Marina Loft (DRC 51-R-12)

Size: px
Start display at page:

Download "Marina Loft (DRC 51-R-12)"

Transcription

1 Marina Loft (DRC 51-R-12) traffic study prepared for: Cymbal Development OCtober 2012

2 Traf Tech October 1, 2012 Mr. Asi Cymbal - President Cymbal Development 3470 North Miami Avenue Upper Suite Miami, Florida Re: Marina Loft (DRC 51-R-12) Revised Traffic Study Dear Mr. Cymbal: Traf Tech Engineering, Inc. is pleased to provide you with the results of the updated traffic study undertaken for the proposed Marina Loft development planned to be located on the north side of SW 5 th Street both east and west of SW 3 rd Avenue in the City of Fort Lauderdale, Florida. The traffic-related comments provided by the City of Fort Lauderdale are incorporated in the updated traffic report. It has been a pleasure working with Cymbal Development on this project. Sincerely, TRAF TECH Joaquin E. Vargas, P.E. Senior Transportation Engineer 8400 North University Drive, Suite 309, Tamarac, Florida Tel: (954) Fax: (954)

3 TABLE OF CONTENTS INTRODUCTION...1 INVENTORY...3 Existing Land Uses...3 Proposed Land Uses and Access...3 EXISTING CONDITIONS...4 Roadway System...4 Intersections...4 TRAFFIC COUNTS...7 TRIP GENERATION...10 TRIP DISTRIBUTION AND TRAFFIC ASSIGNMENT...15 TRAFFIC ANALYSIS...22 Future Conditions Traffic Volumes...22 Level of Service Analyses...22 Ingress/Egress Driveways...38 Link Evaluation...38 Construction Traffic...38 CONCLUSIONS AND RECOMMENDATIONS...41 LIST OF FIGURES FIGURE 1 Project Location Map...2 FIGURE 2a Existing Lane Geometry...5 FIGURE 2b Existing Lane Geometry...6 FIGURE 3a Existing Traffic Counts...8 FIGURE 3b Existing Traffic Counts...9 FIGURE 4a Project Traffic Assignment Phase FIGURE 4b Project Traffic Assignment Phase FIGURE 5a Project Traffic Assignment Phase FIGURE 5b Project Traffic Assignment Phase FIGURE 6a Project Traffic Assignment Phase FIGURE 6b Project Traffic Assignment Phase FIGURE 7a Background Traffic Year 2015 Phase FIGURE 7b Background Traffic Year 2015 Phase FIGURE 8a Background Traffic Year 2017 Phase FIGURE 8b Background Traffic Year 2017 Phase i Marina Loft Traffic Study

4 FIGURE 9a Background Traffic Year 2020 Phase FIGURE 9b Background Traffic Year 2020 Phase FIGURE 10a Total Traffic w/project Year 2015 Phase FIGURE 10b Total Traffic w/project Year 2015 Phase FIGURE 11a Total Traffic w/project Year 2017 Phase FIGURE 11b Total Traffic w/project Year 2017 Phase FIGURE 12a Total Traffic w/project Year 2020 Phase FIGURE 12b Total Traffic w/project Year 2020 Phase LIST OF TABLES TABLE 1 Trip Generation Summary (Proposed Uses - Phase 1 AM Peak)...11 TABLE 2 Trip Generation Summary (Proposed Uses - Phase 1 PM Peak)...11 TABLE 3 Trip Generation Summary (Proposed Uses - Phase 2 AM Peak)...12 TABLE 4 Trip Generation Summary (Proposed Uses - Phase 2 PM Peak)...12 TABLE 5 Trip Generation Summary (Proposed Uses - Phase 3 AM Peak)...13 TABLE 6 Trip Generation Summary (Proposed Uses - Phase 3 PM Peak)...13 TABLE 7 Intersection Level of Service Analyses Signalized Intersections (Phase 1) TABLE 8 Intersection Level of Service Analyses Stop Control Intersections (Phase 1) TABLE 9 Intersection Level of Service Analyses Signalized Intersections (Phase 2) TABLE 10 Intersection Level of Service Analyses Stop Control Intersections (Phase 2) TABLE 11 Intersection Level of Service Analyses Signalized Intersections (Phase 3) TABLE 12 Intersection Level of Service Analyses Stop Control Intersections (Phase 3) TABLE 13 Link Evaluation AM Peak Hour...39 TABLE 14 Link Evaluation PM Peak Hour...40 ii Marina Loft Traffic Study

5 INTRODUCTION Marina Loft is a proposed mixed-use development planned to be located on the north side of SW 5 th Street both east and west of SW 3 rd Avenue in the City of Fort Lauderdale in Broward County, Florida. More specifically, the project site is bounded by the New River on the north, SW 5 th Street and SW 4 th Court on the south, the FEC railroad on the east, and SW 4 th Avenue on the west. Figure 1 on the following page shows the location of the project site as well as the transportation network located in the immediate vicinity of the project site. Traf Tech Engineering, Inc. was retained by Cymbal Development to conduct a traffic study in connection with the subject project. The study addresses trip generation, access to the site, the traffic impacts on the nearby transportation network, and potential roadway improvement intended to mitigate the new trips generated by the project, if any. This study is divided into seven (7) sections, as listed below: 1. Inventory 2. Existing Conditions 3. Traffic Counts 4. Trip Generation 5. Trip Distribution and Traffic Assignment 6. Traffic Analysis 7. Conclusions and Recommendations 1 Marina Loft Traffic Study

6 N SITE Traf Tech PROJECT LOCATION MAP FIGURE 1 Marina Loft Fort Lauderdale, Florida

7 INVENTORY Existing Land Uses The project site is divided in three parcels (East, Center, and West) and currently contains several marine-related developments currently in operation. This project includes the redevelopment of all three parcels. On the east parcel, there is an existing development called River Front Marina. On the center parcel, a boat repair facility is currently in place called Mid River Marina and on the west parcel boat storage. Proposed Land Uses and Access The existing developments located on the three parcels will be replaced with a mixed-use development consisting of residential use, retail use, restaurants, and a boat storage facility. The project will be developed in three phases. The proposed land uses and intensities associated with each phase are presented below: PHASE 1 (YEAR 2015) o 200 boat storage units (existing) o 348 residential units o 3,714 square-foot restaurant o 477 parking spaces in a parking garage on the west parcel PHASE 2 (YEAR 2017) o 339 additional residential units o 4,179 additional square feet of restaurant space o 6,008 square feet of retail use o 424 additional parking spaces in a parking garage on the center parcel PHASE 3 (YEAR 2020) o 385 additional residential units (including 13 live/work units) o 7,523 additional square feet of restaurant space o 9,250 additional square feet of retail use o 563 additional parking spaces in a parking garage on the east parcel The proposed access for the mixed-use development is planned to be provided via three access driveways (one for each parking garage). The west parcel parking structure will be served by one access driveway located off of SW 4 th Avenue, the center parking garage will be served by an access driveway located off of SW 4 th Court, the parking structure located on the east parcel will be served by a full-access driveway located off of SW 3 rd Avenue. Appendix A contains a copy of the proposed site plan for the project. 3 Marina Loft Traffic Study

8 EXISTING CONDITIONS This section addresses the existing roadway system located in the vicinity of the project site. Roadway System Three major north-south roadways and one east-west collector facility are located in the vicinity of the project site. The three north-south roadways include SW 7 th Avenue/SW 4 th Avenue, Andrews Avenue, and SE 3 rd Avenue. All these facilities provide two through lanes in each direction. The east-west facility located near the project site includes SW 6 th Street. This roadway generally provides one through lane in each direction and extends from Federal Highway on the east to west of SW 4 th Avenue. In addition to the above major roadways, SW 3 rd Avenue, SW 4 th Avenue and SW 4 th Court provide direct access to the project site. These roadways provide one through lane in each direction. Intersections For purposes of this study, seven intersections located in the vicinity of the proposed project were selected for analysis purposes. The seven intersections are described below: 1. SW 7 th Avenue and Broward Boulevard: This is a signalized intersection. 2. SW 4 th Avenue and SW 6 th Street: This is a signalized intersection. 3. SW 4 th Avenue and Davie Boulevard: This is a signalized intersection. 4. SW 5 th Street and SW 3 rd Avenue: This is a stop-controlled intersection 5. SW 6 th Street and SW 3 rd Avenue: This intersection is a stopped-controlled intersection with one lane on each approach. 6. SW 6 th Street and Andrews Avenue: This is a signalized intersection. The east leg of this intersection is one-way in the westbound direction. 7. SE 6 th Street and SE 3 rd Avenue: This is also a signalized intersection functioning with three approaches (the west leg is one way in the westbound direction). Figures 2a and 2b depict the turning lanes provided at the seven intersections listed above, as well as other nearby stopped-controlled intersections. 4 Marina Loft Traffic Study

9 N LEGEND Left-Turn Lane Through Lane Right-Turn Lane SITE Frontage Rd Free Flow ONE WAY Traf Tech EXISTING LANE GEOMETRY FIGURE 2a Marina Loft Fort Lauderdale, Florida

10 Broward Boulevard SW 4 th Avenue SW 7 th Ave SW 6 th Street Davie Boulevard Traf Tech EXISTING LANE GEOMETRY FIGURE 2b Marina Loft Fort Lauderdale, Florida

11 TRAFFIC COUNTS Traf Tech Engineering, Inc., in association with Crossroads Engineering Data, Inc., collected intersection turning movement counts at the following seven (7) intersections located within the study area: 1. SW 7 th Avenue and Broward Boulevard (signalized) 2. SW 4 th Avenue and SW 6 th Street (signalized) 3. SW 4 th Avenue and Davie Boulevard (signalized) 4. SW 5 th Street and SW 3 rd Avenue (stop control) 5. SW 6 th Street and SW 3 rd Avenue (stop control) 6. SW 6 th Street and Andrews Avenue (signalized) 7. SE 6 th Street and SE 3 rd Avenue (signalized) Figures 3a and 3b summarize the results of the intersection turning movement counts undertaken during the AM and PM peak hours. Appendix B contains the intersection turning movement counts, as collected in the field. The signal timing plans of the five signalized intersections located in the vicinity of the project site are also contained in Appendix B. 7 Marina Loft Traffic Study

12 N 2 (0) 28 (43) 4 (5) 5 (8) 4 (8) 9 (14) LEGEND XX AM Peak Hour (YY) PM Peak Hour (0) 2 (0) 1 (9) 7 (9) 4 (20) 32 (2) 2 SITE 2 (2) 467 (544) 197 (92) 80 (312) 1 (4) 26 (177) 36 (61) 3 (5) 14 (19) 7 (11) 56 (425) 2 (3) 22 (51) 425 (611) 69 (88) 65 (217) 87 (193) 178 (148) 460 (728) 202 (95) 172 (297) 40 (228) 35 (120) (7) 1 (2) 0 (4) 2 (2) 0 (567) 625 (55) 193 (41) 25 (102) 334 (2) 6 (5) 4 (3) 7 (1) 2 (81) 210 (61) 85 (46) 33 (470) 563 (39) 165 (633) 772 (48) 97 Traf Tech INTERSECTION TURNING MOVEMENT COUNTS FIGURE 3a Marina Loft Fort Lauderdale, Florida

13 Broward Boulevard 84 (130) 393 (301) 94 (43) SW 7 th Ave 31 (51) 1,098 (1,893) 38 (56) (156) 134 (1,518) 1,777 (125) 238 (300) 181 (674) 312 (59) 72 SW 6 th Street Davie Boulevard SW 4 th Avenue 80 (203) 205 (392) 78 (65) (146) 325 (701) 1,138 (76) 97 (55) (56) 506 (808) 52 (167) (302) 407 (57) 109 Traf Tech INTERSECTION TURNING MOVEMENT COUNTS FIGURE 3b Marina Loft Fort Lauderdale, Florida

14 TRIP GENERATION The trip generation for the proposed Marina Loft development was based on information contained in the Institute of Transportation Engineer s (ITE) Trip Generation manual (8 th Edition). According to the subject ITE manual, the most appropriate land use categories for the subject project are ITE s Land Use 232 High Rise Residential Condominium/Townhouse, ITE s Land Use 814 Specialty Retail, and ITE s Land Use 931 Quality Restaurant. Tables 1 and 2 document the trips generated by the Phase 1 development plan. As indicated in Tables 1 and 2, the Phase 1 trips consist of approximately 1,870 daily trips, approximately 133 AM peak hour trips (27 inbound and 106 outbound), and approximately 162 PM peak hour trips (102 inbound and 60 outbound). Tables 3 and 4 document the trips generated by the Phase 2 development plan. As indicated in Tables 3 and 4, the Phase 2 trips consist of approximately 2,144 daily trips, approximately 130 AM peak hour trips (26 inbound and 104 outbound), and approximately 178 PM peak hour trips (109 inbound and 69 outbound). Tables 5 and 6 documents the trips generated by the Phase 3 development plan. As indicated in Table 5 and 6, the Phase 3 trips consist of approximately 2,762 daily trips, approximately 147 AM peak hour trips (30 inbound and 117 outbound), and approximately 227 PM peak hour trips (140 inbound and 87 outbound). The trip generation equations for the proposed development program, given by ITE, are: HIGH RISE RESIDENTIAL CONDOMINIUM/TOWNHOUSE (Land Use 232) Daily Trips T = 3.77 (X) Where T = average daily vehicle trip ends X = number of residential units AM Peak Hour of Adjacent Street (Typical Morning Rush Hour) T = 0.29 (X) (19% inbound and 81% outbound) Where T = average AM peak hour vehicle trip ends X = number of residential units PM Peak Hour of Adjacent Street (Typical Afternoon Rush Hour) T = 0.34 (X) (62% inbound and 38% outbound) Where T = average PM peak hour vehicle trip ends X = number of residential units 10 Marina Loft Traffic Study

15 TABLE 1 TRIP GENERATION SUMMARY (Proposed Uses - Phase 1) Marina Loft (DRC 51-R-12) AM Peak Hour Land Use Size Daily Trips Total Trips Inbound Outbound Residential 348 1, Restaurant 3, Total = 1, Source: ITE Trip Generation Manual (8th Edition) TABLE 2 TRIP GENERATION SUMMARY (Proposed Uses - Phase 1) Marina Loft (DRC 51-R-12) PM Peak Hour Land Use Size Daily Trips Total Trips Inbound Outbound Residential 348 1, Restaurant 3, Total = 1, Source: ITE Trip Generation Manual (8th Edition)

16 TABLE 3 TRIP GENERATION SUMMARY (Proposed Uses - Phase 2) Marina Loft (DRC 51-R-12) AM Peak Hour Land Use Size Daily Trips Total Trips Inbound Outbound Residential 339 1, Retail 6, Restaurant 4, Total = 2, Source: ITE Trip Generation Manual (8th Edition) TABLE 4 TRIP GENERATION SUMMARY (Proposed Uses - Phase 2) Marina Loft (DRC 51-R-12) PM Peak Hour Land Use Size Daily Trips Total Trips Inbound Outbound Residential 339 1, Retail 6, Restaurant 4, Total = 2, Source: ITE Trip Generation Manual (8th Edition)

17 TABLE 5 TRIP GENERATION SUMMARY (Proposed Uses - Phase 3) Marina Loft (DRC 51-R-12) AM Peak Hour Land Use Size Daily Trips Total Trips Inbound Outbound Residential 385 1, Retail 9, Restaurant 7, Total = 2, Source: ITE Trip Generation Manual (8th Edition) TABLE 6 TRIP GENERATION SUMMARY (Proposed Uses - Phase 3) Marina Loft (DRC 51-R-12) PM Peak Hour Land Use Size Daily Trips Total Trips Inbound Outbound Residential 385 1, Retail 9, Restaurant 7, Total = 2, Source: ITE Trip Generation Manual (8th Edition)

18 SPECIALTY RETAIL (Land Use 814) Daily Trips T = (X) Where T = average daily vehicle trip ends X = 1,000 square feet of gross leasable area AM Peak Hour of Adjacent Street (Typical Morning Rush Hour) T = Not Provided (Assumed to be zero) PM Peak Hour of Adjacent Street (Typical Afternoon Rush Hour) T = 2.71 (X) (44% inbound and 56% outbound) Where T = average PM peak hour vehicle trip ends X = 1,000 square feet of gross leasable area QUALITY RESTAURANT (Land Use 931) Daily Trips T = (X) Where T = average daily vehicle trip ends X = 1,000 square feet of gross floor area AM Peak Hour of Adjacent Street (Typical Morning Rush Hour) T = 0.81 (X) (Distribution assumed to be 50% inbound and 50% outbound) Where T = average PM peak hour vehicle trip ends X = 1,000 square feet of gross floor area PM Peak Hour of Adjacent Street (Typical Afternoon Rush Hour) T = 7.49 (X) (67% inbound and 33% outbound) Where T = average PM peak hour vehicle trip ends X = 1,000 square feet of gross floor area It is important to mention that in order to assess impacts with a conservative approach, no trip deductions were made to account for internal trips, passer-by traffic, or other modes of transportation. 14 Marina Loft Traffic Study

19 TRIP DISTRIBUTION AND TRAFFIC ASSIGNMENT The trip distribution and traffic assignment for the proposed project was based on knowledge of the study area, examination of the surrounding roadway network characteristics, review of current traffic volumes, and existing land use patterns. The trip distribution assumed for the Marina Loft mixed-use development is summarized below: o 15% to and from the north via NW 7 th Avenue (north of Broward Boulevard) o 10% to and from the north via South Andrews Avenue o 2% to and from the north via SE 3 rd Avenue o 10% to and from the south via SW 4 th Avenue (south of Davie Boulevard) o 5% to and from the south via South Andrews Avenue o 3% to and from the south via SE 3 rd Avenue o 5% to and from the east via SE 6 th Street/SE 7 th Street east of SE 3 rd Avenue The AM and PM peak hour traffic generated by the Marina Loft mixed-use project was assigned to the nearby transportation network using the trip distribution documented above. The traffic assignment associated with Phase 1 is summarized in Figures 4a and 4b. The traffic assignment associated with Phase 2 is summarized in Figures 5a and 5b. The traffic assignment associated with Phase 3 is summarized in Figures 6a and 6b. 15 Marina Loft Traffic Study

20 N 3 (10) 106 (60) (62) 16 3 (10) SITE 10% (6) 11 2% LEGEND XX AM Peak Hour (YY) PM Peak Hour 45% Frontage Road (30) 8 10% 5% 12 (46) 48 (27) 32 (18) 80 (45) 26 (15) 4 (16) 3 (10) 1 (2) 1 (5) (30) 8 (46) 12 30% 5% (6) 11 (9) 15 (5) 1 3% (3) 1 Traf Tech PROJECT TRAFFIC ASSIGNMENT Phase 1 FIGURE 4a Marina Loft Fort Lauderdale, Florida

21 15% 25% Broward Boulevard 5% 4 (15) SW 7 th Ave 1 (5) (26) 7 (15) 27 (9) 16 (3) 5 SW 6 th Street Davie Boulevard SW 4 th Avenue 15% 5% 16 (9) 11 (6) 5 (3) (15) 4 1 (5) (10) 3 10% Traf Tech PROJECT TRAFFIC ASSIGNMENT Phase 1 FIGURE 4b Marina Loft Fort Lauderdale, Florida

22 N 3 (11) 104 (69) (66) 15 3 (11) SITE 10% (8) 11 2% LEGEND XX AM Peak Hour (YY) PM Peak Hour 45% Frontage Road (32) 8 10% 5% 11 (48) 46 (30) 32 (20) 78 (50) 26 (19) 4 (18) 3 (11) 1 (2) 1 (6) (32) 8 (48) 11 30% 5% (8) 11 (11) 15 (6) 1 3% (3) 1 Traf Tech PROJECT TRAFFIC ASSIGNMENT Phase 2 FIGURE 5a Marina Loft Fort Lauderdale, Florida

23 15% 25% Broward Boulevard 5% 4 (16) SW 7 th Ave 1 (5) (27) 6 (17) 26 (10) 15 (3) 5 SW 6 th Street Davie Boulevard SW 4 th Avenue 15% 5% 16 (10) 11 (7) 5 (3) (16) 4 1 (5) (11) 3 10% Traf Tech PROJECT TRAFFIC ASSIGNMENT Phase 2 FIGURE 5b Marina Loft Fort Lauderdale, Florida

24 N 3 (14) 117 (87) (42) 9 (84) 18 3 (14) SITE 10% (9) 11 2% LEGEND XX AM Peak Hour (YY) PM Peak Hour 45% Frontage Road (42) 9 10% 5% 14 (63) 53 (39) 36 (26) 89 (65) 28 (22) 4 (21) 3 (13) 1 (2) 1 (7) (42) 9 (63) 14 30% 5% (9) 11 (13) 17 (7) 1 3% (4) 1 Traf Tech PROJECT TRAFFIC ASSIGNMENT Phase 3 FIGURE 6a Marina Loft Fort Lauderdale, Florida

25 15% 25% Broward Boulevard 5% 5 (21) SW 7 th Ave 1 (7) (35) 8 (22) 29 (13) 18 (4) 6 SW 6 th Street Davie Boulevard SW 4 th Avenue 15% 5% 18 (13) 12 (9) 6 (4) (21) 5 1 (7) (14) 3 10% Traf Tech PROJECT TRAFFIC ASSIGNMENT Phase 3 FIGURE 6b Marina Loft Fort Lauderdale, Florida

26 TRAFFIC ANALYSIS This section of the study is divided into two parts. The first part consists of developing the future conditions traffic volumes for the study area. The second part includes levelof-service analyses for existing and future conditions. Future Conditions Traffic Volumes Two sets of future traffic volumes were developed. The first set includes background traffic conditions for each of the three development phases and the second set adds the project trips anticipated to be generated by each individual phase of the Marina Loft project. In order to develop future-year traffic volumes, without the proposed project, two separate analyses were undertaken. The first analysis converts the existing AM and PM peak hour traffic counts collected in the field during the month of July to average peak season conditions. Based on FDOT s Peak Season Factor Category report, an adjustment factor of 1.09 is required to convert traffic counts collected in the fourth week of July to average peak season conditions (refer to Appendix C). The second analysis includes a growth factor to project 2012 peak season traffic volumes to the three future analysis years (2015, 2017, and 2020). For purposes of this traffic study, a 0.5% growth rate was applied to the 2012 traffic counts in order to develop 2015, 2017 and 2020 background traffic conditions. The 0.5% traffic growth rate is considered conservative since two nearby traffic count stations have reflected negative traffic growth along SW 7 th Avenue and SW 4 th Avenue (refer to Appendix C). Additionally, future trips associated with seven readily-available developments (Andrews Towers, Broward Courthouse, one20fourth, New River Yacht Club, Progresso Point, 111 Broward, and Henry Square) were added to the background traffic. Information pertaining to these seven approved projects is contained in Appendix D. The future traffic calculations (peak season adjustments, traffic growth, committed developments, and the traffic associated with the three phases of the proposed development) for the study intersections are contained in Appendix E in tabular format. Figures 7a, 7b, 8a, 8b, 9a, 9b, 10a, 10b, 11a, 11b, 12a, and 12b present the future traffic volumes for the study area. Figures 7a through 9b include background traffic only (for each development phase) and Figures 10a through 12b present the total traffic conditions for each development phase. Level of Service Analyses Intersection capacity analyses were performed for the seven study intersections. The analyses were undertaken following the capacity/level of service procedures outlined in the Highway Capacity Manual using SYNCHRO. The results of the intersection analyses are summarized in Tables 7 through12. Appendix F contains the computer printouts of the intersection capacity analyses. 22 Marina Loft Traffic Study

27 N 2 (0) 31 (48) 4 (6) 6 (9) 4 (9) 10 (15) LEGEND XX AM Peak Hour (YY) PM Peak Hour (0) 2 (0) 1 (10) 8 (10) 4 (22) 35 (2) 2 SITE 2 (2) 517 (602) 329 (135) 119 (431) 1 (4) 60 (335) 40 (67) 3 (6) 15 (21) 8 (12) 123 (695) 2 (3) 24 (85) 578 (826) 76 (97) 80 (257) 117 (224) 197 (164) 618 (889) 223 (105) 190 (329) 73 (279) 39 (133) (8) 1 (2) 0 (4) 2 (2) 0 (627) 692 (99) 375 (45) 28 (184) 642 (2) 7 (6) 4 (3) 8 (1) 2 (152) 270 (88) 136 (105) 120 (730) 670 (43) 183 (754) 927 (90) 115 Traf Tech BACKGROUND TRAFFIC Phase 1 (Year 2015) FIGURE 7a Marina Loft Fort Lauderdale, Florida

28 Broward Boulevard 93 (144) 509 (348) 104 (48) SW 7 th Ave 34 (56) 1,314 (2,244) 42 (62) (173) 148 (1,772) 2,089 (144) 294 (354) 205 (800) 357 (65) 80 SW 6 th Street Davie Boulevard SW 4 th Avenue 100 (276) 246 (519) 86 (72) (176) 430 (776) 1,259 (84) 107 (61) (62) 560 (894) 58 (185) (357) 537 (63) 121 Traf Tech BACKGROUND TRAFFIC Phase 1 (Year 2015) FIGURE 7b Marina Loft Fort Lauderdale, Florida

29 N 2 (0) 137 (108) 4 (6) 9 (19) 4 (9) 10 (16) LEGEND XX AM Peak Hour (YY) PM Peak Hour (0) 2 (0) 1 (10) 8 (10) 4 (84) 52 (2) 2 SITE 2 (2) 522 (608) 343 (182) 167 (462) 1 (4) 92 (355) 120 (113) 3 (6) 42 (36) 12 (28) 124 (700) 2 (3) 25 (86) 583 (833) 77 (98) 84 (270) 118 (226) 200 (167) 623 (898) 226 (106) 192 (332) 75 (287) 39 (134) (8) 1 (2) 0 (4) 2 (2) 0 (664) 706 (99) 377 (92) 40 (185) 645 (2) 7 (6) 4 (3) 8 (1) 2 (159) 284 (98) 152 (110) 121 (735) 676 (47) 185 (761) 936 (91) 116 Traf Tech BACKGROUND TRAFFIC Phase 2 (Year 2017) FIGURE 8a Marina Loft Fort Lauderdale, Florida

30 Broward Boulevard 94 (145) 517 (366) 105 (48) SW 7 th Ave 35 (57) 1,326 (2,265) 43 (68) (174) 150 (1,788) 2,109 (172) 304 (372) 234 (816) 377 (69) 85 SW 6 th Street Davie Boulevard SW 4 th Avenue 116 (287) 259 (529) 92 (76) (192) 437 (783) 1,272 (85) 108 (61) (68) 565 (903) 58 (187) (370) 545 (64) 122 Traf Tech BACKGROUND TRAFFIC Phase 2 (Year 2017) FIGURE 8b Marina Loft Fort Lauderdale, Florida

31 N 2 (0) 242 (178) 5 (6) 12 (30) 5 (9) 10 (16) LEGEND XX AM Peak Hour (YY) PM Peak Hour (0) 2 (0) 1 (10) 8 (10) 5 (151) 67 (2) 2 SITE 2 (2) 530 (617) 357 (231) 215 (497) 1 (5) 124 (378) 199 (164) 3 (6) 68 (56) 16 (46) 125 (707) 2 (3) 25 (87) 590 (843) 78 (100) 88 (284) 120 (229) 204 (172) 631 (910) 229 (108) 195 (337) 76 (297) 40 (136) (8) 1 (2) 0 (5) 2 (2) 0 (705) 725 (100) 380 (141) 51 (187) 651 (2) 7 (6) 5 (3) 8 (1) 2 (168) 298 (110) 168 (117) 122 (743) 686 (50) 189 (772) 949 (91) 118 Traf Tech BACKGROUND TRAFFIC Phase 3 (Year 2020) FIGURE 9a Marina Loft Fort Lauderdale, Florida

32 Broward Boulevard 95 (147) 528 (387) 107 (49) SW 7 th Ave 35 (58) 1,345 (2,297) 45 (74) (177) 152 (1,814) 2,139 (201) 314 (394) 263 (838) 397 (73) 92 SW 6 th Street Davie Boulevard SW 4 th Avenue 134 (300) 274 (543) 98 (80) (211) 447 (795) 1,291 (86) 110 (62) (74) 574 (917) 59 (189) (387) 555 (65) 124 Traf Tech BACKGROUND TRAFFIC Phase 3 (Year 2020) FIGURE 9b Marina Loft Fort Lauderdale, Florida

33 N 2 (0) 137 (108) 4 (6) 9 (19) 4 (9) 10 (15) LEGEND XX AM Peak Hour (YY) PM Peak Hour (0) 2 (0) 1 (10) 8 (10) 4 (84) 51 (2) 2 SITE 2 (2) 517 (602) 341 (181) 167 (458) 1 (4) 92 (353) 120 (112) 3 (6) 41 (36) 12 (28) 123 (695) 2 (3) 24 (85) 578 (826) 76 (97) 83 (267) 117 (224) 198 (166) 618 (889) 223 (105) 190 (329) 74 (284) 39 (133) (8) 1 (2) 0 (4) 2 (2) 0 (657) 700 (99) 375 (91) 40 (184) 642 (2) 7 (6) 4 (3) 8 (1) 2 (158) 281 (97) 151 (110) 121 (730) 670 (46) 184 (754) 927 (90) 115 Traf Tech TOTAL TRAFFIC with PROJECT Phase 1 (Year 2015) FIGURE 10a Marina Loft Fort Lauderdale, Florida

34 Broward Boulevard 93 (144) 513 (363) 104 (48) SW 7 th Ave 34 (56) 1,314 (2,244) 43 (67) (173) 148 (1,772) 2,089 (170) 301 (369) 232 (809) 373 (68) 85 SW 6 th Street Davie Boulevard SW 4 th Avenue 116 (285) 257 (525) 91 (75) (191) 434 (776) 1,259 (84) 107 (61) (67) 560 (894) 58 (185) (367) 540 (63) 121 Traf Tech TOTAL TRAFFIC with PROJECT Phase 1 (Year 2015) FIGURE 10b Marina Loft Fort Lauderdale, Florida

35 N 2 (0) 241 (177) 4 (6) 12 (30) 4 (9) 10 (16) LEGEND XX AM Peak Hour (YY) PM Peak Hour (0) 2 (0) 1 (10) 8 (10) 4 (150) 67 (2) 2 SITE 2 (2) 522 (608) 354 (230) 213 (492) 1 (4) 124 (375) 198 (163) 3 (6) 68 (55) 16 (46) 124 (700) 2 (3) 25 (86) 583 (833) 77 (98) 87 (281) 118 (226) 201 (169) 623 (898) 226 (106) 192 (332) 76 (293) 39 (134) (8) 1 (2) 0 (4) 2 (2) 0 (696) 714 (99) 377 (140) 51 (185) 645 (2) 7 (6) 4 (3) 8 (1) 2 (167) 295 (109) 167 (116) 122 (735) 676 (50) 186 (761) 936 (91) 116 Traf Tech TOTAL TRAFFIC with PROJECT Phase 2 (Year 2017) FIGURE 11a Marina Loft Fort Lauderdale, Florida

36 Broward Boulevard 94 (145) 521 (382) 105 (48) SW 7 th Ave 35 (57) 1,326 (2,265) 44 (73) (174) 150 (1,788) 2,109 (199) 310 (389) 260 (826) 392 (72) 90 SW 6 th Street Davie Boulevard SW 4 th Avenue 132 (297) 270 (536) 97 (79) (208) 441 (783) 1,272 (85) 108 (61) (73) 565 (903) 58 (187) (381) 548 (64) 122 Traf Tech TOTAL TRAFFIC with PROJECT Phase 2 (Year 2017) FIGURE 11b Marina Loft Fort Lauderdale, Florida

37 N 2 (0) 359 (265) 5 (6) 15 (44) 5 (9) 10 (16) LEGEND XX AM Peak Hour (YY) PM Peak Hour (0) 2 (0) 1 (10) 8 (10) 5 (235) 85 (2) 2 SITE 2 (2) 530 (617) 371 (294) 268 (536) 1 (5) 160 (404) 288 (229) 3 (6) 96 (78) 20 (67) 125 (707) 2 (3) 25 (87) 590 (843) 78 (100) 91 (297) 120 (229) 205 (174) 631 (910) 229 (108) 195 (337) 77 (304) 40 (136) (8) 1 (2) 0 (5) 2 (2) 0 (747) 734 (100) 380 (204) 65 (187) 651 (2) 7 (6) 5 (3) 8 (1) 2 (177) 309 (123) 185 (124) 123 (743) 686 (54) 190 (772) 949 (91) 118 Traf Tech TOTAL TRAFFIC with PROJECT Phase 3 (Year 2020) FIGURE 12a Marina Loft Fort Lauderdale, Florida

38 Broward Boulevard 95 (147) 533 (408) 107 (49) SW 7 th Ave 35 (58) 1,345 (2,297) 46 (81) (177) 152 (1,814) 2,139 (236) 322 (416) 292 (851) 415 (77) 98 SW 6 th Street Davie Boulevard SW 4 th Avenue 152 (313) 286 (552) 104 (84) (232) 452 (795) 1,291 (86) 110 (62) (81) 574 (917) 59 (189) (401) 558 (65) 124 Traf Tech TOTAL TRAFFIC with PROJECT Phase 3 (Year 2020) FIGURE 12b Marina Loft Fort Lauderdale, Florida

39 TABLE 7 Intersection Level of Service Signalized Intersections Marina Loft Phase 1 Future Traffic Conditions Intersection 2012 Existing 2015 Without Phase With Phase 1 Broward/SW 7 th Avenue D (D) E (E) E (E) SW 4 th Ave/SW 6 th St A (B) C (E) C (E) SW 4 th Ave/Davie Blvd C (C) D (D) D (D) SW 6 th St/Andrews B (B) B (B) B (B) SE 6 th St/SE 3 rd Ave A (B) A (B) A (B) Source: Highway Capacity Manual. LEGEND: AM Peak (PM Peak) As indicated in Table 7, all signalized intersections are currently operating adequately. Level of service deficiencies are expected in the year 2015 without the Marina Loft development. The Marina Loft Phase 1 development will not cause any of the signalized intersection to degrade in level of service (the deficient intersections will remain deficient at level of service E ). However, signal timing fine-tuning is recommended for the intersection of SW 4 th Avenue and SW 6 th Street in order to improve the side-street operation. TABLE 8 Intersection Level of Service Stop Control Intersections Marina Loft Phase 1 Future Traffic Conditions Intersection/Movements 2012 Existing Year 2015 Without Phase 1 Year 2015 With Phase 1 SW 6 th Street/SW 3 rd Ave A (A) B (B) C (C) - NB B (C) C (E) D (F) - SB B (C) B (E) C (F) - EB Left-Turn A (A) A (A) A (A) - WB Left-Turn A (A) A (A) A (A) SW 5 th Street/SW 3 rd Ave A (A) A (A) A (A) - NB Left-Turn A (A) A (A) A (A) - SB Left-Turn A (A) A (A) A (A) - EB A (A) A (A) A (A) - WB A (A) A (A) B (B) Source: Highway Capacity Manual. LEGEND: AM Peak (PM Peak) As indicated in Table 8, the northbound and southbound approaches of the SW 6 th Street/SW 3 rd Avenue intersection are projected to experience less-than-desirable delay during afternoon peak period. Therefore, it is recommended that a second northbound and a second southbound lane be added to the intersection in order to operate both approaches with a shared left-turn/through lane and an exclusive right-turn lane. 35 Marina Loft Traffic Study

40 TABLE 9 Intersection Level of Service Signalized Intersections Marina Loft Phase 2 Future Traffic Conditions Intersection 2012 Existing 2015 With Phase With Phase 2 Broward/SW 7 th Avenue D (D) E (E) E (F) SW 4 th Ave/SW 6 th St A (B) C (E) C (F) SW 4 th Ave/Davie Blvd C (C) D (D) D (D) SW 6 th St/Andrews B (B) B (B) B (C) SE 6 th St/SE 3 rd Ave A (B) A (B) A (B) Source: Highway Capacity Manual. LEGEND: AM Peak (PM Peak) As indicated in Table 9, at the buildout year of Phase 2 level of service F conditions are projected for the Broward/SW 7 th Avenue intersection and the SW 4 th Avenue/SW 6 th Street intersection. Since the Broward/SW 7 th Avenue consists of the intersection of a County roadway and an FDOT facilities, transit oriented concurrency will address the projected deficiency at this location. Moreover, signal timing fine-tuning is recommended for the intersection of SW 4 th Avenue and SW 6 th Street in order to improve the side-street operation. TABLE 10 Intersection Level of Service Stop Control Intersections Marina Loft Phase 2 Future Traffic Conditions Intersection/Movements 2012 Existing Year 2015 With Phase 1 Year 2017 With Phase 2 SW 6 th Street/SW 3 rd Ave A (A) C (C) D (D) - NB B (C) D (F) D (F) - SB B (C) C (F) D (F) - EB Left-Turn A (A) A (A) A (A) - WB Left-Turn A (A) A (A) A (A) SW 5 th Street/SW 3 rd Ave A (A) A (A) A (A) - NB Left-Turn A (A) A (A) A (A) - SB Left-Turn A (A) A (A) A (A) - EB A (A) A (A) B (A) - WB A (A) B (B) B (B) Source: Highway Capacity Manual. LEGEND: AM Peak (PM Peak) As presented in Table 10, the northbound and southbound approaches of the SW 6 th Street/SW 3 rd Avenue intersection are projected to operate at level of service F. Therefore, it is recommended that a second northbound lane and a second southbound lane be added to the intersection in order to operate both approaches with a shared leftturn/through lane and an exclusive right-turn lane. 36 Marina Loft Traffic Study

41 TABLE 11 Intersection Level of Service Signalized Intersections Marina Loft Phase 3 Future Traffic Conditions Intersection 2012 Existing 2017 With Phase With Phase 3 Broward/SW 7 th Avenue D (D) E (F) E (F) SW 4 th Ave/SW 6 th St A (B) C (F) C (F) SW 4 th Ave/Davie Blvd C (C) D (D) D (D) SW 6 th St/Andrews B (B) B (C) B (C) SE 6 th St/SE 3 rd Ave A (B) A (B) A (B) Source: Highway Capacity Manual. LEGEND: AM Peak (PM Peak) Similar to the Phase 2 projected traffic conditions, level of service F conditions are expected for the Broward/SW 7 th Avenue intersection and the SW 4 th Avenue/SW 6 th Street intersection during the buildout of Phase 3 in As indicated previously, transit oriented concurrency will address the projected deficiency at this Broward Boulevard location. Moreover, signal timing fine-tuning is recommended for the intersection of SW 4 th Avenue and SW 6 th Street in order to improve the side-street operation. TABLE 12 Intersection Level of Service Stop Control Intersections Marina Loft Phase 3 Future Traffic Conditions Intersection/Movements 2012 Existing Year 2017 With Phase 2 Year 2020 With Phase 3 SW 6 th Street/SW 3 rd Ave A (A) D (D) E (E) - NB B (C) D (F) E (F) - SB B (C) D (F) F (F) - EB Left-Turn A (A) A (A) A (B) - WB Left-Turn A (A) A (A) A (A) SW 5 th Street/SW 3 rd Ave A (A) A (A) A (A) - NB Left-Turn A (A) A (A) A (A) - SB Left-Turn A (A) A (A) A (A) - EB A (A) B (A) B (B) - WB A (A) B (B) B (B) Source: Highway Capacity Manual. LEGEND: AM Peak (PM Peak) As indicated in Table 12, the northbound and southbound approaches of the SW 6 th Street/SW 3 rd Avenue intersection are projected to fail. If right-of-way is available, it is recommended that separate eastbound and westbound left-turn lanes be provided along SW 6 th Street and two approach lanes on both the north and south legs of the intersection. 37 Marina Loft Traffic Study

42 As indicated in Appendix F, the proposed signal timing optimization consist of transferring green time (approximately 14 seconds) from the north-south through phase to the east-west phase. Additionally, the timing for the southbound left-turn protected phase was increased from 12 seconds to 16 seconds. The cycle length remained at 80 seconds in order to maintain Broward County s coordination along SW 7 th /4 th Avenue. Ingress/Egress Driveways As indicated in the existing traffic counts documented in Figure 3a, the project trips summarized in Figures 4a, 5a, and 6a, the background traffic conditions depicted in Figures 7a, 8a, and 9a, as well as the total traffic volumes presented in Figures 10a, 11a, and 12a, almost all of the traffic volume projected at the SW 4 th Avenue driveway, the SW 4 th Court entrance/exit driveway, and the SW 3 rd Avenue ingress/egress driveway is associated with the Marina Loft development. For this reason, minimal to no queuing is projected at the three garage entrance/exit driveways. Link Evaluation A roadway link analysis was conducted for the study area. The subject segment evaluation is presented in Tables 13 and 14. As indicated in the subject tables, all roadway segments are currently operating at an acceptable level of service and will continue to operate adequately with the proposed project in place (all three phases). Construction Traffic All construction related traffic will be encouraged to arrive via SW 7 th /4 th Avenue and will access the site from SW 3 rd Avenue. All construction vehicles will be stored on site in order to avoid negative impacts to the surrounding land uses, especially the residential homes. If required by the City of Fort Lauderdale, a construction staging plan will be developed as part of this project. 38 Marina Loft Traffic Study

43 TABLE 13 Link Evaluation - Marina Loft AM Peak Hour Analysis Existing Traffic Phase 1 Phase 2 Phase 3 (2012) (2015) with Project (2017) with Project (2020) with Project Roadway Segment Lanes Capacity Volume LOS Volume LOS Volume LOS Volume LOS SW/SE 6th Street - Andrews to SE 3rd 3* ok 277 ok 282 ok 289 ok - SW 4th to Andrews ok 878 ok 943 ok 1017 ok Andrews Avenue - North of 6th Street ok 1630 ok 1655 ok 1688 ok - South of 6th Street ok 1637 ok 1666 ok 1704 ok SW 7th/4th Avenue - North of 6th Street ok 1727 ok 1807 ok 1906 ok - South of 6th Street ok 1685 ok 1739 ok 1806 ok SW 3rd Avenue - North of 6th Street ok 224 ok 344 ok 480 ok Traffic volumes taken from Figures 3a, 3b, 10a, 10b, 11a, 11b, 12a, 12b of the traffic study * One Way Westbound SW/SE 6th Street assumed as a "Major City/County Road" with up to 4.5 signals per mile Andrews Avenue assumed as a "Major City/County Road" with up to 4.5 signals per mile SW 7th/4th Avenue assumed as a "Major City/County Road" with up to 4.5 signals per mile SW 3rd Avenue assumed as a "Other Signalized Roadways" with signals per mile

44 TABLE 14 Link Evaluation - Marina Loft PM Peak Hour Analysis Existing Traffic Phase 1 Phase 2 Phase 3 (2012) (2015) with Project (2017) with Project (2020) with Project Roadway Segment Lanes Capacity Volume LOS Volume LOS Volume LOS Volume LOS SW/SE 6th Street - Andrews to SE 3rd 3* ok 588 ok 605 ok 626 ok - SW 4th to Andrews ok 1019 ok 1093 ok 1189 ok Andrews Avenue - North of 6th Street ok 1896 ok 1919 ok 1950 ok - South of 6th Street ok 1987 ok 2019 ok 2063 ok SW 7th/4th Avenue - North of 6th Street ok 1908 ok 2035 ok 2205 ok - South of 6th Street ok 1718 ok 1785 ok 1875 ok SW 3rd Avenue - North of 6th Street ok 277 ok 413 ok 587 ok Traffic volumes taken from Figures 3a, 3b, 10a, 10b, 11a, 11b, 12a, 12b of the traffic study * One Way Westbound SW/SE 6th Street assumed as a "Major City/County Road" with up to 4.5 signals per mile Andrews Avenue assumed as a "Major City/County Road" with up to 4.5 signals per mile SW 7th/4th Avenue assumed as a "Major City/County Road" with up to 4.5 signals per mile SW 3rd Avenue assumed as a "Other Signalized Roadways" with signals per mile

45 CONCLUSIONS AND RECOMMENDATIONS Marina Loft is a proposed mixed-use development planned to be located on the north side of SW 5 th Street both east and west of SW 3 rd Avenue in the City of Fort Lauderdale in Broward County, Florida. More specifically, the project site is bounded by the New River on the north, SW 5 th Street and SW 4 th Court on the south, the FEC railroad on the east, and SW 4 th Avenue on the west. Traf Tech Engineering, Inc. was retained by Cymbal Development to conduct a traffic study in connection with the subject project. The study addresses trip generation, access to the site, the traffic impacts on the nearby transportation network, and potential roadway improvement intended to mitigate the new trips generated by the project, if any. The project site is divided in three parcels (East, Center, and West) and currently contains several marine-related developments currently in operation. This project includes the redevelopment of all three parcels. On the east parcel, there is an existing development called River Front Marina. On the center parcel, a boat repair facility is currently in place called Mid River Marina and on the west parcel boat storage. The existing developments located on the three parcels will be replaced with a mixed-use development consisting of residential use, retail use, restaurants, and a boat storage facility. The project will be developed in three phases. The proposed land uses and intensities associated with each phase are presented below: PHASE 1 (YEAR 2015) o 200 boat storage units (existing) o 348 residential units o 3,714 square-foot restaurant o 477 parking spaces in a parking garage on the west parcel PHASE 2 (YEAR 2017) o 339 additional residential units o 4,179 additional square feet of restaurant space o 6,008 square feet of retail use o 424 additional parking spaces in a parking garage on the center parcel PHASE 3 (YEAR 2020) o 385 additional residential units (including 13 live/work units) o 7,523 additional square feet of restaurant space o 9,250 additional square feet of retail use o 563 additional parking spaces in a parking garage on the east parcel 41 Marina Loft Traffic Study

46 The proposed access for the mixed-use development is planned to be provided via three access driveways (one for each parking garage). The west parcel parking structure will be served by one access driveway located off of SW 4 th Avenue, the center parking garage will be served by an access driveway located off of SW 4 th Court, the parking structure located on the east parcel will be served by a full-access driveway located off of SW 3 rd Avenue. The conclusions and recommendations of the traffic study are presented below: o The trips generated by the Phase 1 development plan consist of approximately 1,870 daily trips, approximately 133 AM peak hour trips (27 inbound and 106 outbound), and approximately 162 PM peak hour trips (102 inbound and 60 outbound). o The trips generated by the Phase 2 development plan consist of approximately 2,144 daily trips, approximately 130 AM peak hour trips (26 inbound and 104 outbound), and approximately 178 PM peak hour trips (109 inbound and 69 outbound). o The trips generated by the Phase 3 development plan consist of approximately 2,762 daily trips, approximately 147 AM peak hour trips (30 inbound and 117 outbound), and approximately 227 PM peak hour trips (140 inbound and 87 outbound). o In order to assess impacts with a conservative approach, no trip deductions were made to account for internal trips, passer-by traffic, or other modes of transportation. PHASE 1 o All signalized intersections are currently operating adequately. Level of service deficiencies are expected in the year 2015 without the Marina Loft development. The Marina Loft Phase 1 development will not cause any of the signalized intersection to degrade in level of service (the deficient intersections will remain deficient at level of service E ). However, signal timing fine-tuning is recommended for the intersection of SW 4 th Avenue and SW 6 th Street in order to improve the side-street operation. o The northbound and southbound approaches of the SW 6 th Street/SW 3 rd Avenue intersection are projected to experience less-than-desirable delay during afternoon peak period. Therefore, it is recommended that a second northbound and a second southbound lane be added to the intersection in order to operate both approaches with a shared left-turn/through lane and an exclusive right-turn lane. 42 Marina Loft Traffic Study

47 PHASE 2 o Signal timing fine-tuning is recommended for the intersection of SW 4 th Avenue and SW 6 th Street in order to improve the side-street operation. PHASE 3 o Signal timing fine-tuning is recommended for the intersection of SW 4 th Avenue and SW 6 th Street in order to improve the side-street operation. o If right-of-way is available, it is recommended that separate eastbound and westbound left-turn lanes be provided along SW 6 th Street. In addition to the above recommendations, bicycle racks should be provided on site as well as public transportation information in order to encourage non-automobile mode of transportation. Sidewalk improvements should be constructed as part of Phase 1 to encourage walking and bicycling throughout the area. 43 Marina Loft Traffic Study

5858 N COLLEGE, LLC N College Avenue Traffic Impact Study

5858 N COLLEGE, LLC N College Avenue Traffic Impact Study 5858 N COLLEGE, LLC nue Traffic Impact Study August 22, 2016 Contents Traffic Impact Study Page Preparer Qualifications... 1 Introduction... 2 Existing Roadway Conditions... 5 Existing Traffic Conditions...

More information

Traffic Impact Study WestBranch Residential Development Davidson, NC March 2016

Traffic Impact Study WestBranch Residential Development Davidson, NC March 2016 Traffic Impact Study WestBranch Residential Development Davidson, NC March 216 TRAFFIC IMPACT STUDY FOR THE WestBranch Residential Development LOCATED IN DAVIDSON, NC Prepared For: Lennar Carolinas, LLC

More information

List of Exhibits...ii

List of Exhibits...ii One Brickell Traffic Study TABLE OF CONTENTS List of Exhibits...ii EXECUTIVE SUMMARY...1 1. INTRODUCTION...2 1.1 Study Area...2 1.2 Study Objective...5 2. EXISTING TRAFFIC CONDITIONS...6 2.1 Data Collection...6

More information

Glenn Avenue Corridor Traffic Operational Evaluation

Glenn Avenue Corridor Traffic Operational Evaluation Glenn Avenue Corridor Traffic Operational Evaluation PREPARED FOR: THE CITY OF AUBURN PREPARED BY: DECEMBER 2007 Glenn Avenue Corridor Study--Auburn, Alabama TABLE OF CONTENTS Introduction... 1 Background

More information

Traffic Impact Analysis Chatham County Grocery Chatham County, NC

Traffic Impact Analysis Chatham County Grocery Chatham County, NC Chatham County Grocery Chatham County, NC TABLE OF CONTENTS 1. INTRODUCTION... 1 1.1. Location and Study Area... 1 1.2. Proposed Land Use and Access... 2 1.3. Adjacent Land Uses... 2 1.4. Existing ways...

More information

Henderson Avenue Mixed-Use Development

Henderson Avenue Mixed-Use Development Zoning Case: Z145-3 Traffic Impact Analysis Henderson Avenue Mixed-Use Development Dallas, TX October 26 th, 216 Kimley-Horn and Associates, Inc. Dallas, Texas Project #644827 Registered Firm F-928 Traffic

More information

King Soopers #116 Thornton, Colorado

King Soopers #116 Thornton, Colorado Traffic Impact Study King Soopers #116 Thornton, Colorado Prepared for: Galloway & Company, Inc. 1.0 EXECUTIVE SUMMARY King Soopers #116, a grocery marketplace anchored commercial development, is proposed

More information

Harrah s Station Square Casino

Harrah s Station Square Casino Transportation Analysis Harrah s Station Square Casino Pittsburgh, Pennsylvania Submitted To: City of Pittsburgh and Pennsylvania Gaming Control Board Prepared By: DKS Associates GAI Consultants December

More information

Appendix C. NORTH METRO STATION AREA TRAFFIC IMPACT STATEMENT 88th Avenue Station

Appendix C. NORTH METRO STATION AREA TRAFFIC IMPACT STATEMENT 88th Avenue Station Appendix C NORTH METRO STATION AREA TRAFFIC IMPACT STATEMENT 88th Avenue Station Prepared for: Regional Transportation Department and URS Corporation as part of the North Metro EIS David Evans and Associates,

More information

Transportation Impact Study for Abington Terrace

Transportation Impact Study for Abington Terrace Transportation Impact Study for Abington Terrace Abington Township, Montgomery County, PA Sandy A. Koza, P.E., PTOE PA PE License Number PE059911 Prepared by McMahon Associates, Inc. 425 Commerce Drive,

More information

Donahue Drive Corridor Traffic Operational Evaluation

Donahue Drive Corridor Traffic Operational Evaluation Donahue Drive Corridor Traffic Operational Evaluation PREPARED FOR: THE CITY OF AUBURN PREPARED BY: JANUARY 2007 Donahue Drive Corridor Study--Auburn, Alabama TABLE OF CONTENTS Introduction... 1 Background

More information

PINESTONE TRAFFIC IMPACT STUDY Travelers Rest, South Carolina

PINESTONE TRAFFIC IMPACT STUDY Travelers Rest, South Carolina PINESTONE TRAFFIC IMPACT STUDY Travelers Rest, South Carolina Prepared for Longbranch Development Prepared by January 13, 219 ii Table of Contents Subject Page Signature Page... i Table of Contents...

More information

Walmart (Store # ) 60 th Street North and Marion Road Sioux Falls, South Dakota

Walmart (Store # ) 60 th Street North and Marion Road Sioux Falls, South Dakota Walmart (Store #4865-00) 60 th Street North and Marion Road Sioux Falls, South Dakota Prepared for: Wal-Mart Stores, Inc. Bentonville, Arkansas Prepared by: Kimley-Horn and Associates, Inc. ã2013 Kimley-Horn

More information

TRANSPORTATION ANALYSIS REPORT US Route 6 Huron, Erie County, Ohio

TRANSPORTATION ANALYSIS REPORT US Route 6 Huron, Erie County, Ohio TRANSPORTATION ANALYSIS REPORT US Route 6 Huron, Erie County, Ohio December 12, 2012 Prepared for: The City of Huron 417 Main Huron, OH 44839 Providing Practical Experience Technical Excellence and Client

More information

OFFICE/RETAIL DEVELOPMENT 1625 BANK STREET OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for: Canada Inc.

OFFICE/RETAIL DEVELOPMENT 1625 BANK STREET OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for: Canada Inc. OFFICE/RETAIL DEVELOPMENT 1625 BANK STREET OTTAWA, ONTARIO TRANSPORTATION BRIEF Prepared for: 9402209 Canada Inc. December 15, 2015 115-625 Report_2.doc D. J. Halpenny & Associates Ltd. Consulting Transportation

More information

6060 North Central Expressway Mixed-Use Site Dallas, Texas

6060 North Central Expressway Mixed-Use Site Dallas, Texas Volume 1 Traffic Impact Analysis 6060 North Central Expressway Mixed-Use Site Dallas, Texas April 30, 2018 Kimley-Horn and Associates, Inc. Dallas, Texas Project #063238300 Registered Firm F-928 Traffic

More information

Traffic Impact Statement

Traffic Impact Statement Traffic Impact Statement Mixed Use Development, US 41 and Old Trail Drive aka Tide-Starbucks 4900 9 th Street North General Development Site Plan (GDSP) Collier County, FL 10/6/2015 Prepared for: Prepared

More information

Traffic Impact Analysis Walton Acres at Riverwood Athletic Club Clayton, NC

Traffic Impact Analysis Walton Acres at Riverwood Athletic Club Clayton, NC Traffic Impact Analysis Walton Acres at Riverwood Athletic Club Clayton, NC 1. TABLE OF CONTENTS INTRODUCTION...1 1.1. Site Location and Study Area...1 1.2. Proposed Land Use and Site Access...2 1.3.

More information

MEMORANDUM. Matt Folden, AICP, MNCPPC Rebecca Torma, MCDOT. Nancy Randall, AICP, PTP Barbara Mosier, P.E., PTOE Kevin Berger

MEMORANDUM. Matt Folden, AICP, MNCPPC Rebecca Torma, MCDOT. Nancy Randall, AICP, PTP Barbara Mosier, P.E., PTOE Kevin Berger To: From: Matt Folden, AICP, MNCPPC Rebecca Torma, MCDOT Nancy Randall, AICP, PTP Barbara Mosier, P.E., PTOE Kevin Berger 1110 Bonifant Street Suite 210, Silver Spring, MD 20910 301-448-1333 WellsandAssociates.com

More information

THIS PAGE LEFT BLANK INTENTIONALLY

THIS PAGE LEFT BLANK INTENTIONALLY GA SR 25 Spur at Canal Road Transportation Impact Analysis PREPARED FOR GLYNN COUNTY, GEORGIA 1725 Reynolds Street, Suite 300 Brunswick, Georgia 31520 PREPARED BY 217 Arrowhead Boulevard Suite 26 Jonesboro,

More information

REDEVELOPMENT TRAFFIC IMPACT STUDY

REDEVELOPMENT TRAFFIC IMPACT STUDY REDEVELOPMENT TRAFFIC IMPACT STUDY For Wendy s Parker, Colorado January 215 Prepared for: Sterling Design Associates, LLC 29 W. Littleton Boulevard #3 Littleton, Colorado 812 Prepared by: 1233 Airport

More information

Chapter 4 Traffic Analysis

Chapter 4 Traffic Analysis Chapter 4 Traffic Analysis PURPOSE The traffic analysis component of the K-68 Corridor Management Plan incorporates information on the existing transportation network, such as traffic volumes and intersection

More information

Shockoe Bottom Preliminary Traffic and Parking Analysis

Shockoe Bottom Preliminary Traffic and Parking Analysis Shockoe Bottom Preliminary Traffic and Parking Analysis Richmond, Virginia August 14, 2013 Prepared For City of Richmond Department of Public Works Prepared By 1001 Boulders Pkwy Suite 300, Richmond, VA

More information

Atlanta Braves Stadium and Mixed- Use Development

Atlanta Braves Stadium and Mixed- Use Development Transportation Analysis Atlanta Braves Stadium and Mixed- Use Development DRI #2381 Cobb County, Georgia Prepared for: BRED Co., LLC Prepared by: Kimley-Horn and Associates, Inc. 817 West Peachtree Street

More information

FRONT RANGE CROSSINGS TRAFFIC IMPACT STUDY

FRONT RANGE CROSSINGS TRAFFIC IMPACT STUDY FRONT RANGE CROSSINGS TRAFFIC IMPACT STUDY Prepared for: City of Thornton And Colorado Department of Transportation Prepared by: 11 Blake Street, Suite 2 Denver, Colorado 822 Contact: Brian Bern, PE, PTOE

More information

Focused Traffic Analysis for the 200 Nellen Avenue Project

Focused Traffic Analysis for the 200 Nellen Avenue Project March 13, 2017 Mr. Phil Boyle Town of Corte Madera 300 Tamalpais Drive Corte Madera, CA 94976-0159 Focused Traffic Analysis for the 200 Nellen Avenue Project Dear Mr. Boyle; W-Trans has completed a focused

More information

Volume 1 Traffic Impact Analysis. Texas Odyssey TIA Dallas, Texas. Kimley-Horn and Associates, Inc. Dallas, Texas. May 23, 2018

Volume 1 Traffic Impact Analysis. Texas Odyssey TIA Dallas, Texas. Kimley-Horn and Associates, Inc. Dallas, Texas. May 23, 2018 Volume 1 Traffic Impact Analysis Texas Odyssey TIA Dallas, Texas May 23, 2018 Kimley-Horn and Associates, Inc. Dallas, Texas Project #064529800 Registered Firm F-928 Traffic Impact Analysis Texas Odyssey

More information

Traffic Circulation Study for Neighborhood Southwest of Mockingbird Lane and Airline Road, Highland Park, Texas

Traffic Circulation Study for Neighborhood Southwest of Mockingbird Lane and Airline Road, Highland Park, Texas ARIZONA TEXAS NEW MEXICO OKLAHOMA February 13, 2015 Mr. Meran Dadgostar P.E., R.S. Town of Highland Park 4700 Drexel Dr. Highland Park, Texas 75205 Re: Traffic Circulation Study for Neighborhood Southwest

More information

COMMERCIAL DEVELOPMENT 2015 ROBERTSON ROAD OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for:

COMMERCIAL DEVELOPMENT 2015 ROBERTSON ROAD OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for: COMMERCIAL DEVELOPMENT 2015 ROBERTSON ROAD OTTAWA, ONTARIO TRANSPORTATION BRIEF Prepared for: First Bay Properties Inc. 311 Richmond Road, Suite 203 Ottawa, ON K1Z 6X3 August 8, 2017 117-663 Brief_1.doc

More information

Gateway Transportation Study

Gateway Transportation Study Gateway Transportation Study Amherst, Massachusetts SUBMITTED TO University of Massachusetts Amherst Town of Amherst SUBMITTED BY Vanasse Hangen Brustlin, Inc. Watertown, Massachusetts March 213 Back of

More information

MoPac South: Impact on Cesar Chavez Street and the Downtown Network

MoPac South: Impact on Cesar Chavez Street and the Downtown Network MoPac South: Impact on Cesar Chavez Street and the Downtown Network Prepared by: The University of Texas at Austin Center for Transportation Research Prepared for: Central Texas Regional Mobility Authority

More information

TRANSPORTATION IMPACT STUDY

TRANSPORTATION IMPACT STUDY Dundas MEP Developments Inc. City of Toronto 219 and 231 Dundas Street East, Proposed Mixed-Use Development TRANSPORTATION IMPACT STUDY 9782/2 April 216 LEA Consulting Ltd. Consulting Engineers & Planners

More information

OTTAWA TRAIN YARDS PHASE 3 DEVELOPMENT CITY OF OTTAWA TRANSPORTATION IMPACT STUDY. Prepared for:

OTTAWA TRAIN YARDS PHASE 3 DEVELOPMENT CITY OF OTTAWA TRANSPORTATION IMPACT STUDY. Prepared for: OTTAWA TRAIN YARDS PHASE 3 DEVELOPMENT CITY OF OTTAWA TRANSPORTATION IMPACT STUDY Prepared for: The Ottawa Train Yards Inc. 223 Colonnade Road South, Suite 212 Nepean, Ontario K2E 7K3 January 17, 2012

More information

Waterford Lakes Small Area Study

Waterford Lakes Small Area Study Waterford Lakes Small Area Study Existing Traffic Conditions PREPARED FOR: ORANGE COUNTY PUBLIC WORKS DEPARTMENT TRAFFIC ENGINEERING DIVISION ORLANDO, FLORIDA PREPARED WITH: INWOOD CONSULTING ENGINEERS

More information

3.2.2 Proposed Road Network within Phase 1B Lands

3.2.2 Proposed Road Network within Phase 1B Lands 3.2.2 Proposed Road Network within Phase 1B Lands Figure 3.1 also shows the proposed road network within the Premier Gateway Phase 1B Employment Area lands, which features two collector roads providing

More information

TRANSPORTATION IMPACT STUDY PROPOSED RIVERFRONT 47 MIXED USE DEVELOPMENT

TRANSPORTATION IMPACT STUDY PROPOSED RIVERFRONT 47 MIXED USE DEVELOPMENT November 2016 TRANSPORTATION IMPACT STUDY PROPOSED RIVERFRONT 47 MIXED USE DEVELOPMENT & Aspinwall Borough, Sharpsburg Borough & O Hara Township, Allegheny County, Pennsylvania Prepared for: Riverfront

More information

Traffic Impact Study Little Egypt Road Development Denver, North Carolina June 2017

Traffic Impact Study Little Egypt Road Development Denver, North Carolina June 2017 Traffic Impact Study Little Egypt Road Development Denver, North arolina June 2017 N. Little Egypt Road DQ\ QDQFLQJ VDOHV RU RWKHU SHUIRUPDQFH EDVHG FULWHULD Proposed Site Driveways Site Driveway 1 TRAFFI

More information

Traffic Impact Study. Westlake Elementary School Westlake, Ohio. TMS Engineers, Inc. June 5, 2017

Traffic Impact Study. Westlake Elementary School Westlake, Ohio. TMS Engineers, Inc. June 5, 2017 TMS Engineers, Inc. Traffic Impact Study Westlake Elementary School Westlake, Ohio June 5, 2017 Prepared for: Westlake City Schools - Board of Education 27200 Hilliard Boulevard Westlake, OH 44145 TRAFFIC

More information

TRAFFIC IMPACT STUDY. Creekside Thornton, Colorado. For. August 2015 November 2015 Revised: August Prepared for:

TRAFFIC IMPACT STUDY. Creekside Thornton, Colorado. For. August 2015 November 2015 Revised: August Prepared for: TRAFFIC IMPACT STUDY For Creekside Thornton, Colorado August 215 November 215 Revised: August 216 Prepared for: Jansen Strawn Consulting Engineers 45 West 2 nd Avenue Denver, Colorado 8223 Prepared by:

More information

Table of Figures. Table of Tables. Table 1: Traffic Volumes Ramblas Delay. Table 2: Las

Table of Figures. Table of Tables. Table 1: Traffic Volumes Ramblas Delay. Table 2: Las Table of Contents 1. Executive Summary... 4 2. Analysiss Methodology... 4 3. Introduction... 4 4. Roadway Geometric Conditions... 5 4.1 Las Ramblas Community Access/ Egress Roads... 7 5. Traffic Data Collection...

More information

Design Traffic Technical Memorandum

Design Traffic Technical Memorandum State Road 7 Extension PD&E Study Design Traffic Technical Memorandum Palm Beach County, FL October 2010 State Road 7 Extension PD&E Study Design Traffic Technical Memorandum Palm Beach County, FL Prepared

More information

TRAFFIC IMPACT STUDY

TRAFFIC IMPACT STUDY TRAFFIC IMPACT STUDY for the GLEN ELLEN COUNTRY CLUB SENIOR RESIDENTIAL REDEVELOPMENT 84 Millis, Massachusetts Prepared by: McMahon Associates, Inc. Prepared for: Toll Brothers, Inc. August 216 DRAFT

More information

THE LANDMARK AT TALBOT PARK

THE LANDMARK AT TALBOT PARK TRAFFIC IMPACT STUDY FOR THE LANDMARK AT TALBOT PARK IN NORFOLK, VA INTERMODAL ENGINEERING, P.C. OCTOBER, 200 The Landmark at Talbot Park is a proposed redevelopment of the existing apartments along the

More information

List of Attachments. Location Map... Site Plan... City of Lake Elsinore Circulation Element... City of Lake Elsinore Roadway Cross-Sections...

List of Attachments. Location Map... Site Plan... City of Lake Elsinore Circulation Element... City of Lake Elsinore Roadway Cross-Sections... List of Attachments Exhibits Location Map... Site Plan... City of Lake Elsinore Circulation Element... City of Lake Elsinore Roadway Cross-Sections... Existing Lane Geometry and Traffic Controls... Existing

More information

TRAFFIC STUDY GUIDELINES Clarksville Street Department

TRAFFIC STUDY GUIDELINES Clarksville Street Department TRAFFIC STUDY GUIDELINES Clarksville Street Department 9/1/2009 Introduction Traffic studies are used to help the city determine potential impacts to the operation of the surrounding roadway network. Two

More information

HENDERSON DEVELOPMENT 213, 217, 221, 221 ½, 223 HENDERSON AVENUE and 65 TEMPLETON STREET OTTAWA, ONTARIO TRANSPORTATION OVERVIEW.

HENDERSON DEVELOPMENT 213, 217, 221, 221 ½, 223 HENDERSON AVENUE and 65 TEMPLETON STREET OTTAWA, ONTARIO TRANSPORTATION OVERVIEW. HENDERSON DEVELOPMENT 213, 217, 221, 221 ½, 223 HENDERSON AVENUE and 65 TEMPLETON STREET OTTAWA, ONTARIO TRANSPORTATION OVERVIEW Prepared for: 2294170 Ontario Inc. February 2, 2017 117-652 Report_1.doc

More information

TRAFFIC IMPACT STUDY COMPREHENSIVE UPDATE TOWN OF THOMPSON S STATION, TENNESSEE PREPARED FOR: THE TOWN OF THOMPSON S STATION

TRAFFIC IMPACT STUDY COMPREHENSIVE UPDATE TOWN OF THOMPSON S STATION, TENNESSEE PREPARED FOR: THE TOWN OF THOMPSON S STATION TRAFFIC IMPACT STUDY COMPREHENSIVE UPDATE TOWN OF THOMPSON S STATION, TENNESSEE PREPARED FOR: THE TOWN OF THOMPSON S STATION Transportation Consultants, LLC 1101 17 TH AVENUE SOUTH NASHVILLE, TN 37212

More information

NEW YORK CENTRAL PARK SUBDIVISION BLAIS STREET/ST-PIERRE STREET EMBRUN, ONTARIO TRAFFIC IMPACT STUDY. Prepared for:

NEW YORK CENTRAL PARK SUBDIVISION BLAIS STREET/ST-PIERRE STREET EMBRUN, ONTARIO TRAFFIC IMPACT STUDY. Prepared for: NEW YORK CENTRAL PARK SUBDIVISION BLAIS STREET/ST-PIERRE STREET EMBRUN, ONTARIO TRAFFIC IMPACT STUDY Prepared for: Solidex Holdings Limited & Investissement Maurice Lemieux Investments Attn: Mr. Anthony

More information

Abrams Associates. Transportation Impact Analysis. City of Rocklin. Prepared for: David Mohlenbrok City of Rocklin 4081 Alvis Court Rocklin, CA 95677

Abrams Associates. Transportation Impact Analysis. City of Rocklin. Prepared for: David Mohlenbrok City of Rocklin 4081 Alvis Court Rocklin, CA 95677 Transportation Impact Analysis Sierra College Boulevard Commercial Project City of Rocklin Prepared for: David Mohlenbrok City of Rocklin 081 Alvis Court Rocklin, CA 95677 Prepared by: 1875 Olympic Boulevard,

More information

MEDICAL/OFFICE BUILDING 1637 BANK STREET OTTAWA, ONTARIO TRANSPORTATION OVERVIEW. Prepared for:

MEDICAL/OFFICE BUILDING 1637 BANK STREET OTTAWA, ONTARIO TRANSPORTATION OVERVIEW. Prepared for: MEDICAL/OFFICE BUILDING 1637 BANK STREET OTTAWA, ONTARIO TRANSPORTATION OVERVIEW Prepared for: 2434984 Ontario Inc. 13-5510 Canotek Road Ottawa, Ontario K1J 9J5 June 4, 2015 115-613 Report_2.doc D. J.

More information

FINAL DESIGN TRAFFIC TECHNICAL MEMORANDUM

FINAL DESIGN TRAFFIC TECHNICAL MEMORANDUM FINAL DESIGN TRAFFIC TECHNICAL MEMORANDUM July 2014 FINAL (SR 43) Project Development and Environment Study From State Road 60 (Adamo Drive) to I-4 (SR 400) Hillsborough County, Florida Work Program Item

More information

Evaluation of M-99 (Broad Street) Road Diet and Intersection Operational Investigation

Evaluation of M-99 (Broad Street) Road Diet and Intersection Operational Investigation Evaluation of M-99 (Broad Street) Road Diet and Intersection Operational Investigation City of Hillsdale, Hillsdale County, Michigan June 16, 2016 Final Report Prepared for City of Hillsdale 97 North Broad

More information

TRAFFIC IMPACT STUDY And A TRAFFIC SIGNAL WARRANT ANALYSIS FOR A SENIOR LIVING AND APARTMENT DEVELOPMENT

TRAFFIC IMPACT STUDY And A TRAFFIC SIGNAL WARRANT ANALYSIS FOR A SENIOR LIVING AND APARTMENT DEVELOPMENT TRAFFIC IMPACT STUDY And A TRAFFIC SIGNAL WARRANT ANALYSIS FOR A SENIOR LIVING AND APARTMENT DEVELOPMENT DEERFIELD TOWNSHIP, WARREN COUNTY, OHIO Nantucket Circle and Montgomery Road () Prepared for: ODLE

More information

STILLWATER AVENUE CORRIDOR STUDY Old Town, Maine

STILLWATER AVENUE CORRIDOR STUDY Old Town, Maine Draft Study STILLWATER AVENUE CORRIDOR STUDY Old Town, Maine SUBMITTED TO: BANGOR AREA COMPREHENSIVE TRANSPORTATION SYSTEM SUBMITTED BY: I MAY 23, 2017 DRAFT STILLWATER AVENUE STUDY FINAL REPORT Table

More information

Patuxent Green Golf Course

Patuxent Green Golf Course Patuxent Green Golf Course Laurel, Maryland February 23, 2018 Traffic Impact Analysis Prepared for: ADC Builders Alan Cohen 2701 Tower Oaks Boulevard, Suite 200 Rockville, Maryland 20852 TABLE OF CONTENTS

More information

2136 And 2148 Trafalgar Road Townhouse Development Traffic Brief. Paradigm Transportation Solutions Limited

2136 And 2148 Trafalgar Road Townhouse Development Traffic Brief. Paradigm Transportation Solutions Limited 2136 And 2148 Trafalgar Road Townhouse Development Traffic Brief Paradigm Transportation Solutions Limited March 217 March 217 Project: 1627 Diana Vlasic, M.C.I.P., R.P.P Metropolitan Consulting 445 Paletta

More information

Corporation of the Town of Oakville. December 16, 2013

Corporation of the Town of Oakville. December 16, 2013 Corporation of the Town of Oakville Transportation Impact Analysis and Parking Study for Proposed Secondary School, Oakville Draft Final Report Submitted by: HDR Corporation 100 York Boulevard, Suite 300

More information

INDUSTRIAL BUILDING 3009 HAWTHORNE ROAD CITY OF OTTAWA TRANSPORTATION OVERVIEW REVISED. Prepared for: Canada Inc.

INDUSTRIAL BUILDING 3009 HAWTHORNE ROAD CITY OF OTTAWA TRANSPORTATION OVERVIEW REVISED. Prepared for: Canada Inc. INDUSTRIAL BUILDING 3009 HAWTHORNE ROAD CITY OF OTTAWA TRANSPORTATION OVERVIEW REVISED Prepared for: 7849648 Canada Inc. Octiober 1, 2015 114-598 Overview_2.doc D. J. Halpenny & Associates Ltd. Consulting

More information

Technical Memorandum TRAFFIC IMPACT STUDY. RIDLEY ROAD CONVENIENCE STORE Southampton County, VA. Prepared for: Mr. David Williams.

Technical Memorandum TRAFFIC IMPACT STUDY. RIDLEY ROAD CONVENIENCE STORE Southampton County, VA. Prepared for: Mr. David Williams. Technical Memorandum TRFFIC IMPCT STUDY RIDLEY ROD CONVENIENCE STORE Southampton County, V Prepared for: Mr. David Williams By: Charles Smith, P.E., PTOE EPR Charlottesville, V July 2014 1 TBLE OF CONTENTS

More information

Table of Contents FIGURES TABLES APPENDICES. Traffic Impact Study Hudson Street Parking Garage MC Project No.: A Table of Contents

Table of Contents FIGURES TABLES APPENDICES. Traffic Impact Study Hudson Street Parking Garage MC Project No.: A Table of Contents Traffic Impact Study Hudson Street Parking Garage MC Project No.: 151714A Table of Contents Table of Contents I. INTRODUCTION... 2 II. EXISTING CONDITIONS... 5 III. 215 EXISTING TRAFFIC CONDITIONS... 6

More information

South Street Campus Lands Development. City of London TRANSPORTATION IMPACT ASSESSMENT

South Street Campus Lands Development. City of London TRANSPORTATION IMPACT ASSESSMENT South Street Campus Lands Development City of London TRANSPORTATION IMPACT ASSESSMENT TW1387 South Street Campus Lands Development City of London TRANSPORTATION IMPACT ASSESSMENT May 2013 South Street

More information

MEMORANDUM. Trip Generation and Distribution. CyRide / ISU Intermodal Facility Steering Committee. Date: August 31, 2009

MEMORANDUM. Trip Generation and Distribution. CyRide / ISU Intermodal Facility Steering Committee. Date: August 31, 2009 MEMORANDUM Transportation Jim Kollbaum, PE 12120 Shamrock Plaza Suite 300 Omaha, NE 68154 (402) 334-8181 (402) 334-1984 (Fax) To: CyRide / ISU Intermodal Facility Steering Committee Date: August 31, 2009

More information

James M. Moore, Director of Planning & Building Services, Town of Fairfax. Victory Village Senior Housing Development Traffic Study

James M. Moore, Director of Planning & Building Services, Town of Fairfax. Victory Village Senior Housing Development Traffic Study Traffic Study To: From: James M. Moore, Director of Planning & Building Services, Town of Fairfax David Parisi, PE, TE, Parisi Transportation Consulting Date: October 14, 216 Subject: Victory Village Senior

More information

MEETING FACILITY 2901 GIBFORD DRIVE CITY OF OTTAWA TRANSPORTATION BRIEF. Prepared for: Holiday Inn Express 2881 Gibford Drive Ottawa, ON K1V 2L9

MEETING FACILITY 2901 GIBFORD DRIVE CITY OF OTTAWA TRANSPORTATION BRIEF. Prepared for: Holiday Inn Express 2881 Gibford Drive Ottawa, ON K1V 2L9 MEETING FACILITY 2901 GIBFORD DRIVE CITY OF OTTAWA TRANSPORTATION BRIEF Prepared for: Holiday Inn Express 2881 Gibford Drive Ottawa, ON K1V 2L9 December 18, 2012 112-566 Brief_1.doc D. J. Halpenny & Associates

More information

Traffic Study North Shore School District 112

Traffic Study North Shore School District 112 Traffic Study North Shore School District 112 Proposed Expansion of Northwood Junior High School Prepared By: May 1, 2015 1. Introduction Kenig, Lindgren, O Hara, Aboona, Inc. (KLOA, Inc.) has been retained

More information

Meadowlake Ranch Traffic Impact Analysis (LSC #184600) August 27, 2018

Meadowlake Ranch Traffic Impact Analysis (LSC #184600) August 27, 2018 LSC TRANSPORTATION CONSULTANTS, INC. 545 East Pikes Peak Avenue, Suite 210 Colorado Springs, CO 80903 (719) 633-2868 FAX (719) 633-5430 E-mail: lsc@lsctrans.com Website: http://www.lsctrans.com Traffic

More information

CastleGlenn Consultants Inc.

CastleGlenn Consultants Inc. February 1 st, 2010 CastleGlenn Consultants Inc. Engineers, Project Managers & Planners Mr. Kevin Yemm Planning and Land Development Richraft Ltd. 2280 St. Laurent Boulevard Suite 201 Ottawa, Ontario (Tel:

More information

Highway 111 Corridor Study

Highway 111 Corridor Study Highway 111 Corridor Study June, 2009 LINCOLN CO. HWY 111 CORRIDOR STUDY Draft Study Tea, South Dakota Prepared for City of Tea Sioux Falls Metropolitan Planning Organization Prepared by HDR Engineering,

More information

Bridge Street Corridor Study Report

Bridge Street Corridor Study Report Bridge Street Corridor Study Report Prepared for: Prepared by: BRIDGE STREET CORRIDOR STUDY REPORT PREPARED FOR: CITY OF ARROYO GRANDE COMMUNITY DEVELOPMENT DEPARTMENT 300 EAST BRANCH STREET ARROYO GRANDE,

More information

D.13 Transportation and Traffic

D.13 Transportation and Traffic This section addresses transportation and traffic issues and impacts related to the Proposed Project. Section D.13.1 provides a description of the affected environment for the Proposed Project. Applicable

More information

EAST AND SOUTH STREET CITY OF ANAHEIM, CALIFORNIA

EAST AND SOUTH STREET CITY OF ANAHEIM, CALIFORNIA T R A F F I C I M P A C T A N A LY S I S EAST AND SOUTH STREET CITY OF ANAHEIM, CALIFORNIA April 217 T R A F F I C I M P A C T A N A LY S I S EAST AND SOUTH STREET CITY OF ANAHEIM, CALIFORNIA Submitted

More information

The current document is revised based on the comments received on:

The current document is revised based on the comments received on: General Overview 1 Introduction Over the last several years, the Waterford Lakes area has experienced increased congestion due to a substantial increase in residential and commercial development. The current

More information

EXECUTIVE SUMMARY. Page 1 of 6

EXECUTIVE SUMMARY. Page 1 of 6 EXECUTIVE SUMMARY The purpose of this report is to identify conformance with the original traffic impact study for the proposed retail development on Lot 5 of Riverdale Retail Filing No. 1 located on the

More information

Paul VI Redevelopment. Traffic Impact Study

Paul VI Redevelopment. Traffic Impact Study ATTACHMENT 5 Paul VI Redevelopment Traffic Impact Study April 18, 2017 PAUL VI REDEVELOPMENT TRAFFIC IMPACT STUDY CITY OF FAIRFAX, VIRGINIA Prepared for: IDI GROUP COMPANIES Prepared by: Wells + Associates,

More information

84-88 Columbia Street West Waterloo, Ontario Transportation Impact Study. Paradigm Transportation Solutions Limited

84-88 Columbia Street West Waterloo, Ontario Transportation Impact Study. Paradigm Transportation Solutions Limited 84-88 Columbia Street West Waterloo, Ontario Transportation Impact Study Paradigm Transportation Solutions Limited June 217 Project Summary Project Number 15255 June 217 Client Masri O Inc. Architects

More information

Waterford Lakes Small Area Study

Waterford Lakes Small Area Study Over the last several years, the Waterford Lakes area has experienced increased congestion due to a substantial increase in residential and commercial development. The current Existing and Future Conditions

More information

Michael A. Werthmann, PE, PTOE Principal

Michael A. Werthmann, PE, PTOE Principal 9575 West Higgins Road, Suite 400 Rosemont, Illinois 60018 p: 847-518-9990 f: 847-518-9987 MEMORANDUM TO: FROM: Brian Lorenc GHB-630, LLC Michael A. Werthmann, E, TOE rincipal Luay R. Aboona, E rincipal

More information

INDUSTRIAL BUILDING 1660 COMSTOCK ROAD CITY OF OTTAWA TRANSPORTATION OVERVIEW. Prepared for:

INDUSTRIAL BUILDING 1660 COMSTOCK ROAD CITY OF OTTAWA TRANSPORTATION OVERVIEW. Prepared for: INDUSTRIAL BUILDING 1660 COMSTOCK ROAD CITY OF OTTAWA TRANSPORTATION OVERVIEW Prepared for: Simluc Contractors Limited 2550 Blackwell Street, Ottawa K1B 5R1 October 18, 2013 113-584 Overview_1.doc D. J.

More information

TABLE TRAFFIC ANALYSIS SCENARIOS

TABLE TRAFFIC ANALYSIS SCENARIOS 4.11 TRANSPORTATION The potential traffic impacts of the proposed project are evaluated in the Buena Park Beach/Orangethorpe Mixed Use Project Traffic Analysis (Traffic Analysis) by Austin-Foust Associates

More information

TRAFFIC ACTION PLAN. Laurie Meadows Neighborhood CITY OF SAN MATEO

TRAFFIC ACTION PLAN. Laurie Meadows Neighborhood CITY OF SAN MATEO TRAFFIC ACTION PLAN Laurie Meadows Neighborhood CITY OF SAN MATEO Draft January 2017 Table of Contents Introduction... 2 The Traffic Forum Process... 5 Neighborhood Traffic Issues... 7 Neighborhood Recommendations

More information

Traffic Analysis Update: 195 Meandering Brook Drive Development

Traffic Analysis Update: 195 Meandering Brook Drive Development 1223 Michael Street, Suite 1, Ottawa, Ontario K1J 7T2 P: +1 613.738.416 F: +1 613.739.715 www.parsons.com September 27, 216 Jean-Guy Rivard c/o Valecraft Homes 1455 Youville Drive Suite 21 Ottawa, Ontario

More information

APARTMENT BUILDING DEVELOPMENT 1161 HERON ROAD OTTAWA, ONTARIO TRANSPORTATION IMPACT STUDY. Prepared for:

APARTMENT BUILDING DEVELOPMENT 1161 HERON ROAD OTTAWA, ONTARIO TRANSPORTATION IMPACT STUDY. Prepared for: APARTMENT BUILDING DEVELOPMENT 1161 HERON ROAD OTTAWA, ONTARIO TRANSPORTATION IMPACT STUDY Prepared for: 1649362 Ontario Inc. c/o Manor Park Management 231 Brittany Drive, Suite D Ottawa ON K1K 0R8 July

More information

Appendix B. Environmental Resource Technical Memorandum. Assessment on Travel Pattern and Access Impacts

Appendix B. Environmental Resource Technical Memorandum. Assessment on Travel Pattern and Access Impacts Appendix B Environmental Resource Technical Memorandum Assessment on Travel Pattern and Access Impacts TECHNICAL MEMORANDUM ENVIRONMENTAL RE-EVALUATION FOR UNION STATION TO OAK CLIFF DALLAS STREETCAR To:

More information

QUICKIE C STORE AND GAS BAR 1780 HERON ROAD OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for:

QUICKIE C STORE AND GAS BAR 1780 HERON ROAD OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for: QUICKIE C STORE AND GAS BAR 1780 HERON ROAD OTTAWA, ONTARIO TRANSPORTATION BRIEF Prepared for: Quickie Convenience Stores Larny Holdings Ltd. c/o PBC Group April 15, 2015 115-615 Report_1.doc D. J. Halpenny

More information

Traffic Impact Study for Rolling Ridge Redevelopment

Traffic Impact Study for Rolling Ridge Redevelopment Traffic Impact Study for Rolling Ridge Redevelopment Webster Groves, Missouri October 19, 2018 Prepared For: Gershman Commercial Real Estate 150 North Meramec Avenue Suite 500 St. Louis, Missouri 63105

More information

Brian McHugh, Buckhead Community Improvement District. SUBJECT: Wieuca Road at Phipps Boulevard Intersection Improvements Project

Brian McHugh, Buckhead Community Improvement District. SUBJECT: Wieuca Road at Phipps Boulevard Intersection Improvements Project MEMO TO: FROM: Brian McHugh, Buckhead Community Improvement District Jagan Kaja, AICP, WSP Parsons Brinckerhoff SUBJECT: Wieuca Road at Phipps Boulevard Intersection Improvements Project DATE: October

More information

VIVA RETIREMENT COMMUNITIES OAKVILLE TRAFFIC IMPACT STUDY

VIVA RETIREMENT COMMUNITIES OAKVILLE TRAFFIC IMPACT STUDY VIVA RETIREMENT COMMUNITIES OAKVILLE TRAFFIC IMPACT STUDY VIVA RETIREMENT COMMUNITIES OAKVILLE TRAFFIC IMPACT STUDY DECEMBER 2012 READ, VOORHEES & ASSOCIATES TORONTO, ONTARIO Read, Voorhees & Associates

More information

TRAFFIC IMPACT STUDY CRITERIA

TRAFFIC IMPACT STUDY CRITERIA Chapter 6 - TRAFFIC IMPACT STUDY CRITERIA 6.1 GENERAL PROVISIONS 6.1.1. Purpose: The purpose of this document is to outline a standard format for preparing a traffic impact study in the City of Steamboat

More information

South Albion-Bolton Community Plan North Hill Supermarket Transportation Study Part B: Evaluation of Alternatives

South Albion-Bolton Community Plan North Hill Supermarket Transportation Study Part B: Evaluation of Alternatives Community Plan North Hill Supermarket Transportation Study Part B: Evaluation of Alternatives Prepared for: The Town of Caledon August 9 Transportation Solutions Ltd. 43 Forest Road Cambridge, ON N1S 3B4

More information

Ownership Lots 17 & 18 (Part of Lot 14), Montgomery Auto Sales Park

Ownership Lots 17 & 18 (Part of Lot 14), Montgomery Auto Sales Park Traffic Impact Analysis Ownership Lots 17 & 18 (Part of Lot 14), Montgomery Auto Sales Park Silver Spring, MD Lot 17: Site Plan No. 821413 Lot 18: Site Plan No. 821414 Filing Number: 13-TS-1198527A Prepared

More information

Traffic Impact & Access Study. Proposed Putnam Pike Commercial Development Smithfield, Rhode Island. Prepared For. Town of Smithfield, Rhode Island

Traffic Impact & Access Study. Proposed Putnam Pike Commercial Development Smithfield, Rhode Island. Prepared For. Town of Smithfield, Rhode Island Traffic Impact & Access Study Proposed Putnam Pike Commercial Development Smithfield, Rhode Island Prepared For Town of Smithfield, Rhode Island February 212 Traffic Impact & Access Study Proposed Putnam

More information

December 15, City of Ottawa Planning and Growth Management Branch 110 Laurier Ave. W., 4 th Floor Ottawa, ON K1P 1J1

December 15, City of Ottawa Planning and Growth Management Branch 110 Laurier Ave. W., 4 th Floor Ottawa, ON K1P 1J1 December 15, 2017 City of Ottawa Planning and Growth Management Branch 110 Laurier Ave. W., 4 th Floor Ottawa, ON K1P 1J1 Attention: Mr. Wally Dubyk, C.E.T. Project Manager, Infrastructure Approvals Dear

More information

The proposed development is located within 800m of an existing Transit Station where infill developments and intensification are encouraged.

The proposed development is located within 800m of an existing Transit Station where infill developments and intensification are encouraged. Stantec Consulting Ltd. 1331 Clyde Avenue, Suite 4 Ottawa ON K2C 3G4 Tel: (613) 722-442 Fax: (613) 722-2799 May 14, 213 File: 1638823 Robinson Park Development Corp. 5699 Power Road Ottawa, ON, K1G 3N4

More information

TECHNICAL MEMORANDUM. Kevin Even, P.E. Village Engineer and Public Works Director Village of Waunakee. From: Kevin Wehner, P.E. KL Engineering, Inc.

TECHNICAL MEMORANDUM. Kevin Even, P.E. Village Engineer and Public Works Director Village of Waunakee. From: Kevin Wehner, P.E. KL Engineering, Inc. TEHIL MEMORUM To: Kevin Even, P.E. Village Engineer and Public Works irector Village of Waunakee 400 King James Way, uite 200 Madison, Wisconsin 3719 608-663-1218 www.klengineering.com From: Kevin Wehner,

More information

Joshua Saak, P.E., PTOE Traffic Design Engineer Ada County Highway District May 23, 2013

Joshua Saak, P.E., PTOE Traffic Design Engineer Ada County Highway District May 23, 2013 Joshua Saak, P.E., PTOE Traffic Design Engineer Ada County Highway District May 23, 2013 Creating Great Streets Through Road Diets and Conversions The Charlotte Experience Topics to Discuss Charlotte s

More information

Place Vanier 250 Montreal Road Transportation Impact Study Addendum. Prepared for Broccolini Construction September 20 th, 2012

Place Vanier 250 Montreal Road Transportation Impact Study Addendum. Prepared for Broccolini Construction September 20 th, 2012 Update for the May 31 st, 2012 Traffic Impact Study Prepared for Broccolini Construction 111-23596-00 September 20 th, 2012 2611 Queensview Drive, Suite 300, Ottawa, Ontario CANADA K2B 8K2 Telephone: 613-829-2800

More information

DRAFT Davidson Elementary School Expansion Transportation Impact Analysis

DRAFT Davidson Elementary School Expansion Transportation Impact Analysis DRAFT Davidson Elementary School Expansion Transportation Impact Analysis Prepared for: Town of Davidson 216 S. Main Street Davidson, NC 28036 Prepared by: Stantec Consulting Services Inc. 2127 Ayrsley

More information

TRAFFIC ASSESSMENT River Edge Colorado

TRAFFIC ASSESSMENT River Edge Colorado TRAFFIC ASSESSMENT River Edge Colorado Submitted by: Fehr & Peers 621 17th Street, Ste. 231 Denver, CO 8293 (33) 296-43 December, 21 App. M-2 Traffic Assessment River Edge Colorado December 21 TABLE OF

More information

The preliminary study area was defined as the geographic area bounded by the following:

The preliminary study area was defined as the geographic area bounded by the following: QUESTION 21 TRANSPORTATION See State Comprehensive Plan (Chapter 187, F.S.) GOAL (11); POLICY (2) GOAL (12); POLICIES (3),(4) GOAL (16); POLICIES (1) GOAL (18); POLICIES (1),(3)(4),(6) GOAL (20); POLICIES

More information

MEMORANDUM. David Mohlenbrok, Environmental Services Manager

MEMORANDUM. David Mohlenbrok, Environmental Services Manager MEMORANDUM DATE: August 10, 2017 TO: FROM: RE: Planning Commission Members David Mohlenbrok, Environmental Services Manager Blue Memo # 1 for Rocklin Station Project Comments Received on Initial Study/Mitigated

More information