1 Gateway Transportation Study Amherst, Massachusetts SUBMITTED TO University of Massachusetts Amherst Town of Amherst SUBMITTED BY Vanasse Hangen Brustlin, Inc. Watertown, Massachusetts March 213

2 Back of cover page

3 Transportation Study University of Massachusetts Town of Amherst Gateway Transportation Study Prepared for University of Massachusetts Amherst The Town of Amherst Amherst, Massachusetts Prepared by Vanasse Hangen Brustlin, Inc. Watertown, Massachusetts March 213

4 Back of cover page

5 Table of Contents Summary Introduction Project Description Study Methodology Existing Conditions Existing Roadway Network Existing Traffic Volumes Vehicle Patterns - Lincoln Avenue and Fearing Street Pedestrian Volumes Vehicular Crash History Future Conditions No-Build Traffic Build Traffic Traffic Operations Level of Service Criteria Existing Conditions No-Build Condition Build Condition Proposed Roadway Improvements East-West Connector Road Pedestrian Volumes with Phillips Street Pedestrian Corridor Intersection of Triangle Street at East Pleasant Street Recommendations TS\1858.7\reports\Gateway_Transportation_Study_FINAL.docx i Contents

6 Tables Table Page Table 1 Weekday Traffic Volumes... 8 Table 2 Vehicular Crash Summary (29-211) Table 3 Vehicular Crash Summary (29-211) Table 4 Vehicle Trip Generation for Background Development... 2 Table 5 Trip Distribution Summary Table 6 Mode Share for Residents and Workers in Amherst from the 2 Census Table 7 UMass Commute Modes Table 8 Build Condition Trip Generation by Area Table 9 Build Condition Gateway Trip Generation Total Table 1 Intersection Level-of-Service Criteria Table 11 Signalized Intersection Capacity Analysis Summary Existing Conditions Table 12 Unsignalized Intersection Capacity Analysis Summary Existing Conditions Table 13 Signalized Intersection Capacity Analysis Summary No Build Conditions Table 14 Unsignalized Intersection Capacity Analysis Summary No Build Conditions Table 15 Signalized Intersection Capacity Analysis Summary Build Condition Table 16 Build Condition with and without Roundabout at Massachusetts Ave and North Pleasant St Table 17 Unsignalized Intersection Capacity Analysis Summary Build Conditions Table 18 Build vs. Build with Diverted Garage Trips - Massachusetts Avenue at North Pleasant Street Table 19 Build vs. Build with Diverted Garage Trips - Unsignalized Intersections Figures Figure Page Figure 1 Gateway Redevelopment Area... 4 Figure 2 Transportation Study Area... 6 Figure 3 Existing Conditions - Morning Peak Hour Volumes... 1 Figure 4 Existing Conditions - Evening Peak Hour Volumes Figure 5 Directional Volumes on Lincoln Avenue Figure 6 Directional Volumes on Fearing Street Figure 7 Existing Conditions - Pedestrian Volumes (1:3 PM - 11:3 PM) Figure 8 Existing Conditions - Pedestrian Volumes (12: AM - 1: AM) Figure 9 Trip Distribution Figure 1 No-build Traffic Volumes Morning Peak Hour Figure 11 No-build Traffic Volumes Evening Peak Hour Figure 12 Site Generated Trips - Morning Peak Hour Figure 13 Site Generated Trips - Evening Peak Hour... 3 Figure 14 Build Traffic Volumes - Morning Peak Hour Figure 15 Build Traffic Volumes - Evening Peak Hour Figure 16 Proposed Roadway Improvements Figure 17 Diverted Garage Trips Figure 18 Pedestrian Diversion Volumes (1:3 PM 11:3 PM)... 5 Figure 19 Pedestrian Diversion Volumes (12: AM - 1: AM) TS\1858.7\reports\Gateway_Transportation_Study_FINAL.docx ii Contents

7 Summary Vanasse Hangen Brustlin, Inc. (VHB) has evaluated the transportation impacts associated with the redevelopment of the Gateway area along East Pleasant and Triangle Streets in Amherst. The redevelopment involves a clustered mixed-use development that includes retail, office, residential, hotel, and open space elements. The analyses include a 1-year forecast, which accounts for the Phase 1 elements of the UMass Master Plan. This report is organized into five chapters: Chapter 1 - Introduction describes the purpose of the study, methodology, and defines the study area; Chapter 2 Existing Conditions presents the existing traffic demands and a review of crash trends over a 3-year period; Chapter 3 Future Conditions provides an assessment of the traffic impacts of the Gateway redevelopment over a 1-year planning horizon; Chapter 4 Traffic Operations summarizes the roadway capacity analyses for the study area intersections and quantifies how well the roadways handle peak demands; and Chapter 5 Proposed Roadway Improvements presents the roadway mitigation that is recommended to offset the traffic increases associated with the project. The following overarching conclusions were reached: The Gateway project includes land uses that are complementary to each other and self-sustaining. Retail, office, and residential uses that are clustered together support each other, thereby reducing vehicle trips and parking requirements. In addition, a relatively high non-vehicle mode share for Amherst residents and workers further reduces the number of vehicle trips generated by the project. The density of the redevelopment and its proximity to the UMass campus helps to create a strong transition and connectivity between the Town Center and UMass. TS\1858.7\reports\Gateway_Transportation_Study_FINAL.docx 1 Summary

8 Major changes to roadways or intersections are not needed to accommodate the project. The infrastructure recommendations include: New east-west connector road. A new connector road proposed in the UMass Master Plan between Lincoln Avenue and North Pleasant Street south of Massachusetts Avenue will absorb traffic that would otherwise use Fearing Street. Phillips Street pedestrian path. A pedestrian corridor along Phillips Street, through the redeveloped Lincoln Apartments and along an extension of Sunset Court from McClure Street to Lincoln Avenue is also proposed in the UMass Master Plan. This pedestrian path meets existing desire lines and diverts pedestrian traffic from Fearing Street. Triangle Street/East Pleasant Street intersection. Optimizing the signal timing/phasing at the intersection of Triangle Street and East Pleasant Street can provide an improvement in operations. Widening of this intersection was considered, along with converting the signalized intersection into a roundabout, however concerns over possible physical impacts to abutting properties and Kendrick Park outweighed any benefits from significantly altering the intersection. The next chapter of this report, Chapter 1 - Introduction, describes the study methodology and defines the key 19 intersections that were chosen based on their proximity to the Gateway project. TS\1858.7\reports\Gateway_Transportation_Study_FINAL.docx 2 Summary

9 1 Introduction Vanasse Hangen Brustlin, Inc. (VHB) has been retained by the University of Massachusetts (UMass) to evaluate the transportation impacts associated with the proposed redevelopment of the Gateway area in Amherst, Massachusetts. This study includes an evaluation of existing conditions, projection of future traffic conditions without the project, assessment of impacts associated with the Gateway redevelopment, and analysis of pedestrians and traffic impacts, including potential roadway improvements in the neighborhood south of Massachusetts Avenue. The evaluation identifies existing and potential deficiencies, and discusses potential improvements to offset project impacts as well as improve existing deficiencies. 1.1 Project Description As shown in Figure 1, the Gateway redevelopment project is comprised of three separate zones, the Gateway Neighborhood zone (North), the Gateway zone (Central), and Town Center Expansion zone (South). Over all three zones, the project includes the following elements: 29 residential units; 159,29 square feet of retail space; 47,97 square feet of office space; a 1-room hotel; and 3.52 acres of open space. The project encompasses land areas on both sides of North Pleasant Street between Massachusetts Avenue and Triangle Street, Kendrick Park, and East Pleasant Street between Triangle Street and Hallock Street. TS\1858.7\reports\Gateway_Transportation_Study_FINAL.docx 3 Introduction

10 \\mawatr\ts\1858.7\graphics\figures\redevelopment_area.indd Massachusetts Avenue North Pleasant Street East Pleasant Street Fearing Street Triangle Street Vanasse Hangen Brustlin, Inc. Gateway Redevelopment Area Figure 1 University of Massachusetts Gateway Traffic Study Amherst, MA

11 1.2 Study Methodology The transportation impact assessment of the Gateway project involved three steps. For the first step included defining the study area and completing inventories of roadway geometry, observations of traffic flow, and traffic data collection. The second step involved projecting the future traffic demands onto the roadway network with and without the Gateway project. The final step was an evaluation of how well the roadways and intersections handle the future traffic demands and identifying mitigation to offset any impacts. As illustrated in Figure 2, the study area includes the following 19 intersections: Signalized intersections (4 locations): Commonwealth Avenue at Massachusetts Avenue North Pleasant Street at Massachusetts Avenue Triangle Street at East Pleasant Street Triangle Street/Dickinson Street at Main Street Unsignalized intersections (15 locations): North University Drive at Massachusetts Avenue Sunset Avenue at Massachusetts Avenue (Eastbound) Lincoln Avenue at Massachusetts Avenue (Eastbound) Robsham Visitor Center Driveway (In) at Massachusetts Avenue (Eastbound) Robsham Visitor Center Driveway (Out) at Massachusetts Avenue (Eastbound) Parking Lot 34 Driveway at Massachusetts Avenue (Eastbound) Parking Lot 34 Driveway at Massachusetts Avenue (Westbound) Presidents Drive (Out) at Massachusetts Avenue (Westbound) Presidents Drive (In) at Massachusetts Avenue (Westbound) Lot 71 Driveway at Massachusetts Avenue (Westbound) Fearing Street at North University Drive Fearing Street at Sunset Avenue Fearing Street at Lincoln Avenue Fearing Street at North Pleasant Street Cottage Street/Pray Street at Triangle Street Once the existing conditions were evaluated, future traffic demands with and without the Gateway project were estimated to assess the likely impact of the project. Traffic growth from other area developments and planned UMass growth in the next ten years under Phase 1 of the Master Plan were layered into the forecast. Traffic flow analyses were completed for morning and evening peak hour conditions under three scenarios: Existing Conditions; No-Build Conditions (Existing Conditions plus area development and Phase 1 of the UMass Master Plan); and Build Conditions (No- Build Condition plus the Gateway project). Potential measures to address existing or projected deficiencies were identified and evaluated. TS\1858.7\reports\Gateway_Transportation_Study_FINAL.docx 5 Introduction

12 \\mawatr\ts\1858.7\graphics\figures\study_area.indd Vanasse Hangen Brustlin, Inc. Figure 2 Transportation Study Area

13 2 Existing Conditions To understand the traffic impacts associated with the Gateway project, a thorough review of the existing roadway system and its operations was conducted. Existing conditions observed in the study area included an inventory of roadway and intersection geometry; collection of daily and peak period traffic volumes; and examination of intersection crash data. 2.1 Existing Roadway Network The four primary roadways in the study area are North Pleasant Street, Massachusetts Avenue, Fearing Street, and Lincoln Avenue. North Pleasant Street is a two-lane, two-way roadway that travels north/south through the center of the UMass campus, connecting Amherst center with North Amherst. The roadway is under the jurisdiction of the Town of Amherst. Accommodating vehicles, buses, pedestrians, and bicyclists, North Pleasant Street serves both the University and Amherst center as well as through traffic. It is the main north/south transit route for UMass shuttle buses and Pioneer Valley Transit Authority (PVTA) local and regional buses. North Pleasant Street carries approximately 12, vehicles per day between Fearing Street and Massachusetts Avenue. Massachusetts Avenue is a four-lane, median divided roadway that travels east/west between North Pleasant Street and North University Drive. The roadway is under the jurisdiction of UMass. It separates the main UMass campus from several parking lots and the Southwest Residential Area. Massachusetts Avenue handles approximately 13,8 vehicles per day. Massachusetts Avenue provides direct access to several parking lots, Whitmore Administration Building, and to the major regional and local bus stop at Haigis Mall. Fearing Street is a residential two-way, two-lane roadway that runs parallel to Massachusetts Avenue connecting North University Drive with North Pleasant Street. Fearing Street is under the jurisdiction of the Town of Amherst and carries approximately 3,3 vehicles per day. TS\1858.7\reports\Gateway_Transportation_Study_FINAL.docx 7 Existing Conditions

14 Lincoln Avenue is a two-way, two-lane roadway that connects Massachusetts Avenue, Fearing Street, and Amity Street to Northampton Street (Route 9). Lincoln Avenue is under the jurisdiction of the Town of Amherst and carries approximately 2,5 vehicles per day north of Fearing Street. It provides direct access to UMass Lot 32 and the Lincoln Apartments (University of Massachusetts housing). 2.2 Existing Traffic Volumes To quantify existing traffic flow patterns along the roadways serving the Gateway area, peak-hour and daily traffic volumes were collected. Turning movement counts (TMCs) were collected at the 19 key intersections during the typical weekday peak periods of travel (7: AM to 9: AM and 4: PM to 6: PM). Daily traffic volume counts were collected on the key roadway segments over a 48-hour period using automatic traffic recorders (ATRs). As shown in Table 1, daily traffic volumes vary significantly along study area roadways. The two most heavily traveled roadways in the study area are Massachusetts Avenue and North Pleasant Street. Massachusetts Avenue carries approximately 12,2 vehicles per day and North Pleasant Street carried approximately 12, vehicles per day. The lowest volumes were recorded on Sunset Avenue (9 vehicles per day) and Lincoln Avenue (2,7 vehicles per day). Table 1 Weekday Traffic Volumes Morning Peak Hour Location Daily 3 Vol 4 Factor 5 K Dir. Dist. 6 Evening Peak Hour K Vol Factor Dir. Dist. Massachusetts Ave East of Commonwealth Ave 1 12, % 54% EB 1,7 8.8% 54%WB North Pleasant Street North of Fearing Street 2 12, % 7% NB 9 7.5% 57%SB North University Drive North of Fearing Street 2 9, % 51% NB % 6%SB Fearing Street West of Nutting Avenue 2 3, % 56% WB % 52%EB Lincoln Avenue South of Lincoln Apartments 2 2, % 83% NB % 73%SB Sunset Avenue South of Massachusetts Avenue % 59% SB 8 8.9% 59%SB Source: Daily and peak hour traffic counts conducted by UMass ITE Student Chapter 1. Based on counts conducted on April 26 and 27, Based on count conducted on October 12 and 13, Daily - Average daily traffic volume expressed in vehicles per day 4. Vol Hourly volume, expressed in vehicles per hour 5. K Factor The percent of weekday daily traffic that occurs during the peak hour 6. Dir. Dist. The directional distribution of traffic TS\1858.7\reports\Gateway_Transportation_Study_FINAL.docx 8 Existing Conditions

15 Weekday morning and evening peak period TMCs were conducted at the 19 study area intersections. The data were used to establish existing peak hour traffic conditions at the study intersections. Existing morning and evening peak hour traffic volumes are presented in Figures 3 and 4, respectively. All traffic count data are included in the Appendix. 2.3 Vehicle Patterns - Lincoln Avenue and Fearing Street Travel patterns along Lincoln Avenue and Fearing Street are discussed in this section. Table 1 in the previous section summarized the vehicle directional volume on Lincoln Avenue and Fearing Street during the morning and evening peak hours. Figures 5 and 6 illustrate the hourly volumes by direction on Lincoln Avenue and Fearing Street. On Lincoln Avenue (Figure 5), most of the traffic heads northbound toward campus in the morning and southbound from campus in the evening. During the morning peak, approximately 2 vehicles travel northbound (toward campus). The southbound flow in the morning is approximately 5 vehicles. During the evening peak hour, approximately 19 vehicles are headed southbound and 7 vehicles northbound. The maximum two-way volume was 26 vehicles between 4: and 5: PM. Unlike Lincoln Avenue, traffic on Fearing Street is fairly evenly split over the day in each direction. The eastbound flow toward North Pleasant Street is almost identical to the westbound flow toward North University Drive over the entire day. Traffic on Fearing Street is notably higher in the evening peak hour compared to the morning peak hour. TS\1858.7\reports\Gateway_Transportation_Study_FINAL.docx 9 Existing Conditions

16 \\mawatr\ts\1858.7\graphics\figures\8x11_networks.indd Ave Ave Vanasse Hangen Brustlin, Inc. Figure 3 Existing Conditions Weekday Morning Not to Scale

17 \\mawatr\ts\1858.7\graphics\figures\8x11_networks.indd Ave Ave Vanasse Hangen Brustlin, Inc. Figure 4 Existing Conditions Weekday Evening Not to Scale

18 12: AM 1: AM 2: AM 3: AM 4: AM 5: AM 6: AM 7: AM 8: AM 9: AM 1: AM 11: AM 12: PM 1: PM 2: PM 3: PM 4: PM 5: PM 6: PM 7: PM 8: PM 9: PM 1: PM 11: PM Number of Vehicles 12: AM 1: AM 2: AM 3: AM 4: AM 5: AM 6: AM 7: AM 8: AM 9: AM 1: AM 11: AM 12: PM 1: PM 2: PM 3: PM 4: PM 5: PM 6: PM 7: PM 8: PM 9: PM 1: PM 11: PM Number of Vehicles Figure 5 Directional Volumes on Lincoln Avenue Lincoln Avenue Northbound Southbound Combined Figure 6 Directional Volumes on Fearing Street Fearing Street Westbound Eastbound Combined TS\1858.7\reports\Gateway_Transportation_Study_FINAL.docx 12 Existing Conditions

19 2.4 Pedestrian Volumes Residents in the neighborhood along Lincoln Avenue and Fearing Street have expressed concerns regarding the volume of pedestrians traveling on these streets during the late night on Friday and early morning on Saturday. Lincoln Avenue and Fearing Street are the most direct routes for students traveling between the Southwest Residential Area and the bars and restaurants in downtown Amherst. Pedestrian turning movement counts were conducted on a clear Friday night (October 21, 211) at the intersections of Fearing Street at Lincoln Avenue and Fearing Street at North Pleasant Street. The counts were conducted between 9:3 PM and 2:3 AM (see Figures 7 and 8). The hours with the highest pedestrian volumes were 1:3 PM to 11:3 PM and midnight to 1: AM. The volumes for those two hours are presented in Figures 7 and 8. Approximately 21 pedestrians were observed on Fearing Street east of Lincoln Avenue between 1:3 PM and 11:3 PM. The majority (165) were walking east toward Nutting Avenue and North Pleasant Street. Between 12: AM and 1: AM, 165 pedestrians were counted in the same location. Almost 1 pedestrians were walking west toward Lincoln Avenue. These directional flows are reflective of travel to downtown in the late evening and return travel from downtown in the early morning. TS\1858.7\reports\Gateway_Transportation_Study_FINAL.docx 13 Existing Conditions

20 1 \\mawatr\ts\1858.7\graphics\figures\net_base.dwg Not to Scale Note: Volumes at Nutting Avenue were estimated based on volumes at Lincoln Avenue and North Pleasant Street. Vanasse Hangen Brustlin, Inc. Figure 7 Existing Conditions Pedestrian Volumes Friday October 21, 211 1:3-11:3 PM

21 \\mawatr\ts\1858.7\graphics\figures\net_base.dwg Not to Scale Note: Volumes at Nutting Avenue were estimated based on volumes at Lincoln Avenue and North Pleasant Street. Vanasse Hangen Brustlin, Inc. Figure 8 Existing Conditions Pedestrian Volumes Friday October 21, : - 1: AM

22 2.5 Vehicular Crash History To determine if there are an excessive number of crashes occurring at the study area intersections, crash data were obtained from the Amherst Police Department and the University of Massachusetts Police Department for a three-year period from 29 to 211. Tables 2 and 3 summarize the crash data. There were 56 crashes over the 3-year period 29 to 211 period at the 19 study area intersections. The leading types of crashes were angle (19), followed by head-on and rear-end crashes (11 each). Forty-nine of the 56 crashes occurred on dry pavement and approximately 32 percent occurred in the weekday morning (7-9 AM) or evening (4-6 PM) peak periods. Of the 35 accidents for which crash severity was reported, only four resulted in personal injury and there were no fatalities. The highest crash location was Massachusetts Avenue at North University Drive with 14 crashes, followed by Massachusetts Avenue at Commonwealth Avenue with 11 crashes. The intersections of Massachusetts Avenue eastbound at Sunset Avenue and Massachusetts Avenue at North University Drive each had a crash that involved a pedestrian. Yearly intersection crash rates have been calculated for each intersection based on existing traffic volumes and the number of crashes. Crash rates are expressed in accidents per million entering vehicles per year. Also reported are the average crash rates for signalized and unsignalized intersections in MassDOT District 2. With the exception of North University Drive at Massachusetts Avenue, existing crash rates at the intersections analyzed are well below the state averages. The crash rate at North University Drive and Massachusetts Avenue is just below the District 2 average for unsignalized locations. TS\1858.7\reports\Gateway_Transportation_Study_FINAL.docx 16 Existing Conditions

23 Table 2 Vehicular Crash Summary (29-211) Fearing St at N. University Dr Fearing St at Sunset Ave Fearing St at Lincoln Ave Fearing St at N. Pleasant St Triangle St at E. Pleasant St Triangle St at Cottage St/ Pray St Triangle St at Main St Year Total Calculated Crash Rate MassDOT District 2 Rate Exceed? No No No No No No No Collision Type Angle Head-on 1 1 Rear-end 3 3 Rear-to-Rear 1 1 Sideswipe, opposite direction Sideswipe, same direction Single vehicle crash Unknown Crash Severity Fatal injury Non-fatal injury Property damage only Unknown Time of Day Weekday, 7: AM - 9: AM 1 1 Weekday, 4: PM - 6: PM Saturday, 11: AM - 2: PM Weekday, other time Weekend, other time Pavement Conditions Dry Wet Snow 1 1 Non Motorist (Bike, Ped) Total Source: Town of Amherst Police Department Total TS\1858.7\reports\Gateway_Transportation_Study_FINAL.docx 17 Existing Conditions

24 Table 3 Vehicular Crash Summary (29-211) Mass. Ave at N University Dr Mass. Ave at N. Pleasant Street Mass. Ave at Comm. Ave Mass. Ave EB at Sunset Ave Mass. Ave EB at Lincoln Ave Mass. Ave WB at Parking Lot 71 Mass. Ave EB at Robsham Entrance Mass. Ave WB at Presidents Drive (Out) Mass. Ave EB at Robsham Exit Mass. Ave WB at Presidents Drive (In) Year Total Calculated Crash Rate MassDOT District 2 Rate Exceed? No No No No No No No No No No No No Collision Type Angle Head-on Rear-end Rear-to-Rear Sideswipe, opposite direction 1 1 Sideswipe, same direction Single vehicle crash Unknown 1 1 Crash Severity Fatal injury Non-fatal injury Property damage only Unknown Time of Day Weekday, 7: AM - 9: AM Weekday, 4: PM - 6: PM Saturday, 11: AM - 2: PM 1 1 Weekday, other time Weekend, other time 4 4 Pavement Conditions Dry Wet Snow 1 1 Non Motorist (Bike, Ped) Total Source: UMass Police Department Mass. Ave EB at Parking Lot 34 Mass. Ave WB at Parking Lot 34 Total TS\1858.7\reports\Gateway_Transportation_Study_FINAL.docx 18 Existing Conditions

25 3 Future Conditions To assess the traffic impacts of the Gateway redevelopment, future traffic conditions were analyzed with and without the project over a 1-year planning horizon. Volumes on the roadway network under the future No-Build condition (without the project) were assumed to include existing traffic, traffic resulting from Phase I development in the UMass Master Plan and traffic from other development in Amherst. Anticipated traffic from the Gateway project was added to the No-Build traffic volumes to reflect Build conditions in the study area. 3.1 No-Build Traffic Trip Generation Traffic growth on area roadways is a function of expected land development, economic activity, changes to the transportation network, and changes in demographics. A frequently used procedure is to identify estimated traffic generated by planned new developments that would be expected to affect study area roadways. In addition, the increase of study area traffic volumes due to increases in UMass employment and student enrollment was included as a part of traffic growth without the proposed Gateway redevelopment. The Gateway redevelopment project is located at the southeast entrance of the University of Massachusetts. The majority of University traffic travels through the redevelopment area. As a result, the increase in staff, faculty and students during Phase I development of the UMass Master Plan (ten-year period) is included as part of the background traffic growth under the No-Build Condition. In addition to accounting for Phase I Master Plan traffic, the traffic associated with other planned and/or approved developments near the study area was considered. Based on consultation with Town of Amherst officials, approximately 6, square feet of retail space and 48 condominium units were included as part of the No-Build Condition. The trip generation for this development is shown in Table 4. The TS\1858.7\reports\Gateway_Transportation_Study_FINAL.docx 19 Future Conditions

26 proposed development is expected to add approximately 15 morning peak hour trips and 24 evening peak hour trips to the area roadway network. The total new trips accounted for the vehicle mode share for both land uses. The background development is expected to have vehicle mode shares of 7. percent and 63.4 percent respectively. Table 4 Vehicle Trip Generation for Background Development Use Retail (6 ksf) 1 Condominium (48 units) 2 Total Weekday AM Peak Hour 3 Enter Exit Total Weekday PM Peak Hour 3 Enter Exit Total Institute of Transportation Engineers, Trip Generation, 8th Edition - Land Use Code 23 [Residential Condominium/Townhouse]; average rates. 2 Institute of Transportation Engineers, Trip Generation, 8th Edition - Land Use Code 875 [Department Store (non-christmas)]; average rates. 3 expressed in vehicles per hour Trip Distribution and Assignment The trips generated by expected (No-Build) and proposed (Build) development were distributed and assigned to area roadways based on 2 Census Journey To-Work data. Almost two-thirds of Amherst residents work in Amherst and about 5 percent of people who work in Amherst live in Amherst. As a result, an averaged trip distribution was used. The directional distribution of trips to and from the Gateway project is summarized in Table 5 and illustrated on Figure 9. Commonwealth Avenue, North Pleasant Street and North University Drive are the primary routes for vehicles accessing the Gateway area. Detailed directional distribution calculations are presented in the Appendix. The new morning and evening peak hour traffic generated by the No-Build and Build developments was assigned to the area roadways based on the trip distribution patterns illustrated on Figure 9 and summarized in Table 5. No-Build development traffic was added to the existing traffic volumes to establish No-Build traffic volumes. The No-Build traffic volume networks for the morning and evening peak hours are shown in Figures 1 and 11. TS\1858.7\reports\Gateway_Transportation_Study_FINAL.docx 2 Future Conditions

27 Table 5 Trip Distribution Summary Travel Route To/From Percent of Site Traffic Commonwealth Avenue Northwest 38% North Hadley Road West 7% Lincoln Avenue/Fearing Street North 2% Route 9 (Northampton Street) West 26% North Pleasant Street North 6% South 12% Main Street East 2% East Pleasant Street North 2% Triangle Street Southeast 5% All Routes 1% 3.2 Build Traffic Design year (Build) traffic volumes for the study area roadways were determined by projecting site-generated traffic and assigning it to the study area roadways. The projected site-generated traffic volumes were added to the No-Build networks to create the Build traffic volume networks. The following sections describe the procedures used to develop the Build networks which represent a 1-year planning horizon. Trip Generation Trip generation was calculated for the proposed Gateway redevelopment using the Institute of Transportation Engineer s (ITE) Trip Generation, 8th Edition. The following ITE Land Use Codes (LUC) were used: LUC 23 Residential Condominium/Townhouse LUC 31 Hotel LUC 71 General Office Building LUC 875 Department Store (non-christmas) TS\1858.7\reports\Gateway_Transportation_Study_FINAL.docx 21 Future Conditions

28 \\mawatr\ts\1858.7\graphics\figures\8x11_networks.indd Ave Vanasse Hangen Brustlin, Inc. Figure 9 Trip Distribution Not to Scale

29 \\mawatr\ts\1858.7\graphics\figures\8x11_networks.indd Ave Ave Vanasse Hangen Brustlin, Inc. Figure 1 Not to Scale

30 \\mawatr\ts\1858.7\graphics\figures\8x11_networks.indd Ave Ave Vanasse Hangen Brustlin, Inc. Figure 11 Not to Scale

31 Mode Share ITE trip generation rates are generally developed from observations in suburban locations where the predominant mode of travel is by auto. In Amherst, other modes of travel, particularly walk and transit, are more extensively used. As a result, it was appropriate to adjust the ITE trip generation to reflect the lower auto share representative of Amherst. Local mode share was developed from the 2 Census Journey-to-Work data, which are summarized in Table 6. Separate mode shares are provided for residents of Amherst and employees who work in Amherst. Table 6 Mode Share for Residents and Workers in Amherst from the 2 Census Live in Amherst Work in Amherst Mode Number Percent Number Percent Drive Alone 9, % 12, % Carpool 1, % 1,73 8.5% Transit 1,345 8.% 1,434 7.% Walk 4, % 4,16 2.4% Bike 3, 1.8% % Taxi/Other % 19.5% Total 16,985 1.% 12,413 1.% Source: 2 Census Journey-to-Work data The auto mode share, which includes drive alone and carpool, is 63.4 percent for residents and 7.5 percent for workers in Amherst. These auto mode shares reflect the high walk shares of almost 26 percent and 2 percent respectively. The 63.4 percent auto mode share was applied to residential units and the 7.5 percent auto mode share was applied to retail and office. An auto mode share of 75 percent was assumed for the hotel. Mode share information from UMass was also reviewed to validate the use of the 2 journey-to-work data. As shown in Table 7, the total vehicle mode share at UMass declined from 77 percent in 1999 to 6 percent in 29. This decrease was offset by a 12 percent gain in the bus mode share and a 4 percent gain in the bike mode shares. The 6 percent vehicle mode share at UMass is somewhat lower than the census mode shares for all commuters. Using the census mode shares is a conservative approach to avoid potentially under estimating the vehicle trip generation for the project. TS\1858.7\reports\Gateway_Transportation_Study_FINAL.docx 25 Future Conditions

32 Table 7 UMass Commute Modes Mode Drive Alone 73% 5% Carpool 4% 1% Bus 17% 29% Bike 1% 5% Walk 3% 5% Combination 2% 1% Total 1% 1% Source: UMass Transportation Demand Management Program Mixed Use Internal Trip Capture The Gateway redevelopment is a mixed-use development, which includes residential, hotel, retail, and office uses. These uses complement each other such that there are internal trips made within the Gateway project. As a result, a portion of the total trips generated by the individual uses will not be new vehicle trips, rather they will be linked trips between each complementary use. These internal trips reduce the total vehicle trips added to the roadways. The internal capture rate between the four uses in the Gateway is projected to be 4 percent and 12 percent in the morning and evening peak hours, respectively, based on ITE guidelines 1. The external vehicle trip generation reflects these reductions. Build Condition Traffic Applying the vehicle mode shares to the ITE trip generation and reducing the total trips for internal capture results in the net new vehicle trips to and from the project. Table 8 presents the new vehicle trips generated by sub area from the proposed redevelopment. Table 9 presents the total new vehicle trips for the entire redevelopment area. The proposed development is expected to add approximately 213 morning peak hour trips and 299 evening peak hour trips to area roadways. The Gateway generated traffic was added to the No-Build traffic volumes to establish Build peak hour traffic volumes. The trips generated by Gateway were distributed to the network based on the trip distribution presented in Table 5 and Figure 9. These trips are shown in Figures 12 and 13 for the morning and evening peak hours. The resulting Build Condition morning and evening peak hour traffic volumes are shown in Figures 14 and Institute of Transportation Engineer s (ITE) Trip Generation, 9th Edition TS\1858.7\reports\Gateway_Transportation_Study_FINAL.docx 26 Future Conditions

33 Table 8 Build Condition Trip Generation by Area 1 GATEWAY NEIGHBORHOOD Use Retail Residential Hotel Office (8 ksf) (39 units) (N/A) (N/A) Weekday AM Peak Hour Enter Exit Total Weekday PM Peak Hour Enter Exit Total GATEWAY Use Retail Residential Hotel Office Units (69 ksf) (114 units) (1 rooms) (N/A) Weekday AM Peak Hour Enter Exit Total Weekday PM Peak Hour Enter Exit Total TOWN CENTER Use Retail Residential Hotel Office Units (82 ksf) (137 units) (N/A) (48 ksf) Weekday AM Peak Hour Enter Exit Total Weekday PM Peak Hour Enter Exit Total expressed in vehicles per hour Total Total Total TS\1858.7\reports\Gateway_Transportation_Study_FINAL.docx 27 Future Conditions

34 Table 9 Build Condition Gateway Trip Generation Total Retail Residential Use (159 ksf) 1 (29 units) 2 Hotel Office (1 Rooms) 3 (48 ksf) 4 Total Weekday AM Peak Hour Enter Exit Total Weekday PM Peak Hour Enter Exit Total Institute of Transportation Engineers, Trip Generation, 8th Edition - Land Use Code 875 [department store] ksf; average rates. 2 Institute of Transportation Engineers, Trip Generation, 8th Edition - Land Use Code 23 [residential condominium/townhouse] 29 dwelling units; average rates. 3 Institute of Transportation Engineers, Trip Generation, 8th Edition - Land Use Code 31 [hotel] 1 rooms; average rates. 4 Institute of Transportation Engineers, Trip Generation, 8th Edition - Land Use Code 71 [general office building] 48 ksf ; average rates. TS\1858.7\reports\Gateway_Transportation_Study_FINAL.docx 28 Future Conditions

35 \\mawatr\ts\1858.7\graphics\figures\8x11_networks.indd Vanasse Hangen Brustlin, Inc. Figure 12 Site Generated Trips Not to Scale

36 \\mawatr\ts\1858.7\graphics\figures\8x11_networks.indd Vanasse Hangen Brustlin, Inc. Figure 13 Site Generated Trips Not to Scale

37 \\mawatr\ts\1858.7\graphics\figures\8x11_networks.indd Ave Ave Vanasse Hangen Brustlin, Inc. Figure 14 Not to Scale

38 \\mawatr\ts\1858.7\graphics\figures\8x11_networks.indd Ave Ave Vanasse Hangen Brustlin, Inc. Figure 15 Not to Scale

39 4 Traffic Operations To assess the quality of traffic flow, roadway capacity analyses were conducted for 4 signalized intersections and 15 unsignalized intersections. Capacity analyses provide an indication of how well the roadway facilities handle the traffic demands placed upon them. Traffic engineering procedures and principles from the 21 Highway Capacity Manual 2 (HCM) were used to analyze the study area intersections. 4.1 Level of Service Criteria Level of service (LOS) is the term used to describe the different operating conditions that occur on a given roadway segment or intersection under various traffic volume loads. It is a qualitative measure of the effect of a number of factors including roadway geometrics, speed, travel delay, freedom to maneuver, and safety. Six levels of service are defined for each type of facility. Levels of service are given letter designations from A to F, with LOS A representing the best operating conditions and LOS F representing the worst. Levels of service A through D are typically considered acceptable while LOS E and F represent excessive delays. LOS is reported differently for signalized and unsignalized intersections. For signalized intersections, the analysis considers the operation of all traffic entering the intersection and the level of service designation is for overall conditions at the intersection. For unsignalized intersections, the analysis assumes that through traffic on the main road is not affected by traffic on the side streets. Thus, the level of service is calculated for traffic exiting from side street approaches and for left turns from the main road. Table 1 presents the criteria for signalized and unsignalized intersection level of service, which are based on the average delay in seconds per vehicles. 2 Highway Capacity Manual, Transportation Research Board, Washington, D.C., 21 TS\1858.7\reports\Gateway_Transportation_Study_FINAL.docx 33 Traffic Operations

40 Table 1 Intersection Level-of-Service Criteria Delay (seconds/vehicle) Level of Service Signalized Intersections Unsignalized Intersections/Roundabouts A <1-1 B >1-2 >1-15 C >2-35 >15-25 D >35-55 >25-35 E >55-8 >35-5 F >8 >5 Source: Highway Capacity Manual, Transportation Research Board, Washington, D.C., Existing Conditions Existing traffic operating conditions were analyzed for the four signalized intersections and 15 unsignalized locations within the study area. The analyses were conducting using the morning and evening peak hour volumes shown in Figure 4 and Figure 5. Signalized Intersection Capacity Analysis The results of the signalized intersection capacity analyses for existing conditions are summarized in Table 11. One intersection experiences deficient overall operating conditions. Massachusetts Avenue at North Pleasant Street operates at LOS F during both the morning and evening peak hours. This is due to excessive delays to the leftturn from Massachusetts Avenue to North Pleasant Street, which is a heavy turning movement (196 vehicles in the morning peak hour and 245 vehicles in the evening peak hour). The intersection of Massachusetts Avenue at Commonwealth Avenue operates at acceptable levels of service overall, although the southbound left-turn experiences long delays in the evening peak hour. Since this is not the critical movement in the evening peak hour, the overall intersection operations is considered to be acceptable at LOS D or better. TS\1858.7\reports\Gateway_Transportation_Study_FINAL.docx 34 Traffic Operations

41 Table 11 Signalized Intersection Capacity Analysis Summary Existing Conditions Weekday Morning Peak Hour Weekday Evening Peak Hour Intersection Lane Group V/C 1 Delay 2 LOS 3 V/C Delay LOS Massachusetts Avenue at Commonwealth Avenue Massachusetts Avenue at North Pleasant Street Triangle Street at East Pleasant Street Main Street at Triangle Street EB LT B.4 16 B EB TH B B WB TH-TH-RT C D SB LT C 1.15 >12 F SB RT.12 3 A B Overall B D EB LT >1.2 >12 F >1.2 >12 F EB TH-TH.8 22 C C WB TH-TH.5 39 D D WB RT.12 3 C.15 3 C SB LT C D SB RT C C Overall F.7 83 F EB LT-TH C D EB RT.7 15 B B WB LT-TH-RT D C NB LT.43 3 C C NB TH-RT B B SB LT C C SB TH-RT D C Overall C C EB LT-TH-RT.19 9 A C WB LT-TH B.42 2 C WB RT.31 1 B B NB LT-TH-RT.5 27 C D SB LT-TH-RT C C Overall B C Source: VHB, Inc. using Synchro 7 (Build 614) software. Note: Shaded cells denote LOS E/F conditions. NB = Northbound; SB = Southbound; EB = Eastbound; WB = Westbound; LT = left-turn; TH = through; RT = right-turn Weekday Morning Peak Hour: 8: AM to 9: AM; Weekday Evening Peak Hour: 4:15 PM to 5:15 PM. 1 V/C Volume-to-capacity ratio. V/C ratios range from 1. when demand equals the theoretical capacity to when demand is zero. Values over 1. indicate demand in excess of the theoretical capacity. 2 Delay Control delay per vehicle, expressed in seconds, includes initial deceleration delay, queue move-up time, stopped delay, and final acceleration delay. 3 LOS Level-of-Service. LOS A indicates free flow conditions with minimal delays. LOS E and F indicate congested conditions. 4 Q 95th percentile queue length estimate, in feet. TS\1858.7\reports\Gateway_Transportation_Study_FINAL.docx 35 Traffic Operations

42 Unsignalized Intersection Capacity Analysis The results of the unsignalized intersection capacity analysis are summarized in Table 12. As noted previously, the analysis results for unsignalized intersections reflect the operation of the critical turning movement (typically the left-turn from the minor street or the mainline left-turn movement into the minor street). The northbound approaches of North University Drive and Lincoln Avenue at Massachusetts Avenue and the southbound approach of Presidents Drive Exit at Massachusetts Avenue westbound all operate at LOS E in the evening peak hour. All other unsignalized intersections operate at acceptable levels of service in the existing condition. Table 12 Unsignalized Intersection Capacity Analysis Summary Existing Conditions Critical Weekday Morning Peak Hour Weekday Evening Peak Hour Intersection Movement(s) Dem 1 V/C 2 Delay 3 LOS 4 Dem V/C Delay LOS Massachusetts Avenue at North University Drive NB LT-RT C E Massachusetts Avenue Eastbound at Sunset Avenue NB RT B B Massachusetts Avenue Eastbound at Lincoln NB TH-RT C E Avenue Massachusetts Avenue Eastbound at Robsham SB LT-TH B C Visitors Center Entrance Massachusetts Avenue Eastbound at Robsham NB TH-RT B C Visitors Center Exit Massachusetts Avenue Eastbound at Parking Lot 34 SB LT-TH B C Driveway Massachusetts Avenue Westbound at Parking Lot 34 NB LT 2. 1 B B Driveway Massachusetts Avenue Westbound at Presidents NB LT-TH C D Drive Entrance Massachusetts Avenue Westbound at Presidents SB TH-RT B E Drive Exit Massachusetts Avenue Westbound at Parking NB LT-TH C C Lot 71 Driveway Fearing Street at North University Drive WB LT-RT B D Fearing Street at Sunset Avenue NB LT-TH-RT 1. 9 A 2. 1 B Fearing Street at Lincoln Avenue NB LT-TH-RT A SB LT-TH-RT A Fearing Street at North Pleasant Street EB LT-TH-RT C C Pray Street/Cottage Street at Triangle Street SB LT-TH-RT C C Source: VHB, Inc. using Synchro 7 (Build 614) software. Note: Shaded cells denote LOS E/F conditions. NB = Northbound; SB = Southbound; EB = Eastbound; WB = Westbound; LT = left-turn; TH = through; RT = right-turn 1 Dem Demand. 2 V/C Volume-to-capacity ratio. Values over 1. indicate demand in excess of the theoretical capacity. 3 Delay Control delay per vehicle, expressed in seconds, includes initial deceleration delay, queue move-up time, stopped delay, and final acceleration delay. 4 LOS Level-of-Service. LOS A indicates free flow conditions with minimal delays. LOS E and F indicate congested conditions. TS\1858.7\reports\Gateway_Transportation_Study_FINAL.docx 36 Traffic Operations

43 4.3 No-Build Condition The trips generated by the retail development and condominium units expected in downtown Amherst without the Gateway project were assigned to the existing roadway system to produce No-Build traffic volumes. In addition, the road diet for Massachusetts Avenue proposed under Phase I of the UMass Master Plan is included in the No-Build condition. The details of the Massachusetts Avenue road diet are discussed in the following section. Transportation Recommendations for UMass Master Plan Phase I Massachusetts Avenue is a four-lane divided roadway with two 13-foot travel lanes in each direction and an approximately 6-foot median. Currently, there are no bicycle accommodations on Massachusetts Avenue. The highway type design of this roadway is oversized for the 12, vehicles using the road daily, which typically can be accommodated by a two-lane roadway. The recommended cross-section for Massachusetts Avenue includes a complete streets approach with a road diet. The road diet will include the following: Signalized Intersection Capacity Analysis Closure of the existing westbound barrel Widening of the existing eastbound barrel from the south curb to the north to include: A five-foot bicycle lane in each direction; One 12-foot travel lane in each direction; Ten-foot westbound left-turn lane at Lincoln Street and possibly Sunset Avenue; and A ten-foot planting strip and ten-foot sidewalk on the north side of the widened eastbound barrel. Retention of the existing sidewalk and planting strip on the south side of Massachusetts Avenue The results of the signalized intersection capacity analyses for No-Build conditions are summarized in Table 13. Compared to existing conditions, the same LOS E/F locations occur. TS\1858.7\reports\Gateway_Transportation_Study_FINAL.docx 37 Traffic Operations

44 Table 13 Signalized Intersection Capacity Analysis Summary No-Build Conditions Weekday Morning Peak Hour Weekday Evening Peak Hour Intersection Lane Group V/C 1 Delay 2 LOS 3 V/C Delay LOS EB LT C.4 16 B Massachusetts Avenue at Commonwealth Avenue EB TH.3 17 B B WB TH-TH-RT C D SB LT C >1.2 >12 F SB RT.12 3 A B Overall C D Massachusetts Avenue at North Pleasant Street Triangle Street at East Pleasant Street Main Street at Triangle Street EB LT >1.2 >12 F >1.2 >12 F EB TH-TH.9 22 C C WB TH-TH D D WB RT.12 3 C.15 3 C SB LT C D SB RT C C Overall F F EB LT-TH C D EB RT.8 15 B B WB LT-TH-RT D C NB LT C C NB TH-RT B B SB LT C C SB TH-RT D C Overall D C EB LT-TH-RT.19 1 A C WB LT-TH B C WB RT.33 1 B B NB LT-TH-RT C D SB LT-TH-RT C.8 31 C Overall B C Source: VHB, Inc. using Synchro 7 (Build 614) software. Note: Shaded cells denote LOS E/F conditions. NB = Northbound; SB = Southbound; EB = Eastbound; WB = Westbound; LT = left-turn; TH = through; RT = right-turn Weekday Morning Peak Hour: 8: AM to 9: AM; Weekday Evening Peak Hour: 4:15 PM to 5:15 PM. 1 V/C Volume-to-capacity ratio. V/C ratios range from 1. when demand equals the theoretical capacity to when demand is zero. Values over 1. indicate demand in excess of the theoretical capacity. 2 Delay Control delay per vehicle, expressed in seconds, includes initial deceleration delay, queue move-up time, stopped delay, and final acceleration delay. 3 LOS Level-of-Service. LOS A indicates free flow conditions with minimal delays. LOS E and F indicate congested conditions. Unsignalized Intersection Capacity Analysis The results of the unsignalized intersection capacity analysis are summarized in Table 14. With the recommended road diet cross-section of Massachusetts Avenue, the following pairs of three-legged intersections will be combined into one intersection with four legs: TS\1858.7\reports\Gateway_Transportation_Study_FINAL.docx 38 Traffic Operations

45 Massachusetts Avenue at Lincoln Avenue/Parking Lot 71 Driveway; Massachusetts Avenue at Robsham Visitors Center Entrance/Presidents Drive Exit; and Massachusetts Avenue at Robsham Visitors Center Exit/Presidents Drive Entrance. Under No-Build conditions, three intersections remain at LOS E/F levels and three intersections are expected to degrade to LOS E/F along Massachusetts Avenue. The northbound approaches of North University Drive and Lincoln Avenue, and the southbound Presidents Drive Exit at Massachusetts Avenue would continue operate at LOS E/F in the evening peak hour. The Lincoln Avenue approach would also experience LOS F in the morning peak hour. In addition, the northbound approaches at the Robsham Visitors Center Exit and the Parking Lot 34 Driveway are projected to degrade to LOS E/F in the evening peak hour. All other intersections experience a slight increase in volume to capacity ratio and delay. Table 14 Unsignalized Intersection Capacity Analysis Summary No-Build Conditions Critical Weekday Morning Peak Hour Weekday Evening Peak Hour Intersection Movement(s) Dem 1 V/C 2 Delay 3 LOS 4 Dem V/C Delay LOS Massachusetts Avenue at North University Drive NB LT-RT D E Massachusetts Avenue at Sunset Avenue NB RT B B Massachusetts Avenue at Lincoln Avenue/Parking NB LT-TH-RT Lot 71 Driveway 1 >1.2 >12 F 182 >1.2 >12 F Massachusetts Avenue at Robsham Visitors Center SB LT-TH-RT C >12 F Entrance/Presidents Drive Exit Massachusetts Avenue at Robsham Visitors Center NB LT-TH-RT C F Exit/Presidents Drive Entrance Massachusetts Avenue at Parking Lot 34 Driveway NB LT-RT B E Fearing Street at North University Drive WB LT-RT B D Fearing Street at Sunset Avenue NB LT-TH-RT 1. 9 A 2. 1 B Fearing Street at Lincoln Avenue NB LT-TH-RT A SB LT-TH-RT A Fearing Street at North Pleasant Street EB LT-TH-RT D C Pray Street/Cottage Street at Triangle Street SB LT-TH-RT C C Source: VHB, Inc. using Synchro 7 (Build 614) software. Note: Shaded cells denote LOS E/F conditions. NB = Northbound; SB = Southbound; EB = Eastbound; WB = Westbound; LT = left-turn; TH = through; RT = right-turn 1 Dem Demand. 2 V/C Volume-to-capacity ratio. Values over 1. indicate demand in excess of the theoretical capacity. 3 Delay Control delay per vehicle, expressed in seconds, includes initial deceleration delay, queue move-up time, stopped delay, and final acceleration delay. 4 LOS Level-of-Service. LOS A indicates free flow conditions with minimal delays. LOS E and F indicate congested conditions. 4.4 Build Condition Trips generated by the Gateway project were assigned to the roadway network based on the distribution pattern discussed in Section 3.1. These volumes were added to TS\1858.7\reports\Gateway_Transportation_Study_FINAL.docx 39 Traffic Operations

46 the No-Build traffic volumes to produce Build traffic volumes. The Build Condition represents a 1-year forecast over Existing Conditions. Signalized Intersection Capacity Analysis The results of the signalized intersection capacity analyses for the Build condition are summarized in Table 15. The only significant change in level service occurs at the intersection of Massachusetts Avenue and Commonwealth Avenue, where the overall operating condition declines from LOS D to LOS E during the evening peak hour. In addition, the westbound approach to the intersection of Triangle Street and East Pleasant Street declines to LOS E in the morning peak hour although the overall intersection operation remains at an acceptable level of service. Roundabout at Massachusetts Avenue and North Pleasant Street Under the Build condition, the intersection of Massachusetts Avenue at North Pleasant Street operates at LOS E/F in the morning and evening peak hours. A roundabout is recommended for this intersection in Phase II of the UMass Master Plan, and would significantly improve operations. A roundabout analysis was conducted using SIDRA software. The result of the roundabout analysis compared to a traffic signal is summarized in Table 16. With the installation of the roundabout, the overall level of service improves from LOS F to an acceptable LOS B in the morning peak hour and from LOS E to LOS C in the evening peak hour. Delays on all approaches decrease significantly under roundabout control. Unsignalized Intersection Capacity Analysis The results of the unsignalized intersection capacity analysis are summarized in Table 17. One additional location degrades to LOS E/F under Build conditions. The eastbound Fearing Street approach to North Pleasant Street declines to LOS E in the morning peak hour. Level of service on the Lot 34 driveway at Massachusetts Avenue remains deficient but declines from LOS E to LOS F. All other intersections experience a minor increase in volume-to-capacity ratio and delay. TS\1858.7\reports\Gateway_Transportation_Study_FINAL.docx 4 Traffic Operations

47 Table 15 Signalized Intersection Capacity Analysis Summary Build Condition Weekday Morning Peak Weekday Evening Peak Intersection Lane Group EB LT V/C 1.85 Delay 2 24 LOS 3 C V/C.4 Delay 16 LOS B Massachusetts Avenue at Commonwealth EB TH B.2 17 B Avenue WB TH-TH-RT.4 33 C.89 5 D SB LT D >1.2 >12 F SB RT.12 3 A B Overall C E Massachusetts Avenue at North Pleasant Street Triangle Street at East Pleasant Street Main Street at Triangle Street EB LT >1.2 >12 F >1.2 >12 F EB TH-TH C C WB TH-TH D D WB RT.13 3 C.16 3 C SB LT C D SB RT C C Overall F E EB LT-TH C.8 39 D EB RT.1 15 B B WB LT-TH-RT E C NB LT.6 33 C C NB TH-RT B B SB LT C C SB TH-RT D C Overall D C EB LT-TH-RT.19 1 A C WB LT-TH B C WB RT.34 1 B.2 21 C NB LT-TH-RT C D SB LT-TH-RT.5 26 C.78 3 C Overall B C Source: VHB, Inc. using Synchro 7 (Build 614) software. Note: Shaded cells denote LOS E/F conditions. NB = Northbound; SB = Southbound; EB = Eastbound; WB = Westbound; LT = left-turn; TH = through; RT = right-turn Weekday Morning Peak Hour: 8: AM to 9: AM; Weekday Evening Peak Hour: 4:15 PM to 5:15 PM. 1 V/C Volume-to-capacity ratio. V/C ratios range from 1. when demand equals the theoretical capacity to when demand is zero. Values over 1. indicate demand in excess of the theoretical capacity. 2 Delay Control delay per vehicle, expressed in seconds, includes initial deceleration delay, queue move-up time, stopped delay, and final acceleration delay. 3 LOS Level-of-Service. LOS A indicates free flow conditions with minimal delays. LOS E and F indicate congested conditions. TS\1858.7\reports\Gateway_Transportation_Study_FINAL.docx 41 Traffic Operations

48 Table 16 Build Condition with and without Roundabout at Massachusetts Ave and North Pleasant St Weekday Morning Peak Hour Build Condition Build with Roundabout Intersection Lane Group V/C 1 Delay 2 LOS 3 V/C Delay LOS Massachusetts Avenue at North Pleasant Street EB LT >1.2 >12 F EB TH-TH C.42 9 A WB TH-TH D WB RT.13 3 C B SB LT C SB RT C B Overall F B Weekday Evening Peak Hour Build Condition Build with Roundabout Intersection Lane Group V/C 1 Delay 2 LOS 3 V/C Delay LOS Massachusetts Avenue at North Pleasant Street EB LT >1.2 >12 F EB TH-TH C C WB TH-TH D B WB RT.16 3 C SB LT D.74 2 B SB RT C Overall E.82 2 C Source: VHB, Inc. Build Condition using Synchro 7 (Build 614) software; Build with Roundabout using SIDRA Intersection 5.1 Note: Shaded cells denote LOS E/F conditions. NB = Northbound; SB = Southbound; EB = Eastbound; WB = Westbound; LT = left-turn; TH = through; RT = right-turn 1 V/C Volume-to-capacity ratio. V/C ratios range from 1. when demand equals the theoretical capacity to when demand is zero. Values over 1. indicate demand in excess of the theoretical capacity. 2 Delay Control delay per vehicle, expressed in seconds, includes initial deceleration delay, queue move-up time, stopped delay, and final acceleration delay. 3 LOS Level-of-Service. LOS A indicates free flow conditions with minimal delays. LOS E and F indicate congested conditions. Table 17 Unsignalized Intersection Capacity Analysis Summary Build Conditions Critical Weekday Morning Peak Hour Weekday Evening Peak Hour Intersection Movement(s) Dem 1 V/C 2 Delay 3 LOS 4 Dem V/C Delay LOS Massachusetts Avenue at North University Drive NB LT-RT D E Massachusetts Avenue at Sunset Avenue NB RT B C Massachusetts Avenue at Lincoln Avenue/Parking Lot NB LT-TH-RT 1 >1.2 >12 F 182 >1.2 >12 F 71 Driveway Massachusetts Avenue at Robsham Visitors Center SB LT-TH-RT C 152 >1.2 >12 F Entrance/Presidents Drive Exit Massachusetts Avenue at Robsham Visitors Center NB LT-TH-RT C >12 F Exit/Presidents Drive Entrance Massachusetts Avenue at Parking Lot 34 Driveway NB LT-RT B F Fearing Street at North University Drive WB LT-RT B D Fearing Street at Sunset Avenue NB LT-TH-RT 1. 9 A 2. 1 B Fearing Street at Lincoln Avenue NB LT-TH-RT A SB LT-TH-RT A Fearing Street at North Pleasant Street EB LT-TH-RT E D Pray Street/Cottage Street at Triangle Street SB LT-TH-RT C C Source: VHB, Inc. using Synchro 7 (Build 614) software. Note: Shaded cells denote LOS E/F conditions. NB = Northbound; SB = Southbound; EB = Eastbound; WB = Westbound; LT = left-turn; TH = through; RT = right-turn 1 Dem Demand. 2 V/C Volume-to-capacity ratio. Values over 1. indicate demand in excess of the theoretical capacity. 3 Delay Control delay per vehicle, expressed in seconds, includes initial deceleration delay, queue move-up time, stopped delay, and final acceleration delay. 4 LOS Level-of-Service. LOS A indicates free flow conditions with minimal delays. LOS E and F indicate congested conditions. TS\1858.7\reports\Gateway_Transportation_Study_FINAL.docx 42 Traffic Operations

49 5 Proposed Roadway Improvements As part of this study, the following roadway improvements were analyzed as mitigation for the Gateway project to improve circulation for vehicles and pedestrians and address the deficiencies noted in Chapter 4: A new east-west connector road between Lincoln Avenue and North Pleasant Street; A pedestrian walkway that extends from Phillips Street to Lincoln Avenue; and Signal timing adjustments at the intersection of Triangle Street at East Pleasant Street The first two improvements are illustrated in Figure East-West Connector Road The construction of a new garage (Garage South), located the southeast corner of the intersection of Massachusetts Avenue and Lincoln Avenue is proposed for Phase II of the UMass Master Plan. To reduce the impact of garage traffic on Fearing Street, a new east-west connector road parallel to Fearing Street is recommended as part of the Master Plan under Phase II. The new connector road is proposed to align with Butterfield Terrace, across North Pleasant Street, to form a four-way unsignalized intersection. It would extend west from North Pleasant Street to Lincoln Avenue. With construction of the garage and other planned UMass Master Plan Phase II development, Parking Lots 32 and 34, the Robsham Visitor Center Parking Lot and the metered parking spots at Haigis Mall are eliminated. This in turn would eliminate the driveway intersections on Massachusetts Avenue associated with those parking areas. Traffic that previously entered and exited these parking areas along Massachusetts Avenue will be diverted to the new garage, which can be directly accessed from the new connector road and Lincoln Avenue. Based on this new roadway configuration and parking location, Figure 17 illustrates the diversion of garage trips in the morning and evening peak hours. TS\1858.7\reports\Gateway_Transportation_Study_FINAL.docx 43 Proposed Roadway Improvements

50 \\mawatr\ts\1858.7\graphics\figures\proposed_improvements.indd East/West Connector Road Phillips Street Pedestrian Path Vanasse Hangen Brustlin, Inc. Figure 16 Proposed Roadway Improvements Not to Scale

Traffic Impact Analysis Chatham County Grocery Chatham County, NC

Traffic Impact Analysis Chatham County Grocery Chatham County, NC Chatham County Grocery Chatham County, NC TABLE OF CONTENTS 1. INTRODUCTION... 1 1.1. Location and Study Area... 1 1.2. Proposed Land Use and Access... 2 1.3. Adjacent Land Uses... 2 1.4. Existing ways...

More information

TRAFFIC IMPACT ANALYSIS

TRAFFIC IMPACT ANALYSIS TRAFFIC IMPACT ANALYSIS FOR THE CHAMPAIGN UNIT#4 SCHOOL DISTRICT PROPOSED HIGH SCHOOL (SPALDING PARK SITE) IN THE CITY OF CHAMPAIGN Final Report Champaign Urbana Urbanized Area Transportation Study 6/24/2014

More information

5858 N COLLEGE, LLC N College Avenue Traffic Impact Study

5858 N COLLEGE, LLC N College Avenue Traffic Impact Study 5858 N COLLEGE, LLC nue Traffic Impact Study August 22, 2016 Contents Traffic Impact Study Page Preparer Qualifications... 1 Introduction... 2 Existing Roadway Conditions... 5 Existing Traffic Conditions...

More information

Traffic Impact Analysis Walton Acres at Riverwood Athletic Club Clayton, NC

Traffic Impact Analysis Walton Acres at Riverwood Athletic Club Clayton, NC Traffic Impact Analysis Walton Acres at Riverwood Athletic Club Clayton, NC 1. TABLE OF CONTENTS INTRODUCTION...1 1.1. Site Location and Study Area...1 1.2. Proposed Land Use and Site Access...2 1.3.

More information

The Cape Cod Five Cents Savings Bank

The Cape Cod Five Cents Savings Bank TRAFFIC IMPACT AND ACCESS STUDY The Cape Cod Five Cents Savings Bank Hyannis, Massachusetts PREPARED FOR The Cape Cod Five Cents Savings Bank 19 West Road Orleans, Massachusetts 0263 PREPARED BY 1 Walnut

More information

TRAFFIC ASSESSMENT River Edge Colorado

TRAFFIC ASSESSMENT River Edge Colorado TRAFFIC ASSESSMENT River Edge Colorado Submitted by: Fehr & Peers 621 17th Street, Ste. 231 Denver, CO 8293 (33) 296-43 December, 21 App. M-2 Traffic Assessment River Edge Colorado December 21 TABLE OF

More information

Evaluation of M-99 (Broad Street) Road Diet and Intersection Operational Investigation

Evaluation of M-99 (Broad Street) Road Diet and Intersection Operational Investigation Evaluation of M-99 (Broad Street) Road Diet and Intersection Operational Investigation City of Hillsdale, Hillsdale County, Michigan June 16, 2016 Final Report Prepared for City of Hillsdale 97 North Broad

More information

Route 28 (South Orleans Road)/Route 39 (Harwich Road)/Quanset Road Intersection

Route 28 (South Orleans Road)/Route 39 (Harwich Road)/Quanset Road Intersection TRAFFIC FEASIBILITY STUDY Route 28 (South Orleans Road)/Route 39 (Harwich Road)/Quanset Road Intersection Orleans, Massachusetts Prepared for: Town of Orleans Prepared by: Fay, Spofford & Thorndike, LLC

More information

Traffic Impact Study WestBranch Residential Development Davidson, NC March 2016

Traffic Impact Study WestBranch Residential Development Davidson, NC March 2016 Traffic Impact Study WestBranch Residential Development Davidson, NC March 216 TRAFFIC IMPACT STUDY FOR THE WestBranch Residential Development LOCATED IN DAVIDSON, NC Prepared For: Lennar Carolinas, LLC

More information

THIS PAGE LEFT BLANK INTENTIONALLY

THIS PAGE LEFT BLANK INTENTIONALLY GA SR 25 Spur at Canal Road Transportation Impact Analysis PREPARED FOR GLYNN COUNTY, GEORGIA 1725 Reynolds Street, Suite 300 Brunswick, Georgia 31520 PREPARED BY 217 Arrowhead Boulevard Suite 26 Jonesboro,

More information

PINESTONE TRAFFIC IMPACT STUDY Travelers Rest, South Carolina

PINESTONE TRAFFIC IMPACT STUDY Travelers Rest, South Carolina PINESTONE TRAFFIC IMPACT STUDY Travelers Rest, South Carolina Prepared for Longbranch Development Prepared by January 13, 219 ii Table of Contents Subject Page Signature Page... i Table of Contents...

More information

Glenn Avenue Corridor Traffic Operational Evaluation

Glenn Avenue Corridor Traffic Operational Evaluation Glenn Avenue Corridor Traffic Operational Evaluation PREPARED FOR: THE CITY OF AUBURN PREPARED BY: DECEMBER 2007 Glenn Avenue Corridor Study--Auburn, Alabama TABLE OF CONTENTS Introduction... 1 Background

More information

Traffic Impact and Access Study PROPOSED DURKEE FARM ESTATES. Foster Street Littleton, Massachusetts. Prepared for: Grimes Road, LLC.

Traffic Impact and Access Study PROPOSED DURKEE FARM ESTATES. Foster Street Littleton, Massachusetts. Prepared for: Grimes Road, LLC. Traffic Impact and Access Study PROPOSED DURKEE FARM ESTATES Foster Street Littleton, Massachusetts Prepared for: Grimes Road, LLC. Westford, MA Prepared by: MDM Transportation Consultants, Inc. 28 Lord

More information

TRAFFIC IMPACT STUDY And A TRAFFIC SIGNAL WARRANT ANALYSIS FOR A SENIOR LIVING AND APARTMENT DEVELOPMENT

TRAFFIC IMPACT STUDY And A TRAFFIC SIGNAL WARRANT ANALYSIS FOR A SENIOR LIVING AND APARTMENT DEVELOPMENT TRAFFIC IMPACT STUDY And A TRAFFIC SIGNAL WARRANT ANALYSIS FOR A SENIOR LIVING AND APARTMENT DEVELOPMENT DEERFIELD TOWNSHIP, WARREN COUNTY, OHIO Nantucket Circle and Montgomery Road () Prepared for: ODLE

More information

OFFICE/RETAIL DEVELOPMENT 1625 BANK STREET OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for: Canada Inc.

OFFICE/RETAIL DEVELOPMENT 1625 BANK STREET OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for: Canada Inc. OFFICE/RETAIL DEVELOPMENT 1625 BANK STREET OTTAWA, ONTARIO TRANSPORTATION BRIEF Prepared for: 9402209 Canada Inc. December 15, 2015 115-625 Report_2.doc D. J. Halpenny & Associates Ltd. Consulting Transportation

More information

TRAFFIC IMPACT STUDY

TRAFFIC IMPACT STUDY TRAFFIC IMPACT STUDY for the GLEN ELLEN COUNTRY CLUB SENIOR RESIDENTIAL REDEVELOPMENT 84 Millis, Massachusetts Prepared by: McMahon Associates, Inc. Prepared for: Toll Brothers, Inc. August 216 DRAFT

More information

Proposed Lowe s Home Improvement Center

Proposed Lowe s Home Improvement Center Traffic Impact and Access Study Proposed Lowe s Home Improvement Center Dennis, Massachusetts Prepared for Prepared by Lowe s Home Centers, Inc. 1605 Curtis Bridge Road Wilkesboro, North Carolina 28697

More information

HILTON GARDEN INN HOTEL HOTEL EXPANSION 2400 ALERT ROAD, OTTAWA TRANSPORTATION BRIEF. Prepared for:

HILTON GARDEN INN HOTEL HOTEL EXPANSION 2400 ALERT ROAD, OTTAWA TRANSPORTATION BRIEF. Prepared for: HILTON GARDEN INN HOTEL HOTEL EXPANSION 2400 ALERT ROAD, OTTAWA TRANSPORTATION BRIEF Prepared for: Bona Building & Management Co. Ltd. Place Vanier, 333 North River Road Vanier, Ontario K1L 8B9 October

More information

Henderson Avenue Mixed-Use Development

Henderson Avenue Mixed-Use Development Zoning Case: Z145-3 Traffic Impact Analysis Henderson Avenue Mixed-Use Development Dallas, TX October 26 th, 216 Kimley-Horn and Associates, Inc. Dallas, Texas Project #644827 Registered Firm F-928 Traffic

More information

Harrah s Station Square Casino

Harrah s Station Square Casino Transportation Analysis Harrah s Station Square Casino Pittsburgh, Pennsylvania Submitted To: City of Pittsburgh and Pennsylvania Gaming Control Board Prepared By: DKS Associates GAI Consultants December

More information

ALLEY 24 TRAFFIC STUDY

ALLEY 24 TRAFFIC STUDY ALLEY 24 TRAFFIC STUDY in City of Frostburg, Maryland January 2013 3566 Teays Valley Road Hurricane, WV Office: (304) 397-5508 www.denniscorporation.com Alley 24 Traffic Study January 2013 Frostburg, Maryland

More information

Shockoe Bottom Preliminary Traffic and Parking Analysis

Shockoe Bottom Preliminary Traffic and Parking Analysis Shockoe Bottom Preliminary Traffic and Parking Analysis Richmond, Virginia August 14, 2013 Prepared For City of Richmond Department of Public Works Prepared By 1001 Boulders Pkwy Suite 300, Richmond, VA

More information

Walmart (Store # ) 60 th Street North and Marion Road Sioux Falls, South Dakota

Walmart (Store # ) 60 th Street North and Marion Road Sioux Falls, South Dakota Walmart (Store #4865-00) 60 th Street North and Marion Road Sioux Falls, South Dakota Prepared for: Wal-Mart Stores, Inc. Bentonville, Arkansas Prepared by: Kimley-Horn and Associates, Inc. ã2013 Kimley-Horn

More information

STILLWATER AVENUE CORRIDOR STUDY Old Town, Maine

STILLWATER AVENUE CORRIDOR STUDY Old Town, Maine Draft Study STILLWATER AVENUE CORRIDOR STUDY Old Town, Maine SUBMITTED TO: BANGOR AREA COMPREHENSIVE TRANSPORTATION SYSTEM SUBMITTED BY: I MAY 23, 2017 DRAFT STILLWATER AVENUE STUDY FINAL REPORT Table

More information

Traffic Circulation Study for Neighborhood Southwest of Mockingbird Lane and Airline Road, Highland Park, Texas

Traffic Circulation Study for Neighborhood Southwest of Mockingbird Lane and Airline Road, Highland Park, Texas ARIZONA TEXAS NEW MEXICO OKLAHOMA February 13, 2015 Mr. Meran Dadgostar P.E., R.S. Town of Highland Park 4700 Drexel Dr. Highland Park, Texas 75205 Re: Traffic Circulation Study for Neighborhood Southwest

More information

TRANSPORTATION ANALYSIS REPORT US Route 6 Huron, Erie County, Ohio

TRANSPORTATION ANALYSIS REPORT US Route 6 Huron, Erie County, Ohio TRANSPORTATION ANALYSIS REPORT US Route 6 Huron, Erie County, Ohio December 12, 2012 Prepared for: The City of Huron 417 Main Huron, OH 44839 Providing Practical Experience Technical Excellence and Client

More information

Magnolia Place. Traffic Impact Analysis. Prepared for: City of San Mateo. Prepared by: Hexagon Transportation Consultants, Inc.

Magnolia Place. Traffic Impact Analysis. Prepared for: City of San Mateo. Prepared by: Hexagon Transportation Consultants, Inc. Magnolia Place Traffic Impact Analysis Prepared for: City of San Mateo Prepared by: Hexagon Transportation Consultants, Inc. Updated January 4, 2010 Table of Contents 1. Introduction...1 2. Existing Conditions...6

More information

FAIRFIELD INN & SUITES HOTEL 135 THAD JOHNSON PRIVATE OTTAWA TRANSPORTATION BRIEF. Prepared for:

FAIRFIELD INN & SUITES HOTEL 135 THAD JOHNSON PRIVATE OTTAWA TRANSPORTATION BRIEF. Prepared for: FAIRFIELD INN & SUITES HOTEL 135 THAD JOHNSON PRIVATE OTTAWA TRANSPORTATION BRIEF Prepared for: Bona Building & Management Co. Ltd. Place Vanier, 333 North River Road Vanier, Ontario K1L 8B9 August 12,

More information

MEETING FACILITY 2901 GIBFORD DRIVE CITY OF OTTAWA TRANSPORTATION BRIEF. Prepared for: Holiday Inn Express 2881 Gibford Drive Ottawa, ON K1V 2L9

MEETING FACILITY 2901 GIBFORD DRIVE CITY OF OTTAWA TRANSPORTATION BRIEF. Prepared for: Holiday Inn Express 2881 Gibford Drive Ottawa, ON K1V 2L9 MEETING FACILITY 2901 GIBFORD DRIVE CITY OF OTTAWA TRANSPORTATION BRIEF Prepared for: Holiday Inn Express 2881 Gibford Drive Ottawa, ON K1V 2L9 December 18, 2012 112-566 Brief_1.doc D. J. Halpenny & Associates

More information

Project Report. South Kirkwood Road Traffic Study. Meadows Place, TX October 9, 2015

Project Report. South Kirkwood Road Traffic Study. Meadows Place, TX October 9, 2015 Meadows Place, TX October 9, 2015 Contents 1 Introduction... 1 2 Data Collection... 1 3 Existing Roadway Network... 2 4 Traffic Volume Development... 2 5 Warrant Analysis... 3 6 Traffic Control Alternative

More information

HOLIDAY INN HOTEL 235 KING EDWARD AVENUE CITY OF OTTAWA TRANSPORTATION BRIEF. Prepared for:

HOLIDAY INN HOTEL 235 KING EDWARD AVENUE CITY OF OTTAWA TRANSPORTATION BRIEF. Prepared for: HOLIDAY INN HOTEL 235 KING EDWARD AVENUE CITY OF OTTAWA TRANSPORTATION BRIEF Prepared for: Momentum Planning & Communications 1165 Greenlawn Crescent Ottawa, ON K1L 6C2 June 29, 2015 115-618 Brief_1.doc

More information

9 Leeming Drive Redevelopment Ottawa, ON Transportation Brief. Prepared By: Stantec Consulting Ltd.

9 Leeming Drive Redevelopment Ottawa, ON Transportation Brief. Prepared By: Stantec Consulting Ltd. 9 Leeming Drive Redevelopment Ottawa, ON Transportation Brief Prepared By: Stantec Consulting Ltd. TIA GUIDELINES CHECKLIST Report Context Municipal Address Comment: Section 1.1 Location relative to major

More information

INDUSTRIAL BUILDING 3009 HAWTHORNE ROAD CITY OF OTTAWA TRANSPORTATION OVERVIEW REVISED. Prepared for: Canada Inc.

INDUSTRIAL BUILDING 3009 HAWTHORNE ROAD CITY OF OTTAWA TRANSPORTATION OVERVIEW REVISED. Prepared for: Canada Inc. INDUSTRIAL BUILDING 3009 HAWTHORNE ROAD CITY OF OTTAWA TRANSPORTATION OVERVIEW REVISED Prepared for: 7849648 Canada Inc. Octiober 1, 2015 114-598 Overview_2.doc D. J. Halpenny & Associates Ltd. Consulting

More information

Chapter 4 Traffic Analysis

Chapter 4 Traffic Analysis Chapter 4 Traffic Analysis PURPOSE The traffic analysis component of the K-68 Corridor Management Plan incorporates information on the existing transportation network, such as traffic volumes and intersection

More information

QUICKIE C STORE AND GAS BAR 1780 HERON ROAD OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for:

QUICKIE C STORE AND GAS BAR 1780 HERON ROAD OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for: QUICKIE C STORE AND GAS BAR 1780 HERON ROAD OTTAWA, ONTARIO TRANSPORTATION BRIEF Prepared for: Quickie Convenience Stores Larny Holdings Ltd. c/o PBC Group April 15, 2015 115-615 Report_1.doc D. J. Halpenny

More information

1609 E. FRANKLIN STREET HOTEL TRAFFIC IMPACT STUDY EXECUTIVE SUMMARY

1609 E. FRANKLIN STREET HOTEL TRAFFIC IMPACT STUDY EXECUTIVE SUMMARY 1609 E. FRANKLIN STREET HOTEL TRAFFIC IMPACT STUDY EXECUTIVE SUMMARY Prepared for: The Town of Chapel Hill Public Works Department Traffic Engineering Division Prepared by: HNTB North Carolina, PC 343

More information

FRONT RANGE CROSSINGS TRAFFIC IMPACT STUDY

FRONT RANGE CROSSINGS TRAFFIC IMPACT STUDY FRONT RANGE CROSSINGS TRAFFIC IMPACT STUDY Prepared for: City of Thornton And Colorado Department of Transportation Prepared by: 11 Blake Street, Suite 2 Denver, Colorado 822 Contact: Brian Bern, PE, PTOE

More information

HENDERSON DEVELOPMENT 213, 217, 221, 221 ½, 223 HENDERSON AVENUE and 65 TEMPLETON STREET OTTAWA, ONTARIO TRANSPORTATION OVERVIEW.

HENDERSON DEVELOPMENT 213, 217, 221, 221 ½, 223 HENDERSON AVENUE and 65 TEMPLETON STREET OTTAWA, ONTARIO TRANSPORTATION OVERVIEW. HENDERSON DEVELOPMENT 213, 217, 221, 221 ½, 223 HENDERSON AVENUE and 65 TEMPLETON STREET OTTAWA, ONTARIO TRANSPORTATION OVERVIEW Prepared for: 2294170 Ontario Inc. February 2, 2017 117-652 Report_1.doc

More information

METHODOLOGY. Signalized Intersection Average Control Delay (sec/veh)

METHODOLOGY. Signalized Intersection Average Control Delay (sec/veh) Chapter 5 Traffic Analysis 5.1 SUMMARY US /West 6 th Street assumes a unique role in the Lawrence Douglas County transportation system. This principal arterial street currently conveys commuter traffic

More information

Date: September 7, Project #: Re: Spaulding Youth Center Northfield, NH Property. Traffic Impact Study

Date: September 7, Project #: Re: Spaulding Youth Center Northfield, NH Property. Traffic Impact Study To: Ms. Susan C. Ryan Spaulding Youth Center 72 Spaulding Road Northfield, NH 03276 Date: September 7, 2017 Project #: 52455.00 From: Robin Bousa Director of Transportation Systems Re: Spaulding Youth

More information

Draft Report. Traffic Impact Study. Superstore, Wal-Mart, and Kent Development. Yarmouth, Nova Scotia. Prepared for

Draft Report. Traffic Impact Study. Superstore, Wal-Mart, and Kent Development. Yarmouth, Nova Scotia. Prepared for oad & Traffic Management Road & Traffic Management R Atlantic Traffic Engineering Specialists Draft Report Traffic Impact Study Superstore, Wal-Mart, and Kent Development Yarmouth, Nova Scotia Prepared

More information

Traffic Study of Fuller Street, Cady Street, West Street and West Avenue. Final Report

Traffic Study of Fuller Street, Cady Street, West Street and West Avenue. Final Report Traffic Study of Fuller Street, Cady Street, West Street and West Avenue Final Report July 2005 Prepared for: Town of Ludlow Prepared by: Pioneer Valley Planning Commission 26 Central Street West Springfield,

More information

TRAFFIC IMPACT ANALYSIS OF PROPOSED CHESTNUT HILL COLLEGE MASTER PLAN DEVELOPMENT

TRAFFIC IMPACT ANALYSIS OF PROPOSED CHESTNUT HILL COLLEGE MASTER PLAN DEVELOPMENT TRAFFIC IMPACT ANALYSIS OF PROPOSED CHESTNUT HILL COLLEGE MASTER PLAN DEVELOPMENT Prepared by Orth-Rodgers & Associates, Inc. December 14, 2009 Updated November 9, 2010 230 South Broad Street Philadelphia

More information

OTTAWA TRAIN YARDS PHASE 3 DEVELOPMENT CITY OF OTTAWA TRANSPORTATION IMPACT STUDY. Prepared for:

OTTAWA TRAIN YARDS PHASE 3 DEVELOPMENT CITY OF OTTAWA TRANSPORTATION IMPACT STUDY. Prepared for: OTTAWA TRAIN YARDS PHASE 3 DEVELOPMENT CITY OF OTTAWA TRANSPORTATION IMPACT STUDY Prepared for: The Ottawa Train Yards Inc. 223 Colonnade Road South, Suite 212 Nepean, Ontario K2E 7K3 January 17, 2012

More information

Subject: Solberg Avenue / I-229 Grade Separation: Traffic Analysis

Subject: Solberg Avenue / I-229 Grade Separation: Traffic Analysis MEMORANDUM Transportation Bill Troe, AICP Jason Carbee, AICP 12120 Shamrock Plaza Suite 300 Omaha, NE 68154 (402) 334-8181 (402) 334-1984 (Fax) To: Project File Date: Subject: Solberg Avenue / I-229 Grade

More information

List of Exhibits...ii

List of Exhibits...ii One Brickell Traffic Study TABLE OF CONTENTS List of Exhibits...ii EXECUTIVE SUMMARY...1 1. INTRODUCTION...2 1.1 Study Area...2 1.2 Study Objective...5 2. EXISTING TRAFFIC CONDITIONS...6 2.1 Data Collection...6

More information

List of Attachments. Location Map... Site Plan... City of Lake Elsinore Circulation Element... City of Lake Elsinore Roadway Cross-Sections...

List of Attachments. Location Map... Site Plan... City of Lake Elsinore Circulation Element... City of Lake Elsinore Roadway Cross-Sections... List of Attachments Exhibits Location Map... Site Plan... City of Lake Elsinore Circulation Element... City of Lake Elsinore Roadway Cross-Sections... Existing Lane Geometry and Traffic Controls... Existing

More information

December 4, Merrimac Zoning Board of Appeals 2-8 School Street Merrimac, MA Attn: Kathy Marshall. Dear Board Members:

December 4, Merrimac Zoning Board of Appeals 2-8 School Street Merrimac, MA Attn: Kathy Marshall. Dear Board Members: December 4, 28 Merrimac Zoning Board of Appeals 2-8 School Street Merrimac, MA 86 Attn: Kathy Marshall RE: RAMSHEAD MERRIMAC, MA Dear Board Members: Bayside Engineering, Inc. has received the MDM Transportation

More information

Highway 111 Corridor Study

Highway 111 Corridor Study Highway 111 Corridor Study June, 2009 LINCOLN CO. HWY 111 CORRIDOR STUDY Draft Study Tea, South Dakota Prepared for City of Tea Sioux Falls Metropolitan Planning Organization Prepared by HDR Engineering,

More information

Bridge Street Corridor Study Report

Bridge Street Corridor Study Report Bridge Street Corridor Study Report Prepared for: Prepared by: BRIDGE STREET CORRIDOR STUDY REPORT PREPARED FOR: CITY OF ARROYO GRANDE COMMUNITY DEVELOPMENT DEPARTMENT 300 EAST BRANCH STREET ARROYO GRANDE,

More information

INDUSTRIAL BUILDING 1660 COMSTOCK ROAD CITY OF OTTAWA TRANSPORTATION OVERVIEW. Prepared for:

INDUSTRIAL BUILDING 1660 COMSTOCK ROAD CITY OF OTTAWA TRANSPORTATION OVERVIEW. Prepared for: INDUSTRIAL BUILDING 1660 COMSTOCK ROAD CITY OF OTTAWA TRANSPORTATION OVERVIEW Prepared for: Simluc Contractors Limited 2550 Blackwell Street, Ottawa K1B 5R1 October 18, 2013 113-584 Overview_1.doc D. J.

More information

Grant Avenue Streetscape

Grant Avenue Streetscape REPORT TYPE GOES HERE Grant Avenue Streetscape PREPARED FOR City of Manassas 9027 Center Street Manassas, VA 20110 PREPARED BY 8300 Boone Boulevard Suite 700 Vienna, Virginia 22182 571.389.8121 July 31,

More information

1609 E. FRANKLIN STREET HOTEL

1609 E. FRANKLIN STREET HOTEL 1609 E. FRANKLIN STREET HOTEL TRAFFIC IMPACT STUDY Prepared for: The Town of Chapel Hill Public Works Department Traffic Engineering Division Prepared by: HNTB North Carolina, PC 343 East Six Forks Road

More information

EXECUTIVE SUMMARY. Page 1 of 6

EXECUTIVE SUMMARY. Page 1 of 6 EXECUTIVE SUMMARY The purpose of this report is to identify conformance with the original traffic impact study for the proposed retail development on Lot 5 of Riverdale Retail Filing No. 1 located on the

More information

Marina Loft (DRC 51-R-12)

Marina Loft (DRC 51-R-12) Marina Loft (DRC 51-R-12) traffic study prepared for: Cymbal Development OCtober 2012 Traf Tech October 1, 2012 Mr. Asi Cymbal - President Cymbal Development 3470 North Miami Avenue Upper Suite Miami,

More information

MEMORANDUM. DATE March 1, 2012 TO Town of Milton Mark Abbott, Seth Asante, and Efi Pagitsas Boston Region MPO Staff

MEMORANDUM. DATE March 1, 2012 TO Town of Milton Mark Abbott, Seth Asante, and Efi Pagitsas Boston Region MPO Staff MEMORANDUM DATE March 1, 212 TO Town of Milton FROM RE Mark Abbott, Seth Asante, and Efi Pagitsas Boston Region MPO Staff FFY 211 Safety and Operations Analyses at Selected Boston Region MPO Intersections:

More information

Traffic Impact Study Little Egypt Road Development Denver, North Carolina June 2017

Traffic Impact Study Little Egypt Road Development Denver, North Carolina June 2017 Traffic Impact Study Little Egypt Road Development Denver, North arolina June 2017 N. Little Egypt Road DQ\ QDQFLQJ VDOHV RU RWKHU SHUIRUPDQFH EDVHG FULWHULD Proposed Site Driveways Site Driveway 1 TRAFFI

More information

TRAFFIC IMPACT STUDY COMPREHENSIVE UPDATE TOWN OF THOMPSON S STATION, TENNESSEE PREPARED FOR: THE TOWN OF THOMPSON S STATION

TRAFFIC IMPACT STUDY COMPREHENSIVE UPDATE TOWN OF THOMPSON S STATION, TENNESSEE PREPARED FOR: THE TOWN OF THOMPSON S STATION TRAFFIC IMPACT STUDY COMPREHENSIVE UPDATE TOWN OF THOMPSON S STATION, TENNESSEE PREPARED FOR: THE TOWN OF THOMPSON S STATION Transportation Consultants, LLC 1101 17 TH AVENUE SOUTH NASHVILLE, TN 37212

More information

Road Conversion Study Plumas Street

Road Conversion Study Plumas Street Plumas Street Phase I Submitted to The Regional Transportation Commission of Washoe County Submitted by Zong Tian, Ph.D., P.E. Saeedeh Farivar Haiyuan Li, Ph.D. Center for Advanced Transportation Education

More information

Figure 1: Vicinity Map of the Study Area

Figure 1: Vicinity Map of the Study Area ARIZONA TEXAS NEW MEXICO OKLAHOMA May 5, 2016 Mr. Anthony Beach, P.E. BSP Engineers 4800 Lakewood Drive, Suite 4 Waco, Texas 76710 Re: Intersection and Access Analysis along Business 190 in Copperas Cove

More information

DUNBOW ROAD FUNCTIONAL PLANNING

DUNBOW ROAD FUNCTIONAL PLANNING DUNBOW ROAD FUNCTIONAL PLANNING Final Report August 3, 216 #31, 316 5th Avenue NE Calgary, AB T2A 6K4 Phone: 43.273.91 Fax: 43.273.344 wattconsultinggroup.com Dunbow Road Functional Planning Final Report

More information

Chapter 16: Traffic and Parking A. INTRODUCTION

Chapter 16: Traffic and Parking A. INTRODUCTION Chapter 6: Traffic and Parking A. ITRODUCTIO This chapter examines the potential traffic and parking impacts of the proposed Fresh Kills Park roads. The analysis of transit and pedestrians is presented

More information

NEW YORK CENTRAL PARK SUBDIVISION BLAIS STREET/ST-PIERRE STREET EMBRUN, ONTARIO TRAFFIC IMPACT STUDY. Prepared for:

NEW YORK CENTRAL PARK SUBDIVISION BLAIS STREET/ST-PIERRE STREET EMBRUN, ONTARIO TRAFFIC IMPACT STUDY. Prepared for: NEW YORK CENTRAL PARK SUBDIVISION BLAIS STREET/ST-PIERRE STREET EMBRUN, ONTARIO TRAFFIC IMPACT STUDY Prepared for: Solidex Holdings Limited & Investissement Maurice Lemieux Investments Attn: Mr. Anthony

More information

MEDICAL/OFFICE BUILDING 1637 BANK STREET OTTAWA, ONTARIO TRANSPORTATION OVERVIEW. Prepared for:

MEDICAL/OFFICE BUILDING 1637 BANK STREET OTTAWA, ONTARIO TRANSPORTATION OVERVIEW. Prepared for: MEDICAL/OFFICE BUILDING 1637 BANK STREET OTTAWA, ONTARIO TRANSPORTATION OVERVIEW Prepared for: 2434984 Ontario Inc. 13-5510 Canotek Road Ottawa, Ontario K1J 9J5 June 4, 2015 115-613 Report_2.doc D. J.

More information

The proposed development is located within 800m of an existing Transit Station where infill developments and intensification are encouraged.

The proposed development is located within 800m of an existing Transit Station where infill developments and intensification are encouraged. Stantec Consulting Ltd. 1331 Clyde Avenue, Suite 4 Ottawa ON K2C 3G4 Tel: (613) 722-442 Fax: (613) 722-2799 May 14, 213 File: 1638823 Robinson Park Development Corp. 5699 Power Road Ottawa, ON, K1G 3N4

More information

MEMORANDUM. Charlotte Fleetwood, Transportation Planner

MEMORANDUM. Charlotte Fleetwood, Transportation Planner MEMORANDUM Date: Updated August 22, 2017 To: Organization: Charlotte Fleetwood, Transportation Planner Boston Transportation Department From: Jason DeGray, P.E., PTOE, Regional Director of Engineering

More information

Traffic Study North Shore School District 112

Traffic Study North Shore School District 112 Traffic Study North Shore School District 112 Proposed Expansion of Northwood Junior High School Prepared By: May 1, 2015 1. Introduction Kenig, Lindgren, O Hara, Aboona, Inc. (KLOA, Inc.) has been retained

More information

Figure 1: East West Connector Alignment Alternatives Concept Drawing

Figure 1: East West Connector Alignment Alternatives Concept Drawing Page 2 of 9 Figure 1: East West Connector Alignment Alternatives Concept Drawing The Montebello Drive extension will run north south and connect Wilsonville Road to the Boones Ferry Road to Brown Road

More information

APARTMENT BUILDING DEVELOPMENT 1161 HERON ROAD OTTAWA, ONTARIO TRANSPORTATION IMPACT STUDY. Prepared for:

APARTMENT BUILDING DEVELOPMENT 1161 HERON ROAD OTTAWA, ONTARIO TRANSPORTATION IMPACT STUDY. Prepared for: APARTMENT BUILDING DEVELOPMENT 1161 HERON ROAD OTTAWA, ONTARIO TRANSPORTATION IMPACT STUDY Prepared for: 1649362 Ontario Inc. c/o Manor Park Management 231 Brittany Drive, Suite D Ottawa ON K1K 0R8 July

More information

TRANSPORTATION IMPACT ASSESSMENT

TRANSPORTATION IMPACT ASSESSMENT TRANSPORTATION IMPACT ASSESSMENT PARKSIDE APARTMENTS AND CONDOMINIUMS 383-385 WASHINGTON STREET BRAINTREE, MASSACHUSETTS Prepared for: 383 WASHINGTON STREET, LLC Boston, Massachusetts February 217 Prepared

More information

4. ENVIRONMENTAL IMPACT ANALYSIS 9. TRANSPORTATION AND TRAFFIC

4. ENVIRONMENTAL IMPACT ANALYSIS 9. TRANSPORTATION AND TRAFFIC 4. ENVIRONMENTAL IMPACT ANALYSIS 9. TRANSPORTATION AND TRAFFIC 4.9.1 INTRODUCTION The following section addresses the Proposed Project s impact on transportation and traffic based on the Traffic Study

More information

Paul VI Redevelopment. Traffic Impact Study

Paul VI Redevelopment. Traffic Impact Study ATTACHMENT 5 Paul VI Redevelopment Traffic Impact Study April 18, 2017 PAUL VI REDEVELOPMENT TRAFFIC IMPACT STUDY CITY OF FAIRFAX, VIRGINIA Prepared for: IDI GROUP COMPANIES Prepared by: Wells + Associates,

More information

REDEVELOPMENT TRAFFIC IMPACT STUDY

REDEVELOPMENT TRAFFIC IMPACT STUDY REDEVELOPMENT TRAFFIC IMPACT STUDY For Wendy s Parker, Colorado January 215 Prepared for: Sterling Design Associates, LLC 29 W. Littleton Boulevard #3 Littleton, Colorado 812 Prepared by: 1233 Airport

More information

TABLE TRAFFIC ANALYSIS SCENARIOS

TABLE TRAFFIC ANALYSIS SCENARIOS 4.11 TRANSPORTATION The potential traffic impacts of the proposed project are evaluated in the Buena Park Beach/Orangethorpe Mixed Use Project Traffic Analysis (Traffic Analysis) by Austin-Foust Associates

More information

PRELIMINARY DRAFT WADDLE ROAD / I-99 INTERCHANGE PROJECT ALTERNATIVE ANALYSIS FINAL TRAFFIC SUMMARY REPORT

PRELIMINARY DRAFT WADDLE ROAD / I-99 INTERCHANGE PROJECT ALTERNATIVE ANALYSIS FINAL TRAFFIC SUMMARY REPORT PRELIMINARY DRAFT WADDLE ROAD / I-99 INTERCHANGE PROJECT ALTERNATIVE ANALYSIS FINAL TRAFFIC SUMMARY REPORT Prepared by: In Association with: November 2013 EXECUTIVE SUMMARY Patton Township, in partnership

More information

March 11, Lynnfield Board of Selectmen Town of Lynnfield 55 Summer Street Lynnfield, MA Walnut Street Traffic Assessment

March 11, Lynnfield Board of Selectmen Town of Lynnfield 55 Summer Street Lynnfield, MA Walnut Street Traffic Assessment March 11, 2015 Lynnfield Board of Selectmen Town of Lynnfield 55 Summer Street Lynnfield, MA 01940 Re: Walnut Street Traffic Assessment Dear Board of Selectmen Members: As requested, BETA Group, Inc. (BETA)

More information

Water Street Corridor Streetscape TRAFFIC STUDY

Water Street Corridor Streetscape TRAFFIC STUDY TRAFFIC STUDY November 12, 2015 WATER STREET CORRIDOR STREETSCAPE IMPROVEMENTS PROJECT BOROUGH OF MANHATTAN EDC Contract No.: 48480002 Prepared for: Prepared by: TABLE OF CONTENTS I. INTRODUCTION/ EXECUTIVE

More information

URBAN QUARRY HEADQUARTERS 2717 STEVENAGE DRIVE CITY OF OTTAWA TRANSPORTATION OVERVIEW. Prepared for: Urban Quarry 4123 Belgreen Drive, Ottawa K1G 3N2

URBAN QUARRY HEADQUARTERS 2717 STEVENAGE DRIVE CITY OF OTTAWA TRANSPORTATION OVERVIEW. Prepared for: Urban Quarry 4123 Belgreen Drive, Ottawa K1G 3N2 URBAN QUARRY HEADQUARTERS 2717 STEVENAGE DRIVE CITY OF OTTAWA TRANSPORTATION OVERVIEW Prepared for: Urban Quarry 4123 Belgreen Drive, Ottawa K1G 3N2 February 27, 2014 113-584 Overview_1.doc D. J. Halpenny

More information

Traffic Impact and Access Study. The Preserve at Abbyville Proposed 40B Residential Development. Norfolk, Massachusetts

Traffic Impact and Access Study. The Preserve at Abbyville Proposed 40B Residential Development. Norfolk, Massachusetts Traffic Impact and Access Study The Preserve at Abbyville Proposed 40B Residential Development Norfolk, Massachusetts Prepared for DiPlacido Development Corp. April 2017 Prepared by GREEN INTERNATIONAL

More information

THE LANDMARK AT TALBOT PARK

THE LANDMARK AT TALBOT PARK TRAFFIC IMPACT STUDY FOR THE LANDMARK AT TALBOT PARK IN NORFOLK, VA INTERMODAL ENGINEERING, P.C. OCTOBER, 200 The Landmark at Talbot Park is a proposed redevelopment of the existing apartments along the

More information

MIT Kendall Square Initiative

MIT Kendall Square Initiative MIT Kendall Square Initiative Volume II: Technical Studies and Information (NoMa Project and SoMa Project) Final Development Plan Submission Cambridge Planning Board #302 and #303 November 5, Submitted

More information

Volume 1 Traffic Impact Analysis. Texas Odyssey TIA Dallas, Texas. Kimley-Horn and Associates, Inc. Dallas, Texas. May 23, 2018

Volume 1 Traffic Impact Analysis. Texas Odyssey TIA Dallas, Texas. Kimley-Horn and Associates, Inc. Dallas, Texas. May 23, 2018 Volume 1 Traffic Impact Analysis Texas Odyssey TIA Dallas, Texas May 23, 2018 Kimley-Horn and Associates, Inc. Dallas, Texas Project #064529800 Registered Firm F-928 Traffic Impact Analysis Texas Odyssey

More information

Transportation Impact Study for Abington Terrace

Transportation Impact Study for Abington Terrace Transportation Impact Study for Abington Terrace Abington Township, Montgomery County, PA Sandy A. Koza, P.E., PTOE PA PE License Number PE059911 Prepared by McMahon Associates, Inc. 425 Commerce Drive,

More information

Date: April 4, Project #: Re: A Street/Binford Street Traffic/Intersection Assessment

Date: April 4, Project #: Re: A Street/Binford Street Traffic/Intersection Assessment To: Peter Cavanaugh General Electric From: David Bohn, PE Ryan White, PE Date: April 4, 217 Project #: 13421. Re: / Traffic/Intersection Assessment Consistent with the Cooperation Agreement between the

More information

TZ Vista Traffic Impact Study

TZ Vista Traffic Impact Study TZ Vista Traffic Impact Study A. INTRODUCTION This Traffic Impact Study (TIS) provides a detailed analysis to assess the potential traffic and transportation impacts of the TZ Vista multi-family residential

More information

Troutbeck Farm Development

Troutbeck Farm Development Troutbeck Farm Development Willistown Township, Chester County PA For Submission To: Willistown Township Last Revised: October, 4 TPD# INLM.A. 5 E. High Street Suite 65 Pottstown, PA 9464 6.36.3 TPD@TrafficPD.com

More information

Technical Memorandum TRAFFIC IMPACT STUDY. RIDLEY ROAD CONVENIENCE STORE Southampton County, VA. Prepared for: Mr. David Williams.

Technical Memorandum TRAFFIC IMPACT STUDY. RIDLEY ROAD CONVENIENCE STORE Southampton County, VA. Prepared for: Mr. David Williams. Technical Memorandum TRFFIC IMPCT STUDY RIDLEY ROD CONVENIENCE STORE Southampton County, V Prepared for: Mr. David Williams By: Charles Smith, P.E., PTOE EPR Charlottesville, V July 2014 1 TBLE OF CONTENTS

More information

South Albion-Bolton Community Plan North Hill Supermarket Transportation Study Part B: Evaluation of Alternatives

South Albion-Bolton Community Plan North Hill Supermarket Transportation Study Part B: Evaluation of Alternatives Community Plan North Hill Supermarket Transportation Study Part B: Evaluation of Alternatives Prepared for: The Town of Caledon August 9 Transportation Solutions Ltd. 43 Forest Road Cambridge, ON N1S 3B4

More information

Truck Climbing Lane Traffic Justification Report

Truck Climbing Lane Traffic Justification Report ROUTE 7 (HARRY BYRD HIGHWAY) WESTBOUND FROM WEST MARKET STREET TO ROUTE 9 (CHARLES TOWN PIKE) Truck Climbing Lane Traffic Justification Report Project No. 6007-053-133, P 101 Ι UPC No. 58599 Prepared by:

More information

TRANSPORTATION IMPACT STUDY PROPOSED RIVERFRONT 47 MIXED USE DEVELOPMENT

TRANSPORTATION IMPACT STUDY PROPOSED RIVERFRONT 47 MIXED USE DEVELOPMENT November 2016 TRANSPORTATION IMPACT STUDY PROPOSED RIVERFRONT 47 MIXED USE DEVELOPMENT & Aspinwall Borough, Sharpsburg Borough & O Hara Township, Allegheny County, Pennsylvania Prepared for: Riverfront

More information

COMMERCIAL DEVELOPMENT 2015 ROBERTSON ROAD OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for:

COMMERCIAL DEVELOPMENT 2015 ROBERTSON ROAD OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for: COMMERCIAL DEVELOPMENT 2015 ROBERTSON ROAD OTTAWA, ONTARIO TRANSPORTATION BRIEF Prepared for: First Bay Properties Inc. 311 Richmond Road, Suite 203 Ottawa, ON K1Z 6X3 August 8, 2017 117-663 Brief_1.doc

More information

Traffic Impact Memorandum. May 22, 2018

Traffic Impact Memorandum. May 22, 2018 BISHOP PROFESSIONAL DEVELOPMENT BUILDING Proposed Land-use Change & Parking Modification 3601 SW 31st Street Topeka, Kansas 66614 CFS Project No. 185077 Traffic Impact Memorandum May 22, 2018 Prepared

More information

Appendix C. NORTH METRO STATION AREA TRAFFIC IMPACT STATEMENT 88th Avenue Station

Appendix C. NORTH METRO STATION AREA TRAFFIC IMPACT STATEMENT 88th Avenue Station Appendix C NORTH METRO STATION AREA TRAFFIC IMPACT STATEMENT 88th Avenue Station Prepared for: Regional Transportation Department and URS Corporation as part of the North Metro EIS David Evans and Associates,

More information

Abrams Associates. Transportation Impact Analysis. City of Rocklin. Prepared for: David Mohlenbrok City of Rocklin 4081 Alvis Court Rocklin, CA 95677

Abrams Associates. Transportation Impact Analysis. City of Rocklin. Prepared for: David Mohlenbrok City of Rocklin 4081 Alvis Court Rocklin, CA 95677 Transportation Impact Analysis Sierra College Boulevard Commercial Project City of Rocklin Prepared for: David Mohlenbrok City of Rocklin 081 Alvis Court Rocklin, CA 95677 Prepared by: 1875 Olympic Boulevard,

More information

Waterford Lakes Small Area Study

Waterford Lakes Small Area Study Waterford Lakes Small Area Study Existing Traffic Conditions PREPARED FOR: ORANGE COUNTY PUBLIC WORKS DEPARTMENT TRAFFIC ENGINEERING DIVISION ORLANDO, FLORIDA PREPARED WITH: INWOOD CONSULTING ENGINEERS

More information

M-58 HIGHWAY ACCESS MANAGEMENT STUDY Mullen Road to Bel-Ray Boulevard. Prepared for CITY OF BELTON. May 2016

M-58 HIGHWAY ACCESS MANAGEMENT STUDY Mullen Road to Bel-Ray Boulevard. Prepared for CITY OF BELTON. May 2016 M-58 HIGHWAY ACCESS MANAGEMENT STUDY Prepared for CITY OF BELTON By May 2016 Introduction Missouri State Highway 58 (M-58 Highway) is a major commercial corridor in the City of Belton. As development has

More information

NO BUILD TRAFFIC OPERATIONS

NO BUILD TRAFFIC OPERATIONS 3. 23 NO BUILD TRAFFIC OPERATIONS This section addresses the operations of the transportation system and details how it would be expected to function under year 23 No Build conditions with the projected

More information

Cheyenne Metropolitan Planning Organization

Cheyenne Metropolitan Planning Organization Dell Range Boulevard Corridor Study PHASE II SECTION 20 DRAFT Prepared for: Cheyenne Metropolitan Planning Organization November 20, 2015 (Section 20 is bordered by Powderhouse Road on the west, Storey

More information

Plymouth Rubber Redevelopment

Plymouth Rubber Redevelopment TRAFFIC IMPACT AND ACCESS STUDY Plymouth Rubber Redevelopment Canton, Massachusetts PREPARED FOR Canton Holdings, LLC c/o North American Real Estate Management 1 East Oak Hill Drive, Suite 11 Westmont,

More information

TRANSPORTATION IMPACT STUDY

TRANSPORTATION IMPACT STUDY Dundas MEP Developments Inc. City of Toronto 219 and 231 Dundas Street East, Proposed Mixed-Use Development TRANSPORTATION IMPACT STUDY 9782/2 April 216 LEA Consulting Ltd. Consulting Engineers & Planners

More information