1 1 of 8 Funding Application Competition Application Type Status Submitted: Regional TAP Bicycle and Pedestrian submitted September 20th, :48 PM Project Information 1. Project Title Bell St Protected Bike Lane 2. Transportation 2040 ID 3. Sponsoring Agency Seattle 4. Cosponsors 5. Does the sponsoring agency have "Certification Acceptance" status from WSDOT? Yes 6. If not, which agency will serve as your CA sponsor? Contact Information 1. Contact name Jim Storment 2. Contact phone Contact jim.storment@seattle.gov Project Description 1. Project Scope The City of Seattle will build a protected bike lane (PBL) on Bell St from 5th Ave to Denny Way, and also build traffic calming features to support 2-way bicycle travel in Bell Street Park from 5th Ave to 2nd Ave. 2. Project Justification, Need, or Purpose The Bell St PBL will be the final piece in a bicycle network spanning the north end of the Downtown Seattle Regional Growth Center (RGC). It builds upon several bicycle projects recently completed (Westlake Cycle Track) or currently in construction (2nd Ave, 7th Ave, and 9th Ave N PBLs). The 2nd Ave PBL (from Pike St to Denny Way) will be completed in late The 7th Ave PBL (from Pike St to Bell St) and the 9th Ave N PBL (from Denny Way to Westlake Ave) will be completed in In addition, portions of the 4th Ave PBL are expected to be completed as early as 2018 with the entire corridor completed by When the Bell St PBL is completed, an "all ages and abilities" bicycle network will extend nearly 4 miles throughout Downtown Seattle and the Belltown/Uptown neighborhood. The north-south PBLs, which will be in place shortly, create the spine of downtown Seattle's
2 The north-south PBLs, which will be in place shortly, create the spine of downtown Seattle's bicycle network. Providing the Bell St east-west link completes a critical connection in the basic bike network. It will not only serve as a commuter route, but it also will provide a safer, fully connected, all ages and ability facility for a wide variety of intra-city bicycle trips. These include trips to and from the Central Business District, Pike Place Market, Seattle Waterfront, Washington State Ferry terminal, Seattle Art Museum, Benaroya Hall, and Pioneer Square, to name a few. 2 of 8 Project Location 1. Project Location Bell St 2. Please identify the county(ies) in which the project is located. King 3. Crossroad/landmark nearest the beginning of the project 2nd Ave 4. Crossroad/landmark nearest the end of the project Denny Way 5. Map and project graphics Bell_St_Protected_Bike_Lanes.pdf Plan Consistency 1. Is the project specifically identified in a local comprehensive plan? 2. If yes, please indicate the (1) plan name, (2) relevant section(s), and (3) page number where it can be found. 3. If no, please describe how the project is consistent with the applicable local comprehensive plan, including specific local policies and provisions the project supports. Seattle's Comprehensive Plan strongly prioritizes transportation investments that support non-motorized travel modes and help achieve the City's air quality goals. The plan's Transportation element speaks strongly to the need for safe, convenient, and affordable travel options for people who walk or bike. In its introduction, the Transportation element notes that "While many people still rely on a personal car as their best or only transportation option, the City plans to make travel more efficient and predictable for all by offering highquality travel options... The City can make improvements to better connect people to urban centers and urban villages by many travel options, especially by transit and bicycle." The plan also outlines a series of overarching transportation goals, including the following: - T 1.1 Provide safe and reliable transportation facilities and services to promote and accommodate the growth this Plan anticipates in urban centers, urban villages, and manufacturing/industrial centers. - T 1.2 Improve transportation connections to urban centers and villages from all Seattle neighborhoods, particularly by providing a variety of affordable travel options (pedestrian, transit, and bicycle facilities) and by being attentive to the needs of vulnerable and marginalized communities. - T 1.3 Design transportation infrastructure in urban centers and villages to support compact, accessible, and walkable neighborhoods for all ages and abilities. - T 1.5 Invest in transportation projects and programs that further progress toward meeting Seattle s mode-share goals, in Transportation Figures 1 and 2, and reduce dependence on personal automobiles, particularly in urban centers. (Downtown goes from 77% to 85%.) - T 1.7 Recognize the connection between transportation choices and climate change and work to reduce vehicular emissions. Individual sub-elements continue to echo the theme of increasing non-motorized travel. For example, the Transportation Options and Safety sub-elements offer recommendations like these: - T 3.1 Develop and maintain high-quality, affordable, and connected bicycle, pedestrian, and transit facilities. - T 3.2 Improve transportation options to and within the urban centers and urban villages, where most of Seattle s job and population growth will occur. - T 3.11 Develop and maintain bicycle and pedestrian facilities, including public stairways, that enhance the predictability and safety of all users of the street and that connect to a wide range of key destinations throughout the city. - TG 6 Provide and maintain a safe transportation system that protects all travelers, particularly the most vulnerable users.
3 particularly the most vulnerable users. 3 of 8 Finally, within the Comprehensive Plan's specific sections on its unique RGCs, the City identifies goals like these for Downtown Seattle: - DT-G9 Support transportation improvements that complement and reinforce desired land use patterns. Strive to accommodate growth in peak hour travel primarily by transit, and encourage transit and pedestrian travel as the primary means of internal circulation. - DT-TP5 Promote pedestrian circulation as the principal method of movement for trips within Downtown. Improve the street-level environment as the primary component of the pedestrian network. Strive to make the pedestrian network accessible to the elderly and disabled. Continue to support a comprehensive program of public improvements to streets and sidewalks in coordination with the transportation, open space, land use, and urban design policies. Federal Functional Classification 1. Functional class name 19 Urban Local Access Support for Centers 1. Describe the relationship of the project to the center(s) it is intended to support. For example, is it located within a designated regional, countywide or local center, or is it located along a corridor connecting to one of these areas? Bell St is located within the Seattle Downtown RGC, the largest and most active center in the region. The RGC holds approximately 25,000 homes and 166,000 jobs, and it is experiencing very rapid growth. Seattle was the fastest-growing city in the nation in 2016, and it has been consistently in the top 5 in recent years. Seattle also topped all US cities for its number of construction cranes and high-rise projects simultaneously underway (approximately 60 and growing - more than New York and San Francisco combined). In July 2017, for the first time, there were more tech jobs in Seattle than in Silicon Valley (8,135 vs. 7,702). The city as a whole, and its downtown core, is experiencing at least 2-3% growth every year in a totally urbanized, built-out city with no room to sprawl. The City accommodates over 1,000 new residents every week through infill development alone. However, the city is not adding substantial drive-alone traffic - due in part to its strategic planning and investments. Since 2010, 95% of the net gain in downtown commute trips has been absorbed by non-drive alone modes. 2. Describe how the project supports existing and/or planned population/employment activity in the center. Seattle's Comprehensive Plan calls for continued growth in the Downtown area, adding an estimated 12,000 households and 35,000 jobs by This level of growth severely strains a transportation network that's already very physically constrained and catching up with years of intensive development. Without opportunities to widen roadways, the pressures of rapid growth demand more non-motorized choices for many short-distance trips - as well as some longer-range commute trips from neighborhoods on the perimeter of the urban center. Within downtown, the majority of residents live and work within the urban center. They pay a high price for their home's location. Their home-buying decisions are based upon being able to live and work within the same neighborhood, and to live comfortably without paying to own and park a car. Parking options downtown are expensive, inconvenient, and hard to find. Downtown residents depend upon a robust, "all ages and abilities" network to make walking and biking safe and convenient throughout their neighborhood. The success of the RGC, and its ability to meet its growth targets, will depend on increasing the viability of non-motorized modes. Downtown's residents and commuters need to know that regardless of their destination, they will find a connected, easy to use, all ages and abilities network for their trips. In addition to serving nearby residents, Bell Street's connection to other high-quality nonmotorized facilities enables employment growth in the Downtown RGC by opening access to downtown from many locally designated growth centers like Ballard, Fremont, and Queen Anne. The new PBL will connect to the existing 2nd Ave and Westlake PBLs, creating a complete network for bicycle commuters who travel into Downtown Seattle from these northerly neighborhoods. Thousands of people currently ride to work from these neighborhoods, and with the completion of the 2nd Ave and Westlake PBLs, they can make this trip almost entirely on separated, safer facilities - but they lack a high-quality east-west connection between the 2 facilities. Specifically, automated counters recorded more than 981,000 riders crossing the Fremont Bridge in 2016 and more than 3,200 riders on the Westlake PBL in approximately the first 5 months of Upgrading Bell St closes this gap in the network, providing seamless access for southbound commuters into the Downtown Seattle employment hub.
4 3. Describe how the project helps the center develop in a manner consistent with the adopted policies and plans for the center. In addition to the citywide goals stated in Seattle's Comprehensive Plan (described above), the plan also contains specific sections on its unique Regional Growth Centers. In the section for Downtown Seattle, the City identifies goals like these: - DT-G9 Support transportation improvements that complement and reinforce desired land use patterns. Strive to accommodate growth in peak hour travel primarily by transit, and encourage transit and pedestrian travel as the primary means of internal circulation. - DT-TP5 Promote pedestrian circulation as the principal method of movement for trips within Downtown. Improve the street-level environment as the primary component of the pedestrian network. Strive to make the pedestrian network accessible to the elderly and disabled. Continue to support a comprehensive program of public improvements to streets and sidewalks in coordination with the transportation, open space, land use, and urban design policies. One of the overarching themes of this section is achieving economic growth in the Downtown RGC through community vitality. The City of Seattle seeks to make downtown an inviting place where people want to work and play, thereby attracting employers and investors. The strategy is working. Amazon's website clearly explains their location decisions: "Several years ago we outgrew our space and we made a conscious choice to invest in downtown Seattle even though it would have been cheaper to move to the suburbs. We now employ more than 25,000 people in Seattle who come from all around the world. Our employees tell us that they love being in the heart of the city. In fact, about 15% live in the same zip code as their office and about 20% walk to work. And they frequent the restaurants, food trucks and shops that have popped up all around South Lake Union, the neighborhood in Seattle we call home." Expedia, Weyerhaeuser, and other recent relocations tell a similar story. From the Seattle Times, " 'We looked all over the Puget Sound region as to what the opportunities were,' said Mark Nagle, vice president of global real estate for Expedia, which is moving its headquarters to Seattle from Bellevue. The fast-growing company, which now has 3,000 employees, picked the Amgen campus because it will allow Expedia to grow in one place." Companies increasingly choose locations where their employees can comfortably walk or bike to work, and use the same travel options for shopping, dining, and generally enjoying their community. The Bell St Protected Bike Lane is an important link in creating that environment in Downtown Seattle. Criteria: Bicycle and Pedestrian Projects 1. Describe how the project extends or completes a regional or local bicycle and pedestrian system, and/or adds facilities to an existing bicycle and pedestrian system or network. Bell Street's connection to the 2nd Ave and Westlake PBLs create a complete network for bicycle commuters who would travel to Downtown Seattle from neighborhoods to the north. Thousands of people currently ride to work from these neighborhoods, and with the completion of the 2nd Ave and Westlake bikeways, they can now make this trip almost entirely on safer, separated bicycle facilities - but they lack a high-quality east-west connection between the 2 facilities. Building traffic calming measures such as partial closures in the Bell St Park area will promote and enhance the pedestrian environment and improve safety with lower speeds and traffic volumes. Improvements to the easterly section of Bell St will allow 2- way bike travel on a roadway that now only accommodates 1-way travel for people on bikes or in motor vehicles. 2. Describe how the project addresses a need in the community and reduces key barriers to use and functionality, i.e., safety and comfort, distance, slope, gaps, etc. Upgrading Bell St closes a gap in the RGC s robust non-motorized network, providing seamless access for people on bikes to and from the downtown Seattle employment hub as well as destinations in Belltown, South Lake Union, the Seattle waterfront, and Pioneer Square. Today bicyclists transferring between the 2nd Ave and Westlake PBLs must ride in traffic for this segment of their trip. Typically they would travel westbound on Bell St and eastbound on Blanchard (a principal transit corridor). This gap of nearly 7 blocks discourages many bicyclists and potential bicyclists which is a barrier to achieving a significant mode shift. The bicyclists on these corridors must mix with motorized traffic in a highly complex urban environment. This barrier reduces safety for all riders, as well as motor vehicle drivers. 3. Describe the connections to other multimodal facilities the project provides. The Bell St project is a network connector, opening access to numerous local destinations as well as multimodal travel options. Within a mile, the network provides access to light rail, commuter rail, ferries, local and regional bus routes, and streetcars. Downtown Seattle is the regional hub of transit activity, and virtually all modes of transportation available in the region are linked to Bell St via current or planned PBLs within the greater downtown area. 4 of 8
5 4. Describe how the project will benefit a variety of user groups, including those groups identified in the President's Order for Environmental Justice, seniors, people with disabilities, those located in highly impacted communities and/or areas experiencing high levels of unemployment or chronic underemployment. The Downtown Seattle RGC shows unusually high rates of poverty. The 2 census districts served by this project have poverty rates of 17% and 24%, compared to the regional average of 11.3%. In addition, numerous social services agencies operate in the area - drawing more people and families in need to this area from throughout the region. At least 5 agencies are located within 2 blocks of the project site: - Compass Housing Alliance (homeless shelter/transitional housing) - Low Income Housing Institute (homeless shelter/transitional housing) - Donated Dental Services (free, volunteer-based dental care) - Casa Latina (immigrant workers' counseling) - Washington State of SnoKing Community Services (refugee services, homeless counseling, medical assistance, etc.) These agencies and their customers depend on safe and affordable access, especially nonmotorized access, to reach vital services. 5. Discuss whether the resource is threatened and if there will be a loss of opportunity if this project is not funded. Rapid growth in the project area creates a significant pressure to develop the bike network promptly. The planned PBL is surrounded by some of the largest public and private developments in the region, and failing to deliver a complete bike network along with these major developments will create a missed opportunity for large-scale mode shift. Years later, after new employees and commuters have become entrenched in their habits and comfort zones, it's much harder to generate an interest in low-impact, non-motorized commute modes. Seattle's current growth simply cannot be accommodated without a connected bike network. 5 of 8 A few of the major land developments nearby include these sites: - The Washington State Convention Center is designing a $1.6 billion expansion, set for completion in The Convention Center is 7 blocks from Bell St. - A major renovation of Seattle's Central Waterfront, estimated at $700 million, will be completed in stages from approximately 2019 to Bell St connects directly to the Seattle waterfront. - The South Lake Union Regional Growth Center, 2 blocks from the project site, is seeing explosive growth. Amazon is working on a campus expansion worth more than $2 billion, while other major employers like Vulcan and Facebook have aggressive expansion plans of their own in this RGC. - The Downtown Regional Growth Center, where the Bell St PBL will be located, is already slated for at least $5 billion of new real estate development. PSRC Funding Request 1. Has this project received PSRC funds previously? 2. If yes, please provide the project's PSRC TIP ID Phase Year Alternate Year Amount PE $0.00 construction $1,400, Total Request: $1,400, Total Estimated Project Cost and Schedule PE Funding Source Secured/Unsecured Amount Local Secured $300, Expected year of completion for this phase: 2018 $300,000.00
6 Construction 6 of 8 Funding Source Secured/Unsecured Amount TAP(UL) Unsecured $1,400, Local Secured $300, Expected year of completion for this phase: 2020 Summary 1. Estimated project completion date Total project cost $2,000, Funding Documentation 1. Documents BMP_Budget.pdf $1,700, Please describe the secure or reasonably expected funds identified in the supporting documentation. For funds that are reasonably expected, an explanation of procedural steps with milestone dates for completion which will be taken to secure the funds for the project or program should also be included. The City of Seattle will complete PE using local funds (Levy to Move Seattle). The City is requesting $1,400,000 for Construction. The required local match, and any additional construction costs, will also be covered by levy revenues. Project Readiness: PE 1. Are you requesting funds for ONLY a planning study or preliminary engineering? 2. Is preliminary engineering complete? 3. What was the date of completion (month and year)? 4. Have preliminary plans been submitted to WSDOT for approval? 5. Are there any other PE/Design milestones associated with the project? Please identify and provide dates of completion. You may also use this space to explain any dates above. 6. When are preliminary plans expected to be complete and approved by WSDOT (month and year)? June 2018 Project Readiness: NEPA 1. What is the current or anticipated level of environmental documentation under the National Environmental Policy Act (NEPA) for this project? Categorical Exclusion (CE) 2. Has the NEPA documentation been approved? 3. Please provide the date of NEPA approval, or the anticipated date of completion (month and year). June 2018 Project Readiness: Right of Way
7 1. Will Right of Way be required for this project? 2. How many parcels do you need? 3. What is the zoning in the project area? 4. Discuss the extent to which your schedule reflects the possibility of condemnation and the actions needed to pursue this. 5. Does your agency have experience in conducting right of way acquisitions of similar size and complexity? 6. If not, when do you expect a consultant to be selected, under contract, and ready to start (month and year)? 7. In the box below, please identify all relevant right of way milestones, including the current status and estimated completion date of each. 7 of 8 Project Readiness: Construction 1. Are funds being requested for construction? Yes 2. Do you have an engineer's estimate? 3. Engineers estimate document 4. Identify the environmental permits needed for the project and when they are scheduled to be acquired. additional environmental permits are anticipated, aside from the standard NEPA checklist required for all projects receiving federal funds. 5. Are Plans, Specifications & Estimates (PS&E) approved? 6. Please provide the date of approval, or the date when PS&E is scheduled to be submitted for approval (month and year). June When is the project scheduled to go to ad (month and year)? March 2020 Other Considerations 1. Describe any additional aspects of your project not requested in the evaluation criteria that could be relevant to the final project recommendation and decisionmaking process. A Bell St Streetscape Concept Plan has been developed for this corridor, with the intent to extend the Bell St Park concept (non-motorized priority) from 5th Ave to Denny Way. This plan has been presented publicly, and is supported by several significant stakeholders in the area. If this alternative plan is heavily endorsed by the community, the City would revise its designs in late 2018/2019 to incorporate the community's input. These changes would not alter the project outcome: a new 2-way bicycle connection along Bell St, connecting the basic bike network through the Belltown/Uptown RGC. 2. Describe the public review process for the project and actions taken to involve stakeholders in the project's development. As part of Seattle s Center City Bike Network plan, the City has developed a Public Involvement Plan that guides outreach and strives for inclusion. Furthermore, the City has created a robust alternatives analysis to provide the east-west bicycle connection along the Bell St corridor. This alternatives analysis was thoroughly vetted with major stakeholders in the Belltown/Denny Triangle area including Amazon and Clise representatives. These alternatives were presented at several public forums, as well as with individual stakeholders. The final recommendation from this outreach effort was an approved concept plan for the 2- way PBL on Bell Street. It was recognized that Bell St, with traffic calming enhancements, would serve as the non-motorized connection between the network's north-south spines.
8 would serve as the non-motorized connection between the network's north-south spines. The adjacent parallel Streets, Blanchard and Lenora Streets, would serve as the transit/vehicular connections for the neighborhoods. 3. Final documents Bell_St_Photos.pdf 8 of 8
9 Planned Bell St Protected Bike Lanes Transportation Alternatives Program Grant Application Bell St Protected Bike Lanes
10 Bell St Protected Bike Lanes Bell St Park is a curbless street that supports public gatherings and offers recreational space for a dense urban community. Motor vehicles are allowed for local access, but non-motorized uses are prioritized and cars enter as occasional guests. Many people on bikes enjoy the park since conflict points with motor vehicles are minimized. However, the City has found that many users still need some markings and signage to interact safely especially when crossing busy intersections. East of the park, Bell St becomes a typical one-way street. Cycles mix with motor vehicles and pedestrians in a challenging urban street environment. However, this section is still an important connection in the City s high-priority bike network.
Chapter 2. Bellingham Bicycle Master Plan Chapter 2: Policies and Actions
Chapter 2 Bellingham Bicycle Master Plan Chapter 2: Policies and Actions Chapter 2: Policies and Actions The Bicycle Master Plan provides a road map for making bicycling in Bellingham a viable transportation
More informationSolana Beach Comprehensive Active Transportation Strategy (CATS)
Solana Beach Comprehensive Active Transportation Strategy (CATS) 3.0 Goals & Policies The Solana Beach CATS goals and objectives outlined below were largely drawn from the Solana Beach Circulation Element
More informationACTIVE TRANSPORTATION/NONMOTORIZED TRANSPORTATION
ACTIVE TRANSPORTATION/NONMOTORIZED TRANSPORTATION BACKGROUND Active transportation, also known as nonmotorized transportation, is increasingly recognized as an important consideration when planning and
More informationBerkeley Strategic Transportation Plan A-76
Berkeley Strategic Transportation Plan A-76 Appendices 1. A Team Effort 2. Where We ve Been A-11 Berkeley Strategic Transportation Plan Alameda County Transportation Plan Alameda County will be served
More informationFunding Application. Project Information. Contact Information. Project Description. 1 of 10. April 19th, :11 AM
1 of 10 Funding Application Competition Application Type Status Submitted: Prepopulated with screening form? Regional FHWA Designated Growth Centers submitted April 19th, 2018 11:11 AM No Project Information
More informationExhibit 1 PLANNING COMMISSION AGENDA ITEM
Exhibit 1 PLANNING COMMISSION AGENDA ITEM Project Name: Grand Junction Circulation Plan Grand Junction Complete Streets Policy Applicant: City of Grand Junction Representative: David Thornton Address:
More informationCHAPTER 7.0 IMPLEMENTATION
CHAPTER 7.0 IMPLEMENTATION Achieving the vision of the Better Streets Plan will rely on the ability to effectively fund, build and maintain improvements, and to sustain improvements over time. CHAPTER
More informationBicycle Master Plan Goals, Strategies, and Policies
Bicycle Master Plan Goals, Strategies, and Policies Mobilizing 5 This chapter outlines the overarching goals, action statements, and action items Long Beach will take in order to achieve its vision of
More information2. Context. Existing framework. The context. The challenge. Transport Strategy
Transport Strategy Providing quality connections Contents 1. Introduction 2. Context 3. Long-term direction 4. Three-year priorities 5. Strategy tree Wellington City Council July 2006 1. Introduction Wellington
More informationCITY OF COCOA BEACH 2025 COMPREHENSIVE PLAN. Section VIII Mobility Element Goals, Objectives, and Policies
CITY OF COCOA BEACH 2025 COMPREHENSIVE PLAN Section VIII Mobility Element Goals, Objectives, and Policies Adopted August 6, 2015 by Ordinance No. 1591 VIII MOBILITY ELEMENT Table of Contents Page Number
More informationProposed. City of Grand Junction Complete Streets Policy. Exhibit 10
Proposed City of Grand Junction Complete Streets Policy Exhibit 10 1 City of Grand Junction Complete Streets Policy Vision: The Complete Streets Vision is to develop a safe, efficient, and reliable travel
More informationRESOLUTION NO ?? A RESOLUTION OF THE CITY OF NEPTUNE BEACH ADOPTING A COMPLETE STREETS POLICY
RESOLUTION NO. 2018-?? A RESOLUTION OF THE CITY OF NEPTUNE BEACH ADOPTING A COMPLETE STREETS POLICY WHEREAS, safe, convenient, and accessible transportation for all users is a priority of the City of Neptune
More informationC C C
C-012-001 Thank you for your support for the creation of new public space and nonmotorized access between downtown and the waterfront through the Overlook Walk, the East-West Connections, and the Promenade.
More informationFunding Application. Project Information. Contact Information. Project Description. 1 of 6. September 20th, :04 PM
1 of 6 Funding Application Competition Application Type Status Submitted: Regional TAP Bicycle and Pedestrian submitted September 20th, 2017 2:04 PM Project Information 1. Project Title SR 527/Seattle
More informationPurpose and Need. Chapter Introduction. 2.2 Project Purpose and Need Project Purpose Project Need
Chapter 2 Purpose and Need 2.1 Introduction The El Camino Real Bus Rapid Transit (BRT) Project (Project) would make transit and other transportation improvements along a 17.6-mile segment of the El Camino
More informationEXECUTIVE SUMMARY. Vision
Vision Walking and bicycling in Salt Lake City will be safe, convenient, comfortable, and viable transportation options that connect people to places, foster recreational and economic development opportunities,
More informationTransportation Master Plan Advisory Task Force
Transportation Master Plan Advisory Task Force Network Alternatives & Phasing Strategy February 2016 BACKGROUND Table of Contents BACKGROUND Purpose & Introduction 2 Linking the TMP to Key Council Approved
More informationChapter 5 Future Transportation
Chapter 5 Future Transportation The Future Land Use Plan identifies the desired land use designations. The land uses desired for Crozet depend, in large part, on the success of the transportation system,
More informationCity of Novi Non-Motorized Master Plan 2011 Executive Summary
City of Novi Non-Motorized Master Plan 2011 Executive Summary Prepared by: February 28, 2011 Why Plan? Encouraging healthy, active lifestyles through pathway and sidewalk connectivity has been a focus
More informationPerryville TOD and Greenway Plan
Perryville TOD and Greenway Plan Greenway Glossary Pathway: A bicycle and pedestrian path separated from motorized vehicular traffic by an open space, barrier or curb. Multi-use paths may be within the
More informationNM-POLICY 1: Improve service levels, participation, and options for non-motorized transportation modes throughout the County.
Transportation PRINCE WILLIAM COUNTY 2008 COMPREHENSIVE PLAN NON-MOTORIZED PLAN CONTENTS Goals, Policies, and Action Strategies Table 4 (Bike Facility Classifications and Descriptions) Table 5 (Bike Facility
More informationLiving Streets Policy
Living Streets Policy Introduction Living streets balance the needs of motorists, bicyclists, pedestrians and transit riders in ways that promote safety and convenience, enhance community identity, create
More informationActive Transportation Infrastructure Investment A Business Case
Active Transportation Infrastructure Investment A Business Case In 2016, the Real Estate Foundation awarded the Capital Regional District a $50,000 grant for Shifting Gears: Land Use Change through Active
More informationRapidRide Roosevelt Seat Sea t t le t le Depa De r pa t r men men t of Sept T an r sp an or sp t or a t t a ion
RapidRide Roosevelt Seattle Bicycle Advisory Board 1 Our mission, vision, and core values Mission: deliver a high-quality transportation system for Seattle Vision: connected people, places, and products
More informationORDINANCE NO
1 Sponsored by: Councilmembers Stan Flemming, Connie Ladenburg, and Rick Talbert 2 Requested by: Executive/Public Works and Utilities - Transportation Services 3 4 5 6 7 10 11 ORDINANCE NO. 2014-445 12
More informationCONNECTING PEOPLE TO PLACES
CONNECTING PEOPLE TO PLACES 82 EAST BENCH MASTER PLAN 07 Introduction The East Bench transportation system is a collection of slow moving, treelined residential streets and major arteries that are the
More informationRegional Transportation Needs Within Southeastern Wisconsin
Regional Transportation Needs Within Southeastern Wisconsin #118274 May 24, 2006 1 Introduction The Southeastern Wisconsin Regional Planning Commission (SEWRPC) is the official areawide planning agency
More informationCommunity Task Force July 25, 2017
Community Task Force July 25, 2017 Welcome and Introductions Project Partners Regional Transportation District (RTD) Colorado Department of Transportation (CDOT) Denver Regional Council of Governments
More informationChapter 7. Transportation. Transportation Road Network Plan Transit Cyclists Pedestrians Multi-Use and Equestrian Trails
Chapter 7 Transportation Transportation Road Network Plan Transit Cyclists Pedestrians Multi-Use and Equestrian Trails 7.1 TRANSPORTATION BACKGROUND The District of Maple Ridge faces a number of unique
More informationBikeway action plan. Bicycle Friendly Community Workshop March 5, 2007 Rochester, MN
Bikeway action plan Summary The was held on March 5, 2007 at the Rochester Mayo Civic Center. The workshop was hosted by Rochester-Olmsted County Planning Department in collaboration with the League of
More informationPEDESTRIAN ACTION PLAN
ATTACHMENT 2 CITY OF SANTA MONICA PEDESTRIAN ACTION PLAN CITY OF SANTA MONICA PEDESTRIAN ACTION PLAN This page intentionally left blank EXECUTIVE SUMMARY CHAPTER 1 EXECUTIVE SUMMARY Setting the Stage
More informationAMATS Complete Streets Policy
AMATS Complete Streets Policy Table of Contents: Section 1. Definition of Complete Streets Section 2. Principles of Complete Streets Section 3. Complete Streets Policy Section 4. Consistency Section 5.
More informationCirculation in Elk Grove includes: Motor vehicles, including cars and trucks
Circulation, as it is used in this General Plan, refers to the many ways people and goods move from place to place in Elk Grove and the region. Circulation in Elk Grove includes: Motor vehicles, including
More informationMetropolitan Council Transportation Committee
Nicollet-Central Transit Alternatives Metropolitan Council Transportation Committee August 2013 Project Purpose (approved by Policy Advisory Committee 10/25/2012) The purpose is to improve transit connectivity,
More informationKey objectives of the survey were to gain a better understanding of:
3 COMMUNITY INPUT Community input is an essential part of corridor studies. For the SR 87 corridor study, VTA staff conducted an extensive online survey of people living and commuting along the corridor.
More informationSeattle Transit Master Plan
Seattle Transit Master Plan Seattle City Council Transportation Committee Briefing July 26, 2011 Seattle Department of Transportation In Association with: URS Corporation SVR DKS Associates The Underhill
More informationWALKNBIKE DRAFT PLAN NASHVILLE, TENNESSEE EXECUTIVE SUMMARY NASHVILLE, TENNESSEE
NASHVILLE, TENNESSEE EXECUTIVE SUMMARY Executive Summary A world-class multi-modal transportation system is essential to a vibrant city and better quality of life. -Mayor Barry The WalknBike plan aims
More informationGoal 3: Foster an environment of partnerships and collaboration to connect our communities and regions to one another.
Non-Motorized Transportation Plan (NMTP) Draft Vision, Goal and,, Tri-County Regional Planning Commission (TCRPC) Purpose The purpose of the Tri-County Regional Planning Commission (TCRPC) Non-Motorized
More informationTOWN OF PORTLAND, CONNECTICUT COMPLETE STREETS POLICY
TOWN OF PORTLAND, CONNECTICUT COMPLETE STREETS POLICY I. VISION, GOALS & PRINCIPLES VISION To improve the streets of Portland making them safer and more accessible for all users including pedestrians,
More informationBuilding Community Partnerships for Mobility:
Building Community Partnerships for Mobility: San Francisco 2008 Presented by: Cynthia Hoyle, AICP Transportation Planning Consultant Champaign-Urbana Mass Transit District Background The Heartland Champaign-Urbana,
More informationKelowna On the Move. Pedestrian and Bicycle Master Plan
Kelowna On the Move Pedestrian and Bicycle Master Plan Executive Summary April 2016 Purpose of the Plan The Pedestrian and Bicycle Master Plan identifies infrastructure, planning, and policy requirements
More informationWelcome. Background. Goals. Vision
Welcome The formal Public Information Centre (PIC) for the Transportation Master Plan How We GO will be held in early 2017. At that time we will present the recommended transportation system for Niagara
More informationMemorandum. Fund Allocation Fund Programming Policy/Legislation Plan/Study Capital Project Oversight/Delivery Budget/Finance Contract/Agreement Other:
Memorandum Date: November 20, 2017 To: Transportation Authority Board From: Eric Cordoba Deputy Director Capital Projects Subject: 12/5/17 Board Meeting: San Francisco Freeway Corridor Management Study
More informationSacramento Grid 2.0. The Downtown Transportation Study
Sacramento Grid 2.0 The Downtown Transportation Study April 20, 2016 The Grid 4.25 square miles Street grid defined at birth of City Lettered and numbered streets spaced every 400 ft East-west alleys halfway
More informationBuilding a bike friendly Chicago
CASE STUDY Miovision Scout Building a bike friendly Chicago How video data is moving Chicago forward Chicago 2020 Becoming the Most Bike-Friendly City in the United States In 2011, Mayor Rahm Emanuel set
More informationA Matter of Fairness: ROCOG s Environmental Justice Protocol. What is Mobility Limitation?
No Person Left Behind What is Mobility Limitation? What is the Access Limitation? Environmental Justice population should be provided adequate mobility & access to meet their needs; Identify acceptable
More informationFitting Light Rail through Well-established Communities
Fitting Light Rail through Well-established Communities San Francisco 2008 Michael D. Madden Chief, Project Development, Maryland Transit Administration Project Setting Located inside the Capital Beltway
More informationNorth Coast Corridor:
North Coast Corridor: Connecting People, Transportation & Environment Legislative Hearing: 11.8.10 1 North Coast Corridor Region s Lifeline A Regional Strategy Mobility, Economy & Environment North Coast
More informationSan Jose Transportation Policy
San Jose Transportation Policy Protected Intersections in LOS Policies to Support Smart Growth Presented by: Manuel Pineda City of San Jose Department of Transportation Bay Area Map San Francisco Oakland
More informationCITY OF BLOOMINGTON COMPLETE STREETS POLICY
CITY OF BLOOMINGTON COMPLETE STREETS POLICY POLICY OBJECTIVE: The City of Bloomington will enhance safety, mobility, accessibility and convenience for transportation network users of all ages and abilities,
More information4. ENVIRONMENTAL IMPACT ANALYSIS 9. TRANSPORTATION AND TRAFFIC
4. ENVIRONMENTAL IMPACT ANALYSIS 9. TRANSPORTATION AND TRAFFIC 4.9.1 INTRODUCTION The following section addresses the Proposed Project s impact on transportation and traffic based on the Traffic Study
More informationAppendix C 3. Bicycle / Pedestrian Planning
Appendix C 3. Bicycle / Pedestrian Planning BICYCLE/PEDESTRIAN PLANNING 2005 Master Plan GOAL: Provide for safe and convenient bicycle and pedestrian circulation throughout the City. Develop a city-wide
More informationRegional Alternatives Analysis. Downtown Corridor Tier 2 Evaluation
Regional Alternatives Analysis Downtown Corridor Tier 2 Evaluation September 19, 2011 EVALUATION PROCESS REVIEW OF EVALUATION PROCESS Tier 1: Screen Seven Alignment Options into a Short List Tier 2: Evaluate
More informationTypical Rush Hour Commute. PennyforTransportation.com
Typical Rush Hour Commute In the News Overview of the Plan Collaborative plan with projects in every community Prioritizing connectivity and congestion relief Dedicated transportation-specific funding;
More informationCITY OF SEATTLE RESOLUTION. WHEREAS, the Washington State Department of Transportation (WSDOT) led the Seattle
SDOT SR0 Design Refinements RES August, 0 Version #D 0 CITY OF SEATTLE RESOLUTION..title A RESOLUTION relating to the State Route 0, Interstate to Medina Bridge Replacement and High Occupancy Vehicle Project;
More informationCity of Wilsonville 5 th Street to Kinsman Road Extension Project
City of Wilsonville 5 th Street to Kinsman Road Walking Tour & Neighborhood Workshop Summary Report Public Outreach Overview On July 18 th, 2017, the City of Wilsonville hosted a neighborhood walking tour
More informationDevelop a Multi-Modal Transportation Strategy (Theme 6)
DEVELOP A MULTI-MODAL TRANSPORTATION STRATEGY (THEME 6) WHY IS THIS THEME ADDRESSED? Develop a Multi-Modal Transportation Strategy (Theme 6) Statement of Ideal Reduce resident and visitor reliance on single
More informationWELCOME TO OPEN HOUSE # 1 June 14, 2017
Langstaff Road Weston Road to Highway 7 Class Environmental Assessment Study WELCOME TO OPEN HOUSE # 1 June 14, 2017 Please sign in and join our mailing list Purpose of Open House #1 & Study Area York
More informationOmaha s Complete Streets Policy
Omaha s Complete Streets Policy (Adopted August 2015) VISION To create great places and enhance our quality of life, the City of Omaha will provide safe, accessible streets for all users. Complete Streets
More informationClimate Change Action Plan: Transportation Sector Discussion Paper: Cycling
Climate Change Action Plan: Transportation Sector Discussion Paper: Cycling ontario.ca/climatechange Contents 1. Minister of Transportation s message... 3 2. Introduction... 5 3. Sector Overview and Support
More informationClackamas County Comprehensive Plan
ROADWAYS The County s road system permits the movement of goods and people between communities and regions, using any of a variety of modes of travel. Roads provide access to virtually all property. They
More informationBasalt Creek Transportation Refinement Plan Recommendations
Basalt Creek Transportation Refinement Plan Recommendations Introduction The Basalt Creek transportation planning effort analyzed future transportation conditions and evaluated alternative strategies for
More informationHow To Encourage More Efficient Transportation in Brazilian Cities
How To Encourage More Efficient Transportation in Brazilian Cities Todd Litman Victoria Transport Policy Institute Presented Seminar on Discouraging The Use Of Cars São Paulo, Brazil 3 September 2013 Creating
More informationCITY OF VAUGHAN EXTRACT FROM COUNCIL MEETING MINUTES OF OCTOBER 30, 2012
CITY OF VAUGHAN EXTRACT FROM COUNCIL MEETING MINUTES OF OCTOBER 30, 2012 Item 31, Report No. 39, of the Committee of the Whole, which was adopted without amendment by the Council of the City of Vaughan
More informationCity of Charlottesville Bicycle and Pedestrian Master Plan Update
City of Charlottesville Bicycle and Pedestrian Master Plan Update September 17, 2014 I. Welcome and meeting overview II. Project status update III. Network overview IV. Break-out groups Pedestrian Network
More informationCorpus Christi Metropolitan Transportation Plan Fiscal Year Introduction:
Introduction: The Safe, Accountable, Flexible, Efficient Transportation Equity Act: A Legacy for Users (SAFETEA-LU) has continued the efforts started through the Intermodal Surface Transportation Efficiency
More informationSANTA CLARA COUNTYWIDE BICYCLE PLAN August 2008
SANTA CLARA COUNTYWIDE BICYCLE PLAN August 2008 To assist VTA and Member Agencies in the planning, development and programming of bicycle improvements in Santa Clara County. Vision Statement To establish,
More informationPublic Event 1 Community Workshops
Public Event 1 Community Workshops Nov. 24 & Dec. 3, 2016 Welcome Workshop Purpose We re looking to you for ideas and insights to help guide future transportation infrastructure planning in the Park Lawn
More informationo n - m o t o r i z e d transportation is an overlooked element that can greatly enhance the overall quality of life for the community s residents.
N o n - m o t o r i z e d transportation is an overlooked element that can greatly enhance the overall quality of life for the community s residents. 84 Transportation CHAPTER 11 INTRODUCTION Transportation
More informationMoving Cambridge. City of Cambridge Transportation Master Plan Public Consultation Centre. March 7, :00 8:00 PM.
City of Cambridge Transportation Master Plan Public Consultation Centre March 7, 2018 5:00 8:00 PM Region of Waterloo City of Cambridge Transportation Master Plan Public Consultation Centre March 7, 2018
More informationUniversity of Victoria Campus Cycling Plan Terms of Reference. 1.0 Project Description
University of Victoria Campus Cycling Plan Terms of Reference 1.0 Project Description The Campus Cycling Plan, a first for the University, will provide a comprehensive and coordinated approach to support
More informationIntro Strategic Plan SFTP TDM Facilities Transit Bicycle Pedestrian Taxi BICYCLE UPDATE. Presented by Timothy Papandreou, Strategic Planning & Policy
BICYCLE UPDATE Presented by Timothy Papandreou, Strategic Planning & Policy 114 Strategic Goals & Objectives Goal 1: Create a safer transportation experience for everyone Objective 1.3: Improve the safety
More informationSTUDY ADVISORY COMMITTEE. October 8, 2015
STUDY ADVISORY COMMITTEE October 8, 2015 Study Purpose evaluate the long-term transportation strategies and investments needed to sustain the county s economic health and quality of life in the coming
More informationA CHANGING CITY. of Edmonton, it is essential that it reflects the long-term vision of the City.
A CHANGING CITY By the year 2040, Edmonton will be home to more than 1 million people. To accommodate growth and support a healthy and compact city, we need a new approach to development/redevelopment
More informationChapter 2: Standards for Access, Non-Motorized, and Transit
Standards for Access, Non-Motorized, and Transit Chapter 2: Standards for Access, Non-Motorized, and Transit The Washtenaw County Access Management Plan was developed based on the analysis of existing
More informationProvidence Downtown Transit Connector STAKEHOLDER MEETING #2. Stakeholder Meeting #1 October 24, 2016
Providence Downtown Transit Connector STAKEHOLDER MEETING #2 Stakeholder Meeting #1 October 24, 2016 February 2017 1 AGENDA 1 DTC Goals and Expectations 2 Street Design Concepts 3 Potential Benefits and
More informationRoadways. Roadways III.
Introduction 97 Roadway Design Principles 98 Safe Speeds 99 Optimizing of Street Space 00 Minimum Lane Widths in the City of Boston 02 Design Features that Reduce Operating Speeds 05 Travel Lanes Transit
More informationComplete Streets: Policy Framework Complete Streets: Implementation Plans A more Complete Street: Laurier Bike Lane Pilot Project
Complete Streets Initiatives City of Ottawa Complete Streets: Policy Framework Complete Streets: Implementation Plans A more Complete Street: Laurier Bike Lane Pilot Project Zlatko.Krstulic@Ottawa.ca May
More informationEnvironment and Public Works Committee Presentation
Mixed Use Centers Complete Streets Guidelines Project Environment and Public Works Committee Presentation December 10, 2008 Project Objectives: Conduct an inter-departmental and agency process to study
More information4 MOBILITY PLAN. Mobility Plan Objectives. Mobility Context. 1. Integrate with Local and Regional Transit Improvements
Harbor Mixed Use CHAPTER Transit Corridor 4: Mobility Plan 4 MOBILITY PLAN Mobility Plan Objectives The Harbor Corridor Plan seeks to expand and improve the ways that people move along and through the
More informationSTONY PLAIN ROAD STREETSCAPE
Jasper Place Revitalization Strategy: Vision The people involved in the Jasper Place Revitalization Strategy envision: Goal 1: Feeling safe in our community Create a community where feeling safe is common--where
More informationMASTER BICYCLE AND PEDESTRIAN PLAN
VILLAGE OF NORTHBROOK MASTER BICYCLE AND PEDESTRIAN PLAN DRAFT PLAN OPEN HOUSE May 2, 2018 AGENDA 1. Community Engagement 2. Vision and Goals 3. General Structure of Plan 4. Recommendations Overview 5.
More informationBETHEL ROAD AND SEDGWICK ROAD CORRIDOR STUDY
DRAFT PLAN City Council Meeting August 14, 2017 STUDY AREA Sedgwick Corridor State Route 160, principal arterial with Class 3 access management designation, commuter and freight route, connection to SR
More informationSan Mateo County Comprehensive Bicycle and Pedestrian Plan Open House
San Mateo County Comprehensive Bicycle and Pedestrian Plan Open House October 28, 2010 Presented to San Mateo County residents and interested parties by Lauren Ledbetter, Alta Planning + Design Matt Haynes,
More informationWelcome! San Jose Avenue Open House August 25, 2015
Welcome! San Jose Avenue Open House August 25, 2015 Vision Zero The City and County of San Francisco adopted Vision Zero San Francisco Vision Zero High Injury Network as a policy in 2014, committing an
More information2014/2015 BIKE ROUTE PLAN 83 AVENUE PROTECTED BIKE LANE
About the Project 2014/2015 BIKE ROUTE PLAN The City of Edmonton is planning a major bike route on the south side of Edmonton. This bike route is one part of a plan to provide citizens with transportation
More informationArlington s Master Transportation Plan
Arlington s Master Transportation Plan The Master Transportation Plan (MTP) Adopted in eight parts Goals & Policies element and MTP Map adopted in 2007 Bicycle, Pedestrian and Demand and Systems Management
More information1 st and 2 nd Street Couplet FAQ s
1 st and 2 nd Street Couplet FAQ s Q. Will the proposed roundabout at Flume/2nd/1 st Streets affect access to businesses nearby?... 2 Q. What if the project isn t received well by the community after construction?...
More informationSMART 1 Public Meeting #1. February 24, 2016
SMART 1 Public Meeting #1 February 24, 2016 Agenda Who is the SMTC? SMART 1 project overview Syracuse Metropolitan Transportation Council An Introduction: Who we are & what we do What is an MPO? A Metropolitan
More informationFunding Application. Project Information. Contact Information. Project Description. 1 of 12. April 19th, :34 PM
1 of 12 Funding Application Competition Application Type Status Submitted: Prepopulated with screening form? Regional FHWA Designated Growth Centers submitted April 19th, 2018 4:34 PM No Project Information
More informationSouth King County High-Capacity Transit Corridor Study
HIGH-CAPACITY TRANSIT CORRIDOR STUDY South King County Corridor South King County High-Capacity Transit Corridor Study Corridor Report August 2014 South King County High Capacity Transit Corridor Report
More informationAppendix A-K Public Information Centre 2 Materials
Appendix A-K Public Information Centre 2 Materials Our Rapid Transit Initiative Make an impact on the future of transit Join the discussion on Rapid Transit in London You re invited to a Public Information
More informationCOASTAL RAIL TRAIL ROSE CREEK BIKEWAY PROJECT COMMUNITY WORKSHOP #2 AUGUST 15, 2013
COASTAL RAIL TRAIL ROSE CREEK BIKEWAY PROJECT COMMUNITY WORKSHOP #2 AUGUST 15, 2013 CHRIS CARTERETTE, AICP PROJECT MANAGER Chris.Carterette@sandag.org Direct: 619-699.7319 REGIONAL PLANNING BACKGROUND
More informationCPC Parking Lot Riverside Drive. Transportation Rationale
CPC Parking Lot Transportation Rationale Prepared By: NOVATECH Suite 200, 240 Michael Cowpland Drive Ottawa, Ontario K2M 1P6 September 2015 Novatech File: 114093 Ref: R-2015-153 Table of Contents 1.0 INTRODUCTION...
More informationExecutive Summary Route 30 Corridor Master Plan
Route Corridor Master Plan Project Overview The Route Corridor Master Plan is a coordinated multimodal transportation and land use plan for the entire stretch of Route through East Whiteland Township,
More informationClassification Criteria
SCHEDULE D TO RECOMMENDED OFFICIAL PLAN AMENDMENT NO. 40 SCHEDULE C-4 Road Criteria Criteria Traffic Service Objective Land Service/Access Typical Daily Traffic Volume Flow characteristics Travel Speed
More informationCity of Gainesville Transportation/Roadway Needs PROJECT SUMMARY
A1 Roadway Resurfacing $23,846,000 TYPE: Preservation of existing system Roadway resurfacing A2 Signal Replacement $6,000,000 TYPE: Preservation of existing system Replace traffic signals. B1 W 6th St
More informationEast Burke Transportation, Safety and Capacity Improvements
East Burke Transportation, Safety and Capacity Improvements The purpose of this project is to increase mobility and improve safety for pedestrians, cyclists, and motor vehicles along VT Route 114 in the
More informationItem to be Addressed Checklist Consideration YES NO N/A Required Description Complete Streets Guidelines
Passaic County Complete Streets Checklist - Concept Development Project Name Item to be Addressed Checklist Consideration YES NO N/A Required Description Complete Streets Guidelines Existing Plans Have
More informationROUTES 55 / 42 / 676 BUS RAPID TRANSIT LOCALLY PREFERRED ALTERNATIVE
ROUTES 55 / 42 / 676 BUS RAPID TRANSIT LOCALLY PREFERRED ALTERNATIVE April, 2012 1 INTRODUCTION The need for transit service improvements in the Routes 42/55/676 corridor was identified during the Southern