1 Report No. 8 of the Transportation Services Committee Regional Council Meeting of October 20, TRAFFIC CONTROL SIGNAL TIMING AND SYNCHRONIZATION The Transportation Services Committee recommends: 1. Receipt of the presentation by Steven Kemp, Director, Traffic Management & Intelligent Transportation Systems, and Paul Nause, Manager, Traffic Engineering & Integrated Intelligent Transportation Systems; and 2. Adoption of the recommendation contained in the following report dated September 21, 2011, from the Commissioner of Transportation Services. 1. RECOMMENDATION It is recommended that this report be received for information. 2. PURPOSE This report provides information regarding traffic control signal timing and synchronization on the Regional road system and explains the challenges of optimizing the operation of signalized intersections to meet the conflicting needs of different road users. 3. BACKGROUND The Region currently operates and maintains 776 traffic control signals The Region currently operates and maintains 776 traffic control signals within the boundaries of York Region. Of that total, 659 are owned by the Region; 56 are maintained by the Region under an agreement with the Ontario Ministry of Transportation; 34 are maintained by the Region under an agreement for 407 ETR and 27 for the local municipalities of Aurora, Newmarket, Vaughan, Richmond Hill and Markham. The Region installs approximately 30 new traffic control signals each year at an average installation cost of approximately $150,000 and ongoing annual operating and maintenance cost of approximately $6,000 per location.

2 Report No. 8 of the Transportation Services Committee Regional Council Meeting of October 20, 2011 In addition, the Region has a sophisticated communications infrastructure that connects each traffic control signal to a Centralized Traffic Control System (CTCS). This system allows staff to remotely monitor and make adjustments to the traffic control signal timings at each intersection. Optimizing traffic control signal timing is one component of an overall strategy to manage traffic congestion in York Region. Other components include infrastructure improvements to relieve congestion i.e. new traffic signals, intersection improvements and road widening, infrastructure improvements to reduce car dependency e.g. bicycle lanes, transit and HOV lanes, event and incident management, intelligent transportation systems, travel demand management etc. As part of a strategy to optimize traffic control signal timing, Regional staff proactively carry out corridor reviews to evaluate and improve traffic flow. Approximately 15 corridor reviews are completed each year for selected locations based on public feedback, development-related traffic growth and scheduled review cycles. The corridor review process involves before travel time runs to collect data, then analyzing the data to fine tune the traffic control signal timing and synchronization in the field, and finally followed by after travel time runs to determine and verify corridor travel time results. The results of a typical review is provided below. This example was completed on Yonge Street between Savage Road South to Davis Drive. Table 1 provides a summary of the travel runs for a weekday, and Table 2 provides a summary of the travel runs for a weekend. The results of the review are as follows: Time Period and Direction Table 1 Traffic Signal Progression Analysis - Weekday Yonge Street: Savage Road South to Davis Drive Travel Time (sec/veh) Before After Analysis No. of No. of Stops Stops Travel Time (sec/veh) Travel Time Savings (sec/veh) Percent Decrease in Travel Time AM Peak (NB) AM Peak (SB) Off Peak (NB) Off Peak (SB) * -1 PM Peak (NB) PM Peak (SB) AM Peak northbound and southbound travel time decrease of 38 seconds/vehicle and 16 seconds/vehicle, respectively

3 Report No. 8 of the Transportation Services Committee Regional Council Meeting of October 20, 2011 OFF Peak northbound travel time decrease of 9 seconds /vehicle and a slight travel time increase in the southbound direction of 4 seconds/vehicle* PM Peak northbound and southbound travel time decrease of 22 seconds/vehicle and 6 seconds/vehicle, respectively Time Period and Direction Table 2 Traffic Signal Progression Analysis - Weekend Yonge Street: Savage Road South to Davis Drive Travel Time (sec/veh) Before After Analysis No. of No. of Stops Stops Travel Time (sec/veh) Travel Time Savings (sec/veh) Percent Decrease in Travel Time AM Peak (NB) AM Peak (SB) PM Peak (NB) PM Peak (SB) * -26 AM Peak northbound and southbound travel time decrease of 23 seconds/vehicle and 55 seconds/vehicle, respectively PM Peak northbound travel time decrease of 22 seconds/vehicle PM Peak southbound increase of 58 seconds/vehicle, however adjustments to the traffic signal synchronization result in balanced travel times between the northbound and southbound direction * 4. ANALYSIS AND OPTIONS Traffic control signal timing and synchronization is a means to optimize the traffic signal system and to balance the competing needs of all road users Different road users can have competing objectives and perspectives on what the optimal signal operation should be. At traffic control signals, pedestrians do not want to wait too long to cross and want enough time to cross the intersection safely; while local residents want to get in and out of their communities quickly. This means they may want new traffic control signals where none exists or they want longer red time for the Regional road users. Commuters, on the other hand, do not want to stop and want to get to their destinations as quickly as possible. The objective, as traffic engineers look at these competing demands, is to install new traffic control signals only where the benefits exceed the disbenefits as listed in Table 3.

4 Report No. 8 of the Transportation Services Committee Regional Council Meeting of October 20, 2011 Table 3 Installation of New Traffic Control Signals Benefits Provide more comfortable crossing opportunities for cyclists and pedestrians Reduced right angle collisions Decreased delay to minor road traffic during peak time periods Disadvantages Increased delay and stops for major road traffic Increased frequency of rear-end collisions Increased delay to minor road traffic during off-peak periods Once installed, traffic control signals can seldom be considered in isolation; in addition to having signal timing that balances the competing needs at an intersection, a traffic control signal needs to be considered as part of a wider transportation network. Sometimes it is necessary to increase the wait time for side street traffic at a single intersection in order to achieve a more optimized transportation network. This is the case along an arterial corridor that has several traffic control signals, where signals are timed and coordinated so that motorists can travel along a route with minimal stops and delay. In these cases, an increase in delay at any one intersection that forms part of an optimized arterial corridor, is offset by the improved traffic operations that result from achieving good synchronization along the length of the arterial roadway. Approximately 18% of traffic signal requests that Regional staff receive are to improve the synchronization of traffic control signals along a specific corridor to reduce the incidence of drivers hitting every red light The communication network to which all traffic control signals are connected, allows for the synchronization of green phases so that platoons of traffic can travel through a series of signals without stopping. A well-synchronized corridor consists of coordination and progression. Coordination refers to the timing of the signals so that a succession of green lights can be provided in sequence through multiple signalized intersections. Progression is the uninterrupted flow of traffic through a series of coordinated intersections. It is only possible to retain progression throughout a network of coordinated signals if a number of factors are aligned: Spacing of Traffic Control Signals Vehicular Volumes Amount of side street vehicular traffic

5 Report No. 8 of the Transportation Services Committee Regional Council Meeting of October 20, 2011 Amount of pedestrian traffic. Vehicle travel speeds For good progression to be achieved, the green time at downstream traffic control signals need to be long enough to discharge the queue prior to the arrival of the platoon. There should be sufficient time to let the platoon progress through the intersection. At intersections of two high volume roads, it is not always possible to assign sufficient green time to discharge the queue and to accommodate the platoon. In addition, these types of intersections are constrained due to the traffic demand in all directions. The legal posted speed is used as the basis for designing traffic progression through a series of traffic signals Vehicles entering and exiting driveways, on-street parking, pedestrian activity, construction, etc. can cause travel speeds along a road to be highly variable and unpredictable. When the actual travel speeds, as a result of these factors, are lower than the design values, the platoon will reach the next intersection too late, and encounter a red indication. Conversely, when platoons drive faster than the speed limit, they could arrive too early at the next signal and encounter a red indication as well. Drivers who are consistently experiencing short duration stops at traffic control signals are often driving faster than the posted speed limit, which is our design speed for signal coordination. During times of the day when there are strong directional flows, the priority is to achieve progression in the dominant flow direction The direction of travel which has lower volumes will typically experience poor traffic progression due to the priority given to the dominant flow direction. When flows are more balanced, outside peak periods, two-directional coordination is required. It is extremely rare that intersection green times, spacing and travel times align to allow for ideal two-way coordination. In addition, intersections have a limited capacity depending on the number of lanes to deal with the traffic volumes. If the number of vehicles exceeds capacity, the time required for queues to clear will consume most or all of the available green time, leaving inadequate green time to accommodate arriving platoons. Servicing motorists entering from minor roads, left-turning motorists, pedestrians as well as having responsive signals for transit and emergency vehicles reduces the opportunity to synchronize traffic control signals The majority of traffic control signals in York Region are traffic actuated which means the time allocated to the minor road, left-turns and pedestrian phases are only displayed when there is a demand. In cases when there is no demand, the unused green time is added to the major road green time; therefore, the start of a major road green phase is not fixed and is difficult to coordinate precisely with the start of a green phase at an adjacent traffic control signal. In these cases, providing the additional green time to the main

6 Report No. 8 of the Transportation Services Committee Regional Council Meeting of October 20, 2011 street may appear to the driver that signals are not synchronized. This results in traffic leaving early and arriving at the next intersection too early. The synchronization of traffic control signals is further complicated by traffic signal preemption. These traffic signal features intentionally disrupt signalization to provide traffic signal priority. At the majority of Regional traffic control signals, emergency vehicles and rapid transit (VIVA) buses are given priority. This enables emergency vehicles to travel quickly and safely and assists transit in adhering to time of day schedules. The result of a traffic signal pre-emption is a temporary loss of synchronization. Under these circumstances it can take several cycles to regain the synchronization along a corridor. Intelligent Transportation Systems help improve progression by providing advanced technology to increase monitoring capabilities to evaluate traffic progression In order to optimize travel for the VIVA buses and other road users on the future dedicated rapidways, a new centralized traffic control system will be acquired. The Region s existing system does not have the capability to manage the complex phasing, timing and responsive control required for traffic lanes and dedicated bus lanes. The new centralized traffic control system will be able to respond to fluctuating traffic demands to adjust signal timing and optimize traffic flow. The system will also improve monitoring and data collection capabilities using strategically placed traffic sensors. Advancements in technology related to automatic vehicle location (AVL) systems, cellular phone tracking, Bluetooth sensors and smartphone GPS probing, provide opportunities to supply intelligent transportation systems with real time traffic data. The Transportation Services Traffic Management and Intelligent Transportation Systems Branch are actively assessing the use of AVL data from the Region s Transit fleet, cellular phone data through an agreement with Intelligent Mechatronic Systems Inc. (formerly Intellione Inc.) as well as Bluetooth sensors deployed along the Highway 7 vivanext construction. The data captured from these sources can help to assess the traffic conditions and progression on the Regional road network. 5. FINANCIAL IMPLICATIONS There are three Technologists dedicated to all aspects of traffic signal operations, including signal timing and synchronization. The cost associated with traffic signal timing and synchronization improvements is included in the existing Transportation Services operating budget. The total annual operating cost for this activity is approximately $160,000 which represents less than 0.1% of the total Transportation Services operating budget. The capital cost associated with centralized traffic signal control system replacement will be included in the overall project cost for vivanext rapidway construction. The cost for

7 Report No. 8 of the Transportation Services Committee Regional Council Meeting of October 20, 2011 the centralized traffic control system replacement will be determined after the detail design process is complete and the successful vendor has been selected. 6. LOCAL MUNICIPAL IMPACT Optimizing traffic flows along an arterial corridor is achieved through good synchronization along the length of the arterial roadway. This helps the local municipalities avoid neighbourhood infiltration issues by keeping the traffic on the arterial roads. 7. CONCLUSION Traffic patterns are ever changing due to growth and development, therefore, the need to continuously monitor and adjust traffic control signal timings is required to ensure progression along corridors. In addition, technology advancements in Intelligent Transportation Systems will assist in managing congestion and delays on the Regional road network. For more information on this report, please contact Steven Kemp, Director, Traffic Management and Intelligent Transportation Systems at extension The Senior Management Group has reviewed this report.

8 PRESENTATION Traffic Control Signal Timing And Synchronization Why is the Light Always Red for Me? Presentation to Transportation Services Committee Please refer to Agenda Item D3 Steven Kemp and Paul Nause October 5, 2011 Purpose of This Presentation 1. To provide information on the method used for traffic control signal timing and synchronization. 2. To explain the challenges of optimizing the operation of signalized intersections. Slide 2

9 Outline Traffic Control Signal Infrastructure How Do Traffic Control Signals Work? Traffic Control Signal Timing Traffic Control Signal Synchronization Traffic Management Challenges Opportunities for Improvement Slide 3 Traffic Control Signal Infrastructure and How Signals Work Slide 4

10 Traffic Control Signal Infrastructure No. of Traffic Control Signals 776 New Installations 30/yr Average Installation Cost $150,000 Annual Maintenance Costs $6,000 Other Components Central Traffic Control System (CTCS) Communications Infrastructure Slide 5 Traffic Signals How Do They Work? Slide 6

11 Traffic Signals How Do They Work? Slide 7 Traffic Signals How Do They Work? Traffic Control Signals will: increase delay to major road traffic (and sometimes for the cross street as well) increase the frequency of rear-end collisions So why would you ever install one? Slide 8

12 Traffic Signals How Do They Work? Traffic Control Signals will also: Reduce the number of right angle collisions (these are often the most serious) Provide more comfortable crossing opportunities for cyclists and pedestrians Efficiency/Safety Trade Off Slide 9 Traffic Control Signal Timing Slide 10

13 Pedestrians What Is Optimized? Don t want to wait long Want to have enough time to cross Local Residents Want to get on and off major road quickly Commuters Don t Want To Stop Get from A to B as quickly as possible Slide 11 What Is Optimized? Transit Riders Residents Truckers Pedestrians Commuters How to balance these competing objectives? Slide 12

14 An Example Yonge Street at Gladman Slide 13 What is Optimized? Step 1 : Individual Traffic Control Signal Optimization Step 2 : Synchronized Traffic Control Signals in groups Street A Street B Street C Street D Yonge Street Slide 14

15 What is Optimized? Stand Alone Coordinated Admin entrance Yonge St NB/SB Admin entrance Yonge St NB/SB Cycle length = 100 sec Cycle length = 140 sec No coordination with Eagle. Same cycle time as Eagle. Can coordinate signals. Slide 15 Signal Timing Basics - Challenges Pedestrian crossing time requirements Need for left turn phases How much green time to allocate to each phase? Desire for coordinated signals in groups Sometimes more green = less capacity Sometimes more road = less capacity Slide 16

16 Traffic Control Signal Synchronization Slide 17 Traffic Control Signal Synchronization Synchronize green phases so that platoons of traffic can travel through a series of signals to: minimize stops; or minimize travel time Slide 18

17 Traffic Control Signal Synchronization Gladman Green Band Eagle Clearmeadow Mulock Time (sec) Slide 19 Why Do I Hit Every Red Light? You Are Going the Opposite Direction Gladman Two-way Coordination Eagle Clearmeadow Reduced green band Mulock Time (sec) Slide 20

18 Why Do I Hit Every Red Light? You Are Driving the Wrong Speed Gladman Variable Speeds Green Band Eagle Too fast Clearmeadow Too slow Mulock Time (sec) Transportation Services Committee -October 5, 2011 Slide 21 Why Do I Hit Every Red Light? Congestion (standing queues) Left turns and Pedestrian phases Transit Priority Emergency Vehicle Pre-emption Out of date traffic signal timing Slide 22

19 Traffic Management Challenges Balancing User Needs Responding to changing traffic patterns Capacity constraints and congestion Slide 23 Opportunities for Improvement New Traffic Signal Control System Pro-active approach to signal timing updates Intelligent Transportation Systems Slide 24

20 Discussion/Questions? Slide 25

4 DISRUPTION MANAGEMENT PLAN HIGHWAY 7 RAPIDWAY CONSTRUCTION BETWEEN BAYVIEW AVENUE AND WARDEN AVENUE TOWNS OF MARKHAM AND RICHMOND HILL

4 DISRUPTION MANAGEMENT PLAN HIGHWAY 7 RAPIDWAY CONSTRUCTION BETWEEN BAYVIEW AVENUE AND WARDEN AVENUE TOWNS OF MARKHAM AND RICHMOND HILL 4 DISRUPTION MANAGEMENT PLAN HIGHWAY 7 RAPIDWAY CONSTRUCTION BETWEEN BAYVIEW AVENUE AND WARDEN AVENUE TOWNS OF MARKHAM AND RICHMOND HILL The Transportation Services Committee recommends the adoption of

More information

8 PROPOSED ROUNDABOUT DUFFERIN STREET AND KING VAUGHAN ROAD INTERSECTION CITY OF VAUGHAN

8 PROPOSED ROUNDABOUT DUFFERIN STREET AND KING VAUGHAN ROAD INTERSECTION CITY OF VAUGHAN 8 PROPOSED ROUNDABOUT DUFFERIN STREET AND KING VAUGHAN ROAD INTERSECTION CITY OF VAUGHAN The Transportation Services Committee recommends the adoption of the recommendation contained in the following report

More information

Markham Sports, Entertainment and Cultural Centre Transportation Overview

Markham Sports, Entertainment and Cultural Centre Transportation Overview Markham Sports, Entertainment and Cultural Centre Transportation Overview ARENA LOCATION 2 3 TRANSPORTATION VISION IN MARKHAM On April 12, 2011, Markham Council adopted a long-term Transportation Vision

More information

York Region Population and Employment Growth

York Region Population and Employment Growth March 1, 2016 1 York Region Population and Employment Growth York Region needs to comply with The Provincial Growth Plan and new forecasts introduced to 2036 and 2041 2 Regional Official Plan Review York

More information

Having held a public hearing, that Council approve:

Having held a public hearing, that Council approve: 3. MODIFICATIONS TO MERIVALE ROAD FROM FALLOWFIELD ROAD TO OLD HIGHWAY 16 TO ACCOMMODATE THE GROWTH WITHIN THE SOUTH MERIVALE BUSINESS PARK - PUBLIC HEARING COMMITTEE RECOMMENDATIONS Having held a public

More information

Operational Comparison of Transit Signal Priority Strategies

Operational Comparison of Transit Signal Priority Strategies Operational Comparison of Transit Signal Priority Strategies Revision Submitted on: November, 0 Author: Adriana Rodriguez, E.I Assistant Engineer Parsons Brinckerhoff 0 South Orange Avenue, Suite 00 Orlando,

More information

DESIGN CONSIDERATIONS FOR BUS PRIORITY ABSTRACT

DESIGN CONSIDERATIONS FOR BUS PRIORITY ABSTRACT DESIGN CONSIDERATIONS FOR BUS PRIORITY J COETZEE and G WESSELS ITS Engineers (Pty) Ltd E-Mail: jan@itse.co.za ; gerrit@itse.co.za ABSTRACT Providing priority to buses at traffic signals is widely used

More information

WEST AND SOUTH WEST RING ROAD DOWNSTREAM TRAFFIC IMPACTS

WEST AND SOUTH WEST RING ROAD DOWNSTREAM TRAFFIC IMPACTS Page 1 of 9 EXECUTIVE SUMMARY Alberta Transportation ( AT ) is preparing to construct the final sections of the Calgary Ring Road. This includes the South West Ring Road ( SWRR ) (from Lott Creek Blvd

More information

Transportation Master Plan Advisory Task Force

Transportation Master Plan Advisory Task Force Transportation Master Plan Advisory Task Force Network Alternatives & Phasing Strategy February 2016 BACKGROUND Table of Contents BACKGROUND Purpose & Introduction 2 Linking the TMP to Key Council Approved

More information

Toronto and East York Community Council. Director, Transportation Services, Toronto and East York District

Toronto and East York Community Council. Director, Transportation Services, Toronto and East York District No Turn on Red Regulations STAFF REPORT ACTION REQUIRED Date: June 1, 2010 To: From: Toronto and East York Community Council Director, Transportation Services, Toronto and East York District Wards: Trinity

More information

Northbound San Jose Avenue & I-280 Off-Ramp Road Diet Pilot Project

Northbound San Jose Avenue & I-280 Off-Ramp Road Diet Pilot Project Project Overview Fed by a two-lane Interstate-280 (I-280) off-ramp, high vehicular volumes and speeds are longstanding issues along San Jose Avenue. Residents in the surrounding neighborhoods have expressed

More information

TRAFFIC IMPACT ANALYSIS

TRAFFIC IMPACT ANALYSIS TRAFFIC IMPACT ANALYSIS FOR THE CHAMPAIGN UNIT#4 SCHOOL DISTRICT PROPOSED HIGH SCHOOL (SPALDING PARK SITE) IN THE CITY OF CHAMPAIGN Final Report Champaign Urbana Urbanized Area Transportation Study 6/24/2014

More information

HIGHBURY AVENUE/HAMILTON ROAD INTERSECTION IMPROVEMENTS PUBLIC INFORMATION CENTRE 1 MAY 14, 2015

HIGHBURY AVENUE/HAMILTON ROAD INTERSECTION IMPROVEMENTS PUBLIC INFORMATION CENTRE 1 MAY 14, 2015 HIGHBURY AVENUE/HAMILTON ROAD INTERSECTION IMPROVEMENTS Municipal Class Environmental Assessment PUBLIC INFORMATION CENTRE 1 MAY 14, 2015 ACCESSIBILITY Under the Accessibility Standards 2015 for Customer

More information

Welcome. The Brooklin Secondary Plan and Transportation Master Plan are collectively referred to as the Brooklin Study.

Welcome. The Brooklin Secondary Plan and Transportation Master Plan are collectively referred to as the Brooklin Study. Welcome The Town of Whitby is undertaking a study to prepare a Secondary Plan and Transportation Master Plan to guide and manage growth in the Brooklin area. The Brooklin Secondary Plan and Transportation

More information

Draft North Industrial Area-Wide Traffic Plan

Draft North Industrial Area-Wide Traffic Plan Summary of North Industrial and Hudson Bay Industrial Recommended Improvements Table 1. Summary of s Item Location 1 2 3 4 5 6 7 8 9 10 11 12 Millar Ave north of 51st St Super 8 Motel back lane 400 Block

More information

Arterial Traffic Analysis Some critical concepts. Prepared by Philip J. Tarnoff

Arterial Traffic Analysis Some critical concepts. Prepared by Philip J. Tarnoff Arterial Traffic Analysis Some critical concepts Prepared by Philip J. Tarnoff Agenda Fundamentals Signal timing concepts Actuated signal controllers Developing timing plans Types of signal control First

More information

WELCOME Public Information Centre

WELCOME Public Information Centre WELCOME Public Information Centre Fernforest Drive Brampton Soccer Centre Community Room #2 Tuesday January 19, 2016 6:30 p.m.to 9:00 p.m. Please sign in Neighbourhood Traffic Calming Guide Background

More information

4 Ridership Growth Study

4 Ridership Growth Study Clause 4 in Report No. 15 of Committee of the Whole was adopted, without amendment, by the Council of The Regional Municipality of York at its meeting held on November 16, 2017. 4 Ridership Growth Study

More information

CITY OF SASKATOON COUNCIL POLICY

CITY OF SASKATOON COUNCIL POLICY ORIGIN/AUTHORITY Clause 1, Report No. 1-1980 and Clause 4, Report No. 22-1990 of the Works and Utilities Committee; Clause 6, Report No. 17-2004 of the Planning and Operations Committee; and Clause D5,

More information

Welcome! San Jose Avenue Open House August 25, 2015

Welcome! San Jose Avenue Open House August 25, 2015 Welcome! San Jose Avenue Open House August 25, 2015 Vision Zero The City and County of San Francisco adopted Vision Zero San Francisco Vision Zero High Injury Network as a policy in 2014, committing an

More information

METHODOLOGY. Signalized Intersection Average Control Delay (sec/veh)

METHODOLOGY. Signalized Intersection Average Control Delay (sec/veh) Chapter 5 Traffic Analysis 5.1 SUMMARY US /West 6 th Street assumes a unique role in the Lawrence Douglas County transportation system. This principal arterial street currently conveys commuter traffic

More information

Corporate. Report COUNCIL DATE: June 26, 2006 NO: C012 COUNCIL-IN-COMMITTEE. TO: Mayor & Council DATE: June 22, 2006

Corporate. Report COUNCIL DATE: June 26, 2006 NO: C012 COUNCIL-IN-COMMITTEE. TO: Mayor & Council DATE: June 22, 2006 Corporate NO: C012 Report COUNCIL DATE: June 26, 2006 COUNCIL-IN-COMMITTEE TO: Mayor & Council DATE: June 22, 2006 FROM: General Manager, Engineering FILE: 0410-20(MoT/Gate) SUBJECT: Surrey Response on

More information

Planning Committee STAFF REPORT March 7, 2018 Page 2 of 4 The following MTSOs are being used across the five subregions: Intersection Level of Service

Planning Committee STAFF REPORT March 7, 2018 Page 2 of 4 The following MTSOs are being used across the five subregions: Intersection Level of Service Planning Committee STAFF REPORT Meeting Date: March 7, 2018 Subject Summary of Issues Recommendations Financial Implications Options Attachments Changes from Committee Review Draft 2017 Multimodal Transportation

More information

Public Works and Infrastructure Committee. General Manager, Transportation Services

Public Works and Infrastructure Committee. General Manager, Transportation Services STAFF REPORT ACTION REQUIRED Extending the Bay Street Bicycle Lanes Date: May 16, 2013 To: From: Public Works and Infrastructure Committee General Manager, Transportation Services Wards: Toronto Centre

More information

WELCOME TO OPEN HOUSE # 1 June 14, 2017

WELCOME TO OPEN HOUSE # 1 June 14, 2017 Langstaff Road Weston Road to Highway 7 Class Environmental Assessment Study WELCOME TO OPEN HOUSE # 1 June 14, 2017 Please sign in and join our mailing list Purpose of Open House #1 & Study Area York

More information

Strategies to Re capture Lost Arterial Traffic Carrying Capacities

Strategies to Re capture Lost Arterial Traffic Carrying Capacities Strategies to Re capture Lost Arterial Traffic Carrying Capacities Chalap K. Sadam, P.E. and Albert L. Grover, P.E. Over the years, many arterials that were initially designed to carry tens of thousands

More information

EXECUTIVE SUMMARY OF CALEDON TRANSPORTATION NEEDS STUDY

EXECUTIVE SUMMARY OF CALEDON TRANSPORTATION NEEDS STUDY EXECUTIVE SUMMARY OF CALEDON TRANSPORTATION NEEDS STUDY The Caledon Transportation Needs Study has been undertaken as a joint project by the Town of Caledon and the Region of Peel to determine the existing

More information

CITY OF HAMILTON PLANNING AND ECONOMIC DEVELOPMENT DEPARTMENT Transportation Planning and Parking Division

CITY OF HAMILTON PLANNING AND ECONOMIC DEVELOPMENT DEPARTMENT Transportation Planning and Parking Division CITY OF HAMILTON PLANNING AND ECONOMIC DEVELOPMENT DEPARTMENT Transportation Planning and Parking Division TO: Chair and Members Public Works Committee COMMITTEE DATE: June 18, 2018 SUBJECT/REPORT NO:

More information

TRAFFIC IMPACT ANALYSIS OF PROPOSED CHESTNUT HILL COLLEGE MASTER PLAN DEVELOPMENT

TRAFFIC IMPACT ANALYSIS OF PROPOSED CHESTNUT HILL COLLEGE MASTER PLAN DEVELOPMENT TRAFFIC IMPACT ANALYSIS OF PROPOSED CHESTNUT HILL COLLEGE MASTER PLAN DEVELOPMENT Prepared by Orth-Rodgers & Associates, Inc. December 14, 2009 Updated November 9, 2010 230 South Broad Street Philadelphia

More information

4 COMMUNITY SAFETY ZONES WALTER SCOTT PUBLIC SCHOOL AND ROSELAWN PUBLIC SCHOOL TOWN OF RICHMOND HILL

4 COMMUNITY SAFETY ZONES WALTER SCOTT PUBLIC SCHOOL AND ROSELAWN PUBLIC SCHOOL TOWN OF RICHMOND HILL 4 COMMUNITY SAFETY ZONES WALTER SCOTT PUBLIC SCHOOL AND ROSELAWN PUBLIC SCHOOL TOWN OF RICHMOND HILL The Transportation Services Committee recommends the adoption of the recommendations contained in the

More information

Public Information Centre

Public Information Centre WELCOME Public Information Centre Father Tobin Road Lougheed Middle School - Library Wednesday November 7, 2012 7:00 p.m.to 9:00 p.m. Please sign in Neighbourhood Traffic Calming Guide Background The City

More information

Roadways. Roadways III.

Roadways. Roadways III. Introduction 97 Roadway Design Principles 98 Safe Speeds 99 Optimizing of Street Space 00 Minimum Lane Widths in the City of Boston 02 Design Features that Reduce Operating Speeds 05 Travel Lanes Transit

More information

Richmond-Adelaide Cycle Tracks

Richmond-Adelaide Cycle Tracks Public Drop-In Event Richmond-Adelaide Cycle Tracks June 25, 2018 12:00 p.m. 3:00 p.m. 4:30 p.m. 7:30 p.m. Metro Hall, Rotunda 55 John Street 1 Purpose of Event In Scope Communicate an update about the

More information

2. NORTEL CARLING CAMPUS EXPANSION - PROPOSED MODIFICATIONS TO MOODIE DRIVE (REGIONAL ROAD 59) AND HIGHWAY 417 INTERCHANGE

2. NORTEL CARLING CAMPUS EXPANSION - PROPOSED MODIFICATIONS TO MOODIE DRIVE (REGIONAL ROAD 59) AND HIGHWAY 417 INTERCHANGE 2. NORTEL CARLING CAMPUS EXPANSION - PROPOSED MODIFICATIONS TO MOODIE DRIVE (REGIONAL ROAD 59) AND HIGHWAY 417 INTERCHANGE COMMITTEE RECOMMENDATIONS AS AMENDED That Council approve: 1. The endorsement

More information

Moving Cambridge. City of Cambridge Transportation Master Plan Public Consultation Centre. March 7, :00 8:00 PM.

Moving Cambridge. City of Cambridge Transportation Master Plan Public Consultation Centre. March 7, :00 8:00 PM. City of Cambridge Transportation Master Plan Public Consultation Centre March 7, 2018 5:00 8:00 PM Region of Waterloo City of Cambridge Transportation Master Plan Public Consultation Centre March 7, 2018

More information

MUTCD Part 6G: Type of Temporary Traffic Control Zone Activities

MUTCD Part 6G: Type of Temporary Traffic Control Zone Activities MUTCD Part 6G: Type of Temporary Traffic Control Zone Activities 6G.01 Typical Applications Each temporary traffic control (TTC) zone is different. Many variables, such as location of work, highway type,

More information

OFFICE/RETAIL DEVELOPMENT 1625 BANK STREET OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for: Canada Inc.

OFFICE/RETAIL DEVELOPMENT 1625 BANK STREET OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for: Canada Inc. OFFICE/RETAIL DEVELOPMENT 1625 BANK STREET OTTAWA, ONTARIO TRANSPORTATION BRIEF Prepared for: 9402209 Canada Inc. December 15, 2015 115-625 Report_2.doc D. J. Halpenny & Associates Ltd. Consulting Transportation

More information

City of White Rock. Strategic Transportation Plan. May 16, 2005

City of White Rock. Strategic Transportation Plan. May 16, 2005 City of White Rock Strategic Transportation Plan May 16, 2005 1 Outline Scope of Plan & Approach Council input and direction Key issues based on existing conditions Range of strategies to consider? Next

More information

Edenbrook Hill Drive Traffic Calming Study

Edenbrook Hill Drive Traffic Calming Study WELCOME Public Information Centre Edenbrook Hill Drive Traffic Calming Study Fletchers Meadow Secondary School Wednesday January 20, 2016 6:30 p.m.to 9:00 p.m. Please sign in Neighbourhood Traffic Calming

More information

Lincoln Avenue Road Diet Trial

Lincoln Avenue Road Diet Trial Lincoln Avenue Road Diet Trial Data Collection Report June 1, 2015 Department of Transportation Table of Contents I. Introduction...... 3 II. Data Collection Methodology & Results...... 5 A. Traffic Volume

More information

CITY OF WEST KELOWNA COUNCIL POLICY MANUAL

CITY OF WEST KELOWNA COUNCIL POLICY MANUAL CITY OF WEST KELOWNA COUNCIL POLICY MANUAL Page 1 of 7 DEPARTMENT: Engineering Services SUBJECT: Traffic Calming Policy (Revised June 6, 2017) Policy Statement: The provision of traffic calming measures

More information

5 REQUEST FOR GRADE-SEPARATED PEDESTRIAN UNDERPASS CROSSINGS OF LESLIE STREET AND ST. JOHN S SIDEROAD TOWN OF AURORA

5 REQUEST FOR GRADE-SEPARATED PEDESTRIAN UNDERPASS CROSSINGS OF LESLIE STREET AND ST. JOHN S SIDEROAD TOWN OF AURORA 5 REQUEST FOR GRADE-SEPARATED PEDESTRIAN UNDERPASS CROSSINGS OF LESLIE STREET AND ST. JOHN S SIDEROAD TOWN OF AURORA The Transportation Services Committee recommends the adoption of the recommendations

More information

Traffic Control Signals Review 4325 McCowan Road

Traffic Control Signals Review 4325 McCowan Road REPORT FOR ACTION Traffic Control Signals Review 4325 McCowan Road Date: March 15, 2018 To: Scarborough Community Council From: Director, Transportation Services, Scarborough District Wards: Ward 41 Scarborough

More information

M-58 HIGHWAY ACCESS MANAGEMENT STUDY Mullen Road to Bel-Ray Boulevard. Prepared for CITY OF BELTON. May 2016

M-58 HIGHWAY ACCESS MANAGEMENT STUDY Mullen Road to Bel-Ray Boulevard. Prepared for CITY OF BELTON. May 2016 M-58 HIGHWAY ACCESS MANAGEMENT STUDY Prepared for CITY OF BELTON By May 2016 Introduction Missouri State Highway 58 (M-58 Highway) is a major commercial corridor in the City of Belton. As development has

More information

CITY OF OTTAWA ROADWAY MODIFICATION APPROVAL UNDER DELEGATED AUTHORITY

CITY OF OTTAWA ROADWAY MODIFICATION APPROVAL UNDER DELEGATED AUTHORITY RMA-2015-ATM-038 CITY OF OTTAWA ROADWAY MODIFICATION APPROVAL UNDER DELEGATED AUTHORITY DATE: April 22, 2015 SUBJECT Approval of Roadway Modifications Recommended through an Area Traffic Management Study

More information

DEPARTMENT OF ENVIRONMENTAL SERVICES. North Harrison Street (Lee Highway to Little Falls Road) Comparative Analysis. Prepared for:

DEPARTMENT OF ENVIRONMENTAL SERVICES. North Harrison Street (Lee Highway to Little Falls Road) Comparative Analysis. Prepared for: DEPARTMENT OF ENVIRONMENTAL SERVICES North Harrison Street (Lee Highway to Little Falls Road) Comparative Analysis Prepared for: Arlington County Department of Environmental Services 2100 Clarendon Boulevard,

More information

Northern Virginia Express Lanes Design Challenges and Solutions. IBTTA Maintenance and Roadway Operations Workshop June 25, 2018

Northern Virginia Express Lanes Design Challenges and Solutions. IBTTA Maintenance and Roadway Operations Workshop June 25, 2018 Northern Virginia Express Lanes Design Challenges and Solutions IBTTA Maintenance and Roadway Operations Workshop June 25, 2018 Virginia Express Lanes Overview 60 miles of managed lanes (4 projects) Long

More information

Preliminary Transportation Analysis

Preliminary Transportation Analysis Preliminary Transportation Analysis Goals of a Robust, Multimodal Transportation Network Safe Accessible/Connected Efficient Comfortable Context-Sensitive Motor Vehicle: Continue to analyze the data to

More information

VIVA RETIREMENT COMMUNITIES OAKVILLE TRAFFIC IMPACT STUDY

VIVA RETIREMENT COMMUNITIES OAKVILLE TRAFFIC IMPACT STUDY VIVA RETIREMENT COMMUNITIES OAKVILLE TRAFFIC IMPACT STUDY VIVA RETIREMENT COMMUNITIES OAKVILLE TRAFFIC IMPACT STUDY DECEMBER 2012 READ, VOORHEES & ASSOCIATES TORONTO, ONTARIO Read, Voorhees & Associates

More information

TRANSPORTATION ANALYSIS REPORT US Route 6 Huron, Erie County, Ohio

TRANSPORTATION ANALYSIS REPORT US Route 6 Huron, Erie County, Ohio TRANSPORTATION ANALYSIS REPORT US Route 6 Huron, Erie County, Ohio December 12, 2012 Prepared for: The City of Huron 417 Main Huron, OH 44839 Providing Practical Experience Technical Excellence and Client

More information

Improving Cyclist Safety at the Dundas Street West and Sterling Road Intersection

Improving Cyclist Safety at the Dundas Street West and Sterling Road Intersection STAFF REPORT ACTION REQUIRED Improving Cyclist Safety at the Dundas Street West and Sterling Road Intersection Date: August 17, 2012 To: From: Wards: Reference Number: Public Works and Infrastructure Committee

More information

BLUE SEA VILLAGE MER BLEUE 2159 MER BLEUE ROAD OTTAWA, ONTARIO TRANSPORTATION IMPACT ASSESSMENT. Prepared for: Ontario Limited.

BLUE SEA VILLAGE MER BLEUE 2159 MER BLEUE ROAD OTTAWA, ONTARIO TRANSPORTATION IMPACT ASSESSMENT. Prepared for: Ontario Limited. BLUE SEA VILLAGE MER BLEUE 2159 MER BLEUE ROAD OTTAWA, ONTARIO TRANSPORTATION IMPACT ASSESSMENT Prepared for: 2534189 Ontario Limited April 6, 2018 117-668 TIA Report_2.doc D. J. Halpenny & Associates

More information

1. Provide a dedicated westbound approach bus lane at the intersection;

1. Provide a dedicated westbound approach bus lane at the intersection; 3. MODIFICATIONS AT HIGHWAY 417 WESTBOUND OFF-RAMP/PINCREST ROAD - PUBLIC HEARING COMMITTEE RECOMMENDATIONS Having held a public hearing, that Council approve the preliminary design for the proposed modifications

More information

Mineral Avenue Corridor Assessment. ITE 2017 Western District Annual Meeting San Diego, CA June 21 st

Mineral Avenue Corridor Assessment. ITE 2017 Western District Annual Meeting San Diego, CA June 21 st Mineral Avenue Corridor Assessment ITE 2017 Western District Annual Meeting San Diego, CA June 21 st Biography - Aaron Heumann, PE, PTOE Currently City of Littleton Transportation Engineering Manager 24

More information

Evaluation of M-99 (Broad Street) Road Diet and Intersection Operational Investigation

Evaluation of M-99 (Broad Street) Road Diet and Intersection Operational Investigation Evaluation of M-99 (Broad Street) Road Diet and Intersection Operational Investigation City of Hillsdale, Hillsdale County, Michigan June 16, 2016 Final Report Prepared for City of Hillsdale 97 North Broad

More information

REVIEW OF LOCAL TRAFFIC FLOW / LONG RANGE PLANNING SOLUTIONS STUDY

REVIEW OF LOCAL TRAFFIC FLOW / LONG RANGE PLANNING SOLUTIONS STUDY ITEM Town of Atherton TRANSPORTATION COMMITTEE STAFF REPORT TO: FROM: MEMBERS OF THE COMMITTEE ROBERT OVADIA, PUBLIC WORKS DIRECTOR DATE: FEBRUARY 12, 2019 SUBJECT: REVIEW OF LOCAL TRAFFIC FLOW / LONG

More information

KING STREET TRANSIT PILOT

KING STREET TRANSIT PILOT STREET TRANSIT PILOT Update toronto.ca/kingstreetpilot #kingstreetpilot HIGHLIGHTS PREVIOUS HIGHLIGHTS TRANSIT RELIABILITY TRANSIT TRAVEL TIMES 85% of streetcars arriving within 4 minutes westbound during

More information

Memorandum. Fund Allocation Fund Programming Policy/Legislation Plan/Study Capital Project Oversight/Delivery Budget/Finance Contract/Agreement Other:

Memorandum. Fund Allocation Fund Programming Policy/Legislation Plan/Study Capital Project Oversight/Delivery Budget/Finance Contract/Agreement Other: Memorandum Date: November 20, 2017 To: Transportation Authority Board From: Eric Cordoba Deputy Director Capital Projects Subject: 12/5/17 Board Meeting: San Francisco Freeway Corridor Management Study

More information

Welcome. If you have any questions or comments on the project, please contact:

Welcome. If you have any questions or comments on the project, please contact: Welcome This drop-in public open house is intended to provide information about the Bay Street bike lanes project. This project proposes a dedicated cycling facility along Bay Street between Aberdeen Avenue

More information

5858 N COLLEGE, LLC N College Avenue Traffic Impact Study

5858 N COLLEGE, LLC N College Avenue Traffic Impact Study 5858 N COLLEGE, LLC nue Traffic Impact Study August 22, 2016 Contents Traffic Impact Study Page Preparer Qualifications... 1 Introduction... 2 Existing Roadway Conditions... 5 Existing Traffic Conditions...

More information

3 FRAMEWORK FOR IMPLEMENTATION OF LAKE-TO-LAKE CYCLING ROUTE

3 FRAMEWORK FOR IMPLEMENTATION OF LAKE-TO-LAKE CYCLING ROUTE 3 FRAMEWORK FOR IMPLEMENTATION OF LAKE-TO-LAKE CYCLING ROUTE The Planning and Economic Development Committee recommends the adoption of the recommendations contained in the following report dated December

More information

Route 28 (South Orleans Road)/Route 39 (Harwich Road)/Quanset Road Intersection

Route 28 (South Orleans Road)/Route 39 (Harwich Road)/Quanset Road Intersection TRAFFIC FEASIBILITY STUDY Route 28 (South Orleans Road)/Route 39 (Harwich Road)/Quanset Road Intersection Orleans, Massachusetts Prepared for: Town of Orleans Prepared by: Fay, Spofford & Thorndike, LLC

More information

NEW YORK CENTRAL PARK SUBDIVISION BLAIS STREET/ST-PIERRE STREET EMBRUN, ONTARIO TRAFFIC IMPACT STUDY. Prepared for:

NEW YORK CENTRAL PARK SUBDIVISION BLAIS STREET/ST-PIERRE STREET EMBRUN, ONTARIO TRAFFIC IMPACT STUDY. Prepared for: NEW YORK CENTRAL PARK SUBDIVISION BLAIS STREET/ST-PIERRE STREET EMBRUN, ONTARIO TRAFFIC IMPACT STUDY Prepared for: Solidex Holdings Limited & Investissement Maurice Lemieux Investments Attn: Mr. Anthony

More information

Mathematics of Planet Earth Managing Traffic Flow On Urban Road Networks

Mathematics of Planet Earth Managing Traffic Flow On Urban Road Networks Mathematics of Planet Earth Managing Traffic Flow On Urban Road Networks Adrian George Manager Network Improvements Anthony Fitts Manager Signal Design Melbourne s transport demands are growing 5m people

More information

RapidRide Roosevelt Seat Sea t t le t le Depa De r pa t r men men t of Sept T an r sp an or sp t or a t t a ion

RapidRide Roosevelt Seat Sea t t le t le Depa De r pa t r men men t of Sept T an r sp an or sp t or a t t a ion RapidRide Roosevelt Seattle Bicycle Advisory Board 1 Our mission, vision, and core values Mission: deliver a high-quality transportation system for Seattle Vision: connected people, places, and products

More information

Purpose: Financial Implications and Impact Statement: It is estimated that the cost to implement:

Purpose: Financial Implications and Impact Statement: It is estimated that the cost to implement: Various Modifications Lower Jarvis Street and Lake Shore Boulevard East; Lower Jarvis Street, east side, between Lake Shore Boulevard East and The Esplanade - 45-77 Lower Jarvis Street; and Lower Jarvis

More information

Welcome to the Open House

Welcome to the Open House Leslie Street Between 19 th Avenue and Stouffville Road Addendum to Class Environmental Assessment Study Welcome to the Open House Please sign in at the front desk. March 28, 2017 Richmond Green Sports

More information

2.2 TRANSIT VISION 2040 FROM VISION TO ACTION. Emphasize transit priority solutions STRATEGIC DIRECTION

2.2 TRANSIT VISION 2040 FROM VISION TO ACTION. Emphasize transit priority solutions STRATEGIC DIRECTION TRANSIT VISION 2040 FROM VISION TO ACTION TRANSIT VISION 2040 defines a future in which public transit maximizes its contribution to quality of life with benefits that support a vibrant and equitable society,

More information

Harbord Street and Hoskin Avenue Bicycle Lane Upgrades

Harbord Street and Hoskin Avenue Bicycle Lane Upgrades STAFF REPORT ACTION REQUIRED and Bicycle Lane Upgrades Date: April 22, 2014 To: From: Wards: Reference Number: Public Works and Infrastructure Committee General Manager, Transportation Services 19 and

More information

P.O. Box 1749 Halifax, Nova Scotia B3J 3A5 Canada Item No Halifax Regional Council September 18, 2018

P.O. Box 1749 Halifax, Nova Scotia B3J 3A5 Canada Item No Halifax Regional Council September 18, 2018 P.O. Box 1749 Halifax, Nova Scotia B3J 3A5 Canada Item No. 14.1.6 Halifax Regional Council September 18, 2018 TO: SUBMITTED BY: Mayor Savage and Members of Halifax Regional Council Original Signed Jacques

More information

Welcome to the McKenzie Interchange Project Open House!

Welcome to the McKenzie Interchange Project Open House! Welcome to the McKenzie Interchange Project Open House! Purpose of Open House To provide you with information regarding the project and for you to have the opportunity to share your input on design concepts.

More information

Shockoe Bottom Preliminary Traffic and Parking Analysis

Shockoe Bottom Preliminary Traffic and Parking Analysis Shockoe Bottom Preliminary Traffic and Parking Analysis Richmond, Virginia August 14, 2013 Prepared For City of Richmond Department of Public Works Prepared By 1001 Boulders Pkwy Suite 300, Richmond, VA

More information

A127/A130 Fairglen Interchange Improvement Schemes. Information Leaflet February 2017

A127/A130 Fairglen Interchange Improvement Schemes. Information Leaflet February 2017 A127/A130 Fairglen Interchange Improvement Schemes Information Leaflet February 2017 1 2 Foreword By Councillor Kevin Bentley Essex is continuing to grow as a vibrant economic hub and as a fantastic place

More information

Gateway Transportation Study

Gateway Transportation Study Gateway Transportation Study Amherst, Massachusetts SUBMITTED TO University of Massachusetts Amherst Town of Amherst SUBMITTED BY Vanasse Hangen Brustlin, Inc. Watertown, Massachusetts March 213 Back of

More information

25th Avenue Road Diet Project A One Year Evaluation. Transportation Fund for Clean Air Project #05R07

25th Avenue Road Diet Project A One Year Evaluation. Transportation Fund for Clean Air Project #05R07 25th Avenue Road Diet Project A One Year Evaluation Transportation Fund for Clean Air Project #05R07 Submitted by: The San Francisco Municipal Transportation Agency Dan Provence May 22, 2009 EXECUTIVE

More information

Multimodal Approach to Planning & Implementation of Transit Signal Priority within Montgomery County Maryland

Multimodal Approach to Planning & Implementation of Transit Signal Priority within Montgomery County Maryland Multimodal Approach to Planning & Implementation of Transit Signal Priority within Montgomery County Maryland A Path to Successful Implementation James Allday Bunch - Sabra, Wang & Associates, Inc. ITS

More information

Chapter 4 Traffic Analysis

Chapter 4 Traffic Analysis Chapter 4 Traffic Analysis PURPOSE The traffic analysis component of the K-68 Corridor Management Plan incorporates information on the existing transportation network, such as traffic volumes and intersection

More information

Bicycle Traffic Control Signal - St. Clair Avenue West and Poplar Plains Road

Bicycle Traffic Control Signal - St. Clair Avenue West and Poplar Plains Road PW17.11 REPORT FOR ACTION Bicycle Traffic Control Signal - St. Clair Avenue West and Poplar Plains Road Date: November 4, 2016 To: Public Works and Infrastructure Committee From: Acting General Manager,

More information

Transportation Assessment

Transportation Assessment Transportation Assessment Midtown Open House February 10, 2018 Overview Midtown in Focus Overview & Purpose of Today Transportation Assessment overview Summary of Transportation work to date Review & Analysis

More information

Rebuilding Highway 7 Town Centre Boulevard to Sciberras Road

Rebuilding Highway 7 Town Centre Boulevard to Sciberras Road Rebuilding Highway 7 Town Centre Boulevard to Sciberras Road Project Status Update Presentation to City of Markham Development Services Committee October 22, 2013 Presentation Outline Background Status

More information

Frequently Asked Questions (FAQ)

Frequently Asked Questions (FAQ) Frequently Asked s (FAQ) Study Process... 2 Rapid Transit Service and Operations... 5 Public Consultation... 8 Business Impacts... 8 Design and Property Impacts... 9 Construction Impacts...12 Traffic,

More information

Traffic Congestion Management and Traffic Signal Coordination

Traffic Congestion Management and Traffic Signal Coordination STAFF REPORT ACTION REQUIRED Traffic Congestion Management and Traffic Signal Coordination Date: April 30, 2013 To: From: Wards: Reference Number: Public Works and Infrastructure Committee General Manager,

More information

APPENDIX 2 LAKESHORE ROAD TRANSPORTATION REVIEW STUDY EXECUTIVE SUMMARY

APPENDIX 2 LAKESHORE ROAD TRANSPORTATION REVIEW STUDY EXECUTIVE SUMMARY APPENDIX 2 LAKESHORE ROAD TRANSPORTATION REVIEW STUDY EXECUTIVE SUMMARY Appendix 2 City of Mississauga Lakeshore Road FINAL REPORT Transportation Review Study December 2010 EXECUTIVE SUMMARY Study Purpose

More information

2. KING EDWARD AVENUE AND ST. PATRICK STREET - SAFETY IMPROVEMENT

2. KING EDWARD AVENUE AND ST. PATRICK STREET - SAFETY IMPROVEMENT 2. KING EDWARD AVENUE AND ST. PATRICK STREET - SAFETY IMPROVEMENT COMMITTEE RECOMMENDATION That Council approve the construction of the proposed modifications for the intersection of King Edward Avenue

More information

OTTAWA TRAIN YARDS PHASE 3 DEVELOPMENT CITY OF OTTAWA TRANSPORTATION IMPACT STUDY. Prepared for:

OTTAWA TRAIN YARDS PHASE 3 DEVELOPMENT CITY OF OTTAWA TRANSPORTATION IMPACT STUDY. Prepared for: OTTAWA TRAIN YARDS PHASE 3 DEVELOPMENT CITY OF OTTAWA TRANSPORTATION IMPACT STUDY Prepared for: The Ottawa Train Yards Inc. 223 Colonnade Road South, Suite 212 Nepean, Ontario K2E 7K3 January 17, 2012

More information

INDUSTRIAL BUILDING 3009 HAWTHORNE ROAD CITY OF OTTAWA TRANSPORTATION OVERVIEW REVISED. Prepared for: Canada Inc.

INDUSTRIAL BUILDING 3009 HAWTHORNE ROAD CITY OF OTTAWA TRANSPORTATION OVERVIEW REVISED. Prepared for: Canada Inc. INDUSTRIAL BUILDING 3009 HAWTHORNE ROAD CITY OF OTTAWA TRANSPORTATION OVERVIEW REVISED Prepared for: 7849648 Canada Inc. Octiober 1, 2015 114-598 Overview_2.doc D. J. Halpenny & Associates Ltd. Consulting

More information

Appendix A. Road Classification Review of Outstanding Issues and Proposed Classifications (All Wards) Staff Report Road Classification System

Appendix A. Road Classification Review of Outstanding Issues and Proposed Classifications (All Wards) Staff Report Road Classification System Appendix A Road Classification Review of Outstanding Issues and Proposed Classifications (All Wards) Staff Report 2000 A.1 of A.10 A.2 of A.10 STAFF REPORT January 26, 2000 To: From: Works Committee Barry

More information

ECONOMY PEOPLE ENVIRONMENT

ECONOMY PEOPLE ENVIRONMENT Report Back on Local Transit Improvements May 29, 2013 ECONOMY PEOPLE ENVIRONMENT Intro Council Requested Report Back Topics Progress on Planning for Broadway Subway False Creek Bridges Local Transit Improvements

More information

Southwest Bus Rapid Transit (SW BRT) Functional Planning Study - Executive Summary January 19 LPT ATTACHMENT 2.

Southwest Bus Rapid Transit (SW BRT) Functional Planning Study - Executive Summary January 19 LPT ATTACHMENT 2. Southwest Bus Rapid Transit (SW BRT) Functional Planning Study - Executive Summary 2011 January 19 1 of 19 Introduction This executive summary presents the results of the Southwest Bus Rapid Transit (SW

More information

2.0 LANE WIDTHS GUIDELINE

2.0 LANE WIDTHS GUIDELINE 2.0 LANE WIDTHS GUIDELINE Road Engineering Design Guidelines Version 2.0.1 May 2018 City of Toronto, Transportation Services City of Toronto Page 0 Background In early 2014, Transportation Services initiated

More information

NEWMARKET CENTRE Mobility Hub Profile

NEWMARKET CENTRE Mobility Hub Profile Mobility Hub Profile Dundas Newmarket West-Bloor Centre Anchor Hub Gateway Hub N MOBILITY HUBS: Places of connectivity between regional and rapid transit services, where different modes of transportation

More information

Bellevue Downtown Association Downtown Bike Series

Bellevue Downtown Association Downtown Bike Series Bellevue Downtown Association Downtown Bike Series Meeting 2 Franz Loewenherz Andreas Piller Kyle Potuzak Chris Long October 26, 2017 Today s Agenda: 1) Meeting Purpose 2) 9/28 Meeting Recap 3) Candidate

More information

Enclosure 1. Crimson Drive Traffic Safety and Calming Review Report

Enclosure 1. Crimson Drive Traffic Safety and Calming Review Report Enclosure 1 Crimson Drive Traffic Safety and Calming Review Report Prepared by: Tahir Hameed, P.Eng. Traffic Safety Engineer Planning Engineering and Safety Transportation Planning and Engineering Date:

More information

DOWNTOWN TUPELO MAIN STREET: ROAD DIET STUDY

DOWNTOWN TUPELO MAIN STREET: ROAD DIET STUDY DOWNTOWN TUPELO MAIN STREET: ROAD DIET STUDY Since mid-2009, RPM Transportation Consultants (RPM) has worked with the Downtown Tupelo Main Street Association to evaluate traffic conditions and potential

More information

EXECUTIVE SUMMARY Callan Park accommodates travel from a wide range of transport modes, including walking, cycling, bus and light rail.

EXECUTIVE SUMMARY Callan Park accommodates travel from a wide range of transport modes, including walking, cycling, bus and light rail. TRANSPORT AND ACCESS EXECUTIVE SUMMARY Callan Park accommodates travel from a wide range of transport modes, including walking, cycling, bus and light rail. Whilst there are some walking facilities within

More information

1609 E. FRANKLIN STREET HOTEL TRAFFIC IMPACT STUDY EXECUTIVE SUMMARY

1609 E. FRANKLIN STREET HOTEL TRAFFIC IMPACT STUDY EXECUTIVE SUMMARY 1609 E. FRANKLIN STREET HOTEL TRAFFIC IMPACT STUDY EXECUTIVE SUMMARY Prepared for: The Town of Chapel Hill Public Works Department Traffic Engineering Division Prepared by: HNTB North Carolina, PC 343

More information

CONNECTED VEHICLE PILOT DEPLOYMENT PROGRAM

CONNECTED VEHICLE PILOT DEPLOYMENT PROGRAM CONNECTED VEHICLE PILOT DEPLOYMENT PROGRAM August 2, 2016 Presentation Concept Pilot Location Deployment Characteristics Use Cases Application Overview 2 Concept Demonstrate and measure the impact of Connected

More information

Traffic Impact Analysis Chatham County Grocery Chatham County, NC

Traffic Impact Analysis Chatham County Grocery Chatham County, NC Chatham County Grocery Chatham County, NC TABLE OF CONTENTS 1. INTRODUCTION... 1 1.1. Location and Study Area... 1 1.2. Proposed Land Use and Access... 2 1.3. Adjacent Land Uses... 2 1.4. Existing ways...

More information

WELCOME. Stakeholder Involvement Group Meeting #2 Round Lake Public Works October 24, 2018

WELCOME. Stakeholder Involvement Group Meeting #2 Round Lake Public Works October 24, 2018 WELCOME Stakeholder Involvement Group Meeting #2 Round Lake Public Works October 24, 2018 MEETING AGENDA 1. Welcome and Introductions 2. Study Progress Update 3. Problem Statement 4. Technical Analysis

More information

NORTH TURNAROUND. Recommended Design: Expand the existing transit terminal

NORTH TURNAROUND. Recommended Design: Expand the existing transit terminal NORTH TURNAROUND Recommended Design: Expand the existing transit terminal Feedback from stakeholders and the public: Make it easy to transfer between local and Rapid Transit service Why is this design

More information