Applications for Funding
|
|
- Meryl Logan
- 5 years ago
- Views:
Transcription
1 Coordinated Call for Projects Second Cycle of OBAG, TLC and PBTF Funding Applications for Funding As of The following table lists the applications for funding available through the Coordinated Call for Projects. It includes the name of the project and its sponsor, and the funding requests in thousands of dollars. The available funding comes from three funding programs: the One Bay Area Grant (OBAG 2) program, the Measure J Transportation for Livable Communities (TLC) program, and the Measure J Pedestrian, Bicycle and Trail Facilities (PBTF) program. The first of these programs involves federal funds available from the Metropolitan Transportation Commission and is further divided into four subprograms: Competitive OBAG, Local Streets and Roads Preservation (LSRP), Safe Routes to School (SRTS), and Federal Aid Secondary (FAS). The funding requests in the table are divided into two sections: 1. Funding requests for OBAG 2 funding. These requests are listed in the columns with headings marked in red (Competitive, LSRP, etc.) and may include requests for Measure J funding as part of their funding plan. 2. Funding requests for Measure J funding only. These requests are listed in the columns with headings marked in green (TLC and PBTF); they represent funding requests asking only for Measure J funds with no OBAG 2 funds requested. Some projects CCP-25, CCP-31 and CCP-48, for example have asked funded with either OBAG 2 or Measure J funds.
2 Page 2 CCP-01 CCP-02 CCP-03 CCP-04 CCP-05 CCP-06 CCP-07 CCP-08 CCP-09 North Shore Bay Trail Gap Closure Various Streets and Roads Preservation Empire Avenue at Amber Lane Traffic Signal Olympic Corridor Improvement - Bike Ped Facilities SF Bay Trail - Lone Tree Point (Rodeo to Hercules) Shadelands Multi-Modal Improvement Plan Ygnacio Valley & Oak Grove Road Rehabilitation Walker Avenue Sidewalk 2018 Pavement Rehabilitation at Various Locations Richmond $976 Brentwood $1,868 Brentwood $366 Walnut Creek $3,894 East Bay Regional Park District Walnut Creek $160 Walnut Creek $2,655 $1,000 $1,000 Walnut Creek $817 Antioch $2,474 CCP-10 Willow Pass Road Repaving Concord $4,183 CCP-11 Arlington Boulevard Pedestrian Safety, Phase 1 El Cerrito $345 $1,000 CCP-12 Cambridge Elementary Safe Routes to School Concord $283
3 Page 3 CCP-13 CCP-14 CCP-15 CCP-16 Carlson Blvd and Central Ave Pavement Rehabiliation Sycamore/Willow Pavement Rehabilitation Pleasant Hill Rd Pavement Rehabilitation & Maintenance East Downtown Concord Neighborhood Sidewalk Gap Closure El Cerrito $544 Hercules $492 Lafayette $579 Concord $611 CCP-17 CCP-18 CCP-19 CCP-20 CCP-21 CCP-22 CCP-23 CCP-24 East Downtown Concord PDA Access & Safe Routes to Transit El Cerrito del Norte Station Access Improvement Project High Intensity Activated Crosswalk Beacon (HAWK) San Pablo Ave Rehabilitation Monument Boulevard Class I Path Oakley MultiModal Parking Lots Project Pittsburg Pavement Safe Routes to Orchard Park Elementary School Concord $3,430 BART $3,200 $931 Pinole $120 Pinole $586 Concord $4,368 Oakley $4,350 Pittsburg $1,385 Oakley $1,223
4 Page 4 CCP-25 SF Bay Trail - Pinole Shores to Bayfront Park, Construction East Bay Regional Park District $1,000 $1,000 $1,000 CCP-26 Shale Hill Pinole $550 CCP-27 CCP-28 CCP-29 CCP-30 CCP-31 CCP-32 CCP-33 CCP-34 CCP-35 CCP-36 Sycamore/San Pablo Pedestrian Walkway Walnut Creek Bus Stop Access & Safety Walnut Creek Transportation Demand Mgmt Strategy Willow Pass Road Safe Routes to Transit Willow/Palm Ave Pedestrian Walkway 13th Street Complete Streets College Transit Village Master Plan Glorietta Elementary Safe Routes to School Orinda Way Pavement Rehabilitation ADA on 7th St, Central, Cutting, Giant Hwy Hercules $901 $901 Walnut Creek & Connection Walnut Creek $225 Concord $883 Hercules $1,058 $138 $138 $1,058 $1,058 Richmond $3,669 San Pablo $200 Orinda $387 Orinda $620 Richmond $2,205 $852
5 Page 5 CCP-37 CCP-38 CCP-39 Reliez Valley Road Trail Spur Sycamore Valley Park & Ride Expansion Strategic Bicycle, Pedestrian and Safe Routes to School Martinez $192 Danville $1,800 Moraga $596 $150 $650 $990 CCP Neighborhood Street Rehab Clayton $308 CCP-41 Appian Way/Valley View Road Intersection $3,658 $3,658 CCP-42 CCP-43 CCP-44 CCP-45 Bailey Road Complete Streets Project BART Pedestrian Bicycle Connectivity Project Bike Route Network on Barrett Avenue Camino Pablo Bicycle Route Corridor CCP-46 Citywide Safe Routes 2 School Master Plan CCP-47 CCP-48 Clayton Town Center Ped Safety Blvd Improvement Project (Viking Dr to Harriett Dr) $3,835 Pittsburg $3,870 $600 Richmond $1,000 Orinda $484 $33 $33 San Pablo $200 $200 Clayton $252 Pleasant Hill $4,500 $825 $4,792 $4,792
6 Page 6 CCP-49 CCP-50 CCP-51 CCP-52 Downtown Streets Rehab Project Danville Townwide Bike Master Plan Downtown Orinda Streetscape Master Plan El Cerrito del Norte TOD Complete Streets Improvement Martinez $846 Danville $75 Orinda $200 El Cerrito $4,500 $2,683 CCP-53 Fred Jackson Way First Mile/Last Mile Connection Project $3,638 $700 CCP-54 Gregory Lane/Elinora Drive Signal Installation Pleasant Hill $544 CCP-55 Harbour Way & 16th Street Complete Streets Project Richmond $3,935 $510 CCP-56 Iron Horse Active Transportation Corridor Study $350 CCP-57 Iron Horse Trail/Bollinger Canyon Rd Bike Ped Overcrossing San Ramon $4,500 $6,600 $2,900 CCP-58 Kirker Pass Road Open Grade Overlay Project $1,343 CCP-59 L Street Pathway to Transit- Bike Ped Improvement Antioch $2,092 $1,223 $187
7 Page 7 CCP-60 CCP-61 CCP-62 CCP-63 CCP-64 CCP-65 Lafayette Town Center Pathway & BART Bike Station Lincoln Elementary SRTS Ped Enhancements Pacheco Boulevard Pedestrian Creek Crossing Pittsburg/BayPoint Station Access Improvement Plaza San Pablo Greenway Trail Pleasant Hill Road Improvement (Gregory Lane to Taylor) Lafayette & BART $1,979 $1,979 $1,979 Richmond $383 BART $4,500 $656 $656 San Pablo $1,280 $1,280 Pleasant Hill $920 $2,240 CCP-66 CCP-67 CCP-68 CCP-69 CCP-70 CCP-71 Rodeo Downtown Infrastructure Project Rumrill Boulevard Complete Streets (Phase 11) San Pablo Ave Bike over BNSF Market Street Pavement Rehabilitation Project Alcosta Blvd Pavement Rehab Street Smarts San Ramon Valley $470 $470 San Pablo $5,164 $5,164 Pinole $1,736 $1,736 San Pablo $619 San Ramon $1,176 San Ramon $300
8 Page 8 CCP-72 Local Streets and Roads Preservation Project $4,327 CCP-73 Ward Street Area Ped and Streetscape Project Martinez $1,897 CCP-74 West Walk and Bike Leaders $671 CCP-75 Camino Ramon Danville $1,357 CCP-76 FY Street Repair and Resurfacing Project Oakley $969 Total $50,762 $28,709 $6,075 $1,343 $11,439 $8,088 $43,246 $29,173 Number
Planning Committee STAFF REPORT
Planning Committee STAFF REPORT Meeting Date: December 7, 2011 Subject Summary of Issues Recommendations Financial Implications Options Attachments Applications Received through the CC TLC and PBTF Call
More informationProject Cost Committed Funding Funding Request
Coordinated Call for Projects Project Descriptions The following list describes the projects applying for funding through the Coordinated Call for Projects, which agency or agencies are sponsoring them,
More information1. Welcome and Greeting...1:30 pm. 2. Public Comment...1:35 pm
This meeting is scheduled to be audiocast live on the CCTA website. Visit our Meetings & Agendas page to tune in. AGENDA PDA / OBAG Working Group Meeting #5 Date Monday, May 13, 2013 Time Place 1:30 PM
More informationCountywide!Bicycle!and!Pedestrian!Advisory!Committee!!! 1. Call!to!Order!(Chair,!Leah!Greenblat)!...!11:00!am! 2. Public!Comment!...!11:05!am!
AGENDA CountywideBicycleandPedestrianAdvisoryCommittee Date Monday,29April2013 Time 11:00AMto1:00PM Place AuthorityBoardroom 2999OakRoad,Suite110 WalnutCreekCA94597 1. CalltoOrder(Chair,LeahGreenblat)...11:00am
More informationPlanning Committee STAFF REPORT February 1, 2017 Page 2 of 3 sufficient funding through other sources, another was split into two separate projects, a
Planning Committee STAFF REPORT Meeting Date: February 1, 2017 Subject Summary of Issues New Quarterly Project Status Reports and Program Monitoring Report for Measure J Programs 12 (Transportation for
More informationTRANSPORTATION TRAINING TOPICS. April 6, 2010
TRANSPORTATION TRAINING TOPICS April 6, 2010 Roles of Transportation Providers Context and Policy Makers Division of Transportation and Traffic Other City Operations Other Transportation Operators CMA
More informationOrinda Bicycle, Trails and Walkways Master Plan
Orinda Bicycle, Trails and Walkways Master Plan Public Meeting October 15, 2008 Presented by: Ian Moore, Alta Lauren Ledbetter, Alta Bruce Wolff, Alta Introductions City of Orinda Monica Pacheco, Assistant
More informationSan Jose Transportation Policy
San Jose Transportation Policy Protected Intersections in LOS Policies to Support Smart Growth Presented by: Manuel Pineda City of San Jose Department of Transportation Bay Area Map San Francisco Oakland
More informationTOWN OF MORAGA MORAGA WAY AND CAMINO PABLO/CANYON ROAD IMPROVEMENTS Town Council Meeting March 13, 2019
TOWN OF MORAGA MORAGA WAY AND CAMINO PABLO/CANYON ROAD IMPROVEMENTS Town Council Meeting March 13, 2019 1 Edric Kwan, Public Works Director Josh Peterman, Principal, Fehr and Peers Shawn Knapp, Senior
More informationCONTRA COSTA. Countywide Bicycle and Pedestrian Plan. Executive Summary. July Contra Costa Countywide Bicycle & Pedestrian Plan
CONTRA COSTA Countywide Bicycle and Pedestrian Plan Executive Summary July 2018 i The preparation of this report has been financed through a grant from the U.S. Department of Transportation and the Federal
More informationBicycle Pedestrian Master Plan Pre Bid Meeting Portsmouth, NH August 15, 2013
Bicycle Pedestrian Master Plan Pre Bid Meeting Portsmouth, NH August 15, 2013 2005 Master Plan GOAL: Provide for safe and convenient bicycle and pedestrian circulation throughout the City. Develop a city
More informationCastro Valley Municipal Advisory Council March 19, 2018
Castro Valley Municipal Advisory Council March 19, 2018 1 Background 2 Draft Bicycle Vision and Pedestrian Networks 3 Next Steps 4 Updates Agenda 2 PROJECT AREA: Unincorporated Areas of Alameda County
More informationEl Camino Real Specific Plan. TAC/CAC Meeting #2 Aug 1, 2018
El Camino Real Specific Plan TAC/CAC Meeting #2 Aug 1, 2018 Land Use Alternatives Goals and Tradeoffs Parks & open space Housing Retail & services Civic spaces Parking Community gathering spaces 3 Alternatives
More informationPlanning Committee STAFF REPORT October 5, 2016 Page 2 of 2 by a task force of local staff familiar with safe routes to school programs, projects and
Planning Committee STAFF REPORT Meeting Date: October 5, 2016 Subject Contra Costa Safe Routes to School Program Report Summary of Issues Recommendations Financial Implications Options Attachments Changes
More informationKEARNY MESA COMMUNITY PLAN UPDATE
KEARNY MESA COMMUNITY PLAN UPDATE January 18, 2018 SUBCOMMITTEE MEETING Mobility Concepts and Urban Design Presentation Outline Mobility Concepts: Multimodal Planning Toolbox Presentation and Activities
More information2019 Federal Transportation Improvement Program
VEN051211 Ventura SCCAB VEN051211 CAX63 L NON-EXEMPT 0 Description: PTC 4,417 Agency CAMARILLO LAS POSAS ROAD FROM VENTURA BLVD TO PLEASANT VALLEY ROAD WIDEN FROM 2 TO 6 LANES CITY FUNDS 4,417 4,417 4,417
More informationFunded Safe Routes to Transit Projects
Funded Safe Routes to Transit s CYCLE 1 AC Transit Bicycle arking lan $100,000 C BART BART C2 Railcar Reconfiguration $581,000 C City of Albany, City of El Cerrito El Cerrito/Albany Ohlone Greenway Safety
More informationPRESS RELEASE San Joaquin Council of Governments
PRESS RELEASE San Joaquin Council of Governments For Immediate Release February 23, 2018 Contact: Nicole Gorham, 235-0582 gorham@sjcog.org SJCOG Board Awards $19.63 Million in Measure K Bicycle, Pedestrian,
More informationSR-203 Sidewalks and Town-Wide Mobility Improvements. Town Council Presentation September 7, 2016
SR-203 Sidewalks and Town-Wide Mobility Improvements Town Council Presentation September 7, 2016 SR-203 Sidewalks and Town- Wide Mobility Improvements SR-203 Sidewalks and Appurtenances Town-Wide Mobility
More informationCottonwood Heights HAWK Pedestrian Crossing on Fort Union Blvd. Project Type Capital Improvement
Cottonwood Heights HAWK Pedestrian Crossing on Fort Union Blvd. At West Side of Mountview Park Entrance (Approx. 1600 East) $ 206,800 $ 192,800 Install a HAWK Pedestrian Crossing System on Fort Union Boulevard,
More informationTOWN OF MORAGA. CAMINO PABLO & CANYON ROAD INTERSECTION IMPROVEMENTS Public Information Meeting February 20, 2019
TOWN OF MORAGA CAMINO PABLO & CANYON ROAD INTERSECTION IMPROVEMENTS Public Information Meeting February 20, 2019 Edric Kwan, Public Works Director April Malvino Miller, BKF Project Design Manager Shawn
More informationBALBOA AREA: TRANSPORTATION PROJECTS & PLANNING
BALBOA AREA: TRANSPORTATION PROJECTS & PLANNING TRANSPORTATION FOR ALL AGES, ABILITIES & MEANS CHANGING PATTERNS: TRENDING TO WALKING, BIKING, TRANSIT San Francisco s Change in Number of Commuters by Mode
More informationSan Francisco s Capital Plan & the Mayor s Transportation Task Force 2030: Funding the next steps for transportation
San Francisco s Capital Plan & the Mayor s Transportation Task Force 2030: Funding the next steps for transportation San Francisco Capital Needs In 2006, the Mayor and Board of Supervisors approved San
More informationWatertown Complete Streets Prioritization Plan. Public Meeting #1 December 14, 2017
Watertown Complete Streets Prioritization Plan Public Meeting #1 December 14, 2017 Goals for Public Meeting Overview of MassDOT Complete Streets Funding Program Educate the community on Complete Streets
More informationTRANSPORTATION COMMISSION Agenda Staff Report
TRANSPORTATION COMMISSION Agenda Staff Report Agenda Item No. 5.a DATE: JULY 31, 2014 TO: FROM: SUBJECT: TRANSPORTATION COMMISSION COMMUNITY DEVELOPMENT DEPARTMENT - PLANNING DRAFT OLYMPIC CORRIDOR PREFERRED
More informationNon-Motorized Transportation 7-1
Non-Motorized Transportation 7-1 Transportation facilities no longer mean just accommodating a vehicle powered by a combustion engine. Pedestrian and non-motorized facilities are important modes of travel
More informationAppendix C 3. Bicycle / Pedestrian Planning
Appendix C 3. Bicycle / Pedestrian Planning BICYCLE/PEDESTRIAN PLANNING 2005 Master Plan GOAL: Provide for safe and convenient bicycle and pedestrian circulation throughout the City. Develop a city-wide
More informationFirst Mile, Last Mile: Plans for all Shapes and Sizes. Hannah Lindelof, Principal Planner San Francisco Bay Area Rapid Transit September 18, 2017
First Mile, Last Mile: Plans for all Shapes and Sizes Hannah Lindelof, Principal Planner San Francisco Bay Area Rapid Transit September 18, 2017 BART Station Access Policy Goals A. Safer, Healthier, Greener.
More informationCITY OF PITTSBURGH. City of Pittsburgh Active Transportation Profile REGIONAL ACTIVE TRANSPORTATION PLAN FOR SOUTHWESTERN PENNSYLVANIA
REGIONAL ACTIVE TRANSPORTATION PLAN FOR SOUTHWESTERN PENNSYLVANIA 1 2 ACTIVE TRANSPORTATION AT A GLANCE Trails & Bike Routes 270 miles 28 miles 41 miles 24 miles 3 F A C I L I T I E S Facility Metrics
More informationEngineering - Bicycle and Pedestrian
Capital Improvement Plan Project Summary # Bikeways Program 781,000 860,000 900,000 933,000 933,000 933,000 # Cannonball Path 1,200,000-780,000 - - - # Capital City Trail - 70,000 - - 910,000 - # Goodman
More information2014 Countywide Comprehensive
c i l P u b iew Rev a f t Dr 2014 Countywide Comprehensive Transportation Plan Volume 3: Comprehensive Transportation Project List August 1, 2014 The preparation of this report has been financed through
More informationContra Costa Sub-regional Action Plans for the Routes of Regional Significance Multimodal Traffic Service Objectives (MTSO)
ATTACHMENT B Contra Costa Sub-regional Action Plans for the Routes of Regional Significance Multimodal Traffic Service Objectives () Draft Monitoring Report Prepared by Iteris, Inc. February 2018 TABLE
More informationBackground Planning Committee STAFF REPORT March 7, 2018 Page 2 of 2 On June 21, 2017, the Authority approved the programming of second cycle One Bay
Planning Committee STAFF REPORT Meeting Date: March 7, 2018 Subject Summary of Issues Recommendations Financial Implications Options Attachments Approval of Resolution 18-11-G Appropriating Measure J TLC
More informationGoodlettsville Bicycle and Pedestrian Plan Executive Summary
Goodlettsville Bicycle and Pedestrian Plan July 2010 In Cooperation with the Nashville Area Metropolitan Planning Executive Organization Summary Introduction Progressive and forward thinking communities
More informationFY Regional Transportation Improvement Program
FY2014-2018 Regional Transportation Improvement Program Basic Project List (All Values in Thousands of Dollars) All costs in current dollars Project Name Key # Year Project Cost 10th Avenue Bridge, Caldwell
More informationSOUTHWEST AREA TRANSPORTATION COMMITTEE
SOUTHWEST AREA TRANSPORTATION COMMITTEE MEETING AGENDA Thursday, July 16, 2015 3:30 p.m. (PLEASE MAKE NOTE OF DATE AND TIME) District II Supervisor s Office 3338 Mt. Diablo Boulevard, Lafayette, CA Any
More informationEXECUTIVE SUMMARY. Vision
Vision Walking and bicycling in Salt Lake City will be safe, convenient, comfortable, and viable transportation options that connect people to places, foster recreational and economic development opportunities,
More informationCity of Gainesville Transportation/Roadway Needs PROJECT SUMMARY
A1 Roadway Resurfacing $23,846,000 TYPE: Preservation of existing system Roadway resurfacing A2 Signal Replacement $6,000,000 TYPE: Preservation of existing system Replace traffic signals. B1 W 6th St
More informationTRANSPORTATION ALTERNATIVES PROGRAM: SELECTED PROJECTS AND FUNDING ALLOCATIONS
ITEM #9: TRANSPORTATION ALTERNATIVES PROGRAM: SELECTED PROJECTS AND FUNDING ALLOCATIONS The Transportation Alternatives Program (TAP) created by MAP-21 requires that 50% of the program funds received by
More informationCity of Birmingham Draft Multi-modal Transportation Plan
City of Birmingham Draft Multi-modal Transportation Plan City Commission Public Hearing Monday, November 25, 2013 7:30 pm Norman Cox, PLA, ASLA The Greenway Collaborative, Inc. Ann Arbor, Michigan The
More informationAPPENDIX D: SACRAMENTO URBAN AREA TRANSPORTATION PRIORITIES
1 County County County County 2 Yolo Arterial Roadway Collector Roadway Urban Residential Street Rural Residential Roadway I-80 / U.S. 50 Bus/Carpool Lanes in both directions Richards Blvd PM Yol 80 0.237
More informationDowntown Naples Mobility and Connectivity Study. Naples City Council Presentation January 2017
Downtown Naples Mobility and Connectivity Study Naples City Council Presentation January 2017 Agenda 1. Introduction 2. Scope Review 3. Project Schedule 4. Existing Conditions 5. Public Charrette 6. Mobility
More informationMoraga Pedestrian and Bicycle Master Plan Update and Wayfinding Plan. Citizens Advisory Committee Meeting July 21, 2015
Moraga Pedestrian and Bicycle Master Plan Update and Wayfinding Plan Citizens Advisory Committee Meeting July 21, 2015 Planning process Inventory of existing conditions 2 of 21 Planning process Inventory
More information42nd Ave N Reconstruction
CITY OF MINNEAPOLIS 42nd Ave N Reconstruction Community Meeting #2 May 2016 6:00 7:30 p.m. 5/16/2016 1 Purpose of Meeting Inform: Provide an overview of project, identify anticipated scope of work, and
More informationDraft MOBILITY ELEMENET. Community Meeting May 22, 2013
Draft MOBILITY ELEMENET Community Meeting May 22, 2013 Agenda Presentation Ira Brown New Mobility Paradigm Movement of People Implementation Q&A Ira Brown and Dave Roseman Small Group Discussion at Each
More informationFY 2016 TRANSPORTATION ALTERNATIVES PROGRAM PROJECT SELECTION
AGENDA ITEM #8: FY 2016 TRANSPORTATION ALTERNATIVES PROGRAM PROJECT SELECTION The Transportation Alternatives Program (TAP) created by MAP-21 requires that 50% of the program funds received by the state
More informationMEASURE B AND MEASURE BB Annual Program Compliance Report Reporting Fiscal Year AGENCY CONTACT INFORMATION
MEASURE B AND MEASURE BB Annual Program Compliance Report Reporting Fiscal Year 2016-2017 AGENCY CONTACT INFORMATION Agency Name: City of Livermore Date: 12/4/2017 Primary Point of Contact Name: Debbie
More informationCITY OF LANCASTER PROPOSED NEW PROJECTS
CITY OF LANCASTER 2013-2014 PROPOSED NEW PROJECTS Project Code 11 Facilities and Fixtures Project Title 1 11BS018 Main. Yard Storage Bldg, Phase 2 2 11GS007 Parks Improvements 3 11GS008 Dog Park AHP 4
More informationCITY OF PORTSMOUTH PLANNING DEPARTMENT
CITY OF PORTSMOUTH PLANNING DEPARTMENT MEMORANDUM TO: JOHN P. BOHENKO, CITY MANAGER FROM: JULIET T.H. WALKER, PLANNING DIRECTOR SUBJECT: BICYCLE / PEDESTRIAN PLAN PROGRESS UPDATE DATE: 3/13/2018 Background
More informationCalifornia Department of Transportation, District 4. Sloat Boulevard Project Skyline Blvd. to 19 th Ave. Community Update January 13, 2016
California Department of Transportation, District 4 Sloat Boulevard Project Skyline Blvd. to 19 th Ave. Community Update January 13, 2016 Agenda Welcome and introductions Project overview, history and
More informationComplete Streets Needs. Complete Streets Project Origin (planning documentation or supporting analysis)
Mobility MassDOT Program Project Prioritization Plan (Revised 3/31/16) Municipality Winchendon 7/25/2017 Location Needs Request Schedule 1 Development of roundabout at the intersection of Front Street
More informationUrbana Pedestrian Master Plan
Urbana Pedestrian Master Plan Recommendations Gabe Lewis, Transportation Planner Champaign County Regional Planning Commission November 15, 2018 Public Meeting #2 Public Input Round #1 Thank You! 10 public
More informationSUMMARY OF TRANSPORTATION INVESTMENTS
Santa Cruz County 2016 Measure D: Transportation Improvement Expenditure Plan - Approved by over 2/3 of Santa Cruz County voters on November 8, 2016 - Overview Measure D, the 2016 Transportation Improvement
More informationMajor Bike Routes 102 Avenue Workshop April 21, 2015
Major Bike Routes 102 Avenue Workshop April 21, 2015 Our Purpose Today Provide context on how Major Bike Routes fit into Edmonton s future Share information on what we heard in our last phase, and how
More information10A. DATE: October 5, Pedestrian and Bicycle Advisory Committee. Kevin Colin, Deputy Planning Manager Curt Bates, City Engineer
10A DATE: October 5, 2016 TO: PREPARED BY: SUBJECT: Pedestrian and Bicycle Advisory Committee Kevin Colin, Deputy Planning Manager Curt Bates, City Engineer Discussion and Provide Comments, Associated
More informationTable #6 VISION CHARACTERISTICS
Table #6 VISION White Flint is a place to live, work, play, shop, and walk with sufficient density to encourage quality redevelopment. Vibrant streets and consistent streetscapes are important. CHARACTERISTICS
More informationCity of Atlanta-MARTA Sales Tax Referendum Draft Project List. Atlanta City Council Work Session May 19, 2016
1 City of Atlanta-MARTA Sales Tax Referendum Draft Project List Atlanta City Council Work Session May 19, 2016 2 SB 369 - MARTA Sales tax for up to 0.50% is allowed in the City of Atlanta for MARTA Purpose
More informationMEMORANDUM - CITY OF PASADENA Department Of Transportation DATE: OCTOBER 21, 2008 TO: ENVIRONMENTAL ADVISORY COMMISSION FROM: ~ FRED C. DOCK, DIRECTOR OF TRANSPORTATION SUBJECT: UPDATE ON DEPT. OF TRANSPORTATION
More informationPlanning Committee STAFF REPORT March 7, 2018 Page 2 of 4 The following MTSOs are being used across the five subregions: Intersection Level of Service
Planning Committee STAFF REPORT Meeting Date: March 7, 2018 Subject Summary of Issues Recommendations Financial Implications Options Attachments Changes from Committee Review Draft 2017 Multimodal Transportation
More informationCity of Madison: 2017 Capital Budget Capital Improvement Plan
Capital Improvement Plan Project Summary Bikeways Program 779,000 751,000 630,000 670,000 703,000 703,000 Cannonball Path 210,000 - - 730,000 - - Cap City Trail 1,140,000-360,000 - - 910,000 Ice Age Junction
More informationCongress Avenue. Palm Beach MPO Subcommittee Meetings December 2017
1 Congress Avenue Palm Beach MPO Subcommittee Meetings December 2017 2 Agenda Study Purpose Study Process Multimodal Alternatives Development Next Steps *ACTION ITEM: CONFIRM ALTERNATIVES TO MOVE INTO
More informationWest Village Mobility & Integration
West Village Mobility & Integration PRESENTED TO TOPCA Town Hall November 9, 2017 [7189-21] Port Credit 2 West Village + Mobility AWalkable Community A CompleteCommunity A SustainableCommunity 3 Mobility
More informationSamish-Maple-Ellis Corridor Pedestrian & Bicycle Safety Improvements. Bellingham City Council March 26, 2018
1 Samish-Maple-Ellis Corridor Pedestrian & Bicycle Safety Improvements Bellingham City Council March 26, 2018 2009 Samish Way Urban Village Street Plans Multiple Plans Adopted by City Council 2009 Samish
More informationo n - m o t o r i z e d transportation is an overlooked element that can greatly enhance the overall quality of life for the community s residents.
N o n - m o t o r i z e d transportation is an overlooked element that can greatly enhance the overall quality of life for the community s residents. 84 Transportation CHAPTER 11 INTRODUCTION Transportation
More information7. COST ESTIMATES AND FUNDING
7. COST ESTIMATES AND FUNDING This chapter provides planning level cost estimates of constructing and maintaining the proposed bicycle network and lists potential project funding sources. Cost estimates
More informationNew Orleans Complete Streets Experience CITY OF NEW ORLEANS. Louis Haywood Department of Public Works January 19, 2016
New Orleans Complete Streets Experience CITY OF NEW ORLEANS Louis Haywood Department of Public Works January 19, 2016 Complete Streets policies Ensure that the entire right-of-way is planned, designed,
More informationOperations -- Transit From: N/A To: N/A. Improvement Type: Regionally Significant: No
Central Puget Sound Regional 2017-2020 Transportation Improvement Program Amendments and Corrections to be included in the 2017-20 STIP PSRC's Amendment 2017-08 County: King List of 17-08 Amendment Projects:
More informationCongestion Management Program 2015 Monitoring Report
Congestion Management Program 2015 Monitoring Report Prepared by Iteris. Inc August, 2015 TABLE OF CONTENTS Executive Summary... 1 Introduction... 3 1.1 CMP Network... 3 1.2 CMP Requirements... 6 1.3 Updates
More information'Tis the Season...for Construction Multi Modal Project Updates
Page 1 of 5 September 13th, 2013 Free Transit Days Tuesday, Sept. 24th: Sponsored by Methodist Thrift Store Tuesday, Oct. 29th: Sponsored by Methodist Thrift Store Needham Elementary Celebrates Safe Routes
More informationPEDESTRIAN ACTION PLAN
CITY OF SANTA MONICA PEDESTRIAN ACTION PLAN DRAFT OCTOBER 2015 Safe Streets Santa Monica, December 3, 2015 Beth Rolandson, AICP Principal Transportation Planner Strategic + Transportation Planning, Planning
More informationMEETING OF THE CITY OF CONCORD BICYCLE, PEDESTRIAN AND SAFE ROUTES TO TRANSIT PLAN ADVISORY COMMITTEE AGENDA
MEETING OF THE CITY OF CONCORD BICYCLE, PEDESTRIAN AND SAFE ROUTES TO TRANSIT PLAN ADVISORY COMMITTEE Monday, April 25, 2016 5:30 p.m., Regular Meeting PERMIT CENTER CONFERENCE ROOM 1950 Parkside Drive,
More informationEnhancing Downtown
Enhancing Downtown 2014-2015 Process Masterplan reviewed TIF scope, fund availability, and timing Conceptual cost estimate stage things may change with full engineering Sequencing Coordination with businesses
More informationBicycle Lanes Planning, Design, Funding South Mountain Partnership Trails Workshop Roy Gothie PennDOT Statewide Bicycle Pedestrian Coordinator
Bicycle Lanes Planning, Design, Funding 2018 South Mountain Partnership Trails Workshop Roy Gothie PennDOT Statewide Bicycle Pedestrian Coordinator Policy Changes: BOP Bicycle Policy Changes The OLD Way
More informationArlington Public Schools Thomas Jefferson Site Evaluation Preliminary Findings. Thomas Jefferson Working Group Meeting #2 October 1, 2014
Arlington Public Schools Thomas Jefferson Site Evaluation Preliminary Findings Thomas Jefferson Working Group Meeting #2 October 1, 2014 SAN ANTONIO BEXAR COUNTY PEDESTRIAN SAFETY ACTION PLAN INTRODUCTION
More informationUPDATING THE WEST COUNTY ACTION PLAN
UPDATING THE WEST COUNTY ACTION PLAN Presentation to the WCCTAC Technical Advisory Committee Presented By: In Association With: DKS CH2M HILL Dyett & Bhatia Eisen Letunic February 14, 2013 The Consultant
More informationBicycle + Pedestrian Connectivity Gap Analysis
Accelerated Bridge Program Bicycle + Pedestrian Connectivity Gap Analysis Tuesday, October 11 Shriners Hospital, Boston 6:30-8:00 PM Thursday, October 13 Community Rowing, Brighton 6:30-8:00 PM Tuesday,
More informationEl Centro Mobility Hub
The El Centro drive shed comprises a major portion of the El Centro downtown area, which is well served by bus routes. The proposals intend to promote use of public transit through improvements and enhancements
More informationBicycle and Pedestrian Plans and Improvements
Bicycle and Pedestrian Plans and Improvements Presented to the City Council By Randle Harwood, Planning and Development, and Richard Zavala, Parks and Community Services September 24, 2013 Purpose Review
More informationKorematsu Middle School/ Castro Park Community Meeting
Korematsu Middle School/ Castro Park Community Meeting TUESDAY, SEPTEMBER 22, 2015 6:30 8:00 PM CITY HALL, CITY COUNCIL CHAMBERS Agenda Welcome and Introductions School Updates School Overview School Parking
More informationSan Francisco Planning Department IPIC Report 2016
San Francisco Planning Department IPIC Report 2016 and Expenditure Plan FY 2017 2018 San Francisco Planning Commission January 7, 2016 IMPLEMENTING OUR COMMUNITY PLANS The Plan Implementation Team manages
More informationSarasota/Manatee MPO Project Priorities 2016 Adopted April 25, 2016
All projects on the following priority lists should be implemented in the priority sequence listed, as consistent with the fiscal constraints identified in the MPO s adopted Long Range Transportation Plan
More informationMAKE YOUR PLACE IN CHANNELSIDE
MAKE YOUR PLACE IN CHANNELSIDE INTRODUCTION PROJECT LIMITS Channelside Drive from Cumberland Ave to Kennedy Boulevard EXISTING CONDITIONS EXISTING CONDITIONS CHANNELSIDE DRIVE FROM E. CUMBERLAND AVENUE
More informationFY Transportation Improvement Program - DRAFT Alphabetical Listing of Roadway, Bicycle, Pedestrian and Rideshare Projects
-2022 Transportation Improvement Program - DRAFT Project Number Alamo Area Commute Solutions Pgm - FY 2017 5101.0 0915-12-547 AACOG Alamo Area Commute Solutions Pgm - FY 2018 5102.0 0915-12-543 AACOG Alamo
More informationMayor s Bicycle Advisory Council. Wednesday, December 13 th, 2017
Mayor s Bicycle Advisory Council Wednesday, December 13 th, 2017 Bicyclist Fatalities, Year to Date (January 1 November 30, 2017) - MBAC Briefing Bicyclist Fatality Statistics Year to date total, 2017
More informationCity Birmingham Multi-Modal Transportation Plan Visioning Workshop Results Meeting
City Birmingham Multi-Modal Transportation Plan Visioning Workshop Results Meeting Monday, January 28, 2013 7:30 PM, City Hall Norman Cox, PLA, ASLA. Ann Arbor, Michigan. www.greenwaycollab.com Community
More informationHennepin County Bicycle and Pedestrian Planning
Hennepin County Bicycle and Pedestrian Planning 1 Value of bicycle and sidewalk systems Safety Livability Mobility Health Personal Finances Economic Sustainability Clean Air Recreation Parking and congestion
More informationCONNECTING PEOPLE TO PLACES
CONNECTING PEOPLE TO PLACES 82 EAST BENCH MASTER PLAN 07 Introduction The East Bench transportation system is a collection of slow moving, treelined residential streets and major arteries that are the
More informationSTATUS OF 2009 PEDESTRIAN MASTER PLAN (AS OF DECEMBER 2013)
Appendix P.1 STATUS OF 2009 PEDESTRIAN MASTER PLAN (AS OF DECEMBER 2013) The 2009 Pedestrian Master Plan establishes 21 core recommendations in three goal areas to improve pedestrian transportation in
More informationA Matter of Fairness: ROCOG s Environmental Justice Protocol. What is Mobility Limitation?
No Person Left Behind What is Mobility Limitation? What is the Access Limitation? Environmental Justice population should be provided adequate mobility & access to meet their needs; Identify acceptable
More informationACTIA Programs Annual Compliance Report Reporting Year Bicycle and Pedestrian Safety Table 1: Summary of Expenditures and Accomplishments
Bicycle and Pedestrian Safety Table 1: Summary of Expenditures and Accomplishments Note: Definitions for each drop down menu appear as Comments (scroll over the column title or in the Review mode, choose
More informationCaltrans Sloat Boulevard Pedestrian Safety Project Response to Community Questions, Comments & Concerns
Caltrans Sloat Boulevard Pedestrian Safety Project Response to Community Questions, Comments & Concerns Revised: May 10, 2016 The California Department of Transportation (Caltrans) is planning various
More informationChicago Safe Routes to School Safe Routes to High School (SRTS/SRTHS)
Chicago Safe Routes to School Safe Routes to High School (SRTS/SRTHS) Marshall Community High School and Faraday Elementary School Recommended Improvements Agenda Goals Related Programs Project Location/Area
More informationBerkeley Strategic Transportation Plan A-76
Berkeley Strategic Transportation Plan A-76 Appendices 1. A Team Effort 2. Where We ve Been A-11 Berkeley Strategic Transportation Plan Alameda County Transportation Plan Alameda County will be served
More informationAGENDA ACTIVE TRANSPORTATION PROGRAM (ATP) CYCLE 4 MPO COMPONENT FOR ACTION
VENTURA COUNTY TRANSPORTATION COMMISSION Transportation Technical Advisory Committee (TTAC) City of Camarillo Administrative Conference Room 601 Carmen Road, Camarillo, CA Thursday, January 17, 2019 9:00
More informationTOWN OF WILLIAMSTON, SC BICYCLE AND PEDESTRIAN MASTER PLAN TOWN OF WILLIAMSTON, SC BICYCLE AND PEDESTRIAN MASTER PLAN
TOWN OF WILLIAMSTON, SC BICYCLE AND PEDESTRIAN MASTER PLAN Americans Want Choices 55% of Americans would rather drive less & walk more. Transit use is growing faster than population or highway travel.
More informationTransportation REGIONAL NETWORKS CHAPTER 5. Traffic congestion in Walnut Creek has been a major concern since the end of World War II.
CHAPTER 5 Transportation Traffic congestion in Walnut Creek has been a major concern since the end of World War II. The City has worked to address traffic concerns since the 1950s through new roadways
More informationPRINCE GEORGE S PLAZA METRO AREA PEDESTRIAN PLAN
PRINCE GEORGE S PLAZA METRO AREA PEDESTRIAN PLAN May 28, 2008 Agenda Welcome and introductions Project overview and issue identification Planning context and strengths Design challenges and initial recommendations
More informationRoadway Project Recommendations:
Northwest RTPO Regional Transportation Improvement Program Recommendations (RTIPR) for NMDOT District 6 (Cibola, McKinley) & District 5 (San Juan) 2018-2023 for 5 Year STIP (FY 2018 through FY 2023) way
More informationWELCOME. Thank you for joining us at the Second Public Workshop for the Carlsbad Pedestrian Master Plan. We look forward to receiving your feedback.
City of Carlsbad Pedestrian Master Plan: WELCOME WELCOME Please Sign In Provide Input at Flip Charts Review Boards Presentation of Draft Plan Thank you for joining us at the Second Public Workshop for
More informationChapter 5 Future Transportation
Chapter 5 Future Transportation The Future Land Use Plan identifies the desired land use designations. The land uses desired for Crozet depend, in large part, on the success of the transportation system,
More information