Implementing Actuated Signal-Controlled Intersection Capacity Analysis with Pedestrians

Size: px
Start display at page:

Download "Implementing Actuated Signal-Controlled Intersection Capacity Analysis with Pedestrians"

Transcription

1 Ipleenting Atuated Signal-Controlled Intersetion Capaity Analysis with Pedestrians DingXin Cheng, Zong Z. Tian, and Honghao Liu For an atuated signalized intersetion, pedestrian alls are likely to affet the effetive greens serving the vehile oveents, whih affet the apaity and delay of the intersetion. However, the urrent proedure in the Highway Capaity Manual 2000 (HCM) for analyzing atuated signalized intersetions treats pedestrian rossing and tiing statially, with either pedestrian alls at all signal yles or no pedestrians at all. In reality, pedestrian arrivals are rando events with soe yles having ore pedestrians than others and other yles having no pedestrian all at all. This paper deonstrates that the urrent proedure an lead to erroneous results in apaity and delay estiations. A odel is introdued to overoe the shortoings in the urrent proedure. The odel takes into aount the stohasti nature of pedestrian rossings and their effets. The odel oputes the probability of having pedestrian alls in a yle and the orresponding apaities and delays for traffi oveents. An ipleentation fraework was developed to help pratitioners ondut apaity analyses using the odel. The odel s results on a seiatuated signalontrolled intersetion were oparable with the results fro the Si- Traffi irosiulation odel. The effets of pedestrians on intersetion apaity and delay were analyzed using the proposed odel. Depending on the pedestrian volue and traffi onditions, the urrent HCM proedure ould produe signifiant error, espeially when the pedestrian volue is low, beause it does not onsider the stohasti nature of pedestrian arrivals. For atuated signalized intersetions, during a signal yle in whih there is a pedestrian all, the pedestrian phase will be ativated with an indiation of the solid Walk interval followed by a Flashing Don t Walk (FDW) learane interval. Beause pedestrian arrivals are rando events, pedestrian alls ay our only in soe yles. When there is a pedestrian all, the orresponding green split needs to be at least the su of the Walk and the FDW intervals. However, the urrent proedure in the Highway Capaity Manual 2000 (HCM) for analyzing atuated signalized intersetions does not onsider the stohasti nature of pedestrian arrivals and tiing (). The urrent HCM proedure reoends that the phase split satisfy the pedestrian tiing regardless of the pedestrian volues even though there ay be D.-X. Cheng, Departent of Civil Engineering, California State University, Chio, CA Z. Z. Tian, Departent of Civil and Environental Engineering, University of Nevada, Reno, Mail Stop 258, Reno, NV H. Liu, Departent of Civil and Environental Engineering, M.S. 023, Texas Teh University, Lubbok, TX Corresponding author: D.-X. Cheng, dxheng@suhio.edu. Transportation Researh Reord: Journal of the Transportation Researh Board, No. 207, Transportation Researh Board of the National Aadeies, Washington, D.C., 2008, pp DOI: 0.34/207-5 no pedestrian all during soe yles. It is not a proble if the required vehile phase split is greater than the pedestrian Walk plus FDW tie. However, if the vehile deand is low and the pedestrian tie is high, the urrent HCM ethod ay not provide aurate apaity and delay estiates. The objetive of this paper is to inorporate the stohasti nature of pedestrian all events into the HCM apaity analysis proedure. Although the stohasti nature of pedestrian rossings has been entioned by researhers and pratitioners, not any analytial odels are available to address the pedestrian issues. In 2000, Tian et al. disussed the ipat of pedestrian rossing on signal oordination (2). They found that aoodating pedestrian tiing in the signal tiing is generally a better strategy fro the signal oordination point of view, beause the signal will reain oordinated even when pedestrian alls our. In 200, Tian et al. addressed the effet of pedestrians on signalized intersetion apaity on a split-phase operation (3). They developed a odel to deterine the onditions for whih the use of an exlusive pedestrian phase ight atually inrease the apaity opared with the typial split-phasing operation. In 2006 Tian and Xu developed a atheatial odel to apture the stohasti effet of pedestrians on the apaity and delay of a pedestrian oveent phase (4). The present study further extends the odel to evaluate the ipat on the intersetion apaity and delay. Furtherore, this paper provides a odeling fraework for researhers and pratitioners to ipleent the odel when analyzing atuated signalized intersetion operations. To illustrate the odel and its ipleentation, the paper inludes the following setions. First, a brief review of urrent HCM proedure to handle pedestrian all events is given. Then, an analytial odel is introdued that onsiders the stohasti nature of pedestrian alls. Next, a fraework to inorporate the proposed odel into the HCM apaity and delay analysis proedure is presented. Finally, the effet of pedestrians on apaity will be disussed and the onlusions reahed fro this study will be presented. HCM PROCEDURE AND CURRENT PRACTICE The urrent proedure in the HCM treats pedestrian alls as fixed events without onsidering their stohasti harateristis. When dealing with pedestrian rossings, the HCM reoends setting the green split to satisfy the pedestrian tiing (split) of the Walk plus FDW intervals if pedestrian phases and push buttons are provided. However, it is up to the analyst to deide whether the pedestrian split should be used to perfor the apaity analysis. A general pratie is that the vehile split is used only when the pedestrian volue is low and the pedestrian split is used when the pedestrian 25

2 26 Transportation Researh Reord 207 volue is high. However, traffi engineers do not have lear guidane on when to use pedestrian split and when not to. Most traffi analysis software that ipleents the HCM proedure does not provide ore pedestrian appliation beyond what is offered in the HCM. For exaple, Synhro (5) and the Highway Capaity Software fro MTrans (6) will display a warning essage if the input green split is less than the pedestrian tiing. The TRAFFIX software fro Dowling and Assoiates, In. (7), does not provide any warning if the vehile tiing setting violates the pedestrian tiing. Therefore, it is up to analysts to deide whether to onsider pedestrian effets or not. In suary, the urrent analytial proedure for analyzing signalized intersetions an produe either the result without pedestrian alls or the result with pedestrian alls. There are norally no differenes aong the results with different pedestrian volues, exept soe inor adjustents on the saturation flow rates based on the HCM proedure. When pedestrian volue is low and pedestrian rossings do not our in every yle, the urrent proedure overestiates the apaity for the pedestrian phase oveent and underestiates the apaity for the other oveents if the pedestrian phase split option is hosen. However, when the pedestrian split is not onsidered for a partiular phase (i.e., a onurrent phase), the urrent proedure ould underestiate the apaity for the phase and ay overestiate the apaity of other phase oveents. PROPOSED ANALYTICAL MODEL Model Developent This setion presents the developent of an analytial odel for onsidering the stohasti nature of pedestrian rossing. For easy illustration, the data in Figure are used to deonstrate the odel. This diagra will be used later in the paper to disuss the effets of pedestrians on intersetion apaity analysis based on the proposed odel. The geoetri layout and traffi deands for eah oveent are presented in Figure, in whih the north south street is a ajor street and the east west street is a inor street. To siplify the proble, only the east west pedestrian rossings are onsidered, and it is assued that the north south street has enough green tie to over pedestrian rossings on the north south approahes. The pedestrian oveent rossing the south leg is denoted as =, and the pedestrian oveent rossing the north leg is denoted as = 2. The eastbound through oveent is therefore the onurrent phase of =, and the westbound through oveent is the onurrent oveent or phase of = 2. The nubers following the turning oveent arrows are the traffi deands in vehiles per hour (veh/h), whih will be used in the exaples that follow. Beause the east west through oveent phases are the onurrent vehile phases for the two pedestrian oveents, the green splits for both through oveent phases ust satisfy the pedestrian Walk plus FDW intervals if both phases have pedestrian alls. The Walk interval is used to initiate pedestrians to enter the rosswalk, and the FDW is a learane interval that ust be long enough to allow pedestrians to safely ross the intersetion. Typially, in pratie the Walk interval is set between 4 and 7 s based on the FHWA Manual on Unifor Traffi Control Devies (8) and the FDW is deterined based on the rossing distane and an assued pedestrian walking speed, typially 4 ft/s. The HCM also inludes an equation to alulate the required pedestrian tie, whih onsiders the width of the rosswalk in the equation as well. In atuated signal operations, the aount of green tie needed for the east west inor street is governed totally by the pedestrian alls and ontroller paraeter settings, suh as the iniu green, passage tie, and axiu green. When there is no pedestrian all, the vehile phase will run the iniu green and then either gap out or extend to its axiu, depending on the vehile deands. When there is a pedestrian all, the vehile phase will run a iniu of Walk plus FDW and then either gap out or extend to the axiu. Pedestrian alls affet the length of the iniu green of a tiing phase with pedestrian push button. Furtherore, pedestrian alls affet the apaity of oveents orresponding to the previous tiing phase. Assue that pedestrian arrivals are rando and follow a Poisson distribution and x is a rando variable denoting the nuber of pedestrian alls during a yle on one approah. The average nuber of pedestrian alls per yle, λ, an be alulated fro the pedestrian volue of the oveent using Equation =2 = FIGURE Saple intersetion layout and traffi deand.

3 Cheng, Tian, and Liu 27 λ V p, equals pedestrian volue of oveent (ped/h) and C equals yle length (s). The probability of having x nuber of pedestrian alls, p x,, is obtained by x λe px, = x! The probability of having no pedestrian alls, p 0,, is obtained by 0 λ λe p0, = = e 0! The probability of having at least one pedestrian all, p, is obtained by p = p = e λ 0, ( 4) For the ase of a dual entry ontroller setup for the two onurrent vehile phases on the inor street, any one approah that has a pedestrian all will trigger the pedestrian phase, thus the two through oveent phases will extend to at least Walk plus FDW. In this ase, the probability of having at least one pedestrian all during a yle, p, is alulated by λ λ2 λ+ λ2 p = p0, = ( e e ) = e () 5 The probability of having no pedestrian alls, p 0,, is then p0 p e 2, = = ( λ + λ ) () 6 The probabilities above would not be affeted by the fat that pedestrians ross in groups. Equation 7 gives the proposed for of a apaity odel, whih deterines the apaity of oveent based on the probabilities of two apaities: the apaity without pedestrians and the apaity with pedestrians. = p0,, + p2, = p0,, + p0, 2, ( 7) = apaity for the pedestrian onurrent through oveent (veh/h);, = apaity without pedestrians (veh/h); 2, = apaity with pedestrians (veh/h); p 0, = probability of having no pedestrian alls, or equivalent to the proportion of yles that have no pedestrian alls; and p = probability of having pedestrian alls, or equivalent to the proportion of yles that have pedestrian alls. Substituting Equations 5 and 6 into Equation 7, the following equations are obtained: λ+ λ2 λ λ2 = e + e 2 8, 2, Vp, = C 3, = ( ) ( + ),, () g, = C s λ ( p) s ax g,, g = C λ ( ) ( ) () ( 2) () 3 () 9 ( 0) g, = green split without pedestrians, whih an be deterined on the basis of the ethodology developed by Webster (9); g p = green split with pedestrians, g p = walk + FDW or is alulated by the HCM equation; and s = saturation flow rate for oveent (veh/h). Delay an be alulated siilar to the way oveent apaities are alulated, as shown in Equations and 2. d = p0, d, + ( p0, ) d2, ( ) ( λ+ λ2) ( λ+ λ2) d = p0, d, + ( p0, ) d2, = e d, + [ e ]d2, ( 2) d = delay for pedestrian onurrent through oveent (s), d, = delay without pedestrians (s), and d 2, = delay with pedestrians (s). To obtain d, and d 2,, the HCM proedure or any software ipleenting the HCM proedure an be used. Model Validation with Mirosiulation To validate the analytial odel result with the atuated signal operation with pedestrian push button, the proposed odel was opared against the irosiulation results using SiTraffi by Hush and Albek (0). The SiTraffi software was hosen beause of the ease with whih stohasti pedestrian rossings with atuated signal ontrols ould be odeled. Certainly, other advaned irosiulation software an also work for this validation purpose. At first, the siulation odel was alibrated using the HCM proedure based on two ases that the HCM handles: (a) with pedestrian alls and (b) without pedestrian alls. The purpose of the alibration is to ensure that siulation results are onsistent with the two base ases above. During the alibration with the two base senarios using the HCM, adjustents were ade in SiTraffi to the following settings: detetor length, passage tie, and soe driver- and vehilerelated paraeters. After the siulation odel alibration, siulation runs were onduted using different pedestrian volues. Eah siulation was set up to have a 3-in seeding period and a 5-in siulation period, whih is onsistent with the 5-in analysis period used in the HCM. A total of 20 runs were onduted for eah pedestrian volue senario, and the average intersetion delays were seleted for oparison. The reason delay was seleted for aking oparisons is that SiTraffi does not expliitly produe apaity estiates. To opare the different odel results, Figure 2 illustrates the delays fro the SiTraffi siulation odel, the proposed odel, and the HCM results based on different pedestrian volues. Basially, the results based on the urrent HCM proedure are indiated by only two values: delay without pedestrians and delay with pedestrian alls. The HCM results with pedestrians are the sae regardless of the pedestrian volues. Figure 2 indiates that the results athed well between the SiTraffi siulation and the proposed odel. Fro a pratial point of view, the proposed odel and the siulation produed alost the sae delay results for all pedestrian volues. The HCM proedure has siilar results for only very high pedestrian volues and no pedestrian volues. For all other pedestrian volues, the HCM results are different fro the other two odels. The differene in delays

4 28 Transportation Researh Reord 207 Average Delay, se/veh HCM Max Pedestrian Volue, Ped/hr SiTraffi Proposed HCM FIGURE 2 Coparison of intersetion delays between SiTraffi and proposed odel. between the urrent HCM proedure and the SiTraffi and proposed odels an be treated as the errors of the urrent HCM proedure. As the figure indiates, the highest error is at the lower end of pedestrian volues. IMPLEMENTING THE ANALYTICAL MODEL To help pratitioners use the proposed odel to ondut apaity analysis, Figure 3 illustrates a proedure to estiate one vehile oveent with pedestrian phase when rando arrivals of pedestrians are onsidered. When dealing with a seiatuated signal operation using the proposed odel, norally only the dual entry through phase on the inor street needs to be onsidered beause typially the green split on a ajor street through oveent an aoodate the pedestrian rossing on a inor street. As indiated in the flowhart, an analyst needs to run the urrent HCM apaity proedure twie: with pedestrian all on rossing the ajor street and without pedestrian all on rossing the ajor street. Then the oveents and intersetion apaity and delay an be estiated using the proposed odel in Equations 7 and. For a fully atuated signal-ontrolled intersetion, the ase beoes ore oplex beause the yle length of the intersetion an hange with the pedestrian alls, and pedestrian alls fro both the ajor and inor streets need to be onsidered. However, the priniple of using the stohasti approah is siilar. It requires alulating the probabilities of no pedestrian alls, pedestrian alls on ajor street approahes only, pedestrian alls on inor street approahes only, and pedestrian alls on both ajor and inor streets. The su of the probabilities above ultiplied by the orresponding apaities will give the estiated intersetion apaity. Siilarly, one an obtain the delay for a fully atuated intersetion with pedestrian push buttons. SAMPLE CALCULATION A saple proble is presented in this setion to illustrate the appliations of the proposed odel. The saple proble is based on the data shown earlier in Figure. To siplify the proedure, all vehiles were Set Pedestrian Volue to Zero Calulate Delay/ Capaity Using HCM Software Copute Probability of No Pedestrian Cyle Start Obtain Intersetion Lane Configuration and Traffi Control Collet Traffi Counts and Pedestrian Counts Calulate Average Nuber of Peds Per Cyle Obtain Probability Weighted Average Delay and Capaity End Set Pedestrian Volue to Average Volue Calulate Delay/ Capaity Using HCM Software Copute Probability of Pedestrian Cyle FIGURE 3 Capaity and delay proedure onsidering stohasti pedestrian alls.

5 Cheng, Tian, and Liu 29 assued to be passenger ars and the default saturation flow rates of,900 vehiles per hour per lane (vphpl) for through oveents and,805 vphpl for left-turn oveents were used. No other adjustents on the saturation flow rate are ade. This exaple addresses the eastbound through oveent. The westbound through oveent an be analyzed using a siilar approah. In the exaple, the following paraeters are given: The intersetion uses seiatuated oordinated signal ontrol with yle length, C = 90 s; lost tie, L = 4.0 se; Walk = 6.0 s; FDW = 24.0 s; V p, = V p,2 = 20 ped/h; V p, and V p,2 are fro V p, defined previously; = for eastbound through oveent; and = 2 for westbound through oveent. Results without pedestrians: Capaity (EB), vph C=60 C=80 C=00 C=20 C=40 Y = 06. X = 074. Y = su of intersetion ritial lane flow ratios, X CI = intersetion ritial volue apaity ratio, y = eastbound through oveent ritial lane flow ratio, g, = eastbound through oveent green split (s),, = eastbound through oveent apaity (veh/h), and d, = eastbound through oveent delay (s/veh). Results with pedestrians: Y = 054. X =. y = 0. g = s p p CI y = 0. g = 77. s CI = 63 veh h d = 55. = 633 veh h d = 2. 5 Based on Equations 5 and 6:, = p, = = p = sveh sveh p 0, and p 0,2 are defined by p 0, desribed previously with = and p and p 2 are defined by p desribed previously with =. Final apaity,, and delay, d, are alulated using Equations 7 and : ( ) = = veh h ( ) = If alulated using the urrent HCM proedure, the apaity would be 633 veh/h and the delay would be 2.5 s/veh. For this eastbound through oveent, the apaity would be overestiated by 38% and the delay underestiated by 37%. It would be the opposite for the other oveents, in whih apaity would be underestiated and the delay would be overestiated at this intersetion. This exad = sveh 00 FIGURE Pedestrian Volue, ped/hr Effet of pedestrians on eastbound apaity. ple deonstrates that the urrent HCM proedure ould produe signifiant errors in apaity and delay estiations. PEDESTRIAN EFFECT ON CAPACITY On the basis of the proposed analytial odel above, the effets of pedestrian rossings on intersetion apaity and delay an be exained. For the intersetion illustrated in Figure, a wide range of pedestrian volues and different yle lengths are exained for eah oordinated seiatuated signal operation. The effets of pedestrians on the inor street through oveent (i.e., eastbound through) are illustrated in Figure 4. Figure 5 presents the pedestrian effets on the ajor street through oveent (i.e., northbound through), and Figure 6 illustrates the pedestrian effets on the intersetion apaity. For the inor street, Figure 4 reveals soe interesting findings. At first glane, the results ay see to be ounterintuitive beause higher apaities are ahieved with lower yle lengths for the eastbound Capaity (NB), vph FIGURE 5 C=40 C=20 C=00 C=80 C= Pedestrian Volue, ped/hr Effet of pedestrians on northbound apaity.

6 30 Transportation Researh Reord 207 Total Capaity, vph FIGURE 6 approah. This an be well explained by a loser exaination. For the ase of alulating the apaity with pedestrians, 2,, the eastbound phase always has the Walk plus FDW pedestrian tie. With the inrease of yle length, the g/c ratio dereases, resulting in less apaity. Although the probability of having a pedestrian all inreases with the inrease of yle length, the final weighted apaity still dereases. For the ajor street through oveent, the pedestrian effet on the apaity is just the opposite of the inor street, as indiated in Figure 5. The apaity dereases with the inrease of pedestrian volue, and a shorter yle length results in a larger derease in apaity. This is aused by the derease in the ajor street green tie due to the inrease of inor street green tie needed to aoodate inor street pedestrian splits. Figure 6 shows the overall intersetion apaity dereases with the inrease of the pedestrian volues. This is logial beause soe effetive green ties are used to aoodate the needs of inor street pedestrian alls. The ajor street, whih has higher traffi deand, has less apaity and ore delay. Therefore, the overall intersetion has less apaity when pedestrian volue inreases. Also on the basis of the odel results in Figure 6, pedestrians have less effet on longer yle lengths than on shorter yle lengths. This is reasonable beause, for the sae green tie redution on the ajor street, the resulting g/c ratio would ause a larger apaity redution on a shorter yle length than on a longer yle length. Overall, results fro the proposed odel see to be reasonable. The pedestrian effets on apaity during a wide variety of pedestrian and yle length senarios are well represented by the proposed analytial odel. SUMMARY AND CONCLUSIONS C=40 C=20 C=00 C=80 C= Pedestrian Volue, ped/hr Effet of pedestrians on intersetion apaity. A proposed analytial odel and its ipleentation ethod for analyzing atuated signalized intersetions with onsideration of the stohasti effet of pedestrian rossings were presented in this paper. Model results were opared against and validated by traffi irosiulation odel. The proposed odel overoes the shortoings of the urrent HCM proedure in whih pedestrian arrivals are treated as stati. The odel an help researhers to better understand the pedestrian ipat on various signal operation senarios. The ipleentation flowhart an also assist pratitioners in realistially oputing the apaity and delay of intersetions with atuated signal ontrols. Based on the ontents of this study, the following onlusions an be drawn: On the basis of the odel validation results using irosiulation, the proposed odel produed delay results that were onsistent with results fro SiTraffi. However, the urrent HCM proedure had apparent deviations fro the siulation results. The proposed odel iproved the urrent analytial proedure in dealing with pedestrian effets on apaity and delay estiation. On the basis of the saple alulation in this study, the urrent HCM analytial proedure ould produe signifiant errors, espeially for a inor street with low pedestrian volues. The error in the partiular saple alulations was ore than 30%. An ipleentation fraework was proposed to inorporate the odel into the urrent HCM proedures and to allow analysts to ondut apaity and delay analysis onsidering stohasti pedestrian all events. For oordinated seiatuated signal ontrols, one interesting finding fro this study was that higher pedestrian volues resulted in higher apaity and lower delay for the pedestrian-onurrent oveent. The reason is that the inor street oveent phase would be likely to get the pedestrian split, Walk plus FDW, whih was generally greater than that based on the vehile deand. Another interesting finding was that a longer yle length atually resulted in a lower apaity for the onurrent oveent. However, longer yle lengths produe an overall higher apaity for the intersetion. This paper proposed an analytial odel for dealing with pedestrian ipats on apaity and delay. It deonstrated the appliation of the odel using a seiatuated signal ontrol senario. Further study would be to expand the odel to handle fully atuated signalized intersetions. REFERENCES. Highway Capaity Manual. TRB, National Researh Counil, Washington, D.C., Tian, Z., T. Urbanik, K. Kair, M. Vandehey, and H. Long. Pedestrian Tiing Treatent on Coordinated Signal Systes. Pro., International Conferene on Traffi and Transportation Studies 2000, ASCE, Beijing, Aug Tian, Z. Z., T. Urbanik, R. Engelbreht, and K. Balke. Pedestrian Tiing Alternatives and Ipats on Coordinated Signal Systes Under Split-Phasing Operations. In Transportation Researh Reord: Journal of the Transportation Researh Board, No. 748, TRB, National Researh Counil, Washington, D.C., 200, pp Tian, Z., and F. Xu. Modeling the Effets of Pedestrians on Intersetion Capaity and Delay with Atuated Signal Control. Pro., 5th International Syposiu on Highway Capaity, Yokohaa, Japan, July Hush, D., and J. Albek. Synhro 6: Traffi Signal Software User Guide. Traffiware, Albany, Calif., Highway Capaity Software MTrans Center, University of Florida, Gainesville, TRAFFIX 7.. Dowling and Assoiates, In., Oakland, Calif., Manual on Unifor Traffi Control Devies, 2003 ed. FHWA, Washington, D.C., Webster, F. V. Traffi Signal Settings. Road Researh Tehnial Paper No. 39. Her Majesty s Stationery Offie, London, 958 (reprinted with inor aendents 969). 0. Hush, D., and J. Albek. SiTraffi 6: Traffi Siulation Software User Guide. Traffiware, Albany, Calif., The Highway Capaity and Quality of Servie Coittee sponsored publiation of this paper.

MODELLING THE EFFECTS OF PEDESTRIANS ON INTERSECTION CAPACITY AND DELAY WITH ACTUATED SIGNAL CONTROL

MODELLING THE EFFECTS OF PEDESTRIANS ON INTERSECTION CAPACITY AND DELAY WITH ACTUATED SIGNAL CONTROL MODELLING THE EFFECTS OF PEDESTRIANS ON INTERSECTION CAPACITY AND DELAY WITH ACTUATED SIGNAL CONTROL ABSTRACT Zong Tian, Ph.D., P.E. Feng Xu, Graduate Assistant Departent of Civil and Environental Engineering

More information

Comparison of the South Dakota Road Profiler with Other Rut Measurement Methods

Comparison of the South Dakota Road Profiler with Other Rut Measurement Methods TRANSPORTATION RESEARCH RECORD 1311 Comparison of the South Dakota Road Profiler ith Other Rut Measurement Methods ]AMES B. DuBosE During the fall of 1989, the Illinois Department of Transportation ompleted

More information

An improvement in calculation method for apparel assembly line balancing

An improvement in calculation method for apparel assembly line balancing Indian Journal of Fibre & Textile Research Vol.38, Septeber 2013, pp 259-264 An iproveent in calculation ethod for apparel assebly line balancing F Khosravi 1, a, A H Sadeghi 1 & F Jolai 2 1 Textile Departent,

More information

Traffic Impact Study Little Egypt Road Development Denver, North Carolina June 2017

Traffic Impact Study Little Egypt Road Development Denver, North Carolina June 2017 Traffic Impact Study Little Egypt Road Development Denver, North arolina June 2017 N. Little Egypt Road DQ\ QDQFLQJ VDOHV RU RWKHU SHUIRUPDQFH EDVHG FULWHULD Proposed Site Driveways Site Driveway 1 TRAFFI

More information

11/ This paper not to be cited without prior reference to the author. I'

11/ This paper not to be cited without prior reference to the author. I' / 11/ This paper not to be ited without prior referene to the author. I' International Counil for the Exploration of the Sea C. M. 197 2/H : 3 0 Pelagi Fish (N) Committee THE EFFECTS OF REGULATIONS OF

More information

FINITE ELEMENT ANALYSIS OF BLOOD FLOW AND APPLY OF PRESSURE IN THE HUMAN THUMB AND APPLICATIONS IN DISEASE INVENTION

FINITE ELEMENT ANALYSIS OF BLOOD FLOW AND APPLY OF PRESSURE IN THE HUMAN THUMB AND APPLICATIONS IN DISEASE INVENTION CHAPER-II FINIE ELEMEN ANALYSIS OF BLOOD FLOW AND APPLY OF PRESSURE IN HE HUMAN HUMB AND APPLICAIONS IN DISEASE INVENION his Chapter Published in International Journal of Siene and Advaned ehnology (ISSN:

More information

Driver Decision Making at Traffic Signals

Driver Decision Making at Traffic Signals TRANSPORTATION RESEARCH RECORD 1172 93 Driver Deision Making at Traffi Signals RICHARD VAN DER HORST The driving task at signalized road intersetions is simplified substantially over that at nonsignalized

More information

Effect of Pavement/Shoulder Drop-Offs on Highway Safety

Effect of Pavement/Shoulder Drop-Offs on Highway Safety Effet of Pavement/Shoulder Drop-Offs on Highway Safety John C. Glennon Transportation Consulting Engineer Overland Park, Kansas Drop-offs at the pavement/shoulder (or shoulder/roadside) edge have been

More information

Pedestrian Timing Strategies at Large Signalized Intersections

Pedestrian Timing Strategies at Large Signalized Intersections Pedestrian Timing Strategies at Large Signalized Intersections Zong Tian, Ph.D., P.E. Department of Civil & Environmental Engineering University of Nevada Reno Reno, NV 89557 OVERVIEW Safety Efficiency

More information

Application of Diamond Interchange Control Strategies at Closely Spaced Intersections

Application of Diamond Interchange Control Strategies at Closely Spaced Intersections Application of Diamond Interchange Control Strategies at Closely Spaced Intersections Zong Tian, Thomas Urbanik II, and Reed Gibby Signalized diamond interchanges are one of the most common interchange

More information

501 Interchange Design Interchange Design Considerations... 10

501 Interchange Design Interchange Design Considerations... 10 5 Interchange Design Table of Contents 51 Interchange Design... 1 51.1 General...1 51.2 Interchange Type...1 51.2.1 Diaond Interchanges... 1 51.2.1.1 Tight Urban Diaond Interchange (TUDI)... 1 51.2.1.2

More information

Rules of Hockey5s including explanations

Rules of Hockey5s including explanations Rules of Hokey5s inluding explanations Effetive from 1 January 2015 (updated 18 May 2015) Copyright FIH 2015 The International Hokey Federation Rue du Valentin 61 CH 1004, Lausanne Switzerland Telephone:

More information

Investigation on the Vortex Thermal Separation in a Vortex Tube Refrigerator

Investigation on the Vortex Thermal Separation in a Vortex Tube Refrigerator doi: 1.236/sieneasia13-1874.2.31.2 SieneAsia 31 (2): 2-223 Investigation on the Vortex Thermal Separation in a Vortex Tube Refrigerator Pongjet Promvonge* and Smith Eiamsa-ard Department of Mehanial Engineering,

More information

Rules of Hockey5 including explanations

Rules of Hockey5 including explanations Rules of Hokey5 inluding explanations Effetive from 1 September 2012 Copyright FIH 2012 The International Hokey Federation Rue du Valentin 61 CH 1004, Lausanne Switzerland Telephone: ++41 21 641 0606 Fax:

More information

IV. Environmental Impact Analysis K. Traffic, Access, and Parking

IV. Environmental Impact Analysis K. Traffic, Access, and Parking IV. Environmental Impat Analysis K. Traffi, Aess, and Parking 1. Introdution This setion analyzes the potential projet impats assoiated with traffi, aess, and parking. The analyses in this setion are based

More information

Statistical Mechanics of the Frequency Modulation of Sea Waves

Statistical Mechanics of the Frequency Modulation of Sea Waves Statistial Mehanis of the Frequeny Modulation of Sea Waves Hiroshi Tomita and Takafumi Kawamura Ship Researh Institute, Shinkawa 6-8-, Mitaka, Tokyo 8-, Japan tomita@srimot.go.jp Abstrat. The longtime

More information

Volume-to-Capacity Estimation of Signalized Road Networks for Metropolitan Transportation Planning

Volume-to-Capacity Estimation of Signalized Road Networks for Metropolitan Transportation Planning Volume-to-Capacity Estimation of Signalized Road Networks for Metropolitan Transportation Planning Hao Xu (Corresponding Author) Research Associate Department of Civil & Environmental Engineering Texas

More information

General Technical Data and Calculations

General Technical Data and Calculations 18 Bosh Rexroth AG R31EN 232 (26.4) General Produt Desription General Tehnial Data and Calulations Fores and load moments In Rexroth the running traks are arranged at a ompression angle of 45. This results

More information

Rules of Beach Hockey including explanations

Rules of Beach Hockey including explanations Rules of Beah Hokey inluding explanations Effetive from 1 June 2016 (updated 31 May 2016) Copyright FIH 2016 The International Hokey Federation Rue du Valentin 61 CH 1004, Lausanne Switzerland Telephone:

More information

Wave Force on Coastal Dike due to Tsunami

Wave Force on Coastal Dike due to Tsunami Wave Force on Coastal Dike due to Tsunai by Fuinori Kato 1, Shigeki Inagaki 2 and Masaya Fukuhaa 3 ABSTRACT This paper presents results of large-scale experients on wave force due to tsunai. A odel of

More information

HAND CALCULATION METHOD FOR AIR SUPPLY RATES IN VESTIBULE PRESSURIZATION SMOKE CONTROL SYSTEM

HAND CALCULATION METHOD FOR AIR SUPPLY RATES IN VESTIBULE PRESSURIZATION SMOKE CONTROL SYSTEM International Journal on ngineering Perforance-Based Fire odes, Volue, Nuber, p.7-40, 999 HAND AUATION MTHOD FO AI SUPPY ATS IN PSSUIZATION SMOK ONTO SYSTM M. Kujie Nikken Sekkei td, 4-6- Koraibashi, huo-ku,

More information

Race car damping 2. Fig-1 quarter car model.

Race car damping 2. Fig-1 quarter car model. Race car daping A nuber of issues ago I wrote an article on exploring approaches to specify a race car daper. This article is the second in that series and we shall be following on fro where we left off.

More information

AN OPTIMIZATION MODEL AND ALGORITHM OF STUDENTS' PHYSICAL FITNESS TEST SEQUENCE

AN OPTIMIZATION MODEL AND ALGORITHM OF STUDENTS' PHYSICAL FITNESS TEST SEQUENCE 28 th February 203. Vol. 48 3 2005-203 JATIT & LLS. All rights reserved. ISSN: 992-8645 www.jatit.org E-ISSN: 87-395 AN OPTIMIZATION MODEL AND ALGORITHM OF STUDENTS' PHYSICAL FITNESS TEST SEQUENCE JINSONG

More information

Integration of Lean Approaches to Manage a Manual Assembly System

Integration of Lean Approaches to Manage a Manual Assembly System Open Journal of Social Sciences, 204, 2, 226-23 Published Online Septeber 204 in SciRes. http://www.scirp.org/journal/jss http://dx.doi.org/0.4236/jss.204.29038 Integration of Lean Approaches to Manage

More information

Impact of Using Freeway Shoulders as Travel Lanes on Fuel Consumption

Impact of Using Freeway Shoulders as Travel Lanes on Fuel Consumption Transportation Researh Reord 901 l Impat of Using reeway Shoulders as Travel Lanes on uel Consumption WILLIM R. MCSLN general proedure, based on data derived from the merian ssoiation of State Highway

More information

MECHANICAL INTEGRITY ASSESSMENT OF A LARGE HORIZONTAL NGL PRESSURE VESSEL: CASE STUDY

MECHANICAL INTEGRITY ASSESSMENT OF A LARGE HORIZONTAL NGL PRESSURE VESSEL: CASE STUDY Abstrat MECHANICAL INEGRIY ASSESSMEN OF A LARGE HORIZONAL NGL PRESSURE VESSEL: CASE SUDY A methodology for assessing the strutural integrity of a large horizontal NGL (Natural Gas Liquid) vessel has been

More information

Intersection of Massachusetts Avenue and Maple Street in Lexington Signalized Intersection and Roundabout Comparison

Intersection of Massachusetts Avenue and Maple Street in Lexington Signalized Intersection and Roundabout Comparison Intersection of Massachusetts Avenue and Maple Street in Lexington Signalized Intersection and Roundabout Comparison Michael Wallwork, Roundabout Expert, Orange Park, Florida Tom Bertulis (MS, PE, PTOE),

More information

An Indian Journal FULL PAPER ABSTRACT KEYWORDS. Trade Science Inc.

An Indian Journal FULL PAPER ABSTRACT KEYWORDS. Trade Science Inc. [Type text] [Type text] [Type text] ISSN : 0974-7435 Volue 10 Issue 24 BioTechnology 2014 An Indian Journal FULL PAPER BTAIJ, 10(24), 2014 [15430-15434] Mechanical analysis of tennis racket and ball during

More information

Estimation of the Effect of Cadence on Gait Stability in Young and Elderly People using Approximate Entropy Technique

Estimation of the Effect of Cadence on Gait Stability in Young and Elderly People using Approximate Entropy Technique MEASUREMENT SCIENCE REVIEW, Volue 4, Section 2, 4 Estiation of the Effect of Cadence on Gait Stability in Young and Elderly People using Approxiate Entropy Technique M. Arif *, Y. Ohtaki **, R. Nagatoi

More information

The following excerpt are pages from the North American Product Technical Guide, Volume 2: Anchor Fastening, Edition 17.

The following excerpt are pages from the North American Product Technical Guide, Volume 2: Anchor Fastening, Edition 17. The following exerpt are pages from the North Amerian Produt Tehnial Guide, Volume 2: Anhor Fastening, Edition 17. Please refer to the publiation in its entirety for omplete details on this produt inluding

More information

HURRICANE SANDY LIMITED REEVALUATION REPORT UNION BEACH, NEW JERSEY DRAFT ENGINEERING APPENDIX SUB APPENDIX E OVERTOPPING & FAILURE ANALYSIS

HURRICANE SANDY LIMITED REEVALUATION REPORT UNION BEACH, NEW JERSEY DRAFT ENGINEERING APPENDIX SUB APPENDIX E OVERTOPPING & FAILURE ANALYSIS HURRICANE SANDY LIMITED REEVALUATION REPORT UNION BEACH, NEW JERSEY DRAFT ENGINEERING APPENDIX SUB APPENDIX E OVERTOPPING & FAILURE ANALYSIS Revised 18 Feb 2015 1 OVERTOPPING & FAILURE ANALYSIS 1.0 Introdution

More information

Road Conversion Study Plumas Street

Road Conversion Study Plumas Street Plumas Street Phase I Submitted to The Regional Transportation Commission of Washoe County Submitted by Zong Tian, Ph.D., P.E. Saeedeh Farivar Haiyuan Li, Ph.D. Center for Advanced Transportation Education

More information

The following excerpt are pages from the North American Product Technical Guide, Volume 2: Anchor Fastening, Edition 16.

The following excerpt are pages from the North American Product Technical Guide, Volume 2: Anchor Fastening, Edition 16. The following exerpt are pages from the North Amerian Produt Tehnial Guide, Volume 2: Anhor Fastening, Edition 16. Please refer to the publiation in its entirety for omplete details on this produt inluding

More information

The following excerpt are pages from the North American Product Technical Guide, Volume 2: Anchor Fastening, Edition 16.1.

The following excerpt are pages from the North American Product Technical Guide, Volume 2: Anchor Fastening, Edition 16.1. The following exerpt are pages from the North Amerian Produt Tehnial Guide, Volume 2: Anhor Fastening, Edition 16.1. Please refer to the publiation in its entirety for omplete details on this produt inluding

More information

ANALYSIS OF SIGNALISED INTERSECTIONS ACCORDING TO THE HIGHWAY CAPACITY MANUAL FROM THE POINT OF VIEW OF THE PROCESSES APPLIED IN HUNGARY

ANALYSIS OF SIGNALISED INTERSECTIONS ACCORDING TO THE HIGHWAY CAPACITY MANUAL FROM THE POINT OF VIEW OF THE PROCESSES APPLIED IN HUNGARY 2nd Int. Symposium in Civil Engineering 1998 Budapest ANALYSIS OF SIGNALISED INTERSECTIONS ACCORDING TO THE HIGHWAY CAPACITY MANUAL FROM THE POINT OF VIEW OF THE PROCESSES APPLIED IN HUNGARY István Styevola

More information

Chapter Capacity and LOS Analysis of a Signalized I/S Overview Methodology Scope Limitation

Chapter Capacity and LOS Analysis of a Signalized I/S Overview Methodology Scope Limitation Chapter 37 Capacity and LOS Analysis of a Signalized I/S 37.1 Overview The Highway Capacity Manual defines the capacity as the maximum howdy rate at which persons or vehicle can be reasonably expected

More information

Congruence Axioms. Data Required for Solving Oblique Triangles. 1 of 8 8/6/ THE LAW OF SINES

Congruence Axioms. Data Required for Solving Oblique Triangles. 1 of 8 8/6/ THE LAW OF SINES 1 of 8 8/6/2004 8.1 THE LAW OF SINES 8.1 THE LAW OF SINES Congrueny and Olique Triangles Derivation of the Law of Sines Appliations Amiguous Case Area of a Triangle Until now, our work with triangles has

More information

ABNORMAL GAIT CLASSIFICATION USING SILHOUETTES

ABNORMAL GAIT CLASSIFICATION USING SILHOUETTES ABNORMAL GAIT CLASSIFICATION USING SILHOUETTES S. M. H. Sithi Shameem Fathima and R. S. D. Wahida Banu 2 Syed Ammal Engineering College, Ramanathapuram, Tamilnadu, India 2 Government College of Engineering,

More information

Probabilistic Models for Pedestrian Capacity and Delay at Roundabouts

Probabilistic Models for Pedestrian Capacity and Delay at Roundabouts Probabilistic Models for Pedestrian Capacity and Delay at Roundabouts HEUNGUN OH Doctoral Candidate VIRGINIA P. SISIOPIKU Assistant Professor Michigan State University Civil and Environmental Engineering

More information

BKTA: 3-way change-over ball valve (T) with male thread, PN 40

BKTA: 3-way change-over ball valve (T) with male thread, PN 40 BKTA: 3-way hange-over ball valve (T) with male thread, PN 40 ow energy effiieny is improved Effiieny means preise hangeover with minimum leakage Features 3-way hange-over ball valve with T-bore for use

More information

Analysis of a Twin Screw Expander for ORC Systems using Computational Fluid Dynamics with a Real Gas Model

Analysis of a Twin Screw Expander for ORC Systems using Computational Fluid Dynamics with a Real Gas Model Purdue University Purdue e-pubs International Compressor Engineering Conferene Shool of Mehanial Engineering 2014 Analysis of a Twin Srew Expander for ORC Systems using Computational Fluid Dynamis with

More information

Wind energy potential of Ban village

Wind energy potential of Ban village Available online at www.pelagiaresearhlibrary.om Advanes in Applied Siene Researh, 2013, 4(3):220-225 ISSN: 0976-8610 CODEN (USA): AASRFC Wind energy potential of Ban village Maren. I. Borok 1, Gyang Y.

More information

EMPLOYER SAMPLE PROCEDURES FOR HEAT ILLNESS PREVENTION

EMPLOYER SAMPLE PROCEDURES FOR HEAT ILLNESS PREVENTION EMPLOYER SAMPLE PROCEDURES FOR HEAT ILLNESS PREVENTION FEB 2010 California Employers with any outdoor plaes of employment must omply with the Heat Illness Prevention Standard T8 CCR 3395. These proedures

More information

Exercise 1 Network Planning Design. Teresa Grilo Dep. of Engineering and Management Instituto Superior Técnico Lisbon, Portugal

Exercise 1 Network Planning Design. Teresa Grilo Dep. of Engineering and Management Instituto Superior Técnico Lisbon, Portugal Exercise 1 Network Planning Design Teresa Grilo Dep. of Engineering and Manageent Instituto Superior Técnico Lisbon, Portugal SCM/IST 1 SCM/IST IST Lisbon Ana Ana Carvalho 2015 2015 Introduction Find the

More information

VKR: 2-way regulating ball valve with female thread, PN 40

VKR: 2-way regulating ball valve with female thread, PN 40 Produt data sheet 7.1 56.090 VKR: 2-way regulating ball valve with female thread, PN 40 ow energy effiieny is improved Effiieny means preise ontrol and working with minimum leakage Features 2-way regulating

More information

Recommendations on Two Acceleration Measurements with Low Strain Integrity Test

Recommendations on Two Acceleration Measurements with Low Strain Integrity Test Recoendations on Two Acceleration Measureents with Low Strain Integrity Test Liqun Liang, PhD., P.E., 1 Scott Webster, P.E., 2 and Marty Bixler, P.E. 3 1 Pile Dynaics Inc., 3725 Aurora Rd, Cleveland, Ohio

More information

APPNDIX K COAL RACTIVITY ANALYSIS Hazen Researh, In 461 Indiana Street Golden, CO 843 Tel: (33) 279-451 Fax: (33) 278-1528 April 2, 2 FDRAL XPS TRANSMITf AL Mr Paul White Pioneer Coal Ltd 1535 Druond Road

More information

INTERSECTION OPERATIONAL ANALYSIS AND NECESSARY RECOMMENDATIONS CIVL 440 Project

INTERSECTION OPERATIONAL ANALYSIS AND NECESSARY RECOMMENDATIONS CIVL 440 Project INTERSECTION OPERATIONAL ANALYSIS AND NECESSARY RECOMMENDATIONS CIVL 44 Project INTERSECTION: 16TH AVENUE & EAST MALL FOR AM PEAK HOUR Group Work: Syed Shafaat Ali Shah (2347426) Mohammad Moudud Hasan

More information

Unit Activity Answer Sheet

Unit Activity Answer Sheet Geoetry Unit Activity Answer Sheet Unit: Extending to Three Diensions This Unit Activity will help you eet these educational goals: Matheatical Practices You will use atheatics to odel real-world situations.

More information

Vaccine Storage and Handling Guidelines

Vaccine Storage and Handling Guidelines Vaine Storage and Handling Guidelines Table of Contents 2 Introdution 3 Definitions 3 The Importane of the Cold Chain 3 Proteting Ontario s Vaine Supply 4 Maintaining Vaine Poteny and Minimizing Wastage

More information

IMPROVED SPECTRAL WAVE MODELLING OF WHITE-CAPPING DISSIPATION IN SWELL SEA SYSTEMS

IMPROVED SPECTRAL WAVE MODELLING OF WHITE-CAPPING DISSIPATION IN SWELL SEA SYSTEMS Proceedings of OMAE 2004: 23rd International Conference on Offshore Mechanics and Arctic Engineering 20-25 June 2004, Vancouver, Canada OMAE2004-51562 IMPROVED SPECTRAL WAVE MODELLING OF WHITE-CAPPING

More information

MODEL FOR PREDICTING BATHYMETRIC AND GRAIN SIZE CHANGES BASED ON BAGNOLD S CONCEPT AND EQUILIBRIUM SLOPE CORRESPONDING TO GRAIN SIZE COMPOSITION

MODEL FOR PREDICTING BATHYMETRIC AND GRAIN SIZE CHANGES BASED ON BAGNOLD S CONCEPT AND EQUILIBRIUM SLOPE CORRESPONDING TO GRAIN SIZE COMPOSITION MODEL FOR PREDICTING BATHYMETRIC AND GRAIN SIZE CHANGES BASED ON BAGNOLD S CONCEPT AND EQUILIBRIUM SLOPE CORRESPONDING TO GRAIN SIZE COMPOSITION Yasuhito Noshi, Takaaki Uda 2, Masumi Serizawa 3, Takayuki

More information

Effectiveness of a law to reduce alcohol-impaired driving in Japan

Effectiveness of a law to reduce alcohol-impaired driving in Japan 1 Takemi Program, Department of International Health, Harvard Shool of Publi Health, Boston, MA, USA; 2 Department of Emergeny Mediine, St Mary s Hospital, Kurume, Japan; 3 Division of Pharmaoepidemiology

More information

Full scale measurements of pressure equalization on air permeable façade elements

Full scale measurements of pressure equalization on air permeable façade elements Full sale measurements of pressure equalization on air permeable façade elements Carine van Bentum, Chris Geurts Department of Strutural Dynamis, TNO, Delft, The Netherlands email: arine.vanbentum@tno.nl,

More information

BKR: 3-way regulating ball valve with female thread, PN 40

BKR: 3-way regulating ball valve with female thread, PN 40 Produt data sheet 5.1 56.091 BKR: 3-way regulating ball valve with female thread, PN 40 ow energy effiieny is improved Effiieny means preise ontrol and working with minimum leakage Features 3-way regulating

More information

Modelling the decrease in wave height over the shoreface due to slope-induced changes in bottom friction.

Modelling the decrease in wave height over the shoreface due to slope-induced changes in bottom friction. Chapter : Modelling the derease in wave height over the shorefae due to slope-indued hanges in bottom frition. Abstrat Wave height-redution on the shorefae is partly indued by frition at the bottom. The

More information

International Journal of Biological & Medical Research

International Journal of Biological & Medical Research Int J Biol Med Res. 2012; 3(2): 1662-1666 Int J Biol Med Res Volume 3, Issue 1, Jan 2012 www.biomedsidiret.om BioMedSiDiret Publiations Contents lists available at BioMedSiDiret Publiations International

More information

Simulating Method of Ship s Turning-basins Designing

Simulating Method of Ship s Turning-basins Designing International Journal on Marine Navigation and Safety of Sea Transportation Volue 5 Nuber 2 June 2011 Siulating Method of Ship s Turning-basins Designing J. Kornacki Szczecin Maritie University, Szczecin,

More information

Fish Farm Consent Modelling. Poll na Gille

Fish Farm Consent Modelling. Poll na Gille Poll na Gille February 2014 Report Written by Environental Manager Marine Harvest Scotland Fars Office Blar Mhor Industrial Estate Fort Willia, PH33 7PT Tel: + 44(0)1397 70 1550 Fax: + 44(0)1397 70 1174

More information

Chapter 7 Intersection Design

Chapter 7 Intersection Design hapter 7 Dr. Yahya Sarraj Faculty of Engineering The Islamic University of Gaza An intersection is an area, shared by two or more roads, whose main function is to provide for the change of route directions.

More information

GENERAL ARTICLES. Xing Wang

GENERAL ARTICLES. Xing Wang A Granger causality test of the causal relationship between the nuber of editorial board ebers and the scientific output of universities in the field of cheistry Xing Wang Editorial board ebers, who are

More information

Ripple Tank: Instruction Manual

Ripple Tank: Instruction Manual Ripple Tank: Instruction Manual The Ripple Tank coprises the following individual parts: Assebly of the ripple tank: Water Tank.......1pcs Detachable legs....3pcs Angular holders.......2pcs Plate fitting...1pcs

More information

Absorption Equilibrium and Kinetics for Ethylene-Ethane Separation with a Novel Solvent Introduction Experimental

Absorption Equilibrium and Kinetics for Ethylene-Ethane Separation with a Novel Solvent Introduction Experimental Absorption Equilibrium and Kinetis for Ethylene-Ethane Separation with a Novel Solvent Travis A. Reine, R. Brue Eldridge 2004 The University of Texas at Austin Prepared for Presentation at 2004 Annual

More information

Place Vanier 250 Montreal Road Transportation Impact Study Addendum. Prepared for Broccolini Construction September 20 th, 2012

Place Vanier 250 Montreal Road Transportation Impact Study Addendum. Prepared for Broccolini Construction September 20 th, 2012 Update for the May 31 st, 2012 Traffic Impact Study Prepared for Broccolini Construction 111-23596-00 September 20 th, 2012 2611 Queensview Drive, Suite 300, Ottawa, Ontario CANADA K2B 8K2 Telephone: 613-829-2800

More information

Rural Accident Rate Variations with Traffic Volume

Rural Accident Rate Variations with Traffic Volume 62 TRANSPORTATION RSARCH RCORD 1281 Rral Aident Rate Variations with Traffi Volme J. W. HALL AND 0. J. PNDLTON The natre of the relationship between horly traffi volmes and horly aident rates on rral highways

More information

Chapter 5 5. INTERSECTIONS 5.1. INTRODUCTION

Chapter 5 5. INTERSECTIONS 5.1. INTRODUCTION Chapter 5 5. INTERSECTIONS 5.1. INTRODUCTION Intersections are the physical component of the roadways where two highways intersect. They are the most complex element of roadways, since it requires more

More information

Topic No January 2000 Manual on Uniform Traffic Studies Revised July Chapter 8 GAP STUDY

Topic No January 2000 Manual on Uniform Traffic Studies Revised July Chapter 8 GAP STUDY Chapter 8 8.1 PURPOSE GAP STUDY (1) The Gap Study is used to determine the size and the number of gaps in the vehicular traffic stream for unsignalized intersections and access points, pedestrian studies,

More information

APPENDICES STRANDJACK WEDGES Friction coefficients, micro slip and handling

APPENDICES STRANDJACK WEDGES Friction coefficients, micro slip and handling APPENDICES STRANDJACK WEDGES Frition oeffiients, miro slip and handling Report nr. DCT 2005-78 By: H.G.M.R. van Hoof Idnr : 501326 20 November, 2005 Researh strand jak wedges Appendies By H.G.M.R. van

More information

Projectile Motion Lab (2019)

Projectile Motion Lab (2019) Nae: Date: Partner(s): Period: Projectile Motion Lab (2019) Object: Measure the velocity of a ball using two Photogates and coputer software for tiing. Apply concepts fro two-diensional kineatics to predict

More information

Effect of Surface Morphing on the Wake Structure and Performance of Pitching-rolling Plates

Effect of Surface Morphing on the Wake Structure and Performance of Pitching-rolling Plates Effect of Surface Morphing on the Wake Structure and Perforance of Pitching-rolling Plates Yan Ren 1, Geng Liu 2 and Haibo Dong 3 Departent of Mechanical & Aerospace Engineering University of Virginia,

More information

Sensor Technologie A TEMPOSONICS. R Series CANbasic C207. Operating Manual. Configuration and CAN-Bus Coupling. page PL.

Sensor Technologie A TEMPOSONICS. R Series CANbasic C207. Operating Manual. Configuration and CAN-Bus Coupling. page PL. Sensor Technologie TEMPOSONICS R 551040 A R Series 2004 CANbasic C207 Operating Manual Configuration and CAN-Bus Coupling page 1 Operating anual for CANbasic C207 Connecting diagra: RP-x-xxxxM-D6x-1-C207

More information

FREE-SURFACE AND SEEPAGE BUBBLY FLOWS ON A GABION STEPPED SPILLWAY WEIR: EXPERIMENTAL OBSERVATIONS

FREE-SURFACE AND SEEPAGE BUBBLY FLOWS ON A GABION STEPPED SPILLWAY WEIR: EXPERIMENTAL OBSERVATIONS E-proeedings of the 36 th IAHR World Congress FREE-SURFACE AND SEEPAGE BUBBLY FLOWS ON A GABION STEPPED SPILLWAY WEIR: EXPERIMENTAL OBSERATIONS GANGFU ZHANG (1), & HUBERT CHANSON (2) (1) The University

More information

Diverging Diamond Interchange and Double Crossover Intersection Vehicle and Pedestrian Performance

Diverging Diamond Interchange and Double Crossover Intersection Vehicle and Pedestrian Performance Diverging Diamond Interchange and Double Crossover Intersection Vehicle and Pedestrian Performance Praveen K. Edara, Department of Civil and Environmental Engineering, Virginia Polytechnic Institute and

More information

The Optimal Control of a Periodic Adsorber:

The Optimal Control of a Periodic Adsorber: ., Natural Convetion in nonnewtonian Fluids Heated from Below, paper presented at First Paifi Chem. Eng. Congr. (1972). Samuels, M. R., Stability of a Fluid in a Long Horizontal, Retangular Cylinder Heated

More information

3D simulation of ship motions to support the planning of rescue operations on damaged ships

3D simulation of ship motions to support the planning of rescue operations on damaged ships Procedia Coputer Science Volue 51, 2015, Pages 2397 2405 ICCS 2015 International Conference On Coputational Science 3D siulation of ship otions to support the planning of rescue operations on daaged ships

More information

TECHNIQUES TO IMPROVE SAFETY AND OPERATIONS AT SIGNALIZED DIAMOND INTERCHANGES IN NEVADA

TECHNIQUES TO IMPROVE SAFETY AND OPERATIONS AT SIGNALIZED DIAMOND INTERCHANGES IN NEVADA TECHNIQUES TO IMPROVE SAFETY AND OPERATIONS AT SIGNALIZED DIAMOND INTERCHANGES IN NEVADA FINAL REPORT Prepared for Nevada Department of Transportation Authors Zong Z. Tian, PhD, PE Ahmed Abdel Dayem Department

More information

Survey Assessment of Semi-pelagic Gadoids: The Example of Walleye Pollock, Theragra chalcogramma, in the Eastern Bering Sea

Survey Assessment of Semi-pelagic Gadoids: The Example of Walleye Pollock, Theragra chalcogramma, in the Eastern Bering Sea Survey Assessment of Semi-pelagi Gadoids: The Example of Walleye Pollok, Theragra halogramma, in the Eastern Bering Sea WILLIAM A KARP and GARY E WALTERS Introdution Diret assessment provides essential

More information

Dewpoint Internal Gas Pressure and Chemical Composition of the Gas Within the Free Volume of DWPF Canistered Waste Forms (U)

Dewpoint Internal Gas Pressure and Chemical Composition of the Gas Within the Free Volume of DWPF Canistered Waste Forms (U) a WSRCMS960244 OOdF 940804(cg Dewpoint Internal Gas Pressure and Cheical Coposition of the Gas Within the Free Volue of DWPF Canistered Waste Fors (U) by J R Harbour Westinghouse Savannah River Copany

More information

Simulating the effects of fatigue and pathologies in gait

Simulating the effects of fatigue and pathologies in gait Siulating the effects of fatigue and pathologies in gait T Koura 1, A Nagano, H Leung 3 and Y Shinagawa 4 1,3 Departent of Coputer Engineering and Inforation Technology, City University of Hong Kong, 83

More information

RESPIRATORY PROTECTIVE EQUIPMENT

RESPIRATORY PROTECTIVE EQUIPMENT RESPIRATORY PROTECTIVE EQUIPMENT SETTING Correspondene to: Dr R M Howie, 12 Morningside Close, Edinburgh EH10 4DB, UK; robin.howie@ btlik.om T RMHowie Oup Environ Med 2005; 62:423 428. doi: 10.1136/oem.2002.004424

More information

February 8, Ms. Jamie Jun, Esq. Fromhold Jaffe & Adams 789 East Lancaster Avenue, Suite 220 Villanova, PA 19085

February 8, Ms. Jamie Jun, Esq. Fromhold Jaffe & Adams 789 East Lancaster Avenue, Suite 220 Villanova, PA 19085 WWW.TRAFFICPD.COM February 8, 2016 Ms. Jamie Jun, Esq. Fromhold Jaffe & Adams 789 East Lancaster Avenue, Suite 220 Villanova, PA 19085 Re: Kohelet Yeshiva School Lower Merion Township, Montgomery County,

More information

Preventive Strike vs. False Targets in Defense Strategy

Preventive Strike vs. False Targets in Defense Strategy International Journal of Perforability Engineering Vol. 8, No., July, pp. -. RAMS Consultants Printed in India Preventive Strike vs. False Targets in Defense Strategy GREGORY LEVITIN and KJELL HAUSKEN.

More information

The water outgassing rate of internal surfaces of vacuum systems

The water outgassing rate of internal surfaces of vacuum systems Journal of Physics: Conference Series PAPER OPEN ACCESS The water outgassing rate of internal surfaces of vacuu systes Recent citations - Soe probles of the vacuu technique developent L N Rozanov and A

More information

C6Hi (g) 6 H2O + 6 C02(g) + energy

C6Hi (g) 6 H2O + 6 C02(g) + energy Experient Cell Respiration 110 Cell respiration refers to the process of converting the cheical energy of organic olecules into a for iediately usable by organiss. Glucose ay be oxidized copletely if sufficient

More information

MEMO DRAFT VIA . Mr. Terry Bailey Foremost Development Company. To: Michael J. Labadie, PE Steven J. Russo, E.I.T. Fleis & VandenBrink.

MEMO DRAFT VIA  . Mr. Terry Bailey Foremost Development Company. To: Michael J. Labadie, PE Steven J. Russo, E.I.T. Fleis & VandenBrink. MEMO DRAFT VIA EMAIL To: From: Mr. Terry Bailey Foremost Development Company Michael J. Labadie, PE Steven J. Russo, E.I.T. Fleis & VandenBrink Date: August 29, 214 Re: Proposed Apartments City of Walled

More information

Module 3 Developing Timing Plans for Efficient Intersection Operations During Moderate Traffic Volume Conditions

Module 3 Developing Timing Plans for Efficient Intersection Operations During Moderate Traffic Volume Conditions Module 3 Developing Timing Plans for Efficient Intersection Operations During Moderate Traffic Volume Conditions CONTENTS (MODULE 3) Introduction...1 Purpose...1 Goals and Learning Outcomes...1 Organization

More information

Use of Default Parameters for Estimating Signalized Intersection Level of Service

Use of Default Parameters for Estimating Signalized Intersection Level of Service 82 TRANSPORTATON RESEARCH RECORD 1457 Use of Default Parameters for Estimating Signalized ntersection Level of Service RCHARD G. DOWLNG The 1985 Highway Capacity Manual (HCM) "operations" method for estimating

More information

Traffic Impact Study. Roderick Place Columbia Pike Thompson s Station, TN. Transportation Group, LLC Traffic Engineering and Planning

Traffic Impact Study. Roderick Place Columbia Pike Thompson s Station, TN. Transportation Group, LLC Traffic Engineering and Planning F i s c h b a c h Transportation Group, LLC Traffic Engineering and Planning Traffic Impact Study Roderick Place Columbia Pike Thompson s Station, TN Prepared March 2016 Ms. Gillian L. Fischbach, P.E.,

More information

Synchro Studio 8. Overview. By Ioannis Psarros

Synchro Studio 8. Overview. By Ioannis Psarros Synchro Studio 8 Overview By Ioannis Psarros What is Synchro? Software for signal optimization Developed by Trafficware Optimization can be applied to: Cycle lengths Splits Offsets Source: http://bikewalklee.blogspot.com

More information

REDEVELOPMENT TRAFFIC IMPACT STUDY

REDEVELOPMENT TRAFFIC IMPACT STUDY REDEVELOPMENT TRAFFIC IMPACT STUDY For Wendy s Parker, Colorado January 215 Prepared for: Sterling Design Associates, LLC 29 W. Littleton Boulevard #3 Littleton, Colorado 812 Prepared by: 1233 Airport

More information

On Runway Capacity and Wake Vortex Safe Separation Distance (SSD)

On Runway Capacity and Wake Vortex Safe Separation Distance (SSD) On Runway Capacity and Wake Vortex Safe Separation Distance (SSD) L.M.B.C. Capos CCTAE (Center for Aeronautical and Space Science and Tecnology), Instituto Superior Tecnico, Lisbon Technnical University.

More information

Bubble Augmented Propulsion with a Convergent-Divergent Nozzle

Bubble Augmented Propulsion with a Convergent-Divergent Nozzle 30 th Syposiu on Naval Hydrodynaics Hobart, Tasania, Australia, -7 Noveber 014 Bubble Augented Propulsion with a Convergent-Divergent Nozzle Jin-Keun Choi, Xiongjun Wu, and Georges L. Chahine (DYNAFLOW,

More information

BLOSSOM AT PICKENS SIGNALIZED INTERSECTION IMPROVEMENT STUDY

BLOSSOM AT PICKENS SIGNALIZED INTERSECTION IMPROVEMENT STUDY BLOSSOM AT PICKENS SIGNALIZED INTERSECTION IMPROVEMENT STUDY Class Project Report for ECIV 542 Traffic Engineering Submitted by Omor Sharif Muchun Song Narges Kaveshgar Quyen Pham Chih-Yao Lin Submission

More information

AN EXPERIMENTAL STUDY ON NONLINEAR WAVE DYNAMICS: ROUGE WAVE GENERATION AND WAVE BLOCKING

AN EXPERIMENTAL STUDY ON NONLINEAR WAVE DYNAMICS: ROUGE WAVE GENERATION AND WAVE BLOCKING AN EXPERIMENTAL STUDY ON NONLINEAR WAVE DYNAMICS: ROUGE WAVE GENERATION AND WAVE BLOCKING Wen-Yang Hsu, Igor Shugan, Wen-Son Chiang, Ray-Yeng Yang, Hwung-Hweng Hwung 2, Sergey Kuznetsov 3 and Yana Saprykina

More information

EROSION AND ACCRETION ON CURVED BEACH

EROSION AND ACCRETION ON CURVED BEACH EROSION AND ACCRETION ON CURVED BEACH Kideok Do 1, Nobuhisa Kobayashi 2 and Kyung-Duck Suh 3 The perforance of a large nourishent project on Bethany Beach, Delaware is evaluated using available beach profile,

More information

Chapter 6. Gait cycle parameters recognition using the. wearable motion detector

Chapter 6. Gait cycle parameters recognition using the. wearable motion detector Authors:Che-Chang Yang (2011-01-21); recoended: Yeh-Liang Hsu (2011-02-21). Note: This article is the Chapter 6 of Che-Chang Yang s doctoral thesis Developent of a Hoe Telehealth Syste for Teleonitoring

More information

EFFECTS OF ARRIVAL TYPE AND DEGREE OF SATURATION ON QUEUE LENGTH ESTIMATION AT SIGNALIZED INTERSECTIONS

EFFECTS OF ARRIVAL TYPE AND DEGREE OF SATURATION ON QUEUE LENGTH ESTIMATION AT SIGNALIZED INTERSECTIONS EFFECTS OF ARRIVAL TYPE AND DEGREE OF SATURATION ON QUEUE LENGTH ESTIMATION AT SIGNALIZED INTERSECTIONS Behnoush Garshasebi Department of Civil and Environmental Engineering Room B106, Newmark Civil Engineering

More information

Deakin Research Online

Deakin Research Online Deakin Researh Online This is the published version: Shaneyfelt, Ted, Joordens, Matthew A., Nagothu, Kranthimanoj and Jamshidi, Mo 2008, RF ommuniation between surfae and underwater roboti swarms, in WAC

More information

THEORETICAL BACKGROUND OF "LEAK-BEFORE-BREAK" AS A CONCEPT IN PRESSURE VESSELS DESIGN. Šárka Pacholková a Howard Taylor b

THEORETICAL BACKGROUND OF LEAK-BEFORE-BREAK AS A CONCEPT IN PRESSURE VESSELS DESIGN. Šárka Pacholková a Howard Taylor b METAL 00 14. 16. 5. 00, Hrade nad Moravií THEORETICAL BACGROUND OF "LEA-BEFORE-BREA" AS A CONCEPT IN PRESSURE VESSELS DESIGN Šárka Paholková a Howard Taylor b a VÚ- NOVÁ HUŤ, a.s., Vratimovská 689, 707

More information

76.111/1. BUD: Flanged three-way valves, PN 6. Sauter Components

76.111/1. BUD: Flanged three-way valves, PN 6. Sauter Components 76.111/1 BUD: Flanged three-way valves, PN 6 ow energy effiieny is improved urate ontrol with high reliability. reas of appliation Continuous ontrol of old/hot water and air in losed networks 1) and flow

More information