RJ Kendall Pty Ltd. Building & Engineering Consultant. 5 th May Peter Fitzpatrick Director of Properties Diocese of Wagga Wagga

Size: px
Start display at page:

Download "RJ Kendall Pty Ltd. Building & Engineering Consultant. 5 th May Peter Fitzpatrick Director of Properties Diocese of Wagga Wagga"

Transcription

1 RJ Kendall Pty Ltd Building & Engineering Consultant 13 Clare Ave, Wagga Wagga, NSW 2650 ph ABN th May 2014 Peter Fitzpatrick Director of Properties Diocese of Wagga Wagga RE: Fill Lots & Lloyd Estate Stage 5, Wagga Wagga This is to confirm that I have received and examined the following documents: 1. Aitken Rowe Geotechnical Engineering compaction records and certificate of fill placement dated 26 th March Detailed plan of subdivision from Esler and Associates Project Sheets 42 & 43 Rev E I have confirmed from these documents that 1. all fill has been placed as controlled fill across the whole of these allotments 2. all fill is to a depth of 1500mm or less. 3. the fill has an allowable bearing capacity of 100kPa. In accordance with AS2870 Residential Slabs and Footings Code and the advice from Aitken Rowe, this fill is suitable to use as a foundation material for any foundation designed in accordance with that Code providing the required bearing capacity is less than or equal to 100kPa. In this instance there is no requirement to carry foundations down to natural ground. I recommend that Aitken Rowe testing shall be further engaged to give a site classification for these sites which will complete the site information required in order to allow the foundation design to be carried out. Rod Kendall B.E. (HONS), L.G.E, F.I.E.AUST. 75 Baylis

2 G Geotechnical Engineering Environmental Consultancy Soil Concrete Aggregate Testing NATA Accredited Laboratories ABN ACN April 2014 Reg. No.: FC14-08 Turners Excavations Pty Ltd 14 Blaxland Road Wagga Wagga NSW 2650 Attention: Mr. Lew Turner Dear Sir, CERTIFICATION OF FILL PLACEMENT TREE BACKFILL AREA (South of Lot 526), LLOYD ESTATE STAGE 5, WAGGA WAGGA, NSW Further to your request, we inspected the exposed subgrade and tested the fill placement at the above site between 4 and 7 March We confirm that placement of fill at the above site was tested by Aitken Rowe Testing Laboratories Pty Ltd in accordance with AS Guidelines on earthworks for commercial and residential developments. The fill placement was inspected and tested for the maximum depth of 1500mm in compacted layers of 300mm throughout tree backfill area. The test reports are herewith attached. The subject site is located at Lloyd Estate (Stage 5), Wagga Wagga, NSW and includes the tree backfill area of an unidentified lot directly south of Lot 526 and north of the existing dam. We inspected the exposed subgrade prior to the placement of the new fill to ensure topsoil and unsuitable materials were removed and the exposed subgrade is properly proof rolled. It was noted that topsoil was removed across the site at the time of inspection and an excavation up to 1500mm in depth had been undertaken. We then witnessed proof rolling of the exposed medium plasticity sandy silty clay subgrade and no soft or heaving areas were detected. We also witnessed proof rolling on the final fill layer and the exposed fill was found to be firm and stable at the time of the inspection. The medium plasticity sandy silty clay fill material was placed throughout the site. Five In-situ density tests carried out on the fill placement indicated relative compaction ranging from 98.5% to 100.0% standard. The result shows achievement of required density in accordance with the specification requirements. It is considered that the fill is deemed controlled fill across the tree backfill area in accordance with AS The controlled fill can then therefore be considered suitable to use as foundation/subgrade, for which an allowable bearing pressure of 100kPa may be adopted. It should be noted that this certification is limited to the backfilling of the tree area only and not for the entire lot. 4/2 Riedell Street (Po Box 5158), Wagga Wagga, NSW, 2650 Tel (02) Fax (02) Benerembah Street, Griffith, NSW, Tel (02) Fax (02) admin@artl.com.au

3 Should you have any queries, please do contact us. Yours truly, Tin Maung Senior Geotechnical Engineer Attachments: Addendum In-situ density test report Proof roll inspection report Registration No: FC14-08 Project/Location: Certification of Fill Placement Tree Removal Area (South of Lot 526), Lloyd Estate Stage 5, Wagga Wagga, NSW Client: Turners Excavations Wagga Wagga 2

4 ADDENDUM LIMITS OF INVESTIGATION The recommendations made in this report are based on the assumption that the test results are representative of the overall subsurface conditions. However, it should be noted that even under optimum circumstances, actual conditions in some parts of the building site may differ from those said to exist, because no geotechnical engineer, no matter how qualified, and no subsurface exploration program, no matter how comprehensive, can reveal all that is hidden by earth, rock and time. The client should also be aware that our recommendations refer only to our test site locations and the ground level at the time of testing. The recommendations in this report are based on the following: - a) The information gained from our investigation. b) The present "state of the art" in testing and design. c) The building type and site treatment conveyed to us by the client. d) Historical Information Should the client or his agent have omitted to supply us with the correct relevant information, or make significant changes to the building type and/or building envelope, our report may not take responsibility for any consequences and we reserve the right to make an additional charge if more testing is necessary. Not withstanding the recommendations made in this report, we also recommend that whenever footings are close to any excavations or easements, that consideration should be given to deepening the footings. Unless otherwise stated in our commission, any dimensions or slope direction and magnitude should not be used for any building costing calculations and/or positioning. Any sketch supplied should be considered as only an approximate pictorial evidence of our work.

5 2 Riedell St. Wagga Wagga N.S.W DENSITY IN SITU CLIENT : TURNERS EXCAVATIONS - WAGGA WAGGA LLOYD ESTATE - STAGE 5 PAGE: 1 OF: 1 ORDER NO : TEST METHODS : AS AS AS AS WAGGA WAGGA SECTIONS REPRESENTED : TREE REMOVAL BACKFILL (South of Lot 526) SAMPLING PROCEDURE: AS LOT No. : CLAUSE: 6.4b LAYER & MATERIAL : FILL - SANDY SILTY CLAY REGISTRATION No. : R12b FC14-08 SAMPLE OR SITE No.: CHAINAGE (m): WEST CENTRE WEST EAST CENTRE OFFSET (m) : CENTRE CENTRE CENTRE CENTRE CENTRE DATE OF TEST : 5/03/14 5/03/14 5/03/14 7/03/14 7/03/14 TIME OF TEST : DEPTH BELOW FINAL LEVEL (mm) : NIL REDUCED LEVEL (m) : TESTED DEPTH (mm) : FIELD DRY DENSITY (t/m 3 ): FIELD WET DENSITY ( t/m 3 ) : PCWD. PEAK CONVERTED WET DENSITY ( t/m 3 ) : APCWD. ADJUSTED PEAK CONVERTED WET DENSITY ( t/m 3 ) : 3 MAXIMUM DRY DENSITY ( t/m 3 ) : APPARENT OPT. MOISTURE CONTENT %: 2.0 DRY 1.1 DRY 1.0 DRY 1.8 DRY 1.9 DRY OPTIMUM MOISTURE CONTENT (%) : FIELD MOISTURE VARIATION % : 2.3 DRY 1.3 DRY 1.2 DRY 2.1 DRY 2.2 DRY CONTENT ACTUAL % : % of OPTIMUM MOISTURE CONTENT : % of OVERSIZE: NIL NIL NIL NIL NIL DENSITY OF OVERSIZE ( if any ) t/m 3 : N/A N/A N/A N/A N/A FRACTION TESTED (mm): COMPACTIVE EFFORT : STANDARD STANDARD STANDARD STANDARD STANDARD TIME FROM ADDITION OF ADDITIVE TO LAB. COMPACTION: MD DETERMINATION BEFORE/AFTER COMPACTION : BEFORE BEFORE BEFORE BEFORE BEFORE RELATIVE COMPACTION (%) : SPECIFIED (%) : Accredited for compliance with ISO/IEC The results of the tests, calibrations and/or measurements included in this document are traceable to Australian/national standards. Number: 4679 APPROVED SIGNATORY :... DATE : 17/03/2014 Form R12b revised 17/03/2014

6 PAGE: 1 4/2 Riedell St. Wagga Wagga N.S.W OF: 2 TEST METHOD: T198 PROOF ROLLING TEST ORDER No.: CLIENT : TURNERS EXCAVATIONS - WAGGA WAGGA DATE OF TEST: 4/03/14 TREE REMOVAL BACKFILL (South of Lot 526) LOCATION/SECTION/LOT No.: LLOYD ESTATE - STAGE 5, WAGGA WAGGA REGISTRATION No : FC14-08 TOPSOIL REMOVED (mm): 100 DEPTH BELOW FINAL LEVEL(mm): UNSUITABLE MATERIAL REMOVED: 1500 ROLLER DESCRIPTION: TYPE: GRADER MODEL: CAT GROSS MASS: 18t TYRE PRESSURE: N/K SURFACE DEFORMATION / CONDITION PERCIEVED AS: 1. NON PERCEPTIBLE 2. NO DEFLECTION, FIRM ROLLING PATTERN (% OF OVERLAP): 70 TIME OF PROOF ROLL: 0845 SURFACE NOT WETTED PRIOR TO PROOF ROLL Site Plan (Failed) (Passed) APPROVED BY :... DATE : 17/03/2014 Form R38 Dated 25/09/13

7 PAGE: 2 4/2 Riedell St. Wagga Wagga N.S.W OF: 2 TEST METHOD: T198 PROOF ROLLING TEST ORDER No.: CLIENT : TURNERS EXCAVATIONS - WAGGA WAGGA DATE OF TEST: 8/03/14 TREE REMOVAL BACKFILL (South of Lot 526) LOCATION/SECTION/LOT No.: LLOYD ESTATE - STAGE 5, WAGGA WAGGA REGISTRATION No : FC14-08 TOPSOIL REMOVED (mm): N/A DEPTH BELOW FINAL LEVEL(mm): NIL FILL MATERIAL PLACED (mm): ROLLER DESCRIPTION: TYPE: GRADER MODEL: CAT GROSS MASS: 18t TYRE PRESSURE: N/K SURFACE DEFORMATION / CONDITION PERCIEVED AS: 1. NON PERCEPTIBLE 2. NO DEFLECTION, FIRM ROLLING PATTERN (% OF OVERLAP): 70 TIME OF PROOF ROLL: 0850 SURFACE NOT WETTED PRIOR TO PROOF ROLL Site Plan (Failed) (Passed) APPROVED BY :... DATE : 17/03/2014 Form R38 Dated 25/09/13

8 G Geotechnical Engineering Environmental Consultancy Soil Concrete Aggregate Testing NATA Accredited Laboratories ABN ACN March 2014 Reg. No.: FC14-02 Turners Excavations Pty Ltd 14 Blaxland Road Wagga Wagga NSW 2650 Attention: Mr. Lew Turner Dear Sir, CERTIFICATION OF FILL PLACEMENT LOTS & , LLOYD ESTATE STAGE 5, WAGGA WAGGA, NSW Further to your request, we inspected the exposed subgrade and tested the fill placement at the above site between 21 January and 17 March We confirm that placement of fill at the above site was tested by Aitken Rowe Testing Laboratories Pty Ltd in accordance with AS Guidelines on earthworks for commercial and residential developments. The fill placement was inspected and tested for the maximum depth of 800mm (for lots ) and 1000mm (for lots ) in compacted layers of 300mm throughout with the exception of the top layer which was tested in a 100mm layer for lots and 200mm layer for lots at the site. The test reports are herewith attached. The subject site is located at Lloyd Estate (Stage 5), Wagga Wagga, NSW and includes lots and lots We inspected the exposed subgrade prior to the placement of the new fill to ensure topsoil and unsuitable materials were removed and the exposed subgrade is properly proof rolled. It was noted that 150mm of topsoil was removed across the site at the time of inspection. We then witnessed proof rolling of the exposed medium plasticity sandy silty clay subgrade and no soft or heaving areas were detected. We also witnessed proof rolling on the final fill layer and the exposed fill was found to be firm and stable at the time of the inspection. The medium plasticity sandy silty clay fill material was placed throughout the site. Eighteen In-situ density tests carried out on the fill placement indicated relative compaction ranging from 98.5% to 102.5% standard. The result shows achievement of required density in accordance with the specification requirements. It is considered that the fill is deemed controlled fill across the site in accordance with AS The controlled fill pad can then therefore be considered suitable to use as foundation/subgrade, for which an allowable bearing pressure of 100kPa may be adopted. 4/2 Riedell Street (Po Box 5158), Wagga Wagga, NSW, 2650 Tel (02) Fax (02) Benerembah Street, Griffith, NSW, Tel (02) Fax (02) admin@artl.com.au

9 Should you have any queries, please do contact us. Yours truly, Tin Maung Senior Geotechnical Engineer Attachments: Addendum In-situ density test report Proof roll inspection report Registration No: FC14-02 Project/Location: Certification of Fill Placement Lots & , Lloyd Estate Stage 5, Wagga Wagga, NSW Client: Turners Excavations 2

10

11 2 Riedell St. Wagga Wagga N.S.W DENSITY IN SITU CLIENT : TURNERS EXCAVATIONS - WAGGA WAGGA LLOYD ESTATE - STAGE 5 PAGE: 1 OF: 3 ORDER NO : TEST METHODS : AS AS AS AS WAGGA WAGGA SECTIONS REPRESENTED : LOTS & SAMPLING PROCEDURE: AS LOT No. : CLAUSE: 6.4b LAYER & MATERIAL : FILL; Sandy Silty CLAY REGISTRATION No. : R12b FC14-02 SAMPLE OR SITE No CHAINAGE (m) LOT 548 LOT 547 LOT 544 LOT 525 LOT 527 LOT 541 OFFSET (m) EAST EAST N/W S/E SOUTH WEST DATE OF TEST 3/02/14 3/02/14 3/02/14 3/02/14 3/02/14 4/02/14 TIME OF TEST DEPTH BELOW FINAL LEVEL (mm) REDUCED LEVEL (m) TESTED DEPTH (mm) FIELD DRY DENSITY (0.01 t/m 3 ) FIELD WET DENSITY (0.01 t/m 3 ) PCWD. PEAK CONVERTED WET DENSITY (0.01 t/m 3 ) APCWD. ADJ. PEAK CONVERTED WET DENSITY (0.01 t/m 3 ) MAXIMUM DRY DENSITY (0.01 t/m 3 ) OPTIMUM MOISTURE CONTENT (0.5 %) FIELD MOISTURE VARIATION (0.5 %) (WET/DRY): DRY DRY DRY DRY DRY DRY CONTENT ACTUAL (0.5 %) MOISTURE RATIO (0.5 %) OVERSIZE (0.1 %) NIL NIL NIL NIL NIL NIL DENSITY OF OVERSIZE (if any) (0.01 t/m 3) N/A N/A N/A N/A N/A N/A FRACTION TESTED (mm) COMPACTIVE EFFORT STANDARD STANDARD STANDARD STANDARD STANDARD STANDARD TIME FROM ADDITION OF ADDITIVE TO LAB. COMPACTION MD DETERMINATION BEFORE/AFTER COMPACTION AFTER AFTER AFTER AFTER AFTER AFTER DENSITY RATIO (0.5 %) SPECIFIED DENSITY RATIO (%) Accredited for compliance with ISO/IEC The results of the tests, calibrations and/or measurements included in this document are traceable to Australian/national standards. APPROVED SIGNATORY :... DATE : 25/03/2014 Number: 4679 Form R12b revised 17/03/2014

12 2 Riedell St. Wagga Wagga N.S.W DENSITY IN SITU CLIENT : TURNERS EXCAVATIONS - WAGGA WAGGA LLOYD ESTATE - STAGE 5 PAGE: 2 OF: 3 ORDER NO : TEST METHODS : AS AS AS AS WAGGA WAGGA SECTIONS REPRESENTED : LOTS & SAMPLING PROCEDURE: AS LOT No. : CLAUSE: 6.4b LAYER & MATERIAL : FILL; Sandy Silty CLAY REGISTRATION No. : R12b FC14-02 SAMPLE OR SITE No CHAINAGE (m) LOT 547 LOT 545 LOT 525 LOT 527 LOT 549 LOT 542 OFFSET (m) SOUTH N/E S/E NORTH NORTH SOUTH DATE OF TEST 4/02/14 4/02/14 4/02/14 4/02/14 11/02/14 11/02/14 TIME OF TEST DEPTH BELOW FINAL LEVEL (mm) REDUCED LEVEL (m) TESTED DEPTH (mm) FIELD DRY DENSITY (0.01 t/m 3 ) FIELD WET DENSITY (0.01 t/m 3 ) PCWD. PEAK CONVERTED WET DENSITY (0.01 t/m 3 ) APCWD. ADJ. PEAK CONVERTED WET DENSITY (0.01 t/m 3 ) MAXIMUM DRY DENSITY (0.01 t/m 3 ) OPTIMUM MOISTURE CONTENT (0.5 %) FIELD MOISTURE VARIATION (0.5 %) (WET/DRY): DRY DRY DRY DRY DRY DRY CONTENT ACTUAL (0.5 %) MOISTURE RATIO (0.5 %) OVERSIZE (0.1 %) NIL NIL NIL NIL NIL NIL DENSITY OF OVERSIZE (if any) (0.01 t/m 3) N/A N/A N/A N/A N/A N/A FRACTION TESTED (mm) COMPACTIVE EFFORT STANDARD STANDARD STANDARD STANDARD STANDARD STANDARD TIME FROM ADDITION OF ADDITIVE TO LAB. COMPACTION MD DETERMINATION BEFORE/AFTER COMPACTION AFTER AFTER AFTER AFTER AFTER AFTER DENSITY RATIO (0.5 %) SPECIFIED DENSITY RATIO (%) Accredited for compliance with ISO/IEC The results of the tests, calibrations and/or measurements included in this document are traceable to Australian/national standards. APPROVED SIGNATORY :... DATE : 25/03/2014 Number: 4679 Form R12b revised 17/03/2014

13 2 Riedell St. Wagga Wagga N.S.W DENSITY IN SITU CLIENT : TURNERS EXCAVATIONS - WAGGA WAGGA LLOYD ESTATE - STAGE 5 PAGE: 3 OF: 3 ORDER NO : TEST METHODS : AS AS AS AS WAGGA WAGGA SECTIONS REPRESENTED : LOTS & SAMPLING PROCEDURE: AS LOT No. : CLAUSE: 6.4b LAYER & MATERIAL : FILL; Sandy Silty CLAY REGISTRATION No. : R12b FC14-02 SAMPLE OR SITE No CHAINAGE (m) LOT 544 LOT 526 LOT 527 LOT 549 LOT 543 LOT 545 OFFSET (m) WEST N/W SOUTH N/W N/W S/E DATE OF TEST 11/02/14 11/02/14 11/02/14 17/03/14 17/03/14 17/03/14 TIME OF TEST DEPTH BELOW FINAL LEVEL (mm) 100 NIL NIL NIL NIL NIL REDUCED LEVEL (m) TESTED DEPTH (mm) FIELD DRY DENSITY (0.01 t/m 3 ) FIELD WET DENSITY (0.01 t/m 3 ) PCWD. PEAK CONVERTED WET DENSITY (0.01 t/m 3 ) APCWD. ADJ. PEAK CONVERTED WET DENSITY (0.01 t/m 3 ) MAXIMUM DRY DENSITY (0.01 t/m 3 ) OPTIMUM MOISTURE CONTENT (0.5 %) FIELD MOISTURE VARIATION (0.5 %) (WET/DRY): DRY DRY DRY DRY DRY DRY CONTENT ACTUAL (0.5 %) MOISTURE RATIO (0.5 %) OVERSIZE (0.1 %) NIL NIL NIL NIL NIL NIL DENSITY OF OVERSIZE (if any) (0.01 t/m 3) N/A N/A N/A N/A N/A N/A FRACTION TESTED (mm) COMPACTIVE EFFORT STANDARD STANDARD STANDARD STANDARD STANDARD STANDARD TIME FROM ADDITION OF ADDITIVE TO LAB. COMPACTION MD DETERMINATION BEFORE/AFTER COMPACTION AFTER AFTER AFTER AFTER AFTER AFTER DENSITY RATIO (0.5 %) SPECIFIED DENSITY RATIO (%) Accredited for compliance with ISO/IEC The results of the tests, calibrations and/or measurements included in this document are traceable to Australian/national standards. APPROVED SIGNATORY :... DATE : 25/03/2014 Number: 4679 Form R12b revised 17/03/2014

14 PAGE: 1 4/2 Riedell St. Wagga Wagga N.S.W OF: 2 TEST METHOD: T198 PROOF ROLLING TEST ORDER No.: CLIENT : TURNERS EXCAVATIONS - WAGGA WAGGA DATE OF TEST: 21/01/14 LLOYD ESTATE - STAGE 5, WAGGA WAGGA LOCATION/SECTION/LOT No.: LOTS & REGISTRATION No : FC14-02 TOPSOIL REMOVED (mm): 150 DEPTH BELOW FINAL LEVEL(mm): UNSUITABLE MATERIAL REMOVED: N/A ROLLER DESCRIPTION: TYPE: GRADER MODEL: CAT GROSS MASS: 18t TYRE PRESSURE: N/K SURFACE DEFORMATION / CONDITION PERCIEVED AS: 1. NON PERCEPTIBLE 2. NO DEFLECTION, FIRM ROLLING PATTERN (% OF OVERLAP): 70 TIME OF PROOF ROLL: 0930 SURFACE NOT WETTED PRIOR TO PROOF ROLL Site Plan Waterhouse Avenue Goldstein Crescent Lots mm B.F.L N (Failed) (Passed) Ansett Place Chipp Place Clunies Ross Crescent Lots mm B.F.L APPROVED BY :... DATE : 25/03/2014 Form R38 Dated 25/09/13

15 PAGE: 2 4/2 Riedell St. Wagga Wagga N.S.W OF: 2 TEST METHOD: T198 PROOF ROLLING TEST ORDER No.: CLIENT : TURNERS EXCAVATIONS - WAGGA WAGGA DATE OF TEST: 17/03/14 LLOYD ESTATE - STAGE 5, WAGGA WAGGA LOCATION/SECTION/LOT No.: LOTS & REGISTRATION No : FC14-02 TOPSOIL REMOVED (mm): N/A UNSUITABLE MATERIAL REMOVED: N/A DEPTH BELOW FINAL LEVEL(mm): NIL ROLLER DESCRIPTION: TYPE: GRADER MODEL: CAT GROSS MASS: 18t TYRE PRESSURE: N/K SURFACE DEFORMATION / CONDITION PERCIEVED AS: 1. NON PERCEPTIBLE 2. NO DEFLECTION, FIRM ROLLING PATTERN (% OF OVERLAP): 70 TIME OF PROOF ROLL: 1620 SURFACE NOT WETTED PRIOR TO PROOF ROLL Site Plan Lots NIL Goldstein Crescent B.F.L Waterhouse Avenue N (Failed) (Passed) Ansett Place Chipp Place Clunies Ross Crescent Lots NIL B.F.L APPROVED BY :... DATE : 25/03/2014 Form R38 Dated 25/09/13

CENGRS GEOTECHNICA PVT. LTD. Job No Sheet No. 1

CENGRS GEOTECHNICA PVT. LTD. Job No Sheet No. 1 CENGRS GEOTECHNICA PVT. LTD. Job No. 214030 Sheet No. 1 INTERIM REPORT ON GEOTECHNICAL INVESTIGATION FOR PROPOSED 66 KV GRID PLOT AT G-7, DWARKA, NEW DELHI. 1.0 INTRODUCTION 1.1 Project Description M/s.

More information

REPORT GEO-TECHNICAL INVESTIGATION FOR THE PROPOSED BLOCK-1 SUB-STATION SY NO-44, NEAR KYATAGANACHERLU VILLAGE

REPORT GEO-TECHNICAL INVESTIGATION FOR THE PROPOSED BLOCK-1 SUB-STATION SY NO-44, NEAR KYATAGANACHERLU VILLAGE REPORT ON GEO-TECHNICAL INVESTIGATION FOR THE PROPOSED BLOCK-1 SUB-STATION SY NO-44, NEAR KYATAGANACHERLU VILLAGE CLIENT: KARNATAKA SOLAR POWER DEVELOPMENT CORPORATION BANGALORE 0 GEO-TECHNICAL INVESTIGATION

More information

REPORT GEO-TECHNICAL INVESTIGATION FOR THE PROPOSED BLOCK-7 SUB-STATION SY NO-225, NEAR RAYACHERLU VILLAGE

REPORT GEO-TECHNICAL INVESTIGATION FOR THE PROPOSED BLOCK-7 SUB-STATION SY NO-225, NEAR RAYACHERLU VILLAGE REPORT ON GEO-TECHNICAL INVESTIGATION FOR THE PROPOSED BLOCK-7 SUB-STATION SY NO-225, NEAR RAYACHERLU VILLAGE CLIENT: KARNATAKA SOLAR POWER DEVELOPMENT CORPORATION BANGALORE 0 GEO-TECHNICAL INVESTIGATION

More information

EXPERIMENT 5 FIELD DENSITY TEST: SAND REPLACEMENT METHOD (PREPARED BY : MUHAMMAD MUNSIF AHMAD)

EXPERIMENT 5 FIELD DENSITY TEST: SAND REPLACEMENT METHOD (PREPARED BY : MUHAMMAD MUNSIF AHMAD) 1.0 OBJECTIVE EXPERIMENT 5 FIELD DENSITY TEST: SAND REPLACEMENT METHOD (PREPARED BY : MUHAMMAD MUNSIF AHMAD) To determine the in-situ density of fine and medium rained soil. 2.0 INTRODUCTION In most specifications

More information

ITEM 400 STRUCTURAL EXCAVATION AND BACKFILL

ITEM 400 STRUCTURAL EXCAVATION AND BACKFILL AFTER MARCH 1, 2012 ITEM 400 STRUCTURAL EXCAVATION AND BACKFILL 400.1 Description. This item shall govern for all excavation required for the construction of all structures, except pipe or box sewers for

More information

APPENDIX C VEGETATED EMERGENCY SPILLWAY. VERSION 1.0 March 1, 2011

APPENDIX C VEGETATED EMERGENCY SPILLWAY. VERSION 1.0 March 1, 2011 APPENDIX C VEGETATED EMERGENCY SPILLWAY VERSION 1.0 March 1, 2011 [NOTE: Could use a better photo more clearly showing the emergency spillway in the context of the dam.] SECTION C-1: DESCRIPTION OF PRACTICE

More information

SUPPORTING NOTES FOR THE EVALUATION OF UNBOUND ROAD BASE AND SUB-BASE AGGREGATES

SUPPORTING NOTES FOR THE EVALUATION OF UNBOUND ROAD BASE AND SUB-BASE AGGREGATES SUPPORTING NOTES FOR THE EVALUATION OF UNBOUND ROAD BASE AND SUB-BASE AGGREGATES (These notes are guidelines only and must not be included in the Contract Documents). 1. SCOPE These Notes are guidelines

More information

FIGURES APPENDIX A SYMBOL SAMPLING DESCRIPTION Location of sample obtained in general accordance with ASTM D 1586 Standard Penetration Test with recovery Location of sample obtained using thin-wall

More information

GUIDANCE FOR THE APPLICATION OF EQUIPMENT CALIBRATION AND TRACEABILITY OF MEASUREMENTS ON INSPECTION BODIES

GUIDANCE FOR THE APPLICATION OF EQUIPMENT CALIBRATION AND TRACEABILITY OF MEASUREMENTS ON INSPECTION BODIES GUIDANCE FOR THE APPLICATION OF EQUIPMENT CALIBRATION AND TRACEABILITY OF MEASUREMENTS ON INSPECTION BODIES ESYD G-DIAKRIB/01/01/26-03-2015 1/6 ESYD G-DIAKRIB Issue: 01 Revision: 01 Issue Date: 28-11-2007

More information

FINAL REPORT ON: GEOTECHNICAL INVESTIGATION FOR ENVIRONMENTAL REGULATORY TRAINING INSTITUTE AT NIMLI VILLAGE, TIJARA ALWAR, RAJASTHAN.

FINAL REPORT ON: GEOTECHNICAL INVESTIGATION FOR ENVIRONMENTAL REGULATORY TRAINING INSTITUTE AT NIMLI VILLAGE, TIJARA ALWAR, RAJASTHAN. FINAL REPORT ON: GEOTECHNICAL INVESTIGATION FOR ENVIRONMENTAL REGULATORY TRAINING INSTITUTE AT NIMLI VILLAGE, TIJARA ALWAR, RAJASTHAN Submitted to: M/s. Nilayam Housing Pvt. Ltd. 4, Windmill Place Aya

More information

GRAVEL ROAD MAINTENANCE PLAN FOR THE TRANSPORT OF SOLAR ENERGY EQUIPMENT FROM CAPE TOWN TO THE ALEXANDER BAY AREA

GRAVEL ROAD MAINTENANCE PLAN FOR THE TRANSPORT OF SOLAR ENERGY EQUIPMENT FROM CAPE TOWN TO THE ALEXANDER BAY AREA GRAVEL ROAD MAINTENANCE PLAN FOR THE TRANSPORT OF SOLAR ENERGY EQUIPMENT FROM CAPE TOWN TO THE ALEXANDER BAY AREA C2589C/MP-REP-001 Rev 1 GRAVEL ROAD MAINTENANCE PLAN APRIL 2015 PREPARED FOR: PREPARED

More information

STRUCTURAL STABILITY ASSESSMENT

STRUCTURAL STABILITY ASSESSMENT STRUCTURAL STABILITY ASSESSMENT CFR 257.73(d) Fly Ash Reservoir II Cardinal Plant Brilliant, Ohio October, 2016 Prepared for: Cardinal Operating Company Cardinal Plant Brilliant, Ohio Prepared by: Geotechnical

More information

RESISTANCE OF COMPACTED ASPHALT MIXTURE TO MOISTURE INDUCED DAMAGE (Kansas Test Method KT-56)

RESISTANCE OF COMPACTED ASPHALT MIXTURE TO MOISTURE INDUCED DAMAGE (Kansas Test Method KT-56) 5.9.56 RESISTANCE OF COMPACTED ASPHALT MIXTURE TO MOISTURE INDUCED DAMAGE (Kansas Test Method ) 1. SCOPE This test covers preparation of specimens and measurement of the change of tensile strength resulting

More information

Type Testing Procedure for Crankcase Explosion Relief Valves

Type Testing Procedure for Crankcase Explosion Relief Valves (Jan 2005) (Corr.1 Nov 2005) (Rev.1 Oct 2006) (Corr.1 Mar 2007) (Rev.2 Sept 2007) (Corr.1 Oct 2007) (Rev.3 Jan 2008) Type Testing Procedure for Crankcase Explosion Relief Valves 1. Scope 1.1 To specify

More information

UNIT-I SOIL EXPLORATION

UNIT-I SOIL EXPLORATION SIDDHARTH GROUP OF INSTITUTIONS :: PUTTUR Siddharth Nagar, Narayanavanam Road 517583 QUESTION BANK (DESCRIPTIVE) Subject with Code : Geotechnical Engineering - II (16CE127) Year & Sem: III-B.Tech & II-Sem

More information

Supersedes: The copy of this document located on Measurement Canada s website is considered to be the controlled copy.

Supersedes: The copy of this document located on Measurement Canada s website is considered to be the controlled copy. Bulletin Category: GAS Bulletin: G-23 Page: 1 of 7 The copy of this document located on Measurement Canada s website is considered to be the controlled copy. Recognition of data from specialty gas suppliers

More information

CRITERIA FOR LABORATORY ACCREDITATION IN THE FIELD OF PRESSURE METROLOGY

CRITERIA FOR LABORATORY ACCREDITATION IN THE FIELD OF PRESSURE METROLOGY CRITERIA FOR LABORATORY ACCREDITATION IN THE FIELD OF PRESSURE METROLOGY Approved By: Chief Executive Officer: Ron Josias Senior Manager: Mpho Phaloane Revised By: Specialist Technical Committee Date of

More information

POST-INSTALLATION INSPECTION REPORT

POST-INSTALLATION INSPECTION REPORT POST-INSTALLATION INSPECTION REPORT Commissioned by : Plan 4 Sport Fitness Trails UK Ltd Site Name : Ifield School 01 July 2011 RoSPA inspections are an independent safety assessment of the site and equipment

More information

Reinforced Soil Retaining Walls-Design and Construction

Reinforced Soil Retaining Walls-Design and Construction Lecture 32 Reinforced Soil Retaining Walls-Design and Construction Prof. G L Sivakumar Babu Department of Civil Engineering Indian Institute of Science Bangalore 560012 Example calculation An 8 m high

More information

Field Instruction. This instruction applies to Horizon Power employees and contractors involved in Horizon Power s underground projects.

Field Instruction. This instruction applies to Horizon Power employees and contractors involved in Horizon Power s underground projects. 5.23 Soil Compaction Testing Requirements Purpose This instruction has been developed to support projects where the reinstatement and compaction of soil is required following an excavation. The purpose

More information

MINE SAFETY TARGETED ASSESSMENT PROGRAM. Ground or strata failure NSW metalliferous mines. April

MINE SAFETY TARGETED ASSESSMENT PROGRAM. Ground or strata failure NSW metalliferous mines. April MINE SAFETY TARGETED ASSESSMENT PROGRAM Ground or strata failure NSW metalliferous mines April 2017 www.resourcesandenergy.nsw.gov.au Document control Publication title: Ground or strata failure NSW metalliferous

More information

Field Instruction. This instruction applies to Horizon Power employees and contractors involved in Horizon Power s underground projects.

Field Instruction. This instruction applies to Horizon Power employees and contractors involved in Horizon Power s underground projects. 5.23 Soil Compaction Testing Requirements Purpose This instruction has been developed to support projects where the reinstatement and compaction of soil is required following an excavation. The purpose

More information

Monitoring excavation in the highway

Monitoring excavation in the highway This unit covers the requirements that you must meet when monitoring excavation work in the highway. You must ensure that you act in accordance with all current specifications and procedures and that you

More information

CONE PENETRATION TESTS

CONE PENETRATION TESTS February 25, 2015 John Doe, P.E. Acme Engineering and Testing 1234 Test Avenue, Suite 204 Lake Wales, FL 33853 Re: Sample CPT Soundings Dear Mr. Doe, Direct Push Services, LLC (DPS) was retained by Acme

More information

4.7 Landscape Provisions.

4.7 Landscape Provisions. 4.7. A. Intent. Landscaping of required Yards and required Bufferyards is an essential element of the design of a site with respect to promoting the public health, safety, comfort, convenience and general

More information

Pole Foundation Design with Spreadsheet

Pole Foundation Design with Spreadsheet PDHonline Course S235 (1 PDH) Pole Foundation Design with Spreadsheet Instructor: John W. Andrew, PE 2012 PDH Online PDH Center 5272 Meadow Estates Drive Fairfax, VA 22030-6658 Phone & Fax: 703-988-0088

More information

Specifier Note: Retain or delete material(s) below to conform to project requirements.

Specifier Note: Retain or delete material(s) below to conform to project requirements. SECTION 32 15 40 DECOMPOSED GRANITE SURFACING NOTE: These specifications were current at the time of publication but are subject to change at any time without notice. Please confirm the accuracy of these

More information

Grading Plan - Drawing No. C-2 - Project Revision 1 dated January 30, 2018.

Grading Plan - Drawing No. C-2 - Project Revision 1 dated January 30, 2018. patersongroup consulting engineers memorandum re: Geotechnical Recommendations Reinforced Slope Details Proposed Commercial Building 2510 Walkley Road - Ottawa to: Christopher Simmonds Architect Inc. -

More information

Application of Expansive Soil Geotechnical Procedures

Application of Expansive Soil Geotechnical Procedures Application of Expansive Soil Geotechnical Procedures FPA PRESENTATION John T. Bryant, Ph.D., P.G., P.E with Robert L. Lytton, Ph.D., PE. And Mr. Dean Read HOUSTON, TEXAS WEDNESDAY DECEMBER 10, 2008 2008

More information

Reinstatement of sub-base and base (roadbase) in non-bituminous materials

Reinstatement of sub-base and base (roadbase) in non-bituminous materials This unit covers the requirements that you must meet when reinstating sub-base and base (roadbase) in. You must ensure that you act in accordance with all current specifications and procedures and that

More information

3. Types of foundation

3. Types of foundation Foundation Engineering CE 48. Types of foundation & foundation materials Contents Introduction Shallow Foundations Deep Foundations Introduction Why different types of? General types of Introduction Why

More information

Influence of Settlement on Bearing Capacity Analysis of Shallow Foundations on Sandy Clays in the Niger Delta, Nigeria

Influence of Settlement on Bearing Capacity Analysis of Shallow Foundations on Sandy Clays in the Niger Delta, Nigeria Available online at www.scholarsresearchlibrary.com European Journal of Applied Engineering and Scientific Research, 201, 2 (4):20-27 (http://scholarsresearchlibrary.com/archive.html) ISSN: 22 0041 Influence

More information

ANNUAL INSPECTION BY A QUALIFIED PROFESSIONAL ENGINEER ALL CCR IMPOUNDMENTS CCR Rule Section (b)

ANNUAL INSPECTION BY A QUALIFIED PROFESSIONAL ENGINEER ALL CCR IMPOUNDMENTS CCR Rule Section (b) ANNUAL INSPECTION BY A QUALIFIED PROFESSIONAL ENGINEER ALL CCR IMPOUNDMENTS ASBURY POWER PLANT 21133 Uphill Lane Asbury, Missouri 64832 January 18, 2017 EMPIRE DISTRICT ELECTRIC COMPANY Prepared by: Rachel

More information

TAO Safety Policy No. HS-5.1 Page 1 of 15 Revision No. 2 Revision Date: July 19, 2005

TAO Safety Policy No. HS-5.1 Page 1 of 15 Revision No. 2 Revision Date: July 19, 2005 TAO Safety Policy No. HS-5.1 Page 1 of 15 Revision No. 2 1.0 OVERVIEW This safety policy provides guidance for conducting trenching and excavation activities at project sites. Emphasis is placed on sloping

More information

Chutes Part 2: Synthetic linings

Chutes Part 2: Synthetic linings s Part 2: Synthetic linings DRAINAGE CONTROL TECHNIQUE Low Gradient Velocity Control Short Term Steep Gradient Channel Lining Medium-Long Term Outlet Control [1] Soil Treatment Permanent [2] [1] s can

More information

COAL COMBUSTION RESIDUALS (CCR) FUGITIVE DUST CONTROL PLAN SANDY CREEK ENERGY STATION RIESEL, TEXAS. Prepared for:

COAL COMBUSTION RESIDUALS (CCR) FUGITIVE DUST CONTROL PLAN SANDY CREEK ENERGY STATION RIESEL, TEXAS. Prepared for: COAL COMBUSTION RESIDUALS (CCR) FUGITIVE DUST CONTROL PLAN SANDY CREEK ENERGY STATION RIESEL, TEXAS Prepared for: SANDY CREEK SERVICES, LLC P.O. Box 370 Riesel, Texas 76682 Prepared by: SCS ENGINEERS TBPE

More information

SPECIFICATION FOR REPEATED LOAD TRIAXIAL (RLT) TESTING FOR PAVEMENT MATERIALS

SPECIFICATION FOR REPEATED LOAD TRIAXIAL (RLT) TESTING FOR PAVEMENT MATERIALS SPECIFICATION FOR REPEATED LOAD TRIAXIAL (RLT) TESTING FOR PAVEMENT MATERIALS 1. SCOPE This specification details the six (6) stage permanent strain Repeated Load Triaxial (RLT) test for unbound and modified

More information

ASX Announcement. Target Energy Fairway Reserves Update. Corporate information. 20 September 2017

ASX Announcement. Target Energy Fairway Reserves Update. Corporate information. 20 September 2017 Target Energy Fairway Reserves Update Fairway Proven Reserves (net to Target) of 3.19 million barrels of oil equivalent (MMBOe) as of 30 June 2017 2017 update increases Fairway Proven Reserves by 11% Total

More information

COAL COMBUSTION RESIDUALS (CCR) FUGITIVE DUST CONTROL PLAN SANDY CREEK ENERGY STATION RIESEL, TEXAS. Prepared for:

COAL COMBUSTION RESIDUALS (CCR) FUGITIVE DUST CONTROL PLAN SANDY CREEK ENERGY STATION RIESEL, TEXAS. Prepared for: COAL COMBUSTION RESIDUALS (CCR) FUGITIVE DUST CONTROL PLAN SANDY CREEK ENERGY STATION RIESEL, TEXAS Prepared for: SANDY CREEK SERVICES, LLC P.O. Box 370 Riesel, Texas 76682 Prepared by: SCS ENGINEERS TBPE

More information

TECHNICAL SPECIFICATIONS SECANT CAISSON WALL TECHNICAL SPECIFICATIONS. October 19, Nanaimo Colliery Dam Auxiliary Spillway, Nanaimo, BC

TECHNICAL SPECIFICATIONS SECANT CAISSON WALL TECHNICAL SPECIFICATIONS. October 19, Nanaimo Colliery Dam Auxiliary Spillway, Nanaimo, BC SECANT CAISSON WALL TECHNICAL TECHNICAL Nanaimo Colliery Dam Auxiliary Spillway, Nanaimo, BC Submitted to: Toby Seward City of Nanaimo 455 Wallace Street Nanaimo, BC V9R 5J6 Report Number: Distribution:

More information

HumeCeptor system Installation guide. Issue 2

HumeCeptor system Installation guide. Issue 2 HumeCeptor system Installation guide Issue 2 Purpose of this guide This guide outlines the construction procedures and requirements for the installation of the HumeCeptor system. This document should be

More information

Cubzac-les-Ponts Experimental Embankments on Soft Clay

Cubzac-les-Ponts Experimental Embankments on Soft Clay Cubzac-les-Ponts Experimental Embankments on Soft Clay GEO-SLOPE International Ltd. www.geo-slope.com 1, 7 - th Ave SW, Calgary, AB, Canada TP T Main: +1 3 9 Fax: +1 3 39 Introduction In the 197 s, a series

More information

SECTION [ ] [02730] STABILIZED DECOMPOSED GRANITE SURFACING

SECTION [ ] [02730] STABILIZED DECOMPOSED GRANITE SURFACING SECTION [32 15 40] [02730] STABILIZED DECOMPOSED GRANITE SURFACING EDIT SPECIFICATION: Edit the following guide specification to comply with project requirements. This document is available in word processing

More information

Impact Test Equipment Ltd & User Guide. User Guide

Impact Test Equipment Ltd   &   User Guide. User Guide SL Impact Test Equipment Ltd www.impact-test.co.uk & www.impact-test.com User Guide User Guide Impact Test Equipment Ltd. Building 21 Stevenston Ind. Est. Stevenston Ayrshire KA20 3LR T: 01294 602626 F:

More information

SCOPE OF ACCREDITATION TO ISO/IEC 17025:2005 & ANSI/NCSL Z TROXLER ELECTRONICS LABORATORIES, INC. James Pratt Phone:

SCOPE OF ACCREDITATION TO ISO/IEC 17025:2005 & ANSI/NCSL Z TROXLER ELECTRONICS LABORATORIES, INC. James Pratt Phone: SCOPE OF ACCREDITATION TO ISO/IEC 17025:2005 & ANSI/NCSL Z540-1-1994 TROXLER ELECTRONICS LABORATORIES, INC. James Pratt Phone: 919 314 2707 CALIBRATION Valid To: See Footnote 5 Certificate Number: 3260.01

More information

Copyright ASTM International, 100 Barr Harbor Drive, PO Box C700, West Conshohocken, PA , United States.

Copyright ASTM International, 100 Barr Harbor Drive, PO Box C700, West Conshohocken, PA , United States. LastD 4429 93 standard and is intended only to provide the user of an ASTM standard an indication of what changes have been made to the previous version. Because it may not be technically possible to adequately

More information

IN-PLACE DENSITY AND MOISTURE CONTENT OF SOIL AND SOIL- AGGREGATE BY NUCLEAR METHODS (SHALLOW DEPTH) FOP FOR AASHTO T 310

IN-PLACE DENSITY AND MOISTURE CONTENT OF SOIL AND SOIL- AGGREGATE BY NUCLEAR METHODS (SHALLOW DEPTH) FOP FOR AASHTO T 310 AND MOISTURE CONTENT OF SOIL AND SOIL- AGGREGATE BY NUCLEAR METHODS (SHALLOW DEPTH) FOP FOR AASHTO T 310 Scope This procedure covers the determination of density, moisture content, and relative compaction

More information

PRECISION ESTIMATES OF AASHTO T324, HAMBURG WHEEL-TRACK TESTING OFCOMPACTED HOT MIX ASPHALT (HMA) APPENDICES FOR FINAL REPORT

PRECISION ESTIMATES OF AASHTO T324, HAMBURG WHEEL-TRACK TESTING OFCOMPACTED HOT MIX ASPHALT (HMA) APPENDICES FOR FINAL REPORT Project No. 10-87-2B DRAFT 6/06/14 PRECISION ESTIMATES OF AASHTO T324, HAMBURG WHEEL-TRACK TESTING OFCOMPACTED HOT MIX ASPHALT (HMA) APPENDICES FOR FINAL REPORT Prepared for National Cooperative Highway

More information

INTERNATIONAL SKATING UNION

INTERNATIONAL SKATING UNION INTERNATIONAL SKATING UNION Communication No. 2128 SHORT TRACK SPEED SKATING PADDING MEASURES TO INCREASE SAFETY FOR SKATERS (This Communication will replace ISU Communication No. 1726, as of June 1, 2018)

More information

SMART STEEL CRASH CUSHION

SMART STEEL CRASH CUSHION APRIL 2015 DETAIL SHEET SMART STEEL CRASH CUSHION VicRoads Requirements Refer to Austroads - Safety Barrier System Acceptance Conditions for the SMART Steel Crash Cushion. All requirements listed by Austroads

More information

Buoyancy Control Calculated Cost Allowance for 1 Year Study Cost Estimate

Buoyancy Control Calculated Cost Allowance for 1 Year Study Cost Estimate Prepared for Millennium Project Revision A 21 March 2005 by Greg Lamberson Record of Revisions Prepared Rev Date Description By A 21 Mar 05 Buoyancy Control Study Report FGL Checked By Client Accept Approved

More information

Notice of Intent to Close Inactive CCR Surface Impoundments

Notice of Intent to Close Inactive CCR Surface Impoundments Notice of Intent to Close Inactive CCR Surface Impoundments Virginia Electric and Power Company Possum Point Power Station Coal Combustion Residual Surface Impoundments A, B, C, D, and E Dumfries, Virginia

More information

Anchor Posts. *Patent Nos: Europe USA 12/372,965 2 ANCHOR SYSTEMS ANCHOR POSTS

Anchor Posts. *Patent Nos: Europe USA 12/372,965 2 ANCHOR SYSTEMS ANCHOR POSTS Anchor Post System Anchor Posts Anchor Posts are an innovative patented* system designed by our founder, Ewan Smith, for lightweight foundations using hand held equipment. Ingeniously simple, they fulfil

More information

Standard Test Procedures Manual

Standard Test Procedures Manual STP 240-20 Standard Test Procedures Manual Section: 1. SCOPE 1.1. Description This method describes the test used to evaluate the thickness and bearing capacity of the subbase and subgrade using the Dynamic

More information

;0iii] C*Iq'FgRHI{CE --::-- ;: -.. !: t,' li l:j. :t. ti?-. tlr. . *,, :;. :slill I iii-: .ir,::ri:}.:f :aei*l$ljai:!r. ; i:r ;: i:- ; i I!

;0iii] C*Iq'FgRHI{CE --::-- ;: -.. !: t,' li l:j. :t. ti?-. tlr. . *,, :;. :slill I iii-: .ir,::ri:}.:f :aei*l$ljai:!r. ; i:r ;: i:- ; i I! --::--.ir,::ri:}.:f :aei*l$ljai:!r..lt'., +ri :l lii ";l r*,r i!,t a'j ii - :i :t. ti?-. tlr C*q'FgRH{CE ; i:r ;: i:- ; i! ;0iii]!: t,' li l:j 20 09 -l- ;: -... *,, :;. :slill iii-: Proceedings 5th New

More information

INTRODUCTION TO HULK EARTH ANCHORS Anchoring Rope and Rigging PTY LTD are market leaders in the conceptualisation and production of innovative earth anchoring solutions used in a variety of engineered

More information

West Cliff Colliery Longwall Subsidence Management Plan Variation Reduction in Longwall 34 void length.

West Cliff Colliery Longwall Subsidence Management Plan Variation Reduction in Longwall 34 void length. Illawarra Coal 26 The Director-General Industry & Investment NSW Mineral Resources PO Box 344 Hunter Region Mail Centre NSW 2310 Illawarra Coal Holdings Pty Ltd BHP Billiton Illawarra Coal Administration

More information

Chapter 11. Culverts and Bridges Design Checklist for Culvert Design

Chapter 11. Culverts and Bridges Design Checklist for Culvert Design Yes No N/A Design Requirements I. GENERAL DESIGN GUIDELINES Chapter 11. Culverts and Bridges A. Culvert design is in accordance with the Culverts chapter of Volume 2 of the UDFCD Manual for additional

More information

IN-PLACE DENSITY OF BITUMINOUS MIXES USING THE NUCLEAR MOISTURE-DENSITY GAUGE FOP FOR WAQTC TM 8

IN-PLACE DENSITY OF BITUMINOUS MIXES USING THE NUCLEAR MOISTURE-DENSITY GAUGE FOP FOR WAQTC TM 8 OF BITUMINOUS MIXES USING THE NUCLEAR MOISTURE-DENSITY GAUGE FOP FOR WAQTC TM 8 Scope This test method describes a test procedure for determining the density of bituminous mixes by means of a nuclear gauge

More information

General Accreditation Guidance. User checks and maintenance of laboratory balances

General Accreditation Guidance. User checks and maintenance of laboratory balances General Accreditation Guidance User checks and maintenance of laboratory balances January 2018 Copyright National Association of Testing Authorities, Australia 2010 All intellectual property rights in

More information

SITE S7: EMBANKMENT FAILURE WEST OF MILLARVILLE

SITE S7: EMBANKMENT FAILURE WEST OF MILLARVILLE LANDSLIDE RISK ASSESSMENT SOUTHERN REGION SITE S7: EMBANKMENT FAILURE WEST OF MILLARVILLE LEGAL LOCATION: LSD 4-3-21-4 W5M and 1-4-21-4 W5M REFERENCE LOCATION ALONG HIGHWAY The slide area is located between

More information

LAMINATED POLES. engineered to solve problems. Coastal Douglas-fir. Field Raked and Tangent Poles

LAMINATED POLES. engineered to solve problems. Coastal Douglas-fir. Field Raked and Tangent Poles Coastal Douglas-fir Field Raked and Tangent Poles LAMINATED POLES engineered to solve problems 1 Design Criteria Submission Form You can either fax this information to 253-627-4188 or submit your drawings

More information

ITF Court Surface Classification Scheme. ISSS Technical Meeting Nyon, October 2002

ITF Court Surface Classification Scheme. ISSS Technical Meeting Nyon, October 2002 ITF Court Surface Classification Scheme ISSS Technical Meeting Introduction Introduction! No way to measure performance characteristics and, therefore:! For manufacturers to describe their products,! For

More information

Le Sueur County, MN Tuesday, April 7, 2015 Board Meeting

Le Sueur County, MN Tuesday, April 7, 2015 Board Meeting Le Sueur County, MN Tuesday, April 7, 2015 Board Meeting Item 7 9:50 a.m. Darrell Pettis, Administrator/Engineer RE: Ditch #16 Viewers RE: AET CSAH 3 Project Testing RE: Pumpkin Hill Right of Way Plat

More information

Bearing Capacity and Settlement Response of PMS Tanks on Cohesionless Soil Lithology in Lekki, Lagos of Nigeria

Bearing Capacity and Settlement Response of PMS Tanks on Cohesionless Soil Lithology in Lekki, Lagos of Nigeria Available online at www.scholarsresearchlibrary.com European Journal of Applied Engineering and Scientific Research,, ():- (http://scholarsresearchlibrary.com/archive.html) ISSN: 8 Bearing Capacity and

More information

HISTORY OF CONSTRUCTION

HISTORY OF CONSTRUCTION HISTORY OF CONSTRUCTION CFR 257.73(c)(1) West Boiler Slag Pond Clifty Creek Plant Madison, Indiana October, 2016 Prepared for: Indiana Kentucky Electric Corporation Prepared by: American Electric Power

More information

Limerock Bearing Ratio Technician Training Course

Limerock Bearing Ratio Technician Training Course Limerock Bearing Ratio Technician Training Course Module 2: Equipment LBR Technician Release 10, Module 2 1 - The equipment section of this training will cover equipment referenced in AASHTO T 180, FM

More information

Full Depth Reclamation ALDOT FDR Requirements Lyndi D. Blackburn, PE

Full Depth Reclamation ALDOT FDR Requirements Lyndi D. Blackburn, PE Full Depth Reclamation ALDOT FDR Requirements Lyndi D. Blackburn, PE Assistant Materials and Tests Engineer Alabama Department of Transportation Bureau of Materials and Tests 110 + MILES ALDOT FDR TOTALS

More information

Safety Barrier System Acceptance Conditions SMART Steel Crash Cushion

Safety Barrier System Acceptance Conditions SMART Steel Crash Cushion Safety Barrier System Acceptance Conditions SMART Steel Crash Cushion The SMART Steel Crash Cushion is accepted for use on the New South Wales classified road network. The acceptance is based on the determination

More information

ONR Transport Permissioning Stakeholder Event. 20% NCT Regulation

ONR Transport Permissioning Stakeholder Event. 20% NCT Regulation ONR Transport Permissioning Stakeholder Event 20% NCT Regulation Introduction The NCT 20% regulation & guidance quick overview Issues & ONR view on how they can be resolved Future changes to improve the

More information

EVALUATION SUBJECT: DIVISION: HEATING, VENTILATING AND AIR CONDITIONING (HVAC) SECTION: HVAC DUCTS AND CASINGS.

EVALUATION SUBJECT: DIVISION: HEATING, VENTILATING AND AIR CONDITIONING (HVAC) SECTION: HVAC DUCTS AND CASINGS. ICC-ES Report PMG-1171 Reissued 11/2018 This report is subject to renewal 11/2019 EVALUATION SUBJECT: UNDERGROUND SINGLE WALL & DOUBLE WALL INSULATED DUCT FOR HVAC DIRECT BURIAL APPLICATIONS AND UNDERGROUND

More information

INSTITUTE OF AERONAUTICAL ENGINEERING (Autonomous) Dundigal, Hyderabad

INSTITUTE OF AERONAUTICAL ENGINEERING (Autonomous) Dundigal, Hyderabad INSTITUTE OF AERONAUTICAL ENGINEERING (Autonomous) Dundigal, Hyderabad - 500 043 CIVIL ENGINEERING Tutorial Question Bank Name : FOUNDATION ENGINEERING Code : A60126 Class : III B. Tech II Semester Branch

More information

SERVICE BULLETIN. Owner/Operators of Pacific Scientific Company Restraint Systems using Buckle Assembly Part Numbers XX and XX.

SERVICE BULLETIN. Owner/Operators of Pacific Scientific Company Restraint Systems using Buckle Assembly Part Numbers XX and XX. TO: SUBJECT: PURPOSE: Owner/Operators of Pacific Scientific Company Restraint Systems using Buckle Assembly Part Numbers 1111430-XX and 1111475-XX. Information regarding the potential failure of the Guarded

More information

A Slipway Structure for River Ship Repair

A Slipway Structure for River Ship Repair 1 Paper N 0 : III.05 A Slipway Structure for River Ship Repair Zorislav Sorić, Radovan Vugrinec Predrag Kvasnička, Tomislav Kišiček Josip Galić, Leo Matešić Abstract: A slipway structure for ship repair

More information

HCMTCB ASPHALT CERTIFICATION KEY ELEMENTS LIST

HCMTCB ASPHALT CERTIFICATION KEY ELEMENTS LIST HCMTCB ASPHALT CERTIFICATION KEY ELEMENTS LIST Release Date: November 6, 2014 AASHTO T-168 Sampling of Bituminous Material Funnel Device 1 Select units to be sampled by what method? 2 Relative size and

More information

REPORT TO THE CORONER Sydney to Hobart Yacht Race. Yachting Harnesses and Lines

REPORT TO THE CORONER Sydney to Hobart Yacht Race. Yachting Harnesses and Lines File Ref: 2000/001799 REPORT TO THE CORONER 1998 Sydney to Hobart Yacht Race Yachting Harnesses and Lines Chris Turner, BE WorkCover New South Wales 10 March 2000 REPORT TO THE CORONER 1998 Sydney to Hobart

More information

ATT-66/96, DENSITY TEST, ASBC CONTROL STRIP METHOD

ATT-66/96, DENSITY TEST, ASBC CONTROL STRIP METHOD 1.0 Scope ATT-66/96, DENSITY TEST, ASBC CONTROL STRIP METHOD 1.0 SCOPE This test procedure describes the method of determining the required minimum number of "passes" with approved compaction equipment,

More information

Richards Bay Coal Terminal

Richards Bay Coal Terminal Text Leon Goussard Manager Port Infrastructure Transnet National Ports Authority Port of Richards Bay leon.goussard@transnet.net Railway and harbour engineering New berth 306 expands capacity of Richards

More information

EXHIBT A - BID FORM SUNSET VALLEY GOLF COURSE. Golf Course Master Plan Implementation. Date: December 1, 2016

EXHIBT A - BID FORM SUNSET VALLEY GOLF COURSE. Golf Course Master Plan Implementation. Date: December 1, 2016 EXHIBT A - BID FORM SUNSET VALLEY GOLF COURSE I. CONTRACTOR MOBILIZATION Golf Course Master Plan Implementation Date: December 1, 2016 Includes the contractor mobilizing on-site with equipment, materials

More information

FOR INFORMATION ONLY. Gold Coast Seaway Channel Scour and Rock Wall Stability Investigation. R.B doc December 2011

FOR INFORMATION ONLY. Gold Coast Seaway Channel Scour and Rock Wall Stability Investigation. R.B doc December 2011 A part of BMT in Energy and Environment Gold Coast Seaway Channel Scour and Rock Wall Stability Investigation R.B18625.001.00.doc December 2011 Gold Coast Seaway Channel Scour and Rock Wall Stability Investigation

More information

TG3 Use of Nuclear Density Meters (NDM)

TG3 Use of Nuclear Density Meters (NDM) CETANZ Technical Guideline (TG) Page 1 of 17 1 NTRODUCTION This guideline aims to provide consistency amongst CETANZ members performing in NDM tests within a New Zealand Testing Laboratory context. The

More information

Magnetic Tape Installation Straight guide tape, embedded magnetic bar, curve segments HG A

Magnetic Tape Installation Straight guide tape, embedded magnetic bar, curve segments HG A Installation Instructions HG 19600-A Magnetic Tape Installation Straight guide tape, embedded magnetic bar, curve segments HG 19600-A English, Revision 01 Dev. by: TE Date: 25.06.2015 Author(s): RAD Götting

More information

COAL MINES TECHNICAL SERVICES, GAS DETECTION RELATED SERVICES FOR MINES RESCUE

COAL MINES TECHNICAL SERVICES, GAS DETECTION RELATED SERVICES FOR MINES RESCUE COAL MINES TECHNICAL SERVICES, GAS DETECTION RELATED SERVICES FOR MINES RESCUE Peter Mason Manager, Coal Mines Technical Services, a division of Mines Rescue Pty Ltd, Australia ABSTRACT The NSW Mines Rescue

More information

Time rate of swelling of compacted highly plastic clay soil from Sudan

Time rate of swelling of compacted highly plastic clay soil from Sudan Time rate of swelling of compacted highly plastic clay soil from Sudan 1 A M Elsharief, 2 Mai Sufian 1 University of Khartoum, Khartoum, Sudan 2 Sudan University of Science and Technology, Khartoum, Sudan

More information

Civil Application Solutions

Civil Application Solutions Civil Application Solutions Features - Chiseled Cutting Edges - Increased Surface Area - Lateral Direction Guide Ribs Benefits - Faster Installation and Penetrates Harder Soils - Quicker Loading, Stronger

More information

INSTITUTE OF AERONAUTICAL ENGINEERING (Autonomous) Dundigal, Hyderabad CIVIL ENGINEERING TUTORIAL QUESTION BANK

INSTITUTE OF AERONAUTICAL ENGINEERING (Autonomous) Dundigal, Hyderabad CIVIL ENGINEERING TUTORIAL QUESTION BANK INSTITUTE OF AERONAUTICAL ENGINEERING (Autonomous) Dundigal, Hyderabad - 00 04 CIVIL ENGINEERING TUTORIAL QUESTION BANK Course Name Course Code Regulation Course Structure Course Coordinator Course Faculty

More information

INSTALLATION & MAINTENANCE

INSTALLATION & MAINTENANCE INSTALLATION & MAINTENANCE REAR COCOA WHEELS MOP & HANDLE BEACON PROBRICK Beacon ProBricks will improve several difficult maintenance areas on your fields. Areas to install ProBricks include: the table

More information

Gourock Golf Club. Report on Proposed Course Improvement Works. 11th April 2016

Gourock Golf Club. Report on Proposed Course Improvement Works. 11th April 2016 Gourock Golf Club Report on Proposed Course Improvement Works Present Hugh Logue - Course Manager 11th April 2016 Jay Dobson - Consultant Turfgrass Agronomist Perspective Gourock Golf Club like many in

More information

SECTION 3 STREET DESIGN

SECTION 3 STREET DESIGN 3.01 GENERAL SECTION 3 STREET DESIGN For purposes of geometric and structural design, streets shall be classified according to the following table. The City Engineer will determine the class of all proposed

More information

Aluminum Sheeting Guide (ASG)

Aluminum Sheeting Guide (ASG) Tabulated Data Aluminum Sheeting Guide (ASG) February 2016 Copyright, U.S.A.,Griswold Machine & Eng., 2016 594 Mendon Road, Union City, MI 49094 (800) 248 2054 Fax: (517) 741 7483 CAUTION EXCAVATION PROCEDURES

More information

Certified Reference Materials FOR REFRACTOMETERS AND POLARIMETERS

Certified Reference Materials FOR REFRACTOMETERS AND POLARIMETERS Certified Reference Materials FOR REFRACTOMETERS AND POLARIMETERS Regular verification of laboratory instrumentation is of primary importance in a modern manufacturing facility, not only for reasons of

More information

RECYCLED AGGREGATES FOR MINOR SCHEMES (RAMS)

RECYCLED AGGREGATES FOR MINOR SCHEMES (RAMS) RECYCLED AGGREGATES FOR MINOR SCHEMES (RAMS) Project Report May 2011 By Prof N Ghazireh Head of R & D, Tarmac Ltd Tarmac Ltd Millfields Road Ettingshall Wolverhampton WV4 6JP 1 CONTENTS EXECUTIVE SUMMARY...4

More information

Design Guide. Table of Contents

Design Guide. Table of Contents DESIGN GUIDE Table of Contents Table of Contents... 1 1.0 Introduction... 2 2.0 Product Information... 3 3.0 Structural Design... 8 4.0 Subsurface Foundation Requirements... 9 5.0 Installed Storage Volumes

More information

Standard Test Methods for Density of Soil and Soil-Aggregate in Place by Nuclear Methods (Shallow Depth) 1

Standard Test Methods for Density of Soil and Soil-Aggregate in Place by Nuclear Methods (Shallow Depth) 1 This document is not an ASTM standard and is intended only to provide the user of an ASTM standard an indication of what changes have been made to the previous version. Because it may not be technically

More information

SH&E Work Method Statement Concrete Cutting & Drilling Fast Cut Qld Pty Ltd, 91 Basalt, GEEBUNG PH M ABN

SH&E Work Method Statement Concrete Cutting & Drilling Fast Cut Qld Pty Ltd, 91 Basalt, GEEBUNG PH M ABN SH&E Work Method Statement Concrete Cutting & Drilling Fast Cut Qld Pty Ltd, 91 Basalt, GEEBUNG PH 07 3265 6537 M 0411 756 719 ABN 45 081 359 613 OHS-FRM-100 Rev 11 (07/18) Page 1 SH&EWMS No.: F-C-QLD-30

More information

Hose Management Inspection Guidelines for HP Drilling and Production Hoses

Hose Management Inspection Guidelines for HP Drilling and Production Hoses Jubilee Industrial Estate, Ashignton, Northumberland NE63 8UB, UK Hose Management Inspection Guidelines for HP Drilling and Production Hoses Rev No Date Amended Amended By Approved By 04 26/02/09 T. Henderson

More information

PO Box 370 Phone: Swansea NSW 2281 Fax: AUSTRALIA Mobile: Web:

PO Box 370 Phone: Swansea NSW 2281 Fax: AUSTRALIA Mobile: Web: EZI-DRY Pty Limited ABN: 98 114 507 443 PO Box 370 Phone: 0249711993 Swansea NSW 2281 Fax: 0249135490 AUSTRALIA Mobile: 0427587900 Web: www.ezi-dry.com.au Email: ezidry@exemail.com.au INSTRUCTION MANUAL

More information

OP CHECKLIST FOR 1D CONSOLIDATION LABORATORY TEST

OP CHECKLIST FOR 1D CONSOLIDATION LABORATORY TEST Page 1 of 5 WORK INSTRUCTIONS FOR ENGINEERS NHB Compiled by : LSS Checked by : GSS Approved by : OP-3-31. CHECKLIST FOR 1D CONSOLIDATION LABORATORY TEST Page 2 of 5 31.0 CHECKLIST ITEMS *(refer to respective

More information

Gas Injection Systems

Gas Injection Systems NSF International Recreational Water Program Component Certification Specification CCS-14530 Gas Injection Systems The Public Health and Safety Company. TM NSF Recreational Water Program Component Certification

More information

INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS Part No. IS275 Rev A- 09584-09584 TM HeatGuard INSTALLATION INSTRUCTIONS Certified Product Australian Standard AS4032.2 Lic. No. 1593 SAI-Global CONTENTS Choosing the correct model......... 3 How to install

More information