1 Albany Shaker Road Corridor Study Public Meeting # 2

2 Scope / Meeting Purpose This project is a CDTC Linkage Study. The Linkage Program is designed to implement the adopted planning and investment principles in CDTC s regional transportation plan, New Visions Initiation and Data Gathering Existing Conditions Public Meeting # 1 Recap Build 2030 Analysis Draft Transportation Mitigation Measures Evaluation of Alternatives Public Meeting # 2 Report Integrate with Comprehensive Plan

3 Study Area

4 Study Purpose Identify transportation and land-use recommendations that Mitigate the traffic concerns Enhance the character of the corridor Address safety and quality of life concerns Integrate with Town s Comprehensive Plan update Public outreach approach that develops a mutual understanding of issues and builds consensus

5 Livable Streets Provides transportation choices Safer streets for all modes Value communities and neighborhoods Promotes Community Interaction Enhance economic growth Quality of life Complete Streets are streets for everyone, no matter who they are or how they travel.

6 Existing Conditions Public Meeting # 1 Recap

7 Vacant Parcels in the Corridor

8 Land-use/Zoning Known development projects under construction or in planning Vacant parcels with probable development density based on zoning or discussions with property owners Exception: one parcel for density greater than underlying zoning based on landowner discussions and site s unique location Was conservative in that not all parcels would be expected to be developed within planning period

9 Public Meeting # 1 Recap Existing Public Build 2030 Mitigation Public

10 Concerns / Issues raised Traffic Congestion Safety: Speed Side street traffic The Crossings Town Park Pedestrian/Bicycle friendly Safety : Critical Locations Access to side streets/driveways

11 Consistent with Comprehensive Plan Issues that impact quality of life in the Town of Colonie Quality of Life Safety and security Traffic Congestion Strongly support following programs/initiatives Pedestrian accommodations Slower speeds Improvements in Town Parks

12 Concerns / Issues raised Traffic Congestion Safety: Speed Side street traffic The Crossings Town Park Pedestrian/Bicycle friendly Safety : Critical Locations Access to side streets/driveways

13 Traffic from New Development Traffic volumes in the corridor would increase by average of 5% based on Build-out conditions Similar growth pattern: from Albany Shaker Road to Old Niskayuna Road via Maxwell Road/Osborne Road Exit 4 connector, west of Wolf Road and increased capacity on I-87, will not increase traffic on Maxwell Road and the corridor east of Maxwell Road

14 Corridor Traffic Mostly limited to Osborne Road intersection Along the entire Corridor

15 Traffic from New Development Likely increase in traffic due to development will progress slowly over time and will not have immediate impact Based on the CDTC STEP Model 40% of the traffic is cutthrough

16 Hourly Traffic Variations Practical Capacity Threshold Albany Shaker Road Osborne Rd to Wolf Rd (Typical Weekday) Vehicles per Hour (VPH) Legend Traffic Existing 2016 WB EB :00 AM 1:00 AM 2:00 AM 3:00 AM 4:00 AM 5:00 AM 6:00 AM 7:00 AM 8:00 AM 9:00 AM 10:00 AM 11:00 AM 12:00 PM 1:00 PM 2:00 PM 3:00 PM 4:00 PM 5:00 PM 6:00 PM 7:00 PM 8:00 PM 9:00 PM 10:00 PM 11:00 PM

17 Impact from New Development Traffic will increase but will not have significant impact on traffic conditions Traffic will not alter the recommendations in the study

18 Concerns / Issues raised Traffic Congestion Safety: Speed Side street traffic The Crossings Town Park Pedestrian/Bicycle friendly Safety : Critical Locations Access to side streets/driveways

19 Safety: Speed Posted speed limit is 40 mph Average speed is 35 mph 85 th percentile speed is 45 mph Peak hour speeds: Near Shaker El 36/34 mph (AM/PM) Near Twilight Terrace 40/30 mph (AM/PM) High residential use-traffic conflict index (CDTC) leading to noise level, driveway movement, unsafe environment

20 Safety: Speed Mitigation Reduce speed limit to 30 or 35 mph Increased speed enforcement Driver feedback signs

21 Safety: Speed 30 MPH 40 MPH Higher the speed, reduction in cone of visibility Risk of serious injury increases dramatically above 30 mph Recommend speed reduction to mph NACTO Street Design Guidance

22 Safety: Speed Data shows that driver feedback signs are effective In Shelburne, Vermont, radar speed feedback signs showed a reduction in speed by 6 to 8 mph On US Route 9 in the Town of Malta, CDTC found that the driver feedback signs resulted in a 5 mph reduction in average speed Recommend installation of driver feedback signs

23 Concerns / Issues raised Traffic Congestion Safety: Speed Side street traffic The Crossings Town Park Pedestrian/Bicycle friendly Safety : Critical Locations Access to side streets/driveways

24 Side Street Traffic Consider traffic calming measures on alternate routes to discourage regional traffic from using local/neighborhood streets Street design Education Enforcement Locations to Consider: Campagna Drive/Marie Parkway Emerick Ln/Briarwood Road Danielwood Drive Loudon Parkway

25 Side Street Traffic Tighten street geometry to reduce travel speed, making is less desirable Increased enforcement on side streets like Marie Parkway Feasibility of additional traffic control signs/devices

26 Concerns / Issues raised Traffic Congestion Safety: Speed Side street traffic The Crossings Town Park Pedestrian/Bicycle friendly Safety : Critical Locations Access to side streets/driveways

27 The Crossings Access to The Crossings park Single access point Busier in good weather Exclusive pedestrian phase during peak hours add to delays Limited parking in the park

28 The Crossings Metro Park Rd Mitigation Access via Metro Park Road Improve and attract by better wayfinding Encourage and advertise this access Increase parking Secondary access and increased parking recommended Albany Shaker Rd

29 The Crossings Intersection Add leading left turn phase to signal only* Add crosswalk and pedestrian facilities to EB approach Add left turn lane Consider mini roundabout The Crossings Emerick Ln

30 The Crossings Signal Timing Changes August 2017 Lead left-turn for WB approach EB delay increases by 3 seconds Reduced queues westbound Observed increased queues eastbound Exclusive pedestrian phase Emerick Ln The Crossings * Based on average of 5 pedestrian calls per hour

31 The Crossings Mini Roundabout Pros Traffic calming Improved traffic flow Pedestrian facilities Cons Mini Roundabout not a viable option Roundabout will reduce vehicle gaps for those to turn left on side streets in the corridor ROW impacts Costs $ 500,000 1 million The Crossings Emerick Ln

32 The Crossings Left Turn Lanes Pros Improved traffic flow Cons If done within existing ROW, lose shoulders If widening, ROW impacts Pedestrian safety Costs $ 500,000 The Crossings Emerick Ln Widening for turn lanes to be considered in the future based on traffic conditions

33 Concerns / Issues raised Traffic Congestion Safety: Speed Side street traffic The Crossings Town Park Pedestrian/Bicycle friendly Safety : Critical Locations Access to side streets/driveways

34 Pedestrian/Bicycle Provide sidewalks on both sides of the road between The Crossings and Everett Road intersections Existing Pedestrian & Crosswalk Facility Recommended option Pros Improved pedestrian connections Pedestrian safety Character of the street Cons Tight ROW Acquire ROW at some locations Cost $1-2 million

35 Pedestrian/Bicycle Provide a dedicated path on one side of Albany Shaker that could accommodate bicycles Dedicated bike path not a viable option Pros Dedicated bike lane/path Bicycle safety Character of the street Complete streets Cons Acquire ROW on adjacent properties Cost implications ($ 3-5 million)

36 Pedestrian/Bicycle Provide/improve intersection crossing improvements at these locations: The Crossings/Emerick Lane Marie Parkway Shaker El Everett Road Osborne Road Provide Share the Road signs in locations with narrow shoulders Recommended option

37 Marie Parkway Add pedestrian accommodations Tighten radii and remove median

38 Marie Parkway Pros Improved pedestrian connection Reduced walking distance Improved circulation for emergency vehicles Cons Current signal does not support Upgrade signal to provide pedestrian pedestrian accommodations. accommodations is recommended Cost $ 500,000

39 Shaker El Add crosswalk to side street Improve pedestrian accommodations like Yield to Pedestrian sign Consider roundabout or signalization Shaker El Danielwood

40 Shaker El Mini Roundabout Heavy east-west traffic Low volumes on sidestreet Side street access will get difficult Limited Right-of-way School bus turning Cost $ 500,000 1 million Shaker El Danielwood Mini Roundabout not a viable option

41 Shaker El Pros Improved pedestrian connection Easier to turn left out of Shaker El Signalization will also slow down traffic more other modes friendly Cons Another signalized intersection will slow traffic in peak hour Cost $ 300,000 Signalization is recommended Shaker El Danielwood

42 Concerns / Issues raised Traffic Congestion Safety: Speed Side street traffic The Crossings Town Park Pedestrian/Bicycle friendly Safety : Critical Locations Access to side streets/driveways

43 Safety: Critical Locations Based on concentration of crashes and types the following priorities should be considered: Everett Road Intersection Osborne Road Intersection, particularly the westbound approach between Osborne and Tipton Maxwell Road Roundabout

44 Everett Road Road Diet Option Eliminate second WB thru lane Add EB left lane Pedestrian accommodations

45 Everett Road

46 Everett Road Pros Reduce crashes due to the merge Easier turning into driveways/side streets Pedestrian accommodations Cons Cost $ 200,000 Intersection Improvements recommended option ROW impacts

47 Osborne Road Signal timing changes Consider a roundabout Other geometric improvements to improve peak hour flow Consider reduction of turn radii to improve walkability Osborne Rd Osborne Rd

48 Osborne Road Signal Timing And WB through lane Intersection Existing LOS Osborne Rd Build LOS Osborne Rd WB thru turn lane LOS Albany Shaker Rd EB L D (40.8) D (40.7) C (35.5) TR C (27.9) C (33.2) C (27.7) Albany Shaker Rd WB L D (35.1) D (37.1) C (24.7) T F (211.6) F (254.7) E (72.9) R (TR) B (10.9) B (10.7) D (47.9) Osborne Rd NB L D (42.2) D (54.9) D (59.7) TR D (41.8) D (48.7) D (50.0) Osborne Rd SB L C (31.5) C (33.5) C (35.2) TR E (70.9) F (96.0) E (79.3) Overall F (87.8) F (106.5) D (51.8)

49 Osborne Road Signal Timing And SB right turn lane Intersection Existing LOS Osborne Rd Osborne Rd Build LOS Right turn lane LOS Albany Shaker Rd EB L D (40.8) D (40.7) C (32.0) TR C (27.9) C (33.2) C (26.5) Albany Shaker Rd WB L D (35.1) D (37.1) C (29.6) T F (211.6) F (254.7) F (181.6) R B (10.9) B (10.7) A (9.4) Osborne Rd NB L D (42.2) D (54.9) D (58.9) TR D (41.8) D (48.7) D (51.3) Osborne Rd SB L C (31.5) C (33.5) C (32.2) TR(T) E (70.9) F (96.0) D (52.8) (R) C (24.9) Overall F (87.8) F (106.5) E (76.1)

50 Osborne Road Signal Timing And WB or SB lane improvements Pros Reduce vehicle crashes Pedestrian accommodations Reduce in delays Osborne Rd Cons Additional lanes- not a feasible option ROW acquisition Pedestrian safety Improves traffic flow Cost $ 500,000 Osborne Rd

51 Osborne Road Roundabout Pros Improved traffic flow Vehicle crash reduction Speed reduction Pedestrian safety Cons Bottleneck effect Private property acquisition Cost $2.5 million approximately Intersection Roundabout possibly a long term option Osborne Rd Osborne Rd LOS Albany Shaker Rd EB LTR B (12.8) Albany Shaker Rd WB L,TR D (44.5) Osborne Rd NB LTR C (24.4) Osborne Rd SB L,TR B (12.2) Overall C (26.1)

52 Access Management Better access management between Maxwell Rd and Wolf Rd, including consideration of a raised median in conjunction with roundabout improvements

53 Access Management Raised median recommended Example of raised median island

54 Maxwell Rd Roundabout Improved signage Evaluate EB thru lane capacity to eliminate merge Lane assignments Reevaluate design with current and emerging criteria Confirm potential impacts associated with Aviation Rd extension

55 Maxwell Rd Roundabout Pros Improved traffic flow Reduce crashes with proper signage Cons Cost Impact due to future development

56 Maxwell Rd Roundabout Conceptual Conceptual

57 Concerns / Issues raised Traffic Congestion Safety: Speed Side street traffic The Crossings Town Park Pedestrian/Bicycle friendly Safety : Critical Locations Access to side streets/driveways

58 Access to Side Streets/Driveways Center turn lane throughout the corridor (except the signalized intersections)

59 Access to Side Streets/Driveways Using shoulders for center-turn-lane WB Lane Center Turn Lane EB Lane PROS Facilitate access Reduce turn conflicts Decrease delays Existing condition with shoulders on either sidecons No shoulders Eliminates space for bicycles Increased speed and traffic No buffer between vehicles Shoulder WB Lane EB Lane and pedestrian Shoulder Cost $$$

60 Access to Side Streets/Driveways CONS No shoulders Eliminates space for goals bicycles Not Complete Street Less pleasant and safe to walk Not consistent with Study Center turn lane is not recommended at this time

61 Concerns / Issues raised Traffic Congestion Safety: Speed Side street traffic The Crossings Town Park Pedestrian/Bicycle friendly Safety : Critical Locations Access to side streets/driveways

62 Coordination with other Studies The Town is in the middle of update to the Comprehensive Plan and an update to the Airport Area GEIS Expected to be completed before completion of the Comprehensive Plan and the Airport Area GEIS It is expected that the Comprehensive Plan will either keep projected development densities at current levels or lower them through the Comp plan and future land use law changes. These changes should not influence the results of the ASR Study.

63 Schedule Summer: Develop and evaluate recommendations Fall: Confirm recommendations with Team November: Public Meeting # 2 January: Draft Report

64 Next Steps Consensus on transportation mitigation measures Compile public input and summarize information Present final recommendations to the Town and County Draft report- January 2018

65 Poll Everywhere: Live Audience Participation 1. Polling screen 2. Text ALBANYSHAKERRD to join; then text your answer(s) to Real time results!

66 Poll Everywhere Questions

67 THANK YOU for your feedback!

68 Questions

69 Your Opinion Let us know what your like or concerns are : albanyshakercolonie@cmellp.com OR Fill out a comment form

70 Thank You

Public Involvement Meeting Tuesday, June 13, Albany Shaker Road Corridor Study

Public Involvement Meeting Tuesday, June 13, Albany Shaker Road Corridor Study Public Involvement Meeting Tuesday, June 13, 2017 Albany Shaker Road Corridor Study Agenda / Meeting Outline 1. Introduce the project 2. Complete Streets 3. Share/confirm our findings 4. Your Opinion 5.

More information

VT15 / Allen Martin Drive Intersection Scoping Study

VT15 / Allen Martin Drive Intersection Scoping Study VT15 / Allen Martin Drive Intersection Scoping Study ALTERNATIVES PRESENTATION MEETING DECEMBER 19, 2016 Agenda Study Area Project Background Existing Conditions Identified Issues Proposed Alternatives

More information

Public Information Centre

Public Information Centre WELCOME Public Information Centre Father Tobin Road Lougheed Middle School - Library Wednesday November 7, 2012 7:00 p.m.to 9:00 p.m. Please sign in Neighbourhood Traffic Calming Guide Background The City

More information

BETHEL ROAD AND SEDGWICK ROAD CORRIDOR STUDY

BETHEL ROAD AND SEDGWICK ROAD CORRIDOR STUDY DRAFT PLAN City Council Meeting August 14, 2017 STUDY AREA Sedgwick Corridor State Route 160, principal arterial with Class 3 access management designation, commuter and freight route, connection to SR

More information

Summary: Mercer County Princeton Avenue & Spruce Street Study January 2009

Summary: Mercer County Princeton Avenue & Spruce Street Study January 2009 Summary: Several recent studies have assessed potential development and redevelopment opportunities in the Mercer Crossing area of Trenton, Ewing, and Lawrence. This Princeton Avenue and Spruce Street

More information

Town of Bethlehem. Planning Assessment. Bethlehem Town Board

Town of Bethlehem. Planning Assessment. Bethlehem Town Board Town of Bethlehem US 9W Corridor Transportation Planning Assessment Presented e to: Bethlehem Town Board June 2009 Overview Study Background Route 9W Corridor Conditions and Improvements Selkirk Bypass

More information

Public Information Meeting. Warren County Pathway Corridor Project September 27, 2018

Public Information Meeting. Warren County Pathway Corridor Project September 27, 2018 Public Information Meeting Warren County Pathway Corridor Project September 27, 2018 Why are we here? Introduce Study Hear concerns and Ideas Obtain input on preliminary Alternatives Previous Study (2008)

More information

Arlington Public Schools New Elementary School at Thomas Jefferson Site Off-Site Transportation. Thomas Jefferson BLPC / PFRC Meeting July 27, 2016

Arlington Public Schools New Elementary School at Thomas Jefferson Site Off-Site Transportation. Thomas Jefferson BLPC / PFRC Meeting July 27, 2016 Arlington Public Schools New Elementary School at Thomas Jefferson Site Off-Site Transportation Thomas Jefferson BLPC / PFRC Meeting July 27, 2016 1.Review of Analysis 2.Key Transportation Issues 3.Recommendations

More information

WELCOME Public Information Centre

WELCOME Public Information Centre WELCOME Public Information Centre Fernforest Drive Brampton Soccer Centre Community Room #2 Tuesday January 19, 2016 6:30 p.m.to 9:00 p.m. Please sign in Neighbourhood Traffic Calming Guide Background

More information

Edenbrook Hill Drive Traffic Calming Study

Edenbrook Hill Drive Traffic Calming Study WELCOME Public Information Centre Edenbrook Hill Drive Traffic Calming Study Fletchers Meadow Secondary School Wednesday January 20, 2016 6:30 p.m.to 9:00 p.m. Please sign in Neighbourhood Traffic Calming

More information

TRANSPORTATION FACILITY PLANNING Waugh Chapel Road Maytime Drive to New Market Lane

TRANSPORTATION FACILITY PLANNING Waugh Chapel Road Maytime Drive to New Market Lane July 24, 2018 TRANSPORTATION FACILITY PLANNING Waugh Chapel Road Maytime Drive to New Market Lane DPWandYOU.com Making a difference, together Meeting Agenda Purpose of the project Overview of work conducted

More information

Borough of Danville, PA Traffic Calming Program Guidelines

Borough of Danville, PA Traffic Calming Program Guidelines Borough of Danville, PA Traffic Calming Program Guidelines Adopted by Borough Council on 1 INTRODUCTION Speeding Traffic is a major concern in the Borough of Danville because of its detrimental impacts

More information

Colchester/Riverside/Barrett/ Mill Intersection Study. PAC Meeting #3 September 22, 2016

Colchester/Riverside/Barrett/ Mill Intersection Study. PAC Meeting #3 September 22, 2016 Colchester/Riverside/Barrett/ Mill Intersection Study PAC Meeting #3 September 22, 2016 Tonight s Agenda Review Project Purpose and Need Describe short term and long improvements and changes since public

More information

Simulation Analysis of Intersection Treatments for Cycle Tracks

Simulation Analysis of Intersection Treatments for Cycle Tracks Abstract Simulation Analysis of Intersection Treatments for Cycle Tracks The increased use of cycle tracks also known as protected bike lanes has led to investigations of how to accommodate them at intersections.

More information

Los Altos Hills Town Council - June 18, 2015 Palo Alto City Council June 22, AGENDA ITEM #2.B Presentation

Los Altos Hills Town Council - June 18, 2015 Palo Alto City Council June 22, AGENDA ITEM #2.B Presentation Los Altos Hills Town Council - June 18, 2015 Palo Alto City Council June 22, 2015 AGENDA ITEM #2.B Presentation Previous Presentations Los Altos Hills Town Council in May 2014 and February 2015 Palo Alto

More information

El Camino Real Specific Plan. TAC/CAC Meeting #2 Aug 1, 2018

El Camino Real Specific Plan. TAC/CAC Meeting #2 Aug 1, 2018 El Camino Real Specific Plan TAC/CAC Meeting #2 Aug 1, 2018 Land Use Alternatives Goals and Tradeoffs Parks & open space Housing Retail & services Civic spaces Parking Community gathering spaces 3 Alternatives

More information

North Avenue Corridor Study

North Avenue Corridor Study North Avenue Corridor Study Advisory Committee Meeting #6 July 1, 2014 Agenda Concept Revisions based on Advisory Committee feedback Review of New Concept Scoring & Costs Concept Discussion/Questions Voting:

More information

CITY OF WEST LAKE HILLS. Forest View Neighborhood Traffic Calming Study

CITY OF WEST LAKE HILLS. Forest View Neighborhood Traffic Calming Study CITY OF WEST LAKE HILLS 901 South Mopac Expressway Building V, Suite 220 Austin, Texas 78746 Texas P.E. Firm Registration No. F-929 Klotz Associates Final Report Submittal: March 20, 2015 Revised Final

More information

Off-road Trails. Guidance

Off-road Trails. Guidance Off-road Trails Off-road trails are shared use paths located on an independent alignment that provide two-way travel for people walking, bicycling, and other non-motorized users. Trails specifically along

More information

Transportation Planning Division

Transportation Planning Division Transportation Planning Division Presentation Outline Study Tasks Recap of Previous Meeting Stakeholder Interviews Data Collection Design Principles Tool Box Recommendations Schedule Moving Forward North

More information

MEMORANDUM. Charlotte Fleetwood, Transportation Planner

MEMORANDUM. Charlotte Fleetwood, Transportation Planner MEMORANDUM Date: Updated August 22, 2017 To: Organization: Charlotte Fleetwood, Transportation Planner Boston Transportation Department From: Jason DeGray, P.E., PTOE, Regional Director of Engineering

More information

5.0 Roadway System Plan

5.0 Roadway System Plan Southwest Boise Transportation Study Page 16 5.0 Roadway System Plan The Roadway System Plan outlines roadway improvements in the Initial Study Area. It forecasts future deficiencies on the arterial system,

More information

Balancing Operation & Safety for Motorized and Non-Motorized Traffic

Balancing Operation & Safety for Motorized and Non-Motorized Traffic Balancing Operation & Safety for Motorized and Non-Motorized Traffic Brian Willham, PE, PTOE Iowa Director - MOVITE June 30, 2014 Learning Objectives: When & Why should we measure the performance of complete

More information

J Street and Folsom Boulevard Lane Conversion Project (T ) Before and After Traffic Evaluation

J Street and Folsom Boulevard Lane Conversion Project (T ) Before and After Traffic Evaluation J Street and Folsom Boulevard Lane Conversion Project (T15125400) Before and After Traffic Evaluation Prepared by Transportation Division June 2014 Executive Summary On February 12, 2013, the City of Sacramento

More information

Boston Post Road Design Feasibility Study

Boston Post Road Design Feasibility Study Boston Post Road Design Feasibility Study Prepared for the City of Rye Final Report July 18, 2007 Prepared by: Buckhurst Fish & Jacquemart (BFJ) 115 Fifth Avenue New York, NY 10003 www.bfjplanning.com

More information

Princeton Avenue and Spruce Street Transportation and Site Access Enhancements Project

Princeton Avenue and Spruce Street Transportation and Site Access Enhancements Project Princeton Avenue and Spruce Street Transportation and Site Access Enhancements Project Mercer County Planning Division AECOM Transportation (formerly DMJM Harris) January 29, 2009 Agenda Project Status

More information

Route 28 (South Orleans Road)/Route 39 (Harwich Road)/Quanset Road Intersection

Route 28 (South Orleans Road)/Route 39 (Harwich Road)/Quanset Road Intersection TRAFFIC FEASIBILITY STUDY Route 28 (South Orleans Road)/Route 39 (Harwich Road)/Quanset Road Intersection Orleans, Massachusetts Prepared for: Town of Orleans Prepared by: Fay, Spofford & Thorndike, LLC

More information

INDUSTRIAL BUILDING 3009 HAWTHORNE ROAD CITY OF OTTAWA TRANSPORTATION OVERVIEW REVISED. Prepared for: Canada Inc.

INDUSTRIAL BUILDING 3009 HAWTHORNE ROAD CITY OF OTTAWA TRANSPORTATION OVERVIEW REVISED. Prepared for: Canada Inc. INDUSTRIAL BUILDING 3009 HAWTHORNE ROAD CITY OF OTTAWA TRANSPORTATION OVERVIEW REVISED Prepared for: 7849648 Canada Inc. Octiober 1, 2015 114-598 Overview_2.doc D. J. Halpenny & Associates Ltd. Consulting

More information

TRAFFIC IMPACT STUDY And A TRAFFIC SIGNAL WARRANT ANALYSIS FOR A SENIOR LIVING AND APARTMENT DEVELOPMENT

TRAFFIC IMPACT STUDY And A TRAFFIC SIGNAL WARRANT ANALYSIS FOR A SENIOR LIVING AND APARTMENT DEVELOPMENT TRAFFIC IMPACT STUDY And A TRAFFIC SIGNAL WARRANT ANALYSIS FOR A SENIOR LIVING AND APARTMENT DEVELOPMENT DEERFIELD TOWNSHIP, WARREN COUNTY, OHIO Nantucket Circle and Montgomery Road () Prepared for: ODLE

More information

Reference number /VP. Lafayette Downtown Congestion Study - Additional Traffic Analysis

Reference number /VP. Lafayette Downtown Congestion Study - Additional Traffic Analysis To James Hinkamp and Tony Coe, City of Lafayette Date January 19, 2017 Copies Reference number 243381/VP From Michael Iswalt and Vanessa Peers File reference 4-05 Subject Lafayette Downtown Congestion

More information

Chapter 2: Standards for Access, Non-Motorized, and Transit

Chapter 2: Standards for Access, Non-Motorized, and Transit Standards for Access, Non-Motorized, and Transit Chapter 2: Standards for Access, Non-Motorized, and Transit The Washtenaw County Access Management Plan was developed based on the analysis of existing

More information

TRANSPORTATION ANALYSIS REPORT US Route 6 Huron, Erie County, Ohio

TRANSPORTATION ANALYSIS REPORT US Route 6 Huron, Erie County, Ohio TRANSPORTATION ANALYSIS REPORT US Route 6 Huron, Erie County, Ohio December 12, 2012 Prepared for: The City of Huron 417 Main Huron, OH 44839 Providing Practical Experience Technical Excellence and Client

More information

REGIONAL BICYCLE AND PEDESTRIAN DESIGN GUIDELINES

REGIONAL BICYCLE AND PEDESTRIAN DESIGN GUIDELINES REGIONAL BICYCLE AND PEDESTRIAN DESIGN GUIDELINES November 16, 2011 Deb Humphreys North Central Texas Council of Governments Bicycle and Pedestrian Advisory Committee Snapshot of the Guide 1. Introduction

More information

WISCONSIN AVENUE EXTENSION SECOND PUBLIC INFORMATION MEETING. March 28, 2017

WISCONSIN AVENUE EXTENSION SECOND PUBLIC INFORMATION MEETING. March 28, 2017 WISCONSIN AVENUE EXTENSION SECOND PUBLIC INFORMATION MEETING March 28, 2017 STUDY AREA N MEETING AGENDA Introductions Study Background Alternatives Studied Recommended Alternative Discussion STUDY BACKGROUND

More information

C C C

C C C C-012-001 Thank you for your support for the creation of new public space and nonmotorized access between downtown and the waterfront through the Overlook Walk, the East-West Connections, and the Promenade.

More information

Bridgewater Complete Streets Prioritization Plan and Pedestrian Safety Assessment

Bridgewater Complete Streets Prioritization Plan and Pedestrian Safety Assessment Bridgewater Complete Streets Prioritization Plan and Pedestrian Safety Assessment Presented by Luciano Rabito Manager of Complete Streets Presented to Bridgewater, MA Wednesday, April 26, 2017 6:30 P.M.

More information

CITY OF LOS ANGELES INTER-DEPARTMENTAL MEMORANDUM

CITY OF LOS ANGELES INTER-DEPARTMENTAL MEMORANDUM CITY OF LOS ANGELES INTER-DEPARTMENTAL MEMORANDUM Date: April 1, 219 To: Honorable City Council c/o City Clerk, Room 395, City Hall Attention: Honorable Mike Bonin, Chair, Transportation Committee From:

More information

Welcome! San Jose Avenue Open House August 25, 2015

Welcome! San Jose Avenue Open House August 25, 2015 Welcome! San Jose Avenue Open House August 25, 2015 Vision Zero The City and County of San Francisco adopted Vision Zero San Francisco Vision Zero High Injury Network as a policy in 2014, committing an

More information

EXECUTIVE SUMMARY. Vision

EXECUTIVE SUMMARY. Vision Vision Walking and bicycling in Salt Lake City will be safe, convenient, comfortable, and viable transportation options that connect people to places, foster recreational and economic development opportunities,

More information

Omaha s Complete Streets Policy

Omaha s Complete Streets Policy Omaha s Complete Streets Policy (Adopted August 2015) VISION To create great places and enhance our quality of life, the City of Omaha will provide safe, accessible streets for all users. Complete Streets

More information

Complete Street Analysis of a Road Diet: Orange Grove Boulevard, Pasadena, CA

Complete Street Analysis of a Road Diet: Orange Grove Boulevard, Pasadena, CA Complete Street Analysis of a Road Diet: Orange Grove Boulevard, Pasadena, CA Aaron Elias, Bill Cisco Abstract As part of evaluating the feasibility of a road diet on Orange Grove Boulevard in Pasadena,

More information

MEMORANDUM. DATE March 1, 2012 TO Town of Milton Mark Abbott, Seth Asante, and Efi Pagitsas Boston Region MPO Staff

MEMORANDUM. DATE March 1, 2012 TO Town of Milton Mark Abbott, Seth Asante, and Efi Pagitsas Boston Region MPO Staff MEMORANDUM DATE March 1, 212 TO Town of Milton FROM RE Mark Abbott, Seth Asante, and Efi Pagitsas Boston Region MPO Staff FFY 211 Safety and Operations Analyses at Selected Boston Region MPO Intersections:

More information

Southview Blvd & 3 rd Avenue Improvement Project. Public Open House December 4, to 7pm

Southview Blvd & 3 rd Avenue Improvement Project. Public Open House December 4, to 7pm Southview Blvd & 3 rd Avenue Improvement Project Public Open House December 4, 2014 5 to 7pm Southview Blvd & 3 rd Avenue Public Information Meeting Agenda Presentation 5:30 to 6:15 pm Purpose of Project

More information

Why Zone In on Speed Reduction?

Why Zone In on Speed Reduction? Learn it. Do it. Live it! SPEED REDUCTION IN THE ZONE Why Zone In on Speed Reduction? Speeding is a serious issue that plays a major role in the risk of serious injury and pedestrian fatality in a crash.

More information

STILLWATER AVENUE CORRIDOR STUDY Old Town, Maine

STILLWATER AVENUE CORRIDOR STUDY Old Town, Maine Draft Study STILLWATER AVENUE CORRIDOR STUDY Old Town, Maine SUBMITTED TO: BANGOR AREA COMPREHENSIVE TRANSPORTATION SYSTEM SUBMITTED BY: I MAY 23, 2017 DRAFT STILLWATER AVENUE STUDY FINAL REPORT Table

More information

How to Develop a Pedestrian Safety Action Plan

How to Develop a Pedestrian Safety Action Plan How to Develop a Pedestrian Safety Action Plan Course Introduction Presented by: Peter Eun FHWA RC Safety Engineer Ryan Snyder President, Ryan Snyder Associates, LLC Paul Zykofsky Director, Land Use and

More information

City of Vallejo Traffic Calming Toolbox

City of Vallejo Traffic Calming Toolbox City of Vallejo Traffic Calming Toolbox June 1, 2013 Final Table of Contents Introduction... 1 Non-Physical Devices... 3 High-Visibility Crosswalk... 3 In Pavement Lighted Crosswalk... 4 Rapid Flashing

More information

WELCOME. Stakeholder Involvement Group Meeting #2 Round Lake Public Works October 24, 2018

WELCOME. Stakeholder Involvement Group Meeting #2 Round Lake Public Works October 24, 2018 WELCOME Stakeholder Involvement Group Meeting #2 Round Lake Public Works October 24, 2018 MEETING AGENDA 1. Welcome and Introductions 2. Study Progress Update 3. Problem Statement 4. Technical Analysis

More information

Designing for Pedestrian Safety

Designing for Pedestrian Safety Designing for Pedestrian Safety Introduction to Pedestrian Safety Design and Planning Principles Presented by: Craig Allred FHWA Resource Center Technical Specialist and Michael Ronkin Owner, Designing

More information

Public Works Committee Meeting Richard E. Mastrangelo Council Chamber November 20, 2017

Public Works Committee Meeting Richard E. Mastrangelo Council Chamber November 20, 2017 Public Works Committee Meeting Richard E. Mastrangelo Council Chamber November 20, 2017 Purpose of Meeting Why are we here? Project Recap/Updates Project Limits/Segments Road Diet Concept Lessons Learned

More information

CHAPTER 3: Vision Statement and Goals

CHAPTER 3: Vision Statement and Goals Davidson Walks & Rolls: Active Transportation Master Plan CHAPTER 3 Contents: Overview Vision Statement Measurable Goals Public Outreach CHAPTER 3: Vision Statement and Goals Overview The vision statement

More information

Proposed. City of Grand Junction Complete Streets Policy. Exhibit 10

Proposed. City of Grand Junction Complete Streets Policy. Exhibit 10 Proposed City of Grand Junction Complete Streets Policy Exhibit 10 1 City of Grand Junction Complete Streets Policy Vision: The Complete Streets Vision is to develop a safe, efficient, and reliable travel

More information

Feasibility Study of Pedestrian Crossings Along Route 7, East of Cascades Parkway and West of Dranesville Road. October 3, 2017

Feasibility Study of Pedestrian Crossings Along Route 7, East of Cascades Parkway and West of Dranesville Road. October 3, 2017 Feasibility Study of Pedestrian Crossings Along Route 7, East of Cascades Parkway and West of Dranesville Road October 3, 2017 Study Area (area within a ¼-mile radius of the study intersections) Route

More information

North Avenue Corridor Study

North Avenue Corridor Study North Avenue Corridor Study Transportation, Energy and Utilities Committee September 10, 2014 Presentation Outline Project Initiation: Why North Avenue? Existing Conditions + Issues Vision + Goals Improvement

More information

Bay to Bay Boulevard Complete Streets Project

Bay to Bay Boulevard Complete Streets Project Bay to Bay Boulevard Complete Streets Project Dale Mabry Highway to Bayshore Boulevard February 08, 2018 Photo Source: Tampa Bay Times Alessandra Da Pra Meeting Format Introduction Resurfacing Information

More information

6.4 RECOMMENDED IMPROVEMENTS

6.4 RECOMMENDED IMPROVEMENTS 6.4 RECOMMENDED IMPROVEMENTS 6.4.1 Williston Road Recommendations While all alternatives would be an improvement over existing conditions, Alternative 3B is recommended over the others because it provides

More information

Highway 49, Highway 351 and Highway 91 Improvements Feasibility Study Craighead County

Highway 49, Highway 351 and Highway 91 Improvements Feasibility Study Craighead County Highway 49, Highway 351 and Highway 91 Improvements Feasibility Study Craighead County Executive Summary March 2015 Highway 49, Highway 351 and Highway 91 Improvements Feasibility Study Craighead County

More information

2014/2015 BIKE ROUTE PLAN 83 AVENUE PROTECTED BIKE LANE

2014/2015 BIKE ROUTE PLAN 83 AVENUE PROTECTED BIKE LANE About the Project 2014/2015 BIKE ROUTE PLAN The City of Edmonton is planning a major bike route on the south side of Edmonton. This bike route is one part of a plan to provide citizens with transportation

More information

US 41 COMPLETE STREETS CORRIDOR PLANNING STUDY from University Parkway to Whitfield Avenue

US 41 COMPLETE STREETS CORRIDOR PLANNING STUDY from University Parkway to Whitfield Avenue 41 US 41 COMPLETE STREETS CORRIDOR PLANNING STUDY from University Parkway to Whitfield Avenue EXECUTIVE SUMMARY DRAFT FEBRUARY 2019 Project Overview The US 41 Complete Streets Corridor Planning Study,

More information

4. ENVIRONMENTAL IMPACT ANALYSIS 9. TRANSPORTATION AND TRAFFIC

4. ENVIRONMENTAL IMPACT ANALYSIS 9. TRANSPORTATION AND TRAFFIC 4. ENVIRONMENTAL IMPACT ANALYSIS 9. TRANSPORTATION AND TRAFFIC 4.9.1 INTRODUCTION The following section addresses the Proposed Project s impact on transportation and traffic based on the Traffic Study

More information

FAIRFIELD INN & SUITES HOTEL 135 THAD JOHNSON PRIVATE OTTAWA TRANSPORTATION BRIEF. Prepared for:

FAIRFIELD INN & SUITES HOTEL 135 THAD JOHNSON PRIVATE OTTAWA TRANSPORTATION BRIEF. Prepared for: FAIRFIELD INN & SUITES HOTEL 135 THAD JOHNSON PRIVATE OTTAWA TRANSPORTATION BRIEF Prepared for: Bona Building & Management Co. Ltd. Place Vanier, 333 North River Road Vanier, Ontario K1L 8B9 August 12,

More information

Chapter 4 Traffic Analysis

Chapter 4 Traffic Analysis Chapter 4 Traffic Analysis PURPOSE The traffic analysis component of the K-68 Corridor Management Plan incorporates information on the existing transportation network, such as traffic volumes and intersection

More information

Draft North Industrial Area-Wide Traffic Plan

Draft North Industrial Area-Wide Traffic Plan Summary of North Industrial and Hudson Bay Industrial Recommended Improvements Table 1. Summary of s Item Location 1 2 3 4 5 6 7 8 9 10 11 12 Millar Ave north of 51st St Super 8 Motel back lane 400 Block

More information

North Avenue Corridor Study

North Avenue Corridor Study North Avenue Corridor Study City Council October 6, 2014 Presentation Outline Project Initiation & Process Corridor Conditions & Issues Vision & Goals Concept Development - Development/Evaluation Implementation

More information

Southbend to Prima Vista. October 30, Floresta Corridor Master Plan

Southbend to Prima Vista. October 30, Floresta Corridor Master Plan Application of a Complete Street initiative and how it might function operationally 8 8 Southbend to Prima Vista October 30, 2017 Presentation Agenda 2 Perspective and History Traffic projections, Levels

More information

Tonight is for you. Learn everything you can. Share all your ideas.

Tonight is for you. Learn everything you can. Share all your ideas. Strathcona Neighbourhood Renewal Draft Concept Design Tonight is for you. Learn everything you can. Share all your ideas. What is Neighbourhood Renewal? Creating a design with you for your neighbourhood.

More information

Executive Summary Route 30 Corridor Master Plan

Executive Summary Route 30 Corridor Master Plan Route Corridor Master Plan Project Overview The Route Corridor Master Plan is a coordinated multimodal transportation and land use plan for the entire stretch of Route through East Whiteland Township,

More information

INDUSTRIAL BUILDING 1660 COMSTOCK ROAD CITY OF OTTAWA TRANSPORTATION OVERVIEW. Prepared for:

INDUSTRIAL BUILDING 1660 COMSTOCK ROAD CITY OF OTTAWA TRANSPORTATION OVERVIEW. Prepared for: INDUSTRIAL BUILDING 1660 COMSTOCK ROAD CITY OF OTTAWA TRANSPORTATION OVERVIEW Prepared for: Simluc Contractors Limited 2550 Blackwell Street, Ottawa K1B 5R1 October 18, 2013 113-584 Overview_1.doc D. J.

More information

Chapter V Transportation Concept Alternatives

Chapter V Transportation Concept Alternatives Chapter V Transportation Concept Alternatives Three (3) fundamentally different approaches to meeting vehicular travel needs in the corridor were considered. One approach is to leave the road as it is

More information

Traffic Impact Study WestBranch Residential Development Davidson, NC March 2016

Traffic Impact Study WestBranch Residential Development Davidson, NC March 2016 Traffic Impact Study WestBranch Residential Development Davidson, NC March 216 TRAFFIC IMPACT STUDY FOR THE WestBranch Residential Development LOCATED IN DAVIDSON, NC Prepared For: Lennar Carolinas, LLC

More information

Broad Street Bicycle Boulevard Design Guidelines

Broad Street Bicycle Boulevard Design Guidelines Broad Street Bicycle Boulevard Design Guidelines Building from the strategies introduced in the 2013 Bicycle Transportation Plan and community input received thus far, City Transportation Staff have identified

More information

Henderson Avenue Mixed-Use Development

Henderson Avenue Mixed-Use Development Zoning Case: Z145-3 Traffic Impact Analysis Henderson Avenue Mixed-Use Development Dallas, TX October 26 th, 216 Kimley-Horn and Associates, Inc. Dallas, Texas Project #644827 Registered Firm F-928 Traffic

More information

BD RESOLUTION NO RESOLUTION ADOPTING THE VISION ZERO RAMP INTERSECTION STUDY PHASE 1

BD RESOLUTION NO RESOLUTION ADOPTING THE VISION ZERO RAMP INTERSECTION STUDY PHASE 1 BD00 RESOLUTION NO. - RESOLUTION ADOPTING THE VISION ZERO RAMP INTERSECTION STUDY PHASE [NTIP PLANNING] FINAL REPORT WHEREAS, The Vision Zero Ramp Intersection Study Phase was recommended by Commissioner

More information

Giles Run Connector Road

Giles Run Connector Road Giles Run Connector Road Laurel Hill Adaptive Reuse Area to Laurel Crest Drive South County Federation Meeting June 14, 2016 History Connector road included in the Laurel Hill Comprehensive Plan amendment

More information

Meeting Summary Public Information Meeting #1 Warren County Pathway Corridor Project September 27, 2018

Meeting Summary Public Information Meeting #1 Warren County Pathway Corridor Project September 27, 2018 Meeting Summary Public Information Meeting #1 Warren County Pathway Corridor Project September 27, 2018 The first public information meeting for the Warren County Pathway Corridor Project was held on Thursday,

More information

City of Moorhead Committee of the Whole Meeting

City of Moorhead Committee of the Whole Meeting City of Moorhead Committee of the Whole Meeting Corridor Study Limits Center Avenue (Red River to 8th Street) TH 10 (Red River to TH 336) TH 75 (20th Ave S to Main Avenue) 2 Study Need: Project Overview

More information

City of Wilsonville 5 th Street to Kinsman Road Extension Project

City of Wilsonville 5 th Street to Kinsman Road Extension Project City of Wilsonville 5 th Street to Kinsman Road Walking Tour & Neighborhood Workshop Summary Report Public Outreach Overview On July 18 th, 2017, the City of Wilsonville hosted a neighborhood walking tour

More information

54 th Avenue North Complete Streets Concept Plan

54 th Avenue North Complete Streets Concept Plan 54 th Avenue North Complete Streets Concept Plan June 2018 TABLE OF CONTENTS Introduction and Purpose...1 Existing Conditions...5 Stakeholder and Public Outreach...15 Preferred Options West Segment...19

More information

City of Seattle Edward B. Murray, Mayor

City of Seattle Edward B. Murray, Mayor City of Seattle Edward B. Murray, Mayor Department of Transportation Scott Kubly, Director Eastlake Community Council 117 E Louisa St. #1 Seattle, WA 98102-3278 January 28, 2016 RE: Roosevelt to Downtown

More information

to the Public Information Centre for the Downtown Traffic Study

to the Public Information Centre for the Downtown Traffic Study to the Public Information Centre for the Downtown Traffic Study City of Sault Ste. Marie July 25, 2018 Purpose of Study Determine if changes to one-way corridors can enhance downtown s character and spaces

More information

Mineral Avenue Corridor Assessment. ITE 2017 Western District Annual Meeting San Diego, CA June 21 st

Mineral Avenue Corridor Assessment. ITE 2017 Western District Annual Meeting San Diego, CA June 21 st Mineral Avenue Corridor Assessment ITE 2017 Western District Annual Meeting San Diego, CA June 21 st Biography - Aaron Heumann, PE, PTOE Currently City of Littleton Transportation Engineering Manager 24

More information

Ottawa Beach Road Study

Ottawa Beach Road Study Ottawa Beach Road Study Prepared For: Park Township September 30, 2014 Project No. G140303 OTTAWA BEACH ROAD STUDY PREPARED FOR: PARK TOWNSHIP SEPTEMBER 30, 2014 PROJECT NO. G140303 TABLE OF CONTENTS 1.0

More information

Street / Bob Billings Parkway Lawrence, Kansas CFS Project No

Street / Bob Billings Parkway Lawrence, Kansas CFS Project No Drive Improvements 6 th Street to 15 th Street / Bob Billings Parkway Lawrence, Kansas 6644 CFS Project No. 15-56 Traffic Impact Study July 15, 15 Prepared for: City of Lawrence Public Works Department

More information

Vision: Traditional hamlet with an attractive business/pedestrian friendly main street connected to adjacent walkable neighborhoods

Vision: Traditional hamlet with an attractive business/pedestrian friendly main street connected to adjacent walkable neighborhoods N D. Focus Area II Vision: Traditional hamlet with an attractive business/pedestrian friendly main street connected to adjacent walkable neighborhoods Transit Road Focus Area II is located in the Hamlet

More information

Prince George s County plans, policies, and projects

Prince George s County plans, policies, and projects Prince George s County plans, policies, and projects Over 250 projects for trails, bikeways, designated bike lanes and sidewalk construction Trail projects that improve access to Metro Sidewalk and trail

More information

Community Task Force July 25, 2017

Community Task Force July 25, 2017 Community Task Force July 25, 2017 Welcome and Introductions Project Partners Regional Transportation District (RTD) Colorado Department of Transportation (CDOT) Denver Regional Council of Governments

More information

Traffic Impact Analysis Chatham County Grocery Chatham County, NC

Traffic Impact Analysis Chatham County Grocery Chatham County, NC Chatham County Grocery Chatham County, NC TABLE OF CONTENTS 1. INTRODUCTION... 1 1.1. Location and Study Area... 1 1.2. Proposed Land Use and Access... 2 1.3. Adjacent Land Uses... 2 1.4. Existing ways...

More information

Modern Roundabouts. BY : Mark T. Johnson, P.E. An Informational Presentation Prepared For:

Modern Roundabouts. BY : Mark T. Johnson, P.E. An Informational Presentation Prepared For: Modern Roundabouts An Informational Presentation Prepared For: Transportation Research Board Roundabout Conference Vail, CO May 2005 Roundabout implementation in constrained urban environment - achieving

More information

CONTENTS EXECUTIVE SUMMARY 1

CONTENTS EXECUTIVE SUMMARY 1 CONTENTS CHAPTER PAGE EXECUTIVE SUMMARY 1 1 ISSUES AND PURPOSE OF THE ANALYSIS 2 1.1 Background 2 1.2 Analysis Area 2 1.3 Issues and Observations 3 1.4 Project and Public Meetings 3 2 LIST OF PREFERRED

More information

Northbound San Jose Avenue & I-280 Off-Ramp Road Diet Pilot Project

Northbound San Jose Avenue & I-280 Off-Ramp Road Diet Pilot Project Project Overview Fed by a two-lane Interstate-280 (I-280) off-ramp, high vehicular volumes and speeds are longstanding issues along San Jose Avenue. Residents in the surrounding neighborhoods have expressed

More information

Blair/Williamson Intersection Expressed Needs

Blair/Williamson Intersection Expressed Needs Blair/Williamson Intersection Expressed Needs NORTH Blair Street is a barrier for pedestrians and bicycles Relocate Capitol City Trail crossing from Blair Street and John Nolen Drive intersection to Williamson

More information

Caltrans Sloat Boulevard Pedestrian Safety Project Response to Community Questions, Comments & Concerns

Caltrans Sloat Boulevard Pedestrian Safety Project Response to Community Questions, Comments & Concerns Caltrans Sloat Boulevard Pedestrian Safety Project Response to Community Questions, Comments & Concerns Revised: May 10, 2016 The California Department of Transportation (Caltrans) is planning various

More information

ORANGE COUNTY PUBLIC WORKS TRAFFIC INVESTIGATIONS

ORANGE COUNTY PUBLIC WORKS TRAFFIC INVESTIGATIONS ORANGE COUNTY PUBLIC WORKS TRAFFIC INVESTIGATIONS STAFF REPORT OF: January 6, 2019 SUPERVISORIAL DISTRICT: 5 SUBJECT: LOCATION: INVESTIGATOR: O Neill Drive at Roanoke Drive; Ladera Ranch; TB 922-E6 Clever

More information

Project Goals and Objectives

Project Goals and Objectives Project Goals and Objectives Goal 1: Goal 2: Goal 3: Transform Coast Highway into a Complete Street that accommodates all roadway users (pedestrians, bicyclists, and autos) Objectives: Improve the pedestrian

More information

AGENDA REPORT. Issue: Discussion of potential improvements on Barnwell Road at Niblick Drive

AGENDA REPORT. Issue: Discussion of potential improvements on Barnwell Road at Niblick Drive AGENDA REPORT To: From: By: Honorable Mayor and City Council Members Warren Hutmacher, City Manager Tom Black, Public Works Director Date: March 23, 2016 Agenda: March 28, 2016 WORK SESSION AGENDA: Barnwell

More information

Traffic Impact Analysis Walton Acres at Riverwood Athletic Club Clayton, NC

Traffic Impact Analysis Walton Acres at Riverwood Athletic Club Clayton, NC Traffic Impact Analysis Walton Acres at Riverwood Athletic Club Clayton, NC 1. TABLE OF CONTENTS INTRODUCTION...1 1.1. Site Location and Study Area...1 1.2. Proposed Land Use and Site Access...2 1.3.

More information

Roundabouts are good for business

Roundabouts are good for business Roundabouts are good for business What is a roundabout Rules 0f Roundabouts 1. Slow down when approaching a roundabout 2. Yield to vehicles in the roundabout 3. When clear, proceed right into the roundabout

More information

Safe Streets. City of Lake Forest Park. March 21, 2017

Safe Streets. City of Lake Forest Park. March 21, 2017 Safe Streets City of Lake Forest Park March 21, 2017 1 01 WELCOME 2 Agenda WELCOME WHAT IS THIS PROJECT? CONTEXT DRAFT CITYWIDE PROJECTS EXERCISE INTRODUCTION 3 02 WHAT IS THIS PROJECT? 4 WHAT IS THIS

More information

Truck Climbing Lane Traffic Justification Report

Truck Climbing Lane Traffic Justification Report ROUTE 7 (HARRY BYRD HIGHWAY) WESTBOUND FROM WEST MARKET STREET TO ROUTE 9 (CHARLES TOWN PIKE) Truck Climbing Lane Traffic Justification Report Project No. 6007-053-133, P 101 Ι UPC No. 58599 Prepared by:

More information

Central Avenue Bikeway Traffic and Safety Impact Assessment

Central Avenue Bikeway Traffic and Safety Impact Assessment FEBRUARY 2018 Lead Agency: San Diego Association of Governments (SANDAG) 401 B Street, Suite 800 San Diego, CA 92101 Contact: Chris Carterette, AICP, Project Manager 619.699.7319 chris.carterette@sandag.org