1 Swamp Road Residents Study SRRG Meeting with PennDot and Elected Officials Newtown and Wrightstown, PA April 25, 2008
2 Newtown Township Section of Swamp Road
3 Limited Public Funds No reconstruction of a road that is not congested Improve safety by mitigating specific road hazards Improve quality of life Retain the rural character Preserve open and green space Improve peace and enjoyment for residents Avoid increase in noise, visual disturbance, air pollution, and environmental impact
4 Traffic Calming Reclassify from a minor arterial to a major collector road Make the road eligible for simple safety measures for navigating hills and curves Conduct a study for reducing speeds to safer limits Post signs against use of Jake Brakes Post warning signs at trouble spots Replace damaged and missing signs
5 Traffic Enforcement Not enough enforcement and police visibility Increase enforcement Increase truck details Establish VASCAR (Vehicle Average Speed Calculator) monitoring zones
6 Location 1: Corner of Rt. 413 Existing Condition: Unsafe for Tyler Walk pedestrians for crossing into Tyler Park.
7 Location 1: Corner of Rt. 413 Potential Fix: Provide a pedestrian crossing at the existing traffic light Safe crossing for pedestrians Increase awareness for drivers regarding presence of pedestrians
8 Location 2: Tyler Walk Entrance Existing Condition: Unsafe and difficult left turn from Tyler Walk during peak traffic time in the mornings
9 Location 2: Tyler Walk Entrance Potential Fixes: Residents prefer that the existing traffic lights at the bypass and college are timed to provide safe egress An alternative, as a last resort could be a traffic control light that only operates during the morning rush hour
10 Location 3: Colonial Commons & Existing Conditions: Unsafe and difficult left turns from Colonial Commons and BCCC during peak traffic time in the mornings Difficult crossing for pedestrians at all times due to high traffic speed BCCC Entrances
11 Location 3: Colonial Commons & Potential Fixes: Provide a four-way stop or a traffic light. Residents prefer the four-way stop Provide a pedestrian crossing College Traffic Study BCCC Entrances 3 rd entrance Improved traffic flow inside the college to reduce backups on Swamp Road
12 Location 4: Temora Farm Bridge Existing Condition: Bridge is wide enough. It was repaired sufficiently by PennDOT in But trucks often cross the center lane markings.
13 Location 4: Temora Farm Bridge Potential Fix: Install additional raised reflectors on the lane markings to alert drivers to stay in lane. Add Slow Down signs and a white arrow on the road with the words SLOW approaching the bridge.
14 Location 5: Twining Bridge Area Existing Conditions: Vertical as well as horizontal blinds and sharp curve Extremely difficult to make safe left turns from Twining Bridge Road and Tyler Park Unsafe for pedestrians for crossing into Tyler Park
15 Location 5: Twining Bridge Area Potential Fixes: Create a 3-way 3 stop at Twining Bridge Road and provide a pedestrian crossing Pave small section of park exit to eliminate spinning of wheels
16 Wrightstown Township Section of Swamp Road
17 Scope and Process Wrightstown Section of Swamp Road Eastern limit: Intersection of Twining Bridge Road Western Limit: Township Line, past Rushland Observe and investigate existing conditions Identify Specific Problem Locations
18 Process (continued) Gather Information: Photographs of problems and locations Current speed limits and warning signs Review prior studies, Accident Reports Describe Locations and Problems Develop Proposed Fixes for Problems Interview adjacent residents Interview Newtown Police Department Get input from Township Transportation Engineer
19 Process (continued) Summarize Findings and Recommendations Public Meeting: Wrightstown Section Both Boards of Supervisors met with the two residents groups on April 17, 2008 Coordinate with Newton Residents Group
20 Location 1: Unmarked Crossing at 2 Horse Stables Existing Conditions 1. Eastbound sight distance limited due to vertical curve, risk to pedestrian and horses crossing Swamp Road. 2. Drainage issue-water flows for days after a hard rain from north shoulder, freezes in winter. 3. Unmarked pedestrian and horse crossing Westbound, between Farms, Icy Road
21 Eastbound, between Farms, Icy Road
22 Location 1: Unmarked Crossing at 2 Horse Stables Potential Fixes: 1. Horse Crossing caution signs, Bridle Path (W11-20 or W11-7) 2. Reduce speed limit. 3. Fix drainage, and until fixed, post a Watch For Ice (W8-19) warning sign. Eastbound, between Farms, crest of hill
23 Location 2: Poor Drainage Between WMR and New Culvert Existing Conditions: Poor drainage of north side of road, drains days after heavy precipitation, freezes in winter. Drainage from intersection runs down hill and across the road, freezes in winter. Steep vertical and horizontal curves, and lack of shoulders approaching/leaving 4-way 4 stop intersection compounded by weather related hazards. Eastbound, from WMR, black ice forming as water is dragged uphill and freezes on January 13, 2008
24 Location 2: Poor Drainage Between WMR and New Culvert Potential Fixes: Fix drainage, and until fixed, post a Watch For Ice (W8-19) sign and warning sign. Reduce westbound speed limit to the same speed as locations 1 and 2. Westbound, Failed Drainage, February 14, 2008
25 Location 2: Poor Drainage Between WMR and New Culvert CAUSES ICY ROADWAY Westbound, February 14, 2008 Ice forming all the way to stop sign.
26 Location 3: Intersection of Worthington Mill and Swamp Roads 4-Way Stop with complex alignments and topography including two vertical curves and oblique angle of intersection. Views obstructed by embankments and/or vegetation on all four sides of intersection. Ineffective drainage. Condition is worsened by ruts caused by truck traffic. Hidden driveways on south and north side of Worthington Mill Road. Swamp Road westbound Swamp Road Eastbound
27 Location 3: Intersection of WMR and Swamp WMR northbound Potential Fixes: No major realignment or widening of this intersection. Stop Ahead signs at effective distances in ALL approach directions. Reduce speed limit to 25 in vicinity of intersection on both roads. Hidden Driveway signs with curve warnings (W1-1) 1) on Swamp Road to warn turning traffic of the driveways to north and south. WMR southbound
28 Location 4: Hickory Lane Existing Conditions: Very limited sight distance for drivers entering Swamp Road due to vertical curve to west of the intersection. Dangerous conditions exist for vehicles entering and exiting Hickory Lane. Higher vehicle speeds encouraged by wider shoulders and hills. Intersection
29 Location 4: Hickory Lane Intersection Potential Fixes: Reduce speed limit to 35 MPH. Post Hill Blocks View Sign (W7-6) and Advisory Speed (W13-1) 1).
30 Major Safety Concerns 1. Speeding and driving too fast for conditions. 2. Limited sight distance due to hills, curves and vegetation. 3. Poor drainage resulting in flooding and icy conditions, a cause of many accidents. 4. Lack of warning signs at trouble spots; for example, Slippery When Wet, Hidden Driveway, Deer Crossing, etc. Existing signs are not replaced when damaged (hit). 5. Not enough enforcement and police visibility along with a lack of pull-off areas for enforcement stops.
31 Location 5: Neshaminy Avenue Existing Conditions: Sight distance limited for drivers entering Swamp road here. Vertical curve that crests just west of this intersection greatly limits sight distance for vehicles entering and exiting Neshaminy Avenue and adjacent residences. Intersection
32 Location 5: Neshaminy Avenue Intersection Potential Fixes: Reduce speed limit to 35. Post Hill Blocks View Sign (W7-6) and Advisory Speed (W13-1) 1)
33 Location 6: Hill and Curve west of Neshaminy Avenue Intersection Existing Conditions: Horizontal curve and incline make it difficult for vehicles to stay within their travel lanes. Numerous accidents have occurred at this location. Driveways located on curve.
34 Location 6: Hill and Curve west of Neshaminy Avenue Intersection Potential Fixes: Reduce speed limit to 35 MPH. Hidden Driveway signs should be posted both east and west of the curve. Remove vegetation on south side of road to improve sight distances.
35 Location 7: Sharp Curve 0.1 mile east Existing Conditions: Sharp horizontal curve limits sight distance of vehicles traveling both east and west. Scene of numerous accidents. Poor drainage on north side of road. Water covers road after heavy rains, freezes in winter. Speed limit of 40 MPH posted prior to this turn traveling east is misleading, most vehicles can not negotiate this turn at this speed. of SR 0232
36 Location 7: Sharp Curve 0.1 mile east of SR 232 Potential Fixes: Reduce eastbound speed limit to 25 from Route 232 until after the curve. Replace Curve (W1-1) 1) sign. Install effective drainage controls, and until fixed, post signs to warn drivers of adverse conditions with these signs: Post Road Subject to Flooding (W8-18) Watch For Ice (W8-19) Slippery When Wet
37 Location 8: Quarry and School Bus Depot Entrances Existing Conditions: Uncontrolled quarry traffic from Eureka Stone Quarry often does not stop prior to entering Swamp Road from quarries. School Bus also do not always stop sign at exit. There are no stop signs!
38 Location 8: Quarry and School Bus Potential Fixes: Post Stop Signs at both quarry exits. Post Trucks Entering Roadway signs with a (W11-10) 10) and an intersection warning sign (W2-1) on Swamp in both directions. Depot Entrances
39 General Improvement Needs 1. No major road reconstruction widening road and softening of curves and hills will only promote speeding. 2. Retain rural character - instead of rebuilding the entire roadway, encourage slower speeds and include strategic mitigation of specific road hazards as listed in the following table. 3. Fix the drainage - design and build controls to prevent flooding and black ice. 4. Strategic vegetation removal to improve sight distances. 5. Increase enforcement. establish and use VASCAR (Vehicle Average Speed Calculator) monitoring zones and related pull- over areas.
40 Location 9: A Series of 3 Tight Existing Conditions: Limited sight distance in both directions. Narrow roadway. Flooding during heavy rains on eastern-most curve. Horizontal Curves
41 Location 9: A Series of 3 Tight Horizontal Curves Potential Fixes 20 MPH sign after stop signs at intersection of Mill Creek Road going east. 20 MPH sign before first curve going west. Install additional warning signs (W1-5) and Roadway Subject to Flooding and Slippery When Wet (W8-5).
42 Location 10: Intersection of Mill Creek Road Existing Conditions: Traffic flow and control not a problem since temporary stop signs have been added. Intersection floods in heavy rains, due to flow from Penns Park Road.
43 Location 10: Intersection of Mill Potential Fixes: Permanently retain 4-4 way stop. Improve drainage control. Creek Road
44 Location 11: Sharp Curve between Mill Creek and Barn and Quarry Existing Conditions: Long straight roadways leading to very sharp curve encourages excessive speed in sharp radius horizontal curve. This is the scene of frequent and sometimes severe accidents.
45 Location 11: Sharp Curve between Mill Creek and Barn and Quarry Potential Fixes: Reduce speed limit in adjacent road segments. Increase curve radius, move roadway south. Improve banking of curve to match radius. Until fixed, post larger and more effective warning signs: Dangerous Curve.
46 Location 12: Village of Rushland Existing Conditions: Excessive, unsafe speeds (40 MPH) allowed through this residential and commercial area.
47 Location 12: Village of Rushland Potential Fixes: Reduce speed limit to 25 MPH, post at both sides of village. Retain village atmosphere, no widening of roadway or shoulders.
48 Location 13: Intersection of Swamp Existing Conditions: and Rushland Roads Eastbound Rushland Road turning left to go west on Swamp Road crosses and conflicts with eastbound Swamp Road which bears left at existing triangular island. Site limited by vegetation on northwest side of intersection. Westbound Swamp Road drivers often miss the right turn to continue on Swamp.
49 Location 13: Intersection of Swamp and Rushland Roads Potential Fixes: Post Stop sign on eastbound Rushland Road at intersection. Install directional signs for Swamp Road and Rushland Road. Remove vegetation on northwest side of intersection to improve sight distances.
50 Location 14: Curve on Swamp West of Rushland Road Existing Conditions: Swamp Road is well built here but design encourages speeding. Site of numerous accidents. Driveways
51 Location 14: Curve on Swamp West of Rushland Road Potential Fixes: Reduce and Enforce Speed Limit. Post warning signs for driveways.
52 General Improvement Needs 1. No major road reconstruction widening road and softening of curves and hills will only promote speeding. 2. Retain rural character - instead of rebuilding the entire roadway, encourage slower speeds and include strategic mitigation of specific road hazards as listed in the following table. 3. Fix the drainage - design and build controls to prevent flooding and black ice. 4. Strategic vegetation removal to improve sight distances. 5. Increase enforcement. establish and use VASCAR (Vehicle Average Speed Calculator) monitoring zones and related pull- over areas.
Module 5: Navigating Roadways
Module 5: Navigating Roadways Topic 1: Intersections 1. One out of FATAL crashes occur at intersections. 2. Label the intersection warning signs: 3. When possible, begin searching seconds ahead of the
More informationAGENDA REPORT. Issue: Discussion of potential improvements on Barnwell Road at Niblick Drive
AGENDA REPORT To: From: By: Honorable Mayor and City Council Members Warren Hutmacher, City Manager Tom Black, Public Works Director Date: March 23, 2016 Agenda: March 28, 2016 WORK SESSION AGENDA: Barnwell
More informationGiles Run Connector Road
Giles Run Connector Road Laurel Hill Adaptive Reuse Area to Laurel Crest Drive South County Federation Meeting June 14, 2016 History Connector road included in the Laurel Hill Comprehensive Plan amendment
More informationMemorandum. Sunday, July 13, Saturday, July 19, 2014
Memorandum To: David Lowin, Brooklyn Bridge Park Corporation From: Daniel Schack, AICP, PTP Date: Re: Brooklyn Bridge Park Pier 5/6 Loop Road Traffic Study Project No: 14-01-2407 At the request of Brooklyn
More informationReadington Road (C.R. 637) Construction
Public Information Meeting Thursday, August 2, 2012 Readington Road (C.R. 637) Construction from Dreahook Road to Harlan School Road Branchburg Township, Somerset County Readington Township, Hunterdon
More informationRecommended Roadway Plan Section 2 - Land Development and Roadway Access
Recommended Roadway Plan Section 2 - Land Development and Roadway Access SECTION 2 Land Development and Roadway Access 2.1 Land Use and Access Management The Federal Highway Administration (FHWA) defines
More informationCity of Vallejo Traffic Calming Toolbox
City of Vallejo Traffic Calming Toolbox June 1, 2013 Final Table of Contents Introduction... 1 Non-Physical Devices... 3 High-Visibility Crosswalk... 3 In Pavement Lighted Crosswalk... 4 Rapid Flashing
More informationWEST AVENUE AND NEW ROAD TRAFFIC STUDY PART III WEST AVENUE CLOSURE ALTERNATIVES ANALYSIS
WEST AVENUE AND NEW ROAD TRAFFIC STUDY PART III WEST AVENUE CLOSURE ALTERNATIVES ANALYSIS CITY OF LINWOOD ATLANTIC COUNTY, NEW JERSEY March 30, 2006 PREPARED FOR: City of Linwood 400 Poplar Avenue Linwood,
More informationDraft North Industrial Area-Wide Traffic Plan
Summary of North Industrial and Hudson Bay Industrial Recommended Improvements Table 1. Summary of s Item Location 1 2 3 4 5 6 7 8 9 10 11 12 Millar Ave north of 51st St Super 8 Motel back lane 400 Block
More informationENGINEER S PRELIMINARY REPORT. for the #######-###### COLLISION
ENGINEER S PRELIMINARY REPORT for the #######-###### COLLISION By: Lance E. Robson, P.E. October 3, 2005 1 INVESTIGATION OF THE #######-###### COLLISION ENGINEER S PRELIMINARY REPORT October 3, 2005 ---------------------------------------------------------------------------------------------------------------
More informationChapter V Transportation Concept Alternatives
Chapter V Transportation Concept Alternatives Three (3) fundamentally different approaches to meeting vehicular travel needs in the corridor were considered. One approach is to leave the road as it is
More informationAppendix C. TRAFFIC CALMING PROGRAM TOOLBOX
Appendix C. TRAFFIC CALMING PROGRAM TOOLBOX PHASE I...2 Do Not Enter Sign...3 One-Way Sign...4 Turn Prohibition...5 Pavement Markings...6 Speed Monitoring Trailer...7 Neighborhood Speed Watch...8 Police
More informationMulti-Modal Traffic Analysis. Parisi and Associates
Mill Valley to Corte Madera Bicycle and Pedestrian Corridor Study Appendix D: Multi-Modal Traffic Analysis Prepared by Parisi and Associates August 2009 Appendix D - Multi-Modal Traffic Analysis Table
More informationTraffic Signs and Signals
CHAPTER FOUR Traffic Signs and Signals Traffic signs control traffic flow, making streets and highways safer for drivers, bicyclists and pedestrians. These signs, which are posted by the Indiana Department
More informationLesson #7. Review: Lesson #6 Destination: Eureka. SKILLS A. Protected Left Turns
SKILLS A. Protected Left Turns Lesson #7 Review: Lesson #6 Destination: Eureka 1. The only time you are protected from oncoming traffic is when you have a green left turn arrow 2. Oncoming traffic has
More informationSpeed Control & Limits
Speed Control & Limits Exceeding the speed limit is a common contributing factor of fatal and other types of accidents. *25 mph* School zones, business or residential districts *55 mph* Certain state highways
More informationControlled. Semi-Controlled PAGE 01 CHAPTER 12 INTERSECTIONS
PAGE 01 CHAPTER 12 INTERSECTIONS You will cross many intersections while driving. Intersections are especially dangerous because vehicles are crossing each other s driving path. Many crashes happen at
More informationHome Link Assignment # 1 - SIGNS
Home Link Assignment # 1 - SIGNS 1 A. Road slippery when wet B. Hidden intersection ahead C. Narrow road ahead D. Winding road ahead 2 A. Slow moving vehicle ahead B. Head end street ahead C. Yield right-of-way
More informationTRAFFIC CALMING GUIDE FOR TORONTO CITY OF TORONTO TRANSPORTATION SERVICES DIVISION
TRAFFIC CALMING GUIDE FOR TORONTO CITY OF TORONTO TRANSPORTATION SERVICES DIVISION CITY OF TORONTO TRANSPORTATION SERVICES DIVISION 2016 TRAFFIC CALMING GUIDE FOR TORONTO TABLE OF CONTENTS Introduction
More informationAlberta Infrastructure HIGHWAY GEOMETRIC DESIGN GUIDE AUGUST 1999
Alberta Infrastructure HIGHWAY GEOMETRIC DESIGN GUIDE AUGUST 1999,1'(; A ACCELERATION Data on acceleration from stop D-29 Effects of grade D-35 Intersections D-97, D-99 Lanes D-97, F-5, F-7, F-15, F-21,
More informationRoad Safety Audit training course. Motorways - safety issues of the motorway design
Road Safety Audit training course Motorways - safety issues of the motorway design Jesper Mertner, Road safety auditor, COWI A/S 1 ROAD SAFETY AUDITING COURSE Content 1. Safety 2. Cross sections 3. Horizontal
More informationIntersection Improvement: Sturgeon Road, Silver Avenue and Murray Park Road Roundabout. Welcome. Public Information Session
Intersection Improvement: 1 Welcome WHY IS AN INTERSECTION IMPROVEMENT NEEDED? 2 Traffic volumes for Sturgeon Road, Silver Avenue and Murray Park Road exceed the capacity of the existing 4-way stop controlled
More informationADJUSTING TO, FOLLOWING, AND MEETING URBAN TRAFFIC
Lesson 4 Student Notes 1 ADJUSTING TO, FOLLOWING, AND MEETING URBAN TRAFFIC 1. What two main factors make city driving difficult? There are more cars, buses, trucks, and pedestrians per mile. City hazards
More informationBoston Post Road Design Feasibility Study
Boston Post Road Design Feasibility Study Prepared for the City of Rye Final Report July 18, 2007 Prepared by: Buckhurst Fish & Jacquemart (BFJ) 115 Fifth Avenue New York, NY 10003 www.bfjplanning.com
More informationDuwamish Way-finding and CTR Report
V. North Tukwila When the North Tukwila Manufacturing and Industrial Center was designated in 1992 as part of the region s land use and transportation plan, the plan called for the area to set a light-rail
More informationWelcome. Thank you for your interest in the Lewis & Clark Viaduct Concept Study
Welcome Thank you for your interest in the Lewis & Clark Viaduct Concept Study Please use the arrows in the upper left hand corner to navigate through the presentation. Use the envelope icon to ask a question
More informationTRAFFIC ACTION PLAN. Laurie Meadows Neighborhood CITY OF SAN MATEO
TRAFFIC ACTION PLAN Laurie Meadows Neighborhood CITY OF SAN MATEO Draft January 2017 Table of Contents Introduction... 2 The Traffic Forum Process... 5 Neighborhood Traffic Issues... 7 Neighborhood Recommendations
More information11.2 Detailed Checklists CHECKLIST 1: FEASIBILITY STAGE AUDIT. 1.1 General topics Scope of project; function; traffic mix
11.2 Detailed Checklists CHECKLIST 1: FEASIBILITY STAGE AUDIT 1.1 General topics 1.1.1 Scope of project; function; traffic mix What is the intended function of the scheme? Is the design consistent with
More informationOff-road Trails. Guidance
Off-road Trails Off-road trails are shared use paths located on an independent alignment that provide two-way travel for people walking, bicycling, and other non-motorized users. Trails specifically along
More informationUnit Six: Driving Faster with More Risk URBAN, SUBURBAN, AND RURAL DRIVING
Unit Six: Driving Faster with More Risk URBAN, SUBURBAN, AND RURAL DRIVING What Is The Impact Of Distraction? Objectives For Unit Six Students will be able to describe the skills necessary to What safely
More informationCITY OF WEST LAKE HILLS. Forest View Neighborhood Traffic Calming Study
CITY OF WEST LAKE HILLS 901 South Mopac Expressway Building V, Suite 220 Austin, Texas 78746 Texas P.E. Firm Registration No. F-929 Klotz Associates Final Report Submittal: March 20, 2015 Revised Final
More informationVermont Permit Test Flash Cards
Vermont Permit Test Flash Cards Study online at quizlet.com/_aormb are the most likely places for car and motorcycle collisions to occur. intersections are areas around trucks where cars disappear 2. :
More informationROUTE 22 CORRIDOR STUDY: CORRIDOR MANAGEMENT PLAN APPENDIX A A-12
ROUTE 22 CORRIDOR STUDY: CORRIDOR MANAGEMENT PLAN APPENDIX A A-12 3.0 HARLEM VALLEY TRANSPORTATION PLAN Incorporates transportation systems management and safety improvements. Location: Route 22 corridor
More informationA plan for improved motor vehicle access on Railroad Avenue in Provincetown
A plan for improved motor vehicle access on Railroad Avenue in Provincetown February 2011 A plan for improved motor vehicle access on Railroad Avenue in Provincetown INTRODUCTION AND PROBLEM IDENTIFICATION
More informationPaul Huston, P.E., Design-Build Coordinator Chuck Gonderinger, HDR Engineering. Minnesota Department of Transportation (the Department)
To: From: Paul Huston, P.E., Design-Build Coordinator Chuck Gonderinger, HDR Engineering Date: March 20, 2001 Subject: Roadway Geometric Design Criteria Project: TH 14/218 Design-Build Project, SP 7408-29,
More informationINGHAM COUNTY ROAD DEPARTMENT AUSTIN E. CAVANAUGH ADMINISTRATION BUILDING 301 Bush Street, P.O. Box 38, Mason, MI
INGHAM COUNTY ROAD DEPARTMENT AUSTIN E. CAVANAUGH ADMINISTRATION BUILDING 301 Bush Street, P.O. Box 38, Mason, MI 48854-0038 March 27, 2018 William M. Conklin, P.E. Managing Director FOR IMMEDIATE RELEASE:
More informationCHAPTER 2: SIGNALS, SIGNS AND PAVEMENT MARKINGS
CHAPTER 2: SIGNALS, SIGNS AND PAVEMENT MARKINGS This chapter provides the information you need to know about Pennsylvania roadways. It covers: Signals Signs Pavement Markings SIGNALS Traffic signals are
More information180 Grand Avenue, Suite x117 Dowling Associates, Inc.
180 Grand Avenue, Suite 250 510.839.1742 x117 Oakland, CA 94612 510.839.0871 fax www.dowlinginc.com mbowman@dowlinginc.com Dowling Associates, Inc. Date: Memorandum To: CC: From: Ms. Leah Greenblat City
More informationLee s Summit Road Improvement Study Public Open House June 7, 2007 Summary of Comment Card Responses
Lee s Summit Road Improvement Study Public Open House June 7, 2007 Summary of Comment Card Responses Introduction At the Lee s Summit Road Improvement Study Public Open House held Thursday, June 7, 2007
More informationTraffic Signal Phasing Study Summary & Staff Recommendations
Traffic Signal Phasing Study Summary & Staff Recommendations Consultant Study by Skipper Consulting, Inc. Staff Committee Recommendations by Randy Pewitt, Executive Director of Emergency Mgt. and Safety
More informationCHECKLIST 2: PRELIMINARY DESIGN STAGE AUDIT
CHECKLIST 2: PRELIMINARY DESIGN STAGE AUDIT 2.1 General topics 2.1.1 Changes since previous audit Do the conditions for which the scheme was originally designed still apply? (for example, no changes to
More informationCounty of Spartanburg South Carolina
County of Spartanburg South Carolina Traffic Calming Program June 2012 (Revised/Program on Hold) PURPOSE The potential negative impacts from vehicular traffic on residential roads have been a longstanding
More informationIdentify the letter of the choice that best completes the statement or answers the question.
Chapter 10 - Practice Questions Multiple Choice Identify the letter of the choice that best completes the statement or answers the question. 1) Before passing a vehicle in your lane, a. anticipate the
More informationLINCOLNWOOD POLICE DEPARTMENT
LINCOLNWOOD POLICE DEPARTMENT 6900 N. Lincoln Avenue, Lincolnwood, IL 60712 (847) 673-2167 Robert LaMantia Chief of Police September 19, 2017 Illinois Department of Transportation Traffic Operations Bureau
More informationSmall Area Study U.S. Route 220 and VA Route 615 Intersection. Bath County, Virginia
Small Area Study U.S. Route 220 and VA Route 615 Intersection Bath County, Virginia Prepared by the Central Shenandoah Planning District Commission Final Report February 2018 Table of Contents 1. INTRODUCTION...
More information122 Avenue: 107 Street to Fort Road
: 107 Street to Fort Road November 24, 2015 4:30 8:00 p.m. Meeting Purpose Summarize project work completed to date Share results of public input from Phase 1 Share the draft concept plan and proposed
More information2014/2015 BIKE ROUTE PLAN 83 AVENUE PROTECTED BIKE LANE
About the Project 2014/2015 BIKE ROUTE PLAN The City of Edmonton is planning a major bike route on the south side of Edmonton. This bike route is one part of a plan to provide citizens with transportation
More informationCorporate. Report COUNCIL DATE: May 25, 1998 NO: R1500 REGULAR COUNCIL. TO: Mayor & Council DATE: April 27, 1998
R1500 : Traffic Safety at 25 Avenue and 128 Street Intersection Corporate NO: R1500 Report COUNCIL DATE: May 25, 1998 REGULAR COUNCIL TO: Mayor & Council DATE: April 27, 1998 FROM: General Manager, Engineering
More informationLake Whitney Elementary School
Lake Whitney Elementary School SCHOOL ROUTE PLAN For LAKE WHITNEY ELEMENTARY SCHOOL LOCATION 18 ORANGE COUNTY Prepared for: ORANGE COUNTY SCHOOL ASSESSMENT PROGRAM ORANGE COUNTY PUBLIC WORKS Traffic Engineering
More informationAGENDA ITEM 6 D THOMASVILLE ROAD (HERMITAGE BOULEVARD TO LIVE OAK PLANTATION ROAD) ROADWAY SAFETY AUDIT
May 15, 2018 AGENDA ITEM 6 D THOMASVILLE ROAD (HERMITAGE BOULEVARD TO LIVE OAK PLANTATION ROAD) ROADWAY SAFETY AUDIT TYPE OF ITEM: Discussion STATEMENT OF ISSUE The Florida Department of Transportation
More informationORANGE COUNTY TRAFFIC COMMITTEE. Intersection Control. Constituent. Deepthi Arabolu. Relocate Stop Sign
ORANGE COUNTY TRAFFIC COMMITTEE SUPERVISORIAL DISTRICT: 3 SUBJECT: Intersection Control LOCATION: Browning Avenue at Rainbow Drive; North Tustin; TB 830-E3 INITIATED BY: INVESTIGATOR: REQUEST: Constituent
More informationVT15 / Allen Martin Drive Intersection Scoping Study
VT15 / Allen Martin Drive Intersection Scoping Study ALTERNATIVES PRESENTATION MEETING DECEMBER 19, 2016 Agenda Study Area Project Background Existing Conditions Identified Issues Proposed Alternatives
More informationWISCONSIN AVENUE EXTENSION SECOND PUBLIC INFORMATION MEETING. March 28, 2017
WISCONSIN AVENUE EXTENSION SECOND PUBLIC INFORMATION MEETING March 28, 2017 STUDY AREA N MEETING AGENDA Introductions Study Background Alternatives Studied Recommended Alternative Discussion STUDY BACKGROUND
More informationTransportation Corridor Studies: Summary of Recommendations
Transportation Corridor Studies: Summary of Recommendations Route 4 Corridor Study: Route 10 Corridor Study: Route 44 Corridor Study: Route 175 Corridor Study: Route 5/15 Corridor Study: Rentschler Field
More informationCHAPTER 2: SIGNALS, SIGNS AND PAVEMENT MARKINGS
Chapter 2 - Signals, Signs and Pavement Markings CHAPTER 2: SIGNALS, SIGNS AND PAVEMENT MARKINGS This chapter provides the information you need to know about Pennsylvania roadways. It covers: Signals Signs
More informationOrange Center Elementary School
Drag and drop pic and stretch/crop to the limits of the blue rectangle (delete this text box) Orange Center Elementary School Drag and drop pic and stretch/crop to the limits of the blue rectangle (delete
More informationHIGHBURY AVENUE/HAMILTON ROAD INTERSECTION IMPROVEMENTS PUBLIC INFORMATION CENTRE 1 MAY 14, 2015
HIGHBURY AVENUE/HAMILTON ROAD INTERSECTION IMPROVEMENTS Municipal Class Environmental Assessment PUBLIC INFORMATION CENTRE 1 MAY 14, 2015 ACCESSIBILITY Under the Accessibility Standards 2015 for Customer
More informationDriveway Design Criteria
Design Manual Chapter 5 - Roadway Design 5L - Access Management 5L-4 Driveway Design Criteria A. General For efficient and safe operations, access drives and minor public street intersections can be improved
More informationTRAFFIC CALMING TOOLBOX. For the residents of the City of Decatur, Georgia
TRAFFIC CALMING TOOLBOX For the residents of the City of Decatur, Georgia 2 City of Decatur Traffic Calming Toolbox Public Works Department 2635 Talley Street Decatur, GA 30030 404.377.5571 3 Welcome to
More informationPERFORMANCE ACTIVITY 405 LIMB MANAGEMENT
PERFORMANCE ACTIVITY 405 LIMB MANAGEMENT 405 LIMB MANAGEMENT ACTIVITY DESCRIPTION Cut and/or remove and/or grind tree limbs from the right-of-way. TRAFFIC CONTROL Utilize intermittent mobile operations
More informationImproving Cyclist Safety at the Dundas Street West and Sterling Road Intersection
STAFF REPORT ACTION REQUIRED Improving Cyclist Safety at the Dundas Street West and Sterling Road Intersection Date: August 17, 2012 To: From: Wards: Reference Number: Public Works and Infrastructure Committee
More informationAccess Management Standards
Access Management Standards Section 1: Application of Access Standards This chapter describes the Department's access management standards for access connections on the county roadway system. The standards
More informationPRIORITIES RESULTS YOUR PRIORITIES FOR BRIDGEPORT 5% 4% 13% RESIDENTIAL CHOICES TRAILS & PARKS
Community Visioning Open House The Community Visioning Open House was held on January, 31st 2018 at Harrisburg Area Community College (HACC), Lancaster Campus. Approximately 80 people attended this Open
More informationMASER ASSOCIATES. Engineers Planners Surveyors TRAFFIC IMPACT ANALYSIS FOR PROPOSED RESIDENTIAL MULTI-FAMILY SEA GULL VILLAGE TOWNSHIP OF COLTS NECK
000 MASER ASSOCIATES Engineers Planners Surveyors TRAFFIC IMPACT ANALYSIS FOR PROPOSED RESIDENTIAL MULTI-FAMILY DEVELOPMENT SEA GULL VILLAGE TOWNSHIP OF COLTS NECK MONMOUTH COUNTY Prepared By: Richard
More informationPrepared By: Town of Waxhaw Traffic Calming Policy
Policy For Resolutions for Town Meetings Prepared By: Town Manager Michael McLaurin Director Greg Mahar CPD Waxhaw N.C. Community Planning &Development Administrative Department Department: Date Approved
More informationHidden Oaks Elementary School
Hidden Oaks Elementary School SCHOOL ROUTE PLAN For HIDDEN OAKS ELEMENTARY SCHOOL LOCATION 13 ORANGE COUNTY Prepared for: ORANGE COUNTY SCHOOL ASSESSMENT PROGRAM ORANGE COUNTY PUBLIC WORKS Traffic Engineering
More informationBrief Outline of the Neighborhood Traffic Management Program (NTMP)
Brief Outline of the Neighborhood Traffic Management Program (NTMP) Typically, this is the process after Department of Public Works (DPW) receives a request for speed humps, complaints about speeding,
More informationPublic Meeting #1 Comment Summary
Public Meeting #1 Comment Summary This summary includes comments received on comment forms and during conversations between attendees and project team staff at the February 18, 2016 public open house.
More informationInterstate Route 77 / US Route 62 / State Route 687 (Fulton Road) Transportation Improvement Project. Prepared September 6, 2017
EODOT Project: ODOT Project: STA-IR 77-.50; PID 00290 Interstate Route 77 / US Route 62 / State Route 687 (Fulton Road) Transportation Improvement Project Summary of Public Comments Received and Responses
More informationChapter Twenty-eight SIGHT DISTANCE BUREAU OF LOCAL ROADS AND STREETS MANUAL
Chapter Twenty-eight SIGHT DISTANCE BUREAU OF LOCAL ROADS AND STREETS MANUAL Jan 2006 SIGHT DISTANCE 28(i) Chapter Twenty-eight SIGHT DISTANCE Table of Contents Section Page 28-1 STOPPING SIGHT DISTANCE
More informationCaltrans Sloat Boulevard Pedestrian Safety Project Response to Community Questions, Comments & Concerns
Caltrans Sloat Boulevard Pedestrian Safety Project Response to Community Questions, Comments & Concerns Revised: May 10, 2016 The California Department of Transportation (Caltrans) is planning various
More information91
90 91 92 93 94 95 96 97 98 99 100 101 102 103 104 105 106 As previously depicted in Exhibit 4-J, vehicular accidents are shown along Forrester Road. The contributing factors may be due to its current two
More informationRoad Markings. Lecture Notes in Transportation Systems Engineering. Prof. Tom V. Mathew
Road Markings Lecture Notes in Transportation Systems Engineering Prof. Tom V. Mathew 1 Overview The essential purpose of road markings is to guide and control traffic on a highway. They supplement the
More informationCHAPTER 6H. TYPICAL APPLICATIONS
Section 6H.01 Typical Applications Support: CHAPTER 6H. TYPICAL APPLICATIONS Chapter 6G contains discussions of typical temporary traffic control activities. Chapter 6H presents typical applications for
More informationPublic Information Centre
WELCOME Public Information Centre Father Tobin Road Lougheed Middle School - Library Wednesday November 7, 2012 7:00 p.m.to 9:00 p.m. Please sign in Neighbourhood Traffic Calming Guide Background The City
More informationMalvern Borough Local Traffic Calming
Malvern Borough Local Traffic Calming Purpose: To address speeding and high volume cut-through traffic on Malvern Borough owned residential streets. Traffic Calming Measures: Traffic Calming Measures (TCM)
More informationWhy do you think the chances of a collision are greater at an intersection than at any other point on the roadway?
UNIT 5 PACKET 1 NAME: HOUR: DATE: NO: Chapter 7 Negotiating Intersections THINK*PAIR*SHARE In a group of 2 to 3 people write down at least 4 things that would require your attention to safely navigate
More informationTraffic Calming Policy
Article I. Purpose and Goal. The purpose of this policy is to establish criteria and procedures the City will use to evaluate requests for, and if appropriate, implement traffic calming measures. Neighborhood
More informationPERFORMANCE ACTIVITY 306 DRAINAGE PIPE WORK DESCRIPTION 4
PERFORMANCE ACTIVITY 306 DRAINAGE PIPE WORK DESCRIPTION 1 WORK DESCRIPTION 2 WORK DESCRIPTION 3 WORK DESCRIPTION 4 Repair Install Remove Clean 306 DRAINAGE PIPE ACTIVITY DESCRIPTION Install, repair, clean,
More informationDrag and drop pic and stretch/crop to the limits of the blue rectangle (delete this text box) Maxey Elementary School
Drag and drop pic and stretch/crop to the limits of the blue rectangle (delete this text box) Maxey Elementary School SCHOOL ROUTE PLAN For MAXEY ELEMENTARY SCHOOL LOCATION 33 ORANGE COUNTY Prepared for:
More informationTechnical Memorandum TO: Joel DeNunzio, P.E. Residency Administrator Charlottesville Residency FROM:
M April 18, 2017 SUBJECT: Study Requests Batesville, VA Albemarle County R E E F E I SS G I ONAL EN N CO M DATE: ALIREZA FARHANGI Lic. No. 055515 O Jamison Brown Traffic Engineer Culpeper District Traffic
More informationTRAFFIC ACTION PLAN. North Central Neighborhood CITY OF SAN MATEO
TRAFFIC ACTION PLAN North Central Neighborhood CITY OF SAN MATEO Draft February 2017 Table of Contents Introduction... 1 The Traffic Forum Process... 4 Neighborhood Traffic Issues... 6 Neighborhood Recommendations
More informationWELCOME Public Information Centre
WELCOME Public Information Centre Fernforest Drive Brampton Soccer Centre Community Room #2 Tuesday January 19, 2016 6:30 p.m.to 9:00 p.m. Please sign in Neighbourhood Traffic Calming Guide Background
More informationClay Street Bridge Replacement Project
Clay Street Bridge Replacement Project Frequently Asked Questions (FAQs) The project is located in downtown Placerville on Clay Street between US Highway 50 and Main Street and Cedar Ravine Road. The proposed
More informationBrevoort Neighbourhood (Proposed Draft Plan) TRAFFIC REVIEW Wednesday, September 24, 2014, 7:00 9:00 P.M. Walter Murray Collegiate
Brevoort Neighbourhood (Proposed Draft Plan) TRAFFIC REVIEW Wednesday, September 24, 2014, 7:00 9:00 P.M. Walter Murray Collegiate Facilitators: Mitch Riabko & Kathy Dahl (Great Works Consulting) Meeting
More informationNewtown Borough Integrated Transportation and Circulation Study
Newtown Borough Integrated Transportation and Circulation Study JANUARY, 2012 Submitted by: Jacobs Engineering Group Inc. 1247 Ward Avenue, Suite 100 West Chester, Pennsylvania 19380-4259 HEADER Table
More informationResidential Traffic Calming Program Guide. Town of Ashland, Virginia
Residential Traffic Calming Program Guide Town of Ashland, Virginia August 1, 2006 TABLE OF CONTENTS A. INTRODUCTION... 1 B. GOALS... 1 C. CRITERIA... 1 D. IDENTIFYING NEIGHBORHOOD TRAFFIC CONCERNS...
More informationCONTENTS EXECUTIVE SUMMARY 1
CONTENTS CHAPTER PAGE EXECUTIVE SUMMARY 1 1 ISSUES AND PURPOSE OF THE ANALYSIS 2 1.1 Background 2 1.2 Analysis Area 2 1.3 Issues and Observations 3 1.4 Project and Public Meetings 3 2 LIST OF PREFERRED
More informationPractical Application of Turn Lane Design Criteria in Developing Suburban & Urban Corridors
Practical Application of Turn Lane Design Criteria in Developing Suburban & Urban Corridors Presented by Gilmer D. Gaston, P.E., PTOE October 14, 2014 San Antonio Austin Houston Fort Worth Dallas When
More informationRoad Traffic Signs in Germany
Warning signs Road Traffic Signs in Germany General danger Curve left Curve right Double curve Double curve Accident hazard Sliding danger Winter sports along road Soft shoulder Rough road edge Steep upgrade
More informationMake Lincoln Highway an economically vibrant corridor that is safe, efficient, and beautiful for local residents and visitors.
Lincoln Highway Streetscape Plan Stakeholder Workshop #2 Handout Contents Introduction and Project Vision Planning Principles Specific Recommendations including a Proposed Typical Roadway Section Renderings
More informationINTERSECTION SITE SAFETY ASSESSMENTS DUBUQUE COUNTY, IOWA
TECHNICAL MEMORANDUM To: Chandra Ravada, East Central Intergovernmental Association From: David Veneziano, Iowa LTAP Safety Circuit Rider and the RSA Team Date: August 6, 2018 Re: Safety Assessment Intersections
More informationCHAPTER 6H. TYPICAL APPLICATIONS
2006 Edition Page 6H-1 CHAPTER 6H. TYPICAL APPLICATIONS Section 6H.01 Typical Applications Support: Whenever the acronym TTC is used in this Chapter, it refers to temporary traffic control. Standard: The
More informationROUNDABOUTS. Improving Safety and Efficiency. SR83 & Smithville Western Rd. Joel Montgomery, PE Director of Administration
ROUNDABOUTS Improving Safety and Efficiency SR83 & Smithville Western Rd. Joel Montgomery, PE Director of Administration The Ohio Department of Transportation District 3 906 North Clark Ave. Ashland, OH
More informationHow Might Connected Vehicles and Autonomous Vehicles Influence Geometric Design? October 10, 2017
How Might Connected Vehicles and Autonomous Vehicles Influence Geometric Design? October 10, 2017 Overview Design Vehicle Design Driver Potential Geometric Impacts of Autonomous Vehicles Connected Vehicles
More information11 CHECKLISTS Master Checklists All Stages CHECKLIST 1 FEASIBILITY STAGE AUDIT
11 CHECKLISTS 11.1 Master Checklists All Stages CHECKLIST 1 FEASIBILITY STAGE AUDIT 1.1 General topics 1. Scope of project; function; traffic mix 2. Type and degree of access to property and developments
More informationParks Highway: MP Lucus Road to Big Lake Road
2 Purpose and Need 2.1 Corridor History The Parks Highway is a 324-mile long Rural Interstate Highway that extends from its intersection with the Glenn Highway north to Fairbanks, Alaska. The Parks Highway
More informationSECTION 12 ROAD MARKINGS AND DELINEATION
SECTION 12 ROAD MARKINGS AND DELINEATION (Blank Page) MANUAL OF TRAFFIC SIGNS AND MARKINGS - Part III: Motorways and Expressways 12-1 12.1 GENERAL 12.1.1 INTRODUCTION The markings and delineation details
More informationBICYCLE RULES OF THE ROAD
ILLINOIS ILLINOIS ILLINOIS ILLINOIS ILLINOIS ILLINOIS ILLINOIS ILLINOIS BICYCLE RULES OF THE ROAD Jesse White Secretary of State Bicycle riding is a great way to get into shape and enjoy the outdoors.
More informationRank #1 Highest Priority Intersection
Rank #1 Highest Priority Intersection Attachment 3: Proposed Interventions Pedestrian Safety City of Toronto s 10 Priority Intersections Sheppard Avenue East and Ambrose Road/Provost Drive Located in the
More information