I-10 AT SCENIC LOOP RD. Open House

Size: px
Start display at page:

Download "I-10 AT SCENIC LOOP RD. Open House"

Transcription

1 I-10 AT SCENIC LOOP RD Open House

2 General Information I-10 At Scenic Loop Rd KENDALL COUNTY OPEN HOUSE June 30, 2015 Currey Creek Baptist Church 35 Cascade Cavern 5:00 7:00 Boerne, TX

3 Public Meeting Goals Provide tools to inform the public of the proposed project Presentation Proposed Project Layout Staff available to answer questions 3

4 Project Need and Purpose Need Significant congestion exists at the Scenic Loop Rd intersections with the east and west frontage roads. Congestion is expected to increase over time. The Existing I-10 Bridge over Scenic Loop Rd has low clearance and potential for bridge strikes. Purpose Improve mobility by adding separate turn lanes and increasing turn lane storage at the intersection approaches Improve Bridge Clearance to reduce the potential for bridge strikes 4

5 Project Timeline* Project Need Identified Evaluate human and natural environment Prepare environmental study documents Early June - Coordination With City of Boerne Representatives Received approval to proceed to construction June 30 - Public Meeting Fall 2015 Anticipate beginning construction Fall 2017 Anticipate completing construction This timeline is preliminary and subject to change. 5

6 Existing Conditions Key Challenges Significant Congestion at peak travel times Low Bridge Clearance Limited Sidewalks to accommodate pedestrians Normal Speed Slow Speed N 6

7 Proposed Improvements Overview Provide Separate Turning Lanes along Frontage Road to reduce congestion Reconstruct I-10 Overpass at Higher Elevation to Improve Clearance Include Right Turn Lane along northbound Scenic Loop Rd. Provide Sidewalks 7

8 Proposed Improvements 8

9 2015 Traffic Simulation Morning Peak Existing Conditions Proposed Improvements N N 9

10 2015 Traffic Simulation Evening Peak Existing Conditions Proposed Improvements N N 10

11 Intersection Wait Times 11

12 Intersection Wait Times West Intersection A.M. Wait Time (in seconds) 160 East West % Reduction 59% Reduction 0 EXISTING PROPOSED EXISTING PROPOSED EXISTING PROPOSED East Approach West Approach North Approach 12

13 Intersection Wait Times 13

14 Intersection Wait Times East Intersection A.M. Wait Time (in seconds) West East 88% Reduction 85% Reduction EXISTING PROPOSED EXISTING PROPOSED EXISTING PROPOSED West Approach East Approach South Approach 14

15 Environmental Impacts Environmental Impacts No impact to wetlands of waters of the U.S. No impact to base flood elevation No impacts to threatened or endangered species No displacements or ROW acquisition for proposed improvements No reduction of air quality is anticipated. 15

16 General Information Construction Anticipated to Begin: Fall 2015 Construction Duration: 19 Months 16

17 Potential Funding Strategy City of Boerne Funding: Kendall County Funding: Federal Funding: TxDOT Allocated Funding: $0.55 Million $0.55 Million $8.01 Million $0.89 Million $10 Million 17

18 Next Steps Proposed I-10 Corridor Improvements (From SH 46 to Fair Oaks Pkwy) N Conversion from Two-Way to One- Way Frontage Roads Revise Ramp Configuration to Improve Safety and Local Access Intersection Improvements at Major Cross Streets and Side Streets Integrates Proposed Improvements at Scenic Loop Rd. Possible Public Meeting Fall 2015 Begin Project State Highway 46 End Project Fair Oaks Pkwy 18

19 Provide Your Comments Options for Commenting 1. Give comment card to TxDOT staff tonight 2. Provide comments to onsite court reporter 3. Fax comments to: (972) , Attn: Phillip Hanley 4. Mail comments to: HDR Attn: Phillip Hanley Preston Rd, Suite 200 Dallas, TX comments to: Deadline for comments: July 08,

20 Thank You for Your Participation! 20

FM 471 PROJECT. OPEN HOUSE FM 471 (Culebra Road) from SH 211 to Old FM 471 Medina and Bexar Counties. FM 471 Project

FM 471 PROJECT. OPEN HOUSE FM 471 (Culebra Road) from SH 211 to Old FM 471 Medina and Bexar Counties. FM 471 Project FM 471 PROJECT OPEN HOUSE FM 471 (Culebra Road) from SH 211 to Old FM 471 Medina and Bexar Counties January 24, 2018 Project Location 2 Proposed Improvements Improvements include: Expansion of FM 471 from

More information

I-20 ODESSA-MIDLAND CORRIDOR STUDY. Public Meeting for Schematic Design

I-20 ODESSA-MIDLAND CORRIDOR STUDY. Public Meeting for Schematic Design I-20 ODESSA-MIDLAND CORRIDOR STUDY Public Meeting for Schematic Design The environmental review, consultation, and other actions required by applicable Federal environmental laws for this project are being,

More information

BOERNE/KENDALL COUNTY TRANSPORTATION FORUM. March 22, 2018

BOERNE/KENDALL COUNTY TRANSPORTATION FORUM. March 22, 2018 BOERNE/KENDALL COUNTY TRANSPORTATION FORUM March 22, 2018 Frontage Road Operational Improvements 2 Frontage Roads Under Construction Fair Oaks Pkwy to Dominion I-10 - Fair Oaks Pkwy to FM 3351 Scope: Convert

More information

Municipal Class EA To Address Traffic Congestion On The Ontario Street Corridor (Grand Bend) Public Information Meeting June 4, 2018

Municipal Class EA To Address Traffic Congestion On The Ontario Street Corridor (Grand Bend) Public Information Meeting June 4, 2018 Municipal Class EA To Address Traffic Congestion On The Ontario Street Corridor (Grand Bend) Public Information Meeting June 4, 2018 Background Agenda Traffic Study Update Class EA Alternatives Bridge

More information

FY STIP. Austin District. November Quarterly Revisions HIGHWAY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

FY STIP. Austin District. November Quarterly Revisions HIGHWAY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM FY 2011-2014 STIP STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM HIGHWAY Austin District November Quarterly Revisions November 2011 FY 2011-2014 Transportation Improvement Program Amendments October 10,

More information

SH 68. Meeting with Affected Property Owners September 9, 2014

SH 68. Meeting with Affected Property Owners September 9, 2014 SH 68 Meeting with Affected Property Owners September 9, 2014 SH 68 US 83/I-2 TO US 281/I-69C Meeting with Affected Property Owners (MAPO) September 9, 2014 Agenda Open Meeting with Affected Property Owners

More information

IOWA HIGHWAY 58 CORRIDOR IMPROVEMENT STUDY PROJECT UPDATE NO. 1 OCTOBER 17, 2013

IOWA HIGHWAY 58 CORRIDOR IMPROVEMENT STUDY PROJECT UPDATE NO. 1 OCTOBER 17, 2013 IOWA HIGHWAY 58 CORRIDOR IMPROVEMENT STUDY PROJECT UPDATE NO. 1 OCTOBER 17, 2013 INTRODUCTION This web page provides information on the Iowa Highway 58 (IA 58) Corridor Improvement Study in Cedar Falls,

More information

I-35 COMAL COUNTY OPERATIONAL IMPROVEMENTS

I-35 COMAL COUNTY OPERATIONAL IMPROVEMENTS I- COMAL COUNTY OPERATIONAL IMPROVEMENTS OPEN HOUSE The environmental review, consultation, and other actions required by applicable Federal environmental laws for this project are being, or have been,

More information

WELCOME PTH 59N - PTH 101 INTERCHANGE FUNCTIONAL DESIGN STUDY PUBLIC INFORMATION SESSION MONDAY, JUNE 13, :00 P.M. - 8:00 P.M.

WELCOME PTH 59N - PTH 101 INTERCHANGE FUNCTIONAL DESIGN STUDY PUBLIC INFORMATION SESSION MONDAY, JUNE 13, :00 P.M. - 8:00 P.M. WELCOME - PTH 1 INTERCHANGE FUNCTIONAL DESIGN STUDY PUBLIC INFORMATION SESSION MONDAY, JUNE 13, 11 4:00 P.M. - 8:00 P.M. PROJECT STUDY AREA 1 Wenzel Street PR 2 Pritchard Farm Farm Road Road McGregor Farm

More information

UPC Design / CN Locally Administered PE Phase VDOT Administered CN Phase

UPC Design / CN Locally Administered PE Phase VDOT Administered CN Phase Presentation for County Board, February 27, 2018 Regular Hearing N. Lynn Street Esplanade and Custis Trail Improvements Funding Request for VDOT Construction Bid Award UPC Design 70762 / CN 109813 Locally

More information

Proposed Action, Purpose and Need Technical Memorandum

Proposed Action, Purpose and Need Technical Memorandum Proposed Action, Purpose and Need Technical Memorandum MoPac (State Loop 1) Intersections, Austin District From North of Slaughter Lane to South of La Crosse Avenue CSJ: 3136-01-015 Travis County, Texas

More information

US 69 RELIEF ROUTE STUDY

US 69 RELIEF ROUTE STUDY US 69 RELIEF ROUTE STUDY Jacksonville, Texas PUBLIC MEETING #2 May 29 th, 2018 Welcome to the public meeting for the US 69 Relief Route Study in Jacksonville. This is the second public meeting for this

More information

Public Information Meeting

Public Information Meeting Richmond Highway (U.S. Route 1) Corridor Improvements Public Information Meeting Tuesday, April 18, 2017 Mount Vernon High School 8515 Old Mt. Vernon Road, Alexandria, VA 22309 Amanda Baxter, VDOT, Special

More information

February 26, 2013 Presentation Overview of Proposed Roadway Network and Intersection Improvements Bond Program

February 26, 2013 Presentation Overview of Proposed Roadway Network and Intersection Improvements Bond Program February 26, 2013 Presentation Overview of Proposed Roadway Network and Intersection Improvements Bond Program Excellence - Integrity - Service - Creativity - Communication TRANSPORTATION BOND PROGRAM

More information

State Road 54/56 Tampa Bay s Northern Loop. The Managed Lane Solution Linking I-75 to the Suncoast Parkway

State Road 54/56 Tampa Bay s Northern Loop. The Managed Lane Solution Linking I-75 to the Suncoast Parkway State Road 54/56 Tampa Bay s Northern Loop The Managed Lane Solution Linking I-75 to the Suncoast Parkway SUNCOAST PARKWAY Both I 75 and the Suncoast Parkway are planning, or in the process of constructing,

More information

RM 620 FEASIBILITY STUDY

RM 620 FEASIBILITY STUDY RM 620 FEASIBILITY STUDY Sections 5 & 6 December 7, 2015 STUDY PROCESS Study Purpose and Goals The RM 620 Feasibility Study was launched by the Texas Department of Transportation (TxDOT) to analyze transportation

More information

FM 471. Open House Public Meeting FM 471

FM 471. Open House Public Meeting FM 471 Open House Public Meeting November 12, 2014 FROM: LP 1604 TO: FM 3487 BEXAR COUNTY OPEN HOUSE PUBLIC MEETING November 12, 2014 H.B. Zachry Middle School 9410 Timber Pass 5:00 7:00 PM San Antonio, TX 78250

More information

City of Madison, East Johnson Street North Baldwin Street to First Street Local Street Dane County

City of Madison, East Johnson Street North Baldwin Street to First Street Local Street Dane County City of Madison, East Johnson Street North Baldwin Street to First Street Local Street Dane County Public Involvement Meeting Thursday, November 10, 2016 5:30 to 7 P.M. Festival Foods 810 E. Washington

More information

TXDOT LAUNCHES PEDESTRIAN SAFETY CAMPAIGN TO ADDRESS PEDESTRIAN FATALITIES AND INJURIES IN AUSTIN

TXDOT LAUNCHES PEDESTRIAN SAFETY CAMPAIGN TO ADDRESS PEDESTRIAN FATALITIES AND INJURIES IN AUSTIN DECEMBER 2017 E-NEWSLETTER A monthly e-newsletter providing information about Mobility35, a regionwide effort to improve safety and mobility along I-35 in Williamson, Travis, and Hays counties. TXDOT LAUNCHES

More information

72 Avenue Four Laning (BNSF Overpass to 120 Street) WELCOME. Public Information Meeting

72 Avenue Four Laning (BNSF Overpass to 120 Street) WELCOME. Public Information Meeting 72 Avenue Four Laning (BNSF Overpass to 120 Street) WELCOME Public Information Meeting Project Goals About the Project The goal of this project is to address congestion along 72 Avenue and adjacent streets

More information

Short and Long Term Needs

Short and Long Term Needs Short and Long Term Needs The short- and long-term programs of proposed projects listed below have been designed to address the mobility issues in South Montgomery County. These improvements to the transportation

More information

INNER LOOP EAST. AIA Rochester Annual Meeting November 13, 2013 TRANSFORMATION PROJECT. Bret Garwood, NBD Erik Frisch, DES

INNER LOOP EAST. AIA Rochester Annual Meeting November 13, 2013 TRANSFORMATION PROJECT. Bret Garwood, NBD Erik Frisch, DES INNER LOOP EAST TRANSFORMATION PROJECT AIA Rochester Annual Meeting November 13, 2013 Bret Garwood, NBD Erik Frisch, DES Why? We are building a city that encourages walking, biking and enjoying the outdoor

More information

I-395 Express Lanes Northern Extension Project Public Hearings

I-395 Express Lanes Northern Extension Project Public Hearings I-395 Express Lanes Northern Extension Project Public Hearings Susan Shaw, PE, Megaprojects Director Virginia Department of Transportation Amanda Baxter, Special Projects Manager Virginia Department of

More information

I-215 / NEWPORT ROAD INTERCHANGE PROJECT PRESS KIT

I-215 / NEWPORT ROAD INTERCHANGE PROJECT PRESS KIT I-215 / NEWPORT ROAD INTERCHANGE PROJECT PRESS KIT March I-215 / NEWPORT ROAD INTERCHANGE PROJECT Fact Sheet Project Overview This project will reconstruct the existing interchange located on Interstate

More information

Welcome to the Sellwood Bridge Project Open House!

Welcome to the Sellwood Bridge Project Open House! Welcome to the Sellwood Bridge Project Open House! 5:30 7:30 pm Please sign in here Information stations and project staff are located throughout the room. Goals for Tonight s Meeting: Learn how the Preferred

More information

Fairfax County Parkway Widening Fairfax County

Fairfax County Parkway Widening Fairfax County Get Involved VDOT representatives will review and evaluate information received as a result of this meeting. Please fill out the comment sheet provided in this brochure if you have any comments or questions.

More information

Attached for your reference please find project updates on ongoing VDOT construction projects in Southampton County.

Attached for your reference please find project updates on ongoing VDOT construction projects in Southampton County. SOUTHAMPTON COUNTY BOARD OF SUPERVISORS Regular Session i July 25, 2016 6. HIGHWAY MATTERS A. PLAN PROJECT UPDATES Attached for your reference please find project updates on ongoing VDOT construction projects

More information

APPENDIX E Evaluation of Improvement Alternatives

APPENDIX E Evaluation of Improvement Alternatives APPENDIX E Evaluation of Improvement Alternatives Table E-1 Preliminary Comparison of Design Alternatives, Concord Table E-2 Preliminary Comparison of Route 2 Improvement Packages, Acton and Concord TABLE

More information

City of Fairfax, Virginia City Council Work Session

City of Fairfax, Virginia City Council Work Session City of Fairfax, Virginia City Council Work Session Agenda Item # City Council Meeting 12a 9/8/2015 TO: FROM: SUBJECT: ISSUE(S): SUMMARY: FISCAL IMPACT: RECOMMENDATION: ALTERNATIVE COURSE OF ACTION: RESPONSIBLE

More information

List of Display Boards

List of Display Boards List of Display Boards Welcome Introduction Municipal Class Environmental Assessment (EA) Process Need and Justification for an Interchange Alternatives for Evaluation Vertical and Horizontal Alignments

More information

Atwood Avenue Fair Oaks Avenue Cottage Grove Road

Atwood Avenue Fair Oaks Avenue Cottage Grove Road Atwood Avenue Fair Oaks Avenue Cottage Grove Road Agenda Purpose Review project scope & goals Present design alternatives Gather feedback Answer Questions Format Open House Presentation Q&A Open House

More information

Welcome. Thank you for attending tonight s open house. The purpose of this open house is to give you an opportunity to:

Welcome. Thank you for attending tonight s open house. The purpose of this open house is to give you an opportunity to: Welcome Thank you for attending tonight s open house. The purpose of this open house is to give you an opportunity to: Review the circulation plan concept Give us your input Why a circulation plan? During

More information

Welcome. 53 Avenue Overpass over Whitemud Drive Rehabilitation. Public Information Session. Wednesday, March 9, :30-8:00 p.m.

Welcome. 53 Avenue Overpass over Whitemud Drive Rehabilitation. Public Information Session. Wednesday, March 9, :30-8:00 p.m. BRIDGE REHABILITATION Welcome 53 Avenue Overpass over Whitemud Drive Rehabilitation Public Information Session Wednesday, March 9, 2016 4:30-8:00 p.m. Tonight you can: Learn about the 53 Avenue Overpass

More information

Walton Acres at Riverwood Athletic Club Clayton, North Carolina

Walton Acres at Riverwood Athletic Club Clayton, North Carolina 9. CONCLUSIONS This Traffic Impact Analysis Update was conducted to determine the potential traffic impacts of the proposed Walton Acres at Riverwood Athletic Club residential development, located east

More information

City of Sammamish. Welcome. Issaquah-Fall City Road Improvements Project Phase I Design: 242nd Avenue SE to Klahanie Drive SE

City of Sammamish. Welcome. Issaquah-Fall City Road Improvements Project Phase I Design: 242nd Avenue SE to Klahanie Drive SE Welcome Welcome to the third community meeting for the Issaquah-Fall City Road Improvements Project. AGENDA 6:00 p.m. Welcome and sign-in 6:10 p.m. Presentation 6:50 p.m. Open house Learn about the roadway

More information

IH 20 RANGER HILL PUBLIC MEETING

IH 20 RANGER HILL PUBLIC MEETING IH 20 RANGER HILL PUBLIC MEETING AUGUST 25, 2015 IH 20, Eastland County, TX CSJ 0007-06-084 IH 20 from 3.5 mi. East of LP 254 to SH 16 (Ranger Hill) August 25, 2015 Agenda Introductions Purpose of the

More information

Intersection Control Evaluation Report. This report conforms to the Caltrans Traffic Operations Policy Directive

Intersection Control Evaluation Report. This report conforms to the Caltrans Traffic Operations Policy Directive Intersection Control Evaluation Report This report conforms to the Caltrans Traffic Operations Policy Directive 13-02. Intersection Control Evaluation (ICE) is a directive issued by the California Department

More information

Frequently Asked Questions

Frequently Asked Questions Frequently Asked Questions Business US 190 in Copperas Cove From Avenue D to Constitution Drive What is access management? A. Access Management is a growing effort by government agencies to improve how

More information

Description: Widen I-64 to 6 lanes from I-265 to the KY 53 interchange in Shelby County.

Description: Widen I-64 to 6 lanes from I-265 to the KY 53 interchange in Shelby County. I-64 KIPDA ID # 350 Project Type: ROADWAY CAPACITY Description: Widen I-64 to 6 lanes from I-265 to the KY 53 interchange in Shelby County. Purpose: Project will improve capacity and address safety concerns.

More information

I also hope you can maintain easy access to my property through the construction process.

I also hope you can maintain easy access to my property through the construction process. Mobility35: I-35 at SH 123 Open House Comment/Response Matrix # Last Name First Name Date Method Comment (Verbatim) Response 1 Anderson Ross 11/8/2016 VOH Thank you for the opportunity to comment. I am

More information

WHANGAREI IMPROVEMENTS

WHANGAREI IMPROVEMENTS WHANGAREI IMPROVEMENTS PROJECT OVERVIEW The NZ Transport Agency (NZTA) is working with Whangarei District Council (WDC) to improve the state highway through Whangarei. In addition to the recently completed

More information

I-290 Phase I Study Area OAK PARK AVE AUSTIN BLVD. Reconstruction Area (9 miles) Oak Park RIDGELAND AVE CENTRAL AVE HARLEM AVE. Cicero.

I-290 Phase I Study Area OAK PARK AVE AUSTIN BLVD. Reconstruction Area (9 miles) Oak Park RIDGELAND AVE CENTRAL AVE HARLEM AVE. Cicero. RIDGELAND AVE OAK PARK AVE AUSTIN BLVD UP-RR BRC-RR ASHLAND AVE Study Area Map I-290 Phase I Study Area 294 UP RR Metra UP-W Illinois Prairie Path 38 Berkeley WOLF RD Hillside MANNHEIM RD Bellwood 290

More information

RM 620/RM 2222 CONNECTOR (BYPASS) STATUS REPORT RM 620/2222 STATUS

RM 620/RM 2222 CONNECTOR (BYPASS) STATUS REPORT RM 620/2222 STATUS RM 620/RM 2222 CONNECTOR (BYPASS) STATUS REPORT January 25, 2017 RM 620/2222 BYPASS - INTRODUCTION Because of the enormous traffic demand at the RM 620/2222 intersection, TxDOT searched for a way to relieve

More information

NORTH HOUSTON HIGHWAY IMPROVEMENT PROJECT

NORTH HOUSTON HIGHWAY IMPROVEMENT PROJECT NORTH HOUSTON HIGHWAY IMPROVEMENT PROJECT Project Briefing Packet April 2015 RECOMMENDED ALTERNATIVES Project divided into 3 Segments Segment 1 Beltway 8 to I-610 Segment 2 I-610 to I-10 Segment 3 Downtown

More information

Creating the Future Bruce B Downs Blvd

Creating the Future Bruce B Downs Blvd Creating the Future Bruce B Downs Blvd How things look today May not be how things look in the future. Bruce B Downs PD&E Study 2003 Construction programmed 2009, Palm Springs to Pebble Creek Tampa Rail

More information

PEABODY SQUARE RECONSTRUCTION PROJECT

PEABODY SQUARE RECONSTRUCTION PROJECT FINAL DESIGN PRESENTATION HEARING Thursday April 23, 2015 with Peabody City Council Peabody, Massachusetts 6:00 PM PEABODY SQUARE RECONSTRUCTION PROJECT 239 LITTLETON ROAD, SUITE 3, WESTFORD, MA 01886

More information

Public Meeting. I-35 Corridor from John Kilpatrick Turnpike North to Waterloo Road October 26, 6:00pm Edmond Community Center Auditorium

Public Meeting. I-35 Corridor from John Kilpatrick Turnpike North to Waterloo Road October 26, 6:00pm Edmond Community Center Auditorium Public Meeting I-35 Corridor from John Kilpatrick Turnpike North to Waterloo Road October 26, 2017 @ 6:00pm Edmond Community Center Auditorium Before we get started Please turn off or mute any electronic

More information

Virginia Street Bus RAPID Transit Extension Project. Environmental Assessment (EA) Presentation Public Hearing June 22, 2017

Virginia Street Bus RAPID Transit Extension Project. Environmental Assessment (EA) Presentation Public Hearing June 22, 2017 Virginia Street Bus RAPID Transit Extension Project Environmental Assessment (EA) Presentation Public Hearing June 22, 2017 Presentation to RTC July 17, 2015 Presentation Overview Project Timeline Environmental

More information

City of Madison, East Johnson Street North Baldwin Street to First Street Local Street Dane County

City of Madison, East Johnson Street North Baldwin Street to First Street Local Street Dane County City of Madison, East Johnson Street North Baldwin Street to First Street Local Street Dane County Public Involvement Meeting Thursday, April 28, 2016 6 to 8 P.M. Lapham Elementary School 1045 E. Dayton

More information

Iowa Highway 58 Corridor Improvement Study

Iowa Highway 58 Corridor Improvement Study 1 Iowa Highway 58 Corridor Improvement Study Public Informational Meeting May 6, 2014 2 Welcome and Introductions Randy Lorenzen, City of Cedar Falls Engineer 3 Outline of Presentation Review of Project

More information

AAMPO MOBILITY PROJECT DISCUSSION. July/August 2015

AAMPO MOBILITY PROJECT DISCUSSION. July/August 2015 AAMPO MOBILITY PROJECT DISCUSSION July/August 2015 Proposition 1 FY 16 & 17 $1.74 billion transferred to State Highway Fund in FY 2015 $147.3 million let in SAT district in FY 2015 US 90, IH 10, IH 410

More information

Terwillegar Drive Expressway Draft Concept Plan

Terwillegar Drive Expressway Draft Concept Plan Terwillegar Drive Expressway Draft Concept Plan Anthony Henday Drive to Whitemud Drive November 28 5:00-8:00 p.m. December 1 10:00 a.m. - 3:00 p.m. Let s Talk Today you can: Learn about the new direction

More information

Appendix C. NORTH METRO STATION AREA TRAFFIC IMPACT STATEMENT 88th Avenue Station

Appendix C. NORTH METRO STATION AREA TRAFFIC IMPACT STATEMENT 88th Avenue Station Appendix C NORTH METRO STATION AREA TRAFFIC IMPACT STATEMENT 88th Avenue Station Prepared for: Regional Transportation Department and URS Corporation as part of the North Metro EIS David Evans and Associates,

More information

122 Avenue: 107 Street to Fort Road

122 Avenue: 107 Street to Fort Road : 107 Street to Fort Road November 24, 2015 4:30 8:00 p.m. Meeting Purpose Summarize project work completed to date Share results of public input from Phase 1 Share the draft concept plan and proposed

More information

SH-6 Corridor Improvement Study Policy Committee Progress Report M O N D AY, J U N E 1 0, B R A Z O S C E N T E R

SH-6 Corridor Improvement Study Policy Committee Progress Report M O N D AY, J U N E 1 0, B R A Z O S C E N T E R SH-6 Corridor Improvement Study Policy Committee Progress Report M O N D AY, J U N E 1 0, 2 0 1 3 B R A Z O S C E N T E R Project Overview Study Goals and Objectives» Improve traffic flow» Reduce delay»

More information

COMMUNITY WORKSHOP (CW) 3 February 21, 2015

COMMUNITY WORKSHOP (CW) 3 February 21, 2015 QEW Improvements QEW Improvements COMMUNITY WORKSHOP (CW) 3 February 21, 2015 1 WORKSHOP PURPOSE MOVING FORWARD Review of Technically Preferred alternative Seeking feed back for progressing to next design

More information

Pattullo Bridge Replacement Project Community Connections Phase 2 Consultation. Appendix 3: Open House Display Boards

Pattullo Bridge Replacement Project Community Connections Phase 2 Consultation. Appendix 3: Open House Display Boards Replacement Project Community Connections Phase 2 Consultation Appendix 3: Open House Display Boards November 2016 Welcome! Welcome to the Replacement Project Public Open House We Want to Hear from You

More information

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects ROUTE/ Project ID No. TIP No. Electrical Load Center Replacement - North 04324 04324 This project will provide for the betterment of the existing highway lighting facilities located along Routes 3, 17

More information

"Mobility 2045" Alphabetical Listing of Roadway, Bicycle, Pedestrian and Rideshare Projects

Mobility 2045 Alphabetical Listing of Roadway, Bicycle, Pedestrian and Rideshare Projects Number Alamo Area Commute Alamo Area MPO: Bexar, Comal Guadalupe & partial Kendall County AACOG Solutions Program Alamo Area Commute Solutions Pgm - FY 2017 $100,000 5101.0 0915-12-547 7/2018 Bexar Alamo

More information

CITY OF FRANKLIN, TENNESSEE. Columbia Avenue. Widening & Improvements Project. Public Meeting May 16, 2017

CITY OF FRANKLIN, TENNESSEE. Columbia Avenue. Widening & Improvements Project. Public Meeting May 16, 2017 CITY OF FRANKLIN, TENNESSEE Columbia Avenue Widening & Improvements Project Public Meeting May 16, 2017 Agenda 6:00 6:30 Formal Presentation 6:30 8:00 Town Hall Forum City of Franklin Columbia Avenue Alternatives

More information

I-635 LBJ EAST PROJECT

I-635 LBJ EAST PROJECT 635 I-635 LBJ EAST PROJECT Transportation and Trinity River Project Committee 9 June 2014 TxDOT Dallas District Dallas County, Texas CSJ: 2374-01-137, 2374-02-053 Agenda I-635 LBJ East Project Overview

More information

Highway 217 Corridor Study. Phase I Overview Report

Highway 217 Corridor Study. Phase I Overview Report Highway 217 Corridor Study Phase I Overview Report November 3, 24 BACKGROUND AND OVERVIEW Study purpose The Highway 217 Corridor Study is developing multi-modal transportation solutions for traffic problems

More information

Brooklyn Boulevard (County Road 152) Reconstruction Project Phase I. OPEN HOUSE June 20, 2017

Brooklyn Boulevard (County Road 152) Reconstruction Project Phase I. OPEN HOUSE June 20, 2017 Brooklyn Boulevard (County Road 152) Reconstruction Project Phase I OPEN HOUSE June 20, 2017 Brooklyn Boulevard (County Road 152) Phase I Project Partners Project Lead Other Project Partners include Brooklyn

More information

VDOT I-66 Inside the Beltway Eastbound Widening Environmental Assessment. Staff Recommendations

VDOT I-66 Inside the Beltway Eastbound Widening Environmental Assessment. Staff Recommendations VDOT I-66 Inside the Beltway Eastbound Widening Environmental Assessment Staff Recommendations Department of Environmental Services Transportation January 28, 2017 Timeline of Transform66 June 2012: I-66

More information

section 4 Existing Conditions, Issues, and Options

section 4 Existing Conditions, Issues, and Options section 4 Existing Conditions, Issues, and Options 4.0 Existing Conditions, Issues, and Options This section analyzes each segment of the corridor on a street to street basis. Each segment is discussed

More information

TRANSPORTATION NEEDS ASSESSMENT

TRANSPORTATION NEEDS ASSESSMENT TRANSPORTATION NEEDS ASSESSMENT A travel demand analysis was carried out to determine the operational issues and the potential benefit that adding traffic capacity would have on the road network. All the

More information

SECTION 2 ALTERNATIVES INCLUDING PROPOSED ACTION 2.0 ALTERNATIVES INCLUDING PROPOSED ACTION 2.1 INTRODUCTION 2.2 ALTERNATIVES CONSIDERED BUT REJECTED

SECTION 2 ALTERNATIVES INCLUDING PROPOSED ACTION 2.0 ALTERNATIVES INCLUDING PROPOSED ACTION 2.1 INTRODUCTION 2.2 ALTERNATIVES CONSIDERED BUT REJECTED 2.0 ALTERNATIVES INCLUDING PROPOSED ACTION 2.1 INTRODUCTION The City of Starke is currently a bottleneck for traffic traveling along U.S. 301 in Bradford County. Local urban traffic combined with increasing

More information

Design Criteria. Design Criteria

Design Criteria. Design Criteria F Design Criteria Design Criteria Ministry of Transportation Ministère des Transports DESIGN CRITERIA Page: 1 of 13 WORK PROJECT NO. N/A GO Bloomington Station TYPE OF PROJECT LOCATION Bloomington Road

More information

I-264 CORRIDOR EVALUATION STUDY. September 7, 2016 Eric Stringfield VDOT Planning Director Chris Lawrence AECOM Senior Transportation Engineer

I-264 CORRIDOR EVALUATION STUDY. September 7, 2016 Eric Stringfield VDOT Planning Director Chris Lawrence AECOM Senior Transportation Engineer I-264 CORRIDOR EVALUATION STUDY September 7, 2016 Eric Stringfield VDOT Planning Director Chris Lawrence AECOM Senior Transportation Engineer Study Overview Interchange Locations Study Context Follow-up

More information

City of Moorhead Committee of the Whole Meeting

City of Moorhead Committee of the Whole Meeting City of Moorhead Committee of the Whole Meeting Corridor Study Limits Center Avenue (Red River to 8th Street) TH 10 (Red River to TH 336) TH 75 (20th Ave S to Main Avenue) 2 Study Need: Project Overview

More information

Colerain Avenue Roadway Improvements. Sponsored by Hamilton County Engineer

Colerain Avenue Roadway Improvements. Sponsored by Hamilton County Engineer Colerain Avenue Roadway Improvements Sponsored by Hamilton County Engineer Participants Lead Agency: Hamilton County Engineer Review and Approval: Ohio Department of Transportation Design Engineer: Edwards

More information

Uptown Houston November 2014

Uptown Houston November 2014 Uptown Houston November 2014 City of Houston Leads the Nation in Job Growth Leads the Nation in Exports Record Construction Permits - $ 8 Billion Most Competitive Metro in America - Forbes New Development

More information

Capital Projects Update: N. Lynn Street Esplanade and Custis Trail Improvements Advertisement for Construction - Progress Report

Capital Projects Update: N. Lynn Street Esplanade and Custis Trail Improvements Advertisement for Construction - Progress Report Capital Projects Update: N. Lynn Street Esplanade and Custis Trail Improvements Advertisement for Construction - Progress Report UPC Design 70762 / CN 109813 Locally Administered PE Phase VDOT Administered

More information

CHAPTER 3 STUDY AREA OPERATIONAL OVERVIEW

CHAPTER 3 STUDY AREA OPERATIONAL OVERVIEW HPTER 3 STUY RE OPERTIONL OVERVIEW This chapter describes the overall traffic operations within the study area under existing and future conditions and focuses on individual intersections not directly

More information

Public Hearing Tarrant County. October 11 th, 2012

Public Hearing Tarrant County. October 11 th, 2012 Public Hearing Tarrant County October 11 th, 2012 Public Hearing Agenda Welcome and Project Overview Ms. Maribel P. Chavez, P.E. District Engineer Texas Department of Transportation Fort Worth District

More information

DISTRICT BICYCLE PROGRAM

DISTRICT BICYCLE PROGRAM DISTRICT BICYCLE PROGRAM TxDOT Fort Worth District Public Hearing Bicycle Use on the State Highway System Public Hearing Agenda 1 2 3 4 5 6 Introduction Susan Howard TxDOT Public Involvement Specialist

More information

Hennepin Avenue Reconstruction Washington Avenue to 12 th Street

Hennepin Avenue Reconstruction Washington Avenue to 12 th Street CITY OF MINNEAPOLIS Hennepin Avenue Reconstruction Washington Avenue to 12 th Street April 2016 1 Upcoming Opportunities Public Meeting #2 April 25, 2016 Minneapolis Central Library Doty Board Room Repeat

More information

Cincinnati Dayton Rd Widening

Cincinnati Dayton Rd Widening Cincinnati Dayton Rd Widening Project Overview Widening of Cincinnati Dayton Rd to four lanes - providing a center turn lane and an additional northbound lane Realignment of Station Rd Widening of bridge

More information

Thank you for attending

Thank you for attending Improving mobility safety comfort WELCOME Thank you for attending The purpose of this meeting is to: Learn about the project Prioritize potential walking and biking improvements on Snelling Ave Gather

More information

Dr. Naveed Anwar Executive Director, AIT Consulting Affiliated Faculty, Structural Engineering Director, ACECOMS

Dr. Naveed Anwar Executive Director, AIT Consulting Affiliated Faculty, Structural Engineering Director, ACECOMS Dr. Naveed Anwar Executive Director, AIT Consulting Affiliated Faculty, Structural Engineering Director, ACECOMS Overview Highway Functions and Classifications Highway Design Components Design Control

More information

Clackamas County Comprehensive Plan

Clackamas County Comprehensive Plan ROADWAYS The County s road system permits the movement of goods and people between communities and regions, using any of a variety of modes of travel. Roads provide access to virtually all property. They

More information

Brian McHugh, Buckhead Community Improvement District. SUBJECT: Wieuca Road at Phipps Boulevard Intersection Improvements Project

Brian McHugh, Buckhead Community Improvement District. SUBJECT: Wieuca Road at Phipps Boulevard Intersection Improvements Project MEMO TO: FROM: Brian McHugh, Buckhead Community Improvement District Jagan Kaja, AICP, WSP Parsons Brinckerhoff SUBJECT: Wieuca Road at Phipps Boulevard Intersection Improvements Project DATE: October

More information

Comments EXECUTIVE SUMMARY

Comments EXECUTIVE SUMMARY Comments 1. Under any Alternatives, MCDOT should provide better at-grade pedestrian crossing of Georgia Avenue and Forest Glen Road, including improved crosswalks with wider medians and adequate signal

More information

County of Fairfax, Virginia. Department of Transportation

County of Fairfax, Virginia. Department of Transportation Fairfax County Parkway History 2 Planning began 50 years ago 1960s Washington s Regional Transportation Plan Recommends improved north/south travel Construct Capital Beltway and outer beltway Outer beltway

More information

NOTICE OF PREPARATION. Environmental Programs 3331 North First Street, Building B-2 San Jose, CA

NOTICE OF PREPARATION. Environmental Programs 3331 North First Street, Building B-2 San Jose, CA NOTICE OF PREPARATION May 29, 2018 To: Reviewing Agencies and Organizations From: Santa Clara Valley Transportation Authority Environmental Programs 3331 North First Street, Building B-2 San Jose, CA 95134-1927

More information

Highland Creek Village Transportation Master Plan: Stakeholder #3 Meeting Summary

Highland Creek Village Transportation Master Plan: Stakeholder #3 Meeting Summary Highland Creek Village Transportation Master Plan: Stakeholder #3 Meeting Summary Prepared by Maogosha Pyjor In cooperation with AECOM Meeting Date: May 28, 2015 Location: Royal Canadian Legion, 45 Lawson

More information

DESIGN MEMORANDUM WITH DESIGN EXCEPTIONS SP SP

DESIGN MEMORANDUM WITH DESIGN EXCEPTIONS SP SP DRAFT NOT FINAL (Note: document was not finalized due to an eastbound stopping site distance design issue that requires more detailed bridge and roadway design considerations. This discussion starts on

More information

Capital Projects Update: N. Lynn Street Esplanade and Custis Trail Improvements 100% Engineering Design - Progress Report

Capital Projects Update: N. Lynn Street Esplanade and Custis Trail Improvements 100% Engineering Design - Progress Report Capital Projects Update: N. Lynn Street Esplanade and Custis Trail Improvements 100% Engineering Design - Progress Report UPC 70762 Locally Administered PE Phase VDOT Administered CN Phase 4/6/17 1 Project

More information

Sixth Line Development - Transit Facilities Plan

Sixth Line Development - Transit Facilities Plan Memorandum Date: November 13, 2012 To: From: c.c. Subject: Rob Freeman (Freeman Planning) Kevin Phillips Sixth Line Development - Transit Facilities Plan 33016631 This memo was prepared to review the transit

More information

City of Gainesville Transportation/Roadway Needs PROJECT SUMMARY

City of Gainesville Transportation/Roadway Needs PROJECT SUMMARY A1 Roadway Resurfacing $23,846,000 TYPE: Preservation of existing system Roadway resurfacing A2 Signal Replacement $6,000,000 TYPE: Preservation of existing system Replace traffic signals. B1 W 6th St

More information

INNOVATIVE INTERSECTION DESIGN

INNOVATIVE INTERSECTION DESIGN INNOVATIVE INTERSECTION DESIGN J. Eddie Valtier, P.E. ELP TP&D Director Introduction Why Do We Need To Start Looking For Innovative Intersection Designs? Congestion is worsening and traffic volumes and

More information

APPENDIX G: INTERSECTION NEEDS AT OKEECHOBEE BOULEVARD

APPENDIX G: INTERSECTION NEEDS AT OKEECHOBEE BOULEVARD APPENDIX G: INTERSECTION NEEDS AT OKEECHOBEE BOULEVARD INTERSECTION NEEDS AT SR 7 and OKEECHOBEE BOULEVARD SR 7 Extension Project Development and Environment (PD&E) Study From Okeechobee Boulevard (SR

More information

A: PLANNED P ROJECTS PROJECTS

A: PLANNED P ROJECTS PROJECTS Appendix A: PLANNED PROJECTS Programming Study Sound Barrier along south side of for approx. 2100 feet. Construction Complete $850,000 5 8613.00 Y Y Y Sound Barrier along south side of for 500' west of

More information

Welcome to the McKenzie Interchange Project Open House!

Welcome to the McKenzie Interchange Project Open House! Welcome to the McKenzie Interchange Project Open House! Purpose of Open House To provide you with information regarding the project and for you to have the opportunity to share your input on design concepts.

More information

Agenda. Introduction to Roundabouts. Introduction to Roundabouts. Introduction to Roundabouts 6/6/2018

Agenda. Introduction to Roundabouts. Introduction to Roundabouts. Introduction to Roundabouts 6/6/2018 PROPOSED PROJECT 161-003 SAFETY AND OPERATIONAL IMPROVEMENTS TO THE INTERSECTION OF ROUTE 106 (NEW CANAAN ROAD) AND BELDEN HILL ROAD Connecticut Department of Transportation Representatives Division of

More information

FY 2006 TRANSPORTATION CAPITAL PROGRAM

FY 2006 TRANSPORTATION CAPITAL PROGRAM Airport Circle Elimination, CR 563, 646 S9820 Intersection, operational, and safety improvements at the intersection of Tilton Road (CR 563) and Delilah Road (CR 646) will include elimination of the circle,

More information

Potential Bicycle Facility on Bayou Street Mobile, Alabama

Potential Bicycle Facility on Bayou Street Mobile, Alabama Potential Bicycle Facility on Bayou Street Mobile, Alabama By Richard A. Hall, P.E. Prepared For Mobile Downtown Alliance Hall Planning & Engineering, Inc. March 28, 2018 Introduction Review of the February

More information

FY Transportation Improvement Program - DRAFT Alphabetical Listing of Roadway, Bicycle, Pedestrian and Rideshare Projects

FY Transportation Improvement Program - DRAFT Alphabetical Listing of Roadway, Bicycle, Pedestrian and Rideshare Projects -2022 Transportation Improvement Program - DRAFT Project Number Alamo Area Commute Solutions Pgm - FY 2017 5101.0 0915-12-547 AACOG Alamo Area Commute Solutions Pgm - FY 2018 5102.0 0915-12-543 AACOG Alamo

More information

RM 620 FEASIBILITY STUDY SURVEY RESPONSES

RM 620 FEASIBILITY STUDY SURVEY RESPONSES RM 620 FEASIBILITY STUDY SURVEY RESPONSES as of January 11, 2016 1/11/16 Who is Responding to the RM 620 Feasibility Study Survey? As of January 11, 2016, 2,835 survey responses have been received Approximately

More information

Maywood Town Hall Meeting. May 4, 2016

Maywood Town Hall Meeting. May 4, 2016 Maywood Town Hall Meeting May 4, 2016 1 AGENDA Overall I-290 Study Background Maywood Advisory Working Group (AWG) findings to date Noise Wall Update Next Steps 2 Questions? Study team members also available

More information