Orange County District 4 Prepared for: Orange County Public Works Department Traffic Engineering Division 4200 S. John Young Parkway Orlando, FL 32839-9205 Prepared

More information

5. RUNNINGWAY GUIDELINES

5. RUNNINGWAY GUIDELINES 5. RUNNINGWAY GUIDELINES These guidelines should be considered collectively when making runningway decisions. A runningway is the linear component of the transit system that forms the right-of-way reserved

More information

Atwood Avenue Fair Oaks Avenue Cottage Grove Road

Atwood Avenue Fair Oaks Avenue Cottage Grove Road Atwood Avenue Fair Oaks Avenue Cottage Grove Road Agenda Purpose Review project scope & goals Present design alternatives Gather feedback Answer Questions Format Open House Presentation Q&A Open House

More information

What Is a Complete Street?

What Is a Complete Street? Session 5 Charleen Zimmer, AICP, Zan Associates May 5-7, 2010 What Is a Complete Street? May 2010 5-1 Not a Complete Street More of a Complete Street May 2010 5-2 Benefits of Complete Streets Safety for

More information

Brooklyn Boulevard (County Road 152) Reconstruction Project Phase I. OPEN HOUSE June 20, 2017

Brooklyn Boulevard (County Road 152) Reconstruction Project Phase I. OPEN HOUSE June 20, 2017 Brooklyn Boulevard (County Road 152) Reconstruction Project Phase I OPEN HOUSE June 20, 2017 Brooklyn Boulevard (County Road 152) Phase I Project Partners Project Lead Other Project Partners include Brooklyn

More information

RIVERSIDE, Newton MA BH NORMANDY RIVERSIDE LLC. Riverside Station. A green, transit-oriented community

RIVERSIDE, Newton MA BH NORMANDY RIVERSIDE LLC. Riverside Station. A green, transit-oriented community Riverside Station A green, transit-oriented community October 6, 2011 TONIGHT S AGENDA: 1. Project Update (5 min.) 2. Master Plan Update (10 min.) 3.Traffic Plan Update (10 min.) Questions & Answers MASTER

More information

UCF/ALAFAYA TRAIL PEDESTRIAN SAFETY STUDY

UCF/ALAFAYA TRAIL PEDESTRIAN SAFETY STUDY February 2017 PREPARED FOR: ORLANDO, FLORIDA PREPARED BY: TABLE OF CONTENTS TABLE OF CONTENTS... 1-0 TABLE OF FIGURES... 1-2 Chapter 1 Study Purpose and Scope... 1-1 Purpose... 1-1 Scope and Study Limits...

More information

Bridgewater Complete Streets Prioritization Plan and Pedestrian Safety Assessment

Bridgewater Complete Streets Prioritization Plan and Pedestrian Safety Assessment Bridgewater Complete Streets Prioritization Plan and Pedestrian Safety Assessment Presented by Luciano Rabito Manager of Complete Streets Presented to Bridgewater, MA Wednesday, April 26, 2017 6:30 P.M.

More information

Multimodal Analysis in the 2010 Highway Capacity Manual

Multimodal Analysis in the 2010 Highway Capacity Manual Multimodal Analysis in the 2010 Highway Capacity Manual It s not just cars anymore! Jamie Parks, AICP HCAT Conference May 9-10, 2011 Multimodal LOS in the 2010 HCM History and background Overview of methods

More information

Thank you for attending

Thank you for attending Improving mobility safety comfort WELCOME Thank you for attending The purpose of this meeting is to: Learn about the project Prioritize potential walking and biking improvements on Snelling Ave Gather

More information

Rolling Out New Bike Facilities Within the North Bethesda & White Flint Area

Rolling Out New Bike Facilities Within the North Bethesda & White Flint Area Rolling Out New Bike Facilities Within the North Bethesda & White Flint Area Rolling Out New Bike Facilities Within the North Bethesda & White Flint Area Agenda Designing for all Cyclists Background on

More information

Planning Study SR 976. Project Advisory Team Meeting May 24, 2017

Planning Study SR 976. Project Advisory Team Meeting May 24, 2017 ` SR 976 BIRD ROAD/SW 40TH STREET FROM SR 821/HEFT TO SR 5/US-1 Miami-Dade County, Florida FPID No.: 434845-4-22-01 Planning Study Project Advisory Team Meeting May 24, 2017 1 Agenda Introductions Project

More information

Watertown Complete Streets Prioritization Plan. Public Meeting #1 December 14, 2017

Watertown Complete Streets Prioritization Plan. Public Meeting #1 December 14, 2017 Watertown Complete Streets Prioritization Plan Public Meeting #1 December 14, 2017 Goals for Public Meeting Overview of MassDOT Complete Streets Funding Program Educate the community on Complete Streets

More information

Overview. Illinois Bike Summit IDOT Complete Streets Policy Presentation. What is a Complete Street? And why build them? And why build them?

Overview. Illinois Bike Summit IDOT Complete Streets Policy Presentation. What is a Complete Street? And why build them? And why build them? Overview Illinois Bike Summit IDOT Complete Streets Policy Presentation Aren Kriks, P.E. District One Bicycle Coordinator and Bureau of Programming Project Engineer History of Complete Streets IDOT Policy

More information

Chapter 3.6 Elementary School Z. Volusia County MPO. March Page 13.0

Chapter 3.6 Elementary School Z. Volusia County MPO. March Page 13.0 Chapter 3.6 Elementary School Z DeLand, FL Volusia County MPO March 2008 Page 13.0 Volusia County MPO Bicycle and Pedestrian School Safety Review Study Introduction Elementary School Z is a planned elementary

More information

Southbend to Prima Vista. October 30, Floresta Corridor Master Plan

Southbend to Prima Vista. October 30, Floresta Corridor Master Plan Application of a Complete Street initiative and how it might function operationally 8 8 Southbend to Prima Vista October 30, 2017 Presentation Agenda 2 Perspective and History Traffic projections, Levels

More information

NJDOT Complete Streets Checklist

NJDOT Complete Streets Checklist Background The New Jersey Department of Transportation s Complete Streets Policy promotes a comprehensive, integrated, connected multi-modal network by providing connections to bicycling and walking trip

More information

Bike Planning: A New Day

Bike Planning: A New Day Bike Planning: A New Day Josh Sikich, AICP, LEED AP Chicago Office Director Alta Planning + Design 312-265-0628 joshuasikich@altaplanning.com cities of all sizes are changing Illinois Bike Summit October

More information

Hennepin Avenue Reconstruction Washington Avenue to 12 th Street

Hennepin Avenue Reconstruction Washington Avenue to 12 th Street CITY OF MINNEAPOLIS Hennepin Avenue Reconstruction Washington Avenue to 12 th Street April 2016 1 Upcoming Opportunities Public Meeting #2 April 25, 2016 Minneapolis Central Library Doty Board Room Repeat

More information

Retrofitting Urban Arterials into Complete Streets

Retrofitting Urban Arterials into Complete Streets Retrofitting Urban Arterials into Complete Streets John N. LaPlante, P.E., P.T.O.E., T.Y. Lin International Prepared for: Illinois Traffic Engineering & Safety Conference Urbana, Illinois October 18, 2007

More information

FM 1092/Murphy Road Access Management Study Pulic Meeting #1. Wednesday, August 31, :00 p.m. 8:00 p.m.

FM 1092/Murphy Road Access Management Study Pulic Meeting #1. Wednesday, August 31, :00 p.m. 8:00 p.m. FM 1092/Murphy Road Access Management Study Pulic Meeting #1 Wednesday, August 31, 2011 6:00 p.m. 8:00 p.m. Introductions Agency Partners H-GAC Missouri City TxDOT Introductions Consulting Team In Association

More information

Feasibility Study of Pedestrian Crossings Along Route 7, East of Cascades Parkway and West of Dranesville Road. October 3, 2017

Feasibility Study of Pedestrian Crossings Along Route 7, East of Cascades Parkway and West of Dranesville Road. October 3, 2017 Feasibility Study of Pedestrian Crossings Along Route 7, East of Cascades Parkway and West of Dranesville Road October 3, 2017 Study Area (area within a ¼-mile radius of the study intersections) Route

More information

ROAD SAFETY AUDIT. Granite Avenue at Interstate 93 Ramps. Town of Milton. May 22, Prepared for: MassDOT

ROAD SAFETY AUDIT. Granite Avenue at Interstate 93 Ramps. Town of Milton. May 22, Prepared for: MassDOT ROAD SAFETY AUDIT Granite Avenue at Interstate 93 Ramps Town of Milton May 22, 2017 Prepared for: MassDOT Prepared by: Toole Design Group 2 Oliver Street, Suite 305 Boston, MA 02109 Table of Contents Background...

More information

Route 7 Corridor Study

Route 7 Corridor Study Route 7 Corridor Study Executive Summary Study Area The following report analyzes a segment of the Virginia State Route 7 corridor. The corridor study area, spanning over 5 miles in length, is a multi

More information

SCHOOL CROSSING PROTECTION CRITERIA

SCHOOL CROSSING PROTECTION CRITERIA CITY OF MADISON TRAFFIC ENGINEERING SCHOOL CROSSING PROTECTION CRITERIA January 2016 Adopted as Policy on August 31, 1976, by Common Council by Amended Resolution #29,540 Amended on September 14, 1976,

More information

Chapter 5: Crossing the Street

Chapter 5: Crossing the Street Chapter 5: Crossing the Street Whether walking or bicycling, a student s journey to school will more than likely require crossing one or more streets. Per the Safe Routes to School Guide, maintained by

More information

Prince George s County plans, policies, and projects

Prince George s County plans, policies, and projects Prince George s County plans, policies, and projects Over 250 projects for trails, bikeways, designated bike lanes and sidewalk construction Trail projects that improve access to Metro Sidewalk and trail

More information

City of Novi Non-Motorized Master Plan 2011 Executive Summary

City of Novi Non-Motorized Master Plan 2011 Executive Summary City of Novi Non-Motorized Master Plan 2011 Executive Summary Prepared by: February 28, 2011 Why Plan? Encouraging healthy, active lifestyles through pathway and sidewalk connectivity has been a focus

More information

COMPLETE STREETS A STEP FORWARD ITE District 10/FSITE Annual Meeting November 3, 2015

COMPLETE STREETS A STEP FORWARD ITE District 10/FSITE Annual Meeting November 3, 2015 COMPLETE STREETS A STEP FORWARD 2015 ITE District 10/FSITE Annual Meeting November 3, 2015 About Lakeland Incorporated: 1885 Population: 100,728 Area: Approx. 75 sq. mi Major Employers: Publix, Lakeland

More information

CURBSIDE ACTIVITY DESIGN

CURBSIDE ACTIVITY DESIGN 5 CURBSIDE ACTIVITY DESIGN This chapter provides design guidance for separated bike lanes adjacent to curbside activities including parking, loading and bus stops. Typical configurations are presented

More information

Physical Implications of Complete Streets Policies

Physical Implications of Complete Streets Policies Presentation Overview Physical Implications of Complete Norm Cox, ASLA, LLA Landscape Architect Ann Arbor, Michigan, 10:45 to Noon What Are Complete Streets? What Matters to Bicyclists and Pedestrians

More information

City of Vallejo Traffic Calming Toolbox

City of Vallejo Traffic Calming Toolbox City of Vallejo Traffic Calming Toolbox June 1, 2013 Final Table of Contents Introduction... 1 Non-Physical Devices... 3 High-Visibility Crosswalk... 3 In Pavement Lighted Crosswalk... 4 Rapid Flashing

More information

Hennepin County Transportation Department

Hennepin County Transportation Department Hennepin County Transportation Department Complete Streets Design and Implementation Prepared for the Complete Streets Task Force Craig Twinem, P.E. Design Division Manager Tom Johnson, P.E. Transportation

More information

Innovative Intersections

Innovative Intersections Innovative Intersections Things You Need to Know About FDOT D-7 Safety Academy October 19, 2016 Mark Doctor FHWA Resource Center Atlanta, GA HOW DO YOU FEEL??? about innovative intersections??? Why is

More information

THE FUTURE OF THE TxDOT ROADWAY DESIGN MANUAL

THE FUTURE OF THE TxDOT ROADWAY DESIGN MANUAL THE FUTURE OF THE TXDOT ROADWAY DESIGN MANUAL Kenneth Mora, P.E. (Design Division) 10/10/2017 Table of contents 1 2 Reduction in FHWA design controlling criteria Innovative Intersection Guidance 3-7 8-42

More information

CITY OF WEST LAKE HILLS. Forest View Neighborhood Traffic Calming Study

CITY OF WEST LAKE HILLS. Forest View Neighborhood Traffic Calming Study CITY OF WEST LAKE HILLS 901 South Mopac Expressway Building V, Suite 220 Austin, Texas 78746 Texas P.E. Firm Registration No. F-929 Klotz Associates Final Report Submittal: March 20, 2015 Revised Final

More information

CURB EXTENSIONS BULB OUTS DPS 201 NECKDOWNS

CURB EXTENSIONS BULB OUTS DPS 201 NECKDOWNS CURB EXTENSIONS BULB OUTS DPS 201 NECKDOWNS WHY WHEN & WHERE When Limited Sight Distance Pedestrians & Vehicles Vehicles and Signs Want to put two curb ramps in Discourage High speed turning High number

More information

PEDESTRIAN ACCOMMODATIONS DPS 201 AT INTERCHANGES

PEDESTRIAN ACCOMMODATIONS DPS 201 AT INTERCHANGES PEDESTRIAN ACCOMMODATIONS DPS 201 AT INTERCHANGES UNDERSTANDING THE ISSUES Intersections of freeway ramp terminals at crossroads are the most critical components of an interchange Challenge: balance mobility

More information

Retrofitting for Complete Streets

Retrofitting for Complete Streets Retrofitting for Complete Streets Healthy Communities/Active Transportation Columbus March 30, 2010 John LaPlante, PE, PTOE Director of Traffic Engineering jlaplante@tylin.com What is a Complete Street?

More information

Community Transportation Plan

Community Transportation Plan Community Transportation Plan Appendix A: Traffic Calming CITY OF DECATUR COMMUNITY TRANSPORTATION PLAN Appendix A: City of Decatur City-wide Residential Traffic Calming Program Process & Procedures The

More information

25th Avenue Road Diet Project A One Year Evaluation. Transportation Fund for Clean Air Project #05R07

25th Avenue Road Diet Project A One Year Evaluation. Transportation Fund for Clean Air Project #05R07 25th Avenue Road Diet Project A One Year Evaluation Transportation Fund for Clean Air Project #05R07 Submitted by: The San Francisco Municipal Transportation Agency Dan Provence May 22, 2009 EXECUTIVE

More information

INTERSECTION DESIGN. Bicycle Facility Workshop Intersections 4-1

INTERSECTION DESIGN. Bicycle Facility Workshop Intersections 4-1 INTERSECTION DESIGN 4-1 Intersections Avoid unusual conflicts Provide direct path for cyclists, close to that of motor vehicles Bicyclists should be visible; their movements should be predictable Simple

More information

5 CIRCULATION AND STREET DESIGN

5 CIRCULATION AND STREET DESIGN 5 CIRCULATION AND STREET DESIGN This chapter describes circulation and streetscape improvements proposed for the Northwest Chico Specific Plan Area. It includes detailed design specifications for existing

More information

July 5, Arthur R. Ware, Jr. Elementary School 2017 Safe Routes to School Walkabout Report

July 5, Arthur R. Ware, Jr. Elementary School 2017 Safe Routes to School Walkabout Report July 5, 2017 Arthur R. Ware, Jr. Elementary School 2017 Safe Routes to School Walkabout Report 1 Walkabout Report Introduction On April 28, 2017, City, School, and SAWMPO staff met to conduct a Safe Routes

More information

Duwamish Way-finding and CTR Report

Duwamish Way-finding and CTR Report V. North Tukwila When the North Tukwila Manufacturing and Industrial Center was designated in 1992 as part of the region s land use and transportation plan, the plan called for the area to set a light-rail

More information

10.0 CURB EXTENSIONS GUIDELINE

10.0 CURB EXTENSIONS GUIDELINE 10.0 CURB EXTENSIONS GUIDELINE Road Engineering Design Guidelines Version 1.0 March 2017 City of Toronto, Transportation Services City of Toronto Page 0 Background In early 2014, Transportation Services

More information

UNCONTROLLED PEDESTRIAN CROSSING GUIDELINES

UNCONTROLLED PEDESTRIAN CROSSING GUIDELINES City and County of Denver UNCONTROLLED PEDESTRIAN CROSSING GUIDELINES Prepared for: Prepared by: Adopted September 2016 This page is intentionally left blank. Contents for Denver Uncontrolled Pedestrian

More information

Northbound San Jose Avenue & I-280 Off-Ramp Road Diet Pilot Project

Northbound San Jose Avenue & I-280 Off-Ramp Road Diet Pilot Project Project Overview Fed by a two-lane Interstate-280 (I-280) off-ramp, high vehicular volumes and speeds are longstanding issues along San Jose Avenue. Residents in the surrounding neighborhoods have expressed

More information

S.R. 3009, Section A20 South Park & Logan Road Intersection Improvement Project

S.R. 3009, Section A20 South Park & Logan Road Intersection Improvement Project Open House Public Meeting S.R. 3009, Section A20 South Park & Logan Road Intersection Improvement Project Municipality of Bethel Park, Allegheny County Bethel Park Municipal Building 5001 West Library

More information

DRAFT - CITY OF MEDFORD TRANSPORTATION SYSTEM PLAN Roadway Cross-Sections

DRAFT - CITY OF MEDFORD TRANSPORTATION SYSTEM PLAN Roadway Cross-Sections Roadway Cross-Sections Medford s roadway cross-section standards apply to new and reconstructed roads. The crosssections take into consideration roadway function and operational characteristics, including

More information

Balancing Highway Speeds and Community Needs

Balancing Highway Speeds and Community Needs Balancing Highway Speeds and Community Needs State/Tribal Transportation Conference September 2016 Three parts to this session: Session Overview What are the WSDOT considerations? What are issues we are

More information

Best Practices for the Design and Operation of Reduced Conflict Intersections

Best Practices for the Design and Operation of Reduced Conflict Intersections Best Practices for the Design and Operation of Reduced Conflict Intersections OCTOBER 2016 Prepared By: Table of Contents INTRODUCTION... 5 Purpose... 5 Definition... 5 Advantages... 6 Disadvantages...

More information

TRAFFIC IMPACT ANALYSIS

TRAFFIC IMPACT ANALYSIS TRAFFIC IMPACT ANALYSIS FOR THE CHAMPAIGN UNIT#4 SCHOOL DISTRICT PROPOSED HIGH SCHOOL (SPALDING PARK SITE) IN THE CITY OF CHAMPAIGN Final Report Champaign Urbana Urbanized Area Transportation Study 6/24/2014

More information

REGIONAL BICYCLE AND PEDESTRIAN DESIGN GUIDELINES

REGIONAL BICYCLE AND PEDESTRIAN DESIGN GUIDELINES REGIONAL BICYCLE AND PEDESTRIAN DESIGN GUIDELINES November 16, 2011 Deb Humphreys North Central Texas Council of Governments Bicycle and Pedestrian Advisory Committee Snapshot of the Guide 1. Introduction

More information

Rightsizing Streets: The Seattle Experience

Rightsizing Streets: The Seattle Experience Rightsizing Streets: The Seattle Experience April 30, 2013 Brian Dougherty Seattle Department of Transportation Complete Streets 16% of households do not have a car Seniors Youth Transit riders Safety

More information

DEPARTMENT OF PUBLIC WORKS Carroll County, Maryland

DEPARTMENT OF PUBLIC WORKS Carroll County, Maryland DEPARTMENT OF PUBLIC WORKS Carroll County, Maryland Prepared by the Bureau of Engineering 225 North Center Street, Room 221, Westminster, MD 21157 (410) 386-2157 e-mail: trafficcalming@ccg.carr.org http://ccgovernment.carr.org/trafficcalming

More information

5/7/2013 VIA . RE: University Village Safeway Expansion (P13-019)

5/7/2013 VIA  . RE: University Village Safeway Expansion (P13-019) 5/7/2013 VIA EMAIL David Hung, Associate Planner Community Development Department, Current Planning Division City of Sacramento 300 Richards Boulevard, 3 rd Floor Sacramento, CA 95811 RE: University Village

More information

Project Overview. Rolling Road Widening Fairfax County. Get Involved. Design Public Hearing. Contact Information

Project Overview. Rolling Road Widening Fairfax County. Get Involved. Design Public Hearing. Contact Information Get Involved VDOT representatives will review and evaluate information received as a result of this meeting. Please fill out the comment sheet provided in this brochure if you have any comments or questions.

More information

Minutemen Causeway Pedestrian Safety Study City of Cocoa Beach

Minutemen Causeway Pedestrian Safety Study City of Cocoa Beach Minutemen Causeway Pedestrian Safety Study City of Cocoa Beach March 15, 2012 Traffic Planning and Design, Inc. 535 Versailles Drive Maitland, Florida 32751 www.tpdtraffic.com Traffic Planning and Design,

More information

ORANGE COUNTY TRAFFIC COMMITTEE. Speed Limit. Traffic Engineering. Deepthi Arabolu. Establish Speed Limit

ORANGE COUNTY TRAFFIC COMMITTEE. Speed Limit. Traffic Engineering. Deepthi Arabolu. Establish Speed Limit ORANGE COUNTY TRAFFIC COMMITTEE SUPERVISORIAL DISTRICT: 3 SUBJECT: LOCATION: INITIATED BY: INVESTIGATOR: REQUEST: Speed Limit Orange Park Boulevard; Orange Park Acres; TB 770-F7 & 800-F1, F3 Traffic Engineering

More information

TRANSPORTATION TRAINING TOPICS. April 6, 2010

TRANSPORTATION TRAINING TOPICS. April 6, 2010 TRANSPORTATION TRAINING TOPICS April 6, 2010 Roles of Transportation Providers Context and Policy Makers Division of Transportation and Traffic Other City Operations Other Transportation Operators CMA

More information

Frequently Asked Questions

Frequently Asked Questions Why is this roadway needed? Can't SR 50, University Boulevard and Aloma Avenue be widened instead of building this road? The need for this roadway was identified and determined through the East Orange

More information

Bus Rapid Transit ALTERNATIVES ANALYSIS. Open House

Bus Rapid Transit ALTERNATIVES ANALYSIS. Open House Bus Rapid Transit ALTERNATIVES ANALYSIS Open House June 23, 2015 Open House Meeting Agenda Agenda Introductions What is BRT? Project Goals Study Tasks Next steps Discussion PVTA Bus Rapid Transit Study

More information

Addendum to SDDCTEA Pamphlet 55 17: Better Military Traffic Engineering Revision 1 Effective: 24 Aug Crosswalk Guidelines

Addendum to SDDCTEA Pamphlet 55 17: Better Military Traffic Engineering Revision 1 Effective: 24 Aug Crosswalk Guidelines Addendum to SDDCTEA Pamphlet 55 17: Better Military Traffic Engineering Revision 1 Effective: 24 Aug 2017 Crosswalk Guidelines Warrants for Uncontrolled Crosswalk Locations Crosswalks at Midblock Locations

More information

Huntington Station Metro Zone / North Kings Highway Concept Plan

Huntington Station Metro Zone / North Kings Highway Concept Plan Summary Narrative of Huntington Station Metro Zone / North Kings Highway Concept Plan Located in Fairfax County, Virginia prepared for A.J. Dwoskin & Associates, Inc.. 9302 Lee Highway, Suite 300 Fairfax,

More information

Coquitlam Cross-town Bike Route Improving Bicycle Facilities in a Mature Suburban Environment

Coquitlam Cross-town Bike Route Improving Bicycle Facilities in a Mature Suburban Environment Coquitlam Cross-town Bike Route Improving Bicycle Facilities in a Mature Suburban Environment Sarah Rocchi, Vice-President, Projects, Opus International Consultants (Main Presenter) Catherine Mohoruk,

More information

Public Information Meeting

Public Information Meeting Richmond Highway (U.S. Route 1) Corridor Improvements Public Information Meeting Tuesday, April 18, 2017 Mount Vernon High School 8515 Old Mt. Vernon Road, Alexandria, VA 22309 Amanda Baxter, VDOT, Special

More information

Item to be Addressed Checklist Consideration YES NO N/A Required Description Complete Streets Guidelines

Item to be Addressed Checklist Consideration YES NO N/A Required Description Complete Streets Guidelines Passaic County Complete Streets Checklist - Concept Development Project Name Item to be Addressed Checklist Consideration YES NO N/A Required Description Complete Streets Guidelines Existing Plans Have

More information

MASONIC AVENUE STREET DESIGN STUDY Community Workshop 3. Masonic Ave Street Design Study Community Workshop 3 September 30, 2010

MASONIC AVENUE STREET DESIGN STUDY Community Workshop 3. Masonic Ave Street Design Study Community Workshop 3 September 30, 2010 Masonic Ave Street Design Study Community Workshop 3 September 30, 2010 Introduction MASONIC AVENUE STREET DESIGN STUDY Community Workshop 3 SF Municipal Transportation Agency Javad Mirabdal, Project Manager

More information

Access Management Regulations and Standards

Access Management Regulations and Standards Access Management Regulations and Standards Efficient highway operation Reasonable property access Concept of Access Management The way to manage access to land development while simultaneously preserving

More information

INTERSECTION DESIGN TREATMENTS

INTERSECTION DESIGN TREATMENTS Designing for Bicyclist Safety INTERSECTION DESIGN TREATMENTS LEARNING OUTCOMES Understand intersection design options and features Select appropriate design feature for a bikeway in a given context C1

More information

Downtown Signals Traffic Analysis

Downtown Signals Traffic Analysis Downtown Signals Traffic Analysis City of St. Mary s April 16, 2018 Presented by: Allan Heitbrink, P.E. & Craig Eley, P.E. Who We Are Craig Eley, P.E o o o Previously the ODOT D7 Traffic and Safety Engineer.

More information

CTH M Reconstruction

CTH M Reconstruction CTH M Reconstruction ID 5992 09 81 City of Madison, South Pleasant View Road (Cross Country Road Prairie Hill Road) CTH M Dane County Public Information Meeting Thursday, May 24, 2012 6 p.m. to 8 p.m.

More information

Building Great Neighbourhoods BELLEVUE AND VIRGINIA PARK

Building Great Neighbourhoods BELLEVUE AND VIRGINIA PARK Building Great Neighbourhoods BELLEVUE AND VIRGINIA PARK This is Meeting 2 Unfortunately, some residents in Bellevue and Virginia Park received the wrong information for this public open house (Meeting

More information

MEMORANDUM. Earl Haugen and UND Transportation and Traffic Coordination Committee

MEMORANDUM. Earl Haugen and UND Transportation and Traffic Coordination Committee SRF No. 7766 MEMORANDUM TO: FROM: Earl Haugen and UND Transportation and Traffic Coordination Committee Rick Lane, P.E. DATE: November 26, 2013 SUBJECT: UNIVERSITY AVE REVIEW Our review of the University

More information

Walkability Audit Cities of Olympia, Tumwater and Lacey, Washington. Next Steps Memorandum September FINAL

Walkability Audit Cities of Olympia, Tumwater and Lacey, Washington. Next Steps Memorandum September FINAL Walkability Audit Cities of Olympia, Tumwater and Lacey, Washington Memorandum September 2012 - FINAL 1. INTRODUCTION The U.S. Environmental Protection Agency (EPA) selected the Thurston Regional Planning

More information

Miami Health District

Miami Health District Miami Health District Streetscapes, Gateways, and Signage Basis of Design Report Study Miami Partnership Meeting July 21, 2008 Gannett Fleming EDAW The Corradino Group Sponsored by the Miami Partnership:

More information

6.4 RECOMMENDED IMPROVEMENTS

6.4 RECOMMENDED IMPROVEMENTS 6.4 RECOMMENDED IMPROVEMENTS 6.4.1 Williston Road Recommendations While all alternatives would be an improvement over existing conditions, Alternative 3B is recommended over the others because it provides

More information

Most Important Part of any Plan

Most Important Part of any Plan Most Important Part of any Plan Objectives must be evaluated to determine if they have been achieved Achievement of Objectives: 10 of 13 Objectives Achieved 1 not achieved 2 not due yet Transportation

More information

West Dimond Blvd Upgrade Jodhpur Street to Sand Lake Road

West Dimond Blvd Upgrade Jodhpur Street to Sand Lake Road West Dimond Blvd Jodhpur St to Sand Lake CSS Transportation Project Summary Municipality of Anchorage Project # 05 005 Project Manager: John Smith, P.E. (MOA PM&E) Project Administrator: Julie Makela,

More information

Chapter 4.3 Enterprise Elementary. Volusia County MPO. March Page 7.0

Chapter 4.3 Enterprise Elementary. Volusia County MPO. March Page 7.0 Chapter 4.3 Enterprise Elementary Enterprise, FL Volusia County MPO March 2008 Page 7.0 Volusia County MPO Bicycle and Pedestrian School Safety Review Study Introduction Enterprise Elementary School is

More information

Project Fact Sheet. August 1,

Project Fact Sheet. August 1, Fact Sheet City of Gainesville Transportation Master Plan In December 2012, the Mayor and City Council selected a consultant team of Pond & Company and Arcadis to prepare the City of Gainesville Transportation

More information

Planning Guidance in the 2012 AASHTO Bike Guide

Planning Guidance in the 2012 AASHTO Bike Guide Planning Guidance in the 2012 AASHTO Bike Guide Presentation by: RJ Eldridge Peter Lagerwey August 22, 2012 WEBINAR 2: PLANNING GUIDANCE IN THE 2012 AASHTO BIKE GUIDE Today s Webinar Significant Updates

More information

Southside Pilot Proposal

Southside Pilot Proposal To improve bicycle access and mobility to UC Berkeley, Downtown Berkeley, and the Southside area, a pilot project could include a two-way parking-protected cycle track. Turn pockets and island bus stops

More information

USDOT Bicycle and Pedestrian Safety Initiative: Safer People and Safer Streets. Barbara McCann, USDOT Office of Policy

USDOT Bicycle and Pedestrian Safety Initiative: Safer People and Safer Streets. Barbara McCann, USDOT Office of Policy { USDOT Bicycle and Pedestrian Safety Initiative: Safer People and Safer Streets Barbara McCann, USDOT Office of Policy 4 Steps from policy to practice Creating multi-modal streets means: 1. Change Decision-Making

More information

Project Development & Environment (PD&E) Study. November 17, SR 90 (SW 8th Street and SW 7th Street) SW 8 th Street/SW 7 th Street PD&E Study 1

Project Development & Environment (PD&E) Study. November 17, SR 90 (SW 8th Street and SW 7th Street) SW 8 th Street/SW 7 th Street PD&E Study 1 Financial Management Number: 432639-6-22-01 Federal Aid Project Number: 0202-054-P Efficient Transportation Decision Making Number: 14230 Project Development & Environment (PD&E) Study SR 90 (SW 8th Street

More information

MINNESOTA DEPARTMENT OF TRANSPORTATION Engineering Services Division Technical Memorandum No T-01 January 7, 2015

MINNESOTA DEPARTMENT OF TRANSPORTATION Engineering Services Division Technical Memorandum No T-01 January 7, 2015 MINNESOTA DEPARTMENT OF TRANSPORTATION Engineering Services Division Technical Memorandum No. 15-01-T-01 To: From: Subject: Electronic Distribution Recipients Nancy T. Daubenberger, P.E. Division Director,

More information

Arterial Management Plan for US Route 250 and State Route 623

Arterial Management Plan for US Route 250 and State Route 623 Arterial Management Plan for US Route 250 and State Route 623 June 25, 2014 Brad Shelton, AICP Access Management and Traffic Impact Analysis Programs Manager Transportation and Mobility Planning Division

More information

Lawrence Loop SWOT Analysis

Lawrence Loop SWOT Analysis Alignment: A1 (Map Color: Red) Description: This alignment connects to the Sandra Shaw Trail on the north side of the pond and heads north through undeveloped property and then west to Michigan Street

More information

Frequently Asked Questions

Frequently Asked Questions Frequently Asked Questions Business US 190 in Copperas Cove From Avenue D to Constitution Drive What is access management? A. Access Management is a growing effort by government agencies to improve how

More information

El Paso County 2040 Major Transportation Corridors Plan

El Paso County 2040 Major Transportation Corridors Plan El Paso County 2040 Major Transportation Corridors Plan Connect-our-County Online Transportation User Survey Preliminary Results June 24, 2010 Years of Residence 2. How many years have you LIVED HERE?

More information

Pedestrian Safety Action Plan Bicycle Safety Action Plan

Pedestrian Safety Action Plan Bicycle Safety Action Plan Pedestrian Safety Action Plan Bicycle Safety Action Plan January 24, 2017 VISION: Safe travel for all MISSION STATEMENT: Partner with the community to plan and fund transportation projects and programs

More information

FINAL DESIGN TRAFFIC TECHNICAL MEMORANDUM

FINAL DESIGN TRAFFIC TECHNICAL MEMORANDUM FINAL DESIGN TRAFFIC TECHNICAL MEMORANDUM July 2014 FINAL (SR 43) Project Development and Environment Study From State Road 60 (Adamo Drive) to I-4 (SR 400) Hillsborough County, Florida Work Program Item

More information

SCHOOL CROSSING PROTECTION CRITERIA

SCHOOL CROSSING PROTECTION CRITERIA CITY OF MADISON TRAFFIC ENGINEERING SCHOOL CROSSING PROTECTION CRITERIA AUGUST 1990 Adopted as Policy on August 31, 1976, by Common Council by Amended Resolution #29,540 Amended on September 14, 1976,

More information

SCHOOL ROUTE PLAN. For HUNTER S CREEK ELEMENTARY SCHOOL LOCATION 14 ORANGE COUNTY. Prepared for:

SCHOOL ROUTE PLAN. For HUNTER S CREEK ELEMENTARY SCHOOL LOCATION 14 ORANGE COUNTY. Prepared for: SCHOOL ROUTE PLAN For HUNTER S CREEK ELEMENTARY SCHOOL LOCATION 14 ORANGE COUNTY Prepared for: ORANGE COUNTY SCHOOL ASSESSMENT PROGRAM ORANGE COUNTY PUBLIC WORKS Traffic Engineering Division 42 South John

More information

Welcome. 53 Avenue Overpass over Whitemud Drive Rehabilitation. Public Information Session. Wednesday, March 9, :30-8:00 p.m.

Welcome. 53 Avenue Overpass over Whitemud Drive Rehabilitation. Public Information Session. Wednesday, March 9, :30-8:00 p.m. BRIDGE REHABILITATION Welcome 53 Avenue Overpass over Whitemud Drive Rehabilitation Public Information Session Wednesday, March 9, 2016 4:30-8:00 p.m. Tonight you can: Learn about the 53 Avenue Overpass

More information

PEDESTRIAN CROSSING TREATMENTS

PEDESTRIAN CROSSING TREATMENTS PEDESTRIAN CROSSING TREATMENTS BEST PRACTICES Presented by: Doug Enderson, P.E., PTOE Cody Salo, P.E. 1 PRESENTER INTRODUCTIONS Doug Enderson, P.E., PTOE Ped Crossing Experience: ADA Design-Build ADA Inventory

More information

Designing for Pedestrian Safety

Designing for Pedestrian Safety Designing for Pedestrian Safety Roundabouts: How They Work for Pedestrians Presented by: Fred Ranck FHWA Resource Center Safety Design Engineer October 5, 2010 Roundabouts: Learning Objectives At the end

More information

Section 7 Complete Green Street Guidelines DRAFT

Section 7 Complete Green Street Guidelines DRAFT Section 7 Complete Green Street Guidelines DRAFT 1 Section: 7.0 COMPLETE GREEN STREET GUIDELINES These guidelines serve as options to mitigate the environmental impact of a project as well as guide the

More information