Size: px
Start display at page:

Download ""

Transcription

1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

31

32

33

34

35

36

37

38

39

40

41

42

43

44

45

46

47

48

49 NO PARKING ZONE, YELLOW CURB (OPTIONAL) Z 8 20 MIN. 8 Z (SEE SHEET 2) 4" WHITE "X" (TYP.),(OPTIONAL) TYPE I NO PARKING ZONE, YELLOW CURB (OPTIONAL) Z ALL SPACES 22 MIN., 26 MAX. EACH Z TYPE II NO PARKING ZONE, YELLOW CURB (OPTIONAL) Z 20 28" 8 Z 12" EXTENSION (TYP.) ENABLES DRIVERS TO SEE LIMITS OF STALL ALL SPACES 22 MIN. 26 MAX. 20 TYPE III DEPARTMENT DIRECTOR Kirk T. Steudle MICHIGAN DEPARTMENT OF TRANSPORTATION BUREAU OF HIGHWAY DEVELOPMENT STANDARD PLAN FOR Michigan Department of Transportation PREPARED BY DESIGN DIVISION APPROVED BY: DIRECTOR, BUREAU OF FIELD SERVICES ON-STREET PARKING ZONE MARKINGS DRAWN BY: CHECKED BY: LMF JGM APPROVED BY: DIRECTOR, BUREAU OF HIGHWAY DEVELOPMENT 01/20/12 F.H.W.A. APPROVAL 10/18/11 PLAN DATE PAVE-955-B SHEET 1 OF2

50 ACCESSIBLE RAMP 4" WHITE 2 MIN. RESERVED PARKING ONLY 2 MIN. R7-8 SIGN (R7-8P FOR VAN ACCESSIBLE) 4" WHITE ACCESSIBLE RAMP SIDEWALK 8 _ 4" WHITE 4" WHITE (TYP.) 22 MIN. 26 MAX. (TYP) OPTIONAL ACCESSIBLE PAVEMENT MARKING SYMBOL (SEE PAVE-956) 4" WHITE "X" (OPTIONAL) ACCESSIBLE MARKINGS INTERSECTION TYPE NO TRAFFIC CONTROL NO CROSSWALK NO TRAFFIC CONTROL WITH CROSSWALK TRAFFIC CONTROL PRESENT "Z"(FT) SEE SECTION OF THE MICHIGAN VEHICLE CODE FOR MORE INFORMATION. NOTES: 1. All parking zone markings shall be 4 inch white. 4 inch blue may supplement the white zone marking for an accessible stall. 2. For mid-block driveway, clearance from parking stall to the curb cut shall be 20 ft minimum. 3. The use of a yellow (or other color) painted curb to denote a no parking zone is optional, and shall only be used to supplement standard signs. 4. On-street parking for state trunk lines through municipalities shall be one of the three types illustrated. 5. Type II on-street parking zone markings shown this sheet, Type I or III may also be used. NOT TO SCALE MICHIGAN DEPARTMENT OF TRANSPORTATION BUREAU OF HIGHWAY DEVELOPMENT STANDARD PLAN 01/20/12 F.H.W.A. APPROVAL 10/18/11 PLAN DATE PAVE-955-B SHEET 2 OF2 NOTE: THE ORIGINAL SIGNED COPY IS KEPT ON FILE AT THE MICHIGAN DEPARTMENT OF TRANSPORTATION.

51

52

53

54

55

56

57 YIELD YIELD SCHOOL SCHOOL SCHOOL LEGEND (TYP.) W16-9P AHEAD (SEE PAVE-900 SHEET 1) S1-1 4" WHITE BROKEN LINE (TYP.) 4" DOUBLE YELLOW (TYP.) SPECIAL EMPHASIS CROSSWALK 24" WHITE STOP BAR (TYP.) (TO BE LOCATED FROM THE SIGNAL HEAD) 6 MIN. S1-1 AHEAD W16-9P SCHOOL SCHOOL MID-BLOCK SIGNALIZED SCHOOL CROSSING W16-9P AHEAD SCHOOL LEGEND (TYP.) (SEE PAVE-900 SHEET 1) SCHOOL SCHOOL SCHOOL LEGEND (TYP.) (SEE PAVE-900 SHEET 1) S1-1 AHEAD R1-5 W16-7P W16-9P SCHOOL S1-1 4" WHITE BROKEN LINE (TYP.) S1-1 6 MIN. 6 MIN. S1-1 W16-7P SPECIAL EMPHASIS CROSSWALK S1-1 SPECIAL EMPHASIS CROSSWALK W16-7P 4" DOUBLE YELLOW (TYP.) R1-5 4" YELLOW BROKEN LINE (TYP.) (SEE NOTE 3, SHEET 2) SCHOOL AHEAD S1-1 W16-9P SCHOOL SCHOOL AHEAD S1-1 W16-9P NON-SIGNALIZED SCHOOL CROSSING NON-SIGNALIZED SCHOOL CROSSING DEPARTMENT DIRECTOR Kirk T. Steudle MICHIGAN DEPARTMENT OF TRANSPORTATION BUREAU OF HIGHWAY DEVELOPMENT STANDARD PLAN FOR Michigan Department of Transportation PREPARED BY APPROVED BY: DIRECTOR, BUREAU OF FIELD SERVICES SCHOOL MARKINGS DESIGN DIVISION DRAWN BY: CHECKED BY: LMF JGM APPROVED BY: DIRECTOR, BUREAU OF HIGHWAY DEVELOPMENT 01/20/12 F.H.W.A. APPROVAL 10/18/11 PLAN DATE PAVE-960-B SHEET 1 OF2

58 SINGLE LANE APPROACH MULTI LANE APPROACH C L C L SCHOOL 9-8" 8 SCHOOL SCHOOL 9-8" 9-8" 8 NOTES: 1. Place 9 ft 8 inch SCHOOL marking for each lane. Omit legend in left turn or exclusive right turn lanes. 2. Pavement marking should not extend over into opposing lane. 3. Pavement lane line markings (passing, no passing zone) per existing markings or as directed by the Engineer. 4. Refer to PAVE-945 for stop bar, crosswalk and yield line marking details. NOT TO SCALE MICHIGAN DEPARTMENT OF TRANSPORTATION BUREAU OF HIGHWAY DEVELOPMENT STANDARD PLAN 01/20/12 F.H.W.A. APPROVAL 10/18/11 PLAN DATE PAVE-960-B SHEET 2 OF2 NOTE: THE ORIGINAL SIGNED COPY IS KEPT ON FILE AT THE MICHIGAN DEPARTMENT OF TRANSPORTATION.

59

60

61

62

63

64

65

66

67

68

69

70

71 6"SOLID WHITE "Z" "Z" 45^ 12" 6"SOLID WHITE REDUCTION W4-2R (BOTH SIDES) LANE ENDS MERGE LEFT W9-2 (RIGHT SIDE) D D D/4 MERGE MERGE MEDIAN 6" WHITE EDGE LINE ARROW AND MERGE 4" DOUBLE 6" YELLOW EDGE LINE LEGEND (OPTIONAL) SOLID YELLOW TAPER LANE ADDITION 6" WHITE EDGE LINE 4" BROKEN WHITE LINE D = ADVANCE WARNING DISTANCE (REFER TO TABLE 2C-4 OF MMUTCD FOR D VALUES) FOR "Y" VALUES SEE PAVE-945 SHEET 1 12" SOLID YELLOW 45^ PAVEMENT WIDTH REDUCTION CROSS-HATCH SPACING DOUBLE 4" SOLID YELLOW (TYP.) SEPARATOR "Y" POSTED SPEED LIMIT (MPH) 25 OR LESS 3O 35 4O 45 5O 55 "Z" (FT) DEPARTMENT DIRECTOR Kirk T. Steudle MICHIGAN DEPARTMENT OF TRANSPORTATION BUREAU OF HIGHWAY DEVELOPMENT STANDARD PLAN FOR Michigan Department of Transportation 2-LANE TO 4- LANE PREPARED BY DESIGN DIVISION APPROVED BY: DIRECTOR, BUREAU OF FIELD SERVICES TRANSITION PAVEMENT MARKINGS DRAWN BY: CHECKED BY: LMF JGM APPROVED BY: DIRECTOR, BUREAU OF HIGHWAY DEVELOPMENT 01/20/12 F.H.W.A. APPROVAL 10/18/11 PLAN DATE PAVE-970-B SHEET 1 OF1

72

73

74

INTERSECTION WITH RIGHT TURN TAPER

INTERSECTION WITH RIGHT TURN TAPER (TYP.) TAPER 4" BROKEN INTERSECTION WITH RIGHT TURN TAPER 4" SOLID WHITE 4" BROKEN ARROW & LEGEND MARKINGS (SEE NOTE 2) INTERSECTION WITH RIGHT TURN LANE Notes: 1. Paint intersection tapers greater than

More information

FREEWAY AND SERVICE ROAD CONNECTIONS

FREEWAY AND SERVICE ROAD CONNECTIONS EDGE LINE WHITE STOP BAR SERVICE ROAD EDGE LINE DOTTED LINE (5 MARK, 20 GAP) EDGE LINE 4" WHITE BROKEN LINE 12" WHITE DOTTED LINE (5 MARK, 20 GAP) LINE LINE EDGE LINE 300 SERVICE ROAD 1/2 X (500 MAX) CHANNELIZING

More information

FOR LOOP RAMPS-TAPERED DECELERATION LANE

FOR LOOP RAMPS-TAPERED DECELERATION LANE 6" WHITE DOTTED LINE: 5 MARK, 20 SKIP 6" WHITE CRYSTAL MONO-DIRECTIONAL MAIN LINE END (EVERY 50 FEET) 50 FEET BEYOND LAST CRYSTAL PAVEMENT MARKER 5 AMBER MONO-DIRECTIONAL 50 FEET BEFORE LAST CRYSTAL PAVEMENT

More information

ARLINGTON COUNTY PAVEMENT MARKING SPECIFICATIONS

ARLINGTON COUNTY PAVEMENT MARKING SPECIFICATIONS DEPARTMENT OF ENVIRONMENTAL SERVICES ARLINGTON COUNTY PAVEMENT MARKING SPECIFICATIONS MAY 2017 Table of Contents 1. General... 2 2. Design Criteria... 3 3. Marking Plan Preparation... 4 Exhibits... 5 MK

More information

CHAPTER 1 STANDARD PRACTICES

CHAPTER 1 STANDARD PRACTICES CHAPTER 1 STANDARD PRACTICES OBJECTIVES 1) Functions and Limitations 2) Standardization of Application 3) Materials 4) Colors 5) Widths and Patterns of Longitudinal Pavement Marking Lines 6) General Principles

More information

SIGN PLACEMENT-ELEVATION VIEW: FREEWAY (FORESLOPE) ROADSIDE SIGN LOCATIONS & SUPPORT SPACING MICHIGAN DEPARTMENT OF TRANSPORTATION (MIN.

SIGN PLACEMENT-ELEVATION VIEW: FREEWAY (FORESLOPE) ROADSIDE SIGN LOCATIONS & SUPPORT SPACING MICHIGAN DEPARTMENT OF TRANSPORTATION (MIN. 3' HINGE POINT EACH POST (TYP) (MIN.) (SAW CUT OR FUSE PLATE) EDGE OF FORESLOPE 4" STEEL COLUMN 6" WOOD POST THRU TRAVELED 7'MIN. SHOULDER LATERAL OFFSET (FORESLOPE) (VARIABLE) BREAKA POSTS THE LATERAL

More information

Figure 3B-1. Examples of Two-Lane, Two-Way Marking Applications

Figure 3B-1. Examples of Two-Lane, Two-Way Marking Applications Figure 3B-1. Examples of Two-Lane, Two-Way Marking Applications A - Typical two-lane, two-way marking with passing permitted in both directions B - Typical two-lane, two-way marking with no-passing zones

More information

Updated There is no park access points beyond the limit of the phase I work. roadway to be constructed Viewport has been along full limits of the park

Updated There is no park access points beyond the limit of the phase I work. roadway to be constructed Viewport has been along full limits of the park The signs will be installed as Temporary signs the color (Orange/White) have been added to the plans. Need to specify color to be used for stripes. Closures that may be in place for extended periods need

More information

FREEWAY, WEAVING LANE, AND SERVICE ROAD CONNECTIONS

FREEWAY, WEAVING LANE, AND SERVICE ROAD CONNECTIONS EDGE LINE WHITE STOP LINE SERVICE ROAD EDGE LINE 6" X 5 WHITE DOTTED LINE WITH 20 GAPS EDGE LINE 4" WHITE BROKEN LINE EDGE LINE 1/3 Y v SERVICE ROAD Y 900 X ( 5 0 12" SOLID WHITE CHANNELIZING LINE X EDGE

More information

CHAPTER 6H. TYPICAL APPLICATIONS

CHAPTER 6H. TYPICAL APPLICATIONS 2006 Edition Page 6H-1 CHAPTER 6H. TYPICAL APPLICATIONS Section 6H.01 Typical Applications Support: Whenever the acronym TTC is used in this Chapter, it refers to temporary traffic control. Standard: The

More information

Including Revision 1 dated May 2012 and Revision 2 dated May 2012

Including Revision 1 dated May 2012 and Revision 2 dated May 2012 Including Revision 1 dated May 2012 and Revision 2 dated May 2012 Page 634 2009 Edition Notes for Figure 6H-1 Typical pplication 1 Work eyond the Shoulder 1. If the work space is in the median of a divided

More information

Appendix Work Zone Traffic Control

Appendix Work Zone Traffic Control ppendix Work Zone Traffic Control The purpose of this appendix is to present basic guidelines for work zone traffic control and to supplement the Highway Work Zone Safety Checklist. This appendix presents

More information

Updated There is no park access roadway to be constructed points beyond the limit of along full limits of the park's the phase I work. Phase 1. Revise

Updated There is no park access roadway to be constructed points beyond the limit of along full limits of the park's the phase I work. Phase 1. Revise The signs will be installed as Temporary signs the color (Orange/White) have been added to the plans. Need to specify color to be used for stripes. Closures that may be in place for extended periods need

More information

PERMANENT PAVEMENT MARKING PLAN

PERMANENT PAVEMENT MARKING PLAN PERMANENT PAVEMENT MARKING PLAN GENERAL INFORMATION: NOTES & GUIDELINES POLY PREFORM INLAY APPLICATION: PERMANENT PAVEMENT MARKING PLAN INDEX THE ENGINEER S INVOLVEMENT IN THE APPLICATION OF THE MATERIAL

More information

CHAPTER 6H. TYPICAL APPLICATIONS

CHAPTER 6H. TYPICAL APPLICATIONS Section 6H.01 Typical Applications Support: CHAPTER 6H. TYPICAL APPLICATIONS Chapter 6G contains discussions of typical temporary traffic control activities. Chapter 6H presents typical applications for

More information

CW20-1D 48" X 48" (Flags- See note 1) G " X 24" (See note 2)

CW20-1D 48 X 48 (Flags- See note 1) G  X 24 (See note 2) CK: DW: CK: x for mph or less mph devices may be omitted if the work area is a minimum of from the nearest traveled way. (See notes 4 & 5) x for mph or less Work Space mph x for mph or less mph (See notes

More information

Homework Module 7.01 Drivers Manual Study Questions

Homework Module 7.01 Drivers Manual Study Questions Homework Module 7.01 Drivers Manual Study Questions Name: Date: Directions: Use the Oregon Driver Manual to answer each of the following questions. It is suggested that you underline or highlight each

More information

CHAPTER 3A. GENERAL PAGE CHAPTER 3B. PAVEMENT AND CURB MARKINGS PAGE

CHAPTER 3A. GENERAL PAGE CHAPTER 3B. PAVEMENT AND CURB MARKINGS PAGE Virginia Supplement to the 2009 MUTCD Revision 1 Page TC-3-1 PART 3. MARKINGS CHAPTER 3A. GENERAL PAGE Section 3A.01 Functions and Limitations Section 3A.02 Standardization of Application Section 3A.03

More information

Developed by: The American Traffic Safety Services Association (ATSSA) 15 Riverside Parkway, Suite 100 Fredericksburg, VA

Developed by: The American Traffic Safety Services Association (ATSSA) 15 Riverside Parkway, Suite 100 Fredericksburg, VA Addendum Developed by: The American Traffic Safety Services Association (ATSSA) 15 Riverside Parkway, Suite 100 Fredericksburg, VA 22406-1022 800-272-8772 This material is based upon work supported by

More information

ATTACHMENT NO. 11. RRLRT No. 2. Railroad / Light Rail Transit Technical Committee TECHNICAL COMMITTEE: Busway Grade Crossings STATUS/DATE OF ACTION

ATTACHMENT NO. 11. RRLRT No. 2. Railroad / Light Rail Transit Technical Committee TECHNICAL COMMITTEE: Busway Grade Crossings STATUS/DATE OF ACTION ATTACHMENT NO. 11 RRLRT No. 2 TECHNICAL COMMITTEE: TOPIC: Railroad / Light Rail Transit Technical Committee Busway Grade Crossings STATUS/DATE OF ACTION RRLRT TC Draft: 06/23/2011 RRLRT TC Approval: 06/27/2014

More information

PERMANENT PAVEMENT MARKING PLAN

PERMANENT PAVEMENT MARKING PLAN PERMANENT PLAN GENERAL INFORMATION: TES & GUIDELINES POLY PREFORM INLAY APPLICATION: PERMANENT PAVEMENT MARKING PLAN INDEX THE ENGINEER'S INVOLVEMENT IN THE APPLICATION OF THE MATERIAL SHALL BE LIMITED

More information

City of Albert Lea Policy and Procedure Manual 4.10 ALBERT LEA CROSSWALK POLICY

City of Albert Lea Policy and Procedure Manual 4.10 ALBERT LEA CROSSWALK POLICY 4.10 ALBERT LEA CROSSWALK POLICY PURPOSE: Pedestrian crosswalks are an integral part of our transportation infrastructure. To be effective and promote safety, marked crosswalks must be installed after

More information

PERMANENT PAVEMENT MARKING PLAN

PERMANENT PAVEMENT MARKING PLAN TITLE: CROSSWALK BLOCK WHITEPOLY PREFORM GENERAL INFORMATION: PERMANENT PAVEMENT MARKING PLAN NOTES & GUIDELINES POLY PREFORM INLAY APPLICATION: PERMANENT PAVEMENT MARKING PLAN INDEX THE ENGINEER S INVOLVEMENT

More information

Designing for Pedestrian Safety. Alabama Department of Transportation Pre-Construction Conference May 2016

Designing for Pedestrian Safety. Alabama Department of Transportation Pre-Construction Conference May 2016 Designing for Pedestrian Safety Alabama Department of Transportation Pre-Construction Conference May 2016 1 Designing for Pedestrians Marking Crosswalks at Signalized intersections High Visibility Markings

More information

TRAFFIC LINE MANUAL Edition Revision 1 June 2012 TRAFFIC-ROADWAY SECTION

TRAFFIC LINE MANUAL Edition Revision 1 June 2012 TRAFFIC-ROADWAY SECTION TRAFFIC LINE MANUAL 2011 Edition Revision 1 June 2012 TRAFFIC-ROADWAY SECTION TABLE OF CONTENTS Foreword...iv Section A: General Principles A-1 Functions and Limitations... 1 A-2 Colors... 1 A-3 Colored

More information

STREET and UTILITY REPAIRS WORK AREA PROTECTION GUIDE

STREET and UTILITY REPAIRS WORK AREA PROTECTION GUIDE STREET and UTILITY REPAIRS WORK AREA PROTECTION GUIDE May 2006 Street and Utility Repairs Work Area Protection Guide TABLE OF CONTENTS 1. Introduction... 1 2. Typical Applications... 11 2.1 Use of Hand-Signaling

More information

General References Definitions. (1) Design Guidance. (2) Supporting Information

General References Definitions. (1) Design Guidance. (2) Supporting Information Chapter 1240 Turning Roadways 1240.01 General 1240.02 References 1240.03 Definitions 1240.04 Turning Roadway Widths 1240.05 Documentation 1240.01 General The roadway on a curve may need to be widened to

More information

TRAFFIC LINE MANUAL. June 2011 TRAFFIC-ROADWAY SECTION

TRAFFIC LINE MANUAL. June 2011 TRAFFIC-ROADWAY SECTION TRAFFIC LINE MANUAL TRAFFIC-ROADWAY SECTION TABLE OF CONTENTS Foreword...iv Section A: General Principles A-1 Functions and Limitations... 1 A-2 Colors... 1 A-3 Colored Pavements... 1 A-4 Functions, Widths,

More information

Section 3A.04 Colors. Section 3B.10 Approach Markings for Obstructions

Section 3A.04 Colors. Section 3B.10 Approach Markings for Obstructions Section 3A.04 Colors Markings shall be yellow, white, red, or blue, or purple. The colors for markings shall conform to the standard highway colors. Black in conjunction with one of the above colors shall

More information

Attachment No. 4 Approved by National Committee Council

Attachment No. 4 Approved by National Committee Council Attachment No. 4 Approved by National Committee Council The Signals Technical Committee distributed a technical committee recommendation to sponsors concerning pedestrian hybrid beacons following the January

More information

City of Margate, Florida. Neighborhood Traffic Management Manual

City of Margate, Florida. Neighborhood Traffic Management Manual City of Margate, Florida Neighborhood Traffic Management Manual Table of Contents Page No. I. INTRODUCTION... 1 II. TRAFFIC CALMING REQUEST AND PROCESSING PROCEDURES... 2 1. COMPLETE AND SUBMIT PROJECT

More information

Oregon Supplement to the Manual on Uniform Traffic Control Devices. Adopted July 2005 by OAR

Oregon Supplement to the Manual on Uniform Traffic Control Devices. Adopted July 2005 by OAR Oregon Supplement to the Manual on Uniform Traffic Control Devices Adopted July 2005 by OAR 734-020-0005 2003 Edition Oregon Supplement to the MUTCD Page 2 INTRODUCTION Traffic control devices installed

More information

Chapter V TRAFFIC CONTROLS. Tewodros N.

Chapter V TRAFFIC CONTROLS. Tewodros N. Chapter V TRAFFIC CONTROLS www.tnigatu.wordpress.com tedynihe@gmail.com Lecture Overview Traffic markings Longitudinal markings Transverse markings Object markers and delineator Traffic signs Regulatory

More information

Identify the letter of the choice that best completes the statement or answers the question.

Identify the letter of the choice that best completes the statement or answers the question. Chapter 02 - Practice Questions Multiple Choice Identify the letter of the choice that best completes the statement or answers the question. 1) No-parking zones often are near a. fire hydrants, curves,

More information

California Manual on Uniform Traffic Control Devices

California Manual on Uniform Traffic Control Devices California Manual on Uniform Traffic Control Devices FHWA s MUTCD 2009 Edition as amended for use in California 2012 Edition State of California Business, Transportation and Housing Agency Department of

More information

Sign Design Manual (TEM 295-2)

Sign Design Manual (TEM 295-2) TEMPORARY TRAFFIC CONTROL SIGNS INDEX Regulatory Signs R1-1 R-1 STOP R1-2 R-2 YIELD R1-2a R-2A TO ONCOMING TRAFFIC R4-1 R-33 DO NOT PASS R4-2 R-34 PASS WITH CARE R4-3 R-35 SLOWER TRAFFIC KEEP RIGHT R4-9

More information

MUNICIPALITY OF ANCHORAGE TRAFFIC CODE UPDATE MASTER RECOMMENDATION REPORT: 9.14, 9.16, 9.18

MUNICIPALITY OF ANCHORAGE TRAFFIC CODE UPDATE MASTER RECOMMENDATION REPORT: 9.14, 9.16, 9.18 MUNICIPALITY OF ANCHORAGE TRAFFIC CODE UPDATE MASTER RECOMMENDATION REPORT: 9.14, 9.16, 9.18 Report Date: Please send all recommendations for update to Shane Locke (343-8413, lockesr@muni.org) 8-Apr-09

More information

RE: 2007 NPA Text (Clean Version)

RE: 2007 NPA Text (Clean Version) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 21 20 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 RE: 2007 NPA Text (Clean Version) P. 230, Lines 29-30 SECTION 3B.04 White Lane Line Pavement Markings

More information

CHAPTER 2G. PREFERENTIAL AND MANAGED LANE SIGNS

CHAPTER 2G. PREFERENTIAL AND MANAGED LANE SIGNS 2011 Edition - Revision 2 Page 275 Section 2G.01 Scope CHAPTER 2G. PREFERENTIAL AND MANAGED LANE SIGNS 01 Preferential lanes are lanes designated for special traffic uses such as high-occupancy vehicles

More information

Cycle Track Design Best Practices Cycle Track Sections

Cycle Track Design Best Practices Cycle Track Sections Design Best Practices Sections It is along street segments where the separation and protection methods of cycle tracks offer more comfort than conventional bicycle lanes, and are more attractive to a wide

More information

TURN ARROW. LANE-REDUCTION ARROW (RIGHT) (For Left Lane, Use Mirror Image) LANE-REDUCTION ARROW MARKING DETAIL

TURN ARROW. LANE-REDUCTION ARROW (RIGHT) (For Left Lane, Use Mirror Image) LANE-REDUCTION ARROW MARKING DETAIL Center of Lane TURN ARROW (Right Arrow Opposite) 8.00' 14.85' 5.67' 5.67' 4.36' 2.57' Center of Lane 6.37' 2.85' 7.50' 10.50' 18' W4-2R d/4 Speed (S) Lane Width (W) (MPH) (FT) 25 30 35 40 Lane-Reduction

More information

RAILROAD CROSSING AT TWO LANE ROADWAY

RAILROAD CROSSING AT TWO LANE ROADWAY 24" WHITE STOP LINE PEPENDICULA TO OADWAY CENTELINE AND APPOXIMATELY 15 FEET FOM NEAEST AIL MEASUED ALONG OADWAY CENTELINE O EDGE OF PAVEMENT WHICHEVE IS THE SHOTE DISTANCE AILOAD GADE COSSING DEVICE 15

More information

Tract or Parcel Project Name PCN Checked By Date

Tract or Parcel Project Name PCN Checked By Date Tract or Parcel Project Name PCN Checked By Date City of Escondido Public Works Department Signing & Striping Plan Review Checklist The following checklist is a guideline for new CIP and development construction

More information

Traffic Signs and Signals

Traffic Signs and Signals CHAPTER FOUR Traffic Signs and Signals Traffic signs control traffic flow, making streets and highways safer for drivers, bicyclists and pedestrians. These signs, which are posted by the Indiana Department

More information

Attachment No. 13. National Committee on Uniform Traffic Control Devices RWSTC RECOMMENDATION FOLLOWING SPONSOR COMMENTS

Attachment No. 13. National Committee on Uniform Traffic Control Devices RWSTC RECOMMENDATION FOLLOWING SPONSOR COMMENTS 1 2 3 4 Attachment No. 13 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 RWSTC agenda item IV. 2 June 2011 National Committee on Uniform

More information

Traffic Signs and Markings. Instructor: Dr. Yahya Sarraj Associate Prof. Of Transportation

Traffic Signs and Markings. Instructor: Dr. Yahya Sarraj Associate Prof. Of Transportation and Markings Instructor: Dr. Yahya Sarraj Associate Prof. Of Transportation Definition; A traffic sign is defined as a device mounted on a fixed or portable support whereby a specific message is conveyed

More information

PART 9. TRAFFIC CONTROLS FOR BICYCLE FACILITIES TABLE OF CONTENTS

PART 9. TRAFFIC CONTROLS FOR BICYCLE FACILITIES TABLE OF CONTENTS 2006 Edition Page TC9-1 PART 9. TRAFFIC CONTROLS FOR BICYCLE FACILITIES TABLE OF CONTENTS SECTIONS CHAPTER 9A. Section 9A.01 Section 9A.02 Section 9A.03 Section 9A.04 Section 9A.05 Section 9A.06 Section

More information

Traffic Control Devices

Traffic Control Devices 533372 Highway Engineering Traffic Control Devices Traffic Control Devices o The media by which traffic engineers communicate with drivers o Every traffic law, regulation, or operating instruction must

More information

Guidance for Installation of Pedestrian Crosswalks on Michigan State Trunkline Highways

Guidance for Installation of Pedestrian Crosswalks on Michigan State Trunkline Highways Guidance for Installation of Pedestrian Crosswalks on Michigan State Trunkline Highways Michigan Department of Transportation July 7, 2014 Engineering Manual Preamble This manual provides guidance to administrative,

More information

The 2009 Manual on Uniform Traffic Control Devices (MUTCD) (Brief) Highlights for Arizona Practitioners. Arizona Department of Transportation

The 2009 Manual on Uniform Traffic Control Devices (MUTCD) (Brief) Highlights for Arizona Practitioners. Arizona Department of Transportation The 2009 Manual on Uniform Traffic Control Devices (MUTCD) (Brief) Highlights for Arizona Practitioners Arizona Department of Transportation New 2009 MUTCD 9 Parts (down from 10 in 2003) 816 pages (up

More information

MEMORANDUM. Date: 9/13/2016. Citywide Crosswalk Policy

MEMORANDUM. Date: 9/13/2016. Citywide Crosswalk Policy MEMORANDUM Date: 9/13/2016 Re: Citywide Crosswalk Policy Foreword Through the s Circulation Element and Complete Streets Policy, it is the City s goal to promote walking trips and provide safe facilities

More information

SECTION 12 ROAD MARKINGS AND DELINEATION

SECTION 12 ROAD MARKINGS AND DELINEATION SECTION 12 ROAD MARKINGS AND DELINEATION (Blank Page) MANUAL OF TRAFFIC SIGNS AND MARKINGS - Part III: Motorways and Expressways 12-1 12.1 GENERAL 12.1.1 INTRODUCTION The markings and delineation details

More information

(This page left intentionally blank)

(This page left intentionally blank) (This page left intentionally blank) 2011 Edition- Revision 2 Page 813 CHAPTER 9A. GENERAL Section 9A.01 Requirements for Bicyclist Traffic Control Devices 01 General information and definitions concerning

More information

MEMORANDUM TERESA MCCLISH, COMMUNITY DEVELOPMENT DIRECTOR SUBJECT: CONSIDERATION OF RESTRICTING PARKING ADJACENT TO 170 AND 171 BRISCO ROAD

MEMORANDUM TERESA MCCLISH, COMMUNITY DEVELOPMENT DIRECTOR SUBJECT: CONSIDERATION OF RESTRICTING PARKING ADJACENT TO 170 AND 171 BRISCO ROAD MEMORANDUM TO: FROM: BY: TRAFFIC COMMISSION TERESA MCCLISH, COMMUNITY DEVELOPMENT DIRECTOR MATT HORN, CITY ENGINEER SUBJECT: CONSIDERATION OF RESTRICTING PARKING ADJACENT TO 170 AND 171 BRISCO ROAD DATE:

More information

Pavement Markings (1 of 3)

Pavement Markings (1 of 3) Pavement Markings (1 of 3) DESCRIPTION AND DEFINITION Disadvantages Relatively high cost (over typical Crash reduction as yet unknown painted edge line) No tactile effect The STOP AHEAD pavement marking

More information

Multimodal Design Guidance. October 23, 2018 ITE Fall Meeting

Multimodal Design Guidance. October 23, 2018 ITE Fall Meeting Multimodal Design Guidance October 23, 2018 ITE Fall Meeting Introductions Jessica Wilson TDOT Multimodal Division Office of Multimodal Planning Program Supervisor Jessica.L.Wilson@tn.gov Ali Hangul TDOT

More information

An Overview of the 2009 MUTCD

An Overview of the 2009 MUTCD An Overview of the 2009 MUTCD CLRP Highway School June 7, 2010 Sally S. Olsen, P.E. New York State Department of Transportation solsen@dot.state.ny.us 518-457-5690 Goals for this Session Review the changes

More information

ADDENDUM NUMBER ONE (1) For

ADDENDUM NUMBER ONE (1) For ADDENDUM NUMBER ONE (1) For OCCOQUAN REGIONAL PARK MULTIPURPOSE TRAIL Recreation Trails Program (RTP) Federal Highway Administration (FHWA) CFDA Number: 20.219 State Project Number: VRT-301 In Lorton,

More information

Pedestrian Hybrid Beacons

Pedestrian Hybrid Beacons Pedestrian Hybrid Beacons Ronnie Bell Austin Transportation Department & NCUTCD Signals Technical Committee Pedestrian WHAT? What is it and why are we talking about it? FHWA issued new MUTCD - December

More information

Addendum to SDDCTEA Pamphlet 55 17: Better Military Traffic Engineering Revision 1 Effective: 24 Aug Crosswalk Guidelines

Addendum to SDDCTEA Pamphlet 55 17: Better Military Traffic Engineering Revision 1 Effective: 24 Aug Crosswalk Guidelines Addendum to SDDCTEA Pamphlet 55 17: Better Military Traffic Engineering Revision 1 Effective: 24 Aug 2017 Crosswalk Guidelines Warrants for Uncontrolled Crosswalk Locations Crosswalks at Midblock Locations

More information

2009 Manual on Uniform Traffic Control Devices

2009 Manual on Uniform Traffic Control Devices 2009 Manual on Uniform Traffic Control Devices Tori Brinkly, PE Highway Safety Engineer WFL-FHWA April 20, 2010 Paragraphs are numbered. Standard Statements are bolded. Guidance statements are italicized.

More information

Video Review: Signs, Signals and Markings Video Review 4.1

Video Review: Signs, Signals and Markings Video Review 4.1 Video Review: Signs, Signals and Markings Video Review 4.1 Video 4.1 Review: 1. What must you do before turning left at an intersection with a green light? 2. What do flashing yellow lights mean? 3. At

More information

Name Roads Station Distance Miles

Name Roads Station Distance Miles Name Roads Station Distance Miles Saw Mill to San Mateo 62+00 to 135+00 1.382575758 San Mateo to Alamo 135+00 to 261+50 2.395833333 Alamo to NM 599 261+50 to 305+00 0.823863636 Sidewalk and Curb Only Rabbit

More information

Edge Wedge 150 lb/ft 3

Edge Wedge 150 lb/ft 3 Page 1 of 14 Page 2 of 14 6443 OL 4774 Mill 22,098 Edge Wedge (Rock) @ 150 lb/ft 3 Page 3 of 14 Edge Wedge (Rock) @ 150 lb/ft 3 Page 4 of 14 Edge Wedge (Rock) @ 150 lb/ft 3 Page 5 of 14 Page 6 of 14 Page

More information

CHAPTER 2: SIGNALS, SIGNS AND PAVEMENT MARKINGS

CHAPTER 2: SIGNALS, SIGNS AND PAVEMENT MARKINGS CHAPTER 2: SIGNALS, SIGNS AND PAVEMENT MARKINGS This chapter provides the information you need to know about Pennsylvania roadways. It covers: Signals Signs Pavement Markings SIGNALS Traffic signals are

More information

USER GUIDE FOR R1-6 GATEWAY TREATMENT

USER GUIDE FOR R1-6 GATEWAY TREATMENT USER GUIDE FOR R1-6 GATEWAY TREATMENT FOR PEDESTRIAN CROSSINGS Prepared by: Western Michigan University T.Y. Lin International December 2016 Acknowledgements Michigan Department of Transportation MDOT

More information

Active Transportation Facility Glossary

Active Transportation Facility Glossary Active Transportation Facility Glossary This document defines different active transportation facilities and suggests appropriate corridor types. Click on a facility type to jump to its definition. Bike

More information

Lesson #7. Review: Lesson #6 Destination: Eureka. SKILLS A. Protected Left Turns

Lesson #7. Review: Lesson #6 Destination: Eureka. SKILLS A. Protected Left Turns SKILLS A. Protected Left Turns Lesson #7 Review: Lesson #6 Destination: Eureka 1. The only time you are protected from oncoming traffic is when you have a green left turn arrow 2. Oncoming traffic has

More information

USER GUIDE FOR R1-6 GATEWAY TREATMENT

USER GUIDE FOR R1-6 GATEWAY TREATMENT USER GUIDE FOR R1-6 GATEWAY TREATMENT FOR PEDESTRIAN CROSSINGS Prepared by: Western Michigan University T.Y. Lin International December 2016 Updated May 2018 Acknowledgements Michigan Department of Transportation

More information

APPENDIX F DESIGN STANDARDS REVIEW SUMMARIES AND REDLINES

APPENDIX F DESIGN STANDARDS REVIEW SUMMARIES AND REDLINES APPENDIX F DESIGN STANDARDS REVIEW SUMMARIES AND REDLINES 092775000 Carson City ADA Transition Plan 2015-03-25 Carson City ADA Transition Plan.docx March 2015 APPENDIX This page intentionally left blank.

More information

Pedestrians and Bicyclists. Bruce Friedman and Scott Wainwright FHWA MUTCD Team

Pedestrians and Bicyclists. Bruce Friedman and Scott Wainwright FHWA MUTCD Team Impact of the New MUTCD on Pedestrians and Bicyclists Bruce Friedman and Scott Wainwright FHWA MUTCD Team Development of the 2009 MUTCD NPA published in the Federal Register on January 2, 2008 Received

More information

Minnesota Manual on Uniform Traffic Control Devices

Minnesota Manual on Uniform Traffic Control Devices Minnesota Manual on Uniform Traffic Control Devices MN MUTCD January 2014 MINNESOTA MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES MN MUTCD January 2014 Minnesota Department of Transportation Office of Traffic,

More information

2017 Changes to the 2011 MMUTCD January 2017

2017 Changes to the 2011 MMUTCD January 2017 2017 Changes to the 2011 MMUTCD January 2017 The design for the Weight Limit symbol sign (R12-5) has been modified to show a threeunit vehicle as the third line of the regulatory weight limit sign. This

More information

BI-DIRECTIONALS FREE-ACCESS

BI-DIRECTIONALS FREE-ACCESS BI-DIRECTIONALS FREE-ACCESS Dimensions may vary depending on design vehicle and turning movements. See GEO-650-Series for addtional details. SPECIAL Special situations, i.e., See Notes 4 & 5 wide streets,

More information

TRANSMITTAL LETTER. Revision to Publication 149, Chapter 20 (Criteria for the Design of Traffic Signal Supports) - March 2009 Edition

TRANSMITTAL LETTER. Revision to Publication 149, Chapter 20 (Criteria for the Design of Traffic Signal Supports) - March 2009 Edition OS-299 (7-08) TRANSMITTAL LETTER PUBLICATION: Publication 149 - Traffic Signal Design Handbook DATE: 10/14/10 SUBJECT: Revision to Publication 149, Chapter 20 (Criteria for the Design of Traffic Signal

More information

Ottawa Beach Road Study

Ottawa Beach Road Study Ottawa Beach Road Study Prepared For: Park Township September 30, 2014 Project No. G140303 OTTAWA BEACH ROAD STUDY PREPARED FOR: PARK TOWNSHIP SEPTEMBER 30, 2014 PROJECT NO. G140303 TABLE OF CONTENTS 1.0

More information

PERMANENT PAVEMENT MARKING PLAN

PERMANENT PAVEMENT MARKING PLAN PERMANENT PAVEMENT MARKING PLAN NOTES & GUIDELINES PERMANENT PAVEMENT MARKING PLAN INDEX GENERAL INMATION: EPOXY: 0 PERM PAVEMENT MARKING TITLE AND TABULATION 0-0 DETAILS PMSamplePlan.typicals PLOTTED/REVISED:0/8/206

More information

Appendix A-6. Signing and Marking Guidelines. Number Name Pages. 2B.06 Signing at T Intersections 1. 2B.12 Pedestrians in Crosswalk 1

Appendix A-6. Signing and Marking Guidelines. Number Name Pages. 2B.06 Signing at T Intersections 1. 2B.12 Pedestrians in Crosswalk 1 MARYLAND STATE HIGHWAY ADMINISTRATION Office of Traffic and Safety Traffic Engineering Design Division Traffic Control Devices Design Manual Appendix A-6 Signing and Marking Guidelines Number Name Pages

More information

NCUTCD Proposal for Changes to the Manual on Uniform Traffic Control Devices

NCUTCD Proposal for Changes to the Manual on Uniform Traffic Control Devices 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 NCUTCD Proposal for Changes to the Manual on Uniform Traffic Control Devices Attachment No. 2 Item No.: 15A.EC.01

More information

Signs. signs, signals and road markings. in this chapter

Signs. signs, signals and road markings. in this chapter 3 signs, signals and road markings in this chapter Signs regulatory signs school, playground and crosswalk signs lane use signs turn control signs parking signs reserved lane signs warning signs object

More information

Ohio Department of Transportation Edition of the OMUTCD It s Here!

Ohio Department of Transportation Edition of the OMUTCD It s Here! Ohio Department of Transportation John R. Kasich, Governor Jerry Wray, Director 2012 Edition of the OMUTCD It s Here! June 6, 2012 Here are reasons why we have a Manual of Uniform Traffic Control Devices

More information

Driveway Design Criteria

Driveway Design Criteria Design Manual Chapter 5 - Roadway Design 5L - Access Management 5L-4 Driveway Design Criteria A. General For efficient and safe operations, access drives and minor public street intersections can be improved

More information

BLUETT TRAFFIC CALMING ON-SITE MEETING #2 DISCUSSION SUMMARY

BLUETT TRAFFIC CALMING ON-SITE MEETING #2 DISCUSSION SUMMARY BLUETT TRAFFIC CALMING ON-SITE MEETING #2 DISCUSSION SUMMARY Date: Wednesday, April 11, 2018 Time: 5:30 p.m. to 7:30 p.m. Location: Clague Middle School parking lot Attendees: Public Present: 42 Council

More information

CONSTRUCTION ENCROACHMENT PERMIT APPLICATION AND PROCESSING INSTRUCTIONS

CONSTRUCTION ENCROACHMENT PERMIT APPLICATION AND PROCESSING INSTRUCTIONS 'HYHORSPHQW (QJLQHHULQJ 5LFKDUGV %OYG UG )ORRU 6DFUDPHQWR &$ Phone: 916-808-8300 Fax: 916-808-1984 (QJLQHHULQJ 6HUYLFHV 'LYLVLRQ CONSTRUCTION ENCROACHMENT PERMIT APPLICATION AND PROCESSING INSTRUCTIONS

More information

INTERSECTIONS AT GRADE INTERSECTIONS

INTERSECTIONS AT GRADE INTERSECTIONS INTERSECTIONS 1 AT GRADE INTERSECTIONS INTERSECTIONS INTERSECTIONS = INTERRUPTED FACILITIES Definitions and key elements An intersection is defined as an area where two or more roadways join or cross.

More information

National Committee on Uniform Traffic Control Devices RWSTC RECOMMENDATION FOLLOWING SPONSOR COMMENTS

National Committee on Uniform Traffic Control Devices RWSTC RECOMMENDATION FOLLOWING SPONSOR COMMENTS 1 2 3 ATTACHMENT NO. 1 RW No. 1, Jan 2012 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 National Committee on Uniform Traffic Control Devices

More information

REVISION 2 VIRGINIA WORK AREA PROTECTION MANUAL. Ginger Quinn & Paul Kelley April 11, 2018

REVISION 2 VIRGINIA WORK AREA PROTECTION MANUAL. Ginger Quinn & Paul Kelley April 11, 2018 REVISION 2 VIRGINIA WORK AREA PROTECTION MANUAL Ginger Quinn & Paul Kelley April 11, 2018 ADA & District Traffic Engineer Added in various sections Work Zone Pedestrian and Bicycle Guidance document VDOT

More information

Chapter 2: Standards for Access, Non-Motorized, and Transit

Chapter 2: Standards for Access, Non-Motorized, and Transit Standards for Access, Non-Motorized, and Transit Chapter 2: Standards for Access, Non-Motorized, and Transit The Washtenaw County Access Management Plan was developed based on the analysis of existing

More information

2003 Edition Page 2B-1

2003 Edition Page 2B-1 2003 Edition Page 2B-1 CHAPTER 2B. REGULATORY SIGNS Section 2B.01 Application of Regulatory Signs Regulatory signs shall be used to inform road users of selected traffic laws or regulations and indicate

More information

Chapter 2B. REGULATORY SIGNS

Chapter 2B. REGULATORY SIGNS Chapter 2B. REGULATORY SIGNS TABLE OF CONTENTS Chapter 2B. Regulatory Signs Page Section 2B.1 Application of Regulatory Signs............................................ 2B-1 2B.2 Design of Regulatory

More information

Section 9A.07 Meaning of Standard, Guidance, Option, and Support

Section 9A.07 Meaning of Standard, Guidance, Option, and Support 2012 Edition Page 895 PART 9. TRAFFIC CONTROLS FOR BICYCLE FACILITIES CHAPTER 9A. GENERAL Section 9A.01 Requirements for Bicyclist Traffic Control Devices 01 General information and definitions concerning

More information

Controlled. Semi-Controlled PAGE 01 CHAPTER 12 INTERSECTIONS

Controlled. Semi-Controlled PAGE 01 CHAPTER 12 INTERSECTIONS PAGE 01 CHAPTER 12 INTERSECTIONS You will cross many intersections while driving. Intersections are especially dangerous because vehicles are crossing each other s driving path. Many crashes happen at

More information

1. Places where one road meets or crosses another are called intersections. F

1. Places where one road meets or crosses another are called intersections. F Intersections STUDY GUIDE OR CHAPTER 10 LESSON 1 Basic Intersections A. or each sentence below, circle T if the statement is true and if it is false. Correct each false 1. Places where one road meets or

More information

Road Markings. Lecture Notes in Transportation Systems Engineering. Prof. Tom V. Mathew. 1 Overview 1. 2 Classification 2

Road Markings. Lecture Notes in Transportation Systems Engineering. Prof. Tom V. Mathew. 1 Overview 1. 2 Classification 2 Road Markings Lecture Notes in Transportation Systems Engineering Prof. Tom V. Mathew Contents 1 Overview 1 2 Classification 2 3 Longitudinal markings 2 3.1 Center line.....................................

More information

Fundamentals of Traffic Control Devices

Fundamentals of Traffic Control Devices Fundamentals of Traffic Control Devices Traffic Engineering & Operations October 8, 2014 Raj Ponnaluri, Angela Wilhelm, and Christopher Lewis Agenda Agenda Signs Pavement Markings Signals Traffic Operations

More information

Presented By: Jim Roth, P.E. Signing Engineer Office of Traffic Engineering Ohio Department of Transportation 1980 West Broad Street Columbus, Ohio

Presented By: Jim Roth, P.E. Signing Engineer Office of Traffic Engineering Ohio Department of Transportation 1980 West Broad Street Columbus, Ohio 1 Presented By: Jim Roth, P.E. Signing Engineer Office of Traffic Engineering Ohio Department of Transportation 1980 West Broad Street Columbus, Ohio 43223 (614) 752-0438 Fax: (614) 644-8199 jim.roth@dot.state.oh.us

More information

REVOCABLE PERMIT FOR STREET BANNER APPLICATION PACKAGE

REVOCABLE PERMIT FOR STREET BANNER APPLICATION PACKAGE Development Engineering 300 Richards Blvd., 3rd Floor Sacramento, CA 95811 Engineering Services Division REVOCABLE PERMIT FOR STREET BANNER APPLICATION PACKAGE Phone: 916-808-8300 Fax: 916-808-1984 Preparation

More information

November 2012: The following Traffic and Safety Notes were revised:

November 2012: The following Traffic and Safety Notes were revised: CHANGE LIST for MDOT Traffic and Safety, TRAFFIC AND SAFETY NOTES Located at http://mdotcf.state.mi.us/public/tands/plans.cfm JANUARY 2014: The following Traffic and Safety Note was added: Note 705A Angled

More information

California DMV Test. Mark the correct answers

California DMV Test. Mark the correct answers California DMV Test Mark the correct answers 1. When you leave your lane to pass another vehicle, you know you have enough room to return to your driving lane when you: Have passed the other vehicle's

More information

Page 1 of KA

Page 1 of KA Page 1 of 11 75-16 KA 5188-01 KA 5188-01 Page 2 of 11 (0+00-28+69) 14,664 SQYDS ROCK EDGE WEDGE 0+00-26+30 D = 0.083333' W = 2.0' 26+30-338+65 D = 0.25' W = 3.0' KA 5188-01 Page 3 of 11 28+69-338+65 (103,553

More information