1 Railroad Quiet Zones Case Studies in Colorado 8 th Annual Spring Transportation Symposium April 9, 2010
2 Railroad Quiet Zones What is a Quiet Zone? A section of a rail line that contains one or more consecutive public crossings at which locomotive horns are not routinely sounded. Use of Locomotive Horns at Highway- Rail Grade Crossings; Final Rule Effective June 2005 Amended August 2006 Requires horns to be sounded to warn motorists at public crossings Provides exceptions where risk is minimized via safety measures Enables communities to establish quiet zones by reducing the risk caused by lack of horns
3 Case Studies in Colorado #1 - Commerce City BNSF South Quiet Zone Full Reconstruction with All New Railroad Equipment #2 - Arvada UPRR Quiet Zone Roadway Approach Work Only #3 - El Paso County BNSF Quiet Zone Quiet Zone Establishment Processing Only
4 Case Study #1: Commerce City Rosemary St Pre- Project Conditions 80 th Ave Rocky Mtn Arsenal National Wildlife Refuge Rosemary & 80 th merged at BNSF crossing Stop controlled
5 Case Study #1: Commerce City Proposed Design R fi d i Reconfigured crossing Fully signalized intersection
6 Case Study #1: Commerce City Construction Offline construction allows existing crossing to remain operational Railroad coordination for approach work is critical
7 Case Study #1: Commerce City Then and Now Pre-Project View Southeast Post-Project View Southeast Pre-Project SH2 SB approach Post-Project SH2 SB approach
8 Case Study #1 Summary Commerce City BNSF South Quiet Zone Project Elements - Timeline - Construction Project underway when Final Rule became effective Reviewed and modified crossing design to include Quiet Zone compliant features Multiple agencies involved Funded by the City Design: April 2005 June 2006 (14 months) Construction Complete: November 2007 (17 months) Quiet Zone Established: November 7, 2007 Construction Costs - Railroad Work: $450,000 (does not include costs for road approaches)
9 Case Study #2: Arvada Pre- Project Conditions Kipling UPRR View South Pierce UPRR View North Existing Railroad Equipment met Requirements for Quiet Zone Compliance Installation of Raised Medians on Approaches would allow for Quiet Zone Establishment
10 Case Study #2: Arvada Proposed Design
11 Case Study #2: Arvada Kipling Pre-Project View South Kipling Post-Project View South Then and Now Pierce Pre-Project View North Pierce Post-Project View North
12 Case Study #2 Summary City of Arvada UPRR Quiet Zone Project Elements - Timeline - City completed study of Quiet Design: Feb Feb. Zone options in-house and 2008 (12 months) determined features to be Construction Complete: implemented August 2008 (7 months) Project included final design Quiet Zone Established: of approach medians August 16, 2008 Funded by the City (Street Construction Costs - and Maintenance Funds) Road Approach Work: Kipling crossing established Kipling - $25,000 as Quiet Zone; Pierce is Pierce - $30,000 being established separately Railroad Work: due to distance Flagging Approx. $800 per 8-hour day
13 Case Study #3: El Paso County Project Conditions Fontaine Blvd Traffic Control Devices: CWT, gates, lights, flashers, bells, raised medians View East of Crossing Fontaine Blvd View West toward Crossing 80 ft. raised median 107 ft. raised median (to nearest access)
14 Case Study #3: El Paso County Project Conditions Main St Traffic Control Devices: CWT, gates, lights, flashers, bells, raised medians 79 ft. raised median (to nearest access) View West toward Crossing 60 ft. raised median View South along Tracks
15 Case Study #3 Summary El Paso County BNSF Quiet Zone Project Elements - Timeline - Construction improvements had already been completed as part of an adjacent project Railroad equipment and Roadway approaches were Quiet Zone compliant Coordination effort funded by County Included 2 crossings: Fontaine and Main Coordination: Feb July 2008 (6 months) No Construction Quiet Zone Established: September 3, 2008 Construction Costs - Road Approach Work: $0 Railroad Work: $0
16 Conclusions Railroad crossings can be evaluated to determine what, if any, improvements are needed for Quiet Zone establishment Process varies depending on existing crossing features and possible improvements Costs of improvements typically borne by the road authority Timeline can range from less than 1 year for coordination efforts to several years for full design and construction
Salem City Council November 9, 2009
Salem City Council November 9, 2009 $1.212 million of the $100 million bond was set aside for Railroad Crossing Safety Improvement Projects Construct projects to improve both vehicular and pedestrian safety
More informationAnn Arbor, Michigan Quiet Zone Assessment
Ann Arbor, Michigan Quiet Zone Assessment DRAFT FINAL City of Ann Arbor, Michigan February 2019 SRF No. 11295 Table of Contents Executive Summary... iii Introduction... 1 Study Purpose and Background...
More informationQuiet Zones: Silencing Train Horns at Railroad Crossings
Quiet Zones: Silencing Train Horns at Railroad Crossings Council Transportation and Environment Committee Prepared by Public Works and Transportation Transportation Programs - Planning January 12, 2009
More informationWelcome! CHICAGO TO ST. LOUIS HIGH-SPEED RAIL Public Meeting.
Welcome! CHICAGO TO ST. LOUIS HIGH-SPEED RAIL Public Meeting www.idothsr.org Corridor Map Summit Chicago Station Rehabilitation Underway Joliet New Station Open New Station Under Construction Dwight Pontiac
More informationFrequently Asked Questions
Frequently Asked Questions Business US 190 in Copperas Cove From Avenue D to Constitution Drive What is access management? A. Access Management is a growing effort by government agencies to improve how
More informationATTACHMENT NO. 11. RRLRT No. 2. Railroad / Light Rail Transit Technical Committee TECHNICAL COMMITTEE: Busway Grade Crossings STATUS/DATE OF ACTION
ATTACHMENT NO. 11 RRLRT No. 2 TECHNICAL COMMITTEE: TOPIC: Railroad / Light Rail Transit Technical Committee Busway Grade Crossings STATUS/DATE OF ACTION RRLRT TC Draft: 06/23/2011 RRLRT TC Approval: 06/27/2014
More informationCotton Belt Corridor PE/EIS
Cotton Belt Corridor PE/EIS February, 28, 2011 Cotton Belt Corridor PE/EIS February 28, 2011 Prepared by Stantec Consulting, Inc Cotton Belt Corridor PE/EIS Table of Contents 1.0 INTRODUCTION... 2 2.0
More informationTypes of Crossings. Passive Crossings.
Railroad-highway Crossings Railroad-highway grade crossings are a special kind of intersection where the roadway crosses train tracks. These crossings are always dangerous. Every such crossing must be
More informationBRIDGE REPLACEMENT AND REHABILITATION PROGRAM
BRIDGE REPLACEMENT AND REHABILITATION PROGRAM INTRODUCTION An integral element of the City's transportation infrastructure is a network of bridges designed to carry vehicular, railroad, light rail, pedestrian,
More informationThe 2009 Manual on Uniform Traffic Control Devices (MUTCD) (Brief) Highlights for Arizona Practitioners. Arizona Department of Transportation
The 2009 Manual on Uniform Traffic Control Devices (MUTCD) (Brief) Highlights for Arizona Practitioners Arizona Department of Transportation New 2009 MUTCD 9 Parts (down from 10 in 2003) 816 pages (up
More informationGOVERNMENT OF SASKATCHEWAN SUBMISSION TO THE RAILWAY SAFETY ACT REVIEW PANEL
GOVERNMENT OF SASKATCHEWAN SUBMISSION TO THE RAILWAY SAFETY ACT REVIEW PANEL Saskatchewan Highways & Transportation May 29, 2007 I Introduction Government of Saskatchewan Submission To the Railway Safety
More informationWill Kempton, Chief Executive Officer. Update on Proposed Implementation of a Wayside Horn System Along the San Clemente Beach Trail
May 27, 2010 To: From: Subject: Transit Committee Will Kempton, Chief Executive Officer System Along the San Clemente Beach Trail Overview The Orange County Transportation Authority and City of San Clemente
More informationBay to Bay Boulevard Complete Streets Project
Bay to Bay Boulevard Complete Streets Project Dale Mabry Highway to Bayshore Boulevard February 08, 2018 Photo Source: Tampa Bay Times Alessandra Da Pra Meeting Format Introduction Resurfacing Information
More informationMASONIC AVENUE STREET DESIGN STUDY Community Workshop 3. Masonic Ave Street Design Study Community Workshop 3 September 30, 2010
Masonic Ave Street Design Study Community Workshop 3 September 30, 2010 Introduction MASONIC AVENUE STREET DESIGN STUDY Community Workshop 3 SF Municipal Transportation Agency Javad Mirabdal, Project Manager
More informationThank you for attending
Improving mobility safety comfort WELCOME Thank you for attending The purpose of this meeting is to: Learn about the project Prioritize potential walking and biking improvements on Snelling Ave Gather
More informationTopic No January 2000 Manual on Uniform Traffic Studies Revised July Chapter 8 GAP STUDY
Chapter 8 8.1 PURPOSE GAP STUDY (1) The Gap Study is used to determine the size and the number of gaps in the vehicular traffic stream for unsignalized intersections and access points, pedestrian studies,
More informationThis Manual Part recommends functional/operating guidelines for control of automatic grade crossing warning systems. Draft
Recommended Functional/Operating Guidelines for Control of Automatic Grade Crossing Warning Systems Revised 2017 (6 Pages) A. Purpose This Manual Part recommends functional/operating guidelines for control
More informationRapid City Quiet Zone Assessment
Rapid City Quiet Zone Assessment DRAFT City of Rapid City, South Dakota May 2018 SRF No. 11039 Table of Contents Introduction... 3 Study Purpose and Background... 3 Minimum Warning Device Requirements...
More informationVIII. Project Prioritization & Implementation
Transportation Plan 2030 July 2006 VIII. Project Prioritization & Implementation Public Transit Service Investigation into the development of a demand responsive service route system through a process
More informationWest Rail Line Update FasTracks Bike Jeffco. September 13, 2011
West Rail Line Update FasTracks Bike Jeffco September 13, 2011 Bike route along the West Rail Line West Rail Line Bike Paths West Rail Line is a bike and pedestrian friendly project The bike path will
More informationAppendix C. NORTH METRO STATION AREA TRAFFIC IMPACT STATEMENT 88th Avenue Station
Appendix C NORTH METRO STATION AREA TRAFFIC IMPACT STATEMENT 88th Avenue Station Prepared for: Regional Transportation Department and URS Corporation as part of the North Metro EIS David Evans and Associates,
More informationINNOVATIVE INTERSECTION DESIGN
INNOVATIVE INTERSECTION DESIGN J. Eddie Valtier, P.E. ELP TP&D Director Introduction Why Do We Need To Start Looking For Innovative Intersection Designs? Congestion is worsening and traffic volumes and
More informationDesigning Safety into Highway-Rail Grade Crossing Projects
Designing Safety into Highway-Rail Grade Crossing Projects February 13, 2017 Copyright 2016 by CTC, Inc. (CTC) Overview of Grade Crossing Safety 2 A train strikes a vehicle or person every 4 hours in U.S.
More information5. RUNNINGWAY GUIDELINES
5. RUNNINGWAY GUIDELINES These guidelines should be considered collectively when making runningway decisions. A runningway is the linear component of the transit system that forms the right-of-way reserved
More informationOrange County Rail-Highway Grade Crossing Safety Enhancement Program. City of San Juan Capistrano April 17, 2012
Orange County Rail-Highway Grade Crossing Safety Enhancement Program City of San Juan Capistrano April 17, 2012 Orange County Rail-Highway Grade Crossing Safety Enhancement Program (OCX) 52 crossings 8
More informationPERFORMANCE ACTIVITY 401 MOWING WORK DESCRIPTION 5
PERFORMANCE ACTIVITY 401 MOWING WORK DESCRIPTION 1 WORK DESCRIPTION 2 WORK DESCRIPTION 3 WORK DESCRIPTION 4 WORK DESCRIPTION 5 Brush Management Hand Trimming Outdoor Advertising Window Routine Safety 401
More informationWhat if there were no signs, signals or markings?? Throughout Ch 2 you will learn how signs, signals, and markings help regulate traffic flow.
What if there were no signs, signals or markings?? Throughout Ch 2 you will learn how signs, signals, and markings help regulate traffic flow. Signs, Signals and Road Markings Purpose: To become acquainted
More informationPUBLIC,UTILITIES COMMSSION OF THE
GENERAL ORDER NO. 88-8 (Supersedes General Order No. 88-A) PUBLIC,UTILITIES COMMSSION OF THE.. STATE OF CALIFORNIA RULES FOR ALTERING PUBLIC HIGHWAY-RAIL CROSSINGS ADOPTED January 8,2004. EFFECTIVE February
More informationDesigning for Pedestrians: An Engineering Symposium. Rutgers University March 21, 2013
Designing for Pedestrians: An Engineering Symposium Rutgers University March 21, 2013 The Problem 2 Pedestrian Fatalities Pedestrian Fatalities by Year in US (1994-2010) 6000 5000 4000 3000 2000 1000 0
More informationAppendix T CCMP TRAIL TRAFFIC & TRANSPORTATION DESIGN STANDARD
Appendix T CCMP 3.3.4 TRAIL TRAFFIC & TRANSPORTATION DESIGN STANDARD 3.3.4 Trail Traffic and Transportation Design Multi-use trails have certain design standards, which vary depending on the agency that
More informationTransportation Impacts: Toronto York Spadina Subway Extension
STAFF REPORT ACTION REQUIRED Transportation Impacts: Toronto York Spadina Subway Extension Date: June 6, 2011 To: From: Wards: Reference Number: North York Community Council Director, Transportation Services
More information7th Street Bridge Project. Public Presentation February 24, :30pm-8pm
7th Street Bridge Project Public Presentation February 24, 2014 6:30pm-8pm Public Meeting Agenda Welcome and introductions Judith Buethe Opening remarks - David Leamon, PE/Hans Strandgaard, PE Project
More informationMOUNTAIN HOUSE SPECIFIC PLAN I 9.1 INTRODUCTION ASSUMPTIONS TRANSPORTATION FACILITIES TRANSPORTATION IMPROVEMENTS PHASING 9.
CHAPTER NINE: TRANSPORTATION AND CIRCULATION 9.1 INTRODUCTION 9.1 9.2 ASSUMPTIONS 9.1 9.3 TRANSPORTATION FACILITIES 9.1 9.4 TRANSPORTATION IMPROVEMENTS PHASING 9.3 LIST OF FIGURES LIST OF TABLES Figure
More informationOverview. Illinois Bike Summit IDOT Complete Streets Policy Presentation. What is a Complete Street? And why build them? And why build them?
Overview Illinois Bike Summit IDOT Complete Streets Policy Presentation Aren Kriks, P.E. District One Bicycle Coordinator and Bureau of Programming Project Engineer History of Complete Streets IDOT Policy
More informationImprovements Infrastructure Gap Assessment and Improvements Street Striping
Infrastructure Project Proposal The federal-aid Safe Routes to School program funds infrastructure/engineering projects that fall into two categories: Design (available only to School Development Authority
More informationDr. M.L. King, Jr. Street North Complete Streets Resurfacing Opportunities HOUSING, LAND USE, AND TRANSPORTATION COMMITTEE MARCH 22, 2018
Dr. M.L. King, Jr. Street North Complete Streets Resurfacing Opportunities HOUSING, LAND USE, AND TRANSPORTATION COMMITTEE MARCH 22, 2018 What s Happening The City plans to mill and resurface Dr. M.L.
More informationPERFORMANCE ACTIVITY 306 DRAINAGE PIPE WORK DESCRIPTION 4
PERFORMANCE ACTIVITY 306 DRAINAGE PIPE WORK DESCRIPTION 1 WORK DESCRIPTION 2 WORK DESCRIPTION 3 WORK DESCRIPTION 4 Repair Install Remove Clean 306 DRAINAGE PIPE ACTIVITY DESCRIPTION Install, repair, clean,
More informationPennDOT Access Management Model Ordinances Training
PennDOT Access s Training Trainers: Chad Dixson, AICP, TPD Angela Watson, PB Objective of Today Assist Pennsylvania s municipalities and transportation professionals in better understanding the benefits
More informationConstruction Update. Local Officials Briefing March 2016
Construction Update Local Officials Briefing March 2016 1 History: Chicago-St. Louis Corridor Since 1980 s IDOT has been looking at this corridor for high-speed service 1992 Designated a HSR Corridor EIS
More informationGRANDFORKS MILSPURFEASIBILITYSTUDY. GrandForksandEastGrandForksMPO. FINALReport. August2010
GRADFORKS MILSPURFEASIBILITYSTUDY GrandForksandEastGrandForksMPO FIALReport August2010 Table of Contents Chapter 1: Introduction and Background... 1 Chapter 2: Existing Conditions and Issues Identification...
More informationPERFORMANCE ACTIVITY 613 IMPACT ATTENUATOR WORK DESCRIPTION 3
PERFORMANCE ACTIVITY 613 IMPACT ATTENUATOR WORK DESCRIPTION 1 WORK DESCRIPTION 2 WORK DESCRIPTION 3 Install Remove Repair 613 IMPACT ATTENUATOR ACTIVITY DESCRIPTION Repair, install, remove and maintain
More informationRSA Efforts in the Tampa Bay Area
RSA Efforts in the Tampa Bay Area Presentation to the RSA Regional Peer Exchange April 29, 2008 -- Little Rock, Arkansas Peter Hsu, PE, Florida Department of Transportation District 7 Overview Introduction
More information11/28/2016 VIA
11/28/2016 VIA EMAIL Ethan Meltzer, Assistant Planner City of Sacramento Community Development Department 300 Richards Blvd., 3 rd Floor Sacramento, Ca 95811 RE: Natomas Corporate Center Commercial Building
More informationStation 1: Street & Sidewalk Upgrades
Station 1: Street & Sidewalk Upgrades Existing no left turn; Potential left turn arrow, see Circulation Study boards for more information Thru-lane guidance Improved lead-in green bike lane 17TH ST CASTRO
More informationMASONIC AVENUE STREET DESIGN STUDY Community Workshop 2. Masonic Ave Street Design Study Community Workshop 2 August 10, 2010
Masonic Ave Street Design Study Community Workshop 2 August 10, 2010 Introduction MASONIC AVENUE STREET DESIGN STUDY Community Workshop 2 SF Municipal Transportation Agency Javad Mirabdal, Project Manager
More informationAPPENDIX E GRADE CROSSING LOCATIONS
APPENDIX E GRADE CROSSING LOCATIONS 1 2 3 Citrus Avenue Riverside County and City Palmyrita Avenue Columbia Avenue MP 0.57 002X-0.6 027301Y MP 1.00 002X-1.0 027302F MP 1.24 002X-1.3 027303M 1. Existing
More informationUpper Valley Traffic Study
TexITE Summer Meeting Upper Valley Traffic Study El Paso, Texas Presented by: Randy Schulze, P.E., PTOE, PTP June 18, 2010 Introduction Background Methodology Public Outreach MPO Forecasts Analysis Recommendations
More informationTEMPORARY TRAFFIC CONTROL GUIDELINES FOR HIGHWAY-RAIL GRADE CROSSINGS
TEMPORARY TRAFFIC CONTROL GUIDELINES FOR HIGHWAY-RAIL GRADE CROSSINGS 1.0 INTRODUCTION 1.1 Purpose The Southern California Regional Rail Authority (SCRRA) is the designated track owner of the Metrolink
More informationIMPROVING PEDESTRIAN SAFETY AT UNCONTROLLED CROSSINGS. Guidelines for Marked Crosswalks
IMPROVING PEDESTRIAN SAFETY AT UNCONTROLLED CROSSINGS Presented by Nazir Lalani P.E. Traffex Engineers Inc. N_lalani@hotmail.com Guidelines for Marked Crosswalks Source: FHWA, Safety Effects of Marked
More informationChapter 4 TOOLBOX AND SAMPLE BIKE BOULEVARD LAYOUT
Chapter 4 TOOLBOX AND SAMPLE BIKE BOULEVARD LAYOUT OVERVIEW This chapter describes a cohesive set of strategies to create a bicycle boulevard, namely to make streets safer and more efficient for bicycle
More informationWHANGAREI IMPROVEMENTS
WHANGAREI IMPROVEMENTS PROJECT OVERVIEW The NZ Transport Agency (NZTA) is working with Whangarei District Council (WDC) to improve the state highway through Whangarei. In addition to the recently completed
More informationTraffic Signal Warrant Analysis Report
Traffic Signal Warrant Analysis Report US26: Springwater At-Grade Intersection key# 15773 US26 at SE 267 th Avenue (M.P. 16.24) and US26 at SE Stone Road (M.P. 16.77) Prepared by Katherine Carlos, E.I.
More informationGolden Gate Park. Project Goal and Description. Lower Great Highway Facts
PROJECT OVERVIEW Project Goal and Description The goal of the is to increase pedestrian safety and comfort along Lower Great Highway by evaluating and implementing near- and medium-term pedestrian improvements
More informationEnvironmental Review Binder Documentation McGilchrist Street SE: 12th Street SE to 25th Street SE Project City of Salem, Marion County, Oregon
Environmental Review Binder Documentation McGilchrist Street SE: 12th Street SE to 25th Street SE Project City of Salem, Marion County, Oregon Updated Project Information (as of August 11, 2017) STIP Project
More informationORANGE COUNTY GRAND JURY
ORANGE COUNTY RAIL CROSSING SAFETY: SNAPSHOT OF A PROCESS SUMMARY Metrolink operates the commuter rail system that serves the Southern California region. It was established in 1991 as the Southern California
More informationSan Tomas Expressway
Implementation Plan San Tomas Expressway Roads and Airports Department August 19, 2003 Implementation Plan San Tomas Expressway County of Santa Clara Roads and Airports Department 101 Skyport Drive San
More informationFreeway ramp intersection study
Freeway ramp intersection study Supporting Vision Zero: Zero traffic deaths in San Francisco by 2024 Study Goals: Primary Improve Safety Improve Accessibility Secondary Provide Efficient Circulation Accommodate
More informationIs Train Horn Noise a Problem in your Town? By: John P. Redden, P.E., senior railroad engineer, Hanson Professional Services Inc.
Is Train Horn Noise a Problem in your Town? By: John P. Redden, P.E., senior railroad engineer, Hanson Professional Services Inc. Copyright 2009 by Hanson Professional Services Inc. All rights reserved.
More information2004 Traffic and Safety Notes. Cross Reference between the Old Note Number and the New Note Number
Michigan Department of Transportation 2004 Traffic and Safety Notes Cross Reference between the Old Note Number and the New Note Number OLD NEW Number Number Title (Prior to 2004) 1.1.1 101-Series General
More informationTraffic Improvements for the Transit Oriented Development District (TODD) Meriden Public Library March 11, 2014
Traffic Improvements for the Transit Oriented Development District (TODD) Meriden Public Library March 11, 2014 Project Overview Coordinate roadway improvements with other major projects HUB Flood Control
More informationChapter 8 Chapter 8 VEHICLE GAP STUDY PURPOSE VEHICLE GAP STUDY (FIGURE 8-1)
Chapter 8 Chapter 8 Formatted: Heading 1 VEHICLE GAP STUDY 5.48.18.1 PURPOSE (1) The Vehicle Gap Study (Form No. 750-020-08) is used to determine the size and the number of gaps in the vehicular traffic
More informationMUTCD Part 6D: Pedestrian and Worker Safety
MUTCD Part 6D: Pedestrian and Worker Safety Section 6D.01 Pedestrian and Worker Safety The needs and control of all road users (motorists, bicyclists, and pedestrians) within the highway, including persons
More informationIs Train Horn Noise a Problem in your Town?
Is Train Horn Noise a Problem in your Town? By: John P. Redden, P.E., senior railroad engineer, Hanson Professional Services Inc. September 2005 Copyright 2009 by Hanson Professional Services Inc. All
More informationRE: Park Plaza Walgreens (P12-016)
12/5/2014 VIA EMAIL David Hung, Associate Planner City of Sacramento Community Development Department 300 Richards Blvd., 3rd Floor Sacramento, CA 95811 RE: Park Plaza Walgreens (P12-016) Dear Mr. Hung:
More information5/31/2016 VIA . Arwen Wacht City of Sacramento Community Development Department 300 Richards Blvd., 3 rd Floor Sacramento, CA 95811
5/31/2016 VIA EMAIL Arwen Wacht City of Sacramento Community Development Department 300 Richards Blvd., 3 rd Floor Sacramento, CA 95811 RE: El Pollo Loco (P16-028) Dear Ms. Wacht: WALKSacramento has reviewed
More informationCity of El Cerrito San Pablo Avenue Specific Plan. Capital Improvement Program
City of El Cerrito San Pablo Avenue Specific Plan Capital Improvement Program May 2015 San Pablo Avenue Intersection Improvements San Pablo Avenue and Hill Street/Eastshore Boulevard Background Existing
More informationRoundabouts Near At-Grade Railroad Crossings
Roundabouts Near At-Grade Railroad Crossings May 12, 2008 1,592 Words Alex J. Ariniello LSC Transportation Consultants, Inc., 1889 York Street Denver, CO 80206 Phone: 303-333-1105 FAX: 303-333-1107 email:
More informationTRAFFIC ACTION PLAN. Laurie Meadows Neighborhood CITY OF SAN MATEO
TRAFFIC ACTION PLAN Laurie Meadows Neighborhood CITY OF SAN MATEO Draft January 2017 Table of Contents Introduction... 2 The Traffic Forum Process... 5 Neighborhood Traffic Issues... 7 Neighborhood Recommendations
More informationRM 620/RM 2222 CONNECTOR (BYPASS) STATUS REPORT RM 620/2222 STATUS
RM 620/RM 2222 CONNECTOR (BYPASS) STATUS REPORT January 25, 2017 RM 620/2222 BYPASS - INTRODUCTION Because of the enormous traffic demand at the RM 620/2222 intersection, TxDOT searched for a way to relieve
More information12/4/2016 VIA . RE: Grocery Outlet Del Paso (DR16-328)
12/4/2016 VIA EMAIL Ethan Meltzer, Assistant Planner City of Sacramento Community Development Department 300 Richards Blvd, 3 rd Floor Sacramento, CA 95811 RE: Grocery Outlet Del Paso (DR16-328) Dear Mr.
More informationJONESBORO HIGHWAY 63 HIGHWAY 18 CONNECTOR STUDY
JONESBORO HIGHWAY 63 HIGHWAY 18 CONNECTOR STUDY Craighead County May 2007 JONESBORO HIGHWAY 63 HIGHWAY 18 CONNECTOR STUDY Craighead County May 2007 Prepared by Planning and Research Division Arkansas State
More informationUS287 Asset Inventory Loveland. Figure 6-1 Loveland Bridges and Traffic Signals
Chapter 6: City of Loveland US287 extends for approximately 13.1 miles through the City of Loveland. Between the northern City boundary and 29 th Street, the road is labeled Garfield Avenue, before transitioning
More informationDevelopment Opportunities Golden, Colorado Case Study
Development Opportunities Golden, Colorado Case Study Minnesota Roundabout Conference April 5-6, 5 2006 Alex J. Ariniello, P.E., P.T.O.E. Overview Golden Roundabouts Other roundabout applications Retail/business
More informationMEMORANDUM. Background
MEMORANDUM DATE: September 2, 2013 TO: FROM: SUBJECT: PROJECT: City of Fife Attn: Russ Blount 5411 23 rd Street East Fife, WA 98424 Al Tebaldi, PE 54 th Avenue East Crossing Safety Memorandum FIFE0000-0177-
More informationUS 20 Feasibility Study. Village Board Meeting. Shales Parkway to IL Route 390 IL Route 390 Extension (North Ave to US 20)
US 20 Feasibility Study Shales Parkway to IL Route 390 IL Route 390 Extension (North Ave to US 20) Village Board Meeting Bartlett Village Hall February 16, 2016 1 Background 1991 IDOT Study Recommendations
More informationFor Signals Training Consortium Use Only
Introduction and Overview to Highway Grade Crossings Course 104 PARTICIPANT GUIDE Introduction and Overview to Highway Grade Crossings Participant Guide Signals Maintenance Training Consortium COURSE 104
More informationDraft North Industrial Area-Wide Traffic Plan
Summary of North Industrial and Hudson Bay Industrial Recommended Improvements Table 1. Summary of s Item Location 1 2 3 4 5 6 7 8 9 10 11 12 Millar Ave north of 51st St Super 8 Motel back lane 400 Block
More informationSUBJECT Memorandum of Understanding to Complete a Caltrain Grade Separation Study for the Whipple Avenue Crossing
REPORT To the Honorable Mayor and City Council From the City Manager October 1, 2018 SUBJECT Memorandum of Understanding to Complete a Caltrain Grade Separation Study for the Whipple Avenue Crossing RECOMMENDATION
More informationNorfolk Tide LRT System Weaving Transit in Downtown Norfolk
Rail-Volution 2010 Weaving Transit into Existing Communities Norfolk Tide LRT System Weaving Transit in Downtown Norfolk Dan Meyers, AICP URS, Planning Manager Minneapolis, Minnesota Norfolk Tide LRT Alignment
More informationHIGHWAY- RAILROAD GRADE CROSSING SAFETY PROJECT SELECTION
HIGHWAY- RAILROAD GRADE CROSSING SAFETY PROJECT SELECTION Maureen Jensen P.E. Assistant Director Office of Freight and Commercial Vehicle Operations October 4, 2017 mndot.gov Outline Grade Crossing Safety
More informationTECHNICAL MEMORANDUM. Introduction
TECHNICAL MEMORANDUM To: From: John M. Welsh Chris Furlong AHC, Inc. Andrew T. Smith, P.E. Edward Y. Papazian, P.E. Kimley-Horn and Associates, Inc. Date: July 6, 2017 Subject: 200 9 th reet South Redevelopment
More informationMarion Railroad Overpass/Underpass Feasibility Study
Marion Railroad Overpass/Underpass Feasibility Study August 31, 2015 PREPARED FOR: SOUTHERN ILLINOIS METROPOLITAN PLANNING ORGANIZATION N PREPARED BY: CRAWFORD, MURPHY & TILLY, INC. 2750 W. Washington
More information3.0 PROJECT DESCRIPTION
The following section of the Draft EIR contains a description of the proposed Elk Grove Boulevard/SR 99 Interchange Modification project, consistent with the requirements of CEQA Guidelines Section 15124.
More informationCalifornia Manual on Uniform Traffic Control Devices
California Manual on Uniform Traffic Control Devices FHWA s MUTCD 2009 Edition as amended for use in California 2012 Edition State of California Business, Transportation and Housing Agency Department of
More informationAccess Management in the Vicinity of Intersections
Access Management in the Vicinity of Intersections FHWA-SA-10-002 Technical Summary Photo: Ralph Bentley (used with permission) 0 Access Management is: The design, implementation and management of entry
More informationSaskatchewan Drive Roadway Rehabilitation and Shared-Use Path Widening
Saskatchewan Drive Roadway Rehabilitation and Shared-Use Path Widening We are here today to present the draft plan for the Saskatchewan Drive Roadway Rehabilitation and Shared-Use Path Widening project
More informationProposed Project I 35 from Denton to Cooke County Line
Proposed Project I 35 from Denton to Cooke County Line The existing I 35 facility is four lanes from I 35E/I 35W to Farm to Market Road (FM) 3002. The purpose of the proposed project is to increase capacity
More informationFLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT 7 DISTRICT WIDE BICYCLE/PEDESTRIAN ACCESS TO TRANSIT SAFETY ASSESSMENT AND IMPROVEMENT PLAN
FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT 7 DISTRICT WIDE BICYCLE/PEDESTRIAN ACCESS TO TRANSIT SAFETY ASSESSMENT AND IMPROVEMENT PLAN TRANSIT SAFETY ASSESSMENT SR 55/US 19 AT 80 TH AVE N DRAFT JUNE
More informationItem 08M 1 of 9
MEETING DATE: December 20, 2017 PREPARED BY: Christopher L. Magdosku, City Engineer DEPT DIRECTOR: Brenda Wisneski DEPARTMENT: Development Services CITY MANAGER: Karen P. Brust SUBJECT: Interim North Coast
More informationWhat's in the 2012 California MUTCD for Pedestrians, Bicyclists, and School Areas?
What's in the 2012 California MUTCD for Pedestrians, Bicyclists, and School Areas? CA MUTCD 2012 edits by John Ciccarelli Member, California Traffic Control Devices Committee Member, NCUTCD Bicycle Technical
More informationThis page intentionally left blank.
This page intentionally left blank. COMMUNITY Coweta Community Overview Coweta Coweta, a residential community located in Wagoner County, is a suburb of Tulsa situated southeast of the metropolitan area
More informationSD Highway 50 in Yankton (4 TH Street) Reconstruction Project NH 0050(99)381 PCN By Josh Larson McLaury Engineering Inc.
SD Highway 50 in Yankton (4 TH Street) Reconstruction Project NH 0050(99)381 PCN 6926 By Josh Larson McLaury Engineering Inc. Project Limits SD 50 from Broadway to Burleigh and from Marne Creek to Archery
More information9/21/2016 VIA . RE: The Knot (DR16-270)
9/21/2016 VIA EMAIL Garrett Norman, Assistant Planner City of Sacramento Community Development Department 300 Richards Boulevard, 3 rd Floor Sacramento, CA 95811 RE: The Knot (DR16-270) Dear Mr. Norman:
More informationSt. Francis Drive through the City of Santa Fe Corridor Study
VII. ENGINEERING AND ENVIRONMENTAL EVALUATION TRAIL CONNECTIVITY In the southern portion of the Corridor there is a lack of a sidewalk, trail or bicycle facility within the right-ofway. However, the City
More informationMission-Geneva Transportation Study Community Workshop 2 July 8, 2006
Community Workshop 2 July 8, 2006 Small Group Workbook 1 Basic Improvements on Mission Street Streetscape. Pedestrian-scale lighting; landscaping; community art on utility boxes; more (possibly unique)
More informationProject Goals and Objectives
Project Goals and Objectives Goal 1: Goal 2: Goal 3: Transform Coast Highway into a Complete Street that accommodates all roadway users (pedestrians, bicyclists, and autos) Objectives: Improve the pedestrian
More informationBuilding Great Neighbourhoods QUEEN ALEXANDRA
Building Great Neighbourhoods QUEEN ALEXANDRA We are here today to Explain how the City is investing in improving your neighbourhood and how your neighbourhood will be improved to meet current City standards.
More informationChapter 6 Transportation Plan
Chapter 6 Transportation Plan Transportation Plan Introduction Chapter 6 Transportation Plan Transportation Plan Introduction This chapter describes the components of Arvada s transportation system, comprised
More informationDriver Education Ch. 4: Safe Driving Rules & Regulations. Ms. Marx
Driver Education Ch. 4: Safe Driving Rules & Regulations Ms. Marx Speed Control Speed is one of the most common contributing factors of fatal & other types of accidents School zones, business or residential
More informationNorthbound San Jose Avenue & I-280 Off-Ramp Road Diet Pilot Project
Project Overview Fed by a two-lane Interstate-280 (I-280) off-ramp, high vehicular volumes and speeds are longstanding issues along San Jose Avenue. Residents in the surrounding neighborhoods have expressed
More information