1 28 VIRGINIA DEPARTMENT OF TRANSPORTATION \\ CULPEPER DISTRICT Route 245 over Broad Run. The recently replaced bridge links The Plains and other communities in northern Fauquier to Interstate 66.
2 PROJECT UPDATES FAUQUIER COUNTY The Schoolhouse Road project was finished in May, three months ahead of schedule. Recently Completed Rehabilitation of Route 245 over Broad Run VDOT completed work to the Route 245 (Old Tavern Road) bridge over Broad Run and reopened the roadway to traffic on April 7. The bridge, located south of The Plains, was built in 1936 and serves 3,500 vehicles daily. During the eight-month maintenance project, VDOT contractor McClain & Co., Inc. of Culpeper replaced the bridge s substandard deck and rehabilitated its abutments, requiring reduction of the roadway to a single lane. Twoway traffic was controlled with temporary traffic signals at each end of the project work zone. Route 17 Southbound Access Restriction VDOT closed access from the signalized Opal intersection at Frontage Route 1077 (Marsh Road) to Route 17 southbound on Dec. 2, A U-turn facility was constructed to redirect through motorists to the loop ramp for access to Route 17 southbound. The project was completed by staff of VDOT s Warrenton Residency for less than $100,000 and in approximately three weeks. Post-construction monitoring shows a desired decrease in backups in the left-turn lane at Opal, where rear-end and side-swipe crashes had become common. Route 661 Intersection Improvements VDOT contractor General Excavation Inc. of Warrenton completed this $1.74 million intersection improvement project on May 8, three months ahead of schedule. TRANSPORTATION UPDATE // FALL
3 Presented at public hearing in May, this rendering depicts a conceptual design for the Route 15/17/29 interchange at the south end of Warrenton. Construction began in early March to reconstruct the mile stretch of Schoolhouse Road near Cedar Lee Middle School to address safety concerns and provided improved pedestrian and bicycle access. VDOT realigned the east-west segment of Route 661 and installed stop signs to create a three-way stop. Sidewalks, crosswalks, and a shared-use path were also added to serve students walking to school. Under Construction Route 15/17/29 Median Closures in Opal CONTRACTOR: General Excavation Inc. of Warrenton CONTRACT AMOUNT: $1.7 million COMPLETION DATE: December 11, 2017 Construction began in mid-august on this Highway Safety Improvement Program-funded project to reduce the number of traffic conflicts along Route 15/27/29 north of Opal. This phase of construction, to be completed in mid- December, will focus on three crossovers near Quarles Truck Stop. Two crossovers will be closed and the third will be reconstructed to provide directional left-in, left-out access to the truck stop. Preliminary engineering on a second phase of the project is expected to begin in 2018 and will address a crossover near the East Coast service station and Clark Brothers Gun Shop, as well as additional locations to the north. In Design Route 15/17/29 Warrenton Interchange A public hearing was held May 9 on the project to replace the current signalized intersection of Route 15/17/29, Route 15/29 Business (Broadview Avenue) and Lord Fairfax Drive with a grade-separated facility. The improvements will enhance safety and traffic flow. An interchange was envisioned at this location when the Warrenton Bypass was constructed in the 1980s and was partially funded in The project received the balance 30 VIRGINIA DEPARTMENT OF TRANSPORTATION \\ CULPEPER DISTRICT
4 of its $26.9 million budget in 2016 through the first round of SMART SCALE. VDOT is advancing this project through the design-build method, in which a contractor is selected to both complete the final design and construct the project. A request for qualifications (RFQ) was advertised in late April, from which VDOT short-listed three teams. These teams received the request for proposals (RFQ) on July 18, with technical proposals due Dec. 7 and price proposals Jan. 11, VDOT expects to award a design-build contract in early 2018, with relocation of utilities, clearing and grading work beginning in late summer. The project will be completed in approximately two years. Rehabilitation of Route 17 Southbound Bridge over Norfolk Southern Railroad and Route 805 With this project, VDOT will replace the superstructure, including the deck and railings, of the Route 17 southbound bridge that spans the Norfolk Southern Railroad and Route 805 in Bealeton. It also involves widening the existing bridge abutments and piers and rebuilding the approaches. Construction will take place in phases to maintain a single southbound travel lane. Due to an unanticipated need for additional right of way, construction was pushed back one year to spring 2019 and will take 18 months to complete. Approximately 22,000 vehicles travel this segment of Route 17 daily. Warrenton Park and Ride Lot Expansion This $900,000 project, funded through the first round of SMART SCALE, will expand the existing Park and Ride lot at Route 15/29 and Route 605 (Colonial Road) north of Warrenton. Improvements include enhanced lighting, sidewalks and landscaping. Construction is expected to begin in October Minor Rehabilitation of the Remington Truss Bridge VDOT is planning to advertise a project in early 2018 to rehabilitate the Route 15 bridge that spans the Rappahannock River, connecting Remington to Culpeper County. The truss bridge, built in 1930, is structurally deficient with a significantly deteriorated deck and superstructure and is currently posted with an 11-ton weight limit. Broadview Avenue Access Management/Frost Avenue During the second round of SMART SCALE, $5.4 million in funding was allocated to the town of Warrenton for two access management projects along Broadview Avenue. Preliminary engineering is under way on both projects: $2.6 million to create safer conditions for turning vehicles and add bike lanes along Broadview Avenue $2.8 million to make improvements at the intersection of Broadview Avenue, Frost and West Shirley avenues Whiting Road Railroad Crossing Upgrades With this $2 million project, VDOT proposes to construct a segment of Route 622 (Whiting Road) across the Norfolk Southern Railroad for access to the Route 17/66 Industrial Park. After several years with a deficit, additional state money was allocated in July to bring the project to full funding, and design work and coordination with the railroad company has resumed. Construction is tentatively planned for Th existing Route 15 bridge over the Rappahannock River has been in place since TRANSPORTATION UPDATE // FALL
5 Route 29 at Route 600 (Broad Run Church Road), where a signalized RCUT would reduce red-light time and address a history of rear-end and turning-related crashes at the intersection. VDOT has secured $2.48 million in funding through the federal Highway Safety Improvement Program to build the project. Route 29 and Route 676 (Riley Road), where an RCUT would create safer conditions for traffic turning left out of Riley Road. The design reduces the number of conflict points that may cause crashes, as well as minimizes delays for motorists entering Route 29. Route 29 and Route 215 (Vint Hill Road), where the road s hilly nature limits sight distance of vehicles stopped ahead, resulting in a significant history of northbound rear-end collisions. A SMART SCALE candidate project to shave down the Route 29 grade did not score well enough on the congestion mitigation or safety measures to be funded. Instead, a Michigan left concept converts the left-turn movements to right turns paired with downstream U-turns. The current signal location would be eliminated and replaced with signals at the two U-turn locations, which have better visibility and roadway geometry. Fauquier residents and regular users of Route 29 came out in force to the county s Sept. 19 meeting showcasing safety and mobility improvement concepts. Photo courtesy of FauquierNow.com. Proposed Route 29 New Baltimore Corridor Improvements Fauquier County, in coordination with VDOT, held a community meeting Sept. 19 to share a set of intersection design concepts to improve safety and reduce congestion on the Route 29 corridor north of Warrenton. More than 200 people attended to review plans for these locations: Route 29 at Route 838 (Telephone Road), where a restricted crossing U-turn, or RCUT, would ease traffic flow and improve access into Mill Run Business Park. The RCUT eliminates left turns from Route 838 and Old Alexandria Turnpike; drivers instead turn right and U-turn at one-way median openings just north and south of the intersection. Reconstruction of Route 602 Fauquier County applied through the SMART SCALE process to reconstruct Route 602 (Rogues Road), but the project did not receive funding. Preliminary engineering will continue, using previously allocated secondary-road funds, from Academic Avenue at Kettle Run High School to Watson Drive, to include widening the travel lanes and shoulders for improved safety and drainage. Locally Administered Route 920 Vint Hill Extension Jointly coordinated by Fauquier County and the Vint Hill Economic Development Authority, construction is ongoing on a road project through the former Vint Hill Farms military complex, which was closed in 1999 through the base realignment and closing (BRAC) process. The $8.2 million project will connect various streets on the base to new roads, incorporating pedestrian facilities and a roundabout for traffic calming. 32 VIRGINIA DEPARTMENT OF TRANSPORTATION \\ CULPEPER DISTRICT
6 Aiken Drive Upgrades Preliminary engineering is ongoing on a revenue-sharing project to bring Aiken Drive, a private road, up to VDOT standards for acceptance into the secondary system of state highways. The project is fully funded at $3.5 million, with construction anticipated in Mini-Roundabout at Route 15/29 and Falmouth Street At the intersection of Route 15/29 (James Madison Highway) and Falmouth Street, the town of Warrenton will construct a mini-roundabout for improved traffic flow. Survey work has begun as part of the preliminary engineering process, with construction expected in summer The $434,000 project is jointly funded with town and state monies through VDOT s revenue-sharing program. Traffic Signal Upgrades The town of Warrenton has begun construction on upgrades to the existing span-wire traffic signal at Blackwell Road and Lee Highway. The project is funded through VDOT s revenue-sharing program. Extension of Salem Avenue In May, Fauquier County began design work on the $1.4 million project to extend Route 1006 (Salem Avenue) from its current terminus to connect with Route 55 (West Main Street) in Marshall. VDOT is working with the county to review plans. Construction on the revenue-sharing project is expected to begin in fall Transportation Alternatives Learn more about this program on page 9. Town of Remington Railway Depot The town of Remington is planning to renovate its railway depot, which was relocated in spring The project will make extensive renovations to the outside of the building. The project is anticipated to be advertised this winter. Warrenton Branch Greenway and Palmer Trail Extension Design work is under way on a project to expand Warrenton s network of mixed-use trails. The 1-mile Palmer Extension, part of the Warrenton Branch Greenway, will be built along the old Orange & Alexandria Railway. The Woods of Warrenton The Woods of Warrenton, a mixed-use trail project, was originally advertised in fall 2015, but due to budget and construction issues, was not awarded. VDOT has worked with Fauquier County to revise bid documents and the project will be re-advertised this fall. The trail will connect to existing trails in the White s Mill and Warrenton Chase subdivisions. Pierce Elementary School Connector Trail Fauquier is expected to advertise a project this fall to construct a trail from M.M. Pierce Elementary School to the existing pedestrian bridge over Tinpot Run in the Remington community. Safe Routes to School: Cedar Lee Middle School The purpose of this project is to construct a multi-use facility for students who walk and bike to Cedar Lee Middle School, located on Route 661 (Schoolhouse Road) in Bealeton. The project was awarded in August and construction will begin this fall. Town of Marshall Streetscape Project Fauquier County is working with its consultant to revise plans for a streetscape project along Main Street in Marshall. The project will add sidewalks and landscaping and relocate current overhead utilities underground. TRANSPORTATION UPDATE // FALL
7 Recreational Access Program Learn more about this program on page 9. Recreational Access Road into Fauquier County Sports Complex Fauquier County is planning a new roadway and bikeway from Route 643 (Meetze Road) into the county s proposed 70-acre community sports complex. Turn lanes will also be added at the Route 643 intersection. Fauquier County is currently coordinating with the utility companies prior to advertising the project this fall. Rural Rustic Roads Learn more about this program on page 9. This season, Rural Rustic Road projects were completed on: Route 604 (Burwell Road) from the Prince William County line to 0.1 mile south Route 788 (Tall Cedars Road) from Route 637 (Shipps Store Road) to the end of state maintenance A project is under way on: Route 659 (Fox Groves Road) from Route 651 (Lees Mill Road) to the end of state maintenance A project is ready for development on: Route 607 (Shenandoah Path) from Route 806 (Elk Run Road) to 0.9 mile south OPAL OPERATIONAL FIX When roadway widening isn t a favorable option, VDOT employs other measures, such as the traffic signal adjustments recently made in Opal, to bring congestion relief within a corridor s current footprint. By installing new traffic signal heads at the Opal intersection, plus dedicated left-turn lanes on Route 17 northbound and on Route 687 (Opal Road), traffic can now make simultaneous left turns from both routes onto Route 15/29. The result is improved efficiency for about 43,000 motorists who use the intersection daily. 34 VIRGINIA DEPARTMENT OF TRANSPORTATION \\ CULPEPER DISTRICT
Route 29 Solutions Projects
Route 29 Solutions Route 29 Solutions Projects www.route29solutions.org October 10, 2014 Route 29 Widening to Six Lanes Albemarle County This project will widen a 1.8-mile segment of Route 29 from four
More informationLegislative Update. Frederick County Fall Staunton District. Interstate 81 - Exit 300 at Interstate 66 Southbound Acceleration Lane Extension
Interstate 81 - Exit 300 at Interstate 66 Southbound Acceleration Lane Extension Application ID 1643 Northern Shenandoah Valley Regional Commission (NSVRC) $3,437,423 This project extends the Interstate
More informationLegislative Update Williamsburg Residency
Hampton Roads District Legislative Update Williamsburg Residency Jim Brewer, Resident Administrator 757-253-5140 Projects Under Way Warwick Boulevard Project http://www.warwickboulevard.org/ Contractors:
More informationFairfax County Parkway Widening Fairfax County
Get Involved VDOT representatives will review and evaluate information received as a result of this meeting. Please fill out the comment sheet provided in this brochure if you have any comments or questions.
More informationAGENDA REPORT. Issue: Discussion of potential improvements on Barnwell Road at Niblick Drive
AGENDA REPORT To: From: By: Honorable Mayor and City Council Members Warren Hutmacher, City Manager Tom Black, Public Works Director Date: March 23, 2016 Agenda: March 28, 2016 WORK SESSION AGENDA: Barnwell
More informationARRENTON RANSPORTATION
ARRENTON RANSPORTATION LAN DEVELOPED BY THE TRANSPORTATION PLANNING DIVISION OF THE VIRGINIA DEPARTMENT OF TRANSPORTATION IN COOPERATION WITH THE U.S. DEPARTMENT OF TRANSPORTATION, FEDERAL HIGHWAY ADMINISTRATION
More informationAttached for your reference please find project updates on ongoing VDOT construction projects in Southampton County.
SOUTHAMPTON COUNTY BOARD OF SUPERVISORS Regular Session i July 25, 2016 6. HIGHWAY MATTERS A. PLAN PROJECT UPDATES Attached for your reference please find project updates on ongoing VDOT construction projects
More informationCulpeper District. Albemarle County Monthly Report October, 2011
Culpeper District Albemarle County Monthly Report Special Issues FY2013 Revenue Sharing Program - If you wish to participate in the Revenue Sharing Program for the fiscal year starting July 1, 2012, applications
More informationBluffdale/ UDOT South High-T Intersection Project Type Operations
Bluffdale/ UDOT 14600 South High-T Intersection Project Type Operations 14600 South and Redwood Road $ 600,000 $ 550,000 This project is to install a new High-T intersection at Redwood Road and 14600 South
More informationRoute 29 Corridor Assessment Update. Development of Possible Solutions
Route 29 Corridor Assessment Update Development of Possible Solutions Public Workshop #3 October 27, 2016 Purpose of Developing Possible Solutions Recap of where we ve been and timeline for moving forward
More informationRoute 7 Corridor Study
Route 7 Corridor Study Executive Summary Study Area The following report analyzes a segment of the Virginia State Route 7 corridor. The corridor study area, spanning over 5 miles in length, is a multi
More informationWelcome. Thank you for your interest in the Lewis & Clark Viaduct Concept Study
Welcome Thank you for your interest in the Lewis & Clark Viaduct Concept Study Please use the arrows in the upper left hand corner to navigate through the presentation. Use the envelope icon to ask a question
More informationRio Intersection Traffic Restrictions Begin Monday
May 18, 2016 8 Rio Intersection Traffic Restrictions Begin Monday This special edition of the Route 29 Solutions e mail newsletter includes everything you need to know about the May 23 through September
More informationPublic Information Meeting
Richmond Highway (U.S. Route 1) Corridor Improvements Public Information Meeting Tuesday, April 18, 2017 Mount Vernon High School 8515 Old Mt. Vernon Road, Alexandria, VA 22309 Amanda Baxter, VDOT, Special
More informationCounty of Fairfax, Virginia. Department of Transportation
Fairfax County Parkway History 2 Planning began 50 years ago 1960s Washington s Regional Transportation Plan Recommends improved north/south travel Construct Capital Beltway and outer beltway Outer beltway
More informationChapter 5 Future Transportation
Chapter 5 Future Transportation The Future Land Use Plan identifies the desired land use designations. The land uses desired for Crozet depend, in large part, on the success of the transportation system,
More informationFI-2 I-66 Between Route 29, Lee Highway and Route 15, James Madison Highway
TRANSPORTATION PLAN INTENT Transportation is the key to the economic and social development of Prince William County and especially to the I 66/Route 29 Sector Plan area. This includes transportation for
More informationCity of Sammamish. Welcome. Issaquah-Fall City Road Improvements Project Phase I Design: 242nd Avenue SE to Klahanie Drive SE
Welcome Welcome to the third community meeting for the Issaquah-Fall City Road Improvements Project. AGENDA 6:00 p.m. Welcome and sign-in 6:10 p.m. Presentation 6:50 p.m. Open house Learn about the roadway
More informationUPC Design / CN Locally Administered PE Phase VDOT Administered CN Phase
Presentation for County Board, February 27, 2018 Regular Hearing N. Lynn Street Esplanade and Custis Trail Improvements Funding Request for VDOT Construction Bid Award UPC Design 70762 / CN 109813 Locally
More informationWELCOME. Stakeholder Involvement Group Meeting #2 Round Lake Public Works October 24, 2018
WELCOME Stakeholder Involvement Group Meeting #2 Round Lake Public Works October 24, 2018 MEETING AGENDA 1. Welcome and Introductions 2. Study Progress Update 3. Problem Statement 4. Technical Analysis
More informationBasalt Creek Transportation Refinement Plan Recommendations
Basalt Creek Transportation Refinement Plan Recommendations Introduction The Basalt Creek transportation planning effort analyzed future transportation conditions and evaluated alternative strategies for
More informationInstitute for Real Estate Management Chapter (IREM) 77 VDOT Northern Virginia Megaprojects September 13, 2017
Institute for Real Estate Management Chapter (IREM) 77 VDOT Northern Virginia Megaprojects September 13, 2017 Susan Shaw, P.E., Megaprojects Director Virginia Department of Transportation Northern Virginia
More informationTRANSPORTATION ALTERNATIVES PROGRAM: SELECTED PROJECTS AND FUNDING ALLOCATIONS
ITEM #9: TRANSPORTATION ALTERNATIVES PROGRAM: SELECTED PROJECTS AND FUNDING ALLOCATIONS The Transportation Alternatives Program (TAP) created by MAP-21 requires that 50% of the program funds received by
More informationFY 2016 TRANSPORTATION ALTERNATIVES PROGRAM PROJECT SELECTION
AGENDA ITEM #8: FY 2016 TRANSPORTATION ALTERNATIVES PROGRAM PROJECT SELECTION The Transportation Alternatives Program (TAP) created by MAP-21 requires that 50% of the program funds received by the state
More informationAccess Management Regulations and Standards
Access Management Regulations and Standards January 2014 Efficient highway operation Reasonable property access Concept of Access Management The way to manage access to land development while preserving
More informationI-95/Temple Avenue Improvements Project Colonial Heights, VA
I-95/Temple Avenue Improvements Project Colonial Heights, VA Pardon Our Dust Informational Meeting February 3, 2016 Harold Dyson, P.E. Construction Manager, Richmond District Tom Heil, P.E. Allan Myers
More informationCity of Wilsonville 5 th Street to Kinsman Road Extension Project
City of Wilsonville 5 th Street to Kinsman Road Walking Tour & Neighborhood Workshop Summary Report Public Outreach Overview On July 18 th, 2017, the City of Wilsonville hosted a neighborhood walking tour
More informationTransportation Corridor Studies: Summary of Recommendations
Transportation Corridor Studies: Summary of Recommendations Route 4 Corridor Study: Route 10 Corridor Study: Route 44 Corridor Study: Route 175 Corridor Study: Route 5/15 Corridor Study: Rentschler Field
More informationNORTHERN VIRGINIA HIGHLIGHTS for the Dulles Area Transportation Association
NORTHERN VIRGINIA HIGHLIGHTS for the Dulles Area Transportation Association June 20, 2012 Garrett Moore VDOT District Administrator, Northern Virginia Paving Program 2012 This season's paving program will
More informationCULPEPER DISTRICT TRANSPORTATION UPDATE / FALL 2017
CULPEPER DISTRICT TRANSPORTATION UPDATE / FALL 2017 From the District Engineer: In 2017, the Culpeper District successfully delivered several large projects that have been years in the making. In Culpeper
More informationWashington St. Corridor Study
FIGURE 7.17 Bridge Alternatives - Cross Sections 86 Discarded Alternative: Short-Term Bridge Repair Short-term repairs and west bridge span replacement were considered during analysis. Short-term repairs
More informationAccess Management Regulations and Standards
Access Management Regulations and Standards Efficient highway operation Reasonable property access Concept of Access Management The way to manage access to land development while simultaneously preserving
More informationFrequently Asked Questions
Frequently Asked Questions Business US 190 in Copperas Cove From Avenue D to Constitution Drive What is access management? A. Access Management is a growing effort by government agencies to improve how
More informationReadington Road (C.R. 637) Construction
Public Information Meeting Thursday, August 2, 2012 Readington Road (C.R. 637) Construction from Dreahook Road to Harlan School Road Branchburg Township, Somerset County Readington Township, Hunterdon
More informationFY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects
Barclay Street Viaduct NS9807 NS9807 This project will provide for the rehabilitation of the Barclay Street Viaduct, from Route 19 to Marshall Street, in order to increase the weight load of the structure.
More informationTransform 66 Project February 4, 2016 Partnering Conference Michigan Department of Transportation American Council of Engineering Companies
Transform 66 Project February 4, 2016 Partnering Conference Michigan Department of Transportation American Council of Engineering Companies Susan Shaw, PE, CCM, DBIA Megaprojects Director Northern Virginia
More informationMeeting Schedule 7:00-7:15 Open House 7:15-7:45 Existing Conditions/Short-Term Improvements Study Presentation 7:45-8:00 Q&A Session 8:00-8:10
Meeting Schedule 7:00-7:15 Open House 7:15-7:45 Existing Conditions/Short-Term Improvements Study Presentation 7:45-8:00 Q&A Session 8:00-8:10 Long-Term Study Presentation 8:10-8:40 Table Discussions 8:40-9:00
More informationProject Description Form 6V
Project Description Form 6V Basic Project Information Submitting Jurisdiction/Agency: Prince William County Project Title: Route 15 Widening: Route 55 to south of RR tracks & Construct RR Overpass Project
More informationProject Overview. Rolling Road Widening Fairfax County. Get Involved. Design Public Hearing. Contact Information
Get Involved VDOT representatives will review and evaluate information received as a result of this meeting. Please fill out the comment sheet provided in this brochure if you have any comments or questions.
More informationSmall Area Study U.S. Route 220 and VA Route 615 Intersection. Bath County, Virginia
Small Area Study U.S. Route 220 and VA Route 615 Intersection Bath County, Virginia Prepared by the Central Shenandoah Planning District Commission Final Report February 2018 Table of Contents 1. INTRODUCTION...
More informationTerwillegar Drive Expressway Draft Concept Plan
Terwillegar Drive Expressway Draft Concept Plan Anthony Henday Drive to Whitemud Drive November 28 5:00-8:00 p.m. December 1 10:00 a.m. - 3:00 p.m. Let s Talk Today you can: Learn about the new direction
More informationCity of Gainesville Transportation/Roadway Needs PROJECT SUMMARY
A1 Roadway Resurfacing $23,846,000 TYPE: Preservation of existing system Roadway resurfacing A2 Signal Replacement $6,000,000 TYPE: Preservation of existing system Replace traffic signals. B1 W 6th St
More informationI-215 / NEWPORT ROAD INTERCHANGE PROJECT PRESS KIT
I-215 / NEWPORT ROAD INTERCHANGE PROJECT PRESS KIT March I-215 / NEWPORT ROAD INTERCHANGE PROJECT Fact Sheet Project Overview This project will reconstruct the existing interchange located on Interstate
More informationGovernance and Priorities Committee Report For the July 2, 2015 Meeting
CITY OF VICTORIA For the July 2, 2015 Meeting To: Governance and Priorities Committee Date: From: Subject: Brad Dellebuur, A/Assistant Director, Transportation and Parking Services Executive Summary The
More informationTRASBURG RANSPORTATION
TRASBURG RANSPORTATION LAN DEVELOPED BY THE TRANSPORTATION PLANNING DIVISION OF THE VIRGINIA DEPARTMENT OF TRANSPORTATION IN COOPERATION WITH THE U.S. DEPARTMENT OF TRANSPORTATION, FEDERAL HIGHWAY ADMINISTRATION
More informationI-395 Express Lanes Northern Extension Project Crystal City Civic Association September 21, 2016
I-395 Express Lanes Northern Extension Project Crystal City Civic Association September 21, 2016 Mike Snare, PE, Project Manager Virginia Department of Transportation GEC Michelle Holland, Megaprojects
More informationAPPENDIX G: INTERSECTION NEEDS AT OKEECHOBEE BOULEVARD
APPENDIX G: INTERSECTION NEEDS AT OKEECHOBEE BOULEVARD INTERSECTION NEEDS AT SR 7 and OKEECHOBEE BOULEVARD SR 7 Extension Project Development and Environment (PD&E) Study From Okeechobee Boulevard (SR
More informationCONTENTS EXECUTIVE SUMMARY 1
CONTENTS CHAPTER PAGE EXECUTIVE SUMMARY 1 1 ISSUES AND PURPOSE OF THE ANALYSIS 2 1.1 Background 2 1.2 Analysis Area 2 1.3 Issues and Observations 3 1.4 Project and Public Meetings 3 2 LIST OF PREFERRED
More informationMunicipal Class EA To Address Traffic Congestion On The Ontario Street Corridor (Grand Bend) Public Information Meeting June 4, 2018
Municipal Class EA To Address Traffic Congestion On The Ontario Street Corridor (Grand Bend) Public Information Meeting June 4, 2018 Background Agenda Traffic Study Update Class EA Alternatives Bridge
More informationBroadway Complete Streets Project
Broadway Complete Streets Project Megan Johnson, P.E. Associate Civil Engineer James Pangburn, P.E. Consultant Project Manager After the construction of the highway system, Broadway was cut off
More informationFY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects
ROUTE/ Project ID No. TIP No. Electrical Load Center Replacement - North 04324 04324 This project will provide for the betterment of the existing highway lighting facilities located along Routes 3, 17
More informationPROJECT FACT SHEET May 25, 2018
SITE CHALLENGES & PROJECT BACKGROUND In 2014, the City of Aspen identified the Castle Creek Bridge and Hallam Street corridor as a deficient link in Aspen s bicycle and pedestrian network. Safe and efficient
More informationPennsylvania Avenue (CR 484) Design Alternatives Study
MEMORANDUM Pennsylvania Avenue (CR 484) Design Alternatives Study Prepared for: APRIL 2016 Prepared By TABLE OF CONTENTS Project Background... 2 Previous Concept... 2 Existing Conditions... 4 New Alternatives...
More informationAccess Management Regulations and Standards for Minor Arterials, Collectors, Local Streets
Access Management Regulations and Standards for Minor Arterials, Collectors, Local Streets September 2009 Paul Grasewicz Access Management Administrator Concept of Access Management The way to manage access
More information91
90 91 92 93 94 95 96 97 98 99 100 101 102 103 104 105 106 As previously depicted in Exhibit 4-J, vehicular accidents are shown along Forrester Road. The contributing factors may be due to its current two
More informationThe Year Ahead: Virginia Department of Transportation Northern Virginia District
The Year Ahead: Virginia Department of Transportation Northern Virginia District Nicholas J. Roper, P.E. District Project Development Engineer Phone: (703)259-1953 Email: nicholas.roper@vdot.virginia.gov
More informationPine Hills Road Pedestrian/Bicycle Safety Study Board of County Commissioners Work Session
Pine Hills Road Pedestrian/Bicycle Safety Study Board of County Commissioners Work Session February 20, 2018 Meeting Agenda Study Overview Existing Conditions Access Management Potential Gateway Features
More informationBrian McHugh, Buckhead Community Improvement District. SUBJECT: Wieuca Road at Phipps Boulevard Intersection Improvements Project
MEMO TO: FROM: Brian McHugh, Buckhead Community Improvement District Jagan Kaja, AICP, WSP Parsons Brinckerhoff SUBJECT: Wieuca Road at Phipps Boulevard Intersection Improvements Project DATE: October
More informationRoads and Vehicular Traffic Design Principles. Roads and Vehicular Traffic Recommendations
CIRCULATION AND PARKING roads and vehicular traffic The Campus Master Plan updates the campus transportation network through a multi-modal approach that encourages walking and biking while improving vehicular
More informationDulles Area Transportation Association. October 11, Susan Shaw, P.E., Megaprojects Director Virginia Department of Transportation
Dulles Area Transportation Association October 11, 2017 Susan Shaw, P.E., Megaprojects Director Virginia Department of Transportation Transform 66: Outside the Beltway 2 Project Overview Multimodal improvements
More informationPROJECT FACT SHEET March 21, 2018
SITE CHALLENGES & PROJECT BACKGROUND In 2014, the City of Aspen identified the Castle Creek Bridge and Hallam Street corridor as a deficient link in Aspen s bicycle and pedestrian network. Safe and efficient
More informationDRAFT. Corridor study. Honeysuckle Road. October Prepared for the City of Dothan, AL. Prepared by Gresham, Smith and Partners
DRAFT Corridor study Honeysuckle Road October 2017 Prepared for the City of Dothan, AL Prepared by TABLE OF CONTENTS SECTION I... 1 STUDY SUMMARY... 1 INTRODUCTION... 1 CONCLUSIONS... 5 SECTION II... 7
More informationLos Altos Hills Town Council - June 18, 2015 Palo Alto City Council June 22, AGENDA ITEM #2.B Presentation
Los Altos Hills Town Council - June 18, 2015 Palo Alto City Council June 22, 2015 AGENDA ITEM #2.B Presentation Previous Presentations Los Altos Hills Town Council in May 2014 and February 2015 Palo Alto
More informationDraft North Industrial Area-Wide Traffic Plan
Summary of North Industrial and Hudson Bay Industrial Recommended Improvements Table 1. Summary of s Item Location 1 2 3 4 5 6 7 8 9 10 11 12 Millar Ave north of 51st St Super 8 Motel back lane 400 Block
More informationI-395 Express Lanes Northern Extension Project Public Hearings
I-395 Express Lanes Northern Extension Project Public Hearings Susan Shaw, PE, Megaprojects Director Virginia Department of Transportation Amanda Baxter, Special Projects Manager Virginia Department of
More informationProject Update May 2018
Project Update May 2018 Dakota County, in cooperation with the City of Lakeville, is planning to reconstruct 202 nd Street West (County Road 50) from Holyoke Avenue to Cedar Avenue (County Road 23). 202
More informationWelcome to the Open House
Leslie Street Between 19 th Avenue and Stouffville Road Addendum to Class Environmental Assessment Study Welcome to the Open House Please sign in at the front desk. March 28, 2017 Richmond Green Sports
More informationTonight is for you. Learn everything you can. Share all your ideas.
Strathcona Neighbourhood Renewal Draft Concept Design Tonight is for you. Learn everything you can. Share all your ideas. What is Neighbourhood Renewal? Creating a design with you for your neighbourhood.
More informationPattullo Bridge Replacement Project Community Connections Phase 2 Consultation. Appendix 3: Open House Display Boards
Replacement Project Community Connections Phase 2 Consultation Appendix 3: Open House Display Boards November 2016 Welcome! Welcome to the Replacement Project Public Open House We Want to Hear from You
More informationFY 2006 TRANSPORTATION CAPITAL PROGRAM
Eden Lane Bridge over Whippany River NS9908 The existing structure was built in 1972 as a temporary single-span structure. The bridge consists of simply supported steel acrow panel trusses and is supported
More informationM-58 HIGHWAY ACCESS MANAGEMENT STUDY Mullen Road to Bel-Ray Boulevard. Prepared for CITY OF BELTON. May 2016
M-58 HIGHWAY ACCESS MANAGEMENT STUDY Prepared for CITY OF BELTON By May 2016 Introduction Missouri State Highway 58 (M-58 Highway) is a major commercial corridor in the City of Belton. As development has
More informationEXHIBIT B-1 PROJECT DESCRIPTION. Phase 1 of the Preferred Alternative
EXHIBIT B-1 PROJECT DESCRIPTION Phase 1 of the Preferred Alternative The Transform 66 Public-Private Partnership (P3) Project (the Project ) means the Phase 1 of the Preferred Alternative components of
More informationAttachment One. Integration of Performance Measures Into the Bryan/College Station MPO FY 2019 FY 2022 Transportation Improvement Program
Attachment One Integration of Performance Measures Into the Bryan/College Station MPO FY 2019 FY 2022 Transportation Improvement Program Introduction Begun as part of the Moving Ahead for Progress in the
More informationHouma-Thibodaux Metropolitan Planning Organization STP<200K Funding Application APPLICATION
APPLICATION HOUMA-THIBODAUX METROPOLITAN PLANNING ORGANIZATION (HTMPO) FOR SURFACE TRANSPORTATION PROGRAM (STP
More informationCapital Projects Update: N. Lynn Street Esplanade and Custis Trail Improvements Advertisement for Construction - Progress Report
Capital Projects Update: N. Lynn Street Esplanade and Custis Trail Improvements Advertisement for Construction - Progress Report UPC Design 70762 / CN 109813 Locally Administered PE Phase VDOT Administered
More informationOverview. Illinois Bike Summit IDOT Complete Streets Policy Presentation. What is a Complete Street? And why build them? And why build them?
Overview Illinois Bike Summit IDOT Complete Streets Policy Presentation Aren Kriks, P.E. District One Bicycle Coordinator and Bureau of Programming Project Engineer History of Complete Streets IDOT Policy
More informationDRAFT BUENA VISTA 2020 TRANSPORTATION PLAN
DRAFT BUENA VISTA 2020 TRANSPORTATION PLAN DEVELOPED BY THE TRANSPORTATION PLANNING DIVISION OF THE VIRGINIA DEPARTMENT OF TRANSPORTATION IN COOPERATION WITH THE U.S. DEPARTMENT OF TRANSPORTATION, FEDERAL
More informationBay to Bay Boulevard Complete Streets Project
Bay to Bay Boulevard Complete Streets Project Dale Mabry Highway to Bayshore Boulevard February 08, 2018 Photo Source: Tampa Bay Times Alessandra Da Pra Meeting Format Introduction Resurfacing Information
More informationPROJECT OBJECTIVES. Improve vehicle capacity for the intersection. Improve pedestrian and bicycle access
COMMUNITY MEETING Project Update March 15, 2010 Purcellville, Virginia OVERVIEW Project need / objectives Project recap Design elements Proposed improvements Summary of project benefits / next steps PROJECT
More informationCulpeper District. Albemarle County Monthly Report September, 2011
Culpeper District Albemarle County Monthly Report Special Issues FY Revenue Sharing Program - If you wish to participate in the Revenue Sharing Program for the fiscal year starting July 1, 2012, applications
More informationWest Dimond Blvd Upgrade Jodhpur Street to Sand Lake Road
West Dimond Blvd Jodhpur St to Sand Lake CSS Transportation Project Summary Municipality of Anchorage Project # 05 005 Project Manager: John Smith, P.E. (MOA PM&E) Project Administrator: Julie Makela,
More informationCity Avenue Projects
City Avenue Projects City Avenue Special Services District Conceived in the early 1990 s Lita Cohen, Jim Ettelson, Joe Manko, and Michael Nutter Saint Joseph s provided key start-up support. True Public/Private
More informationHouma-Thibodaux Metropolitan Planning Organization STP<200K Funding Application APPLICATION
APPLICATION HOUMA-THIBODAUX METROPOLITAN PLANNING ORGANIZATION (HTMPO) FOR SURFACE TRANSPORTATION PROGRAM (STP
More informationAPPENDIX E Evaluation of Improvement Alternatives
APPENDIX E Evaluation of Improvement Alternatives Table E-1 Preliminary Comparison of Design Alternatives, Concord Table E-2 Preliminary Comparison of Route 2 Improvement Packages, Acton and Concord TABLE
More informationDEPARTMENT OF ENVIRONMENTAL SERVICES. North Harrison Street (Lee Highway to Little Falls Road) Comparative Analysis. Prepared for:
DEPARTMENT OF ENVIRONMENTAL SERVICES North Harrison Street (Lee Highway to Little Falls Road) Comparative Analysis Prepared for: Arlington County Department of Environmental Services 2100 Clarendon Boulevard,
More informationWelcome! San Jose Avenue Open House August 25, 2015
Welcome! San Jose Avenue Open House August 25, 2015 Vision Zero The City and County of San Francisco adopted Vision Zero San Francisco Vision Zero High Injury Network as a policy in 2014, committing an
More informationFunding Sources Appendix I. Appendix I. Funding Sources. Virginia Beach Bikeways and Trails Plan 2011 Page I-1
Funding Sources Virginia Beach Bikeways and Trails Plan 2011 Page I-1 Funding Sources Federal and state agencies provide funding for local bikeway and trail projects. Descriptions follow for programs that
More informationNew Measure A Expenditure Categories DEFINITIONS OF ELIGIBLE EXPENDITURES Adopted March 8, 2007
New Measure A Expenditure Categories DEFINITIONS OF ELIGIBLE EXPENDITURES Adopted March 8, 2007 City Street and County Road Maintenance Program The preservation and keeping of public street and road rights-of-way
More informationBoard of Supervisors February 27, 2017
: Traffic Analysis Results & Draft Conceptual Plan Board of Supervisors February 27, 2017 Transportation Solutions Building Better Communities Presentation Overview Background Summary of Traffic Analysis
More informationSTREET AND HIGHWAY PLAN
STREET AND HIGHWAY PLAN Introduction The street and highway system in the Winston-Salem Urban Area consists of thousands of miles of traffic carrying facilities, ranging from short local residential streets
More informationCSAH 101 Preliminary Design
CSAH 101 Preliminary Design Public Open House No. 2 January 29, 2013 CSAH 62 to Hutchins Drive Welcome / Introductions Hennepin County Craig Twinem, Transportation Maury Hooper, Transportation Nick Peterson,
More informationPROPOSED BICYCLE AND PEDESTRIAN FACILITY Vicinity of Route 123/I-495 Interchange Tysons, Fairfax County, Virginia
PROPOSED BICYCLE AND PEDESTRIAN FACILITY Vicinity of Route 123/I-495 Interchange Tysons, Fairfax County, Virginia PRELIMINARY ENGINEERING REPORT Prepared for: Prepared by: July 2017 Table of Contents 1
More information4. ENVIRONMENTAL IMPACT ANALYSIS 9. TRANSPORTATION AND TRAFFIC
4. ENVIRONMENTAL IMPACT ANALYSIS 9. TRANSPORTATION AND TRAFFIC 4.9.1 INTRODUCTION The following section addresses the Proposed Project s impact on transportation and traffic based on the Traffic Study
More informationRio Mills Rd/Berkmar Dr Extended Connection
SMART SCALE Application Rio Mills Rd/Berkmar Dr Extended Connection Status: Scored ID: F2-0000001408-R02 General Point of Contact Information Point of Contact Name Kevin McDermott Point of Contact Phone
More informationTRANSPORTATION & MOBILITY
TRANSPORTATION & MOBILITY ROADWAY SYSTEM There are approximately 40 miles of roadways in Manitou Springs. For planning purposes, roadways are typically assigned a functional classification which defines
More informationCapital Projects Update: N. Lynn Street Esplanade and Custis Trail Improvements 100% Engineering Design - Progress Report
Capital Projects Update: N. Lynn Street Esplanade and Custis Trail Improvements 100% Engineering Design - Progress Report UPC 70762 Locally Administered PE Phase VDOT Administered CN Phase 4/6/17 1 Project
More informationClackamas County Comprehensive Plan
ROADWAYS The County s road system permits the movement of goods and people between communities and regions, using any of a variety of modes of travel. Roads provide access to virtually all property. They
More informationProject Description Form 8EE
Project Description Form 8EE Basic Project Information Submitting Jurisdiction/Agency: Town of Dumfries Project Title: Route 1 (Fraley Blvd) Widening: Brady's Hill Road to Dumfries Road Project Location:
More informationRoundabout Feasibility Memorandum
Roundabout Feasibility Memorandum To From Gwen Pipkin Bill Howell Date June 18, 2013 Subject Roundabout Feasibility Study SR 29 PD&E Study From Oil Well Road to SR 82 Collier County, FL FPID 417540-1-22-01
More informationIntersection Improvement: Sturgeon Road, Silver Avenue and Murray Park Road Roundabout. Welcome. Public Information Session
Intersection Improvement: 1 Welcome WHY IS AN INTERSECTION IMPROVEMENT NEEDED? 2 Traffic volumes for Sturgeon Road, Silver Avenue and Murray Park Road exceed the capacity of the existing 4-way stop controlled
More information